Loading...
HomeMy WebLinkAboutPermit M02-021 - BOEING #9-98M02 -021 Boeing 9 -98 9725 East Marginal Wy S City of ' ukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Parcel No.: 0003400018 Permit Number: MO2 -021 Address: 9725 EAST MARGINAL WY S TUKW Issue Date: 02/20/2002 Suite No: Permit Expires On: 08/19/2002 Tenant: Name: BOEING #9 -98 Address: 9725 EAST MARGINAL WY S, TUKWILA, WA Owner: Name: BOEING Address: PO BOX 3707 - M/S 1F-09, SEATTLE WA Contact Person: Name: JAMES MILLER Address: MCKINSTRY CO, 5005 3RD AVE S Contractor: Name: MCKINSTRY COMPANY Address: 5005 3 AV S, PO BOX 24567 Contractor License No: MCKIN* *372ND DESCRIPTION OF WORK: VOLUNTARY SEISMIC/SWAY BRACING UPGRADE INTENDED TO IMPROVE THE PERFORMANCE OF THE BUILDING AND TO REDUCE RISK TO OCCUPANTS. ADDED SWAY BRACING TO MIXING BOXES AND DUCT WORK. ADDED BRACING TO EXISTING HVAC PIPING. DEMO AND REROUTE SOME DUCT AND PIPE TO AVOID NEW STRUCTURAL MEMBERS. Value of Construction: $15,000.00 Fees Collected: $97.87 Type of Fire Protection: Uniform Mechnical Code Edition: 1997 Permit Center Authorized Signature: Signature: Print Name: doc: Mech MECHANICAL PERMIT t ��< t. - MO2 -021 Phone: Phone: 206 - 832 -8112 Phone: 206 762 -3311 Expiration Date: 01/02/2004 Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this pe - it do-s not presume to give authority to violate or cancel the provisions of any other state or local laws regulating constr c '.n .,.'-rformance of work. I am authorized to sign and obtain this mechanical permit. Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Printed: 02 -20 -2002 ACTIVITY NUMBER: MO2 -021 DATE: 2 -28 -02 PROJECT NAME: BOEING 9 -98 SEISMIC UPGRADE SITE ADDRESS: 9725 E. MARGINAL WY S Original Plan Submittal Response to Incomplete Letter # Response. to Correction Letter # XX Revision # 1 After Permit Is Issued _ EPARTMENTS: Buildin !vision EI • Li W o PLAN REV / SLIP Fire,ppreion Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined. incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route d Structural Review Required APPROVALS OR CORRECTIONS: Approved Notation: 113I.vu0II5 a•IN.uv.. 2.28 -02 ❑ PERMIT COORD COPY Planning Division ❑ Permit Coordinator DUE DATE: 3-05-02 No further Review Required DUE DATE: 4 -02 -02 El Not Applicable ❑ REVIEWER'S INITIALS: DATE: Approved with Conditions ❑ Not Approved (attach comments) ❑ REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ TUES /THURS ROUTING: Please Route REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: nr.Asu 515 y.a1 2-28-02 Fire Prevention Structural Structural Review Required PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: MO2 -021 DATE: 2 -28 -02 PROJECT. NAME: BOEING 9 -98 SEISMIC UPGRADE SITE ADDRESS: 9725 E. MARGINAL WY S Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # XX Revision # 1 After Permit Is Issued Planning Division ❑ Permit Coordinator ❑ DUE DATE: 3-05-02 Not Applicable ❑ Comments: Permit. Center Use Only INCOMPLETE LETTER'MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW 0 Staff Initials: No further Review Required DATE: DUE DATE: 4 -02-02 Approved Approved with Conditions C Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: k(/6tit� DATE: me Permit Center Use Only CORRECTION LETTER MAILED: ACTIVITY NUMBER: MO2 -021 DATE: 2 -28 -02 PROJECT NAME: BOEING 9 -98 SEISMIC UPGRADE SITE A DDRESS: 9725 E. MARGINAL WY S Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # XX Revision # 1 After Permit Is Issued DEPARTMENTS: Building Division Public Works Complete ❑ unv.nn.6 any 2-28-02 PLAN REVIEW /ROUTING SLIP El APPROVALS OR CORRECTIONS: Fire Prevention 4 )g ° Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ TUES /THURS ROUTING: Please Route ❑ St . `ral Review Required REVIEWER'S INITIALS: � C55-. Planning Division Permit Coordinator DUE DATE: 3-05-02 Not Applicable ❑ Comments: Permit :Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: El No further Review Requ'red DATE: 3 (S 02., DUE DATE: 4 -02 -02 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: z ~ w 00 0 fRw w w 2 u.? co O 1— w o UJ w 0 O 0 1— wW u. ( U O I... z DEPARTMENTS: \PRROUTE.DOC 5/99 PERMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: MO2 -021 DATE: 01 -30 -01 PROJECT NAME: Boeing 9 - SITE ADDRESS: 9725 East Marginal Wy S SUITE # Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued Buildin Divisi n L Fire Prevention Ng, 14. 2•6. Public Works n Structural DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete n TUES /THURS ROUTING: Please Route Structural Review Required , Fr APPROVALS OR CORRECTIONS: (4 weeks) Approved Approved with Conditions REVIEWER'S INITIALS: PERMIT COORD COPY Planning Division Permit Coordinator n DUE DATE: 01 -31-02 Not Applicable n Comments: No further Review Required REVIEWER'S INITIALS: DATE: DUE DATE 02 -28 -02 Not Approved (attach comments) DATE: CORRECTION DETERMINATION: DUE DATE Approved n Approved with Conditions Not Approved (attach comments) n REVIEWER'S INITIALS: DATE: � w 00 0 �LL w u-? w Z Z Co w 0 O � w U= O F-- z A DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Please Route TUES /THURS ROUTING: n REVIEWER'S INITIALS: Structural Incomplete Structural Review Required APPROVALS OR CORRECTIONS: (4 weeks) Approved n Approved w` iitth Conditions REVIEWER'S INITIALS: \PRROUTE.DOC 5/99 II 4.f: Lev1':Y+ " 3, .nlfs PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: MO2 -021. DATE: 01 -30 -01 PROJECT NAME: Boeing:9 -98 SITE ADDRESS: 9725 East Marginal Wy S SUITE # 1 Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued Fire Prevention n Planning Division Permit Coordinator DUE DATE: 01-31-02 Not Applicable n Comments: No further Review ' equire DATE: DATE: DUE DATE 02 -28 -02 Not Approved (attac corn ents) CORRECTION DETERMINATION: DUE DATE Approved n Approved with Conditions Not Approved (attach comments) REVIEWER'S INITIALS: DATE: PERMIT NO.: M D D2\ MECHANICAL PERMIT APPLICATIONS INSPECTIONS ❑ 2 Pre - construction ❑ 50 WSEC Residential ❑ 60 WA Ventilation/Indoor AQC ❑ 610 Chimney Installation/All Types ❑ 700 Framing ❑ 1080 Woodstove ❑ 1090 Smoke Detector Shut Off 1100 Rough -in Mechanical ❑ 1101 Mechanical Equipment/Controls ❑ 1102 Mechanical Pip /Duct Insul ❑ 1105 Underground Mech Rough -in ❑ 1115 Motor Inspection - E! 1400 Fire - Final ❑ 1800 Mechanical - Final ❑ 4015 Special -Smoke Control System CONDITIONS 10001 No changes to plans unless approved by Bldg Div 10002 Plumbing permits shall be obtained through King Co 10003 Electrical permits obtained through L & I 10005 All permits, insp records & approved plans available ❑ 10014 Readily accessible access to roof mounted equipment 10016 Exposed insulation backing material 10019 All construction to be done in conformance w /approved plans 10027 Validity of Permit ❑ 10036 Manufacturers installation instructions required on site ❑ 10041 Ventilation is required for all new rooms & spaces ❑ 1004 Fuel burning appliances ❑ 10043 Appliances, which generate.... ❑ 10044 Water heater shall be anchored.... Additional Conditions: FEES Plan Reviewer: Y M.. Permit Tech: TENANT NAME: T- .A 1 "' 6 ?3 Basic Fee (Y/N) Supplemental Fee (Y/N) Plan Check Fee (Y/N) Furnace /Burner to 100,000 BTU (qty) Over 100,000 BTU (qty) Floor Furnace (qty) Suspended /Wall /Floor- mounted Heater (qty) Appliance Vent (qty) Heating /Refrig/Cooling Unit /System (qty) Boiler /Compressor to 3 HP /100,000 BTU (qty) to 15 HP /500,000 BTU (qty) to 30 HP /1,000,000 BTU (qty) to 50 HP /1,750,000 BTU (qty) over 50 HP /1,750,000 BTU (qty) Air Handling Unit to 10,000 cfm (qty) over 10,000 cfm (qty) Evaporative Cooler (qty) Ventilation Fan (qty) Ventilation System (qty) Hood (qty) Incinerator — Domestic (qty) Incinerator — Comm /Ind (qty) Other Mechanical Equipment (qty) Other Mechanical Fee (enter $$) Add'I Fees — Work w/o Permit (Y/N) Insp Outside Normal Hours (hrs) Reinspections (hrs) Miscellaneous Inspections (hrs) Add'I Plan Review (hrs) Date:2 tq . Date: ACTIVITY NUMBER: MO2 -021 DATE: 01 -30 -01 PROJECT NAME: Boeing 9 - SITE ADDRESS: 9725 East Marginal Wy S SUITE # II ( Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Is Issued DEPARTMENTS: Building Division Public Works DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete n Incomplete n Not Applicable Comments: TUES /THURS ROUTING: Please Route REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: (4 weeks) Approved Ti Approved with Conditions i thp REVIEWER'S INITIALS: f _ _- l(") CORRECTION DETERMINATION: Approved I Approved with Conditions REVIEWER'S INITIALS: \PRROUTE.DOC 5/99 PLAN REVIEW /ROUTING SLIP Fire Prevention Structural Structural Review Required Planning Division Permit Coordinator No further Review Required DUE DATE 02 -28 -02 n DUE DATE: 01-31-02 Not Approved (attach comments) DATE: 1 1C" f Z DUE DATE Not Approved (attach comments) DATE: � w 00 0 0 9 w • 0 J LL.? • Cy � w zt 1- 0 z LU U � ON O I— o I I O Cu z co O~ z d Project Name/Tenant: 3o o x • • J e 3,..1) A , R - ' 1 8) :T ? : Value of Mechanical .Equipment: P /vv A) Ao 4a a al Site Address : ` i 7 25 eT . MArze; TitiAs- WAY s . City State/Zip: 4/6/443 Tax Parcel Number: Property Owner: Date: 1/Z /p Z Phone: ( ) Street Address: 54. - 1 E A3 A la,ov& City State/Zip: Fax #: ( ) Contractor: 8608 Address: Phone: (24 ) 762, 3 l 1 Street Address: 500 5 3' Avc S 5£A-r City State/Zip: , l 3 4 4 Fax #: (ZoG) ba. ,2 es Z ' 4 7 Contact Person: r ' Ames 41). Phone: (fat, ) g3 z , ei I z Street Address: Mb' 5da 3 Av( S . A State/Zip: 9/ 3 4,.t Fax #: (7,0o ) 8 3z • '6 ei 0 ;' BUILDING• ::!OWNER:OR:AUTHORIZEDA GE :T ? : Signature: Date: 1/Z /p Z Print na !{ A4E- 5 . h./. Alzu - �s , 2 - : Phone ( ZU6) 153. .1911 2 Fax #: �G . ) $3 Z . 8608 Address: 5 3 e - `, City/State/Zip: 3 CITY OF T( . 'WILA Permit Center 6300 Southcenter Boulevard, Suite 100 Tukwila, WA 98188 (206) 431 -3670 Mechanical Permit Application Application and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or facsimile. I C° 006 MECHANICAL' PERMIT, REVIEW AND APPROVAL REQUESTED: (TO BE FILLED, OUTIYAPPLICANT): Description of work to be done (please be specific): VOL ,,rr,"/ ,S 'A ' .t AGS,.JA. 0=W P - Abe - r zA4 P eov3 'TNT PC -LFaRr t- DF T'M-A '$t.ISe -o . ,4 TO 'TG c CC.M kJTS I AAl Lrmit • J' w A`f R IP.IA : % Td M x /C ZrJ l., &' es AA., --+ Abt>541 ps 4 '?'v i'x .srr.)4 ,4 V AG P zP r ►t, a6 e). F Eta.et f ;�,aA%fG To AV "Jew) Current Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued OR submit Form H-4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent: If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. PL A ite F E IL.E'AIG e 5z-bti . F ' -r DD I --Z z. ( i3At)4 Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 114.4 of the Uniform Mechanical Code (current edition). No application shall be extended more than once. Date application accepted: Date application expires: Application taken by: (initials) Ct/)/ 11/2/99 mcch pernnl.doc Na No .{Zpv u�.RC'rsfs No REv%S Raar ;.ion ic- Mechanical Permits COMMERCIAL: Two complete sets of drawings and attachments required with application submittal op, a s Submittal Requirements a • • N 40 • ••-. Floor plan and system layout Roof plan required to identify individual equipment and the location of each installation (Uniform Mechanical Code 504 (e)) Details and elevations (for roof mounted equipment) and proposed screening Heat Loss Calculations or Washington State Energy Code Form #H -7 H.V.A.C. over 2,000 CFM (approximately 5 ton and larger) must be provided with smoke detection shut- off and will be routed to the Fire Prevention division for additional comments (Uniform Mechanical Code 1009). Specifications must be provided to show that replacement equipment complies with the efficiency ratings and other applicable requirements of the Washington State Nonresidential Energy Code. Structural engineer's analysis is required for new and the replacement.of existing roof equipment weighing 400 pounds and greater (Uniform Building Code 1632.1). Structural documentation shall be stamped by a Washington State licensed Structural Engineer. 11/2/99 miscpmtdoc NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents being installed or replaced. RESIDENTIAL: Two complete sets of attachments required with application submittal Submittal Requirements New Single Family Residence Heat loss calculations or Form H -6. Equipment specifications. Change - out or replacement of existing mechanical equipment I Narrative of work to be done, including modification to duct work. Installation of Gas Fireplace NOTE: Water heaters and vents are included in the Uniform Mechanical Code — please include any water heaters or vents,being installed or replaced. Narrative with specification of equipment and chimney type. If using existing chimney, provide a letter by a certified chimney sweep stating that the chimney is in safe condition. z w JU 00 u) 0 J H w u- co _ w Z = ZO LL! w 0 O ( 0 — W H- IL O ,z w O z Parcel No.: 0003400018 Address: 9725 EAST MARGINAL WY S TUKW Suite No: Tenant: BOEING #9 -98 1: ** *BUILDING DEPARTMENT * ** 2: No changes will be made to the plans unless approved by the Engineer and the Tukwila Building 3: Plumbing permits shall be obtained through the Seattle -King County Department of Public Health. that agency, including all gas piping (296 - 4722). 4: Electrical permits shall be obtained through the Washington State Division of Labor and Industries inspected by that agency (248- 6630). 5: All permits, inspection records, and approved plans shall be available at the job site prior to the start of any construction. These documents are to be maintained and available until final inspection approval is granted. 6: All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1997 Edition) as amended, Uniform Mechanical Code (1997 Edition), and Washington State Energy Code (1997 Edition). 7: Validity of Permit. The issuance of a permit or approval of plans, specifications, and computations shall not be con- strued to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinance of the jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. 8: ** *FIRE DEPARTMENT CONDITIONS * ** 9: Refrain from blocking sprinkler coverage with shelving. NFPA standard #13 states that any shelving or decks in excess of 4 feet in width will require installation of sprinklers thereunder. 10: Maintian sprinkler coverage per N.F.P.A. 13. Addition /relocation of walls, closets or partitions may require relocating and /or adding sprinkler heads. 11: These plans were reviewed by Inspector 510. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575- 4407. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating constr ti9 or performance of work. Signature: doc: Conditions City of ' ? ukwila Department of Community Development / 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Print Name: , /./ 0 Fi PERMIT CONDITIONS MO2 -021 Permit Number: Status: Applied Date: Issue Date: MO2 -021 ISSUED 01/30/2002 02/20/2002 Division. Plumbing will be inspected by and all electrical work will be Date: Printed: 02 -20 -2002 I Parcel No.: 0003400018 Address: 9725 EAST MARGINAL WY S TUKW Suite No: Applicant: BOEING #9 -98 Receipt No.: R020000241 Payment Amount: 97.87 Initials: SKS Payment Date: 02/20/2002 10:22 AM User ID: 1165 Balance: $0.00 Payee: MCKINSTRY CO TRANSACTION LIST: Payment Check 5289 97.87 ACCOUNT ITEM LIST: doc: Receipt City of i 6300 Southcenter BL, Suite 100 / Tukwila, WA 98188 / (206) 431 -3670 Current Pmts Amount MECHANICAL - NONRES PLAN CHECK - NONRES RECEIPT Type Method Description Description Account Code 000/322.100 78.30 000/345.830 19.57 Permit Number: MO2-021 Status: APPROVED Applied Date: 01/30/2002 Issue Date: Total: 97.87 02/21 ''7.1fi TOTAL 97.87 Printed: 02 -20 -2002 City of Thkwila John W Rants, Mayor Fire Department Project Name 21DEI:\v c ) -) Address 1 1 �._� �= i ' r ., • Sprinklers: st Fire Alarm: Hood & Duct: Halon: Monitor: Pre -Fire: Permits: Authorized Signature FINALAPP.FRM TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Retain current inspection schedule •K, Needs shift inspection Approved without correction notice Approved with correction notice issued Thomas P. Keefe, Are Chief Permit No. DC?` : ,71 5 Date T.F.D. Form F.P. 85 Suite # Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone; (206) 575-4404 • Fax (206) 575-449 Project: Type of Inspec 'on Addre s: Date called: Special instructions: " t frDate wante -� p. m. Requester: Phone: T .--, r ,.,..} / INSPECTIO i O. INSPECTION RECORD Retain a copy with per CITY OF.TUKWILA BUILDING. DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 g. Approved per applicable codes. EI Corrections required prior to approval. COMMENTS: .f 94 7 // $47.00 REINSPECTION REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: Date: iProlect: . , -. - tvatot Li- 1411^1t Typ*nspection: \ / n Date called: 4142, 0 dress: E. 14A,01145 ■ i 14.11 IS0 Special instructions: .,. Date wanted: I I / 4 1(Aq10 A Jc_2 p.m. Requri;: P/Sone: r7-0 (Q) , A , S$ - ; `17 INSPECTION NO. • I , INSPECTION RECOR Retain a copy with permit •:*.CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 . • Approved per applicable codes. L j Corrections required prior to approval. COMMENTS: • „T-ot A)) (L„,i co 1 'R ex ", Ski C..socC rowi, 0 IL \-e) c Inspector: - e R■fi,v,..4 - A Date: $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: Date: Py9l Ty r f ` Inspectio : :. Ile, i ✓ Jate called: Special instructions: ! Date wanted / j 0 Requn t c .- - c P it -F) ' -ST 3-50 '.3 ?a,doli =,�'.ix [ a:,c ,rii'�rYG.S.La•!;:'.c.:n INSPECTION RECORD Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION •6300 Southcenter Blvd, #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 Approved per applicable codes. Li Corrections required prior to approval. COMMENTS: 1 S1 Hwy- Su nvac6vt4- - 1-0s0 \-1-c, Inspector: Date: 2 2. ) $47.00 REINSPECTION FIE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: Date: COMMENTS: Type of spection: I F1n0r !)c GI Uarl rats+ S ecial ins�tru �S1 /V t s: N P I�/ 5 Date wanted: _ I &AI 1 /V A/ Uel/I d'Gfrtii Phone: \' ,.2a6 y1.5* - 7 , /d ,, ?-' Pio o r- AJ L-- ua r. ta 0 V__- -k- cove v' Proj .. Type of spection: Ad ess: 7 15 C • � ,2 /74 -Pi.- .,D Date ailed: s - y- � / / o.-..Z S ecial ins�tru �S1 /V t s: N P I�/ 5 Date wanted: _ '`/ /3 79 p.m. Request r: /" Phone: \' ,.2a6 y1.5* - 7 , /d 11 INSPECTION RECO Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila WA 98188 ot, (206)431 -3670 R Approved per applicable codes. Corrections required prior to approval. Inspector: "4 r � Date: 1 S '0 2 El $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: Date: iwecitailtSikagesa4.4t t n# dadfiataisimitaidkatairl n' ^`,.lS i✓, ' I, INSPECTION RECOR Retain a copy with permit INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 )431 =3670 Project: 64 9 -98 dress: •Spe J t , /1 do � Q S-0 apm PCep Typ; of Inspe ion:;: Date called Date wanted. // • ! ._ '• T�. p.m. Requester: Phone Approved per applicable codes. Corrections required prior to approval. COMMENTS: . 1 - G i n t i� !('� Y`�t'h P <� � n 4 i 1'. �,„tocl e . i ) r ?I -d I onr fl 04\ -Prt S k. C U P Y Inspector k-- C Date: L 0 $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: Date: V\ t -:C, fifr4s , 8y� 1 . ,.wx 4, ‘!•4 1 44:: , A >,'t :;*tt.4;: ri:dr4 Pr ' ct: Typ Inspection dress: e - 7(3 S's ' P ,,..Date ' �� called: / L l 7(o Special instructions: D ate wanted]` : -? .2 5/0-2 ,m. 5 p.rri. Reque tt3r:.! Ph he ac INSPECTION NO. INSPECTION RECOR Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 . COMMENTS: 1$'" 'Fl U L - () IL n ‹o Approved per applicable codes. Inspector:c r Date: R 0 2: El $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: Date: • apt 4 .,! :•ij tklA 1 PERMIT NO. Srww.:3s�a:., (206)431 Corrections "required prior to approval. I Prp� e�ct: : GHQ Ty of Inspects { . res, to called: Special instructions: ' / Date wanted:, _; :., '.,. P . 4 iO Requter:t: ! P e: . , .. INSPECTION' RECOR .. Retain a copy with permit,: CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 :'1 INSPECTION NO. .:. V. S. iari�tl( �t. ndij�J .iYSAl➢f!jc7 /'u`'$:�lifjr�!.:.. ! sl: fk;# 1:' iy'.' �4�iiw. S'': % %�i4{CYi:.:'r.�..:4,s�.41: (206)431 -3670 a Approved per applicable codes. ❑ Corrections required prior to approval. COMMENTS: 2 . hc F)oc r Alyr h avec D L LvuEe.. Inspector. Date: 3 t2ii El $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: Date: .1,>...v J.i.. .vi.:: z,. A.:".^�1.1?u4:Aay'..eh� COMMENTS: 1 • -1- F 100r 0 V7e I IS: ....,. ..,.., Date c 3- t Special instructions: ' . S00-\\'‘ 941) Re,que t-- I i t Ph -- 13C- -1 -1-P05 _ "- N s •Y1.,"'"t \ i4,-e kr # , Cs`PC tilt' % Ne•r,\ CA N p prO \.)0( .-\„, . , . . • ; - 0 :V,. ,,,, 1.24.yaN4;7•• tt ect: • - • - C F 1.01: ie of Inspection: Tco L h-In ewe r 0 V7e I IS: Address: TV, E Noty,h4 tv( S Date c 3- t Special instructions: ' . Date wanted: 941) Re,que t-- I Ph -- 13C- -1 -1-P05 • l' OH INSPECTION RECOR Retain a copy with pernut • INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION" 6300 Southcenter Blvd, #100, Tukivila, * Et Approved per applicable codes. pi Corrections required prior to approval. 'Inspector: 4•11:660bri.'n J AY tV:441ma.i. H-ot PERMIT NO. (206)431-3670 Date: $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid • at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. • 'Ite0iPt No: Date: et 1 (..) w uj 0 g 11 u_ < g 1— 0 Z 1— uj n a • co 0 — I— Ui uj I 0 1— — • 5 ell c o • — 0I COMMENTS: u,4A w n + N + \./ ` Type of Inspectio . "- IN ;v, ay.cA C j +o 13 Date called: 3- 1,-0.2, 151 F loor ()h :. Date wanted: 3 - l� - V.� a.m. p.m. Requester: G rct v‘,'\-- Phone: A /Iciv-e- c€ii Znc s Wcl 'b (94 \1A1/ bakes a Aci o pp lica6le r 4 - a Project: � , q -` 8 Type of Inspectio . "- IN ;v, Address: .: lik)/ -c P- 1410(r9. Date called: 3- 1,-0.2, Special instructions: / Date wanted: 3 - l� - V.� a.m. p.m. Requester: G rct v‘,'\-- Phone: INSPECTION RECOR Retain a copy with perm INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 7 PERMIT NO. (206)431 -3670 Approved per applicable codes. 0 Corrections required prior to approval. In „ Date: �— f b -0 z $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid "et'6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: Date: Pe 1 1 0 Type Inspection: ` - a -(r A e . / 1 Date called. `' / / ci, Special instructions: f Date want / 7 . Oa .: qt: Req ter: C'_ P'\ eS:X35 INSPECTION NO. A pproved per applicable codes. INSPECTION RECOR Retain a copy with permit CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 .: ,•I PERMIT NO. • (206)431 -3670 ❑ Corrections required prior to approval. COMMENTS: g " F 1 6or V �— A C G L I I And --. 000 1 G\-;v% Grproveri : e.okc " O 14- - h Svk`t " d1 " vC -t- of Inspector: Date: (- $47.00 REINSPECTION FEE REQUIRED.' Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No: Date: n.r Lti3` t e!� ;tu3tr•P. a.^t �nFa ", �;, , r .hY1,ic:. •':t .iw tfi;� C {;a41t..::;4tstiV; ;;MeP:. r. N -Approved per applicable codes. ,...,':INSPECTION RECOR Retain copy with perm INSPECTION NO.' CITY OF TUKWIIA BUILDING DIVISION 6300 Southcenter Blvd, #100, Tukwila, WA 98188 Project: T3r)Pil•lei 6 1 - qg Address: E Special instructions: Type of Inspection: WIA.)(.-; I- Date called: 2 -to - 2 . (.) Date wanted: 2- - - o2— p.m. Requester: C-4 Phone: #2_cc COMMENTS: is+ Fly- GL 11 Q.Aci F t-t A t op rOu-ec( ".p tilt( r( clo (.4- ok YAs.%)G4.4-12 AOC + ( A CP rOved z::qa t .1-44.4sigvato 1\402 PERMIT NO. (206)431-3670 Corrections required prior to approval. Inspector: - $47.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid . at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: 0 z Receipt No: Date: laweectoliahle.dolf4 ...lbi*P.64`..W4ultstolormeg,sf w — 0 0 co 0 uj 0 u_ < Z 0 Z I- ll/ uj U 0 - Ui Ca I- u j L 0 al c o 0 - I= F 0 Revision 1 No. I I Date Received Staff Date Initials Issued I I I • Staff Initials Staff Initials -- ,61' -6' '-/Zs ; r . 1, �. 3, • 1 •S: S Summary of Revision: y // '" OZ- L"���'lt�.� � GC'ZL : , L i «-f' _.,-e `2 --c- ' G- c rZ'L �i� • Received By: / i Received By: Received By: KCEv! N, _ N4 Revision No. 1 Date , Staff Received I Initials Date Staff Issued Initials I I I Summary of Revision: Staff Initials Received By: Revision No. Date Received Staff Initials Staff 1 Date Initials I Issued 1 Staff 1 Initials Staff Initials I I I Summary of Revision: Summary of Revision: • Received By: Revision No. I I Date Received Staff Initials Date Issued Staff Initials Staff Initials Summary of Revision: I L Received By: Revision No. Date Received j I Staff I Initials Date Issued Staff Initials I l Summary of Revision: Received By: PROJECT NAME: a 2` j - fr Site Address: 9'7�5 (c' 4 Original Issue Date: - O�ot REVISION LOG tMl (please print) ' (please print) (please print) (please print) FEB -28 -2002 11:52 City of rldCWila Department of Community Development - Permit Center 6300 Soethcanar Blvd, Suite 100 Tukwila, WA 98188 (206)431 -3670 Nekton snbnditels mast be selmnitted in person at the Permit Center. Revisions will not be accepted throgh the meg fax, etc. Dam: Z Z 8 Z ❑ Retp=e m Incomplete Letter 1 ❑ Reirnae, • ,leapt tia•Coae�lan # _l _- after Peamit:is Issued . . Pre* Name: 8 �. $ :1998' 3e4 •8.: : :972S.1Eait a av South: Contact Person:. ' James ' MiUCr ' Phobo Number . 296 • Z - 81 t 2 Stanmary of Ravteiaa: ^sCK I NSTRY CO. Plan Check/Pamir Number: MO2 -021 206 7622624 P.02/03 • • RECEIVED z irrUr ^' .'r /ILA PERMIT CENTER ShieiNumbigir: .4t.l:,111110 Mt *..I4 :Am (iaA►r ■ z -at-c ) "Cb " oib htrQla etjri n.fneJrr '•l, q�'rsvieton ' Received at the City, of Tlsc iila Permit C lor.by: '_ Y • Bntered is Sietre:ovn LICENSE DETAIL INFORMATION Form STATE OF WASHINGTON DEPARTMENT OF LABOR AND INDUSTRIES Specialty Compliance Services Division P. O. Box 44000 Olympia, WA 98504 -4000 THE RESULT OF YOUR INQUIRY FOR LICENSE NUMBER SELECTED IS: LICENSE DETAIL INFORMATION Current Filter. None Rplstration' or License MCKIN**372NO Name MC KINSTRY CO Address 5005 3RD AVE S Address PO BOX 24567 City SEATTLE State WA Zip 981240567 Phone Number 2067623311 Effective Date 8/20/63 Expiration Dab 1/2/04 Registration Status ACTIVE Type CONSTRUCTION CONTRACTOR Entity CORPORATION Specialty Code GENERAL Other Specialties UBI Number 179012657 * * *VIEW CROSS REFERENCE FILE FOR THIS LICENSE* * * * * *VIEW PRINCIPAL OWNERS) FOR THIS LICENSE* * * *VIEW CONTRACTOR BOND /SAVINGS INFORMATION *CHECK INQUIRY FOR SUMMONS AND COMPLAINTS* * * * VIEW CONTRACTOR INSURANCE INFORMATION * * * * ** New inquiry by CITY, NAME, PRINCIPAL OWNER NAME, NUMBER, UBI NUMBER or return to the L &I Construction Compliance Home Page https://wws2.wa.gov/lni/bbip/TF2Form.asp?License=MCICIN**372NO 01/04/2002 qrnmemeneett Page 1 of 1 I REGISTERED AS PROVIDED BY LAW AS CONST CONT GENERAL REGIST. # CCO1 MCKIN**372N0 EFFECTIVE DATE MC KINSTRY CO 5005 3RD AVE S PO BOX 24567 SEATTLE WA 98124-0567 t'Fr 1Mt(Vr7i -T • WS" EXP. DATE 01/02/2004 08/20/1963 b-'4- CL I — c ' • .• ... A . ..L., • . 6 - . irfl 5C__Dro- L 0 ' 14- 1 . , . '; • - 0 3 • • . P ikL \ &r'Ci-jsIlr"- 69 RECEIVED CITY OF TUKWILA PERMIT CENTER mo oa Balance Due: $ Need Current Contractor Registration Card: fl Yes Need to Enter Contractor Information in Sierra: Yes ed Contact Person k Balance Due: $ 97, eed Current Contractor Registration Card: eed to Enter Contractor Information in Sierra: ❑ Yes 4No El Yes No •v� •q:•'•1 x,:::.w: tin}}y�;:.v:: ii..i..:.... i ^:: r..... x.........::: (7o6) FJa -e' Z W re i JU O 0 W J = H U) W u ma I— W ZF.— I— O Z U � O - D I- Ww I I-- - W Z U= O ~ Z I SYM A VICINITY MAP PROJECT SITE ACCESS RD 7 -127 FROM SEATTLE- TACOMA AIRPORT DEVELOPMENTAL CENTER REVISION BUILDING 9 -98 STRUCTURAL UPGRADE FROM DOWNTOWN SEATTLE EAST MARGINAL WAY CORPORATE PARK 703445 -03 STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 - 599 TUKWILA BY DLR GROUP DUN GROUP 900 APPROVED GM GM FROM KENT & AUBURN 04 24 01 2.21.02 NO SCALE DATE SYM EXIT 157 900 AREA MAP BUILDING ADDRESS: 9725 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON PROJECT SITE 9 -98 BUILDING LOCATION NO SCALE REVISION BUILDING 9 -98 STRUCTURAL UPGRADE APPROVED DATE BOEING DEVELOPMENTAL CENTER 9725 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON 9-8108 GENERAL NOTES CONSTRUCTION SET OF DOCUMENTS, REVIEWED AND STAMPED BY COY OF TUKWILA MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION WITHOUT ABOVE MENTIONED SET OF DOCUMENTS. 1. VERIFY ALL DIMENSIONS AND CONNECTIONS BEFORE ANY WORK. 2. NOTIFY FACILITY ENGINEERS SHOULD EXISTING CONDMONS REQUIRE DESIGN REVISIONS. 3. COORDINATE WORK WITH OTHER CRAFTS. 4. RETURN THIS SAME SET TO GARY TALLER AT BLDG. 9 -51 COL N /1, AFTER COMPLETION OF THIS CONSTRUCTION. PROJECT CHECKLIST CHECK BOX ? THESE DRAWINGS CONFORM TO THE 1994 U.B.C., U.F.C., U.P.C., AND THE WAC 51 -20 AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. ROOMS LABELED PER OCCUPANCY PER U.B.C. TABLE 10 -A. BUILDING FLOOR NUMBER ON PRINT FOR AREA OF CONSTRUCTION. NUMBER OF PRINTS REQUIRED FOR PERMIT PACKAGE ❑ 1. TENANT IMPROVEMENT (STRUCTURAL): ❑ 5 'SETS OF ARCHITECTURAL DRAWINGS ❑ 5 SETS OF STRUCTURAL DRAWINGS ❑ 5 SETS OF STANDARD DETAILS ❑ 5 SETS OF ENGINEERING CALCULATIONS 0 5 SETS OF ENERGY CALCULATIONS ❑ 5 SETS OF CONSTRUCTION SPECIFICATIONS ® 2. TENANT IMPROVEMENT (NON- STRUCTURAL): ® 4 SETS OF ARCHITECTURAL DRAWINGS ❑ 4 SETS OF STANDARD DETAILS ❑ 4 SETS OF ENERGY CALCULATIONS ❑ 4 SETS OF CONSTRUCTION SPECIFICATIONS ❑ MECHANICAL, 4 COMPLETE SETS ❑ FIRE PROTECTION /SPRINKLERS, 3 COMPLETE SETS • BRIEF PROJECT NARRATIVE: STRUCTURAL UPGRADE OF BUILDING 9 -98 WITH SEISMIC DAMPERED CROSS BRACING THROUGHOUT. REMOVAL AND REPLACEMENT OF PORTIONS OF STAIRWAY WALL WITH SEISMICALLY BRACED WALLS. REMOVAL AND REPLACEMENT OF CEILING GRID AND PANELS WITH SEISMICALLY BRACED SYSTEM THROUGHOUT CORRIDOR AND ENTRY AREAS. MODIFICATION AND SEISMIC BRACING OF RELATED ELECTRICAL AND MECHANICAL EQUIPMENT WITHIN THE AREAS OF WORK. ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN NECKED NECKED APPROVED APPROVED A DnUITCl`TI IDC AIrt eTCD BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98 MO-/ "Wu. P4xT : DATE - - -/dtat co CURRENT REVISION J #703445 -05 SHEET JOB NO DWG N0. I understand that the Flan Check approvals are Subject to errors end omission: and approval of plans does not authorize the viclatioo of any adopted code or Ord; ^ance. Re eipt of oaa- tractor's copy ++ p .paci plans acknowledged. By Date Permit No RE -ISSUE FOR PERMIT 2 -21 -02 CODE SUMMARY LAND USE CODE BUILDING CODES OCCUPANCY GROUP CONSTRUCTION TYPE FLOOR AREAS: BUILDING FOOTPRINT BUILDING GROSS FIRST FLOOR SECOND FLOOR PENTHOUSE BUILDING HEIGHT STORIES OCCUPANT LOAD: HANDICAPPED REQUIREMENTS FIRE PROTECTION SEISMIC ZONE CRY OF TUKWILA 1997 U.B.C., U.F.C., U.P.C., AND THE WAC 51 -20 AS ADAPTED OR AMENDED BY LOCAL ORDINANCES, AND COMPLIANCE WITH CITY OF TUKWILA ZONING. GROUP B TYPE II, NON- COMBUSTIBLE 67,313 S.F. 145,402 S.F. 67,313 67,313 S.F. 10,776 S.F. 44 FT. 2 NO CHANGES BARRIER FREE FULLY AUTOMATIC, F/S CLASS .1 SPRINKLERS THROUGHOUT 3 REC Clry Of' PERMIT C REVISION N0. 1 T1 3 SYMBOL J #703445 -05 NLO -011 REQUIRED FOR: ❑ CpEC1h 5.iCAL (' LECTRICAL. gPLUNIB;NG [{� GAS PIPING CITY OF TUKWILA BUILDING DIVISiON IVED UKW,Aq NT=R DATE 02.21.02 COMP NO. DRAWING INDEX REVISED 2.21.02 '•WING O. SHEET N0. SEQ. N0. SHEET TITLE REV N0. ' DATE > APPROVED DATE Q ZIPA27�a ® MECHANICAL ACCEPTABILITY THIS DESIGN AND /OR IS APPROVED DRAWN > * • 98 —M1 M1 M9 SEISMIC BRACING SPECIFICATION — 04 24 01 > * 98 -M2 M2 M10 SEISMIC BRACING SPECIFICATION — 04 24 01 * ' 98 -1M10 1M10 M11 HVAC PLAN B 04 24 01 * • 98 -1M11 1M11 M12 HVAC PLAN F 04 24 01 * • 98 - 1M12 1M12 M13 HVAC PLAN C 04 24 01 * 9 98 -1M13 1M13 M14 HVAC PLAN D 04 24 01 * 9 98 -2M10 2M10 M15 HVAC PLAN B 04 24 01 * 9— `8 -2M11 2M11 M16 HVAC PLAN D 04 24 01 * 9— '8 -2M12 2M12 M17 HVAC PLAN A 04 24 01 * 9 48 -2M13 2M13 M18 HVAC PLAN A 04 24 01 * 9 •8 -1M61 1M61 M19 HVAC PIPING PLAN A 04 24 01 * 9 '8 -1M62 1M62 M20 HVAC PIPING PLAN A 04 24 01 * 9 —:8 -1 M63 1M63 . M21 HVAC PIPING PLAN A 04 24 01 * 9— ':8 -2M61 2M61 M22 HVAC PIPING PLAN A 04 24 01 * 9— •8 -2M62 2M62 M23 HVAC PIPING PLAN A 04 24 01 * 9— 8 -2M63 2M63 M24 HVAC PIPING PLAN A 04 24 01 * 9— :8 -1M260 1M260 M25 FIRE PROTECTION PLAN B 04 24 01 * 9 98 —1 M261 1M261 M26 FIRE PROTECTION PLAN B 04 24 01 * • 98 -1M262 1M262 M27 FIRE PROTECTION PLAN D 04 24 01 * ' —98 -1 M263 1M263 M28 FIRE PROTECTION PLAN B 04 24 01 * — 98 -2M260 2M260 M29 FIRE PROTECTION PLAN A 04 24 01 * '- 98 -2M261 2M261 M30 FIRE PROTECTION PLAN B 04 24 01 * '- 98 -2M262 2M262 M31 FIRE PROTECTION PLAN A 04 24 01 * — 98 -2M263 2M263 M32 FIRE PROTECTION PLAN A 04 24 01 * •- 98 —M517 M517 M33 SEISMIC BRACING DETAILS — 04 24 01 9 98— RFA1OR RFA1OR A20 STRUCTURAL A 04 24 01 9 — "8 —S1 S1 S1 ELECTRICAL — 04 24 01 * ' 98-1E10 1E10 E12 PARTIAL LIGHTING PLAN — 04 24 01 * - - 98 -1E11 1E11 E13 ' PARTIAL LIGHTING PLAN — 04 24 01 * —98-1E12 1E12 E14 PARTIAL LIGHTING PLAN — 04 24 01 * —98-1E13 1E13 El5 PARTIAL LIGHTING PLAN — 04 24 01 * J- 98 -2E10 2E10 E16 PARTIAL LIGHTING PLAN — 04 24 01 * 9 98 -2E11 2E11 Ell PARTIAL LIGHTING PLAN — 04 24 01 *. 9 •8 -2E12 2E12 E18 PARTIAL LIGHTING PLAN — 04 24 01 * 9— '•8 -2E13 2E13 El9 PARTIAL LIGHTING PLAN — 04 24 01 * 9 -9: S450 S450 S10 PARTIAL PLANS — 04 24 01 9- 9 : —S451 S451 S11 PARTIAL PLANS — 04 24 01 9- 91 —S500 S500 S12 SECTIONS AND DETAILS — 04 24 01 * 9— •: —S501 5501 S13 SECTIONS AND DETAILS — 04 24 01 * 9— ': —S502 S502 S14 SECTIONS AND DETAILS — 04 24 01 * 9— •. —S503 S503 S15 SECTIONS AND DETAILS — RECEIVO CITY OF TUMV * 9 —• 8 -1 E13R 1E13R E4 PARTIAL LIGHTING PLAN — FEB 3 * 9— '.8 -2E1OR 2E1OR E5 v r PMI r7s■ rs���_ vill II 11 NI Mil I: PERMIT CP T * 9 98 -2E11R 2E11R � r PARTIAL UGHTING PLAN — 04 24 01 * 9 98 -2E12R 2E12R E7 PARTIAL LIGHTING PLAN — 04 24 01 A • 98 -2E13R 2E13R E8 PARTIAL LIGHTING PLAN — 04 24 01 • 98 -1E6OR 1E6OR E9 PARTIAL 208Y/120V POWER PLAN — 04 24 01 ) 1E61R E10 PARTIAL 208Y/120V POWER PLAN — 04 24 01 l 1E63R Ell PARTIAL 208Y/120V POWER PLAN — 04 24 01 DRAWING INDEX REVISED 2.21.02 D' WING Ne SHEET N0. SEQ. N0. SHEET TITLE REV N0. DATE > APPROVED DATE Q ZIPA27�a ® ARCHITECTURAL ACCEPTABILITY THIS DESIGN AND /OR IS APPROVED DRAWN > * 9— '8 -1A10 1A10 A21 PARTIAL FLOOR PLAN C 04 24 01 > * 9 e8 -1All 1A11 A22 PARTIAL FLOOR PLAN F 04 24 01 * 9 W8 -1Al2 1Al2 A23 PARTIAL FLOOR PLAN F 04 24 01 * 9 '8 -1A13 1A13 A24 PARTIAL FLOOR PLAN F 04 24 01 A 9 :8 -2A10 2A10 A25 PARTIAL FLOOR PLAN E 04 24 01 * 9— •8 -2A11 2A11 A26 PARTIAL FLOOR PLAN D 04 24 01 * 9— • 1 -2Al2 2Al2 A27 PARTIAL FLOOR PLAN C 04 24 01 * 9 -9: 2A13 2A13 A28 PARTIAL FLOOR PLAN C 04 24 01 CHECKED 9- 9. —A60 A60 A29 EXTERIOR ELEVATIONS C 04 24 01 * 9— .T -1A280 1A280 A30 REFLECTED CEILING PLAN A 04 24 01 * 9— •< -1A281 1A281 A31 REFLECTED CEILING ; PLAN A 04 24 01 * 9— •. -1A282 2A282 A32 REFLECTED CEILING PLAN B 04 24 01 * 9— •1 -1A283 2A283 A33 REFLECTED CEILING 'PLAN B 04 24 01 * 9 -9 % -2A280 2A280 A34 REFLECTED CEILING 'PLAN A 04 24 01 * 9 -9: 2A281 2A281 A35 REFLECTED CEIUNGI'PLAN A 04 24 01 * 9-9; 2A282 2A282 A36 REFLECTED CEILING PLAN B _ 04 24 01 * 9- 91 -2A283 2A283 A37 REFLECTED CEILING 'PLAN A 04 24 01 * 9— •4—A350 A350 A38 DOOR SCHEDULE _ 04 24 01 * 9— 8—A501 A501 A39 SECTIONS AND DETAILS D 04 24 01 * 9 .8 -A502 A502 A40 SECTIONS AND DETAILS _ 04 24.01 * 9 48 —A503 A503 A41 SECTIONS AND DETAILS — 04 24 01 * 9 •8 —A504 A504 A42 SECTIONS AND DETAILS A 04 24 01 * 9 '8 —A505 A505 A43 SECTIONS AND DETAILS _ 04 24 01 * 9 •8 —RFA10 RFA10 A44 ROOF PLAN A 04 24 01 * 9 98- 2A283R 2A283R A19 REFLECTED CEILING PLAN A 04 24 01 9 98— RFA1OR RFA1OR A20 STRUCTURAL A 04 24 01 9 — "8 —S1 S1 S1 ABBREVIATIONS, LEGEND AND DRAWING LIST — 04 24 01 9 —'8 —S2 S2 S2 GENERAL NOTES — 04 24 01 * 9 •8 —S2A S2A S3 GENERAL NOTES — 04 24 01 * • 98 -1510 1510 S4 FOUNDATION PLAN ':` — 04 24 01 * ' -98 -25110 25110 S5 SECOND FLOOR FRAMING PLAN — 04 24 01 * • 98- RFS160 RFS160 S6 ROOF FRAMING PLANT — 04 24 01 * 9— :8 —S280 5280 S7 TYPICAL CONCRETE; DETAILS — 04 24 01 * 9- 9: —S320 S320 S8 BRACED FRAME ELEVATIONS AND DETAILS — 04 24 01 * 9 -9: —5400 5400 S9 TYPICAL SHEET DETAILS — 04 24 01 * 9 -9: S450 S450 S10 PARTIAL PLANS — 04 24 01 9- 9 : —S451 S451 S11 PARTIAL PLANS — 04 24 01 9- 91 —S500 S500 S12 SECTIONS AND DETAILS — 04 24 01 * 9— •: —S501 5501 S13 SECTIONS AND DETAILS — 04 24 01 * 9— ': —S502 S502 S14 SECTIONS AND DETAILS — 04 24 01 * 9— •. —S503 S503 S15 SECTIONS AND DETAILS — 04 24 01 * 9 —• 8 -1 E13R 1E13R E4 PARTIAL LIGHTING PLAN — 04 24 01 * 9— '.8 -2E1OR 2E1OR E5 v r PMI r7s■ rs���_ vill II 11 NI Mil I: P!! * 9 98 -2E11R 2E11R � r PARTIAL UGHTING PLAN — 04 24 01 * 9 98 -2E12R 2E12R E7 PARTIAL LIGHTING PLAN — 04 24 01 A • 98 -2E13R 2E13R E8 PARTIAL LIGHTING PLAN — 04 24 01 • 98 -1E6OR 1E6OR E9 PARTIAL 208Y/120V POWER PLAN — 04 24 01 DRAWING INDEX REVISED 2.21.02 DI'AWING SHEET N0. APPROVED SHEET TITLE REV N0. DATE BY APPROVED DATE Q ZIPA27�a ® GENERAL ACCEPTABILITY THIS DESIGN AND /OR IS APPROVED DRAWN * • 98 —A0 GO — TITLE SHEET A 04 24 01 * • 98 —G1 G1.1 — SHEET INDEX A 04 24 01 • 98 —G1 G2 — ABBREVIATIONS AND SYMBOLS C 04 24 01 STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 -05 DLR GROUP GM 2.21.02 A 9 98 -1A01 1A01 Al 1ST FLOOR EXITING PLAN E 04 24 01 * 9 •8 -2A01 2A01 A2 2ND FLOOR EXITING PLAN A 04 24 01 • ARCHITECTURAL REMOVAL CHECKED 9- 9: —lAlOR 1A1OR A3 PARTIAL FLOOR PLAN C 04 24 01 9- 9: -1A11R 1A11R A4 PARTIAL FLOOR PLAN F 04 24 01 9— • : -1Al2R 1Al2R A5 PARTIAL FLOOR PLAN F 04 24 01 COMP NO. 9— •: -1A13R 1A13R A6 PARTIAL FLOOR PLAN F 04 24 01 9— •: -2A1OR 2A OR A7 PARTIAL FLOOR PLAN E 04 24 01 9— : -2A11R 2A11R A8 PARTIAL FLOOR PLAN D 04 24 01 9— '8 -2Al2R 2Al2R A9 PARTIAL FLOOR PLAN C 04 24 01 9 18 -2A13R 2A13R A10 PARTIAL FLOOR PLAN C 04 24 01 9 ''8 —A6OR A6OR All EXTERIOR ELEVATIONS — 04 24 01 * 9 •8- 1A280R 1A28OR Al2 REFLECTED CEILING PLAN A 04 24 01 * 9 98- 1A281R 1A281R A13 REFLECTED CEILING PLAN A 04 24 01 A 9 98- 1A282R 1A282R Al4 REFLECTED CEILING PLAN B 04 24 01 * 9 98- 1A283R 1A283R Al5 REFLECTED CEILING PLAN B 04 24 01 * 9 98- 2A280R 2A280R Al6 REFLECTED CEILING PLAN A 04 24 01 * 9 98- 2A281R 2A281R A17 REFLECTED CEILING PLAN A 04 24 01 * 9 98- 2A282R 2A282R Al8 REFLECTED CEILING PLAN A 04 24 01 * 9 98- 2A283R 2A283R A19 REFLECTED CEILING PLAN A 04 24 01 9 98— RFA1OR RFA1OR A20 ROOF PLAN A 04 24 01 MECHANICAL REMOVAL * 9 98 -1M1OR 1M1OR MI HVAC REMOVAL PLAN B 04 24 01 * •- 98 -1M11R 1M11R M2 HVAC REMOVAL PLAN F 04 24 01 * `- 98 -1M12R 1M12R M3 HVAC REMOVAL PLAN C 04 24 01 * • 98 -1M13R 1M13R M4 HVAC REMOVAL PLAN D 04 24 01 * • 98 -2M1OR 2M1OR M5 HVAC REMOVAL PLAN B 04 24 01 * 9 48 -2M11R 2M11R M6 HVAC REMOVAL PLAN D 04 24 01 * 9 = 8 -2M12R 2M12R M7 HVAC REMOVAL PLAN A 04 24 01 * 9— •: -2M13R 2M13R M8 HVAC REMOVAL PLAN A 04 24 01 ELECTRICAL REMOVAL * 9 48 -1 E1 OR 1 E1 OR El PARTIAL LIGHTING PLAN — 04 24 01 * 9— '8 -1E11R 1E11R E2 PARTIAL LIGHTING PLAN — 04 24 01 * 9— •8 -1E12R 1E12R E3 PARTIAL LIGHTING PLAN — 04 24 01 * 9 —• 8 -1 E13R 1E13R E4 PARTIAL LIGHTING PLAN — 04 24 01 * 9— '.8 -2E1OR 2E1OR E5 PARTIAL LIGHTING PLAN — 04 24 01 * 9 98 -2E11R 2E11R E6 PARTIAL UGHTING PLAN — 04 24 01 * 9 98 -2E12R 2E12R E7 PARTIAL LIGHTING PLAN — 04 24 01 A • 98 -2E13R 2E13R E8 PARTIAL LIGHTING PLAN — 04 24 01 • 98 -1E6OR 1E6OR E9 PARTIAL 208Y/120V POWER PLAN — 04 24 01 - 98 -1E61R 1E61R E10 PARTIAL 208Y/120V POWER PLAN — 04 24 01 — 98 -1E63R 1E63R Ell PARTIAL 208Y/120V POWER PLAN — 04 24 01 SYM REVISION - BY APPROVED DATE SYM REVISION BY APPROVED DATE Q ZIPA27�a ® 5118 \ REGISTERED ` ARCHITECT ' � � ' ,� LO & TT KRDSE T E O• WASHINGTON ACCEPTABILITY THIS DESIGN AND /OR IS APPROVED DRAWN DATE SUBTITLE SHEET INDEX REVISION SYMBOL J #703445 -05 SHEET B DATE 02.21.02 A BUILDING 9 -98 STRUCTURAL UPGRADE 703445 -03 DLR GROUP GM 04 24 01 CHECKED B STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 -05 DLR GROUP GM 2.21.02 APPROVED BY DEPT. DATE ENGINEER T TLE APP1- IITC(`TI IPAI BUILDING 9 STRUCTURAL UPGRADE B UILDING 9-98 UUACTED n r G1.1 CHECKED APPROVED JOB NO. J #703445 -05 COMP NO. APPROVED DWG NO. no n, LA R SY A RELOCATE BUSINESS /FIN 125 105 125 125 125 ii4-1911 90 111111100141 ---!m=-1--17 ; : =r' �.. 18 -0" 14/10 16/1 20/12 O O O O O 120 REVISION BUILDING 9 -98 STRUCTURAL UPGRADE J #90034 -00 J #703445 -05 STRUCTURAL UPGRADE DE— SCOPING REVISION J #703445 -05 BY JH DLR GROUP DLR GROUP APPROVED RP GM DATE 4/15/99 04.24.01 02.21.02 REVISION FLOOR PLAN SCALE: 1/8 " =1 -0" BY APPROVED DATE ?LAeritrinfiva. MOo ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED ROVED BY DEPT. DATE DRAWN K.BUN CHECKED A ANOINEtN CH CKED APPR APPROVED DATE 4.3.01 UBTNLE TITLE 1Arnu AAlInAl "A,71-n REMOVAL HVAC PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 CONSTRUCTION NOTES: REMOVE LIGHT — TROFFER STYLE DIFFUSERS AND ASSOCIATED DUCTWORK IN CORRIDOR ONLY AS REQUIRED FOR CMU WALL DEMOLITION AND BRACING. PRESERVE AND PROTECT EXISTING DIFFUSERS FOR RE— INSTALLATION. CURRENT REVISION J #703445 -05 SHEET JOB N0. 4703445 -05 DWG NO. 1 M13 KEY PLAN SCALE NONE SYMBOL C 1M1OR RECEIVED CTTY OF TUKWiLA FEC 2 2002 PERMIT CENTER A 4/15/99 DATE 02.21.02 COMP N0. z SYM REDRAWN ADDED VAV BOX AT J -3 ADDED VAV BOX AT G -3 RELOCATE BUSINESS / FIN. REVISION RELOCATE HR /CONTRACTS /PRO DEV J #774011 -LO J #790773 -LO J #1 90034 -00 J190079 -00 BY KB SR KGP JN KGP APPROVED DATE 1.15.97 8/19/97 3/19/97 4/15/99 6/25/99 SYM 70 REVISION F BUILDING 9 -98 STRUCTURAL UPGRADE 70 J #703445 -05 G STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 -05 BY DLR GROUP DLR GROUP HVAC PLAN SCALE: 1/8" = 1' -0" APPROVED RP GM DATE 04.24.01 02.21.02 UP 0 100 100 0 70 70 tia 4 WiMO . 1.11 ® ®iii via di unairAulii �®Am 0 0 0 0 am .4141 ■fi l�11 2 1 mY O ° email ' Ei EIMIMI iii . 1_ 104 u 74111 ma 104 B/P MACHINE 0 j v 2 16 15 70 70 9 90® 90 A 1 " 12 90 CCESA DOOR I��I =MI 10' -4" 10' -9 "- �" '��� v __ 70 111000011 . -, j1 n 181 ! L0 n r �_ ini. j o 70 70 I■ 1 180 I ii lli . O 105C , 2 ] / . .... -:i��- 600 ,..... „..... -:,.. 1 90 kgral.P.L. � IpO 11 250 =� 250 .. ' 5C _ " ►�� �r s v ' 1 i 84 B P 100 © IN o f EXHA ST � M ```lam �� �� 36/14 1 ® II I �, , ® L� ~� �P 250 1f -_� 10� ' 110 =I � r m " ii iii 70 I I tri Ilin 29/20 13%20 105 6111 r 110 2900 fl290 ►� 70 rot. ' 110 90 90 I ur N 1058 05 1 I:(('P1290 280 70 �, 90 90 90 © II FF� 44-∎. 7 ,� p . ,OD fill ° 9D ■ PA © , 115 ❑t >:zx: >::> �� Il wfl, - Flex R ,� Jim.' o �, zJ ELE I.TOR 115 STAIR 115 200 212 12 rti 10 © v 200 200 105 200 f 0 05- 05 105 05C ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE 105 DRAWN P.DUARTE CHECKED ENGINEER CHECKED APPROVED APPROVED DATE 4.5.01 MO-o3J MFC:HANICAI MACTFR REMOVAL HVAC PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 (:C11 F -I /1 -1l LEGEND: O CEILING DIFFUSER, ARROW INDICATE AIR THROW 0 tti V 11 N TRUC DUCT, SINGLE LINE RETURN /RELIEF GRILLE CEILING TYPE NON- DUCTED VOLUME DAMPER { DUCT, DOUBLE LINE I— 0 THERMOSTAT, WALL w THERMOSTAT, CEILING 1. REMOVE UGHT - TROFFER STYLE DIFFUSERS AND ASSOCIATED DUCTWORK IN CORRIDOR ONLY AS REQUIRED FOR CMU WALL DEMOU11ON AND BRACING. PRESERVE AND PROTECT EXISTING DIFFUSERS FOR RE- INSTALLATION. NOT USED. CAP AIR CELL OPENING IN DECK ABOVE. EXIST. DIFFUSERS OR MIXING BOX WILL INTERFERE WITH NEW X -BRACE LOCATION. REMOVE AND RETAIN FOR REINSTALLATION PER 1M11. EXIST. DUCTWORK CONFUCTS WITH NEW X -BRACE LOCATION. REMOVE DUCTS MINIMUM OF 7' -0" BOTH NORTH AND SOUTH OF GRIDUNE. 7 TO FACIUTATE REISTALLATION PER 1M11. © EXIST. MIXING BOX AND DISTRIBUTION SYSTEM (DUCTWORK & DIFFUSERS) WILL BE IN THE WAY OF CONSTRUCTING X- BRACE. REMOVE AND RETAIN FOR REINSTALLATION IN SAME LOCATIONS. EXIST. DIFFUSER OR GRILLE CONFLICTS WITH NEW X -BRACE CONSTRUCTION. REMOVE AND RETAIN FOR REINSTALLATION IN SAME LOCATION. CURRENT REVISION J #190079 -00 SHEEP JOB N0. 1M11R J #190079 -00 1M10 1Mu 1M12 e O KEY PLAN SUL NONE SYMBOL DWG NO. 0 -0A -11111 RECENED CRY OF TUI(Wi PERMMCEWER —O —Q DATE 02.21.02 COMP NO 2 SYM A REDRAWN SEE DETAIL 1M12 9 -98 REWORK OFFICE AREA RELOCATE DIFFUSER I I. If PA 12/12 - BARS 300 120 120 12/12 TYP) 1M12 M512 106E 60 400 f, 70 42/20 36/14 15/20 106 27 20 400 21/12 61 REVISION BUILDING 9 -98 STRUCTURAL UPGRADE 110 J #180166 -04 J #190077 -00 J #703445 -05 STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 - BY K. BUN CFH DMV /RWS DLR GROUP DLR GROUP 5' -0" APPROVED " 660 � ^ 0 110 ' 1 110 I RWS DOT RP GM DATE 1 -15 -97 3.4.99 08.18.99 04.24.01 02.21.02 sy RENSION ® O FLOOR PLAN SCALE: 1/8 " =1' -0" 8Y APPROVED DATE 115G1 Z ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PROVED BY DEPT. DATE DRAWN K. BUN CHECKED GIN CHECKED APPROVED APPROVED DATE 1 - 15 - 97 SUBTITLE MECHANICAL MASTER HVAC PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 COL. F- L/1 -13 LEGEND: t--- -1 DUCT, SINGLE LINE O CEILING DIFFUSER, ARROW INDICATE AIR THROW 0 0 D.C. [REM OVAL CURREM REVISION J#703445 -05 SHEET RETURN /RELIEF GRILLE CEILING TYPE NON- DUCTED VOLUME DAMPER t 0 THERMOSTAT, WALL m THERMOSTAT, CEILING 0 ►. T r :, 1 4 DUCT, DOUBLE UNE REMOVE LIGHT- TROFFER STYLE DIFFUSERS AND ASSOCIATED DUCTWORK IN CORRIDOR ONLY AS REQUIRED FOR CMU WALL DEMOLITION AND BRACING. PRESERVE AND PROTECT EXISTING DIFFUSERS FOR RE- INSTALLATION. NOT USED. CAP AIR OPENING IN DECK ABOVE. EXIST. DIFFUSERS OR MIXING BOX WILL INTERFERE WITH NEW X -BRACE LOCATION. REMOVE AND RETAIN FOR REINSTALLATION PER 1M12. EXIST. DUCTWORK CONFLICTS WITH NEW X -BRACE LOCATION. REMOVE DUCTS MINIMUM OF 7' -0" BOTH NORTH AND SOUTH OF GRIDLINE. 7 TO FACILITATE REISTALLATION PER 1M12. DELETE MIXING BOX AND ASSOCIATED DIFFUSERS. RETURN TO BOEING FOR SURPLUS. EXIST. DIFFUSER CONFLICTS WITH NEW X -BRACE CONSTRUCTION. REMOVE AND RETAIN FOR REINSTALLATION IN SAME LOCATION. RECE VED CITY OF TUKIMLp FE3 2 PERMIT CENTER 1810 1811 KEY PLAN SCALE NONE SYMBOL 1M12: JOB Na 4703445 -05 DWG N0. 9- 98 -1M12 DATE 02.21.02 COMP N0. M3 SYM A 9 -98 REWORK OFFICE AREA EXTRS: RELOCATE ESTIMATING EXTRS: RELOCATE ESTIMATING REVISION BUILDING 9 -98 STRUCTURAL UPGRADE II WIER - 1 1 : Poi WI 1- 0 1 • R• ��,,s1 c ^: I PA 7 ;' wr, ZE ' sm mfr ii t ra 100 100 C 0 \ MOW f_Dr C_ I Imo"_ IRS' 3 it 'ill RN 100 100 100 100 100C 00 100 J #180166 -04 J #190083 -00 J# 190083 -00 J #703445 -05 STRUCTURAL UPGRADE DE— SCORING REVISION J #703445 -05 BY RAD CH /KB CFH DLR GROUP DLR GROUP APPROVED RWS RWS RWS RP GM DATE 3.4.99 9.3.99 9.14.99 04.24.01 02.21.02 SYM 15 REVISION FIRST FLOOR PLAN SCALE: 1/8 " =1' -0" BY APPROVED DATE 115 90 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. WC,UANIIPAI UACTCD HVAC FIRST FLOOR PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: O CEIUNG DIFFUSER, ARROW INDICATE AIR THROW DUCT, DOUBLE LINE OT THERMOSTAT, WALL O THERMOSTAT, CEILING CONSTRUCTION NOTES: REMOVE UGHT - TROFFER STYLE DIFFUSERS AND ASSOCIATED DUCTWORK IN CORRIDOR ONLY AS REQUIRED FOR CMU WALL DEMOLITION AND BRACING. PRESERVE AND PROTECT EXISTING DIFFUSERS FOR RE- INSTALLATION. ItAf\ - del REMOVAL CURRENT REVISION J #703445 -05 SHEET JOB NO. DWG N0. DUCT, SINGLE LINE RETURN /RELIEF GRILLE CEILING TYPE NON- DUCTED VOLUME DAMPER KEY PLAN SCALE: NONE 1 13 R J #703445 -05 RECEIVED cm of nncw;w 5202 R ERMITCENTE R DATE 02.21.02 COMP NO. M4 A REDRAWN ADD CEILING DIFFUSERS BUILDING 9 -98 STRUCTURAL UPGRADE i 0 400 400 „tr.,. a/ � ��i i i 1 1 i Ji _ GiuM •L•"..,!IiI mi glp �J ! m■nI c L A� 1 JZ ; _ 80 ifiLijill I U a© O O INI IN i Ell , i li CD i'P i 1 1 SA111 �� ' a R [[ ,. 13 12 111.1 � ■� - - W n� an iii � r�. r amm �l �.� t= v 84 � �- t � J il.7ii��Ku==-- -r=u.o f O t moo= 2/ 0 _II A 107 I Ilatill C IM 6 "c 115 80 80 c \ 80 11 cid" o so figEl 807 801�� 90 107 N\ 80 90 I, 80 90 80 80 12 /I 80 80 80 • RN SILENCER IAC HUNG TIGHT EAM 15 100 100 800 15 4 o fv ir+� c*i FU ��— I 80 100 IIIIIIIIIII +� 150 85 ® 85 0 2 ® Q QQ *QQr alffil E IN 401 N F IU Imo 11.iI 2/ 80 80 80 80 1 00 80 80 80 80 80 0 14 10 7 107\ 80 80 80 10 14/12 80 , 80 20 12 J #701565 -00 J #703445 -05 STRUCTURAL UPGRADE DE-SCOPING REVISIONS J #703445 -05 KB DMV DLR GROUP DLR GROUP RP 04.24.01 GM 05.24.00 02.21.02 107 � c \ 107 10 O O FLOOR PLAN SCALE: 1/8 " =1' -0 24/24 RETURN AIR DUCT UP THRU CAPPED CEILING O O 80 O CHECKED ENGINEER CHECKED ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PROVED MY DEPT. DATE DRAWN K.BUN APPROVP O - DATE 1.16.97 O D a- HVAC PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.2 LEGEND: 0 I DUCT, SINGLE LINE O CEILING DIFFUSER, ARROW INDICATE AIR THROW RETURN /RELIEF GRILLE CEILING TYPE NON- DUCTED REMOVAL I OT THERMOSTAT. WALL O THERMOSTAT, CEIANG SHEET JOB NO. VOLUME DAMPER DUCT, DOUBLE LINE CONSTRUCTION NOTES: REMOVE LIGHT - TROFFER STYLE DIFFUSERS AND ASSOCIATED DUCTWORK IN CORRIDOR ONLY AS REQUIRED FOR CMU WALL DEMOLITION AND BRACING. PRESERVE AND PROTECT EXISTING DIFFUSERS FOR RE-INSTALLATION. a) CURRENT REVISION SYMBOL J #703445 -05 C 2M1OR J #703445 -05 KEY PLAN SCNE: NONE =moo., PERMIT CENTER DA 02.21.02 M5 COMP NO SYM A REDRAWN ADD CEILING DIFFUSER ADD CEILING DIFFUSER r-� FROM 1ST FLR 12x12 80 NE 300 CFM ( 36/14 11 kk $1 I 48/24 DUCT SILENC FOR RETURN AIR LAC g9,-,T012 MDL 75 HUNG Tl el, 'A%; +iY 4$0 TO BEAM TIP 3 i'i THIS SHEET. MANBARA SECURED WAIL i1 � '� � % re ' - RA 24/24 LAC #75 DUCT SILENCERS (MANBARS T SECURED WALL) REVISION 12" SQ. DIFF /REPLACING LIGHT DIFF. J #180014 J #792311 L0 J #795417 -00 BY KB RAD DMV DMV APPROVED DATE 1.15.97 12.4.98 05.26.99 01.05.00 SYM 80 REVISION O STRUCTURAL UPGRADE DE- SCOPING REVISION J8703445 -05 BY DLR GROUP APPROVED GM FLOOR PLAN SCALE: 1 /8 " =1' -0" DATE 02.21.02 O O O gin MO-O21 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PROVED BY DEPT DATE Ce T T 105 105 105 105 :1 a O O REMOVAL BTEELE HVAC PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: DUCT, SINGLE LINE O CEILING DIFFUSER, ARROW INDICATE AIR THROW RETURN /RELIEF GRILLE ® CEILING TYPE NON- DUCTED VOLUME DAMPER { DUCT, DOUBLE LINE 0 THERMOSTAT, WALL THERMOSTAT, CEILING CONSTRUCTION NOTES: REMOVE LIGHT - TROFFER STYLE DIFFUSERS AND ASSOCIATED DUCTWORK IN CORRIDOR ONLY AS REQUIRED FOR CMU WALL DEMOLITION AND BRACING. PRESERVE AND PROTECT EXISTING DIFFUSERS FOR RE- INSTALLATION. ® EXIST. MIXING BOX AND DISTRIBUTION SYSTEM (DUCTWORK & DIFFUSERS) WILL BE IN THE WAY OF CONSTRUCTING X- BRACE. REMOVE AND RETAIN FOR REINSTALLATION IN SAME LOCATIONS. EXIST. DIFFUSER CONFLICTS WITH NEW X -BRACE CONSTRUCTION_ REMOVE AND RETAIN FOR REINSTALLATION IN SAME LOCATION. ® REMOVE RA SILENCER AND RETURN TO BOEING FOR SURPLUS. REMOVE AND RETAIN FOR REINSTALLATION. crrroF Vw',w I 1 U8 CURRENT REVISION J #703445 -05 SHEET KEY PLAN SCA. NONE SYMBOL 2M11R JO J #703445 -05 DWG NO. REMOVE MIXING BOX AND ASSOCIATED DIFFUSERS. RETURN TO BOEING FOR SURPLUS. CAP AIR CELL OPENING IN DECK ABOVE. EXIST. DIFFUSERS OR MIXING BOX WILL INTERFERE WITH NEW X -BRACE LOCATION. REMOVE AND RETAIN FOR REINSTALLATION PER 2M11. EXIST. DUCTWORK CONFLICTS WITH NEW X -BRACE LOCATION. REMOVE DUCTS MINIMUM OF 7-0' BOTH NORTH AND SOUTH OF GRIDLINE.7 TO FACILITATE REISTALLATION PER 2M11. COMP NO. SATE 02.21.02 M6 SYM A REDRAWN 13 12 11 10 REVISION BUILDING 9 -98 STRUCTURAL UPGRADE J #703445 -05 STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 -05 BY KB DLR GROUP DLR GROUP 1.15.97 RP 04.24.01 GM 02.07.02 0 0 FLOOR PLAN SCALE: 1/8 " =1' -0" 80 g LASIPMEIAK ® o' 80 PROVED BY O O M ACCEPTABILITY THIS DESIGN AND /OR SPECIBCA11ON IS APPROVED DEPT. DATE DRAWN K.BUN CHECKED CHECKED APPROVED DATE 1.15.97 TITLE SIDLE O O HVAC PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.2 LEGEND: © CEILING DIFFUSER, ARROW INDICATE AIR THROW DUCT, SINGLE LINE RETURN /RELIEF GRILLE CEILING TYPE NON- DUCTED -I VOLUME DAMPER GENERAL NOTES: CURRENT REVISION J #703445 -05 SHEEP JOB NO. DUCT, DOUBLE LINE OT THERMOSTAT, WALL 0 THERMOSTAT, CEILING CONSTRUCTION NOTES: 1. REMOVE UGHT- TROFFER STYLE AND EXISTING 2'X2' DIFFUSERS AND ASSOCIATED DUCTWORK IN CORRIDOR ONLY AS REQUIRED FOR CMU WALL DEMOLITION AND BRACING. PRESERVE AND PROTECT EXISTING DIFFUSERS FOR RE- INSTALLATION. NOT USED. J #703445 -05 CAP AIR CELL OPENING IN DECK ABOVE. EXIST. DIFFUSERS OR MIXING BOX WILL INTERFERE WTH NEW X -BRACE LOCATION. REMOVE AND RETAIN FOR REINSTALLATION PER 1M10. EXIST. DUCTWORK CONFLICTS WITH NEW X -BRACE LOCATION. REMOVE DUCTS MINIMUM OF 7' -0' BOTH NORTH AND SOUTH OF QRIDLINE. 7 TO FACILITATE REISTALLATION PER 1M10. REMOVE MIXING BOX AND ASSOCIATED DIFFUSERS. SURPLUS. EXIST. DIFFUSER CONFLICTS WITH NEW X -BRACE CONSTRUCTION. REMOVE AND RETAIN FOR REINSTALLATION IN SAME LOCATION. SYMBOL 2-12R KEY PLAN SC. NONE DATE • 1 n ^SIT+ n- 75: ^::LS ITER 02.21.02 M7 COMP NO SY A REDRAWN BUILDING 9 -98 STRUCTURAL UPGRADE lu I Cpl _ 4 00 �_ IU L • � 11 n A C 2, ik U U ® C _ s 400 upW DA!! 1 C ✓7 U v � N V ir 2 250 8 80 C-t- 0 C 107 80 2b0 17 50 115 85 85 90 n• J ' 14 ■ 12 14 10 I _ _ „ -�� 104 I�_� i r��� 't'�S]iLliYJ�[caf[!i[f7WLa1, ■tn k "SPAM ow �� -, WiTill H-7 A A � ;^ tVille. : m.o N 0 I . Fl ER _ C C, BO' ti 2 (6 gTYP) C "1 CFM 3ITYP) 20 90 130 10 I 3i 00 00 Ail 3 I.a. 27 0 I •c 1 �p 1 'LI 'I (/r 01 i / 1 100 n 6Y f � N 4112 1B1 U � C 11 ■ I ` 300 '2 �Q - 1! (■�\ -, — ..� . ._ II0 rr 300 DI 12 12 13 12 17. 8 ^ Ed ! !)i l 300 2 370 10 300 110 0 350 300 00 200 00 100 270 ®350 2 100 350 N .f:fl 11 - [' 235 3 3 235 235 3501 30 REVISION J #90034 -00 4703445 -05 STRUCTURAL UPGRADE DE- SCOPING REVISION 4703445 -05 BY KB DLR GROUP DLR GROUP APPROVED RP GM DATE 1.15.97 04.24.01 02.21.02 R/A -22x22 EILIN GRILLE TO 22 18 FILTER BOX REVISION FLOOR PLAN SCALE: 1/8 " =1' -0" BY APPROVED DATE gLAirazezAw. O ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED ROVED BY DEPT. DATE DRAWN K.BUN GI EE CHECKED APPROVED O 0 DATE 1.15.97 BT1TLE O O IVI U koa l REMOVAL HVAC PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.2 LEGEND: 1 1 DUCT, SINGLE LINE 1 O CEILING DIFFUSER, ARROW INDICATE AIR THROW 0 1"T2 RETURN /RELIEF GRILLE CEILING TYPE NON- DUCTED VOLUME DAMPER DUCT, DOUBLE LINE THERMOSTAT, WALL THERMOSTAT, CEILING NSTRUCTION NO S 1. REMOVE LIGHT - TROFFER STYLE AND 2'X2' DIFFUSERS AND ASSOCIATED DUCTWORK IN CORRIDOR ONLY AS REQUIRED FOR CMU WALL DEMOLITION AND BRACING. PRESERVE AND PROTECT EXISTING DIFFUSERS FOR RE- INSTALLATION. CURRENT REVISION J #703445 -05 SHEET J #703445 -05 KEY PLAN SLUE: NONE 2M13R JOB N SYMBOL B DATE 02.21.02 M8 COMP NO PART 1 GENERAL 1A SUMMARY A. 1.2 REGULATORY AGENCIES A. All work shall be in conformance with the requirements of the applicable codes. 1.3 SEISMIC ZONE A. This project is located in Seismic Zone 3 Importance Factor 1.0. 1.4. SUBMITTALS A. General: PART 2 - PRODUCTS 2.1 PIPE ATTACHMENTS A. B. Materials C. D. B. Shop Drawings: C. Product Data: REVISION PIPE SUPPORTS, ANCHORS, AND SEISMIC RESTRAINTS Included in this Section are pipe hangers, pipe supports, piping expansion.. devices, pipe guides, and seismic restraints, and structural attachments for piping, ductwork and equipment. 1. Mechanical equipment shall include the following items to the extent required on plans or in other sections of these specifications: a. HVAC Equipment (includes only equip in ceiling, no rooftop) b. HVAC Ductwork c. HVAC Piping 1. Detail drawings along with catalog cuts, templates, and erection and installation details for sway bracing shall be submitted. 2. Submittals shall be complete in detail. 3. Submittals shall indicate thickness, type, grade, class of metal, and dimensions. 4. Submittals shall show construction details, reinforcement, anchorage, and installation with relation to the building construction. 1. Ceiling hanger attachments. 2. Equipment shop drawings, for coordination of seismic restraints. 1. Pipe hangers and supports. 2. Structural attachments. 3. Seismic restraints. 4. Sway bracing. General 1. Products shall be in accordance with MSS SP 58 and MSS SP 69. 1. Hanger material: Match piping material at point of contact with piping. Manufacturer a. Black steel pipe - Carbon steel, cast iron or malleable iron, b. Galvanizeu steel pipe - Carbon steel, cast iron or malleable with zinc coating. c. Copper tubing - Carbon steel or malleable iron, plastic coated. d. Cast iron pipe - Carbon steel, cast iron or malleable iron. e. Plastic pipe - PVC coated, carbon steel. Size 1. Hangers shall be sized to suit the pipe. 2. Hangers on insulated pipe shall be sized to fit over the insulation. 1. Hangers shall be Grinnell, model numbers as listed; B -Line, Michigan Hanger, PHD; Grabler; or equal. BY APPROVED DATE Sow REVISION A. B. C. D. E. F. G. A. Manufacturer Pipe Rings 2.2 INTERMEDIATE SUPPORTS 2.3 STRUCTURAL ATTACHMENTS Hangers shall be Grinnell, model numbers as listed; B -Line, Michigan Hanger, PHD; Grabler; or equal. Steel Pipe: Adjustable wrought, clevis, Grinnell Fig. 260. 2. Copper Pipe: Light weight adjustable wrought clevis copper plated, Grinnell Fig. CT -65. 3. Application: Use only on piping systems where axial movement from thermal expansion is less than 1/2 ". Pipe Clamps 1. Vertical Piping: Unistrut P -1000 channel and Unistrut P -1100 series pipe clamps or equal. Copper pipe clamps for copper pipe. 2. Horizontal Racked Piping: Unistrut P -2024 series clamps for Unistrut channel pipe racks or equal. 3. Grinnell Fig. 127 U- -bolts or Grinnell Fig. CT -124 Tube Straps for structural steel pipe. Pipe Rolls 1. Suspended Pipe: Adjustable swivel pipe rolls, Grinnell Fig. 174. 2. Racked Pipe: Pipe roll stand, Grinnell Fig. 271. 3. Application: Use on piping systems where axial movement from thermal expansion is 1/2" or greater. H. Insulation Saddles and Inserts 1. Saddles: Grinnell Figure 186 -188, size to match insulation thickness. 2. Inserts: Factory fabricated split type shield with galvanized steel jacket and calcium silicate insert: Mechanical Pipe Shields, Thermal Pipe Shields, or equal. Hanger Rods 1. Continuous threaded rod shall be used except where otherwise noted. No chain, wire or perforated strap shall be used. 2. Hot rolled steel rod, ASTM A 36; size to "Code for Pressure Piping ", ANSI B31.1, with safety factor of 5. 3. Hanger Rod Size and Maximum Load: Wall Inserts: Rod Diameter (Inches) 3/8 1/2 5/8 3/4 7/8 1 1 -1/4 1 -1/2 B. Trapeze Pipe Racks Ceiling Inserts: Pipe Size Load at 650 F (Inches) (Pounds) 2 and smaller 2 -1/2 and 3 -1/2 • 4 and 5 6 8 to 12 14 and 16 20 24 Fabricate from structural angles or channels or Unistrut channels to suit weight of piping to be supported. Size for minimum safety factor of 5. Steel Structure Clamps: Beam clamps, channel clamps and bar joist clips, Grinnell or equivalent. Select to suit structural system and meet loading recommendations of manufacturer. 1. 3" and smaller pipe, Grinnell Fig. 285. 2. 3 -1/2" and larger pipe, Grinnell Fig. 281. 3. Multiple pipes on trapeze, Grinnell Fig. 285 or Fig. 281, selected for maximum weight of piping. 1. Unistruts P -3200 series inserts for concrete walls. 2. Unistruts P -1800 series inserts for brick walls. 3. Unistrut P -1000 channels with P -1045 and P -1047 fittings for frame and block walls. BY APPROVED DATE 610 1,130 1,810 2,710 3,770 4,960 8,000 11,630 2.4 2.5 it /MG' C. PIPE ANCHORS A. Except as otherwise shown on the drawings, pipe anchors shall be constructed of structural steel with all welded joints and connections. B. NOT USED 2.6 SEISMIC RESTRAINTS A. B. C. D. E. Wall Inserts: B. 1. Unistruts P -3200 series inserts for concrete walls. 2. Unistruts P -1800 series inserts for brick walls. 3. Unistrut P -1000 channels with P -1045 and P -1047 fittings for frame and block walls. Where Unistrut model numbers are listed, equivalent products of Powerstrut, Superstrut or Ostrut, or equal, may be used. Anchor members and weld areas shall be designed to constrain all axial and rotational stresses in the piping, at the test temperatures and test pressures specified. Anchorage And Bracing of Mechanical Systems: Provide complete seismic anchorage and bracing for the lateral and vertical support of piping, ductwork and mechanical equipment as required by UBC Chapter 16 and SMACNA "Seismic Restraint Manual ", for Seismic Hazard Level (SHL) Coordinate seismic restraints with other work. Seismic restraints for suspended piping which is suspended from spring hangers shall be cable type, to avoid short circuiting the vibration mounts. Cable connector brackets shall have neoprene grommets. Connectors shall be Mason, Amber -Booth or equal. All piping, ductwork and suspended equipment shall have seismic restraints as follows (see Sections 3.2 & 3.3 of: SMACNA manual for complete text): 1. Ductwork: brace all ducts with cross sectional areas of 6 square feet and larger (oval similar), except duct on hangers within 12" of structure 2. Brace all pipes 2 -1/2 inches nominal diameter and larger, except pipes suspended by individual hangers within 12" of structure Materials and Equipment 1. Bolts and Nuts: Squarehead bolts and heavy hexagon nuts, ASME B18.2.1 and ASME B18.2.2, and ASTM A 307 or ASTM A576. 2. Sway Brace: Material used for members listed in "SCHEDULES" of this specification, except for pipes, shall be structural steel conforming with ASTM A 36. Steel pipes shall conform to ASTM A 501. 3. Sway Bracing Cable: Galvanized steel 7 x 19 strand aircraft cable, with electro- galvanized steel swivel anchor fittings and galvanized steel cable clamps. ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED ROVED BY DEPT. DATE DRAWN K. PAULSON CHECKED R. PETERS /ENGINEER R. PETERS CHECKED APPROVED APPROVED DATE 04.24.01 04.24.01 04.24.01 PART 3 - EXECUTION 3.1 INSTALLATION A. B. C. D. E. F. G. H. B. C. D. sownn.E SEISMIC BRACING SPECIFICATIONS TITLE MFCHANI(:AI MASTER BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98 All piping supports and hangers shall provide a means of adjustment for leveling, grading of piping and cold spring movements. All hanger rod lengths shall be sufficient to limit rod displacement from thermal expansion to 4 degrees from vertical. Pipe rings and clamps shall be sized to pass around the outside of the piping insulation. Install vertical piping supports to allow for pipe movement due to thermal expansion and contraction. Piping shall not be hung from other piping. All elements of the support system shall be suitable for the system and shall have a safety factor of not less than 4.0 Supporting elements not specifically specified shall be provided in accordance with SMACNA and NFPA standards. Piping and heavy equipment supports, not otherwise detailed, shall conform to applicable provision of MSS SP- 58 and MSS SP -69. Where it is necessary to frame structural members between existing members or where structural members are used in lieu of commercially manufactured supports, such supplementary steel shall be provided in accordance with the AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings. Welding of structural members, where approved, shall be in accordance with AWS D.1.1. 3.2 HANGER SPACING FOR HORIZONTAL PIPING A. Steel Pipe: Maximum hanger spacing and minimum hanger rod diameters as follows: 1/2", 3/4" 1 ", 1 -1/4" 1 -1/2" 2" 2-1/2", 3" 4" Copper Pipe: Maximum hanger spacing and minimum hanger rod diameters as follows: 1/2 ", 3/4" pipe 1" pipe 1 -1/4 ", 1 -1/2" pipe 2 ", 2 -1/2" pipe 3 ", 4" pipe Plastic Pipe: Maximum hanger spacing as recommended by the manufacturer or as follows; hanger rod diameters 3/8 ". 1/2", 3/4" 1 ", 1 -1/2" 2 ", 2 -1/2" 4" 6" 8" pipe pipe pipe pipe pipe pipe 1. Continuous support troughs may be used instead of individual hangers. 2. Piping shall not sag between hangers. Install additional hangers or supports at concentrated loads such as valves, when required. SHEET JOB NO. G NO. 6 ft. span 7 ft. span 9 ft. span 10 ft. span 12 ft. span 14 ft. span 5 ft. span 7 ft. span 8 ft. span 9 ft. span 10 ft. span pipe 3 ft. sP9E pipe 4 ft. i fru N. pipe 5 ft. Fspaa? pipe 5 -1/2 ft. span, pipe 6 ft. span pipe 7 ft. span pipe 7 -1/2 ft. span CURRENT REVISION J #703445 -05 M1 SYMBOL J #703445 -05 3/8" rod 3/8" rod 3/8" rod 3/8" rod 1/2" rod 5/8" rod 3/8" rod 3/8" rod 3/8" rod 1/2" rod 1/2" rod COMP NO. RECEIVED CITV OF TUKIM(q PERMIT CENTER DATE 04.24.01 M9 SYM REVISION BY APPROVED DATE SYM REVISION 3.3 PIPING ANCHORS, GUIDES AND SUPPORTS 3.7 SPREADERS 3.6 A. B. C. D. E. F. G. A. SWAY BRACES A. B. C. APPROVED Anchor and support all piping to route expansion and contraction in the required direction. Install sufficient guides and anchors to keep pipes in accurate alignment, to direct the expansion movement and to prevent buckling, swaying and undue strain. Use hangers for supporting pipe 2 inches and larger that are fabricated to permit adjustment after erection while still supporting its load. Use wall brackets where pipes are adjacent to walls or other vertical surfaces which may be used for support. Install supports to adequately carry the load and still maintain proper alignment. Space guides according to manufacturer's recommendations except where specified or shown otherwise. Supports for plastic piping shall have 1/4" thick neoprene padding between the pipe and the support. 3.4 EQUIPMENT, PIPING AND DUCTWORK SEISMIC RESTRAINTS General: General: All ductwork and piping shall be provided with seismic restraints in accordance with Seismic Hazard Level (SHL) B of the SMACNA Seismic Restraint Manal: Guidelines for Mechanical Systems dated 1998, Second Edition. 1. Sway braces shall be installed on piping to preclude damage during seismic activity. All bracing shall conform to the arrangements shown on the drawings. Piping grouped for upport on trapeze —type hangers shall be braced at the same intervals as determined by the smallest diameter pipe of the group. Do not fasten sway braces to two dissimilar parts of a building that may respond in a different mode during an earthquake; for example, a wall and a roof. 2. No trapeze —type hanger shall be secured with less than two 1/2 —inch bolts. Bracing rigidly attached to pipe flanges, or similar, shall not be used where it would interfere with thermal expansion of piping. Types of Braces: 1. Transverse Sway Bracing: Transverse sway bracing for steel pipe shall be provided at intervals not to exceed those given in SMACNA Chapter 6 tables. 2. Longitudinal Bracing: Longitudinal bracing for steel pipe shall be provided at intervals not to exceed those given in SMACNA Chapter 6 tables. Fasteners: 1. Anchor Rods, Angles, and Bars: Anchor rods, angles, and bars shall be bolted to either pipe clamps or pipe flanges at one end and cast —in —place concrete or masonry insert or clip angles bolted to the steel structure on the other end. Rods shall be solid metal or pipe as specified below. Anchor rods, angles, and bars shall not exceed lengths given in schedule "Maximum Length for Anchor Braces." 2. Clamps and Hangers: Clamps or hangers on uninsulated pipes shall be applied directly to pipe. 3. Bolts: Bolts used for attachment of anchors to pipe and structure shall be not less than 1/2 —inch diameter. ?LArawyrissee PROVED BY A. 3.8 EQUIPMENT SWAY BRACING A. ACCEPTABILITY THIS DESIGN AND /OR SPECIRCA110N IS APPROVED DEPT. DATE Spreaders shall be provided between adjacent piping runs to prevent contact during seismic activity whenever pipe or insulated pipe surfaces are less than 4 inches apart. Spreaders hail be applied at same interval as sway braces, at an equal distance between the sway braces. If rack type hangers are used where the pipes are restrained from contact by mounting to the rack, spreaders are not required for pipes mounted in the rack. Spreaders shall be applied to the surface of bare pipe and over insulation on insulated pipes utilizing high— density inserts and pipe protection shields. Equipment sway bracing shall be provided for all items supported from overhead floor or roof structures. Braces shall consist of angles, rods, bars or pipes secured at both ends with not less than 1/2 —inch bolts. Sufficient braces shall be provided for equipment to resist a horizontal force equal to 113 percent of the weight of equipment without exceeding safe working stress of bracing components. In lieu of bracing with vertical supports, these items may be supported with hangers inclined at 45 degrees directed up and radially away from equipment and oriented symmetrically in 90— degree intervals on the horizontal plane, bisecting the angles of each corner of the equipment, provided that supporting members are properly sized to support operating weight of equipment when hangers are inclined at a 45- degree angle. See Detail 1/M521. DRAWN K. PAULSON CHECKED R. PETERS ENGINEER R. PETERS CHECKED APPROVED DATE 04.24.01 04.24.01 04.24.01 END OF SECTION AAra - oai BTITLE SEISMIC BRACING SPECIFICATION BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98 CURRENT REVISION J #703445 -05 SHEET M2 JOB NO SYMBOL J #703445 -05 RECEIVEp Ctiy OF TUK4iq[? FEB ` DATE COMP N0. 04.24.01 M10 SYM A RELOCATE BUSINESS /FIN REVISION BUILDING 9 -98 STRUCTURAL UPGRADE 125 125 125 LI 1.211 115 A � , IOWA 90 90 ��0��1, . . - =, A,1=1 :: =C======r= =- ==— I— .—.I'o . Ma_ A O 150 STAIR "5' 14/10 20/12 J #90034 -00 J #703445 -05 STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 -05 BY JH DLR GROUP DLR GROUP RP KP 4/ 04.24.01 02.21.02 BY REVISION 280 �'� � - I_: o �� r0 In FLOOR PLAN SCALE: 1/8 " =1' -0" SEE DETAIL 9 .10 6 5 4 3 2 1 J BO APPRnVFn MO O APPROVED ACCEPTABILFIY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DRAW K.BUN CHECKED HECKED APPROVED 4.3.01 HVAC PLAN CURRENT REVISION SYMBOL J #703445 -05 SHEET 1M10 JOB NO. 4703445 -05 DATE 02.21.02 M11 COMP NO BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 GENERAL NOTES: 1. D -1 = TITUS TMS -AA, 24 "X24 "LAY -IN OR EQUAL D -2 = TITUS MP -30, (4) 1" SLOT, 36" L RAG -1 = TITUS PAR 24" "X24" LAY -IN OR EQUAL CONSTRUCTION NOTES: THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY DUCT AND EQUIPMENT SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. 2. BRACE OR REPLACE EXISTING DIFFUSERS, DUCTWORK AND EQUIPMENT ONLY AS REQUIRED FOR CMU WALL REPLACEMENT AND BRACING. PROVIDE MINIMAL AMOUNT OF UPGRADE WORK ONLY WHERE PRESERVATION OF EXISTING CONDITIONS IS NOT POSSIBLE. IF REQUIRED UNDER THESE CIRCUMSTANCES, BRACE PER OR OR 1M101M517 1M101M517 1M10 M517 OR OR ( 1M10 M517 1M10 M517 1M10 M517 OR KEY PLAN SCALE: NONE RECEMEO CITYpF"NKyyN - rS l PERMIT CENTER 1M11 1M12 1MI3 O 4 — 0 A 4/15/99 SYM REDRAWN ADDED VAV BOX AT J -3 ADDED VAV BOX AT G -3 RELOCATE BUSINESS / FIN. REVISION 13 I i AI— IJ II ilia H illi �orae M �A ..i d • ' ii ' I 2 1 20 42 ■ .� 1 20 lg 1♦ • n� II 0 0 10' -4" 10' -9 "± 12/12 100 B/P MACHINE 290 110 36/14 pi 1111111111YAMME* v ° 0 r: Ion L /I Akio" E Akio" 1 / AA. 11 .......... iA• 2 6' -8" r .7 15 N 70 0115 70 9 107 9 90 90 1 0 I 8 "0 CCESS DOOR 60 115 70 115 20 N = J L NU 36/12 0 111W � _ c_ o� G 100 100 115 ELE 'TOR STAIR EX I A I P Ii H ST 100 100 110 1 7 0 70 ��� Mil 12 12 ®m 11 250 � � I r 10 2.W ®�11 ® ' PIK o LJ 115 L P 200 2 12 12 0 180 105 Tom a 105 11 105 105 2) 200 El 200 200 20 5 105 05C 0 05 05 J #774011 -LO J #790773 -LO J #190034 -00 BY KB SR KGP JH APPROVED DATE 1.15.97 8/19/97 3/19/97 4,/15/99 c Inc /nn SYM G STRUCTURAL 70 REVISION BUILDING 9 -98 STRUCTURAL UPGRADE 70 J #703445 -05 UPGRADE DE- SCOPING REVISION J #703445 -05 BY DLR GROUP DLR GROUP HVAC PLAN SCALE: 1/8" = 1' -0" APPROVED RP KP DATE 04.24.01 02.21.02 T1 p iROVEZAW® 70 70 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE 105 DRAWN P.DUARTE HHECED ENDIN95W CHECKED APPROVED APPROVED DATE 4.5.01 UBTITLE HVAC PLAN 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 GENERAL NOTES: NOT USED. ® NOT USED LEGEND: O CEILING DIFFUSER, ARROW INDICATE AIR THROW RETURN /RELIEF GRILLE CEILING TYPE NON- DUCTED CURRENT REVISION J #190079 -00 SHEET DUCT, SINGLE LINE I VOLUME DAMPER DUCT, DOUBLE LINE OT THERMOSTAT, WALL THERMOSTAT, CEILING 1. D -1 = TITUS TMS -AA, 24 "X24 "LAY -IN OR EQUAL D -2 = TITUS MP -30, (4) 1" SLOT, 36" L RAG -1 = TITUS PAR 24" "X24" LAY -IN OR EQUAL CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY DUCT AND EQUIPMENT SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. 2. BRACE OR REPLACE EXISTING DIFFUSERS, DUCTWORK AND EQUIPMENT ONLY AS REQUIRED FOR CMU WALL REPLACEMENT AND BRACING. PROVIDE MINIMAL AMOUNT OF UPGRADE WORK ONLY WHERE PRESERVATION OF EXISTING CONDITIONS IS NOT POSSIBLE_ IF REQUIRED, BRACE PER OR OR OR 1M10 M517 1M10 M517 1M10 M517 OR OR 1M10 M517 1M10 M5171M10 0517 NOT USED. NEW STRUCTURAL X -BRACE IN THIS LOCATION. REROUTE EXISTING DUCTWORK. RELOCATE EXISTING DIFFUSER OR MIXING BOX TO THIS LOCATION. INSTALL NEW DUCTWORK AS REQUIRED. (ORIGINATED FROM ® ON 1M1,R.) NEW AIR CELL CONNECTION. ® EXTEND DUCTWORK TO NEW MIXING BOX LOCATION. NEW TAP TO RELOCATED MIXING BOX. RECEI EC CITY OF TVM FEB SYMBOL 1M11 JOB N0. 4703445 -05 DWG NO. KEY PLAN SCALE: NONE PERMIT CENTE., COMP N0. 1M10 rA 1N12 1013 0 —0 DATE 02.21.02 M12 SYM A REDRAWN SEE DETAIL 9 -98 REWORK OFFICE AREA RELOCATE DIFFUSER 1M121M51 REVISION BUILDING 9 -98 STRUCTURAL UPGRADE TT 95 60 100 100 D 90 CFM egr �� CI , 12/12 -BARS 300 TYP) 1M12 1M12 M512 Nam- 42/20 15/20 106 27 20 • 21/12 io ®emu ■J - 4 WI 0 0 O 660 • ■ liP r i�AA �7 0 110 � 1�L�1 II.�II� � .II -III • • e Lal 1 VA r_. 110 235 10C+� 1 110 CR 0110 1 1 Ou � C+ ; . *' 200 i 5441 : jjv 200 . 5 � • ;; _ Si � 3 mn ,t P L ® :1W.. _ 111 H !r EN g ;S IT 6 V lib 200 N �YI IS 2001? i Ii P 200 200 2C 60 600 i 200 � Q2oo i ii i ,. 80 SY ro � 1 P — GJ 11 11 0 0115 T i 011 110 280 10 12/12 104 380 380 120 120 38 ti _ \ 104 95 •. n�M',fI11 "7; ' 70 70 70 rip" 70 i� � 1 1 c al I 70 �� " I 1 70 h� �nF 36/14 106 14 90 00 110 115 8/12 24/12 60 ®" 0 105 105 105 10 105 10 105 10 C 8 "0 D -1, 150 CFM J #180166 -04 J #190077 - 00 J #703445 -05 BY K. BUN CFH DMV /RWS DLR GROUP 5' -0" APPROVED RWS DOT RP DATE 1 -15 -97 3.4.99 08.18.99 04.24.01 Sr 1 0 10 09 LS REVISION FLOOR PLAN SCALE: 1/8 " =1' -0" BY APPROVED DATE 115C gLiezatEnv a® n 90 MO-oii • 23 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN K. BUN C HECKED EN GINEER C HECKED APPROVED IT DATE 1 -15 - 97 SUBTITLE O HVAC PLAN BLDG 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: I--I O CEILING DIFFUSER, ARROW INDICATE AIR THROW 1 El f + I--L 1 GENERAL NOTES: 1. D -1 = TITUS TMS -AA, 24 "X24 "LAY -IN OR EQUAL D -2 = TITUS MP -30, (4) 1" SLOT, 36" L RAG -1 = TITUS PAR 24" "X24" LAY -IN OR EQUAL CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY DUCT AND EQUIPMENT SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. C> BRACE EQUIPMENT PER I 1 NOT USED. NOT USED. ® BRACE PER OR OR 1M12 M517 1M12 M517 1M12IM517 7� NEW AIR CELL CONNECTION. CURRENT REVISION J #703445 -05 SHEET JOB NO J #703445 -05 DUCT, SINGLE LINE RETURN /RELIEF GRILLE CEILING TYPE NON- DUCTED VOLUME DAMPER DUCT, DOUBLE LINE THERMOSTAT, WALL THERMOSTAT, CEILING 1M12 OR /r 12 M517 1M12 M517 NEW STRUCTURAL X -BRACE IN THIS LOCATION. REROUTE EXISTING DUCTWORK. RELOCATE EXISTING DIFFUSER OR MIXING BOX TO THIS LOCATION. INSTALL NEW DUCTWORK AS REQUIRED. (ORIGINATED FROM ® ON 1 M12R.) SYMBOL RECE ciTV of Tc; rvu., EXTEND DUCTWORK TO NEW MIXING BOX LOCATION. PERMIT CENTER NEW TAP TO RELOCATED MIXING BOX. 10. BRACE OR REPLACE EXISTING DIFFUSERS, DUCTWORK AND EQUIPMENT IN CORRIDORS ONLY AS REQUIRED FOR CMU WALL REPLACEMENT AND BRACING. PROVIDE MINIMAL AMOUNT OF UPGRADE WORK ONLY WHERE PRESERVATION OF EXISTING CONDITIONS IS NOT POSSIBLE. IF REQUIRED, BRACE PER OR OR OR 1M10 M517 1M10 M517 1M10 M517 DA 02.21.02 COMP N0. M13 A 9 -98 REWORK OFFICE AREA B EXTRS: RELOCATE ESTIMATING REVISION J #180166 -04 J #190083 -00 C EXTRS: RELOCATE ESTIMATING J# 190083 -00 D BUILDING 9 -98 STRUCTURAL UPGRADE J #703445 -05 CH /KB OUR GROUP APPROVED 3.4.99 9.3.99 9.14.99 04.24.01 REVISION HVAC FIRST FLOOR PLAN 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDMONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY DUCT AND EQUIPMENT SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. 2. BRACE OR REPLACE EXISTING DIFFUSERS, DUCTWORK AND EQUIPMENT IN CORRIDORS ONLY AS REQUIRED FOR CMU WALL REPLACEMENT AND BRACING. PROVIDE MINIMAL AMOUNT OF UPGRADE WORK ONLY WHERE PRESERVATION OF EXISTING CONDITIONS IS NOT POSSIBLE. IF REQUIRED, BRACE PER OR OR q OR 1M10 M517 1M10 M517 1M101M517 1M101M517 NDER SEPARATE PERMIT. CURRENT REVISION J #703445 -05 SHEET 10CC 1000 100C 100C- 100e. 100C -+� FIRST FLOOR PLAN SCALE: 1/8 " =1' -0" eLOPIZEZAW ® ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PROVED BY DEPT. DATE CHECKED ENGINEER CHECKED APPROVED DRAWN K.BUN DATE 1.15.97 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: O CEILING DIFFUSER, ARROW INDICATE AIR THROW RETURN /RELIEF GRILLE CEILING TYPE NON- DUCTED DUCT, DOUBLE UNE CD THERMOSTAT, WALL D THERMOSTAT, CEILING GHNSRRUCITO SNOTES: DUCT, SINGLE UNE VOLUME DAMPER 1. D 1 = TITUS TMS -AA, 24 "X24 "LAY -IN OR EQUAL D -2 = TITUS MP -30, (4) 1" SLOT, 36" L RAG -1 = 11TUS PAR 24 - X24" LAY -IN OR EQUAL CONSTRUCTION NOTES: BRACE EQUIPMENT PER 1M12 1M13 JOB NO 4703445 -05 KEY PLAN SC. NONE CITY OF ita„ FEB DATE 02.21.02 COMP N0. - 0 M14 SYM A REDRAWN ADD CEIUNG DIFFUSERS 800 ®®®®® -®Q I V , ill L ,,,,:!...... 11.. ; Y \C \ IN' ! ifQ? n ■ I� n u 1 i 1 mffUI1LJ 13 12 C�]�ITN•r = = =u =m= � T +Iniw �•�1� = 84 . -- • sir �u�Jl kY1RM 16 1 : ==u =e =u— �r -., 107 Iii! Erg ;TJ -- � 6 t7 • � n A 6 Mo Ira C � 11 m�■ UP, 'vu U • 'rr 115 80 80 1C7 107 80 80 90 80 80 U' 90 90 RN SILENCER IAC HUNG TIGHT 80 80 80 107 80 14 1010 14/12_ 107 80 0 80 !e1 80 3 80 80 80 , 80 i C 0 20 12 REVISION BUILDING 9 -98 STRUCTURAL UPGRADE J #701565 -00 J #703445 -05 STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 -05 BY KB DMV DLR GROUP DIP GROUP APPROVED KP KP 0 DATE 1.15.97 05.24.00 04.24.01 02.21.02 SY 10 107 REVISION O FLOOR PLAN SCALE: 1 " =1' -0" APPROVED O DATE 24/24 RETURN AIR DUCT UP THRU CAPPED CEILING O O O eLairI7AFLAW ® O O 0 ACCEPTABILITY THIS DESIGN AND /OR SPECIRCATION IS APPROVED DRAWN K.BUN CHECKED INK APPROVED DATE 1.16.97 SUBTITLE 0 n HVAC PLAN 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.2 LEGEND: 1- 1 DUCT, SINGLE LINE O CEILING DIFFUSER, ARROW INDICATE AIR THROW D VOLUME DAMPER DUCT, DOUBLE LINE OT THERMOSTAT, WALL © THERMOSTAT, CEILING GENERAL NOTES: 1. D -1 = TITUS TMS -AA, 24 "X24 "LAY -IN OR EQUAL D -2 = TITUS MP -30, (4) 1" SLOT, 36" L RAG -1 = TITUS PAR 24" "X24" LAY -IN OR EQUAL CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY DUCT AND EQUIPMENT SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. 2. BRACE OR REPLACE EXISTING DIFFUSERS, DUCTWORK AND EQUIPMENT ONLY AS REQUIRED FOR CMU WALL REPLACEMENT AND BRACING. PROVIDE MINIMAL AMOUNT OF UPGRADE WORK ONLY WHERE PRESERVATION OF EXISTING CONDITIONS IS NOT POSSIBLE. IF REQUIRED, BRACE PER OR / \ OR / \ OR 1M10 M517 1M10 M517 1M101M517 OR n OR 1M10 M517 1M10J M517 1M10 M517 6 Mi�ao i RETURN /RELIEF GRILLE CEILING TYPE NON- DUCTED CURRENT REVISION J #703445 -05 SHEET JOB NO. KEY PLAN SC. NONE SYMBOL 2M10 J #703445 -05 COMP N0. Ft;' 7 > DATE 02.21.02 M15 SYM A REDRAWN 12" SQ. DIFF /REPLACING LIGHT RIFF. ADD CEILING DIFFUSER ADD CEILING DIFFUSER AEI 48/22 J con I en° rozIapoi bill III .�� -_`� a�1,J -I♦ iI i u I"� r iisumm -. rsai mil WMI 48o : 1111111011111111111111111111 I®I JIM IPL i4II 11 11�' I ' 111 '°� -i�f 600 I OEM II Q �1 to-f, Aft ■ in c �C C 2 1 84 u 8o Ili 135 50 mil IB m , ini • +� ■I j L^J IN &Z. mix n A 80 80 36/14 80 80 3 80 107 107 107 80 80 FROM 1ST FLR 12x12 80 NEC 300 CFM ( 6) 0 i U A U' i N -RA 24/24 RC $75 DUCT SILENCERS (MANBARS T SECURED WALL) REVISION J #180014 J #79231ILO J #795417 -00 BY KB RAD DMV DMV APPROVED DATE 1.15.97 12.4.98 05.26.99 01.05.00 SYM 80 REVISION O O STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 -05 BY DLR GROUP O FLOOR PLAN SCALE: 1/8 " =1' -0" APPROVED KP DATE 02.21.02 O 48/24 DUCT SILENCER FOR RETURN AIR IAC MDL 75 HUNG TIGHT TO BEAM (TYP 3) PLACES ( THIS SHEET. MANBARA AT SECURED WALL O ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PROVED BY DEPT. MOo � DATE DRAWN K.BUN CHECKED LNGINEEH CHECKED APPROVED DATE 105 05 105 105 1.15.97 SUBTITLE ABANDON IN _ PLACE 0 O 0 0 HVAC PLAN 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: GENERAL NOTES: 1. D -1 = TI11JS TMS –AA, 24 "X24 "LAY –IN OR EQUAL D -2 = 11TUS MP -30, (4) 1" SLOT, 36" L RAG -1 = TITUS PAR 24" "X24" LAY –IN OR EQUAL CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS –BUILT INFORMATION. CONTRACTOR TO VERIFY DUCT AND EQUIPMENT SIZE AND LOCATION IN AREAS NOTED, FOR RELOCATION AND BRACING. 2. BRACE OR REPLACE EXISTING DIFFUSERS, DUCTWORK AND EQUIPMENT ONLY AS REQUIRED FOR CMU WALL REPLACEMENT AND BRACING. PROVIDE MINIMAL AMOUNT OF UPGRADE WORK ONLY WHERE PRESERVATION OF EXISTING CONDITIONS IS NOT POSSIBLE. IF REQUIRED, BRACE PER NOT USED. NOT USED. NOT USED. 1--- -1 O CEILING DIFFUSER, ARROW INDICATE AIR THROW DUCT, SINGLE LINE RETURN /RELIEF GRILLE 0 CEILING TYPE NON– DUCTED VOLUME DAMPER { ' DUCT, DOUBLE LINE 0 THERMOSTAT, WALL D THERMOSTAT, CEILING OR OR OR 1M10 M517 1M10 M517 1M10 M517 OR OR 1M10 M517 1M10 M517 1M10 11,v1517 NEW STRUCTURAL X –BRACE IN THIS LOCATION. REROUTE EXISTING DUCTWORK. RELOCATE EXISTING DIFFUSER OR MIXING BOX TO THIS LOCATION. INSTALL NEW DUCTWORK AS REQUIRED. (ORIGINATED FROM ® ON 2M11R.) NEW AIR CELL CONNECTION. EXTEND DUCTWORK TO NEW MIXING BOX LOCATION. NEW TAP TO RELOCATED MIXING BOX. RE$E41 GIN OF TUKViI:. FEE: , V PERMIT CENTER CURRENT REVISION SYMBOL J #703445 - SHEET 2M11 JOB D. J #703445 -05 KEY PLAN SCALE NONE DATE - 2M10 F 21 2M13 02.21.02 M16 COMP NO APPROVED DATE SYM APPROVED st oueT. EM' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED SUBTITLE HVAC PLAN . This AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY DUCT AND EQUIPMENT SIZE AND LOCATION INAREAS NOTED FOR RELOCATION AND BRACIN &I 2. BRACE OR REPLACE EXISTING DIFFUSERS, DUCTWORK AND EQUIPMENT ONLY AS REQUIRED FOR CMU WALL REPLACEMENT AND BRACING. PROVIDE MINIMAL AMOUNT OF UPGRADE WORK ONLY WHERE PRESERVATION OF EXISTING CONDITIONS IS NOT POSSIBLE. IF REQUIRED, BRACE PER OR OR OR 1M10 M517 1M10 M517 1M10 14517 NOT USED. NOT USED. ® NOT USED. 4 OR 5 OR ( 1M10 M517 1M10 M517 1M10 14517 CURRENT REVISION J #703445 -05 SHEET JOB NO. SYMBOL 2M12 J #703445 -05 21410 21411 0 21413 DATE 02.21.02 COMP N0. M17 SYM A REDRAWN 13 12 11 REVISION BUILDING 9 -98 STRUCTURAL UPGRADE J #703445 -05 STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 -05 BY KB DIR GROUP MR GROUP RP KP 1.15.97 04.24.01 02.21.02 80 REVISION O O FLOOR PLAN SCALE: 1/8 " =1' -0" DATE I I 0 O 36/14 !.1 120 C 00 O] 120 120 'RuI 55; . ©► 0 i rov i 1, If 17 If {l siw- A. MAID Ili n C7 II w A 320 A 320 1 /moo. 1i t c ' ' LIN atr l 0] O 17 70 1c 10 ec 170 100 1 80 80 80 80 8 1440 '0° 2 00 G7 ; immin 107 80 80 107 107 80 80 80 48/22 80 80 M_ I �q co- 1 110 80 i 0L ui 80 1;. 120 ',:� ■IY 80 235 c • 235 C]r - 320 n � v 6/14 ► �� 4 116 4 ®i 4111 H Il 80 BRAWN DATE K.BUN 1.15.9 CHECKED APPROVED O O Mrnoa I 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.2 LEGEND: t— I O CEIUNG DIFFUSER, ARROW INDICATE AIR THROW 0 0 DUCT, SINGLE UNE RETURN /REUEF GRILLE CEIUNG TYPE NON- DUCTED VOLUME DAMPER DUCT, DOUBLE LINE 0 THERMOSTAT, WALL ID THERMOSTAT, CEIUNG GENERAL NOTES: 1. D -1 = TITUS TMS -AA, 24 "X24 "LAY -IN OR EQUAL D -2 = TITUS MP -30, (4) 1" SLOT, 36" L RAG -1 = TITUS PAR 24" "X24" LAY -IN OR EQUAL NEW STRUCTURAL X -BRACE IN THIS LOCATION. REROUTE EXISTING DUCTWORK. © RELOCATE EXISTING DIFFUSER OR MIXING BOX TO THIS LOCATION. INSTALL NEW DUCTWORK AS REQUIRED. (ORIGINATED FROM ® ON 2M12R.) 2> NEW AIR CELL CONNECTION. ® EXTEND DUCTWORK TO NEW MIXING BOX LOCATION. NEW TAP TO RELOCATED MIXING BOX. RECEIVE cm oP rum . , TEA 2 : PERMIT CEN,' KEY PLAN SCALE: NONE ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PROVED BY DEPT. DATE ARAWN K.BUN APPROVED REVISION APPROVED REVISION APPROVED APPROVED 1.15.97 HVAC PLAN JOB NO. J #703445 -05 DWG N0. COMP NO. 02.21.02 A REDRAWN 300 . 4 !l n % 14 12 1410 I � � 1 � � C�]trt l�� ■In, 104 f11LI I -raa ::�E �CAa i11n>,rti� \ \M1 Pri '1 I:1 .1 11 7, ! . 74 mom Fl R ,,' .t,� 3I0 �1 ® 12 12 13 12 -. 3501 _n]=: "nI ®_O_ ®[n7 -1- ri '_ I, JS.'.., �A�",... • >.ii ®.+ i ii 1 � e ,' MI MEI 116 so j ]i& inn ilk ' i . 1 BUILDING 9 -98 STRUCTURAL UPGRADE J #90034 -00 J #703445 -05 STRUCTURAL UPGRADE DE- SCORING REVISION J #703445 -05 KB DLR GROUP DLR GROUP RP KP 1.15.97 04.24.01 02.21.02 R/A -22x22 EILIN GRILLE TO 22 18 FILTER BOX FLOOR PLAN SCALE: 1/8"=1'-0" O O 0 g O O 0 AAE UANII,AI AA A CTED O 0 GENERAL NOTES: CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDI1ONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY DUCT AND EQUIPMENT SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. O.o9j 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.2 LEGEND: 1` DUCT, SINGLE LINE O CEILING DIFFUSER, ARROW INDICATE AIR THROW El RETURN /RELIEF GRILLE CEILING TYPE NON - DUCTED i--� VOLUME DAMPER DUCT, DOUBLE LINE OT THERMOSTAT, WALL D THERMOSTAT, CEILING 1. D -1 = TITUS TMS -AA, 24 "X24 "LAY -IN OR EQUAL D -2 = TITUS MP -30, (4) 1" SLOT, 36" L RAG -1 = TITUS PAR 24" "X24" LAY -IN OR EQUAL. 2. BRACE OR REPLACE EXISTING DIFFUSERS, DUCTWORK AND EQUIPMENT ONLY AS REQUIRED FOR CMU WALL REPLACEMENT AND BRACING. PROVIDE MINIMAL AMOUNT OF UPGRADE WORK ONLY WHERE PRESERVATION OF EXISTING CONDITIONS IS NOT POSSIBLE. IF REQUIRED, BRACE PER 1M10 M517 1M10 M517 1M101M517 1M10 M517 1M10 M517 1M101517 RECEIVED CITY OF TUKWIL PERMIT CENT'- OR /7\ OR /N\ OR OR OR KEY PLAN SCNE NONE _O SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE BOA ® /V6® I(; t _ ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DATE DRAWN K. BUN DATE 1.15.97 "'nu PIPING PLAN CURRENT REVISION SYMBOL J #703445 -05 C DATE 02,21.02 — DRAWN KB 1.15.97 A BUILDING 9 -90 STRUCTURAL UPGRADE J #703445 -05 DLR GROUP RP 04.24.01 APPROVED BY DEPT. TTrLE BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9-98.1 SHEET 1 ���jjj B STRUCTURAL UPGRADE DE— SLOPING REVISION J #703445 - 05 DLR GROUP KP 02.21.02 � �,� � �. 'S K ' Sp ',0 CH ECKED - - APPROVED JOB N0. J #703445 -05 COMP N0. 1"HWS TO 2ND FLR 1 "HWS TO 1ST FLR FLOOR PLAN SCALE: 1/8 " =1' -0" TT 1 1/2" COND fll 1 1/4" CONNECT UNK HWS WEST 'N HWS SOUTH ZON HWS NORTH ZON 1M61 M514 COND PA 1 "HWS TO 2ND FLR r: � %n t 3 "A CAPPED III 1 FOI� 1 "H DN TO 1ST FLR I1 I I ©I EXPAN COMP O C% MOa -oa I 0 LEGEND: - CW - CRY WATER - CGLYS - COOLING GLYCOL SUPPY -CGLYR - COOLING GLYCOL RE FORN D CONDENSATE DRAIN - RV - REFRIGERANT VENT GENERAL NOTES: CONSTRUCTION NO 1. THIS AREA HAS NOT BEEN VISUA SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. NOT USED. PIPING INTERFERES WI1H X— BRACING. RELOCATE SOUTH_ (FIELD COORDINATE) TE ROUTE EXISTING RADIATOR PIPING AROUND X —BRACE AT SAME ELEVATION. CLAD WITH EXTERIOR PIPE CLADDING. RECEIVED CITY OF TUKWI, EE ?Gri PERMIT CENTER KEY PLAN SCALE NONE SYM A REDRAWN EXPANSION COMPENSATOR 1 "HWS TO 2ND F 1 "HWR TO 1ST FI 1"HWS TO 2ND F REVISION BUILDING 9 -98 STRUCTURAL UPGRADE 4703445 -05 STRUCTURAL UPGRADE DE— SCOPING REVISION J #703445 -05 BY KB DLR GROUP DLR GROUP APPROVED RP KP DATE 1.15.97 04.24.01 02.21.02 SYM REVISION FLOOR PLAN SCALE: 1/8"=1'-0" APPROVED DATE Q ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE DRAWN K.BUN CHECKED CHECKED APPROVED DATE 1.15.97 BTITLE 2ND IN ER FINS E 1/4 CELLO 1ST Bo -oai FLR PIPING PLAN TITLE BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: -CW- CITY WATER - CGLYS- COOLING GLYCOL GUPPY - CGLYR - COOLING GLYCOL RETURN D CONDENSATE DRAIN -HWS - HOT WATER SUPPLY - PC - PUMPED CONDENSATE - RV - REFRIGERANT VENT GENERAL NOTES: 1. PIPE SUPPORT SPACING TO BE AS PER DETAI UNLESS OTHERWISE SPECIFIED. 1M62 M510 2. ALL PIPING UNDER RAISED FLOOR TO BE SUPPORTED BY UNISTRUT P -1000 CHANNEL, KWIK BOLTED TO FLOOR, PIPE CI,LAMPS TO BE AS FOLLOWS. NOM PIPE SIZE 314" 2 1/2" 3. SEE SHEET M -2 FOR PIPING SPECIFICATIONS. 4. SEE SPECIFICATIONS 35Q- 55100 -AC AND 35Q- 558100 -IFC FOR AC UNITS, IFC UNITS AND PUMP PACKAGES. IL 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. NOT USED. PIPING INTERFERES WITH X— BRACING. RELOCATE SOUTH. (FIELD COORDINATE.) ROUTE EXISTING RADIATOR PIPING AROUND X -BRACE AT SAME ELEVATOR. CLAD WITH EXTERIOR PIPE CLADDING. CURRENT REVISION J #703445 -05 SHEET UNISTRUT CLAMP OT S: 1M62 JOB NO. J #03445 -05 1M63 KEY PLAN SCALE: NONE SYMBOL P -2027 P -2029 P -2031 P -2043 COMP NO. - ATE 02.21.02 M20 PA r PA 1 "HWR UP TO FLOOR PLENUM 1LHWR UP TO 2ND FLOOR PLENUM F _ 3/8" I o �- c 1c J` I •.I r .�I ;� II CARRY RETURP ENCLOSURE 0 1"HWR FROM OVER ENTANCE 1 . Mil I 1.- cN 3/8" , F p ��3/8 A HWR Ir . A _J lj • I. = 11 IA il n II • � - I 4` [ 2 1/2 =411' ' Ill 111 1/2" 1/2" Y r a- EXPAN COMP I 1 I I � ' ,, C-3 I I 1' r1/2 1 HWS 1 JO I i 2" HWS 2 cn _ © - PA 1 1/2 -1 U RV 2 1/2" __g 3/4 ,. I I I I I I n!tl 2 1 - - - - -- - - - --I r7,___ l 1 1 f i il r • � a PA ,..„ ,, v UP TO 2ND .G k - > <J = I , R 3/4" BIBB HOSE ( ,><� SYM A REDRAWN EXPANSION COMPENSATOR 1 "HWS TO 2ND F 1 "HWR TO 1ST FI 1"HWS TO 2ND F REVISION BUILDING 9 -98 STRUCTURAL UPGRADE 4703445 -05 STRUCTURAL UPGRADE DE— SCOPING REVISION J #703445 -05 BY KB DLR GROUP DLR GROUP APPROVED RP KP DATE 1.15.97 04.24.01 02.21.02 SYM REVISION FLOOR PLAN SCALE: 1/8"=1'-0" APPROVED DATE Q ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE DRAWN K.BUN CHECKED CHECKED APPROVED DATE 1.15.97 BTITLE 2ND IN ER FINS E 1/4 CELLO 1ST Bo -oai FLR PIPING PLAN TITLE BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: -CW- CITY WATER - CGLYS- COOLING GLYCOL GUPPY - CGLYR - COOLING GLYCOL RETURN D CONDENSATE DRAIN -HWS - HOT WATER SUPPLY - PC - PUMPED CONDENSATE - RV - REFRIGERANT VENT GENERAL NOTES: 1. PIPE SUPPORT SPACING TO BE AS PER DETAI UNLESS OTHERWISE SPECIFIED. 1M62 M510 2. ALL PIPING UNDER RAISED FLOOR TO BE SUPPORTED BY UNISTRUT P -1000 CHANNEL, KWIK BOLTED TO FLOOR, PIPE CI,LAMPS TO BE AS FOLLOWS. NOM PIPE SIZE 314" 2 1/2" 3. SEE SHEET M -2 FOR PIPING SPECIFICATIONS. 4. SEE SPECIFICATIONS 35Q- 55100 -AC AND 35Q- 558100 -IFC FOR AC UNITS, IFC UNITS AND PUMP PACKAGES. IL 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. NOT USED. PIPING INTERFERES WITH X— BRACING. RELOCATE SOUTH. (FIELD COORDINATE.) ROUTE EXISTING RADIATOR PIPING AROUND X -BRACE AT SAME ELEVATOR. CLAD WITH EXTERIOR PIPE CLADDING. CURRENT REVISION J #703445 -05 SHEET UNISTRUT CLAMP OT S: 1M62 JOB NO. J #03445 -05 1M63 KEY PLAN SCALE: NONE SYMBOL P -2027 P -2029 P -2031 P -2043 COMP NO. - ATE 02.21.02 M20 EXPANSI COM P EN 1"HWR U CARRY R IN ENCLO ABOVE Fl 1 "HWS U TO 2ND nn ®Cg) c3) REVISION REDRAWN BUILDING 9 -98 STRUCTURAL UPGRADE J #703445 -05 Ell STRUCTURAL UPGRADE DE— SCOPING REVISION J #703445 -05 ABOVE FINS DLR GROUP DLR GROUP APPROVED RP KP DATE 1.15.97 04 24.01 02.21.02 FLOOR PLAN SCALE: 1/8 " =1' -0" ® REVISION ME II EMI MI — - - - APPROVED DATE �BOE /AEG' NIM 0 4 STONAL ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PROVED B Y. DEPT. DATE ABOVE FINS DRAWN K.BUN CHECKED CHECKED APPROVED APPROVED DATE 1.15.97 SU TITLE a-oal O PIPING PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: - CW - CITY WATER — CGLYS— COOLING GLYCOL SUPPY — CGLYR— COOLING GLYCOL RETURN D CONDENSATE DRAIN —HWS -- HOT WATER SUPPLY — PC — PUMPED CONDENSATE — RV — REFRIGERANT VENT GENERAL NOTES: CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS —BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. NOT USED. CRY OF T N�vati PERMIT CENTER CURRENT REVISION SYMBOL J #703445 -05 SHEET 1 M 6 JOB NO J#703445 -05 1M60 1M61 1M62 1M63 KEY PLAN SCALE: NONE DATE 02.21.02 M21 COMP NO 3/4 "HOSE (TYP BIBB 14 PLCS) \ IIIINIm II - 4 2 2 1 /2 "CGLYR 1 /2 "CGLYS I & R UP THRU MECH CHASE TO PENTHOUSE :S) ,,,_ c. ,,. ,:... — ,,r, 1 PA I — BIBB ii;& BIBB W/ ° -15 ce (nP) i N, . - ill I _ _ - a PA I h I t 3/4" Wilt I z TRAPEZ HANGE SEE Dop•IL PIPE 1 ! _ SMH • _ (TYP) Wrif,�I ��■1�+ 1 I -I + !! 4 I —Q.. — I 1 CW - — I I 1:� 11 IN iA p • I I li :� II tig _ ,�— 2 1/2„ / U u� O D APPEDD CR E3 E3 c..4 AI .. .9 ....i 1 "COND DRAIN TO DISCHAGE IN SERVICE SINK I ii! 1° / ' r� E �.f3 „�i / 1/2 1/2” D .'" TO EWC o CW N° -t �r ' HUNG BEAM MPS - ' FE r I • - MHO I I PANSISN EXPANSION CO • I 1ST FLR UM �— 1 • 1 , . " A . 1 1 /2 3 CONI ffill ,IFPIFE G P HANGER: NISTRUT P -1100 :L ATTACHED 785 PIP RV 411 +_ Am" —+ �1 I 1 / 2 . CAPPED LINE �3/4 1 1 SEED f ll � . -;� ..ac � 11• L M511 j 1 SURE NS LR "LIEBERT" DATAMATE DMC044C —P02 208V, 10, 60 CYCLE 111 --� i� !� D ∎mi _ �, Y SMH Z i 1 1 1 "HWR TO 2ND FLOOR RADIATION PIPING CARRY RETURN IN ENCLOSURE ABOVE FINS c - i MAN BAR SEE DETAIL ,, ° 1 M63 M511 1 /4 "� ��� I HWS FIELD •IINGQ D 1/2" irk 2 1/ I II PA l H L / PA 11 EXPAN COMP 1 1 M163 M510 ICI, l !!! 2 1 1 4" HWS r 1 4 ! 1 "HWS TO 2ND FLOOR HWS HWS t �° �_. . = ` _ CARRY SUPPLY IN ENCLOSURE 1 "HWS ON 1 1/4" TO 2ND FLR PLENUM — 1" TO 2ND FLR 1 ` ABOVE CEILING _ — ` 1 "HWR TO PLENUM 1'HWS DN CARRY SUPPLY IN FWD FRIIPF EXPANSI COM P EN 1"HWR U CARRY R IN ENCLO ABOVE Fl 1 "HWS U TO 2ND nn ®Cg) c3) REVISION REDRAWN BUILDING 9 -98 STRUCTURAL UPGRADE J #703445 -05 Ell STRUCTURAL UPGRADE DE— SCOPING REVISION J #703445 -05 ABOVE FINS DLR GROUP DLR GROUP APPROVED RP KP DATE 1.15.97 04 24.01 02.21.02 FLOOR PLAN SCALE: 1/8 " =1' -0" ® REVISION ME II EMI MI — - - - APPROVED DATE �BOE /AEG' NIM 0 4 STONAL ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PROVED B Y. DEPT. DATE ABOVE FINS DRAWN K.BUN CHECKED CHECKED APPROVED APPROVED DATE 1.15.97 SU TITLE a-oal O PIPING PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: - CW - CITY WATER — CGLYS— COOLING GLYCOL SUPPY — CGLYR— COOLING GLYCOL RETURN D CONDENSATE DRAIN —HWS -- HOT WATER SUPPLY — PC — PUMPED CONDENSATE — RV — REFRIGERANT VENT GENERAL NOTES: CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS —BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. NOT USED. CRY OF T N�vati PERMIT CENTER CURRENT REVISION SYMBOL J #703445 -05 SHEET 1 M 6 JOB NO J#703445 -05 1M60 1M61 1M62 1M63 KEY PLAN SCALE: NONE DATE 02.21.02 M21 COMP NO SYM A REDRAWN 1 "HWS FROM] 1ST FLR PLENUM , ' HWR FROM 1ST & 2ND FLR REVISION BUILDING 9 -98 STRUCTURAL UPGRADE STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 -05 13 12 0 10 J #703445 -05 BY KB DLR GROUP DLR GROUP APPROVED RP 04.24.01 KP DATE 1.15.97 SY HWR REVISION BY SCALE: 1/8 " =1' -0" APPROVED 0 FLOOR PLAN DAIS 00 0 0 cei__Airderaefilf,V® -4 "HWR 1 TO N "HWS j PENTHOUSE CONNECTING LINK WEST ZONE SOUTH ZONE NORTH ZONE 1" PLANT R 3 "V FROM SOIL 3 /4 "COND DN 5 "COND DN 4 "HOT VENT 1 1 /2 "CHWS&R ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE PA A 1 ° HWS FROM 1ST FLOOR PLENUM EXPAN COMP 1 1 /4 "HWR O 0 0 MOO 0 BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: - CW - CITY WATER - CGLYS- COOLING GLYCOL SUPPY -CGLYR - COOLING GLYCOL RETURN D CONDENSATE DRAIN -HWS - HOT WATER SUPPLY - PC - PUMPED CONDENSATE -RV - REFRIGERANT VENT GENERAL NOTES: CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. IN STAIRWELL ONLY. -� (8 M517 2M611M5 o. BRACE PER 2M61 9 (10 24 2M61 M517 PIPING INTERFERES WITH X- BRACING. RELOCATE SOUTH. (FIELD COORDINATE) 3 ROUTE EXISTING RADIATOR PIPING AROUND X -BRACE AT SAME ELEVATION. CLAD MN EXTERIOR PIPE CLADDING_ Rc'CENED cDV CE ruNw��, .V 2 ?DO? PERMIT CENTER JOB N0. 2M61 J #703445 -05 KEY PLAN SC. NONE COMP N0. M22 SYM A REDRAWN EXPANSION COMPENSATOR REVISION BALDING 9 -98 STRUCTURAL UPGRADE 1 "HWS FROM 1ST FLR PLENUM J #703445 -05 STURCTURAL UPGRADE DE- SCOPING REVISION J #703445 - KB DLR GROUP DLR GROUP 0 10 00 RP 1.15.97 04.24.01 KP 02.21.02 (D 1 "CHS &R UP TO 1/2 "CONDENSATE PENTHOUSE, SEE SHEET M500 UP TO PENTHOUSE, SEE SHEET , 500 4" 150# STEAM I LJ 4" 150# STEAM I-HWR FLOOR PLAN SCALE: 1/8 " =1' -0" I f I LJ �8 "CS 8 "CS 2 CS 4" U ~ III��N . I DRAIN VALVES 1 "A UP TO PENTHOUSE MOISTURE DRAIN ? • NORTH ZOf}IE EAST ZON SOUTH ZONE PA 2 HWR O O O ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED PROVED BY DEPT. DATE DRAWN K.BUN COE A.NOINEE CHECKED APPROVED APPROVED PAX 1 1 /4 "HWR EXPAN COMP O 1 "HWS FROM 1ST FLR PLENUM GENERAL NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. I> NOT USED. UCTIO 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: - CD - CONDENSATE SUPPLY - CW - CITY WATER - CGLYS - COOLING GLYCOL SUPPY - CGLYR- COOLING GLYCOL RETURN D CONDENSATE DRAIN -HWS- HOT WATER SUPPLY - PC - PUMPED CONDENSATE - RV - REFRIGERANT VENT PIPING INTERFERES WITH X- BRACING. RELOCATE SOUTH. (FIELD COORDINATE.) ROUTE EXISTING RADIATOR PIPING AROUND X -BRACE AT SAME ELEVATION. CLAD WITH EXTERIOR PIPE CLADDING. KEY PLAN SCALE. NONE CURRENT REVISION J #703445 -05 SHEET 2M62 JOB 110.1 4703445 -05 DWG N0. COMP N0. M23 SY A REDRAWN EXPANSION COMPENSATOR 1 1/4 "HWR FR 2ND FLOOR, 1 "HWR FROM 1ST FLOOR CARRY RETURN IN ENCLOSURE ABOVE FINS REVISION BUILDING 9 -98 STRUCTURAL UPGRADE J #703445 - 05 STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 - BY KB DLR GROUP DLR GROUP APPROVED RP .111111 1 "HWS FROM 1ST i .. . -•• . FLOOR PLENUM DATE 1.15.97 04.24.01 KP 02.21.02 REVISION FLOOR PLAN SCALE: 1/8 " =1' -O" 0 ®® 0 1 "HWR FROM 1ST FLR 1 1/4 "HWR FROM 2ND FLR APPROVED DATE ED gLAWEZA/40 ® EXPANSION COMPENSATOR 0 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED ROVED. BY DEPT. DATE DRAWN K.BUN ENGINEER CHECKED APPROVED APPROVED 0 DATE 1.15.97 i PA BTRLE 1"HWS FROM 1ST FLR PLENUM EXPANSION COMPENSATOR CARRY RETURN IN ENCLOSURE ABOVE FINS MQoa I 1 1/4"HWR RADIATION PIPING 0 0 PIPING PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LIC(4JAAIInA1 AAA CTCin nnl. n v / LEGEND: - CD - CONDENSATE SUPPLY - CW - CITY WATER - CGLYS- COOUNG GLYCOL SUPPY - CGLYR - COOUNG GLYCOL RETURN D CONDENSATE DRAIN -HWS - HOT WATER SUPPLY - PC - PUMPED CONDENSATE - RV - REFRIGERANT VENT GENERAL NOTES: CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. NOT USED. RECEN CITYOFTUHA1 PER MITCENTER CURRENT REVISION SYMBOL 4703445 -05 SHEET 2M63 JOB N0. DWG NO. J #703445 -05 26160 2M61 26162 DATE COMP N0. -0 0 02.21.02 M24 SYM A REDRAWN RELOCATE BUSINESS /FIN 9 -98 STRUCTURAL UPGRADE ■ 14' -10" 14' 14' -10" l 1 11' -10" -10" 17' -2 6' -6" 14' -10" 14' 10" 1 1/4" 14 -10 14 -10 - 4' -10" 1 1/4" 14' -10" 5VES BOLE 1 1 4" 4' -10" t 1 14' -10" 14' -10" 1L-10" 14 -1 1 14' -10" 16' -b 1 1/4" 16_0" 7'-4 3 4" 16' -0" 7' -2" . 14' - 10" 1 1" II!t■ 1" 1 4fAIl j\ � /11111=TaN■i0i LIM Mid I; 111 i IR OWL -11.111-I •0 wirmwmaiiimir 1 MIRLIZMI 'AMA_ ' -4 3/4" 4" I� i var!9flIf11Lr 11 NE mom "' ill * Ii 14 -10 14' -10" 14 10' „ 14 ¶ 14 -10 14' -10 14' -10" 1" 14' -10" -10" M 1" 14' -10 1 "1 4" I 14 -10 I® 114" 11111111/ I!! II y�� O�Ff6 OFFICE 4 11f 1" 1" 1 1 4 14 -10 14 -10 14 -10 1 1 4" 7' -2 7' -2" 1 1/2" t 14' -10" 14' -10" 1" t 1 14' -10 6' -6 • 14' -10" 1 1 14' -10" 1'' -10° 14' -10" 14 x/14 -10 7' -4 3/4" '° 14' -10" 14' -10 1 1 4" 11 2" 1" L 14' -10" 6 6 REVISION J #90034 -00 J #703445 -05 STRUCTURAL UPGRADE DE- SCOPING REVISION 4703445 -05 BY KB JH DIR GROUP DLR GROUP APPROVED RP KP DATE 1.15.97 4.13.99 04.24.01 02.21.02 SYM REVISION i FLOOR PLAN SCALE: 1/8 " =1' -0" NY APPROVED DATE 0 16'x' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED MO-oi DEPT. DATE DRAWN K.BUN CHECKED }N�INEEK CHECKED APPROVED APPROVED DATE 1.15.97 UBTITLE TITLE O O GENERAL NOTES: 0 HVAC PLAN 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: NOT USED. ®+° SPRINKLER HEAD — 2 -WAY EARTHQUAKE BRACING X 4--WAY EARTHQUAKE BRACING ." PIPE HANGER 0 SPRINKLER RISER CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. BRACE PER 1M260 M517 1M260 M517 9 1 X10 1M260 M517 1M260 M517 ONLY IF REQUIRED FOR CMU WALL REPLACEMENT AND BRACING. RECEIVED CDY OF TUKWILA E 9 , PERMIT CENTER CURRENT REVISION SYMBOL J #703445 -05 C SHEEP JOB N0. DWG NC_ 1M260 J #703445 -05 8 114261 KEY PLAN SCALE NONE 1,26. —0 DATE 02.21.02 M25 COMP NO sYM A REDRAWN RELO HR /CONTRACTS /PRO DEV 9 -98 STRUCTURAL UPGRADE REVISION 14' -10" ( " -10" 1" t 1" 14' -10" 14' -10" 14' -10" 14' -10" 1 1 4" 1, 14' -10" 1,I' -10" 7' -2 1/ ' 14' -10" - " -- ' 14' -10" 1'- 1" I 1 14' -10' 14' -10" ■14' -10" 14' -10" ' 1 1 4" 1" '. 14' -10" 14' -10" - " 1-1 T1- 6' -6" 14' -10" - " 1-1 T1- -10" � IL'lt lflY MEM. 114_1 0 n 1 1 14' -10 " l ''" I_I —aI1W 14' -10" 14' -10" 14' -10" t7' -2 1/ 7' -5 14' -10" 1 1/4" "" -10 I 14' -10" 1 1/4" ►j 1 14' -10" 14' -10" 8" UP TO 2ND FLR O 1700 ■ 1 1 4" ;i 1,/2" 1 "t 1 1/4" 1/4" T 1 1/4 1 1/4" . 1 1/4" 1 1/4" 1 1/2" 1 1/4" 1 1/2" 13 STRUCTURAL UPGRADE DE— SCOPING REVISION J #703445 -05 12 11 J #90079 -00 J #703445 -05 BY KB KGP DLR GROUP DUB GROUP APPROVED RP KP DATE 1.15.97 6.25.99 04.24.01 02.21.02 SYM 10 O9 08 REVISION FLOOR PLAN SCALE: 1/8 " =1' -0" APPROVED DATE UP 0 O I I - � t I I t 1 1 /4" 5 177e- 1 1 Z LAtmatErAw ® o' 1 1/4"' 1 l 11" 1 " ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE DRAWN K.BUN CHECKED ENGINEER CHECKED APPROVED DATE 1.15.97 TTTLE BTITLE HVAC PLAN 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION_ CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. BRACE PER NOT USED. M261 M517 1M26 x1517 9 1M26517 1 M 1M261 M517 10 ONLY IF REQUIRED FOR RELOCATION /UPGRADE AT NEW INTERIOR CROSS BRACING LOCATIONS. LEGEND: --s—o— SPRINKLER HEAD �--� 2 -WAY EARTHQUAKE BRACING X 4-WAY EARTHQUAKE BRACING PIPE HANGER ® SPRINKLER RISER GENERAL NOTES: CONSTRUCTION NOTES: SPRINKLER HEAD DROP INTERFERES WITH NEW CEILING COFFER. RELOCATE DROP. RELOCATE SPRINKLER MAINS & BRANCHES INTERFERING WITH NEW STRUCTURAL X- BRACING INSTALLATION & LOCATION. HELD COORDINATE. mg 13 tO iM260 RECEIVED CITY OF TUKWI, LEi3 u 20OF PERMIT CENTER CURRENT REVISION SYMBOL J #703445 -05 C SHEET 1M 261 JOB NO J #703445 -05 KEY PLAN SC. NONE DATE 02.21.02 COMP N0. M26 SYM A REDRAWN 9 -98 REWORK OFFICE AREA REVISED HEAD LOCATION AT COL P9 INSTALL ONE SPRINKLER HEAD 9 -98 STRUCTURAL UPGRADE REVISION TT 11 J #180166 -04 J #180166 J#1800241 -00 J #703445 -05 BY KB HARRAH HARRAH DNA/ DLR GROUP APPROVED R.W.S. R.W.S. R.W.S. RP DATE 1.15.97 3.4.99 4.7.99 9.24.99 04.24.01 SYM 10 ®9 ® REASON STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 -05 FLOOR PLAN SCALE: 1/8 " =1' -0" DLR DROOP APPROVED GM DATE 2.21.02 1" 1 eoEITAVA 1 "* 1 1 ", 1 iL 1 /4" .- /4" 1 1 /4" t 1 1/4 "t 1" 1 "1 1 t /4" i A 1 1/4 "t 1" 1" 4 PROVED WY ACCEPTABILITY THIS DESIGN AND /OR SPECIRCADION IS APPROVED DEPT. 1" 4 t 1" DATE 1" 4 MOo i DRAWN K.BUN CHECKED UNGINEAR CHECKED APPROVED APPROVED t DATE 1.15.97 SUBTDLE AJCOLJAMInAI AJACTCD HVAC PLAN 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 1.) LEGEND: SPRINKLER HEAD • -► 2 -WAY EARTHQUAKE BRACING X 4-WAY EARTHQUAKE BRACING �- PIPE HANGER ® SPRINKLER RISER GENERAL NOTES: NOTIFY BOEING FIRE DEPT. 24 HOURS PRIOR TO SHUTDOWN. 2.) FOR EARTHQUAKE BRACING USE 1" STEEL PIPE FOR BRACES UP TO 7' -0" LONG & 1 -1/4" PIPE FOR BRACES 7' -1" TO 9' -O" LONG. FLATTEN AND DRILL ENDS FOR MOUNTING. 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS -BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. BRACE PER NOT USED 8 1M262 M517 1M262 M517 9 , ° ( 1M262 M517 1M262 M517 ONLY IF REQUIRED FOR RELOCATION /UPGRADE AT NEW INTERIOR CROSS BRACING LOCATIONS CONSTRUCTION NOTES: SPRINKLER HEAD DROP INTERFERES WITH NEW CEILING COFFER. RELOCATE DROP. RELOCATE SPRINKLER MAINS & BRANCHES INTERFERING WITH NEW STRUCTURAL X- BRACING INSTALLATION & LOCATION. FIELD R CIT p F iIIXWRq FEJ, PERMIT CENTER CURRENT REVISION SYMBOL J #703445 -05 SHEET 1M262 JOB N0. DWG NO. 4703445 -05 KEY PLAN SCALE NONE COMP N0. -0 DATE 2.21.02 M27 SY A REDRAWN 9 -98 STRUCTURAL UPGRADE REVISION EXTRA; OC; RELOCATE ESTIMATING J #90034 -00 J #703445 -05 STRUCTURAL UPGRADE DE— SCOPING REVISION J #703445 -05 BY KB JH DLR GROUP DLR GROUP APPROVED RP GM DATE 1.15.97 4.13.99 04.24.01 2.21.02 SYM 10 ®CD REVISION FLOOR PLAN SCALE: 1/8 " =1' -0" BY APPROVED DATE gLATOE.41AKV' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE DRAWN K.BUN CHECKED CHECKED APPROVED PP Mooa DATE 1.15.97 BTITLE HVAC PLAN 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: — .—o-- SPRINKLER HEAD 2 —WAY EARTHQUAKE BRACING X 4—WAY EARTHQUAKE BRACING f PIPE HANGER 0 SPRINKLER RISER GENERAL NOTES: CONSTRUCTION NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS —BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. BRACE PER 1M2631M517 1M263 M517 R 1M2631M517 1M263 M517 ONLY IF REQUIRED FOR CMU WALL REPLACEMENT AND BRACING NOT USED BRACE PER CURRENT REVISION SYMBOL 703445 -05 C J # SHEET JOB N0. 1M2631M517 1M2631M517 1M263 KEY PLAN SCAM NONE 1M263 J #703445 -05 1M260 1M261 1M 0 O 114262 DATE 2.21.02 COMP N0. V M28 APPROVED DATE ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN K.BUN CHECKED CHECKED APPROVED DATE 1.15.97 SUBTITLE TRLE FIRE PROTECTION PLAN CURRENT REVISION SYMBOL p 4703445 -05 SHEET 2M260 JOB NO J #703445 -05 20261 20262 20263 0 DATE COMP N0. 2.21.02 M29 SYM A REDRAWN 9 -98 STRUCTURAL UPGRADE REVISION J #703445 -05 STRUCTURAL UPGRADE DE- SCOPING REVISION J #703445 - BY KB DLR GROUP DLR GROUP APPROVED RP GM DATE 1.15.97 04.24.01 2.21.02 REVISION 0 O 0 FLOOR PLAN SCALE: 1 /8 " =1' -0" 0 0 �BOE /Nw 0 0 0 0 0 M I BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.2 LEGEND: -��- SPRINKLER HEAD �--� 2 -WAY EARTHQUAKE BRACING X 4-WAY EARTHQUAKE BRACING -f-- PIPE HANGER ® SPRINKLER RISER GENERAL NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS-BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. BRACE PER 8 NOT USED 2M260 M517 2M260 M517 9\ X10 2M260 0517 2M260 M517 ONLY IF REQUIRED FOR CMU WALL REPLACEMENT AND BRACING CONSTRUCTION NOTES: CITY OF - �, •.:, PERMIT -0 20 KEY PLAN SCJ E NONE IN Ell En EN REVISION REDRAWN CALCM J #100005 -00 9 -98 STRUCTURAL UPGRADE J #703445 - 05 STRUCTURAL UPGRADE DE— SCOPING REVISION J #703445 - IEN DLR GROUP DUN GROUP APPROVED RP GM DATE EIE1110 - 3.29.00 04.24.01 2. 21.02 O O N REVISION 0 U FLOOR PLAN SCALE: 1/8 " =1' -0" APPROVED DATE O O O g LAPPIZEZAK ® d-- �stoxct 1 APPROVED BY ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE DRAWN K.BUN NECKED G C HECKED APPROVED APPROVED SUBTITLE FIRE PROTECTION PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.1 LEGEND: —4—o-- SPRINKLER HEAD �—� 2 —WAY EARTHQUAKE BRACING X 4—WAY EARTHQUAKE BRACING PIPE HANGER ® SPRINKLER RISER GENERAL NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS —BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. BRACE PER NOT USED M260 M517 1M26 O M517 �9 > OR (10� 1M2602 1M260 M517 ONLY IF REQUIRED FOR RELOCATION /UPGRADE AT NEW INTERIOR CROSS BRACING LOCATIONS CONSTRUCTION NOTES: SPRINKLER HEAD DROP INTERFERES WITH NEW CEILING COFFER. RELOCATE DROP. ® RELOCATE SPRINKLER MAINS & BRANCHES INTERFERING WITH NEW STRUCTURAL X— BRACING INSTALLATION & LOCATION. FIELD COORDINATE. cn- oc ElvEo ruin. „, PERMIT CEN,R 1"770R3747-05 SYMBOL C SHEET 2M261 JOB NO. 4703445 -05 _ J DATE 2.21.02 SYM A REDRAWN BUILDING 9 -98 STRUCTURAL UPGRADE 13 12 11 REASION J #703445 -05 STRUCTURAL UPGRADE DE— SCOPING REVISION 4703445 -05 BY KB DLR GROUP DLR GROUP APPROVED DATE 1.15.97 RP 04.24.01 GM 2.21.02 SYM REVISION BY APPROVED FLOOR PLAN SCALE: 1/8"=1'-0" DATE 0 ?LAMPE/Mg® ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE DRAWN K.BUN CHECKED EASIN CHECKED APPROVED 0 0 DATE 1.15.97 0 0 0 0 0 0 MOOa FIRE PROTECTION PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.2 LEGEND: --�"�— SPRINKLER HEAD 2 —WAY EARTHQUAKE BRACING X 4—WAY EARTHQUAKE BRACING —�-! PIPE HANGER ® SPRINKLER RISER GENERAL NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS —BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. BRACE PER NOT USED 2M262 M517 2M26 gM517 6 9 2M M517 R 2M262 M517 ONLY IF REQUIRED FOR RELOCATION /UPGRADE AT NEW INTERIOR CROSS BRACING LOCATIONS CONSTRUCTION NOTES: >. SPRINKLER HEAD DROP INTERFERES WITH NEW CEILING COFFER. RELOCATE DROP. ® RELOCATE SPRINKLER MAINS & BRANCHES INTERFERING WITH NEW STRUCTURAL X— BRACING INSTALLATION & LOCATION. FIELD COORDINATE. RECEIVEp cm of TuKwun PERMIT CENTER KEY PLAN SCALE NONE CURRENT REVISION SYMBOL B p J#703445-05 SHEET 2M262 JOB NO . J #703445 -05 DATE 2.21.02 COMP NO. M31 SYM A REDRAWN REVISION BUILDING 9 -98 STRUCTURAL UPGRADE J #703445 -05 STRUCTURAL UPGRADE DE— SCOPING REVISION 4703445 - BY KB DAR GROUP DAR GROUP APPROVED RP GM DATE 1.15.97 04.24.01 2.21.02 SY REVISION FLOOR PLAN SCALE: 1/8 " =1 - 0" APPROVED DATE Q�BOE /NG° G MO ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS• APPROVED PROVED BY - DEPT. DATE DRAWN K.BUN CHECKED CHECKED APPROVED ATE 1.15.97 SUBTITLE TITLE FIRE PROTECTION PLAN BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98.2 LEGEND: —•—o— SPRINKLER HEAD f—� 2 —WAY EARTHQUAKE BRACING X 4—WAY EARTHQUAKE BRACING PIPE HANGER ® SPRINKLER RISER GENERAL NOTES: 1. THIS AREA HAS NOT BEEN VISUALLY SURVEYED FOR CONDITIONS INCONSISTENT WITH THE AS —BUILT INFORMATION. CONTRACTOR TO VERIFY PIPE SIZE AND LOCATION IN AREAS NOTED FOR RELOCATION AND BRACING. BRACE PER 7 ( 8 2M263 M517 2M263 14517 (9� (101 2M263 14517 2M26,31517 ONLY IF REQUIRED FOR CMU WALL REPLACEMENT AND BRACING NOT USED CONSTRUCTION NOTES: RECEIVED CfiY OFTUKWI�q PERMIT CENTER CURRENT REVISION J #703445 -05 SHEET �7 KEY PLAN SOME: NONE SYMBOL B 2M263 JOB NO. m n J #703445 -05 214260 2M261 214262 A 2M263 0 DATE 2.21.02 M32 COMP N0. EQUIPMENT EQUIPMENT HANGE ROD (T YP.) � EQUIPMENT LIMIT STOP ALTERNATE RIGID TRANSVERE REVISION SUSPENDED EQUIPMENT .SEISMIC BRACING DETAIL (T SCALE NONE ELEVATION SLACK CABLE FOR VIBRATION ISOLATED EQUIPMENT (TOP.) PLAN ELEVATION \EQUIP. PATH TOP SUPPORT POINTS SCALE: NONE 1M62,3; 2M60,1,2,3; 1M260,1,23 M517 2M260,1,2,3 BY QUIP. FRAME OR SUPPORT POIN EISMIC CABLE BRACE (TAP.) 1M10,1,2,3; 2M10,1,2,3 M517 8 APPROVED DATE SKR QONIAL BNACE SCALE: NONE SCALE: NONE NNE 1. SEE SWCANA BRACE SAO TAME FOR VERTICAL MAGEE ,DAME BRACES, BOO SO1 8 CONNECTION TO S PPORRNG MCRAE REVISION SIDE BRACING FOR RECTANGULAR DUCTS arix lute. CONNECTION TO SIPPORING MOSER STRUCnEx.AL UNMORAL RAL BRACE ORE EACH SEE OF DUCT. (SKIN DOII ®) CENTER BRACING FOR RECTANGULAR DUCTS TYPICAL CABLE TRANSVERSE TYPICAL CABLE SCALE: NONE 1M62,3; 2M60,1,2,3; 1M260,1,2,3 M517 2M260,1,2,3 APPROVED DATE 2M10,1,2 M517 2M10,1 2 M g NNE SEE SNACNA TABLES FOR VDDIGL HANGERS, SZE MK CONNECTION TO SNICEURAL SUPP ER SOLT p iraPEZAW° SCALE: NONE 1M62,3; 2M60,1,2,3; 1M260,1,2,3 M517 2M260,1,2,3 SCALE: NONE CABLE SIDE BRACING FOR RECTANGULAR DUCTS 2M10,1 2 M517 SCALE: NONE SCALE NONE PROVED BY BRACE AT PIPE HANGER \ LONGITUDINAL BRACE 10 PIPE TRAPEZE ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. '---- C01IElbl TO SRPORONG MECUM I11311ER----"1 STRUT BRACING FOR CABLE CENTER BRACING FOR RECTANGULAR DUCTS \\ 2M10,1 2 1517 DATE DRAWN G. ALCARAZ CHECKED K. PAULSON ENGINEER R. PETERS CHECKED APPROVED APPROVED cia dM517 DATE 04.24.01 04.24.01 04.24.01 STOLE SCALE: NONE SCALE: NONE ISSUE FOR BID TRLE BUILDING 9 -98 STRUCTURAL UPGRADE BUILDING 9 -98 SEISMIC BRACING DETAILS SIDE BRACING FOR RECTANGULAR DUCTS 4 NOTE I. SEE SRAM MULE SIM TABLE FOR VERSUS. xNKERS, WbONAL BRACES, BOLT AWE R COIHICIUN TO SIRPJRIAC STROM TYPICAL RIGID TRANSVERSE BRACE AT PIPE HANGER \\ SCALE: NONE 1M62,3; 2M60,1,2,3; 1M260,1,2,3, M517 2M260,1,2,3 CABLE BRACING FOR PIPE TRAPEZE SHEET • CURRENT REVISION J #703445 -05 - M517 SYMBOL M517 J #703445 -05 2M10,1 2 M517 DWG NO. ,,,, DATE COMP NO. 04.24.01 M33