HomeMy WebLinkAboutTrans 2008-02-12 Item 3A - Agreement - 2008-2009 Overlay Program and Repair with KPG IncTo: Mayor Haggerton
From: Public Works Director c ri)
Date: February 7, 2008
Subject: 2008 2009 Overlay and Renair Protrams
Project No. 08 -RWO1
Consultant Selection, Scope of Work, and Fee Estimate
ISSUE
Select a consultant to provide design and plans, specifications and estimates (PS E) for the
City's 2008 and 2009 Overlay Programs.
BACKGROUND
Task 1
The CIP includes two components (Residential Commercial) for the Annual Overlay Program
to provide repairs and overlays on the City's street system. The 2008 list of projects include:
Residential
Street From To
1. S 140 St 53 Ave S 55 Ave S
2. S 132" St 32 Ave S 34 Ave S
3. S 131 P1 Localized leveling East of Macadam Rd
4. S 139 St TIB 42" Ave S
5. S 140 St TIB 42 Ave S
6. S 137 St West of Macadam Rd as budget allows
Commercial
INFORMATION MEMO
Street From To
7. S'center Pkwy Klickitat Dr Nordstrom Signal
8. Frager Road Localized leveling near creek crossing
9. Airport Way NB ramp from Boeing Access Rd
10. E Marginal Wy BAR Sound Transit Project
11. E Marginal Wy BAR Norfolk
12. S 130 P1 South of S 129 St as budget allows
P:\PROJECTS\A- RW RS Projects \08RW01 2008 Overlay Repair\ConSelctfor2008.doc
Mayor Haggerton
Page 2
February 7, 2008
Task 2 Other Work
Pavement ratings for all streets in the City will be updated to reflect current conditions and
entered into the Pavement Management System. Results from the updated Pavement
Management System will be used to prioritize future overlay and repair candidates, estimate
costs to maintain the street system to an acceptable condition, and assist in establishing an annual
budget for the Overlay Program.
An analysis of the estimated construction costs vs. budget will occur at the 50% design level. If
estimated project costs exceed the 2008 budget, then selected projects will be automatically
delayed and included in the 2009 Overlay Program. The scope of work will include the option to
supplement the contract for design of the 2009 Overlay Program.
ACTION TAKEN
In order to advertise the City's annual overlay program early in the year, work must begin in the
4 quarter of the previous year. The CEP budget was established to include the design costs for
2008 as well as funds to begin design for 2009. The 2008 consultant selection process also
includes selection for the 2009 Overlay Program.
Three firms were short- listed from the City's consultant roster of films that indicated they
provide expertise in pavement design, overlay design and pavement management. All three
firms were rated based on the expertise and experience necessary to perform the work. KPG, Inc.
was selected as the most qualified (see rating sheet attached).
KPG, Inc., has provided design and construction services for the City in past years. A draft
Scope of Work and Fee Estimate are attached.
Contract Budget
Design (Commercial) $67,209.60 $100,000.00
Design (Residential) 22352.00 24.000.00
Totals $89,561.60 $124,000.00
RECOMMENDATION
Approve the selection of KPG, Inc. as Design Consultant for the 2008 and 2009 Overlay
Programs and authorize the Mayor to execute a contract with KPG, Inc., in the amount of
$89,561.60.
Attachments: 2008 Overlay Project Maps
Rating Sheet
KPG Letter dated 2/6/08
Eshibit A: Scope of Work
Exhibit B: Fee Estimate
P:\PROJECTS\A- RW RS Projects \08RWO1 2008 Overlay Repair \ConSeletfor2008.doc
2008 Overlay Projects Vicinity Map
2008 Overlay Projects Vicinity Map
Agency Overlay
Program Management
P :\PROJECTSrA- RW RS Projects \08RWO i 2008 Overlay Repair\2008 consel
CONSULTANT SELECTION
2008 2009 OVERLAY REPAIR PROGRAM
Pavement Design Rehabilitation
Repair Expertise
David Evans W H
Associates Pacific
Project Manager 1 1 1
2 2
Tukwila Overlay
Program Knowledge 2 1 1
Pavement Management
System Experience 2 2 1
Expertise Using
Federal Funds 1 1
KPG
TOTALS 9 8 6
For each category, highest score is 1 (with the lowest or worst score at 4)
Consultant with the lowest score is ranked the best.
February 6, 2008
Mr. Robin Tischmak, P.E.
City of Tukwila
Department of Public Works
6300 Southcenter Blvd.
Tukwila, WA 98188
Re: 2008 Overlay Program
Dear Robin,
MPG
SEATTLE TACOMA
ENGINEERS
ARCHITECI
LANDSCAPE ARCHITECTS
SURVEYORS
KPG is pleased to submit to you the attached scope of work and hour and fee estimate for the
referenced project. The work scope includes preparation of plans, specifications and estimates
for the 2008 overlay program (Up to 12 sites total), construction support for Interurban Avenue,
and update of the Pavement Management Program by Pavement Engineers, Inc.
Our total estimated fee for this work is $89,561.60 and we are ready to begin immediately upon
your notice to proceed.
We look forward to working with you on this project. Please feel free to contact me at 206 -267-
1052 if you should have any questions or would like to discuss this proposal.
Very Truly Ypurs,
Nelson Davis, P.E.
Principal
753 9th Avenue North
Seattle, WA 98109
Fax 1 206.286.1639
Phone 1 206.286.1640
Exhibit A
City of Tukwila
2008 Overlay Program
Scope of work
February 6, 2008
TASK 1 2008 OVERLAY PROGRAM
The Consultant shall prepare final Plans, Specifications and Estimates for the following overlay
projects:
Commercial Roadways:
Frager Road:
Southcenter Parkway
Airport Way
E. Marginal Way
E. Marginal Way
S. 130 Place
Residential Roadways:
S 131 Place
S 132n Street
S 140 Street
S 139 Street
S 140 Street
S 137 Street
TASK 3 PAVEMENT MANAGEMENT SUPPORT
Localized leveling near slough at creek crossing
Klickitat to Nordstrom signal, northbound inside lane maintenance
Northbound Ramp from Boeing Access Road
Boeing Access Road to Sound Transit Project
Boeing Access Road to Norfolk
South of S 129 Street as budget allows
Localized leveling east of Macadam Road
32 Avenue S to 34 Avenue S
53 Avenue S to 55 Avenue S
Tukwila International Boulevard to 42 Avenue S
Tukwila International Boulevard to 42 Avenue S
West of Macadam as budget allows
The Consultant shall provide all necessary field reviews, base mapping, and utility notification
required to complete final bid documents. 40 copies of the final bid documents will be provided
to the City for bid advertisement. Interim review submittals (10 copies) will be prepared at the
50% and 90% stage of plan completion. The Consultant shall also prepare the bid tabulation,
check low bidder(s) references, and provide a recommendation for award to the City.
Permitting, environmental documentation, geotechnical review, or stormwater detention and
water quality have not been included in this scope and estimate.
Projects will be bid as a single bid package as budget allows. Projects may be re- prioritized or
deferred to a future overlay program based on available budget and other considerations.
Detailed estimates will be prepared at the 50% design to determine the final projects to be
included in the 2008 Overlay Program.
TASK 2— INTERUBAN AVENUE CONSTRUCTION SUPPORT
The Consultant will attend the pre- construction meeting, provide field observation services, and
prepare pay estimate for construction of the Interurban Avenue Overlay. It is anticipated that
construction will last 3 working days and will be completed in February, 2007.
An allowance of $15,000 is included to provide support and upgrades to the City's pavement
management system. This work will be performed primarily by Pavement Engineers, Inc. under
subcontract to the Consultant.
KPG 1 of 1 2008 Overlay Program
HOUR AND FEE ESTIMATE
Project: City of Tukwila
2008 Overlay Program
Description
Task
Task1 2008 Overlay Program
1.1 Coordination meetings
.__._Utility. c
1.3 Prepare base maps_.,
Frager Road
Sout hcenter Parkway_
Airpo rf WaY_
E. M ar5
final Way N of BAR
EXHIBIT B
S -130th Pace
S 131st Place
S 132nd Street
S 140th Street
S 139th Street
S1 Street
1.4 Prepare overlay _plans
S 137th Street
lans estimate 20 sheets
Quantities I estimates
1.6 Prepare specifications
15
1.7 Prepare review submittals
Reimbursable expenses see breakdown for details
Task Totals
Task 2 interurban Avenue Construction Support
2.1 4
Attend pre construction meeting_ 20
2,2 Field observation
2 3 prepare final pay reguest see breakdown for details
Task expenses
Task Totals 6
pavement Management Support
Task 3 ement Coordination
3.1 pavement Manag expenses see breakdown for details
Reimbursable exp Task Totals
Estimated rates are based on: cost f direct salary
Fee calculated as 15 %0o d sect salary overhead
Fee
217/200
Architecture
Landscape Architecture
Civil EngineeEngineering Total Fee
*Labor Hour Estimate
Project al
Engineer Technician 65 Clerical
113.57,$
0 980.52
2
1,831
12 34
12 ,831 76 34 4
0
4
2 1,476.44
Senior
Engineer
1 2 328.16
8 0
8 4 0
0
4
0 0
12
S
Y of BAR)
4 0”
Fee
x,831.3
,831.3
,626 _34_
1,476._
478744
8
2
12_
0 4_ 12 0 1,476
0 4 12 0 2,626 34
16...._ 24,417.80
16 40
o
2 8 -_120 p 6,643 92._
16 100
8 16l 8 5 125.84
_4 217.28
16 16 8 1,450.00
344
8 0 J `t4 66,600. .4
60 208 582.04
3 435
2 0 _1 5 8
24 550.00
0
8 4 5 550 .20
4
34
2,222.
8 4
15,000.
4 8 4 I 4 17,222.
4 89,561.
Total Estimated Fee:
�F]�"^n�
Project: City of TUICWit3
2008 Overlay Program
uG�� t
HOUR
EXHIBIT B
Mileage
Task 2 Interurban Avenue Construction Support
lilliieage
Allovvance for Testin9 Services
Tavslc,..3_-ra_777.m,peilneo_tiva,. gtA:n,a_.:a_t_g8er..na.;;_et_:_uiprl....o.,Tt._n__o_iima____:ie.,n...aiszolt_o_in..si_u_ik.to....ta,..r.::
21712
11.".
Landscape Architecture
COSt
200 00