Loading...
HomeMy WebLinkAboutTrans 2008-11-25 Item 3B - Contract Supplement #2 - Tukwila Urban Center Access (Klickitat) / Local Improvement District Special Benefit Study and Right-of-Way Acquisition Assistance with Macaulay and Associates INFORlvIATION NIElVIO To: OdJMayor Haggerton From: ~PubliC Works Director Date: November 19, 2008 Subject: Tukwila Urban Center Access Project (Klickitat) Project No. 84-R\V19, Agreement No. 06-070 Supplement #2 LID Special Benefit Study and Right-of-\Vay Acquisition Assistance ISSUE Supplement to the contract with Macaulay & Associates for the Klickitat LID Special Benefit Study to increase budget and time for completion. BACKGROUND In July 2005, Lee Voorhees, an attorney with Foster Pepper Shefelrnan, spoke with staff on the basics of forming Local Improvement Districts (LID). LID's are complex funding mechanisms that are legally restricted from assessing more than the project would increase property values. Macaulay & Associates was selected out of several appraisers in the fall of 2005 to conduct the feasibility study. The study showed a definite benefit of the project, indicating that formation of an LID would be quite feasible. In June 2006, Macaulay & Associates was further retained to develop a Summary of Formation, Special Benefit/Proportionate Assessment Study (preliminary Assessment Role) which is the document upon which the LID assessments are based. In 2007, Macaulay & Associates entered into a supplemental agreement to update the market analysis done in 2006. That update was completed in early 2008. ANALYSIS Due to circumstances beyond the control of City staff and Macaulay & Associates, the development of the Preliminary Assessment Role has been delayed. Complications with design and right-of-way acquisition have created the need for this second supplemental agreement that will provide an updated appraisal for the LID. With this supplement of $25,200.00, the LID Special Benefit Study will not exceed a total of $142,100.00. RECOMMENDATION Authorize the Mayor to sign Supplemental Agreement #2 with Macaulay & Associates in the amount not to exceed $25,200.00 to provide supplemental services on the LID Special Benefits Study. Attachments: Supplemental Agreement Scope of Work p:\projects\a- rw & rs projects\84rw19 klickitat_sctr pbvy_i5 access rev\infonnation memo - lid formation macauly supplement 11-19-08.doc SUPPLEMENTAL AGREEMENT NlTh'IBER ~ TO CONSULTANT AGREEMENT NUMBER 06-070 THIS SUPPLEMENTAL AGREElVIENT is entered into between the City of Tukwila, Washington, herein-after referred to as "the City", and Macaulav & Associates. Ltd., hereinafter referred to as lithe Consultant", in consideration of the mutual benefits, terms, and conditions hereinafter specified. The City desires to supplement the agreement entered into with the Consultant and executed on or about June 23, 2006 and identified as Agreement No. 06-070. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: 1. Scope of Services, is hereby changed to include reimbursement for direct expenses for costs associated with updating the market data and property owner information associated with the preliminary assessment study for the KlickitatlSouthcenter Access Improvement Project, identified on Exhibit "A" attached hereto. 2. Payment, shall be amended as follows: For work associated with the updating the preliminary assessment study, the payment shall be based on a time and materials basis not to exceed $25,200 3. Time for Performance, sh~ll be amended as follows: The Consultant shall perform all services and provide all work product required pursuant to this Agreement by June 30, 2009, unless an extension of such time is granted in writing by the City. Payment for the work provided by the Consultant as part of this supplement shall be made and the total amount of payment to the Consultant for this work shall not exceed $25,200 without express written modification of the Agreement signed by the City. The maximum amount payable under this agreement as supplemented inclusive of all fees and other costs is now $142,100. DATED this day of ,20_. CITY OF TUKWILA CONSULTANT Jim Haggerton, Mayor By: Printed Name: Title: R I UV\acaulay g , \ -""88 ocia tes Ltd. Real Estate Appraisers & Consultanls 2927 Colby Avenue, Suite 100' Everett, WA 98201 Everett 425-258-2611 . Seattle 206-382-9711 · Fax 425-252-1210 Charles R. Macaulay, MAl ROPert J. M"Caular, MAl Jim E. Dodge Yvonne Alexanuer:Smilh Teresa M. Q'l,c"I)' Paul C. Bird Richard J. DeFrancesco GregMuller Kelly R. Hao November-lS/2008 Cyndy Knighton Senior Transportatibnengineer City of Tukwila 6300 Southceriter Blvd., Suite 100 Tuhvila, WA 98188-2544 Re: Time and fee proposal for lipdating the special benefit/proportionate assessment study for proposed Klitkitat/Southcenter Access Improvement Project, 1'Ul<wila, W A. Dear lvKKnighton: The scope of our servicesWillinvoIve updating market data, market saies/rentaldata and the special benefit/proportionateassessmentdraft report. As part ofthe new assignment, market value estimates both \vithout and with the LlDprojed assumed cbmplEitedfor 268:!: parcels in theproposed LlDboundary area will he updated. Additional scope of services maydnvolvc LID fqrmationl1earing preparation arid meetings, which woulc:i be part Qfa,separate (lgr~el11ent. Basedononr hourly rateSQur fee estimateissummarizedobelQw: l10urly - -Total ~oRate -- Robert}. Macaulay,.MAI Property inspcdions,analysis, meetings/consultation ,md rCF()rtupdatepr~parati9n Yvonne Alexander-Smith M<ifkej feseilrch, t:eport editingandupdating p~patation 80 $225 $18,000 80 $90 $7,200 Total $25,200 Basedon our current work load, fheupdatedreportandanaIysiswouldbe completedby February 20,2009. If you have any questions or neeociadditional information please call. Sincerely, MACAULAY & ASSOCIATES, LTD. I :~- fl../ 1 .1 1/'1jf -_, ~;: RobertJ. Macaulay,MAl \-VAStal" CcrlifilJd-Generai Appraiser Na, 1100517 Knighton.ll0S ..,,-.~J,,_~ ,,:':~-~,~c-,---_._.. -c' -~."-_"r'"_,~,-'5:~~c,,__ >" __c~-,-,~,.7':~"::o--_." > - ~- .-~.- - -~ ==:" . ~ _.- .-.'- -~