Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit 0550-M - PARKWAY PLAZA WEST
0550-M 91-122 PARKWAY PLAZA WEST HVAC 17501 SOUTHCENTER PARKWAY . ::: M D T •N . - 1988 FIRE PROTECTION: Sprinklers ( )Detectors (X)N/A CONTRACTOR: TRC Inc. 'PHONE: 575 SWNDITIONS (other than noted on or attached to p rn_eStligal& : 98188 INA APPROVED FOR i BUILDING ISSUANCE BY: i AHIMET.....)--■ OFFICIAL DATE: 1 hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit. SIGNATURE: att G A., eL,L)A-- DATE: V PRINT NAME: ( pl c ), v.,..,v COMPANY: 1 C . PROPERTY OWNER: Renton Village Management PHONE: 7714= ADDRESS: 15 South Grady Way, Suite 240, Renton, WA IZIP: 98055 CONTRACTOR: TRC Inc. 'PHONE: 575 ADDRESS: 946 Industry Drive, Tukwila, WA IZIP: 98188 INA CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431-3670 MECHANICAL PERMIT NO. 0.5 5 0- m DATE ISSUED: — 6-9 4 X 1 - Rough-in/Vents/Ducts 431-3670 2 - Fire Final 575-4407 3 - Planning Final 431-3680 x 5 - Mechanical Final 431-3670 (POST WITH PLANS IN A CONSPICUOUS LOCATION) MECHAPICAL PERMIT Basic PermitE' Unit Fee T TAL: Plan Check No.: AMOUNT RE 91-122-M JJ SITE ADDRESS: 17501 Southcenter Py SUITE NO. P • kIMAI TYPE OF WORK: • DESCRIPTION OF WORK: Parkwa Plaza West New/Addition Modifications X Repair Other: Change PVC hydronic piping to copper piping. VALUE OF WORK: 61 500.00 • DATE DATE(S) REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE ISSUED OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732) Electrical - Washington State Department of Labor and Industries (277-7272) This permit shall become null and void if the work is not commenced within 180 days from the date of 1 issuance, or if the work is suspended or abandoned for a period of 180 days from the last inSpection.• PERMIT NO. 0550- N1 CONTACTED L-e- 1 ' 1 Q ssa. DATE READY _ G DATE NOTIFIED —7 {n q `-B ,-.per, PERMIT EXPIRES ) ' ,) 2nd NOTIFICATION BY: (init.) AMOUNT OWING 1 " 5l • CDS 3RD NOTIFICATION Bit ) MECHANIC`. PERMIT APPLICATION TRACKING PLAN CHECK NUMBER "1% PROJECT NAME SITE ADDRESS INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". DEPARTMENTAL REVIEW "X" in box indicates which departments need to review the project. DEPJ .RTl 1 1�:::;:,::: O FIRE O PLANNING O OTHER INIT: INIT: INIT: RO ' 4 BUILDING - initial review (ROUTED) BUILDING - final rnviAw ( — U — � INIT: REVIEW COMPLETED `7 -t (-91 CONSULTANT: Date Sent - <REQ FIRE DEPT. LETTER DATED: ZONING: SCREENING REQUIRED? fYes 11 No REFERENCE FILE NOS.: UMC EDITION (year): Op* SUITE NO. !.. CM .....:.............. . Date Approved - FIRE PROTECTION: Sprinklers Detectors INSPECTOR: O N/A FAR/LAND USE CONDITIONS? )Yes (1No 09117/90 PROPERTY OWNER reet+)0 U iii" 7 GWl �ji ..AMOUNT.:. PHONE .07.Js3 �-,3cza:nn ADDRESS b--* 5 • (7 a.c1,ci c� u'I+� `` zq, ZI Pef�s -s I ! CONTRACTOR --- �� l'7 ! ct i • PHONE 6 -- i? al ZIP qe /8 S ADDRESS 47 -1 -vlC bri v&• WA. ST. CONTRACTOR'S LICENSE # -- d= A * 17 1 a N EXP. DATE I 1 19 DESCRIPTION ..AMOUNT.:. RCPT:. '":: DATE BASIC FEE :k l'7 ! ct i • UNIT(S)' FEE . PLAN CHECK FEE _ ;; ` „: . OTHER• « ::TOTAL - 1'-{; fat 5 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 PLAN CHECK NUMBER APPLICATION MUST BE FILLED OUT COMPLETELY SITE ADDRESS PROJECT NAME/TENANT 2-k/) TYPE OF WORK: ❑ New /Addition DESCRIBE WORK TO BE DONE: aincal e BUILDING OWNER SIGNATURE OR AUTHORIZED PRINT NAME OF>`UNITS AGENT J((1. SUITE # 0 Modifications BUILDING US (9ffice, warehouse, etc.) 11CL, NATURE OF BUSINESS: WILL THERE BE A CHANe IN USE? p.,No ❑ Yes IF YES, EXPLAIN: ADDRESS q 6646 Trr�� CONTACT PERSON 7771-c-kseysl f� MECHAG ]CAL PERMIT APPLICATION Mechanical Foe Worksheet must also be filled out and attached to this alication. :Repair VALUE OF CONSTRUCTION - $ 4 co ) 5 c o. 00 ❑ Other: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? No ❑ Yes IF YES, EXPLAIN: .EREBY CERTIFY TMAT i HAVE READ ANC EXAM INED THISr APPLICATIQN I UE AND. CORRECT, AND I AM AUTHO RJED APP V FOR :THIS :PERMIT;< FEES (for staff use only) DATE DATE APPLICATION ?XPIS 6)Q Vil THE;SAME. PHONE „ CITY /ZIPsetaV cm/gig PHONE 5 ti APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. If you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431 -3670. DATE APPLICATION ACCE TE SUy3MITTAL CHECKiIST MECHANICAL E Completed mechanical permit application (one for each structure or tenant) El Two (2) sets of mechanical plans, which include: • Floor plan • System layout • Elevations (for roof mounted equipment) • Heat Loss Calculations C Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) Note: Hood and duct systems require a building permit for the duct shaft. DESCRIPTION UNIT COST NO OF UNITS X TOTAL COST $15.00 BASIC FEE SUPPLEMENT PERMIT FEE $4.50 1 Installation or relocation of each forced -air gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h. $9.00 x 2 Installation or relocation of each forced -air or gravity -type fumace or bumer, including ducts and vents attached to such appliance over 100,000 Btu /h. $11.00 x 3 Installation or relocation of each floor furnace, including vent. $9.00 X 4 Installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included in an appliance permit. $4.50 x () Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 I D X le)". 7 installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu /h. $ X 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 x 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu/h. $22.50 X 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 x 11 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56.00 X 12 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 X 13 Each air - handling unit over 10,000 cfm. $11.00 x 14 Each evaporative cooler other than a portable type. $6.50 X 15 Each ventilation fan connected to a single duct. $4.50 x 16 Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 Installation of each hood which Is served by mechanical exhaust, Including the ducts for such hood. $6.50 X 18 Installation or rebcation of each commercial or industrial -type incinerator. $1 1.00 x 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 x 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee Is listed in this code. $6.50 x 0111W90 SUBTOTAL 105,00 PLAN CHECK FEE subtotal) Q4 GRAND TOTAL $ I 1, a-5 CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. MECHA1 CAL PERMIT FEE WORKSHEET INSTRUCTIONS Co mplete the worksheet, Irtd loafing the n u m ber of units being stalled in each category. At time of bmittal, staff will calculate the fees. CITY OF TUKWILA 6200 SOUTIICENTE R BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #91- 122 -M: Parkway Plaza West 17501 Southcenter Py PHONE 11 (2061 433.1800 THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER Or . 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 3. All high - strength bolting to be special inspected (Sec. 306, UBC). 4. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing, the fire performance rating thereof. 5. All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington State Regulations for Barrier Free Facility (1989 Edition). 6. All spray applied fireproofing as required by U.B.C. Standard No. 43 -8, shall be special inspected. 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. Gary I.. VanDuscn, Mayor PROJECT: -� r ,A,q) ��Gi PERMIT NO. �cj — ,JY) '� C- SITE ADDRESS: �� `� P V \r x? DATE CALLED: TYPE OF INSPECTIO ' .,,L'n - DATE WANTED: �`•�'- SPECIAL INSTRUCTIONS: — REQUESTER: ignsamim PHONE NO.: ' 7'3 -- CD 7 INSPECTION RESULTS /COMMENTS;---- -- -- , _.. q' q - a/ 0 ki _ , DATE: 1 - 3-- INSPECTOR: pr CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 ( INSPECTION Nw' RECORD 1/ 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: (M/ ( r~ 1 . AZ - c.-..) PERMIT NO. 25U'. ►rte SITE ADDRESS: 1 b ( P C- �, L � q , DATE CALLED: ,„„, TYPE OF INSPECTION: I rr If DATE WANTED: � SPECIAL INSTRUCTIONS: .; ,:::; , �, I c L . ;� ,, , , � � 7�' ' f REQUESTER: f, , I PHONE NO.: , -.-- ai/ ! INSPECTION RESULTS /COMMENTS: "" t iq -- ?./ .1 FkAt r f 1 ....s.,- .e.;".- -i-t, Is..R. { . _ 5t- / d _ .'1 DATE: �" I " / INSPECTOR: C1 > �� ' - ■: INSPECTION RECORD CITY OF TUKWILA Dept. of Community Development - Building Division Phone: (206) 431 -3670 6300 Southcenter Boulevard — #100 Tukwila Washington 98188 PROJECT: Fir#44.04" PERMIT NO. Q S.50 "sYV\ SITE ADDRESS: 1'7$O\ QµtAtml bWD. DATE CALLED: 1 - Q/ TYPE OF INSPECTION: SWV. "Ve.d� DATE WANTED: V•• 9 I • I ' ; m m . SPECIAL INSTRUCTIONS: < tcrolt d elmie. REQUESTER: J „ �,N PHONE NO.: 5?S- 6 711 INSPECTION RESULTS /COMMENTS• DATE: x' 'II INSPECTOR: �..- ---- ..gi CITY OF TUKWIL.A Dept. of Community Development - Building Division Phone: (206) 431 -3670 INSPECTI41 RECORD 6300 Southaenter Boulevard - #100 Tukwila Washington 98188 PAN REVIEW COMMEi. fS Plan Check No.: Y22- AA Project: ` mo t'" L�. Y V ST REQUIRED INSPECTIONS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. X All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 2 All high- strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. X Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). X All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. )< 'AIl spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 P )a) 7. .,• Validity of Permit. The issuance of a permit or approval of plans, ` specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. 1. Footings 2. Foundation 3. Slab /Slab Insulation 4. Shear Wall Nailing 5. Roof Sheathing Nailing 6. Masonry Chimney 7. Framing 8. Insulation 9. Suspended Ceiling 10. Wall Board Fastening 11. , . " 12. 13. 14. Fire Final 15. Planning Final 16. Public Works Final N/ 17. Building Final PAN REVIEW COMMEi. fS Plan Check No.: Y22- AA Project: ` mo t'" L�. Y V ST REQUIRED INSPECTIONS No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4722). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries, and all electrical work will be inspected by that agency (277- 7272). 4. All mechanical work shall be under separate permit through the City of Tukwila. X All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 6. When special inspection is required, either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. 7. All structural concrete to be special inspected (Sec. 306, UBC). 8. All structural welding to be done by W.A.B.O. certified welder and special inspected (Sec. 306, UBC). 2 All high- strength bolting to be special inspected (Sec. 306, UBC). 10. Any new ceiling grid and light fixture installation is required to meet lateral bracing requirements for Seismic Zone 3. 11. Partition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 12. Readily accessible access to roof mounted equipment is required. 13. Engineered truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State Professional Engineer. X Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 15. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure). 16. A statement from the roofing contractor verifying fire retardancy of roof will be required prior to final inspection (see attached procedure). X All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 18. All food preparation establishments must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19. Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20. Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. )< 'AIl spray applied fireproofing, as required by U.B.C. Standard No. 43 -8, shall be special inspected. 22. All wood to remain in placed concrete shall be treated wood. 23. All structural masonry shall be special inspected per U.B.C. Section 306 P )a) 7. .,• Validity of Permit. The issuance of a permit or approval of plans, ` specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. 25. A Certificate of Occupancy will be required for this permit. REVISION FACILITIES DEPARTMENT COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTL, WASHINGTON 98124 98124 INDOOR ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED KEY PLAN CONSTRUCTION NOTES GENERAL NOTES • FT> COMPUTER ROOM A/C UNIT ON RAISED FLOOR. LIEBERT MODEL FD-240G GLYCOL 72°6 SENSIBLE REVISION A INSTALL 2 EDPA: MON A/C NITS :66#86Z115 -0t. VATOR FACILITIES • DEPARTMENT I`OMMERCIAL AIRPLANE COMPANY The Boeing Company 98002 ' . 98201 ACCEPTABILITY.:: THIS DESIGN AND /OR SPECIFICATION IS APPRt1'VED APPROVED ®Y. DEPTT ATE PIPING PLAN PLAN KEY PLAN CONSTRUCTION NOTES SYM • REVISION BY APPVVED DATE SYM ' . REVISION APPROVED DATE , ' . . .., .-: ., . - , .... ‘ . __ .4%, - -' -'''- COMNIERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE. WASHINGTON 88 124 DEPARTMENT . • 98002 98201 98055 . 98124 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN BY - r3 .5.GAgvw f DATE . . SUBTITLE PIPING PLAN LAST REVISION Mr" DATE SHEET 7 OF ,,,, • AUBURN, WN. — - CHECKED H V AC E EVERETT, WN. .I 0 RENTON, WN. APPROVED BY DEPT. DATE 11111 .11 H C „f A.PPP APPROVED APPII. • D . -41 .6. S'-tr,fr TITLE M E BLDG.7 gl EVit...ER COL. A I I 20 PLAZA FACILITIES __ ......_ • . JOB NO. SEATTLE, WN. . . DWG N° ' 107 wit 0 le M$ INCH 2 3 4 Aorpouroloorarawastwome. 06 6Z Eld Z.Z 9Z SZ CZ ZZ LZ 0? 6! Ell LI. - 1111111111111111i111111ditiMIIIN111111111 IM1101111111111111 - 1”711.1111•11=111111n1.7116. 11111111111E11111111 11 11111 111i11111111111111 pi 6 7 8 NOTE: If the microfilmed document is less clear than this notice, it is due to the quality of the original document. 91 St V: Et et 11 01, 6 8 itill111111111111411111111111111111111111iiIIIIIIIIIIIIIIIIMIllitilinlinnhinildilil , - "---,; !,/ !,!:..1 . ' iV •1:2f 4 °,7 ::! . '74:4V,'41,1i ;-4'. ' ' , • .! , e ; ' , tr -,- ,,, ,,,..• 1 1112101011■111111111111, 1 lip 1- 11 1 11111111111111111111111111111111111111111 9 t 10 11 "" 12 0 • • , ILONSINI■11. • KE.Y PLAN . THIS DWG . VOIDS oRIGINP.L. CONTI DA/G. BY ALI— 1 CD 51—tE.E:r ME:TA-L. INC. JOB al7 19a0 M-3 4 B.m.N.c. # 107-107_ 4000 GENERAL NOTES RECEIVED CITYOFTUKWILA JUL 9 1991 PERMIT CENTER 0 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED SY DEPT. .DALE DRAWN @Y ERFI CHECKED APPROVED APPROVED 3 -/1 -85 TITLE BLDG. 7 MECHANiCAL MASTER COL .1 - 18 /L °V PLAZA JOB NCI. LAST REY9SION SHEET COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE, WASHINGTON 98124 FACILiT1ES DEPARTMENT 98124 GLYCOL COOLED SUBTITLE KEY PLAIN SCALE: 1/8 HVAC PIPING PLAN LEGEND SANITARY VENT COLD WATER (C.W) HOT WATER (H.W.) WASTE FLOOR DRAIN (FD.) GATE VALVE GLOBE VALVE BALL VALVE CHECK VALVE UNION GENERAL NOTES I}NE,W COMPUTER Room A/C LN1'T ON RAISED I-L.00R . CONTEMPO MODEL # CEMC 1034 C." - 10 TON GLYCOL COO1-.ED. 72 /Go F, SCNSIBLE. 103, 200 61 /HR 5,000 CF q(oO V, (oO cY, 3O , 32. FLA L= 53.5 ) W'- 34 x H =73 x MIT. = 1300 L.135 S uPPLV, I %2 1P5 RETUP.N 172 I P5 DRAIN 3/4" OD 5, HUMIDtFi r l/" a)THts DvwC,. vol DS ORtGINP.L.. CONST. DWG. BY A Lt_ It~D 5I -rtE7' MCT 1 t►.,C. J0137. 19a0-m-3 CONSTRUCTION NOTES • , • EI\ovE, EXIST EDPAC A/C UNIT AND INS'T'ALL NEV,/ 10 r ON CONT' MPO UN►T N AME LocAT1ON. ,....,, INSTALL PalZFO ATED COMPUTER FLOOR~ PANELS' WHERE (`1EW UIPIvis J 15 To E. MDIJ NTE D. U51 2 f3^4/ L.$ IN FRa i`J ,4t4D . a PA N E LG B6HitWp WHt It MACH/ INTAKE AND exH,4IJST I.5 LOGATE tai RECEIVED r.ITY OF TUKWILA JUL 9 19SI PERMIT CENTER 4 APPROVED DATE REVISION BY APPROVED REVISION WOMEN ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED SY DEPT. .DALE DRAWN @Y ERFI CHECKED APPROVED APPROVED 3 -/1 -85 TITLE BLDG. 7 MECHANiCAL MASTER COL .1 - 18 /L °V PLAZA JOB NCI. LAST REY9SION SHEET COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE, WASHINGTON 98124 FACILiT1ES DEPARTMENT 118002 98201 98055 98124 N4ATCH LINE RA15ED FLOOF GLYCOL COOLED OR AIC PtPfmG COra1Jrz. CTIOIIS SEE. OETA1 L M8 M9 SUBTITLE KEY PLAIN SCALE: 1/8 MO MOO OM& Ali MM. MI6 allt. — CW CI • HVAC PIPING PLAN LEGEND SANITARY VENT COLD WATER (C.W) HOT WATER (H.W.) WASTE FLOOR DRAIN (FD.) GATE VALVE GLOBE VALVE BALL VALVE CHECK VALVE UNION GENERAL NOTES I}NE,W COMPUTER Room A/C LN1'T ON RAISED I-L.00R . CONTEMPO MODEL # CEMC 1034 C." - 10 TON GLYCOL COO1-.ED. 72 /Go F, SCNSIBLE. 103, 200 61 /HR 5,000 CF q(oO V, (oO cY, 3O , 32. FLA L= 53.5 ) W'- 34 x H =73 x MIT. = 1300 L.135 S uPPLV, I %2 1P5 RETUP.N 172 I P5 DRAIN 3/4" OD 5, HUMIDtFi r l/" a)THts DvwC,. vol DS ORtGINP.L.. CONST. DWG. BY A Lt_ It~D 5I -rtE7' MCT 1 t►.,C. J0137. 19a0-m-3 CONSTRUCTION NOTES • , • EI\ovE, EXIST EDPAC A/C UNIT AND INS'T'ALL NEV,/ 10 r ON CONT' MPO UN►T N AME LocAT1ON. ,....,, INSTALL PalZFO ATED COMPUTER FLOOR~ PANELS' WHERE (`1EW UIPIvis J 15 To E. MDIJ NTE D. U51 2 f3^4/ L.$ IN FRa i`J ,4t4D . a PA N E LG B6HitWp WHt It MACH/ INTAKE AND exH,4IJST I.5 LOGATE tai RECEIVED r.ITY OF TUKWILA JUL 9 19SI PERMIT CENTER ACCEPTABILITY THIS DESIGN AND/Oft SPECIFICATION IS APPROVES APPROVED BY DEPT. .DATE DRAWN B !1A a t -7 SUBTITLE LAST REVISION SY O DATE SHEET OF CHECKED toy I VAC PIPING P L_ A N CH /.., • i .S-1. — TITLE MECHANICAL MASTER BLDG. 7 COL. A — T/ II - 20 • • PLAZA :;:::; . JOB NO. -ft DWG "do 7- 107 -4503 ,; ,: I i II I I { I I I I I IIII ;I IIII1111 [rill r11 l ... 11 111lIILli JI.LI'II1 I I I LI I1 1 I IIII 0 to MS INCH 2 a 3, 4 5 ! 6 7 8 NOTE: If the microfilmed document is less clear than this ■ notice, it is due to the quality of the priginal document. 06 se sse GU 9Z 5Z •I, ; £Z ZZ l Z 0? 61 9l Ll 91 51 ht £l Zl u b� 6 wrl 0 ! ' I I ( i s I I f ( I II ( ! i !!Iffi!Ii Illi�lfll illl�llllllll (I ilii�if!L�Ii,l�Illl I�Il�Il.il !flillll! !lli�lii! 111�lliil� rlllfllf! II!!Illi!�!IIIU! I!fl�Ilil ili�lli!I !i!!I!!I�!!I!I!I!II!I!�!I!! I I +ili II II !! 1 I t `` : t x :,,, ..: :- .n.. „ ._ �.,,..: � . Iii ! lIIIfli iillIIIIli!!!,iii! IIII�liinliiiiiaf !I lIiiil!i!!liiiihin !III�!I!II!!!I :., , r , ... . £ .... a. ,. , 4 ; : :, � IIIIiI,�.li.11 Ili tirt � fi. 1 . v .,, a., - .;• •.., �4, ..L r�.., r r . '� z, t. f J .,y S 7''; .� s, '.-v r s r.. .. . <; n r G. 'd: S>�•,{_l.� -.,r 1�' .,.✓'.. �/ .r.�19'' r1. !Sx .�. ..,, �.x., :....:. ,... -a -... .. <., ,. .r. ..._ ,... ._ -�i .- ...w.........} .. ,.:,.. 3'' &. s ".f r.,..r. , < ,X'� ±' r.,'r rr. ,,: •e:c.• � ,e�.,t',e, « >''n�. s s :a. -. ta,+" :v'�' �.r`; .� ., _. ..R - + ■ /, 4�. -,v ,r!J�3�'.�.ar.P rS ✓�,1�` ;f n � r i ':£� ,� r,. ;C�; • . � .. f.. .. . *.,,. .. ... .... ,.r , -. . �: , -r. ..a3.r fi,- � .. �,, f , a " _:. ., .. -. , -, _ :. ._. ...: _v..,._... a .. i.. .. _. .. .. _.,._.,..,... ,... ,.._. -. ._... sl•�.C.a.* .. -_... ......w'�✓ .,. .._ ... ,.._ _v.- ,.;ri.. .,. ... .. , . .. _..� ... s�:�]�.a �•.. 1. � ..e...�.4 �.. s:r u. .... ..•.. r.. .e .. ..r .J1'` .... ._ / 1200 C.>✓ Z u "&,/11 (DUO C FMI PLAN VIEW SCALE: 1/8'= 1 O" APPROVED. DATE FACILITIES DEPARTMENT COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE, WASHINGTON 98124 AUBURN, WN. 98002 EVERETT, WN. C] RENTON, WN. 98055 kW SEATTLE, WN. 98124 98201 11 I , h KEY PLAN GENERAL NOTE S I.) TH15 DwG vOI D5 ORIGINAL CoN5 — r DWG. By SHEE.T rA13. %NC. JOB ?' 4920 BHT. NA r3.M,A c f# 107- 107 -4CaoO RECEIVED CITY (WTI JKWiLA JUL 9 1991 PERMITCENTER t. � t' V j l.. 0 0 Ia 0 a c APPROVED MATCH LINE PLAN ACCEPTABILITY . THIS DESIGN AND /OR SPECIFICRTION IS APPROVED APPROVED BY 1 DEPT. w•. n.+ nr�w r ..s.wa+ w - ..�.. TITLE SYM REVISION BY 1 APPROVED DATE 1 $YM C.? C.)0 O G P M FACILITIES DEPARTMENT \I". `rCJR COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Comnany SEATTLE, WASHINGTON 98124 98002 98201 98055 98124 CHECKED .DATE APPROVED APPROVED LAST REVISION SHEET JOB N6. LWG N°.107-107-4503 sufiTITLE ft_gzi BLDG. 7 01 KEY PLAN • 1 1111111 1 1111' 11 [.11 3 0 18 THS INCH 2 111111111111111101101111111 111111 I 111111111 "111111 1 1' __. 6 _,.. 7 8 microfilmed document is less clear than this due to the quality of the original document. oc 6Z 8C LZ 9Z SZ ; CZ ZZ lZ 0Z 6l 81 Ll 91 GI hl CI Zt It OL 6 8 4 IIIt,1 111!!II!II111 !I!i !1! I'l1II! 11111 IIfit!111 1111111111IIIII!!I 11111111 !!1!II1!!I !1.111!1!! !!!!II!!! 1! 11!lif!1111!!1I1!1111111111 IIIIII1!!IIII!II!!!IiI!11T111 (!!1111?! 1!I1111!I !1!III!iIiIIIII!!II 1 !!IIIII!�!IIIIIIIIIII!!IIIIII !I !III III � `. wI11117 II III1li11I11 9 10 11 SIN° 12 i. THIS DWG. '✓O►DS OR t( ; 1NP.L. CONS DWG. ay P\t-A -1CD 51 -A'1 1'\ T /'L. PACs. tNC.. JOB 4 11 9 20 HT. M C f3 /'..t.. 107-107- 9000 HVAC PIPING PLAN MECHANICAL MASTER COL.I - 18/ L °V maw GENER i\L. NOT e:5 RECEIVED CITY OF T JUL 91991 PERMIT CENTER PL AZ 0 m 0 Ws, REVISION BY APPROVED DATE EYM REVISION IKI&TAI.I. 4 PALL YAM Me 850239'04- APPROVED 11.21, -e E VeNTOIRS,krizes,v POOP, FACILITIES DEPARTMENT Acciw�,� D vUr� COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE. WASHINGTON 9t3124 E2; 1Z oe, 61. 8L L 9t St bt Cl Et ilIIII I:111111 11111iIIlllfillllll llillllllillllllll�l llllliflliffll fIlll llll11111,1,1;111101111f1 lf x�it �'�y `ytali:�1 u> r ,✓ .. �f .r. '�;. � ,�?.. �• .. ?...�, 3fs,',i .. _i.�'xl�+N'. t° .f yt+ wiliiiiiiiiiippitypif Ii1'i i 1 FrilIi IIrt 11 fl'jLII1.11I I1I1� 1 -1II(l , ii , !i 'ij' 1 3 4 5 6 7 8 NOTE: If the microfilmed document is less clear than this notice, it is due to the quality of the original document. 98002 98201 98055 98124 II 01, 6 6 I IIIIf11I11IIII111111 I1I{illi111111llli.11111 � i:. PLAN 1/8"=1 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE. APPR. VED APPROVED DATE , SUBTITLE GENER NOTE -5 I.� THIS DWG. VOIDS ORIGINAL_ CONST. Dv✓C:. EiY AL META`. I= A(3. INC J 013 # 9a.o SNT. M -( 4 I`3 M.A.C. AT 107. 107 4000 c , o Ns - N u e ION 1\10 s i IOSTA LL 4 I501 -AT10N SA LL Y4 LV Ti2u� U'iloN cor'r CTIoN KEY PLAN NVAC PIPING PLAN PERMIT CENTER J03 NO. LAST REVISION TITLE ci MECHANICAL MASTER BLDG. 7 COL. A -T / 11 20 PLAZA �i. DWG " 1 07 i 07 a 4504 fGV J 0 a) 0 0 APPROVED ` WOMEN APPROVED BY DEPT. i.DATE CHECKED APPROVED SUET /TALE CONSTRUCTION NOTES I { N5 T - ALL I L vim• SUPPY* !RETURN LINES TO M /IN LINCONMPL - rE W/ISOLAT,OAJ VALVES AT HEAT" PUM (1,J5-T"kLL )VLn PVC coND. DFZAI►''J LINES TO HEAT FUMFos cc) m 3 a�r w/T '. LAST REVISION SKEET Jos NO. OWG "G '107-107- 4 504 H VAC PIPING PLAN D 6-24-87 SYM REVISION IFIROMM11•1112M1111101MMI ="11•111•171.711M9 nti • • • A D 1 fkEVISION \M8 M 107 - IO7 -4511 ADDED HEAT PUMP XA -43 J iY 850230 I H.CTAU. 1541, iT i7VA4vC , i It;•1 r' tttiAr Ptl MPBi REROUTE PYC "WIPE TO HEAT PUMP U015 81016,o -02 ADD T-wo HEAT PUMPS e U(o if87O3�, 11•1011110- APIINIMIIIIMIIMOWINMESAVA ' 1/ • A • 0, COA4MERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE, WASHINGTON 98124 FACILITIES DEPARTMENT t 1 • 0 AUBURN, WN. Q EVERETT, WN. 0 RENTON, WN. SEATTLE, INN 98002 98201 98055 98124 '==-/ PLAN SCALE: 1 /8 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN i bAT G? PPE TA `l- TITLE BLDG. 7 MECHANICAL MASTER KEY PLAN COL.!- 18 /L PLAZA RECEIVED CITY OF TUKWILA JUL' 9 `6' i PERMIT CENTER >s;.r "ti • k --. . CAL RA.C. NOTE 1.) c DWG. V0105 ^! 1c)INI .;._ CON ST, DWG. By ALLIED 5t rim's- INC. JUG /7 4920 I`�l-Co• . I3•M.AC IO7 t07-1o0O 0 0 ca 0- .-1 0 VD o 0 0 iro G REVISION CAKRII N APPROVED DRAWN BY r3.5. GARDNER CHECKED CONSTRUCTION NOTES REPLACE EXISTING HEAT PUMP WITH NEW CU MATE MASTER MODEL it BR-042. REU5E F"XI5TU4 G HANGER RODS C HUNTING HARDWARE. RECONNECT NEW UNIT TO EXISTING WATER AND CONDENSATE LINES, SYMBO' SHEET .0B NO. LAST REVISION FACILITIES DEPARTMENT COMMERCIAL AIRPLANE COMPANY A Div.sion of The Boeing Company SEATTLE, WASHINGTON 92124 98002 98201 98055 98124 MATCHUNE: ( ACCESS cr1 `, )OCR ACCEPTABILITY THIS DESIGN AND /OR • SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE 4- () SUBTITLE TITLE BLDG. 7 KEY PLAN OMMIOlirmonl • 14 -0 I 4 %L C� COL ..11 /A - T I .) TH15 D' AV . \/O►D 5 ORICat W /\t_ CQNST. Dv'Jc,. BY. ALLIED c•ShE E:r METAL_ F.•13 INC. DWG. 77' .4920- M r3 M f3 C. t2 107 - 107- 4 000 6. al HVAC PIPING PLAN MECHANICAL MASTER GENER P\1_ NOTES I -5 vs RECEIVED (ITV of TUKWILA JUL 9 1991 PERMIT CENTER PLAZA 0 f,1 I ' , 3 /'I/B .IV 0 0 0 s cyxc /xw -Os CYXC - 09 CGX'N -08 MMEO ;(DE 72, 300 7E,300 "72 'IB000 I " /)►R 1 r DETAIL 3 -19.85 REVISION K 11‘1'TR I.I. NEW 1 V4" CIAIIIEN trTE 1)KAI N PIPE NV Pg0')21 -•CZ 15 r_ R • RE MOve:0 GLYCOL_ PI PIt4G. (SEE 51AT- M-4) G ADDED A /c. DRAINS (=Xt5 F AS - P.SOtLT• CCMPOTER RM A/C 1_ . S 8 .5. G. BY APPROVED DATE IIIIIIJ 2.I 11 111`111111IIII111II 1 0 ioIRSINCH 1 2 r OE 6Z 8e LZ 92 GL 4 7 , 2 / CZ ZZ 12 OZ 6S 81 Lt 9E G +�t ( II�11IIlIIIIII�III _Ilillllllli 1111 111111111 (Ill llill111 1I1111 111111! 12.�111il�llill lliilll111111111111IIIIIIIlII111iII1 r Y� r� Z . J• � C x -� � (� r� � �l1< �y +'L?> >� > f �' f S'jr � 5 'py.�' r j °f c. --. A.�r .. .,. t ,.' S .,.;:� is -., r..._:! S • 4,".. "y. ... '!/,�/."�...��r s,� { ...�.R.S 4...d� r.. J ,t;. III• Ii 1[1 III -f 111111111411111 I1 111I1 lilt , 111 5 6 .. ...,. 7 8 ttcroftl�Ied docurent is less clear than this due to the quality of the priginal docuient. ACC ES' DOOR II II It 01. 6 8 L 9 1111,1P11111111111 111111111 1111111 11 II11111111 1 11 litt 1 1 1 i 1 1 1! l!I 1 ,) i��"v�'.�ui1.^�>''..; f,2.. n ° ��1. >'?. ��.•�nrd�C��Tn �1.�% ,.�.��y,. 12 /i ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY 1 DEPT. APPROVED APPROVED DAT E 2.- 25 -8 SYM 8O SHEET SUBTITLE H VAC PIPING PLAN EaUIPmE/\Jt LI ST I) .i ,per C ItPACITY, 2° DB 40°F1013 A/C 1 CYXC- 05 47, 00 0 BTU /HR .. A/C UN I ••M Y2 COLD v1.1 IV ER %2 11111.1 AIRFI_OW (CFM2 ELECTRICAL HUMIDIF ICAT)ON ;800 440/60/3 10 LB/HR 4 0 4,400 •l,400 t 0 • 460/60/3 2(Jg/L't) />> 5�n l.ti' ?,f'4 "� / -o 12, LB /HR 12.sL8 /HR 12.5 L /H R N0NOME y - - t% bowl 4r" I �Ei1_Irl, PLrrv TYPICl1 L INSTALL/►TI()N 1 /a�'PETI s (P,T) N PLUGS C'JL l:ll'.II O G L`• ;G'U'I S u o) t 4 P$ < E.T LIR h) �- 1'/: 6.V l / Pi SE!) n FL C • -v- gin. L (t A MID RE T U ,1,7 Vr1LUC / 6VLl :Ai. REVISION REHEAT HOT GAS 31,200 67 HoT GAS 5'4 BTU /HR EL EC. ELECTfIC ; BY APPROVED DATE ' SYM F.1G 1I I -7,;1 INSTALL NEW /0 TO IV COMPACTAC REVIS,r A/C cm/ ir posI QNs 230064 -ze. REt ^s, 1_ • !t, 3715( �� iNi //J l L /ICU FYI' 1. rl7 C SeN /C 5 /TE 0 ri SUPPLY RLTURPJ HUMIDIFIER 1 "IP3 I" IPS 1/4" FLARE 1 IPS 1 IPS 1 1 /4" IPS 3/4 F pT REF • .S//EE \.j'l /Z FAR Ali RL V A. 1 "IPS I "IPS I I /4" IPS 3/4' r PT AM AIMMIONMZZO.I.Mnor 1/4" FLARE 1/4" FLARE I/4" FLARE DRAIN_ 7 /8 "oos 7 /8" O DS 7 /8" ODS o5 3/ :v'r FACILITIES DEPARTMENT GPM SLQI C / a.2 2 OPM t 70 A/C t» ' T o.) C ,1 1' Root; COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE, WASHINGTON 98124 ,...4.. ,..leu.— O AUBURN, WN. El EVERETT, WN. C] RENTON, WN. SEATTLE, WN. 1 I — 98002 98201 98055 98124 1 a MNTCH LINE. no •I • 5 Fl FTH FLOOR PLAN SCALE : I /a" = I' -0" i 53C� '1 �E- ---- 'C) ■ • C -Ft•}1 IACCE.'3 • DOOR i 0. G 2.2. 3 4 1/4 , TITLE BLDG. 7 / J - 4/z/1 r /z U • • 0 j.' EG"END " ' ... . ■ 4' 1 - 5 _I§ - -IIf -- , UNION r © MECHANICAL MASTER GATE VALVE ■."1!L., VALVE BALL VALVE CHECK - - VALVE 1 RECEIVED r.ITY OFTt IKWILA JUL 9 1991 PERMIT CENTER COL .1 /LV PLAZA S: NITARY VENT '1 COLD WATER (C.W) HOT WATER (H.W) WASTE FLOOR DRAIN •( F.D.) IINCIMINIMSOISNRISINAIa CONSTRUCTION NOTES INSTAII. NEW 1 C(1N11(NSATE ()FAIN PIPE AS 511 /MN.. G E N E KA l.._ NOTES . GLYCOL SUPPLY AND RETURN PIPING SHALL Gtr PVC $CH4O WITH SOCKET TYPE PVC ScH 40 FITTINGS. FITTINGS SHALL ESE JOINED USING SOLVENT WE.LDIPNG• 2. COLD WATER PIPING SHALL BE TYPE "L" COPPER WITI4 WROT SOLDER TYPE PRESSURE FITTINGS. ,JOINTS SHALL BE SOLDERED USING SO - 6O SOLDER, INSULATE WITH 1 /2" THICK PIPE INSULATION, 3. DRAIN PIPING SHALL BE PVC SCH. 40 DRAW PIPING SHALL f3E SLOPED '/4" PER FT, WARD DRAI 4. TO PIPE SOPPOP.T SUPPORT SPACII'J FOR PVC PIPE SHALL BE 5 1 /2' AND FOR 1 /2" COPPER SMALL �E 3 5, CHILLED WATER /21 PIPING SHALL BE GI.ALV. • STEEL. SCH 40 TO DISTI:ILUT - 10N MANIFOLD INSULATE INSULATE 1" THICK INSULATION. G T HWG /'...SNLI:."C MI`"IAL FAC3 (S D t 4 C_ . J VO 0 IDS 13 //' 41‘91.110c% H T M - CHILLER INSTALLATION NOTES, 1. CLEAN AND PRESSURE TEST SYSTEM PI PIiU . 2. FILL ZI WATER SYSTEM AND PRESSURIZE -T0 I PSI 3, PREPARE CHILLER FOR STARTUP TO RE SUPER - V ISED 6Y R.W. CAMPBELL CO. SEE CHECKLIST WITH JOB PKG. 4, PROVIDE CHEMICAL TREATMENT FOR CH!LLED WATER PER MAINTENANCE STANDARD PRACTICE. 5. BLEED AIR PROM CHILLED WATER LOOP WHEN FIRST INSTALLING WATER IN SYSTEM BY OPENING AIR VENT AT TINE TOP `4F THE CHILLED WATER COIL. O m 0 0 SYM REVISION BY APPROVED DATE SYM REVISION! BY APPROVED DATE A RF Dr•: AAr ✓N Q,p T �. Aid, �,.�,� -Z -�4 • +.'T. DRAWN BY CHECKED APPROVED APPROVED N SYM : Q 41a 1 114 n 1 �XH . SOO G FM N COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE, WASHINGTON 98124 FACILITIES DEPARTMENT cc 22 ACCE I7OOF', 7 poop" 1430 (-FM 4' C7 AUBURN, WN. [� EVERETT, WN, CJ RENTON, WN, NI SEATTLE, WN. 11 98002 98201 98055 9812€ WNW fa'�.lf:c�lix� MATC.H LIN PLAN I /811 -I1 -011 ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE SUBTITLE TITLE BLDG. 7°107.6 :,..., . � _'.. ; - .�' r '. � �'`'�,,� zw• :•� et ?:,�r ;. ar .-. � -�,'� a�s�FG' �r . - _1 � 't, ., y, � P i�IIIIII��iI (Ill�1IIII�iI� fIJ'�1�I�i,I�I(�If 'ffli�f�f I 1 I1�1 +IIijttI,I�f�`f'I!'ftIJI�1���I iii;Il�IIf� {�f�` II III 0 16TH5INCH 1 OE sZ ee 1111111III LZ 9Z SZ hZ CZ ZZ LZ 02 6L 8I LI 91 ' 1 1111Pi!IIJIIIj! 1 i i J i iJi!11IIJ �1IIIII IIII1111I111j111III III111111IIII!IIf iii J i i i ni I 'f K.• 2 3 4 5 6 7 g . NOTE: Lf the microfilmed document is less clear than this ` notice, it is due to the quality of the original document. GI. +7L CI ZL • it co, e, I ;II1111I! III! 11111II !I!!llllllillllllliI n1H11111111111111iIIIIIIIIIIII L. 9 5 ti E Z w I w (� 111111111 111111111 I! Iii! I! II IIII1! 11! / r i Kay PLAN HVAC• PIPING PLAN MECHANICAL MASTER GENERAL~ NOTE S 1. T1 DWG. VOIDS ORICGO\Ii\t. coNST. DWG BY 51 -10E7 METAL F"P■r• \NC. J013 4' 49 2.0 514 M- 15 c B. M A C.. A' 107-1 RECEIVED - (:ITY OF TI IKWIL.A JUL 9 i x PERMIT CENTER CO-L, A /II PLAZA LAST_ REVI SHEET M -7 JOB NO. DWG No. 107-107"4506 0 w 0 J 0 a ►- m 0 ac O APPROVED REVISION APPROVED DEPT. DRAWN BY CHECKED CPl .M >. APPROVED APPROVED SUBTITLE BLDG, 7 - 107.6 LAST REVISION H VA C PIPING PLAN MECHANICAL MASTER SHEET JOB NC,. COL.L 1 PLAZ DWG "'107-107-4506 .xl� �i7i+4:u3a REVISION ♦ DATE $Ivac ,8:r1 2 , 11 ReC.C??01.??,1W /�t; ,/e 0,/ NSTALL KAN UN' of 02PAC 0 IJI 1 ;7260 REDRAWN MRCS Geo. 8E4KW 1TH DWCi. 0 COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE, WASHINGTON 98124 FACILITIES DEPARTMENT v FM G+ 61 1/ 4 C� AUBURN, Wei. Cl EVERETT, Wit. D RENTON,WN. MI SEATTLE, WN. 98002 98201 98055 98124 MA( CH LINE 4ves•slto ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY PLAN 1 / 8 KEY PLAN 6-1 \\,,,OTES [1 — > GC)MPUTe PICDOM PLO MC)I -J IT �G'PA.G MG�P�l. C.GX G - Z ; 7V/4,90 ° /GoO 5t I5R qq 5 C i U / (&OOQ GPM, 4(oOV, 600.1, .5 0, 3(0.4 FL.�. . L.- G3 /7."" 4V= 31 4 HT: 7b WT = 1,50 LT'S Su PPL( 1 II I PS , r ,ET i.11 +v 11I 1 , , A I T °' M PT , `Ni R, 1/4" I PLAF,E 2. T1-1 DwG. VOIDS ORIGIN■L CONs DWG By At...uE:D 51- . . METAL r"'AQ, 1NC• JOB f 492 - 5t-M M - £ C3• M A C . 1o7. 107- `400 . Cow T LZI OI! r NOTL s; RECEIVED CITY OF TUKWILA JUL 9 131 PERMITCENTER • 7 2 , 1 0 1 WI 0 s 0. ac 0 1 ACCEPTABILITY THIS DESIGN SPECIFICATION IS APPROVED BY AND /OR APPPOVED DEPT. DATE nF2A N X,, D.IP, I�{� _ DAT 7•� SUBTITLE FIVAC PIPING PLAN . . ,..�... � LAST REVISION .. _ S DATE SHEET M 7 OF CHECKED Ch i .. • TITLE (�. MECHANICAL MASTER BLDG 7 - 1077 COL A PLAZL ::::: �. JOB N0. P eoy DWG NO. 107 - 4507 ' .... ,� H r � i► 1 VZ I ►� 4 • I � E�E VA1"Q ► .� COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE. WASHINGTON 98124 FACILITIES DEPARTMENT 14.50 1 I0 .' C.Fel ❑ AUBURN, Wt. ❑ EVERETT, WN. 0 RENTON, WN. IN SEATTLE, WN. 98002 98201 98055 98124 IlIl1 ►Illlllll�i�illl 0 Id 41$ INCH 1 2 A c E SS Dooms► ✓X H . 4 500 G. :t.tl A.ccEss hoop, Wr I I I �'1 �:ITI, 11 ' l I t �l i la III • (. - L1 111111111 11 I l i - l j , l -:. 1 1 � II I I I I I I I I I I 3 4 5 6 7 NOTE: If the microfilmed document is less clear than this notice, it is due to the Quality of the original document. 0t✓ 6z 9e L7, 9z 111111111111111111111 g: Z fi� £2 �z I I 1 OZ 61 8t G: 9t �t +7t cI • 11 pi, 6 1 11111(IIIiliiiili�!IIII 1111Iit;I i1)1111111110i 11 H1 11 11111TH 111II1111111 ►1 II ► I ► j I 1, I , IIIIIIII IIIJIIIII !!1.11 I IIIIIIIIII IiIIIII I►LIlII1lIiI {!!I•lilII. Iy au•p J 'r'r v t : II1hI1: ' IIJII1I1IIIIIII1I1III111111111 IIIII I�II 9 10 11 R 12 • r L 9 S e Z I WW 0 II11111 IIIIIII1nr1 11111111IIIIIIIIIIIIIIII1 Y I �11I I , I VIII s�'a+z'.. „r'�•... �., 1 :.. , ,._. ....,., SOAP 1 _4 PLAN II8 " =1 - MA,TG,HLINt= ih s 0E.NCR. NOTES t. Tt-l15 DWG \/OSD5 OR1 (,1N AL coNsT. b■G• C3Y c.0 s N G.c. M t,.T A►,,.. F- ,h[3 1 NI C.. J 013 # 49 5i-1T. M -9 , r3 rn.la.c X 10 I07- 4000. l; E.Y PLAN RECEIVED CITY OF TUKWILA JUL 9 199 PERMIT CENTER ..a 0 to 0 ..M.VUfJ ;' A�X rE�4hmt' �M' �+ 7�Raa? d'' 1'* �K`!? aF�."._ �i�yrei�i @A�@�+Y!•L1AtS8�>,�SS..' .• � •��. 'ri�A!1�F1Y%�K+�fomar-c'rY.' "Tarr ACCEPTABILITY THIS DESIGN SPECIFICATION IS 1D /AR APPROVED DEPT. .DATE StElp, 11= SUBTITLE LAST REVISION 1 DATE SHEET -! I CHECKED .e. —..,. H V A t PIPING PLAN ► OF APPROVED DT C ‘ ' TITLE .. ::::: . MECHANICAL MASTER BLDG. 7 ... COL 1 /L-�V PLAL: AP =%. ED ■ Al ..4. • NO.107-107-4507 SNP REVISION REVISION APPROVED BY APPROVED DATE Co00 CFM WOMEN >a.G C ES POOP, FACILITIES DEPARTMENT wn T COMMERCIAL AIRPLANE COMPANY A Division of The Boeing Company SEATTLE, WASHINGTON 98124 1 �l 0 AUBURN, WN. 0 EVERETT, WN. - 0 RENTON, WN. in SEATTLE, WN. 11 98002 98201 98055 98124 MA.TGI-1L awl nfi ffiNAVISSAISIMild 1'J'l'1 111 1Frr1f1111111111 .111111111ri111IiI111 1Iif1I7 i .7 r 1 4 5 6 7 8 NOTE: If the microfilmed document is less clear, than this notice, it is due to the quality of the original document. et LI 9 91 *.� et Z1 • ( u I DL I1 111111111111111111111II1111I11111 i11I1 1 111111111111111111III1 KEY PLAN wy ; • RECEIVED CITY OF TUIKWILA JUL 9 199 PERMIT 1 ENTER Met WWI 6E.NI'RAL NOTES COM1~UTER ROOM A/C CONTEMPO MOD�w 7534 7.5 70N, 40D ;'(t , 2IHP BLUWE:R MOTbR, 85, 260 ?i U/r (17,0(A) : EN3) , 435o C5 N1. 2 . YH15 OVn/G. VO►O5 ORIGINAL, CONST. UWCJ• C3Y / LL i D 51-1iE MI-T AI., P'AC, %N C. JG13 4920 SNT. 0-9 1- 13 M.A.C /Y %o7- 107- 4000 CONSTRUCTION NOTES (> 1 N 5 TA L L 'CONTEM PCB` t 7534 ovEQ LocA�ripr\I :x15TIN UNIT U5E Ex15TIN6 CoNpEN3�T DRAIN ANp tiom � .;: - ILA t REPLACE E X 151 '4" PVC w/ 2" aVC t) ExISTInle a« ■rie& PoiA. CLOSE OFF Ext$TIN6 3/4u TAP RAP PPOVID4 NEW 2.D► &PP's.V A.ND etJczN Y Wirt-1 We) N1 4 ' •r ti REVISION RE1OC1T1 WAIL TO PK1YIQE ACCESS TO SHUT -OFF VALVE APPROVED DATE SYM REVISION FACILITIES DEPARTMENT ACCEPTABIL TY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN BY GENERAL NOTES THIS DWG. VOIDS OR1C31NA+._, CoNST. DWG. APPROVED TITLE BLDG. 7-107.8 CONSTRUCTION NOTES 2E.LOCA1E EXISTING WALL AS SHOWN, REUSE EXISTING )iRTEIUALS H 'VA C PIPING PLAN MECHANICAL MASTER COL. E-T / 5 -18 . PLAZA 4 ' - I I - ! SYMBOL DATE : of . q , i RECEIVED CITY OF TUKWILA Jul 9 Wi PERMITCENTER ., • r �aTKS�r�cH i 2 f 3 • 0C 6Z se LZ 9z 9Z VZ CZ zz lz OZ 61. 91 Lt 91 $1 4t Cl Zl • It O1, f I f litlill!I!I IIIIIIIIIIIII1! I! illlllkllf !0 (lii!LjJill;ill!!!I ff f !! i I I IIIIIII!i l�llludliIII! IIi II!l! �Il1lI! illllll! llllllli llllill!!! �IIII II�II!! llillLl�ili l�IJllliii�liil!ifiilill �lili{I :t f c y . r s �• ':� �r''i! - `3'r�'�"`s .p, L 5 t'. , b :> �a'E' `r+ .. rs NOTE: if the microfilmed document is less clear than this notice, it is due to the quality of the original document. 0 o lIlIIIIi !I !min l'dim I!I!!IlI1I1 SYM REVISION BY APPROVED DATE MI SYM REVISION INSTALL NEVI DRY GHEE; f PUMPS PET. JOB x P80O32-r)Z MIR Via APPROVED DATE GYZO -3S IIIIIIIIIII.MMIMIIIIIIIIIIIIIIIII INSTALL NEW GAUGES f SENSORS FUR ems 3015 ISCP. (VY TIT' " A- IT-5 c INSTALL )HEW �r,. k.-.. .u5T LAP dTh in�•nL .•1• � nCQ �� +\ x373 � IIIIIWIIIIIIIIIIIIMIIIIIIIIIIIIIIIIIIIIIIIII 5 MI 4 REACTIVATE REVISES) NEAT RECOVERY SYSTEM JOfS i3 TiCR c � �--1— 8.31.810 � ... f\ Nc:,D tTL( (WA5 IO7 -107 -4019 c,W r T� .M -I DP . , Z. • DETAIL 150 K.W. IX/CT J COMPUTOP, ROOM A/C UNITS NOTE; REVERSE FLOW ; INEC TIGN REQUIRED A.H.L1, SECTION I.. IIIII1ILIII111IIIII111I1I1 ;11111III111I1II 9'1lil(ippl,h('LIII.;IhIL LI 111111 111111111 I JII1!LII 1111 li, i 11.10111-1111 I 111111 111 _ I X11 111111111 111111111 0 ia THs INCH 1 2 fi J ' ff '} 5 6 7 8 9 10 11 "emeR Awf 12 NOTE: If the microfilmed document is less clear titan this ' notice, it is due to the quality of th original :e .,,, , c (, : 1, ::: :.,,,,, m ?, oc iz BC �z 9z sz 4 7Z �z zz lz p� sa a� LL 9L GI �I CI a� a 8 ? 9 S e z P"' p l I I I ' 1111 IIIIIIIIIIIIIIIIIII II�IIIIII IIIIIIIII IIIIIII,IIIIIIIIIlI MIIIIII IIIIIIIII 111111111611111 111111 cicllcicc !!ills!!! 1111IIICI N1111I i II ' ii :.: ,. ..- , ra - ,1 iILll�ii1s11�1lHill�iilcnlllllll1il�11: IIlIlilulc,c11Is11IIIIlI111 1.1 I �I } 4, r I I..tI ( �I1111111II1I1 Iii ;� •Yh -. •,ti,t 21-. �� x _ rt :.} .r`^c -a-.S „j rd.Y ^..'. i3 v �+a s a 1 >, . 1 : .i A.. 'iJ.. lr.. r.4 Y� �'Y ..�✓):..,�' 3 t Nr :>;`* . :- + s.. c. .FFr .. J i , a �•E>` ; S> , . . , _.,.. — c EL• i'-7i2” A.t F. Ld - LL.2'10 " A.F.r. - 7 2i2" — RLf. APPROVED L EL. 4'- 4 "A.FF.. -- NEW Di; 114;\ G, -20 - ee LAST REVISION SHEET M IRS SYMBOL • MAST UST AIR FAN - SUPPLY AIR FAN CIRCULATING PUMPS 40OGPM Q 130' ND V-1 d CNC "`'• 4" BUTTERFLY VALVE SUPPLY Alf FAN C1QMPUTCR COOLING) GLYCOL SYSTEM SCHEMATIC SECTION N.T.S. NEW SIIEETI1ETAL TRANSITION 97 "x l08• •;o 101 "x132" DETAIL - 41111111110P OI1T5!1)E AIR TEMPERATURE SENSOR 2 "x V4 " BAR , f- - CMS:, Ca,'`✓r'rJ('Tll)NS QTNE /; END 11/2"x1- W FRAME, &)LT COILS TO FRAME HEAT RECOVERY 5Y5TET1 SEQUENCE OF OPEKATION 1) BELOW 00°F OUTSIDE, AIR TEF1t'ERATURE, VALVE V-1 IS CLOSED, V•2 F V5 ARE OPEN, GLYCOL 15 ROUTED TO COILS AT SUPPLY AIR FANS. Z.) ELECTRIC HEAT AT SUPPLY AIR FANS WILL STAGE ON TO MAINTAIN 60°F SUPPLY AIR, 3.) A40VE (API OUTSIDE AIR TEMPERATURE VALVE V•1 IS OPEN V2E V•3 ARE CLOSES) GLYCOL IS ROUTED TO THE COIL AT THE EXHAUST AIR FAN. `►� FLOW METE? S /VIM UR PIODIfIEI) EXISTING, FILTER PACK ✓ i)IL SUPPORTS 11/2")11 '4 "L ��- SPRING, ISOL/1 10,4 1 2'1" / P(NTH0115E FLOOR :' i "5--, 11/2'01/2' x FRAME 21/2"x RAME 2'/2 "x 1 /4" TSAR STOCK AT EACH COIL DETAIL N.T.S. ENS 90° EACH ND %4 I/4 FACILITIES DEPARTMENT C O I L 1/21'4"),1/4" FRAME IDETA I L N.T.S. • M3 "�t fIOLf , 3" ON FIORL.,1" ON VERT, how.■ `-COIL Ft AN G L: AIR SIDE t� • ❑ AUBURN, WA. 98002 O EVERETT, WA. 98201 ❑ KENT, WA. 98031 ❑ PORTLAND, OR. 97220 ❑ RENTON, WA. 98055 SEATTLE, WA. 98124 Z coILS f)C TAI L EXHAUST AIR SHAFT NEW COILS 3® 132 "x24 "r 1@ 132 " :3O" PLAN VIEW ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION ;S APPROVED 1/2-= 1'- O" AUTOMATIC I3ACK•ORAFT DAMPERS IN FAN DISCHARGE • T)ETAI L 'DETAIL N.T.S. SUBTITLE TITLE 4 "BUTTERFLY VALVE / (LuSTIN(i) j FETES' PLUG - — RCTURN EXISTIN(; COIL SECTION — EXTERIOR NEW TRANSITION FLOW METER , -6"s6 SUPPLY TI REMOVE 'I°I% CIRCUIT SETTER AND IN' TAIL NEW 6 "0 SCH.40 PVC PIPE I> RELOCATE '1" BUTTERFLY VALVE AND TEE CONNECTION TO THE (0'4 SUPPLY UNE AS SHOWN. t RELOCATE Li" BALL VALVE V•1 AS SHOWN REROUTE 2'/2 "4 CPVC PIPE TO OLD CLUB) COILS IN THE SUPPLY AIR FAN UNITS AS SHOWN. I> REMOVE FLUB) COILS AS SHOWN. INSTALL NEW FLOW METER AS SHOWN. INSTALL NEW PETES' PLUG AS SHOWN, NOTE: CONTACT BILL REA 59 Foe THE INSTALLATION 4 FAI RICATION SEQUENCE FARICATE ' INSTALL NEW 6 "0 5C1.40 PVC SPOOL 9D INSTALL NEW 'UMPS,VALVES, PIPING f PIPE SUYPOKTS I Il / INSTALL NEW DRY MOORS l3),VALVES PIPING 4PIPE 5l1PIT')RTS — 2'/2" r SUPPLY — 4VSUPPLY el" RETURN —• 2 yz "d SUPPLY CONSTRUCTION NOTE - 4" BUTTERFLY VALVE ID Z1/2• A' RETURN -- V 3 - 2'h" 13All VALVE V 1 4" BAIL VALVE < VZ MIL VALVE �*- 3 "0 RETUKN RECEIVED "'ITV nc TI IKWILA JUL 9 1991 PERMIT CENTER GYLCOL SYSTEM/ HEAT RECOVERY DETAILS MECHANICAL MASTER B 7 -107.10 PENTHOUSE PLAZA AIR SIDE. -� • )t a 0 1- ` -1