Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 6767 - Security Pacific Bank - Tenant Improvement
6767 91-361 security pacific 6300 southcenter boulevard #202 demo Permit 6767 - Security Pacific TYPE OF CONST,• III -N UBC EDITION (year 1988 SETBACKS: N - S - E- W- FIRE PROTECTION: ®Sprinklers fl Detectors E N/A UTILITY PERMITS REQUIRED? 0Yes ©No ( publicWortcsl ZONING: BAR /LAND IJSE CONDITIONS? 0 Yes @ No CONDITIONS (other than those noted on or attached to permlt/plans) ARCHITECT PHONE ADDRESS ZJP PROPERTY OWNER Security Pacific Bank PHONE 585 - 4374 ADDRESS 600 University Avenue, Seattle, WA ZIP 98124 CONTRACTOR Pacific Construction Systems PHONE 455 -3000 ADDRESS 2275 116th Avenue N.E., Bellevue, WA ZIP 98004 WA. ST. CONTRACTOR'S LICENSE # PACIFCS187PK EXP. DATE 10 - 01 - 91 ARCHITECT PHONE ADDRESS ZJP CITY OF TUKWILA Dept. of Community Development- Building 6300 Southcenter Boulevard, Tukwila WA (206) 431 -3670 BUILDING PERMIT NO • PROJECT INFORMATION DATE ISSUED: SITE ADDRESS 6300 Southcenter B1 PROJECT NAME/TENANT Security Pacific TYPE OF U Now Building U Addition U Tenant Improvement (commercial) U Demolition (building) U Grading/Fill WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) O Other: DESCRIBE WORK TO BE DONE: Demo tenant walls (non- structural) and grid. Upgrade deck insula- tion, reinstall new grid and upgrade partial existing grid to code. USE FLOOR. j SQUARE yI FEET TO' OCC. LOAD SIGNATURE: Vj PRINT NAME: CERTIFICATE OF OCCUPANCY NO. SQUARE FEET t BUILDING PERMIT OCC. LOAD SQUARE FEET APPROVED FOR ISSUANCE BY: ',�,.�• /� / c` k:J'7`' Th perm t hall, 6ecome null andvol • issuance, or if the work is Division 98188 (POST WITH INSPECTION CARD AND PLANS IN A CONSPICUOUS LOCATION) /.. MC, LOAD DESCRIPTION BUILDING' PERMIT PLAN;: CHECK: FEE BUILDING .SURCHARGE AMOUNT RCPT # :. : TOTAL 21.00 9 : DATE PLAN CHECK NO.: 91 -361 SUITE SQUARE FEET 202 OCC. LOAD BUILDING OFFICIAL DATE : / \\ COMPANY: DATE ISSUED: CONSTRUCTION - $ 750.00 ASSESSOR ACCOUNT # 000320-0050-08 SQUARE FEET DATE: %/) OCC. LOAD TOTAL SQUARE FEET TOTAL OCC, LOAD I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of Iav and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. t �f the wor rs not commenced: within 180 da :from ; the date of <:< or aband oned for a period of 1:80 days from the: last; nspection uareonw PERMIT NO. CONTACTED r DATE READY DATE NOTIFIED q ` �j `'l IQ BY: .... (init.) PERMIT EXPIRES 2nd NOTIFICATION BY: (init.) AMOUNT OWING � � �� 3RD NOTIFICATION BY: Unit.) BUILDING `'ERMIT APPLICATION TRACKING PROJECT NAME • r �� �Ic.i f is PLAN CHECK NUMBER INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) FLOOR SQUARE FEET TO OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET 000. LOAD TOTAL SQUARE FEET DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. E P.'A RTM O PUBLIC WORKS O OTHER ( BUILDING - review g FIRE F/2`-ti( O PLANNING Ay/ A✓/4 BUILDING - ' 1%-i" lq final review REVIEW COMPLETED SITE ADDRESS (v oo �aumc 1- X 1 (2c/ c i( ROUTED INIT: INIT: INIT: INIT: ROV q CONSULTANT: UIRREME Date Sent - FIRE PROTECTION: Sprinklers FIRE DEPT. LETTER DATED: ZONING: REFERENCE FILE NOS.: PUBLIC WORKS LETTER DATED: R i l b t 4/ TYPE OF CONSTRUCTION: INIT: m MINIMUM SETBACKS: N- S- UTILITY PERMITS REQUIRED? Yes SUITE NO. :OMIMEN1 Date Approved - N/A BAR/LAND USE CONDITIONST UBC EDITION (year): TOTAL OCC. LOAD 08/17/90 SITE ADDRESS SUITE # VALUE OF CONSTRUCTION - $ - 7S O` s)- C)Q sc 5 \-\CCU \ \ U� . 2_02_ PROJECT NAMEJTENANT Sccv \\ F o4 - € IL v\ LD \ C� l�P CO NQ=1 ASSESSOR ACCOUNT # OCDC3 - c.:)C:)so - \._ .S TYPE OF • New Building Additio Tenant Improvement (commercial) Li Demolition (building) WORK: ❑ Rack Storage ❑ Reroof ❑ Remodel (residential) ❑ Other DESCRIBE WORK TO BE DONE: \C -- VE %. NV, - c WPL■. . �� ca C.. c4. \0 • 0 ncpczNoc �C� \\NsUL(i -k Z7 Ci XE.. ?$\ * S`rfa.'� tvtr,..) C. - VC) C .... ■C'G=.(2N0 .- fQ — . \ E k \Mt' \ �co Gam& cR\c- '\U c.C, . l\ LL c \t, w3't� - S"S•2�.? ' 51, BUILDING USE (office, warehouse, etc.) L 1 I Q =��ac■:sue-- Q C2 S3 = M4— '_T`\ \M_ .L .2.(Y . NATURE OF BUSINESS: m N WILL THERE BE A CHANGE IN USE? ❑ / / /No Yes If Yes, new building requirements may need to be met. Please explain: NI�S �< L". \2C-. \ • L.f\ ■ = LLCTexc Ac / S�2\sc t},f(� .O SQUARE FOOTA - Building: / Tenant Space: Area of Construction: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? X No ❑ Yes IF YES, EXPLAIN: PROPERTY OWNER :C_l ) 1_ \"'c y ` lac \ . , ��t�w„.. PHONE _L\.V7 ZIPc \.Z`-\ ADDRESS (QC T» ' S \.... Av g . � \L�. Wta. CONTRACTOR ?0\ c \ \C_ C, (,........\.....:<,...\,....v., `�� \a(\f \� PHONE�,. _. , c::: , ADDRESS 2:2_--7 S \ \ (c-R1 /a•. \ate . N� . '1?,�t__L , Je S \\ , Z IPc:\ COOL\ WA. ST. CONTRACTOR'S LICENSE # 7 la C\ t =- C_S \ ¶ ? P K EXP. DATE \Q3-1 _ ck\ PHONE ARCHITECT ADDRESS ZIP CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK FEE BUILDING SURCHARGE. PLAN CHECK NUMBER I HEREBY; CERTIFY. THAT I .HAVE: READ :AND .EXAMIN.ED' THiS APPLICATION BE:TRUE AND » CORRECT, 'AND I A AUTHORIZED TO APPLY F.OR. THIS `P.ERM BUILDING OWNER SIGNATURE OR AUTHORIZED AGENT CONTACT PERSO DATE APPLICATION ACCEPTED PRINT NAME \_.cam. =i, BUILDING PERMIT APPLICATION AMOUNT DESCRIPTION BUILDING PERMIT FEE ADDRESS ? \C� 7 \O ..TO.TAL D..KN DATE DATE APPLICATION EXPIRES .RCPT:'# DATE :SA PHONE CGg3 -La-) k Flo - SG G• � CITY/ZIPc\ \\ HONE APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coordinator at 431 -3670 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 431 -3670. arfor COMMERCIAL NEW COMMERCIAL BUILDINGS/ADDITIONS . Completed building permit application (one for each structure) ri Assessor Account Number . . • ; • , . : Two sets (2) of the following .: ; • : •• • • •-: F - 1 Specifications • • . ' • 1;•:: Structural calculations stamped by a VVeshlrigtOn State lieenied .• U Sella report stamped by a Washington State licensed engineer . • • Topographical survey : • 1.: . [-I Energy calculations stamped by a Washington State licensed ,-•:... engineer or architect : .. - .... . :"' :::-..: ' .. ; :- : :•:: . ::: :: 11 Legal description : .:- .. . .. . ' - ';:' - • ';,;-:: ::: ,.:-.. :. 1 Working drawings, stamped by a Washington State license d architect, which include... • .' , • ; Site plan - . :.,.. .;::::..• Architectural drawings - :: • :. . - :: :-, :. ,...,,•;.. . . . : : -.:- • ; Structural drawings ....:: : : ;•, : •;:..: :....:;.::::.',, .:. ..,:,:.:::.....:..,:,::: : ,, ; .. :: • ::::... Mechanical drawings •• : : . - -1: : : . ' ....:' :: : : . ' .:" '.'•::': -:.:•:•".--.."-::: • , .:•:.::: .. :: Elevations .. :: .: .,„ : ,:•.:., ..-,-. . :. ....... , :., ., , •. ••••:Civil drawings : ...: . : • .; :;.• .: 2: .: ;.:•:.,:•-•',-,:,-..:. -.....,:.,:::-:, -. • -": :• . , : :: '-','....:"•••,::::.; Landscape plan ,:.:: i...: •: : . . . - :. ; ; , :: , . .-: , :,•:, -.. : .,: , .: .: , •: : - • , . , , 1 Completed utility permit application (one for entire project)" :: : • ...; Six (6) sets of civil drawings NOTE See . utility permit application and checklist for specific utility submittal requirements.: • . . • : RACK STORAGE Completed building porrnit -• :Two (2):sets Of plans, wtilch ; • Building floor plan showing • • Entire apace where racks will be located :; • Diliten4ioneot all aisles: Tenant space floor plan' shOWing rack storage layout,: aisles and NOTE Include di mensions of nickel (height width and q th) aisles and exit Prays:on plan ••: • •.:.• 1 bY:a Washington ,State • . engineer (rack storage A'. and over). • RESIDENTIAL : NEW •SINGLE-FAMILY - DWELLINGS/ADDITIONS ::•.:::,:: • SAMITTAL CHECKLIST Completed building permit application (one for each Assessor Account Number. Two sets (2) of working drawings which include Site plan,''hin4.. Closest hidrent . • ,.'• • Foundation acce to •building,' ;howit Floor plan width and length of access): Roof plan • • Building elevations (all • Structural fratning' " :-• .Washington State Energy Code data • Completed . •:. . . I • . .. Li Six (6) sets of site plans showing utilities NOTE; Building site plan and utility site plan may be combined See-- utility permit application and checklist for specific submittal requirements Additional topographical and soils information may bo required if unique site conditions . COMMERCIAL TENANT IMPROVEMENTS Completed bUildirig eaChl:atiiieture or • , • : • • • • At sesier . . Two ( sets of conitUctiOni:plar*WiciiinelUde: Site plan I ocatlon of tenant space Existing and proposed parking 'Landscape plan (If applicable, ie change of use) . . :•• . . • Overall building plan . .. . . Tenant location adjacent (common wall) tenant dimensionablbuilding Floor plan of proposed tenant space T enant . . . . .. . spaceplenwIth use of each room labelled . . . Exit :doors," egress W walls existing wall, and walls . . . •••• . .• • •. • •, ..„ . • •••.• .....•„ •. ....... ••• ••••••.., •.•••• •,. • •. .• . • •••••• • ••••• • •• ..• Construction details • • • . ■•■•■■■■•• .• sectIonashOWing:W.all constructionandpeiiiod for ndc�iling '' •••••• --• Structural 'Caloblatieriaiiiiiiieel:by: : V . • • • . • • •. .• •• •• •• • ... "••..: ••••: 77:: engineer may be required if...kuCtUral work is to be done (2 sets) • • . • • ..... • NOTE:.; If Eny . utility ivcirkis:iciiii:doiie;'§ikiiiit: •: • " "• • • ••••.••••• ..••••••••.. • • .••"•••••..,•• • separate ••.• .• • ••••••••••.•.- y .,•••.. •• •••••-•. application and plans ••••.• • • '•• . . Completed : e s.sorc building structu Narrative de scrib in g existing root, material being 0 , . material t?eingirista iled.,: : ''; •.• . , f TEle required '• g n • . , •• : : : .• : • . . . Completed : . Asseasor Acco unt •-•: • . Two (2) sets of plane, which include:: %. Site Plan (showing building and location of antenna/sateilite dis Detalla:'ante,iiiie/Setellite dish and Method of attachment Structural calculations stamp ......... ..Waihindter:State engineer may be required . . ...... El RE .: :!.t pi..... .E ,.. ... .,i. :::.N. ....,: ::::.1: i .:.1■ ..;e .•...4 .... ... ..,,1e1; :,... .. .,.: ..d„ ... ,.,. . :.....!ib.:::..u:Mi.,:i ici., ;..t. !.rii.:::::„......,.....; :•i.i.,......:.0......i.,'4.....:...7..,..5),......::..‘....:,.,,...::::,.;.:.:..,...1...i..:,,0.i..:,...f:;,......,.:!:1'...,...;.,tjr':.:?-;;;::::;1":::::"......1 U_i ..l'ASSer'i....: ‘ijah Inclu Site •!:,:-:!: •;•H''''::'''''''''..:qaCiiiiiii:Ntien!?r::::11....,;:i.::::....,...'..,'..::,.....:.'..:::.,:..-;',.,..... .. I—i '17"1:,......':..():..::s..‘.:....:.'::::'::::::::::::::'.:.:....1!;::::.::;::'::1 plerl.:;::::,:::::•,,:: •:::::-,........--::: :',.',,:::.'••,:',:::::::•::::::::-.:::::::::::.::.:::: , •., • F.60.001°9f:!..,T,..:-:::',:::::::::,„,,- :„'',.:',.::,:,•,;::::::,':::::.:':;:::,:::,:::•-•:::::-.,:::::: :::::)•::-,::::;::::. .:.:::::::•:•:FlOar.::plaoli:::::::::-:::::::"::.::'::•::::::::::::::::::::::.::•.:::::':::::::...:;:i.:::::-,:::::::::::::":::'-';'. fi • ..6 Igli.yeW ).„:..::...:i::;'i. ,. framing :0149,',:::::::.:,:i:::::,..:.........::::...., it..apii.fi64i141 i .... •(•:;:•:::: ...':•::•:::''''',..l."::."Stiiiiiing'i319Y4.J1,,9,9. s e c tion :::•::::,:..:p.,1,:::.::.)F:::,:.:•••• d.ri ..croas....,........,::.:::i:::::::::J::::'" truq ' ur7, .:::.::::.u:...-.:', .:.. . ::,,,....i6i;ide:.:6;1.*:#Pr.,„.,::..,,,„::::.:...:::::,;.:.:.''.:,,..,.::.:::::.., ,;;:.;•/ijiii..is't0..60'191T..:.• ::•::-•.,::::::.:'1:•:;::•-•::::::'''''"i':":'''''''''' . . R NOT ..in--,,y!:.....!?.1:ty...',,,...:L,'.......:::,..;,...,...!..it!e.....'::::Ci•••;-::::,::;':::::::::::,!:':::::!::::.::::::.::::,;.•':,::."::::::,'.:**::::::::',..:'::::::::':::::,..,;:'':;:::i.:::::!.,;':•:':::::;:::::::...,•:•: ,.,.••••••::..,- ',..• EROOS:-....-:::,•:.::::::..:::::::::::::::::::::•:•::::::::::":::„':'::::•::::::',"1:"..-::::::',:-•";i,.tforiloneJgr;:..(3Pq.• :::::,: .•:•:•:-• -• -:-. ;;;;:',:-::::.::::::':.::::,-'1 :-,,i..::::,:,::::::::::::::;::•:,--..h::.:--::•-:-::•,,":,'" 6 • it app.lP77:7-.,..,-::...., "..: • ' ' ,,•:,:...;;;.n6l6fe,ii tiLiilrfin9:1?:-,7:::,.........,.,,•:-...,,:.....,...::::.....::....:,.....-,....: , '.. — ....:::i;:' ,,- ;:''146iiii;(#. :;.:::::::',,:.,..,....:::.::..,..,:.:::::,.::,..' ..:..:.:.... '.. ,..,;(id; tiOd.•:::'::::::-.:::-:: .'/%s*-30r:0c0'::4.......,,,.,'..nf.: Piate ri ii ! . be . ,!...,..,..... i.o ., :: ...„ . 77 .. ..... , : :: .: ‘, .,.... , :: :: „.......,....., .. ...,:...:,:..::::,.::::::"::::...::::,......•.:,:.:,..: ,,,,.. ,i.,....,:.''...'dalacrbing:eXJ!99!::"•-•:::::::::::.:::':::::::::::::::,::::•::::::::::::.::.:.";::':::::::"::::::::,::::::::'::::::•-•::-42::::::',.. ,a..a .ye. -... i material beingii?!-•-ri6,i,:io,iioa! Insp ection .................................... ,.. ... :,... • . ..:' • •• -: ::'"'''.": ."'':" ''' liiier.:.1 require ..7 OTE:A:eeitific4;1,91..).:.:.... : ::::.i.,.:. !: .„ :? :,,. ..,..:; -: '::::::.:::: : :,..........: , .. , ..-..... : ,:..., off of the permi i' ..1 ......„....... , . . PROJECT: i'_1.Y,!,� 1 %,L,j. / - PERMIT NO. /7 le l SITE ADDRESS: ,r r 1 ,7 a DATE CALLED: /0— " " %L TYPE OF INSPECTIO �s DATE WANTED: ! - ' ° - SPECIAL INSTRUCTIONS: REQUESTER: j PHONE NO.: r qr/'"- l0 ,3 7 INSPECTION RESULTS /COMMENTS: • INSPECTOR: DATE: . /0 ^g- '' I LLYSet.n:':.. ,:.'.y.KK:•:• i':. ,,;5'i'�',:,.Y; ,.kEr. tr�� r.r , q!:vc ^ ?.::r ... ws.Ma ,�a`2tsry :>;c!,t,+t;K ........ CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 ^:u :+cVh:', , :,r: 2t::_s1.:1s�rcr�xvi rt,> *,I = ; • INSPECTION RECORD 6300 Southcenter Boulevard #100 Tukwila Washington 98188 PROJECT: SITE ADDRESS: (' TYPE OF INSPECTION: ✓ 1 SPECIAL INSTRUCTIONS: CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RESULTS /COMMENTS: /a INSPECTOR: / �lil47) ) .'',.," �Z';: i' i:' ':i:.'^*7't,'rd:',....,e`S.t < '� :.:1 +e13G� „e..' ref' ti: yiU: r, >^,: r::aSS�id s!:7�.E�":�'G?'w:F✓`�:�:; Yrt,`,.�`r�.v"Y; INSPECTION. RECORD DATE CALLED: DATE WANTED: REQUESTER: PHONE NO.: q.q-7(c 6300 Southcenter Boulevard - #100 Tukwila Washington 98188 a.m. 4: 5 1114:.' 10):S. v ta4f- G.p•':.' "t� Permit No. CORRECTION NOTICE h following items are found to be in violation of Ordinance 0/3C— C and shall be corrected. CITY OF.:TUKWILA Building Division 6200 Southcenter Blvd, Tukwila, WA 98188 433-1845 Date -�l Job Address 6 3 65ro SL Signed Building ffiolal %inspector PROJECT: pG Pow- PERMIT NO. lei 7 (v SITE ADDRESS: (o 3.c t .S C- ray ^ DATE CALLED: TYPE OF INSPECTION: DATE WANTED: SPECIAL INSTRUCTIONS: REQUESTER: %k. PHONE NO.: INSPECTION RESULTS /COMMENTS: .---X./ A L .. i INSPECTOR: " c-'L'" "."_ DATE: /Q- f g 1 CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 r:1i! : aLt4'S�i41:q:: �1 Il'e'a.. A14f,e■ ',V4.14{,t'w, INSPECTION RECORD 6300 Southcenter Boulevard -- #100 Tukwila Washington 98188 PROJECT: I C S PERMIT NO. SITE ADDRESS: (p60 ...C. .644.4 .P adz- DATE CALLED: TYPE OF INSPECTION: fi (-4 4 i DATE WANTED: 2- SPECIAL INSTRUCTIONS: milli REQUESTER: - _ PHONE NO.: INSPECTION RESULTS/COMMENTS: C-A - t &It 4 6/4 -0 WI eifi, . CAI. 0 RO-tir._ u tr4 C.-azor ie-170-‘4.. t IEREintiar"...S INSPECTOR: C- Ci-: DATE: • // CITY OF TUKW1LA Dept. of Community Development - Building Division Phone: (206) 431-3670 INSPECTION RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: -- 714-1- &. - .. ,2 U_ PERMIT NO. ,, 6 7 I SITE ADDRESS: r 3 O v / ° .4 4,— DATE CALLED: TYPE OF INSPECTION: u Gl �-- - = 4...4,_ ��- 0 a'n'' -- DATE WANTED: c�C nEw SPECIAL INSTRUCTIONS: V` ,lL4-c..4„ . ' ,L..,CP ,,e. . _-€ . e,._ ' REQUESTER: 44- 4!'�1�c" f / PHONE NO.: #9 q — 6 .3 , INSPECTION RESULTS /COMMENTS: Aro . / • • /I / INSPECTOR: , _W, DATE: tt;,U k,Q92GYt, 7i7 1tQ'w, It " ; '�;'�.i: 1 : .t._��.,. ...if.. CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTION RECORD 6300 Southcenter Boulevard - #100 Tukwlla Washington 98188 IL':& tit.t i"- a,t*± h' w',:" .?;'a.ft:i.41, , Yt zarut46 1, CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: SITE ADDRESS: • .0 s .1► 1. ! , TYPE OF INSPECTION: " SPECIAL INSTRUCTIONS: INSPECTION RESULTS /COMMENTS: r.ls:4f +tirM's;.:.* .24sPotloy44Ap.N`a1h'44IXIV 4 1 1 INSPECTION RECORD INSPECTOR: ,tom ,v DATE: e • PERMIT NO. DATE CALLED: q- IA j DATE WANTED: ' Le-1 I c( .lc5 REQUESTER: PHONE NO.: 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 a.m. PROJECT: I LL:L� 4,e,... / .J '00z) 7� PERMIT NO. (p 7 l4) 7 SITE ADDRESS: (05 / DATE CALLED: q -/ / -q ( TYPE OF INSPECTION: cPc.,, D V 41 DATE WANTED: .- --C7 / e .m. SPECIAL INSTRUCTIONS: REQUESTER: /3, PHONE NO.: - 'C / r 76 36, INSPECTION RESULTS /COMMENTS: !, 1 ., _. r4. A Iv \ 4 , Tit i4,2— H-.h .._ - . INSPECTOR: �:tti,.r � , f/1,, DATE: c" 17__ - 2'/ CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 rnir. ':F #<fj.,M4Ys ✓i:! n'o-:117- .tw"�:'1 it .Pty' : o WXCuwu INSPECTIO. RECORD 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 pacific construction systems work scope floor plan general notes CITY OF TUKWILA 6200 SOUTHCENTKR BOULEVARD, TUKWILA, WASHINGTON 98188 PHONE II (206) 433.1800 Plan Check #91 -361: Security Pacific 6300 Southcenter Bl #202 THE FOLLOWING COMMENTS APPLY TO AND BECOMEagr , O THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER 1(I 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department arid plumbing will be inspected by that agency, including all gas piping (296 - 4732). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872- 6363). 4. All mechanical work shall be under separate permit through the City of Tukwila. 5. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 7. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1991 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 8. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Goy L. VanDuscn, Mayor "X" REQUIRED INSPECTIONS PHONE DATE APPROVED INSPECT. INITIALS DATE(S) CORRECTION NOTICE ISSUED 1 Footings 431 -3670 2 Foundation 431 -3670 3 Slab and/or Slab Insulation 431 -3670 4 Shear Wall Nailing 431 -3670 5 Roof Sheathing Nailing 431 -3670 6 Masonry Chimney 431 -3670 7 Framing 431 -3670 X 8 Insulation 431 -3670 X 9 Suspended Ceiling 431 -3670 10 Wall Board Fastening 431 -3670 X 11 Pre - Demo 431 - 3670 12 13 X 14 FIRE FINAL lnsp: 575 -4407 , 15 PLANNING FINAL 431 -3670 16 PUBLIC WORKS FINAL 431 -3670 X 17 BUILDING FINAL 431 -3670 CITY OF TUKWILA Department of Community Development - Permit Center 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 SiTE ADDRESS: 6300 Southcenter Bi BUILDING PERMIT INSPECTION RECORD (Post with Building Permit In conspicuous place) SUITE NO.: 202 BUILDING (DI f„ PERMIT NO. L(,1 - 1 I - 9 DATE ISSUED: DATE PROJECT: Security Pacific CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE PECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAEI- If structural slab or if undersiab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - After rough -in Inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be Installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FiRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - CorStact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all worts, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and Industries — 277 -7272 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 431 -3670. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 0W14190 Plan Check No.: ' f Project: EC- U REQUIRED INSPECTIONS PLAN REVIEW COMMENTS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 0 Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). 31 Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be Inspected by that agency (277- 7272). 19 All mechanical work shall be under separate permit through the City of Tukwila. S All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation 1s required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. CO Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final Inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final Inspection (see attached procedure). 17 All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U,B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab /Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening 11 1 3 fLe.--T)G Nti> 12. 13. X 14. Fire Final 15. Planning Final 16. Public Works Final X 17. Building Final Plan Check No.: ' f Project: EC- U REQUIRED INSPECTIONS PLAN REVIEW COMMENTS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 0 Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). 31 Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be Inspected by that agency (277- 7272). 19 All mechanical work shall be under separate permit through the City of Tukwila. S All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 9. All high - strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation 1s required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. CO Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final Inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final Inspection (see attached procedure). 17 All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractors responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U,B.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 4 City: f Tukwila y FIRE DEPARTMENT 444 Andover Park East 2 6 Tukwila, Washington 98188 -7661 (206) 575 -4404 Gary L. VanDusen, Mayor Fire Department Review Control #91 -361 (513) September 6, 1991 Re: Security Pacific Bank - 6300 Southcenter Blvd., Suite #202 Dear Sir: The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. Maintain fire extinguisher coverage throughout. 2. Exit hardware and marking must meet the requirements of Uniform Fire Code Sections 12.104 & 10.402(a). Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort. (UFC 12.104b) 3. Maintain sprinkler protection for all enclosed areas. (NFPA 13, 4- 1.1.1) (UFC 10.302) All sprinkler drawings shall be prepared by companies licensed to perform this type of work.' Drawings shall first be approved by the Washington Survey & Rating Bureau, Factory Mutual Engineering or Industrial Risk Insurers, then by the Tukwila Fire Department. No sprinkler work shall commence without approved drawings. (City Ordinance #1528 & NFPA 13, 1 -9.1) (UFC 10.305) 4. All required occupancy separations, area separation walls, and draft -stop partitions shall be maintained and shall be properly repaired, restored or replaced when damaged, altered, breached, penetrated, removed or improperly installed. (UFC 10.401) City f Tukwila FIRE DEPARTMENT 444 Andover Park East Tukwila, Washington 98188 -7661. (206) 575 -4404 Page number 2 Gary L. VanDusen, Mayor Walls and ceilings of corridors serving an occupant load of 30 or more shall, be not less than•one -hour fire resistive construction. (UBC 3305(g)) (UFC 12.105(a)) • 5. Remove combustible waste at the end of each day. Maintain sprinkler protection whenever possible. if welding or hot work is to be done, obtain a welding. permit from the fire department. Yours truly -.The Tukwila Fire Prevention Bureau ::. CITY OF TUKW1LA Department of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: SE.C.-VQ e T Y ADDRESS: DATE: OCCUPANCY GROUP TYPE OF CONSTRUC LOCATION ON PROPERTY W .., --- LL ... _ Nb' BUILDING HEIGHT /# OF STORIES OCCUPANT LOAD EXITING REQUIREMENTS VA)OtZte._ -T / � y� )e Mt) CI.�"f" ° Lp V..JArt_ t 11 DETAILED REQUIREMENTS TYPE OF CONSTRUCTION PART V, CHAPTER 23, U.B.C. W.S.E.C. CHAPTER 51-10, W.A.C. NOTES PREPARED BY: S-2 "Corr A-L bcc.0 PA sr( L8Aa) PLAN REVIE ' Ac. I V* 1 C PLAN CHECK NUMBER 6300 Southcenter Boulevard - #100 Tukwila Washington 98188 DATE:/ 4r CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 PROJECT: PA cl CI c ADDRESS: DATE: (3 / 2 e. C Au..a Lrr F7 M E_ SS4 Pr 0 44-13 6 8 NEC+, r i Lo 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 Prepared by: