Loading...
HomeMy WebLinkAboutTrans 2007-06-25 Item 3A - Resolution - Bid Rejection for Green River Pedestrian and Utility BridgeANALYSIS RECOMMENDATION attachments: Vicinity Map Bid Tabulation Bid Rejection Resolution (P.Pmjeas\A- RW RS ProjctslW7RW02 Gr Riv Pied Br\Gr Riv Ped By Bid Rejec ion Info Memo) INFORMATION MEMO To: Mayor Mullet From: Public Works Directo Date: June 19, 2007 Subject: Green River Pedestrian and Utility Bridge No. 0000TUK18 Project No. 07 -RWO2 BID REJECTION ISSUE Reject all bids for repairs and sealing the Green River Pedestrian and Utility Bridge. BACKGROUND Attachment III.A. This project was designed to provide repairs and sealing of the Green River Pedestrian Bridge on the Green River Trail near South 180t Street and Andover Park East. The repairs include replacement of the wooden deck and repairs to deteriorating sections of the bridge truss. The sealing includes coating the entire bridge with a stain/sealant to preserve the wood from further deterioration. The project was advertised for bids on May 31 and June 7 and bids were opened June 15, 2007. Four bids were received with the apparent low bid of $209,500.00 from Cadence Construction. The engineer's estimate was $192,100. The bids were reviewed and tabulated and no errors or irregularities were found in the bids. However, the apparent low bidder and the other bidders, are non responsive to the experience requirement. Cadence Construction has worked primarily on residential renovation projects up to $55,000 with no experience working on a wooden truss bridge over water. Further, the remaining three bidders have worked on similar size projects, but none with wood bridges over water. Working with wood bridges and work over the river requires special expertise to protect the bridge and the environment. Reject all bids for the construction bid for the Green River Pedestrian and Utility Bridge and re- design and re- advertise in two packages. The first package will be bridge repair and the second will be bridge painting. I Green River Pedestrian and Utility Bridge Repairs and Maintenance Vicinity Map (A) CITY OF TUKWILA Green River Pedestrian and Utility Bridge No. 0000TUK18 Project No. 07 -RWO2 Bid Opening Date: June 15, 2007 1 QUANTITY 1 Engineer's Estimate Cadence Construction Tye Miller, Inc Epic Construction ITEM NO. UNITS UNIT UNIT PRICE COST UNIT PRICE COST UNIT PRICE COST UNIT PRICE COST NO. ITEM OR TASK DESCRIPTION 1 (Mobilization 1 LS 16,100.00 16,100.00 21,760.00 21,760.00 28,000.00 28,000.00 26,300.00 26,300.00 2 (Timber Truss Repair 1 LS 34,500.00 34,500.00 7,344.00 7,344.00 8,000.00 8,000.00 5,070.00 5,070.00 3 I Bridge Flooring Replacement 1 LS 46,000.00 46,000.00 48,520.00 48,520.00 25,000.00 25,000.00 39,700.00 39,700.00 4 (Cleaning and Painting 1 LS 80,500.00 80,500.00 116,876.00 116,876.00 160,000.00 160,000.00 192,000.00 192,000.00 OD -2 !Construction Signs Class A 1 FA 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 10,000.00 00-1 (Minor Changes 1 FA 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 5,000.00 1 QUANTITY 1 ITEM NO. NO. ITEM OR TASK DESCRIPTION UNITS UNIT UNIT PRICE 1 2 3 4 OD -2 OD -1 Mobilization Timber Truss Repair Bridge Flooring Replacement Cleaning and Painting Construction Signs Class A Minor Changes 1 1 1 1 1 1 Total 192,100.00 209,500.00 236,000.00 278,070.00 LS LS LS LS FA FA David L. Sack COST 30,000.00 30,000.00 40,000.00 40,000.00 80,000.00 80,000.00 142, 753.00 142, 753.00 10,000.00 10,000.00 5,000.00 5,000.00 Total 307,753.00 BID TABULATION Iran �J h ec TranTech Engineering; "LLC A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REJECTING THE BIDS SUBNIITTED FOR THE GREEN RIVER PEDESTRIAN AND UTILITY BRIDGE AND AUTHORIZING STAFF TO RE- DESIGN THE PROJECT AND RE- ADVERTISE FOR BIDS. WHEREAS, sealed bids were solicited for the Green River Pedestrian and Utility Bridge Project; and WHEREAS, all the bids received from four (4) bidders were publicly opened, examined and declared by the City Clerk's office on June 15, 2007; and WHEREAS, the engineer's estimate for this repair and sealing project was $192,100.00, and the budgeted amount was $270,000.00; and WHEREAS, the bids were not responsive to the requirement for ten (10) years of similar experience for type and size of project; and WHEREAS, RCW 35.23.352 provides for the rejection of any or all bids by resolution of the City Council; and WHEREAS, staff recommends the rejection of all bids and further recommends re- designing the work and re- advertising for bids; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. All bids for the Green River Pedestrian and Utility Bridge Project are hereby rejected. The bid deposits received by the City shall be returned to the bidders with notification of the rejection. Section 2. City staff is hereby authorized to re- design the work and re- advertise for bids. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 2007. A 11'F ST /AUTHENTICATED: Jane E. Cantu, CMC, City Clerk APPROVED AS TO FORM BY: Office of the City Attomey Verna Griffin, Council President Filed with the City Clerk: Passed by the City Council: Resolution Number: P:\PROJECTS\A- RW RS Projects\07RWO2 Gr Riv Ped Br1Gr Riv Ped Br Bid Reject Resolution.doc GL:ksn 621!2007 Page 1 of 1