Loading...
HomeMy WebLinkAboutSpecial 2014-04-03 Southcenter Plan - D. Southcenter Subarea Planning ProcessSouthcenter Subarea Planning Process 2002 -2004 Development of the Vision for the Urban Center Council Briefing 6 Public Workshops — See 9/ 18/08 Memo for Summaries 2 Joint PC /CC Worksessions Multiple Team Meetings with City Staff & Consultants 2004 Endorsement of the Vision by CC and PC Joint PC/ CC Meeting— Directed Team to prepare regulations that implement the Vision Adoption of Updated Comprehensive Plan Policies 2005 -2008 Development of the Plan to Implement the Vision Staff review of Draft Plan prepared by Freedman, Tung & Bottomley (FTB) Urban Land Institute Technical Advisory Panel Worksession on the Implementation Aspects of the Draft Plan Meetings with Local and Regional Developers to Review Plan Direction 'Testing" draft regulations on Proposed Developments (Mall expansion, Baker Blvd Retail, Fidelity & Bank of America, other office & retail projects) Grant Funding for Pedestrian Bridge Study Sounder Station Review Coordination on Tukwila Pond Park Master Plan Grant and Developer Funding for Transit Center Design and Construction 2008 Affirmation of the Vision and Introduction to the Plan Public Open House with FTB 10/23/08 Joint PC /CC Worksession with FTB 10/23/08 2008 -2009 Public Outreach for the Plan Presentation to the SWKC Chamber of Commerce 10/7/08 Presentation to the Parks Commission 11 / 19/08 Mailings & Emailings to 1400 Property Owners, Tenants, & Interested Parties Public Open House 3/4/09, Ha <elnutArticle Meetings with Multiple Property Owners 2009 Review of the Plan Specifics by PC Presentation by FTB 3/ 12/09 Public Hearings 3/26/09, 4/23/09, 5/28/09 3 Worksessions Meetings with Fire Department 3/25, 5/8, 5/20 Plan remanded to staff for revisions to address the public comments Staff to Review Public Comments and Revise Draft Plan Meeting and PC work session with EcoNW to discuss additional economic analysis 7/8/09 Meetings with Fire Department and PW, Individual meetings with Property Owners Z:\DCD \Southcenter Work Session Binder \5SC Planning Process Timeline.docx 199 EcoNW led Focus groups 9/29/09 Local and Regional Developers Local Property Owners and Managers Wesffield Mall Representatives Presented EcoNW TUC Implementation Analysis to PC 12/10/09 2010 Internal Departmental Review Process on Street Cross - sections Meetings with DCD, Public Works & Fire 3/5/ 10, 4/20/ 10, 5/4/ 10, 5/ 18/ 10 Presented EcoNW TUC Implementation Analysis to CAP 3/22/10 Proposed Stakeholder Review Process to CAP9/13/10; to COW 9/27/10; to CAP 2/28/11; to COW3/14/11 2011 Council consensus was to reduce the scope of the Plan and follow standard outreach procedures without a formal stakeholder process Staff Revisions to the Plan to address Public Comments, Council Direction Meetings with DCD, Public Works, Fire and Wesffield Mall Representatives Work Sessions with the PC Briefing on Emergency Management, Background of the Plan and Process 10/27/ 11 Briefing on Walk & Roll Plan, Comprehensive Plan Policy Review 11 / 10/ 11 Briefing on PTA Projects in Urban Center, Review of Revisions to Book 1 12/ 15/ 11 2012 Wesffield Mall Presentation 2/23/ 12 Briefing on Revised Book 2 5/24/ 12 Briefing on Southcenter Architectural Design Manual 6/28/ 12 Revisions to Book 3 Review and Approval of the Revised Plan by PC Public Open House Public Hearing 7/ 19/ 12 Work Sessions to Address Comments and Revise Language Forward PC Recommended Draft Plan to CC 10/25/ 12 2013 Prepare Supplemental Environmental Impact Statement (SEIS) Mailings to all TUC Addresses, Property Owners and Interested Parties & Agencies Community Meeting / Open House on Draft Plan 2/27/ 13 Public Scoping Meeting on Draft SEIS 3/20/ 13 Publish Draft SEIS 10/21/ 13 Publish Final SEIS 4/ 14 Revise Documents to Streamline, increase Ease of Use Peer Review by Makers Architecture & Urban Design Tested draft regulations on Proposed Washington Place Project & Odin Microbrewe y 2014 Routed drafts to Internal and External Reviewers Review of the PC Recommended Plan by CC Worksession 4/3/ 14 Public Hearing 4/ 14/ 14 Z:\DCD \Southcenter Work Session Binder \5SC Planning Process Timeline.docx 200