Loading...
HomeMy WebLinkAboutTrans 2007-05-29 Item 3C - Resolution - Bid Rejection for Tukwila International Boulevard Phase I Final Clean UpISSUE BACKGROUND INFORMATION MEMO To: Mayor Mullet From: VPublic Works Director` Date: May 21, 2007 Subject: Tukwila International Boulevard Phase 1 Final Cleanup Project No. 91 -RWO3 BID REJECTION Award or reject the sole bid for the Tukwila International Boulevard Phase 1 Final Cleanup project. The project was advertised for bids on May 3 and May 10, 2007, and only one bid was opened on May 18, 2007. The engineer's estimate was $47,000.00. Dennis R. Craig Construction submitted a bid in the amount of $115,518.00, which is $68,518.00 over the engineer's estimate. The budgeted amount for this project is $50,000. ANALYSIS The sole bid appears to be indicative of the current bidding climate. RECOMMENDATION Reject the bid and re- package the work to solicit bids from the Small Works Roster. BG:ad attachments: Bid Opening Results Draft Resolution (P:Projects\A- RW RS Projects \91RWO3 \TTB 1— Pole Patching Bid Rejection TC Memo 5-21-07) Attachment III.C. l3 14 BIDDER NAME SECURITY G RAND .TOTAL ALT. ADDENDUMS (1) APPARENT DATE STAMP OF BID RECD ACKNOWLEDGED LOWEST BIDDER RECEIPT (RANK ORDER) Dennis R. Craig Construction 5/17/07 1:55 P.M. Yes 115,518.00 1 ENGINEER'S ESTIMATE DATED this 18 day of May, 2007. CITY OF TUKWILA OFFICE OF THE CITY CLERK BID OPENING Tukwila International Boulevard Phase 1— Final Cleanup 91 -RWO3 May 18, 2007 10:00 A.M. 47,000.00 The above figures appear as written within bid documents; and as read aloud at bid opening. THEY DO NOT however, REPRESENT ANY BID AWARD; apparent low, or otherwise. /s/ Jane E. Cantu, CMC, Citv Clerk Jane E. Cantu, CMC, City Clerk WHEREAS, sealed bids were solicited for the Tukwila International Boulevard Phase 1 Final Cleanup project; and WHEREAS, a sole bid was opened and read aloud by the City Clerk on May 18, 2007; and WHEREAS, a budget was set aside for the construction of the fmal cleanup project; and WHEREAS, the sole bid was over the budgeted amount for construction of this fmal cleanup contract; NOW, 'THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DOES HEREBY RESOLVE AS FOLLOWS: Section 1 The bid is hereby rejected due to budget limitations. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a regular meeting thereof this day of 2007. ATTEST/AUTHENTICATED: Jane E. Cantu, City Clerk APPROVED AS TO FORM: Office of the City Attorney Filed with the City Clerk: Passed by the City Council: Resolution Number: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REJECTING THE SOLE BID SUBMITTED FOR THE TUKWILA INTERNATIONAL BOULEVARD PHASE 1 FINAL CLEANUP PROJECT. (P:Projects\A- RW RS Projects\9IRW03 \TIB I Pole Patching Resolution Rejecting Bid 5- 21-07) Verna Griffm, Council President 15