HomeMy WebLinkAboutPermit 0538-M - VALCO GRAPHICS0538-M 91-108
VALCO GRAPHICS HVAC
480 ANDOVER PARK EAST
.
fl
u IP •k •;;___• 1988
Valco Graphics
FIRE PROTE TION: IIIMMINIDetectors ON/A
an-
•NDITIoN • h4' h:n • :. • •r : h. • a :rml .
•
•k `.:
ADDRESS:
•;I
APPROVED FOR i
, a 1 BUILDING
.......1.1/... / . ).-e' t ili OFFICIAL
ISSUANCE BY: 11..
DATE: (0 .- ;2 7
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit.
-,---,-/
SIGNATURE: /24..--/ A . , (,i-Y4 ‘1,r
' '
DATE: ....77_4("25 -Z ? /c/9 (
I 1 •
. ;::
1
COMPANY: Lco ege/i/cs „Tye
-------,.
PRINT NAME: Wm. L. / ESL
PROPERTY OWNER:
Valco Graphics
PHONE: 284-1755
ADDRESS:
3104 Western Avenue,
Seattle, WA I,ZIP: 98121
•k `.:
ADDRESS:
•;I
Owner
PHONE: •
IZIP:
I 1 •
. ;::
0 ;
k b..•
EXPIRATION DATE:
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
MECHANICAL
PERMIT NO. 053S in
DATE ISSUED:
Valco Gra hics
14 _
MECHA ICAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION).
FEES AMOUNT
LQrnJtEee $15.00
Unit Fee 22.00
Plan Check Fee 9' 25
Plan Check No.: 91
RECEIPT4: DATE
PROJE AT
SITE ADDRESS: 480 Andover Pk E SUITE NO.
VALUE OF WORK: 16,200.00
k.:ki
..TYP OF WORK: 0 New/Addition Modifications Repair Other:
DESCRIPTION OF WORK: Install pollution control venting from press dryer.
'.:RitiliMMIN:1:1:OningatilVOINSPEOPOitillECOROWCiliffOrfOSPOOtiOnt'iitlea5t24:qh0
DATE
APPROVED INSPECTOR
REQUIRED INSPECTIONS
1 - Rough-InNents/Ducts
2 - Fire Final
3 - Planning Final
4 -
x 5 - Mechanical Final
PHONE NO.
431-3670
575-4407
431-3680
431-3670
DATE(S)
CORRECTION NOTICE ISSUED
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732)
Electrical - Washington State Department of Labor and 'Industries (277-7272)
is ilerapt:snolbocome:Ogil:04,4100070.::Worn not commenced within 180 days from the date
issuance, or tni.?;w0 is suspended or abandoned for a period of 180 days from the last inspectio
PERMIT NO.
CONTACTED
BI
JaY
DATE READY
DATE NOTIFIED
I _
lU r ��'
(
BY:
(init.)
{�
l J
PERMIT EXPIRES
2nd NOTIFICATION
3RD NOTIFICATION
BY:
(Init.)
BY:
(init.)
AMOUNT OWING
Ll (
l
l (J
5
PLAN CHECK
NUMBER
qI C) m
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ".
DEPARTMENTAL REVIEW
"X" in box Indicates which departments need to review the project.
)E
2 BUILDING -
initial review
O FIRE
O PLANNING
O OTHER
Q BUILDING -
final ravinw
REVIEW COMPLETED
(ROUTED)
672 VI',
INIT:
INIT:
INIT:
IINIT:t - qfr�_..
MECHANICAL PERMIT
APPLICATION TRACKING
CONSULTANT:
FIRE PROTECTION:
FIRE DEPT. LETTER DATED:
ZONING:
UIR EMENS <'OMtiIIE
REFERENCE FILE NOS.:
UMC EDITION (year):
k9 275
Date Sent -
SCREENING REQUIRED? nYes n No
Date Approved -
Detectors IXf N/A
INSPECTOR: !ST?
FIFA/LAND USE CONDITIONS?
)Yes () No
SITE ADDRESS SUITE #
180 Ah1Do /E R P1aRV- CA9,
VALUE OF CONSTRUCTION - $
1 (0, 2co, QC)
PROJECT NAME/TENANT
\/ M. C C (_ Rta c.
TYPE OF WORK: TA New /Addition ❑ Modifications O Repair ❑ Other:
DESCRIBE WORK TO BE DONE:
P O • _ C>v c �. t VN 'F Peel. "U - •(
:: >: >:::;:;:
<> _<!NU NUMBER . ........... >. TINtIIISiZE < >; >< > < > € > • > > ><' >< < � > >� >'< >! > > > M R
......................... TYPE>><>><;;>> ?>'€> �< < > << > »:: >: >< ><: >« >< :
tic P_L..`1 f F DR4 c.a_ ax _ ) ' c r1 , U0 c_FIA I
IL _'
CONTRACTOR 0 -r
UN IT(SP FEE
>:
BUILDING USE (office, warehouse, etc.)
?RiMT" ►N ' L- sT
NATURE OF BUSINESS:
0.otvkm�.e..e,∎ CSR ■ r‘1.167
WILL THERE BE A CHANGE IN USE? 121 No 0 Yes IF YES, EXPLAIN:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? ❑ No X Yes IF YES, EXPLAIN:
( (•1 o t- P C - rt . * .• le—C4 ck - 'PR' i i.Va ► • M k
PROPERTY OWNER :* y
1 ,
RCPT #t:;.
PHONE R 04, 2. _ r .
ADDRESS 3%04
EVE= •
CAt'T.. = Zi i 1 g
IL _'
CONTRACTOR 0 -r
UN IT(SP FEE
>:
PHONE
ADDRESS
PLAN CHECK FEE
ZIP
WA. ST. CONTRACTOR'S LICENSE #
OTHER
TOTAL'''
EXP. DATE
Li t0 c 5
DESCRIPTION
;AMOUNT::
RCPT #t:;.
:::.DATE::::..:'
BASIC PERMIT FEE
16.00
UN IT(SP FEE
>:
c'J
PLAN CHECK FEE
C` *;9
OTHER
TOTAL'''
Li t0 c 5
CITY OF TUKWILA
Department of Community Development - Building
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
PLAN CHECK
NUMBER
KA
APPLICATION MUST BE FILLED OUT COMPLETELY
CONTACT PERSON
DATE APPLICATION ACCEPTED
(r� L
SIGNA
PRINT NAME I „ ` \wr
ADDRESS -604 vics-ce
MECHAK CAL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be filled out
and attached to this application.
FEES (for staff use only)
PHONE 284
C ITY /ZIP �c_Lci. 9sl
PHONE t , _ r
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed information on application and plan submittal requirements. Application and
plans must be complete in order to be accepted for plan review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the
applicant. This figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is Issued within 180 days following the date of
application shall expire by limitation.- The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
If you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
DATE APPLICATION EXPIRES
IL
06/18/90
SMWrAL CHECIfLIST
MECHANICAL
M Completed mechanical permit application (one for each structure or tenant)
IS Two (2) sets of mechanical plans, which Include:
• Floor plan
• System layout
• Elevations (for roof mounted equipment)
• Heat Loss Calculations
E Structural calculations stamped by a Washington State licensed engineer may be
required if structural work is to be done (2 sets)
Note: Hood and duct systems require a building permit for the duct shaft.
DESCRIPTION
UNIT COST
NO OF
UNITS
X
TOTAL
COST
$15.00
BASIC FEE
SUPPLEMENT PERMIT FEE
$4.50
1
Installation or relocation of each forced -air gravity -type furnace or
burner, including ducts and vents attached to such appliance, up to and
including 100,000 Btu/h.
$9.00
x
2
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance over
100,000 Btu /h.
$11.00
X
3
Installation or relocation of each floor furnace, including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
Installation, relocation or replacement of each appliance vent installed and
not included In an appliance permit.
$4
1
X
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
Installation or relocation of each boiler or compressor to and including
three horsepower, or each absorption system to and including 100,000
Btu /h.
$9.00
X
8
Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
8
Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu/h.
$22.50
X
1 0
installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
11
Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56.00
X
12
Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This tee.shanl not apply to�an
air - handling unit which is a portion of actory- assembled appliance,
cooling unit, evaporative cooler or abso on u is
required elsewhere in this code.)
$6.50
X
13
Each air - handling unit over 10,000 cfm.
$11.00
x
14
Each evaporative cooler other than a portable type.
$6.50
X
18
Each ventilation fan connected to a single duct.
$4.50
x
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
X
installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
1
' Installation or relocation of each commercial or industrial -type incinerator.
$11.00
I
x
j$,170
19
installation or relocation of each commercial or industrial -type incinerator.
$45.00
x
0
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed in
this code.
$6.50
x
6 sa
o6lwo
SUBTOTAL
31. oz.
PLAN CHECK FEE L of
subtotal)
9. o
GRAND TOTAL
$ L1104Q5
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
MECHAi ICAL PERMIT
FEE WORKSHEET
CITY OF TUKWILA
6200 SOUTIICE NTE R BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #91- 108 -M: Valco Graphics
480 Andover Pk E
PHONE # (2061433.1800 Gary L. VanDuscn, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PAU OF THEePPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER D5&1
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County
Health Department and plumbing will be inspected by that
agency, including all gas piping (296 - 4732).
3. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (872-
6363).
4. All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
5. Readily accessible access to roof mounted equipment is
required.
6. Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
7. All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washignton State Energy Code (1989 Edition), and
Washington State Regulations for Barrier Free Facility
(1989 Edition).
8. Validity Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
PROJECT:
PERMIT NO.
a . -
SITE ADDRESS: ✓,,. v I i
TYPE OF INSPECTION: %-ie �,
SPECIAL INSTRUCTIONS:
�
l
G
DATE CALLED: 2 -6
DATE WANTED:
REQUESTER:
9"= Jj ,, �
PHONE NO.:
INSPECTION RESULTS /COMMENTS:
�n
C../ 4--
775
/ c)-, c 7
INSPECTOR: i G ;-ti»/) -,
DATE:
-- Z-R --
a nua
CITY OF TUKW1u
Dept. of Community Development - Building Division
Phone: (206) 431 -3670
01
INSPECTION RECORD V
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
ROOF UNIT PLAN
SECTION A-A
ROOF SUPPORTS FOR NEW ROOF EXHAUST EQUIPMENT
APPROVED
• ANDERSEN • BJORNSTAD • KANE • JACOBS, INC.
CONSULTING ENGINEERS
SEATTLE, WA
ANCHORAGE, AK
RECEIVED
CITY OF TUKWILA,,
JUN 14 1991
PERMIT CENTER
PROJECT
ANDERSEN •BJORNSTAD•KANE•JACOBS,INC.
CONSULTING ENGINEERS
SEATTLE. WA
SUBJECT
LOS ANGELES, CA
ANCHORAGE, AK
APPROVED
JUN 27 1991
ANDERSEN •BJORNSTAD•KANE•JACOBS,INC.
CONSULTING ENGINEERS
SEATTLE, WA
SUBJECT
LOS ANGELES, CA ANCHORAGE, AK
PLAN REVIEW COMMA TS
Pisa Check No.: Ci d$ M Project: \0 ALGO ( RAPt4 t C ,
7( No changes will be made to the plans unless approved by the Architect
REQUIRED INSPECTIONS and the Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
! Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special Inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
X. All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is In addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
1. Footings
2. Foundation
3. Slab/Slab Insulation
4. Shear Wall Nailing
5. Roof Sheathing Nailing
6. Masonry Chimney
7. Framing
8. Insulation
9. Suspended Ceiling
10. Wall Board Fastening
Y
11.'Rr, tk
1 2.
13.
14. Fire Final
15. Planning Final
16. Public Works Final
) ..17. Building Final
PLAN REVIEW COMMA TS
Pisa Check No.: Ci d$ M Project: \0 ALGO ( RAPt4 t C ,
7( No changes will be made to the plans unless approved by the Architect
REQUIRED INSPECTIONS and the Tukwila Building Division.
Plumbing permit shall be obtained through the King County Health
Department and plumbing will be inspected by that agency, including all
gas piping (296- 4722).
! Electrical permit shall be obtained through the Washington State Division
of Labor and Industries, and all electrical work will be inspected by that
agency (277- 7272).
4. All mechanical work shall be under separate permit through the City of
Tukwila.
All permits, inspection records, and approved plans shall be posted at the
job site prior to the start of any construction.
6. When special Inspection is required, either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment of the
inspection agencies prior to the first building inspection. Copies of all
special inspection reports shall be submitted to the Building Division in a
timely manner. Reports shall contain address, project name and permit
number of the project being inspected.
7. All structural concrete to be special inspected (Sec. 306, UBC).
8. All structural welding to be done by W.A.B.O. certified welder and special
inspected (Sec. 306, UBC).
9. All high - strength bolting to be special inspected (Sec. 306, UBC).
10. Any new ceiling grid and light fixture installation is required to meet lateral
bracing requirements for Seismic Zone 3.
11. Partition walls attached to ceiling grid must be laterally braced if over eight
(8) feet in length.
Readily accessible access to roof mounted equipment is required.
13. Engineered truss drawings and calculations shall be on site and available
to the building inspector for inspection purposes. Documents shall bear
the seal and signature of a Washington State Professional Engineer.
Any exposed insulations backing material to have Flame Spread Rating of
25 or less, and material shall bear identification showing the fire
performance rating thereof.
15. Subgrade preparation including drainage, excavation, compaction, and
fill requirements shall conform strictly with recommendations given in the
soils report prior to final inspection (see attached procedure).
16. A statement from the roofing contractor verifying fire retardancy of roof
will be required prior to final inspection (see attached procedure).
X. All construction to be done in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washington State Energy Code (1990
Edition), and Washington State Regulations for Barrier Free Facility (1990
Edition).
18. All food preparation establishments must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Health Department inspection should be made by
calling King County Health Department, 296 -4787, at least three working
days prior to desired inspection date. On work requiring Health
Department approval, it is the contractor's responsibility to have a set of
plans approved by that agency on the job site.
19. Fire retardant treated wood shall have a flame spread of not over 25. All
materials shall bear identification showing the fire performance rating
thereof. Such identification shall be issued by an approved agency
having a service for inspection at the factory.
20. Notify the City of Tukwila Building Division prior to placing any concrete.
This procedure is In addition to any requirements for special inspection.
21. All spray applied fireproofing, as required by U.B.C. Standard No. 43 -8,
shall be special inspected.
22. All wood to remain in placed concrete shall be treated wood.
23. All structural masonry shall be special inspected per U.B.C. Section 306
(a) 7.
Validity of Permit. The issuance of a permit or approval of plans,
specifications and computations shall not be construed to be a permit for,
or an approval of, any violation of any of the provisions of this code or of
any other ordinance of the jurisdiction. No permit presuming to give
authority or violate or cancel the provisions of this code shall be valid.
25. A Certificate of Occupancy will be required for this permit.
CITY OF TUKWILA
Dept. of Community Development - Building Division
Phone: (206) 431.3670
6300 Southcenter Boulevard — #100
Tukwila Washington 98188
a
PLAN REVIEW
PLAN CHECK
NUMBER
qt- losA4
PROJECT: V A LC
GRA1PH Lc. S
ADDRESS:] Q A i D m.l e k 1) 14, E
DATE: toa
7. 0 , 1 cit. ct 1
m.M.)up4e. TV a. N: Altair/A. r:›oc:57-
Pte. use
GENERAL NOTES
APPROVED
pressure available.
2. Itinimme natural gas pressure required to the afterbcrner is 2 PSI.
3. Natural gas required for start--up 44• Cis.
4. Natural gas required for normal operation 300'
based an 700 degree operating tamp. and 350 degrees dryer exhaust
without solvents.
5. Control faceplate to be mounted in press console or SEC will
provide enclosure fore remota mounting.
4. Appr•oximata unit weight 7700 •
7. .Ductwork: nieimem cross section of exhaust duct to afterburner is
1.25 ft'. All duct runs betveen system caepooeots not to •
exceed 2` M.C. static pressure loss. Exhaust volume 2.000 SLIM.
All ducts anst be welded airtight and be insulated for 450 degree air.
W3 galvanized metal to be expooed to airstream.
•
B. Catalyst: heavy metsls, chloroaated hydxocaraoa- silicones, sulfur,
pbospboroos and particulates are knave catalyst poiiens. Their
presence shorten catalyst life_ Passing any solvents through the
catalyst at less than operating temperatures will create a fire hazard
f. Static pressure requirement for Dryer - Aftei±ure r system is 14' W.C.
Add -on heat recovery devices will require addit•innat static prersure
allowances.
10. Thu exhaust fan requires a 1S EP motor: and coatesttoa blower has
a f(2 • liP motor. Plant voTtagn is
TEC control voltage is 110 /60/1.
Eve regal:etaenta are 17 total.
11.
12.
Required from Cast:ser:
1. Kinineee opening through vhich equipment must'be transported -
56 -• width : 110 - • height.
2. Paint; standard color is rich breve,. l3 otters color is desired, please
specify .. .
3. Inaurancs covera.gs by
tepee.
t
$3-•423 v :CV
PARTS UST
OTT SY1-1906 DESCTIPTiOel
PE5SURE TAW'
RECEIVED
CITY r7t: IKWILP
PERMIT CENTER
- PRINT
ALTERATIONS TO AN EXISTING BUILDING
ELECTRICAL PLUMBING
DAVID KEHLE
WALL TYPE SCHEDULE
DOOR SCHEDULE
FINISH SCHEDULE
GENERAL ARRANGEMENT
ELEVATION