Loading...
HomeMy WebLinkAboutUtilities 2012-04-24 Item 2A - Final Acceptance - 2010-2011 Small Drainage Program with Green River ConstructionCity of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton Utilities Committee FROM: Bob Giberson, Public Works Director 10 BY: Michael Ronda, Construction Project Manager DATE: April 20, 2012 SUBJECT: 2010/2011 Small Drainage Program Project No. 91041201, Contract No. 11 -112 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of retainage. BACKGROUND The Notice to Proceed for Contract No. 11 -112 with Green River Construction, Inc., of Tukwila, Washington, was issued on September 1, 2011 for construction of the 2010/2011 Small Drainage Program. This project is the continuation of the annual drainage program that the City has been conducting to maintain the drainage systems within the City. For the 2010/2011 Small Drainage Program, improvements were made at nine project locations; Wells Trucking (near E Marginal Wy /128th), Tukwila International Blvd (Homeland Security), E Marginal Wy S (Museum of Flight), 44 Ave S (Allentown), TIB /138 (Evergreen Foods), S 122n St (Allentown), 40 Ave S (13600 bock), Regional Stormwater Detention Facility (behind The Boulevard Apartments on Southcenter Blvd), and the Gilliam Creek Outfall (near Tukwila Pkwy /66 DISCUSSION Construction was physically completed on March 22, 2012. Eight change orders were issued during construction for a total of $30,330.99. The change orders can be summarized as minor revisions that were offset by under -runs in quantities for various bid items. The budget for this contract, with a 15% contingency, was $906,206.33. The retainage amount is $38,086.07. Contract Award Amount 788,005.50 Change Order Nos. 1 8 30,330.99 Cost Under -runs (56,615.20) Total Amount 761.721 -29 RECOMMENDATION The Council is being asked for formal acceptance and retainage release authorization, subject to standard claim and lien release procedures, for the contract with Green River Construction, Inc. in the amount of $761,721.29 and to consider this item on the consent Agenda at the May 7, 2012 Regular Meeting. Attachments: Vicinity Map Dept of Revenue Notice of Completion WAPW Eng1PROJECTSIA- DR Projects12 01 0 -2011 SDP (91041201)1Construc6onW.200 Correspondencel- DRAFTS12011 SDP -INFO MEMO Closeout- DRAFT- 03- 30- 12.doc Site 3 2010/20 sermP Annual Neighborhoo N m� Drainage Prog ram J 4' u Q m 5, Site 6 Site 2 W E Site 4 Site Not to Scale Site 7 s s 9 l 6t35t 5 6 L t� I t 61 1 t y�`qN Site 5 „1 L T 1 m 1�S,52nd s 6� Y Site Se a e s 56. Site 9 L sae s,55, y Y Tukw Awv Gw..ww.�mli� 154, S1 i a fa P n �..y �...4444wwwwYYYYwwww �..m �I S 16D1 5 Y L� a• wa IMF l �a �5,65,as, F Midl— Mi Dr r s rrnaaa o� d s soc�nst pate: June 21, 2011 2 u4i. NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Contractor's UBI Number: 600 582 -949 Date: 3/23/12 cAtd >�ess.il'tt�iTepartlrtkLiseY City of Tukwila Assigned to: 6200 Southcenter Boulevard Tukwila, WA 98188 Date Assigned: UBI Number: 179 000 -208 Notice is hereby given relative to the completion of contract or project described below Project Name Contract Number Job Order Contracting 2010/2011 Small Drainaqe Proqram 11 -112 Yes Z No Description of Work Done/Include Jobsite Address(es) Drainage improvements at 9 different locations within the City of Tukwila. No specific jobsite address is available because of the various project locations. Federally funded road transportation project? Yes ;6 No Contractor's Name Telephone Number Green River Construction 206 246 -9456 Contractor Address 6402 S 144th St. Suite 1, Seattle WA 98168 If Retainage is Bonded, List Surety's Name (or attach a copy) N/A Surety Agent's Address N/A Date Contract Awarded Date Work Commenced Date Work Completed Date Work Accepted 8/9/11 9/1/11 3/22/12 Contract Amount 788,005.50 Additions 30,330.99 Liquidated Damages 0.00 Reductions 56,615.20 Amount Disbursed 723,635.22 Sub -Total 761,721.29 Amount Retained 38,086.07 Amount of Sales Tax Paid at 0% (If various rates apply, please send a breakdown) 0,00 TOTAL 761,721.29 TOTAL 761,721.29 NOTE: These two totals must be equal Please List all Subcontractors Below: Subcontractor's Name: IUBI Number: JAffidaVit ID (if known) AAA Striping and Legends 602 188 162 I 374240 Fraser Metal Works 602 750 157 368308 Group Four, Inc. 600 061 180 Not Obtained Yet Insituform Technologies 701 880 220 375658 (may be revised) Lakeside Industries 601 106 847 370715 Pacific Concrete Services LLC 602 126 314 373696 Rosso Nursery 602 326 543 375162 Totem Electric 278 043 550 373674 F215- 038 -000 08 -2011 REV 3 1 0020e (08/25/11) y Continued on page 2 3