HomeMy WebLinkAboutSpecial 2014-04-03 Southcenter Plan - D. Southcenter Subarea Planning ProcessSouthcenter Subarea Planning Process
2002 -2004 Development of the Vision for the Urban Center
Council Briefing
6 Public Workshops — See 9/ 18/08 Memo for Summaries
2 Joint PC /CC Worksessions
Multiple Team Meetings with City Staff & Consultants
2004 Endorsement of the Vision by CC and PC
Joint PC/ CC Meeting— Directed Team to prepare regulations that implement the Vision
Adoption of Updated Comprehensive Plan Policies
2005 -2008 Development of the Plan to Implement the Vision
Staff review of Draft Plan prepared by Freedman, Tung & Bottomley (FTB)
Urban Land Institute Technical Advisory Panel Worksession on the Implementation Aspects
of the Draft Plan
Meetings with Local and Regional Developers to Review Plan Direction
'Testing" draft regulations on Proposed Developments (Mall expansion, Baker Blvd Retail,
Fidelity & Bank of America, other office & retail projects)
Grant Funding for Pedestrian Bridge Study
Sounder Station Review
Coordination on Tukwila Pond Park Master Plan
Grant and Developer Funding for Transit Center Design and Construction
2008 Affirmation of the Vision and Introduction to the Plan
Public Open House with FTB 10/23/08
Joint PC /CC Worksession with FTB 10/23/08
2008 -2009 Public Outreach for the Plan
Presentation to the SWKC Chamber of Commerce 10/7/08
Presentation to the Parks Commission 11 / 19/08
Mailings & Emailings to 1400 Property Owners, Tenants, & Interested Parties
Public Open House 3/4/09, Ha <elnutArticle
Meetings with Multiple Property Owners
2009 Review of the Plan Specifics by PC
Presentation by FTB 3/ 12/09
Public Hearings 3/26/09, 4/23/09, 5/28/09
3 Worksessions
Meetings with Fire Department 3/25, 5/8, 5/20
Plan remanded to staff for revisions to address the public comments
Staff to Review Public Comments and Revise Draft Plan
Meeting and PC work session with EcoNW to discuss additional economic analysis 7/8/09
Meetings with Fire Department and PW, Individual meetings with Property Owners
Z:\DCD \Southcenter Work Session Binder \5SC Planning Process Timeline.docx
199
EcoNW led Focus groups 9/29/09
Local and Regional Developers
Local Property Owners and Managers
Wesffield Mall Representatives
Presented EcoNW TUC Implementation Analysis to PC 12/10/09
2010 Internal Departmental Review Process on Street Cross - sections
Meetings with DCD, Public Works & Fire 3/5/ 10, 4/20/ 10, 5/4/ 10, 5/ 18/ 10
Presented EcoNW TUC Implementation Analysis to CAP 3/22/10
Proposed Stakeholder Review Process
to CAP9/13/10; to COW 9/27/10; to CAP 2/28/11; to COW3/14/11
2011 Council consensus was to reduce the scope of the Plan and follow standard outreach procedures
without a formal stakeholder process
Staff Revisions to the Plan to address Public Comments, Council Direction
Meetings with DCD, Public Works, Fire and Wesffield Mall Representatives
Work Sessions with the PC
Briefing on Emergency Management, Background of the Plan and Process 10/27/ 11
Briefing on Walk & Roll Plan, Comprehensive Plan Policy Review 11 / 10/ 11
Briefing on PTA Projects in Urban Center, Review of Revisions to Book 1 12/ 15/ 11
2012 Wesffield Mall Presentation 2/23/ 12
Briefing on Revised Book 2 5/24/ 12
Briefing on Southcenter Architectural Design Manual 6/28/ 12
Revisions to Book 3
Review and Approval of the Revised Plan by PC
Public Open House
Public Hearing 7/ 19/ 12
Work Sessions to Address Comments and Revise Language
Forward PC Recommended Draft Plan to CC 10/25/ 12
2013 Prepare Supplemental Environmental Impact Statement (SEIS)
Mailings to all TUC Addresses, Property Owners and Interested Parties & Agencies
Community Meeting / Open House on Draft Plan 2/27/ 13
Public Scoping Meeting on Draft SEIS 3/20/ 13
Publish Draft SEIS 10/21/ 13
Publish Final SEIS 4/ 14
Revise Documents to Streamline, increase Ease of Use
Peer Review by Makers Architecture & Urban Design
Tested draft regulations on Proposed Washington Place Project & Odin Microbrewe y
2014 Routed drafts to Internal and External Reviewers
Review of the PC Recommended Plan by CC
Worksession 4/3/ 14
Public Hearing 4/ 14/ 14
Z:\DCD \Southcenter Work Session Binder \5SC Planning Process Timeline.docx
200