Loading...
HomeMy WebLinkAboutTrans 2009-05-18 Item 3A - Bid Award - Lakeside Industries for 2009-2010 Overlay and Repair ProgramTO: ISSUE City of Tukwila INFORMATIONAL MEMORANDUM Mayor Haggerton TRANSPORTATION COMMITTEE BUDGET AND BID SUMMARY FROM: Public Works Director DATE: May 14, 2009 SUBJECT: 2009/2010 Annual Overlay Repair Program Project No. 09 -RW01 BID AWARD Award the bid for construction of the 2009/2010 Annual Overlay Repair Program. Jim Haggerton, Mayor BACKGROUND This project will provide roadway repairs and overlays on the 23 street segments listed on Page 2 of this memo. The project was advertised for bids on April 30 and May 7, 2009 for 20 street segments and 4 additive items. The specified basis of award that determines the lowest bidder is the bid amount for the 20 street segments identified as the base bid. Bids were opened May 14, 2009. Six bids were received with the apparent low base bid of $1,297,328.50 from Lakeside Industries. The engineer's estimate was $1,801,848.00. ANALYSIS The bids were reviewed and tabulated. No errors were discovered in the base bids or in the additive items (only the additive items for the lowest bidder were checked). Lakeside Industries has successfully worked for the City on past projects. Since favorable bids were received, the four additive items can be awarded and constructed within budget. Bid Results Estimate Budget Base Bid $1,297,328.50 $1,801,848,00 Additive Items 1 4 263,310.00 328.435.00 Subtotal $1,560,638.50 $2,130,283.00 2009 Construction Budget $1,200,000.00 2010 Construction Budget 1,000,000.00 Contingency (15 234,095.00 319,542.00 0.00 Total $1.794.733.50 $2.449.825.00 $2.200.000.00 RECOMMENDATION The Council is being asked to award the construction bid for the 2009/2010 Overlay Repair Program, including the Base Bid and Additive Items 1 4, to Lakeside Industries in the amount of $1,560,638.50 for consideration at the May 26, 2009 Committee of the Whole meeting and subsequent June 1, 2009 Regular Meeting. Attachments: Vicinity Map Bid Tabulations (Base Bid Tabulation and Lakeside with Additive Items 1-4) INFORMATIONAL MEMO Page 2 The 2009 2010 Annual Overlay Repair Program list includes: 1. S 133 Street: 2. Corporate Drive N: 3. S 150th Street: 4. 33rd Avenue South: 5. 32 Avenue South: 6. S 130th Place: 7. S 144th Street: 8. S 130th Place: 9. S 115th Street: 10. E Marginal Way: 11. Upland Drive: 12. 51st Avenue S: 13. S 112th Street: 14. 34th Avenue S: 15. 41 st Avenue S: 16. 45th Place S: 17. S 138th Street: 18. S 148th Street: 19. S 146th Street: 20. S 131st Street: 21. S 142nd Place: 22. 41st Avenue S: 23. S 149th Street: Lakeside Bid Results Base Bid Schedule A Additive #1 Schedule B Additive #2 Schedule C Additive #3 Schedule D Additive #4 Schedule D Sites #6 #8 107,731.50 Site #9 136,853.50 Adjust gas valve 4,550.00 Adjust private utility casting 14,175.00 Total $1.297.328.50 263.310.00 P:IPROJECTSIA- RW RS Projects109RWO1 2009 -10 Overlay\AwardMemo2009.doc 32 Avenue South to Tukwila International Boulevard Andover Park West to west cul -de -sac Military Road to Tukwila International Boulevard S 132nd Street to S 130th Street S 135th Street to S 133rd Street 56th Avenue S to 57th Avenue S (Additive Item No. 1) Interurban Avenue S to east end 50th Place S to 56th Avenue S (Additive Item No. 1) East Marginal Way to 42nd Ave S (Additive Item No. 2) S 126th Street to SR -599 Bridge Andover Park W to west cul -de -sac S 138th Street to north end West end to Tukwila International Blvd S 135th Street to S 132nd Street S 131st Street to S 130th Street S 137th Street to S 136th Street 51st Avenue S (W) to 51st Avenue S (E) Military Road to Tukwila International Blvd Military Road to Tukwila International Blvd 41st Avenue S to 42nd Avenue S Military Road to east cul -de -sac S 139th Street to north end West end to 57th Avenue S 1,297,328.50 1.560.638.50 2009 - 2010 Overlay Program Vicinity Map CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS 2009/2010 Overlay Program Protect No 09 -RW01 Certified Bid Tabulation �No 5N0c Item [ROADWAY 1 1 -07 Resolution of U1171v Con ll cis 2 1.09 Mo078za17on 1 3 1.10 Rioted Temooram TralOC Control i 4 1- 101Trafl c Control Labor 5 2- 017CIear7no and Grubb no 6 2- 027Rem0v en Coma. Concrete Pavement 7 2 -02 ieemowna Pavement Marko. 2-02 diternowno Cement Concrule Curb 9 12 -03 7Unsul1461 ab1e Foundation Excavation Includ nn Haul 1 10 14 -041 Crushed Suda47r70 Too Course 11 1 5.041Pavemenl Reoa7r Excavation Includ■n Haul 12 1 504 I HMA C ass 1/2' PG 6422 13 1 504 7Thokened Edne 14 1 5.04 IHMA C ass 1/2' PG 64 -22 for Pavement Repair 15 1 5.04 7PIamn0 Beurnmous Pavement 16 15 -04 7 oineCmck Sea no 17 1 5.04 7Pavino Fahrlc 18 7 -12 1 Water Valve 19 B- 01 IE,OS!1Eros10n/Waler POl ut on Control 20 8.01 Intel Protec1on 21 I0 -04 Cement Cone Traffic Curb and Gutter 22 0.131Ad7ust Monument Case and Cover 23 1 820 7Tra000 Locoemenl 24 1 8.20 7Adlust Junction 00 804 Box to Grade 25 18.217Permznenl Smnmo [STORM DRAINAGE 7 30 17 -05lAd us! Catch Basin 131 7.05 7 Replace Catch Bas n Grate 1 32 1 7.05 7 Plastic Catch Basin Markin 1 33 1 2.05 724" Frame with Cover ISANII SEWER 134 1 7-05 7A076s1 Manhole [TRAFFIC CONTROL DEVICE 35 1 5.09 Raised Pavement Marker. Tvoe 1 L 36 I B -09 Raised Pavement Marker. Tvoe 2 37 8- 221PIashc Traffic Arrow 38 B -22 Plastic Bicycle Lane Symbol 39 18 -22 Plastic Sloo Line 40 1 822 Plastic Crosswalk Line 41 1822 Plastic Line. 4-Inch 42 I B -22 Plastic Line. B-Inch ROADSIDE DEVELOPMENT 43 7 8021 Proved,' Restomllon 44 1 8- 0510005 Resloralron 1 616 1 100 1 640 290 90 1 850 5 560 3 300 3.900 13 150 1 18110 1 99 640 26 1 SIDEWALK 26 7 8- 041Cemenl Cone Driveway Entrance 70 27 7 8- 141Cement Cone 570ewalk 60 2B 1 8141 Cement Gone 5lewalk Ramo 4008 1 29 I B -14 Icemen Ram Conc Sidewalk Ra 4A 3 20.1101 I Enn neer, Estimate 1 Lakeside Industries I Western AS0halt. Inc II ICON Materials 1 FA 5 1000015 L5 131.57015 S 000I5 HR 5 5015 LS S B 000 15 SY 5 50 I E LS 1070015 LF 9 2015 CY 15 4075 TON 5 3015 CY 5 55 I TDN 5 8015 LF 515 TON 0515 SY 5 315 FA 10.008 SY E 8 EA 9 300 FA 10 000 EA 75 9 LF .6 40 EA 5 400 EA 5 1000 5 EA 5 300 E LS 4 500 E SY 115 6018 SY I I 5 40 EA 3.000 I 9 5 EA II$ 300015 1 0 000 1 9 10 000 00 E 1000000 133 570 1 980 000 00 9 80 000 00 11 40 000 1 810000 DO 5 10 000 00 11 8080015 5000 5 8080000 5.000 7 5 3 500 00 S 3.500 00 500018 46 B0 5 468000 10700715 5 000 00 500000 12 800 1 5 11 20 7 168 00 1160075 100015 290000 2 700 1 5 52 50 1 5 4 725 0011 101.750 1 E 60 DO 1 E 111 000 00 52479375 6500 5 426 400 00 36 500 1 5 0 25 E 1.025 00 331 500 7 E 7200 200.80000 3945085 3251$ 42.73750 10 00071 5 10 000 00 10 000 00 144 88011 5 1 75 1 5 31.692 50 6 60011 5 250 00 1 5 ,500 00 10.000 510000001E 10 000 00 7.425 5 75 OD 1 9 7 425 00 25 600 E 16 50 1 6 10.560 00 1800 250 00 1 5 1 750 00 26.000 450 00 1 5 11700 00 600 200 00 1 5 400 00 4,00 44000015 4 400 00 1000000 10 000 00 15 10 000 00 68000 00 1 68 000 00 15 46.000 00 1 31 400 00 1 314000015 4000000 45 00 1 72 720 D0 5 5000 9.000 00 1 9 000 00 5 5.400 00 29 00 7 2.900 00 5 25 00 5.000 00 7 5.000 00 5 7 500 00 25 00 1 16 000 00 5 11 00 10001 290000 5 27 00 1 45001 4 050 00 S 50001 33 60 1 62 160 00 5 4500 71 50 469 040 00 S 69 00 1D0 6 30000 S 1D0 71 50 278850 00 S 71 00 350 4802500 5 400 10000 00 10 000 00 10 000 00 184 33 322 40 5 2001 29400 6.46B00 5 300 00 1 10000 00 10.000 00 5 10 00000 5000 4 950 00 5 71 00 1 23631 15 123 20 5 22 00 1 262 50 1 1 837 50 265001 472 50 I 12 285 00 480 00 I 210 00 7 42000 5 210001 11 025 00 1 1102500 5 4.500001 4.200 979015 6.85300 710215 50274015 530015 2400 5 415015 249000 520215 34812015 37.0015 15.000 5 14500015 6.700001 15225015 91350015 14500015 900011 5 1 700 00 1 5 5.100 00 1 1 417 50 1 5 4252 50 1 5 985 00 1 S 72 I EA 4001 E 2880011 5 350001 5 25200001 5 367 50 1 2E4600015 370001 E 23 I EA 50015 11 50011 5 1350015 3.10500!5 19175 15 3260251$ 213001E 15 1 EA 501$ 750 11 5 450015 6750015 47251$ 70075715 45 DD 15 3 1 EA 300 1 900115 3100015 93000115 3255015 976501$ 4520019 I 11 1 11 1 11 I 31 I EA II 40075 12 40071 3500075 10850008E 36750 5 11392508$ 375 DO I5 11 I I 1 11 11 I 3.560 EA 115 315 11 55011 5 20515 7.9130015 21515 82990045 2001E 550 EA 115 515 2750115 37015 2 035 0071 5 .189 5 2.13950115 40015 20 EA 1 1 5 100 1 5 2.00011 5 75 00 1 5 1 500 00 5 78 75 5 1.575 00 17 5 80 00 1 5 23 EA 1 100 1 5 /300 1 1 5 75 00 1 5 1 725 00 1 5 78 75 5 1 8 1 1 2511 5 00 00 15 470 LF II 515 235085 30013 1 4100071E 31515 1480501E 32015 1410 SF 1 5 815 11280115 30015 4 230 0011 5 315 5 444150/5 32015 400 LF 5 1 1 4 400 I I 5 0 90 I S 360 0011 5 0 95 I E 38000 1 5 1 00 5 8 690 LF 5 5 1 5 43 450 4 5 1 05 1 5 9 124 501 5 1 10 1 5 9 559 00 1 5 1 10 7 5 I II I I I I FA 5 10.000 1 10 000 1 810 000 00 1 5 10 000 001 510 000 00 1 5 10000 90 7 5 10 900 00 1 5 LF 5 2 1 5 40.22011 5 1501 5 30165001 S 1 OD 1 5 20.110 001 E 2001 E TOTALS I$ 1,801,84811 151,297,325501 1 51.315.26095 II 26 640 00 4 899 00 5 720 00 9 1 356 00 E 11 625 00 S 7200 DO 2.200 00 1 1 600 00 1 840 00 1 504 00 4 1200 400 00 9 559 00 KEG ,/1:111 LL 17L.007, dam" Prepared By Data May 14 2009 Lak Pavina Co. LLC 11 WoodwortM1 S Co Inc II Watson Asphalt Payme Co I Unit Cost Total Cost V Unit Cost Total Co. II Umt Cost Total Cost 10 000 00 10 000 00 1 5 10 000 00 46 000 00 7 72 250 00 2 72.25000 40 000 00 8 7.500 DO 750000 80 800 00 17 415015 67 064 00 5 400 00 77 8.50000 S 8 500 00 25000011 5000 5 500000 7 500 00 II 7E0 0015 7 500 00 04000 122015 7 808 DO >83000i 10001E 522000 5 220 00 40001 3.608100 B3 250 DO 58 30 1 5 107.055 00 452 640 00 765015 501.8400011 7200 00 1 65 1 5 11045 00 276.90000 870015 339300001 1 51600 00 1 6 10 1 5 80.215 00 I 10 .000 00 71 10 000 00 1 5 1.000 001 36/20001 1757 31692501 8600 00 II 225 00 1 8 4,950 00 II 10.000 00 7 1 1 0 0 0 0 1 1 1 0 1 1 4 00 7.029 080 29 0017 40 00 1 5 3.960 00 14.08D00 1430 9.15200 1.855 0011 11 275 00 7 5 1.925 00 12 480 0011 535 00 7 5 13.910 00 420001 3500015 700001 4500 DO 11 85000015 8 500 oat I 3710007 5 105 DD E 7350001 2.220 00 5 4500 2.70000 II 5.700 00 1 5 1.500 00 5 9 000 00 II 295500 5 1.800 OD 5 540000 1 3750D 1 27000 00 15000 3 450 00 5 4000 S 60000 5 60000 160000 S 4750015 1472500 5 I 17514 67550015 4 00 1 5 2.200 00 11 E 105001 s 210000115 1600015 368000115 1100 5 5.1700045 650 5 9.165 D0175 175 5 7000071 300 5 2607000115 10 000 00 1000000 5 10 000 00 10 000 00 5000000 50 000 00 980000015 98 000 00 95.00D00 45 000 00 50 000 D01 E 50.00000 4500 72720001E 50001E 8080000 250000 2500001$ 2.000 001E 2 000 00 37 00 3.700 00 1 5 52 00 1 E 5.200 00 6.50000 6 500 00 15 7.000 00 1 700000 1200 7650001$ 13001$ 8 320 00 3500 10150 00 1 5 5 00 1 1 450 00 2500 8750001E 60001E 5 400 00 6400 118.400 00 I E 56001 5 103 600 00 8200 5329200015 80001E 52460000 1 50 10.950 00 11 E 1 00 1 5 7100 00 8500 331.50000115 9000 351 000 00 325 49.31250115 3501 E 46.02500 10 000 00 1 10000 001 5 10 000 00 15 10000 00 2 25 1 40242 50 1 5 2 00 1 5 36.220 00 295 OD I 84900015 3500015 7700 10 000 00 1 10 000 00 1 5 10.000 00 1 5 10 000 00 25001 7.425 0011E 500015 4.95000 27 00 1 122800011 5 16001 5 10.24000 295001 2.06500115 3250015 2.27500 450 00 1 11.200 00 115 520 00 7 5 11520 00 200 00 1 400 00 115 250 00 1 E 500 00 4400001 4400001$ 4.500 OD I5 4500.00 42001 5 2 940 00112 110001E 7700 00 29001E 174000/5 460015 2 760 00 9500015 5 700 00 II 16000015 9.60000 850 00 1 5 2.550 00 II 5 1 900 00 18 5.700 00 1 11 1 39500 5 284400015 5000015 3800000 1350015 3.10500115 1500D S :1.45000 1 45001E 675 00 11 5 4500 8 67500 3100015 930 D011$ 700 OD 18 2.10000 I 3950075 12.245001 5000015 15.50000 1 1 20515 7 913 00 37075 203500 75001E 1.50000 75 00 1 5 1 725 00 0 30015 1 410 00 71 30015 4 230 00 1 0 90 1 5 360 00 1 1 05 1 5 9 124 50 II 1 I 1 20515 7 913 00 3 70 1 5 2 035 00 75 00 1 9 1.500 00 75 00 1 5 1 725 00 3001$ 1 410 00 3 Do 1 5 4.230.00 09015 36000 10515 9 124 50 1000000 10 000 00 5 100000071510000001E 1000000 100000075 10.00000 40.220 00 5 10015 20.11000115 10015 20 215 1 1 I 5 43 236 50 51.460.461.50 I $1,490,322.501`__ LEt,$fi$,B19.DD 1 CITY OF TUKWILA DEPARTMENT OF PUBLIC WORKS 2009/2010 Overlay Program Bid Tabulation for Additive Items Eng'neer's Estimate N NO Item Quantity Unit t cost Total COSt act Estimate ROADWAY (Base Bid t 4 Ad tn. Items No. 1 41 1.07 IResolubon al Uhler COm.ls n FA .I8 /ashen LS 23 300 1 8 23 300 P 1.10 IPro.I Temporary Traffic Control LS 1000015 100001 1.10 ,Traffic Centro Labor 2-01 •Clearing and 0!E 500 702 .RemovmoC Cement Concrete Pavement 50 SY 50 15 2 500 S 1 0 3DOO nD Cement Concrete Curb 20 1 E 1 400 Foundation Excavation Inc udino Haul CY 401$ 16001 2.03 MInsueable 4.04 Crushed SUrlannnToo Course O 5.04 Pavement Repair Excavation Include Haul CY 55 14 17 050 I MA Class lrz'PG 6422 I 1 06D TON BO I S 94000 5 04 IH s 1//2' PG 64-22 For Pavement HCOall 8. TON 6 vemenl 3 i s 1320 1 5 e Pa nOCraacir Sealino 1A 69070 0 i 3 55 760 i 1 7.12 ter Pollution Control 1 FA .I i 8-01 and Gutter 70 and Cover EA 400 i E EA S I 0.21 Sam. Smn 1 LS 15001E 1 500 IDEWALK Cons Onvpvmv Entrance 0 1 E 27 1 0 -14 C nc Sidewa k 40 1 S 20 1 menl cons Sidewalk Ramo Tvoe 2 29 614 ICernen1Cenc walk Ramo Tvos 4A 0 I EA E 30001 E 400 STORM DRAINAGE I9 30 800 1 s 31 i 7-05 Menlace 32 I 7.051P c Bash Manono 4 EA a 0IE 33 I Cover 7 -05 12 am h o EA s 300 I s SANITARY SEWER Is 4 1 EA I E 400 1 5 1 600 1 E T na CONTROL DEVICES Is 35 I 869 tRaisse Pavement Marker Tvoe 1 820 EA 5 3 I 8 24 35 I 9 .a.setl Pavement Marker. Ty.2 EA 8.22 IP Symbol 150 i S 40 1 B-22 IPlasbc Crosswalk Line BO SF 5 8 I 3 64015 41 1 8.22 Plastic 1 n adnch 6 930 LF S 1 I S 69301 a ROADSIDE LE s sIS DEVELOPMENT O la 43 I 0 -02 .Prooenv Resmrai on 44 I s .$doe Reslorabn 3350 LF I s 21$ 6700 ADDITIVE ITEMS la 45 I 619 Admst Gas B 1 8.19 Admit Pnete Uc iro Cash. (Amnwe Item No 41 t 21 LA 15 400 I E B 600 00 t a TOTAL ESTIMATED CONSTRUCTION COST 1 5 328,435 1 Total Of All Additives unit Cost Quantity Tula Cost 0uanlily 0019100st Su0otel Cost UnIt Cos/ Total Cost 0 09 27 000 SO 00 COO SO 00 19 200 S50 00 64 00 2 340 $4600 I DOD SO 00 $11 20 $1000 1 1 050 552 50 13 600 60 00 71 391 S57 35 I 660 SBO 00 e BOD E 25 DO 1 SO DO 12198 SI 75 6T5 875 00 I 2617 SO DO 250 50 00 SO 00 $000 950 00 00 1 3 458 SO 1 CCM SO 00 1 500 1 00 5000 7017 1 $350 00 54D 1 5000 7201 SO 00I -1 1 d 5350001 O I 681 SO 00 SO Ou -I SO OD 90 I SO 00 I 240 SO 00 I 6 237 1 $090 5 SO OO O 00 5 025 Et 50 6 9 550 1 50 OD 141751 SO OD 203,311 SiJP 4 t ,F.,1111 \(OS, Sc...D S le Nos Sne Noe S 13019 PI S 13041 PI SO 00 250 Do 61.000 00 S3 200 00 0 0 0 00 SO 00 SO 00 6100 CO 50 00 900 00 sa 2 S11000 0 S3 50 00 SO 017 sU 00 So 00 515000 SD 00 SO 00 SO 00 SO DO SO CO SO 00 SO 00 SO 00 SO DO S350 00 0 00 0 00 SO 00 570300 SO DO SO 00 SO 00 SO 00 SO OD 346600 SO DO SC 5900 0 300 D 530,908 00 S7 750 CM S1 000 00 $6400 00 5500 00 SO 00 o Do SO CO 5100 00 SO 0050 S30 307 SG 00 513600001 EC 0 $5 285 00 SD 00 SO OD SO OD ED MI SO 00 So 00 50 D0 SO 00 SO 00 50 00 SO 00 S0 00 $000 II 50 00 50 00 $35000 x000 SO DD SO 00 SO OD SO 00 5000 661 Do SO 00 53 D0 SO 00 SO oO 576.803.5011 AddNO e tom Lakeside Industries B1d 0 00 O 00 0 00 S17 OM 00 1 oO DC 53.000 00 96000[ S50 017 192 1 000 D[ 61 500 00 0 D S. 00 0 00 t 000 00 0 00 SII 20 70 200 00 SIO 00 20 0 00 852 50 7.200 001 660 DO 190 38.369 501 567 35 490 110 00 SO 00 0 20.000.001 572 OD 3500001 51500 300 0 00 SO 00 0 0 00 00 0 0 00 50 00 0 150 CO 575 00 7 0 OD S18 OD 70 0 OM 50 00 0 OD SO DO 0 O OD SO DO 0 0 OD S950 OD DC C D OC 3 61300 00 t 1 I I 350 ON 535000 2 02, S135 001 224 0001 SO 00 0 1050 635000 1 DD 1 0 00 $205 82 0.00 s3 70 0 DO 10 DO 0 0 00 SO 00 0 0 001 S3 00 30 0001 $300 00 4 167 DO SO 90 2300 0 00 SD 00 0 0 00 60001 3 930 OD 50 I 730 0001 D 7101 50 CO 1 0 107731.501 1 Schedule C S. No 511517 Slreel SO OC 5 00C $3000 OC 600 00 S1 500 0011 32 340 00 St 000 DO I 5764 D0 D0 00 31..050 00 3300 14 001 3 Dot 5011 SO 00i 328 080 000 $4500 Dm 1 S 25011 $00011 SI 60 OM 3750 005 O OC SO 00 S950 OC 30 OC 5C 51000 CO 31500 DC SO 001 $350 001 3540 00 OC SO 00 80 OC 5350 0011 SO CO $1681 00 $407 00 SO DO SO 00 590 00 5240 001 $2 070 00 SO 00 50 00 SO 00 st 095 00 $0 00 SO DO 50 DDII Addia Item No. SO 00 S17.000 00 $3000 DO 5.600 00 1.500 O0 S1.000 001 6784 00 $200 00 51.050 00 400 001 533 001 50 SO 00 0001 00 001 91 56 2501 SO DO. SO 00i .25 001 51.260 017, 0 001 50 00 O 00M 8950 11 S3 457 505 S1 DOD DO 5 s 005 SO O 001 0001 3.720 00 SO 8350 OC 00 .07 OC SD OC SO OC $90 OCT 5240 OD11 52 070 ON 50 00m SO 004 51095 000 so ow Su 001 sus 8S 901 Schedule D w, em ve Items m 36 4 .75 DO 21 MCI 4 G Si, fl.[.T\it. II II II II 5 11 84 550 00 11 316175 01 $18,725.00