Loading...
HomeMy WebLinkAboutCAP 2012-07-09 Item 2A - Bid Award - Tukwila Community Center Spray Park Sewer ConnectionCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Community Affairs Parks Committee JA FROM: Bob Giberson, Public Works Director BY: Mike Cusick, Senior Water /Sewer Engineer DATE: July 6, 2012 SUBJECT: Tukwila Communitv Center Sorav Park Sewer Connection Project No. 91030101 Bid Award ISSUE Award bid to Goodfellow Bros., Inc., for the installation of an outside drop connection on the existing King County sewer manhole that serves the Tukwila Community Center (TCC). BACKGROUND In 2008 the City installed a water spray park at the northwest corner of TCC. At that time it was decided to install a temporary inside drop connection to the King County Metro sewer manhole and, at a later date, install the outside drop connection required by King County. A sewer drop connection is required when the elevation change from the building to the sewer main is too extreme to gradually connect to the sewer main (which can be 14 feet deep). An outside drop for a sewer manhole connection is preferred as the pipe is then not in the manhole structure and will not interfere with maintenance. DISCUSSION The City advertised the project on May 24 and 31, 2012. Four bids were received and opened on June 14, 2012. The bids were checked and tabulated and one minor math error was found in the bids. The low bid was from Gary Harper Construction in the amount of $41,500.50 including sales tax. Mr. Harper was contacted and asked if he thought his bid numbers were correct. He returned a letter to the City stating that he had an error in Bid Item 10 and was requesting to withdrawal his bid (see attached letter from Gary Harper Construction). The City has accepted Gary Harper's bid withdrawal based on standard specifications. The second lowest bidder, Goodfellow Bros., Inc., submitted their bid with one minor math error in their grand total by $0.50. The bid tab reflects the corrected total. References were checked on similar projects and it was reported that Goodfellow Bros., Inc. performed quality work. FINANCIAL IMPACT Funds for this project are in the 301 Parks Fund: Bid Results Enaineer's Estimate Budaet Construction (Includes Sales Tax) $64,495.50 $83,767.50 $10,000.00 Contingency 10% 6,449.55 0.00 70,000.00 Total $70,945.05 $83,767.50 $80,000.00 RECOMMENDATION Council is being asked to award the contract to Goodfellow Bros., Inc. in the amount of $64,495.50 for the Tukwila Community Center Spray Park Sewer Connection and consider this item at the July 16, 2012 Regular Consent Agenda. Attachments: Manhole Specifications (Inside and Outside Drop Connections) Page 47, 2012 CIP Bid tabulation Letter from Gary Harper Construction W:\PW Eng \PROJECTSW- PK Projects \TCC Spray Park Sewer Connection (91030101) \Info Memo Bid Award Goodfellow Bros 070612.docx x NOTES: 1. INSIDE DROPS REQUIRES CUT TOP SECTION OF 90° BEND DIRECTOR'S APPROVAL. 2. U S E INSIDE DROP ONLY ON PVC SYSTEM. 3. SEE SS -08 FOR ACCESS AND CHANNELIZATION. I If STAINLESS STEEL PIPE CLAMP 4. SEE SS -12 AND SS -13 FOR LADDER 11 i 11 AND STEP DETAILS. +.I I DETAIL A ACCESS GI II] I I Manhole I Lid L_ KOR -N -SEAL BOOT, 54 MIN. DIA. PIPE CONNECTION OR EQUAL SEE DETAIL A (ABOVE) L PVC PIPE SAME SIZE LADDER VARIES, 2' MIN. REMOVE GASKET I STAINLESS STEEL BOLTS FROM PVC ELBOW I FROM BOLTED TO MANHOLE WALL. I I MAX. SPACING 6'. Sewer CHANNELIZATION Main j ib RUBBER BOOT FLAP TO PREVENT SPLASHING NOT TO SCALE Ld MANHOLE C i ty Of INSIDE DROP �r SHEET: SS -09 43 Tukwila I REVISION #1: 08.03 19oe APPROVAL: B. SHELTON Jl 3 A NOTES: 1. DROP PIPING TO BE SAME SIZE AS INTERCEPTED SEWER. 2. BACKFILL WITH COMPACTED MATERIAL. 3. CLASS 50 DUCTILE IRON PIPE ONLY. 4. CONCRETE CLASS 5 (1 -1/2). CEMENT 5 SACK MIX WITH 1 -1/2" AGGREGATE. 5. SEE SS -08 FOR ACCESS AND CHANNELIZATION. 6. SEE SS -13 FOR STEP DETAIL. ONE LENGTH TO SOLID BEARING MATERIAL WHEN SPAN IS MORE THAN 4'. 1 FLEXIBLE JOINT MIN DROP PIPE SIZE DROP 8" 1.45' 10" 1.70' 12" 2.08' ACCESS i I I I �I a :a _,a a. a. KOR -N -SEAL MJ OR FL r a 1/2" BLIND FLANGE WITH STAINLESS STEEL BOLTS. 6" MIN. 1 1" MAX. 90° BEND CONCRETE J v NOT TO SCALE I MANHOLE c City O I DROP CONNECTION x I SHEET: SS -10 oy Tukwila I REVISION #1: 08.03 I LAST REVISION: 04.0 a trios 4 APPROVAL: BOB GIBERSON, CITY ENGINEER 12" Typ. STEP 1 CITY OF TUKWILA CAPITAL PROJECT SUMMARY Project Location 2012 2017 Capital Improvement Program 47 l eis 5 2012 to 2017 PROJECT: TCC Spray Park Sewer Connection Project No. 91030101 The Tukwila Community Center Spray Park is using a temporary connection to the King County manhole DESCRIPTION: and King County is requiring a permanent sewer connection with an outside drop. JUSTIFICATION: The sewer connection is required by King County. The sewer connection and grease interceptor were required to be completed by 2010, but an extension STATUS: was received from King County allowing completion by 2012. MAINT. IMPACT: COMMENT: This project will be coordinated by Public Works and Parks Recreation. FINANCIAL Through Estimated (in $000's) 2010 2011 2012 2013 2014 2015 2016 2017 BEYOND TOTAL EXPENSES Design 7 7 Land (R/W) 0 Const. Mgmt. 10 10 Construction 70 70 TOTAL EXPENSES 0 0 87 0 0 0 0 0 0 87 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 BEET 1 (1st Qtr Percent) 0 0 87 0 0 0 0 0 0 87 TOTAL SOURCES 0 0 87 0 0 0 0 0 0 87 Project Location 2012 2017 Capital Improvement Program 47 l eis 5 c O U CU C C O U a� 3 a� CA ca CL z 0 0 0 0 0 0 0 0 0 0 O LIl to O 0 0 0 0 0 0 0 0 0 0 O ri ai F O o o O o O o o o O O Ln Ln z 0 0 0 v o 1 0 0 0 0 0 0 o m Cl) coo rl l O O V M 00 In N 00 V M 1 cr u 0C O N r-4 ri N N N N N Ln N Z Q 0 u vi v� in 0 0 0 0 0 0 0 0 0 0 O o O r 0 0 0 0 0 0 0 0 0 0 0 0 O z z o o 0 0 0 0 0 o o 0 o 0 0 CL O O� O O o 0 0 0 In O 0) Q1 Q Lr V O Ln u .--i ri ri m N r- r O Q i ri u t/T N V► 0 0 0 00 00 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 O Ln Ln 0 Ln w 0 0 0 0 0 0 0 0 0 0 O Ln LA J Lu Z O O In 0 0 0 0 In O O 0 Qi 01 LL F O o N N N Ln Ln N 0 Ln W Ln L O 0 3; Ln In LO O m Q (D V? V? V1 z� co 00 0 0 0 00 0 cc O 0 0 0 0 0 0 0 0 0 0 0 o Lf) Ln 0 0 Ln un 0 0 0 0 0 0 0 0 O d U Z lf1 m N lr N 1� 01 M al l0 Lfl Q Gr O i--I N 00 N .-i r-I N Il m M Tr r I z Q O u Ln in of 0 0 0 0 0 0 0 0 0 0 0 0 O wzF- 0000000000 0 L LM w O D 0 0 0 0 0 0 0 o 0 0 o 0 0 0 0 0 o o o Lo tm Z z U 0 O Ln Ln O O L!1 0 0 0 0 Lf) N N a LL g Lr r n m ri m r1 ar^o z O O a W 0000000000 W o 0 0 0 0 0 0 0 0 o x U o o o o 0 o o 0 O o Q R O O m 0 0 0 0 0 0 o F CL O Ln O O l!n O O O O J J F In I Ln ri m rl 1 Ln F J LU m ci z O N O F N M u N to to to N N V1 z J J U J J J J J J J D Z r ci Q N O `i rl r i ci D c cz Cn c O O E rl E o ci 0 O m a U 0 Y (o Q) U N -4 j C co Y W W Z3 F- z a z z o O W Z J C LL O 0i ui ui z u Z ON CC O O J N Z W 7n cc rl a zD ~z F 0 0 0 a v J a W J u LL O LL LL LL o 0 0 0= O W O O F N z z Z W O O z Z 0 UJ O O m= F O O v y u Q U F r Q Q Z w H W N LL U J U u a o O a LL z w N O� OJ O O Z H F- 7 F Z 5 W o[ w a U O Z e-i N m V Ln lD Il 00 01 O� LU LU F X GARY HARPER CONSTRUC'I'ION INC. 14831 223rd Street SE Snohomish, WA 98296 -3989 (360) 863 -1955 Fax (360) 863- 1966 June 18, 2012 Attn: Mike Cusick, PE City of Tukwila 6200 Southcenter Blvd Tukwila, WA 98188 Re: Tukwila Community Center (TCC) spray park manhole connection Dear Mike, After reviewing my bid, I discovered a mathematical error in bid Item #10. When I was adding it up I missed the 9 in the 9,500.00 figure. I have attached a copy of my tabulation sheet as evidence. Therefore, I am requesting relief from the responsibilities of Award. Under penalty of perjury, 1 declare the above statement to be true and I certify that the attached work sheets are the ones used to prepare the bid. Gary A. Harper G' President Notary sG+'�2GC� �2�Q/�' t Date "e- /1l ���2 °140 s#fn, 7 li Cl I C) o. er.)r 7b /0 `70 7 Ar I? Z6 rr 'n C) 0 61--Z F en, 10 2 ve.) 11 1 MF ar In o 0o ,n 5; �D D �'D 6 0 C) 10