Loading...
HomeMy WebLinkAboutPermit M96-0104 - BOEING #2-80boaNG 4c2-mgc60 rY1610-601D4 City of Tukwila Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188 MECHANICAL PERMIT Permit No: M96 -0104 Type: B- MECHAN Category: NRES Address: 8123 EAST MARGINAL WY S Location: Parcel *: 000160 -0020 Contractor License No: BOEINC*294ML TENANT BOEING *2 -80 8123 EAST MARGINAL WY S, TUKWILA WA 98168 OWNER BOEING PO BOX 3707 - M/S 1F -09, SEATTLE WA 98124 CONTACT LARRY ALLEN Phone: 206 544 -1644 BOEING COMPANY, PO BOX 3707 M/S 19 -35, SEATTLE WA 98124 CONTRACTOR BOEING COMPANY P.O. BOX 3707, M/S IF -09, SEATTLE, WA 98124 ************************,******************* * * * * * * * * * ** * * * * * * * * * * * * * * ** * * ** Permit Description: ADD AC VENT AND DUCTWORK TO NEW DATA ROOM. UMC Edition: 1994 Valuation: Total Permit Fee: ******************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** .h1_25.12 Date Permit Center Authorized Signature Print Name: • (206) 431 -3670 Status: ISSUED Issued: 08/29/1996 Expires: 02/25/1997 3,000.00 59.25 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this building permit. /� Signature:_ 4 - eesa --_ Date: - 74 4th G+ _ -_ .42.46C-6% Title: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CITY OF TUKWILA I Address: 8123 EAST MARGINAL WY S Permit No: M96-0104 . :Suite: . . Tenant: .BOEING #2-80 Status: ISSUED Type:. B-MECHAN Applied: 08/08/1996 Parcel #:, 000160-0020 ' Issued: 08/29/1996 1 c kl. *it kAlc******** * k k**** k k* k k** k* k AA k k **A* lt* Alek k k A* Vk k * fit A 4k4e A Alt A* k* Al, Permit Conditions: . . 1. No ,changes will be made to the plans unless approved by the Architect or Engineer and_the-Tuk,wila,.Building Division. 2, All permits. inspectlonreCOrdsand: plans shall be .available at thejobsite to the any con- ' struction. Thesedotument.s....are to be maintaired avail- able until f1411inspectiOn4pproval is granted..: 3. All construo0bh to,be.done An conformance Ywith approved plans andreouirements.of thejinjfor'm Buil,dingCodei(1 Edition), amended UniforM Code (1994 Ed1.0on) , and Washington State,EnergyCdde (1994 Edition)..' 4. Validtty:of Permit-I The :IsSuati'oe,of a permit or approval ;.01 planspecifications,, an* Computations shall':not.,.be con• . strefOtte a permit for Or an,,a0proval of, any violatfOn of anSi of the provisions of'.;tba:building code or oth*f ordinance of tpe-jurisdictIom, No permit presuming to giVeauthoritY to violate or cancel the provisions;of;ihis I C 0W s hall be va 1 Id. 5. MANUFACTURERS INSTALLATION::rNSTOCTIONS-REOUIRED ON SITE FQW) 6. P be o -throuoh the Seattle-King ComqtyMpartnient_of"PiabriOiealth,;/ 'Plumbing will . 13e' inlE0 piping:, (29, J-47,;22,) ,,., ',‘, ,. '-■., r: `,: t ': ',:, — ,%' ''., ..Elet.ri shall be obtalned throUgh'kthe Washrh4tonY,; ., ,—,- Ste0, and Indus'tries!--and.all electrtc01 'workWill be inspected by that a!4en6i.,(248-6630). ,t.--, •.,:, , 8..Readlj..,K accessi access to roof Mounted equipment is' required. '.:. Project Name/Tenant: _ D Description of work to be done: / t ai_._ - t -* -- Value of Construction: � po i Site Address: / ^^ /-^ 9 City State/Zi.: Tax Parcel Number: Property Owner: e) e- ; /,/ e 9 H, ' � /�, r h9/4. e Phone: � — Street Addre • W O L : D I City State /Zip: r 5e o750 Fax #: 7?9' t----- Phone: Contact Person: Street Address: O v City State /Zip: - - :, - -r Fax #: - s - $ 0 3 Contractor: Phone: Street Address: City State/Zip: Fax #: Architect: /3 0 e rtc// Q Phone: Street Address: City State /Zip: Fax #: Engineer: /1 Phone: Street Address: City State /Zip: Fax #: MISCELLANEOUS PERMIT REVIEW AND APPROVAL REQUESTED: (TO BE FILLED OUT BY APPLICANT) Description of work to be done: / t ai_._ - t -* -- Will there be storage of flammable /combustible hazardous ma = - in the building? ❑ yes El no Attach list of materials and storage location on separate 0 1/2 X 11 paper indicating quantities & Material Safety Data Sheets ❑ Above Ground Tanks ❑ Antennas /Satellite Dishes ❑ Bulkhead/Docks ❑ Commercial Reroof ❑ Demolition ❑ Fence ❑ Mechanical ❑ Manufactured Housing - Replacement only ❑ Parking Lots ❑ Retaining Walls ❑ Temporary Pedestrian Protection /Exit Systems ❑ Temporary Facilities ❑ Tree Cutting MONTHLY SERVICE BILLINGS TO:. Name: Phone: Address: City /State /Zip: 0 Water 0 Sewer 0 Metro 0 Standby MISCPMT.DOC 7/11/96 REC CITY OF TUKWILA CITY OF EIVE Permit Cente- 6300 Southcenter Boulevard, Suite 100. ` M � 8 11 Tukwila, WA 98188 (206) 431 -3670 PERMIT CEN R STAFF USE ONLY NILA Project Number: 9 MR (4 , O Permit Number: ER Miscellaneous Permit Application Application and plans must be complete In order to be accepted for plan review. Applications will not be accepted through the mall or facsimile. APPLICANT REQUEST. FOR MISCELLANEOUS PUBLIC WORKS PERMITS ❑ Channelization /Striping ❑ Flood Control Zone ❑ Landscape Irrigation ❑ Storm Drainage ❑ Water Meter /Exempt # ❑ Water Meter /Permanent # ❑ Water Meter Temp # ❑ Miscellaneous ❑ Curb cut/Access /Sidewalk ❑ Fire Loop /Hydrant (main to vault) #: Size(s)* ❑ Land Altering: 0 Cut cubic yards 0 Fill cubic yards 0 sq. ft.grading /clearing ❑ Sanitary Side Sewer #: ❑ Sewer Main Extension 0 Private 0 Public ❑ Street Use ❑ Water Main Extension 0 Private 0 Public 0 Deduct 0 Water Only Size(s): Size(s): Size(s): Est. quantity: gal Schedule: ❑ Moving Oversized Load /Hauling WATER METER DEPOSIT /REFUND BILLING: Name: Phone: Address: City /State /Zip: Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 107.4 of the Uniform Building Code (current edition). No application shall be extended more than once. Date application acc to : Date application expires: Applicat taken by: (Initials) BUILDING OWNER OR AUTHORIZED' AGENT : SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR Above Ground Tanks/Water Tanks - Supported directly upon grade exceeding 5,000 gallons: and 'a ratio of height to diameter or width which exceeds.2:1 Signature: / 7"52--e---12- Date: ? 6 _ 4. Print name: l I^ 2 / � - ���� Bulkhead/Dock Phone: S �� j � Fax Fax # � ,SS . SD�-� Address: r© / ( 5„_, 4 v 2 o 2 �-, / r /9— 3 • S City /State /Zip: 5 47��P 9�1 .:- y ❑ SUBMIT APPLICATION AND REQUIRED CHECKLISTS FOR Above Ground Tanks/Water Tanks - Supported directly upon grade exceeding 5,000 gallons: and 'a ratio of height to diameter or width which exceeds.2:1 PERMIT REVIEW . Submit checklist No:.. M -9 . ❑ Antennas /Satellite Dishes; Submit checklist No M -1 ❑ Awnings /Canopies - ' No.signage Commercial Tenant Improvement Permit ❑ Bulkhead/Dock Submit. checklist .. No M -10 in Commercial`Reroof Submit checklist , No M -6 ❑ Demolition Submit checklist . No; ; M M -3a ❑ Fences - Over 6 feet in Height Submit checklist No: M -9 ❑ Land Altering/Grading/Preloads . Submit checklist No: M -2. ❑ Loading Docks Commercial. Tenant Improvement Permit.:. Submit checklist No: H -17 0 Mechanical (Residential & Commercial) Submit checklist : No M -8,' Residential only - H -6, H -16 ❑ Mlscellaneous.Public Works'Permits Submit checklist No H -9 0 Manufactured Housing ( RED INSIGNIA ONLY). ':' ° Submit checklist. No: M -5 ❑ Moving - Oversized Load/Hauling Submit checklist ; No: M -5 ❑ Parking Lots Submit. checklist. No: M -4 ❑ Residential"Reroof - .Exempt with following exception: If roof structure to be, repaired ;or replaced Residential Building Permit Submit checklist . . No: M -6 ❑ Retaining Walls - Over 4 feet in height Submit checklist No M -1 ❑ Temporary Facilities Submit checklist No: M -7 ❑ Temporary Pedestrian Protectlon/Exit`Systems" Submit checklist No: M -4 ❑ Tree Cutting Submit checklist . No: M -2 ALL MISCELLANEOUS PE!' T APPLICATIONS MUST BE SUB • ED WITH THE FOLLOWING: ➢ ALL DRAWINGS SHALL BE AT A LEGIBLE SCALE AND NEATLY DRAWN ➢ BUILDING SITE PLANS AND UTILITY PLANS ARE TO BE COMBINED ➢ ARCHITECTURAL DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED ARCHITECT ➢ STRUCTURAL CALCULATIONS AND DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED STRUCTURAL ENGINEER ➢ CIVIL/SITE PLAN DRAWINGS REQUIRE STAMP BY WASHINGTON LICENSED CIVIL ENGINEER (P.E.) ❑ Copy of Washington State Department of Labor and Industries Valid Contractor's License. If not available at the time of application, a copy of this license will be required before the permit is issued, unless the homeowner will be the builder OR submit Form H -4, "Affidavit in Lieu of Contractor Registration ". Building Owner /Authorized Agent If the applicant is other than the owner, registered architect/engineer,.or, contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. MISCPMT.DOC 7/11/96 l t '. N: ,r•.,. rr,` 't Ak******A* hA********k h* A**• k**.*** k**'t*** *k•.k*h **,f'*kk *** ** *Ah ITY OF T1IKWII.A. WA m �k `sr� \` L1 TE: - 101i1i)t • h: k :th*hh'A:r **i*'.k # #k*h * *:t *kksk Ask* X1:4•. h•A• *** **f *k* * * **** ***•, A'.i••kk 1'RAN8MI1• Number: 89600472 Amount: 59.2 08/29/96 11:33 Payment Method: CHECK Natation: BOEING •FRUJ3r ACC trig ELI3 Permit No: M96- 0:101 Tvn' U - MI:.CI1AN MECHANICAL PERMIT PFtr•,cel No: 000160 -0020 Site Address: 0123 EAST MARGINAL WY a 1c►tal Fees: 59.25 1'hii Payment *9.25 Total ALL Pratt : 59.25 Balance: .Q0 k40.A.'k•khk4,*h*A.Ak: ** **• k*** A* Ak*** Ak*h * + ***A** *•t* **•.k *A** ***A * *•A** Account Cade 000/345A30 000/322.100 Description Amount: PLAN CHECK •- NONI1E;3 11.83 MECHANICAL - MOIRES 47.40 bo.ei Comm.erua\ Tr ust - I‘c_count L,5q.a57 000 •11. a6b. oTOs,03 1?-1 •44 -•h,,•••% (Cr 47.1'i i b et s ,' Ty, Project Name Address I/2 EIV7 4 (25. Retain current inspection schedule Needs shift inspection ' Approved without correction notice Approved with correction notice issued Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre-Fire: Permits: Authorized Signature City of Tukwila AhMUK*ILA FIRE DEPARTMENT FINAL APPROVAL FORM FA) _612_ Fire Department Thomas P. Keefe, Fire Chief Permit No. FINALAPP.FRM T.F.D. Form F.P. 85 John W. Rants, Mayor Suite # 3/V/f 7 Date Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 5754404 • Fax: (206) 57•4439 Project Name ‘')(A,t.o • G) Address - ) - 1 s c\ rc,%:%% • Suite # - Retain current inspection schedule Needs shift inspection Sprinklers: Fire Alarm: Hood & Duct: Halon: Monitor: Pre-Fire: Permits: Authokized Signature City of Tukwila John W. Rants, Mayor Fire Department Thomas P. Keefe, Fire Chief TUKWILA FIRE DEPARTMENT FINAL APPROVAL FORM Approved without correction notice Approved with correction notice issued Permit No. VVI - (•)1(.‘ Date FINALAPP.FRM T.F.D. Form F.P. 85 1 Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575-4404 • Fax (206) 57S-4439 P r o j e c t f 0 Type of p in , 9 e n: � / , Date Address: ca . Special instructions: Date wanted: 3 . • Requester: Phone Nd.: awsmw.ra■rcwu COMMENTS: Inspector: [=_1 INSPECTION RECORD / �/ Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION � 1 1 6300 Southcenter Blvd,, #100, Tukwila, WA 9818: / •(2Q6).,431 3670r Date: 4 1 pproved per applicable codes. 4 ''• [ectlons required prior to approval. 4, $42,00 REINSPECTIO FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedulereinspection. Receipt No.: Date: ... . .... ..... �,.. _ a..,..,;...... r.,+ �xu. ro. a. cunw. a. r., a. 7on,+ Mwre,....- m.... e............, v.. w....,.. w,,..-. w, a. �www..,. u. r.+ �m. x. w..( wsvw,.:..nn..e.w.»u,.s.,..,.,. Scope of work for Data Room ti • Architechural: Al: Provide Approximatly 40 linear feet of wall. Wall to be 4" structural 'metal stud with 5/8 sheet rock on each side. Insulate wall. Interior wall height is to be 8'. Roof of area will be able to support 100 Ibs psf. A2: Provide 4' of plywood wainscoating on outside of wall with 1/2 inch fire rated plywood. Pao,, .o U .Nh\ 12ev,.n.0 o., - r - b t o I x 6 3 p+-t c- . A3: Provide 4.0 X 7.0 door set. A4: Provide support for NC unit. A5: Provide ladder and hand rail for roof area. A6: Lag equipment racks to the floor. A7: Provide isolation from the tunnel wall to prevent vibration from damaging sheet rock at the connection point. Option 1: Review foundation for this area. Is floor connected to LSAF or is it part of the original building. If part of the original building, provide new foundation for this area. El: Provide lighting for this area. E2: Provide (2) each 21 In.equipment racks for this area. E3: Provide convience power for this area. (1) Circuit. E4: Provide (1) dedicated 20 amp plug strip per equipment rack. E5: Provide conection to CMCS for this area. Connect through INTF. E6: Provide power for A/C unit. E7: Provide (2) 20 amp Circuits for each Large Rack Unit. (2) ea 4 -piex on the wall. E8: Relocate power as required. Ml: Provide sprinklers in this area. M2: Provide a small chilled water cooler. Approx. (3) tons. Connect to 2 -80 chilled water system. Provide insulation on chilled water pipes and label per standard. M3: Relocate air drop to roof of new room. M4: Relocate air filter to roof of new room. RECEIVED CITY OF TUKWILA AUG 0 8 1996 PERMIT CENTER Fire Department Review Control 0M96 -0104 (512) Dear Sir: City of Tukwila Fire Department August 14, 1996 Re: Boeing Company Building #2 -80 - 8123 East Marginal Way South The attached set of building plans have been reviewed by The Fire Prevention Bureau and are acceptable with the following concerns: 1. Sprinkler protection shall be extended to all areas where required, including all enclosed areas, below obstructions and under overhangs greater than four feet wide. (NFPA 13- 4-4.1.3.2.1) All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of the W.S.R.B., Factory Mutual, Industrial Risk Insurers, Kemper or any other representative designated and /or recognized by The City of Tukwila, prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance #1742) Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (UFC 10.503) (City Ordinance #1742) 2. All electrical work and equipment shall conform strictly to the standards of The National Electrical Code. (NFPA 70) 3. This review limited to speculative tenant space only - John W. Rants, Mayor Thomas P. Keefe, Are Chief Headquarters Station: 444 Andover Park East • Tukwila, Washington 98188 • Phone: (206) 575.404 • Fax (206) 5754439 Page number 2 Fire Department G City of Tukwila J. special fire permits may necessary depending on detailed description of intended use. Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. Yours truly, The Tukwila Fire Preventio Bureau cc: TFD file ncd John W. Rants, Mayor Thomas P. Keefe, Fire Chief Headquarters Station:. 444 Andover Park East • Tukwila, Washington 98188' • Phone (206 ) 57$4404 • Fav (206 ) 575.4439 C.' City of Tukwila August' 14, 1996 Mr. Larry E. Allen The Boeing Company P.O. Box 3707, M/S 19 -35 Seattle, Washington 98114 Dear Mr. Allen: SUBJECT: Development Permit Application Number M96 -0104 Boeing 2 =80 8123 East Marginal Wy S Sincerely, Kelcie J. Peterson Permit Coordinator OBINSIVINer01 Department of Community Development Steve Lancaster, Director eeu-e. `��tsgyi 4t. John W. Rants, Mayor This letter is to inform you that,your permit application received at the City of Tukwila Permit Center on August 8, 1996, was reviewed at the August 13, 1996, plan review meeting. Your application was determined to be complete., Your permit has begun the plan review process, you will be notified of any corrections or when your plan is approved. If you have any concerns or questions please contact me at the City of Tukwila Permit Center at (206) 431 -3672. 6300 Southcenter Boulevard. Suite #100 • Tukwila. Washington 98188 • 1206) 4313670 • Fax 1206) 431-3665 THIS CERTIFIES THAT THE PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A ,,•••••••••■■•■ •••••1:.•■••.••••••• =22=.•••••••• ••••22=••••== ••••••••••••••••••••••••■••• • • •••• •-• • •• • • ••• • ••• • DEPARTMENT OF LABOR AND INDUSTRIES AVVI,A: ffi V.:fi 7 --- l 'iiY;t:!e''''. ' 7 e k 1:6 0.4*.wi‘tIlikT/AEtqa '1'"'" 'S „ P Atk-altdigTfxAttaffiumeth ,'''-.. '-'"': N A'Oc lioli — f• ••••••••••■•■••••••-•••••••••••■••••••••••••••••••••••••••••••••••••••••••••••••••• ISSUED BY DEPARTMENT OF LABOR AND INDUSTRIES STATE OF WASHINGTON .41 F625.052.000 (3-92) i • SYM REVISION PROJECT AREA M 2 -41 2 -66 liif fil[Gli'il�f dill illliVIIVIIIIIIIII� ouuuuuouo iii 2 2 - 51 2 -84 2 -117 2 -116 APPROVED 2 -64 2 -80 DAIS SYM EXIT PASSAGEWAY VICINITY MAR 2— 2 -6 2 REMSIUtI — 110011 011 GATE B -18 SITE ACCESS APPROVED DATE lu 111111 l' FACILITIES DEPARTMENT BUILDING CODE NOTES CONSTRUC11011 OCCUPANCY SEISMIC ZONE 3 ENTIRE BUILDING IS SPRINKLERED TOTAL BUILDING AREA = 128,904 SE PROJECT AREA STRUCTURAL NOTES: Il �uuo DVWTV/IIIVJ A BUIL TYPE V, P1 0 -2 , OFFICE AND L I GI IT MANUFACTURING 3 = 14,000 SF DESIGN AND WORKMANSHIP PER UBC 1991 ROOF LIVE LOAD (SNOW) = 25 psf WIND : 80 mph [66.'.B SEISMIC DESIGN : Fp = Z1 Cp Fp Z = 0.3. (ZONE 3) I = 1.0 Cp = (2)' 0.75 =. 1 .5 Wp = WT OF MECH._EQUIPMENT STRUCTURAL STEEL : Fy = .36 ksi TIMBER HF H1 OP BETTER dill ACCEPTA THIS DESIGN SPECIFICATION 1 APPROVED BY SHEET NO ARCHITECTURAL 2.80 -1Al2 MECHANICAL 2.80 -1012 2.80 -1062' 2.80 -1066 2.80 -1M112 2.80 -10262 2.80 -M503 ELECTRICAL BILITY AND /OR S APPROVED DEPT. DATE 2.80 -1E12 2.80 -1E62 2.80 -1E242 2.80 -1E212 2.80 -2E504 CSWCKED APPROVED APPROVED 1'' , =1 11141 DRAWN BY DATE SUBTITLE N. HUTTO 11 TITLE (6 LEGAL DESCRIPTION APN: 000160- 0020, A TRACT OF LAND BETWEEN THE DUWAMISH WATER.;'Y AS ESTABLISHED BY COMMERCIAL WATERWA DISTRICT b 1 OF KING COUNTY, WASHINGTON & E. 6AF;0INAL WAY, IN SECTIONS 28, 29, 32 & 33, TLL•':NSHIP 24 N, RANGE 4 EAST, W.M., DESCRIBED IN: KROLL BOOK PAGE 79. TRACT CONTAINS AN AREA OF APPRO: 2,897,955 SO FEET. SITE ADDRESS: 812 :, EAST MARGINAL WAY SOUTH DRA,NING INDEX 2.80 -1A528 SECTIONS AND ELEVATIONS ARCH MASTED; COL lulluill �. 111111111 TITLE REVISION FLOOR PLAN REV. E DUCTWORK REV. C HVAC PIPING PLAID REV C HVAC PIPING REV.B PLUMBING PLAN REV. E FIRE PROTECTION REV.B SECTIONS AND DETAILS LIGHTING 208Y/120 VOLT POWER CMCS PLAN CMCS PLAN DETAILS Trnderstand tnat the Plao'''n suUtecttoewers ndomis,,,.-,s Odes roes no . i Innr adopted code o Orsco, c, Jc:•,. tract copy of a,;proven REV.B REV.F REV.D REV.D REV.F FILE COPY COVER SHEET 2.80 BUILDING B Y / Date — VIAD Mo - 0104 LAST REVISION SHEET Al JOB NO. 430007 -60 DWG N0. SYMBOL 2.80 —Al DATE OF COMP NO. PLANT 2 SEPARATE PERMIT REQUIRED FOR: 0 MECHANICAL ,» ELECTRICP.L J "PLUMBING GAS PIPING CITY OF TUKWILA BUILDING DIVISION nit RECEIVED CITY OF TUKWILA PERMIT CENTER EQUIPMENT LIST REF N0. DESCRIPTION AHU AHU- DREYER- HANSON 2H12 SER. NO.60168K1 FAN- (2 EACH) 11 ° 0 X 14" WIDE 4700 CFM AT 2.5 "H D STATIC MOTOR- 1800 RPM, 3 HP 30/60C/480V, 4.3A STEAM COIL- 160,000 BTUH (NOMINAL) 190 LB /HR STEAM (NOMINAL) ? / ?'F AIR TEMP IN /OUT DE /7 CHILLED WATER COIL- 156,500 BTUH 5 ROW, 8FPI,10 PASS, 58X27 PACE 85CW -27.0 X 58.0 -R /A -9/10 45/55'F GLYCOL TEMP IN /OUT 31 GPM, 9.7 FT. H2O PRESS, DROP 80'F DB /68WB (50% RH) AIR IN 55'F DB /54WB AIR OUT SYSTEM NO.AC -02- 080- 1M -D08 PROPERTY NO. 80001429 O STEAM CONTROL VALVE O CHILLED WATER MIXING VALVE O STEAM TRAP (4O STEAM TRAP„ #38 ORIFICE, INVERTED O _ PRESSURE REDUCING VALVE, 125 PSI TO 30 PSI, O STEAM PRESSURE GAGE, 0 -200 PSI STEAM O CHW PRESSURE GAGE, 0 -50 PSI WATER SYM A REVISION INSTALL VACUUM SYSTEM J#700167 -01 AS BUILT -ADDED LSAF INFORMATION NOISY AIR J#740219 -00 PROVIDE DATA HOUSE BY WDB JCG WDB APPROVED WDB DATE 8/22/93 2/14/95 6/7/96 (13 SYM REVISION APPROVED DATE L PLAN V I EW Nr ArzirrAv FACILITIES DEPARTMENT SCALE: 1/8 "= r _ - 10 NECK I 400 CFM (2 TYP) TVUy CAPPED /I\ 0 26X20 120 CFM 1 g; CFM DJ DI CONSTRUCTION NOTES INSTALL DUCTING AND GRILL FOR OUTSIDE AIR. INSTALL GRILL IN WALL( HIGH ). GRILL SHOWN ON CEILING FOR REF. ONLY, M % -0 KEY PLAN NO SCALE RECEIVED C ITY OF TUKWILA PERMIT CENTER ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE EN.. DRAWN BY DATE COLBY 8 18 66 CHECKED APPROVED APPROVED SUBTITLE TITLE MECHANICAL MASTER DUCTWORK BUILDING 2 -80 COL DE- DJ \8 -17 PLANT 2 SHEET 1M12 JOB N0. DWG NO. UST REVISION 163180 2.80-1M12 SYMBOL DATE B 2/14/95 OF COMP NO. EQUIPMENT LIST REF N0. DESCRIPTION Q STEAMTRAP: STEAMGARD 1 / -B -02 STEAMTRAP: STEAMGARD 3 / - -B -9 03 STEAMTR : STEAMGARD 3 / -B -7 b STEAMTRAP: STEA GARD / -B -03 FAN COIL UNIT,18,431BTUH,853 CFM O TRANE #FCDB0801COA0002KO, 115V, 1/4 HP,3.7GPM © TRANE •HA 1004 A • ,1 ■ ` ' :1 ROOF -REF 34X18 COIL IN DUCT, 120# " @20 PSI 0 REF DWG: 102- 080 - 4072 -M9 AIR HANDLING UNIT AHU -6 CFM @ 2 "W.G. 8 HEATING COIL: 60'F TO 110'F 260 # /HR 260 # /HR 6 FIN PER INCH 1 ROW COOLING COIL: 80764' ENT 56' LVG 8 FIN PER, INCH 6 PROPANE HEAT EXCHANGER, 340 # /HR REF DWG: 102 -080- 4072 -M5 102 -080- 4072 -M7 CHILLER NO, 3 DUNHAM -BUSH ARPC -020T REF DWG: 102- 080 - 4083 -M4 WATER CHILLER NO 4 12 CARRIER 30 GA 20,19 TONS 40 GPM 56.6' ENT 820, 45' LVG 420, 90' AMBIENT, 460V 3 PHASE, .0005 FOULING FACTOR PUMP 13 PACO 1270 - 5,6.6" IMP, 1750 RPM, 1 HP, 460V,.3 PHASE 40GPM 40 FT TDH J M E DETAI 462 M502 M62 M503 fll SLOPE STM f 0 co-oio4 SYM C REVISION RENUMBER DRAWING REVISE A/C UNIT 76016 AS BUILD CHILLED WATER - 7/6/87 BY BOLLIG APPROVED DATE 30 JAN87 04 -15 -87 SYM REVISION BY APPROVED X - -- X DATE 1 STM r SLOPE STM PR SEE DETAIL 4 M62 M502 SEE D TAIL f 2 (2 TY ) M62 1502 DRIP DROP TO PROVIDE GRAVITY DRAIN FOR COILS SLOPE DRIP@ I C0ILO2 SLOPE AHU-5 CONSTRUCTION NOTES RUN NEW CHWS /CI-INR AS SHOWN. PIPE 6 FITTINGS TO BE TYPE L COPPER. INSULATE WITH 3/4" THICK ARMAFLEX. 0MOUNT NEW FAN COIL UNIT, AT CEILING SEE DETAIL FOR PIPE INSTALLATION AND CONTROLS. SLOPE j X - ®OE /NG FACILITIES DEPARTMENT - 1" RELIEF / TO ROOF TM SEE 102- 080 - 4072 -M7 FOR PIPING FLOW DIAGRAM. U EXISTING PROPANE • TANK -REF - m SEE DETAIL Q 862 M502 l_J STEAM PIPING PLAN SCALE: 1/8 "= 1' -0" CHILLER' NO 3 D -B ARPC -020T CHILLER. 00 4 SEE DETAIL APPROVED BY 11 /2" C 4 STM 2" PR M62 M502 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DEPT. DATE -. ORAWNBY B.A.ME� H� R.GLADNEY ENGR. W.8OLLIG CHECKED APPROVED W.GEHRING DATE 3 24 86 10 -31 -86 10 -20 -86 10/20/86 APPROVED SUBTITLE TITLE SEE DETAIL n 4 18502 1M501 DH C 1 &____[ HVAC PIPING PLAN BUILDING 2 -80 LEGEND GENERAL NOTES KEY PLAN NO SCALE MECHANICAL MASTER COL DE- DJ/8 -17 PLANT 2 = PIPE GUIDE HUH HORIZONTAL UNIT HEATER VUH VERTICAL UNIT HEATER AHU AIR HANDLING UNIT UH UNIT HEATER --PR-- PUMPED CONDENSATE - -- STEAM OR COND. HIDDEN FROM VIEW SLOPE ALL PIPE 1 /4' PER 10'(OR MORE) IN THE DIRECTION SHOWN, 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW @ 10' INTERVALS 2 " -3" DIA. PIPE @ 15' INTERVALS 4 " -6" DIA. PIPE @ 20' INTERVALS O ©u RECEIVED CITY OP TUKWILA LAST REVISION SHEET 1M62 JOB NO. 760167 SYMBOL PERMIT CENTER DATE OF COMP N DWG NO. 2.80 -1862 EQUIPMENT LIST ITEM No. DESCRIPTION O i / SG TEAMTR AP: STEAMGUARD –11 (--7\ MCQUAY HD SIZE 217 AHU 7 -1 H PM @ 460V S 3 P PH W/ STEAM HEAT COIL REF.DW.9: 102- 080 - 4072 –M9 CRU COMPUTER ROOM UNIT TRANE MODEL #SRUB —C154, VERTICAL, AIR COOLED, 4800 CFM, 823 RPM, 15 TON NOMONAL, 1 "STATIC PRESSURE, 2 COMPRESSORS, EVAPROATOR COIL, 140 TOTAL MBH /125 SENS. 1 "THROW AWAY FILTERS, 37 FULL LOAD AMPS, 460VAC, 3 PH , W16 WT6 — UH UNIT HEATER MODINE MODEL #HS -18L, HORIZONTAL, 21,400 MBH OUTPUT, 365 CFM; 60'F IN, 114'F OUT, 30 PSI STEAM 23 # /HR 20 FT.THROW, 1550 RPM, 115VAC, 1/25 HP A 12 ,--, UH WI5 FOR UNIT HEATER PIPING SEE DETAIL 4 1M66 M51: END OF LINE TRAP, SEE 2 1M66 MS ' REV1510N BY APPROVED - -- /-- UNIT HEATER PIPING SEE DETAIL — �__, APPROVED DATE 5,__, 3/4' T + T � LPS C /OR DRAWN BY BAMEHTA DATE 3/24/85 \' 1M66Cj5 ?3 — N.,-.., PERMIT CENTER SYMBOL – AST R 1 A RENUMBER DRAWING A\` y • — 30 JAN87 cNE R KGL ACNEY 10/28/86 S Tw, STM K 3/4 RI.,,, z = 7/11/93 i T./— DEPT. ED DATE ENCR. W. BOLLIG Jo— TTILE MECHANICAL MASTER BUILDING Z' S O COL COL DA— DE /8 -17 j RG CRU 6�iG� tt 1 1 /8 "T 1 ' C PROVIDE DATA HOUSE Ak 1 2" Ill ir 5/24/96 i II CHECKED H BELOW MEZZ. 10/20/86 i CHWIR x416 1/2 " CHAS 8 CMWR 1 111 1 APPROVED R.GEHRING APPROVED WDB 10/28/86 JOB NO. 76 0 015 c� 1 „STEAM SEE � EE DETAIL ! 4 1 � Y 1 /2 - SLOPE �—. 1 ,, C - c -- -� - - -- - - -- +_ f 2” STM 4° ` � M66 M502 J �–, RELIEF + UP THRU ROOF -, 1' 11 /2 .. .. �O ( SLOPE_— DwG No. 2.80 -1M66 '" ST HIIIIIIII 2' PR MAINTAIN ACCESS TO CONTROLS AND FILTERS PR STMT= S YM REV1510N BY APPROVED DATE SYM REVISION BY APPROVED DATE FACILITIES T ACCEPTABILITY SPECIFlC4TDN IS AND APPROVED BY /OR DRAWN BY BAMEHTA DATE 3/24/85 "T''' HVAG PIPING NO SCALE N.,-.., PERMIT CENTER SYMBOL – AST R DATE 7 11 9 / / , A RENUMBER DRAWING A\` y 30 JAN87 cNE R KGL ACNEY 10/28/86 – AS BUILT –ADDED LSAF DRAWING INFO. ypR 7/11/93 DEPT. ED DATE ENCR. W. BOLLIG TTILE MECHANICAL MASTER BUILDING Z' S O COL COL DA— DE /8 -17 PLANT II SHEET v w `= OF B PROVIDE DATA HOUSE WDB ' WDB 5/24/96 CHECKED 10/20/86 APPROVED R.GEHRING APPROVED WDB 10/28/86 JOB NO. 76 0 015 COMP N0. 1 954 DwG No. 2.80 -1M66 (1 7 M9lo - o1o 1 1 1 STEAM PIPING PLAN SCALE: 1/8 "= 1' -0" 1' /2" 2'" PR 4" STM DC E>INSTALL BALL VALVE IN INTERTIE LOOP. LEGEND — STN - - LPS- - C = PIPE GUIDE HUH HORIZONTAL UNIT HEATER VUH VERTICAL UNIT HEATER AHU AIR HANDLING UNIT UH UNIT HEATER PR PUMPED CONDENSATE STEAM OR COND. HIDDEN FROM VIEW 125 LB STEAM 0 -30 LB STEAM CONDENSATE— GRAVITY DRAIN GENERAL NOTES 1. SLOPE ALL PIPE 1 /4" PER 10'(OR MORE) IN THE DIRECTION' SHOWN. 2. MINIMUM PIPE HANGER SPACING: 2" DIA. PIPE AND BELOW @ 10' INTERVALS 2 " -3" DIA. PIPE @ 15' INTERVALS 4 " -6" DIA. PIPE @ 20' INTERVALS CONSTRUCTION NOTES TIE INTO EXIST CHAS /CHAR TO RUN NEW AS SHOWN. PIPE TO BE TYPE L COPPER PIPE AND FITTINGS. INSULATE WITH 3/4" THICK ARMAFLEX. REMOVE CHECK VALVE( OR WHATEVER THIS FITTING IS ), KEY PLAN H1 -two O 5 O 10 ® 8 EQUIPMENT LIST REF DESCRIPTION 2. Q - eh 11 11 AHU QE 7 AHU- DREYER - HANSON 2H12 SER, NO.60168K1 FAN- (2 EACH) 11 "0 X 14" WIDE 4700 CFM AT 2.5 "H p STATIC MOTOR- 1800 RPM, 3 HP STEAM / 160,000 BTUH (NOMINAL) 190 LB /HR STEAM (NOMINAL) ? / ?'F AIR TEMP IN /OUT CHILLED WATER COIL- 156,500 BTUH 5 ROW, 8FPI10 PASS, 58X27 PACE 85CW -27.0 X 58.0 -R /A -9/10 45/55'F GLYCOL TEMP IN /OUT 31 GPM, 9.7 FT. H2O PRESS. DROP 80'F DB /68WB (50% RH) AIR IN 55'F DBf54W6 AIR -D0 SYSTEM NO.AC -02- 080- 1M -D08 PROPERTY NO. 80001429 • Ali STEAM COIL CHILLED WATER COIL t 1 i -- �� _ +1 _ I ► k • a II LQ II I 111- _ IR,/ Q H- SLOPE ^ 0 0 11 I I 1 2 / 0 •1 N. N d- IF - 4 0 N ° ■ • I 40 I 1+ w T I II 10.41 se 0 SLOPE r — 1 1f2,, CHWR ----� t----.-- STM • . ► 1 I T II I • u I C ----t j-- 1 / 2' I i O STEAM CONTROL VALVE SEE DWG 2.80 -M310 2 CHILLED WATER MIXING VALVE SEE DWG 2.80 -M310 CHWS - • • 0 0 © DETAIL DETAI O STEAM TRAP 44 STEAM TRAP, #38 ORIFICE, INVERTED BUCKET TYPE ARMSTRONG MODEL 800 5 O " PRESSURE RDUCING VALVE,3 /8DIA., O 30 PSI 200 LBS /HR, 125 PSI TE SPENCE NO TYPE ED, FULL PORT SCALE: NONE M503 SCALE: NONE M503 `_- 6 O STEAM PRESSURE GAGE, 0-200 PSI STEAM RATED 3 -1/2" DIA.GAGE FACE, 1/4" NPT CONNECTION WITH SIPHONS (TYPICAL 2). O 7 CHW PRESSURE GAGE, 0 -50 PSI WATER SERVICE 3" DIA.GAGE FACE, 1/4" NPT (TYPICAL 3). O TEMPERATURE GAGE i 6" BACKDRAFT DAMPER N \ 9 VACUUM BRAKER- 1 /2 "DIA.BRASS, ARMSTRONG MOD. 1 /2VB8- 51- BR -P -S -E o- a ,0 , . 10 CIRCULATION BOOST PUMP, CHILLED WATER 31GPM @1OPS1 BOOST, 480,/60Hz/3ph COULD MOD. 35GB5 -1.5F 21 "X 52" �i 24 "X 24° CONSTRUCTION NOTES i POC 0.A. PACE FILTER SECTION 2X6 FRAME t k><4Y PACE MIXING BOX 25 "X 58" (SCF 165, TYPE A) PACE FILTER SPACER 39 "X 58 " C C DEH 7 33 "X 60" S A � � _ �' '6„ 16 X 4� \` --->.<------ -- ><� 48 ° X 24" 0 11 IEt C WATER D COIL 21"X 52" \ / 1 M503 ( / 'HARD CEILING ATMOSPHERIC RELIE y" 1 R,A. ^ - 1 ' 0 N C. O m ir c • N.O '11 ► � ■ 0. I • I S I � POWERS VE VXG 1/2" 1/2, CV =1.87 4.18 GPM 1 5PS1 OFFICE SPAC 1 24 "X 48" R/A GRILL 1 3 24 "X 48" GRILL NOMINAL 4700 CFM SECTION /Ilk, 0 — CHWS — � CHW - pF - 0 , p p Gap Ap ., e* 0- o,N� SCALE: 1/2 " =1 1M13 M503' 1M17 M503 M%O/ RECEIVED M62 M503 crTY of TUKwlla MoXt-olell . PERMIT CENTER SYM REVISION BY APPROVED. DATE SYM REVISION BY APPROVED DATE ��iEI FACILITIES DEPARTMENT THIS C DESIGN B ND SPECIFlCATION ISAPPROVED DRAWN BY R.SLOAN DATE 5// 27/93 SUBTITLE SECTIONS & DETAILS LASTREV SHEET SYMBOL B DATE 6 30 94 / / of - AS -BUILT �. V Q�' ��' - 6 3 93 / / CHECKED B. GLADNEY 7.7.94 A CHANGES I N AC /HEATING J#730007-00 455 P WDB 9/27/9 APPROVED BY DEPT. DATE J G RAY 5/27/93 TIT E BUILDING 2, 8 0 MECHANICAL MASTER COL DE /7 PLANT 2 O B CHANGES I N AC /HEATING J#730007-06 0 W WDB /BG S /30/9 CHECKED WDB 6/22/93 C AS BUILT 0 P W08/80 10.05.95 APPROVED JOB N0. 730007-00 COMP N0. 5276 APPROVED DWO NO. 2.80-M503