Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M01-142 - TYCOM GLOBAL NETWORK (NEVER ISSUED)
MO1 -142 TYCOM GLOBAL NETWORKS 3343 So • 120th St • EXPIRED - PERMIT NEVER ISSUED ..,:rr;•.— :i,i,vac.w.•vr: Ja«p�ea:u•fY.>M'r. •aa.�:a�a.s: Fc1ti•.�L'.= ii:'w "v/L9 SECTION 15182- DOUBLE WALL FRP .DERGROND FUEL TANKS PMT 1 - GENERAL 1,1 SUMMARY A. SECTION INCLUDES: DESIGN, MANUFACTURE, TESTING,DELIV.Y AND INSTALLATION OF DOUBLE -WALL FRP FUEL TANKS WITH BRINE -FILLED INTERSTICE /RESERVOIR FOR UNDERGROUND INSTALLATION COMPLETE WITH: I. TANK ACCESS OPENINGS. 2, ANCHORING STRAPS, 3, LIFTING LUGS, PIPING CONNECTIONS, 5, MONITORING CONNECTIONS B. COMPLIANCE: MECHANICAL DESIGN IN COMPLIANCE WITH THIS SECTION IS RESPONSIBILITY OF MANU'FACT'URER. 1,2 SUBMITTALS A. SUBMIT SIX (6) COPIES OF EACH OF THE FOLLOWING: PRODUCT DATA GENERAL ARRANGEMENT DRAWINGS, EQUIPMENT WEIGHTS, MATERIAL SPECIFICATIONS, INSTALLATION INSTRUCTIONS, PMTS LISTS, BILL OF MAT cRI,S, INSPECTION REPORTS, AND WARRANTY. B. SUBMIT DETAILED LIST OF SPECIAL TOOLS AND DEVICES REQUIRED TO INSTALL ADJUST, REP., TEST, OR OPERATE EQUIPMENT, C. QUSUBOTATIMIT DET AILS AND CUT SHEET OF MANWAYS, COLLARS AND RISERS WITH D. SUBMIT SEALED STRUCTURAL CALCULATIONS 1,3 QUALITY ASSURANCE A. LOCAL CODES: DESIGN AND FABRICATE IN ACCORDANCE WITH LOCAL CODES, ORDINANCES, AND REGULATIONS OF KING COUNTY, CITY OF TIME, AND WASHINGTON STATE. B. COMPLY WITH CURRENT EDITIONS OF THE FOLLOWING APPLICABLE GOVERNING STANDARDS, AS APPLICABLE: I. ASTM D4021, 2, UL STANDARD FOR SAFETY 1316, FILE MH 9061 FOR STORAGE OF FLAMMABLE LIQUIDS. A. CERTIFICATION PLATE SHALL BE ATTACHED TO EACH TANK, 3. NFPA STANDARDS: A. NFPA 30: FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE, B. NFPA 30A: AUTOMOTIVE AND MARINE SERVICE STATION CO.. C. NEPA 31: INSTALLATION OF 01L- BURNING EQUIPMENT. 4, STANDARDS AND GUIDELINES OF TUKWILA WA FIRE DEPARTMENT, 1,4 DELIVERY AND HANDLING A. DELIVER AND HANDLE EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS, B. INSPECT EQUIPMENT WHEN DELIVERED TO ENSURE EQUIPMENT IS UNDAMAGED AND COMPLIES WITH SPECIFIED REQUIREMENTS. I.S WARRANTY A. WARRANT SUPPLIED EQUIPMENT FOR 12 MONTHS A °TER SHIPMENT AGAINST DEFECTS IN DESIGN AND MANUFACTURING, PMT 2 - PRODUCTS 2,1 EQUIPMENT A. FURNISH TANKS DESIGNED FOR UNDERGROUND INSTALLATION COMPLETE AS SHOWN ON APPROVED SHOP DRAWINGS AND INCLUDING NECESSARY BOLTS NITS, GASKETS AND INTERNALS AND INTERNAL PIPING, B. ACCEPTABLE MANUFACTURER XERXES CORPORATION. 2,2 CLEANING A. PRIOR TO SHIPPING, PERFORM FINAL CLEANING OF INTERNAL AND EXTERNAL SURFACES AFTER MANUFACTURING AND TESTING OPERATIONS HAVE BEEN COMPLETED, CLEANING PROCEDURES ME MANUFACTURER'S RESPONSIBILITY. 2.3 DOUBLE -WALL FIBERGLASS REINFORCED PLASTIC (FRP) UNDERGROUND FULL TANKS A. LOADING CONDITIONS: TANKS SHALL MEET THE FOLLOWING DESIGN CRITERIA I. INTERNAL LOAD: TANK SHALL WITHSTAND A 5 PSI AIR PRESSURE TEST WITH 5:1 SAFETY FACTOR, CONTRACTOR SHALL NDIVI WALLY TEST TANKS FOR LEAKAGE PRIOR TO INSTALLATION, MAXIMUM TEST PRESSURE IS 5 PSI - 2, VACUUM TEST: EVERY TANK SNAIL BE VACUUM TESTED BY THE MANUFACTURER AT THE FACTORY TO 11.5 INCHES OF MERCURY, 3. SURFACE LOADS: TANK SHALL WITHSTAND SURFACE H -20 AXLE LOADS WHEN PROPERLY INSTALLED ACCORDING TO CURRENT MANUFACTURER'S INSTALLATION INSTRUCTIONS, 4, EXTERNAL HYDROSTATIC PRESSURE TAN( SHALL BE BURIED IN GROUND WITH 7 FEET OF OVERBURDEN OVER THE TOP OF THE TANK, THE HOLE FULLY FLOODED AND SAFETY FACTOR OF 5:1 AGAINST GENERAL BUCKLING. 5. TANKS SHALL SUPPORT ACCESSORY EQUIPMENT SUCH AS BUT NOT LIMITED TO MANWAY RISERS, PIPING, AND FITTINGS WHEN INSTALLED ACCORDING TO TAN( MANUFACTURER'S RECOMMENDATIONS AND LIMITATIONS. B. PRODUCT STORAGE: TANKS SHALL BE CAPABLE OF STORING PETROLEUM PRODUCTS WITH SPECIFIC GRAVITY UP TO I.I. 2. TANKS SHALL BE VENTED TO ATMOSPHERIC PRESSURE - 3. TANK SHALL BE SUITABLE FOR DIESEL FUEL C. MATERIALS: TANKS SHALL BE MANUFACTURED WITH 100% RESIN AND GLASS - FIBER REINFORCEMENT AND NO SAND FILLERS. D. LEAK DETECTION/TANK MONITORING SYSTEM: I. EACH TANK SHALL BE CONTINUOUSLY M.ITO.D FOR LEAKAGE BY A HYDROSTATIC HEAD PRESSURE LEAK DETECTION SYSTEM, WHICH SHALL CONSIST OF AN INTERSTITIALLY CONTAINED BRINE SOLUTION AND AN ELECTRONIC TANK MONITORING SYSTEM. 2. TANK MANUFACTURER SHALL SUPPLY AS PART OF TFE HYDROSTATIC HEAD PRESSURE LEAK DETECTION SYSTEM A BRINE SOLUTION (TO PREVENT FREEZING) DELIVERED TO THE JOB SITE IN THE INTERSTICE OF THE DOUBLE- WALL TANK WITH AN INTEGRAL BRINE RESERVOIR WHICH RISES OR FALLS TO PREDETERMINED ALARM POINTS. 3. THE BRINE RESERVOIR SHALL BE CONSTRUCTED OF FIBERGLASS AND MOUNT. DIRECTLY TO THE TANK TOP. 4. THE BRINE RESERVOIR SHALL BE FITTED WITH ONE 4 INCH NPT FITTING FOR INSTALLATION OF THE ELECTRONIC RESERVOIR PROBE _ 5, SYSTEM SHALL FUNCTION TO DETECT A LEAK IN EITHER THE PRIMARY TANK OR THE SECONDARY TANK IN EITHER A WET OR DRY EXCAVATION. 6. THE ELECTRONIC TANK MONITORING SYSTEM AND BRINE RESERVOIR SENSING PROBE SHALL NOT BE PROVIDED BY THE TANK MANUFACTURER, BUT BY OTHERS. SEE SECTION 15190. 2,4 APPURTENANCES AND ACCESSORIES A. ANCHOR STRAPS: I. STRAPS SHALL BE FRP ANCHOR STRAPS AS SUPPLED BY TANK MANUFACTURER 2, NUMBER AND LOCATION OF STRAPS SHALL BE SPECIFIED IN CURRENT LITERATURE BY TANK MANUFACTURER. B. MANWAYS: I, All MANWAYS ME TO BE FLANGED AND 22 INCHES I.D., COMPLETE WITH. LISTED GASKETS, BOLTS AND COVERS. 2. LOCATION IS SHOWN ON TANK DRAWINGS. 3. EACH STEEL MANWAY COVER SHALL INCLUDE A MINIMUM OF THREE 4 INCH NPT FITTINGS, EXCEPT WHERE INDICATED OTHERWISE ON .AWLS. C. GAUGE PLATES: GAUGE PLATES SHALL BE INSTALLED UNDER EACH SE VICE FITTING AND MANWAY OPENING, AND WHERE INDICATED ON DRAWINGS D. NPT THREADED FITTINGS: I. ALL THREADED FITTINGS SHALL BE A MATERIAL OF CONSTRUCTION CONSISTENT WITH THE REQUIREMENTS OF THE UL LABEL. 2. ALL STANDARD THREADED FITTINGS SHALL BE HALF COUPLINGS AND SHALL BE 4 INCH IN DIAMETER. REDUCERS ARE TO BE USED FOR SMALLER SIDS WHERE SHOWN AND BY CONTRACTOR. 3. STRENGTH: NPT FITTINGS SHALL WITHSTAND A MINIMUM OF 150 FOOT-POUNDS OF TORQUE AND 1,000 FOOT- POUNDS OF BENDING, BOTH WITH A 2:1 SAFE FACTOR. TY E. MONITOR FITTINGS: EACH MONITOR FITTING SHALL CONSIST OF A 4 INCH NPT FITTING ON THE SECONDARY TANK. F. ATTACHED COLS RISERS: MANUFACTURER'S STANDARD 42 INCH DIAMETER WITH WATERTIGHT COVERS. G. BALLAST PAD: I. CONCRETE: 3000 PSI 0 28 DAYS (NORMAL WEIGHT, ILO IBS /. MINIMUM) 2, REINFORCING: N0. 5 OR 6 BARS, GRADE 60 A6I5 WITH SUPPLEMENT, AS INDICATED ON DRAWINGS. 3, PLACE BARS 12' ON CENTER, EACH WAY, EACH FACE, UNLESS NOTED OTHERWISE ON DRAWINGS. H. PEA GRAVEL: CLEAN, NATURALLY ROUNDED AGGREGATE WITH A MIX OF PARTICLE SIZES WITH DIAMETERS NOT LESS THAT I/8' AND NOT MORE THAN 3/4; CONFORMING TO THE REQUIREMENTS OF ASTM C33. I. FILL PORTS: PROVIDE COLOR CODED FILL PORTS PER GENERALLY ACCEPTED INDUSTRY STANDARDS. J. PIPE SUPPORTS: PROVIDE MANUFACTURER'S STANDARD L- BRACKETS WHERE INDICATED ON DRAWINGS, K. LIFTING LUGS: MANUFACTURER'S STANDARD QUANTITY AND LOCATION, 2,5 SHEET PILING: A. THE SELECTION OF SHEET PIPING MATERIALS SHALL BE THE TANK INSTALLER'S OPTION. THE CONTRACTOR MAY, AT HIS DISCRETION, DISAPPROVE AND REJECT MATERIALS WHICH HE REGARDS TO BE UNSOUND OR NOT IN CONFORMANCE WITH TITLE 29 CODE OF FEDERAL REGULATIONS, PMT 1926, SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION (OSHA). PMT 3 - EXECUTION 3.1 INSTALLATION A. GENERAL: I. INSTALL STORAGE TANK IN ACCORDANCE WITH NFPA 30 AND MANUFACTURER'S INSTALLATION INSTRUCTIONS, 3.2 SHEET PILING INSTALLATION A. THE PURPOSE OF THIS ARTICLE IS TO ENSURE THE SAFETY OF WORKMEN AND THE PUBLIC EXPOSED TO THE HAZARD OF FALLING OR SLIDING MATERIAL IT SHALL BE THE TANK INSTALLER'S RESPONSIBILITY TO PROVIDE PROTECTION ADEQUATE FOR THIS PURPOSE. DETAILS OF THIS SHEETING MUST CONFORM WITH THE REQUIREMENTS OF TITLE 29 CODE OF FEDERAL REGULATIONS, PART 1926, SAFETY AND HEALTH .G .ATIONS FOR CONSTRUCTION (OSHA). THE CONTRACTOR SHALL RESERVE THE RIGHT TO INCREASE THE MINIMUM REQUIREMENTS SET FORTH THEREIN, DEPENDING ON THE HAZARD, B. IN GENERAL, THIS TIME WILL BE REQUIRED WHEREVER AN EXCAVATION EXCEEDS FIVE (5) FEET IN DEPTH AND THE SIDE SLOPES ARE NOT LAID BACK TO A SAFE'. GRADIENT AS SET FORTH IN TITLE 29 CFR, PMT 1926, SAFETY AND HEALTH REG(AATIONS FOR CONSTRUCTION (OSHA) E PILING C SH ET L G SHALL BE INSTALLED WHERE ORDERED BY THE CONTRACTOR D. SHEET PILING INSTALLED UNDER THIS ITEM SHALL BE TIGHT OR CONTINUOUS, EXCEPT WHERE SKELETON SHEET PILING IS PERMITTED UNDER TITLE 29 CFR PMT 1926, SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION (OSHA). SKELETON SHEETING SHALL BE CDNSIDERED AS ANY SHEETING OTHER THAN TIGHT OR CONTINUOUS SHEETING, E. SHEET PILING FOR THIS ITEM SHALL BE OF ADEQUATE CROSS SECTION AND ADEQUATELY BRACED, END OF SECTION 15182 SECTION 15100 - TANK MONITORING SYSTEM PMT I - GENERAL 1.1 SUMMARY A FURNISH AN ELECTRONIC TANK MONITORING SYSTEM (TANS) FOR UNDERGROUND LIQUID STORAGE TANKS (USTS). ASSOCIATED BURIED PIPING AND CONTAINMENT AREAS. THE TANK MONITORING SYSTEM SHALL MEET SPECIFIED REQUIREMENTS AND SHALL BE IN ACCORDANCE WITH U.S. EPA FEDERAL STANDARDS FOR (LISTS) AS DESCRIBED IN SUBPART D. 40 CFR PMT 280, B. COMPLIANCE: MECHANICAL DESIGN IN COMPLIANCE WITH THIS SECTION IS RESPONSIBILITY OF MANUFACTURER, 1.2 SYSTEM DESCRIPTION A. THE TMS SHALL PROVIDE INVENTORY CONTROL IN -TANK LEAK DETECTION, IN -LINE LEAK DETECTION, SUMP SENSING, INTERSTITIAL LEAK SENSING, AND VAPOR SENSING CAPABILITIES FOR UP TO EIGHT TANKS. TMS SHALL FEATURE MODULAR DESIGN TO ALLOW IT TO BE CONFIGURED WITH MONITORING INPUT AND OUTPUT CAPABILITIES ACCORDING TO REQUIREMENTS OF THE PARTICULAR SITE. 1.3 QUALITY ASSURANCE A TANK MONITORING SYSTEM SHALL MEET AIL OF APPLICABLE PERFORMANCE SPECIFICATIONS AND REGULATORY AGENCY REQUIREMENTS SET FORTH BY THE FOLLOWING ORGANIZATIONS: I. AMERICAN PETROLEUM INSTITUTE (APO. 2. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM). 3. ENVIRONMENTAL PROTECTION AGENCY (EPA). A FEDERAL COMMUNICATIONS COMMISSION (FCC). 5. NATIONAL ELECTRIC CODE (NEC). 6. NATIONAL FIRE PROTECTION ASSOCIATION (NPA). 7_ UNDERWRITERS LABORATORIES (UL) 1.4 SUBMITTALS A. SUBMIT SIX (6) COPIES OF EACH OF THE FOLLOWING: PRODUCT DATA GENERAL ARRANGEMENT DRAWINGS, WIRING DIAGRAMS, MATERIAL SPECIFICATIONS, ELECTRICAL REQUIREMENTS, INSTALLATION INSTRUCTIONS, 0 8 M MANUAL BILL OF MATERIALS. WARRANTY, PERFORMANCE GUARANTEE. 1.5 DELIVERY AND HANDLING A DELIVER AND HANDLE EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS. B. INSPECT EQUIPMENT WHEN DELIVERED TO ENSURE EQUIPMENT IS UNDAMAGED AND COMPLIES WITH SPECIFIED REQUIREMENTS, 1.6 WARRANTY A IN ADDITION TO ANY GUARANTEES OTHERWISE PROVIDED, GUARANTEE THAT ALL SUPPLIED MATERIALS AND COMPONENTS WILL FUNCTION. SPECIFIED AND BE FREE FROM DEFECTS IN MANUFACTURING, DESIGN, AND FABRICATION FOR MINIMUM PERIOD ONE YEAR AFTER _ SYSTEM IS PLACED IN OPERATION, NOT TO EXCEED 18 MONTHS AFTER SHIPMENT WARRANTY SHALL COVER PMTS AND LABOR AND SHALL BE EXTENDABLE DURING FIRST YEAR FOR ADDITIONAL COST, PMT 2 - PRODUCTS 2.1 ACCEPTABLE MANUFACTURER A THE TANK MONITORING SYSTEM SHALL BE TUTHILL TRANSFER SYSTEMS/EMCO ELECTRONICS EECO SYSTEM 2000, 2.2 EQUIPMENT A MONITORING CONSOLE I. THE MONITORING CONSOLE CONTROLLER SHALL BE MICROPROCESSOR- BASED, AND SHALL BE DESIGNED AND CONSTRUCTED WITH MODULAR ARCHITECTURE PERMITTING EITHER FACTORY OR FIELD UPGRADES AND SERVICING. 2, CONFIGURATION AND SET-UP DATA SHAD- BE MAINTAINED WITHOUT REQUIRING ELECTRICAL POWER OF ANY KIND. REPLACEMENT OR SUBSTITUTION OF ANY CONTROLLER FR PLUG-IN CARD SHALL NOT REQUIRE SYSTEM. -CONFIGURATION 3. REAL -TIME CLOCK AND NON - CRITICAL L. DATA SUCH AS INVENTORY, DELIVERY, ALARM. THEFT, ERROR, AND LEAK REPORTS SHALL BE MAINTAINED IN BATTERY BACKUP. SYSTEM SHALL INCLUDE DIGITAL DISPLAY FOR VIEWING TANK INFORMATION AND LED INDICATORS FOR THE ALARM CONDITIONS. 4, THE CONSOLE SHNJ_ BE HOUSED IN A LOCKABLE WALL MOUNTED .CLOSURE THE CONSOLE SHALL INCLUDE MICROPROCESSOR BOARD, PROBE/SENSOR CARD. POWER SUPPLY, CONTROL, I/O AND COMMUNICATIONS INTERFACES, FRONT PANEL DISPLAY SHALL INCLUDE AUDIBLE AND VISUAL ALARMS, AND PUSHBUTTON CONTROLS. 5. SYSTEM SHALL OPERATE ON SWITCH SELECTABLE 120 VAC ( +/- 10%), 60 HZ WITH A 15 AMP DEDICATED CIRCUIT, 6. THE MONITORING CONSOLE SHALL BE EMCO ELECTRONICS .CO 02000 307NR B. SYSTEM SHALL HAVE CAPABILITY TO CONTINUOUSLY MONITOR UP TO EIGHT DUAL -FLOAT MAGNETOSTRICTIVE IN -TANK LEVEL PROBES AND UP TO SO DISCR_RE EXTERNAL LEAK SENSORS. - - C. PROVIDE AN RS -485 MODBUS SERIAL PORT FOR COMMUNICATIONS TO A REMOTELY LOCATED BUILDING MANAGEMENT SYSTEM PC (BY OTHERS). PROVIDE RS-23. COMMUNICATIONS INTERFACE MODULE PROVIDING DATA TRANSMISSION VIA LOCAL PORT, MODEM PORT, AND PASS THROUGH PORT (TO ALLOW CONNECTION OF MODEM PORT DATA TO RS232 SERIAL DEVICE). PROVIDE THE FOLLOWING DATA AS A MINIMUM: I. TWO (2) EACH TANK ATTACHED COLLAR RISER LEAK ALARMS 2. ONE (U EACH F. PIPE SUMP LEAK ALARM 3. TANK LEVEL (ANALOG) 4, TANK LOW LEVEL 5. TANK HIGH -HIGH LEVEL 6. TANK CONTAINMENT LEAK 7. GROUND FAULT D. CONTROLLER SHALL PROVIDE TWO SEPARATE SETS OF DRY CONTACTS EACH CONTAINING ONE NORMALLY OPEN AND ONE NORMALLY CLOSED CONTACT, ONE SET SHALL BE PROVIDED FOR STORAGE TANK HIGH -HIGH AND THE OTHER SET FOR STORAGE TANK LEAK SUMMARY (SEE SECTION 17054). E. THE DISPLAY SHALL HAVE A 2 -LINE (20 CHARACTER PER LINE) BACK -UT LIQUID CRYSTAL DISFM.AY WHICH IS VISIBLE WITHOUT EXTERNAL LIGHTING, THE KEYPAD SHALL . 16 KEY WITH AUDIBLE FEEDBACK. THE TMS SHALL CONTINUOUSLY RUN DIAGNOSTICS TO DETECT EQUIPMENT MALFUNCTIONS. TROUBLE CODES AND ALARM CONDITIONS SHALL BE DISPLAYED UNTIL THE OPERATOR ACKNOWLEDGES THE ALARM/TROUB. AND THE CONDITION IS CORRECTED. F. THE TMS SHALL INCLUDE EXTENSIVE INTERNAL SYSTEM DIAGNOSTICS AND DISPLAY PROBLEMS VIA TROUBLE CODES ON THE DISPLAY AUTOMATICALLY AS THEY ARE DETECTED, THE INDICATION SHALL REMAIN ON THE DISPLAY UNTIL THE PROBLEM HAS BEEN CORRECTED AND THE SYSTEM IS RESET. G. THE TMS SHALL PRINT DETAILED HELP INSTRUCTIONS AT THE OCCURRENCE OF ANY ALARM OR SYSTEM TROUBLE. THE TMS SHALT_ MAINTAIN A 250 EVENT HISTORY LOG IN MEMORY. H. THE TMS SHALL CONTAIN RELAY OUTPUTS WITH PROGRMMAB. FUNCTIONS CAPABLE OF ACTUATING ALARMS AND CONTROL DEVICES, I. TANK MONITORING SYSTEM REPORTS: 1. THE TMS SHALL BE CAPABLE OF GENERATING FOUR (4) DAILY REPORTS THAT CAN BE CUSTOMIZED FOR TIME OF REPORT, REPORT CONTENTS, AND DESTINATION (PRINTER OR MODEM /FAX PORT). THE REPORTS N 7 0 TS SHALL CONTAI THE FOLLOWING: A. FUEL ORDER ADVISORY: PROVIDES AVERAGE DAILY USAGE, NUMBER OF DAYS FUEL REMAINING AND AVAILABLE ANKA T GE A SELECTABLE TANK CAPACITY e. AUTOMATIC WATER REMOVAL: PROVIDES VOLUME OF WATER THAT IS REMOVED FROM THE TANK AND INVENTORY INFORMATION BEFORE AND AFTER THE WATER REMOVAL G DELIVERY: INCLUDES GROSS AND NET VOLUME CHANGES AND START /END INVENTORY, D. INVENTORY: INCLUDES THE FLOWING: I) TIME AND DATE 2) TAN( IDENTIFICATION 3) FUEL IDENTIFICATION 41 FUEL HEIGHT 5) FUEL TEMPERATURE 6) FUEL VOLUME, GROSS 7) FUEL VOLUME, NET (TEMP. COMP.) 8) WATER HEIGHT 9) WATER VOLUME 10) PILLAGE TO 95% J. TANK LEVEL MONITOR (TLM) WITH MAGNETORESTRICTIVE PROBE: I. PROBE SHALL BE MAGNETORESTRICTIVE /FLOAT TYPE WITH A WELDED STAINLESS STEEL SHAFT, ALUMINUM HEAD WITH PRODUCT AND WATER FLOATS. 2, PROBE SHALL HAVE A TEMPERATURE OPERATING RANGE FROM -4 TO +158 °F- THE PROBE SHALL CONTAIN AN ARRAY OF AT LEAST FIVE (5) RTD TEMPERATURE SENSORS ALONG ITS LENGTH FOR ACCURATE VOLUMETRIC TEMPERATURE COMPENSATION. 3. THE PROBE SHALL BE CAPABLE OF PERFORMING 3 GPH (HOURLY). 0.2 GPH (MONTHLY) AND 0.1 GPH (YEARLY) LEM TESTS. 4, PROBE SHALL BE UUCSA APPROVED FOR USE IN CLASS I, DIVISION I, GROUP C 8 D HAZARDOUS LOCATIONS, 5, THE TANK LEVEL MONITOR SHALL HAVE PROGRAMMABLE ALARM LIMITS TO ACTIVATE ON A. OVERFILL B. HIGH PRODUCT LEVEL c, ORDER PRODUCT LEVEL D. LOW PRODUCT LEVEL E. HIGH WATER LEVEL F. WATER PRESENT G. LEAKS H. THEFTS 6, T. PERFORMANCE SPECIFICATIONS: A. LEVEL PRECISION: +/ .0005' B. LEVEL ACCURACY: +A- .04% FULL SCALE C. TEMPERATURE'. PRECISION: 1./ ,0021 °F D. TEMPERATURE' ACCURACY: . + / - .5 °F E. 0,2 GPH LEAK TEST: 99 % PD, 196 PFA' F. 0,2 GPH QUICK .AIK TEST: 95% PD, 596 PFA G. 0,1 GPH LEAK TEST: 99 % PD. : 116 PFA H. 0.1 GPH QUICK LEAK TEST: 96 % PD, 496 PFA THE TANK LEVEL MONITOR PROBE. SHALL BE EMCO ELECTRONICS EECO SYSTEM 0400' (EXACT LENGTH TO BE DETERMINED AT TIME OF SUBMITTAL). K. LEAK SENSING (CONTINUOUS MONITORING): I. TANS SHALL HAVE THE CAPABILITY TO MONITOR SUMPS, DOUBLE WALL PIPING, AND HYDROSTATIC RESERVOIRS, 2. TMS SHALL BE. CAPABLE OF INTERFACING WITH LIQUID SENSORS (THERMISTOR, PROXIMITY, AND HYDROSTATIC SPACE FLOOD .SENSORS), VAPOR SENSORS, AND DISCRIMINATING SUMP SENSORS L. LEAK TEST CAPABILITIES: TMS SHALL PERFORM CONTINUOUS, SCHEDULED AND MANUALLY ACTIVATED 0.2 AND 0,1 GPH LEAK DETECTION TESTS IN COMPLIANCE WITH FEDERAL EPA R.UATIOS 40 CFR PMT 28, WHICH SHALL INCLUDE A LEAK ANALYSIS REPORT. THE LEAK ANALYSIS REPORT SHALL INDICATE TANKS FAILING A TEST, TANKS PASSING A TEST, AND TANKS INVALIDATED FROM A TEST, AND THE REASONS FOR THE INVALIDATION. 2. TMS SHALL PROVIDE AUTOMATIC NOTIFICATION OF COMPLIANCE DEADLINES NOT MET FOR MONTHLY LEAK TESTS NOT - COMPLETED -IN'25 DAYS AND - YEARLY LEAK TESTS NOT COMPLETED IN 355 DAYS, 3. TMS SHALL PROVIDE THIRD PANTY CERTIFICATION ACCORDING TO U.S. EPA'S 'STANDARD TEST PROCEDURE FOR EVALUATING LEA. DETECTION METHODS AUTOMATIC TANK GAUGING SYSTEMS'. (0.2 GPH LEAK TEST): 4, TMS SHALL PROVIDE THIRD PARTY CERTIFICATION ACCORDING TO U.S. EPA'S 'STANDARD TEST PROCEDURE FOR EVALUATING LEAK DETECTION METHODS: VOLUMETRIC TANK TIGHTNESS TESTING. METHOD'. (0.1 GPH LEAK TEST) M. HYDROSTATIC BRINE:.SERVOIR SENSOR: I. SENSOR SHALL MOUNT IN THE UNDERGROUND STORAGE TANK BRINE RESERVOIR ON TOP OF EACH TANK MD REST ON THE RESERVOIR FLOOR. 2. THE SENSOR SHALL. DETECT CHANGES IN THE RESERVOIR BRINE OR GLYCOL SOLUTION WHEN THE LEVEL DROPS BELOW: 2. INCHES OR RISES ABOVE II INCHES' OF LIQUID -: 3. THE SENSOR SHALL. BE THE EMCO ELECTRONICS .CO CHOICE LEAK SENSOR 00003-0. - N, SUMP LEAN SENSORS I. DISCRIMINATING TYPE: SHALL EMPLOY BOTH ELETRO- OPTICAL ANO CONWCTVI7Y TECHNOLOGIES FOR DETECTING AND DIFFERENTIATING BETWEEN HYDROCARBON AND WATER.. 2. SENSOR ASSEMBLIES SHALL BE EMCO .ECTRONICSEECO CHOICE LEAK SENSOR 00003 -002, 3. QUANTITY: SEE DRAWINGS O. REMOTE OVERFILL ALARM AND ALARM ACKNOWLEDGEMENT SWITCH: I. REMOTE ALARM UNIT: A. INCLUDE STROBE LIGHT AND AUDIBLE HORN ALARM IN A WEATHERPROOF JUNCTION BOX. B. UNIT SHALL BE EMCO ELECTRONICS EECO .39650, 2. REMOTE ALARM ACKNOWLEDGE UNIT: A. INCLUDE 'A RUSH TO SILENCE HORN' BUTTON. B, UNIT SHALL BE EMCO ELECTRONICS EECO.39653-1. P. PROVIDE ACCESSORY ITEMS AS REQUIRED TO FURNISH A' COMPLETE AND FUNCTIONAL TANK MONITORING SYSTEM, PROVIDE ACCESSORY ITEMS SUCH AS, BUT NOT UNITED TO PROBE INSTALLATION KITS, CABLES, AND RELAY BOARDS. CABLE TYPE SHALL BE AS SPECIFIED BY TMS MANUFACTURER. Q PROVIDE AN ADDITIONAL NEMA 3R WEATHERPROOF ENCLOSU. TO COVER EACH TMS • CONSOLE AND OVERFILL ALARM ACKNOWLEDGEMENT SWITCH, ENCLOSURES SHALL HAVE A SLOPED ROOF, AND LOCKABLE DOORS ENCLOSURES SHALL BE CONSTRUCTED OF STAINLESS STEEL, AND SHALL BE FURNISHED BY THE TMS. MANUFACTURER TO ENSURE THAT THE ENCLOSURES ME ADEQUATELY SIZED TO PROTECT THE CONSOLES SUFFICIENTLY, R. PROVIDE WEATHERPROOF DISCONNECT SWITCH ADJACENT TO TMS PANEL AS REQUIRED BY CODE. PMT 3 - EXECUTION 3,1 INSTALLATION A. INSTALL TAM( MONITORING SYSTEM PER MANUFACTURER'S INSTALLATION INSTRUCTIONS AND AS INDICATED ON DRAWINGS, END OF SECTION 15190 SECTION 15585 -FUEL OIL PUMP SETS PMT 1 - GENERAL' LI SUMMARY A THIS SECTION SPECIFIES EQUIPMENT, DESIGN, SHOP. TESTING, INSTALLATION, START -UP ASSISTANCE, AND FIELD TESTING OF PACKAGED FUEL OIL PUMP SETS, B. COMPLIANCE: MECHANICAL DESIGN IN COMPLIANCE WITH THIS SECTION IS RESPONSIBILITY OF MANUFACTURER, 1.2 DESIGN REQUIREMENTS A PROVIDE COMPLETE PACKAGED DIESEL FUEL OIL SUPPLY PUMP SET TO SERVE THE EMERGENCY' GENERATORS, B. EACH PACKAGED FUEL OIL PUMP SET SHALL INCLUDE FOLLOWING ELEMENTS SUPPLIED AS AN ENGINEERED SYSTEM BY MANUFACTURER I. PUMPS 2. SYSTEM ENCLOSURE AND CONTAINMENT 3, VALVES 4, PUMP CONTROLS 5. MOTOR STARTERS 6, INDICATORS 7. ALARMS 8. ALL OTHER DEVICES AS REQUIRED TO FORM INTEGRATED, FUNCTIONAL SYSTEM SUCH THAT FIELD INSTALLATION IS RESTRICTED LARGELY TO PIPING, WIRING AND SUCH INTERMEDIATE DEVICES THAT ARE REQUIRED BY CODE AND GOOD ENGINEERING PRACTICE C. EACH PACKAGED. FUEL OIL PUMP SET SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH APPLICABLE SECTIONS OF NFPA 30, NFPA 31, NFPA 37, NFPA 70, AND UL 80, D. ALL COMPONENTS OF THE PACKAGED FUEL OIL PUMP SETS SHALL BE COMPATIBLE. WITH N0. 2 AND DIESEL FUEL OIL, INCLUDING ALL GASKETS, SEALS, PIPE COMPOUNDS, AND EQUIPMENT COATINGS, ALL EQUIPMENT AND ACCESSORIES SHALL BE UL LISTED AND FM APPROVED WHEN AVAILABLE, I. QUALITY ASSURANCE A DESIGN AND FABRICATE IN ACCORDANCE WITH STATE AND LOCAL CODES; REGULATIONS, AND ORDINANCES, AND WHERE APPLICABLE, THE LATEST EDITIONS OF STANDARDS OF THE FOLLOWING: I. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI). 2. AMERICAN SOCIETY OF MECHANICAL ENGINEERS . ASIDE ( ) S. AMERICAN SOCIETY FOR 'i ES LNG D MATERIALS . TM T AN MAT (ASTM). ) L. AMERICAN WELDING SOCIE IO (AWS). 5. ENVIRONMENTAL PROTECTION AGENCY (EPA), 6. FACTORY MUTUAL (FM). 7. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE). 11 . NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA). 9. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA). 10. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA). II_ UNDERWRITERS'. LABORATORIES. INC. (UL). 12, NATIONAL BUREAU OF STANDARDS (NBS). B. IT IS THE MANUFACTURERS' RESPONSIBILITY TO PERFORM DETAILED DESIGN. PROVIDE CONSTRUCTION DETAILS: AND COMPLY. WITH.. THE LATEST REVISIONS OF THE UNIFORM BUILDING AND FIRE CODES: AS WELL AS ALL OTHER APPROPRIATE LAWS, ORDINANCES, AND REGULATIONS CONTROLLING FABRICATION AND INSTALLATION OF PACKAGED PUMP SETS, C. PACKAGED PUMP SET MANUFACTURER SHALL HAVE CAPABILITY TO PROVIDE REPAIR, MAINTENANCE, AND PMTS. SUPPLY SERVICE FOR THE PACKAGED PUMP SET AND ALL APPURTENANCES: J.EDMONDS cK J. HERRON oc F'T AaaB A. MOTRE 1 -4 SUBMITTALS A. SUBMIT SIX (6) COPIES OF EACH OF THE FOLLOWING: PRODUCT DATA DIMENSIONED GENERAL ARRANGEMENT DRAWINGS, SCHEMATIC PIPING AND INSTRUMENTATION DRAWINGS. PERFORMANCE CURVES. MOTOR DATA WIRING DIAGRAMS AND FIELD CONNECTIONS, ELECT. REQUIREMENTS, INSTALLATION INSTRUCTIONS, 0 A M MANUAL, PMTS LISTS, BILL OF MATERIALS, INSPECTION REPORTS. WARRANTY. B. INDICATE THE FO LOWI`N'G ON SUBMITTALS: I. APPLICABLE CODES: 2. MAXIMUM ALLOWABLE PRESSURE AND TEMPERATURE. 3- CONSTRUCTION NIATRIALS BY INDUSTRY STANDARDS AND TRADE NAMES. 4. INTERNAL AND OVERALL DIMENSIONS. 5, NOZZLE SIZES, RATINGS, FACINGS, LOCATIONS... SERVICES. 6. LIFTING LUGS OR RIGGING POINT LOCATION. 7. CLEANING; SURFACE PREPARATION, PAINTING, AND MARKING REQUIREMENTS, 8, PURCHASE ORDER NUMBER, EQUIPMENT NUMBER, AND EQUIPMENT NINE, 9- SHIPPING, OPERATING, AND TEST. WEIGHTS. 10. COMPLETE DIMENSIONAL DATA FOR ALL EQUIPMENT. II- ELECTRICAL DATA FOR MOTOS, 12 MOTOR STARTER.WIREMENTS. 13- UTILITY REDUREMENIS. 14 SIZE OF CIRCUIT BREAKER REQUIRED FOR POWER SUPPLY TO EQUIPMENT. 15. PUMP, DESIGN DATA AND CAPACITIES.: 16- ANCHOR BOLT, LAYOUTS: 17- COMPLETE DESCRIPTION. OF MATERIALS. OF CONSTRUCTION, 18, ALL OPEINGSAN) CONNECTION SIZES. 19. DUNES OF SUPPORTS AND SUPPORT REQUIREMENTS. 20- SEN-ED STRUCRRN_ CALCULATIONS [-SUBMIT DETAILED UST OF SPECIAL TOOLS AND DEVICES REQUIRED TO 'INSTALL, ADJUST: REPAIR TEST, OR OPERATE EQUIPMENT: IDENTIFY AND PRICE SEPARATELY ITEMS" THAT ARE NOT PROVIDED WITH EQUIPMENT- 15.DELIVERY A. HANDLING A DELIVER AND HAND. EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS.' B. REPAIR OR REPLACE ALL ITEMS DAMAGED DURING SHIPMENT AND HANDLING, Ib. WARRNUTY - - A IN ADDITION TO ANY GUARANTEES OTHERWISE PROVIDED, GUARANTEE THAT ALL SUPPLIED MATERIALS AND COMPONENTS WILL FUNCTION. SPECIFIED AND BE FR. FROM DEFECTS IN MANUFACTURING. DESIGN, AND FABRICATION FORA MINIMUM PERIOD OF ONE YEAR AFTER SYSTEM IS PLACED IN OPERATION, NOT TO EXCEED 18 MONTHS AFTER SHIPMENT, THE WARRANTY SHALL COVER PARTS AND LABOR AND SHALL BE EXTENDABLE. WRING THE FIRST YEAR FOR ADDITIONAL COST. PART Z - PRODUCTS' 21 ACCEPTABLE MANUFACTURER A THE PACKAGED FUEL OIL PUMP SETS SHALL BE SIMPLE SPS-50 WITH TWO (2) SUPER XL 22 GENERAL A THE PACKAGED FUEL OIL PUMP SET SHALL CONSIST OF (AS A MINIMUM) THE FOLLOWING 1 TWO RAMPS MOTORS; AND STARTERS; AUTOMATIC DUPLEX PUMP CONTROLLER, CHECK. VALVES FIRE RATED SHUTOFF BALL VALVES, PRESSURE RELIEF VALVES, INLET STRAINERS, PRESSURE GAUGES, VACUUM GAUGES, WEATHERPROOF CABINET AND ''CONTAINMENT BASIN, DOOR MOUNTED DISCONNECT SWITCH WITH INTERLOCK, CIRCUIT BREAKERS, CONTROL. TRANSFORMER. PILOT LIGHTS PIMP RUN-0.- AUTO MODE SELECTOR SWITCHES. PUMP FLOW SENSOR, RULING TIME METERS, AUXILIARY HAD RAMP. LEAK DETECTION WITH ALARMS AND REMOTE INDICATION CONTACTS TO BUILDING MANAGEMENT SYSTEM, LOSS OF FLOW SENSOR- AIARMAlW PUMP ACTIVATE, GROUNDING UN. AND ALARM HORN, 23 MATERIALS IL :. -. L PINS PIMP TYPE HYDRAULIC GEAR, POSITIVE DISPLACEMENT TYPE ZPIIMPOIANTITYITY: 2 . PERPIMP SET 3- PUMP FLOW.. 25 GPM PUP DISCHARGE HEAD: 50. PSIG" 5. FUME DUTY 24 HINDAY 6. FUEL HANDLED: DIESEL FUEL OIL AEU. OZ PIMP SET PACKAGE L PROVIDE FUMES ' ANOINTED DUPLEX STYLE PACKAGE WITH PUPS PIPING. INTERCOM MI NG WIRING, STATUS/CONTROL PMffi, AND EWIPC£HT F.TORY INSTALLED FOR SINGLE PORT FLED'. CONNECTION OF ONLY OIL INLET PIING; OIL OUTLET PIPING, RELIEF PIPING AIM ELECTRICAL POWER WIRING - 2 INCLUDE FOR EACH PUMP:. A. CHECK VALVE ON PUMP OUTLET. FIRE RATED BAIL VALVES ON OIL INLET AND OE OUTLET. c PUMP DISCHARGE .LIEF V.V. VENTED BACK TO TANK. D. PUMP SUCTION STRAINER, 60 MESH 3. INCLUDE INTERCONNECTING PIPING, FITTINGS, AND VALVES FOR PACKAGE 4. WEATHERPROOF ROOF .CLOSURE FOR RATS, PUMP MOTORS, PIPING, WIRING, AND CONTROL PANE. ENCLOSURE SHALL INCLUDE INTEGRAL LEN(' CONTAINMENT STMT WITH DRAIN PLUG.. PROVIDE ENCLOSUF E SUCH THAT ELECTRICAL DEVICES ARE SEGREGATED WITHIN A COMPAIRT .MIT FULLY ISOLATED FROM RAE OIL HAtDLRG DEVICES INCLUDING PUMPS, PL HUNG, VALVES, ETC. ENCLOSURE WNALL BE NEMA 3R AND HAVE HINGED, LOCKABLE DOORS: INCLUDE BYPASS OR RELIEF PIPING AS RECOMMENDED BYRMT MAN FACTUDER: 6.. DESIGN ENDRE PACKAGE, INCLUDING PIPING AND ACCESSORIES TO WITHSTAND SPECIFIED MAX.. PRESSURE OF 700 PSG MINIMUM. 25. INSTRUMENTATION AND CONTROLS A FROVDE LOCAL RSTRUEMIT5 INCLUDING L DISCHARGE PRESSU. GAUGE FOR EACH PIMP, WITH GAUGE INLET SHUTOFF VALVE 2. SUCTION.VAOIUM GAUGE FOR EACH PUMP, WITH GAUGE MET SHUTOFF VALVE- 3- TEAK DETECTION SYSTEM FOR PACKAGE MU_ ACTIVATE LOCAL CAPTURE ALARM- 8- FUNISH ALL INSTRUMENTATION AND CONTROLS NECESSARY FOR AN OPERATIONALLY COMPLETE AND AUTOMATIC DUPLEX PIMP CONTROL SYSTEM_ 1- DUEL. PIMP CONTROLLER A DUPLEX PUT CONTROLLER SHALL FUNCTION TO ALTERNATE OPERATION OF EACH MOTOR RAMP ON SUCCESSIVE STARTS:' CONTROLLER SHALL OPERATE DE OF-U. PUMP . A STANDBY - BACKUP IN THE EVENT THAT )MME PRIMARY PUMP FAILS FAILIFE OF THE PRIMARY PIMP SHALL BE INDICATED BY A - REDUCUION I FUEL L.E_TO A POKE BELOW TEE NORM. PUMP STARTLEVEL.. MRS '.SHALL . SENSED BY ME LEVEL CONTROLLER INSTALLED ON BOARD THE GENERATOR MONIED DAY TANKS (BY OTHES), AND TRANSMITTED TO THE PUP CONTROLLER VIA CONTACTS ON BOARD THE GENERATOR MOM® DAY TAN, G THE CONTROLLER SHALL PROVIDE PIMP RATING 1NDICATOS FOR EA. PIN, FAIL ALARM INDICATOR AND OUTPUT CONTACTS MODE CONTROL SWITCH AND CONTROL LOGIC FOR AUTOMATIC OPERATION AS PUMP 1 LEAD /PIMP 2LAG: AMP 2 LEAD/PUMP I LAG: 130TH RUN, THE GENERATOR MONID DAY TANKS SHALL UTILIZE FOUR FLOAT SWITCHES TO CONTROL ME LEVEL VIA THE LEAD/LAG AMPS, THE LEVEL SETPOINTS SHALL BE AS FOLLOWS: T 75% DAY TAN6K FULL: STMT LEAD PUMP 2)5094 DAY TANK FULL STMT LAG PUMP 3) 85% DAY TANK FULL" STOP RAPS 2 SENSOR TO DETECT NAP FLOW. AND INDICATE FAILURE OF PUP_ SENSORS SHALL START LAG PIMPS AND ACTIVATE AI.M S..ONE SENSOR SHALL BE PROVIDED FOR EACH PUMP. 3. RULING TIME METER ONE FOR EACH PUMP. 4. TEE CONTROLLER SH.L. FRONDE TWO SEPARATE SETS OF DRY CONTACTS EACH CONTAINING O NORMALLY CLOSED AND ONE NORMALLY OPEN- ONE SET SHALL BE PROVIDED FOR REMOTE GENERAL ALARM STATUS A. THE OTHER SET FOR LEAK DETECTION ONLY WE BY THE BUILDING MANAGEMENT SYST.TU (SEE SECTION 170.). 25 ELECTRICAL A MOTORS SHALL BE 1-I/2 HORSEPOWER (MINIMUM) OPEN DRIP PROOF COSTRICTION; NEMA TYPE B. CONTRA/0(1S DULY AT 40°C TEMPERATURE RISE .0 VOLT, 3 PHASE, 60 HL B. PROVIDE AND INSTALL ON EACE PACKAGE PUP MOTOR STARTERS FULL VOLTAGE TYPE, NONREV.SING, WITH OVERLOAD RELAY AND CIRCUIT BREAKER DI.ONECT WITH LOCKABLE; EXTERNALLY OPERABLE, WEATHERPROOF HANDLE MECHANISM_ 27. ACCESSORIES A HAND POMP: I. PROVIDE ONE HAND OPERATED 5EIF-PRIMING PISTON TYPE PIMP RATED AT 20 GALLONS PER 100 STROKES WIDE A ISOLATION VALVES ON INLET AND OUJRET, A IN-UNE CHECK VALVE, 2, RUMP SHALL BE INSTALLED AND PIPED WITHIN THE.CLOSU.. B. PROVIDE FOLLOWING ITEMS FACTORY INSTALL.: I. DISCONNECT SWITCH WITH DOOR INTERLOCK FOR MAN POWER INLET CONNECTION 2- '0N -0FF' SYSTEM CIRCUIT BREAKER 3. CONTROL POWER TRANSFORMER (AS REWIRED). A PILOT LIGHTS, 5. PUP RUN-OFF -AUTO OPERATION MODE SELECTOR SWITCHES 6, CONTROL RELAYS 7. ALARM HORN_ 2.8 PAINTING A PAINT ALL EXPOSED METAL SURFACES PER MANUFACTURER'S STANDARD. 2.9 CLEANING A PRIOR TO SHIPPING, PERFORM FINAL CLEANING OF 'INTERNAL AND EXTERNAL SURFACES AFTER MANUFACTURING AND )STING OPERATIONS HAVE BEEN COMPLETED, 2.10 IDENTIFCATON A INCLUDE MANUFACTURER'S STANDARD CORROSION - RESIST ANT N ENT E FOR THE EQUIPM CONSPICUOUSLY LOCATED PERMANENTLY INSCRIBED FOLLOWING BED WITH TH OLLOWI YD INFORMATION: OLO NG NFORMATI !. OWNER'S EQUIPMENT NAME 2- MANUFACTURER'S NAME AND ADDRESS, 3.: MANUFACTURER'S MOD. NUMBER AND SRI. NUMBER DATE OF MANUFACTURE. 5. DESIGN 1MEORMATIDN (AS APPLICABLE) FLOW B. PRESSURE L TEMPERATURE D. CAPACITY E WEIGHT 6. ELECTRICAL CHARACTERISTICS 7.OWNER'S PURCHASE ORDER NUMBER. 8. MANUFACTURER'S PURCHASE ORDER NUMBER B. TAG EQUIPMENT WITH EQUIPMENT NUMBERS WITH A HIGH, 24 GAUGE, 316 SS TAG, LENGTH TO SUIT: C. VALVES INSTRUMENTS, AND CONTROL COMPONENTS SHALL BE TAGGED . SPECIFIED FOR THE EQUIPMENT 2,11 INSPECTION AND TESTING A TESTING /INSPECTIONS I. RUMPS VACUUM TEST, FLOW TEST, ASSURE TEST, LEAKPROOF TEST, MPERENOLTAGE TEST, LOAD TEST, OVERLOAD TEST, 2,12 FUEL OIL. PUMP SET DIMENSIONS: 48' L X 18 W X 48' H Zik LOCKWOOD GREENE A J.A. JONES COMPANY PART 3 - EXECUTION 3,1 INSTALLATION A.INSTALL FUEL OIL. PUMP SET IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS, B. INSTALL FUEL OIL PUMP SET WHERE INDICATED ON DRAWINGS. 3,2 FIELD DUALITY CONTROL A. STARTUP SERVICES: I. FOR FUEL OIL PUMP SET AND ALL ASSOCIATED CONTROLS, PROVIDE ON -SITE FACTORY - AUTHORIZED STARTUP ASSISTANCE, COMMISSIONING ASSISTANCE, AND TRAINING OF OWNER'S OPERATING PERSONNEL IN PROPER OPERATION AND MAINTENANCE, 2. TOTAL TIME OF ON-SITE ASSISTANCE SHALL BE NOT LESS THAN TWO !WORKING DAYS (NOT INCLUDING TRAVEL TIME) AND SHALL BE BY FACTORY - TRAINED MANUFACTURER'S REPRESENTATIVES. B. AFTER: INSTALLATION, SUPERVISE AND DIRECT THE FOLLOWING TESTS AS A MINIMUM:. I. PERFORM LEN, TESTS ON ALL INTERCONNECTING FIELD INSTALLED PIPING. 2, CHECK OPERATION .OF CONTROLS AND SIMULATION OF PROCESS ACTION TO DETERMINE THAT ALL CONTROL LOOPS ARE FUNCTIONAL, 3. CHECK. CONTINUITY AND CORRECT OPERATION OF ALL ELECTRICAL POWER, CONTROL AND DATA WIRING. 4. CHECK, OPERATION OF ALL MOTORS. 5. AFTER .TESTING, CLEAN PIPING WITH DRY OIL FREE AIR AND VISUALLY INSPECT FOR CONTAMINANTS C. AFTER INSTALLATION, INSPECT THE INSTALLATION OF EQUIPMENT AND SEND WRITTEN CERTIFICATION TO THE CONTRACTOR THAT THE EQUIPMENT HAS NOT BEEN INSTALLED IN ACCORDANCE WITH MANUFACTURER'S' INSTALLATION INSTRUCTIONS AND RECOMMEND CORRECTIVE ACTION REQUIRED. D. PROVIDE COMPLETE INSTRUCTIONS TO CORRECT ALL DEFECTS AND DAMAGE, OBSERVED DURING TESTING AND SYSTEM STARTUP MD CERTIFY IN WRITING TO CONTRACTOR'.. THAT ALL SUCH DEFECTS AND DAMAGE HAVE BEEN CORRECTED BEFORE RELEASING FULLY OPERATIONAL FUEL OIL PUMP SET. TO OWNER. END OF SECTION 15585 SECTION 15586-FUEL TREATMENT SYSTEMS PMT I - GENERAL.. -. 1,1 SUMMARY A. THIS SECTION SPECIFIES EQUIPMENT, DESIGN, SHOP TESTING: INSTALLATION, START -UP. ASSISTANCE, AND FIELD TESTING. PACKAGED FUEL TREATMENT SYSTEMS B. COMPLIANCE: MECHANICAL DESIGN IN COMPLIANCE WITH THIS SECTION IS RESPONSIBILITY OF MANUFACTURER, 1,2 DESIGN REQUIREMENTS A THE DIESEL FUEL STORAGE TANKS (FURNISHED BY OTHERS SEE SECTION 15182) SHALL BE EQUIPPED WITH A FM APPROVED, AUTOMATED FUEL MAINTENANCE SYSTEM TO REMOVE PARTICULATE THROUGH 3 MICRONS AND 99,5 %' WATER FROM STORED DIESEL FUEL. B. ALL COMPONENTS OF THE PACKAGED FUEL:.TR.DENT SYSTEM SHALL. BE COMPATIBLE: WITH 2 AND DIESEL FUEL OIL. INCLUDING ALL GASKETS, SEALS, PIPE COMPOUNDS;, AND EQUIPMENT COATINGS ALL EQUIPMENT: MD ACCESSORIES SHALL BE UL LISTED AND FM APPROVED WHEN AVAILABLE. 1,3 QUALITY ASSURANCE A. DESIGN AND FABRICATE. IN ACCORDANCE WITH STATE AND LOCAL. CODES REGULATIONS. AND ORDINANCES, AND WHERE APPLICABLE, .THE LATEST EDITIONS OF STANDARDS OF THE FOLLOWI I. MERICDN NG: NATIONAL STANDARDS INSTITUTE (055)) 2 AMERICAN SOCIETY OF MECHANICAL. ENGINEERS (ASME),. 3. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM): 4, AMERICAN ' WELDING SOCIETY CAWS). 5. ENVIRONMENTAL PROTECTION AGENCY (EPA). 6. FACTORY MUTUAL (FM)... 7. INSTITUTE'S OF ELECTRICAL AND ELECTRONICS 'ENGINEERS (IEEE). B. NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (METAL 9. NATIONAL. FIRE: PROTECTION ASSOCIATION (NFPA), 10. OCCUPATIONAL SAFETY MD HEATH ADMINISTRATION (OSHA). 11. UNDERWRITERS' LABORATORIES INC. 01). 12. NATIONAL'ELECTRICEC. CODE (NEC). 13. NATIONAL. BUREAU OF STANDARDS (NBS).. B. IT IS THE MANUFACTURER'S RESPONSIBILITY ': TO PERFORM DETAILED DESIGN, PROVIDE NSN DNNPLY WI REONS F TE N REGULATIONS FIRE E7 COOL S AD AB' COM BRIC AS N A TH'THE ND I LATEST INSTALLATION ORDOINANHCE$ U AND IFORM REGIAATIONS CONTROLLING'FABRICATION AND INSTALLATION OF PACKAGED':FUEI_ TREATMENT SYSTE CO MS. C. FUEL TREATMENT SYSTEM MANUFACTURER SHALL HAVE CAPABILITY TO PROVIDE REPAIR, MAINTENANCE, AND PARTS .PPLY SERVICE FOR THE FUEL TREATMENT SYSTEMS AND ALL APPURTENMCEES. 1.4 SUBMITTALS A'. SUBMIT SIX (6) COPIES OF EACH OF THE FOLLOWING: PRODUCT DATA, DIMENSIONED GENERAL ARRANGEMENT DRAWINGS: SCHEMATIC PIPING AND INSTRUMENTATION DRAWINGS, PERFORMANCE CURVES, MOTOR DATA WIRING DIAGRAMS AND FIELD CONNECTIONS, ELECTRICAL REQUIREMENTS: INSTALLATION INSTRUCTIONS, 0 B M MANUAL PARTS LISTS, BILL OF MATERIALS, INSPECTION REPORTS, WARRANTY- B. INDICATE THE .FOLLOWING ON SUBMITTALS: APPLICABLE' CODES 2, MAXIMUM ALLOWABLE PRE.URE.AND TEMPERATURE.. 3. CONSTRUCTION MATERIALS BY INDUSTRY STANDARDS AND TRADE NAMES. INTERNAL AND OVERALL DIMENSIONS. 5.. NOZZLE SIZES, RATINGS FACINGS, LOCATIONS, AND SERVICES, 6, LIFTING. LUGS OR RIGGING POINT LOCATION. 7. CLEANING, SURFACE PREPARATION, PAINING, AND MARKING REQUIREMENTS. 8. PURCHASE ORDER'. NUMBER, EQUIPMENT NUMBER AND EQUIPMENT NAME. 9. SHIPPING, OPERATING, AND TEST WEIGHTS: 10 COMPLETE DIMENSIONAL DATA FOR ALL EQUIPMENT- . it ELECTRICAL DATA E. MOT.S. 12, MOTOR STARTER REQUIREMENTS, 13. UTILITY REQUIREMENTS: IA SIZE OF CIRCUIT BREAKER RC-QNRED FOR POWER SUPPLY TO EQUIPMENT. 15. PUMP DESIGN DATA A. CAPACITIES, - 16, ANCHOR BOLT LAYOUTS - 17, COMPLETE DESCRIPTION OF MATERIALS OF CONSTRUCTION 18. ALL OPENINGS' CONNECTION SIZES. 19, DETAILS OF SUPPORTS AND SUPPORT REQUIREMENTS. 20- SEALED STRUCTURAL CALCULATIONS C. SUBMIT DETAILED UST OF SPECAL TOOLS AND DEVICES REQUIRED TO INSTALL, ADJUST: REPAIR, TEST, OR OPERATE EQUIPMENT. IDENTIFY A. PRICE SEPARATELY ITEMS THAT ARE NOT PROVIDED WITH EQUIPMENT- 1,5 DELIVERY AND HANDLING A' DELIVER AND HANDLE EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS, B. REPAIR OR REPLACE ALL ITEMS DAMAGED DURING SHIPMENT AND HANDLING, PMT 2- PRODUCTS 2.1 PRODUCTS A AUTOMATED. FUEL MAINTENANCE. SYSTEM SHALL BE FM APPROVED, FUEL TECHNO INC., MODEL FT- 1- 8A-FM- B- FUEL TREATMENT SHALL BE FUEL TECHNOLOGIE, INC. FT-1001-1X- 6 T- 1001 -TL 6 WARRANTY A IN ADDITION TO ANY GUARANTEES OTHERWISE PROVIDED, GUARANTEE THAT ALL SUPPLIED MATERIALS AND COMPONENTS WILL FUNCTION AS SPECIFIED. AND BE FREE FROM DEFECTS IN MANUFACTURING, DESIGN, AND FABRICATION FOR MINIMUM ONE YEAR AFTER SYSTEM IS PLACED IN OPERATION, NOT TO EXCEED 18 MONTHS AFTER SHIPMENT. WARRANTY SHALL COVER PARTS AND LABOR AND SHALL BE EXTENDABLE DURING THE FIRST YEAR FOR ADDITIONAL FUEL OIL SYSTEM SPECIFICATIONS 2,2 EQUIPMENT A PERFORMANCE CRITERIA 1. PROVIDE. PACKAGED FUEL TREATMENT SYSTEM FOR FILTRATION OF FUEL TO THE MAIN FUEL OIL STORAGE TANKS, SYSTEM SHALL BE INSTALLED WITHIN A WEATHERPROOF ENCLOSURE WITH HINGED LOCKABLE DOORS SUPPLIED INSTALLED, WIRED AND PLUMBED AT A LOCATION INDICATED ON DRAWINGS- SYSTEM SHALL BE COMPLETE IN AL RESPECTS IN ORDER TO PUMP UNFILTERED FUEL FROM MAIN TANKS AND SUPPLY FILTERED FUEL BACK TO MAIN TANKS, 2, DESIGN THE SYSTEM TO MEET OPERATING REQUIREMENTS SPECIFIED: DRAWINGS INDICATE SYSTEM INFORMATION AND ESTABLISH THE BASE DESIGN CRITERIA MANUFACTURER IS RESPONSIBLE FOR VERIFYING AND CONFIRMING ALL PIPE. S.S. EQUIPMENT SIZES, OPERATING. PRESSURES, AND UTILITY CONSUMPTION, INCLUDING MAXIMUM ELECTRICAL POWER REQUIRED.: B. FUEL TREATMENT- SYSTEM: I. FURNISH PACKAGED FUEL TREATMENT SYSTEM COMPLETE AS SHOWN ON APPROVED SHOP DRAWINGS COMPLETE WITH, BUT NOT LIMITED TO PUMP DRIVR C, STRAINER S o. FILTR E. GASKETS F. PIPING, FITTINGS. AND VALVES LOCAL INSTRUMENTATION LEAN DETECTION J L WEATHERPROOF ENCLOSURE ON AND CTAINMENT J. ACCESSORIES 2 PROVIDE A FACTORY MOUNTED PUMP WITH PIPING, INTERCONNECTING WIRING, STATUS /' CONTROL PANEL, MD EQUIPMENT FACTORY INSTALLED FOR SINGLE POINT FIELD CONNECTION OF ONLY OIL' INLET PIPING, OIL OUTLET PIPING, AND ELECTRICAL POWER. 3. DESIGN ENTIRE PACKAGE, INCLUDING PIPING AND ACCESSORIES TO WITHSTAND ' SPECIFIED ' MAXIMUM PRESSURE. THE ENTIRE PACKAGE SHOULD BE TESTED TO WITHSTAND 1.5 TIM. ME MAXIMUM WORKING PRESSURE. 2- PROVIDE A FACTORY MOUNTED PIMP WITH PIPING, INTERCONNECTING WIRING, STATUS/ CONTROL PANE, AND EM MEN FACTORY INSTALLED FOR SINGLE PORN FED CONNECTION OF ONLY OR INLET MEIN,, OR OUTLET PIPING, AND ELECTRICAL POWER WIRING. 3. DESIGN EMIRS PACKAGE INCLUDING PIPING AND ACA, TO WTRSTND SPECIFIED MAXIMUM PRA D. PUMP: I. PUMP FLOWRATE 8 GPM MINIMUM 2 PUMP DISCHARGE HEAD: PER MANUFACTURER'S .COMMENDATIONS 3. PUMP TYPE HYDRAULIC OEM, POSITIVE DISPLA.MENT 4. FUEL HANDLED: DIESEL FUEL OIL 5. PUMP QUANTITY: 1 PER SYSTEM 6. PUMP DUTY: INTERMITTENT 2,3 MATERIALS '... A MATERIALS FOR PUMP, PIPING AND VALVES SHALL BE MANIFACTURELS SFNDMD FOR THIS SYSTEM- 2:4 FILTER PACKAGE A THE FILTER PACKAGE SHALL CONS.. SEVEN STAGES PARTICIPATE AND WATER REMOVAL L .STAGE I: 100 WIRE MESH' STRAINER MR MICRON) ' 2: STAGE E CENTRIFUGE SEPARATES PARTICULATE AND FREE WATER 3: STAGE 3: COALESCING OF WATER AND PARTICULATE 4. STAGE 4 30 MICRON PARTICIPATE REMOVAL AND NE. DX) 96 WATER SEPARATION- . 5, STAGE 5: 10 MICRON PARTICULATE REMOVAL 6. STAGE 6: 'EMULSION' MATER REMOVAL AT 99.5 7- STAGE -7: 3 MICRON PARTICULATE REMOVAL B. ALL FILTERS SHALL' BE SPIN-ON REMOVABLE. NEWOR FE E/C.3LE E..T TYPES- C. PROVIDE FILTER REPLACEMET PACKAGE CONSISTING OF FUEL TEEXW OG ES. INE_ I. (3) FL- 30 -IGGM 2 (6)FL- 70-10W 3, (6) FL- 70-03N 4. (12) FL- 2020 -PM -OR 2.5 CONTROLLER A. CONTROLLER SHAD_ BE A IL LISTED, FM APPROVED ASSEMBLY CONSISTING OF I. INCLUDE PLC W. FOLLOWING : A. INPUTS /OUTPUTS: 24 B. PROGRAM MEMORY: 8 KBYTES - C, BIT PROCESSING TIME 0.37 MS- D. MANUFACTURER: SIEMENS 57 -224 2. PLC' SHALL MONITOR A. MOTOR CONTACTOR AND OVERLOAD. D. SEVEN STAGES FILTRATION- C. LEN( DETECTION 0.. WATER LEVEL. SENSOR E SYSTEM PRESSURE AND VACUUM. 3 INCLUDE - CIRCUIT BREAKER 2 POLE, 16 AMP, RATED AT 480 VAC. SIEMENS_ LOCKABLE DISCONNECT SWITCH: RATED AT 600 VAC - MO 12 THP, ORCONTACT AND THERMAL OVERLOAD I6 AIP,SINGLE PHASE, 1I5 VAC, CLASSIO,EMENS TERMINAL BLOCK: 26 MP, 18-12 DWG„ 36 POLE, SIEMENS_ OPERATOR INTERFACE LED BACKLIGHT,' 2 LINES/20 CHARMERS EACH, FOR. KEYBOARD: 9 KEYS SIEMENS TD -200, SIGNAL DEVICE (AUDIBLE'. ALARMS): 120 VAC, SLOW PANE, 80 TO 95 DB., MALLORY. B THE: CONTROLLER SHALL BE CAPABLE OF BEING: PROGRAMMED TO SERVE UP TO FOIE SEPARATE DIESEL REL.STORAGE TANKS. C. CONTROLLER SHALL BE WAS. OF BEING. PROGRAMMED TO PROVIDE TIM. OPERATION OF THE F.L', CIRCULATION PUMP AND SOLENOID VALVES WHICH CONTROL FUEL FLOW TO AND FROM EACH TAN,'... D. CONTROLLER SHALL MONITOR MOTOR CONTACTOR, LEAK DETECTION, SYSTEM AND VAC PRE UA, AND F FHE SEVEN AGES OF FLTRATION, CONTROLLER RESSU SHALL PROVIDE M EACH AUD ST IBLE ALARM AND VISUAL) OESCRPTOY FOR EACH ALARM CONDMON E. CONTROLLER SHALL PROVIDE TWO SEPARATE SETS OF DRY CONTACTS EACH CONTAINING ONE NORMALLY. CLOSED AND ONE NORMALLY OPEN ONE SET SHALL. BE PROVIDED FOR REMOTE GENERAL AURA STATUS AND TEE OTHER SET FOR LEAK DETECTION ONLY USE BY THE BUILDING MANAGEMENT SYSTEM (SEE SECTION 17054). 2.6 TEXT. DISPLAY AND OPERATOR INTERFACE A THE FOIL KEYBOARD. SHALL HAVE 9 KEYS' THE DISPLAY AREA IS A TWO -L)NE 20 CHARACTERS EACH. BACK-LIT LIQUID-CRYSTAL DISPLAY (ILO)) - 2.7 ENCLOSURE A THE COMPLETE SYSTEM SHALL BE HOUSED IN ALOCKABLE. WEATHERPROOF ENCLOSED NEMA 3R CABINET DESIGNED FOR WALL OR RACK MOUNTING 2,8 INSTRUMENTATION AND CONTROLS A PROVIDE LOCAL INSTRUMENTS INCLUDING: I. DIFFERENTIAL PRESSURE GAUGES FOR EACH FILTER AND STRAINER 2.. LEAK DETECTION SYSTEM FOR PACKAGE WILL ACTIVATE LOCAL RUPTURE ALARM - 3, FURNISH ALL INSTRUMENTATION AND CONTROLS NECESSARY FOR AN OPERATIONALLY COMPLETE AND AUTOMATIC FUEL_ TREATMENT SYSTEM - 2,9 ELECTRICAL A MOTORS TO BE WEATHER PROTECTED EDNREUCTIONL NEMA TYPE B, CDEDADUS DIfTY AT LO°C.. I/2 HP, MI5 VOLT, SINGLE PHASE, 60 ER. 2.10 PAINTING A PAINT ALL EXPOSED METAL SURFACES PER MANUFACTURER'S STANDARD. CLEANING A PRIOR TO SHIPPING, PERFORM FINAL CLEANING OF INTERNAL AND EXTERNAL SURFACES AFTER MANUFACTURING AND TESTING OPERATIONS HAVE BEEN COMPLETED. 2.12 IDENTIFICATION A INCLUDE MANUFACTURERS STANDARD CORROSION - RESISTANT NAMEPLATE FOR THE EQUIPMENT, CONSPICUOUSLY LOCATED, PERMANENTLY INSCRIBED WITH THE FOLLOWING INFORMATION: I. OWNER'S EQUIPMENT NAME_ 2, :MANUFACTURER'S NAME AND ADDRESS- 3. MANUFACTURER'S MODEL NUMBER AND SERIAL NUMBER 4, DATE OF MANUFACTURE 5. DESIGN INFORMATION (AS APPLICABLE) A. FLOW B,SURE c..TEMP D.. CAPACITY. E'.WEIGHT 6. ELECTRICAL CHARACTERISTICS - 7, OWNER'S PURCHASE ORDER NUMBER.. 8, MANUFACTURER'S PURCHASE ORDER NUMBER B. TAG .EQUIPMENT WITH A I' HIGH, 24 GAGE, 316 SS TAG: LENGTH TO SUIT. FASTEN SECURELY -, C. VALVES, INSTRUMENTS, AND CONTROL. COMPONENTS SHALL BE TAGGED AS SPECIFIED FOR THE EQUIPMENT. 2.13 FUEL ADDITIVES A. AFUEL' STABILIZER TREATMENT SHALL BE PROVIDED AND ADDED TO THE MAIN FUEL STORAGE TANK, THE TREATMENT SHALL BE A PRESERVATIVE ANTI - MICROBIAL, COMBUSTION CATALYST; AND DISPERSANT, ALL IN ONE- 2.14 INSPECTION AND TESTING A. TESTING /INSPECTIONS FOR PUMPS:: VACUUM TEST, FLOW TEST, PRESSURE TEST, LEAKPROOF TEST. MPERENOLTAGE TEST, LOAD TEST, OVERLOAD TEST, 2.15 FUEL TREATMENT CAIINET DIMENSIONS: 48' L X 16,5' W X 48' PART 3 - EXECUTION 3.1 INSTALLATION A. INSTALL FUEL TREATMENT SYSTEM IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. B. INSTALL FUEL TREATMENT SYSTEM WHERE INDICATED. DRAWINGS, 3,2 FIELD QUALITY CONTROL A STARTUP SERVICES: I. FOR FUEL TREATMENT SYSTEM AND ALL ASSOCIATED CONTROLS, PROVIDE ONS. FACTORY- AUTHORIZED STARTUP ASSISTANCE, COMMISSIONING ASSISTANCE, AND TRAINING OF OWNER'S OPERATING PERSONNEL IN PROPER OPERATION ADD. MAINTENANCE. -.. 2. TOTAL TIME OF ONSITE ASSISTANCE SHALL BE NOT.. THAN ONE WORKING DAY (NOT INCLUDING TRAVEL TIME) AND SHALL BE BY FACTORY -TRAINED MANUFACTURER'S REPRESENTATIVES B. AFTER INSTALLATION SUPERVISE AND DIRECT THE F 1 OLLOW NG AS A MINI. TESTS 'MIFF I. PERFORM LEAN TESTS ON ALL INTERCONNECTING T G FIELD INSTALLED PIPING. 2. CHECK OPERATION OF CONTROLS AND SIMULATION OF PROCESS ACTION TO DETERMINE THAT ALL CONTROL Loon ARE FUNCTIONAL. 3. CHECK CONTINUITY AND CORRECT OPERATION OF ALL ELECTRICAL POWER CONTROL AND DATA WIRING... 4. CHECK OPERATION OF ALL MOTORS 5, AFTER TESTING, CLEAN PIPING WITH DRY OIL -FREE AIR AND VISUALLY INSPECT FOR CONTAMINANTS C. AFTER INSTALLATION; INSPECT. THE INSTALLATION. OF EQUIPMENT SLIM - LIED UNDER THIS SECTION AND SEND A WRITTEN CERTIFICATION TO THE OWNER'S REPRESENTATIVE. THAT THE EQUIPMENT HAS OR HAS NOT BEEN INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS AND RECOMMEND CORRECTIVE ACTION REQUIRED.... D, PROVIDE COMPLETE INSTRUCTIONS TO CORRECT'ALL DEFECTS AND DAMAGE OBSERVED DURING TESTING AND SYSTEM STMTUPRACI}1GEBTIFY IN WRITING TO OWNER'S REPRESENTATIVE THAT .L SUCH DEFECTS ANEDAMAGE HAVE BEEN CORRECTED BEFORE RELEASING FULLY OPERATIONAL FULL TREATMENT SYSTEM PACKAGE TO OWNER. Ali_ _„ _JOT ENO OF SECTION 1558. �0. I. p PERMIT CENTER !q.t. TyCom. ice 29= JUN -01 021612.41 0 SYSTEM EQI_'PME T SCHEDULE L (I O (I (I O O C () C 2SEAL SUMP LEAK SENSOR FILL DRCS TA:IC ' _ DCUELE PDPP, DOC ,EVE CO DESCRIPTION_ DE COVER, F_ERIC:.ED STEEL RING ST aa FUE :NG SYSTEM CON TRACT. TOP S SOTTO,. - cE 6 ,7,2 , CA ..ACAS IRE.. ERCI MAN'.': ACTURERS INSTALL'TIGN INSTRUCTIONS 4 NE - A _G ...CAT ON C. 6NO ._IC,' ON DEAWING M:.NL'FACTURER%MC■EL CAA / PORES° TUT.612/EMOO E,CTRONICS TIf,LL /ERGO ELECTRONICS /EATS.. ELECTRONICS OP,: 6 ,,.W 6150 - CPW 233V -4A30 DPW 23 -0055 0 'W 92_00,7 �. .v 66 -0022 TOTAL CONY. SE_CNDFAY PIPE - TCI SPAEO0 AMER. DUALOY 3000 7LC6 AAIERON DUALOY 3000/6 -6 MAI6. 4 II — :EcrcR J ' Is tK TR DE SEC - 2F. POPP'_T F'UDT VALVE J I � 1 . -C " C.,NOIIT (YE ALL SIDES) PIPS P RISER ;J A: JROSATIC CLOUTS S5VSOR CCNNECTICN M.rvHOL wEAT- ERPRCOF ExFLDSeN PROOF ETs PROVIDE BAL VALVE AND CAP FO R FUTUP.E CENEPaiOR Ia 5r6,NLE55 STL PIPE L( DOUBLE CON iAINED 3 FlBERGIASS PIPE BRINE RE ER OIR (PUPIL ED W /TANK) �6. R ScRV01R / SENSOR HIGH (MIN) CONCRETE GUIPMENT FAD (YP). 12' -0 OE CORO. CH PROVDE I -1/2" BALL VALVE ANB CAP fOR FUNRE GENERATOR LEAK DETECTION OR TO EMS SYSTEM GENERAL U TO BMS SYS TEM PAD w'IDTH J. EDMONDS J. HERRON oPT. APP.. A. MOORE FOR FOS CONTROL PANEL 2" FGS D EL OIL PS GENERATOR #1 FOR - Fr � 1 CENTRIFTGE STAINE 1 H, 1 FuL O.L -'_�9s FUkP FUR TR=T:A - 4 Nr T,T C,1 NC 6vPA5S OVERFLOW INSTAL FlRE SAfc LEVER GATE VALVE ROwOE PREF<ftftED TL OOEL 110 (YPILAL 3 PLACES) STAINLESS STU PIPE DOUB CCUNED FlBERGtASS P J GENERATOR PAD 1" FP, CON. Q INSTALL FRE SA-E LINER WTE VALVE ��AS CLOSE T�MAIN AS PO_'SIBLE �C3 PROVIDE PR,. ERR© LTIL MCOEL 110 :FA.C:UR� 5 P�Y:ti^c () BELON GRaSE DCUBLS CON A NMN � 0 _ N `CL COAT! AL FlB�PGUSS ° r v., .LEES G.A55 "? NG 0 STAINLESS ST,E, 76E 2" FOS PPM LOCKWOOD GREENE A J.A. JONES COMPANY gel r_Ia,l �l-ol nl r_ s. �nnloroct r -Tr -Tr -F GENERATOR DAY TANK rDITCH ON LEAH DTECPON MONITOR TO B■S SYSTEM CONTE6 61ENT PIPING SYSTEM GENERATOR ##2 BE LOW GRADE DOUBLE CONTAINED coA:(WL PIPING ) GENERAL FAULT L TO 615S SYSTEM • EMERG Gcl DAY TANK START ,ERG GEN 61 DAY • PNK STOP EMERG GENa2 DAY I TANK START EIdERS GEN °2 DAY • TANK STOP il;STALL ARE I�`,'=� to VALVE . C MN TGc PRE'- PRF.E9 UT:L kODEL 10 AIR TIGHT CLOSURE FTITNG (T(P) 2 FOS NO RETURN GL^ CONTAINMENT CTUREO 5'tSiEM. TITLE CONDUIT _r_ I" DRAIN __PITCH ON BITCH ON AL`J. RPE SLEEVE SEAL TIGHT AROUND PIPE AT SURFACE (TYPICAL) FUEL OIL FLOW DIAGRAM ML\ "JAL ��E� FOS -001 EU1 OIL PUMP ST PITCH ON INSTALL FlRE SAFE LE`FR GATE VP_VE �AS CLOSE TO MAN AS POSSIBLE PROVIDE PREP BRED UTiL M00'cL 110 rvc �ss 5- OVERFLOW INSTAL FIRE SAFE LEVER GMTE VALVE PROVIDE PREFERRED URL °DEL 110 (YFICAL 3 PLACES) PITCH 0 OUnINE OF MANUFACTURER'S SKID PACKAGE VENT OR 2" FOS HIAL NOT'& 1. THE FUEL SYSTEM COL OR S+sil EE I..A.:IED THE Tr,NK THE SAT. NG OR O Ffv A ?PP.O`> AGF�VF�'!. HAVE A M S DF 5 '(EARS EA a C IN TAE INSALt OF t STORAGE TANKS, FUEL PIPING. tiE CIL PJ5,30,3 2. PITCH Aim PIPING EACH TO THE MAIN UNDERGROUND STORAGE TANK. 3. PP.OVIOE AL APPURTEVAM PIPING iii =CAS /'r'l4CC /pFFF� c -_ •c PSUIP TS PF.ESSUP.E/VA000M TES FUEL OIL TANK. RKERS. SUMP. 3u6 RP1Y IN ;� 3'LE WITH ALL FEDERAL STATE RND LC?TL CCOE`s AND REGU[AT,C!E. C.Ti P.ACTCP. SHALL PROVIDE INF6L FUEL 5. REFER TO PIPING PLAN DPA'NINGS FOP. DETRE. TANK., RPING AND E"...., LAYOUTS AND LOCATIONS. 6. REFER TO STRUCTURAL GANGS FOR CGNC.Rr PAC AND r✓.1 NG DETAILS- 7. NS ALL EQUIPMENT. RRNG, FUELING SPECIAL - 1.. Arz F"'r=c+`F Ilt ACCOPC6-7 - WITH MANUFACTURER'S INSTALLATION W.RRUC IONS_ E76 ALL €TEA. In A£LOPDANCE WfiA ALL FEDEFEAL STATE AND LOCAL CODES- E. HE FUELING SYSTEM COUTPACTOR SHALL FURNISH 314E INSTALL AL BANK AT.166 R`NG "S vM CONTROLS. WIPING. CONDUCES ANG. PCC5Tr= R_0UI�ED. FOP: A CONPr_- aM FUl1CnONaL SYSTEM, AS WELL AS ALL INDERCDNNECTING COM -T.65 ANC rCr ' 9. SUBMIT (6) COPIES OP PRODUCT DATA AND INSTALLATION INSTRUE7UNS FOP EArr FU1 OIL SPECIALTY ON THIS ORAwING. I0. PROVIDE M SAF SHI.S AT ALL RANGES. TPANSDIGNS. EGUIPMEN: fANN'ECRO.6 COUPLINGS. UNIONS, Al1 T4F,E -07 CG N 7 TG '4"`r, SFFAYCUT FNO E'L"wOUT- ME`.PL SAFES( SHIELDS S PAL BE NA;FACNF.ED 614 F NuO, NG FAaP..GTED Tr.CM GEVE °•A OP, c TANK O T.OLE:S AND FLT Qrt. R+RF Sr TG AM1D COrvDURS PPG`A cD BY EL_C' CCl :.AG -GR 25. GAUGE (MIN) 303 STAINLESS ST TANK LEVEL_ FAULT T LEAK C O E G BM ()BELOW GRADE OOUELE CONTAINED COAXIAL PIPING RECEIV CITY OF TUK1`!i! PERMIT CENTER `SCHED AU PVC CONDUIT FROM TAN. PROBE AND LEAK SENSORS, S AS REQUIRED (YP CA_) IF AC PFF 29—JUN-01 TANK 1 MATCHLINE FOR CONTINUATION RACTOR TO I 1 /' I _ _ / ' / III L ._‘, J III \ III `FUELING SYSTEM CONTRACTOR III Si- .LL VERIFY EXACT LOCATION I111 W/ ELECTRICAL CONTRACTOR AND RELOCATE MANWAY RISER AS REQUIRED. SEE ME -0141 ill I I'. III 1 111 11 �',� -4" CONTAINMENT PIPE II' hl 111 1 W. ,"FFS o u l 11' ai l, II 8' 0"X10 .ONCR7 t � � M illI\\ II i SURFAC PnD / 1 • I LA' Ili l�i / 1 I'Iii I III I I I I 11111 Ili ;Ii /� II: 711-a-3.-FOR ti, :111 j1I 1 2"FCS —F - 1 it 11 I 1 111 I I I J I.III II'. Ip 1 1111 ill 1 1111 :III I I I !II iiE III i ,III Ili i 111' 111 1 III .II 1-T, TREATMENT SYSTEM N) 1 TI II, _IT F -Dnt 1111 II; 11 2 1/ I ,A j I1 I 1 TANK C GENERATOR AREA PLAN SCALE: 1/4 " =1' -0" DEPT DEP PR. NORTH J. EDMONDS J. HERRON A. MOORE MATCHLINE FOR CONTINUATION SEE ME - 0141 GENERATOR 5' -0" I i 7/2 FOS DROP TO GENERATOR COORDINATE EXACT LOCATION WITH GENERATOR. INSTALLER (TYP) `-3" FOR FROM GENERATOR COORDINATE EXACT LOCATION WIT GENERATOR INSTALLER (TYP) 2 "FOS GENERATOR GENERATOR LOCKWOOD GREENS A JA JONES COMPANY FNEYINFFRINR R EiDNRTRIi(.TIDN ED 7111, FUEL OIL SYSTEM EQUIPMENT AND PIPING PLAN NOTES: 1. PITCH ALL UNDERGROUND FUEL OIL PIPING DOWN TO THE TANK AT A MIN:.MUM SLOPE OF 1/16" PER FOOT. 2. FOR EXACT FUEL PIPING DROPS AND STUB -UP LOCATIONS AT GENES ENCLOSURES, SEE MANUFACTURER'S APPROVED GENERATOR DRAWINGS, 3. CONFIRM ALL UNDERGROUND UTILITY LOCATIONS PRIOR TO ALFA EXCAVATION AND TR.ICIPING- 4. ADJUST TANK AND FUEL APPURTENANCES LOCATIONS AS REOUIP.ED TO AAA. UR . AND MINIMIZE EXCAVATION. REVIEW CHANGES /ADJUSTMENTS WITH OWNER'S PEPREEREIG IKE PRIOR TO INSTALLATION. 5. THE FOLLOWING SEISFAIC CRITERIA APPLIES TO THE EQUIPMENT IN SP f?r CATION SECTON 15182 -TANK MONITORING SYSTEMS, SECTION 15585 -FUEL OIL PUMP- SE A7b7 SCION 155866 -FUEL TREATMENT SYSTEMS. A. STRUCTURAL - I. SEISMIC ZONE 3 2. WIND 80 MPH. EXPOSURE B. 3. BUILDING CODE - LATEST EDITION OF THE UNIFORM BUILDING CODE 4. SNOW LOAD: 251/SF B. ALL EQUIPMENT AND IT'S ANCHORAGE SHALL BE DESIGN. AND CONSTRUC'. O WT.—WE, THE STRESSES PRODUCED BY SEISMIC FORCES AS DEFINE) IN THE LATE .ITION OF T UNIFORM BUILDING CODE, SECTION 7630, INCLUDING ALL LOCAL AND .STATE AMENDM . THE FOLLOWING FORMULA VALUES SHALL BE USED AS A MINIMUM. UNLESS 1TR 1.4@ISE SPEEtR I.e STANDARDS CONTAIN MORE STRINGENT REQUIP.EMENTS- Fp = ApCalp /Rp [I - 31-fx /Hrl Wp Fp = TOTAL DESIGN LATERAL DESIGN FORCE Ap = 2.5 FOR EQUIPMENT LATERALLY BRACED OR ANCHOR. TO THE STRUCTURAL FRAME AT A POINT BELOW ITS CENTER OF GRAVITY. Ca = 0.36 Ip = 1.5 Rp = 1.5 FOR CAST IN PLACE ANCHORS OR PANSON BOLTS WTI, E68amE, LE. THAN 8TIMES THE BOLT DIAMETER 1.0 FOR ADHESIVE ANCHORS 3.0 FOR CAST IN PLACE OR EXPANSION E3LTS WITH EMBEDMENT GREATER THAN 8 TIMES THE BOLT DIAMETER Hx = THE ELEVATION WITH: RESPECT TO GRADE OR THE ATTACHME aEVAION, NOT LESS THAN ZERO. Hr = THE STRUCTURE ROOF ELEVATION WITH RESPECT TO GRADE Wp = TOTAL OPERATING WEIGHT. M O H4t 6. SEISMIC RESTRAINT COMPONENTS FOR PIPING A. FINAL CONFIGURATION OF SEISMIC RESTRAINTS SHALL BE EY SUPPORT SYS ENS SUPPLIER, B. ALL DESIGN AND INSTALLATION SHALL MEET REQUIREMENTS FOR SEISMIC ZONE 3, C. WHEN INSTALLATION IS COMPLETE, PROVIDE IC CONTRACTOR CERTIFICATION THAT SEISMIC RESTRAINTS FOR PIPING HAVE BEEN INSTALLED PROPERLY TO PROTECT PIPING FROM POTENTIAL SEISMIC DAMAGE. TYCOM GLOBAL NETWORK ECEIVED CITY R OF TUKW PERMIT CENTER 021612.41. SCALE 29- JUN -01 0 PROJECT: PROJECT DESCRIPTION: CLIENT TYCOM GLOBAL NETWORK CONTACT ROBERT ANDRESEN PATRIOT'S SQUARE 60 COLUMBIA ROAD MORRISTOWN, N.J. 07960 OFFICE (973) 656-8510 FAX (973) 656-8583 rcn Em6I. dresenOtycornItC con L,OCKWOOD GREENE AJAJONESCOMM. ENGINEERING & CONSTRUCTION 19 July 2001 Building Division City of Tukwila RE: Tycom Global Network Facility Intergate East Building Letaal DL___P- on Lot 3, City of Tukwila Boundary Line Adjustment No. L2000-042, recorded under King County Recording No. 20000828900001, situate in the County of King, State of Washington PROJECT DESCRIPTION FIT -UP TYCOM TENANT SPACE SELECTIVE DEMOLITION OF EXISTING BUILDING COMPONENTS; FITUP OF SPACE WITH NEW FLOORS, WALLS, CEILINGS AND INTERSTITIAL SPACE; INTALLATION OF ELECTRICAL AND MECHANICAL SYSTEMS; CONSTRUCTION 00 NEW EXTERIOR EQUIPMENT ENCLOSURE AND TENANT SPECIFIC PARKING DOCKING FACILITIES AND ENTRANCE. PROJECT NAME AND ADDRESS PROJECT NAME: TYCOM GLOBAL NETWORK TELEXCHANGE FACILITY - TUKWILA PROJECT ADDRESS NTERCAT E:ST • BLDG y3 12 INTGRNATIONAL BLVD. TUKWILA. WASHINGTON PROJECT TEAM OWNER ENGINEERS INIERNATTON. GATEWAY EAST. LLC. LOCKWOOD GREENE C/0 S6008 CCRP0RA ;ON CONTACT JOHN COOPER JOHN SAB Y 1500 INTERNATIONAL DR. 1220' INTERNATIONAL BLVD. P.O. BOX 491 FOURTH FLOOR SPARTANBURG, SC 2930. SEA LE WA 9E168 DEICE (864) 599-4230 OFFICE (206) 277 -5257 CELL (866) 3 0.32 cmc I lonncooper®IS.com VICINITY MAP PoMOfix13=M 15001.ervabOnzlD. Spartanburg SC 29. .n(854)518-2000 F. (854) 599.00 L❑CA ❑N MAP NO SCALE CONTRACTOR J. A. JONES CONSTRUCTION CO. CONTACT LARRY SOTO PHONE (425) 76 -9819 TIC 3 JJONE CC 147 PA NORTH CIVIL CTK0001 LEGEND, ABBREVIATIONS AND GENERAL NOTES CTK0002 PARTIAL SITE PLANS CTK0003 SITE DEMOLITION PLAN CTK0004 SECTIONS AND DETAILS ARCHITECTURAL A -0000 COVER SHED A-0001 ABBREVIATIONS, LEGENDS AND GENERAL NOTES A -0002 CODE PLAN A -0003 PARTITION TYPES A -0004 SITE PLAN A -0101 DEMOLITION PLAN A -0111 FIRST FLOOR PLAN A -0112 MECHANICAL PLATFORM AND DETAILS A -0113 INTERSTITIAL SPACE FLOOR PLAN A -0121 REFLECTED CEILING PLAN A -0300 SECTIONS AND DETAILS A -0400 ENLARGED FLOOR PLANS & INTERIOR ELEVATIONS A -0600 FINISH AND DOOR SCHEDULE A -0601 DOOR DETAILS ELECTRICAL TYCOM GLOBAL NETWORK TELEXCHANGE FACILITY TUKWILA - WASHINGTON MECHANICAL PERMIT PACKAGE E -0001 ELECTRICAL LEGEND, ABBREVIATIONS AND GENERAL NOTES 1 -0004 ELECTRICAL SITE PLAN E -0111 ELECTRICAL EQUIPMENT LAYOUT E -0501 ELECTRICAL DETAILS E -0608 POWER PANELBOARD SCHEDULES 0 -0610 LUMINAIRE SCHEDULE TUKWILA SITE E -0611 LIGHTING AND RECEPTACLE PANELBOARD SCHEDULES E -0615 GROUNDING RISER DIAGRAM EG -0004 SITE GROUNDING PLAN EL -0111 GROUND FLOOR LIGHTING PLAN L I S T MECHANICAL/ HVAC P & ID'S / AIR FLOW DIAGRAMS M -0600 MUA -01 AND MUA -02 AND CRAC UNITS AIR FLOW DIAGRAM GENERAL ARRANGEMENT PLAN DRAWINGS ME -0111 EQUIPMENT ARRANGEMENT PLAN FIRST FLOOR ME -0112 EQUIPMENT ARRANGEMENT PLAN CHILLER PLATFORM AND INTERSTITIAL SPACE ME -0131 EQUIPMENT ARRANGEMENT PLAN - ROOF ME -0141 FUEL OIL SYSTEM EQUIPMENT AND PIPING PLAN MECHANICAL PIPING PLAN DRAWINGS MP -0111 MECHANICAL PIPING PLAN FIRST FLOOR MP -0112 FIRST FLOOR LEVEL AND PLATFORM MECHANICAL PIPING PLAN MP -0113 MECHANICAL PIPING AND PLUMBING PLAN INTERSTITIAL SPACE HVAC PLAN DRAWINGS MH -0111 HVAC PLAN FIRST FLOOR MH -0112 HVAC PLAN INTERSTITIAL SPACE MECHANICAL /HVAC LEGENDS, SCHEDULES, SECTIONS, AND DETAILS M -0001 MECHANICAL AND HVAC GENERAL NOTES, LEGENDS AND ABBREVIATIONS M -0300 MECHANICAL SECTIONS AND DETAILS M -0350 HVAC DETAILS M -0650 HVAC EQUIPMENT SCHEDULES MP -0300 PIPING SECTIONS FIRE PROTECTION DRAWINGS FP -0111 FIRE PROTECTION COVERAGE PLAN PLUMBING DRAWINGS P -01.11 PLUMBING PLAN - FIRST FLOOR PLUMBING DIAGRAMS AND SCHEDULES PL -0600 PLUMBING'. NOTES, SCHEDULES AND SCHEMATICS RE ^TED MO I 19Z CITY OF T ILA PERMIT CENTER. B a 9- JUL - 01 ISSUED FOR PLAN CHECK 6./S9 A OI-MAY- 01 !ISSUED FOR FINAL REVIEW - 50% DESIGN VSM oNnwN ar BRC DEPT. DN. DEPT. APPR. LIOCKWOOD GREENE A 3A. JONES COMPANY ENGINEERING &'CONSTRUCT(QN COVER SHEET TyConi. TYCOM GLOBAL NETWORK CHANGE FACILITY - TUKWILA, WA SITE JCS NO. 021612 -41 NO SCALE ° 19- JUL -01 840 No. 9 A -0000 ELEX DWG. -0027 H B p9- JUL -01 ISSUED FOR PLAN CHECK A 41- 1.1AY -(11 FOR FINAI REVIEW - S(17. DFGI(:N ■ DOE- LN 0' J r \ 06,.i I JCS 1^FF 11,380 CFM ENABLE POWER Or HIGH TEMP LOW TEMP HIGH RH` LOW RH% SMOKE DE CTiON FF_N ESS I MCA 02 SEE NOTE 07E A! 282/ L720) FAULT � Y1 ( BMS7 — . 08 I I I fr EMS I/O CURRENT EMS I \ OY' XX I BY FP_ COP.TRACTOR AAAA /1" pH SP =70 SP =50 FROM MUA UNIT, RMS NET PLC INTER =ACE (FWE) INFILTRATION AIR EXHAUST EAN C IS CONTROL CONTROL PANEL PANEL DEP CRU UNIT DOWN FLOW TYPICAL UPFLOW CRU COO a0. C. EXHAUST FAN I (STANDBY) I - MI /7 I \+ - -� • MIX TEMP. MUA -01 IX TEMP. UA -02 A EXHAUST AIR. START /STOP SUPPLY DUCT TEMPERATURE C- FOWLER AAAA PP,E FILTER DIFFERENTIAL PRESSURE 01 1' /TYPICAL BATTERY ROOM EXHAUST SYSTEM 0 2E PO!S FINAL FILTER CP FlNAL FILTER DP MUA -07 FAIT MUA. -G1 FAIL MUA -02 FAIL Erg MU' 02 FAIL sts FREECE' STA` BY F.P. CONTRACTOR CURRENT BMS BY F.P- CONTP.ACTOP. V VV V VV / v MUA -01 & MUA -02 AIR FLOW DIAGRAM FROM MUM UNIT. CONTROL PANEL LOCKWO ®D GREENE A J.A. JONES COMPANY ENGINEERING & CONSTRUCTION THIS DWG PLC INTERFACE 12.E1 EXEILTRATION AIR CONTROL PANEL TYPICAL DOWNFLOW CRU VVVV BY F.P. CON �nACTGR MUA -01 AND MUA -02 AND CRAC UNITS AIR FLOW DIAGRAM ENABLE POWER ON HIGH TEMP LOW TEMP HIGH RH% LOW RH% SMOKE DEI CTION EAAB_E TEMPERATURE SOROINT (RESET) HRH SETPOIPIT: (RESET) FAN RUNNING HEATING SAGE 1 ACTIVE HEATING STAGE 2 ACTIVE SMOKE DETECTION TyCom TYCOM GLOBAL NETWORK NOTES: JOB N0. SCALE !�\ RODE t EF -OS t EF -06 M ;'. 021612.41 Nw . NO EXFIL RATION AIR 500 CFM CEIVE] CITY OF TJit lILA PERMIT CENTER 0M19 —JUL -2001 1 F-1=1- 9 1 5.300 Cat u f ® CORRIDOR 1 Fs 1 5 1 s mg IFS t -X:ILTRATION AIR 625 CFM `025 MECH IICA'_ C 311 'r3 CFM ', 250 EXPILTRATION AIR . COO 260 CFM INEP. GEN + EXFILTRATION 000 CFM AIR 1000 CO -LC -1 CRU -01/02 t 03/0 /05 CFM III 1300 CRU EXPTTRATION CFM AiR 7500 CO -L0-2 - 06/07/08 09,!10/11 CFM v vv 9" 4j EX:LL -RADO, CFM AIR ..t� CO -LO -3 CRU 12/13 ?; i5/i6 CF41 v vv 9" !j EX,TRATIO CFM AIR 'S CO -LO -? CRU ' 19/20/21 CFM vv v v 300 CRU j + _X.IL CATION CFM AIR 1300 CO-L0-5 - 2 2Sf25/26/27 CFM • 0 1200 }j EXFILTRAION CFM AIP. 1200 - CO -LO -6 CRU -28/29 30/31/32 GEM. vv v v Q 43S CFM CRU. EXRLTRATION - AIR 435 - TGN P 33/34, 35 CFM vvv Qv - C T GN CRU- 3E E. RLTRAT1ON - AIR TA ?3S B 36 /371 CFM vv v Q v EXH ^ A.IR 2C00 1 050 CFM CFM GATT CRU INFILTRATION AIR 950 A -39 / 40 CFM Q AAA' hi EXHAUST AIR 2000 1050 CFM CFM BA- CRU INFILTRATION .41R 950 8 01 4 -/ 2 CFM ® 0' I:PS /XE /S CRU-43/44 45/ ?6/ ?7 +','G' a .(H..US A'R 1400 90C C.r CFM UPS CRU INFILTRATION A iR 500 CFM ELEC.' BA TT 48/49 `/ (• CRU .4---• .4---• I 1 I t / 1� DWG. -0027 H B p9- JUL -01 ISSUED FOR PLAN CHECK A 41- 1.1AY -(11 FOR FINAI REVIEW - S(17. DFGI(:N ■ DOE- LN 0' J r \ 06,.i I JCS 1^FF 11,380 CFM ENABLE POWER Or HIGH TEMP LOW TEMP HIGH RH` LOW RH% SMOKE DE CTiON FF_N ESS I MCA 02 SEE NOTE 07E A! 282/ L720) FAULT � Y1 ( BMS7 — . 08 I I I fr EMS I/O CURRENT EMS I \ OY' XX I BY FP_ COP.TRACTOR AAAA /1" pH SP =70 SP =50 FROM MUA UNIT, RMS NET PLC INTER =ACE (FWE) INFILTRATION AIR EXHAUST EAN C IS CONTROL CONTROL PANEL PANEL DEP CRU UNIT DOWN FLOW TYPICAL UPFLOW CRU COO a0. C. EXHAUST FAN I (STANDBY) I - MI /7 I \+ - -� • MIX TEMP. MUA -01 IX TEMP. UA -02 A EXHAUST AIR. START /STOP SUPPLY DUCT TEMPERATURE C- FOWLER AAAA PP,E FILTER DIFFERENTIAL PRESSURE 01 1' /TYPICAL BATTERY ROOM EXHAUST SYSTEM 0 2E PO!S FINAL FILTER CP FlNAL FILTER DP MUA -07 FAIT MUA. -G1 FAIL MUA -02 FAIL Erg MU' 02 FAIL sts FREECE' STA` BY F.P. CONTRACTOR CURRENT BMS BY F.P- CONTP.ACTOP. V VV V VV / v MUA -01 & MUA -02 AIR FLOW DIAGRAM FROM MUM UNIT. CONTROL PANEL LOCKWO ®D GREENE A J.A. JONES COMPANY ENGINEERING & CONSTRUCTION THIS DWG PLC INTERFACE 12.E1 EXEILTRATION AIR CONTROL PANEL TYPICAL DOWNFLOW CRU VVVV BY F.P. CON �nACTGR MUA -01 AND MUA -02 AND CRAC UNITS AIR FLOW DIAGRAM ENABLE POWER ON HIGH TEMP LOW TEMP HIGH RH% LOW RH% SMOKE DEI CTION EAAB_E TEMPERATURE SOROINT (RESET) HRH SETPOIPIT: (RESET) FAN RUNNING HEATING SAGE 1 ACTIVE HEATING STAGE 2 ACTIVE SMOKE DETECTION TyCom TYCOM GLOBAL NETWORK NOTES: JOB N0. SCALE !�\ RODE t EF -OS t EF -06 M ;'. 021612.41 Nw . NO EXFIL RATION AIR 500 CFM CEIVE] CITY OF TJit lILA PERMIT CENTER 0M19 —JUL -2001 u; UR R 9 -.IIII -61, ISCI IFD EDP PI AN CHFCK — r_ _ 1 IL CO -LO 3 I SDK 1 CORRIDOR C C j1 CR 0 Gi - I C U -05 uR t (ELFIL ._) 11 ( ,RE)1 CO -LO 1 I 10? I CO -LO 2 1 106 1 (F.,) RE) 1 , U5J I 1 (F.1 'E) I I I (rulu=. CORRIDOR 113 I CORRIDOR 110 I CO -LO 4 f _ h 1 115 1 INI MUA -01 CORRIDOR 11051 MECHANI 1 1 04 INTERGEN A 11 f RU -i t FUTURE) MUA -D2 DEPT. APa9. COED. GK. I 1FUTURE) (FU1tiR) 1 CO -LO 5 E. BGUGHMAN 13 1 CO -LO 6 1 102 I CORRIDOR 1 110 L e DN BATTERY A 1 11 BATTERY B 136 I LOCKWOOD GREENE A J.A. JONES COMPANY �N1n I�IC�otnin 9 !+l1�I (�TDI!f'TIfl�I %l r r I MEET ME A 1 143 1 MEET ME B 1 1441 TGN A TON B 1 135 1 n UPS BATTERY IL L A .. EQUIPMENT PLAN FIRST FLOOR CORRIDOR 1 120 I ELECTRICAL 11191 COST. OFFICE 113; I COST. OFFICE 38 1 BREAK ROOM ( 1 BMS CLOSET 1 131 1 LAN CLOSET I 133 I ri 1- 3=0, zenal zimer WOMEN'S TOILET b No I 1 P70 /�!Z I JANITOR 1 122 1 123 I P.ACTIO ROO STORAGE ROOM 1120 I MGRS OFC 1 130 1 RECEPTION I 129 STAGING 1 121 I CUST SPLICE RM A RE 115 t I C oP lEl cE RONte1 h 1, v� , v 5 10 15 Scale: 1/8 INCH = 1 FOOT NORTH TyCorn. TY(:OM GLOBAL NETWORK @C) JOB NO. SCALE 021612.41 RECE�: �D cm 0� Tuk;vlu mia, 23 PERMIT CENTER °'1519 -JUL -2001 SDK GROUND LEVEL OEPT. AMR. c00R0. M. Down BY C. FOWLER LJOCKWOOD GREENS A J.A. JONES COMPANY ENGINEERING & CONSTRUCTION MLE EQUIPMENT ARRANGEMENT PLAN CHILLER PLATFORM AND INTERSTITIAL SPACE ThI a . 2 4 6 8 10 e00 NAME Scale: 1/4 INCH = 1 FOOT NORTH TyCom. TYCOM GLOBAL NETWORK OB O. 021612.41 F - $FIVE CITY' OF TU�VnL4 PERMIT CENTER 04 19 —JUL -2001 B DWG. N0. A M -01 — J IPH -01 M -02 12 C. FOWLER OE, Lx 14 15 16 17 I 1 I I I i I ��F04 41.= ITME EF -05 M -03 EQUIPMENT ARRANGEMENT Motita JOB NAME EF -07 TyCom RS 0 5 10 15 Scale: 1/8 INCH = 1 FOOT NORTH NOTES: 1. RPH -01 THRO RP-02 WILL BE LOCATE, OVER ROOF FRAMED ROOF OPENINGS, ME., 92E - ANO LOCATION OF OPENINGS. JOB NO. 021612.41 CITY OF TJ ,, PERMIT CENTER °°-19 —JUL -2001 Nei. No. 8 crw LOCKW ®OD GREENE A J.A. JONES COMPANY. SOME OwG. Na. B 9- JUL -01 ISSUED FOR PLAN CHI( /I I 0 3'V I I � MANWAY RISER 1L ■ r I SS 1 1 -1 DE I � J I 1 ! _ _� I il 1 - I JCE OIL SE ELEV. 16 -6 CONTRACTOR TO VERIFY. MATCHLINE FOR CONTINUATION SEE ME - 0141 IIIL -1 "FR l i 1 111 "EIS 1 1111 1 1111 4 5' F OR . -- -- -- I I' = = =FO III 11 I`ll\ 4 1 I II'I�'I 1 III III 1 Ili Ili ;li 111 1 11 f = - F0R �i 11 11: 111 2 k I i11; ,1I 1'1 t 1 1111 X 11 I III�I 1111 111 1111 1 1111 111 r- 111, Ir 111! III 1111 II; _ 1111 III I _ '11 TIME, TREPEM`_N, SYSTEM MItJJ ; II-11 :sE. Ili 2 -A I li 111 in; III'► -c CONTAINMENT PIPE It I 1171 `FUELING SYSTEM CONTRACTOR SHALL VERIFY EXACT LOCATION W/ EILECTRICAL CONTRACTOR AND RELOCATE MANWAY RISER AS REQUIRED. TANK ' D 'x 1 D' -D" C SURFACE PAC GENERATOR AREA PLAN SCALE: 1/4"-1.-0- COO ,/2" FOS FOR FDTDRE 3" FOR FROM GENERATOR NORTH J. EDMONDS MATCHLINE FOR CONTINUATION SEE ME -0141 GENERATOR GENERATOR 1 1/2" FOS DROP TO GENERATOR 5' -0" 1 1 1/2" FOS DROP TO GENERATOR COORDINATE EXACT LOCATION WITH INSTALLER NSTALLER (TYP) ON. ' - 3" FO FRCM GENERATOR GENERATOR' EXACT LOCATION WIT GENERATOR E INSTALLER (TYP) 2"FOS F U R_ GE N�R. =.TOR 11 � 5 "FOR 11 1 1 bOCKWOOD GREENE A J.A. JONES COMPANY FUEL OIL SYSTEM EQUIPMENT. AND PIPING PLAN ,77 i?/ iyz NOTES: 1. PITCH ALL UNDERGROUND FUEL OIL PIPING DJWN TO THE TANK AT A. MiNIM., SLOPE OF 1/16" PER FOOT. 2. FOR EXACT FUEL PIPING DROPS AND SLUE -UP LOCATIONS AT GENERATOR ENCLOSURES, SEE MA.NUFA.CTUP.EP.'S APPROVED GENERATOR. DRAWINGS_ 3. CONFIRM ALL UNDERGROUND UTILITY LOCATIONS PRIOR TO ANY EXCAVATION AN:S TRENCHING 4. ADJUST TANK AND FUEL APPURTENANCES LOCATIONS AS REQUIRED TO AVOID UM,. AND MINIMIZE EXCAVATION_ REVIEW CHANGES /AQJUSMEtTS WITH OWNER'S R010105TTAT "!F PRIOR TO INSTALLATION. 5, THE FOLLOWING SEISMIC CRITERIA APPLIES TO THE EOUIRME IN SPECIFICATION SECTION 15182 -TANK MONITORING SYSTEMS, SECTION I_7_, - FUEL OIL PUMP SETS, AND SECTION 15586 -FUEL TREATMENT SYSTEMS_ A. STRUCTURAL 1. SEISMIC ZONE 3 2. 'WIND 80 MPH. EXPOSURE B. 3. BUILDING CODE- LATEST EDITION OF THE UNIFORM BUILDING CODE 4. SNOW LOAD: 25 # /SF B. ALL EQUIPMENT AND IT'S ANCHORAGE SHALL BE DESIGNED AND CONSTRUCT". TO 'WITHSTAND THE _STRESSES PRODUCED BY SEISMIC FORCES AS DEFINED IN THE LATEST ... ITIC'N CF THE UNIFORM BUILDING CODE, SECTION T630 INCLUDING A.L LOCAL AND STATE AMENDMENTS_ THE FOLLOWING FORMULA VALUES S- S " MINIMUM, UNLESS OTH.EPWISE SPECIFIED STANDARDS CONTAIN MORE STRINGENT BE Fp = ApCclp /Rp [1 4 - 3Hx /HP) Wp Fp = TOTAL DESIGN LATERAL DESIGN FORCE. A.p = 2.5 FOR EQUIPMENT LATERALLY BRACED OR .ANCHOR.. TO THE STRUCTURAL FRAME AT A POINT BELOW ITS CENTER OF GRAVTY_ Co = 0.36 I = 1.5 Rp = 1.5 FOR CAST IN PLACE ANC! -IRS OR EXPANSION BOLTS WITH EMBEDMENT LESS THAN S: TIMES THE BOLT DP,METFR 1.0 FOR ADHESIVE ANCHORS 3.0 FOR CAS'. IN PLACE OR EXPANSION SOLIS WM EMBEDMENT GREATER THAN 8 TIMES THE BOLT DIAMETER Hx = THE. ELEVATION WITH RESPECT TO GRADE OR THE AI �ACFIME11 ELE,ION, NOT LESS THAN ZERO. Hr = THE STRUCTURE ROOF ELATION WITH RESPECT TO GRADE. Wp = TOTAL OPERATING WEIGHT. 6. SEISMIC RESTRAINT COMPONENTS FOR PIPING A.FINAL CONFIGURATION OF SEISMIC RESTRAINTS STALL BE BY SUPPORT SYSTEMS SUPPLIE, B. ALL DESIGN' AND INSTALLATION SHALL MEET REQUIREMENTS FOR SEISMIC ZONE 3. C. WHEN INSTALATION IS COMPLETE, PROVIDE TO CONTRACTOR. CEERTECAPON THAT SEISMIC RESTRAINTS FOR PIPING HAVE SEEN INSTALLED PROPERLY TO PROTECT PIPING FROM POTENTIAL SEISMIC DAMAGE TyCom. JOB NO SC 021612.41 P5 LED CITY OF TUNYVILA PERMIT CENTER 19 -JUL -2001 NO 6 g CORRIDOR i I loe I j B p - JUL - ISSUED FOR PLAN CHECK "- CHWS -C FUFFRE TO CC -LO,3 09 CO -LO 3 CHWS & CHWR FUTURE TO CO -LO 1 SDK CO - LO 1 CORRIDOR CO - LO 2 1 106 1 -RE, J L ( UR )I_ DETAIL M -0300 TYP 2 .:J 07 C Oc 1 C ^ I i CRL 10 ( n=_) ( I" F.E) (..' WE) — (FUTURE) CORRIDOR 4 " CHWS - c & - CHWR - , FUTURE TO CO - LO 4, CORRIDOR 113. 1 10,0" I 2 "- CHWR -C 222 " - CHWS -C � EEO MUA -01 INTERGEN I 105 uI MECHANICAL 1104 I 4 ° - CHWS -C I & - CHWR -C FUTURE TO GO -LO 2 4 9 2 - CHWS -C "- CHWR -C I CRU - 11 (FUTURE) 4 "- CHWS -C & - CHWR -C FUTURE TO CO - LO 2 EPT. ARP 00RO. CI, MUA -02 CRU -25 ( FUTURE ) ig CO -LO 5 I 110 S. KINSLAND CORRIDOR 1103 1 CRU -27 (FUTURE) 13 2 -1" 3"x2" ECC REDUCERS FLAT ON BOTTOM SUPPLY & RETURN CO -LO 6 0 2 1I ECC REDUCERS FLAT ON BOTTOM SUPPLY Sc RETURN DETAIL / Tr,5 M -0300 4 "- CF!v/S -C I m CORRIDOR 1 1101 r n BATFEERY A 117 I BATTERY B 1 136 1 4"- CHWS -C 4"- CAWR -C 4 = CHWR -C 4 "- CHWS -C / L \ DETAIL M -0300 4 aq 1 1 4 "x3" EDERRS SUP ON ECC BOTTOR 'CM SUPPLY & RER:RN 1 3 ° x2" 'CC REDUCERS FLAT ON BOTTOM SUPPLY &RETURN L®CKWODDGREENE A J.A. JONES COMPANY 15 u l 9 91 0 TGN A 0 MEET ME A 1 143 1 MEET ME B I 744 TGN B 113x1 CRU -48 ��1 "- CHWS -C -1 "- CHWR -C TITLE 3 "x2" ECC. REDUCERS FLAT ON BOTTOM SUPPLY & RFTURN'. DETAIL TYP 2 - 0300 UPS BATTERY 1 118 7 -5" 3 "- CHWS -C 3 "- CHAR -C, ( DETAIL I r j M - 0300 TYP 3. y,``� _ 3 "x2" ECC REDUCERS- /4 FLAT ON BOTTOM I - j 1 SUPPLY & RETURN w T 1 I '1 DETAIL M -0300 TYP 3 l U 1E1 1 4 1"- CHWS -C , "- CHWR -C M -0300 TYP 5 CRU -49 3"x2" CON REDUCERS SUPPLY & RETURN MECHANICAL PIPING PLAN FIRST FLOOR CORRIDOR 1 1201 ELECTRICAL 1 119 I 17 I 1317 23 1 P.ACTIO ROOM 2 CRU -43 ^R� -44 -44 CRU -45 3 "x2" CON REDUCERS- 4 "x3" CON REDUCERS SUPPLY & RETURN SUPPLY & RETURN 4 PLACES DETAIL 3 "- CHWR -C 3 "- CHWS -C STAGING 1 121 I CONFERENCE ROOM 1 -0" - CHWS -C - CHWR -C 3 "- CHWS -C � 3 "- CHWR -C F NOTES: T. REFER TO THE FOLLOWING PIPING SPECIFICATOONS: 15052 - E LISPING, DISINFECT. 15053 - IDENTIFICATION 15054 - PAU.. 15060 - PIPE AND PIPE FIT1NGS 15100 - VALVES 157161 - PIPING SPECIALTIES 15115 - PIPING SUPPORTS AND ANCROPS 15250 - PIPING INSULATION 15528 - ETFCTRICAL FEAT TRACNG (ALL OUTSIDE PIPING) 17530 - UOUID LEAK DETECTION 2. CONTROL VALVES FOR MUA -01. MUA -02, AND RANOU ARE SIZED FH OREA ED BY AIR HANpLING UNIT MANUFACTURER. 4F Com I I ft2/ 5' 5 10 15 20 Scale' 1/8 INCH = 1 FOOT NORTH 021612.41 R E CIYEO C OF TURIYIiA PERMIT CENTER 4 H19 -JUL -2001 B SDK i ` i 1 1-11,1 O. � - In .T 1 /1 -LB .: O M HILLERi ® I FIRST FLOOR LEVEL D BY DE CaORD. Cll. S. KINSLAND 10 CHWS CU11 Er FROM CHILLER PLATFORM SUPPO 11 12 CHWS 12 CHWR = 1 --- -;—I�- 5 1 I I a 10" CHWS - OUTLET FROM CHILL.—f-- I I II� IL IOCKWOOD GREENE A J.A. JONES COMPANY FNRINFFRINI0 P f:t1NCTRIIf'.TIfiM 7 x!:•:•.•0. 10" CH u�ren °s o OUTLET WS FROM CHILLER nE1 TIRE CHWR INLET TO "CHILLER 1" CHWR INLET TO CHILLERIi (FUTURE) 10" CHWS OUTLET FROM CHILLER; (FUTURE) PLATFORM LEVEL ACC -02 14' - 1" FIRST FLOOR LEVEL AND PLATFORM MECHANICAL PIPING PLAN L 10" CHW INLET TO R CHILLER 1 OS MP -0300 T 10" CHWS OUTLET FROM CHILLER Scale: 1/4 INCH = 1 FOOT NOTES: TyCom TYMM (_I (IRA! NFTW(1RI( T. REFER TO THE FOLLOWING PIPING SPECIFICATIONS: 15052 - FLUSHING, CLEANING, AND DISINFECTION 15053 - IDENTIFICATION 15054 - PAINTING 15960 - PIPE AND* PIPE FITTINGS 15100 - VALVES 15110 - PIPING SPECIALTIES 15115 - PIPING SUPPORTS AND ANCHORS 15250 - RPM INS11,110N 6 15528 - ELECTRICAL HEAT TRACING (ALL OUTSIDE PIPING) 17530 - LIQUID LEA! DETECTION ELECTRICAL HEAT TRACE ALL OUTSIDE PIPING JOB NORTH 021612.41 SCALE CITY OF TUn4VIL4 PEFNITCENTER 19 —JUL -2001 8 --f 8' -1" f BELL & COSSET T MODEL CB -4 % 4" FLED CIRCUIT SETT TTER r 4" CHWS & ri TO / FU iFURE CO -LO 3 I '- CHWS -C CHWR -C 4 "- CHWR -C (FUTURE TO CO -LO 7) `- 3' -0" WIDE LEAK CONTAINMENT PAN CONTAINMENT PAN ' LSO WAFE BUTTERFLY (FUTURE W B ND FLG. (FUTURE TO CO -LO 1)� 10' -10 `2 CHWS & CHWR 9 " TO MUA -01 12 4 HWR -f CHWS &CHWR TO MUA -02 CUT EXIST 4" PW, INSTALL 4" CAP AND REMOVE EXIST. 4" PW BACK TO S -E CORNER 10"x8" ECC RED. 4" CHWS & CHWR TO FLAT ON BOTTOM FUTURE CO -LO 4 4" CHWS & CHWR TO FUTT¢RE CO -LO 2 FLAT ON BOTTOM -1 / /-8 "x6" ECC REDUCER \ FLAT ON BOTTOM 6 ECC REDUCER 4 "- CHwS -C \ .: 6 -f WR' L I1 5 -4" 11 -0" 4" CHWS & CHWR TO FUTURE CO -LO 5 DRAwN 0 DEPT. CS. AORD. Cx. 4" PW (EXIST) --I S. 'KINSLAND 13 O 4" cHws & CO 4'- 10 "14" -0" 1 " -0 J J 5" CODE (NEW) _ 6" RDC (EXIST) 4" PW (EXIST) , L 0'- CHWR -C �5 " WIOE LEAK CONTAINMENT PAN \- 1 1/4 "1 PW DN. TO P -8 (SAFELY, SHOWER) �1 1/R 1 PW ON. TO P -8 (SAFEfI' SHOWER) 10 - CHWR -C 6" ERDC (NEW) ROC (EXIST) 211k LOCKWOOD GREENE A J.A. JONES COMPANY. ' -D 2 -2 --- \ \\ 4 - CHWR -C� • 4 "- CHWS -C TO BATTERY A BATTERY B AND UPS [ 3ATTERY 4" PW (EXIST) PW SHEET T 3 "- CHWS -C & CHWR -C TO TGN B &MEET ME B ERDC UP TO NEW 4" OFD (TYPICAL 7) 16 1 -D" DETAIL TYPICAL M -030 MAIN AD BRANCH ES MECHANICAL PIPING AND PLUMBING PLAN ERDC (NEW) !4 ROC (EXIST)' 3" CHWS & CHWR TO TGN A& MEET ME A 3' -0" CONTAINMENT PAN 15 -7" 7 7/4" PW DN. TO P -8 (SAFETY SHOWER) c 1 1/4" PW 4" RDC UP. TO NEW. 4 RD I p3 (TYPICAL 7) 0 ▪ Z 17 a CUT EXIST 2" PW, INSTALL 2" CAP AND REMOVE ff EXIST. 2" PIPE BACK Tp NORTH WALL 3 "- CHWS -C 3 "- CHWR -C 1 1/2 CHWS . &. CFWR TO CONTAINMENT PAN , 70"- CHWS -C 10"- CHWR -C H}- 12 "x10" ECC RED J '- FLAT ON BOTTOM 1 2 PLACES 13' -4" NEW 4" PW DN. SEE DWG. P -0111 FOR CONT_ 10' -8" CUT EXIST 2" PW, INSTALL 2" CAP AND REMOVE EXIST. 2" PIPE y. BACK TO S -E CORNER 10 15 Scale: 1/8 INCH = 1 FOOT •TjC�rn 1 NOTES- 1. SEE ARCHHECEBJRAL DRAWINGS FOR ROOF DRAIN LOCATIONS. 2 SEE DWG_ P-0600 FOR GENERAL NOTES AND PLUMBING LEGEND_ 3. REMOVE ALL EXISTING DES UNIT HEATERS AND GAS PIP@tG- 4_ REMOVE ALL EXISTING COMPRESSED AIR PIPING_ 5.. CHILLED 'WATER LTIES FROlE MAIN HERDER ARE VERTICAL RISERC WITH EITHER WECRBLETS, REDO.. FEES OR STRAIGHT TEES WITH FLA.. B-FLY VALVE_ BRANCH HEADER LINES THAT RUN IN CONTAINMENT PAN, DROP TO SANE. BOTTOM OF PIPE ELEVATION AS MAIN FASTS HEADER- j F 6_ REFER TO ThE I N PIPING SPEC[ETCCTICNS, f5a52'- [ "EU.USEIING. G. C FFAFBNG. AND DISINFECTION I 15053 - IDENTIFICATION [ 15054' - PAINTING 15060 - PIPE AND PIPE FILINGS 15100 VALVES 151TO - PIPING SF'ECLtLT1ES 15175 - PIPING SUPPORTS AND ANCHOR 152:0 - PIPING INSULATION 75528 - BECTRICAL HEAT TRACING (ALL QUTSIOE PIPING) 17530 - LIQUID LEAK DETECTION 12 CHWS FROM CHILLER ! 2" CHWR )� TO CHILLER 4° CHWS & CHWR TO ELECTRICAL ROOM NORTH 00 N0. SCALE T 021612.41 cITY oF`TU „Wu PERMIT CENTER 415 19 - JUL - 2001 Re. NO. B 8 X8" UP THRU SLAB FOR , CONT. SEE DWG. MH -0112 TGN 8 'JS 8 "X3" UP THRU SLAB FOR CONT. SEE DWG. MH -0112 2 "x22 06" 2 "x22" 11®1@ MEN'S MILE 8 °x10" I 126 1 1256A iciA 125 AHU -01 11' -0" AFF 18 "x14 CO -LO 3 CO -LO 1 = CRU -02 CRU-5 II CR - 04 CRU -05' ,' 1 'E) ) II (FUTURE) (FUTURE)I 14"X14" UP THRU SLAB FOR CONT. SEE DWG. MH -0112 CO -LO 2 16 I 12"X12" UP THRU SLAV. FOR CONT. SEE DWG. Mr' -0112 14 ° X14 ° UP THRU SLAB FOR CONT. SEE DWG. MH -0112 CO LO 4 1 Cr.0 -Oc r F RE L CRU (Vl'TURE) I 1 (FUTURE) I (FU F.E) I (FUTURE) 6 X36 UP THRU SLAB FOR ONT. SEE DWG. MH -0112 MUA -Oi 150 152 e �� 14 "'x 36 "x36" CO -LO 5 1300 CFM 12"X12" UP THRU SLAB FOR CONT. SEE DWG. MH -0112 14 ° 'UP THRU SLAB FOR CONT. SEE DWG. MH -0112 8"X74 UP THRU SLAB FOR CONT_ SEE DWG: MH -0112 BATTERY A 2 12 "x12" 12 "x12" 14'x6" 16,16 UP THRU SLAB. FOR CONT. SEE. DWG. MH -0112 190 230 118 1 12 "X12" UP THRU SLAB FOR CONT. SEE DWG. MH -0112 UPS BATTERY 10 "x10" 465 235 CFM 6. DETAIL M - 0.550 TYPICAL CRU -49 14 "x14" UP THRU SLAB_. FOR CONT. SEE DWG. MH -0112 WOMAN'S TOILET JANITOR 1 i © oI E 44 e COMES ml,n IQ, 155 195 14"X14" UP THRU STAB FOR CONT. SEE DWG. MH -0112 I 42"X42" UP THRU SLAB FOR I CONT. SEE DWG. MH -0112 13 14 14"X14' UP THRU SLAB FOR CONT. SEE DWG. MR-0112 TERMINATE 12 ABO FLOOR COVER OPEN END OF DUCT WITH 1/2" HARDWARE CLOTH OFFSET WERE NEEDED TO AVOID BATTERY LAYOUT TYPICAL 6 PLACES 11p11, f') Hqz 5 5 10 Scale: 1/8 INCH = 1 FOOT PACTION ROMS 123 1 STORAGE ROOM L 126 NOTE. AF.L,PPLY & G.S_ DUCTWORK SHOWN ON TH5 SHEET WILL DE< G-A-ZO > AL EXHALGT DUC:WO. W41 HE ` _ZO > Gus. SEC ROOM i 141 I CONFEREN('E Fig-OM 1 120 I VV -06 c "0 0 ) NORTH 2 UP TO IPH OZ ON ROOF - — 857ED CITV 4 OFtTUKWILA PERMIT CENTER UanWU er S. KINSUWD DEPT. ON. L,OCKWOODGREENE SP., TOLE HVAC PLAN nrs - &TvCoin TOO N0. 021612.41 ...19—JUL-2001 B N-...__./ ", N........" \.._.., DETAIL / ‘..._., \-_..../ , i I 7 r (TYPICAL) V0 ) 14,8 DOWN THRU SLAB FOR CONT. - 8 . FSD-07-S1 I II II 10"x10 ° DOWN THRU SLAB 1 VI g Fri S E E F E - 1 81 1G ON M 0E- " I I , -T -. .2 < G-A-2.0 > 24,14° 24,14 NMI . SEE DWG. MH-0111 fil$ _E r ' IJ ' EO - Nr " . VE S e-1 8 -0111 o 2•_3^ 18 x18 < G-A-2.0 1 1 ---- I PP BE ' SM. 2.- FS0-01-R1 IPH-01 ON ROOF. AND Er." OWN THRU SLAB 6 BELOW SLAB. _ DOWN TO MUA-01 & 02 -- -..„ ,.... Z (/171 �` f TERMINI. F5D-06-S1 FSD-06-R1 os r FSD-07-R1 FSD-07-1R3 ' MI 36"x36" mil iii i i -E- -z--1 36,36 DOWN THRU SLAB FOR CONT. SEE DWG. MH-0111 10,10 DOWN T TERMINATE 6 BEL 8,14 DOWN THR FOR CONT. SEE 8"x8" DOWN THRL TERMINATE 6" BELOW vFSLI-02-R3 I -47- 10' NMI o-- Ei--- 1 1 1 1 1 I '"`-FS13-06-R2 RU SLAB W SLAB. SLAB DWG. MH-0111 TIT "" STRUCTURAL STEEL. '.° `- SLAB SLAB. 1 FSD-02-R1 a 1 1 FSD-02-1R2 \ A im i-FSD-02-R 4 o li-FSD-02-R5 DETAIL ,I (TYPICAL) 4 -c35: 0 - D-06-R4 i SD-08-R1 F.-C.-. FSD-08-FQ 1 - EF T ? FSD-06-R5 ° L. 12'-8° 11-IRU SLAB 6 BELOW &AB. LaD-- FSD- I 0 FSD-08-S1 8,8 DOWN TERMINATE 13 sa. All 7 JV < .o > 24,22 FSD-ORT-R3 • < G-A-2.0 > 24,30" 18,18 DOWN THRU SLAB FOR CONT. SEE DWG. MH-0111 'ff- ll old — 'm ,14" DOWN THRU SLAB FOR CONT. SEE DWG. MH-01 8,8 DOWN THRU SLAB TERMINATE 6" BELOW SLAB. FS0-09-51 I TPAI-1 ,5e. IPH-02 ON ROOF ' ' 1 B SSI1B. , 14'-8" FSD-04-51 FSD-05-S1 (--;.--. \ DUAIL --OHO I 1i 1, 1 1 173 I I I I I I I 1 I i \ \ -12,12" DOWN THRU StAB TERMINATE 6 BELOW SLAB. FSD-04-1, "WRIVIAT rAt. I 2-R2 ES,D_-.2 kir lk ET' FSD-05-R2. 16,16 DOWN THRU SLAB FOR CONT. sa DWG_ MH-Ot 11 - -E> g.1,1.4kliii7 FSD-03-R2 .-R2 FSD-05-R3 2 Y 16,16" UP TO EF-02 ON ROOF FSD-09-R2 DETAIL E5_0,-.12,3.1 0 t I I I I FSD-03-R3 I4-R3 18,16 UP TO EF-01 ON ROOF 12,12 " (TYPICAL) II/1 i-f5DR a '' 05-11 icr-a Eige7- , 14-R4 i I FSD-10-S1 1 2,12 DOWN THRU SULB TERMINATE 6" BELOW SLAB. FSD-10-R3 FS. 1 - I , 1 r FSD-05-R5 i FSD-10-R1 12,12 DOWN THRU SLAB TERMINATE 6" BELOW SLAB. 1 EIT EF-05 ON ROOF 14,14" DOWN THRU SLAB FOR CONT_ S. DWG. MH-0111 14,14 UP TO EF-06 ' ON ROOF FSD-12-R5 1 I . . .101M0' 020 or0, _/ FS / D-10-R2 I , 1 1 i I I IJI..° 16,16" FOR 0 r.. , rd,?-orRTIF DOWN THRU SIAB CONT. SEE DWG. MH-0711 ... LI- 0 i 1111 Airi 1_1117 ED- (1 a CN. E. BOUGHMAN LOCKWOOD GREENE 4ik TIRE HVAC PLAN 5 10 15 20 Scale: 1/8 INCH = 1 FOOT' NORTH w0Tvenm JOB NO. 021612.41 NOTE:. ALL SUPPLY & DUCTWORK Sc.. THIS SHELF WELL BE< 6_8-20 > AIL ErrIALIST wow. WILL < 0-0-20 PERMIT CENTER ..19-JUL-2001 DUCTWORK LEGEND SYMBOL DESCRIPTION SYMBOL DESCRIPTION 1i TU CDCN ) ES EXHAU ucr RETURN III VOLUME =ANT W/ LOCING QIIPDRANT !0! DUCT —� MOTORIZED DAMPE2i H .MARK DELME lI '.. COMBINATION FIRE /SMOKE CAM PER. S FLOW (SUPPLY) ( �+ MANUAL DAMPER w/ LOCKING OUADR }" AIR FLOW (RETURN) OR EXHAUST VOLUME EXTRACTOR — I_ - DOOR LOUVER I(III OGEE UP OR DOWN —d—► DOOR UNDERCUT -¢ 'OT10M CURET SUPPLY DIrc V V EXFILTRATION/ RETURN AIR DUCTWORK FLEXIBLE CONNECTION III BLAST GATE + I;I T FIRE DAMPER 1 ='. ACCESS DOOR P &ID VALVE AND PIPING SYMBOLS _^yam BALL VALVE - GATE VALVE - GLOBE VALVE - _ DIAPHRAGM VALVE —{�— CHECK VALVE BALANCING VALVE BACKELOW PREVENTER —/— DAMPER - NEEDLE VALVE '1= UNION — CONCENTRIC REDUCER FLOW DIRECTON Li rR �— FILTER /LUBRICATOR /REGULATOR - SANITARY CONNECTION I- HrHft; FLEX CONNECTION FLANGE CONNECTION SIGHT GLASS CAP VACUUM BREAK 1J CHEMICAL SEAL P TEST PLUG o SPRAFHH J �1 \,/ VENT Y STRAINER DRAIN BUTTERFLY VALVE FILTER IF r PATE & FRAME EXCHANGER II rte. xdc — TRIPLE DUTY VALVE L - - -J VALVE WILL FAIL OPEN CONTROL VALVE — PRESSURE REGULATOR BACKPRESSURE REGULATOR LJ x ACTUATED FLOW VALVE B —X— SOLENOID VALVE I ) THERMOWEELL LOAD CELL SP SLOPE / \ \ / X B PRESSURE RELIEF VALVE VACUUM RELIEF VALVE RUPTURE DISK SPECIALTY ITEM \ DIRECTION OF PIPE SLOPE / MATERIAL FLOW MATERIAL FLOW PLC OUTPUTS PLC INPUTS LOCAL FIELD DEVICE PANEL MOUNTED DEVICE C> FLOW ELEMENT MODULATING VALVE AIR OPERATED SO!ENOID VALVE O DAMPER OPERATOR CENTRIFUGAL PUMP IN -LINE PUMP JI DOUBLE DIAPHRAGM PUMP VALVE WILL FAIL CLOSED LETTER LETTERS OF INSTRUMENT IDENTIFICATION FIRST LETTER ANALYTICAL BURNER; BRIGHTNESS CONDUCTIVE, DENS.; DAMPER VOLTAGE; EMERGENCY FLOW; FURNISHED THICKNESS (GAGING) HAND CURRENT POWER TIME LEVEL MOISTURE OR HUMIDITY OPTICAL PRESSURE EVENT NUMBER RESTRICTION; RADIATION SPEED OR FREQUENCY; SIGHT TEMPERATURE MULTIVARABLE; UTILITY VISCOSITY; VACUUM; VIBRATION; VIDEO WEIGHT OR FORCE MISCELLANEOUS RELAY; CONVERT POSITION SECOND. LETTER ALARM; ANALYZER BATCH; BIAS CONTROL; CONTROLLER CONVERTER DIFFERENTIAL ELEMENT RATIO (FRACTION) GAUGE; GLASS HAND INDICATOR; INDICATING SCAN CONTROL STATION LOGGER; LIGHT MOTOR ORIFICE; OPERATING; OFF PUSH INTEGRATOR; TOTALIZER RECORDER; RELIEF SWITCH; SELECTOR; SAFETY. TRANSMITTER MULTIFUNCTION VALVE WELL; WITH MISCELLANEOUS RELAY; COMPUTE UNCLASSIFIED FINAL CONTROL ELEMENT SUCCEEDING ALARM; POSITION "A "; AUTOMATIC BOX. POSITION "8 ", BUTTON CONTROLLER; CLOSED;. CONVERTER; POSITION "C" DRIVE; DISC ELEMENT; EQUIPMENT FIELD DEVICE HIGH INDICATOR CONTROL STATION LOW METER; MIDDLE OR INTERMEDIATE OPEN PROGRAMMER INTEGRATOR: TOTALIZER RECORDER.. SWITCH TRANSMITTER MULTIFUNCTION VALVE WELL UNCLASSIFIED FINAL CONTROL ELEMENT INSTRUMENT IDENTIFICATION INSTRUMENT IDENTIFICATION AS FOLLOWS: (3) SEQUENCE NUMBER (2) INSTRUMENT IDENTIFICATION (1) DRAWING NUMBER - LSHH - 01A (1) INDICATES P &1D DRAWING NUMBER (2) INSTRUMENT IDENTIFICATION - LETTERS DESIGNATE TYPE OF INSTRUMENTATION AS LISTED IN THE ABOVE TABLE (MAXIMUM FIVE CHARACTERS). MAY CONTAIN A NUMERICAL VALUE THAT DESIGNATES BETWEEN IDENTICAL INSTRUMENTS. (3) SEQUENCE NUMBER OF INSTRUMENT IDENTIFIER (MAXIMUM THREE CHARACTERS) - TYPICAL LOOP DETAIL 1 PIPING LINE SYMBOLS C 1 PROCESS LINE CLEAN -IN -PACE LINE UTILITY LINE INSULATED LINE HEAT TRACED /INSULATED LINE DRAY DE OE P E. BOUGHMAN SERVICE LIST FP FIRE WATER NG NATURAL GAS FOS FUEL OIL SUPPLY CW CITY WATER SS SANITARY SEWER FOR FUEL OIL RETURN PW POTABLE WATER V VENT FES FILTERED FUEL SUPPLY PWH POTABLE HOT WATER VTA VENT TO ATMOSPHERIC FFR FILTERED FUEL RETURN PWD PURGE WATER DRAIN VTR VENT THRU ROOF CD CONDENSATE DRAIN CHWS CHILLED WATER SUPPLY SD STORM DRAIN SW' SERVICE WATER CHWR CHILLED WATER RETURN RDC ROOF DRAIN CONDUCTOR WW WASTEWATER ERDC EMERGENCY ROOF DRAIN CONDUCTOR PEB PROCESS EXHAUST BATTERY SYSTEMS LIST LINE IDENDFICATION AS FOLLOWS: (2) MATERIAL SERVICE (1) LINE SIZE 3 "- CHWS- (C) -ET (3) INSULATION (C OR H) (4) HEAT TRACED (ET) (1) UNE SIZE - A NUMBER FOLLOWED BY INCH MARKS (") INDICATES DIE PIPE SIZE AS MEASURED IN INCHES. THE ABSENCE OF INCH MARKS INDICATES A SIZE MEASURED IN MILLIMETERS. (2) SERVICE IDENTIFIER - FLUID PER SERVICE UST. (3) INSULATION (C OR R) - C INDICATES INSULATION IS REQUIRED FOR COLD SERVICES AND H FOR HOT SERVCES_ OMIT C OR H IF INSULATION IS NOT REQUIRED. (4) HEAT TRACED (ET) - E INDICATES ELECTRICAL HEAT TRACING. IF HEAT TRACING IS NOT REQUIRED OMIT_ INSTRUMENT LINE SYMBOLS A A A A A .s 3E 3E 3E 3F O 0 PNEUMATIC SIGNAL LINE. INSTRUMENT AIR SUPPLY ELECTRICAL SIGNAL UNE CAPILLARY UNE TO INSTRUMENT SOFTWARE UNE SIGNAL INTERFACE INSTRUMENT DEVICE LEGEND HOA PACKAGED (P) BMS (B) INSTRUMENT IDENTIFICATION DEVICE FUNCTION EQUIPMENT NUMBER PER LOOP 4ilk LOCKWOOD GREENE itTLE DUCTWORK TAG DUCT MATERIA G - GALVANIZED. STEEL S - STAINLESS STEEL SL - STAINLESS STEEL WITH LINER X - FACTORY INSULATED FLEXIBLE. Z - UNINSULATED FLEXIBLE WG WELDED GALVANIZED INSULATION TYPE A DUCT. WRAP B EXTERIOR RIGID BOARD U - UNINSUATED F -. FACTORY INSULATED MECHANICAL AND HVAC GENERAL NOTES, LEGENDS GENERAL NOTES: 1. HVAC DRAWINGS ARE IN PART DIAGRAMMATIC AND INTENDED - O SHOW THE SCOPE AND GENERAL ARRANGEMENT OF THE WORK U.. THIS CONTRACT. CONTRACTOR SHALL FOLLOW THESE DRAWINGS IN LAYING OUT THE EQUIPMENT AND DUCTWORK. DRAWINGS ARE NOT INTENDED TO BE SCALED FOR ROUGHING IN MEASUREMENTS NOR TO SERVE AS SHOP DRAWINGS_ WHERE JOB CONDFTTONS REQUIRE MINOP. CHANGES OR ADJUSTMENTS IN THE INDICATED LOCATIONS OR ARRANGEMENT OF THE WORK, SU'.X CHANGES SHALL BE MADE YFTP. AV CHANGE IN THE CONTRACT AMOUNT_ 2.. THE CONTRACTOR SHALL VISIT THE JOB SITE TO FAMILIARIZE HIMSELF WITH ALL COMMONS AFFECTING THE WORK AND TO COORDINATE THE WORK MIFF OTHER CONTRACTORS ON THE PROJECT_ CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND INSTALLATION OF DUCTWORK AND EQUIPMENT 3. EQUIPMENT INDICATED DO N THE DRAWINGS, TOGETHER WITH ITS EASE AND /OR SUPPORT, RT DUCTWORK, WALL, FLOOR AND ROOF OPENINGS AND ELECTRICAL SERVICE ARE BASED ON THE MAKE AND MODEL INDICATED IN THE EQUIPMENT SCHEDULE OR IN THESE SPECIFICATIONS_ SHOULD CO.EACTOR SELECT AN EQUIVALENT ALTERNATE MAKE OF EQUIPMENT, EVEN IF APPROVED EY THE OWNER AS EQUAL,CONTRACTOR SHALL COORDINATE AND MAKE THE MODIFICATIONS IN RTE. WORK WITHOUT CHANGE IN CONTRACT AMOUNT_ 4. UNLESS OTHERWISE SHOWN ON DRAWINGS OR SPECIFIED HEREIN, PRODUCTS USED IN THE WORK SHALL EEFNSCALLED IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS LANG RECOMMENDATIONS_ ANY CHANGES OR MODIFICATIONS PROPOSED BY CONTRACTOR WHICH HE BELIEVES WILL IMPROVE THE INSTALLATION SHALL BE APPROVED BV THE OWNER, REPRESENTATIVE 5. FOR EXACT LOCATION % EBONG MOUNTED DNTCcS SUCH VS DIFFUSERS, REGISTERS, GRILLES, ETC_ SEE ARCHTECTURAL DRAWINGS- B. ACCESS DOORS SHALLBE PROVIDED ON ALL FIRE DAMPERS, DUCT HEATING COILS, AND OTHER DEVICES AND /OR EQUIPMENT DESCRIBED ON THE SPECIFICATIONS_ ACCESS DOOR. SMALL BE PROVIDED WHETHER OR NOT INDICATED ON THE DRAWING_ 7. FOR EXACT LOCATION OF FLOOR AND ROOF OPENINGS, SEE STRUCTURAL DRAWINGS_ B. ALL FIRE DAMPERS SHALL BE TYPE B UNLESS NOTED ON DRA'MNGS. 9: DUCT SIZES SHOWN INDICATE INSIDE CLEAR DIMENSIONS_ 10. FOR EXACT LOCATION OF ROOF OPENINGS SEE STRUCTURAL DWG, ABBREV ACC AD AFF AFS, AHU ASD BOD SOP CP CRU DB DHC DP DPR DWG EAT EF EL ETH EUH EWH EWT FC FD FLR FOB FWE FSD DESCRIPTION ABBREV DESCRIPTION ABBREV DESCRIPTION AIR COOLED CHILLER ACCESS DOOR ABOVE FINISHED F LOOR AIR FLOW SWITCH AIR HANDLING UNIT ACCESS PANEL ADJUSTABLE SPEED DRIVE BOTTOM OF DUCT BOTTOM OF PIPE SOT. OF INSULATION CONTROL PANEL. COMPUTER ROOM UNIT DRY BULB TEMP. DUCT HATNG COIL DEW POINT DAMPER DRAWING ENTERING AIR TEMPERATURE EXHAUST FAN ELEVATION ELECTRIC HEATER TANK ELECTRIC UNIT HEATER ELECTRIC WALL HEATER ENTERING WATER TEMPERATURc' CARTRIDGE FILTER FAN UNIT COIL PRE DAMPER FLOOR FLAT ON BOTTOM ABBREVIATION LEGEND TOT. FLAT ON TOP GR /LB GRANS PER. POUND GS GRADUAL SWITCH H.OF.. HS IPH IX LWT MMF MOD MUA NO NTS P PUMP HAND -OFF -AUTO SWITCH HAND. SWITCH HEAT EXCHANGER INTAKE PENTHOUSE ION EXCHANGE UNIT LEAVING AIR TEMP. LEAVING WATER TEMPERATURE MULTIMEDIA FILTER MOTOR OPERATED DAMPER MAKE -UP AIR UNIT MANU VOLUME AL DAMPER NORMALLY MVD NC NORMALLY. OPEN NOT TO SCALE OUTSIDE AIR OAI OUTSIDE AIR INTAKE OZONE DESTRUCT ODU UNIT O. OZONE GENERATOR PIX PODHINON EXCH. UNIT I FURNISHED WITH EQUIPMENT COMBINATION FIRE /SMOKE PR' PRESSURE REDUCING VALVE PSPP PRIMARY SECONDARY ' PUMPING PACKAGE RA RAC RAHU RECIRCULATING AIR HANDUNG UNT RD RPH RHO RO SCHWP S/D SD TI TK TANK TOD TOP OF DUCT TOS TOU PEAS ACID EXHAUST PEST SOLVENT EXHAUST PEG ENERAL EXHAUST PEBB BEADBLAST EXHAUST PI PRESSURE INDICATION UH W VTR WCA WE WAC WP WS RETURN AIR ROOFTOP AIR CONDMONNG UNIT RELIEF DAMPER RELIEF PE.i0USE RE -HEAT COIL REVERSE OSMOSIS SUPPLY AIR SECONDARY CHILLED WATER PUMP SPUTTER DAMPER SMOKE DETECTOR SUPPLY FAN ROOM THERMOSTAT TEMPERATURE NDICATION TOP OE STEEL TOP OF UNIT TURNING VANE UNIT HEATER ULTRAVIOLET STERILIZER VENT THRU ROOF VARIABLE VOLUME AIR BOX WAS. COLLECTION AREA WET BULB TEMP_ THRU THE WALL AC UNIT WELL PUMP WATER SOFTENER WWTA WASTEWATER TREAT MENT AREA 1 P=CEIVED CITY OF TUKINILA A ` TvC®M I 021612.41 B °.=19-JUL-2001 CRU -01 THRU CRU -38 DELUXE SYS 3 DOWNFLOW cnEe N LL NOTES: DETAIL SCALE: NONE EPT. C OE, APPR. cooao cx. SJ PPLY 010 0IhE R 1. PROVIDE 5 PIPE DI.A. STRAIGHT RUN UPSTREAv AND 2 PIPE DIA. STRAIGHT RUN DOWNSTREAM OF CIRCUIT SETTER. 2. USE BUTTERFLY VALVES FOR PIPE SIZES 3" & OVER AND BALL VALVES FOR PIPE SIZES LESS THAN 3 ". o NnwN Er S. KINSLAND 3 MP -0111 M -0300 CRU -48 THRU CRU -49 CHALLENGER UPFLOW X 51 "IN p i CHILLED WATER COIL PIPING SCHEMATIC D ET.A I L SCALE: NONE 4 M5 -0111 M -0300 LOCKWDDD EiREENE A J.A. JONES COMPANY CRU-39 THRU CRU -47 DELUXE SYS 3 UPFLOW DETAIL SCALE: NONE A S� IG A6) cA PE. NILE 2 MP -0111 M -0300 LEAK CONTAINMENT PAN — 0,10" THK 303HLUMINUM WIOTH VARIES - 12° 14 A HIGH SIDE - WALLS • CHANNEL 3" CLEAR OF CONTAINMENT PAN (BOTH SIDES) CHILLED WATER SUPPLY AND RETURN MECHANICAL SECTIONS AND DETAILS LEAK CONTAINMENT PAN & FLOOR PENETRATIONS DE TAIL SCALE: NONE INSULATION PROTECTION SHIELD. 8" WIDE x 3,5" FLANGE ALUM CHANNEL. SPACE 10 FEET ON CENTERS. ADHERE TO BOTTOM OF CONTAINMENT PAN WITH SILICONE CAULK ALONG FLANGE EDGES. 5 MP -0113 M -0300 1 /FIRE STOP SGLE EXTEND PIPE SLEEVE 4" ABOVE FLOOR_ WELD ALL AROUND IF FLOOR IS CORE GRILLED ADD WATER STOP PLATE AT FLOOR LEVEL SUCONE CAULK WATER TIGHT: SCH 40 STEEL PIPE SLEEVE ID TO BE 2" LARGER THAN PIPE INSULATION DIAMETER ADD 1/4' THE WATER STOP IN CONCRETE AS SHOWN, 021612.41 CRY OF UEVILA PERMIT CENTER ..19—JUL-2001 E, N0. MC. N0. O-.1111 _nf ICGI I[n MR PI AN rHCrK DETAIL SCALE: NONE DETAIL SCALE: NONE 1 MH- 0111,MH -0112 BRANCH DUCT TAKE -OFF DETAIL _` A= PL,ABL_I pl 9 p: I SLEEVE FIRE DAMPER DETAIL 4 MH —Q1 72 — VOUNTINC. ANGLE RECTANGULAR DUCT FIRE /SMOKE DAMPER DETAIL DETAIL SCALE: NONE FIRE DAMPER (=LADE OUT OF AIR SREAM) TO 1" MIN CONCRETE SLAB 1/4" TO 1/2" CLEARANCE MOUNTING ANGLE – 11/2,1," x 10 GA.. OR HEAVIER ANGLES SNUG TO WALL. BOLT TO SLEEVE ALL AROUND. ACCESS DOOR - DETAIL SCALE: NONE 2 MH -0112 ACCESS DOOR "S" JOINT – COLLAR TO DUCT FLOOR MOUNTED FIRE DAMPER DETAIL 5 MH -0112 SLEEVE ANGLE ERAMS FASTEN TO CONCRETE TC SLEEVE ESL NGT CONCRETE SLaB OR CURS FACTORY PR FP,OWDED DAMPER BRICATED :FIRE CCNCRE_ E SLPB SECURE FAN TO CUTH LAG 60LTS. MIN. 2 PER RB WI SID BACKDRAFT DAMPER– SUPPLIED BY FAN MANUFACTURER (ATTACH TO HOLDING PLATE) f .' J ar l EN'D ^'ITH t /2' HARpIYARE CLO �— ID 3Y KINSLAND SHEET 113, HVAC DETAILS. TyCom. JOS NO. 021612.41 °""19 —JUL -2001 B AN E OCKWOOD GREENE A JA JONES COMPANY TRANSITION TO ROOF OPENING SIZE EXHAUST DUCTWORK ROOF MOUNTED EXHAUST FAN DETAIL DETAIL 3 SCALE: NONE ME -0131 gRf kE; CF AIR DEVICE NtCK DIMENSIOPi TRANSFER DUCT DETAIL DETAIL SCALE: NONE 6 MH -0111 1' DUCT !iNER ROOF DECK. CDUNG MOUNTED AIR DEPACE, SEE SCHEDULE ON DWG. M -0550 FU1 WIDTH OF E D=V!CE NFCK D!MEF•90N fl)Piiqz CITY C�R�Tt,K�lI..A PERMIT CENTER COMPUTER ROOM AIR CONDITIONING UNIT SCHEDULE MARK MANUFACTURER AND MODEL N0. AREA SERVED EAT db 'F % RH TOTAL M. SEN518LE 74641 S. BATA Rat, KW HUA9LIlER EL V /Z /P3, /pH /H I Wt;.l CGOUNG COIL DATA REMARKS CFM , HP } / . DISCHARGE E447 DB DEC - F LWi DB DEG. F GPM PER UNIT CONN. SIZE (COPPER) CRU -01 THRU CRU -05 LIE5ERT FH600C COLO -1 72 45 335.6 335.6 17,700 10 30 2 1 9.6 460/3/50 DOWN .5 55 63 2 1/8" 0D 000000 COO -06 THRU CRU -11 UEBERT C FH600 COLD -2 72 45 335.6 335.6 77 IG 30 22A 5.6 460/3/60 DOWN 45 55 65 2 1/8" OD 000000 CPU -12 THRU CRU -16 FH600C COLO -3 72 45 335.6 335.6 172000 40 -- 221 9.6 460/3/60 DOWN 45 55 61 2 1/8" OD 00 0 000 CRU -17 THOU. CRU -21 UEBERT COLO -4 72 45 335.6 335.6 77,JOG 10 3t] 211 9.6 .460 /3/60 DOWN 75 55 61 2 I /8" OD 000000 CRU -22 THRU I CRU -27 ,,, BERT COLD 5 72 145 335.6 335.6 17,000 i4 3D 22.7 66 = 60/3/60 DOWN 45 55 65 2 1/8" CD 000000 CPU -28 THRU'. CPU-32 UEBERT FH740C BOLO -o 72 45 ' 4085 380.8 16,500 tO 30 221 95 460/3/60 DOWN 500 55 75 25/8'.00 0000 00 CRU -33 THRU CRU -35 E9 ERT TGN A 72 45 3356 335.6 17:I00 i0 30 220 96 460/3/60 DOWN 67 58.8 48 2 1/8" OD 00 = .0 ®0 CRU -36 THOU CRU -38 EBERT UFn'422C TGN9 72 : 45 3356 335.6.. 17,100 TO 500 221 96 460/3/60 DOWN 45 55 48 2 7/8" 00 0 _ 0 a 0 CPU -39 AND CRU -40 UEBERT .3,04220 BATTERY A 75 ' S0 2247 189.7 9,300 5 20 174 6.4 460 /3/00 Up 45 55 1 5/8" OD 0000 CPU -41 AND CRU -42 U UH422EBERC T BATTERY 2 75 50 224 7 789.7 9.300 5 2G 17.4 6.4 450/3/50 OF 45 55 52 1 5 /13' 00 0000 CRU -43 THRU CRU -47 UEBERT UN529C UPS/ OF SWG / R 80 4/4 536.6 358.9 i2. -00 75 N % . ° . N / A N/A ? 6 v ' i 3 l c0 UP .5 55 68 Z 1/8" 00 000 F 0 CRU -48 AND CRU -49 i EgT c 6lUp68C ELECT. BATTERY gC N/A 55.6 40.4 4,00 !- N/A N /A. N/A 460/3(67 UP .= 55 t0 1 1/8' CD 0.� ` 00 AIR HANDLING UNIT SCHEDULE • ��' ..+-_ SERVED - J o \� M =_ L Fl _�. Al 5U'PPLY FAN N TOR COOLING COIL DATA PRE -FILTER DATA FINAL FILTER DATA REMARKS CEU I Wt;.l FA TY'E F0N RFM FP T:P, W -07 .9 Ma:;. =• F'M E._ DH I DE.,. FAT WB DEG. F LA7 DB DEC. ` LAT WB DEC. f SENSIBLE MBH TOTAL MBH EON DEC D EG. F LW7 D F GPM AF.D. ( '1Y.GJ MAX WPD FT H2 M AX. FV FPM A.P.D. IN. A.P.D. F INAL TYPE .MAX. N FPM AP.D. INITIAL AP.D. FINAL YPE '.I.' 1s : ='. r AR - U:', .- ..,,. n .._ CENTRIFUGAL ML,AL *AIRE MODEL 406 BP 40 r ._ 02/00 1,:50 :50 752 625 60.7 57.2 144.3 275.2 45 55 55 0.50 15 500 0.25 0.5 K O0OWAWAY 30% 2' THIC T 500 . 0.5 I.0 85% 12" DEEP CA 0 000000 a s Cl O2 L. 05 FRESH ,H THANE CUM'A CORRIDOR 400 C ^'N;rcIFIIGAL • =C - - 175': •..55 5.,. 62.0 60.7 57.2 +44.3 275.2 45 55 55 0.50 75 500 025 05 30% 2 THICK THROW 500 0.5 1.0 85 %.12" DEEP CARTRIDGE 0 0 00000 6 "0 ':.11:. ,. \ 4. JNI .iM, ,TE _ _ _ CENTRT_1L 17:4 _ C= 0 3 ' 1 , 10 1.75. 2 0. , 632 55.8 548 76.9 89.9 SS 55 19 0.50 15 500 0.25 05 300, 2' THICK THF.OWAWAY 500 0.5 1.0 85% 12" DEEP CARTRIDGE 1 z a 00 a 0 ELI. . -�.. - _: is .._ - :,._ _ __. , �. _,.� ■ 0� 67 58.8 - - - 4 5 58.16 10.0 0.66 2.71 503 0.25 05 30% 2' THICK THROWAWAY 500 0.5 1.0' 85% 12" DEEP CARTRIDGE 1 000000 VARIABLE VOLUME AIR DEVICE SCHEDULE !� - RK MLANCIFAC7URER AND MODEL NO_ AR 5ER NOMINAL CFO CONTROL UNIT - ELECTRIC HEATING COIL DATA ACCESSORIES INLET SIZE 0W LE! SIZ_ CHM E.A i. L1 L.A. .i VF MBH KW STEPS. V /Ph /HZ W -07 M -AL006 MODEL 406 BP L'5 & BMS ROOMS 200 6'b 12,12 - - - F': - - - vv W -02 MEIAL-`IRE MODEL 410 6 RECEPTION AND OPEN OFFICE AREA 7140 iO'M 16x12 570 55 -. 72.7 6 3 480/3/60 (DO VV-00 ML,AL *AIRE MODEL 406 BP BREAK . ROOM 200 6'c 72x12 _Rvo (S 'CS.; GPEENHECH GE-I30-5 200C 0.50 - �` V W -0= MA1`A;RE MODEL 405 RP BUST. 010E 137 EY 138 350 6, 72x72 t5-7-120-3 L ._ 1.4 x 07.0 1305 BELT _ Cl O2 W-05 ME T ALL RE MODEL 406 c- CORRIDOR 400 CO 12x12 - - - - - - - 1 ® W -05 M.C� _ M3 4I REF CONFERENCE ROOM 200 6"b 12,12 700 55 - 3.7 2 1 480/3/60 O® vv -07 MODEL 406 6 P MANAGER'S OFFICE 150 6 "0 12x12 _ _ _ _ _ _ _ 0® V'/ „c A!ETAL'AIRE MODEL 410 0 - -ACING AREA, JAN., P AC, MDR., 3 C. SPLICE ROOMS °=0 IS' 16.12 460 55 - 24.0 10 3 480/3/60 CO FAN SCHEDULE PACKAGED AIR COOLED CHILLER SCHEDULE APE' SERVED I - DYER '- ■ `' C M FINISH _:_M= FESSS DA A CONDENSCR FAN DATA 'C. ICAL LL - -.. - L r :_ -, 'Y, P u Ali- NC. I `0 C w COr7 S .s T KW 0 FL -A-(,) A ^ABI`NT AMP. HP(EA (N0 .) V/PH /HZ F.LA(EA) ( Np ) .., .. -- - F': RY A (5,,,,,y) G ..:: -�. -: 2500 2 2C I NRILDTE 3540 46773/60 163/184/153 950 14 40 2.0 460/3/60 0.0 ti JN _ , N u-_ .: '. - 0 05. cEC BFI 000 4 60 /3/ 60 , I" til 00 EF C4 _Rvo (S 'CS.; GPEENHECH GE-I30-5 200C 0.50 1620 SE, 0.5C = 00 /3 /63 0■90 /J FAN SCHEDULE MA, APE' SERVED I - DYER MOJ= - • -= C M FINISH ='�M D M 'C. ICAL LL ACCESSORIES SUPPLY METAL`.SRE EF -01 J•• •' .. C r�::_�n -_ -= M L ?T7 C y e_,.0 C?! .e u P.:' :.50 460 /3/60 ' e EF 02 RY A (5,,,,,y) G ..:: 3 c M � 2500 0.50 2C BE 0 . 5 0 4 6 0 / 3 / 6 0 0 0 r vv EA E. P _` .. a - _K 55-• _2 ti JN _ , N u-_ .: '. - 0 05. cEC BFI 000 4 60 /3/ 60 , I" til 00 EF C4 _Rvo (S 'CS.; GPEENHECH GE-I30-5 200C 0.50 1620 SE, 0.5C = 00 /3 /63 0■90 /J E' 05 3, ._N,•_.K t5-7-120-3 L ._ 1.4 x 07.0 1305 BELT 0.53 1000//60 = 0Th' 0M . r 0 0 = E T G__ • 2C� 11E -3 wN N JN .4G0 0.75 „Y_ _ _. 0.33 120/7/60 000 _r 0/ ' GREEN,. „_ C„ - _. 050 1200 FELT 0.2 120,/1/60 - ?� M m 52 AIR DEVICE SCHEDULE MARK SIZE S ZE T_ FUNCTON MANUFACTURER MODEL NO FINISH RatARKS A 12x12 12x12 SUPPLY METAL`.SRE H4004D ALUM. 0 B 10610 10x10 EXHAUST METAL`AIRE 040006,3 ALUM. O C 868 10610 EXHAUST 21E70L'.5100 /400200 ALUM. O D 8 24x24 SUPPLY METAL •AIRE SERID ES FLOW 7950 MO WHITE 000 E ' 6 "s . 24224 SUPPLY METAL'AI ,E ' 'r.'ir 9 MCD F 7 OW 50 WHITE 00O3 ' 22x22 .24x24 RETURN METAL`90C SERIES /�sG R WHITE G G 8x8 868 SUPPLY MIETAL'AIRE 140040 ALUM. ,\ (J INTAKE AND RELIEF HOOD SCHEDULE MARK on, _,./ED J: E E:'1"1- _-.. 0. SIZE r_iG I,.!- ` SC,F;ES P` O RPH 51 0 uN, SHALL BE DOUBLE WA, CC':_ RSO -,C JECN AL ARRANGEMENT. c. UN COMPONENTS 'N _ 0221. C= AE ` M` C � FRNISH DISCHARGE 0W7 MANUA DiSCONNEST TW-O=. 0 MOTORIZED c FEF 0 E __, 0 EXPLOSION PRO - SPARK PRSCE ODILSTE,GrON 0 12 ,CH J,_5=.E5 ROOF __r.= l z I BIRD _u3.55 '. rL' - 1NF:::5S DATA J N /HE _ _.. CAL SECTION A.S., =.t. __0FOI ELECTRIC DUCT MOUNTED HEATING COIL DATA CC L REMARKS 000 FLOOR CONDENSATE PUMP FLOOR STAND c FLOOR STAND TURNING VANE SMOKE DETECTOR E SOE MONITORING SYSTEM MOTORIZED 'BACK DRAM CAMPER c) NOTE: SENSIBLE COOLING ONLY °.1.1 K C. FOWLER Imo! THERMOS 0 120/1/63, CONTROL 00000 LOCKWOOD GREENS Stir_., TIRE HVAC EQUIPMENT SCHEDULES 0 ACCESSORIES OR REMARKS: WOH OPPOSED BLADE DAMPER.' PERFORATED FACE PROVIDE MODEL TR 50. TO ROUND TP.SITION. SEE PLANS FOR DUCT CONNECTION S12F. /MA-NZ &Mom GENERAL NOTES: 1. MUIR.- SHECH. VJST E.VEEP. RUM, F.F.1 CE=,:GH PHASE 2 FOP. FOUIPUENT WOAD. SEE ELSOR ?L,E ME-Oite. r- 073'. AND ME -0131. ca 021612.41 C ITY OFWRV PERMIT CENTER as 19 -JUL -2001 ,. B % IIIi Ile ow rJ .....mbe*imememmne INLET 'dm aza===gr a °."" ev S. KINSLAND SECTION S/4-0 MP-0112 0 LOCKINCIOD °MOVE PIPING SECTIONS JO SEE ORMMNGS MP-0112 AND MP-0113 FOR NOTES. 2 0 2 4 6 8 10 Scale, 1/4 INCH = 1 FOOT' TyCont JOB NO. 021612.41 PERMIT CENTER . RE, NO. 9- J0L -01 ;ISSUED FOR PLAN CHECK CO - LO 1 1107 1 SEE NOTES 1 & CORRIDOR 1108 I SEE NOTE 3 CO -LO 2 106 1 1 CORRIDOR I ' 110 IEEE NOTE 3 CO -LO 4 1-4 SEE NOTES 1 & 4 CORRIDOR 1 1113 IEEE NOTE 3 1 G1 S NERGEN 1105.1 SEE NOTE 3 I, CO -LO 5 1116 I SEE NOTES 1 & 4 CORRIDOR 1 lit - 15EE NOTE 3 I BATTERY A SEE NOTES 1 & 4 rr� BATTERY B 1136 I SEE. NOTES 1 & 4 MEN'S TOILET SEE. NOTES 1 & 4 SEE NOTE 2 FOR OFFICE O 9 10 11 12 13 i I I i 0 BY DEPT CK C00170. CK. C. FOWLER FLOOR PLAN 14 15 16 17 W 112 ,I SEE NOTE 2 L,OCKWOOD GREENS A J.A. JONES COMPANY JAN 112 I SEE NOTE 2 P. ACTION ROOM 1 SEE NOTE 3 FIRE PROTECTION COVERAGE PLAN NOTES: AREA PROTECTED BY TOTAL FLOODING MERGE, PRCMDE GAS FOR SINGLE RELEASE OF LARGEST ZONE. irtsTALL LOUVERS AND HIGH- PRESSURE COUNTERBALANCED RELIEF VENTS PER RELEASE CALCULATIONS OF INE4GEN SUPPLIER_ INERGEN SYSTEM SHALL BE PROACEO AND INSTALLED BY GRINNELL ARE PROTECTION WHICH IS A DIVISION OF TYCO ARE & SECURITY. CONTACT JIM LYONS C 440,A6-3201. 2. AREA PROTECTED BY WET PIPE SPR NKLER ESTEEM_ UGHT HAZARD OCCUPANCY_ DESIGNED TO PROVIDE DENS OF 0.13 GPM/SO. FT. FOR THE MOST REMOTE 1500 SQUARE FEEL 3, AREA PROTECTED BY WET PIPE SPRINKLER SYSTEM_ ORDINARY HAZARD GROUP I1 OCCUPANCY: DESGNED TO PROVIDE OENSn OF 020'GPM /SO_ FOR THE MOST REMOTE 4500 SCURF FFE<. 2_ AREA PROTECTED BY DOUBLE INTERLOCK'' 200605ION TYPE SPRINKLER SYSTEM. ORDINARY. VA. .O, GROUP It OCCUPANCY_ DESIGNED TO PROVIDE DENSE, OF 0.20 GPM /SO- FT_ FOR THE MOST REMOTE 1500 SQUARE F.T. 5_ DESCN AND INSTALLATION MUST COMPLY MTH THE FOLLOWING REFERENCES: NFPA 13- INSTALLATON OF SPRINKLER SYSTEMS NEPA 25- INSPECTION, TESTING AND MAMTENANCE OF WATER BASED FIRE PP.OTECTTON SYSTEMS NFRA - NATIONAL ELECTRIC CODE NEPA 72- NATIONAL FIRE ALARM CODE NFPA 75- PROTECTION OF EFCTROMC COMPUTER/ DATA PROCESSING EQUIPMENT NEPA 110 - EMERGENCY AND STANDBY POWER SYSTEMS NEPA T i 7- STORE R ECTRICAL ENERGY, EMERGENCY AND STANDBY POWER SYSTEMS NFPA 2001- CLEAN AGENT FIRE EXTINGUISHING SYSTEMS_ Com JOB 0 021612.41 -19 -JUL -2 ILO B r CORRIDORS', , - r it 09 1 I II I i �� y I ]; (F,\ ) I I F �` . ` RE) 1 UBE) . .ELPUP_) I � I I al; i I I - "= ---- - - -(.-' - - -L ? i_/.2::g_. L_ _____L CO -LO t I 1 1 /2 "CD. 1 "CD / 4 "CD .� _ 'O I (FUTURE) � (FUTURE) -1 CO -LO 3 b � � �3 ✓/ I I CORRIDOR 105 I CO -LO 2 I lob I CORRIDOR CO -LO 4 CORRIDOR 7 _1_ /2 "CD ( H CI I °I V c,c cl?- 2'_CD LLLJ r9 L CONDENSATE PUM'r IN 2'x2'x2' SUMP CORRIDOR 151 INTERGEN I105I MECHANICAL C I - 4 s 12 IF CRU -26 (FUTURE) 1 "CD BY 0 PT. cx CO -LO 5 C.. FOWLER CORRIDOR 11031 9 AI P 11 t F, CRU -27 (FUTURE) CO -LO 6 10 I CORRIDOR 14 15 16 [ 1 1/2 "CD T DN BATTERY A I1 17I BATTERY B 1 1361 2''CD , OP UP 1 H L,OCKWOOD GREENE A J.A. JONES COMPANY TGN A TGN B 135 I TITLE UP L MEN'S TOILET I 12o I PLUMBING PLAN - FIRST FLOOR I 125I CORRIDOR Pte_ lti / ? "CD GUS'. OFFICE 7 P -6 /71 I 124 WOMEN'S TOILET 2 STAGING 2 1/2" PW UP xi I 121 3 "SSA wl -J R - JANITOR I 122 I P�3 P I CUST I OFFIC 38 I BREA ROOM 127 BIl•1S CLOSET dLOSET NH P.ACTIO ROOM 1 123 I IJ{ II a sue. J r ) . COST STORAGE; SPLICE ROOM'. 4 RM A I 126 I OFFICE AREA 11321 CRU k O\ r ;t CD CD "PW UP SEE DWG. MP -01t3- 141 -4I -PN FOR GON j 5� DWG. CUR- ' CONFERENCE ROOM RECEPTION 1129 EXIST. 4 "CW TO BE 'REMOVED ' 0 5 TyCom. 0 15 Style: 1 /8 INCH = 1 FOOT NOTES: SEE DWG_ P -0600 FOR GENERAL NOTES. LEGEND, PLUM2FNG SCHEDUL. AND WATER I AND WASTE PIPING SCHEMATICS. 2 SEE ARCH. DWGS. FOR EXACT FI100RE LOCAFIONS. OS NO. S. PIPING LEGEND EXISTING PIP JNCEP SLAB NEW PIPING ONCE, SLAB NEN PIPING UNDER P .SE} B4 PPP.. ABOVE ,LOOK 021612.41 011 P n v °- : !, ., 2 3 ... " I PERMIT CENTER NORTH ""=19-JUL-2001 B PLUMBING FIXTURE SCHEDULE FIXTURE N0. DESCRIPTION WASTE VENT PW PWH NOTES P -1 WATER, CLOSET 4" 3 1 1/4" P —Ia WATER. CLOSET 3 1 1/4" — INSTALL 'HANDICAP P -2 URINAL 2. 1 I/2° 1° - P -3 LAVATORY 1 I/2 " 11/2" 1/2 1/2" P -4 LAVATORY 1 1/2" 1 1/2" 1/2" 1/2" INSTALL FOR HANDICAP P -5 SERVICE SINK. 3 2 3/4' 3/ P -6 COUNTER SINK 1 1/2" 1 1/2" 1/2" 1/2 P -7' ELECTRICA � WATER COOLER 1 1/2" 'I 1/2". ./2 I/2 " P —B SAFETY SHOWER AN0 EYEWASH — — 1 1/4" FLOOR DRAIN SCHEDULE DESCRIPTION CF FLOOR DRAIN SYSTEM WCO COMBINATION Y /!iH PIPING Un' SA NITAR, ECUALS 5, WADE. SLOAN, 3R JCSAk _, LY DEP SEAL .. -5 PLC, ,,INS. PLUMBING SPECIALTIES ITEM T=ap PRIMER VALE (2 TO 5 DRESS) AP PEMER VALVE (1 DRAIN) VACUUM E,E -HE'.S SHOCK ABSORBERS DESCRIPTION 'RECISION PLUMBING PRODUCTS P -1 CR APPROVED EQUAL. '.VITH DISTPE00N UNIT. 'ERN SARI GUARD AUTOMATIC TRAP PRIMER, PRONZE BODY, N- EGP,AL VACUUM BREAKER, NON— LIMING INTERNAL OPERATING ASSEMBLY WITH G.VEIE_D BRONZE COVER, CONNECTION COMPATABLE 'WIH PIFING SYSTEM 1022 OR APPROVED EQUAL. WATTS Nn_ 35 OR APPROVED EQUAL C SIZE FOR HOT AND COLD WATER SUPPLY TO PLUMBING ACCORDANCE WRH PDI WH 201 AND THE FOLLOWING TABLE. . {Y TOE INLET WATER SUPPLY(FIXTURE UNITS) 1/2 INCH 1 TO 11 3/4 INCH 12 TO 32 5.0UX CHIEF, HYDRA — RESISTER, OR APPROVED EQUAL S.S. & VENT PIPING — SCHEMATIC NTS 0 13 DEP DEPT. APPR. C. FOWLER HOT WATER HEATER SCHEDULE EQUIPMENT N0: WH -01 MANUFACTUP.EN BRADFORD — WHITE MODE NO. M- 130R505 TYPE KW ELECTRIC I 4.5 VOLTS PHASE EQUALS BY A.0 SMITH, STATE. BRADS, RI LIOCKWOOD GGREENE A JA JONES COMPANY PIPING LEGEND PW , —' PWH PLUMBING NOTES,' SCHEDULES AND SCHEMATICS NTS ABBREVIATIONS SS — SANITARY SEWER FC0 — FLOOR, CLEAN OUT WCO — WALL CLEAN OUT VTR — VENT THRU ROOF AFF — ABOVE FINISHED FLOOR BOP — BOTTOM OF PIPE P —I — PLUMBING FIXTURE V — VENT HD —' HUB DRAIN INV. EL— !WERT ELEVATION PW — POTABLE WATER PWH — POTABLE WATER —HOT CO — CONDENSATE DRAIN RD — ROOF DRAIN OFD — OVERFLOW ROOF DRAIN RDC — ROOF GRAIN COI,OL OR ERDC — EMERGENCY ROOF DRAIN CONDUCTOR SW — SERVICE WATER PW & PWH PIPING SCHEMATIC eo'" I \/a 3 / �w pRG L L p _S •TyCom. GEN., NOTES. THE EN1RE PW!AB:NG SzST:;•: SH L BE IN 1C C7,""E PWMBRTG CODE Pilo fCCAl PyM Inc -� OR. UNFCR.4 2. Att WORK SHALL EE 'COORDINATED WITH FL_ G? - -= R TO INSTALLATION, CONTRACTOR SHALL COORDINATE RC :�o-vs OF y[ :'�7%IG d R WM, EXISTING CONDITIC,S AND SHALL PRY,- A,.. REROUTING, ETC. Pr' GU4 -- O FOR COMPLETE AND G7GF.9astsTF1.• INS"iALLADCM. 3. THE FLUMBNG CONTRACT.fr S. C:CROMAT . ALL 11., Ara EiNG PIPING.WNH AL STP.UCTU'r_AL FOUNDAiIC... MO AFL EX--7I -n16 IFr=, E2 SEN., ALL PLUMBING SYSTEMS SHALL EE TE.37, AS R.,. PER THE UN,C 17 PLUMBING CODE AND LOCAL FLULAB. NS _ . TO ARCHITECWRAL DRAWINGS FOR WALL LOAF :iONi 6 UN.S' 1 40 OTHERWISE M APE OF ALL E O PI IE A PIPING SHALL B E A. Mi IIMUM 0 i/ / F ." PER FOR OPT._' 2 PIPE D4'? AND SMALLER, AND A MINIMUM' OF 1/5 PER FOOT FOR PIPES 0(A AND iAF.GER, 7. PROVIDE TRAP PRIM q. PIPING- WARE GE.. ON DEVON.- 3t). JOB 021612.41 R C cm o T'a1LA 019 —JUL -2001