Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit EL07-253 - SOUND TRANSIT
SOUND TRANSIT 3651 SOUTHCENTER BL EL07253 Parcel No.: Address: Suite No: Tenant: Name: Address: Owner: Name: Address: Contact Person: Name: Address: Value of Electrical: 720,764.00 Type of Fire Protection: / NONE Permit Center Authorized Signature; Print Name: City .,..A Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us 0043000300 3651 SOUTHCENTER BL TUKW SOUND TRANSIT 3651 SOUTHCENTER BL , TUKWILA WA CPSRTA A'N'N REALESTATE DIV , 201 S JACKSON ST JIM TELEPAK 3223 THIRD AV S, SUITE 100 , SEATTLE WA Contractor: Name: MASS ELECTRIC CONSTRUCTION CO Address: 180 GUEST ST , BOSTON MA Contractor License No: MASSECC044QQ Electrical Service provided by: PUGET SOUND ENERGY ELECTRICAL PERMIT Permit Number: ELO7 -253 Issue Date: 09/07/2007 Permit Expires On: 03/05/2008 DESCRIPTION OF WORK: INSTALL THREE (3) 3 KW SUBSTATIONS AND OVERHEAD CONTACT SYSTEM (1500 VDC) FOR LRV VEHICLE OPERATION. Phone: Phone: 206 - 510 -2888 Phone: Expiration Date: 11/18/2008 Fees Collected: National Electrical Code Edition: Date: $12,096.25 2005 I hereby certify that I have read an dkexar coed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complie wi , whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performanc,F • f work. I am authorized to sign and obtain this electrical permit. Signature: U' �A /1 4 /j Gj l (AS - q " Date: 77 / This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: EL - 4/07 EL07 -253 Printed: 09 -07 -2007 Parcel No.: 0043000300 Address: 3651 SOUTHCENTER EL TUICW Suite No: Tenant: SOUND TRANSIT 1: ** *ELECTRICAL * ** Print Name: / Yd lI (-7 u 5 f 1 $gq Signature: -44///r- doc: Cond -Elec City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Permit Number: EL07 -253 Status: ISSUED Applied Date: 06/28/2007 Issue Date: 09/07/2007 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296 -46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 8: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating construction or the performance of work. Date: q / 7/ EL07 -253 Printed: 09 -07 -2007 ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://Www.ci.tukwila.wa.us SITE LOCATION /J � l/l)l'V l R. A Seuv. aTr....s,, 4 CcA-- vot 1 � t g t4-4 King CoAss t 0 00' Site Address: R 4l t R ` t". t ^ "A3 L l v. < Suite Number: New Tenant: ❑ Yes ❑..No Property Owners Name: Sou I\l� TRflNS 4T C c• tr al 'v g t ! go V kc� Tira.,. c:14 Ao tour i4 Mailing Address: Uv.t8 . t1 tole ' S e �o..t t0.^ 6 . 6e/N--ti -t- Viii- 48 a4- City State Zip Tenant Name: 1W //4 CONTACT PERSON - Who do we contact when your permit is ready to be issued Name: 3 M TELETt K Mailing Address: FLi 3 + + 223 3" S S ot LOO E -Mail Address: C l eerfct_ r+ M0►SSet . ELECTRICAL CONTRACTOR INFORMATION Company Name: 14 4C s E-t r ' i c Cpttic4 VC 60 % . 0. d ,} Mailing Address: $ 223 3 J C S c 400 +� Q���.t W A 1 g 134 City State _ Zip Contact Person: Jlt4 T€.1/eVlk Day Telephone: 2 bk ..S CO 2e■ E -Mail Address: pal 1NQ _ CptM Fax Number: 'iO Contractor Registration Number: tit s �� 2 -gg4 1 Expiration Date: 12 4'11/-06 Valuation of Project (contractor's bid price): $ — 0 ( ,_, r r Scope of ork (please provide detailed information): 11 S`� a � ( 3) KW S v 6 4 Q� 0.V► 0vc,v ad l,p r. cx-C4 `� s4rw• C (SOo vdc) -roc- LAW SbUt, A S T Will service be altered? ❑ Yes IT No Type of Use: .c eNvN i T -p u c,1 Type of work: xr New ❑ Addition ❑ Low Voltage ❑ Generator Property Served by: ❑ Puget Sound Energy Xl Seattle City Light H:Upplications\Forms- Applications On Line4-2007 - Electrical Permit Application.doc bh Li 6147 ❑ Service Change ❑ Fire Alarm Electrical Permit No. Project No. r!e d2- 07 -5 (For office use only) Sea{llC City Fax Number: Floor: Day Telephone: 206 - S to - 213(48 ta 8813 State Zip 2 06- 267 —tse& Adding more than 50 amps? ,I Yes ❑ No 12. -htl. VM CLE o P tzpr tOr1 ❑ Remodel ❑ Tenant Improvement ❑ Telecommunication ❑ Temporary Service Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings 8140.00 (including an attached garage) ❑ Garages, pools, spas and outbuildings 875.00 ea ❑ Low voltage systems (alarm, furnace thermostat) 855.00 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration 875.00 (no added/altered circuits) ❑ Service change with added/altered circuits 875.00 number of added circuits $10.00 ea ❑ Circuits added/altered without service change 850.00 (up to 5 circuits) ❑ Circuits added/altered without service change 850.00 (6 or more circuits) $7.00 ea ❑ Meter /mast repair 865.00 ❑ Low voltage systems 855.00 (alarm, furnace thermostat) PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Print Name: h Mailing Address: l 322'3 3 t \Or 5 &c,[00 Date Application Expires: 1E_ /..6 0 -7 L Date Application Accepted: (J w ZitiA (v -28 -U1 H:MpplieetionsUbrms- Applications On lineal -2007 - Electrical Permit Application.doc bh MULTI - FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. ❑ Temporary service (residential) 858.00 ❑ Temporary service (generator) 875.00 ❑ Manufactured/mobile home service 880.00 (excluding garage or outbuilding) ❑ Carnivals $75.00 Number of concessions 810.00 ea Day Telephone: City MISCELLANEOUS FEES Date: /2810 7 2b in- 510 - -288`6 w q8t` State Zip Staff Initil i 1 Page 2 of 2 Parcel No.: Address: Suite No: Applicant: SOUND TRANSIT Receipt No.: R07 -01243 Payee: MASS ELECTRIC CONSTRUCTION CO ACCOUNT ITEM LIST: Description City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Initials: BLH Payment Date: 06/28/2007 01:49 PM User ID: ADMIN Balance: $0.00 TRANSACTION LIST: Type Method Description Amount Payment Check 870367 12,096.25 Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.0 ELECTRICAL PLAN - NONRES 000.345.832.00.0 9,677.00 2,419.25 Total: $12,096.25 Permit Number: EL07 -253 Status: PENDING Applied Date: 06/28/2007 Issue Date: Payment Amount: $12,096.25 9 303 06/28 0716 TOTAL 1209625 liner Ramint -06 Printe. t (16-2R- 90(17 Parcel No.: Address: Suite No: Applicant: Receipt No.: R07 -02183 Initials: BLH User ID: ADMIN Payee: 0043000300 3651 SOUTHCENTER BL TUKW SOUND TRANSIT MASS ELECTRIC CONSTRUCTION CO TRANSACTION LIST: Type Method Description Payment Check 870402 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us ACCOUNT ITEM LIST: Description Account Code RECEIPT ELECTRICAL PERMIT - NONR 000.322.101.00.0 ELECTRICAL PLAN - NONRES 000.345.832.00.0 Total: $35,754.78 Permit Number: Status: Applied Date: Issue Date: Payment Amount: 835,754.78 Amount 35,754.78 Current Pmts 28,603.82 7,150.96 EL07 -253 ISSUED 06/28/2007 09/07/2007 Payment Date: 10/05/2007 12:45 PM Balance: 80.00 70TAL :5754- 7D doc: Receiot -06 Printed: 10 -05 -2007 Pr�y /��A�/ Type of Inspection: //, - (.� Address: 7 Date Called: Special Instruction 0 ea Date Wanted 6. Requester: Phone No: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 COMMENTS: 779 l% Approved per applicable codes. ❑ Corrections required prior to approval. l Inspecta'9 !Date: r6 ' FCf / v/& El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. (Receipt No.: 'Date: P p l� /� X�'vS7 Type of Inspection: /�, v Addressi Date Called: Special Instructions: Date Wanted: v / m Requester: Phone No: INSPECTION RECORD Retain a copy with permi ' L? INSPECTION NO. Pr NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 COMMENTS: TAB'S 0/ F 6�6 proved per applicable codes. Corrections required prior to approval. Inspect tt g ir44 6 ax I 2 / ❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: !/ �, / � / /l am �`� S Type of Inspectio f//149L, Date Called: Ad P�t,,iN dress: RUE /A Special Instructions: 9 /7/4 f, i nS 1/ Pys r , uester: , Date Wanted: , / (14124.2 9 P.m. R S � eq/ ��te ' Phone No: .S /.7C_? INSPECTION RECORD Retain a copy with permit '"7 ZJ3 PERMIT NO. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 MMENTS: �" � 1 � 1/47,2 o� < - F /Ng roved per applicable codes. El Corrections required prior to approval. J InsPect 6LE 4/r/ IKK 7 El $60. 00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 'Receipt No.: 'Date: Pr ject: co pi /A mnivs/ r Type of Inspection: Address: S /,/,?3-45 � Date Called: Special Instructions: Pfi. Date Wanted: ?� a. .m. Requester: Phone 2,04 x" 71.134.3 3 / - 0 7 . 5 3 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION Ct 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 OMMENTS: COX _ S� � - S #c 33 proved per applicable codes. Corrections required prior to approval. 'inspe t 6/7;6,6'00 1 / V a $58.00 REINS ECTION FEE REQUIRED. Prior to inspection. fee must be paid at 6300 outhcenter Blvd.. Suite 100. Call the schedule reinspection. 'Receipt No. :.. 'Date: INSPECTION RECORD Retain a copy with- permit Project: i 7-0/9/11--C/ Type of Inspectio n A dre ss: ,C � s bi ! —�sT � G //vi t of a Called: Sp cial Instructions: ate Wanted: a.m. p.m. Requester: Phone No: INSPECTION NO. CITY OF TUKWILA BUILDING DIVISI ON 6300 Southcenter Blvd., #100, Tukwila, WA 98188 Approved per applicable codes. D Corrections required prior to approval. COMMENTS: fjg- TPss # C 3� (Inspect ,V)--446/91( v/ l? /t El $58.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. 'Receipt No.: 'Date: INSPECTION RECORD Retain a copy with permit tLG7 -2r3 PERMIT NO. ? ( 206)431 - 367 Date /l //) Project: �j� 5 ' ' / i i / A 7? ' 4) / T Type of Inspection: 7&7} Z .' Address: f AS% // /Nifc A Dat ailed: Special Instructions: s L / " Date Wanted: a.m. p.m. Requester: Phone No: INSPECTION RECORD Retain a copy with permit 7 - INSPEOtION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3 D Approved per applicable codes. D Corrections required prior to approval. COMMENTS: p6 /j)/11// 77/A /6// GW /T)/ G641771167N Inspe ` qr ` L 4 6�ld1/47., ' Date / /, 7/0 $58.00 REINSPECTION FEE REQUIRED. Prior to inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. 'Receipt No.: 'Date: 7 1 STATIONING - 755 -002 755 -003 STRUCTURE NUMBER 755 -001 STAGGER (RICHES) 9 R 9 L 9 R CONTACT HT (FT 20 -6 I 20 -6 20 -3 -IN) MESSENGER HT (FT INI 24-6 24-6 20 -3 TERMINATION HT (FT -INI - _ _ - - ' POLE SET I -OUT 1F11 POLE REFERENCE - - FOUNDATION HEIGHT - - - )INI FOUNDATION REF - - MISCELLANEOUS - - _ STRUCTURE 8 ASSY DESCRIPTION CANT CA -OIL J I CANT CA -02L CANT CA -OIL 119.9 ---- SPAN IFTI 129.5 I 100 1 105.5 1 A STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -INI MESSENGER HT IFT -IN) TERMINATION HT (FT -INI POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FTI NOTES: I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 001 IN PLAN IS 755 -001 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS S8 TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND POLE BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J682 PILE PT Permit No. Pan review cpprcval Is subject to errors and omissionSt t.pprovcl cf con:t ucf;on documents does not authorize the vic!c ion cf cny cccep;:cd code cr crdIncnc e. Receipt of cpprovcd f-lc :d Copy d cond :bons is cCkr vIedged 13y I I" A Date: 967/07 7 \\*\ city of Tukwila BUILDING DIVISION 129.5 ISSUED FOR CONSTRUCTION Demential REVISIONS • ; ',91 t' .'II l '11- • • • k; [• 1� i''^`i i:1:?T11 5 f r' 1' 1 'l 1= on. NOTE:Aevislons moor. clactric COArtfUction company 0 0 0 0 col `t U wI of w w 0.4.W er L. DELA CRUZ err D.S. / N.P. a..c«.d ey. 0. TERRADO Submitted 0. MACDONALD NORTHBOUND te - ' - 1 ---) r — ' --� 1 1 11 1 3 CL 52_8.1 6 l i I SOUTHBOUND 526.61 755 -001 1 ti i o of o,:1 - - 9 R 20 -6 24 -6 6.46 FT L PS -I26 -15 FD -ITG CANT CA -021_ 001 SOUND7lkanisrr JS-1 ASSY (TYP) 100 d 527.61 755 -002 9 L 20 -6 24 -6 6.46 L PS -126 -15 FD -ITG CANT CA -OIL Hatch Mott MacDonal Submitted 9r. G. MACOONALD 06/20/05 Data: 002 105.5 1 DAM it/13/ad 1 fUw: MEC- 60I.DWG Contract No: C807 06/20/05 0 755 -003 9 R 20 -0 24 -0 6.46 L PS -I26 -15 FO -ITM CANT CA -02L 20 10 IMMO 003 0 Fitt UU 0 0 20 40 1 MEC Seattle Controlled N 0 iStac gulldino Division R E C EIVE D 528.66.5 PERMIT NUMBFR v CF TUKWILA J LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN a SCHEDULE STA SB 526.00 TO STA SB 529.00 0 0 J N 28 7007 1MIT CENTER 1 Crewing No 0 CO U w 0 ! I MEC -60I ST Rehm.. No. L57-0P01 Sheet No.: 116 Ron: 0 1. A 06/20/05 S R[V _ OAT[ 0 STRUCTURE NUMBER STAGGER DNCHESI CONTACT NT (FT -NI MESSENGER HT (FT-NI TERMINATION HT (FT -IN) POLE SET -OUT IFT1 755 -005 2 R 19 -6 23 -6 755 -006 9L 19 -0 24-0 0 -0 755 -007 24 L 23-0 20-2 6.46 L 755 -008 9 R 18-6 23-6 STATIONING ‘;D01_E REFERENCE MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 119.9 SPAN (FT) STATIONING STRUCTURE NUMBER STAGGER 'INCHES! CONTACT HT (FT -IN) MESSENGER HT IFT -1N) TERMINATION HT (FT -IN) POLE SET -OUT (FTI POLE REFERENCE FOUNDATION HEIGHT (NI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRPTION 09/09/05 06/20/05 art NORTHBOUND 0 n SOUTHBOUND 119 9 CANT CA -02L CANT CA -02L 004 529.61.4 755 -004 0 -0 6.46 L AP -3 -15 FD-3TM DGA 0G -01 005 D..agaon 99.8/109.8 10 /RI NOTES: I 1. POLE NUMBERS IN PLAN IARE MISSING THE 755 PREFIX SHOWN IN SCHEDULE. I.E. POLE dos IN PLAN IS 755 -005 IN SCHEDULE. 2. FOR POLE FOUNDATIONS 1::0N A RIAL STRUCTURE. SEE CIVIL DRAWINGS. I 3. STATIONING IS 58 TRACK UNLf~ OTHERWISE NOTED. I ALL POLE BRACKETS AND BANDS O BE ALLOCATED BY CONTRACTOR PER L00 -J680. 0 5. INTRUSION DETECTOR CAMERA ON POLE BY OTHERS. N?1 CANT CA -OIL CURVE R = 5015.75 FT Ea 0.75 IN NOTE 5 I BWA ��Ir - j r -- ; r50" "7 14 ! I 48' -- i r t 529.86.4 755 -005 3 R 19 -6 23-6 6.46 L 20 -7 6.46 L WF -2230 -15 FD -5TM TERM BW -01 99 8 CONTRACTOR LAYOUT SUBMITTAL - REVISIONS ISSUED FOR CONSTRUCTION DGA DG-03 CANT CA -06 530.86.2 CUR VE - 5000 - F1 Ea = 0.75 IN 530.96.2 W -2230 -15 FD -5TM 1 0061 0071 755-006 9 L 19-0 23 -0 W -2130 -15 FD -3TM CANT CA -OIL g Mart. alcctric construction company 119.8/119.8 (0 /R) 119.8/119.8 10 /R) Doeignod Byt L. DELA CRUZ D.<.n er. O.S. / N.P. A A Cheated try. G. TEAR ADO 5.1m7N.a tY G. MACDONALD 755 -009 6 L 19 -3 22 -6 TERM BW -01 CANT CA -011 SA -3 M .T.1 . I wei N. L -- c .- I N. VI Vo 532.06 1 008 0091 755 -008 9 R 18-6 22-6 6.46 L 1Jf W -2030 -15 FD-3TM CANT CA -02L SA -3 CANT CA -06 JC -2 165 (0/L1/165 (0 /L1 532.16 19 -3 23 -6 CANT CA -06 1 r r 0 . .02 - E 1 124.7728• UNItLS�IA.IED -_. - - - - - - T OVERLAP L00 -J442 755 -009 6 L 6.46 L of- W -2130 -15 FD -3TM 165 (0/L)/165 (0 /L) wernm.d sn G. MACDONALD Hatch Mot MacDonal Da.: 06/20/05 755 -010 6 R 19 -3 23 -6 CANT CA -06 - - - OVERLAP - - LOO -J442 L J.' 1 COWS 11/15/05 533.71 755 -010 6 R 19 -3 22 -6 6.46 L WF -2130 -9 FD -3TA CANT CA -06 JC -2 CANT CA -02L TERM FA -1 87.6/97.6 (0 /R) 81 - Sonic 1 - .20' FlMnomet .IEC- 602R1.DWG C:nyoct No: C807 Da.: 06/20/05 755 -011 9L 18-6 22 -6 r igs 534 Q - - - - - -- FA - 533.81 6.46 L CANT CA -OIL 87.6/97 6 (0 /R) TERM FA -I 534.68.6 755-012 12 18-6 22 -6 25-0 1 19-11 23.75 L WF -2230 .18 FD -5TA 8.0 R CANT CA -02M DGA D6 -01 MEC Seattle Controlled CURVE R . 715.69 FT Ea = 5.25 IN 1012 1 013 534.686 22 -6 22 -3 19 -11 SCALE IN FEET CANT CA -02M 534.85.4 755 -014 0 -0 23.75 1 AP -3 .18 FD -3TA 1 014 1 015 CURVE R = 700 FT Ea = 5.25 IN 534.85.4 755 -015 RECEIVED - CUTv OF TUK'MLA 0.0 P &ERfv11T GEN f Er -15 FD -3TA DGA 00 -01 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 529 +50 TO STA SB 535 +00 79.4 -- D roning No.i 117 MEC -602 ST R.f.r..w. No. L57 -0P02 Rot.; ( a 13 7 06/20/05 uae NORTHBOUND SOUTHBOUND STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT-11 MESSENGER HT (FT -INI TERMINATION HT IFT -IN) POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT (IN) FOUNDATION REF MISCELLANEOUS STRUCTURE a ASSY DESCRIPTION 755 -016 12 L 18 -6 22 -6 CANT CA -02M SA -3 755 -017 12 L 18-6 22 -6 CANT CA - 02M 755-018 12 L 18-6 22 -6 CANT CA -02M 755 -019 12 L 18-6 22 -6 CANT CA -02M 755-020 12 L 18-6 22.6 CANT CA -02M SPAN IFT) 81 87 85 87 91 83.5 -- ISSUED FOR CONSTRUCTION Noumea NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE, I.E. POLE 016 IN PLAN IS 755 - IN SCHEDULE. FOUNDATIONS ON AERIAL STRU C URE' "S •bRAIWINFiS. - ' �— / �%' i 2 FOR POLE �" � ' ' � v.- `. ..- 1 - f 3. STATIONING IS SB TRACK UNLESS,.OTAE NOTED / r � -- / / % �. --' i / i %�� /= / � � / 4. ALL POLE BRACKETS AND OANDS TO 0 A�CATE6 BY CONTRACTOR -PAR L00. - = �, - '- i'I t.- . -- -/ % .---,-- � - -' - 1 -" „.--- / %' is - j / - -- - r // - ,�/ --' - - �� . /� CU E 15, FT - % Ea = tD _ . � '- T !l lam/ ......,,.i.: oi4 3I !� W I I x � =- - N 1 ti Y-- :: fx11i1 /l. Qlactd c coNttuctlon company L. DELA CRUZ o.o.. °r. D.S. / N.P. or. O. TERRADO SubtnItta4 0. MACDONALD I. • -� - - —�� �$ k� Y L i5� -- -- --- - - - --- .a G. MACDONALD Data 06/20/05 14 CURVE R 700 f s Ea a 5.25 IN Hatch Mott MacDonal DIa_ F E IP ED _` NFp 7p P ENCE NEC AUG 2 7 2007 :17. 1•_20 EC - 603.DWG Na: C807 Date: 06/20/05 \ ```- ,- \ , \\\ \ \ STATIONING 755 -016 12 L 18 -6 22 -6 STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -INI MESSENGER HT IFT -INI TERMINATION HT (FT -IN) POLE SET -OUT WTI POLE REFERENCE FOUNDATION HEIGHT (IN) FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 79.4 535.48 6.46 L WF - 2226 0 FD CANT CA -ON SA -3 536.33 755 -017 12 L 18 -6 22 -6 6.46 L WF -2226 0 FD-STA CANT CA-ON 85 83 537.16.0 755 -018 City Of Tukwila B ILDING b ION. 538.01 755 -019 12 L 18-6 22 -6 6.46 L WF -2226 0 FD-5TA CANT CA -01M 12 L 18-6 538.90 755 -020 12 L 18 -6 22 -6 22 -6 6.46 L 6.46 L WF -2226 WF -2226 0 0 FD -5TA FD -5TA CANT CA -01M 85 89 CANT CA -01M 81.5 20 10 O M EC Seattle Controlled 0 0 W W N 0 20 SCALE IN FEET LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 535.00 TO STA SB 539.00 40 RECEIVED CITY OF TUKWILP JUN 2,8 2007 PERMIT CENTER St RN.•.ac. No. L57 -0P03 Stoat No.: 118 MEC -603 Rev.: 0 STATIONING 755 -022 12 L STRUCTURE NUMBER STAGGER NICHES) 18-6 22 -6 CONTACT HT IFT -I11 MESSENGER HT IFT -III TERMINATION HT IFT -IN) POLE SET -OUT WTI POLE REFERENCE FOUNDATION HEIGHT IINI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION 755 -021 12 L 18.6 22 -6 CANT CA -02M 755-023 12 L 18-6 22 -6 CANT CA -02M 755-024 12 L 18-6 22 -6 CANT CA -02M CANT CA -02M SPAN (FT) 83.5 87.5 87 87 1 88 NORTHBOUND SOUTHBOUNO ATION IS 58 ACK UNLESS 4. ALL •LE BRACKETS A 8ANOS TO B NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN SCHEOU EE PO 021 IN AN IS 755-0 IN SCH DULE IN E. I.E. POLE 2 l FOR L F0 .\ \-2. 04110 ON AER \L 9T _,, _. - --'-c - - �� UCTURE, SEE GV DRAWINGS. WISE NOTE -, \ LLOCATED 8 CONTRA.TOR''ER L00 -J680. 40.00 S -I ASSY (TYPI ;A 54(010 Q IQCttic cotvtructton com pony STATIONING STRUCTURE NUMBER STAGGER IINCHESI CONTACT HT IFT -III MESSENGER HT IFT -INI TERMINATION HT IFT -INI POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT DM FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 81.5 539.71.5 755-021 12 L 18 -6 22.6 6.46 L W F -2226 0 F0 -5TA CANT CA-ON 540.57 755 -022 12 L 18 -6 22-6 6.46 L WF -2226 0 FD -STA 85.5 CANT CA -01M 541.42 755 -023 12 L 18 -6 22 -6 6.46 L WF -2226 0 FD -STA CANT CA -DIM 542.27 755-024 12 L 18-6 22 -6 6.46 L WF-2226 0 FD -5TA 85 CANT CA -DIM L DELA CRUZ O.S. / N.P. Chocked ley. 0. TERRADO St tw d 0. MACOONALD 022 Q__ \N N CURVE R 700,FT, Ea = 5.2 IN \ SoutelliAtene ' • \ /0' URVE R = 715.69 FT Ea . 525 IN k \ 10234 cP v N. \ Subralltad Dahr G. MACDONALD 06/20/05 Hatch Mott MacDonal 024 • I gET Sala: r =2o• MEC-604.DWG v..*o.t No: C807 Date 06/20/05 R E DWG MEC -605 CODE IO1 /F O P NPPA NF E OMP� 0 NFC CF AUG 7 2D07 OCS LAYOUT PLAN a SCHEDULE MEC Seattle Controlled 20 10 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM STA SB 639.50 TO STA SB 643+00 RECEIVED CITY OF TUKWILA JUN 28 7007 PERMIT CENTER 0 SCALE IN FEET winq 5T R./.,w,=. No. L57 -0PO4 Sheet 11o.7. Raga 119 20 MEC -604 40 0 STATIONING STRUCTURE NUMBER STAGGER IINCHES) CONTACT HT (FT-Cq MESSENGER HT IFT -INI TERMINATION HT (FT -INJ POLE SET -OUT (FT1 POLE REFERENCE FOUNDATION HEIGHT (INN FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESORPTION SPAN (FTI STATIONING STRUCTURE NUMBER STAGGER (NCIES) CONTACT HT FT MESSENGER HT IFT -N) TERMINATION HT (FT -INN POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT INN FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESORPTION SPAN (FTI /\ A A A A 06/20/05 ISSUED FOR CONSTRUCTION 88 NORTHBOUND 111 Nn 1 1 I SOUTHBOUND 86 755 -025 121. 18-6 22 -6 CANT CA -02M 025 543.13 755 -025 0*.e. 87 CURVE R.700.00 FT Ea =5.25 IN 85 0 755 -026 12L 18-6 22 -6 CANT CA -0211 543.98 755 -026 121. 18-6 22 -6 6.46 L WF -2226 0 FD-5TA CANT CA -01M Ib Ln 0 3 87 85 rnttis. electric construction company D•+vw •n L. DELA CRUZ Drew. •y. D.S. / N.P. Geobel 0. TERRAOO Submite•4 •1+ 0. MACDONALD 755-027 12. 18-6 22 -6 CANT CA -02M 544.83 755 -027 121. 18.6 22 -6 6.46 L WF -2026 .3 FD-3TA CA -01M 89.7 L� Souninikannrr 755 -028 12 I- 18-6 22 -6 CANT CA -02L NOTES: I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. LE. POLE 025 IN PLAN IS 755 -025 IN SCHEDULE. 2. FOR POLE FOUNDATIONS •W .� AL STRUCT6Ift Ef . D � AWINGS. A 3. STATIO IS SO TRA ,X UHt " - • ' - Iii NO \ ,n L _ I •� \\ 4. ALL POLE BRACKETS ANb BATIQS �,• BE ALLOCA BY .� NTRACTOR PER L00-J680. LT \ \ d \ 1\ Z \ 0 `"7 \ \ \\ \\ VD . \ .• \ \\ \ 1 d \ \ \ \ \ d1 \ \\ ,-' \ �n N \ CURVE 4 5N9 FT _ •17.� y �\� i n \ 028 545.72 755 -028 (2L 18.6 22.6 6.46 L WF -0826 -6 FD-ITA CANT CA -OL 4,„ Submitted Po G. !ACOONAL) w 4. U1 CL 546.00 MI 128 128 Hatch Mot MacDonal 06/20/05 J a,. Sara I' =20' .lone„« C807 Data 18-6 Centred Ma 755 -029 6 L 22 -6 CANT CA -02L 547.00 121. 18-6 22 -6 6.46 L WF -2226 0 FD-5TA CANT CA -OIM CANT 755 -029 6 L 18.6 22 -6 6.46 L WF -0826 -9 FD-ITA CANT CA -OIL MEC- 605.dwg 06/20/05 178 R611141et) POI? N E B F \ + AU6 2 \ 0 07 178 -- SION LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 543 +00 TO STA SB 548+50 MEC Seattle Controlled RECEIVED CITY OF TUKWILA JUN 2 a OO1 PERMIT CENTER Sr nA...na. Me. L57 -0P05 S legit Me: 120 MEC -605 0 STATIONING 548.78 550.52.96 550.77.96 ■ ) 552.38.29 ` V j. s+ STRUCTURE NUMBER 755 -030 755 -031 755 -032 f 755-033 STAGGER /INCHES) 12 R - 12 L 9 R CONTACT HT IFT -IN) 18-6 - 18-6 ! 18-6 MESSENGER HT IFT -INI 22 -6 - 22 -6 22 -6 TERMINATION HT (FT-NI 0 -0 21 -5 - POLE SET -OUT IFT( 6.46 L 6.46 L 6.46 L 6.46 L POLE REFERENCE WF -0826 AP -3 WF -2230 WF -2130 FOUNDATION HEIGHT IINI -9 -9 9 -9 FOUNDATION REF FD-ITA FD-3TA FD -STA FD -3TA MISCELLANEOUS - - - STRUCTURE 8 ASSY DESCRIPTION CANT CA -02L DGA DO -01 CANT CA -OIL TERM BW -0I CANT CA -02L DGA 0G -03 SPAN (FT) 178 I 199.96 160.33 161.7 / 171.7 (0 /R) —. - STATIONING STRUCTURE NUMBER STAGGER I1NCHESI CONTACT HT IFT -IN) MESSENGER HT IFT -INI TERMINATION NT (FT -1N) POLE SET -OUT FT) POLE REFERENCE FOUNDATION HEIGHT IIN1 FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION A A NORTHBOUND 755 -030 I2 R 18-6 22 -6 CANT CA -OIL NOTES: T 3m STATIO —X SOUTHBOUND I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE, I.E. POLE 03 • IN PLAN IS 755 - • 30 IN SCI-1E I LE. ■ 4` 2. FOR. POLE f 1 IONS ON � • � RIAL S R RE. SEE CIVIL 06/20/05 ISSUED FOR CONSTRUCTION KV M « R 0ceictlon mc u, alactric cowttuction company 755 -032 12 L 18-6 22 -6 CANT CA -02L AWING§. NOTED. \ ()GATED BY ' &1,7A \ a �� -\� \\ \ `�_�1�b ®50.00 ridri^ �A'__�"" u•agn.e 111y1 L. DELA CRUZ Crow. ON D.S. / N.P. Chock.4 Sy. 0. TERRA00 s�er.ittb er. 0. MACDONALD u 0 \ • • •' R ER L fir Sourulkantsrr Hatch Mott MacDonal o Submitted NA Dd. G. MACOONALD 06/20/05 755 -033 9 R 18-6 23-6 0 -0 CANT CA -OL SPAN WTI ) 178 199.96 160.33 / 170.33 (0 /R) 0 0 ` Sag.: 1_20• 552.48.29 755-034 6 L 19 -3 22 -6 20 -7 6.46 L WF -2230 -9 FD-5TA CANT CA -06, JC -2 161.7 (0 /CI / 1617 10 /C) • • • \\ 1111 \`rii - \�►\ \via r \ \�\\ �•S1i ►, \ 01111 D G - 1 S SB TRA K UNLE OTH: R 4\ 4. A POLE BRACKETS A D BANDS \ O B. AL 030 I S BOEING ACCESS ROAD ST ON CL S 1 ASSY -4TYP 0 \ m \ t0 0 -J68 • t • • • I\ • ERLTAF ttb n S86'4617.10 - W 1514.3570' CL 554.00 v pp ...oi p , oR Q - r CS P :2 00? n Flown. MEC- 606.0WG Controct No C807 Dot= 06/20/05 TERM BW -01 1- T T T T T T 4' tik A • 4\ 20 10 0 20 4 SCALE N FEET MEC Seattle Controlled LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN a SCHEDULE STA SB 548.50 TO STA SB 554.00 4Q RECEIVED CITY OF TUKWILA JUN 25 71101 PERMIT Crowing No.: MEC -606 ST R.f.r.n -O Ne. L57 -0P06 Shoot No.: Roo.: 121 " 0 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -N1 MESSENGER HT IFT -NI TERMINATION HT IFT-IN) POLE SET -OUT IFT1 POLE REFERENCE FOUNDATION HEIGHT 11N1 FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRNTION SPAN (FT) 161.7 (0 /1) / 161.7 (0 /11 MD I tI r - - U NBb 554.00 W .- 2 1514.3570' CL 1 554.00 CI' W W 1 8 DESCRIPTION 1 (FT) STATIONING STRUCTURE NUMBER STAGGER (NCHESI CONTACT HT IFT -IN) MESSENGER HT IFT -N) TERMINATION HT (FT -IN) POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT (IN) FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY NORTHBOUND SOUTHBOUND 035 755-035 6 R 19 -3 23-6 CANT CA-06 036 554.00 755-035 9 L 18-6 23 -6 6.46 L WF -2130 .9 FD-3TA CANT CA-OL 161.7 / 171.7 (0 /RI CemliAlen 755 -036 9 L 18-6 22 -6 CANT CA -02L VERLAP 554.10 755 -036 6 R 19.3 22 -6 6.46 L WF -2030 -9 FD-3TA CANT CA -06 CONTRACTOR LAYOUT SUBMITTAL REVISIONS 160 (0 /R) / 160 NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 035 IN PLAN I5 755 -035 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL CTURE, SEE CIVIL DRAWINGS. 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND :ANDS TO BE ALLOCATED BY CONTRACTOR PER L00-J680. 160 10 /1) / 160 (0 /LI FA CANT CA -06, JC-2 555.60 755-037 6 L 19-3 23 -6 6.46 L WF -2230 -9 FD-5TA alcct[ic construction company 037 TERM FA-1 755 -038 9 R 18-6 22 -6 0-0 CANT CA-0IL 038 CANT CA -021. L. DELA CRUZ Orme Or O.S. / N.P. *.d,.. m,. 0 TERRADO aa.b4 G. MACDONALD 555.70 755 -038 9 R 18-6 22 -6 0 -0 6.46 L WF -2030 -9 FD-3TA N.b 556.00 DGA 00-3 147.63 157.63 (0 /RI / 147.63 a.en+e d D G. ).4ACDONALD 557.17.63 755-039 TERM FA "4 I2 L 18-6 22-6 6.46 L WF -2230 -9 FD-5TA 755 -039 12 I- 18-6 22 -6 CANT CA -02L 039 20 -7 CANT CA -OIL Hatch Mott MacDonald 06/20/05 040 557.42.63 6.46 L AP-3 -9 FD-3TA soda 172.37 20 10 N b 5 ? OC I• =20' Filename MEC- 607RI.OWO Centred Nat C807 Dote 06/20/05 0 SCALE IN FEET 172.37 20 40 755 -041 12 R 18-6 22 -6 CANT CA -OIL .1 755 -041 12 R 18-6 22 -6 929 L WF -0826 .9 FD-ITA CANT CA -02L LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 554.00 TO STA SB 559.50 171 -- MEC Seatt4e Controlled 171 -- Mooing 122 JEIVED = TUKWILA 8 7nn7 vl "CENTER MEC -607 ST Bros... L57-0P07 Swot Mu Rev.: FOUNDATION REF STATIONING MISCELLANEOUS SPAN (FT) STRUCTURE NUMBER STAGGER (INCHES' CONTACT HT (FT-1111 MESSENGER HT (FT -1N1 POLE REFERENCE FOUNDATION HEIGHT BNI STRUCTURE 8 ASSY DESCRIPTION S`1 ASSY_LLYPI 560.61 755 -042 WF -0826 CANT CA -OIL L. DELA CRUZ Ore.' M D.S. / N.P. 0. TERRADO 561.93 755 -043 NT-2026 FD-3TA CANT CA -02M 562.73 755 -044 9.29 L WF -2126 FD-3TA sue.xwe IN, O.(en G. MACDONALD 06/20/05 CANT CA -02M Hatch Mott MacDonal P =20' WF -2226 FD -5TA CANT CA -02M MEC- 608.DWG 06/20/05 %5 N8 564.0O 564.34 755 -046 9.29 L WF -2226 FD-5TA CANT CA -02M SA -3 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 559.50 TO STA SB 565 +00 SCALE IN FEET 564.87.56 755 -047 0.0 9.29 L AP -3 .3 FD -3TA MEC -608 ST R.Annc. No. L57 -0P08 ST..( He. R...: 123 / 0 J b 1 5 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -1‘11 MESSENGER HT (FT-IN) TERMINATION HT (FT -1N) POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FTI 755 -042 12 18-6 171 22 -6 CANT CA -02L 755.043 12 R 18-6 22.6 132 CANT CA-01M 755 -044 12 R 18.6 22 -6 78.8 CANT CA-01M 755.045 12 R 18-6 22 -6 80 CANT CA-01M 755 -046 t2 R 18-6 77 22 -6 CANT CA -01M SA -3 0 w w COI 06/20/05 NORTHBOUND ISSUED FOR CONSTRUCTION D.**. NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 042 I PI,ANN IS 755 -042 IN S EDULE. 2. OUNDATIONS 0 X L STRUC7 CIVIL [ AWIN S. ING IS SB TR K •NL SS OTH V /fS $ TED. BANDS / BE /• LOCATED 'BY CONTRACTOR PER L004680. s / k:/LE BRACK /' 1 v / h 042 g 011011, electric con.trurc►tion company • • �. N ea SuboWW40 0. MACDONALD 043 044 ------ -- - - - - -- 0 562.Q0 H MEC Seattle Controlled 045 CURVE R = 605 FT Ea = 6.0 IN 046 76.9 r CITY OF TUKWILA JUN 2811001 [�. RMIT DGA 0G -1 20 tO U w 0 W W 40 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -INI MESSENGER HT (FT-NI TERMINATION HT (FT -NI POLE SET -OUT (FIT POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION 755 -048 12 R 18-6 22 -6 19 -10 CANT CA -DIM 755 -049 12 R 18-6 22 -6 CANT CA -01M SPAN (FT) 7 6.9 78.1 (TWA) / 78.1 MPA MP -01 755 -050 12 R 18-6 22 -6 19-10 CANT CA -DIM 77.6 (TWA) / 77. 755 -052 12 R 18-6 22 -6 CANT CA -DIM 77 755 -053 12 R 18-6 22 -6 CANT CA -01M 815 755 -054 12 R 18-6 22 -6 77 CANT CA -DIM 12 R 18-6 22 -6 75 755 -055 CANT CA -DIM 80 -- FOUNDATION REF MISCELLANEOUS SPAN (FT) 06/20/05 Oat_ NORTHBOUND c SOUTHBOUND TERMINATION HT (FT-INI POLE SET -OUT (FTl POLE REFERENCE FOUNDATION HEIGHT (IN) STRUCTURE 8 ASSY DESCRIPTION / e 78.9 A ISSUED FOR CONSTRUCTION a.wlpron NOTES: 1 POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 048 IN PLAN IS 755 -048 IN SCHEDULE. 2. FOR P.L5 FO NDATIONS ON AETAL STRUCTURE. SEE DRAWINGS. 1 { 1 S8 TRA UNLES6 OTHERWISE NOTED / (L B NOTED. A 0 BANDS TO BE ALL0G // TED BY CONTRACjOR PER- 1,S}0 -J680. // / STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -INI MESSENGER HT (FT-IN) STATI 565.12.87 755-048 12 R 18-6 19 -10 929 L WF -3226 .3 FD-5TA CANT CA -02M 565.93 755 -049 12 R 18-6 9.29 L WF -3226 .3 FD -5TA MPA MP -01 -t -ASS 566.72.5 755-050 12 R 18-6 9.29 L WF -3226 .3 FD -5TA CANT CA -02M 566.97.5 0 -0 9.29 L AP -3 .3 FD -3TA DGA D0.01 CURVE R 620.67 FT Ea = 5.5 IN 567.515 755 -052 WF -2226 FD -5TA CANT CA -02M 568.35 755 -053 12 R WF -2226 FD -5TA CANT CA -02M W F -2226 FD -5TA CANT CA -02H 9.29 L 9.29 L WF -2226 FD-5TA CANT CA -02M RECF CITY OF JUN 2. r- l(VII I I. CANT CA -02M 80.I (TWA) / 80.1 / / / 16' 7 - LO. -J452 / 049 / O of / / ,/ / Ql a c tfic conitructlon company / / - / / 1050 _ J 79.6 (TWA) / 79.6 Q_ w eye 1. DELA CRUZ On* rye O.S. / N.P. Chocked ftg. 0. TERRADO subrnRw G. MACDONALD / // 79 L� SouxnikaNSrr / VE R = 605 FT a = 5.5_1N_. --- ,/ ----- Net - 68 ' °° 83.5 rye G. MACDONALD Hatch Mott MacDonal 6/20/05 • 053 aF1an MEC Seattle Controlled 79 : I'.20' Moan. MEC- 609.DW G Contr... No: C807 06/20/05 77 0 055 O / (4, / 1 4 / / / LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 543.00 TO STA SB 570.50 3 / 20 10 / 0 // • 20 SCALE N FEET 82 --- 40 IVED rUKWILA ytlni ;EN i Ef or_ No.: MEC -609 ST RN.r.nce No. L57 -0P09 Stow! No_ 124 Nov: 0 a \ - t STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -INN MESSENGER HT IFT -III TERMINATION HT (FT -11) POLE SET -OUT (FTI POLE REFERENCE FOUNDATION HEIGHT (IN) FOUNDATION REF MISCELLANEOUS STRUCTURE B ASSY DESCRIPTION SPAN (FT) 755 -056 12 R 18-6 22 -6 CANT CA -OIM 80 755 -057 12 R 18-6 22 -6 CANT CA -DIM 78.5 755 -058 12 R 18-6 22 -6 CANT CA -0&l 80 755-060 12 R 18-6 22 -6 CANT CA -01M 93.0 755 -061 12 L 18-6 106.5 22 -6 CANT CA -02L 160 / 160 (0 /R) -- A D/04/05 05/20/05 NORTHBOUND ASPHA 5T T 1. POLE INMBERS IN PL IN SO'1-5E. I.E. PO I ' " ly ST REFERENCE N0. CORRECTED ISSUED FOR CONSTRUCTION 72 es i CURV Ea = 76TgN PREFIX - S = • WN 58.056 IN SCHEDULE 240R POLE FOUNDATIONS 0 . ERI • L STRUCTURE. SEE CIVIL Q�tIC conitfuctlon company o.=gmw L. DELA CRUZ G.- M O.S. / N.P. °wad sr. 0. TERRADO need M 0. MACDONALD i 69 q u 5sv SOtAYD�1' 4t,„ Diaa O. MACDONALD 06/20/05 Se.dwaltial M Hatch Mott MacDonald i ETY.J Scala r.20' illaanas MEC- 61ORLDWG Cent ea N.. C807 Cat= 06/20/05 FEEDER r MEC Seattle Controlled ASP HALT T6E� O I CgA� THE O _.�� 20 10 0 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 570.00 TO STA SB 575.50 20 40 MINI • 572.35.5 755 -058 12 R 18.6 22.6 9.29 L WF -2226 .2 FD-5TA STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -I ) MESSENGER HT (FT -IN) TERMINATION NT (FT -IN) POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT (IN) FD-5TA FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION INV SPAN (FT) SOUTHBOUND 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. 570.73 755 -056 12 R 18-6 22 -6 9.29 L WF -2226 .3 CANT CA -02M 571.53.5 755-057 12 R 18.6 22 -6 9.29 L WF -2226 .3 FD-5TA CANT CA -02M 80.5 CAIIT CA -021A 82 573.05 755 -059 0 -0 9.29 L AP -3 -5 FD-3TA DOA DO-1 94.5 573. 755-06 12 R 16 22- 20- 929 WF: FD- REVIEWED FOR COD . CANT TERM CA-025A BW -0I CANT JP -2. CA -OIL, 05 -01, DISC SW C32 -H-601 107 / 107 (0 /R) 574.37 55-061 9 L 18-6 23-6 0 -0 9.29 L WF -2130 F .9 FD-3TA F DWG 00-3 574.47 SCALE IN FEE 755 -062 6 R 19 -3 22 -6 20 -7 9.29 L WF -2230 -9 FD-5TA CANT CA -06 TERM BW -01 IN -I, IN -2 PERMIT 160 (0 /1) / 160 10 /LI -� T a=.tio N=s MEC -610 ST Rd* OS Na. L57 -0P10 Mat Nos 125 -IVED TUKWILA 7nn7 ;ENTER Rmaz 5 1 1 1 STATIONING 6 R 19 -3 9 L 18.6 STRUCTURE NUMBER STAGGER (RICHES) CONTACT HT (FT-IN) MESSENGER HT IFT-NI 755 -063 9 R 18-6 23-6 TERMINATION HT (FT -11 POLE SET -OUT WTI P011 REFERENCE FOUNDATION HEIGHT (NI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 160 / 160 (0 /RI CANT CA -OIL JP -2. DS -01 DISC SW C32 -H -602 755 -064 6 L 19 -3 22 -6 CANT CA -06 N-1. N -2 577.67 755 -065 755 -066 23-6 22 -6 20 -7 0 -0 6.46 L WF -2130 F TERM BW -01 1N -1. IN -2 160 10 /1) / 160 (0 /1..) CANT CANT CA -06 CA -02L DGA DG-03 DS -01. JP -2 DISC SW C32-H -604 755 -067 12 R 18-6 22 -6 20 -6 -6 FD-3TA F CANT CA -OIL 137 10 /R) / 127 131 755 -069 12 L 18-6 22 -6 CANT CA -021 140 -- 0 0 W (9 0 W — NORTHBOUND — 100 -7440 — — W U) Q tr NOTES: . POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 063 IN PLAN IS 755-06 IN SCHEDULE. FOR POLE FOUNDATIONS ON AERIAL STRUCTUR SEE CIVIL DRAWINGS. 3. STATI c E—Ilrx T OTHERWISE N gTED. 4. ALL POLE BRACKETS AND BANNOS TO BE ALLOCATED BY CONTRACTOR PER L004680. ASPHALT FEEDER FEEDER 10631 0641 u E MARGINAL WAY S FEEDER 1 065 1 0661 ASPHALT 137 067 068 MEC Seattle Controlled 131 069 CANT CA -OIL e 140 --- 20 FFFT DIRT GRA STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -IN) MESSENGER HT IFT -IN) TERMINATION HT IFT -R(I POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS SOUTHBOUND STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 160 10 /1) / 160 (0 /L) .575.97 755 -063 929 L WF -2130 F -9 FD -3TAF CANT CA -06 IN•1 N -2 576.07 755 -064 929 L WF -2130 F -9 FD-3TA F JP-2. DS - O[ DISC SW C32 -H -603 150 / 160 10 /RI ASPHALT FD-5TA FD-3TA FD-ITA 577.57 755-065 578.94 755.067 12 R I8-6 6.46 L CANT CA -02L 579.19 755 -068 6.46 L ASPHALT 755 -069 6.46 L WF -0826 SCAT F (O 0 W (9 0 W W 40 IVED R • UKWILA ?"o7 PERMIT C ENTER n ASSEMBLY MODIFICATIONS ISSUED FOR CONSTRUCTION (/04/05 08/20/05 alactck con,ttuction company O..gnd s$ L. DELA CRUZ Ono. M D.S. / N.P. 0. TERRADO Submitted M 0. MACDONALD L�. Souwlkanair $* bd G. MACDONALD Hatch Mott MacDonald Octo 06/20/05 S..ge nWnamm MEC- 6IIRLDWG Contract Nog C807 Oda 06/20/05 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 9 SCHEDULE STA SB 575.00 TO STA SB 580.50 oga.fgo Na MEC -611 Sr N.f..nc. Na L57 -0P11 Shoo( Nag 126 1..?TGYaVi s STATIONNG STRUCTURE NUMBER STAGGER INCHESI CONTACT HT (FT -NI MESSENGER HT IFT -IN) TERMINATION HT IFT -IN) POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT OM FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN IFT) 14 755 -070 12 R 18-6 22 -6 755 -071 12 L ;18-6 !22 -6 755-072 755 -073 12 l 12 L 18-6 18-6 22 -6 22 -6 0M 06/20/05 SS — POLE REFERENCE FOUNDATION REF MISCELLANEOUS SPAN WTI NORTHBOUND CE r._ r-- j �cr STATIONING STRUCTURE NUMBER STAGGER (INCHES! CONTACT HT (FT-INI MESSENGER HT IFT-INI TERMINATION HT (FT -IN) POLE SET -OUT (FT1 FOUNDATION HEIGHT (INI STRUCTURE 8 ASSY DESCRIPTION Mums W r rAIT � x rMI 140 i1 / NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN 5l IN SCHgpULE • E. POLE 070 IN PLAN„IS 755- OTO DU ft II4 SCHELE. 0 e / 1 N /To ; ,s J A ISSUED FOR CONSTRUCTION 0..e,tvuen ATIONS ON AERIAL STRUCTURE. CIVIL fi 1S_ -SB TRAC - 9r- OTHERWISE- CRETSAND B NOS TO BE ALLOCATED BY I / Ili 1 I 11 070 I f *O 1 581.65 . 755 -070 12 R 18-6 22 -6 6.46 L WF -0826 - FD -ITA CANT CA -021 _r 0 NM/MN Or L. DELA CRUZ QIIccteic conrtnictiOn 0.4 ft company G. TERRADO • 1 r� -- e WINGS._... 38-58 l � -• F-p= � , �.. ,,- .e -- _ -. __ ' - - — �zd - - FO 4= �� _ _- _�jam1- - ___- J1'F- J-- -yy� - =- • - -_ . - --�— w_ W - _ µ+a"`T - - i- -'ll µ•_ - -- w- - -- W- - - - - -- -t r1 - -� FO -- w - - w -_ -- W - - - Vl - - -- W� - -- W --r - -- W - - -- w - - -- w - - -- ;a - - -- - ___ N• - - -- __ ( ; o- 18 - S--- --Sg- _-- ss- _-- gSr - - -SSO`�- SS - - -_ ;ess W I - - -- SS - 1 :" I y O �I I I T CURVE - Ft = 2315.7 FT! cl Ea I ..: 3.0 IN co C i CONTRACTOR PER LOO -J680 r- \ M \ N � _ _.t.r rerc 0 One., en D.S. / N.P. SubMt•d Ott 0. MACDONALD Ni SPH 071 582.94 755 -071 1 12 L 18-6 22 -6 6.46 L WF -2026 -7 ;FD -3TA CANT CA -OIM I 1 0 o' MARGINAL WAY S 1 I m I — I W 072 TAFO — TB: o (T-Y1 - - 4,„ Submitted e G. MACDONALD BUILD Hatch Mot MacDona 06/20/05 127.0 MEC Seattle Controlled San. r•20- 584.21 755 -072 12 L 18 -6 22 -6 6.46 L WF -2026 -4 FD -3TA CANT CA-01M MEC- 612.DWG Contract Na C807 OetK 06/20/05 - - 0£F- - - - C£1- —. — F0 --- -FC— YE R._= 2300 FT j Ea = 3.0 IN l'II i o I I' ! \ \ 126.0 vl - - - -- W - - -- w - - -- w - - 4+) 1( 7 U W 0 i! b w ��- W a 585.47 755 -073 12 L 18 -6 22 -6 6.46 L WF -2026 -4 FD -3TA CANT CA -0N LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 9 SCHEDULE 20/10 STA S8 580+50 TO STA S8 586 +00 — - eve", p_ yyy b r `' .01 2,0 SCALE N FEET 40 IMMO 11-LTC UED CIT`, JKWILA JUN 2a 711117 Poyang Ha: MEC -6I2 ST Reference N. L57 -0P12 Sheet No. ROW_ 127 0 z STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -1N) MESSENGER HT IFT -1N1 TERMINATION HT (FT -INI POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT (IN) FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION 755 -074 6 L 18-6 22 -6 CANT CA -02L 755 -076 9 R 18-6 22 -6 20 -6 CANT CA -OIL SPAN (FT) 128.8 168.5 162.5 (TWA) / 162.5 755 -077 9 L 18-6 22 -6 CANT CA -02L MPA MP -01 163.5 (TWA) / 163.5 --o- STATIONING STRUCTURE NUMBER STAGGER INCHES, CONTACT HT (FT -INI MESSENGER HT (FT -1N1 TERMINATION HT (FT -IN) POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT IINI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION A 06/20/05 0 SEA Bb�SI --- DATE NORTHBOUND CURVE R 2315.75 FT Ea = 3.0 IN / SOUTHBOUND i 10741 © f 1 1 NBc 586.00 : - - '' w i r- f - SA -3 0 CL 566.00 \ 5A -3 _ N_ 1 t _ i ,5, nSSY`1T3'Pl \8 . � - - ` I- - - I \ ISSUED FOR CONSTRUCTION Domaription NOTES: I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE Q75 IN PLAN IS 755 -073 IN SCHEDULE. z z 2. FOR POLE FOUNDATIONS AERIAL STRUCTURE. SEE CIVIL DRAWINGS. z a 3. STATIONING IS SB TRACR I3NLESS OTHERWI E NOTED. -_- wGj 0--- ------ BANDS TO BE LLOCATED BY CONTRACTOR 4. ALL POLE BRACKETS A r, 0 cNi 0 o I j 0 ° m .1 Ea = 3.0 IN 1 ?` V 1 ':c - . / -- -...- \, 1 ° / \ / N 2 { i - - 1 t '� ± ,• i i i7; \ ‘-;\ -; ' - ' -1----1 - �� I 11 586.75.5 755 -074 6 L 18-6 22 -6 6.46 L WF -0826 - FD-ITA CANT CA -OIL M011. ic construction com pany 7c I 11 D.dyr.W Dye L. DELA CRUZ D~.n D„ O.S. / N.P. Chock.d By. 0. TERRADO S..MNW sn G. MACDONALD PER r _fi CL 5'5.00 • Ni 'd -65 00 1 � O L004680. P.00 I O7 1 L.i / - - 1 0761 l _ Sourziliwarr ------------------ ------ - 55"3TJ3.35 - E -09. 7377 • { 58849 755.075 0 -0 9.29 L AP-3 .9 F0-3TA E MARGINAL WAY S 588.44 755 -076 9 R 18-6 22 -6 20 -6 9.29 L WF -2226 .9 FD-5TA CANT CA -02L SubmIttod D. G. MACDONALD Hatch Mott MacDonaI Dot. 06/20/05 sR SQO,on/ 1 1 O Soo#c I'c20• MEC- 613.DWG Centred N. 0807 D.U. 06/20/05 CANT CA -OIL 9 L 18-6 22 -6 590.06.5 755 -077 9.29 L WF -2226 -9 FD -5TA MPA MP -01 • 162.5 (TWA) / 162.5 163.5 (TWA) / 163.5 ---- 1: (I T MEC Seattle Controlled I. - - - -*- -� I ' I L °L 1 L - - -4_ -- OCS LAYOUT PLAN a SCHEDULE 20 10 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM STA SB 586+00 TO STA SB 591.50 /f• SCALE IN FEET Oro wino No.: ST R.ra.nc. No. Suet No.: 128 1 {-- - - 1 C V) RECEIVED OFTUKw 2.8 ?n07 0 PEF SIT CEJ!TE MEC -6I3 L57 -0P13 0 LA 3 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -IN) MESSENGER HT IFT-INI TERMINATION HT (FT -IN) POLE SET -OUT WTI POLE REFERENCE FOUNDATION HEIGHT IINI FOUNDATION REF MISCELLANEOUS 755 -078 6 R 18-6 22 -6 20 -6 755 -080 12 R 18-6 22 -6 755-081 12 R 18-6 22 -6 755 -082 12 R 18-6 22 -6 STRUCTURE 8 ASSY DESCRPTION CANT CA -OIL CANT CA -01M CANT CA -OIM CANT CA -DIM SPAN (FT) 163.5 (TWA) / 163.5 137.1 131.8 135.8 126.9 -- NORTHBOUND CpbIC WAA ,... .... ,)Lii - - w — ' =_ + a7� 0 W IC ` (/) Imo_ SOUTH80UN0 STATIONING STRUCTURE NUMBER STAGGER IINCHESI 22.6 - 20 -6 0-0 9.29t. WF -2226 AP -3 DOA 00 -I 593.08 WF -2126 FO.3TA CANT CA -02M WF -2126 -2 595.78 12 R CONTACT HT (FT -IN) MESSENGER HT (FT -IN) TERMINATION HT IFT -INI POLE SET -OUT 'FT' POLE REFERENCE FOUNDATION HEIGHT IIN) FOUNDATION REF MISCELLANEOUS DESCRPT1ON CA-02L 06/20/05 --542,011 18-6 ISSUED FOR CONSTRUCTION o..ertpuen 079 j -9 -6 591.70 591.95 755 -•78 755 -079 6 ._ - FD-5TA FD -3TA NOTES: I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 078 IN PLAN IS 755 -078 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS 58 ••TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANGS TO BE ALLOCATED BY CONTRACTOR PER LOO -J680. 92.00 II- _ 138 r<; ;a m alactric cotvtructlon company 080 .753 =✓ � — L L. DELA CRUZ Drown 17y, O.S. / N.P. p.«rw ey. G. TERRADO 3.e...RUS eyt 0. MACDONALD sq A / Souvrillumsff E MARGINA' WAY S a ± i; t i 08I Submitted -0. MACDONALD Hatch Mott MacDonal Dalw 06/20/05 CURVE R = 1680 FT Ea = 4.0 IN I 5' • =IITiF7 - - - - -- Is - - - -- CURVE R - 1695.71 FT . �•�_ Ea . 4.0 IN 137 r_2o. fknornc MEC- 614.0WG Ce..a•.t Her C807 Oat.: 06/20/05 .00 128 MEC Seattle Controlled 1 1 RECEIVED CITY OF TUKWIL inO] PERMIT GENTEFI 20 10 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 591+50 TO STA SB 597 +50 O 20 SCALE IN FEET wing No: 129 1 t I O 0 w 2 MEC -614 ST Reform No. L57 -0P14 She.t Ty: R. 40 0 A STATIONING 755 -083 12 R STRUCTURE NUMBER STAGGER IINCHESI 18-6 22-6 CONTACT HT (FT -WI MESSENGER HT (FT -IN) TERMINATION HT (FT -INI POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT MI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT] 128 I CANT CA -0114 755 -084 I2'R 18-6 12 R 18-6 22 -6 22 -6 128.8 CANT CA -01M 755 -085 22 -6 CANT CA -01M 128.8 755 -086 12 R 18-6 CANT CA -01M 129.3 12 R 18-6 22 -6 129.8 755 -087 CANT CA-01M 88.7 U W 2 0 06/20/05 wee alt NORTHBOUND SOUTHBOUND NOTES: I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 083 IN PLAN IS 755 -083 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE, SEE CIVIL DRAWINGS. 3. STATIONING IS SB TFTA.K "UNLESS OTHERWISE NOTED. 4. ALL •'tE—BRACKETS AND BATa. TO E ALLOCATED BY CON 1CCTOR i -- - 15 ' _ _ _ _ JS= t— ASSILIIY _ STATIONING STRUCTURE NUMBER STAGGER (INCHESI CONTACT HT IFT -IN1 MESSENGER HT IFT -INI TERMINATION HT IFT -IN) POLE SET -OUT IFT) _POLE REFERENCE FOUNDATION HEIGHT IINI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT1 128 597.06 755 -083 12 R 18-6 22 -6 9.29 L WF -2126 -2 FD-3TA CANT CA -02M 598.36 755 -084 12 R 18-6 22 -6 9.29 L WF -2126 -2 FD-3TA 130 CANT CA -02M 130 599.66 755 -085 12 R 18-6 12 R 18-6 22.6 9.29 L WF -2126 .2 FD-3TA CANT CAL02M r, REVTFWED FOR CODE COMPLIAN - NI -PA 7. - NEC AU 130.5 ukwila 600.96.5 755 -086 22.6 9.29 L WF -2126 - FD -3TA WF -2126 JUN 28 7nP RMIT CENTER CANT 2M CA -0 89.5 -- CANT CA -02M P 1 602.27.5 755 -087 12 R 18-6 22 -6 9.29 L RFCFI"Ell TV TUKW!LI\ FD-3TA SCALE IN FEE ISSUED FOR CONSTRUCTION 064 g 111010. ciccttic construction company PER L00 -. �7 i CURVE 1 ! L Ea F Mq U Q4V 3t�• -. �A Y .S per L DELA CRUZ D.S. / N.P. 0. TERRADO Submittseler 0. MACDONALD R = 1680 FT a 4.0 IN 085 — \ R o 1695.71 FT O__4.0IN �• .'SF t• r te` = � 34.41mat.1 er. O.cc G. MACDONALD 06/20/05 Hatch Mott MacDonal I oaks nh5^w I S r_20' Menem. MEC- 615.DWG Contract H. C607 06/20/05 MEC Seattle Controlle,J 0 /// LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 6 SCHEDULE STA SB 597.00 TO STA S8 602+50 O...Ing $ MEC -6I5 ST RN.rw,ee Ib. L57 -0P15 9...t Nos 130 M.� 0 40 e 5 1 755 -092 9 R STATIONNG STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -IN) MESSENGER HT IFT -IN1 TERMINATION HT IFT -NI POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT 1141 FOUNDATION REF MISCELLANEOUS 18-6 22 - 6 WF -2130 -4 STRUCTURE a ASSY DESCRIPTION SPAN (FT) 88.7 to ID I SPAN (FT) A A 09/09/05 06/20/05 DOT NORTHBOUND SOUTHBOUND 755 -089 12 R CANT CA-011 NAe 606.00 TED - OVERLAP SCALE IN FEET 1/ 608.00 89.5 NOTES: L POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 088 IN PLAN IS 755 -088 IN SCHEDULE. _ 2. FOR PO .UNDATIONS ON AERIAL STRUCTURE. SEE V •: STATIONING IS SB TRACK UNLESS 0 R 4. ALL POLE BRACKETS _ .- B BE ALLOCATED BY CONTRACTOR PER L00 -J680. STATIONING STRUCTURE NUMBER STAGGER INCHES) CONTACT HT IFT -IN) MESSENGER HT IFT -IN) TERMINATION HT IFT -INI POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT GM FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESORPTION 602.92 755 -088 AP-3 -2 FD-3TA DGA DO-1 603.17 755 -089 12.R 18-6 WF -2230 .2 FD-5TA CANT TERM CA -02M FA -01 r 115 604.32 755-091 I2 R 18-6 22 -6 929 L WF -2230 -4 FD-5TA CANT CA -02M 120 / 130 (0 /R) 605.52 755.092 9 R 18-6 22 -6 929 L WF -2030 .9 FD-3TA CANT CA -02L VIE 160 (O /L) / 160 (0 /L) 60742 755 -094 6 R 18-6 22 -6 6.46 L WF -2130 -9 F FD-3TA CANT CA -06 JC -2 607.22 755 -095 9 L 18-6 23-6 6.46 L WF -2030 -9 C;11 OI- 11 FD-3TA 140 (0 /RI / 120 ^1-r CFN'TE CANT CA -OL a = 4.0 IN 695.71 FT CONTRACTOR LAYOUT SUBMITTAL - REVISIONS ISSUED FOR CONSTRUCTION 105 (0 /RI / 114 604.22 755 -090 6 L 19 -3 22 -6 0 -0 9.29 L FD-3TA CANT CA -06 IA v trl T DGA DO-03 a e construction company 755 -091 9 R 19 -3 22 -6 CANT CA-0114 JC-2 140 (0 /R) / 120 D.4•■ 00 L. DELA CRUZ Orson e„ D .S. / NP. cl..e.d ,y. O TERRADO a.ee+ttd OA 0. MACDONALD TERM FA-I 18.6 23-6 CANT CA -OIL 755 -093 6 L CANT CA -06 CANT CA -06 « z z • = O a Shats.oittod eyt G. MACDONALD Hatch Mott MacDonal 08/20 /05 MEC Seattle Controlled 755 -094 6 R 160 (0 /L) / 160 (0 /L) 130 (0 /R) / 120 1 ".20' MEC- 616R1.DWG c...trod H.. C807 06/20/05 19-3 23-6 755 -095 9 l 18-6 22 -6 CANT CA -02L LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 602.50 TO STA SB 608.00 _I C52 CL 608.00 Drawing M..: MEC -616 ST ROo me tt.. L57 -0P16 Shoot No.: nova 131 1 STATIONING STRUCTURE NUMBER STAGGER (INCHES, CONTACT HT IFT -IN) MESSENGER HT IFT -IN) TERMINATION HT IFT -INI °OLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT IIN) FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN IFTI 130 (0 /RI / 120 1 755 -096 12 l 12 L 18-6 22 -6 CANT CA -02M 107 755-098 12 l 18-6 22 -6 CANT CA -02M 755 -100 18-6 22 -6 CANT CA -02M 755 -101 12 L 18-6 22 -6 CANT CA -02M 755 -102 t2 L 18-6 22 -6 CANT CA -02M • Id I W In A & 06/20/05 R Y Oft[ ISSUED FOR CONSTRUCTION w.«btion Imcur4 clactric construction company 0.09.4 or L. DELA CRUZ on* er O.S. / N.P. ' Chocked e,. 0. TERRADO Sub Jt.d er G. MACDONALD Hatch Mott MacDonal SouwilizAksir s..hn. tt.s Br Dock: G. MACDONALD 06/20/05 [ CRIES tt/u/os I I•.20' MEC- 6 17.OWG com .t no: C807 Odor 06/20/05 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 608.00 TO STA SB 613.50 D.o.hw Ro MEC -617 ST R.f«.nc. t1.. L57 -0P17 I32 0 STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -IN) MESSENGER HT 1FT -IN1 TERMINATION HT IFT -IN) POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT IIN) FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION NORTHBOUND SOUTHBOUND _.._ r 1 \ \f r , , .. T .- / ? �L. / n CANT CA -OIL 608.42 755 -096 9 L 18 -6 23 -6 21 -1 6.46 L WF -2230 - FD-5TA SPAN (FT) 120 / 140 10 /RI NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 096 IN PLAN IS 755 -096 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGPi NG IS SB TRACK UNLESS OTHERWIS 3. STAT1ONI ! 1 __�__ - - - - -- — 4. AL o _ • • 0 EIS AN6 BANDS ----------- O BE AL�9�A1>3_£ TERM BW -0I 0961 097 s r . / - / / Jr''\ t�. 0 i / . 608.52 755 -097 DOA DO -3 6 R 19-3 22.6 0 -0 6.46 L WF•2130 -3 FD -3TA CANT CA -06 7 CANT CA -DIM 107 (0 /L) / 97 (0 /L) 098 609.49 755 -098 12 L 18-6 22.6 20 -6 6.46 L WF -2230 .1 F0 -5TA TERM BW -01 099 609.74 755-099 0 -0 6.46 L AP -3 0 FD -3TA R 599 SR s '• ? CURVE R_= 1180 FT_ - __ - _ Ea = 5.75 IN 610.59 755 -100 12 L 18.6 6.46 l WF -2126 .2 FD -3TA J 101 MEC Seattle Controlled I 0 7 r 20 10 E . 102 0 SCALE IN FEET 612.79 755 -102 12 L 18 -6 22 -6 6.46 L WF -2126 .2 FD -3TA 20 40 - RECEIVED CITY OF TUKWILi JUN 2 7n9 PERMIT CENTER 1 STATIONING STRUCTURE NUMBER STAGGER BNCHESI CONTACT HT IFT -NI MESSENGER NT (FT -INI TERMINATION HT IFT -INI POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT IINI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN WTI III 5 — 755 -103 12 L 18-6 22 -6 CANT CA -02M 755 -106 12 L 18-6 755 -105 12 L 18.6 755-104 12 L 18-6 22 -6 CANT CA -02M SA -3 110.5 22 -6 CANT. CA -02M 112.5 22 -6 1114 CANT CA -02M 755 -107 9 L 18-6 22 -6 110.9 CANT CA -02M 110.9 — 15' NORTHBOUND f 103 ff .- �-: = " `•' NOTES: 11 - -- - ` — SOUTHBOUND CURVE R = 1195.68 FT Ea = 5.75 IN SR 599 24 SD,- o- cU URVE Fjr3J180 i7 .r ri �.. 5.75 IN / } 1- POLE NUMBERS IN PLAN ARE MISS' g_THE 755= - PREFIX SHOWN - - - - - - IN SCHEDULE. I E. PQLE- 103 - PLAN IS 755 -103 IN SCHEDULE. POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS 58 TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. OPEN r: TCH t 1 m 15• \IGO -- ti , . I 1 1 ▪ i MEC Seattle U W • 0 0 UJ SCALE IN FEET STATIONING STRUCTURE NUMBER STRUCTURE 8 ASSY DESCRIPTION SPAN WTI 614.98 755 -104 12 L 18-6 22 -6 6.46 l WF -2126 .2 FD -3TA CANT CA-01M SA -3 616.09 755 -105 12 U 18 -6 22 -6 6.46 L WF -2126 .2 ;.. FD -3TA 617.19 NT -OIM 618.29 755 -107 9 18 -6 22.6 6.46 L WF -2026 FD -3TA CANT CA -01M CI I Y ur 1 STAGGER IINCHESI CONTACT HT IFT -INI MESSENGER HT (FT -IN) TERMINATION HT IFT -IN) POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT BNI FOUNDATION REF MISCELLANEOUS 613.89 755 -103 12 18-6 22 -6 6.46 L WF -2126 .2 FD -3TA CANT CA-01M VED UKWIIA 7nn7 =LATER A A 06/20/05 acv Act ISSUED FOR CONSTRUCTION g mon. aIQctvk Construction company L. DELA CRUZ ar=.. es D.S. / N.P. `ah.o d ey. 0. TERRADO swaww By 0. MACDONALD IIIT SOUNDUANSIT Hatch Mott MacDonal StAnnktad a. Bata: C. MACDONALD 06/20/05 Scd< ` M EC- 61 8.OWG Contract Not C807 Data: 06/20/05 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 613.50 TO STA SB 619.00 Drenaln, 146.: MEC -618 sr Reference L57 -0P18 Shoat Na.: 133 R•• 0 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -INI MESSENGER HT (FT -IN1 TERMINATION HT (FT -IN) POLE SET -OUT WTI POLE REFERENCE FOUNDATION HEIGHT (NI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 110.3 W I I V 0 wi STATIONING k 0 3 STRUCTURE 8 ASSY DESCRIPTION STRUCTURE NUMBER STAGGER (NCHESI CONTACT HT (FT -INI MESSENGER HT (FT-116 TERMINATION HT (FT -NI POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS al SPAN (FT) 06/20/05 are NORTHBOUND SOUTHBOUND 755-108 18-6 3 L 22 -6 CANT CA -02L 4'L M Z Z 0 I ISSUED FOR CONSTRUCTION Doserlption 108 CL 620.00 1_ OPEN 1;+Yt �� — -- --- r; - J I— ASSY—fWP — r V 4" � I , . •f .50. I ! /t /_- _ _ 1 t 11I ,'' I r ° I 619.39 755-108 3L 18-6 22 -6 6.46 L WF -0826 -9 FD-ITA CANT CA -OIL 161007 / 170.7 (COI NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 108 IN PLAN IS 755 -108 IN SCHEDULE. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALL OCA.ED BY CONTRACTOR PER L00 -J680. 125.5 • r;at•di20.00• .. . 125.5 18-6 g awes. alccttic conic uctian company 755 -109 12 R 22 -6 CANT CA -01. 109 620.64.5 755.109 12 R 18-6 22 -6 6.46 L WF -0826 -9 FD -1TA CANT CA -02L a.q•»■ CV L. DELA CRUZ Or...e D.S. / N.P. c...d.w Or. G. TERR ADO N sue.R.i en G. MACDONALD ii 4 1 1 ! �I t CJL i 126 • IP ...am.. .e ..e ..e •.N 126 /\ A 1117 Sanivlhmsrr 755-110 12 L 18-6 22 -6 CANT CA -02L 110 128 5 ttic- 62.00_ . .Flrt1 +i . 1. -... • Hatch Mott MacDonal submitted Dr: Dot.: 0. MACDONALD 06/20/05 e C I Doors 11/15/06 I 755.11 12 R 18-6 22 -6 CANT CA -OIL 5edc MEC- 619.0WG C.ntroct C807 Oats: 06/20/05 N 623.19 755 -111 12 R 0 S5'40'51.76 891.8r59' (' ems':. 624.00 126.28 MEC Seattle Controlled •NBf 624.00 EMI 624.20.2E 755.112 ( )I- TI1KIMI_A FD -3TA DGA DG -1 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE 20 10 STA SB 619 +00 TO STA SB 624 +50 755 -113 12 L 18-6 22-6 CANT CA -02L 120 / 130 (0 /R) —� IC, 1113 I 0 20 SCALE N FEET CANT CA -OIL 624.45.28 755-13 DrInIng TERM BW -01 I34/ 120 5T R.11 0+ • No. L57 -0P19 Shoot No: R«: 0 o . )O) 40 MEC -619 — 0 • II 3 0) 06/20/05 STATIONING STRUCTURE NUMBER STAGGER (NCHESI CONTACT HT (FT-INI MESSENGER HT IFT -1111 TERMINATION HT (FT -NI POLE SET -OUT (FIT POLE -REFERENCE FOUNDATION HEIGHT (N1 FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 755-114 9 R 18-6 23 -6 0 -0 CANT CA -OIL 120/130 (0 /R) DCA DG -3 625.75.28 755-115 6 l 19 -3 22 -6 21 -3 755-16 ' 6 R 19 -3 23-6 CANT CA -06 JC -2 FD -5TA TERM BW -I 148.72 (0 /LI /1 755 -117 9 L 18-6 22 -6 9.29 L WF -2230 -9 755 -119 9 R 18-6 22 -6 (0 /R) CANT CA -01L 114. 48.72 (0 /L) CANT CA -06 755 -120 12 R 18-6 22 -6 20 -6 5 CANT CA -01M 124 -- NORTHBOUND U w 01 w ° w BWA SOUTHBOUND ISSUED FOR CONSTRUCTION NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE, LE. POLE 114 IN PLAN IS 755 -114 IN SCHEDULE. run POte -ON -- AERIAL - STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SO TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. 0 . R .26.en JS-I A s�IT -YPf � M1 UNINSULATED OVERLAP - - - - - - - L4�42 - - -- . NS 626.00 . ...... . 4- - - - - - --------- (C55.) I BWA CL 626.00 -- - - - - -- p e t g mew. aiactric conrttuction company 0..q..e Bn L. DELA CRUZ Room Br D.S. / N.P. a..d.w By. G. TER RADO G. MACDONALD Soure lkaivar >31 (rsq >..A CL 62: -0 UNINSULATED OVERLAP L00 -J442 Hatch Mott MacDonal sw...rt ml Br, oat. G. MACDONALD 06/20/05 ■191.. 62P ID cv 0i ID ( c ena 11/15/0e .11 BWA sow* r =20• MEC- 620.DWG cw.6oct Ne: C807 Volm 06/20/05 • OP'E.N C!T::H MEC Seattle cuntrull r, I 6 BWA J STATIONING STRUCTURE NUMBER STAGGER INCHES) CONTACT HT (FT -IN) MESSENGER HT IFT -INI TERMINATION HT IFT -NI POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT IN) FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 6 755 9 R 18.6 22.6 9.29 L WF -2030 - FD -3TA 120 CANT CA -02L 627.14 755 -116 9 L 18-6 23-6 9.29 L WF -2130 -9 FD -3TA CANT CA -OIL 148.72/148.72 10 /RI 21 -3 627.24 755-117 6 R 19 -3 22 -6 9.29 L 9.29 L WF -2130 .9 FD -3TA 628.64 755-118 6 L I9 -3 23 -6 WF -2230 -14 F0 -5TG CANT CA -06 CANT CA -06 JC -2 TERM BW -1 150 (0 /L)/150 (0 /LI 628.74 755-119 9 R 18 -6 22 -6 0 -0 9.29 l WF -2030 -14 CANT CA -021 DOA D0 -3 629.89 755 -120 12 R 18-6 22 -6 21 -0 17 9 L C I I Y WF-230 12 JUN F0 -5TG `0 FD-370 TERM CANT BW -1 CA -02M 115.1/1251 (0 /R) 125 -- 20 10 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN & SCHEDULE STA SB 624.50 TO STA SB 630.00 r. N BI 630.00 ( 0 --J I w CL 630-00 I 0 1 w 1 11 SB 630.00 0 SCALE IN FEET oro....o No ST R.Iw...* Ne. L57 -0P20 Sheet No. 135 20 (1) 40 CEI'JE® )F TUKWIL 2,g 7(tn7 IT C ENTEF. MEC -620 Rove 0 l yF,• -- L STATIONING STRUCTURE NUMBER STAGGER 11NCHESI CONTACT HT IFT -INI MESSENGER HT (FT -N) TERMINATION HT (FT -I I POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT IINI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION 75-122 12 R 8-6 22 -6 CANT CA -0M 755 -423 12 R 18-6 22 -6 CANT CA -01M 755 -424 12 R 18-6 22 -6 CANT CA -01M 755.125 12 R 18.6 22 -6 CANT CA -OIM SPAN IFT 124 123.8 123.8 123.8 123.8 -- NORTHBOUND SOUTHBOUND STATIONING STRUCTURE NUMBER STAGGER (INCHESI CONTACT HT IFT -IN) MESSENGER HT IFT -INI TERMINATION HT (FT -INI POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT (IN) FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 06/20/05 DA* NOTES: 125 ISSUED FOR CONSTRUCTION 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE• 1-E. POLE 121 IN PLAN IS 55 -121 IN SCHEDULE. 3 STRUCTURE. SEE CIVIL DRAWIS:- -- 3 --- -3 ----3 ___ --- _ - -3 --- -3 -- -3 3. STATIONING IS S K UNLESS ERWISE- NOTFII 4 • ALL POLE BRETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. D DGA DG -I 630.14 75-121 0 -0 9.29 L AP -3 FD-370 634.14 755.122 12 R 18-6 22.6 9.29 L WF -2126 - FD -3TG CANT CA.02M CURVE-R - 1500 - Ea = 4.75 IN 125 g moos. cicctric construction company L. DELA CRUZ D.S. / N.P. D e.. 0. TERRADO 0. MADONALD SR 599 B1 632.39 755 -123 12 R 18 -6 22 -6 9.29 L WF -2126 - FD -3TG CANT CA•02M • Sourailkluvsir A A 125 1 D.e« &.tt.. e,: G. MACDONALD 06/20/05 633.64 755 -124 12 R 18-6 22 -6 929 L WF -2126 - FD-37G CANT CA -02M Hatch Mott MacDonal 124 — I -- CL 632.00 — —' - c8 634•00 - - _ _ SE 632.00 JS -1 ASSY (TYP) ! - ------- CURVE _R = 1515.7 FT I Ea =4.75 - IN' I .�s.ws tt/ts/ae l NBI 634.00 sod.: I - =2o• t MEC- 621.DWG co..6oct M. C807 o.t 06/20/05 634.89 755 -125 12 R 18-6 22 -6 9.29 L WF -2126 -9 FD -3TG CANT CA -02M 125 125 OCS LAYOUT PLAN 8 SCHEDULE 20 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM STA SB 630+00 TO STA SB 635.50 MEC Seattle Controlled 40 SCALE IN FEET RECEIVED CITY OF TUKW LA JUN 2'8 7nn7 PERMIT GENIE R DMVing 136 HALF MEC -621 W mond N. L57 -0P21 sh..t M. Ram: 0 4 STATIONING - 755 - • 755427 i 755.128 __ 755 -129 STRUCTURE NUMBER -t26 12 R 12 R 1 12 R 12 R STAGGER (INCHES! 18-6 18.6 1 18-6 18-6 CONTACT HT IFT -N) MESSENGER HT (Fr-t11 226 22 -6 1 22-6 22-6 TERMINATION HT IFT - - -NI - - POLE SET -OUT (FT) - - . POLE REFERENCE - - - FOUNDATION HEIGHT (NI - - I -_ FOUNDATION REF - - - _ J MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION CANT CA -DIM CANT CA -01M CANT CA -DIM CANT CA -OIL SA -3 SPAN WTI -- 23.8 1 123.8 1 123.8 1 126.9 1 128.5 --- 1 NOTES: NORTHBOUND r N I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. LE. POLE 126 IN PLAN IS 755 -126 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE, SEE CIVIL DRAWINGS. 3. STATION! _LS SB TRACK UNLESS OTHERWISE NOTED, _ SR 599 4. A E_BR ETS AND BANDS BE- ALLOCATED BY CONTRACTOR PER LOO-J680. /5' �- m o If 4 ° , 4, z a w � AD 1 I o I �- _ _ 126. U W 2 0 of -_ CURVE R e 1500 FT - _ - 1 _ - - I ch 1.--_ N8t 636,00 - - `� _ _ IS' 127 `_ } I Z - ` - --- I28 �;t - - - cj -- _\,..!s9 r--• - _ -__ -- _ - __ Z W ( CL 63 6.0 -� ... .. - m NBt .63 -- 8.00 S3 - - - - - J - _ - - -- - - -- \�1 -- -- - - �- N:t 5Sv.00 - - - - _ • , • fn -- - - _ 636 .00 _ •�-- -- - -- 1 fi ` Op _ • �` n - _ ,r 0 1 _ 1 ! { � tA f 1 I - � -- _ --- 1 1�a CL 638.00 CL 6 0.00 _- -- --- - 0 _ 1 IS- -� -• - __JS -1 ASSY IT�f �3R _ -- - - , -- - - - ^� IW -- - aclt _ _ -�, - - -- ----- -._ x__'�_.__w --•- -- CURVE R :1515.7 FT I�� r .. --- "-- .____.._ Ea . 475 IN Q 1 I 1 / - - ----- ._ / J / I I.1.11 ` // SOUTH / ^ \ %/ /\, I '- - - - - - - - - ��(_' A ?2 ¢ 0 .'�I • ELF yid , s a M EC Seattle Controlled 1 20 1 = I 0) 0 0 SCALE N FEET V j T IVED ILA * * �nR i J 1 ' / 1jS.1t'�0..lT t r e HALF 636.14 637.39 = � O]!' 639.91.5 638.64.0 &WI STATIONING STRUCTURE NUMBER 755`126 755-127 12 R I 1 755-528 \T :1 # 755 -129 _ 12 R MilhiMia` I 12 R {-� STAGGER 12 R (NCH£SI CONTACT HT 18-6 18-6 HT IFT-INI ME T (FT- 22 -6 22-6 22-6 22-6 CITY TY '- TERMINATION HT FT N1 IFT - " , 1 9.29 L I WF -2026 • FD-3TA � ' M17•II • r u r 2U , 9.29 L WF -2026 F0-3TA ►`1 i � CANT SA - 3 _ - -- - -- - -- -- - - _ . - - - - - -- _ - -- - - - - _ - - - --- -I -I POLE SET -OUT (FTI 9.29 1 9.29 L POLE REFERENCE s WF -2126 WF -2126 .9 FOUNDATION HEIGHT (INI -9 FOUNDATION REF FD-3T6 FD -3T6 MISCELLANEOUS - -' STRUCTURE 8 ASSY DESCRIPTION CANT CA -02M CANT CA -02M CANT C M SPAN If TI -- 125 1 125 125.4 I 127.4 128.5 - -• 111111010. '� alactrk conitrvttlon CD� Ay `"O A eft L. DELA CR ilir - . - Hatch Mott MacD onal t Submitted en Dote: C. MACDONALD 06/20/05 v° " re • • ��. of ` "�� .... • '; '° p. ''! ` - �o `� _ t. 6C /0,... e Seale: 0 M N EC-6 Centred Mb C o 80 06/20/05 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SD 635.50 TO STA SB 641.00 Dossing NEU MEC -622 A ....., 0.S. / s H.P. Ref L57-0P22 A 0. TERRA00 Sheet ra X37 n«.: A t!Y 06/20/05 Dlt, ISSUED FOR CONSTRUCTION o..o,baoe "' "'° ° ^,�fflt.7�' 0. MACDONALD cWjE7j , 4 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -INI MESSENGER HT (FT-1N) TERMINATION HT (FT -INI POLE SET -OUT WTI POLE REFERENCE FOUNDATION HEIGHT INI FOUNDATION REF MISCELLANEOUS 755-130 12 L 18-6 22 -6 755-131 12 R 18.6 22-6 755432 12 L 18-6 22 -6 755 -134 12 R 18-6 22 -6 21 -3 STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) CANT CA -021 —428.5 I 140 CANT CA -OIL 140 CANT CA -021 140 41 CANT CA -OIL 149.59 (0/RI/159.59 -- NORTHBOUND N V ( WI.. .... C, I— W t _— Ear., c+ W I CD SOUTHBOUND 130 NOTES: I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 130 IN PLAN IS 755 -130 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. Ivag 642.1)0 • � ,y, ) CL 4,41'00 IEEE JS t ASSY - tTYPI SR 599 EMI — CL 644j0 s3 - .. ... SP E44.en • . ... .. - ------ - --- --- - --- __- __- _ --- - 4- _ - - __ -_ _ _ 1.4- ® I --- -- - - - ---- _ _ _ 3 _ _ _ —I _iW o .I � 06/20/05 ISSUED FOR CONSTRUCTION a+a»r sn 1. DELA CRUZ G1)..., D.S. / N.P. a..a+d ey. G. TERRADO &analog' ea O. MACDONALD NEC- 623.DWG Coaled No San/alai Soutakatisrr er G. MACDONALD Hatch Mot MacDonal 06/20/05 ,. c REVIEWED FOR COD COMPLIA Data 06/20/05 }ter►— , :. , E�58� , CL 646.00 — I BWA LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE MEC Seattle Controlled 20 10 STA SB 641.00 TO STA SB 646.50 0 SCALE N FEET Dromm Shoot Nos 138 to 20 IOU W 40 IVED TU KWI LA g 711n7 3ENTER MEC -623 Sr RA.r...n No. L57 -0P23 0 , 645.15.41 645.40.41 STATIONING 64420 755 642.60 755 -131 644.00 755432 755 -133 755 -134 STRUCTURE NUMBER -130 12 R 12 L. — +1.1 1 2 R STAGGER (INCHES) CONTACT HT IFT -INI 12 1 18-6 18 -6 6 18-6 R 22 -6 rili, �rC MESSENGER HT PT-IN) 22 -6 22-6 - 1 929 1- WF -0826 0-0 2022-6 -7 TERMINATION HT (FT-INI - 9.29 L 9.29 L ' T ) POLE SET -OUT (FT) 9.29 L 9.29 L _ AP-3 _ WF -9 POLE REFERENCE WF -0826 WF•0826 �� , _9 -9 FD -STA LIHME_L FOUNDATION HEIGHT 11N1 -9 -9 i 9 FD-ITA ��lt� rl� ', %1v� ION FO -3TA FOUNDATION REF FD -ITA FD-ITA I n G�F, ;!T MISCELLANEOUS o STRUCTURE 8 ASSY DESCRIPTION CANT CA -OIL CANT CA -021 ! l i CANT CA -04. DGA DG -I CANT CA -02L TERM 8W-I SPAN (FT) •128.5 J 140 1 140 I ' 140.41 159.59 --- STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -INI MESSENGER HT (FT-1N) TERMINATION HT (FT -INI POLE SET -OUT WTI POLE REFERENCE FOUNDATION HEIGHT INI FOUNDATION REF MISCELLANEOUS 755-130 12 L 18-6 22 -6 755-131 12 R 18.6 22-6 755432 12 L 18-6 22 -6 755 -134 12 R 18-6 22 -6 21 -3 STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) CANT CA -021 —428.5 I 140 CANT CA -OIL 140 CANT CA -021 140 41 CANT CA -OIL 149.59 (0/RI/159.59 -- NORTHBOUND N V ( WI.. .... C, I— W t _— Ear., c+ W I CD SOUTHBOUND 130 NOTES: I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 130 IN PLAN IS 755 -130 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. Ivag 642.1)0 • � ,y, ) CL 4,41'00 IEEE JS t ASSY - tTYPI SR 599 EMI — CL 644j0 s3 - .. ... SP E44.en • . ... .. - ------ - --- --- - --- __- __- _ --- - 4- _ - - __ -_ _ _ 1.4- ® I --- -- - - - ---- _ _ _ 3 _ _ _ —I _iW o .I � 06/20/05 ISSUED FOR CONSTRUCTION a+a»r sn 1. DELA CRUZ G1)..., D.S. / N.P. a..a+d ey. G. TERRADO &analog' ea O. MACDONALD NEC- 623.DWG Coaled No San/alai Soutakatisrr er G. MACDONALD Hatch Mot MacDonal 06/20/05 ,. c REVIEWED FOR COD COMPLIA Data 06/20/05 }ter►— , :. , E�58� , CL 646.00 — I BWA LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE MEC Seattle Controlled 20 10 STA SB 641.00 TO STA SB 646.50 0 SCALE N FEET Dromm Shoot Nos 138 to 20 IOU W 40 IVED TU KWI LA g 711n7 3ENTER MEC -623 Sr RA.r...n No. L57 -0P23 0 REV 06/20/05 twt NORTHBOUND JS -I AS BWA q 'J q. 650.00 543'05'02 CI 9 C56 • • 0 SOUTHBOUND ISSUED FOR CONSTRUCTION O..oriptles 3. STATIONING IS SB TRACK U_NLESS_ATHERWISE - NO i - NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX' SHOWN IN SCHEDULE, LE. POLE 135 IN PLAN IS 755 -135 IN SCHEDULE. 2. FOR POLE FOUNOATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 4. ALL POLE BRACKETS AND POLE BANOS TO BE A 5. ROUTE FEEDERS :FROM POLE 140 TO 139 AND1 TO SUBMIT DESIGN - SHOWING SLACK IN FEEDER,'. POSITIONING OF FEEDER JUMPERS: - - - - - - - Y (TYP) A A A MAW,. Qlccttdc con/eviction competing LOCATED BY CONTRACTOR PER L00 -J680. N L. OT CATENARY. CONTRACTOR � 9ei¢1G TO CATENARY AND o..ftmw ar L. DELA CRUZ on." .r D.S. / N.P. 0. TERRADO suaMN.e er 0. MACDONALD Effl SR 599 INSULATED OVERLAP I L00 -J440 INSULATED OVERLAP [00 :J440 9 H atch Mot MacDonal Submitted e,.. oel« G. MACDONALD 06/20/05 NOTE 5 FEEDER FEEDER 140 Sows r.20• Thoortoe C807 Contract Ne: COW 06/20/05 MEC- 624.0WG MEC Seattle Controlled 20 10 0 MI - -- '-H r• -' - CM I OCS LAYOUT PLAN a SCHEDULE STA SB 646.50 TO STA SB 652.00 SCALE W :tEET 4 rn O BWA - -- T 20 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM 0 u0 .h Ne. ti I I I I ECEIVED OFTUKWII 2,8 7nn7 ViiT GEi -TE d MEC -624 ST ilef.r.r,e. N.. L57 -0P24 Shoot No, Mu. 139 0 W N O 652.25 90 646.90 - - 1 STATIONING 647.00 - 648.50 648.60 651.62.4 STATIONING 650.09 650,19 � i' II _ u�gl 651.62.4 755 STRUCTURE NUMBER 755-136 755 -139 755 -140 755-137 755-138 755 -142 755139 755140 . ' 1114 1�1� 1 A 9 L 0 9 R STAGGER (INCHES) 9 L I 9 L 6 R R i.- 18-6 r f HT 18.6 18-6 18-6 19 -3 j 19 -3 18 6 23 -6 CONTACT IFT -w l MESSENGER HT IFT -IN) 22 -6 18-6 22 -6 23 -6 22 -6 23 -6 22 -6 1 / I C55 20 -7 22- 1 X07 19 -7 9.5 R CI i ati TERMINATION HT IFT -IN) 23-6 22 -6 - - 22 -6 MESSENGER (FT -INI TERMINATION HT IFT 9.29 I POLE SET (FT) 9.29 L - 9.29 1 9.29 L 9.29 1 -OUT POLE REFERENCE WF -2230 C56 22 -7 1 C56 20 -7 I X08 19 -7 WF -2030 WF -2130 9.29 L - WF -2130 F WF -21 .C1:ahlf, 9 /{ F0-3TA F - WF3230 9 FD-5TA 44 - ' 6 �1 FOUNDATION HEIGHT IINI -9 2525 L '9 -9 WF -2130 - -9 FD -3TA F FOUNDATION REF F0-5TA 1 F0 -3TA FD-3TA WF -3230 POLE REFERENCE - - - - - ���� ��v - MISCELLANEOUS - -9 FOUNOATION HEIGHT I1N) FOUNDATION REF FD-3TA - - - - STRUCTURE 8 ASSY DESCRIPTION CANT CA -OIL FD-5TA CANT C JP -2 CANT IN-I, IN-2 6 - CANT CA -06 IN -4 IN -2 DS -01, DISC SW C33-H -601 CANT CA -OIL JP -2 - TE - M FA -I CANT CA -OIL - TERM BW -1 SPAN (FT) 159.59 � 150/160 (0 /RI 159 (0/1)/159 10 /LI 153.4 (0 /R)/ 143.4 44.4/50.4 (0 /RI ---- REV 06/20/05 twt NORTHBOUND JS -I AS BWA q 'J q. 650.00 543'05'02 CI 9 C56 • • 0 SOUTHBOUND ISSUED FOR CONSTRUCTION O..oriptles 3. STATIONING IS SB TRACK U_NLESS_ATHERWISE - NO i - NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX' SHOWN IN SCHEDULE, LE. POLE 135 IN PLAN IS 755 -135 IN SCHEDULE. 2. FOR POLE FOUNOATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 4. ALL POLE BRACKETS AND POLE BANOS TO BE A 5. ROUTE FEEDERS :FROM POLE 140 TO 139 AND1 TO SUBMIT DESIGN - SHOWING SLACK IN FEEDER,'. POSITIONING OF FEEDER JUMPERS: - - - - - - - Y (TYP) A A A MAW,. Qlccttdc con/eviction competing LOCATED BY CONTRACTOR PER L00 -J680. N L. OT CATENARY. CONTRACTOR � 9ei¢1G TO CATENARY AND o..ftmw ar L. DELA CRUZ on." .r D.S. / N.P. 0. TERRADO suaMN.e er 0. MACDONALD Effl SR 599 INSULATED OVERLAP I L00 -J440 INSULATED OVERLAP [00 :J440 9 H atch Mot MacDonal Submitted e,.. oel« G. MACDONALD 06/20/05 NOTE 5 FEEDER FEEDER 140 Sows r.20• Thoortoe C807 Contract Ne: COW 06/20/05 MEC- 624.0WG MEC Seattle Controlled 20 10 0 MI - -- '-H r• -' - CM I OCS LAYOUT PLAN a SCHEDULE STA SB 646.50 TO STA SB 652.00 SCALE W :tEET 4 rn O BWA - -- T 20 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM 0 u0 .h Ne. ti I I I I ECEIVED OFTUKWII 2,8 7nn7 ViiT GEi -TE d MEC -624 ST ilef.r.r,e. N.. L57 -0P24 Shoot No, Mu. 139 0 W N O 652.25 90 646.90 - - 1 - 651.62.4 STATIONING 755-135 755-136 755-137 755 -138 1 755 -139 755 -140 755 -142 STRUCTURE NUMBER 15 L 9 L 9 R 6 l I 6 R 9 L 6 R STAGGER (INCHES) 19 -3 18-6 18-6 19 -3 j 19 -3 18-6 18-6 CONTACT HT IFT -INI HT 22 -6 23 -6 23 -6 22 -6 I 23-6 22 -6 22 -6 MESSENGER (FT -INI TERMINATION HT IFT 0 - 21 -4 - 1 - C56 22 -7 1 C56 20 -7 I X08 19 -7 -IN) 9.29 L - - - - 2525 L POLE (FT( WF -2130 - - - 1 - WF -3230 POLE REFERENCE - - - -9 FOUNOATION HEIGHT I1N) FOUNDATION REF FD-3TA - - - - FD-5TA MISCELLANEOUS - - - - - STRUCTURE 8 ASSY DESCRIPTION CANT CA -06 JP -2 ES CANT CA -021 TERM BW -I CANT CA -OL CANT CA -06 M -L IN -2 CANT CA -06 IN-1, IN -2 CANT CA -02L JP -2 05 -01, DISC SW C33 -H -602 TERM FA -I CANT CA -021 TERM BW -I SPAN (FT) 149.59 (0/R1/159.59 160/160 (0 /RI 159 (0/L1/159 (0/1) 153.4 (0 /R)/ 143.4 44.4/50.4 (0 /R) --- REV 06/20/05 twt NORTHBOUND JS -I AS BWA q 'J q. 650.00 543'05'02 CI 9 C56 • • 0 SOUTHBOUND ISSUED FOR CONSTRUCTION O..oriptles 3. STATIONING IS SB TRACK U_NLESS_ATHERWISE - NO i - NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX' SHOWN IN SCHEDULE, LE. POLE 135 IN PLAN IS 755 -135 IN SCHEDULE. 2. FOR POLE FOUNOATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 4. ALL POLE BRACKETS AND POLE BANOS TO BE A 5. ROUTE FEEDERS :FROM POLE 140 TO 139 AND1 TO SUBMIT DESIGN - SHOWING SLACK IN FEEDER,'. POSITIONING OF FEEDER JUMPERS: - - - - - - - Y (TYP) A A A MAW,. Qlccttdc con/eviction competing LOCATED BY CONTRACTOR PER L00 -J680. N L. OT CATENARY. CONTRACTOR � 9ei¢1G TO CATENARY AND o..ftmw ar L. DELA CRUZ on." .r D.S. / N.P. 0. TERRADO suaMN.e er 0. MACDONALD Effl SR 599 INSULATED OVERLAP I L00 -J440 INSULATED OVERLAP [00 :J440 9 H atch Mot MacDonal Submitted e,.. oel« G. MACDONALD 06/20/05 NOTE 5 FEEDER FEEDER 140 Sows r.20• Thoortoe C807 Contract Ne: COW 06/20/05 MEC- 624.0WG MEC Seattle Controlled 20 10 0 MI - -- '-H r• -' - CM I OCS LAYOUT PLAN a SCHEDULE STA SB 646.50 TO STA SB 652.00 SCALE W :tEET 4 rn O BWA - -- T 20 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM 0 u0 .h Ne. ti I I I I ECEIVED OFTUKWII 2,8 7nn7 ViiT GEi -TE d MEC -624 ST ilef.r.r,e. N.. L57 -0P24 Shoot No, Mu. 139 0 W N O 652.25 90 i C STRUCTURE NUMBER I STAGGER (INCHES) CONTACT - HT IFT -N) • g MESSENGER HT IFT-INI TERMINATION HT IFT -INI POLE SET -OUT WTI g POLE REFERENCE : FOUNDATION HEIGHT (Ni 1 FOUNDATION REF MISCELLANEOUS 652.06.8 755-144 9 R 18-6 22 -6 2525 L WF -0830 -9 FD-ITA CANT CA -24M 652.12.8 755 -146 NOTE 6 12 L 18-7 23-6 2525 L WF -2130 .9 FD -3TA 653.04.4 755 -148 NB 6 L XOI 14 18.6 X08 18-7 TYP 118 22 -6 X08 22 -7 NR 25.25 L WF -0830 -9 FD-ITA NB CANT CA -OIL HR -MW 653.96.1 755 -150 NOTE 612 18.7 23 -6 25.25 L WF -2130 - FD -3TA 654.02.1 755 -152 9 R 18-6 22 -6 25.25 L WF -0830 - FD-ITA 654.61.4 755-154 6 R 18-6 22 -6 X08 21-10 1 X08 19 -10 1060 21 -2 25.25 L WF -3230 FD-5TA TERM CANT FA-1 CA -02L TERM BW -1 755455 9 L 18-6 22 -6 755 -156 6 R 19.3 23.6 L 755.157 6 L 19 -3 22 -6 STATIONING STRUCTURE NUMBER STAGGER INCHES) CONTACT HT FT-N) MESSENGER NT IFT -IN1 TERMINATION HT IFT -NI POLE SET -OUT FT) POLE REFERENCE FOUNDATION HEIGHT (NI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY OESCRFTION SPAN WTI 44.4 / 50.4 (0 /RI STATIONING STRUCTURE B ASSY DESCRIPT1ON SPAN WTI leA I tr z NORTHBOUND O �I m1 co • • 100 • • • __ 4 4 FA W 1143 I SOUTH80UND T 652.06 .8 755 -143 9 l 18-6 22-6 9.5 R WF -0830 - FDJTA CANT CA -24M 44.4 / 50.4 (0 /R) ST COMMENTS INCORPORATED ISSUED FOR CONSTRUCTION o...e.rwe NOTES: 5. 97.6 / I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 143 IN PLAN IS 755 -143 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS S8 TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND POLE BANGS TO BE ALLOCATED CONTRACTOR PER L00 -J680. Ca SEE NOTE 5 ON DRAWIN 652.12.8 755 -145 NOTE 6 12 R 18-7 23.6 9.5 R WF -2130 -9 F0 -3TA CANT CA -OIL CC -I, JC -2 91.6 (X /0) DIAMOND CROSSOVER ASSY KN -3 a KN - 4 W /INSUL IK 97.6 / 91.6 (X /01 1 7.5' 7.5' 1 STAGGER r ' o ASSY KN- J- 9"01-4 W /INSUL 1K I - DIAMOND CROSSOVER 1 - ENLARGED PLAN SCALE: r 653.04.4 755 -147 SB 6 R X07 I TYP CS 13-6 SB 22.6 58 CANT CA -OIL 9.5 R WF -0830 -9 FD-ITA X07 18.7 NR X07 22-7 H -SPAN HS.02 HR -MW 97.7 / 91.7 )X/01 59.3 / 65.3 (0 /RI 97.7 / 917 (X /0) alacttic Coiutwctlon COMpe y 150 :> I 653.96J 755 -149 NOTE 6 12 R 10.7 23-6 9.5 R WF -2130 -9 FO.3TA CANT CA -01. JC -2 CC -1 D•+_ on L. DELA CRUZ Gn.e M O.S. / N.P- c*.d.il W. 0. TERRADO 7�w+te.r M 0. MACDONALD Ell 6. STAGGER OF TURNOUT CATENARY MEASURED FROM '. MAINLINE TRACK. . 1 : 654.02.1 755 -I51 9 L 13-6 22 -6 CANT CA -021 9.5 R WF -0830 -9 FD-ITA TERM FA -1 59.3 / 65.3 (0 /R1 EMI FA SWA - - - - -- 9 -FS^ ne (NS_ULATED QYERLAE_- �_,....._.-- -- - - --- -- _C9 LOO -J440 654.61.4 755.153 3 L 18-6 JS ASSY (TYPI 22 -6 X07 21 -10 XOT 19 -10 C59 21 -2 9.5 R WF -3230 - FD -5TA CANT CA -02L aeeae.4 ee, G. MACDONALD 128.1 / 138.1 (0 /R) TERM BW-1 128.1 / 138.1 (0 /R) Hatch Mott MacDonal Dees 06/20/05 FEEDER FEEDER 655.89.5 755 -155 9 L 18-6 23 -6 6.46 L WF -2130 F - FD-3TA F CANT CA -OIL JP -2 '+?q 654.00 CL 6.00 655.99.5 755 -156 6 R 19 -3 22 -6 6.46 L WF -2130 F -9 FD -3TA F sea. MEC- 625R1.DWO ce.w.a ea C807 Dees 06/20/05 MEC Seattle Controlled CANT CA -06 IN-I, N -2 DS -01, DISC SW C33 -H -605 INSULATED OVERLAP - - .tea. - 160 10 /L1 / 20 10 0 160 (0 /LI SCALE N FEET 160 (0 /L) / 160 (0 /L) LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN a SCHEDULE STA S8 652.00 TO STA SB 657.50 FEEDER CANT CA -06 IN -1, IN -2 40 - FD -3TA F a..Ing He: 657.49.5 755457 ECEIVE? 19-3 23-6 Off: TUKWIU 23-6 dun 2.3 7097 6.46 L WF- 2I30 Iran I III CENTER MEC -625 $T rar..1me w. L57 -0P25 sn.w w: w..: 140 1 t ) 1 755461 9 R 18-6 22 -6 659.22 755-160 15 L 19 -3 22 -6 0 -0 6.46 L WF 2130 -9 FD-3TA 755-158 9 R 18-6 23-6 STATIONING STRUCTURE NUMBER STAGGER BNCHESI CONTACT HT IFT -IN1 MESSENGER HT IFT-14 TERMINATION HT IFT -IN1 P011 SET -OUT IFT1 POLE REFERENCE FOUNDATION HEIGHT (I1 FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) w w NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE, I.E. POLE 158 IN PLAN IS 755-158 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE, SEE CIVL I DRAWINGS. 1 3.- - STATIONING- IS S8 -TRACK -UNLESS- OTHERWISE- NOTED. 4. ALL POLE BRACKETS AND POLE BANOS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. 1 • STRUCTURE 8 ASSY DESCRPTION SPAN (FT) NORTHBOUND 0 FEEDER SOUTHBOUND CANT CA-OIL JP -2 172.5 10 /R) / 152.5 162.5 (0 /R) / 152.5 TERM FA4 CANT CA -02L CANT CA -06 OGA DG-3 5. ROUTE NB FEEDERS FROM POLE 157 TO 158 AND THEN TO CATENARY. CONTRACT TO SUBMIT DESIGN SHOWING SLACK IN FEEDER, ROUTING TO CATENARY AND POSITIONING OF FEEDER JUMPERS. g .658.00 160 m u, STATIONING STRUCTURE NUMBER 657.59.5 755458 65942 755 -159 MESSENGER HT (FT -IN) TERMINATION HT (FT4NI POLE SET -OUT (FTI POLE REFERENCE FOUNDATION HEIGHT (III 22 -6 6.46 L WF -2130 F . 9 22 -6 6.46 L WF -2230 -9 STAGGER IINCHESI CONTACT HT IFT.1N1 9 R 18.6 9 L 18-6 FOUNDATION REF FD-3TA F FD-5TA MISCELLANEOUS CANT CA -02L JP -2 1)S -01, DISC SW C33-H -603 CANT CA -OL CANT CA -OL 140.5 / 130.50 (0 /R) 109.8 1 110.3 I 110.5 -- 140.5 J S- I- ASSY- IrYP} • 660.52.5 660.77.5 755 -161 755-162 9 R 18-6 -7 FD-3TA -6 FD-3TA 755463 12 18-6 22 -6 CANT CA -02M 109 CIZETILPin EMI 12 L 18-6 22 -6 6.46 WF -2026 FD-3TA Centred MK C807 CURVE R 1160.67 FT Ea 6.0 IN a CURVE R : 1145 FT Ea = 6.15 ------------------------ 109 755464 12 L 18-6 22 -6 di 0 VI CANT CA -02M 20 10 0 z O w 0f - SCALE - IN -FEET ----------- I VI C O l II INFO F MEC Seattle ontrolled NFp, • NEC AUG 2 7 20717 12 L 18-6 22 -6 6.46 L WF -2126 .2 FD-3TA 20 (09 -- A A n 09/09/05 CONTRACTOR LAYOUT SUBMITTAL - REVISIONS 06/20/05 ISSUED FOR CONSTRUCTION DUE Ouobtlen OW 4 aicctric con,truction com pony Dealgned L DELA CRUZ VninM An D.S. / NP. a d.d OA 0. TERRADO a.,.. 0. MACDONALD Souxniivusrr 141 40 I; ; 1i'( V n1R '11 1 N EIVED T UKWILA &... ?lira CENTER MEC -626 ST Wren. He. L57 -0P26 Shoot W.: Rev: ( STATIONING STRUCTURE NUMBER STAGGER INCHES' CONTACT HT (FT-NO MESSENGER HT IFT-INI TERMINATION HT IFT-INI POLE SET -OUT (FT] POLE REFERENCE FOUNDATION HEIGHT IINI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION I\ N/04/05 06/20/05 755 -165 12 18-6 22 -6 CA -02M ST. REFERENCE NO. CORRECTED ISSUED FOR CONSTRUCTION 755 -166 755 -167 755.168 12 L 12 L 12 L 18-6 18-6 18-6 22 -6 22 -6 22 -6 electric construction company Doo.p.M M L. DELA CRUZ Comm Or D.S. / N.P. timemw 0. TERRADO INMAN Sn 0. MACDONALD 4,„ G. MACOONAL.D Hatch Mott MacDonald D.e 06/20/05 r =2o• Almonds MEC- 627RLDWG a ...ma N.. C807 Dotal 06/20/05 755 -169 12 L 18-6 22 -6 O.• a. 01' .7.• CA -02M CA -02M CA -02M CA -02M SA -3 SPAN (FTI 110.5 110 110.5 110.5 110.5 110.4 -- 0 W W STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT-INI MESSENGER HT IFT-INI TERMINATION HT (FT -IN) POLE SET -OUT IF POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) NORTHBOUND SOUTHBOUND ESN 77� 15' I. POLE NUMBERS IN PLAN ARE MISSING THF.p755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 165 IN PLAN 1S 755 -165 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING 15 SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND POLE BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. CURVE R = 1160.67 FT Ea =6.0N CURVE R = 1145 FT Ea = 6.0 IN EDI N8q 666.00 666.0 -- - 666.00 - - - - --- - �s- I- ASSITxe1 - -- - - -- - T\ �6\ N8q 668. - ` - S8 MEC Seattle Controlled Cal 0 2 I0 ;6- W 07 / \ 1 • 663.79.5 755 -165 9 L 18-6 22 -6 • CANT CA -OIM 109 664.88 755 -166 9 L 18-6 22.6 6.46 L WF -2126 - FD-3T0 6.46 L WF -2126 .2 FD-3TA 108.5 CANT CA -01M 665.97 755 -167 9 6.46 L WF -2126 -4 FD-3T0 109 CANT CA -01M 109 667.06 668.15 755 -168 9 L I8-6 22 -6 6.46 L WF -2126 -4 FD-3T0 • . 4II! 7 Li9 18-6 22 -6 6.46 L WF -2126 FD-3T6 11 Y ■_)r n CANT CA -OIM 109 CANT CA -01M SA -3 108.9 -- 20 SCALE IN FEET 'JED uKWILA 7( ENTER 40 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 663.00 TO STA SB 668.50 Drawing Nes MEC -627 ST 11 .no• M=. L57 -0P27 Shoe N..= 142 STATIONING - - 670.33 671.33 . ! ,I� ,,r, a b f ►J STATIONING 755 -170 755 -172 755 -173 75 -1 5 755-176 755 -175 755 -176 STRUCTURE NUMBER 755 -170 STRUCTURE NUMBER 1 2 L 755-172 12 L 9 1 STAGGER (INCHES) 12 L 9 L 6 R 9 STAGGER (INCHESI HT 18-6 18-6 18-6 - 18-6 18.6 18-6 19-3 18-6 19 -3 CONTACT IFT -INI HT 22 -6 22 -6 22 -6 22 -6 22 -6 23 -6 MESSENGER HT IFT -INl 22.6 MESSENGER (FT -INI TERMINATION HT IFT - 23-6 22 -6 TERMINATION HT IFT -INI I 0 -0 20-10 -INI POLE SET - i 0.0 21-1 - - - - -OUT (FT) 6.46 L 6.46 L 6.46 L - 6.46 L 6.46 L - - 6.46 L POLE REFERENCE HEIGHT _ WF -2126 AP -3 - - WF -2130 WF -2230 FOUNDATION 11N) WF -2030 WF -2130 - - -4 -5 _FOUNDATION REF - - -10 - - MISCELLANEOUS FOUNDATION REF FD 370 no-3TG F0 -5T0 FD -3TG FD -5T6 STRUCTURE 8 ASSY DESCRIPTION CANT CA -02M CANT CA -02M CANT CA -02M MISCELLANEOUS - CA-02L CA CANT JC -2 SPAN (FT) 110.4 I 110.5 1 101 1 132.3 / 128.1 (0 /R) - 150 (0 /LI / 150 (0 /1) --.- STATIONING 669.24 670.08 670.33 671.33 . ! ,I� ,,r, a b f ►J 672.64.6 672.70.6 75 -1 5 755-176 STRUCTURE NUMBER 755 -170 755 -171 755-172 7 755-173 STAGGER (INCHES) 12 L 9 CONTACT HT IFT -IN1 18-6 - 18-6 18.6 19 -3 17� 18-6 19 -3 23 -6 22 -6 MESSENGER HT IFT -INl 22.6 - 22 -6 23-6 22 -6 TERMINATION HT IFT -INI 0 -0 20-10 i 0.0 21-1 - - POLE SET -OUT (FT) 6.46 L 6.46 L 6.46 L 6.46 L 6.46 L 6.46 L 6.46 L POLE REFERENCE WF -2126 AP -3 WF -2230 WF -2130 WF -2230 WF -2030 WF -2130 FOUNDATION HEIGHT IINI -4 -5 -6 -10 -10 9 .9 FOUNDATION REF FD 370 no-3TG F0 -5T0 FD -3TG FD -5T6 FD-37A FD -3TA MISCELLANEOUS - -. - - - STRUCTURE 8 ASSY DESCRIPTION CANT CA.OIM GOA DO-1 CANT CA -DIM TERM 8W01 CANT CA -01M DOA 06-3 CANT CA -06 TERM BW -01 CANT CA -OIL CANT CA -06 SPAN IFTI 108.9 J 109.1 1 100 / 110 (0 /R) 131.6 / 127.6 (0 /R1 150 (0 /L) / 150 10 /L) --•-- •■ _ U w 0 w w NORTHBOUND r -- SOUTHBOUND NOTES: CURVE R = 1160.67 FT Ea = 6.0 IN 170 !1 - CUR VE_R--- it45 - FT - E8 -= 6.0 IN • ` rn' --- - ' 0 10.00 DI C 4y A. POLE NUMBERS IN PLAN ARE MISSING THE 755.4REFIX SHOWN IN SCHEDULE. I.E. POLE 170 IN PLAN IS 755- 170`1N SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND POLE BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. a o vs 6 7 0 . 0 0 s MEM JS ASSY (TYP) Nag 672.00 58 672.00 CO REWED FOR NFpq �� p �NCE NEC AUG 2 7 2007 W 0 W UNINS ATED 0 ERLAP - - - 4- OATC ISSUED FOR CONSTRUCTION D..alPean g MOM. <Hac cono ruction company DoaraO L DELA CRUZ ore.. erg D.S. / N.P. 0. TERRADO s..+ errn 0. MAC00NALD Sourafikmar 4,„ tart nyt G. MACDONALD Hatch Mot MacDona Data 06/20/05 121=31/11Y10 i1UTY Scala: Filonorma MEC- 628.DWG Contract Na C807 Dab: 06/20/05 I Q` --1 �i UN! I L AYE0 OVERCAP - - - - 100 -J442 OCS LAYOUT PLAN 8 SCHEDULE MEC Seattle Controlled 20 10 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM STA SB 668.50 TO STA SB 674.00 RECEIVED CITY uF TUKWIIA JUN 2,B -711n PERMIT CENTER 0 20 0) CV t0 0 w 0 10) SCALE IN FEET Errata.; Nos ST Rotor.. L57 -0P28 sn.■c No.: R...: 143 MEC -628 40 0 0 3 a 8 STATIONING STRUCTURE NUMBER STAGGER INCHESI CONTACT HT (FT-GB MESSENGER HT IFT-PA TERMINATION HT (FT -911 POLE SET -OUT IFTI ' ` POLE REFERENCE FOUNDATION HEIGHT (111) FOUNDATION REF • MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT1 CO (Ni t0 U 21 W col STATIONING STRUCTURE NUMBER STAGGER (INCHES' CONTACT HT (FT -NI MESSENGER HT IFT-N) TERMINATION HT IFT -INI POLE. SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT BNI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN WTI A A A A A A 09/09/05 06/20/05 150 (0/11 / 150 (0/11 NORTHBOUND 755477 19 -3 22 -6 MEI - NINSULATED OVER X42• L - SOUTHBOUND 674.14.6 755 -177 6 L 19 -3 23-6 9.29 L WF -2130 -5 FD-3TA CANT CA -06 JC -2 6 L CANT CA -06 150 (0/11 / 150 (0/L1 ISSUED FOR CONSTRUCTION a.eerlption NOTES: 755 -178 9 L 18-6 23-6 CANT CA -ON. CONTRACTOR LAYOUT SUBMITTAL REVISIONS - - - - - - i 179 674.20.6 755 -178 9 L 18-6 22 -6 9.29 L WF -2030 -5 FD-3TA CANT CA -02M CANT CA -06 1242 10/RI / 128.4 675.36 755479 6 L 19 -3 22 -6 20 -2 9.29 L WF -2230 -1 FD-5TA 1212 (0/6) / 125.3 TERM FA-1 755 -180 I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 177 N PLAN IS 755 -177 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE, SEE CIVIL DRAWINGS. 3. STATIONING IS S8 TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND POLE BANGS TO BE ALLOCATED BY CONTRACTOR PER 100 -J680. UNINSULA - - � - - _ O VERLAP _ _ _ L00 -J442 \22> - -� 675.46 755 -180 9 R 18-6 22.6 9.29 L 9 R 18-6 23-6 0 -0 WF -2130 -1 FD-3TA CANT CA -02M mckll. clactf is conitructlon company CANT CA -DIM DGA DG-3 127.5 (0/RI / 17.3 D__ yr L. DELA CRUZ awn wl D.S. / NP. a.d.. S 0. TERRADO Waleoldod Op O. MACDONALD 1 / -5 CANT CA -02M 755-1811 12 R 18-6 1 22 -6 I 20 -6 1 1 1 CANT1 CA -01M 676.64.2 755481 12 R 18-6 1\ 22 -6, 224 20 -41 9.29 1 TERM FA4 WF -2230 - S-1- ASSY -{TYPI - 4 i FD-5TA 182 676.892 755482 0 -0 9.29 L AP -3 .1 FD-3TA DGA DG4 SA:0* .r er G. MACDONALD N7.6 1 bURVE R = 1515.7 FT - - - - - - - - - - -- - - - 1 - 13' _ Ea : 4.5 IN L I� % -- - - - - _ - R E�E WED FOR COD COMpt NFpg 7p _NE AUG 7 1007 6 . 63 18.8 Hatch Mott MacDonal aote 06/20/05 755.183 12 R 18-6 22 -6 CANT CA-01M 7• 183 R 18-6 22 -6 .29 L -2026 .1 F0-3TA CANT CA -02M c=arrAlEye s==.= P =20' Plommm MEC- 629RLDWG Ombra* nee C807 Doim 06/20/05 N4.4 T55 -184 12 R 18-6 22 -6 CANT CA -00.1 ---- --- -- - ------- --- - - - - -- I84 CURVE R = 1500 FT Ea =4.5N 115.5 12 R 18-6 22 -6 .1 MEC Seattle Controlled 678.985 755184 9.29 L WF -2026 FD-3TA CANT CA -02M 20 10 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN a SCHEDULE STA SB 674+00 TO STA SB 679.50 117.3 118.5 0 SCALE N FEET I EI' /ED TU ILA JUN 28 ?nn7 p c�r r;(vll CENTER area 144 20 0 MEC -629 st n....o• No. L57 -0P29 Shoot Ile: Rom 40 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -INI MESSENGER HT (FT -INI TERMINATION HT IFT -1N1 POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT IINI FOUNDATION REF MISCELLANEOUS 755 -185 12 R 18-4 22 -4 T 755 -186 12 R 18-1 22 -1 T 755 -187 12 R 17 -8 21 -8 755-189 12 L 17.2 21.2 CANT CA -021 115 1 118.5 110 11 STATIONING 4 STRUCTURE NUMBER STAGGER (INCHESI CONTACT HT (FT -NIL MESSENGER HT IFT -INI TERMINATION HT IFT -INI POLE SET -OUT (FT] POLE REFERENCE FOUNDATION HEIGHT IINI FOUNDATION REF MISCELLANEOUS STRUCTURE B ASSY DESCRIPTION SPAN (FT) 12/29/05 06/20/05 NORTHBOUND 14' SOUTHBOUND 118.5 14' ST COMMENTS INCORPORATED ISSUED FOR CONSTRUCTION 680.17 755 -185 12 R 18-4 22.4 9.29 1 WF -2026 .I FD-3TA CANT CA -02M o f •)' ml 117 I FS g me afac coa,ttucelon company / -5 ASSY -- CURVE R . 1515.7 FT Eo = 4.5 IN 681.34 755 -186 12 R 18-1 21 -1 9.29 L WF -2026 - FD-3TA CURVE R = 1500 FT Ea = 4.5 IN CANT CA -02M o ormod e$ L. DELA CRUZ O.S. / N.P. algoldwd 1,. 0. TERRADO A. MACDONALD 5' 116 G r2.00 682.49.5 755 -187 12 R 17 -8 21 -8 9.29 L WF -0826 - FD -ITA CANT CA -02M C. MACDONALD REVIEWED F CODE COMPUANCt- NFPA 70 -NEC AUI3 7 2007 118.5 Hatch Mo MacDona o.m 06/20/05 1.1 NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 185 IN PLAN IS 755 -185 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. NINO IS 58 TRACK UNLESS OTHERWISE NOTED. OLE BRACKETS AND POLE BANDS TO BE ALLOCATED 8 ACTOR PER L00 -J680. 83.43 755 -188 0 - 0 9.29 L AP -3 -9 FD -3TA OGA 00-1 683.68 755.189 12 L 17-2 21-2 19 -6 9.29 L WF -2230 - FD -5TA sod.: r =20. FlIonomm MEC- 63ORLDWG Centred Ma C807 Dee.: 06/20/05 CANT CA -OM,. - - - -- fr �� TERM BW -01 g 7fln7 ILO / 120 (0 /RI N 1 -- MEC Seattle Controlled DOA DG -03 684.78 755 -190 9 R 17-0 21 -0 0 - 0 9.29 L WF -2130 - FD-3TA CANT CA -021 OCS LAYOUT PLAN 9 SCHEDULE 755490 9 R 17 -0 21 -0 • CANT CA -OL LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM STA SB 679.50 TO STA SB 685.00 160 10/L1 / 160 (0/L( 190 1 191 20 10 CANT CA -06 0 20 SCALE IN FEET 684.88 755 -191 6 L 17 -9 22 -0 20 -1 9.29 L WF -2230 - FD -5TA o : 145 TERM 8W-01 C7 C0 0 W 2 I in 160 (0 /LI / 160 (0/11 MEC -630 sr nw.r.no. w. L57 -0P30 Re. 40 STATIONING 686+38 686 +48 - 688+07.5 Cft f , 687 +97.5 9+4 89+73 STRUCTURE NUMBER - 755 -192 755 -193 755 -195 1, L14/ . TU 755 -194 STAGGER (INCHES) 6 R 9 L 755 -196 9 R 17 -0 j `+ G D „Q a . 16 -9 - R CONTACT HT (FT -IN) 17 -9 17-0 MESSENGER HT (FT -IN) 21 -0 22 -0 CONTACT HT (FT -M) 21 -0 - —" 1 �V 1 j A 20 -9 40 I 19 -2 - 0-0 v F 1111 JUN TERMINATION HT FT -IN POLE SET -OUT (Fl) 9.29 L 9.29 L 16 -9 9.29 L MESSENGER HT (FT -IN) 9.29 L 9.29 L POLE REFERENCE WF -2130 1VF -2130 -9 FD-3TA WF -2130 -9 FD-3TA 20-9 WF -2230 -9 FD -5TA AP -3 -9 FD -3TA idtzrilvii FOUNDATION HEIGHT (IN) - -9 FOUNDATION REF FD-3TA MISCELLANEOUS - - - - POLE SET -OUT (FT) - - , 9.29 L - - POLE REFERENCE STRUCTURE & ASSY DESCRIPTION - CANT CA-06 JC -2 CANT CA-011 CANT CA -02L - TERM FA -1 CANT CA-01L DGA DG -01 FOUNDATION HEIGHT (IN) - 159.5 (0/R)/159.5 1 141.2 1 114.3 -- SPAN (FT) 160 (0 /L) /160 (0 /L) STATIONING - - , 687 +97.5 - - STRUCiURE HUMBER 755 -192 755 -193 755 -194 755 -195 755 -196 STAGGER (INCHES) 9L 6R i 6L 9R 121 CONTACT HT (FT -M) 17-0 17 -9 17 -9 17-0 16 -9 MESSENGER HT (FT -IN) 21 -0 22 -0 1 21-0 22-0 20-9 TERMINATION HT (FT -IN) - - 1 19-4 0-0 - POLE SET -OUT (FT) - - , 9.29 L - - POLE REFERENCE - - WF -2230 - - FOUNDATION HEIGHT (IN) - - I -6 - - FOUNDATION REF - - FD-5TA - - MISCE UANEOUS - - I - STRUCTURE & ASSY DESCPoPi1ON CANT CA-02L CANT CA-06 JC -2 CANT CA-06 TERM FA -1 CAM CA-01L DGA DG-03 CANT CA-02L SPAN (FT) (0 /R) 159.5 (0/1)/159.5 (0/1) 151.2/14 .2 (0 /R) 1 114.3 --- 160/160 NORTHBOUND 0I M col--—-- 61 .. W - 0 BW 31 c 1 WI N SOUTHBOUND NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. LE. POLE 192 IN PLAN IS 755 -192 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CML DRAWINGS. 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER LAO -J680. - - I UNIN5-ULATED OVERLAP o..dwlen L - _ 100 - 1442- NBA.. 686•00 GA 6a6,n0 CONTRACTOR LAYOUT SUBMITTAL REVISIONS ISSUED FOR CONSTRUCTION CL 686.00 m(uI. alactrk conittuctUon cam pany O ..d er L DELA CRUZ D.S. / NP. 0. TERRADO Submitted OS 0. MACDONALD / - UNINSULAIED OVERLAP_ _ _ LOCI J442 ...... Soutailimmir %wee.' el G. MACOONALD 06/20/05 Hatch Mott MacDonal C o I EWED FO NFpq �0 pLIANCE NEC AUG 2 7 2007 (C62) 1._ Ana Soda I' =20• fllammia Contract Ike C807 Cote 06/20/05 1 MEC- 63IRI.DWG 1961 197 NBA . 690.00 'o - - 2524 F • A CL 690.00 SR 690.00 20 10 0 L_ SCALE IN FEET IV! MEC Seattle Controlled LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN & SCHEDULE STA SB 685 +00 TO STA SB 690 +50 20 Draelnq 40 MEC -631 ST L57 -0P31 146 I M Ico 16 IVED T UKWILA 7nn7 CENTER A j Rd 06/20/05 aat STATIONING STRUCTURE NUMBER STAGGER !INCHES! CONTACT HT (FT -IN) MESSENGER HT PT-IN) TERMINATION HT IFT -!NI POLE SET -OUT (FTI POLE REFERENCE FOUNDATION HEIGHT IN41 FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRPTION SPAN (FTI 755498 12 R 16 -5 20 -5 CANT CA -OIL ---- -114.3 1 755 -199 12 L 16 -2 20 -2 CANT CA -02M 115 100 755-200 3 L 15-N 19 -N CANT CA -02L 100 755 -201 t2 R 15-8 19 -8 CANT CA -0N. 100 755-202 12 I- 15-5 19.5 CANT CA -02M 1 755 -204 12 R 15-1 19 -1 16 -8 CANT CA -OIL 100 1 130 ITWAI / 130 --- NORTHBOUND SOUTHBOUND ISSUED FOR CONSTRUCTION Ducrbfbt NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 198 IN PLAN IS 755 -198 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -0680. cicctf k conrttuction company Deeiur.0 en L. DELA CRUZ oro O.S. / N.P. Chocked 11% O. TERRADO Seh,M.d en 0. MACDONALD 200 SOw Thmgr / -5 STATIONING STRUCTURE NUMBER STAGGER (INCHES! CONTACT HT IFT -INI MESSENGER HT (FT-IN) TERMINATION HT IFT.INI POLE SET -OUT 1FT1 POLE REFERENCE FOUNDATION HEIGHT 11N1 FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 690.63 755 -198 12 R 16 -5 20 -5 9.29 L WF -0826 -9 FD -ITA CANT CA -02M -- -114.3 I 115 691.78 755499 12 L 16 -2 20 -2 9.29 L WF -0826 -9 FD-ITA CANT CA -ON. 100 692.78 755 -200 3L 15-N I9 -N 9.29 L WF -0826 .9 FD-1TA CANT CA -OIL I00 755- 12 19 9.29 L WF -0826 -9 FD -ITA CANT CA -02M 100 694.78 755 -202 12 L 15-5 19 -5 9.29 L WF -0826 -15 FD-ITG CANT CA -OIL 100 695.53 755.203 0 -0 6.46 l AP -3 -15 FD -3TG DGA DG-0I 695.78 755 -204 12 R RE 15-1 19 -I 17 -0 6.46 L CITY . JUN- WF -2226 -15 ��I�1iIV1 FO -5TG CANT CA -02M 1 130 ITWAI / 130 ---- Hatch Mott MacDonal Dot= _ L 1 SuMMM E. 0. MACDONALD 06/20/05 s .170 HIGH RAIL (ACCESS l— 1/ / Soes. r =20• MEC 6 32AWG Conrvet He: C807 06/20/05 1 202 AWN 20 10 -203 0 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 690+50 TO STA SB 696.00 20 SCALE IN FEET — AB+ 696.00 MEC Seattle Controlled 40 1 • - -- () CL 696.0'0 1Q . 1 -- - - - I w tit V) MEC -632 ST R.f.rtno* No. L57 -0P32 Shoot 'Oa Rev: 147 �EI'JED F TUK WILD a B 7nn7 r CENTER 0 STATIONING - 1 - STRUCTURE NUMBER 755 -205 755 -206 755 -208 STAGGER (INCHES) 12 L 12 L 12 L CONTACT HT IFT 14'8 14 -3 ' 14-1 -INI MESSENGER HT WT-INI 18-8 18-3 15-41 TERMINATION HT IFT - 16-10 i -IN) POLE SET (FT) - - - -OUT POLE REFERENCE - - i - FOUNDATION HEIGHT (IN) - - FOUNDATION REF - - - MISCELLANEOUS - - STRUCTURE 8 ASSY DESCRIPTION CANT CA -02M MPA MP -01 CANT CA -02M CANT CA -t6 SPAN (FT) 130 (TWA) / 130 132.5 (TWA) / 132.5 I 148.5 1 152.5 —� NOTES: NORTHBOUND 1- POLE NUMBERS IN PLAN ARE IN SCHEDULE, I.E. POLE 205 MISSING THE 755- PREFIX SHOWN IN PLAN IS 755 -205 IN SCHEDULE- I _ ----- 2- FOR' -- PALE FOUNDATIONS ON AERIAL STRUCTURE, SEE CIVIL � � j l 1 �) 1 I ( 1 DRAWINGS. -- STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. N / / • . ALL_EDLE- BRACKETS AND N ITT BF7SLLOCATED BY CONTRACTOR PER L00-1680- Q /-5 - _ w - F. ° CURVE R =5174 FT -' I co - — Eo = 1.25 IN . —_ —..— —_�f. r 20T 208 'f 2061- ` I� - - — .• 205 - - - 1 - - — - -�� - - — - - - - - ^6' T I - - — - - - r-1-7L i 100 -J452 _— _ _�� - - - _ _— - I •G i 698.00 r r CV I _ - NB, -_ _ . . 0 Il.) WI 6og•0 - - - -� —1 — —1 1 � �_ __ _- - _ CL GO G 0 —1 � - .. _ - --- L -- r---'- 1 S I ASSY1 TYP i SB 700.00 ! •— -- — - -- 58 698 / 0 � I CL 696 - - - - -- - - - - 7: ���� - — — — — ! w 0 w - 1 I _ - - — - 58 695_•.0 t• s• r - _ _--- -^ - - - — ' - - ��- -CURVE-R---=•5458.25 FT -- i __ y I to - - o 1.25 IN - - - - - -- o - -- - - -- - -- - Ft r -J kti _ -- _ __— - - ~r — . __- _ 0 0 1 • — ___ _ / r CO O ; I - -� — _ `_ —_ —tea— �41 � -- ,r k — - ._._— _..— ____.._ - -_ - -• - _ __-._. _ ._ — _ --- tk ,i � -- S — - - - - — ;` /- f ' f _ - -- - - . S OUTHBOUND :i I : I z_ _ -- -- --- ------ Co` SCALE IN FEET ".t... 697.08 698.40 698.65 699.88 A/• }� • • /:/" STATIONING STRUCTURE NUMBER 755-205 755 -206 755-207 7555 08 i ' • � 12 , STAGGER (INCHES) CONTACT HT IFT -IN) 12 L 14.8 12 1 14 -3 I 4 a �, MESSENGER HT IFT -IN) 18 8 18-3 - 14 J r r TERMINATION HT IFT-INI 16 -10 0.0 ' EI \J® TUKWIL.A R • 8 7't� j - CENTE'� PRINT , HALF SIZE POLE SET -OUT (FT) 6.46 l 6.46 L. 6.46 L 6.46 1 WF -2226 AP -3 WF -1026 � . POLE REFERENCE WF -2226 43 - 13= �QTit\ FOUNDATION HEIGHT (IN) -14 43 FOUNDATION REF FD -5TG FD -5T0 FD-3T0 FD -2TG • • 1` r • MISCNEOUS ELLA r InC0101 D SjU STRUCTURE 8 ASSY DESCRIPTION CANT CA-01M MPA MP -01 CANT CA-12 DOA DD -0I CANT CA -I6 SPAN (FTI 130 (TWA) / 130 132 (TWA) / 132 148 152-- r�� QIQCtf�G consttuctUon company °"""' °" L. DELA CRUZ 0./.. °r' O.S. / N.P. `cam« e,. G. TERRADO h 0. MACDONALD I ����r �1��1 WI - r 0 I /4, � � �� � 9 ro ' ,:. Sc a.: I • .2o UNK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 696+00 TO STA SB 701 +50 wing ra.• MEC -633 n n r «..=. ra L57 -0P33 Hatch Mott �+r� IVIaC'D�nal 633.DWG ,� , /A II KV ;� �� " .� � � ''ONU IF. Q L.7iYA: c MEC- wmo + Shoot No.: 148 n« 0 , s ,w u.e ET; O. M AC D O N AL D O6 20/05 / 06/20/05 06/20/05 OM - ISSUED FOR CONSTRUCTION D..cdotlan 06/20/05 amt STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -III MESSENGER HT (FT-INI TERMINATION HT (FT -INI POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION 755 -209 12 L 14 -1 16 -9 CANT CA -14 755 -210 12 L. 14 -4 18-4 CANT CA -02M 755-211 12 L 15-0 19 -0 CANT CA -02M 755-212 12 L 15-7 19 -7 CANT CA -02M SPAN (FT) -152.5 I 177 5 176.5 174.5 158.5 -- NORTHBOUND 209 SOUTHBOUND STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -IN) MESSENGER HT (FT -INI TERMINATION HT (FT -INI POLE SET -OUT (FTI POLE REFERENCE FOUNDATION REF MISCELLANEOUS SPAN (FT) FOUNDATION HEIGHT (IN1 STRUCTURE 8 ASSY DESCRIPTION Otaarbdon NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 209 IN PLAN IS 755 -209 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. NB1 702.00 - -i CL 702.00 56 702.00 701.40 755.209 12 L 14 -1 16 -9 6.46 L WF -1026 -13 FD-2T0 CANT CA -I2 152 I _R =5166 250' A A A av ISSUED FOR CONSTRUCTION 177 aktilt conittuc%ion company CURVE R e 5174 FT Ea : I25 IN - - JS_I ASSY (TYPI 703.17 755 -210 12 L 14 -4 18 -4 6.46 L WF -1026 -13 FD -2T0 CANT CA-01M 210 a.._rw er L. DELA CRUZ o.o... sn D .S. / N.P. O..cw4 s . 0. TERRADO sae«+tw sn 0. MACDONALD 1 CURVE R • 5158.25 FT Ea • 1.25 IN NBA 704.00 01 704.00 53 704.00 Samar/ton 176 1 -5 J 704.93 755-211 12 L 15-0 19-0 6.46 L WF -1026 -13 FD -2TG CANT CA -01M Hatch Mott MacDonal S. .4 art Cat« C. MACDONALD 06/20/05 211 iF•?7 NBi 706.00 SB 706.00 -/` - -- MEC Seattle Controlled scow r =2o• Filononwn MEC 634.DWG Contract Nen C807 Coto: 06/20/05 174 20 10 0 SCALE IN FEET 706.67 755-212 12 L 15-7 19 -7 6.46 L WF -1026 -13 FD -2TG CANT CA -01M UNK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA S8 701+50 TO STA S8 707.00 t;E ;EIVED X11 .` F TUKWILA 2 71ra r. T CENTER 158 --- Omaha No: MEC -634 ST R.lrenc. No. L57 -0P34 Shoot No.: R«: 149 0 a 4 5 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -IN) MESSENGER HT IFT -IN) TERMINATION HT IFT -IN1 POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION 755 -213 9 L 16 -1 20 -1 CANT CA -02L 755 -215 12 R 16 -7 20 -7 19 -0 CANT CA -OIL 755 -217 9 L 17 -0 21 -0 CANT CA -02L SPAN (FT) 158.5 155.5 129.5 150 10 /R1 / 140 -- M w 2 (9 ca ... = - W co I _ NORTHBOUND SOUTHBOUND NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 213 IN PLAN IS 755 -213 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 4680. —1 I ( � I L SB 709•00 JS -I ASSY (T`tki 1 ":7 : I N81 706.00 CL 709.00 v 1 c kcttIc con/ttuctlon company r 1 -5 EEO n3r .10.00 BWA 7:0•07: E-- t t h O,- 712.00 .. . � .3- 71:;°C) ----=-- - - - - -- BWA ... ...... ... SA .. .. ... .... . UNINSUCIS fEO OVERLAP - - - - 1 � 216 LOO -J442 STATIONING STRUCTURE NUMBER STAGGER 'INCHES) CONTACT HT (FT -IN) MESSENGER HT (FT-INI TERMINATION HT IFT -INI POLE SET -OUT (FT) POLE REFERENCE FOUNDATION HEIGHT BM FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT( 158 708.25 755 -213 9 L 16 -1 20 -1 6.46 1 WF -1026 -14 FD -2TG CANT CA -OIL 155.5 709.55.5 755 -214 0 -0 6.46 L AP -3 -9 FD -3TA DCA DG -I 709.80.5 1 �1T}:1lK1►� 711.00 755-215 /I O . _ �,• NC� 755-216 12 R 1 E C 16 -7 20 -7 ,111n 22 -0 19 -6 6.46 L 0 -0 6.46 L CANT CA -02M -9 FD -STA TERM BW -I 129.5 IO /R) / 119.5 20 -0 6.46 L -9 FD -3TA F0-5TA JUNI CANT DGA CA -OIL D6 -3 711.10 755 -217 6 R 17 -9 21 -0 WF -2230 -9 Cfi 1' CANT CA -06 TERM 8W -1 PERMIT 150 / 150 10/R1 SoaM: r_20• MEC- 635.DWG Contract N. C807 Data: 06/20/05 CL 7.00 E VED 1 UKWILA a 7nnl CENTER OCS LAYOUT PLAN 8 SCHEDULE MEC Seattle Controlled 20 10 UNK UGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM STA S8 707.00 TO STA SB 712.50 U s� . 4 72 w o 0 Drawing No.: 20 SCALE IN FEET D..I_.W 071 1. DELA CRUZ Drama pit D.S. / N.P. Chotk.d er. O. TERRADO MEC -635 sr IM.rvw.v No. L57 -0P35 Shoat Nat Row 150 0 STATIONING 712.50 712.60 714.00 _ 715.30.5 R 712.55.5 755 -223 MEWL; Aa y , ,�./ ■ � 1► ��� _ �� iliairlorr _ 716.96.5 755 -224 12 L 17 -8 STRUCTURE NUMBER 755-218 755 -219 9 R 755 - 220 9 1 ,755.222 I- 12 STAGGER (INCHESI 6 L CONTACT HT (FT 17 -9 17 -0 17 -0 I 17.2 -N) MESSENGER HT IFT -INI 22 -0 21 -0 21 -0 - — 'h a. mosaammir � p�,�� � � <L: /�1/1_711R�� + �� 21 -8 - 6.46 L WF -0826 -9 FD-ITA CANT CA -011 SA S TERMINATION HT IFT-INI 19 0 0 -0 6.46 L AP -3 FD-3TA - MI! POLE SET -OUT WTI 6.46 L 6.46 L 6.46 L 16.46 l POLE REFERENCE WF -2130 WF -2030 WF -2230 WF -2230 FOUNDATION HEIGHT ON) -9 -9 • FOUNDATION REF FD -3TA FD -3TA FD -STA FD-STA MISCELLANEOUS . - • STRUCTURE 8 ASSY DESCRIPTION CANT CA-06 JC -2 CANT CA -02L CANT CA -OIL CANT CA -02M TERM BW-1 '-r' 0G-1 SPAN (FT) 150 (0 /L) / 150 I0 /LI 150 (0 /R) / 140 130.5 166 140.5 --- b 1 1 STATIONING STRUCTURE NUMBER STAGGER (INCHESI CONTACT HT (FT - MESSENGER HT (FT -INI TERMINATION HT FT-N) POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT GNI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION 755 -218 9 R 17 -0 22 -0 CANT CA -011. SPAN IFT) 150 (0 /RI / 140 755-219 6 L 17 -9 21 -0 CANT CA -06 JC -2 755-220 6 R 17 -9 22 -0 21 -0 TERM 8W-I CANT CA -06 150 10 /L) / 150 (0 /LI 714.10 755 -221 9 L 17 -0 21 -0 0 -0 6.46 L WF -2130 -9 FD-3TA CANT CA -02L DGA DG-3 755 -222 12 R 17 -2 21 -2 CANT CA -011_ 755-224 12 L 17 -8 21 -8 CANT CA -02L SA -3 130.5 (0 /RI / 130.5 1 166 141 -- A A A A out (( M I. _ _ _ - - _UNINSULAIF4 OVERLAP (01 57 02 GOCS E 843.4 h I ` — C63 - 0 1 W W 06/20/05 NORTHBOUND [ 218 J 219 1 SOUTHBOUND ISSUED FOR CONSTRUCTION Oeeaiptlew NOTES: I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 218 144 PLAN IS 755 -218 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS S8 TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANGS 1'6 6E ALLOCATED B4 CONTRACTOR" PER LOD =J680. 4 BWA 220 L _JS -L ASSY - I <t� Icdttic construction company �i INN — _ --- -------- - - -- -( I - •00 D..+vned si+ L. DELA CRUZ -- (VI 0.s. / N.P. Chegteed O. TERRADO Aegean.' fr 0. MACDONALD Soure I -5 BWA BEll Asbreitw en Oat« C. MACDONA.LD 06/20/05 CL 716.00 Hatch Mott MacDonaI SH�lnt00 - - - -- RE D ate: Fi lename: MEC- 636.DWG C807 Contract Nag 06/20/05 0 0 0 z 0 [ 224 �r1 UNK UGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 712.50 TO STA SB 718.00 20 10 MEC Seattle Controlled CL 718.00 0 .19.00 SR T16,00 - -- W W RECEIVED CITY TUK WILA JUN 2.8 PF_RMIT CEN'i ER .+..o Na. 151 20 SCALE IN FEET i MEC -636 n R.Nnr.c. Na. L57 -0P36 Sheet No. R.*. 0 40 g POLE SET-OUT (FTI POLE REFERENCE FOUNOAT10N HEIGHT IIN) FOUNDATION REF 3 MISCELLANEOUS 'a b .If Y STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -INI MESSENGER HT (FT - III TERMINATION HT (FT -INI POLE SET -OUT (FTI POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION swwwwwwate I ) SPAN (FTI 06/20 Drat_ NORTHBOUND STRUCTURE 8 ASSY DESCRIPTION SOUTHBOUND 140.5 755 -225 12 18-2 22 -2 CANT CA -02M SPAN (FT) 141 1 137 5 141.5 1 143.4 143.4 -- _ -- '4: - ALL POLE BRACKETS 'AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J¢80. --- I CURVE R = 2015.72 FT ® Eo =3.1IN 1 225 I NOTES: L POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 225 IN PLAN IS 755 -225 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL _—_ -_ DRAWINGS. _ - 3. STATIONING IS SB_TR CK- UNEESS OTHERWISE NOTED. ISSUED FOR CONSTRUCTION 755 -226 12 L 18-5 22 -5 CANT CA -02M 136.5 g moos. alacteic canitructian COMp8ity p;j 7200.00 R 2007.8E1 ]1 CL '20.00 JS - AS.Sy_iTyPUC.o° CURVE R = 2000 FT ------ .•--- Eo - =_3.5 IN o..I_ en L. DELA CRUZ Oman Br: D.S. / N.P. G:fe..d By. 0. TERRADO SubnAted011 G. MACDONALD 755 -227 12 L 18-6 22 -6 CANT CA -02M /\ A A NCI SaMUTkaxsrr Hatch Mott MacDonal SullarnItted Br Deft C. MACDONALD 06/20/05 t.17a0 755.228 0 18.6 22.6 CANT CA -02L r =20• r MEC- 637.DWG Contract No C807 Dem 06/20/05 CANT CA -01L 20 10 0 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT WT -INI MESSENGER HT IFT -INI TERMINATION NT (FT -IN) 718.37 755-225 12 I- 6.46 L WF -2026 -6 FD-3TA CANT CA -DIM 719.73.5 755.226 6.46 L WF -2026 -4 FD-3TA CANT CA-01M 140.5 721.14 755 -227 6.46 L WF -2026 FO-3TA CANT CA - DIM 14287 722.56.87 755 -228 6.46 L WF -0826 FD-ITA 143.4 20 SCALE 14 FEET MEC Seattle Controlled LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN a SCHEDULE STA SB 718.00 TO STA SB 723.50 40 D ,f.r.q Ho.: Shoat of 152 RFC TIUKWILA CITY JUN 2,8 711n pF` I\AIT CENTER ER MEC -637 ST RNffw.ef Ho. L57 -0P37 Rot. 0 STATIONING 723.79 CONTACT HT (FT-R9 STRUCTURE NUMBER 755 -230 STAGGER INCHES) MESSENGER HT IFT-NI TERMINATION HT (FT -M) POLE SET -OUT (FTl POLE REFERENCE FOUNDATION HEIGHT NN1 FOUNDATION REF MISCELLANEOUS STRUCTURE 6 ASSY DESCRIPTION TERMINATION HT (FT -INI POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT 1111 FOUNDATION REF MISCELLANEOUS STRUCTURE 6 ASSY DESCRIPTION SPAN (FT) 09/09/05 06/20/05 as 143.4 0 -0 23.75 l WF -2030 - FD-3TA DGA DG-03 0 - 0 8.0 R AP -3 -9 FD-3TA DGA DG-01 724.00.3 755-232 9l 18-6 22 -6 214 23.75 L WF -2230 -9 FD-5TA CANT CA -OIL SPAN (FTI 143.4 115.7 / 125.7 (0/R) 214 8.0 R WF -2230 .9 FD-5TA CANT CA -02M CONTRACTOR LAYOUT SUBMITTAL - REVISIONS ISSUED FOR CONSTRUCTION t�..aylren 727.74.5 9 R 6 L 6 R 9 L 12 L 23-6 22 -6 23-6 22 -6 22.6 755 -233 755 -234 755 -235 755 -236 755 -238 18-6 19.3 19-3 18-6 18-6 TERM BW4 CANT CA -OR. • STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -NI MESSENGER HT IFT-NI NORTHBOUND SOUTHBOUND 723.79 755-229 230 on 5 0 NOTES: I. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE, I.E. POLE 229 IN PLAN IS 755 -229 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER 100 -J660. 5. POLE 755 -230 IS FOR OTHER CONTRACTORS USE 724.00.3 755-231 9 L 18-6 22 -6 m WA WA 725.16 755-233 9 R 18-6 22 -6 1 233 1 234 1 UHINSULA_TED_OYERI AP_. - _ - - UNINSUTATED OVERLAP L00 -J442 725.26 755 -234 6 L 19 -3 23-6 1) N co n to 726.66 755 -235 6 R 19 -3 22 -6 1 235 1 236 1 CODE ED FOR NFPA 7p COMPLIANCE NEC AUG 2 7 2007 240 EEZI 727.90.75 755 -239 20 10 0 m 728.47.0 755.244 12 L 18-6 22 -6 Controlled 20 SCALE N FEET CURVE R o 635.67 FT i5• I Ea 6.0 IN CURVE R ■ 620 FT Ea : 6.0 IN IS* N MEC Seattle 40 WF -2030 WF -2130 -9 -9 FD-3TA TERM BW-1 CANT CA -02L 115.7 / 125.7 (0 /R) mn //. QJcctr c conitrucU un com paray CANT CA -06 JC-2 CANT CA -06 150 (0 /L) / 150 (0 /LI 6.46 L 6.46 L FD-3TA CANT CA -06 Do 4 OA L DELA CRUZ o,- eyt 0.S. / N.P. add sx 0. TERRADO s.nolw eyt 0. MACDONALD 150 (0 /L) / 150 (0 /LI Saewlknxra 6.46 L 6.46 L 8.0 R 0 -0 8.0 R WF -2130 WF -2030 WF -2230 AP -3 -6 FD-3TA -6 FD-3TA -15 FD-5TA -15 FD-3TA CANT CA -06 JC-2 Slulswatlia ert G. MACOONALD Hatch Mott MacDonal Ool.c 06/20/05 CANT CA -02M CANT CA-02M 108.5 (0 /RI / 98.5 CANT CA -OIL CANT TERM CA -0H FA-I DGA DG-1 108.5 (0 /R1 / 98.5 C�laEG7 WF -2230 AP -3 .22 .22 FD-5TA FD-3TA Q 22 -6 { 22-0 1 20-1 S P.2o• MMECC.638R1AWG oonbact Nee C607 ooe� 06/20/05 727.90.75 755.240 0 -0 23.75 L TERM FA-1 DGA DG-1 755.241 12 L 18-6 22 -6 CANT CA -02M 74.5 1 85.3 -- 6.46 L WF -2226 -6 FD-5TA CANT CA -0tH 72.5 1 83.22 --- LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 9 SCHEDULE STA SB 723+50 TO STA SB 729.00 RECEIVED C1 - Y ''uF TUKWILA LUN 28 7007 PERMIT CENTER MEC -638 sT t....n.. H. L57 -0P38 Shoat/4o: I•r¢ 153 1 r STATIONING STRUCTURE NUMBER STAGGER (INCHES► CONTACT HT IFT -IN) MESSENGER HT (FT -1N1 TERMINATION HT IFT -INI POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT (IN) FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (F A 31' 6 REV STATIONING STRUCTURE NUMBER STAGGER (INCHES( CONTACT HT (FT-1N1 MESSENGER HT (FT -IN1 TERMINATION HT (FT -IN) POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 06/20/05 DAN 85.3 NORTHBOUND 1 I GD M 1D WI W I. N I SOUTHBOUND 83.22 - _i ISSUED FOR CONSTRUCTION o..akaen 755 -242 12 L 18-6 22 -6 CANT CA -02M 2421 729.30.22 755 -242 12 L 18-6 22.6 6.46 L WF -2226 .2 FD-5TA CANT CA -am 83 NOTES: 755 -243 12 I- 18-6 22 -6 CANT CA -02M IMO 1 ,o � \6� / J 730.1.21 755 -243 12 L 18 -6 22-6 6.46 L WF -2226 .2 FD-5TA CANT CA-01H moil. dcctf do conottvcfon comp ny 80.9 en IV* 755-244 12 L 18-6 22 -6 CANT CA -02M POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE, I.E. POLE 242 IN PLAN IS 755 -242 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER LOO -J680. L. DELA CRUZ Dram VA 0.S. / N.P. q.. a,. 0. TERRADO tea.. sn 0. MACDONALD / CURVE R = 620 FT Ea = 6.0 IN 730.90 755 -244 12 L 18.6 22 -6 6.46 L W F -2226 .2 FD -5TA CANT CA-01H 82 CURVE R _ 635.67 FT Ea = 6.0 IN 16' Sousunikanisrr suandetaa 755 -245 12 L 18-6 22.6 CANT CA -02M CO 731.70 755-245 12 L 18-6 22 -6 6.46 L WF -2226 *2 FD -5TA CANT CA-01H - - ----- -- ---'may Hatch Mott MacDonald G. MACDONALD 06/20/05 80.5 15 755.246 12 L 18-6 22 -6 CANT CA -02M CO 311iif77. 1 16• saaaa 1'.20' M Mown. E 9.DWG c* .4od Na C807 06/20/05 83.5 755 -247 12 L 18-6 22 -6 CANT CA -02M 733.30 755 -247 12 L 18-6 22.6 6.46 L WF -2226 .2 FD -5TA CANT CA -01H 80.7 20 10 OCS LAYOUT PLAN 8 SCHEDULE 0 SCALE IN FEET MEC Seattle Controlled LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM STA SB 729.00 TO STA SB 734.00 20 Mowing 40 RECEIVED CITY F TUKINIlA JUN 28 Ifni PERM ITCENTER MEC -639 sr..�. � L57 -0P39 sn..i ra_ R.._ 154 0 STATIONING STRUCTURE NUMBER 12 L 18-6 STAGGER (INCHES' CONTACT HT (FT -INI MESSENGER HT (FT -INI TERMINATION HT (FT -INI POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT MI FOUNDATION REF MISCELLANEOUS 755 -248 12 18-6 22 -6 755 -249 12 L 18-6 22 -6 755 -250 12 L 18-6 22 -6 755-251 22.6 755 -252 12 L 18-6 22 -6 755 -253 12 L 18-6 22 -6 STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) CANT CA -02M 80.71 83.3 CANT CA -02M 80.6 CANT CA -0214 83.3 CANT CA -02M 100 CANT CA -02M 104 CANT CA -02M 100.5 NORTHBOUND SOUTH BOUND S / CURVE R e 635.67 FT Ea 6 IN NOTES: 15' CURVE R = 620 FT Ea = 6 IN fi A A A A ISSUED FOR CONSTRUCTION 06/20/05 REY OM a..e.bun•t EEI 400,4 alzcttic conrtwction company JS -I L. DELA CRUZ 0I 250 Y1TXPI 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 248 IN PLAN IS 755.248 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS S8 TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANGS TO BE ALLOCATED BY CONTRACTOR PER L004680. Drown M: D.S. / N.P. 0. TERRADO s,w.+uw e$ 0. MACDONALD - El STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -INI MESSENGER HT IFT -INI TERMINATION HT IFT -INI POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT (IN FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FTI 734.08.68 755 -248 12 L 18.6 22 -6 6.46 l WF -2226 .2 FD -5TA CANT CA-01H 78.68 ' 81.32 734.90 755 -249 12 L 18 -6 22 -6 6.46 L 12 L 18 -6 22 -6 6.46 L WF -2226 .2 FD -5TA CANT CA -01H 755 -251 12 L 18 -6 22 -6 6.46 L 6.46 L WF -2126 .2 FO -3TA CANT CA -DIM 755 -253 12 L 18-6 22 -6 6.46 L CITY S 735.68.66 755 -250 WF -2226 .2 FD-5TA CANT CA -01M 78.66 81.34 736.50 CANT CA -DIM 98.5 ,REVIEWED FOR COD COMPLIAN I NFPA 70 _ N AUG 272007 Ci ty Ut Tuk3 102.5 738.51 WF -2226 WF -2126 .2 *2 FD-5TA FD-3TA CANT CA -DIM 99 -- Soutelkmistr Sue..aw s,= G. MACDONALO 06/20/05 X51 Hatch Mott MacDonal CURVE 1015.72 FT Ea..3 EMI CURVE R = 1000 FT Ea • 3.75 IN Sea.: P =2o• M E N C 040.DWG Contr.., Na C807 Oa.: 06/20/05 16 20 10 0 MEC Seattle Controlled OCS LAYOUT PLAN 8 SCHEDULE 20 SCALE IN FEET LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM STA SB 734.00 TO STA SB 739+00 40 oror4w N*.: CEIVED 1 UKWIL.A 2 - ?OR7 T CENTER MEC -640 si R.I....O No. L57 -0P40 SM.t M. Rev. 155 0 3 STATIONING 739.50 740.25 740.50 741.80 _ 743.40.5 743=50.5 STRUCTURE NUMBER STRUCTURE NUMBER 755 -254 755-255 755 -256 755 -258 755-257 IIIIIIMilIl JIill)1! 755 -260 755 -259 9 L 755 -260 6 R 12 L STAGGER (INCHES) 12 L 9 R - 12 L 9 R 9 L CONTACT HT (FT -INI 18 -6 - 18-6 18-6 19 -3 18-6 19 -3 MESSENGER HT (FT -INI MESSENGER HT IFT -INI 22 -6 - 22 -6 22 -6 22 -6 23 -6 22 -6 23 -6 22 -6 - TERMINATION HT IFT -INI - 0 -0 0 -0 21-2 - O ukwila 9.p L 9.2 L pp�. V� 1 1. �- POLE SET -OUT WTI - 6.46 L 6.46 L 6.46 L 6.46 L • POLE REFERENCE WF -2126 AP -3 WF -2230 WF -2230 - WF -2030 • 0 , Milli& I • WF -2030 WF -2130 ��� r -9 -9 1 i UU FD•3TA FOUNDATION HEIGHT )INI •2 - •4 .5 -9 - FOUNDATION REF - FD -3TA FD-3TA FD-STA - MISCELLANEOUS - FD -3TA FD-3TA - MISCELLANEOUS - - - • - (7F�1�!(1 . STRUCTURE 8 ASSY DESCRIPTION CANT CA -02M CANT CA -02M DGA 0G -03 CANT CA -OL STRUCTURE 8 ASSY DESCRIPTION TERM BW -01 CANT CA-01M DGA 00-01 CANT CA -OIL TERM BW-I - 100.5 CANT CA -021 101 1 130/140 (0 /R► CANT CA -OIL CANT CA -06 (0/11/160.5 172 (0 /RI / 152 -- SPAN (FT) 99 I 100 130 160.5/170.5 (0 /R) 162 (0/L1/162 10 /11 --^ STATIONING - 741.90 - - STRUCTURE NUMBER 755-254 755 -256 755 -257 755 -258 755 -259 755 -260 STAGGER (INCHES) 12 L 12 l 9 R 6 L 6 R 9 L CONTACT HT IFT -INI 18-6 18-6 18-6 19 -3 19 -3 18 -6 MESSENGER HT (FT -INI 22 -6 22.6 23-6 22 -6 23 -6 22 -6 TERMINATION HT IFT -1111 - - 0 -0 21 -4 - - POLE SET -OUT (FT) - POLE REFERENCE - - - WF -2230 - - FOUNDATION HEIGHT (III 9 - - FOUNDATION REF - - - FD-5TA - - MISCELLANEOUS - - - - • STRUCTURE 8 ASSY DESCRIPTION CANT CA -02M CANT CA -02M DGA 0G -03 CANT CA -OL CANT CA -06 JC -2 TERM BW -01 CANT CA -06 CANT CA -021 SPAN (FT) - 100.5 1 101 1 130/140 (0 /R► 160.5 (0/11/160.5 172 (0 /RI / 152 -- R(Y 06/20/05 WIC NORTHBOUND SOUTHBOUND 3. STATIONING IS S8 TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS4( BANDS TO BE ALLOCATED BY CONTRACTOR CURVE R = I. .72 FT Ea = 3.75 IN � - ISSUED FOR CONSTRUCTION NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE, I.E. POLE 254 IN PLAN IS 755.254 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. m JS -1 SY -47YP( CURVE R = 1.00 Ea = 3.75 IN 0 vl Q 0 FT CL 740.00 SB- 1'1 alactek construction connpany 256 m 0 w PER L00 -J680. Ca m - tom - --!- SR 5/8 en L. DELA CRUZ 0.v.n 6,: D.S. / N.P. cw.u.N ay. (I TERRAOO sra.Rw e,t 0. MACDONALD 0 v vo 0 S 154TH ST SaunrokaHSrr sw..Rae d,: G. MACDONAI D BWA 742- 0 Hatch Mott MacDonal Clatim 06/20/05 74...00 1 - - - UNINSIJIATED - 0 ERLAP- - - - - LOO -J442 REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC Sew: =20' w MEC- 641DWG Contract tax C807 Dot. 06/20/05 8!33.6YY: 1- 409.8108' o MEC Seattle Controlled 260 CL 744.pc UNK UGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN a SCHEDULE STA SB 739 +00 TO STA SB 744 +00 CD S8 '44,010 - IW I W 20 10 0 20 SCALE IN FEET n,o.n.q • Sh..t Na t 156 40 EIVED = TUKWILA 5 7nn7 CENTER MEC -641 A R.l.r.r.o. No. 157 -0P41 Roc.: 0 1 1 STATIONING STRUCTURE NUMBER STAGGER (WCNESI CONTACT HT IFT -M► MESSENGER HT IFT -PI1 TERMINATION HT IFT -IN) POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT MO FOUNDATION REF MISCELLANEOUS 755-262 9 R 18-6 22 -6 755 -263 12 R - 18-6 22 -6 755 -265 IZ R 18-6 22 -6 755-266 12 R 18-6 22 -6 STRUCTURE 8 ASSY DESCRIPTION SPAN (F T1 172 (0 /RI /152 CANT CA -OIL 115 CANT CA -01M 109 CANT CA -ON 108.5 CANT CA -01M 108.5 -- NORTHBOUND STATIONING FOUNDATION REF MISCELLANEOUS STRUCTURE a ASSY DESCRIPTION STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -IN) MESSENGER HT IFT -IN) TERMINATION HT (FT -IN) POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT 11N1 746.28.5 746.53.5 TERM FA4 745.02.5 755 -261 6L 19 -3 236 9.29 L WF -2230 CANT CA -06 JC -2 755 -262 9 R 18-6 22 -6 0 -0 9.29 L WF -2030 FD -3TA CANT CA -0214 s /54 TH sr 20 -3 CANT CA -02M 755.264 9.29 L AP -3 WF -2126 CANT CA -02M CL 748.00 748.49 755 -266 WF -2)26 CANT CA -02M U � W 0 0 WI W C7 SOUTHBOUND SPAN (FT1 NOTES: L POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 261 IN PLAN IS 755 -261 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SB UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. UNIN SDCATED- 0 L00 -J442 162 (0/L1/162 10 /0 CO 0 0 0 -- ------------- - - - - -- SR_ 5/8 126 (0 /LI /116 0 0 -- -------- ---- -- ----- CURVE R _1.200 FT - ------------------- __ ^ Ea 2.75 IN z 110.5 110 MEC Seattle Controlled 1 20 10 0 CO 20 SCALE IN FEET 110 -- 40 =!VED TUKWILA 'MN 21 7(1(17 ENTER A A A A A 09/09/05 08/20/05 CONTRACTOR LAYOUT SUBMITTAL - REVISIONS ISSUED FOR CONSTRUCTION mci,1. alacttfc conittuc lon company oh.gww sn L. DELA CRUZ Draw D.S. 0. TERRADO wewrut.d M O. MACDONALD 5ouniukinNSR Sabrowitad C. MACDONALD H atch Mo MacDonai , ( %20/05 r_2o. FlionareNc MEC- 642RLDWO Oa6aa ll« C807 Oat= 06/20/05 UNK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN a SCHEDULE STA SB 744.00 TO STA SB 749.00 Drawing ea.: MEC -642 L57 -0P42 Shoot 11a: lays 157 1 i 1 STATIONING 749.59 750.69.5 751.79.5 - 752.90 �� J��L STRUCTURE NUMBER 755.267 755 -268 755.269 755.269 755-270 755 -270 STAGGER (INCHES) 12 R 12 R 12 R 12 R 12 R 12 R CONTACT HT IFT -IN) 18-6 18.6 18-6 18-6 18 -6 18-6 MESSENGER HT (FT-IN) 22 -6 22 -6 22 -6 22 -6 22-6 22 -6 -� °- TERMINATION HT (FT -IN) - - - - C171 • 1 � POLE SET -OUT (FT) 9.29 L 9.29 L ■ 9.29 L - 9.29 1 - JUN POLE REFERENCE WF -2126 WF -2126 WF -2126 - WF -2126 _ L FOUNDATION HEIGHT I1N1 -2 -2 -2 - -2 - FOUNDATION REF FD-3TA FD -3TA FD -3TA - FD-3TA - PERf1!.( 1 MISCELLANEOUS - - - STRUCTURE 8 ASSY DESCRIPTION CANT CA -02M CANT CA -02M CANT CA -02M CANT CA -01M CANT CA -02M CANT CA -DIM SPAN IFT) 110 I 110.5 1 110 110.5 I 108.5 -- 110 -- STATIONING - - 1 - - STRUCTURE NUMBER 755 -267 755-268 755.269 755 -270 STAGGER (NICHES) 12 R 12 R I 12 R 12 R CONTACT HT IFT 18-6 18-6 I 18-6 18-6 -IN) MESSENGER HT IFT 22 -6 22 -6 1 22 -6 22 -6 -INI TERMINATION HT IFT - - 1 - -III POLE SET IFTI - - 1 - - -OUT POLE REFERENCE - - - _ FOUNDATION HEIGHT (1111 • - - FOUNDATION REF I - - MISCELLANEOUS - - STRUCTURE 8 ASSY DESCRIPTION CANT CA -DIM CANT CA -DIM I I CANT CA -01M CANT CA -DIM SPAN (FT) — 108.5 1 109 1 108.5 I I 109 1 108.5 -- 1 S Y 3 /\ A A 06/20/05 aac NORTHBOUND SOUTHBOUND ISSUED FOR CONSTRUCTION IS- NOTES: L POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 267 IN PLAN IS 755 -267 IN SCHEDULE. 2. FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL DRAWINGS. 3. STATIONING IS SB UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -J680. Si? 518 _--- - - - - -- -------------- - - - - -- CURVE R 1.200 FT Ea =2.751N 267 15 gnaw,. �QCttic conittuctlon company 12 0 7 ` 8665' o..0.. en L DELA CRUZ O.S. / HP. O. 0. TERRADO 3. .4 a 0. MACDONALD J TASSY— {T_ P1_ c8� cc _.. . _.._..__. CURVE R = 1,215.73 FT Ea = 2.75 IN EEO Nom /fl<!'11I1 ur Hatch Mot MacDona G. MACDOONALO 06/20/05 G..Ii'F7.0 Soak: I - =20' MEE 64 3.DWG Ca.4vct No C807 Dot. 06/20/05 270 MEC Seattle Controlled • } ,� � �5q.0� rz � W REVIEWED la NFPA 70 - NEC AUG 2 7 2007 c,\ lu) CODE COMPLIANCE Gty B IB °f Tukwila - (9 ' UNK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE 20 10 STA SB 749+00 TO STA SB 754.00 0 20 SCALE IN FEET .+.g Nn.: 'MED TUKWILA ; 57nm CENTER MEC -643 A W.I.. No. L57 -0P43 sn«t No.: R•; 158 0 40 1 1 756.35 755 -274 755 -271 STATIONING STRUCTURE NUMBER STAGGER (INCHES( CONTACT HT (FT -INI 22 -6 MESSENGER HT IFT -INI TERMINATION HT (FT -INI POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT (IN) FOUNDATION REF MISCELLANEOUS STRUCTURE a ASSY DESCRIPTION 12 R 18-6 CANT CA -01M 755 -272 12 R 18-6 22.6 CANT CA -DIM 0 - 23.75 L AP -3 .2 FD -3TA DGA DG -01 SPAN (FT) -108.5 1 119 135 756.52-1 755 -276 12 R 18-6 22 -6 21 -1 23.75 L WF -2230 .2 FD -5TA CANT CA -02M TERM BW -I 755 -277 9 R 18 -6 23 -6 CANT CA -DIM 123/131 (0 /R) 755 -278 6 L 19 -3 22-6 CANT CA -06 JC -2 755 -279 9 L 18-6 22 -6 CANT CA -01M 69 (0/L1/89 (0 /0 755 -280 9 R 18-6 23 -6 CANT CA -DIM 69 (0/11/89 10 /11 -- NORTHBOUND W 2 FOR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL 1 - -__ 1 n1 DRAWINGS. v� - rnI c a) 3. STATIONING JS B TRACK UNLESS OTHERWISE NOTED. SR 5/B r, CJ ^ 4. ALL POLE 131111 ETS AND BANDS TO BE'AtLOCATED_BY _CONTRACTOR -___ PER 100 -J680. --- --- -_- EMI FM 0 I -} CL 756.00 8.00 • CL 754.0( W _ •• gl :'1 I SOUTHBOUND m .n l 08/20/05 ISSUED FOR CONSTRUCTION o.en4tten NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 271 IN PLAN IS 755 -271 IN SCHEDULE. J , 5. POLE 755- 27�fIS FOR OTHER CONTRACTORS USE. c t 71 1 ' i ` 12 . CURV R • 1800 FT s 451 7.4, S Efa MOM. clucttle con,trvcEIon company CURVE R d 8115 .74 FT Ea • 1.75 IN L. DELA CRUZ Devon er O.S. / N.P. cneh+a sy TERRA00 SAmAU4 OA 0. MACOONALD I . 750.00 170 -- jWA - -Ei NOTE 5 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT -IN) MESSENGER HT (FT -INI TERMINATION HT IFT -IN) POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FTI 754.00 755 -271 12 R 18-6 22-6 9.29 L WF -2026 -2 FD -3TA CANT CA -02M no I 755.20 755 -272 12 R 18.6 22 -6 9.29 L WF -2026 -4 FD-3TA 120 CANT CA -02M 756.35 755 -273 0 8.0 R WF -2030 -12 FD -3TA 136 DOA 00-03 756.52.1 755 -275 12 R 19 -3 23-6 18.6 22 -6 21 -1 8.0 R WF -2230 -12 FD -5TA CANT CA -DIM TERM BW -1 757.80 755 -277 9 R 48 -6 22 -6 9.29 L WF -2030 - FD - 3TA 124/133 10 /RI CANT CA -02M 757.90 755 -278 9 L 9.29 L WF -2130 -4 FD-3TA CANT CA -06 758.60 755 -279 9 L 18 -6 23 -6 9.29 L WF -2030 -4 FD -3TA 70 (0 /L1 /90 (0 /LI CANT CA -02M 758.70 755-280 9 R 18 -6 22.6 n I--P 9.29 L GI' Y '.; WF -2030 -4 F0 -3TA JUN2 { { 1 CANT CA -02M 70 (0/11/90 10 /LI --- �R� 1 S,eanneea er G. MACDONALD Hatch Mott MacDonal oe�« 06/20/05 131 - R ` 80 Scale. r.20 MEC- 644.DWG Combat Na C807 Dodic 06/20/05 Fla 280 MEC Seattle Controlled LO U \7J \UN OVFRL- AP' "f W 2 O _ _ - UNINSULATED OVERLAP ate- - 100 -J444 - - -, ... 444 - -- LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 754.00 TO STA SB 759.00 20 10 0 20 SCALE IN FEET EIVE© TUKWNILA 3_ nin7 CENTER MEC -644 ST a.,...n« "0. L57 -0P44 -1,4s. 159 0 40 ti STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT (FT-N) MESSENGER HT (FT-N) TERMINATION HT IFT -INN POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT IINI FOUNAATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION 755 -281 24 R 19 -3 23-6 CANT CA -06 SPAN (FTI 69 (0/L1/89 (0 /11 755 -282 9 R 18-6 22 -6 CANT CA -01M 760.75 755 -284 12 R 18-6 22 -6 0 23.75 L WF -2230 .2 FD-5TA TERM FA-1 132.5 (0 /R( /124 CANT CA -02M 761.00 755 -286 AP -3 .2 FD-3TA DGA DG-01 119.5 755 -287 755 -288 12 R 3 L 18-6 18-6 22 -6 22 -6 CANT CA -01L 114.5 CANT CA -02L SA-3 NORTHBOUND SOUTHBOUND STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -N) MESSENGER HT IFT -NI TERMINATION HT WT -NI POLE SET -OUT (FTI POLE REFERENCE FOUNDATION HEIGHT (INN FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) ISSUED FOR CONSTRUCTION 5' 759.40 755 -281 24 R 19 -3 22 -6 9.29 L WF -2130 -4 FD-3TA CANT CA -06 JC -2 70 (0/11/90 (0 /LI CONTRACTOR LAYOUT SUBMITTAL - REVISIONS ECM CURVE R = 1800 FT Ea = 175 IN 759.50 755 -282 9 R 18-6 23-6 9.29 1. WF -2030 -4 FD-3TA CANT CA -02M 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 281 IN PLAN IS 755 -281 IN SCHEDULE. -- -- 2 - FORP� FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL FORW V AU011. construction compotly NOTES: 3. STATIONING IS SB TRACK UNLESS OTHERWISE 11t TED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOOATED BY CONTRACTOR PER LOO-J680,7, CURVE R = 1815.74 FT Ea = 1.75 IN 134 (0/R1/125 p_ us L. DELA CRUZ o,.n1 M D.S. / PIP. 0. TERRADO ;ealon+n.a B1 0. MACDONALD TERM FA-1 760.75 755 -283 12 R 18-6 284 .42 FD-5TA CANT CA -01.1 m a. v \' 1 co 1 r N - - - -_ -- -- 1 761.00 755.285 0 -0 8.0 R AP -3 -12 FD-3TA DGA D0-01 120.5 tri V. z Sourrolkiiien 10' SR 518 laAtcaded C. MACDONALD 06 /20/05 m ro 0 E z 761.95.5 755-287 12 R 18-6 22 -6 9.29 L WF -0826 -8 FD-ITA CANT CA -02M z 0 Hatch Mott MacDonal =mann 114.5 xan maw Flrwn MEC- 645R1DWG c Pim C807 06/20/05 -4 _ o 1 - -- 0 1 �* 1 763.10 755 -288 3 L 18-6 22 -6 6.46 L WF -0826 -9 FD-ITA CANT CA -011 SA -3 MEC Seattle Controlled OCS LAYOUT PLAN a SCHEDULE CURVE R : 1300 FT Ea =3.5IN ( 20 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM STA S8 759 +00 TO STA SB 764.00 10 1, (9 0 w 2 Cl 764.00 j 0 SCALE IN FEET _I : c _r n 1'/ ' Eb ^ A JUN 25.70P7 110.5 -- 20 MEC -645 ST R.hraw. R> L57 -0P45 a,..t M..: Rom 160 40 STATIONING 764.20.5 765.35 766.50 -� 755-291 -291 12 L 755 -292 12 L AUG p 7 2007 75 7.63.5 768.80 STRUCTURE NUMBER 755 -289 12 L 755 -290 12 l STAGGER (INCHES) 755 -293 18-6 -289 12 L 12 L 18-6 CONTACT 18.6 18-6 18 -6 HT IFT -IN) MESSENGER HT 18-6 22-6 18-6 22 -6 18-6 22-6 18-6 22 -6 CONTACT HT (FT -INI MESSENGER HT (FT -INI • 22 -6 22 -6 22 -6 . r (FT-INI TERMINATION HT (FT 22 -6 - 22 -6 - - - wQ f • 1 1 6.46 1 WF -2026 H � -t 'V -INI POLE SET -OUT WTI 6.46 L 6.46 L 6.46 L 6.46 L • - I POLE REFERENCE - WF•2026 -OUT POLE REFERENCE WF•2026 WF -2026 - WF -2026 FOUNDATION HEIGHT OW - _ -4 -4 -4 M ► •4 JUN FOUNDATION REF -4 FD -3TA FD -3TA FD -3TA FD -3TA - - FD-3TA MISCELLANEOUS - - - - - r , > h T . STRUCTURE 8 ASSY DESCRIPTION STRUCTURE 8 ASSY DESCRIPTION CANT CA -01M CANT CA-01M CANT CA•OIM CANT CA -01M SPAN (FTI III I 115.5 CANT CA -01M 116.5 ( SPAN (FTI 110.5 I 114.5 115 1 113.5 116.5 116 -- A A NORTHBOUND 7 6.00 CL 766.00 2. FFUR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL /DRAWINGS. STATIONING IS S8 Ti CK UNLESS OTHER_(ISE -NO L , _4,_ALL POLE BRACKETS ND BANDS TO B�LLOCA r r %n� - .0 V -f - W 2 Ur CL T6 4.00 JS -1 Q Sa_ W - . SOUTHBOUND. AK 06/20/05 ISSUED FOR CONSTRUCTION NEV coat D+.aptbn NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 289 IN PLAN IS 755 -289 IN SCHEDULE. 15" s. V' `\ . v:. ma //. alacttic con,truction company 290 C•.d.. sy. G. TERRADO s.ae.e sn 0. MACDONALD ER L00 -J680. n / D..gnw sr L. DELA CRUZ Ammo er D.S. / N.P. Soauuikanisrr CURVE R = 1300 FT Ea 3.5 IN -------- --- ----- - - - - -- - - - - -- o.,:•,, - / f SK ow CURVER =1315.72 FT Ea 3.5 IN o Hatch Mo MacDonal Am. D C. MACDONALD 06/20/05 IQI►'TL:1 r.20. MEC- 646.DWG Contnact No: C807 D.%« 06/20/05 0s -- row, -. -_ r� _ == .ty.{•.1,f.^` _._ lY.:..- .._-- _._ayMI.RN�i� • REVIEWED FOR C NFpq �� P11gNCE\ NE C MEC Seattle Controlled 1 Ea CO W 1 20 10 0 UNK UGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN a SCHEDULE STA S8 764.00 TO STA S8 769.00 W 20 SCALE IN FEET 40 IVED ruKWILA 7fln7 �j ;EN F 'y ER Drawing N ST Refoona L57 -0P46 sn..% No MEC -646 161 0 - - - - STATIONING - 755 755-290 755-291 755 -292 755 -293 STRUCTURE NUMBER STAGGER -289 12 L 12 L I2 1 12 L 12 L (INCHES) 18-6 18-6 18-6 18-6 18-6 CONTACT HT (FT -INI MESSENGER HT (FT -INI 22 -6 22 -6 22.6 22 -6 22 -6 - - - - TERMINATION HT IFT -N POLE SET (FTI - - - - - -OUT POLE REFERENCE - - - FOUNDATION HEIGHT ON) - - - - FOUNDATION REF - - - MISCELLANEOUS - - - - STRUCTURE 8 ASSY DESCRIPTION CANT CA -02M CANT CA -02M CANT CA -02M CANT CA -02M CANT CA - 02M SPAN (FTI III I 115.5 I 116.5 ( 115 1 II8 I 117.5 -- A A NORTHBOUND 7 6.00 CL 766.00 2. FFUR POLE FOUNDATIONS ON AERIAL STRUCTURE. SEE CIVIL /DRAWINGS. STATIONING IS S8 Ti CK UNLESS OTHER_(ISE -NO L , _4,_ALL POLE BRACKETS ND BANDS TO B�LLOCA r r %n� - .0 V -f - W 2 Ur CL T6 4.00 JS -1 Q Sa_ W - . SOUTHBOUND. AK 06/20/05 ISSUED FOR CONSTRUCTION NEV coat D+.aptbn NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE. I.E. POLE 289 IN PLAN IS 755 -289 IN SCHEDULE. 15" s. V' `\ . v:. ma //. alacttic con,truction company 290 C•.d.. sy. G. TERRADO s.ae.e sn 0. MACDONALD ER L00 -J680. n / D..gnw sr L. DELA CRUZ Ammo er D.S. / N.P. Soauuikanisrr CURVE R = 1300 FT Ea 3.5 IN -------- --- ----- - - - - -- - - - - -- o.,:•,, - / f SK ow CURVER =1315.72 FT Ea 3.5 IN o Hatch Mo MacDonal Am. D C. MACDONALD 06/20/05 IQI►'TL:1 r.20. MEC- 646.DWG Contnact No: C807 D.%« 06/20/05 0s -- row, -. -_ r� _ == .ty.{•.1,f.^` _._ lY.:..- .._-- _._ayMI.RN�i� • REVIEWED FOR C NFpq �� P11gNCE\ NE C MEC Seattle Controlled 1 Ea CO W 1 20 10 0 UNK UGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN a SCHEDULE STA S8 764.00 TO STA S8 769.00 W 20 SCALE IN FEET 40 IVED ruKWILA 7fln7 �j ;EN F 'y ER Drawing N ST Refoona L57 -0P46 sn..% No MEC -646 161 0 z g 3 3 3 S 1 3 771.10 755 -298 12 STATIONING STRUCTURE NUMBER STAGGER DNCHESI CONTACT HT IFT -IN1 MESSENGER HT (FT -INI TERMINATION HT IFT -IN1 POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT 11NI FOUNDATION REF MISCELLANEOUS 18-6 22 -6 20 -10 23.75 L WF -2230 STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 06/20/05 oat 117.5 NORTHBOUND WI cn I SOUTHBOUND 755 -294 12 L .12 �1 00 U) • W � r - -�- 3 JS -t ASSY_ITa'PI"" - - NOTES: ISSUED FOR CONSTRUCTION CANT CA -02M CURVE R = 1315.72 \FT Ea = 3.5 IN 46. __I }- ,. CURVE Ea 115.5 60 '� - -- 1. POLE NUMBERS IN -PCAN ARE-'MISSIt9G- TffE 755- PREFIX SHOWN �IN_$CHEOUCE. I.E .-P011 294 i�LA I_PN IS 755 -294 IN SCHEDULE. t ac' � ` OR. �. cN 2. F OLE..FOUNO2STIONS &J AERIAL STRUCTURE. SEE CIVIL INGS. 770.85 755 -296 R 1300 FT STATIONING IS S8 TRACK UNLESS OTHERWISE NOTED. i " ALL POLE BRACKETS AND BANDS TO BE AL'OCATED BY CONTRACTOR ROUTE NB FEEDERS FROM POLE 302 TO 301 AND THEN TO CATENARY. CONTRACTOR TO SUBMIT DESIGN SHOWING SLACK IN FEEDER. ROUTING TO CATENARY AND POSITIONING OF FEEDER JUMPERS. Qlcd cot•truction company +M L. DELA CRUZ Oro., sn D.S. / N.P. Chocked ey. 0. TERRADO i.a+.Kw en 0. MACDONALD 18-6 22 -6 0 -0 23.75 L AP3 FD-3TA OGA DG -01 a 296 /7; - - - -TWA EDI .12 FD -5TA CANT CA -01M 298 TERM BW -I Soutailkaim '; 100 / 110 (0 /R1 a ti s y� F • PER L00..680. # 0 s.A..dtad O C. MACDONALO 755-299 • 9 18-6 23-6 - - - .- WA` _ _„ 297-1 CANT CA -02M JP -2 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -IN) MESSENGER HT (FT -IN) TERMINATION HT (FT -INI 6.46 L WF -2026 POLE SET -OUT IFTI POLE REFERENCE FOUNDATION HEIGHT IINI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN IFTI 116 769.96 755 -294 .4 FD-3TA CANT CA -DIM 114 770.85 755 -295 12 L 18.6 22 -6 0.0 8.0 R AP -3 -14 FD -3TA 00A 00.01 771.10 755 -297 12 L 18-6 22 -6 20 -10 8.0 R W F -2230 -14 FD -5TA CANT CA -02M 772.09 755 -299 9 L 6.46 L WF -2130 -2 FD-3TA 772.19 755 -300 24 L 19 -3 23 -6 18-6 22 -6 6.46 L WF -3230 -2 FD-5TA 772.915 755 -301 9 R 773.01.5 755.302 9 19 -3 22 -6 18-6 23-6 18 -6 22 -6 6.46 L WF -2130 F 6.46 L WF -2130 F -2 FD -3TAF 773.70 755 -303 9 R 6.46 L WF -3230 -2 FD -5TA 773.80 755 -304 9 L 18-6 23 -6 Rpr" 6.46 L WF -2130 JUN 2 -2 FD -3TA I't .niv11 1 - FD -3TAF CANT CA -DIM JP -2 68.3 (0 /R) / 58.3 --- TERM BW-1 CANT CA-IOM JP -2 CANT CA -06 IN -I, IN-2 CANT CA -IOM DS -01. DISC SW C36 -H -601 CANT CA -OIL CANT CA -06 IN -I. 1N -2 99 / 109 I0 /R) 82.5 (0 /LI / 82.5 (0 /L) 78.5 (0 /LI / 78.5 (0 /11 A rev Hatch Mott MacDonal D. 1 0 755 -300 24 L 19 -3 22 -6 CANT CA -06 IN -1, IN-2 83.5 (0 /L) / 83.5 (0 /L) =101Ff. l 755 -301 9 R 19 -3 23.6 18-6 23-6 ���INSULATED OVERLAP ------ too =:la _ I co R EVIEWED FOR CODE COMPLIANCE - - NFPA 7 NEC .�, AUG ° 7 ZOOl ION Soola P =20' CANT CA - tlM 755-302 9 18-6 22 -6 755-303 9 R CANT CA -02M DS -01, DISC SW C36 -H -602 CANT CA -06 93 -I. m .2 79.5 10 /1) / 79.5 (0 /LI 755 -304 9 18-6 22.6 CANT CA -02M JP -2 70.3 10 /RI / 60.3 -- $6�►LE N FEET cos Lv�YE515.72 FT 4, 0 9IU I W 1 CD ti __ 6v CURV6 R 500 FT �- Ea- �3.5.]A �9� \I W to a. 71\ --- .' ^ ~ `•; -- . 7 . - 71 I N 1 , i 61 MEC Seattf -.„ I Controlled LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN a SCHEDULE STA SB 769.00 TO STA SB 774 +00 162 40 Mowing No.: °_VIED 1 JKWILA nor ; ENTER MEC -647 ST Rohr.. No. 157 -0P47 sn..t No: Roo.: 0 • g STATIONING STRUCTURE NUMBER STAGGER INCHES( CONTACT HT IFT -I ) MESSENGER HT PT-P11 TERMINATION HT FT-14) POLE SET -OUT (FT) POLE REFERENCE FOUNDATION MIGHT (16( FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION STATIONING NORTHBOUND SOUTHBOUND STRUCTURE NUMBER STAGGER (INCHES) C0#TACT HT IFT.511 MESSENGER HT IFT -INN TERMINATION HT IFT -IN) POLE SET -OUT IFT) POLE REFERENCE FOUNDATION HEIGHT (N) FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION A A A A i 12/29/05 06 TERM FA-1 774.38.3 755-306 12 18-6 22 -6 21 -9 119.9 23.75 L TERM FA-1 WF -2230 .12 FD-5TA SPAN (FT) 70.3 (0 /RI / 60.3 308 1 _--- ----- 5 >- --::>-- FA: W I � V ; W • a ' I1 ' // /' ' ' 1- ▪ ' W - i "-``\ t` C NI J �^ - NOTES: � � t '�. r � -,� .-� 1,6=)--- 1 POLE NUMB IN PLAN ARE... N THE 75 REFIX. SPOWN IN S9 E E, I.E. POL A N O'� N PC1�A 7551`3 5 1N-Se.HiEOULE. \ �, \-, 2 FO R POLE F ATIONS ON AERIAL' S '1UCI E. CIVIL DRAWINGS. 3. STATIONING I5 SB TRACK UNLESS OTHERWISE NOTED. 4. ALL POLE BRACKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L00 -3680. 774.38.3 755 -305 12 L I6-5 22 -6 21 -9 119 -9 8.0 R WF -2230 -14 FD-5TA CANT CA -011 ISSUED FOR CONSTRUCTION i CANT CA -02H ST' COMMENTS NCORPORATED 774.59.8 755 -308 0 -0 23.75 L AP -3 FD-3TA DWI 00-01 73.7 306 774.59.8 755 -307 0 -0 8.0 R AP -3 -14 .12 FD-3TA DOA DO-01 SPAN (FT) 68.3 (0 /R) / 58.3 I 71.7 755 -309 12 CANT CA -02H 18-6 22 -6 775.10 755 -309 124 186 22 -6 6.46 1. WF -2230 F -2 FD -STAF 307 CANT CA -OH DS -01, DISC SW C36 -H-605 73 1 73 ■ _ - -- "`" E,EiIERT-''`- - :"-• ° j ,. 0 310 t1. - -� 30 - 9 .. R = 515 - - FT'' L 1 - fEEDER I mo alac conottuctlon company 755.310 12 L 18-6 22 -6 CANT CA-0211 DS -01. DISC SW C36-H -606 18.6 22 -6 775.81 755.310 12 L 6.46 L WF -2230 F .2 FD -5TAF CANT CA -0H .a Dyn.� eY: L DELA CRUZ Dmori IPA D.S. / N.P. poor= P. 0. TERRADO 3 4 en 0. MACDONALD n rn ,.1 s y CURVE R = 500 FT -rf, .0o • 776.342 755-312 23.75 L 755-31 0 -0 AP -3 -8 DOA DO-01 0-0 AP -3 .6 FD-3TA DGA D0-01 776.312 8.0 R FD-3TA CANT CA -01M CANT CA -OIL 71.6 1 776.52.6 755 -314 12 L 18-6 22 -6 20-2 23.75 L WF -2230 .6 FD-5TA _o - ;v c +f? - r' = 4 - c i ...... ........- - - -* - 1316 `318 1 „ C - .-- 1 D1 T l r . 21 •n 't ?= DIAMOND CROSSOVER 400 -.1434 12) KN -3 8 KN -4 W /NSUL 776.52.6 755.313 121 18.6 22 -6 20-2 8.0 R WF -2230 -8 FD-5TA Sourekarisrr TERM BW-1 Ell TERM BW -1 106/113 (0 /R) 2 D►AM. N CROSSOVER ENLARGED PLAN n SCALE: r : 10•-O• C. MACDONALD 3• 105.52/112.52 10 /R) Hatch Mott MacDonal 0 8/20 /0 5 777.58.12 755 -3,5 6 L 18-6 22 -6 9.5 R WF -0830 -9 FD-ITA CANT CA -02M 777.58.12 755 -316 6 R 18-6 22 -6 25.25 L WF -0830 - FD-ITA CANT CA -02M 1 tit ^1 1 ^ 1 6• STA i mr 11 M1 � ASSY (2) KN -3 Nt4_ W /INSUL " 1 k8n : .77.0 .. .f 1�1 777.6512 755-318 NOTE 5 (2 1 755 -317 NOTE 5 12 R 18-7 23-6 9.5 R WF -2130 -9 FD-3TA 777.65.12 18-7 23-6 25.25 L WF -2130 -9 FD-3TA CANT CA -061 JC-2 CC-1 62.17 CANT CA -DIM JC-2 CC-I 62.17 / r =20• M C 648RI.DWG °im ea we C807 Dude 06/20/05 / 55.17 (X /0) • _Co �E �-p MEC Seattle Controlled 55.17 (X /0) NB 18-6 NB 22 -6 NO CANT CA -OL �.7 S8 22 -6 778.2029 755 -320 NB 6 L X10 9 L TYP S8 CANT CA -OL 25.25 L WF -0830 -9 FD-ITA 778.20.29 9.5 R WF -0830 - FD-ITA X,0 18-7 NR X10 22 -6 HR -MW 755319 SB 6R X099RTYP S8 18-5 X09 10.7 i41 X09 22 -6 H -SPAN HS -02 HR -MW 62.16 / 65J6 (0 /R) Al Cry. El 778.75.45 755 -321 NOTE 5 12 R 18.7 23-6 9.5 R WF -2130 - FD-3TA CANT CA -OL JC -2 CC -I 778.7545 755.322 NOTE 512L 18.7 23-6 25.25 L WF -2130 - FD-3TA CANT CA -01.. JC-2 CC-0 LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA S8 774.00 TO STA SB 779.00 778.82.45 755-324 9 R 18-6 22 -6 25.25 L WF -0830 -9 FD-ITA CANT CA -024 64.85 SCALE N FEFT 4�1 05 l a• U w b ----.1 o N 1 1 778.82.45 755 -323 9 L riEUCIVCL) - 21 7fln7 9.5 R - 9 - ,,■ti -..- 1 L.,1 i FD-ITA CANT CA -02M / 46.05 (0 /R) 62.16 / 55.16 (X /0) 64.85 / 46.05 (0 /R) ----- MEC -648 ST $•erene• Ns. L57 -0P48 =wet ■•.: Ms • 163 STATIONING STRUCTURE NUMBER STAGGER (INCHES( CONTACT HT (FT-11.0 MESSENGER HT IFT -MI TERMINATION HT IFT -INI POLE SET -OUT (FT( POLE REFERENCE FOUNDATION HEIGHT IIN1 FOUNDATION REF MISCELLANEOUS ARCH ARCH STRUCTURE 8 ASSY DESCRIPTION SPAN (FT) 64.85/46.05 (0 /RI W I U c w I C7 STATIONING STRUCTURE NUMBER STAGGER (INCHES) CONTACT HT IFT -INI MESSENGER HT (FT -INI TERMINATION HT IFT -INI POLE SET -OUT WTI POLE REFERENCE FOUNDATION HEIGHT (INI FOUNDATION REF MISCELLANEOUS STRUCTURE 8 ASSY DESCRIPTION SPAN IFTI 06/2005, Rev twE NORTHBOUND SO UTHBO U ND 779.215 755 -326 21.8 19 -5 25.96 L ARCH TERM FA -I FA FA 779.21.5 21 -8 I 19 -5 10.2 R ARCH ARCH ARCH 21 -9 31.75 L 755 -325 TERM FA-1 64.85/46.05 (0 /RI 779.47.3 755 -328 3R 18-6 22 -6 0 -0 25.96 L ARCH ARCH ARCH NOTES: 1. POLE NUMBERS IN PLAN ARE MISSING THE 755- PREFIX SHOWN IN SCHEDULE, I.E. POLE 325 IN PLAN IS 755 -325 IN SCHEDULE. 2. FOR POLE, UNDATIONS ON AERIAL STRUCTURE, SEE CIVIL DRAWINGS. G � STATIONINti IS SB TRACK UNLESS OTHERWISE NOTED. 4. A o CH, DENOTES POLE AND FOUNDATION BY STATION DESIGNER. 5. ALL 'OL `dbR CKETS AND BANDS TO BE ALLOCATED BY CONTRACTOR PER L004600: 1 779.47.3 755 -327 3 R 18-6 22-6 0 -0 10.2 R ARCH ARCH ARCH C -SPAN L00 -J543 A A JO ISSUED FOR CONSTRUCTION CL 780.00 166.5 N61'02'4223 - `N 78143.8 755 -330 12 L 18-6 N/A N/A ARCH 166.5 4 36 3' .— rt tJ g 11114101. alactric construction company G. TERRADO S. bmat.e D 0. MACDONALD CO if, , • , ITY Darkrad Dr L. DELA CRUZ Oman Dr O.S. / NP. 781.13.8 755 -329 12 L 18-6 21 -9 16 R N/A N/A ARCH C -SPAN L00-J543 II — r 160 o w_ *ma X10 782.73.8 755 -332 12 R 18-6 ea��le Controlled N/A REVIEWED COD E COMPLIANCE PA IYLv 11111111 l:" • 160 ARCH Hatch Mott MacDonal Submitted •r Data C. MACDONALD 06/20/05 21 -0 CW 18 -6 I MW 21 -0 31.75 L N/A TERM FA -I 8 BACK GUY c s 0 h 0 r. r w .I" - 1:::=117.17L31 755 -331 12 R 18 -6 21 -0 MW 21 -0 16 R N/A N/A ARCH TERM FA -I 8 BACK GUY C807 Data: P =20• ..a,ama MEC- 649.0WG cen4act No: 06/20/05 m ! - _t l ' i LINK LIGHT RAIL PROJECT OVERHEAD CONTACT SYSTEM OCS LAYOUT PLAN 8 SCHEDULE STA SB 779+00 TO STA SB 783 +32 ENO OF LINE 1• l C t :�ru / j ✓ �Na • \ \ / TV TV != TI t • 11 1=1. 1v1If ldi;llilCl END OF LINE wr Draping Ho» MEC -649 ST R.ra.na. No. L57 -0P49 Shoat Ma.: 164 R«.: 0 d • Ar -• SS TPS -S001 TPS -S101 TPS -S101 TPS -S 101 TPS -S101 TPS -S001 TPS -S010 TPS -S010 TPS -S010 TPS -S010 C11 -S020 C16 -S020 C23 -S020 C27 -S020 C29 -S020 C32 -S020 C33 -S020 C36 -S020 TPS -S021 TPS -S022 TPS -SO40 TPS -SO40 TPS -SO40 TPS -SO40 TPS -SO40 TPS -S050 TPS -S050 TPS -S050 TPS -S050 TPS -S060 TPS -S060 TPS -S100 TPS -S100 TPS -S100 TPS -S100 TPS -S100 TPS -S100 TPS -S 100 -03 -04 -01 -01 -02 -03 F1 Cubicle Di • ital Out•ut Schematic 01 01 03 03 02 03 02 03 11/05 11/05 11/05 10/05 12/05 10/05 10/05 10/05 10/04 10/05 10/05 10/05 7/05 7/05 7/05 11/05 11/05 11/05 7/05 11/05 11/05 01 01 01 01 01 01 11/05 11/05 12/05 11/05 12/05 11/05 12/05 12/04 11/05 12/04 ba Dwg Number I Sht TPS -D001 A nnrnvari CDRL 12 - STS 30.001_R03 Substation DrawingList S mbols & Abbreviations, Symbols S mbols & Abbreviations, Abbreviations S stem Single Line Diagram S stem Sin le Line Diagram S stem Single Line Diagram S stem Single Line Diagram International District/Chinatown TPSS C11, Single Line Diagram Forest Street TPSS C16, Single Line Diagram McClellan Street TPSS C23, Single Line Diagram -01 Othello Street TPSS C27, Single Line Diagram Rainier Beach TPSS C29 Single Line Diagram Boein• Access Road TPSS C32, Single Line Diagram South 133rd TPSS C33, Single Line Diagram Tukwilla International Boulevard TPSS C36, Single Line Diagram TPSS Protection Devices DC Switch •ear One Line Diagram CDRL 21 - STS 30.039_R01 R if AC Switch ear Elementary, TPSS C11, C23, AC Switch • ElementaW, TPSS C16 & C36 Elementajy, TPSS C32 & C33 Control Schematic ear Devices CDRL 20 - STS 30.0026.02_R02 AC Switch AC Switch AC Switch ear ear ear N Cubicle Schematics N Cubicle Schematics N Cubicle Schematics N Cubicle 24VDC Control Power R1 & R2 Cubicles General Schematics R1 & R2 Cubicles, Trip & Alarm Schematics FO Cubicle General Schematics FO Cubicle General Schematics FO Cubicle General Schematics FO Cubicle PLC Schematics FO Cubicle PLC Schematics FO Cubicle PLC Schematics FO Cubicle PLC Schematics F1 Cubicle General Schematics F1 Cubicle DPU Schematics F1 Cubicle Di • ital In • ut Schematic -r C,32 Title Revision C27 & C29 Rev. Date 00 12/05 3/05 3/05 11/05 00 00 00 00 01 01 01 00 01 02 01 Date r . . c. • , • • • • • • ' . i - , . 1 1 . 1 . 1 . TPS -L001 -01 TPS -L040 -01 TPS -L050 -01 TPS -L060 -01 TPS -L100 -01 TPS -L100 -02 TPS -L100 -03 TPS -L101 -01 TPS -L101 -02 TPS -L101 -03 NO R e v isio Division. s will require a new plan submittal JUN 2 8 7110 F ,k41-r r.r_N t R 01 11/05 0 11/05 12/05 Dwg Number l Sht TPS -W070 TPS -W070 TPS -W070 TPS-W070 TPS -W070 TPS -W070 TPS -W070 i — atn�- r�a�insl CDRL 28 - STS 30.0064_R01 - .late[connectLoa_DlagtamJiV AC&RGCabiing -02 Interconnection Dlagram,.AC.1ZC Station Service -03 interconnectioa.plagrami ltlldl09.Auxlllades -04 In erconnedLon ()Eagan, AC $wltchgeat -05 Intorconn ctloolalagra lt chgear -06 lntecoonnecliolL01agtam ,._QS_1Kitchgear -07 InierconnecII DIagram.profIbtts CDRL 123 - STS 30.0045 TPS$ OLdg�ieo_l� quip BCCwit OilLQ1 Material N u_bicle.�iJLo M teriat IZCublcle.JIILQf t_erial FO CSIblcle. ilLof Material E0 ukicle,�slLof Maletial E0 Q biele_SilLoLMatenial F Cubicle.BilLof.Materiai F Cubicle, Bill of Material Cubicle–Oi1Lof Material Title SOUND TRANSIT Mainline Substation FILE COP 1 DECO5.,Drawing Drawing Rev. Date 1 01 11/05 01_ 11/05 01 11/05 01 11/05 01 11/05 oL 12/05 01� _00 01 12/05 _01 12/05 Q1__ 12/ 12/05 001_1 1 12/05 05 12/05 6/05 Dwg Number C11 -B001 C16 -B001 C23 -B001 C27 -B001 C29 -B001 C32 -B001 C33 -B001 C36 -B001 TPS -B001 TPS -B001 TPS -B001 TPS -B001 TPS -B001 TPS -B001 PRD -B001 PRD -B001 PRD -B001 PRD -B001 Approved Sht CDRL 13 - STS 30.0034_1102 -01 TPSS Building Equipment Arrangement -01 TPSS Building Equipment Arrangement -01 TPSS Building Equipment Arrangement -01 TPSS Building Equipment Arrangement -01 TPSS Building Equipment Arrangement -01 TPSS Building Equipment Arrangement -01 TPSS Building Equipment Arrangement -01 TPSS Building Equipment Arrangement -01 -02 -03 -04 -05 -06 R# Title Revision Plan (International District) Plan (Forest) Plan (McClellan St.) Plan (Othello St.) Plan (Rainier Beach) Plan (Boeing Access Rd.) Plan (South 133rd St.) PIanjTukwilla Intl Blvd) TPSS Building Switchgear Equipment Elevations for C11, C23, C27. C29 TPSS Building Auxiliary Equipment Elevations for C11, C23, C27, C29 TPSS Building Switchqear Equipment Elevations for C16 & C36 TPSS Buildin• Auxilia Equipment Elevations for C16 & C36 TPSS Building Switchqear Equipment Elevations for C32 & C33 TPSS Building Auxiliary Equipment Elevations for C32 & C33 Rev. Date Ig 01 00 00 00 00 00 02 01 10/05 Q1 10/05 00 12/05 00 12/05 00 12/05 00 12/05 9/05 7/05 9/05 9/05 9/05 9/05 9/05 7/05 CDRL 25 - STS 30.0020_1103 -01 AC Switchgear Anchoring Plan 01 9/05 -02 DC Switchgear Anchoring Plan 01 9/05 -03 DC Switchgear Anchoring Details 01 9/05 -04 DC Switchgear Bolt -Up Details 01 9/05 L r Date • v Al • • i • • 00 TPS- TPS -M040 T 040 040 — TPS -M040 TPS -M . - TPS - 040 TPS - 040 TPS -M040 TPS -M040 -01 -02 -03 -04 -05 -06 -07 -08 -09 -01 -02 -03 TPS -M042 -01 TPS -M042 -02 TPS -M042 -03 TPS -M042 -04 TPS -M042 -05 TPS -M043 -01 TPS -M043 -02 TPS -M050 -01 TPS -M050 -02 -03 TPS -M100 -01 TPS -M100 -02 TPS -M101 -01 TPS -M101 -02 DC DC DC Switch Switch Switch DC Switch DC F Cubic e E ear, Line -U ear, ear, ear, r Lighting Arrestor Box and Current Relay Box Details Li•h inq Arrestor and Current Relay Equipment UO NC bi - tea - UO N Cubicle. Details N Cubi le. Interphase Transformer -01 R1 Cubicle. Equipment UO -02 R2 Cubicle. Equipment UO -03 R ubi e Equipment UO Details FO Cubicle. Equipment UO FO Cubicle, Truck Layout ui Name Instrument Panels, Feeder Breaker Drillin men UO Arran ement late Schedule Tem REVI D -F-B` late Instrument Panels,Main Breaker Drillin Tem late i s enL anels Negative Switch Drillinq_Template 11/05 11/05 11/05 11/05 11/05 12/0 12/05 8/05 12/04 12/04 10/05 12/05 10/05 12/05 �An Dwg Number TPS -M041 TPS -M041 TPS -M041 TPS -M050 TPS -M060 TPS-M060 TPS -M060 Sht CDRL 15 - STS 30.0019 RO1 Title QQyvitchaear. Elevation for C11. C23. C27 -029 AC Switchgear, Section Views for C11, C23, C27, C29 Plate schedule for 11.023. C27 C29 AC Switchgear. Elevation for 016 & Q AC Switchaear. Section Views foL(;16 & C36 AC Switchaear. Name lateshhule_for C16 & C3S AC Switchaear. Elevation for C32 & C33 AC Switchaear. Section Views for C321. C33 haear. N meplate scbedule_for C32&C33 Rectifier Transformer. Lav u tifier Transformer. Detail t • 11 ►.11 • SOUND TRANSIT Mainline Substation 1DECO5 Drawing List Drawing No. TPS- D001 -02 Rev. Date : 7/05 ardalll 11 WM 1O 1• •Q_ WIN I 5_ 9/05 9/05 9/05 600/200 -5 MR SINGLE LINE DIAGRAM SYMBOLS O 0 AMMETER VOLTMETER VOLTAGE OR CURRENT TEST TERMINALS CURRENT TRANSDUCER ELECTRICAL INTERLOCK KEY INTERLOCK VOLTAGE TRANSDUCER — o o f-- DC SHUNT LIGHTNING OR —OSAo -I SURGE ARRESTOR w/ GROUND CONNECTION rnm CABLE STRESS CONE TERMINATION _ — — _. DIRECTION OF CONTROL OR RELAY INFLUENCE LINE A 3 PHASE, DELTA, TRANSFORMER CONNECTION 3 PHASE, WYE, TRANSFORMER CONNECTION OPEN DELTA CONNECTION -A--k-A- TRANSFORMER RECTIFIER TRANSFORMER, 12 PULSE (TYPICAL FOR ANSI - CIRCUIT No. 31) CURRENT TRANSFORMER, NUMBER INDICATES QUANTITY VOLTAGE TRANSFORMER, NUMBER DENOTES QUANTITY MULTI -RATIO 600:5 CURRENT TRANSFORMER CONNECTED ON THE 200:5 TAP SINGLE LINE DIAGRAM SYMBOLS 400 1 300 J -11 1 FUSE NUMBER INDICATES QUANTITY 72) O— ISOLATING DEVICE (TYPICAL) MEDIUM VOLTAGE AC CIRCUIT BREAKER, 3 -POLE, DRAW -OUT TYPE PANEL CIRCUIT BREAKER, FRAME SIZE INDICATED ABOVE LINE AND TRIP VALUE BELOW LINE IN AMPS CIRCUIT BREAKER DC CIRCUIT BREAKER DRAW -OUT TYPE w/ SERIES TRIP DEVICE O— FUSED DISCONNECT NUMBER INDICATES QUANTITY 1 « 3 DRAWOUT VT WITH FUSE NUMBER INDICATES QUANTITY MANUAL, NO -LOAD BREAK TYPE DISCONNECT SWITCH O— MOTORIZED, NO -LOAD BREAK TYPE DISCONNECT SWITCH GROUNDING DISCONNECT SWITCH --I OCS SECTION BREAK —��— OCS INSULATED OVERLAP 01 REV 3/17/05 DATE REVISED PER COMMENTS DESCRIPTION PJO BY ENG CHK APP SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE SUITE 106 LAKE OSWEGO, OREGON 97034 SouninTRAwsrr PAT O'HOGAN 3/17/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 3/17/05 DATE DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE SCALE: LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION SYMBOLS AND ABBREVIATIONS SYMBOLS CONTRACT DRAWING REV. NO. RTA /LR 82 -03 / C8071 NO TPS- S001 -01 001 SCHEMATIC DIAGRAM SYMBOLS _ POWER RECTIFIER OR DIODE 6 -1 /c 500kCMIL QUANTITY AND SIZE OF CONDUCTOR (kCMIL SAME AS MCM) T TERMINATION (30 MADE UP NEUTRAL) TEFLON INSULATED CONDUCTOR >2KV FLEXIBLE Cu CONDUCTOR (OR) BRAID >120mm AUXILIARY RELAY COIL TRANSDUCER VOLTAGE OR CURRENT 1 — CONDUCTOR CONNECTION -I. —di-- EXTERNAL CABLE CONNECTION —I— GROUND CONNECTION 227 CHASSIS CONNECTION i BATTERY 1 DEVICE AUXILIARY SWITCH CONTACT - OPEN WHEN ACTUATING DEVICE IS NON- OPERATED OR DE- ENERGIZED STATE DEVICE AUXILIARY SWITCH CONTACT - CLOSED WHEN ACTUATING DEVICE IS NON- OPERATED OR DE- ENERGIZED STATE O i MANUAL PUSHBUTTON SWITCH - NORMALLY CLOSED —1— _0 O-- MANUAL PUSHBUTTON SWITCH - NORMALLY OPEN —x— TEST BLOCK S03 COMPONENT IDENTIFICATION C _ EQUIPMENT ENCLOSURE OUTLINE f 1 EQUIPMENT WITHIN ENCLOSURE L---J ISOLATED FROM EARTH /GROUND SCHEMATIC DIAGRAM SYMBOLS 1 I) --I RES I— or or I1.0 Q0.1 El Al 2 MICRO SWITCH SELECTOR SWITCH MANUAL SWITCH KEY OPERATED OPTO ISOLATOR DEVICE OPERATION COUNTER 1 V\A7 - RESISTOR VARIABLE RESISTOR INDICATOR, G- GREEN, R -RED, Y- YELLOW, BL -BLUE SHIELDED CABLE — — — — -� INTERCONNECT WIRE 0 TERMINALBLOCK TERMINAL TWISTED PAIR INTERPHASE TRANSFORMER (TYPICAL FORA i 'CUIT No. 31) PLC INPUT PLC OUT DPU I DPU OUTPUT FC;� - JUN 2 81007 JUMPER ON TERMINAL BLOCK THERMOCOUPLE 0:7.3,►vll L;EN f ER T, c o c • r, 00 � 0• C Y E u °v o c ow `ate o = L e° c • E 2 u . g in at c E •c w e g o U 01 REV 3/17/05 DATE ANSI DEVICE TABLE NUMBER DESCRIPTION 5 EQUIPMENT SHUTDOWN DEVICE 26R1 RECTIFIER DIODE OVERTEMPERATURE, ALARM 26R2 RECTIFIER DIODE OVERTEMPERATURE, TRIP 27 UNDERVOLTAGE RELAY 30 ANNUNCIATOR 32 REVERSE CURRENT INSTANTANEOUS RELAY 33 EQUIPMENT DOOR INTERLOCK DEVICE 43 SCADA LOCAL / REMOTE SWITCH 47 PHASE SEQUENCE VOLTAGE RELAY 48 INCOMPLETE SEQUENCE RELAY 49T1 TRANSFORMER WINDING OVERTEMPERATURE, ALARM 49T2 TRANSFORMER WINDING OVERTEMPERATURE, TRIP 51A RECTIFIER OVERLOAD RELAY 50/51 PHASE FAULT TIME OVERCURRENT RELAY WITH INSTANTANEOUS ELEMENT 50/51 N GROUND FAULT TIME OVERCURRENT RELAY WITH INSTANTANEOUS ELEMENT 52 AC CIRCUIT BREAKER 59 1500VDC TO 125VDC POTENTIAL RELAY 64G FRAME FAULT RELAY, FRAME GROUNDED 64L FRAME FAULT RELAY, FRAME LIVE 64V RAIL TO EARTH VOLTAGE DETECTION 72 DC FEEDER BREAKER 76 DC FEEDER DIRECT ACTING TRIP DEVICE 82 DC FEEDER LOAD MEASURING FOR LINE TEST 83 LINE TEST RECLOSING RELAY 85RX TRANSFER TRIP RECEIVE 85TX TRANSFER TRIP TRANSMIT 86 AC LOCKOUT RELAY, HAND RESET 89N NEGATIVE DISCONNECT SWITCH 95X TRANSFORMER TEMPERATURE AUXILIARY RELAY 98 -1 DIODE FUSE MONITOR ALARM 98 -2 DIODE FUSE MONITOR TRIP 150 MAIN DC BREAKER MAX OVERCURRENT 150R DC FEEDER RATE OF RISE RELAY 186 DC LOCKOUT RELAY REVISED PER COMMENTS DESCRIPTION PJO BY ENG CHK APP DIAGRAM, DEVICE ABBREVIATIONS DESCRIPTION NUMBER A AL APS BA BT CTR CS /C CS/T DPU DS E ETM ETS F F/O FMR G Hx H UC J K LOR MOC NB OBT OCS OCW OLM OP P PLC PM R RGD S SA S -A SB SCADA SCL S -N & R SSS S -T &C TOC TPSS V VD WN X W AMPERE ALARM, LOCAL AND SCADA AUXILIARY POWER STATION BUFFER AMPLIFIER DC CIRCUIT BREAKER TRUCK COUNTER, CONTROL CONTROL SWITCH /CLOSE CONTROL SWITCH/TRIP DIGITAL PRcjTECTION UNIT DOOR SWIT H DC CIRCUIT BREAKER OPERATING SOLENOID ELECTRONIC TEMPERATURE MONITOR EMERGENCY TRIP SWITCH FUSE, CIRCUIT BREAKER FIBER OPTIC FEEDER MONITORING RELAY DC TO DC CONVERTER INDICATOR DC BREAKER OR LINE DISCONNECT SWITCH CURRENT INTER CONNECT JACK (CONNECTOR) AUXILIARY RELAY OR KEY INTERLOCK LOCAL - OFF - REMOTE MECHANISM OPERATED CELL SWITCH (BREAKER STATUS) NORTH BOUND OPTICAL BUS TERMINAL OVERHEAD CONTACT SYSTEM OVERHEAD CONTACT WIRE OPTICAL LINK MODULE OPERATOR PANEL PLUG (CONNECTOR) PROGRAMAE3LE LOGIC CONTROLLER PANEL METER RESISTOR F RAIL GROUNDING DEVICE SWITCH SURGE ARRESTOR SCADA - ANALOG SOUTH BOUND SUPERVISORY CONTROL AND DATA ACQUISTION SEATTLE CITY LIGHT SCADA - NORMAL & RELEASE STATION SHUTDOWN SWITCH SCADA TRIP '& CLOSE TRUCK OPERATED CELL SWITCH (TRUCK POSITION) TRACTION POWER SUBSTATION VOLTAGE ' VOLTAGE DIVIDER WIRE NUMBER TERMINAL BLOCK OR DC BREAKER DISCONNECT DEVICE 26kV CIRCUIT BREAKER SIEMENS TRANSPORTATION SYSTEMS, INC. 3L0OSWEGO POINT EDRIVE,, SURE 106 (AKEOSWEGO, OREGON 97034 SOUNDTRANSrr PAT O'HOGAN 3117/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 3117/05 APPROVED BY DATE SCALE: EQUIPMENT ABBREVIATIONS API APT A01 A02 A03 BC CCIC EPT DCC DPI FO F1 F2 F3 F4 N R1 R2 TPT AC PANEL AUX POWER TRANSFORMER 26kV SWITCHGEAR, INCOMING /METERING SECTION 26kV SWITCHGEAR, AUXILIARY POWER SECTION 26kV SWITCHGEAR, CIRCUIT BREAKER SECTION BATTERY CHARGER CENTRAL CONTROL INTERFACE CABINET EXTERNAL POWER TRANSFORMER DC CONTACTOR DC PANEL 72-11 OC MAIN BREAKER - 72 -1 FEEDER BREAKER 72-2 FEEDER BREAKER 72-3 FEEDER BREAKER 72-4 FEEDER BREAKER NEGATIVE DISCONNECT SWITCH WYE CONNECTED RECTIFIER DELTA CONNECTED RECTIFIER TRACTION POWER TRANSFORMER DRAWING NUMBERING METHOD XXX -S 101 -01 T DRAWING SHT. NUMBER DRAWING SERIES SUBSTATION NAME DRAWING SERIES SHEET CONTINUATION METHOD (USED ONLY WITHIN A DRAWING SERIES) 2.09 COMPONENT IDENTIFICATION K11 REVIEWED FOR CODE C OMPLIANCE NFPA70_NEC AUG 2 7 Z007 City Of Tukwila BUILDING D SION DATE 3/17/05 DATE DRAWING COLUMN NUMBER DRAWING SHEET NUMBER COMPONENT NUMBER DEVICE ID LINK LIGHT RAIL PROJECT RECEIVED _ I; 1!0•A U i JUN 2 8 7007 2 1rrlVi GE.N tEil TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION SYMBOLS AND ABBREVIATIONS ABBREVIATIONS CONTRACT DRAWING NO RTA /LR 82 - 03 / C807 No. TPS S001 - 02 REV. 01 03 02 01 REV 11/14/05 10/10/05 3/17/05 DATE PINE STREET TPSS N00 1 A Revised for CNRFP -012 ANSI C34.2 CIRCUIT NO 31 REVISED PER COMMENTS REVISED PER COMMENTS NOO -W -406 1200A p NOO -H -711 6000A DESCRIPTION SECTION NUMBER SAS SAS (-) LA1 3.0MW A 26kV 2x1174V Y 26 KV FRCM PINE STREET I SUBSTATION T N00 -N -901 ) --116j---\ 6000A TO RAIL c, i;a , cT/ • 2 SO ) owl .7 \ z• • z J I i I I 1500VDC I o PQT TRANSFER TRIP I 2 ?OO oL '- J L 3 J EST CEILING MOUNTED FEEDER CABLES (1100S) PJO PJO PJO BY ENG LB LB LB CHK LB LB APP L 1 INTERNATIONAL DISTRICT /CHINATOWN r TPSS C11 20 KV FROM SCL l ANSI C34.2 CIRCUIT NO 31 SAS SA C11 -W-401 1200A C11 -H -711 6000A p 26kV 26kV 2xf1'!4V C11 -N -901 {�- � TO RAIL SA SA WESTLAKE UNIVERSITY ( 110 0 N) TUNNEL PIONEER SQUARE INTERNATIONAL DISTRICT/ CHINATOWN P.<T %r-Qt U ) 0 1 N 0 0 CD 3000SWEGOPOINTEORIVE SURE 106 LAKE OSWEGO, OREGON 97034 J (1411N) SIEMENS m m TRANSPORTATION SYSTEMS, INC. C14 -H -604 TRANSFER TRIP C14 -H -602 C14 -H -605 C14 -H -601 TPSS C16 L (1614N) C14 -H -603 SoinunTaanisrr ANSI C34.2 CIRCUIT NO 31 1500VDC SA , SA (1 PAT O'HOGAN ORN BY C16•W -401 1200A H -613/- DRN CKD BY PAT O'HOGAN DES BY FOREST STREET C16 -H -711 6000A DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE A 3.0MW 26kV 2x1174V A 0 H-624 ( -) 26 KV FROM SCL C16 -N -901 -{g}• -1 6000A TO RAIL • r aa�� fi r N =p o f OO • ) ) U U 5 SA 4- 0 TO WEST YARD TRACKS DWG. SO10 -04.4 3/17/05 GATE 3/17/05 DATE 3/17/05 DATE DATE 3/17/05 DATE 4 U u TO EAST YARD TRACKS DWG. S010 -04.4 CONTRACT NO. RTA/LR 82 -03 / C807 10 TRANSFER TRIP TPS OCS RECEIVE!) CITY : T1 !K VI JUN 2 8 ?0f7 2316S) LINK LIGHT RAIL PROJECT DRAW NO. NB--OCW 0 TO YARD TPSS Y1 DWG. SO10 -04.3 TRACTION ELECTRIFICATION SYSTEM SYSTEM SINGLE LINE DIAGRAM REV. TPS-S010-01 03 11/14/05 10/10/05 3/17/05 DATE L TPS OCS TPSS C23 T 26 KV FROM SCL C23 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 C 60 0A C 60 0A �� TO RAIL 1500VDC ,9„i °<T mg N Vi ) ) -z -- (' r 2316N MT BAKER 2524N IMUNDS H -613 OTHELLO SB — OCW (2927N) ER BEACH H -613 SAS SA O Revised for CNPFP -012 (2316S) N 0 O) N REVISED PER COMMENTS REVISED PER COMMENTS McCLELLAN STREET DESCRIPTION p 3.OMW 26kV 2x1174V p Y 1500VDC I 1 A /74 T o ^1. 0 1. = °oT) I TRANSFER T 1 =o = =o °) ) � � J 1. � �X / SA SA J c) 0 N U ( -) V N 0 C24 -H -601 C24 -H -602 PJO PJO PJO BY ENG LB LB C24 -H-603 CHK EDMUNDS STREET I TS C25 L LB LB LE APP SA SA N 0 2524S) C25 -H -612 NC 0 TPSS C27 1 1 1500VDC r7 i�c * PQ 1� rQl T ^ � � TRANSFER TRIP =oo) o ) SA SA SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO PONT E DRIVE SU /7E 106 LAKE OSWEGO.OREGON 97034 SA. SA OTHELLO C27 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 T 26 KV FROM SCL7 C6000A11 ` C27-N-901 r� � TO RAIL I I t 3.OMW 26kV xT4V p Y (-) .tee � o O Q ±8) ' U SA. SA SouNU'nuwsrr TRANSFER TRIP NB — OCW DRN BY PAT O'HOGAN DRN CKD BY PAT O HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE _ RAINIER BEACH TPSS _ C29 T 26 KV FROM SCL (2927S) SA. SA 3/1 7/05 DATE 3/17/05 DATE 3/17/05 DATE DATE 3/17/05 DATE C29 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 p A p 3.0MW 26kV x11 4V Y ( -) C 60 0A C 60 0A �� 1 -- TO RAIL 1500VDC Kai f7 1 _ =ol ) =o; o ) 'TRANSFER TRIP N ? N' Nom" N ``� 10 N (3229s) RECEIVED CITv I II nLA JUN 2 8‘?11fl7 �(rYiM GEN f ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM SYSTEM SINGLE LINE DIAGRAM CONTRACT DRAWING - REV. NO. RTA/LR 82 -03 / C807 I NO. TPS-S010-02 03 0 N� 02 11/14/05 01 3/17/05 REV GATE TPSS C32 26 KV FROM SCL BOEING ACCESS ROAD C32 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 T p 26kV vvLv 26kV 2x1174V p Y C32-H-711 T C 60 0A 1500VDC � TO RAIL _ P.:0 Pat °aT/ °aT So) Soo) So) oo ) ()'.1. U U/ U U `. I SA SA SA SA I I I J Revised for CNRFP -012 REVISED PER COMMENTS DESCRIPTION PJO PJO TRANSFER TRIP LB LB L8 LB L TPSS C33 O 0 SOUTH 133rd STREET T p wlw 3.0MW 26kV 2x1174V p Y ANSI C34.2 _ .L (-) CIRCUIT NO 31 1500VDC SA, SAS • N • 0 S / 0 • (3332S) C33 -W-401 120A 26 KV FROM SCL C33 -H -711 T C33 -N -901 6000A ) ---E1---\ 6000A TO RAIL H -613A SA 0 H- 624/0 c., O � O ±8 ) So ) ` U 0 SA S 300 OSWEGO POIN1E OR/VE, SU/TE 106 L4KEOSWEGO, OREGON 97034 TRANSFER TRIP (3633N) I SA O S m 0 ANSI C34.2 CIRCUIT NO 31 C36 -W-401 1200A (3336S) SIEMENS TRANSPORTATION SYSTEMS, INC. SOUNDTRANSIT TUKWILA INTERNATIONAL BOULEVARD TPSS C36 T 26 KV FROM SCL p 26 V 2x 1/4V p C36 -H -711 C36 -N -901 6000A )- -{g}--N 0 00A TO RAIL 1500VDC N r � O ° S ) = ) cousr 0 U/ SA ( -) PAT O'HOGAN 3/17/05 DRN BY DATE 3/17/05 DRN CKD BY DATE PAT O'HOGAN 3/17/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE (0 o o '1 ) =o) (.6 (0.4- 0 0 SCALE: NONE TRANSFER TRIP (FUTURE) J (FUTURE) NB —9CW TUKWILLA INTERNATIONAL BOULEVARD (FUTURE) Sr9CW LINK LIGHT RAIL PROJECT RECE!VE© CVrJ . _ _r1 r!e \NI IA JUN 2 8 7007 �� 6 VIII c1EN R TRACTION ELECTRIFICATION SYSTEM SYSTEM SINGLE LINE DIAGRAM CONTRACT DRAWING NO. RTA/LR 82 -03 / C807 1 NO. TPSS010 -03 'REV. 02 02 01 10/10/05 3/17/05 DC SWGR NEG RECT DC BRKRS ENCLOSURES AC PANEL AP1 BATTERY CHARGER L}-) _�� )- -- GND MAT AUXILIARY POWER TRANSFORMER 25 kVA 26kV / 240 -120 1 0, 60 HZ 125VDC BATTERY DC PANEL DPI (2) - 3E (NOTE 4) 1 INTERNAL J EXTERNAL 2 EXTERNAL TO TPSS 1 3E PAD MOUNT APT 55 kVA 1 0, 60 HZ 26kV / 240 -120 1NOTE 4j J 25AE AC PANEL L (C807) - 1 (FEED BY OTHERS) SIGNAL BUNGALOW (NIC) RIO RIO DC NEGATIVE BUS, 6000A 100 AMP CONTACTOR AND SWITCH (FUTURE DRAINAGE CABLES) LB LB J ADD 76 TRIP DEVICE TO 72.11 REVISED PER COMMENTS LB LB BY ENG CHK APP UTILITY S METERING ` 1 A'�I' 3 CT L 1 (NOTE 2) NC 26 kV, 3PH, 3W FROM SCL 33A C32 -W-401 i NEGATIVE RETURN CABLES TO RUNNING RAILS OR IMPEDANCE BONDS 1 L 100:5 100:5 SA J A 1200A 33T 3.0 MW 26 kV - - -- 2x1148V) � RECTIFIERr ANSI C34.2 1 33R 3MW CIRCUIT NO 31 A,AL --■P 1 L 1500VDC 2 <E-11 I) E— » it 0.5E 6A, 600V 6kA 50mV (METERING CTS AND PTS ARE REVENUE ACCURACY) S -T &C 6 BA 33N 6000A (NOTE 3) T 6000A - - - - 89N' -- OE --( 72 -11 - 1 C32 -N -901 C32 -H -711 J TRIP, LOCAL & SCADA ALARM T [ (NOTE 8) SCALE SCALE 0 -6000A 0 -2000V S - T &C 2 J 3X OSWEGOPOINTEDRIVE,, SUITE 106 LAKEOSWEGO, OREGON 97034 DPU- TRANSFER TRIP TO /FROM ADJ TPSSs 01 I SCADA I DPU SCALES A = -4k.. 0. ±4kA; V =0 -2kV SIEMENS TRANSPORTATION SYSTEMS, INC. 200 ) 7330 OP 270 ANNUNCIATOR 0 -100A 0 -30KV / PLC `18 % (NOTE 7) \ 32/ DC POSITIVE BUS, 1500VDC, 6000A • CLOSE/RECLOSE S -T &C N` 14 0 A ( 72 -1 r -1- C32 -H -701 DPU 1 _J O T r I x J TO OCW lII ISA (TYP. ALL FEEDERS) S -A A 76 LEGEND SCADA ALARM 4kA S -A 60mV L� SounmikaNSrr <> LOCAL ALARM &SCADA S -T &C SCADA TRIP & CLOSE 30 LOCAL ALARM SCADA ANALOG VIA S7 PLC SA N O U 1 76 1 (NOTE 1) (NOTE 5) ( ( 72 -2 C32 -H -702 ( 72-3 C32 -H -703 76 . 4 .- 1 PAT O'HOGAN 3/17/05 DRN BY DATE ORN CKD BY PAT O'HOGAN DES BY SCALE: NONE NOTES: 1. PROTECTIVE DEVICES, INSTRUMENTS AND INTERLOCKS FOR FEEDER BREAKERS F2 THRU F4 ARE IDENTICAL TO FEEDER 1. 2. CTs, VTs, SAs & METERING PROVIDED BY SCL AND INSTALLED UNDER THIS CONTRACT. 3. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS MAIN DC BREAKER IS OPEN. 4. KEY INTERLOCK PREVENTS ACCESS TO FUSES UNLESS API MAIN BREAKER IS OPEN. 5. K# INTERLOCK PREVENTS OPENING DISCONNECT SWITCH. UNLESS F# BREAKER IS OPEN. 6. 86 ENERGIZED FOR: -REV CURRENT -DC EQUIPMENT DOOR OPEN -RECTIFIER TRIP FUNCTIONS - XFMR TRIP FUNCTIONS - 59. 64L, 64G 7. THE FOLLOWING ARE FUNCTIONS OF THE PLC: 7a. DEVICE 32 PROGRAM SEQUENCE: - ENERGIZE AC LOCKOUT - 86 -TRIP & LOCKOUT AC BREAKER -OPEN MAIN DC BREAKER 7b. DEVICE 48 PROGRAM SEQUENCE: -TRIP & LOCKOUT DC FEEDERS -OPEN MAIN DC BREAKER 7c. 186 ENERGIZED FOR: -ETS /FIRE -48, 64L, 64G. 64V 7d. TRANSFER TRIP -TRIP & LOCKOUT FOR ETS, 48, 64G, 64L & 64V -TRIP & RECLOSE FOR di/dt -COMM. FAILURE IF HAND SHAKE FAILS NOTIFY SCADA 8. ELECTRICAL INTERLOCK OPENS CONTACTOR WHEN 89N OPENS AND CLOSES WHEN 89N CLOSES 0 2 N U DATE 3/17/05 DATE DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE A ff \ 1 I (72-4 1 C32 -H -704 76 .4 .`• 1 i REVIEWED FOR CO DE COMPLIANC NFPA7p_ NEC . AUG 2 7 2007 City Of Tukwila BUILDING D ION RECEIVED C1' "'n1vILA JUN 2 8 7n07 rimil CEN (ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM BOEING ACCESS ROAD TPSS C32 SINGLE LINE DIAGRAM CONTRACT NO. RTA 1 LR 82 - 031 C8071 N /DRAWING I RO/. IREV. 02 REV DATE DESCRIPTION D C,/ O SITRAS DPU DC DIGITAL PROTECTION UNIT 48, 82, 83, 85, 150R, 151 neT 0 0 0 SIMATIC OP 270 HMI - SCREEN g 88888888 ,,. " U •1 II • .. • O ABB DPU 2000R AC PROTECTION RELAY 27, 46, 49, 50/51, 50/51N 111931861) - 00 0 SWARTZ FRAME FAULT RELAY S7 -300 PLC CPU O 0 00 O 0 a a POWER METER ION 7330 S7 BUS CONNECTOR FOR PROFIBUS X3: INPUT /OUTPUT TERMINAL BLOCK OPTICAL LINK MODULE (OLM) COPPER TO FIBER CONVERTER f1FC(:P IPTI(1N ANALOG SIGNALS / (COMM LINK SUPPLIED BY OTHERS) co no PROTOCOL CONVERTER C FN( C.HK AC SWITCHGEAR AC CIRCUIT NEGATIVE DISC. BREAKER SWITCH APP I ®I1 26kVAC I RECTIFIER TRANSFORMER A03 F/O PT N T RIP & ALARM 89N TO RAIL SIGNALS RECTIFIER R1 & R2 3000SWEGOPOINTEDRNE, SUITE 106 LAKEOSWEGO, OREGON 97034 MAIN FEEDER 72 -1 BREAKER 72-0 TRIP &. ALARM SIGNALS �OBTI XTRIP TO /FROM ADJ TPSs SIEMENS TRANSPORTATION SYSTEMS, INC. DC SWITCHGEAR AC & DC STATION SERVICE -_ FIRE & EMERGENCY TRIP BLDG DATA X3 FO ( F/O RX SOUNDTRANSIT Fl 1 %I/01 V & F /O PD TX RAIL l FEEDER 72 -2 FEEDER 72 -3 OCS DRN CKD BY PAT O'HOGAN DES BY SCALE: C FO RX F2 i F/O VPD & F/O TX OCS ( F/O RX CODS WED FOR R PLIANCE NFPA 70 - NEC AUG 2 7 2007 R City Of Tukwila B ILDXN DIV SION PAT O'HOGAN 10/26/2004 DRN BY DATE DATE 10/26/2004 DATE DES CKD BY DATE LANCE BANASZEK 10/26/2004 APPROVED BY DATE F3 F4 PROFIBUS IDP �OCS VPD & F/O TX IL ONTRACC NO R TA ILR 82 - 03 N FEEDER 72-4 F/O RX �OCS F/O VPD & F/O TX RAIL LINK LIGHT RAIL PROJECT PEOE!VED err '' ,. A, /ILA JUN 2.8 7007 b L.tivlll OtN7LF-F TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION TPSS PROTECTION DEVICES I DRA WING No. TPS- 5021 -01 01 916105 NEG CUB. Revised per comments DC SWGR ENCLOSURES REC. FRAME FAULT PROTECTION GROUND BUS GROUND MAT S100 (FO) D.C. SWGR AAA AAA SCALE 0 -2kV M041 PLC T r TRACTION POWER XFMR I SCALE 0...6KA A BA 32 I FROM AC BREAKER SO40 PJO 0 LB .,-30 6000A S060 (NOTE 1) CED RECTIFIER 3.0MW a.30 1500Vdc L2 L1 GEBD 6000A DISC. S050 SW. (N) (NOTE 1) NEGATIVE RETURN CABLES TO RUNNING RAILS OR IMPEDENCE BONDS S101 (F1) DPU D O 1 0 ' (® ( 85 ) A= - 4k..0.. +4k V= 0..2k SA 100 AMP CONTACTOR AND SWITCH BA VD NEGATIVE RETURN BUS 6000 S102 (F ® 4000A I I CED 0 I xi V ch 7 TO OCW 1500VDC, 6000A POSITIVE BUS - 309OSWEGORONIEDRNE. SUITE 106 LAN(EOSWEGO OREGON 97034 DPU ( 85 ) A= - 4k..0.. +4k I V= 0..2k CABLE VAULT SIEMENS TRANSPORTATION SYSTEMS, INC. BA VD • TO OCW $103 11 (F3) 4000A U 0 0 U DPU @1 iF'1•1:7 Cap CED (® A= - 4k..0.. +4k V= 0..2k SOUND11tANSR T BABA ) 4000A tilt) VD SA 'I . 0 il • TO OCW REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2097 City Of Tukwila B ILDIN DIV SION PAT O'HOGAN 1012612004 ORN BY DATE 10126 /2004 ORN CKD BY DATE PAT O'HOGAN 10 /26 /2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 10/26 /2004 APPROVED BY DATE SCALE: NONE S104 (F4) DPU A= - 4k..0..+4k V= 0..2k Q� 4000A T BA VD SA • TO OCW NOTES: 1. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS DC MAIN BREAKER IS OPEN. RFCE!VED JUN 2 8 7007 �'Lii Wll l CLN I ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR ONE LINE DIAGRAM CONTRACT NO. RTAILR 82 -03/ 0807 I NO. DRAWING TPS-S022-01 REV. O1 $ Crg (BY UTILITY) • Li �: I 5 6 VERSA SWITCH 200A. 27KV FUSES PrS BY (BY ABB) (BY UTILITY) () H1 X1 1N1 • IMI • 111111 4 1 SURGE ARRESTER T (BY UTILITY) = • • T 1 REV DATE 111 0A 0B 0C UTILITY INCOMING • DESCRIPTION 2 • MAIN BUS 27kV. 1200A. 25KA POWER COMPANY METERING 3 BY • ENG CHK APP 4 • 3 I3E,25.8KV 5 MECHANICAALL INTERLOC n 260 - 120/4 PRIMARY TAPS 2 41-2.5%1 r 3E.25.81(V 2 H 1 X4 I ,.} MECHANICAL INTERLOCK • 125k 240V 2 CP1 a 3000SWEGO POINT EDRIVE SUITE 106 L4KEOSWEGO, OREGON 97034 6 TO AC PANEL TO REMOTE 55KVA PAD MOUNTED TRANSFORMER SIEMENS TRANSPORTATION SYSTEMS, INC. • 100:5A C50 CTs 100:5A AUG 2 7 2007 7 27ADV25 1200AI 52 -3B City Of Tukwila BSJILDING DIVISION REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC SOUNDTRANSff • Bus Prg py 26 A y T10 2201 SSE, 38KV 1 HI XI 5 6A. 600V I, 31.4 1 41_ MAIN BUS 27kV. 1200A. 25KA DPU2000R OA 3A, 600V IIII MI 4 3 3A. 600V in: �� 2 � 1 DPU2000R 7330 PAT O'HOGAN DRN BY RON ALBERT ORN CKD BY PAT O'HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY 8 7330 MAIN BUS 27kV. 1200A. 25KA 7/12/05 DATE 7/12/05 DATE 7112/05 DATE DATE 7/12/05 DATE SCALE: NONE • 9 • MAIN BUS 27kV 1200A_2` ► 0A 0B TO TRANSFORMER RECTIFIER 0C LINK LIGHT RAIL PROJECT 10 R'A'E IVED Cm" , „(1 n/ILA JUN 2 8 91197 brriv�f OE.N TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR ELEMENTARY FOR TPSS C32 & C33 CONTRACT 1 DRAWING NO. RTA/LR 82 -03 / C807 I NO. SO40-03 I REV. 00 RTC ( +) 0 15t 300VDC ISLE DELAY 11 11 m a 15A, 300VDC TIME DELAY IL II Al 6 A17 15A. 3004DC (_) o—� Dem 3�4 15A, 300VDC TIME DELAY ❑ it 3 4 2 12 43 12 43 1 R 11 L 13T R 16 C X3/47 17 C REMOTE I CLOSE X3/48 ERB /2 1 13 86 O RP1 ■ RP4 Ai A4 \L_ __! F CLOSE 52 I BREAKER CHARGE AND CLOSE SEE DRAWING 19901F10 FOR BREAKER INTERNAL WIRING _� - A \ ❑ RP3 ❑ RP5 ERB /1 A8 v 15 _ 52o 16 A9 22_ 43 21 I S100 -07 FO 11- 18 T 16 O RP6 A6 v r �G_ TRIP RB /3 CERB /5 X3/45 0i3711 REMOTE 186 1 TRIP TRIP 0X3/46 0X3/5( OERB /4 oERB /6 52 BREAKER TRIP SEE DRAWING 19901F10 FOR BREAKER INTERNAL WIRING A7 ` O RP7 12 A 18 A2 102 - 52b 14 READY 303 1€ SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO OINTEDRNE, SUITE 106 LAKE OSWEGO OREGON 97034 n gggggg 8 8 8 8 8 2 Z 0 0 0 0 Q u a Lj �a p ia , Vl N N N N N (+) (+) 10 12 POWER 27 OUT1 OUT2 13 2 ONO 28 ( -) O 0 SOUNDTRANSIT N 25 OUT3 1 23 OUT4 1 21 1 19 O T6 17 SELF -CHECK 26 1 24 J 22 �c 20 18 RS -232 PAT O'HOGAN DRN BY RON ALBERT DRN CEO Y PAT O'HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE 7112/05 DATE 7112/05 DATE 7/12/05 DATE DATE 7/12/05 DATE 0 N g g z z N 0 I 0 n� PML -7330 LINK LIGHT RAIL PROJECT CONTRACT DRAWING NO. RTAAR 82 -03 / C807 NO. SO40-04 10 0 ( +) ( -) G SC S1 S2 S3 S4 0 0 0 0 0 0 0 gSgS 0 0 0 0 O W W W W a ! a a a: 8 Z 0 Z 0 Z W w W W W U. U_ U. N N N N N JUN 2.8 ?n97 i Li rivII O C;L:.iN i TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR CONTROL SCHEMATIC I REV 00 N330 CONTACTS HANDLE ENO M HANDLE END SPRING RETURN 1 12 �1'_J 16 0 - 1 _ I-0 '1X HO I -015 — H o 17 >Y Z e X X X X 2 22 �„ 26 . , 21 -1 Ho 2 3 25 -1 27 X X x X X N330 CONTACTS POSITIONS HANDLE END = = o SPRING RETURN >Y Z e 11 - - I H X X 1 160- 1 - 11 --0 17 X 1 L 120VAC CONTROL POWER EXTERNAL A9 • Al PH 0 NU a 125VDC CONTROL POWER I o EXTERNAL jl ui CV ( -) � wq Cr) Q O- N N N CO ❑p,- ❑p,- ❑ac:- ❑� Al 3 1 3 4 Al 5 2 • 150W, 1 (2) PER CUB. 1 j 1 (TOTAL 300W U 0120V PER CUB.) 2 2 (4.) tA2 40A, 250V (4) DC BUS 1 2 ( +) Al 7 W ❑ Ir A8 u Al 0 Al 2\/ Al 4\/ Al 6u A18 5 51 55 59 0 0 0 (-)Dc BUS ( DC BUS Al 9 23 2 I A20 CUB. 1 CUB 2 CUB. 3 HEATER CIRCUIT 125VDC PLUG 1 1 13 53 57 61 I INTERNAL 52a 52a 52a 52a 52b 52b 52b WIRING 1 52f 566 600 14 54 58 62 I�ir ❑� ❑l• ❑22 ❑ ❑� 52 BREAKER AUXILIARY CONTACTS - All contacts are shown with the breaker in the OPEN POSITION & READY - READY Contact is CLOSED when the breaker is ready for operation. - NOT READY Contact is CLOSED when the breaker is not ready for operation. 3 99 c3 N d O N N m c0 O N CV CV CV LIE- ❑p,- ❑p,- ❑p,- A22 A21 ' A23 ' A24 1 1 23 23 2 42 2 2 I A2 \/ 102 52b 303 1 )15A, 120V 2 52b READY I J cf• N ❑0- • 2 27DC -T 1 )15A, 120V 2 11 2 PLUG 2 INTERNAL BREAKER I WIRING 4 5 8 15A, 120V 1 2 LIGHTS 16 T • SWITCH LIGHT FLUORESCENT INTERIOR LIGHTS (LOCATED INSIDE INSTRUMENT COMP.) 27DC -C 5 1 2 CUB. 1 CUB 2 5 8 • CL CI 0- :1 CI L cl. y in M I N r ❑:,, ❑c ❑c ❑ ❑K ❑„ ❑E 0 ❑c B1v B3v B5v B7� B9 B1 v B1 B13v B15u B17� ■ g g 815 851 855 859 863 813 52a ° 52a ° 52a _ 52a ° 52a I 0 816 8 ? 856 860 864 814 B6T B8/\ B10/\ 812" B14• B16/\ B18'1\ B2 822/N B24/\ N ▪ CD CO N ❑c OF, ❑c ❑a ❑E ci 0 ❑ 0 1 T 6 55 4 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGORONTEDRIVE SUITE 105 LAKEOSWEGO, OREGON 97034 • SELECTOR SWITCH ELECTROSWITCH SERIES 24 CAT. NO. 242028 DEV. CS CONTROL SWITCH ELECTROSWITCH SERIES 24 CAT. NO. 24380 POSITIONS 7 CLOSE TRIP SCADA 52b CONTACTS NOT OPERABLE IN READY CONNECTED AND TEST POSITIONS I= U ce C.) LJ N S U 86 11 13 L� SOUNDTRANSIT • 8 I- U CL U H 24L+ 25 86 26 27 22 DPU 28 47 Al A19 RP11 RP19 13 14 15 16 17 18 19 - 20 0 (1) 40 *1 '41 (1 42 I 37 38 3 ri 36 1 I/C W070 -04.04 t.: 134 15 14-7- 21 22 25 24 31 3rr2/ 37 , ' 1 X35 ! ;� p� 161 23 Z i 38 6 `r1:ll L► 8 27 2 33 UN 8 7n p7 L -Li i t s Gta-ki I E i • 52 b a 52H b PAT O'HOGAN °RN BY RON ALBERT URN CKD BY PAT O'HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY 7/12/05 DATE 7112/05 DATE 7/12/05 DATE DATE 7112/05 DATE SCALE: NONE LEGEND: 0 U 0 24 43R 9 23 26 RPIO A10 Al8 51 27 52a = 52b 52 AUXILIARY SWITCH CONTACT, CLOSED ONLY WHEN a BREAKER IS CLOSED AND IN THE CONNECTED OR TEST POSMON. AUXILIARY SWITCH CONTACT, CLOSED ONLY WHEN BREAKER IS OPEN AND IN THE CONNECTED OR TEST POSITION. POSITION SWITCH CONTACT. CLOSED ONLY WHEN BREAKER IS IN THE CONNECTED POSTION. POSITION SWITCH CONTACT, CLOSED ONLY WHEN BREAKER IS IN THE TEST OR DISCONNECTED POSITION. DISCONNECTING CONTACT, CLOSED ONLY WHEN BREAKER IS IN THE CONNECTED OR TEST POSITION. 1- 1— 0 0 O 0 CI 0 it CC 0 0 Z Z • 10 _FO S100 -07 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR DEVICES CONTRACT DRAWING NO. RTA7LR 82-03/C807 I NO. SO40 -05 I REV. 00 SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) 86 TRIP IND. TO DPU 1 Y 2 13 4 11 1222 21 \\ 1 r 2 33 111 7 4 21 1222 ll1 J� 2 3 4 111 21 1222 01 1 4.07 11/17/05 • (100) FRAME BONDING BUS Cu 1 -1/2" X 318" ( 64 ) 3.05 SON SWARTZ 50K f1 4 • 50K C1 (103) DC GROUND BUS 1 • • 3.06 11 -x♦ 12 3.06 5 6 Revised per comments PJO SOF LB • (101) LB 4 1/4" GLASTIC R1 • R2 5 (102) FO 306 OS WEGO POlNTEDRIVE, SUl7E 106 CAKE OSWEGO, OREGON 97034 6 F1 I F2 I 1 INSULATED MATERIAL SIEMENS TRANSPORTATION SYSTEMS, INC. • -7 F3 SouiuuTwwsrr • F4 I 7;1 , (TPSS C16 ONLY) R EWED FOR CO E COMPLIANCE N PA 70 NEC UG 2 7 200 ity Of Tukwila BUILDING DIVI$ION NOTE: PAT O'HOGAN 12/03/2004 URN BY DATE DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE 1 DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE • 3 9 T -STATS SET TO 55F TO AC PNL. ISOLATION TRANSFORMER 120 /120vACC. 1200W MOUNTED IN J BOX BY API 1SE 4 (L) 4 • Ft 1, 10 AMP. 120V AC XE NEC CUBICLE F r- 0 ,2 - 7 ° 2 72 -0 CUBICLE 1,2 1 2 _ 72 -1 CUBICLE F4_ :tee XH 1,2 EtTi _ oH 1 2 72 - CUBICLE 2 72 -2 CUBICLE 1. ALL WIRES ON THIS SHEET #14 AWG, 2kV UNLESS OTHERWISE NOTED. (WN 100 -109) 2. HEATERS RATED AT 240V, 400W. HEATERS OPERATED AT 120V, 150W. 3. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 4. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 5. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. • x� 1 1,2 1 2 4 CU - - -4 BICLE DC SWITCHGEAR HEATER CIRCUIT NOTES 2 THRU 5 LINK LIGHT RAIL PROJECT 5 N) 1• IU RECEIVED CIS I I.. „'NI l� JUN 2 8 7(107 r VIII GEM ET- TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE FRAME FAULT SCHEMATIC CONTRACT DRAWING REV. NO. RTA / LR 82 - 03 / C8071 NO. TPS S050 - 01 01 RFV OATF f1FRCRIPTIf1N CV FA,n (Ia( APP RI -9 EXTRA HEAVY TRACTION SERVICE � 12 -PULSE RECTIFIER 3000KW. 1500VDC ( a ' 1 91 Technologies •.;; Corporation WYTHEVILLE, VA. USA 21352 INTERPHASE TRANSFORMER SN 120270L028C01 JOB 3511 DATE 1/05 CU COND KVA 270 PHASE 1 HERTZ 360 CLASS H 220'C INS TYPE AA RISE 80 'C @100% LOAD INPUT 135 VAC 1000 AMPS DC BIL 20 (N1 -1 OUTPUT 2000 AMPS DC BIL 20 (NO) RAIL OVER VOLTAGE TIME DELAY BEFORE TRIP 40 NO TRIP 50 2 SEC 80 200 mS 120 10 mS 01 11/17/05 (89N ) (NOTE 1 L1- N1 L- DC NEGATIVE BUS CABLE VAULT SA I � I I I Revised per comments ^T ^w FROM RECTIFIER S060 - 01 INTERPHASE TRANSFORMER 6000A NO 6000A 3.07 3.07 L2- N2 \ NEGATIVE RETURNS TO RAIL 3.02 NO C NC 2 _ S 100 -01 I FO I �XV I L DC NEGATIVE BUS REFERENCE POTENTIAL PJO O C ' ACTIVATED WHEN SWITCH FULLY CLOSED 4 I ACTIVATED WHEN I SWITCH FULLY OPENED C AI! LB CO (3.04) j 300A E 100 AMP CONTACTOR AND SWITCH (FUTURE DRAINAGE CABLES) LB ADO (NOTE 5) 300A (TYP) 60A (TYP) CN (NOTE 4) o 0 0 0 TO REMOTE TRACK RESISTANCE TEST STATION (NIC) SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGOPCINTEDRIVE,, SUITE 106 LAKEOSWEGO, OREGON 97034 CIRCUITRY IN SHADED AREA TO BE DETERMINED RAIL OVERVOLTAGE SOUNDTRANSIT GROUND BUS PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY 12/03/2004 DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03 /2004 APPROVED BY DATE SCALE: NONE NOTES: 1. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS DC MAIN BREAKER IS OPEN. 2. ALL WIRES ON THIS SHEET #14 AWG, 2kV UNLESS OTHERWISE NOTED. (WN 110 -119) 3. RAIL OVERVOLTAGE (64V) SET POINTS ARE ADJUSTABLE VIA THE PLC. INITIAL SET POINTS SHOWN IN TABLE. 4. USED AT TPSS C11, C27 & C36 ONLY 5. ELECTRICAL INTERLOCK OPENS CONTACTOR WHEN 89N OPENS AND CLOSES WHEN 89N CLOSES. NO. � / LR 82 -031 LINK LIGHT RAIL PROJECT 10 RFCE I'IED CITv ,,, �,1jILA � I JUN 2 8 707 Ica val TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE GENERAL SCHEMATICS CO NO wING TPS- S050 -02 01 1 11/17/05 • 4.04 — 2 (24L +) (89N) • (2.03) (CO I I 2 4Nc H1 (24L -) 0 XN 7 H2 8 Revised per comments 3 SWITCH . SWITCH I-- 2.04 OPEN CLOSED DRAINAGE CONTACTOR PJO 100 A CONTACTOR • LB LB Al 4 • SOF (1.03) SOR (1.02) CV N SON (1.02) CV ., D1OB 0 11 12 11 12 11 12 I - VC W070- 05.03 • 164L I (1.03) 11 T 12 �I m CV 04 I0.1 I0.2 10 FRAME DC SWGR FAULT FRAME ISOLATED ENERGIZED b 3000SWEGOPOINTEDRIVE, SUITE 106 LAK(EOSWEGO, OREGON 97034 I (2.02) (�-- 64G I I I 1 3 I (1.02) 8 I I I 1898 189A I T ) NO NC NO C) 11 0 10.3 DC SWGR FRAME GROUNDED (24L +) SIEMENS TRANSPORTATION SYSTEMS, INC. • 06 12 I0.4 CLOSED 13 PLC SOUNDTRANSIT F12 (4.04) • 0 0 11 12 14 S100 -05 (FF1) (64L) (64G) (89B) (89A) (LOP) 51 0 48 0 49 0 5 0 0 51 0 52 0 53 I0.5 I0.6 OPEN LOSS OF CTRL PWR J PAT O'HOGAN 1 210 3/2 004 DRN BY DATE TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE GENERAL SCHEMATICS CONTRACT REV. NO RTA / LR 82 - 03 / C8071 NO. TPS S050 - 03 I 01 DRN CKD BY DATE PAT O'HOGAN 12/03/2004 DES BY DATE DES CKD BY _ LANCE BANASZK 12/03/2004 APPROVED BY DATE SCALE: NONE • I TPT I T I B1 L 2 J I M041 02 I I S060 -02 (33N)6 XR1 i 9 R1 I 9 • LINK LIGHT RAIL PROJECT 10 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 120-139) HECTIVFD G „v JUN 2 8 ?pi i; -E livo CEA 1-ER .,v Cun ruv nOD 125 VDC FROM DC DIST PNL DP1 3.02 FO CUBICLE POWER SUPPLY 300 0SWEGOPOINTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 SIEMENS TRANSPORTATION SYSTEMS, INC. 1 .01 SOl1NDTRANSJT PAT O'HOGAN 7/14/2005 DATE DRN BY DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 7/14/2005 APPROVED BY DATE SCALE: NONE DATE 7/14/2005 DATE LINK LIGHT RAIL PROJECT 1 U RE !VED JUN 2 8 7007 'Er ► iwfl f GEN f R TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE 24VDC CONTROL POWER CONTRACT NO NO. RTA / LR 82 -03/ 08071 NO. TPS- S050-04 I 00 01 RECTIFIER TRANSFORMER 11/17/05 Revised per comments R5 R6 R4 R1 R2 T _ 3323kVA AAIFFA' 3 0, 60HZ, 12 PULSE 26.4kV - 1178VAC Y- 1178VAC 6 HV TAPS: 2 @ 1 1/4 %; 2 @ 2 1/2% r E Y L L A F142 S 142 V143 X V1611, V162 c c- F161 = F162 S161— -. S162— F112 F113 — F131 F132 F133 S112 ! S113 1 S131 S132 S133 C c C C—' V112 V113 V131 V132 I V133 F143 S143 F161 S161 V163 c� F163 S163 V162 X V163 C — . - F162 F F163 5162 --e S163 F151 P F152 S151 S152 C _... C. V151 V152 V121 X V122 C — } C- F121 = F122 S121 —•— S122— F151 S151 F121 S121 F152 S152 F122 S122 F153 S153— F123 S123— F153 S153 F123 S123 C130= C130 = O L11 cc C112 L21 b a = #14AWG, 5KV, FEP, Insulated b = Filter mounting plate attached to heat sink. c = Cu bus R111.1...R113.2 100 OHMS, 500 WATT C111...C113 0.47uF, 2100V R130.1...R130.2 6 OHMS, 200 WATT C130 16uF,3200V R170.1...R171.2 3.9 kOHMS, 500 WATT V111...V163 Rectifier Diode SW4OCXC1170- P;3600A;4000V F111...F163 High Speed Fuse 170M6723; 1000A; 1400V S111...S163 Fuse Micro Switch, 2 -NO /NC contacts 170 H0099 Contact arrangement shown on SHT 2 CC c112 .a O L31 T PJO LB C113— a—� LB 00 F111 F112 S111- --.-. S112 c.-- C V11 ik V112 V141 X V142 F141 F142 S141 —� S142 V141 C F141 S141 F131 S131 —`. c_.,. V131 Z RECTIFIER #1 -y F132 S132 C V132 RECTIFIER #2 - n SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINT EDRIVE,, SU /7E 106 LAKEOSWEGO, OREGON 97034 SOUNDTRANSR PAT O'HOGAN 12/03/2004 ORN BY DATE DRN CKD BY PAT O'HOGAN DES BY 1500VDC 1500VDC DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE • AL HEAT SINK 9 AL HEAT SINK I CU 33/8" X 5" N ti L2- LINK LIGHT RAIL PROJECT TO MAIN DC BREAKER S100-01 1D GI fl! I "(WILA CU 3/8" X 5 "JUN 2 8 9nm G' fliYl{ 0„ N{ iif TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R1 & R2 CUBICLES GENERAL SCHEMATICS CONTRACT D N RAWING NO . RTA I LR 82 -03/ C807 o. TPS- S060-01 I REV. 01 02 0 12/05/05 9/10 /05 0 %I O ATP ( I I Lt r 1 (24L +) X 3111 114 11 S112 14 111 S113 14 T " 3131 114 S132 1 11 14 11 S133 14 11 S151 114 11 S152 11 S153 '4 24 21 S111 24 21 S112 24 2 1 S113 24 S131 24 21 S132 24 21 S133 24 ° S151 • 2 4 I 2 F S152 X21 S153 RECTIFIER #2 - — - I/C W070 -04.09 I/C W070 -05.03 Control Wiling #16 AWG, 5kV, FEP Insulation Issued For Construction fFC(:PIPTI S121 114 11 S122 li 3123 S161 114 1 S162 14 111 S163 14 RJA RJA • 24 S122 24 21 3123 • 2421 S162 2421 S163 3141 114 11 24 21 14 3142 11 S143 14 24 21 S14 PJO 24 S121 24 S161 24 3141 (17) 0 3 L I I — —J - - -- LB RJA RJA PJO L8 OV FN(. (`N( APP (18) 55 56 (98 -1) (98 -2) ALARM TRIP DIODE FAILURE (12) XR2 7 F291 20° C 2 1 F191 20° C 2 (14) r I L1 - �57 (26R1) ALARM F292 135° C 2 F192 35° C 2 RECTIFIER O/T 3000SWEGO POINT EDRIVE, SUITE 106 L4KEOSWEGO, OREGON 97034 S07 SIEMENS TRANSPORTATION SYSTEMS, INC. 14 13 14 13 XR1 L XR1 1 — J _S 100 -05 S050-03 _ 8 FO � 54 i Fs >T4 I (26R2) (33R) 1 (33N) I TRIP EQUIP DOOR OPEN (NOTE 2) 5,11 1 S112 14 T11 S113 14 T " S131 114 S132 I 11 14 11 S133 '4 11 3151 114 1 S152 14 111 S153 14 11 SOUNDTRANSIT 24 2 1 Sill • 2 S112 242 • S113 24 1 S131 24 21 S132 24 21 S133 24 11 21 S151 24 S152 24 21 S153 RECTIFIER #1 I/C W070 -04.09 PAT O'HOGAN DRN BY D RN CKD BY PAT O'HOGAN D ES BY DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE 12 /03/2004 DATE DATE 12/03/2004 DATE DATE 12/03/2004 DATE S121 114 S122 1 14 S123 14 T S141 114 1 114 S142 11 24 2 1 S121 24 21 S122 24 21 S1 NOTES: 1. ALL RECTIFIER INTERNAL WIRES: #16AWG, 5KV, 2. COMPLETE 33 CIRCUIT SHOWN ON S100 -04 (WN 10 -20) RFOE!VED ern/ = '?,1 /I TEFLON I l u Vf 9 f 1117 L1 "��wl b G N I :F LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R1 & R2 CUBICLES TRIP & ALARM SCHEMATICS CONTRACT DRAWING REV. NO. RTA 1 LR 82 C807 NO. TPS-S060-02 02 LINK L L(mV UM V) 15 -14 60 0000 15 -13 90 15 -12 150 300 01 11/17/05 1.02 (125VDC) #12 AW _1 #12 AW 3 125VDC FROM DC DIST PNL DP1 CKT DP1 -F0 S050 -03 24VDC 1 (11L +) XP 1L+ 1 Revised per comments ( 72-0 ) 1L F11 16A J10 «� TB1 A 15 15 22 1.01 TB1 22 125VDC CONTROL POWER R10 250 OHM, 225 WATTS 1 5 110 1 15 6 (111) _..TB1 KO2 K11 (5.02) (5.03) K02 NORMALLY ENERGIZED AND IS DE- ENERGIZED TO TRIP BREAKER. AFTER TRIP CONDITIONS ARE CLEARED K15 (5.03) IS ENERGIZED, K02 IS ENERGIZED, THEN K11 IS ENERGIZED TO CLOSE BREAKER. AFTER TIME DELAY K11 OPENS AND HOLDING COIL CURRENT FLOWS THRU R10. XF XF 14 © 1 -13 XF XF (24L -) 28 15 -27 9 X3 0 1 -14 PJO (24L +) LB (BREAKER TRUCK (BT)) 1 2.01 1.09 (24L +) F 6.01 LB 1 IE 72 -1 L_J 21 (L +) _ 1500V DC POSITIVE BUS,6000A X01 /\(1-4-) J10 4 (-) R1 6KA/50mV ( +) V 2.09 S060 -01 T L1 I (POSITIVE) I I I I —j 3.08 12 112 3111 a 1 Q 31 aI b i ll b 1 a11 I Tli T II ? rill #14 AWG, 2KV, TW PR 11 #14 AWG, 2KV 0 0 S050-02 (L -) 15 ,10 6 (102) (103) f300 27 ±10V 29 (150 A2) VOLTAGE DIVIDER <4000V <2000V <1000V SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINT DRIVE, SUITE 106 LA/(EOSWEGO, OREGON 97034 1 0 w <10V OV 25 3 J Ql -- �XV 2 DC NEGATIVE BUS REFERENCE POTENTIAL 7 0 2 #14 AWG, 2KV (150 Al) E10433- E9509 -H100 UE1 UEU 8 0 10 0 SOUNDTRANSIT RELAY BOARD DC BUFFER AMPLIFIER 10V /20mA ±10V /20mA UAU OV UAI OV 1 3.03 3.03 F/O NOT 5 USED DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE TEST±10V U OV +24V OV COM PAT O'HOGAN 12/03/2004 DRN BY DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE 2 (24L +) 3 (24L -) 1 15 14 13 12 TTT 1.03 #14 AWG, 2KV I VDT T3Pq I I 115000-A2 1 0 -A1J (NOTE 1) MOUNTING DETAIL l NOTES: 1. MOUNT IN H.V. AREA OF CUBICLE WITHIN 18" OF SHUNT R1 2. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS DC MAIN BREAKER IS OPEN. 3. ALL WIRES THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 100 -119) 4. SEE DWG. M101 -03 FOR TRU 1� �i_I VVmt.) Div ; rcorit A JUN 2.8 ?nm j kI I'II I Gri_IL 114b� LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE GENERAL SCHEMATICS CONTRACT WING NO. RTA DRAWING / LR 82 -03 / C8071 NO. TPS- 5100 -01 I REV. O1 REVIEWED F CODE COMP NFPA70 -NC AUG 2 7 2007 R NCE ' City Of Tukwila r BUILDING D SION 01 1.03 1 1/17/05 SIMATIC OP 270 ( A105 ) (24L+) (24L -) ISIEMENSI M L+ 0 XF 15 Revised per comments SIMATIC OP270 O O 0 ❑ ❑ 0 00 00000000 ®{ 00000000 D E 0 XF 1 • •'• • • • • +i • is . MPI TRANSFER TRIP VIA F/O CABLE ( A100 ) MPI PJO CPU LB DC FDRS LB co I-- _ n F- _ 0 0 0 J z N oes V) I— d z 0 J z PROFIBUS DlOA (SHT 3) DC SWITCHGEAR RECTIFIER & RECT. XFMR OBT OBT CCIC D1OB (SHT 4 & 5) ED F/O CABLE BLDG. ALARMS 011 (SHT 6) (0 N AC SWITCHGEAR 3000SWEGOPOINTE' DRIVE,, SUITE 106 LAKEOSWEGO, OREGON 97034 012 (SHT 7) SIEMENS m m TRANSPORTATION SYSTEMS, INC. (24L +) NOTES: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. SOUNDTRANSIT (24L -) DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE ( 72 -0 ) H1 PAT O'HOGAN 12/03/2004 DRN BY DATE DATE 12/030004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE X1 17 CB OPENED CB CLOSED CONT. NO. kTA /LR82 -03/ (24L +) (24 L -) RFCFIVE® JUN 2 8 7W LINK LIGHT RAIL PROJECT 10 —3.06 TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS C I DRAWIN G NO. TPSS100A2 E 01 PLC INPUT CONNECT 0 -50A TEST OVER 50A DISCON. (S02) 0 (OPEN) 1 (CLOSED) 1 (CLOSED) (S01) 1 (CLOSED) 0 (OPEN) 1 (CLOSED) PLC SETTING TIME DELAY BEFORE FO TRIP 0 -50A 1 SEC OVER 50A 0 SEC 6000A TBD CIRCUITRY IN SHADED AREA TO BE DETERMINED ANA •G I ' UTS GA E C 0 o) D10A 'Y2 11117/05 Oa-r= 1W64 Revised per comments 050 r1FC!•17IDTIl1N 0 0 1.07 1.07 ' 0 33 0 34 0 0 (A100 -D10A) RAIL REVERSE MAIN DC MAIN DC MAIN DC OVER SPARE CURRENT BUS VOLTS SPARE BUS VOLTS BUS AMPS VOLTAGE OR I MAX TRIP DC MAIN CURRENT PROTECTION PJO RV FNo. LB :HK 3 13 Q14 0 15 16 17 LB APP BUS VOLTAGE 0...2 kV IW70 IW72 QW64 QW66 (V /A= VOLT /AMP) BUS CURRENT 0...6 kA 5 ANALOG INPUTS & 2 OUTPUTS 2.10— 300 OSWEGO POINTE DRIVE, SUITE 106 LAKEOSBFG0, OREGON 97034 (241 +) , , X SIEMENS TRANSPORTATION SYSTEMS, INC. 43 CS CS TT o16 X16 X11 S1 I I S3 I X17 117 118 L!R CLOSE OPEN IN REMOTE BREAKER BREAKER SOUNDTRANSIT SO2 22 SO1 TEST DRN BY SCALE: NONE (1.05) BT Jt07C' \ TB1 —6— TTB1 6 4 26 ° 27 28 29 POSITION INPUTS (TOC) BREAKER BREAKER RESET CONNECT CLOSED IND. OPEN IND. SUBSTATION TROUBLE PAT O'HOGAN 12/0312004 DATE DRN CKD BY DATE PAT O'HOGAN 12/03/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE I2.7 (241+) RECEIVED - TM 'V11IIA JUN 2 8 71 9 Eriivli I C,EI I I ER 24L -) XF 18 DIGITAL INPUTS 8 X 0.5A —4.01 NOTES: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 130 -149) LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT No. RTA ! LR 82 -03 C807I r S100 -03 � 01 310 — 12/06/05 • 2 (24L +) .. X I0.1 ! "I0.2 1 TPT TB1 1 S050 -03 F i x„ J N_ I N 13 I en �3N IS09 I 14 m I DIGITAL INPUTS FROM I L_ XN I NEGATIVE CUBICLE TI I I/C W070 -05.03 1 z I 2 -IR1 &R2 f �xR11 M041 -02 S060-02 FtXR2 R1 & RT ri T B1 TPr] 1 1 I RECTIFIERS R1 & R2M DIGITAL INPUTS FROM I/C W070 -05.03 I I RECTIFIER XFMR 1 1 I/C W070 -05.03 I . I- N c0 co fD v ( v v I 1 0 x22 v, 3 0 X4 1 051 L TB2 0 II - 1 I I � 1 r I (24L -) (24L -) D1OB 0 (A100-D1OB Revised per comments U) SPARE I0.0 U, 0 FRAME FAULT ISOLATED 0 DC SWGR FRAME ENERGIZED DC SWGR FRAME GROUNDED PJO RJA 0 LB n oo v u) 0 I0.3 1' \ N 0 CLOSE OPEN NEG DISC SW (0 0 U) 0 I I0.5 - 'IIO.6 1H10.7 1 DC SWGR EQUIPMENT DOOR OPEN LOSS OF N CUB DC CTRL PWR 1 0 10 0 11 0) SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE,, SUITE 106 LAKE OSWEGO, OREGON 97034 0 12 U) 0 13 ALARM TRIP RECT DIODE FAILURE 0 CO 0 14 H ut.o 'II1.1 1Hit.a � SOUNDTANSIT (0 0 15 ALARM TRIP RECT OVER TEMP m ALARM TRIP RECT XFMR TEMP PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SPARE SPARE '\ I1.7 (24L +) • DIGITAL INPUTS 16 X 0.5A NOTE: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 150 -169) 20 LINK LIGHT RAIL PROJECT 10 — 5.01 RECEIVED (Try . - ;;! AI!L.A JUN 2.8.741P '6vili CENTER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS C O RTNTRACT7 DRAWING No A / LR 82 -03 I C807I rvo. TPS- 5100 -04 IREV. 01 4.10 — 11/17/05 DATE (24L -) (24L +) Revised per comments (A100-D1OB D1OB pTr XF 12 OFSCRIPTION (5.03) r` K15 = co m (1.05) I- J10 24 J10 25 1/ 2 3 XF 65 TB1 25 XF 20 1) 5 1.03 OPEN BREAKER 00.0 0 23 N J10 n TB1 17 TB1 17 3 H01 J10 18 v Q0.1 TB1 0 18 OPERATION COUNTER 0 24 21 OK TO CLOSE BREAKER PJO RV GNr_ LB ruK F; J10 B1\ 23 3 TB1 23 LB APP N SCADA TRIP AC BREAKER 1 3 7.07 00.2 Q0.3 Q0.4 00.5 Q0.6 00.7 0 25 0 26 0 27 0 28 0 29 0 30 0 31 5 • X 1I-� CLOSE -5.02 - - 5 SCADA CLOSE I� „ d BREAKER AC BREAKER SPARE SPARE SIEMENS TRANSPORTATION SYSTEMS, INC. 3G0OSWEGO POINT EDRIIE SUITE 106 LAKEOSWEGO, OREGON 97034 01.0 0 SPARE HSO 01.1 0 SUBSTATION TROUBLE INDICATION 7 01.2 0 5 • II- TRIP & LOCKOUT FO & AC BREAKER SOUNDTRANSIT • Q1.3 0 35 ** e 01.4 0 01.5 0 37 SPARE SPARE SPARE PAT O'HOGAN 12/03/2004 ERN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/03/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE • 9 DIGITAL OUTPUTS (16 X 0.5A) 0 01.6 CONTRACT NO. RTA /LR 82 -03/ Q1.7 0 39 SPARE SPARE NOTES: 1. 186 ENERGIZED FOR: -REV CURRENT -DC EQUIPMENT DOOR OPEN - RECTIFIER DIODE FAILURE (TRIP) - RECTIFIER OVERTEMP (TRIP) -ANY XFMR TRIP FUNCTIONS -ETS /FIRE - INCOMPLETE SEQUENCE -FRAME FAULT 2. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 170 -189) • 10 0 LINK LIGHT RAIL PROJECT 24L+ (24L -) - 6.01 RECEIVED //�� V JUN 2 8 ?8 TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS I DRAWING No. TPS- S100 -05 01 5.10 • • r, 1.03 -1 (24L +) r XF (24 L +) X3 1 D11 24L- 13 (A100-D11) ETS rn X 0 3 20 0 SSS C) 0 21 0 TPSS FIRE ACCESS SIGT5R= DOORS13 ALARM rn 13 14 (F -S) (DA) 0 22 0 H I4.2 8001 -01 S14 S12 13 14 13 SURGE ARRESTOR ALARM — 14 0 23 0 I I4.3 0 24 0 I I4.4 I 1 I BCF 2 I (BCF) rn 0 25 0 BATTERY CHARGER I ti) of 27 59 _ I 0 0 0 (27) (59) rn 0 26 0 to 1 27 0 I I4.7 XF 23 - - I II t I � CC I of cL o o 11 0 IQ I27A 1 :41127B 1 g l = 2 � 2 � T. - Q Y U_ m I I o m I I o L L( Hw) D- la J Ia IB. (27A> L= L(2731 10 0 11 0 0 28 rn 13 0 14 `!H I5.2 PUTS 16 X 0.5A 0 12 0 ' I I 1 5.0 = • DIGITAL IN 0 29 0 30 2 0 N 0 31 15 SUMP PUMP 1 8I Z 0 CLOGGED o z FILTER _ d I CC o z UI 0 0 I I (RG) 1 (CF) I 0 N 0 32 ° 16 0 17 l 15.6 0 18 RECEIVED C}Tv : Inn/1u JUN 2 8 7 nn7 � i CENTER 0 19 I I5.7 (24L -) 20 EMERGENCY SUBSTATION FIRE TPSS ACCESS SA SHUTDOWN SHUTDOWN AND DOOR ALARM (WITH XTRIP) (NO XTRIP) INTRUSION ALARM ALARM 01 12/06/05 Revised per comments PJO RLA LB • 4 SYS FAIL • BATTERY CHARGER 5 125VDC LOSS OF SHORTED TO VOLTAGE 1500VDC • SIEMENS TRANSPORTATION SYSTEMS, INC. LOSS OF AC AUX PWR LOSS OF DC AUX PWR HIGH WATER SOUNDTRANSIT • PUMP CLOGGED RUNNING FILTER SUMP PUMP PAT O'HOGAN ORN BY DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE 9 • SPARE (24L+) SPARE SPARE NOTE: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 190 -209) 12/03/2004 DATE DATE 12/03/2004 DATE 10 — 7.01 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS DRA NO. TPS- S100 -06 CONTRACT NO. RTA /LR82 -03 /C V 01 ocv n"LTC nCC 010rn flu =MI/_ row top 300 OSWEGOPOINTEDRNE, SUITE 106 OREGON 97034 Dcv DATC DC DIDnn OV coin r141r ADD 01 11/17/05 6.10— (24L +) X (24L -) D12 (24L +) X3 ¶10 1 C A100 -D12) — t — r _ ERB 13 I N CO ERB 0 T 14 I15 N 0 X3 0 • 36 N 0 37 0 • ,I Revised per comments DIGITAL INPUTS FROM AC BREAKER I/C W070 -05.07 N- rh 1 16 1 17 N N 0 38 0 . H I6.2 • PJO Ei N LB 0 39 0 AC AC 431N UV LOCKOUT PHASE SEQ. REMOTE LB N N N I � 0 0 0 1 18 I19 I20 I 1 i_- --J N 0 40 0 HI6.4 U) N 0 41 0 OPEN CLOSED I AC BREAKER SO40 -03 A0 tD N 0 42 08 �g H I6.5 II6.7 1 f LOSS OF DC CTRL SPARE VOLTAGE X 2 0 1 0 0 11 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINTEDRIVE. SUITE 106 LAKE OSWEGO, OREGON 97034 0 12 0 13 17.0 SPARE SPARE 0 14 I7.1 1 )17.2 1 �r souxnrwvusR I7.3 L B - N N SC/T (5.04) m l ERB 4 I (3 16 SPARE SPARE SPARE SPARE 5 SC/ 3 (5.04) 46 0 17 N PAT O'HOGAN DRN BY DEN CKD BY PAT O'HOGAN DES BY 12/03/2004 DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE NONE 5 3 48 �2 U I/C W070 -04.05 SO40 -02 - 03 SO40 -02 I7.4 I 17.5 � 17.6 I A03 0 18 0 19 0 20 RECEIVED CIT\' - . VILA JUN 28 ?!7 CENTEE-1 DIGITAL INPUTS 16 X 0.5A SPARE SPARE SPARE NOTE: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 210 -239) UNK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT DRAW NO. RTA / LR 82 - 03 / C807 NO, TPS S100 - 07 IREV. 01 02 01 I 1Aw _#12 .PWG 0 1 S 125VDC FROM 0 2,4 12/05/05 11/17/05 DC DIST PNL DP1 CKT DP1 -F1 1.02 _ (125VDC) New Line Test Resistors Circuit Revised per comments F11 It 1 OA —J 125VDC CONTROL POWER 1.02 (11L +) (11L-) 1 r — X ( 72 -1 r / I J10 TB1 O 15 15 J 22 TB1 22 11 121 X 12 122 1 5 107 K02 K11 (4.05) (4.07) K02 NORMALLY ENERGIZED AND IS DE- ENERGIZED TO TRIP BREAKER. AFTER TRIP CONDITIONS ARE CLEARED K15 (4.06) IS ENERGIZED, K02 IS ENERGIZED, THEN K11 IS ENERGIZED TO CLOSE BREAKER. AFTER TIME DELAY K11 OPENS AND HOLDING COIL CURRENT FLOWS THRU R10. (1L +) ( 3.06 J— F12 10A RJA PJO < < . . J c1 RJA R10 250 OHM, 225 WATTS • It _J N 2.02 PJO LB 1 5 2 6 s102 -01 O XP_ �XP F2 1,2 1,2 0 34 f34 _ LB LB (108) o TB1 21 i (BREAKER TRUCK (BT)) 72 - 0 I (L +) X01 BREAKER R1 SA (NOTE 3) X02 u 1500V DC POSITIVE BUS, 6000A 4KA/60mV (106) E10433- E9509 -H100 15 -14 15 -13 15 -12 COM 15 TB1 TB1 TO OCW r I L r II 1 1 JL (103) #14 AWG, 2KV, 1W PR + (105) f S.100 FT2 -o - i I--- --1 FO 2 (100) 1 OA 6 #14 AWG, 2KV 15 30003WEGOPOINTEDRNE, SUITE 106 L4KEOSWEGO, OREGON 97034 3 - 1 r II aII 11 II 4 1 1 J L J10 9 <4000V 10 <2000V 6 <1000V 12 3.06 VOLTAGE DIVIDER 1 (150 Al) t300mV t10V <10V OV SIEMENS TRANSPORTATION SYSTEMS, INC. 11 I 72 - 2 I 11 25 27 29 3 DC NEGATIVE BUS (150 A2) 2 #14 AWG, 2KV REFERENCE POTENTIAL 1 (101) KO (4.08) b � a I e Ill b A J 11 II 1 _ J T T J 1 J 1 J KO (4.08) 11 UAU UE1 t10V /20mA ±10V /20mA OV OV 7 8 I 11 S102 -01 r 72-21 SOUNDTRANSIT 017 1 H01 (OP CTR) 2 2 20 023 24 1 RELAY/RESISTOR BOARDS I� 6 6 19 \/18 \./14 `/16 x/25 \./14 \./16 Y DC BUFFER AMPLIFIER T 2.03 OUTPUT TO DPU 96 PAT O'HOGAN DRN BY URN CKD BY PAT O'HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE 16 0 25 (102) 1 14 13 12 777 12/03/2004 DATE DATE 12/03/2004 DATE DATE 12/03/2004 DATE 24 RO1 R02 2.02 #14 AWG, 2 LINE /BUS VOLTAGE MEASURING 3 -100 OHM, 300 W RESISTORS ALL WIRES #14AWG, 2KV r BA NOTES: 1. MOUNT IN H.V. AREA OF CUBICLE WITHIN 18" OF SHUNT R1 2. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 100 -119) 3. SA LOCATED IN CABLE VAULT 150 -A2 150 -A1 1 - - - --J -rte - - � (NOTE 1) 150 -A11 MOUNTING DETAIL LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION Fl CUBICLE GENERAL SCHEMATICS CONTRACT DRAWI REV. NO. RTA / LR 82 -03I C8071 NO TPS- 5101 -01 02 RECEIVED CITY r ninvILA JUN 2.8 2007 E ERMIT CENT 1 R 1.03 (12L -) (12L+ 0 10A 125 VDC INPUT DO NOT USE (C -TRIP) X 1 04 0 X1 0-3 02 VOLTAGE SUPPLY TO BA +24V OV PG /PC PROFIBUS N A20 1 A21 X2 X3 X4 0 27 0 1 1.09 #14AWG, 2KV, SIS 1.07 i 0 X6 F/O INPUT FROM BUFFER AMPLIFIER 150-A PROFIBUS CONNECTION SEE INTERCONNECTION TPS- W070 -07 X2 0 1 8 Al 9 L+ 24V AUXILIARY VOLTAGE AUXILIARY VOLTAGE OUTPUT L+ 24V M A19 A19 A22 A22 Al A2 A3 A4 A5 A6 A7 0 (N N X2 0 6 0 17 0 10 0 11 0 29 0 30 0 31 0 32 0 33 0 34 0 35 0 36 0 0 8 -140 T T 3.02 4.01 N 0 19 0 20 El E2 E3 E4 • • • A SEE SHT 3 E5 E6 E7 E8 E9 El0 El1 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 A23 M M M IEMENSI 0 ❑ ❑ ❑ SITRAS DPU 96 0 41 0 4 • - • - • - DIGITAL INPUTS DIGITAL OUTPUTS M A8 A9 A24 A24 A10 All Al2 A13 A14 A15 A16 SEE SHT 4 X1 0 X2 13 14 26 27 39 40 52 X3 6 'C7 19 0 0 0 X4 0 0 38 0 39 0 3 0 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO PO/N7EDRNE, SURE 106 L4KEOSWEGO, OREGON 97034 0 45 0 46 0 47 0 48 0 49 0 50 FRONT SECTION A -A BOTTOM VIEW 0 5 0 6 0 09 • SOUNDT�iANSIT 0 AUG 2 7 2007 (150 AO DPU 96 ANALOG 1 M OUTPUT t1OV MAX. 20mA A23 A24 A24 A17 A25 ( +) ( -) X13 0 14 0 15 0 28 0 2 REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC City Of Tukwila BUILDING DIVISION PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY 12/03/2004 DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE POLE MOUNTED EQUIPMENT r CATY 1 VOLTAGE PRESCENCE DETECTOR 1 TX J / _F /0 CABLE ICVPD1 RX T 3.07 RECEIVED cm/ 7 K■,./VILA JUN 2 8 2001 tip E iVltT CENTER ER NOTES: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 120 -129) LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F1 CUBICLE DPU SCHEMATICS I D O. RA WING N TPS- S101 -0 2 IR SCALE: NONE CONT NO. RTAILR 82 -03 00 RFV DATF OFC(:RIPTIfIN Dv 01.1(_ !`I -11( 4PD DPU /INPUT CONNECT TEST DISCON. E8 (S02) 0 (OPEN) 1 (CLOSED) 1 (CLOSED) E9 (S01) 1 (CLOSED) 0 (OPEN) 1 (CLOSED) 01 11/17/05 21 21 S01 22 22 (24D +) FROM A9 (1.08) Jam.. TB1 10 12 b (1.06) (4.08) N• 2.03 - { (24D+) (1.08) BT) K02 2 (4.05) 6 TB1 16 J10 CD ACKNOWLEDGE FAULT 43 R 116 S1 I T17 X1 0 15 0 16 0 17 0 18 Revised per comments 24 VDC CS CS C _16 o 11 S 13 0 I S3 I o o17 o1S 14 of DPU96 DIGITAL INPUT BLOCK 16X24V DC REMOTE CLOSE OPEN BREAKER SPARE BREAKER BREAKER DIRECT ON ( BYPASSES LINE TEST PJO LB LB SO2 SPARE TEST CONNECT SPARE LOSS OF CONTROL VOLTAGE TRUCK POSITION 300OSWEGOPO.IiVTEDRIVE SUITE 106 LAKEOSWEG'O, OREGON 97034 TRANSFER TRIP FROM ADJ. TPS SIEMENS TRANSPORTATION SYSTEMS, INC. TB1 0 1-4.01 13 14 14 BT TB1 14 J 2.09 BREAKER BREAKER LINE VPD OPENED CLOSED TEST CONTACTOR ON SOUNDTRANSIT SPARE SPARE SPARE PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE NOTES: 1. DPU TRUCK POSITION INPUTS (TOO) 2. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 140 -169) 12/03/2004 DATE DATE 12/03/2004 DATE FROM A7 4.04 TRANSFER TRIP TO ADJ TPSS SPARE RECEIVED I� crni TI JUN 2 82007 liEiii411 GEN fER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F1 CUBICLE DIGITAL INPUT SCHEMATICS CONTRACT D NO RTA I LR 82-03 / C8071 TPS-S101 -03 IRE" 01 REV DATE DESCRIPTION FY FN(: (:HK APP REV DATE 3.07 (24D+) 1 4 0 -K24 4 1 -K24 — (4.03) 5 (4.03) T X1 26 \ / - H10 Y 24VDC 0 X1 8 GROUP ALARM DESCRIPTION DPU96 DIGITAL OUTPUT BLOCK (16 X 0.5A) 0 30 0 31 0 32 SPARE SPARE SPARE SPARE i (24D -) 33 SYSTEM READY 5 11- --4.02 1 - 41 1 4.01 6 (NOTE 1) 34 A6 A7 / A8 35 "3 25 TO E20 3.09 f-/ A9 f4 i A10 f-/ Alt 3 TO E12 3.06 TRANSFER TRANSFER TRIP TO TRIP FROM ADJ TPSS ADJ TPSS K15 — (4.06) rn co (1.08L J10.. 24 TB1 24 25 O 3 4 31 0 10 H01 OPEN SUSTAINED CIRCUIT SHORT BREAKER CIRCUIT 1 t I�1.03 Fi m 17 BT 17© 18 0 27 1 OM 2 J10 J10 25 v 18 OPERATION COUNTER • OK TO CLOSE BREAKER 5 L11 6f II14 -4.08 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOIN7EDRIVE, SURF 106 LAKEOSWEGO, OREGON 97031 s Al2 ' A13 28 0 29 "30 H2 A H1 / \ / 23 cn co 3 A14 / A15 - / A16 CB CLOSE CB CLOSED CIRCUIT OPENED BREAKER 1 f 11- ?-t -{ X1.04 co co SOUNDTRANSR K15 (4.06) J10, J10, 23 20 TB1 20 19 Al (NOTE 2) 3. TRIP & LOCKOUT DC BREAKER FOR: FRAME FAULT EMERGENCY TRIP /FIRE 32 REVERSE CURRENT ON DC MAIN INCOMPLETE SEQUENCE 4. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 170 -199) BT LINE TEST 4 1.07 3 . 07 31, �F PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/0312004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE NOTES: 1. K24, IS ENERGIZED FOR THE FOLLOWING ALARMS: OVERCURRENT TRIP MCB TRIP UNSUCCESSFUL RECLOSURE FRAME FAULT CB TROUBLE TRUCK TROUBLE TEST CONTACTOR TROUBLE OUTPUT TROUBLE DELAY TRIP dl/dt INSTANT TRIP dI /dt SYSTEM FAULTED TRANSFER TRIP FAILURE 2. LINE TEST SEQUENCE SETTINGS: PRE.- PAUSE: 5 SEC. TEST TIME: 2 SEC. TEST PAUSE: 10 SEC. DELAY BEFORE CLOSE: 3 SEC. SEQUENCE RESET AFTER CLOSE: 5 SEC. AFTER 3 FAILED ATTEMPTS WITH NO RECLOSURE: LOCKOUT DC BREAKER RECEIVED JUN 2 8 2007 PENvili CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F1 CUBICLE DIGITAL OUTPUT SCHEMATICS NO. CONTRACT / LR 82 -031 C807I N0. DRAWING NO. 'REV. 00 11/17/05 DATE AC SWITCHGEAR I 26KV,600A i I I I I A B N� �. —+ INCOMING UTILITY Revised per comments DESCRIPTION SA° TO GND MAT 2.03 PJO av CU BUS 25KVA 26KV/240Vac FN!_ G . — A03 A I GROUND BAR LB APP RECTIFIER TRANSFORMER C H3 g • H2 I H1 I-- - GROUND BUS TO GROUND MAT L 4 R5 I L32 R /L31 F t j L22 54 I L21 • R(3 1 .L12 R2 •L11 ci • •"-----#4/0, CU BARE GND. PAD NEGATIVE DISCONNECT 2 4 GND BUS Q O 1/ T GROUND 2 • II N1 2 U O O to co TO RAIL SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97031 I CU BU DUCT 2KV CU BUS DUCT / 2KV y Y ©31 11 N •It 14 N N - N L1 L2- RECTIFIERS A ©32© 22© 12 • NO CU BUS CABLE VAULT SOUNDTRANSIT T GROUND I DRAWING NO. TPS -W070 01 DC MAIN BREAKER PAT O'HOGAN 2/15/2005 DRN BY DATE ORN CKD BY PAT O'HOGAN DES BY SCALE: NONE I I I I I TPSS 16 ONLY I I C U B U S I I I !F1 ( !F2 ( • i F3 ( !F4 ( ' F5 ( I SAY DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2115 /2005 APPROVED BY GATE DC FEEDER BREAKERS SAI SAY TO OCW CONTRACT NO. RTAILR 82 -03 / C807 SAi Y N J_ Y 0 0 •1 LINK LIGHT RAIL PROJECT I I I I I I I I I I I I SA 10 VEO „( 2007 ,?E - vii - f G N i En TRACTION ELECTRIFICATION SYSTEM MAINELINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM HV AC & DC CABLING EV. 01 01 REV 11117/05 DATE • (2.06) API -BC 3cc #10 BATTERY CHARGER API -TIM 3cc #12 TRK ISO MONITORING (3.05) API -EL 3cc #12 EMERGENCY LIGHTS API-S&I 3cc #12 FIRE AND INTRUSION PANEL (4.04) API -TPT 3cc #12 TPT HTRS (4.04) API -A03 3cc #12 120VAC CTRL PWR SPARE PROVISION (3.05) API -HTR 3cc #12 DC SWGR HTRS API -TIPS 3cc #12 TRACK TST PWR SUPPLY (NOTE 1) LEGEND: A03: AC BREAKER API: 240/120 VAC DISTRUBITION PANEL BC: BATTERY CHARGER CCIC: CENTRAL CONTROL INTERFACE CABINET DP1: 125 VDC DISTRUBITION PANEL EL: EMERGENCY LIGHT ETS: EMERGENCY TRIP SWITCH FO: MAIN DC BREAKER Fl: FEEDER BREAKER #1 S&I: SMOKE AND INTRUSION PANEL SSS: SUBSTATION SHUTDOWN SWITCH TPT: RECTIFIER TRANSFORMER V1: VENTILATOR UNIT #1 V2: VENTILATOR UNIT #2 Revised per comments 11FSCRIPTI(1N • SPARES PROVISION — (1.03) V 3 20A 'r 5 /■ 7 20A /Th 9 20A 20A L1 30A /111 /1 13 20A /--\ 15 20A /1 17 20A / 19 20A /1 21 P.10 RV 23 25 27 29 FNP. 1 2 LB r`Nu • L21 —)150A 40A m 30A rn f 10 20A /Th 20A 12 /1 14 20A /Th I 20A 16 1 /' 18 2^ 30A 20 / 22 30A I 30A 24 / 26 28 30 7 4 DISTRIBUTION PANEL API, 120/240VAC BUS RATING 225 A LB APP • F SPARES PROVISION 5 (3.08) AP1 -HTR, 3cc # 10AWG UNIT HEATERS AP1 -ST, 3cc # 10AWG STAIR TOWER (TPSS C16 ONLY) (3.02) AP1 -L1, 3cc # 12AWG LIGHTS, INTERIOR (3.02) AP1 -LE, 3cc # 12AWG LIGHTS, EXTERIOR AP1 -LV, 3cc # 12AWG LIGHTS, VAULT (EXCEPT TPSS C11) (3.02) AP1 -RI, 3cc # 12AWG RECEPTACLES, INTERIOR (3.02) AP1 -RE, 3cc # 12AWG RECEPTACLES, EXTERIOR (3.08) AP1 -V1, 3cc # 10AWG VENTILATOR UNIT #1 (3.08) AP1 -V2, 3cc # 10AWG VENTILATOR UNIT #2 (3.05) AP1 -SP, 3cc # 12AWG SUMP PUMP (5.07) AP1 -FO, 2cc # 20AWG LOSS OF AC CTRL PWR • SIEMENS TRANSPORTATION SYSTEMS, INC. 300OSWEGO�INTEDRIVE, SUITE 106 CAKE OSWEGO, OREGON 97034 BATTERY CHARGER BK f BK AP1 -BC, BK 3cc #10 AWG, (2.02) 2 -1 /C #2 IN CONbUIT (6.02) DP1 -F1, 2cc #12 AWG F1 CUBICLE CTRL PWR (4.02) DP1 -CCIC, 2cc #12 AWG CCIC CTRL PWR eTB1 L1 'TB 1 -L2 .GND BC -F0, 4cc #14 AWG, BATTERY CHARGER ALARM (5.07) SPARES PROVISION — SOUNDTRANSIT 20A /T\ 1 / 3 20A m 5 1 / 7 /T\ 9 (4.04) DP1 -A03, 2cc #12 AWG l /1. 11 A03 CUBICLE CTRL PWR 20A TB2 ( +)° 17IP� G I a l \ 15 TB2 ( (1-#T2AWG 17 19 21 23 25 27 29 (-) L2 __ __- (T8D) 1 DRN CKD BY PAT O'HOGAN DES BY 2 20A 2 /1N 1 4 ° 6 2 m 20A 10 'r 12 14 16 18 20 22 24 26 28 30 / fh DISTRIBUTION PANEL DP1,.125VDC BUS RATING 250 A PAT O'HOGAN 2/15/2005 DRN BY DATE DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE (5.02) DP1 -F0, 2cc #12 AWG FO CUBICLE CTRL PWR (4.07) DP1 -N, 2cc #12 AWG N CUBICLE CONTROL POWER (3.05) DP1 -ACDC, 2cc #12 AWG AC /DC TEST PANEL (5.07) DP1 -FO, 2cc #14 AWG LOSS OF DC CTRL PWR RECEIVED CITY T III \A/I JUN 2 8 2007 a'ki II GEN NOTES: 1. REQUIRED FOR INTERNATIONAL DISTRICT /CHINATOWN, OTHELLO AND BOEING ACCESS TPSSs ONLY. LINK LIGHT RAIL PROJECT IO TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM AC AND DC STATION SERVICE CONTRACT R REV. NO. RTM.R 82 -0310807 I D . TPS -W070 02 01 REV DATE DESCRIPTION RV FNC.1 CHK APP 1 01 11/17/05 (2.04) AP1 -LE, 3cc # 12AWG B (2.02) AP1 -RE, 3cc #12 AWG (2.04) AP1 -LI, 3cc # 12AWG (2.02) AP1 -RI, 3cc #12 AWG (5.07) SAF -FO, 2cc #14 AWG ALARMS AUTO OFF ° HAND EXTERIOR GFI RECEPTACLES B O� O SW H H ° N INTERIOR GFI RECEPTACLES L-- -J SURGE ARRESTOR ALARM (6) EXTERIOR HPS LIGHTS INTERNAL PHOTO CELL PJO LB EL Revised per comments LB INTERIOR LIGHTS .95A EACH (TYP 10) • (2.02) AP1 -EL, 3cc #12 (2.02) AP1 -S &I, 3cc #12 AWG (2.02) AP1 -HTR, 3cc #12 AWG 120VAC (2.04) AP1 -SP, 3cc #12 AWG 120VAC • L_ EMERGENCY LIGHT FIRE & INTRUSION PANEL 13 R ALARM L -- AC DC TEST STATION (2.09) DP1 -ACDC, 2cc #12 AWG R P+ 1 125VDC CTRL PWR BK I�N- U J _ J ACCESS DOOR _ T.P.S. L_J ACCESS DOOR T.P.S. W 6 L_ - -J (MOUNT IN J BOX ATTACHED TO PNL API) SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 FA FO, 2cc #14 AWG (5.07) ALARM CXT 100 -C10 2cc #14 AWG SHD TW PR INTRUSION ALARM (CONTACTS SHOWN WITH DOOR OPEN) DC HTR ISOLATION TRANSFORMER g g (4.07) HTR -N, 2cc #14AWG, 2K (5.07) SP -F0, 4cc #14AWG ALARMS 7 SOUNDTRANSIT • REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B IIDING DIVISION 8 (2.04) AP1 -V1, 3cc #10 AWG 120VAC (2.04) AP1 -V2. 3cc #10 AWG 120VAC (2.04) AP1 -HTR, 3cc #10 AWG 120VAC (5.07) BL -FO. 2cc #12 AWG CONTROL (5.07) DO -FO, 2cc # 14 AWG ALARM (5.07) SSS -F0, 2cc #14 AWG PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE NONE DATE 2/15/2005 DATE 9 SSS_ VENTILATOR 1 VENTILATOR 2 HEATER r l� BLUE LIGHT XFMR ACCESS PANELS EMERGENCY TRIP SWITCH ETS (5.07) ETS -FO, 2cc #14 AWG — r� L °J • ETS IS LOCATED OUTSIDE PERSONNEL ENTRY DOOR SUBSTATION SHUTDOWN SWITCH 10 SSS RECEl IJUN 2.8 2007 'L hMl CEN i AN SSS IS LOCATED INSIDE EACH ENTRY DOOR LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM BUILDING AUXILIARIES CONTRACT DRAWING NO RTA/LR 82 -03 / C807 NO. TPS- W070 -03 IREV. 01 I ' 15.03) T -FO, 7cc #14 AWG I I TRIP & ALARM SIGNALS I II UI —z II II �® 1 1 ! ! !I 120V C CTRL PWR #12 AWG, R N I! 1! 1 I' i ' 1(5.07) A03 -F0.2, 7cc #14AWG PLC DATA INPUTS CENTRAL CONTROL INTERFACE CABINET CCIC ' 26kV AC BREAKER I_--------------------- - -�L_- REFERENCE DRAWING SERIES: SO40 11/17/05 01 REV DATE (2.07) DPI -CCIC, 2cc #12 AWG. 125VDC CTRL PWR B 1 1 w Revised per comments DESCRIPTION PJO I' 1 11 1 II I I I RECTIFIER TRANSFORMER I REFERENCE DRAWING: M041 -02 TPT ji 1 IL IF 1 1, I! I I (5.07) A03 -FO, 7cc #14AWG I! I I 11 11 1, I I (5.07) A03 -F0.1, 2cc #14AWG 24VDC CTRL PWR LB BY ENG CHK APP 3SP (2.07) DP1 -A03, 2cc #12 AWG, 125VDC CTRL PWR (2.02) AP1 -A03, 3cc #12 AWG, 120VAC CTRL PWR TRIP & CLOSE SIGNALS 1SP LB 1SP B w TB2 LA TB1 24L+ 33T 49T1 24L+ 49T2 ERB 43C C 43T T TP 186 24L+ 27 86 47 43R 52a 52b 27B 180'c, ALARM 200'c, TRIP co ' (3.06) HTR -N, 2cc #12 AWG, 110VAC HTR PWR (5.04) N -F0.3, 7cc #14 AWG, PLC DATA INPUTS 2SP i FPA 70 - NEC ! 1 AUG 2 7 2001 11 City Of Tukwila SIEMENS TRANSPORTATION SYSTEMS, INC. 300 05 WEGO POINTEOR!V SUITE 106 CAKE OSWEGO, OREGON 97034 (2.09) DP1 -N, 2cc #12 AWG, 125VDC CTRL PWR (5.02) N -F0.1, 2cc #14 AWG, 24VDC CTRL PWR (5.04) N -F0.2, #14 SH TW PR PLC ROV INPUT L- T -STAT HTR t I W B 1 W 2 3 4 5 6 7 8 121. L N L2 N2 TERMINAL BLOCK DIVIDER I I XP 1 12L+ XN 1 24L+ 2 24L- 3 24L+ 3 5 64V+ 6 64V- 7 8 9 FFI 10 64L 11 64G 12 898 13 89A 14 15 16 33N 17 33T 18 19 20 21 22 23 24 25 24L- NEGATIVE CUBICLE REFERENCE DRAWING SERIES: S050 SOUNDTRANSIT I I SCALE: NONE 1(5.04) R1 -FO, 4cc #14 AWG RECTIFIER ALARMS • B (5.07) N -F0.4, 2 -1 /C #12AWG, 2KV I 1' I! I I , I! N -F0, 1/C #12AWG, 2KV I VOLTAGE DIVIDER I 1/c #14AWG PAT O'HOGAN 2115/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 2/15/2005 DES BY DATE DES CKD BY DATE LANCE BANASZEK 2/15 /2005 APPROVED BY DATE 2SP , XR1 2 3 7 8 9 10 11 12 24L+ 98 -1 98 -2 4 5 6 26R -1 26R -2 33R -2 12 14 33N RECTIFIER #1 REFERENCE DRAWING SERIES: S060 (5.04) R2 -F0, 7cc #14 AWG RECTIFIER ALARMS 2 3 4 5 6 7 3SP XR2 1 24L+ 98 -1 98 -2 24L+ 24L+ 33R 12 14 9 33R -2 10 11 12 NOTE: 1. HEATERS RATED AT 240V. 400W.1. HEATERS OPERATED AT 120V. 100W. 2. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 3. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 4. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. CONTRACT DRAWING NO. RTA/LR 82 -03 I C807 I NO. TPS- W070-04 RECEIVED, CIS' _ ;_, IInA LA JUN 2 8 20071 IREV. RECTIFIER #2 - N L - -- REFERENCE DRAWING SERIES: S060 - - -- R? J LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM AC AND DC SWITCHGEAR 01 01 REV 11/17/05 DATE (2.09) DP1 -FO, 2cc #12 AWG, 125VDC CONTROL POWER (4.07) N -F0.1, 2cc #14 AWG, —. W 24VDC CONTROL POWER Revised per comments TO PLC D1OA (S100 -03) TO PLC D1 OB (S100 -04) DESCRIPTION XF 1 24L+ 2 3 4 5 6 7 8 9 10 11 12 13 14 15 24L- 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 64V+ 31 64V- 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 FFI 49 64L 50 64G 51 89A 52 89B 53 LOP 54 33R 55 98 -1 56 98 -2 57 26R1 58 26R2 59 49T1 60 49T2 61 62 63 64 65 PJO BY ENG LB CHK LB APP TERMINAL BLOCK DIVIDER JUMPER, 1c #14 TPT -F0, 7cc #14 AWG, TRIP & ALARM SIGNALS (4.04) R2 -F0, 7cc #14 AWG, RECTIFIER ALARMS (4.09) 3SP N -FO 2, 4cc #14 AWG, SH TW PR, (4.07) 2SP PLC ROV INPUT N -F0.3, 7cc #14 AWG (4.07) 23P PLC DATA INPUTS R1 -FO, 4cc #14 AWG, RECTIFIER ALARMS (4.0 2SP REVIEWED FOR CODE COMPLIANCE E NFPA 70 - AUG 27 2007 Eity Of Of Tukwila B ILDIN D SION SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO PO/N7E DR/V E SUITE 106 LAKE OSWEGO, OREGON 97034 TO PLC D11 (S100 -06) TO PLC D12 (S100 -07) X3 16 17 18 19 20 ETS 21 SSS 22 F-S 23 DA 24 SAF 25 BCF 26 27 27 59 28 27A 29 278 30 HW 31 RG 32 CF 33 34 35 36 27 37 86 38 47 39 43R 40 52a 41 52b 42 27B 43 44 45 43T 46 T 47 43C 48 C 49 TP 50 186 51 52 53 54 55 56 57 58 59 60 DC MAIN BREAKER FO REFERENCE DRAWING SERIES: S100 SOUNDTkANSIT (4.07) N -F0.4, 2 -1 /C #14AWG, 2KV g ETS -FO, 2cc #14 AWG EMERG. TRIP SWITCH (3.08) SSS -FO, 2cc #14 AWG (3.08) FA -FO, 2cc #14 AWG, FIRE & INTRUSION ALARM (3.06) DO•F0, 2cc #14 AWG TPSS ACCESS DOOR ALARM (3.08) SAF -FO, 2cc #14 AWG, SURGER ARRESTOR FUSE BLOWN (3.02) BC-F0, 4cc #14 AWG. BATTERY CHARGER ALARM (2.07) AP1 -F0, 2cc #14 AWG, LOSS OF AC CONTROL POWER (2.05) DP1•FO, 2cc #14 AWG, LOSS OF DC CONTROL POWER (2.09) SP -F0, 4cc #14 AWG, SUMP PUMP ALARMS (3.06) A03 - F0.1, 2cc #14 AWG, AC BREAKER ALARM VOLTAGE (4.04) A03 -F0.2, 7cc #14 AWG PLC DATA INPUTS (4.04) A03 -FO, 7cc #14 AWG TRIP & CLOSE SIGNALS (4.04) 1SP (4.07) N -F0, 1/C #14AWG, 2KV VOLTAGE DIVIDER REF. POT. W I PAT O'HOGAN 2/15/2005 DRN BY DATE ORN CKD BY PAT 0110GAN DES BY DES CKD BY DATE LANCE BANASZEK 2/15 /2005 APPROVED BY DATE SCALE: NONE XH 1 DATE 2/15/2005 DATE XV 1 0 (6 T -STAT HTR VD LINK LIGHT RAIL PROJECT 1 I 1 I 1 1 I I I .02) FO -F1, 1/C #14AWG, 2KV I I (6.02) FO -F1.1, 2 -1 /C #14AWG, 2KV I RECE!VFD C! -' ; ! "K A/[ JUN 2 8 7007 J TRACTION ELECTRIFICATION SYSTEM MAINELINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM DC SWITCHGEAR CONTRACT NO. RTAILR 82 -03 / C807 I NO W NGTPS- W070 -05 'REV. 01 01 TERMINAL BLOCK DIVIDER 11/17/05 REV DATE (2.06) DP1 -F1, 2cc #14 AWG, 125VDC CONTROL POWER (5.09) FO -F1, 1/C #14AWG, 2KV, VOLTAGE DIVIDER REF. POT. (5.09) F0 -F1.1, 2 -1 /C #14AWG, 2KV B XV I XH 1 J evised per comments DESCRIPTION 1 1c #14AWG 1c #14AWG, 2kV II PJO VD II I 2cc #14AWG II II II II 11 11 II 1 II II 11 II ! II II II 1� 2kV ! LB LB BY ENG CHK APP I I XV 1 XH II 11 II II 11 11 II 11 11 11 11 II 11 II 1 II 11 1 c #14AWG, 2kV i l I I lc #14AWG, 2kV I I VD 11 11 1 T —STAT I ! II HTR II II I I 2cc #14AWG XV 2 XH I 2 L X I I 1 2 3 4 5 6 W I 1 P SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINTEDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 1L+ 1L- 11L+ 11L- VD II 11 II is 1c #14AWG, 2kV I I 1 1c #14AWG, 2kV I I Pci 11 T—STAT II II HTR II 11 0 FEEDER BREAKER F3 II II 2cc #14AWG II 11 II II II II II II I II II II II II II 11 I XV XH s � T -STAT Ii 2 II HTR II w „ 11 11 I1 „ FEEDER BREAKER Fl I I FEEDER BREAKER F2 11 REFERENCE DRAWING SERIES: S101 " REFERENCE DRAWING SERIES: S102 REFERENCE DRAWING SERIES: S103 " REFERENCE DRAWING SERIES: S104 " REFERENCE DRAWING SERIES: S105 ------------------------- IL-----------------J I- ----------------- JL------- ---------- JL---- -------- ---- -j HTR II si 11 s FEEDER BREAKER F4 II SOUNDTRANSiT L X 4 5 6 W P VD 1 DRN CKD BY PAT O'HOGAN DES BY II Ii I I 1 1 I I I I II II II REVIEWED FORII CODE COMPLIANCE NFPA70 - NEC „ AUG 2 7 2001 II II City Of Tukwila !! BUILDING DMSI01- II it I 1c #14AWG, 2kV is I I 1c #14AWG, 2kV I I 11 T -STAT !! � II 11 PAT I :MOGAN 2/15/2005 DRN BY DATE DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE #14AWG TPSS C16 ONLY XV I 1 2 XH 1 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM DC SWITCHGEAR I pRWING NO TPS- W070-06 CONTRACT NO. RTA/LR 82 -03 / C80 XP 1 1L+ 2 3 1L- 4 5 1u+ 6 11L- RECEIVED. Cr; -: +!0 11LA JUN 2 8 ?OOlj VD I 1 I IQH T—STAT � I FEEDER BREAKER F5 HTR 01 11/17/05 CKT 110 -C2 DATE XTRIP ON OFF EON OFF OST A1,B1 A2,82 jFIGURE2 2 A1,B1 A2,B2 BLUE WIRE XTRIP FEEDER 1 DPU -96 OPEN �GNfl IA 1 Al GN / J 1 B B I RD I I I I ON 1-- -I- --1 L —L XJ FEEDER #1 4 PR CAT 5 (ETHERNET) S7300 r ON T OFF A L —L XJ PROFIBUS CABLE TERMINATION PROCEDURES BUS CONNECTION FOR ALL OTHER NODES ON THE PROFIBUS. THE FEED CABLE SHOULD ALWAYS BE CONNECTED ON THE LEFT. (A1,B1). THE CONTINUATION CABLE SHOULD ALWAYS BE CONNECTED ON THE RIGHT (A2,B2) O SWITCH SETTING FOR ALL OTHER NODES ON THE PROFIBUS: "OFF" (TERMINATING RESISTOR DISCONNECTED) 2®THE CABLE SHIELD MUST LIE BARE ON THE METAL GUIDE. TIP: WHEN THE SWITCH IS IN THE "ON" POSITION, THE PROFIBUS TO THE OTHER NODES IS DISCONNECTED AT THIS POINT (e.g. FOR SERVICES PURPOSES). PJO LB CKT 110 -C3 GN FEEDER 2. DPU -96 OPEN CKT 110 -C4 GN / GN 11 FEEDER 3 DPU -96 CKT 110 -05 FEEDER 4 DPU -96 — Al FIGURE 2 BUS CONNECTION FOR THE FIRST AND LAST NODE ON THE PROFIBUS. THE CABLE MUST ALWAYS BE CONNECTED ON THE LEFT (SEE CONNECTOR MARKING A1,B1) O SWITCH SETTING FOR THE FIRST AND LAST NODE ON THE PROFIBUS "ON" (TERMINATING RESISTOR CONNECTED) OTHE CABLE SHIELD MUST LIE BARE ON THE METAL GUIDE. LB OPEN CKT 110 -C1 MAIN FEEDER FO r I A — � Al B ONOFF L —L XJ FEEDER #2 Al B1 A2B2 F/O CKT 110 -A3 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE,, SUITE 106 LAKE OSWEGO, OREGON 97034 I I Al D I _ _ ON L X L —J FIGURE 1 r I A — '1 AI B ON L —L XJ FEEDER #3 GN OPEN GN RD CKT 110 -A2 GN AC SWITCHGEAR FIGURE 1. O CABLE SHIELD O BUS CABLE e.g. 6XV1 830 -0AH10 O SCREW -TYPE TERMINAL BLOCK ON CONNECTOR P.C.B. FOR CONNECTING THE BUS CABLE IA Al - STRIP THE CABLE INSULATION WITH CABLE STRIPING TOOL • INSERT THE GREEN AND RED CORES IN THE SCREW TERMINAL BLOCK (A1,B1 bzw. A2. 82) - PRESS THE CABLE SHEATH BETWEEN TWO CABLE CLIPS - SCREW THE GREEN AND RED CORES TIGHT IN THE SCREW TERMINAL. SOUNDTRANSIT DPU -2000R k ON T - }- OFFS L-- LX -REVIEWED FOR CODE COMPLIANCE PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE NFPA70 -NEC City Of Tukwila BUILDING DIVISION DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK _ 2/15/2005 APPROVED BY DATE r I A AUG 2 7 2007 B ON [_ -i- A LXL —J FEEDER #4 CKT 110-Al GN CCIC r — I - -1 IA I k oNOFF 1 LX J J CENTRAL CONTROL INTERFACE CABINET !RECEIVED C3Ty = ; "(A /ILA JUN 2 9 ?f97 ii ;EN I LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM PROFIBUS CONTRACT NO. RTA/LR 82 - 03 / C807 I No wING TPS - W070 - 07 ' REV. 01 REV Revised per comments DESCRIPTION BY ENG CHK APP Rev # Date Apv'd LB Description Initial Issue Sound Transit Central Light Rail Link SIEMENS Systems, Inc MAINLINE TPSS TPSS BLDG. ELEC. EQUIP. BILL OF MATERIAL 00 3/17/05 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L001 Pg. 1 of 1 11 Item 1 AC Panelboard, 120/240, 1 phase, 3 wire, 30 circuits, 225 amp main circuit breaker, 225 amp bus, bolt -on branch breakers, Siemens type BL 2 DC Panelboard, 125V, 1 phase, 2 wire, 30 circuits, 200 amp main circuit breaker, 250 amp bus, bolt -on branch breakers, Siemens type BQD 3 Voltage Monitoring Relay, Auto Reset For measuring 220 VAC supply w/ 8 -pin DIN rail socket. Set to 160. 4 Voltage Monitoring Relay, Auto Reset For measuring 125 VDC supply w/ 8 -pin DIN rail socket. Set to 90. 5 Eye wash 6 NOT USED Descri tion 7 Battery Charger, 120 VAC in, 125 VDC @ 20 ADC out 8 Batteries, 6VDC, 50AH 9 ETS lockable pull box with padlockable kit 9 Emergency Trip Switch consisting of: 40mm push lock, twist reset red mushroom head 1 NC contact block enclosure, NAMA type 1 10 Station Shutdown Switch, pull to reset consisting of: 40mm push lock, twist reset red mushroom head 1 NC contact block enclosure, NAMA type 1 protective shroud SURGE ARRESTOR, 1500V Corn • lete with non - metallic enclosure 12 Cuirrent relay, 74SA Complete with non - metallic enclosure 13 See TESLA BOM 05008101B01 for additional building equipment and accessories. 5 1 10 1 1 DP1 1 27A 1 1 27B 1 1 1 ETS 2 SSS SA Dw• S mbol AP1 74SA Function _ AC control power distribution DC control power SENTRON Type S1 distribution AC Voltage Monitoring DC Voltage Monitoring Eye care DC power DC Power ETS box TPS Mass Trip & XTRIP TPS Mass Trip Without XTRIP Lightning Su •ression Lightning Detector Manuf. Part No. SENTRON Type S1 P2A30QJ150EBS P1N3OFX200CTS AC260B- 160 -250 51X120 DC260BM -90 -150 51X120 7602.1 1 SCRF- 130 -020E 12SLA50 AHXE6X6X4 3SB series 3SBO3P4R 3SB1430 -OC 3SB0221 3SB series 3SBO3P4R 3SB1430 -OC 3SB0221 3SB1902 -2BM 6007 -004 MAS -2. Manufacturer Siemens Siemens Time Mark Time Mark Haws ALCAD ALCAD Hoffman Siemens Siemens SMC Elektroba CLLR Stock # REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDIN D SION RECEIVED JUN Z g 7 1:197 = poi i. ER Item Descri • tion 1 AMVAC Circuit Breaker, 27kV, 1200A, 25kA control voltage 125V DC 2 3 -Phase Power Meter, model 7330 with integrated display, 5A nominal, 120VAC input voltage, 125VDC power supply 60Hz, , 4- internal digital inputs, 4 digital outputs, two (2) RS485 ports 3 Multifunctional Solid State Relay 1 50/51, 50/51N, 51T, Circuit protection, 587R1412 -61004 DPU2000 4 NOT USED 5 Circuit breaker control switch 6 NOT USED 7 Lockout relay, 3 decks, 125VDC 8 Kirk Key Interlock, Type D, LC, DOE, Single Lock Interchange Al, mounted on CPT frame rear door 9 Kirk Key Interlock, Type F, LO, FOE, Single Lock Interchange Al, mounted in CPT fuse truck 10 Indicating light, red Red LED 11 Indicating light, green Green LED 12 Indicating light, Blue White LED 13 NOT USED 14 Current transformer, Ratio 100:5SR Rating C100 15 Potential transformer, 26400/26400, ratio (220:1) with 2 -0.5E fuses 38kV 16 Control power transformer, 25KVA, 2600 - 120/240, 10kV BIL 17 NOT USED 18 Control Fuse 6A. 600VDC. Timedelay. Class CC 19 Fuse block, double pole, pullout type, 30A 20 Control fuse, 15A, 300V DC, time delay class CC 21 NOT USED 22 CPT primary fuse, 27kV, 3E amp 23 Strip heater, 150W 24 NOT USED 7330 1 CS 1 86 1 K 1 K 1 RIL 1 1 GIL 1 1 LOC 1 3 CT 2 PT 1 CPT 6 2FU 3 FU Dw..S mbol 52 2 FU -CL 2 3FU 6 HTR Function Main breaker Metering 27, 47, 59, A, V Ammeter, Voltmeter •Breaker control 2438D Breaker lockout 7803D ,Kirk Key ;Kirk Key Breaker closed Breaker open Local Position House Power Manuf. Part No. MA3Q1100000001 P P7330AOB0B0A0AOA KDL000010SC KFL00001OS Circuit protection USCC2 116B6708G43 -R4 1835L3 -R -CR 116B6708G43 -G4 1835L3 -G -CG 116B6708G43 -W4 1835L3-W-CW 923A332G19 -M 677C452G05 CS00979A01E11 ATQR6 Circuit protection ATDR15 CPT protection 9F6ODMJ003 279010H00 Manufacturer ABB PML ABB Electroswitch Electroswitch Kirk Key Interlock Co. Kirk Key Interlock Co. General Electric DDP General Electric DDP General Electric DDP ABB Cuttler Hammer AFP Transformers Ferraz Shawmut Ferraz Shawmut Ferraz Shawmut General Electric Omega CLLR Stock # REVIEWED FOR CO DE - COMPLIANCE NFPA 70 - NEC A11i; 2 7 2007 City Of Tukwila B ILDING b I ! ION RECEIVED Cl ': <\,V! JUN 2 8 ?O 7 l L .67ivI l I 'GeL Eii Rev # Date Apv'd Description S oun d Transit i Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS AC SWITCHGEAR BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Re lease ry Dwg. TPS -L040 Pg. 1 of 1 Item Descri • tion 1 AMVAC Circuit Breaker, 27kV, 1200A, 25kA control voltage 125V DC 2 3 -Phase Power Meter, model 7330 with integrated display, 5A nominal, 120VAC input voltage, 125VDC power supply 60Hz, , 4- internal digital inputs, 4 digital outputs, two (2) RS485 ports 3 Multifunctional Solid State Relay 1 50/51, 50/51N, 51T, Circuit protection, 587R1412 -61004 DPU2000 4 NOT USED 5 Circuit breaker control switch 6 NOT USED 7 Lockout relay, 3 decks, 125VDC 8 Kirk Key Interlock, Type D, LC, DOE, Single Lock Interchange Al, mounted on CPT frame rear door 9 Kirk Key Interlock, Type F, LO, FOE, Single Lock Interchange Al, mounted in CPT fuse truck 10 Indicating light, red Red LED 11 Indicating light, green Green LED 12 Indicating light, Blue White LED 13 NOT USED 14 Current transformer, Ratio 100:5SR Rating C100 15 Potential transformer, 26400/26400, ratio (220:1) with 2 -0.5E fuses 38kV 16 Control power transformer, 25KVA, 2600 - 120/240, 10kV BIL 17 NOT USED 18 Control Fuse 6A. 600VDC. Timedelay. Class CC 19 Fuse block, double pole, pullout type, 30A 20 Control fuse, 15A, 300V DC, time delay class CC 21 NOT USED 22 CPT primary fuse, 27kV, 3E amp 23 Strip heater, 150W 24 NOT USED 7330 1 CS 1 86 1 K 1 K 1 RIL 1 1 GIL 1 1 LOC 1 3 CT 2 PT 1 CPT 6 2FU 3 FU Dw..S mbol 52 2 FU -CL 2 3FU 6 HTR Function Main breaker Metering 27, 47, 59, A, V Ammeter, Voltmeter •Breaker control 2438D Breaker lockout 7803D ,Kirk Key ;Kirk Key Breaker closed Breaker open Local Position House Power Manuf. Part No. MA3Q1100000001 P P7330AOB0B0A0AOA KDL000010SC KFL00001OS Circuit protection USCC2 116B6708G43 -R4 1835L3 -R -CR 116B6708G43 -G4 1835L3 -G -CG 116B6708G43 -W4 1835L3-W-CW 923A332G19 -M 677C452G05 CS00979A01E11 ATQR6 Circuit protection ATDR15 CPT protection 9F6ODMJ003 279010H00 Manufacturer ABB PML ABB Electroswitch Electroswitch Kirk Key Interlock Co. Kirk Key Interlock Co. General Electric DDP General Electric DDP General Electric DDP ABB Cuttler Hammer AFP Transformers Ferraz Shawmut Ferraz Shawmut Ferraz Shawmut General Electric Omega CLLR Stock # REVIEWED FOR CO DE - COMPLIANCE NFPA 70 - NEC A11i; 2 7 2007 City Of Tukwila B ILDING b I ! ION RECEIVED Cl ': <\,V! JUN 2 8 ?O 7 l L .67ivI l I 'GeL Eii Item Descri ption 1 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -sole, C characteristics, 10A Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts 3 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics 4 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -•ole, C characteristics DC to DC Converter Input voltage: 90 -350 VAC or DC Outpu 24 VDC @ 5 AMPS 6 DC to DC Converter Input voltage: 90 -350 VAC or DC Output: 24 VDC @ 5 AMPS 7 Space heater150W, 120VAC 8 Lamp Module, 22mm, Green Complete with lampholder and 24 VDC LED 9 Lamp Module, 22mm, Red 1 H2 Complete with lampholder and 24 VDC LED 10 Interphase Transformer,12- pulse, RI -9 rated, 5% DC Unbalance 1 IT Routine Tested, Open Core and Coil Copper VPI, 1500VDC, 2000ADC Max Dims: 36.37" H x 24" W x 20.5" D, Wt. 950 lbs. 11 Negative Drainage Circuit, consisting of: 1 ND a) 1 -DC Contactor, 24VDC coil, 1N0 +1NC 100ADC contacts b) 1 -Knife Switch, 1 pole,300A, 600VDC 12 Miniature Circuit Breaker, N -Type, DC 440V, 3 SON, SOR, SOF 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts 13 MicroSwitch, 1 NO + 1 NC Contact 1 S11 Rev # 00 01 Date 3/17/05 12/7/05 Apv'd LB LB Description Preliminary Release Revised for ckt changes Q 1 1 1 1 G02 1 HTR 1 Dwg• Symbol F11 F12 F20 F21 G01 H1 14 Thermostat, single pole, snap action 1 TSTAT contacts: 22amps @ 120 /240VAC. Wall mount. 15 Track Resistance Test Station Reference, consisting of: 1 TSR a) 4- Silicon Power Rectifier Diodes, If(av) = 300A, Vrrm = 1.6 kV b) 4 -Knife Switches, 1 pole, 60A, 600VDC 16 Structure Grounding Relay 1 64G & 64L High Resistance 17 DC DISCONNECT SWITCH — 89N, 6000A, 1500 VDC DPST 1 89N non - fusible, manually operated, bolted pressure silver contacts 4 form "C" contacts, 2activated when switch open & 2 when switch closed. 18 Kirk key interlock, Type 'BL ". 1 K key interchange with main DC breaker. Base mounted, 3/8" bolt projection when withdrawn, 1 cylinder key removable in extended position. 19 Cubicle enclosure, complete with: busing, 1 N device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray Function Control Voltage heater • rotection Sound Transit Central Light Rail Link Control Voltage 5SX5206 -7 24VDC pwr supply 5SX9102 Control Voltage 5SX5206 -7 24VDC pwr supply ; Control Voltage 24VDC •wr su Control voltage QUINT -PS -100 240AC/24DC/5 !Switch Open Switch Closed Interphase Transformer Neg. Dm. Circuit Frame fault isolation Cubicle Door Open Frame Fault Negative Disconnect Switch Kirk Key Negative Cubicle 8MF94 Control voltage Test Sta. Ref. 5SX5210 -7 5SX5206 -7 QUINT -PS -100 240AC /24DC /5 2E919 Heater Control 2E815 Manuf. Part No. 3SB3244 -6BA40 3SB3244 -6BA20 14- 193 - 791 -52 -6 Type A 5SX5206 -7 5SX9102 3SE30201A NTE6364 A 7713 C4280 -600 MP- 6011 - 1.5KVDC- NF -SH -K1 K2 Dw. B88785 K -BL -0 -037 -1 E -S SIEMENS Transportation Systems, Inc. Manufacturer Siemens Siemens Siemens Siemens Phoenix Phoenix Grainger (Vulcan) Siemens Siemens MTC P /N. 120270L02BC01 Magnetic Technologies Siemens Filnor Siemens Siemens Grainger (Dayton) NTE Electronics Filnor Swartz Pringle Kirk Key Interlock Co. Siemens CLLR Stock # MAINLINE TPSS NEGATIVE DISCONNECT SWITCH BILL OF MATERIAL Dwg. TPS- L050 Pg. 1 of 1 CODE COMPLIANCE Ep FOR — —NFpq 7 NEC AUG 2 7 2007 .`� �t� ' Of Tukwila YNG W SION RECEIVED CIT`!` - - TIJKWILA JUN 2 11'FMMif-CENT Item Description 1 Capacitor .47uf, 2100V 2 Capacitor 16uf, 3200V MP (metalized- dielectric capacitor) 3 THERMOSTAT Opens @120C, Closes @105C 4 THERMOSTAT Opens @135C, Closes @120C 5 NOT USED 6 Semiconductor fuse,1400V,1000A. With support for microswitch 170H0067 7 Resistor, vitreous enamel, wirewound 200W, 6 ohm, + -10% tolerance 8 Resistor, vitreous enamel, wirewound 200W, 6 ohm, + -10% tolerance 9 Resistor, vitreous enamel, wirewound 500W p 40 C, 3.9 kohm, + -10% tolerance 10 Mounting bracket for Draloric resistors 11 Micro - switch for Bussmann fuses, 250V/2A. 2 N/O contacts. C/w Micro - switch bracket. 12 MicroSwitch, 1 NO + 1 NC Contact 13 Rectifier diode 4000V, 3600A 14 Diode clamp black coated 15 Heat sink, mounting rail, SITRAS REC -D black coated 16 Heat sink, SITRAS REC -D black coated 17 Cubicle enclosure, complete with: busing, device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray Qty Dwg. Symbol 3 C111...C113 18 F111...F163 Diode Protection 170M6753 6 R111.1...113.2 Suppression GWK150100R10 %.M4 Draloric 2 R130.1...130.2 Suppression 4 R170.1....171.2 Discharge 4 18 S111...S163 Blown Fuse 170H0099 Indicator 170H0067 1 S08 Door Interlock 3SE30200A 18 V111...V163 Rectification SW4OCXC1170 -P 18 6 18 1 C130 1 F191 1 F192 1 R Function Suppression Manuf. Part No. KA2100- 0,47SAY Suppression GMKP3200 -161B Temperature 2670143 Monitor Temperature 2670144 Monitor Rectifier Cubicle 8MF94 Manufacturer ROE ROE Bussmann GBS30 /133- 6R0 -10% Draloric GWS500SB- 3K9 -10% Draloric 424339 U1192/137 J K2186- 890 -AL -807 J K2186- 200 -AL -803 Elmwood Sensors Elmwood Sensors Draloric Bussmann Siemens WCS WCS JKK JKK Siemens CLLR Stock # CODE COMPLIANCE 70 -NECCE AUG 2 7 2001 City Of Tukwila BUILDING DIVISIO Rev # 00 Date 6 -3 -05 Apv'd LB Description Preliminary Release Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc MAINLINE TPSS RECTIFIER BILL OF MATERIAL Dwg. TPS- L060 Pg. 1 of 1 RECEIVED CIT" TUKWILA JUN 2 8 2007 »EI MJItT CENTER Rev # Date Apv'd Description Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. P y MAINLINE TPSS DC MAIN BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release Revised for ckt changes 01 12/7/05 LB Dwg. TPS -L100 Pg. 1 of 3 Item Descri • tion 1 SIMATIC S7 CPU 314C -2 DP Control System; with PROFIBUS -DP master /slave interface 64 KB RAM, integrated 24 VDC power supply, clw 4 Analog Inputs, 2 Analog Outputs, 16 Digital Inputs & 16 Digital Outputs Standard temperature range W/2 Mbyte FEPROM memory card 2 SIMATIC S7 -300 Digital Input module 16 inputs, 24 VDC with labeling strip and bus connector 3 PROFIBUS bus connector, 12 Mbit/s data XSFR 90 degree outgoing cable, terminating resistor, with isolation function, without PG socket 4 530mm S7 DIN Rail 5 PROFIBUS bus cable, 2 wire, shielded for interconnecting PROFIBUS terminals. 6 PROFIBUS bus cable, plastic fiber optic for interconnecting PROFIBUS terminals. 7 NOT USED 8 OLM /G12 -1300 Optical Link Module for distances up to 15kM 9 OBT Optical Bus Terminal 10 SIMATIC OP -270 HMI 5.7" color STN display, incl. mounting accessories. 11 NOT USED 12 PROFIBUS bus connector, 12 Mbit/s data XSFR 90 degree outgoing cable, terminating resistor, with isolation function, with PG socket 13 PROFIBUS bus connector, 12 Mbit/s data XSFR 35 degree outgoing cable, terminating resistor, with isolation function, without PG socket 14 SITRAS BUFFER AMPLIFIER DIN RAIL MOUNTING 15 SITRAS VOLTAGE DIVIDER DIN. RAIL MOUNTING 16 NOT USED 17 NOT USED 18 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 16A 19 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts 20 NOT USED 21 Space heater, 150W, 120VAC 1 2 A100 -D11 1 A101 1 A102 40 A103 meters 50 A104 meters 1 A105 1 A106 1 A107 1 A108 1 A109 1 A110 A111 1 F11 1 F12 1 HTR Dw'.S mbol A100 -D10 Function Master PLC 6ES7 314- 6CF02 -0ABO and SCADA Interface Extends I/O of S7 PLC Accessory PLC Accessory PLC Accessory PLC Accessory PLC Accessory PLC Accessory Operator Interface Panel OP Accessory OP Accessory Bus Voltage & Rectifier Current Bus Voltage & Rectifier Current Control Voltage for FO Control Voltage for PLC Manuf. Part No. 6ES7 953- 38LL11 -0AA0 6ES7 321- 1BH02 -0AA0 6ES7 972- 0BAl2 -OXAO 6ES7 390- 1AF30 -0AA0 6XV1 830 -0EH10 6XV1 821 -0AN50 6GK1- 502 -3CC10 6GK1- 500 -3AA00 6AV6 542- 0CA10 -0AX0 6ES7 972- OBB12 -OXAO 6ES7 972- 0BA41 -OXAO E10433- E9509 -H100 E10433- E9511 -H100 5SX5216 -7 5SX5206 -7 5SX9102 2E919 Made B Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Grainger (Vulcan) B CLLR Stock # CO D N P ED FOR C OMPLIANC E AUG 2 7 200? LDIN IN ila ISIOt j RECEIVED Cf!V ` U K1/II I LA JUN 8/0 r EhMi I CEItl I n..., f Rev # Date Apv'd LB LB Description Preliminary Release Revised for ckt changes Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. p y MAINLINE TPSS DC MAIN BREAKER BILL OF MATERIAL 00 6 -3 -05 01 12/7/05 Dwg. TPS -L100 Pg. 2 of 3 Item Descri tion 22 Electromechanical Counter, 6 Digit Operation Voltage 24V DC, Mounting: Snap -in. 23 Lamp Module, 22mm, Green Complete with lampholder and 24 VDC LED 24 Lamp Module, 22mm, Red Complete with lampholder and 24 VDC LED 25 Lamp Module, 22mm, White Complete with lampholder and 24 VDC LED 26 Lamp Module, 22mm, Blue Complete with lampholder and 24 VDC LED 27 Relay, Heavy Duty w /Magnetic Blowout DPDT 10A contacts © 110VDC DC Operation @ 24V DC. 28 Plystyrene enclosure for K02 & K11 w /translucent cover 28 Relay, Heavy Duty w /Magnetic Blowout DPDT contacts @ 110VDC DC Operation @ 24V DC. 29 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 30 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 31 Analog Voltmeter 4.25 "X4.25 ", Black Input: 0 to 20 mADC. Scale: 0.. +2kV. 32 Analog Ammeter 4.25 "X4.25 ", Black Input: 0 to 20 mADC. Scale: +6kA..0.. +6kA. 33 Shunt, Silver Plated. 6000A/50mV with 3/8" fins. 34 Resistor, 250 OHMS, 175 WATTS Variable with screwdriver ad'ustable lu • s 35 Resistor Mounting Kit for R10 Centerin Washers & Bolt 36 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO + 1 NC contacts. 37 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO + 1 NC contacts. 38 Local Remote Switch, Pistol Grip Handle, 1 deck w /engraved escutcheon LOCAL left 45deg., REMOTE vert 39 Breaker Control Switch, Open - Close, Pistol Grip Handle spring return to center, 1 deck, no target w /engraved escutcheon 1 H1 1 H2 1 H3 1 HSO 1 K02 1 K02, K11 1 K11 1 K15 1 K50 1 P1 1 R1 1 R10 SO1 SO2 1 S1 Dw • . S mbol H01 R10 Auxiliary Function Breaker Operation Counter Breaker Open Breaker Closed Local/Remote Substation Trouble Trip Breaker Aux. Relay Relay enclosure Close Breaker Aux. Relay Ok to Close Circuit Breaker Ok to Close Circuit Breaker Main DC Bus Voltage Measuring 1 P2 Rectifier DC Output Current Measuring Reverse Current Measuring Breaker Holding Coil Current Path Truck In Test Position Truck In Connect Position Local /Remote Switch 1 S3 Breaker On /Off Switch Manuf. Part No. SR8 -4016 3SB3244 -6BA20 3SB3244 -6BA60 3SB3244 -6BA50 3TX7130 -ORCO3 TK -2518 116 -508 3TX7130 -ORCO3 3TX7114 -5LCO3 3TX7144 -1 E6 3TX7114 -5LCO3 3TX7144 -1 E6 103 11 1 xxxx 103 11 2 xxxx D225K250 7PA200 3SX3102 3SE3020 -1 A 3SX3102 3SE3020 -1 A 24201D 2438D Mado B Redington Siemens Siemens Siemens Siemens Siemens Altech Siemens Siemens Siemens Yokogawa Yokogawa Ohmite Oh mite Siemens Siemens Electroswitch Electroswitch CLLR Stock # R C CE RECEIVED Tv - JK.wiLA JUN 2 8 ?fl07 L'E AIT cai\ ER Item Description 40 Pushbutton, Flat, 22mm Black Knob, Plastic Front Ring and 1 N0 +1 NC Contact Block 41 Thermostat, single pole, snap action contacts: 22amps @ 120/240VAC. Wall mount. 42 Auxiliary Plug -in Relay, 3 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket Paint finish: ANSI 61 Gray Qty 1 1 TSTAT 1 186 1 1 72 -0 43 DC High Speed Circuit Breaker with: HSCB HPB60 82S 6000A, 2000VDC Five auxiliary switches with connector pin Tripping range: 9 -15 kA With Magnetic Overcurrent device defeated Draw -Out Circuit Breaker w/o Carriage Solenoid Operated, Electrically Held Arc Chute Type 82S Aux Operating Voltage 125V DC 44 DC High Speed Circuit Breaker accessories: 1 ea HSHR430547R0001 Position Indicator 1 ea VEAM connector (Aux) CIRO8F- 32- 8S- F80 -T12- 696 -MOD 2 ea HAK4300 -G50 Ferraz Contact Plates 1 set HAK3200 -F180 Ferraz Finger Clusters - X1 1 set HAK3200 -F110 Ferraz Finger Clusters - X2 45 Kirk key interlock, Type 'FL ". key interchange with negative disconnect switch. Flat mounted, no bolt projection, 1 cylinder key removable in extended position. 46 Cubicle enclosure, complete with: busing, 1 FO device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back 1 K Dwg. Symbol S50 1 72 -0 Aux Function PLC Reset Heater Control Mass Trip Aux. Relay DC Breaker DC Breaker Kirk Key Manuf. Part No. 3SB1201 -0A820 2E815 3TX7115 -5NCO3 3TX7144 -1E4 Main DC Breaker 8MF94 and Master PLC ,Cubicle AUR448211A800212 UR 26.81S -50 -5S K -FL -0 -000 -1 E -S Made 13 Siemens Grainger (Dayton) Siemens Secheron Ferraz Kirk Key Interlock Co. Siemens CLLR Stock # COD � FOR NF�. CO MPLIANCE NEC AUG 2 7 2001 B it Of Tukwila rNG DIV SION RECE!'✓ED Cry T TWA/ILA JUN 2 8 2007 GEN TER Rev # Date Apv'd Description Sound Transit Central Light Rail Link S IEMENS T ransportation Systems, Inc. MAINLINE TPSS DC MAIN BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L100 Pg. 3 of 3 Item Description 40 Pushbutton, Flat, 22mm Black Knob, Plastic Front Ring and 1 N0 +1 NC Contact Block 41 Thermostat, single pole, snap action contacts: 22amps @ 120/240VAC. Wall mount. 42 Auxiliary Plug -in Relay, 3 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket Paint finish: ANSI 61 Gray Qty 1 1 TSTAT 1 186 1 1 72 -0 43 DC High Speed Circuit Breaker with: HSCB HPB60 82S 6000A, 2000VDC Five auxiliary switches with connector pin Tripping range: 9 -15 kA With Magnetic Overcurrent device defeated Draw -Out Circuit Breaker w/o Carriage Solenoid Operated, Electrically Held Arc Chute Type 82S Aux Operating Voltage 125V DC 44 DC High Speed Circuit Breaker accessories: 1 ea HSHR430547R0001 Position Indicator 1 ea VEAM connector (Aux) CIRO8F- 32- 8S- F80 -T12- 696 -MOD 2 ea HAK4300 -G50 Ferraz Contact Plates 1 set HAK3200 -F180 Ferraz Finger Clusters - X1 1 set HAK3200 -F110 Ferraz Finger Clusters - X2 45 Kirk key interlock, Type 'FL ". key interchange with negative disconnect switch. Flat mounted, no bolt projection, 1 cylinder key removable in extended position. 46 Cubicle enclosure, complete with: busing, 1 FO device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back 1 K Dwg. Symbol S50 1 72 -0 Aux Function PLC Reset Heater Control Mass Trip Aux. Relay DC Breaker DC Breaker Kirk Key Manuf. Part No. 3SB1201 -0A820 2E815 3TX7115 -5NCO3 3TX7144 -1E4 Main DC Breaker 8MF94 and Master PLC ,Cubicle AUR448211A800212 UR 26.81S -50 -5S K -FL -0 -000 -1 E -S Made 13 Siemens Grainger (Dayton) Siemens Secheron Ferraz Kirk Key Interlock Co. Siemens CLLR Stock # COD � FOR NF�. CO MPLIANCE NEC AUG 2 7 2001 B it Of Tukwila rNG DIV SION RECE!'✓ED Cry T TWA/ILA JUN 2 8 2007 GEN TER Apv'd Description MAINLINE TPSS LB Preliminary Release Revised for ckt changes 9 Sound Transit i Central Light Rail Link SIEMENS Transportation Systems, Inc. DC FEEDER BREAKER BILL OF MATERIAL LB Dwg. TPS -L101 Pg. 1 of 3 Item 1 Descri • tion SITRAS DPU96 PU CENTRAL UNIT, V3 (V3.11) 24 DIGITAL INPUTS, 16 DIGITAL OUTPUTS INPUT 125 VDC, OUTPUT 24 - 90VDC, 5A, MAX. INST. 7.5A OPERATING TEMP. RANGE 0... +50 DEGC DIN RAIL MOUNTING 2 SITRAS DPU96 X2 Connector Set Rev # 00 01 3 SITRAS DPU96 X1 Connector 4 PROFIBUS bus cable, 2 wire, shielded for interconnecting PROFIBUS terminals. 2 meters 5 DPU96 bus connector for PROFIBUS, 90, w/o PG 6 SITRAS DPU96 Control Function w /Intertripping Function 7 SITRAS DPU96 BA BUFFER AMPLIFIER DIN RAIL MOUNTING 8 Fiber- Optic Cable With Plug, Length 3meters For connecting BA to SITRAS DPU96 PU 9 SITRAS DPU96 VD VOLTAGE DIVIDER MODULE DIN RAIL MOUNTING UNIT 10cmX7cmX12cm 10 Top Hat DIN rail forSITRUS DPU mounting. 11 DC Fuse with trip indicator, 10 A, 1500 VDC, 30kA CC 1591 CPgRD 20X127/10 12 Fuse Holder, 1 pole, 1500 VDC, 63 A PSI 20X127 PRE 13 Miniature Circuit Breaker, N -Type, AC /DC, AC 400V, DC 440V, 4.5 kA, 2 -pole, C characteristics, 10A w /Aux. Contacts 14 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -•ole, C characteristics, 10A 15 Space heater, 150W, 120VAC 16 Electromechanical Counter, 6 Digit Operation Voltage 24V DC, Mounting: Snap -in Panel Mount. 17 Lamp Module, 22mm, Green Complete with lampholder and 24 VDC LED 18 Lamp Module, 22mm, Red Complete with lampholder and 24 VDC LED 19 Lamp Module, 22mm, White Complete with lampholder and 24 VDC LED 20 Lamp Module, 22mm, Yellow Complete with lampholder and 24 VDC LED 21 Contactor, Size 1, 2 Pole, DC-4 Rated Operating Current 32A. 2NO +2NC Contacts w /Screw Terminals. DC Operation 24V DC, 3W. 22 Relay, Heavy Duty w /Magnetic Blowout DPDT 10A contacts @ 11(' DC Operation @ 24V DC. Date 6 -3 -05 12/7/05 1 150 -A2 1 150 -A3 1 FO FO Auxiliary 1 F11 1 1 1 150-Al 1 150-Al 1 150-Al 1 150-Al 1 150-Al 1 1 150 -A2 Dw..S mbol 150 -AO F12 HTR H01 1 H1 1 H3 1 H10 1 KO 1 K02 Function Feeder Control E10433- E9702 -H311 and Protection Unit (dldt, Line Test, Bus Voltage Measuring, & Monitoring) 1 H2 Breaker Closed Manuf. Part No. Process Interface E10433- E9502 -H510 Supply Interface E10433- E9502 -H520 PLC Interface 6XV1 830 OAH10 PLC Interface 6ES7972- 0BA11 -OXAO Breaker Control XTRIP Feeder Volt Amp & Line Test F/O Cable Feeder Volt Amp & Line Test Measuring Line Test Line Test Control Voltage for F(x) DPU -96 Control Power Breaker Operation Counter Breaker Open Local /Remote Group Alarm Line Test Contactor Trip Breaker [Aux. Relay E10433- E9705 -F001 E10433- E9705 -F002 E10433- E9509 -H100 E10433- E9502 -HSO6 E10433- E9511 -H100 6ES7390- 1AF30 -0AA0 F081655 F097203 5SX5210 -7 5SX9102 5SX5205 -7 2E919 SR8 -4016 3SB3244 -6BA40 3SB3244 -6BA20 3SB3244 -6BA60 3SB3244 -6BA30 3TC4417 -0AB4 3TX7130 -ORCO3 Manufacturer Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Ferraz Ferraz Siemens Siemens Grainger (Vulcan) Redington Siemens Siemens Siemens Siemens SIEMENS Siemens CLLR Stock # REVIEWED FOR r DE - COMP CE NFPA 70 - NEC_ AUG 2 7 2007 City Of Tukwila f _ RECEIVED cry ! iI <'.AIILA JUN 28 2007 11- thivi if his N I Eat Rev # Date Apv'd Description Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. p MAINLINE TPSS DC FEEDER BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L101 Pg. 2 of 3 Item Descri • tion 23 Polystyrene enclosure for K02 & K11 w /translucent cover 23 Relay, Heavy Duty w /Magnetic Blowout DPDT contacts @ 110VDC DC Operation @ 24V DC. 24 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 25 Auxiliary Plug -in Relay, 4 Form C Contacts DC Operation © 24V DC, 1.2W. w/ socket 26 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 27 DC High Speed Circuit Breaker with: HPB45 82S Manual Tripping Device M3 4500A, 2000VDC Five auxiliary switches with connector pin Tripping range: 3 -7 kA With Magnetic Overcurrent device set to a value of 5kA Draw -Out Circuit Breaker w/o Carriage Solenoid Operated, Electrically Held Arc Chute Type 82S Aux Operating Voltage 125V DC 28 DC High Speed Circuit Breaker accessories: 1 ea HSHR430547R0001 Position Indicator 1 ea VEAM connector (Aux) CIRO8F- 32- 8S- F80 -T12 -696 -MOD 2 ea HAK4300 -G50 Ferraz Contact Plates 1 set HAK4300 -F180 Ferraz Finger Clusters - X1 1 set HAK4300 -F110 Ferraz Finger Clusters - X2 Without trip counter switch 29 POWER RESISTOR, 100 ohm, 300 watt withstand rated wattage for 5 seconds 30 Shunt, Silver Plated. 4000A/60mV 31 Resistor, Variable, 250 OHMS, 225 WATTS 32 Resistor Mounting Kit for R10 33 Resistor, Wrewound, Variable, 5 %, 50 watt, 500 ohm 34 NOT USED 35 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO & 1 NC Contacts 36 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO & 1 NC Contacts 1 K11 1 K15 1 1 K20 1 1 K24 Dw . S mbol Function K02, K11 Relay enclosure 1 1 172 -x (x =1,2,3 &4) 3 RO 172 -x Aux R1 R10 1 R85P 1 SO1 R10 Auxiliary SO2 Close Breaker Aux. Relay Ok to Close Circuit Breaker Lockout DC Feeder Group Alarm DC Breaker DC Breaker Line Test Measurin di /dt Current Measurin Breaker Holding Coil Current Path Transfer Trip Circuit Truck In Test Position Manuf. Part No. TK -2518 116 -508 3TX7130 -ORCO3 3TX7114 -5LCO3 3TX7144 -1 E6 3TX7111 -3PCO3 3TX7144 -1 E5 3TX7114 -5LCO3 3TX7144 -1 E6 UR26 E125D1xxxE81 E300K16R Dwg. 90000 -972 D225K250 7PA200 D50K500 3SX3102 3SE3020 -1A Truck In Connect 3SX3102 Position 3SE3020 -1A Manufacturer Altech Siemens Siemens Siemens Siemens Secheron Ferraz RARA Canadian Shunt Ohmite Ohmite Ohmite Siemens Siemens CLLR Stock # ity OF RECEIVED JUN 2 8 21107 Rev # Date Apv'd Description Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS DC FEEDER BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L101 Pg. 3 of 3 Item Descri • tion 37 Local Remote Switch, Pistol Grip Handle, 1 deck w /engraved escutcheon LOCAL left 45deg., REMOTE vert 37 Actuator, 22mm, Bks Safety LockSeq. 0 -I Momentary Contact. Key Withdraw at Position O. Closure No. S1, w/ Metal Front Ring Gw22mm,1NO +1NC Contact Block 38 Breaker Control Switch, Open - Close, Pistol Grip Handle 1 S3 spring return to center, 1 deck, no target w /engraved escutcheon 39 Actuator, 22mm, O. M. R. Safety Lock Seq. 1 S4 Line Test 0-I Maintained Contact. Key Withdraw in Left Position. Disable w/ Metal Front Ring c/w 22mm,1 NO +1 NC Contact Block 1 40 Thermostat, single pole, snap action 1 TSTAT ; Heater Control 2E815 contacts: 22amps @ 120/240VAC. Wall mount. 41 Cubicle enclosure, complete with: busing, 1 Fx Feeder Cubicle SEA -FCUB Siemens device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray 1 S2 1 Dw; . S mbol Function Manuf. Part No. S1 Local/Remote 242010 Switch Breaker Direct On 3SB1000.5BA01 3SB1320 -0A Breaker On/Off 2438D Switch 3SB3500 -3AJ01 Siemens 3SB3400 -0A Manufacturer Electroswitch Siemens Electroswitch Grainger (Dayton) CLLR Stock # REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDIN D ION RECEIVED Cm' : -,i wvvILA JUN 2 8 ?n07 ir aill - Cd:.i■ I ER REV DATE SCL METER "DET. A" FIRE & INTRUSION UTILITY METERING APT & FUSE REMOTE CPT & FUSE XFMR AC BREAKER RECTIFIER TRANSFORMER BAT CHGR BATTERY RACK N CUBICLE RECTIFIER. #1 • • RECTIFIER • #2 CCIC AC PANEL BKR TEST STATION DC PANEL 5300CFE ROOF MTD. VENTILATOR • WALL MTG. • • FILTRATION SYSTEM • AUG 2 '7.2007 R City Of Tukwila B ILDING FLOOR)• LATCH (INOLA ED) PANEL 20 BLUE LIGHT ETS IN LOCKED BOX FOR FIRE DEPT CARD ACCESS KNOX BOX DESCRIPTION 3 1 "DET A" NOTE: REMOVABLE PANELS BEHIND TRANSFORMER ONLY 43 6 BY ENG CHK APP 20 192 136 37 28 19 16 —31 594 "•GLASTIC (NOTE 3) • 48 3 18 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE SUITE 106 LAKE OSWEGO, OREGON 97034 3 EPDXY INSULATED FLOOR COVERING • •TELEPHONE PROVIDED BY . SOUND TRANSIT. • •CONTROL CENTER INTERFACE CABINET • 36 12 SOUNDTRANSIT 238 5300CFER0• • MTD. VENTILAT 209 PAT O'HOGAN 9/29/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 9/29/05 DATE DES CKD BY DATE LANCE BANASZEK 9/29/05 APPROVED BY DATE SCALE: 858 118" INSULATED WALLS SSS • 6080 DOOR CARD ACCESS 174 NOTES: 1. ALL DIMENSIONS IN INCHES. 2. LIGHTING RECEPTACLES AND SWITCHES WILL BE PROVIDED ON CONDUIT PLAN. 3. INSTALLER TO SUPPLY, SUPPORT AND PROTECT GLASTIC EXTENSIONS BETWEEN prz RECTIFIER AND RECTIFIER TRANSFOR ER. C I I Ti IIM/ILA LINK LIGHT RAIL PROJECT JUN 2 8 7n97 PL.hMIT GE N 1-ER TRACTION ELECTRIFICATION SYSTEM BOEING ACCESS ROAD TPSS C32 SUBSTATION BUILDING EQUIPMENT ARRANGEMENT PLAN CONTRACT !LR 82-03 / C807 DRAWING NO. C3243001 - 01 REV. 00 CEILING EMI NUTT PT DISCONNECT & METERING COMPARTMENT IO FUSE VEVANG WINDOW LITIUTY I�Nr 132 APT FUSES s VV REMOTE CPT FUSES [' POTENTIAL TRANSFORMERS BUS DUCT WITH PROTECTIVE DIELECTRIC SCREENING NOUN BREAKER FEEDER 12.1 11111111111110 ) TAP ACCESS I A 1 NNOED ACCESS DOOR Mill 136 RECTIFIER TRANSFORMER NEICED ACCESS DOOR T TAP *GCE]] Ell FIXED PANEL WTI rte •^ --. °1Ci F 594 1/4" GLASTIC --31 .••••117.1.••••••••• I.111.. -- .wI. W... --- MN. WINIMMI .... .nI.I -- MIN 11.a. OE/ NOM tEM VIII.. MOM -- M �. -- .EM IINIEM 1/4" GLASTIC 35 1 6 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE SUITE 106 LAKE OSWEGO, OREGON 97034 12-0 1/4' GLASTIC 35 I 31 2 SounmikAwsrr 23 8 FEEDER 72.2 - 238 DRN CKD BY PAT O'HOGAN DES BY FEEDER 72 - 3 Y im fist 23 8 NOTES: 1. ALL DIMENSIONS IN INCHES. PAT O'HOGAN 12/07/2005 DRN BY DATE DATE 12/07/2005 DATE DES CKD BY DATE LANCE 8ANASZEK 12/07/2005 APPROVED BY DATE SCALE: FEEDER 724 23 8 REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDIN D SION - EPDXY INSULATED FLOOR COVERING 858 i RECEIVED cr y i it<ANILA JUN 2:8 2 nn7 6' oi1r16 GL Nlto LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM AC & DC SWITCHGEAR EQUIPMENT ELEVATION FOR SUBSTATION BUILDINGS TPSS C32 & C33 CONTRACT DRAWING REV. Nn RTA /LR 82 - / C807 I NO. TPS- 8001 -05 00 TPSS MODs DISPATCHER NUMBER C32 NONE C33 TWO C33 -H -613 & C33 -H -624 SIEMENS m m TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINT EDRIVE, SUITE 106 LAKE OSWEGa OREGON 97034 Souim'IkANsrr PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY Orel C. • ••_•, 12/07/2005 DATE DATE 12/07/2005 DATE DES CKD BY DATE LANCE BANASZEK 12/07/2005 APPROVED BY DATE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM AUXILIARY EQUIPMENT ELEVATIONS FOR SUBSTATION BUILDINGS TPSS C32 & C33 I REV. 115 CEILING 84 w P1 k' I Cxx -H -624 W 81 W m Cxx -H -613 44 CCIC 36 18 594 FILTRATION SYSTEM HTR EYE WASH FOLD UP WORK BENCH ABOVE \ BATTERY \ 48 -1 16 F--19I --282 588 ❑LIDO❑ BATTERY MOOD 37 BATT. CHGR DC PNL 192 20 43 16 ISOLATION J BOX FIRE & INTRUSION TRANSFORMER PANEL (NIC) AC & DC BRK TEST PNL 20 AC PNL 20 4 NOTES: 1. ALL DIMENSIONS IN INCHES9E 2. AUXIARY EQUIPMENT /CR1�ANGEM EAVAIILA IS TYPICAL FOR ALL MAIN 2Y n7 16 20 I �.olM I GEN 1 ER .52 O� P vs= i? t {�. v C e E 5 Di 0® E ° Aog 01 REV 9/2/05 DATE ANCHOR POINT (12 PLACES) (NOTE 2) DESCRIPTION 127.00 [5.001` 25.40 [1.00] 114.20 [4.50] Revised Per Customer Comments • STME00203 1 63.50 [2.50] 1524.00 [60.00] 1270.00 [50.00] 1295.40 [51.00] 254.00 [ 635.00 [2500] BOTTOM ENTRY TO UTIUTY METERING FRAME 114.20 [4.50) UTILITY METERING CONTROL CABLE ENTRY AREAS TOP OR BOTTOM FRAME 1 FRAME 914.40 [36.00] 660.40 [26.00] 254.00 [10.00) APT FRAME 2 STITCH WELD FLOG LINE PO BY ENG DS CHK LB APP ANCHOR POINT 914.40 (36.00) AC BREAKER FRAME 3 SWITCHGEAR & TRANSFORMER ANCHORING TO METAL FLOOR DETAIL 6807.26 (268.001 0 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINT EDRIVE SURE 106 Me OSWEGO, OREGON 97934 1587.50 [62.50) 3454.40 (138.001 L� Soun,lkaNsir 1587.50 [62.50] ANCHOR POINT (6 PLACES) 139.70 15.50] (NOTE 2) RECTIFIER TRANSFORMER PAT O'HOGAN 6/17/05 DRN BY DAZE DRN CKD BY DATE PAT 011OGAN 6/17/05 DES BY DATE 1828.80 [72.00] 762 [30] DES CKD BY DATE LANCE Ar15116 D BY K 6 ATE SCALE 1:16 139.7 0 ( N CUBICLE NO r RTA /LR 82 -03 / C807 NO R EVIEWED FOR CO DE COMPLI,AN NFPA70_ AUG 2 7 2007 City Of Tukwila ILDIN D 1/4" GLASTIC (NOTE 4) LINK LIGHT RAIL PROJECT ION RECEIVED JUN 2 8 ?007 NOTES: 1. ALL DIMENSIONS IN MILLIMETERS [INCHES]_, _ .._ y 2. 2" STITCH WELD AT ALL ANCHOR POINTS. U. .Er f + /II Utz IN I 3. WIRE BRUSH, COLD GALVANIZE AND PAINT ALL WELDS. TOUCH UP PAINT TO MATCH EQUIPMENT. 4. INSTALLER TO SUPPORT AND PROTECT GLAS11C EXTENSION BETWEEN RECTIFIER TRANSFORMER AND N CUBICLE TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR ANCHORING PLAN PRD.B001 -01 1 01 RECTIFIER #1 T -UP DETAIL- B MECHANICAL CONNE SHT4 LECTRICALLY INSULATED MOUNTINGS TO FLOOR (TYP) RECTIFIER #2 BOLT -UP DETAIL - A R INSULATED CONNE SHT4 114' GLASTIC 110.00 580.00 [4.33] [22.83] BOLT -UP DETAIL -A FOR INSULATED CONNECTION SHT4 N CUBICLE CABLE ENTRANCE (NEGATIVE RETURN CABLES) 328.60 328.60 12.94] [12.94 580.00 [22.83] 225.94 225.94 [8.90] • [26.77] 220.00 220.00 [8.66] 114' GLASTIC 680.00 [26.77] 225.94 580.00 220.00 122.831 [ ' 110.00 [4 33] 15.94 [4.56] 1 518' UNISTRUTS (TYP) BOLT -UP DETAIL - B FOR MECHANICAL CONNECTION SHT4' FO (72 -11) 40.00 [1.57 X80.00 [22.83] CABLE ENTRANCE AREA (POSITIVCABLES TO OCW) 380.00 220.00 380.00 (14.96) (8.661 (14.96] F1 (72 -1) F2 (72 -2) 220.00 1 1 380.00 220.00 1 380.00 [8.66] [14.96] (8.66] [14.96] 220.00 220.00 [8.66] 380.00 (14.96) F3 (72 -3) 380.00 [14.98] 220.00 225.00 (8.86] (TYP) 225.00 [8. (TYP) F4 (72-4) 220.00 1 380.00 [8.66] [14.96) 304.44 [11.99] 186.31 [7.34] 110.00 [4.33] 9/2/05 DATE Revised Per Customer Comments - STME 00203 DESCRIPTION 680.00 [26.77] PO BY ENG DS CHK LB APP 5811.89 [228.81] PLAN VIEW SIEMENS TRANSPORTATION SYSTEMS, INC. 300OS{1EGO1q' 7EORIVE Su/7E (AKEOSWEGO, OREGON 97034 SoumilkaNsff PAT B T D E N CKD BY PAT 01iOGAN DES BY LANG E BANASZEK APPROVED BY SCALE 1 :16 �' 252.50 �` [9.94] NOTES: 1. ALL DIMENSIONS IN MILLIMETERS [INCHES] 2. ANCHORING DETAILS ON SHT. 3 3. BOLT -UP DETAILS ON SHT. 4 DATE 6/17/05 DATE 6/1705 DATE NO RTA /LR 82 -03 / C807 110.00 [4.33] LINK LIGHT RAIL PROJECT 56.14 [2.21] 40.00 [1.57] 74 .36 1400 [29 19] [55.12] 310.00 [12.20] RECEIVED CIS' = Ti Inv JUN 2 8 ?O97 li��:,tiiY[I I CLN I L TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR ANCHORING PLAN LA 01 REV 11/15/05 DATE UNISTRUT ANCHOR CUTOUT IN FLOOR DETAIL (NTS) ANCHORING CUTOUT IN FLOOR SEE DETAIL- A STITCH WELD BOTH SIDES TO FLOOR Revised Per Customer Comments Add Note 2 DESCRIPTION DC SWITCHGEAR ANCHORING DETAIL FOR METAL BUILDINGS ONLY RA DETAIL "A" 76.2 [31 PO LB BY ENG CHK APP 0.98 25mm ANCHOR OL IN EQUIPMENT DC SWITCHGEAR ANCHOR BOLT, HEX HEAD 3/8- 16X21 /4, SS INSULATING BUSHING (STS SUPPLIED) 50.8 [22] INSULATED FLOOR NYLON RETAINER CHANNEL NUT UNISTRUT SIEMENS TRANSPORTATION SYSTEMS, INC. 303 SUITE 106 LAI OSWEGO,, QWEGLW 97034 35.81 [1.411 1'71 34.92 [1.375] CHANNEL NUT WITHOUT SPRING (Side View) DC SWITCHGEAR Sourailiwigr CHANNEL NUT WITHOUT SPRING (Top View) ]j 9.525 [.375] 21.59 (.851 INSULATED FLOOR PAT 01-lOGAN DRN BY CHANNEL NUT WITHOUT SPRING (End View) 1 5/8" UNISTRUTS BETWEEN JOISTS CAP ENDS AND STITCH WELD TO UNDERSIDE OF FLOOR NOTES: 1. ALL DIMENSIONS IN MILLIMETERS [INCHES) 2. Mounting Details Shown on This Drwaing Is Typical For All DC Switchgear Mounted In Prefabricated Buildings Only. DRN CKD BY PAT O HOGAN DES BY LANC BY ASZEK APPROVED BY SCALE NONE 6/17/05 DATE 6/17/05 DATE 6/17/05 DATE L C oft CODE COMPLIANCE NFPA70_ E AUG 2 7 2007 B City ILDIN Of TuD il ION . RECEIVED CiTy , . V'/!IILA JUN 2 R 7n9 t.+ :I\ i Eri LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR ANCHORING DETAILS NO. fRA RTA /LR 82 -03 / C8071 N0 � -03 'REV. 01 01 REV 9/2/05 DATE 25.00 [0 98] 016.00 [00.63] BOLT UP POINT (10 PLACES) Reviesed Per Customer Comments - STME 00203 DESCRIPTION 700.00 [27.56] I1 1400.00 [55.12] I 700.00 [27.56] SIDE VIEW OF DC SWITCHGEAR PO BY ENG DS CHK LB APP 9.52 200.00 [7.87] 680.00 [26.77] 520.00 [86.61] [20.47] 600.00 [23.62] 200.00 [7.87] 2200.00 SIEMENS TRANSPORTATION SYSTEMS, INC. 3XOSWEGOPOIN7EDRIVE SU17E 106 INTOSWEGO, OREGON 97034 DETAIL A (NTS) DETAIL B (NTS) PAT 01-lOGAN DRN BY PAT DES BY LANCE APPROVED BY SCALE: 1:16 114` GLASTIC M8X35 NYLON FASTENER 23.00 PARTITION WALL SHEET METAL. GALV M8X25 FASTENER NOTES: 1. ALL DIMENSIONS IN MILLIMETERS [INCHES] 6/17/05 DATE PARTITION WALL SHEET METAL, GALV STANDARD MECHANICAL MAKEUP DATE 6/17/05 6/17/05 DATE REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 • City Of Tukwila B ILDIN D SION CON !RAC NO. RTA /LR 82 -03 / C80 RECEIVED Ciry „ r1 ^11 LA JUN 2 9 21197 - i�lwl 1 CEA I ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR BOLT -UP DETAILS tTO wIRGPRD- 8001.04 1 REV 01 0 0 SUBSTATION 0 LO LC [ABB FRAME NO. N1 UTILITY PT DISCONNECT & METERING COMPARTMENT N2 FUSE VIEWING WINDOW UTILITY PT COMPARTMENT 1 60" 1& 00 00 APT FUSES OEM I REMOTE CPT FUSES CUM 2 36" SIEMENS m m TRANSPORTATION SYSTEMS, INC. 3000SWEGO4NTEDRIVS SUITE 106 LAKE OSWEGO, OREGON 97034 00 00 (7330) 00 BREAKER POTENTIAL TRANSFORMERS D con SOUNDTRANSIT 22 3 36" m PAT O'HOGAN 7/12/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY SCALE: 1:16 DATE DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila c BUILDING DIVISION RECEIVED Cis' JUN 2 R 7007 u:: � ►�vll l GLI4 I ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR ELEVATIONS FOR C32 & C33 CONTRACT DRAWING REV. NO. RTA /LR 82 -03 I C807 I NO . TPS- M040 -07 00 UNISTRUT CHANNEL FRAME 1 POWER COMPANY METERING FRAME GROUND STUDS GROUND STUDS INSTRUMENT COMPARTMENT APT FUSES NATVAR INSUUTED COPPER ROO REMOTE CPT FUSES 300 0 S W EG O P O I N T E O R N E. SUITE 106 LAKEOSWEGO, OREGON 97034 FRAME 2 APT & APT FUSES REMOTE CPT FUSES SIEMENS TRANSPORTATION SYSTEMS, INC. SOUNDThANSIT INSTRUMENT COMPARTMENT • 1200A BREAKER FRAME 3 MAIN BREAKER JJ CODEj�O�W�p�q CE NFP 70 NEC - AUG 2 7 2007 City Of Tukwila B ILDYN D ION NOTES: 1. POWER COMPANY TO PROVIDE REVENUE METERING CTs & VTs. 2. ALL DIMENSIONS IN INCHES PAT O'HOGAN 7/12/05 DEN BY DATE PECF!'✓FD JUN 2 R 2ll97 L L.1i�vll C;LItl 1� LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR SECTION VIEWS FOR C32 & C33 CONTRACT DRAWING REV. NO. RTA /LR 82 - 03 / C807 I NO. TPS M040 - 08 00 DRN CKD BY DATE PAT O'HOGAN 7/12/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE ITEM N1 N2 N3 N4 N5 N6 N7 N8 N9 QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE (ENGRAVING TO BE DETERMINED BY SOUND TRANSIT) SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 SOUNDThANSR PAT O'HOGAN 7/12/05 DRN BY DATE TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR NAMEPLATE SCHEDULE FOR C32 & C33 CONTRACT REY. NO. RTA ILR 82 I C807 I NO. TPS M040 - 09 00 DRN CKD BY PAT O'HOGAN DES BY SCALE: DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila y B ILD�NC DIVISION R:• ' E!VED On-" ; }t MLA JUN 2 R ?nm L1 LINK LIGHT RAIL PROJECT REV DATE REAR VIEW TOLERANCE: TERMINATION LOCATION DIMENSIONS + OR - 1/4" DRY TYPE TRACTION TRANSFORMER THREE PHASE, 60 HZ, FOR USE W /12 -PULSE EXTRA HEAVY TRACTION RECTIFIER RATED 3000KW, 1500VDC 3223 /4296 KVA AA/FA PRI: 26,400V DELTA (3223 KVA) 150 kV BIL PRI TAPS: +2 X 1 -1/4 % & -2X 2 -1/2% OUT OF COIL FOR SOLID TAP LINK SEC #1: 1178 WYE (1665 KVA) 45 kV BIL SEC #2: 1178 DELTA (1665 KVA) 45 kV BIL IMPEDANCE: 9.0% AT 1/2 KVA, 16% AT FULL KVA COPPER WINDINGS 220 °C INSULATION CLASS, 65 °C TEMPERATURE RISE @ 100% LOAD PERCENT LOAD 25% 50% 75% 100% 150% EFFICIENCIES: 98.7% 99.1 99.2 99.1 98.3 TOTAL LOSSES: 10.7KW 14.1 19.7 29.2 58.0KW SOUND LEVEL: 70dB AT 1 FOOT FROM TRANSFORMER ENCLOSURE IMPREGNATION: DOUBLE CYCLE VPI QUALITROL, 3 PHASE, WINDING TEMPERATURE MONITOR WINDING TEMPERATURE INDICATOR WIRING DIAGRAM 3501 -21A FAN WIRING DIAGRAM 3501 -21B CONTROL WIRING IN GALVANIZED STEEL GRS CONDUIT 1/2 X 4.00 COPPER LV BUS SUPPORTED WITH PORCELAIN INSULATORS NEMA 1 INDOOR ENCLOSURE BASE MATERIAL: 6" X 3 -1/2" STRUCTURAL STEEL ANGLE BASE FINISH: BLACK MACRO -PDXY FINISH DOUBLE HINGED FRONT DOORS, REMOVABLE REAR PANELS STAINLESS STEEL LIFT HANDLES ON REMOVABLE PANELS ALL OTHER PANELS FIXED TAMPERPROOF HARDWARE ON REMOVABLE PANELS ENCLOSURE HARDWARE TO BE 3/8 -16 STAINLESS STEEL DOORS HAVE PADLOCKABLE HANDLE WITH DOOR STOP & LIMIT SWITCHES ENCLOSURE MATERIAL: HINGED DOORS 11 GUAGE AND OTHER PANELS 14 GAUGE ENCLOSURE FINISH: ANSI 61 GRAY ELECTROSTATIC POWDER PAINT PROVISIONS PROVIDED FOR FUTURE FANS APPROXIMATE WEIGHT: 22,000 LB. DESCRIPTION RY ENG CHK APP - 12 ( HI H2 H3 rl 72 56 FIXED PANEL 44- 8 1 014 4.5 1 LL LIFT LUG DETAIL 3/4" THICK "GROUND PAD DETAIL" 1/2" STAINLESS STEEL 1/2 -13 TAP 5 TYP FIXED PANEL 52 TYP 2 -HOLE NEMA GROUND PAD .75 HV TERMINATION DETAIL 1/4" X 4.00" TIN PLATED ' COPPER BUS TAP ACCESS 9/16 x 13/16 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 a e EBBS WI 136 622 TAP ACCESS NS EBB FRONT VIEW 136 BASE DETAIL 62 leggal MOO IMP Hatsaan LIFT LUGS 01 ANCHOR POINT (6 PLACES) 1.125 SOUNDTP1ANSIT 1.75 I- .75 LV BUS DETAIL 1/2 x 4" COPPER B 72 9/16 x 13/16 PAT O'HOGAN 7/12/05 URN BY DATE URN CKD BY PAT O'HOGAN DES BY ED FOR 2 C NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila ILDING DIVJSIO DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE NONE FIXED PANEL HV TAPS SET FOR SOLID LINK ADJUSTMENT CANNOT BE CROSS CONNECTED R1 R5 R4 R3 R2 R6 5 ,3 _ 11;f r FIXED PANEL �+ RECEIVED DI - r' .' 1 111 11 e JUN 2 B ?097 v'Eviil 9 GLN I ER NOTE: ALL DIMENSIONS IN INCHES LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER EQUIPMENT LAYOUT C NTRACT D NO. RTA /LR 82 -03 I C807 I NO. TPS- M041 -01 O 00 >a���� Islamism MEW�>T>r seems FIXED PANEL .T iT.BQS�SRMESSTI TBETWSMIMIEI6Ti esselassammemssm REMOVABLE PANEL 0 00 MIME! I I ams SEWS = =mm,m REMOVABLE PANEL 00 eHeeeeeeHe slams s SEISS I IzimIg1gg3n REMOVABLE PANEL 0 I Seas SEWS ;g IIImI/m$ eeeeeea messes asses SISSEMSS ingigmatgimum eeeeeae MOSSES§ MESSE 1' 1 1 1 =113 REV DATE REAR VIEW TOLERANCE: TERMINATION LOCATION DIMENSIONS + OR - 1/4" DRY TYPE TRACTION TRANSFORMER THREE PHASE, 60 HZ, FOR USE W /12 -PULSE EXTRA HEAVY TRACTION RECTIFIER RATED 3000KW, 1500VDC 3223 /4296 KVA AA/FA PRI: 26,400V DELTA (3223 KVA) 150 kV BIL PRI TAPS: +2 X 1 -1/4 % & -2X 2 -1/2% OUT OF COIL FOR SOLID TAP LINK SEC #1: 1178 WYE (1665 KVA) 45 kV BIL SEC #2: 1178 DELTA (1665 KVA) 45 kV BIL IMPEDANCE: 9.0% AT 1/2 KVA, 16% AT FULL KVA COPPER WINDINGS 220 °C INSULATION CLASS, 65 °C TEMPERATURE RISE @ 100% LOAD PERCENT LOAD 25% 50% 75% 100% 150% EFFICIENCIES: 98.7% 99.1 99.2 99.1 98.3 TOTAL LOSSES: 10.7KW 14.1 19.7 29.2 58.0KW SOUND LEVEL: 70dB AT 1 FOOT FROM TRANSFORMER ENCLOSURE IMPREGNATION: DOUBLE CYCLE VPI QUALITROL, 3 PHASE, WINDING TEMPERATURE MONITOR WINDING TEMPERATURE INDICATOR WIRING DIAGRAM 3501 -21A FAN WIRING DIAGRAM 3501 -21B CONTROL WIRING IN GALVANIZED STEEL GRS CONDUIT 1/2 X 4.00 COPPER LV BUS SUPPORTED WITH PORCELAIN INSULATORS NEMA 1 INDOOR ENCLOSURE BASE MATERIAL: 6" X 3 -1/2" STRUCTURAL STEEL ANGLE BASE FINISH: BLACK MACRO -PDXY FINISH DOUBLE HINGED FRONT DOORS, REMOVABLE REAR PANELS STAINLESS STEEL LIFT HANDLES ON REMOVABLE PANELS ALL OTHER PANELS FIXED TAMPERPROOF HARDWARE ON REMOVABLE PANELS ENCLOSURE HARDWARE TO BE 3/8 -16 STAINLESS STEEL DOORS HAVE PADLOCKABLE HANDLE WITH DOOR STOP & LIMIT SWITCHES ENCLOSURE MATERIAL: HINGED DOORS 11 GUAGE AND OTHER PANELS 14 GAUGE ENCLOSURE FINISH: ANSI 61 GRAY ELECTROSTATIC POWDER PAINT PROVISIONS PROVIDED FOR FUTURE FANS APPROXIMATE WEIGHT: 22,000 LB. DESCRIPTION RY ENG CHK APP - 12 ( HI H2 H3 rl 72 56 FIXED PANEL 44- 8 1 014 4.5 1 LL LIFT LUG DETAIL 3/4" THICK "GROUND PAD DETAIL" 1/2" STAINLESS STEEL 1/2 -13 TAP 5 TYP FIXED PANEL 52 TYP 2 -HOLE NEMA GROUND PAD .75 HV TERMINATION DETAIL 1/4" X 4.00" TIN PLATED ' COPPER BUS TAP ACCESS 9/16 x 13/16 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 a e EBBS WI 136 622 TAP ACCESS NS EBB FRONT VIEW 136 BASE DETAIL 62 leggal MOO IMP Hatsaan LIFT LUGS 01 ANCHOR POINT (6 PLACES) 1.125 SOUNDTP1ANSIT 1.75 I- .75 LV BUS DETAIL 1/2 x 4" COPPER B 72 9/16 x 13/16 PAT O'HOGAN 7/12/05 URN BY DATE URN CKD BY PAT O'HOGAN DES BY ED FOR 2 C NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila ILDING DIVJSIO DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE NONE FIXED PANEL HV TAPS SET FOR SOLID LINK ADJUSTMENT CANNOT BE CROSS CONNECTED R1 R5 R4 R3 R2 R6 5 ,3 _ 11;f r FIXED PANEL �+ RECEIVED DI - r' .' 1 111 11 e JUN 2 B ?097 v'Eviil 9 GLN I ER NOTE: ALL DIMENSIONS IN INCHES LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER EQUIPMENT LAYOUT C NTRACT D NO. RTA /LR 82 -03 I C807 I NO. TPS- M041 -01 O 00 POWER IN FANS ON ALARM TRIP TRANSFORMER TEMPERATURE RISE 80-265 VAC 20 -280 VDC 180'C 190'C 200•C 65'C ;.' 100% LOAD 135'C AFTER RI -B TRANSFORMER ENCLOSURE NORMALLY OPEN CONTACTS HELD CLOSE WHEN DOORS ARE COMPLETELY CLOSED. TERMINAL BLOCK TO BE MOUNTED IN TEMPERATURE MONITOR ENCLOSURE. DOOR SWITCHES DOOR -TOP DOOR - BOTTOM DOORS SIEMENS TRANSPORTATION SYSTEMS, INC. 3G0OSWEGOPOINTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 SOUNDikANSR FAN CONTROLLER SPECIFICATIONS MODEL 118P- U-K -0.1 CAUTI ON MAKE ALL EXTERNAL CONNECTIONS BEFORE APPLYING POWER TO INSTRUMENT. CONTROL VOLTAGE= 20- 220VDC 20- 286VAC 3 PH MONITORING STORED MAXIMUM TEMPERATURE FAN /ALARM/TRIP RELAYS MANUAL FAN CONTROL TYPE "K "'THERMOCOUPLES NOTE: REFER TO OUALITROL INSTRUCTION MANUAL FOR FURTHER INSTRUCTIONS AND FEATURES THERMOCOUPLE LENGTH: 10.0' MOUNTED IN NON - REMOVEABLE PANEL NEMA -1 ENCLOSURE WITH FRONT HINGED PANEL FOR CONTROL WIRING ACCESS WIRING SHALL BE 600V SIS, 14 -GUAGE MIN. ALL WIRING ENCLOSED IN GALVANIZED GRS STEEL CONDUIT PAT O'HOGAN 7112/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE: REAR OF FAN CONTROLLER C C NAM PI MIA .0 "w MI... 1111." AUG 2 7 2007 TEMPERATURE MONITOR ' 6 " CC ..." REVIEWED FOR NFPA 70 - NEC City Of Tukwila BUILDING DIVISION A LINK LIGHT RAIL PROJECT RECEIVED GIB I urAnifik JUN 2 9 7 997 it' Liiw i G E N T E R TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER DETAILS CONTRACT D R A WING I REV. 00 No. RTA /LR 82 -031 C807 1190. M041 -02 REV fATF f)FSCRIPTIf)N RV FN(; CHK APP ff7 !!►!l* #41411 �0 4.%:� Technologies Corporation MANUFACTURED WITH PRIDE IN WYTHEVILLE, VA , USA 24382 DRY TYPE TRACTION TRANSFORMER SN 373223K15AC01 JOB 3501 DATE 12/04 IMP X.XX % @ 85 °C KVA 3223/4296 PHASE 3 HERTZ 60 TYPE AA /FA RISE 65 °C CLASS H 220 °C INS PRI: 26400 AMPS 70.48 BIL 150 CU COND SEC:1 1178 AMPS 816 BIL 45 Xc= .XXX SEC:2 1178 Y/680 AMPS 816 BIL 45 Xc= .XXX TAPS VOLTS AMPS -FA CAUTION: DE- ENERGIZE TRANSFORMER R4 BEFORE CHANGING TAPS 1 -2 27060 91.7 R2 H2 R3 R6 2 -3 26730 92.8 3-4 26400 94.0 4 -5 25740 96.4 5 -6 25080 98.9 H1 H3 R1 R5 APPROXIMATE WT: 22000 LBS. RI -9 EXTRA -HEAVY DUTY TRACTION TRANSFORMER CAPABLE OF 100% LOAD CONT., 150 %FOR 2 HRS WITH (5) -300% 1 -MIN LOADS &(1) 450% 15 SEC LOAD D SIEMENS i TRANSPORTATION SYSTEMS, INC. 3G0 OSWEGOPOINTEDRIVE, SUITE (06 LAKEOSWEGO, OREGON 97034 SOUNDTRANSIT LANCE BANASZEK 7112105 DEN BY DATE DRN CEO BY PAT O'HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY SCALE: DATE 7/12/05 DATE DATE 7/12/05 DATE REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDIN D SION LINK LIGHT RAIL PROJECT PF.OE!'JED 11 <WILA JUN 2 9 70/17 CL:N 1 E TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER NAME PLATE I DRAWING No. M041 - 03 CONTRACT NO. RTA 1LR 82 -031 C807 EV. 00 DV LAIf_ rule ADD OAT 0 00 RECTIFIER TRANSFORMER 0m000 0000■• 0=0000 000■0000 00000 o0o0coo0 ■■0000000 RECTIFIER.] A I 000000000 000000000 000000000 000000000 I RECTIFIER FI•Y I 00000000 000000000 nF.crAI071 AI 1/4" GLASTIC 312 • 1/4" GLASTIC ruv ADD 356 35 16 31i MAIN BREAKER 1 • 1/4" GLASTIC FRONT VIEW SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINTE DRIVE, SU /7E 106 LAKE OSWEGO, OREGON 97034 23i FEEDER F1 238 FEEDER F2 SOUNOTRANSIT FEEDER 3 PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY SCALE: 231 NOTES: 1. EQUIPMENT FRAMES ARE 11GA. GALVANIZED STEEL; DOORS & PANELS ARE 14GA. GALVANIZED STEEL. 2. PAINT FINISH: ANSI 61 GRAY TEXTURED POWDER COAT. 3. OVERALL DEPTH OF DC SWITCHGEAR IS 56 1/2 ". 4. ALL DIMENSIONS IN INCHES 5. FEEDER F5 AT FOREST TPSS ONLY. 11/22/05 DATE DATE 11/22/05 DATE DES CKD BY DATE LANCE BANASZEK 11/22/05 APPROVED BY DATE 23i FEEDER 4 231 FEEDER 5 (NOTE 5) RECEIVED JUN 2 R? 7 it kiivI 9 ( N LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR ELEVATION CONTRACT DRAWING REV. NO. RTA /LR 82 -03 I C807 I NO. TPS- M042 -01 00 ITEM QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE NP1 1 NEGATIVE SWITCH 7/8" 12" x 1 5/8" NP2 1 RECTIFIER #1 - Y 7/8" 12" x 1 5/8" NP3 1 RECTIFIER #2 - 7/8" 12" x 1 5/8" NP4 1 MAIN BREAKER FO 7/8" 12" x 1 5/8" NP5 1 FEEDER BREAKER Fl 7/8" 12" x 1 5/8" NP6 1 FEEDER BREAKER F2 7/8" 12" x 1 5/8" NP7 1 FEEDER BREAKER F3 7/8" 12" x 1 5/8" NP8 1 FEEDER BREAKER F4 7/8" 12" x 1 5/8" N1 g (SEE DETAIL C) 1/4" 5 1/2" x 5/8" N2 5 REMOTE 1/4" 2" x 5/8" N3 1 MAIN CURRENT 1/4" 2" x 5/8" N4 1 MAIN VOLTAGE 1/4" 2" x 5/8" N5 1 STATION TROUBLE 1(4" 2" x 5 /8" N6 1 TROUBLE RESET 1/4" 2" x 5/8" N7 4 GROUP ALARM 1/4" 2" x 5/8" N8 4 DIRECT ON 1/4" 2" x 5/8" N9 1 64 - FRAME FAULT 1/4" 2" x 5/8" QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE NAMEPLATE SIZE NP9 1 FEEDER BREAKER F5 7 TPS -N00 5/8" 4" x 7/8" 7 TPS -C11 5/8" 4" x 718" 8 TPS -C 16 5/8" 4" x 7/8" 7 TPS -C23 5/8" 4" x 7/8" 7 TPS -C27 5/8" 4" x 7/8" 7 TPS -C29 5/8" 4" x 7/8" 7 TPS -C32 5/8" 4" x 7/8" 7 TPS -C33 5/8" 4" x 7/8" 7 TPS -C36 5/8" 4" x 7/8" ITEM QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE NP9 1 FEEDER BREAKER F5 7/8" 12" x 1 5/8" N1 1 (SEE DETAIL C) 1/4" 5 1 /2" x 5(8" N2 1 REMOTE 1/4" 2" x 5/8" N7 1 GROUP ALARM 1/4" 2" x 5/8" N8 1 DIRECT ON 114" 2" x 5/8" NP1 NEGATIVE SWITCH I. ore" N 1 aoseo.l H10 ® H2 N9 SWARTZ RELAY 784mm NOTE 1:- STATION NAME PLATES (NOTE 1) (TPS -X ## I FOLLOWING ADDITIONAL NAMEPLATES FOR FOREST ST. - C16 ONLY DETAIL A NP4 F c c'. N 1 --pi H1 ) ®H2 MAIN BREAKER FO CS S3 N5 N4 ® HSO e OP 270 784mm SIEMENS TRANSPORTATION SYSTEMS, INC. 300 0SWEGOPOINTEORIV& SUITE 106 LAKE OSWEGO, OREGON 97034 H3 51 43 S1 ITPS -X ## I 117 $pUND1ItANSR DETAIL B NP5 FEEDER BREAKER Fl ITPS -X ## 12 N1 yp � 01YN 405tA i H3 H 1 © ` H2 43 S1 [CS S3 � 40 40 40 40 40 40 40 40 N7 H10 584mm 100 fri •S50 DETAIL A 100 • F S2 DETAIL B N6 N8 130 I 40 I 40 1 30 I I. OPEN CLOSED .1 DETAIL C (DETAIL DIMENSIONS IN mm) PAT O'HOGAN 11/22/2005 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 11/22/2005 DATE DES CKD BY DATE LANCE BANASZEK 11/22/2005 APPROVED BY DATE SCALE: DPU N1 (TYP 4) LINK LIGHT RAIL PROJECT RECEIVED C ;v TUKWILA JUN 2 ?n97. X t �t `11 I EN TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR NAMEPLATE SCHEDULE CONTRACT DRAWING NO. RTA /LR 82 -03 I C807 I NO. TPS- M042 -02 I V. 00 v 0 . o -o E °o . u ✓� 5, °O u5 E CID GY fn cod e r a ao5 cD 0 88 2 ° o �,. E to -15 cE 0o a ass 01 12/05/05 704 597 465 333 257 160 a Layout Change S1 8 S3 - Add H3 N2 M1 EMOTE I. OPEN CLOSED IFI FEEDER CUBICLE 584 H1 43 S1 PANEL LAYOUT H10 PJO PJO RJA LB DPU DETAIL "B" 22 mm DEVICE DRILLING DIMENSIONS NTS DIMENSIONS IN MILLIMETERS 300 OSWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 704 597 465 333 257 160 0 SIEMENS TRANSPORTATION SYSTEMS, INC. H3 • r, S1I " I L ° J FEEDER CUBICLE 584 -H10 i 150- 150- - PANEL DRILLING QUANTITY 49 3 FIXING HOLES DETAIL "C" 05.61 SWITCH DRILLING DIMENSIONS NTS SOUNDTRANSIT DETAIL "B" 6 TYP. H2 DETAIL "C" r, — 0 1 /2 TYP. I I I S3 L DPU CUTOUT 21 PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY 11/22/2005 DATE DATE 11/22/2005 DATE DES CKD BY DATE LANCE BANASZEK 11 /22 /2005 APPROVED BY DATE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR INSTRUMENT PANELS FEEDER BREAKER 600mm DRILLING TEMPLATE V. oo SCALE: REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDIN D SION RFC )VED JUN 2 9 ?nm 6"L ealmil l �.,_N i ER I ( tic). No. WING TPS- M042 -03 CONTRACT NO. RTA /LR 82 -03 / C80 4 FIXING HOLES DETAIL "A" 08 METER DRILLING DIMENSIONS NTS MAIN BREAKER PANEL LAYOUT 704.0 300 DETAIL "B" 22 mm DEVICE DRILLING DIMENSIONS NTS 540 391 140 0 DIMENSIONS IN MILLIMETERS SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINT EDRIVg SUITE 106 LANEOSWEGO, OREGON 97034 41. H1 MAIN BREAKER 784 HSO 41.0 H2 � SouNUliuwsrr OP270 CUTOUT 283 H3 PANEL DRILLING QUANTITY 10 _ I r I o p iS1 L '_ J NTS DRN CKD BY PAT O'HOGAN DES BY DETAIL "B" 4 TYP. DETAIL "C" �2 TYP. 3 FIXING HOLES DETAIL "C" 05.61 SWITCH DRILLING DIMENSIONS PAT O'HOGAN 11/22/05 URN BY DATE DATE 11/22/05 DATE DES CKD BY DATE LANCE BANASZEK 11122/05 APPROVED BY DATE TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR INSTRUMENT PANELS MAIN BREAKER 800mm DRILLING TEMPLATE CONTRACT NO. RTA /LR 82 -03 I C807 NO WING M042 -04 REV. 00 SCALE: REVIEWED F CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDZN D SION LINK LIGHT RAIL PROJECT RFCF!VFD CI i rlc\!1/!iik JUN 2 q 707 6=G6 ivU l Cii_i\ l ER SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POI,YTE DRIVE, SUITE 10V 5 LAKE OSWEGO, OREGON 97034 I SOUNDTRANSR PAT O'HOGAN 11122105 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY SCALE: DATE 11/22105 DATE DES CKD BY DATE LANCE BANASZEK 11/22/05 APPROVED BY DATE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR INSTRUMENT PANELS NEGATIVE SWITCH 800mm DRILLING TEMPLATE CONTRACT No. RTA /1..R 82-03 1 0807 D NO. TPS- M042 -05 00. 704.0 352.0 333.0 122.0 o- CENTER LINE NEGATIVE SWITCH H1 " ciosco.l 784.0 N1 N9 ® H2 SWARTZ RELAY PANEL LAYOUT 704.0 352.0 333.0 122.0 DETAIL "B" 22 mm DEVICE DRILLING DIMENSIONS NTS 0 DIMENSIONS IN MILLIMETERS CENTER LINE NEGATIVE SWITCH 784.0 SWARTZ RELAY CUTOUT PANEL DRILLING QUANTITY 10 DETAIL "B" 2 TYP. 162 DETAIL "C" SWARTZ RELAY CUTOUT DRILLING DIMENSIONS NTS DETAIL "C" 4 FIXING HOLES 06.0 RECEIVED Cllr ' `. .'IemMMLA JUN 2 . ?9 97 IV iER BACK PANEL TRANSLUCENT COVER 74SA )1 I> 2 10 6 8 14 74SA 2 6 21g BACK PANEL TRANSLUCENT COVER SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINT E DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 SOUNDDANSff 14 RON ALBERT ERN BY PAT O'HOGAN DRN CKD BY RON ALBERT DES BY SCALE: 12/07/05 DATE 12/07/05 DATE 12/07/05 DATE DES CKD BY DATE LANCE BANASZEK 12/08/05 APPROVED BY DATE SPACER REVIEWED FOR CODE COMPLIANCE NFPA 70- NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION MOUNTING PANEL U—BOLT W/NUTS SURGE ARRESTOR RECEIVED CITv JUN 2 q 7997 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM LIGHTNING ARRESTOR BOX AND CURRENT RELAY BOX DETAILS 2 /LR 82-03 / C8071 ■43criNGTPS—M043-01 I REV. I 00 OC \ h ATC f1CCCOIPTIrlAl CONNECTION TO Fl LOAD BUS CONNECTION TO F2 LOAD BUS CONNECTION TO F3 LOAD BUS CONNECTION TO F4 LOAD BUS CONNECTION TO F5 LOAD BUS (C16 Only) 1 STAND OFF INSULATOR Cor (`W V 2 APP 2 3 4 re r O O r NOTES: 1. 2kV Cable from DC Switchgear to Arrestor Provided By C807 Installation Contractor 2. Common Ground Bus and Stand -off Insulators Provided By C807 Installation Contractor 3. Control / Signal Cable from Sensing Relay to Annunciator Provided By C807 Installation Contractor 3 4 O O CONTROL WIRING TO ANNUNCIATOR 1 3 38 16 300 OSWEGOPOINTEDRNE, SUITE 106 LAKE OSWEGO, OREGON 97034 COMMON LIGHTNING ARRESTOR BUS SIEMENS! TRANSPORTATION SYSTEMS, INC. 0 0 0 0 r 74SA 101 . J CONNECTED TO GROUND MAT MT SOUNDTRANSIT r RON ALBERT URN BY PAT O'HOGAN DRN CKD BY RON ALBERT DES BY 34 DES CKD BY LANCE BANASZEK APPROVED BY SCALE: 12/07/05 DATE DATE 12/07/05 DATE DATE 12/07/05 DATE PR r `1 Copper Bus Bar a x 2 x 38 REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION NO. • PACT /LR 82-031C8 RECEIVED C!iv +KWILA JUN 2 R 7n97 �Et"iiVil a N i F LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM LIGHTNING ARRESTOR & CURRENT RELAY EQUIPMENT LAYOUT TYPICAL I DRAWING No. TPS- M043 -02 v. 00 2 8/10/05 06/03/05 APV IIATP NEW IPT DIMENSIONS FRONT VIEW NEGATIVE N1 I-H o o N2 312 Updated Disconnect & Return Bussing f1FS(:P IPTION SWARTZ RELAY hPS5 8 86 RJA RJA RV RJA RJA FN(: FRONT VIEW (WITHOUT DOORS) PJO PJO (:HK LB LB APP A KEY INTERLOCK (NOTE 1) STRAY CURRENT DRAINAGE PANEL SECTION A -A m SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGOPOINTEDRIVE SUITE 105 LAKE OSWEGO, OREGON 97034 I DRAWING No. TPS- MO50-01 SOUNDTRANSIT PAT O'HOGAN ORN BY DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE SECTION B -B NOTES: 1. TO PREVENT SWITCH FROM BEING OPERATED UNDER LOAD, IT IS INTERLOCKED WITH THE MAIN BREAKER. CAN S BE WITCH MUST T O PE D BEFORE THE MAIN BREAKER 2. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 3. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 4. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. 5. ALL DIMENSIONS IN INCHES 12/23/2004 DATE 12/23/2004 DATE TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE EQUIPMENT LAYOUT CONTRAC NO. RTA /LR 82 -03 / C LEGEND F11 - MINI CKT BRKR FOR HTR CKT H1 - GREEN LIGHT H2 - RED LIGHT Nxx - NAMEPLATE Xx - TERMINAL STRIP �+ RECEIVED CI Tv 1 + rivILA JUN 2 ? "n b' F I Vf l l l G- N 1 ER LINK LIGHT RAIL PROJECT COMPONENT PANEL DETAIL "D" M050 -02 02 , 11 O C 1 Ism 4* 0 .40 N1 0° 0 0 o 0 0 0 0 0 N2 '1 '''N 11:1 II3 II ;H II I mini m i ii HTR 1 1 II �---. (DOTES 2 THRU • ) INTERPHASE TRANSFORMER 5F i.... - 2 8/10/05 06/03/05 APV IIATP NEW IPT DIMENSIONS FRONT VIEW NEGATIVE N1 I-H o o N2 312 Updated Disconnect & Return Bussing f1FS(:P IPTION SWARTZ RELAY hPS5 8 86 RJA RJA RV RJA RJA FN(: FRONT VIEW (WITHOUT DOORS) PJO PJO (:HK LB LB APP A KEY INTERLOCK (NOTE 1) STRAY CURRENT DRAINAGE PANEL SECTION A -A m SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGOPOINTEDRIVE SUITE 105 LAKE OSWEGO, OREGON 97034 I DRAWING No. TPS- MO50-01 SOUNDTRANSIT PAT O'HOGAN ORN BY DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE SECTION B -B NOTES: 1. TO PREVENT SWITCH FROM BEING OPERATED UNDER LOAD, IT IS INTERLOCKED WITH THE MAIN BREAKER. CAN S BE WITCH MUST T O PE D BEFORE THE MAIN BREAKER 2. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 3. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 4. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. 5. ALL DIMENSIONS IN INCHES 12/23/2004 DATE 12/23/2004 DATE TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE EQUIPMENT LAYOUT CONTRAC NO. RTA /LR 82 -03 / C LEGEND F11 - MINI CKT BRKR FOR HTR CKT H1 - GREEN LIGHT H2 - RED LIGHT Nxx - NAMEPLATE Xx - TERMINAL STRIP �+ RECEIVED CI Tv 1 + rivILA JUN 2 ? "n b' F I Vf l l l G- N 1 ER LINK LIGHT RAIL PROJECT COMPONENT PANEL DETAIL "D" M050 -02 02 400 AMP BUS 100 AMP KNIFE SWITCH INSULATING PANEL 100 AMP CONTACTOR STRAY CURRENT DRAINAGE CONTACTOR AND SWITCH REQUIRED AT ONLY REQUIRED AT ALL TPSSs C1, C27 8 C36 1 1 5 1 6 1 DETAIL "D" NTS COMPONENT PANEL 60 AMP DIODE 60 AMP KNIFE SWITCH 222 PADS FOR CABLE CONNECTIONS 2- FORM "C" AUXILIARY �N CONTACTS. ACTUATED WHEN THE SWITCH IS CLOSED — AVAILABLE CONTACT SURFACE SILVERED LINE AND LOAD TERMINALS 9/16 DIA. HOLES rNv v` •N 19 9 I 42 1/2 � 3 2 1/2 4 -5/8 DIA. MOUNTING HOLES FOR 1 /2 DIA. BOLTS 10 ACCOMMODATIONS FOR KIRK INTERLOCK TYPE "B" LOCKING BOLT PROJECTION TO BE 3/8" LONG 2- FORM "C' AUXILIARY WHEN WITHDRAWN. KEY REMOVABLE WHEN LOCKING CONTACTS. ACTUATED WHEN BOLT IS EXTENDED AND SWITCH IS LOCKED IN SWITCH IS OPEN EITHER THE CLOSED OR OPEN POSITIONS. SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRNE, SUITE 106 LAKEOSWEGO, OREGON 97034 REVIEWED ODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDIN D SION SOUNDTRANSIT INSULATED —\ STUD HANDLE DRN CKD BY PAT O'HOGAN DES BY 5 PAT O'HOGAN 12/23/2004 DRN BY DATE DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: 16 3/8 121 1 INSULATING BASE x--1/2 X 1 1/2 ALUMINUM SPACERS NOTES: FOR INDOOR USE FOR VERTICAL UPRIGHT MOUNTING AUXILIARY CONTACTS RATING: 15A ® 125VAC OR 1/2A © 125VDC APPROXIMATE WT. 73 LBS. DO NOT OPERATE UNDER LOAD TYPE MP DISCONNECTING SWITCH 6000A. 1500V.D.C. S.P. S.T. NON– FUSIBLE LIVE FRONT –STUD HANDLE OPERATED BOLTED PRESSURE SILVER CONTACTS RECEIVED Cis KWILA JUN 2 . ?nn7 PEiiivilf CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE EQUIPMENT LAYOUT DETAILS CONTRACT DRAWING NO. RTA /LR 82 -03 / C807 NO. TPS- M050 -02 I REV q RI -9 EXTRA HEAVY TRACTION SERVICE ���� 12 -PULSE RECTIFIER 3000KW, 1500VDC t+fArIM"R Technologies i il ��,� Corporation WYTHEVILLE,VA, USA 24382 ,1 INTERPHASE TRANSFORMER SN 120270L02BC01 JOB 3511 DATE 1/05 CU COND KVA 270 PHASE 1 HERTZ 360 CLASS H 220 °C INS TYPE AA RISE 80 °C @100% LOAD INPUT 135 VAC 1000 AMPS DC BIL 20 (N1 -N2) OUTPUT 2000 AMPS DC BIL 20 (NO) SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTEORNE, SUITE 106 LAKE OSWEGO, OREGON 97034 SOUNDTRANSIT PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY SCALE: DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/2312004 APPROVED BY DATE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE EQUIPMENT LAYOUT INTERPHASE TRANSFORMER I DRAWING N TPS -M050 03 CONTRACT NO. RTA /LR 82 -03 / C8 00 36 37 N1 N1 O 0 O 0 NO 10.0 O 0 O 0 10.0 NO 21.50 1/2" VIBRATION PAD FRONT VIEW N2 O O O 0 N2 .75-- FN 12.00 NO .00 • F-- 7.00 14.00 17.00 SIDE VIEW 21 50 0.75 DIA MOUNTING HOLE( TERMINAL DETAIL 1/2" X 5" COPPER BUS ANSI STD PATTERN O iI Bu I.I �I MSS O TOP VIEW .56 DIA 12.00 - --9.00 2 L REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION NOTES: DRY TYPE INTERPHASE TRANSFORMER - VENTILATED FOR USE IN 12 -PULSE RI-9 X -HEAVY TRACTION RECTIFIER RATED 3000 KW, 1500 VDC 270 EQU. KVA 1 PHASE 360 HERTZ 80 °C RISE@ 100% LOAD 135V AC L -N 20 kV BIL , 1000 ADC (N1 -N2), 2000 ADC (NO) 5% MAX UNBALANCE, LOW NOISE DESIGN COPPER CONDUCTOR TOTAL WEIGHT 950 LBS RECEIVED CITY flr= TUKWILA JUN 2 8 2007 PERMIT CENTER Ar A U I RECTIFIER #1 -Y 00000001111111111 1100 000000000000000 000000000000000 000000000000000 000000000000000 000000000000000 V 000000000000000 000000000000000 000000000000000 000000000000000 000000000000000 110011 11011000011111l0 FRONT VIEW 01 9/10/05 Issued for Construction RJA RJA PJO LB 868 L -1 REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC RECEIVEC CI TI IV1i JUN 2 8 2007 PERMIT CENTER 111 FRONT VIEW (WITHOUT DOORS) SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINTEDRNE, SUITE 106 LAKE OSWEGO, OREGON 97034 FLEX CABLE FROM BUS DUCT SOUNDTRANSIT PAT O'HOGAN 12/23/2004 DATE DRN BY DRN CKD BY PAT O'HOGAN DES BY DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE 55 [1400.03] 56 6 [1429.84] SECTION A -A (SIDE REMOVED) SCALE: LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RI CUBICLE EQUIPMENT LAYOUT WYE CONNECTED RECTIFIER CONTRACT D RAWING NO. RTA /LR 82 - 031 C807 I NO. TPS M060 - 01 I REV. 01 AL SIEMENS 000000000000000 000000000000000 000000000000000 000000000000000 000000000000000 000000000000000 I RECTIFIER #2 p I 0000000000000000 0000000000000000 0000000000000000 0000000000000000 0000000000000000 0000000000000000 FRONT VIEW ITPS -x n1 A/10/05 Issued for Construction RJA RJA PJO LB 868 L -2 FLEX CABLE FROM BUS DUCT a. r L31 L21 L11 FRONT VIEW (WITHOUT DOORS) 3000SWEGO POINT DRIVE, SUITE 106 L A K E = E G O , OREGON 97034 L +2 SIEMENS m m TRANSPORTATION SYSTEMS, INC. AUG 2 7 2007 REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC SOUNDTRANSIT PAT O'HOGAN 12/23/2004 ORN BY DATE DRN CI(D BY PAT O'HOGAN DES BY DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: 2 8 [715.0) 55 56 2 SECTION A -A (SIDE REMOVED) t 3 1- CITY r ;;J KW PEHMIT CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R2 CUBICLE EQUIPMENT LAYOUT DELTA CONNECTED RECTIFIER CONTRACT DRAWING REV. NO. RTA !LR 82 - / C807 NO TPS- M060 -02 1 01 9/10/05 :i ii' .1 d , 111�1� , w��I�Ni��� wu� , nn�inn�'t � annr��nu ��nlIi�Inttr I X111; (t arri t' �L1 A I ► ■Olill` _� 1 11,11 . '1111 IMO ■Y■ u �l • i r � 1� J l j dr.. r.. ..l •s., .I i�._. N I...� N IMMUNISE �LI NIlila iI•: wr lI i�ii_ �tnwiA I I. gin _'' 1'111 '3�i�k ::rI■ 1 1:121 - _ I II Issued For Construction 55- L -1 35 7 16 TOP VIEW RECT #1 - Y 35 16 TOP VIEW RECT #2 - DELTA 300 OSWEGO POIN 1 E DRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 AC CONNECTION PADS DIODE -C130 SIEMENS TRANSPORTATION SYSTEMS, INC. AC HEAT SINK BUS TYPICAL DIODE • ASSY. - R130.1 - R130.2 SOUNDTANSIT DIODE HEAT SINK -R170.1 (-R170.2) -R171.1 (-R171.2) DEVICE PANEL FOR DC - RC NETWORK DRN CKD BY PAT O'HOGAN DES BY SCALE: 4 I+IHI REVIEWED FOR DOE COMPLIANC NFPA70 -NEC AUG 2 7 2007 City Of Tukwila BUILDIN DIVISION PAT O'HOGAN 12!23/2004 DRN BY DATE DATE 1 2/2 312 004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE J - R111.1 - R113.2 -C111-C113 LINK LIGHT RAIL. PROJECT COMPONENT MOUNTING DIAGRAM CONTRACT DRAWING NO. RTA /LR 82 - 03 1 C807 NO. TPS- M060 -03 DEVICE PANEL FOR AC - RC NETWORK RECEIVED CITY ( T1,./ mil LA JUN 2 8 2007 PERMIT I CENTER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R CUBICLE EQUIPMENT LAYOUT DETAILS 'REV. 01 I MAIN BREAKER I 1=3 ��. -.,� H1® 0 H2 CS S3 N5 N4 ® HSO 05 OP 270 312 3 H30 S1 FRONT FRONT VIEW ITPS -X 86$ 5 S4 0 RLA FRONT VIEW (WITHOUT COVERS AND TRUCK) SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPO/N7EDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 SECTION A -A (SIDE REMOVED) SOUNDTRANSIT SCALE: t .� 558 56 6 PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND: BA - BUFFER AMPLIFIER F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR PLC H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT HSO - BLUE LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAUREMOTE SWITCH S3 - CONTROL SWITCH S50 - RESET STATION ALARM VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS LINK LIGHT RAIL PROJECT 558 D. lam► I r TOP VIEW JUN 2 8 2007 PEHNMIT CENTER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT CONTRACT DRAWING I REV. NO. RTA /LR 82 - / C807 I NO. TPS- M100-01 01 I ' « « « -,... d .E X £ llflaNdd I\ 4111 \I 1 X3 = F E 5 El = = 2 5 16 a «a 60 _ Y REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 I ,i.4. -x01 1 XPg PANDUIT2X3' . City Of Tukwila B ILDIN D ION _ . i In ' 65 PANDUIT2X3' o 111 r 01-F + I ' III r=� I I HTR L I Mh .-. •f■ X02 - ---- ( +1 +; 1 THRII 31 I MAIN BREAKER I 1=3 ��. -.,� H1® 0 H2 CS S3 N5 N4 ® HSO 05 OP 270 312 3 H30 S1 FRONT FRONT VIEW ITPS -X 86$ 5 S4 0 RLA FRONT VIEW (WITHOUT COVERS AND TRUCK) SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPO/N7EDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 SECTION A -A (SIDE REMOVED) SOUNDTRANSIT SCALE: t .� 558 56 6 PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND: BA - BUFFER AMPLIFIER F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR PLC H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT HSO - BLUE LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAUREMOTE SWITCH S3 - CONTROL SWITCH S50 - RESET STATION ALARM VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS LINK LIGHT RAIL PROJECT 558 D. lam► I r TOP VIEW JUN 2 8 2007 PEHNMIT CENTER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT CONTRACT DRAWING I REV. NO. RTA /LR 82 - / C807 I NO. TPS- M100-01 01 0 S7 -PLC ° d .E X £ llflaNdd ndO vo i.a eoLa «a z �a _ Y %`--) I ,i.4. -x01 1 XPg PANDUIT2X3' 41 G NI I ®© 4 IIIIIII IIIIUIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIUIIIIIIII IIIIIII 65 PANDUIT2X3' o r 01-F + I VD BA Cu 2x(7' X 3/8 ") « 4X01 « i 4 ( + II ; ; 1 j + « I Cu 2x(7" X 3/8 ") L .-. •f■ X02 - ---- ( +1 +; i 0 I O • a� I R1 SHUNT .r BUSS G TO RECTIFIER R2 0 0 • • HTR { FRAME BOND BUS Cu 1 -1/2" x 3/8" 4 } I MAIN BREAKER I 1=3 ��. -.,� H1® 0 H2 CS S3 N5 N4 ® HSO 05 OP 270 312 3 H30 S1 FRONT FRONT VIEW ITPS -X 86$ 5 S4 0 RLA FRONT VIEW (WITHOUT COVERS AND TRUCK) SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPO/N7EDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 SECTION A -A (SIDE REMOVED) SOUNDTRANSIT SCALE: t .� 558 56 6 PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND: BA - BUFFER AMPLIFIER F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR PLC H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT HSO - BLUE LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAUREMOTE SWITCH S3 - CONTROL SWITCH S50 - RESET STATION ALARM VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS LINK LIGHT RAIL PROJECT 558 D. lam► I r TOP VIEW JUN 2 8 2007 PEHNMIT CENTER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT CONTRACT DRAWING I REV. NO. RTA /LR 82 - / C807 I NO. TPS- M100-01 01 � .I..I, I ,i.4. -x01 I II r 01-F + I .l. I, I L i 1 I 4 31 ' ^I-,- F ,-. I MAIN BREAKER I 1=3 ��. -.,� H1® 0 H2 CS S3 N5 N4 ® HSO 05 OP 270 312 3 H30 S1 FRONT FRONT VIEW ITPS -X 86$ 5 S4 0 RLA FRONT VIEW (WITHOUT COVERS AND TRUCK) SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPO/N7EDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 SECTION A -A (SIDE REMOVED) SOUNDTRANSIT SCALE: t .� 558 56 6 PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND: BA - BUFFER AMPLIFIER F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR PLC H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT HSO - BLUE LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAUREMOTE SWITCH S3 - CONTROL SWITCH S50 - RESET STATION ALARM VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS LINK LIGHT RAIL PROJECT 558 D. lam► I r TOP VIEW JUN 2 8 2007 PEHNMIT CENTER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT CONTRACT DRAWING I REV. NO. RTA /LR 82 - / C807 I NO. TPS- M100-01 01 FRONT VIEW ,Q KIRK KEY LOCKOUT TAGOUT T om— HARDWARE + + WARNING SIGN + 0 a OPERATION COUNTER + 28 g 54 4 SIDE VIEW K11 R10 30 13 16 K02 1 210. DA New Layout For Relay Doe bESCRIPTLON BY SIEMENS TRANSPORTATION SYSTEMS, INC. X0OSNffDPON7ELW* E S!/17E 106 LAKE OSIVE0 O4EYCY 9723! City flfTukwia )3UILD1NG DIVISION 9) 1111 SouaiThanaR IEWED FCR E COMPLIAVf. FPA 70 - NEC AUG 2 7 2007 PAT C7HOGAN DRN CKD BY PAT O'HOGAN DES BY LANCE BANASZEK APPROVED BY SCALE: 12/23/2004 DATE DATE 12/23/2004 DATE DATE 12/23/2004 DATE REAR VIEW X02 X01 28 7 16 RECEIVED CM' I ; `= i l K ILA JUN 28200 kERNBT CENTER UNK UGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT BREAKER TRUCK DRAYONG RREV CONO. 1RN AC RTA 1LR 82 -03 / C807 NO. TPS -M 100-02 01 I I I I FEEDER BREAKER #1 I ITPSx S.1 N7 H10 A E l t .... N PU DPU \./ �•^ -� REV DATE FRONT VIEW 01 10117/0$ Revise Panel LID DESCRIPTION PJO S2 'L Mil MEI 12 • FRONT VIEW (WITHOUT COVERS AND TRUCK) __ Pan�1cGfi•TRT 1 X1 11111111111111111111111111111111111 + HTR ALA LB BY ENG CHK APP Panduit 2 X 3" 35 Panduit 2 X 3" DPU (150 -AO) VD I B X01 X02 R1 •I+ + i 631 63I I fr U Cu 2x (7"X318 ") Cu 6' X 3/8" 2901g. Cu 1 5/8 "X3/16" /St 3 11/16"X2 3/8"X5/32" SIEMENS TRANSPORTATION SYSTEMS, INC. .70005WEGOPOINTEDRIVE SUITE 106 LAKEO4WEEd7 OAFGaN 97x34 REVIEWED FOR CODE COMPLIANCE NFPA NEC AUG 2 7 2007 City efef Tukwila BUILDIN D ION 558 9 56 16 SECTION A -A (SIDE REMOVED) SouHnikanarr DRN OW BY PAT O'HOGAN DES BY SCALE PAT O'HOGAN 12/2312004 DRN BY DATE DATE 12/23/2004 DES CKD BY DATE LANCE BANASZEK 12/23/2004 _'PROVED BY DATE NOTES: 1.�DUIHEATER IN CIS INSULATED WITCHGEAR 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR 3. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND BA - BUFFER AMPLIFIER FO - LINE TEST FUSE F11- MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR DPU HTR- HEATER H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE UGHT H10 - YELLOW UGHT Kxx - CONTROL RELAY Mot - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAUREMOTE SWITCH S2 - DIRECT ON KEYED SWITCH S3- CONTROL SWITCH VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS TOP VIEWDEHMi r c —ENT R LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F CUBICLE EQUIPMENT LAYOUT CONTRACI AR 82-0310807 [NO WINGTPS- M101 -01 'REV. 01 12/05/05 FRONT VIEW I KIRK KEY LOCKOUT TAGOUT L HARDWARE WARNING SIGN r L + OPERATION COUNTER 202 New layout of Line Test & Relay Board + J 54 16 RJA RJA PJO LB �I SIDE 'VIEW HPB45/82S + R10 30 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE,, SUITE 106 LAKEOSWEGO, OREGON 97034 K02 I SOUND11tAN5Ii REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION DRN CKD BY PAT O'HOGAN DES BY PAT O'HOGAN 12/23/2004 DRN BY DATE DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: O LL REAR VIEW -v- RO -Ir 8 Li -I KO + H E( t- VED C{TY r i I_JL:VVILA JUN 2 8 ?Oo7 H .RMi f CENTER ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F CUBICLE EQUIPMENT LAYOUT BREAKER TRUCK LAYOUT CONTRACT DRAWING No. RTA 2R 82.03 / C807 NO. TPS- M101 -02 REV. 01,. / n .........,.a o 44 Dw• Number Sht TPS -D001 TPS -S001 TPS -S001 TPS -S010 TPS -S010 TPS -S010 TPS -S010 C11 -S020 C16 -S020 C23 -S020 C27 -S020 C29 -S020 C32 -S020 C33 -S020 C36 -S020 TPS -S021 TPS -S022 TPS -SO40 -01 TPS -SO40 TPS -SO40 TPS -SO40 TPS -S050 TPS -S050 TPS -S050 TPS -S050 TPS -S060 TPS -S060 TPS -S 100 TPS -S 100 TPS-S100 TPS -S 100 TPS -S 100 TPS -S 100 TPS -S100 TPS-S101 TPS -S101 TPS -S101 TPS -S101 -03 -04 CDRL 12 - STS 30.001_R03 Substation Drawing_List S mbols & Abbreviations S mbols S mbols & Abbreviations Abbreviations S stem Single Line Diagram S stem Sin • le Line Diagram S stem Single Line Diagram S stem Sin •le Line Diagram International District/Chinatown TPSS C11 Sin le Line Dia•ram Forest Street TPSS C16, Single Line Diagram I- Li - D • DC Switch ear One Line Diagram CDRL 21 - STS 30.039_RO1 AC Switch • ear Elementary, TPSS C11, C23, C27 & C29 AC Switch. ear Elementa TPSS C16 & C36 AC Switch • ear Elementa TPSS C32 & C33 00 01 01 03 03 02 03 02 03 02 02 02 02 02 02 00 01 CO 00 CO 00 00 01 01 12/05 3/05 10/05 10/05 10/04 9/05 7/05 7/05 7/05 7/05 7/05 11/05 -01 -01 -02 -01 -02 -01 -01 -01 -01 -01 -01 - 01 - 01 -01 -01 -02 -03 -04 -05 -01 -02 -03 -04 -01 -02 -03 -04 -05 -06 -07 -01 -02 -03 -04 Title McClellan Street TPSS C23 Sin • le Line Dia • ram Ot -II. S - -t TPSS C27 Si •(i iii Dri- • TPSS C29 Si • aT• Boein• Access Road TPSS C32 Sin • le Line Diagram S• ut 33 • TPSS C33 Si Ti ' ill. I to -ti. . Bo leva d TPSS C36 Si TPSS Protection Devices i;i•uiii: Dr 1. AC Switch • ear Control Schematic AC Switch • ear Devices CURL 20 - STS 30.0026.02_R02 N Cubicle Schematics N Cubicle Schematics N Cubicle Schematics N Cubicle 24VDC Control Power R1 & R2 Cubicles General Schematics R1 & R2 Cubicles Tri• & Alarm Schematics FO Cubicle General Schematics FO Cubicle General Schematics FO Cubicle General Schematics FO Cubicle PLC Schematics FO Cubicle PLC Schematics FO Cubicle PLC Schematics FO Cubicle PLC Schematics Fl Cubicle General Schematics Fl Cubicle DPU Schematics Fl Cubicle Die ital In •ut Schematic F1 Cubicle Di • ital Out. ut Schematic 1.11111:1: ► l+' i :f_1U]��1_1:��_ \►[�lr[+`fi'tU1�' I R(W. Date 01 00 01 01 01 01 01 01 02 3/05 11/05 11/05 11/05 11/05 10/05 12/05 10/05 10/05 10/05 10/05 11/05 11/05 7/05 11/05 11/05 12/05 11/05 12/05 11/05 12/05 Rcvicinn Date Dwq Number Sht TPS -W070 -01 Inters.Qnneotion Diagram. HVJAC&D_C Cabli0g TPS -W070 -02 Interconnection Dlagtam AC & DC Station ervic TPS-W070 -03 ) nteMnneotion_Diagram .-ukding_Auxiilades TPS -W070 -04 Inter o nectiotLDiagraM. AC Switchgear TPS -W070 -05 Interconnection DiagramiDC Switchgear TPS -W070 -06 IntenzonnerlOn Diagram. DC Switchgear TPS -W070 -07 Interconnection Diagram. Profibus TPS -L001 TPS -L040 TPS -L050 TPS -L060 TPS -L100 TPS -L100 TPS -L100 TPS -L101 TPS -L101 TPS -L101 -01 -01 -01 -01 -01 -02 -03 -01 -02 -03 Ormr O. • • - evisi • and may i CURL 28 - STS 30.00643101 CDRL 123 - STS 30.0045 TPSS BIdg_Elec uiP AC Switchge_ar..Bill ofMaterial Cubicle, R CubicleJ ill of Mat d l— FO Ctitzicle Bill aMaterial FO CtlblcL.lilLofMat_erial FQQubicle. ill of Material - F Cubicle, Bill of Material F Cubicle, Bill of Material F Cubicle�4ill of�aterial FILE COPY Title cs ore. HbVISIQNS ns wi require a new p an su h ude . dd 'onal • fan review fees REVIEWED - CODE = COMPLIANCE NFPA70 - IEC — AUG - 7 - City Of Tukwila B !WIN D Puhliir• Works, Build' PERMIT NU m a V SOUND TRANSIT Mainline Substation._ 1 DECO5 - Dr Rev. I Date 00 t r1Nii l,Glvl I 01 11/05 Q1 11/05 01 11/05 01 11/05 01 11/05 01 11/05 01 11/05 1 12/05 6/05 Q1 12/05 00 6/05 01 . 12/05 01 12/05 01 12/05 01 _ 12/05 01 12/05 01 12/05 FILE COPY Drawing I Q 1 TPS -M040 TPS-M TPS -M • • 0 TPS -M040 TPS -M040 TPS -M040 TPS -M040 CDRL 15 - STS 30.0019 : "I j .. • f: Gl1•: ►:i�:• . «S • 00 7/05 1 1 t11�H7 o to of 00 • 00 00 00 11/05 00 I O0 12/05 01 9/05 01 10/05 10/05 Dwg Number Sht C11 -6001 C16 -B001 C23 -6001 C27 -B001 C29 -B001 C32 -B001 C33 -B001 C36 -B001 TPS -B001 TPS -B001 TPS -B001 TPS -B001 TPS -6001 TPS-B001 PRD -B001 PRD -B001 PRD -B001 PRD -B001 A. 'roved -01 -01 -01 -01 -01 R# TPSS Buildin Switch • ear Auxilia •ui• CDRL 25 - STS 30.0020 -01 AC Switchgear Anchoring Plan -02 DC Switchgear Anchoring Plan -03 DC Switchgear Anchoring Details -04 DC Switchgear Bolt -Up Details Title CDRL 13 - STS 30.0034_R02 -01 TPSS Buildin• E• ui • ment Arran • ement Plan -01 TPSS Buildin• E•ui• ment Arran •ement Plan -01 TPSS Buildin • E • ui • ment Arran • ement Plan TPSS Buildin • E • ui • ment Arran • ement Plan TPSS Buildin • E•ui• ment Arran •ement Plan TPSS Building Equipment Arrangement Plan TPSS Buildin• E.ui• ment Arran •ement Plan TPSS Buildin. E. ui • ment Arran • ement Plan International District Fores McClellan St. Othello St. Rainier Beach (Boeing Access Rd.) South 133rd St. ukwilla Intl Blvd Revision Rev. Date SD it � D SD _10 _____00 00 _02 -01 E ment Elevations for C11 C23 C27 C29 01 -02 TPSS Buildin• E ui ment Elevations for C11 C23 C27 C29 -03 TPSS Building Switchgear Equipment Elevations for C16 & C36 -04 TPSS Building Auxiliary Equipment Elevations for C16 & C36 -05 TPSS Building Switchgear Equipment Elevations for C32 & C33 -06 TPSS Building Auxiliary Equipment Elevations for C32 & C33 01 00 00 00 00 • • Date 9/05 7/05 9/05 9/05 9/05 9/05 9/05 7/05 10/05 10/05 12/05 12/05 12/05 12/05 9/05 9/05 9/05 9/05 Ow• Number Sht TPS -M041 TPS -M041 TPS -M041 TPS -M042 TPS -M042 TPS -M042 TPS -M042 TPS -M042 TPS -M043 TPS -M043 TPS -M050 TPS -M050 TPS -M050 TPS -M060 TPS -M060 TPS -M060 • Si • CS -01 -02 -03 -05 -06 -07 -08 -09 -01 -02 -03 -01 -02 -03 -04 -05 -01 -02 -01 -02 -03 -01 -02 -03 -01 -02 -01 -02 ill . • - • I I • AC Switch tear. Nameplate edgle_for G16 8 ,itchaear. Elevation foi 32 & C33 •u chaear. Section Ylews for C32 & C33 a Ilctear. Nameplate schedule.for C3 & C33 ectifier Transformer. Lout - hIfier Transformer. Details - tifier Transformer Namepzlate DC Switch • ear, Line -U • Arrangement DC Switch • ear, Name • late Schedule DC Switch. ear, Instrument Panels, Feeder Breaker Drilling Template DC Switch •ear, Instrument Panels,Main Breaker Drilling Template DC Switchgear. Instrument Panels. Neaative Switch Drilling Templle__— Lightinq Arrestor Box and Current Relay Box Details i•h inq Arrestor and Current Relay. Equipment UO N bicle Equipment UO N Cubicle_Details N Cubic e_lnterphase Transformer REVIEWED-FOR - R Cubic e, Equipment UO - CODE-COMPLIANCE_ R2 Cubicle Equipm UO - -NEPA-70 - NEC R Cubicle Equipment UO Details FO Cubicle E•ui•ment U• i INV 7_200T___ C FO Cubicle Truck La out I Feeder F Cubic e ui men UO `w� Q. N F Cubicle Feeder Truck La ou i. 1, 41 ij ri.uki - �ON- a IMO m1:1,rr0111111 SOUND TRANSIT Mainline Substation 1 DECO5 Drawing List Drawing No. TPSD001 -02 Rev. 01 01 Date fiTOT 12/05 01 CCl/ 3/17/05 fIATF SINGLE LINE DIAGRAM SYMBOLS O 0 E IvTI — 01— DC SHUNT LIGHTNING OR —OSAo -J11 SURGE ARRESTOR w/ GROUND CONNECTION CABLE STRESS CONE TERMINATION A 3 PHASE, DELTA, TRANSFORMER CONNECTION 3 PHASE, WYE, TRANSFORMER CONNECTION OPEN DELTA CONNECTION _A-1LA-./ TRANSFORMER ffim 600/200 -5 MR E-2 REVISED PER COMMENTS nPAr.R IPflC N AMMETER VOLTMETER VOLTAGE OR CURRENT TEST TERMINALS CURRENT TRANSDUCER ELECTRICAL INTERLOCK KEY INTERLOCK VOLTAGE TRANSDUCER DIRECTION OF CONTROL OR RELAY INFLUENCE LINE RECTIFIER TRANSFORMER, 12 PULSE (TYPICAL FOR ANSI - CIRCUIT No.31) CURRENT TRANSFORMER, NUMBER INDICATES QUANTITY VOLTAGE TRANSFORMER, NUMBER DENOTES QUANTITY MULTI -RATIO 600:5 CURRENT TRANSFORMER CONNECTED ON THE 200:5 TAP PJO RY ENG CHK APP SINGLE LINE DIAGRAM SYMBOLS 400 1 300 72) �O— III /O —O' 0-- ISOLATING DEVICE (TYPICAL) MEDIUM VOLTAGE AC CIRCUIT BREAKER, 3 -POLE, DRAW -OUT TYPE PANEL CIRCUIT BREAKER, FRAME SIZE INDICATED ABOVE LINE AND TRIP VALUE BELOW LINE IN AMPS CIRCUIT BREAKER DC CIRCUIT BREAKER DRAW -OUT TYPE w/ SERIES TRIP DEVICE 1 I IF__ FUSE NUMBER INDICATES QUANTITY FUSED DISCONNECT NUMBER INDICATES QUANTITY « 3 E---11 I (- > }- DRAWOUT VT WITH FUSE NUMBER INDICATES QUANTITY MANUAL, NO -LOAD BREAK TYPE DISCONNECT SWITCH MOTORIZED, NO -LOAD BREAK TYPE DISCONNECT SWITCH GROUNDING DISCONNECT SWITCH —I I— OCS SECTION BREAK - -��— OCS INSULATED OVERLAP 111 m m TRANSPORTATION SYSTEMS, INC. SIEME 3000SWEGORO/N1EERNE SU11P 106 LAKE OSWEGO, OREGON 97034 SCHEMATIC DIAGRAM SYMBOLS _ POWER RECTIFIER OR DIODE 8-1/c 500kCMIL QUANTITY AND SIZE OF CONDUCTOR (kCMIL SAME AS MCM) h CONDUCTOR CONNECTION -ice- EXTERNAL CABLE CONNEC —I— GROUND CONNECTION /7/ CHASSIS CONNECTION TERMINATION (30 MADE UP NEUTRAL) TEFLON INSULATED CONDUCTOR >2KV FLEXIBLE Cu CONDUCTOR (OR) BRAID >120mm AUXILIARY RELAY COIL TRANSDUCER VOLTAGE OR CURRENT BATTERY DEVICE AUXILIARY SWITCH OPEN WHEN ACTUATING DEVICE IS NON - OPERATED OR DE- ENERGIZED STATE DEVICE AUXILIARY SWITCH CONTACT - CLOSED WHEN ACTUATING DEVICE IS NON - OPERATED OR DE- ENERGIZED STATE __0_123-_ MANUAL PUSHBUTTON SWITCH - NORMALLY CLOSED —O 0-- MANUAL PUSHBUTTON SWITCH - NORMALLY OPEN —x--- TEST BLOCK S03 COMPONENT IDENTIFICATION C _ EQUIPMENT ENCLOSURE OUTLINE r — 1 EQUIPMENT WITHIN ENCLOSURE L - - - ISOLATED FROM EARTH /GROUND SOUNDTRANSIT REVIEWED FOR lettODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila DING D SION • PAT O'HOGAN 3117/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE SCALE: SCHEMATIC DIAGRAM SYMBOLS 1111 H RES I— or or DATE 3/17/05 DATE I I1.0 Q0.1 El Al 1 2 MICRO SWITCH SELECTOR SWITCH MANUAL SWITCH KEY OPERATED OPTO ISOLATOR DEVICE OPERATION COUNTER -fi RESISTOR VARIABLE RESISTOR LED \ / INDICATOR, G- GREEN, R -RED, Y- YELLOW, BL -BLUE SHIELDED CABLE — — — — -0 INTERCONNECT WIRE TERMINALBLOCK TERMINAL TWISTED PAIR INTERPHASE TRANSFORMER (TYPICAL FOR ANSI CIRCUIT No. 31) PLC INPUT PLC OUTPUT DPU INPUT DPU OUTPUT JUMPER ON TERMINAL BLOCK __x THERMOCOUPLE RECEIVED crry n. JUN 2 r 8 2091 I��'li i/111 CEN I ;l LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION SYMBOLS AND ABBREVIATIONS SYMBOLS CONTRACT DRAWING NO. RTA /LR 82.031 C807 I NO. TPS 5001 - 01 I RE'. 001 01 REV 3/17/05 DATE ANSI DEVICE TABLE NUMBER DESCRIPTION 5 EQUIPMENT SHUTDOWN DEVICE 26R1 RECTIFIER DIODE OVERTEMPERATURE, ALARM 26R2 RECTIFIER DIODE OVERTEMPERATURE, TRIP 27 UNDERVOLTAGE RELAY 30 ANNUNCIATOR 32 REVERSE CURRENT INSTANTANEOUS RELAY 33 EQUIPMENT DOOR INTERLOCK DEVICE 43 SCADA LOCAL / REMOTE SWITCH 47 PHASE SEQUENCE VOLTAGE RELAY 48 INCOMPLETE SEQUENCE RELAY 49T1 TRANSFORMER WINDING OVERTEMPERATURE, ALARM 49T2 TRANSFORMER WINDING OVERTEMPERATURE, TRIP 51A RECTIFIER OVERLOAD RELAY 50/51 PHASE FAULT TIME OVERCURRENT RELAY WITH INSTANTANEOUS ELEMENT 50/51 N GROUND FAULT TIME OVERCURRENT RELAY WITH INSTANTANEOUS ELEMENT 52 AC CIRCUIT BREAKER 59 1500VDC TO 125VDC POTENTIAL RELAY 64G FRAME FAULT RELAY, FRAME GROUNDED 64L FRAME FAULT RELAY, FRAME LIVE 64V RAIL TO EARTH VOLTAGE DETECTION 72 DC FEEDER BREAKER 76 DC FEEDER DIRECT ACTING TRIP DEVICE 82 DC FEEDER LOAD MEASURING FOR LINE TEST 83 LINE TEST RECLOSING RELAY 85RX TRANSFER TRIP RECEIVE 85TX TRANSFER TRIP TRANSMIT 86 AC LOCKOUT RELAY, HAND RESET 89N NEGATIVE DISCONNECT SWITCH 95X TRANSFORMER TEMPERATURE AUXILIARY RELAY 98 -1 DIODE FUSE MONITOR ALARM 98 -2 DIODE FUSE MONITOR TRIP 150 MAIN DC BREAKER MAX OVERCURRENT 150R DC FEEDER RATE OF RISE RELAY 186 DC LOCKOUT RELAY REVISED PER COMMENTS DESCRIPTION PJO BY ENG CHK APP DIAGRAM, DEVICE ABBREVIATIONS NUMBER DESCRIPTION A AL APS BA BT CTR CS /C CSIT DPU DS E ETM ETS F F/O FMR G Hx H I/C J K LOR MOC NB OBT OCS OCW OLM OP P PLC PM R RGD S SA S -A SB SCADA SCL S -N & R SSS S-T & C TOC TPSS V VD WN X W AMPERE ALARM, LOCAL AND SCADA AUXILIARY POWER STATION BUFFER AMPLIFIER DC CIRCUIT BREAKER TRUCK COUNTER, CONTROL CONTROL SWITCH /CLOSE CONTROL SWITCH/TRIP DIGITAL PROTECTION UNIT DOOR SWITCH DC CIRCUIT BREAKER OPERATING SOLENOID ELECTRONIC ( TEMPERATURE MONITOR EMERGENCY `RIP SWITCH FUSE, CIRCUIT BREAKER FIBER OPTIC FEEDER MON TORING RELAY DC TO DC CONVERTER INDICATOR DC BREAKER OR LINE DISCONNECT SWITCH CURRENT INTER CONNECT JACK (CONNECTOR) AUXILIARY RELAY OR KEY INTERLOCK LOCAL - OFF - REMOTE MECHANISM OPERATED CELL SWITCH (BREAKER STATUS) NORTH BOUND OPTICAL BUS TERMINAL OVERHEAD CONTACT SYSTEM OVERHEAD CONTACT WIRE OPTICAL LINFC MODULE OPERATOR PANEL PLUG (CONNE:CTOR) PROGRAMABLE LOGIC CONTROLLER PANEL METER RESISTOR RAIL GROUNDING DEVICE SWITCH SURGE ARRESTOR SCADA- ANALOG SOUTH BOUND SUPERVISORY CONTROL AND DATA ACQUISTION SEATTLE CITY LIGHT SCADA - NORMAL & RELEASE STATION SHUTDOWN SWITCH SCADA TRIP A, CLOSE TRUCK OPERATED CELL SWITCH (TRUCK POSITION) TRACTION POWER SUBSTATION VOLTAGE VOLTAGE DIVIDER WIRE NUMBER TERMINAL BLOCK OR DC BREAKER DISCONNECT DEVICE 26kV CIRCUIT, BREAKER SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINT.FDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 SOUNDTRANSIT REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION PAT O'HOGAN DRN BY DEN CKD BY PAT O'HOGAN DES BY SCALE: EQUIPMENT ABBREVIATIONS API APT A01 A02 A03 BC CCIC EPT DCC DP1 FO F1 F2 F3 F4 N R1 R2 TPT 3117/05 DATE DATE 3/17/05 DATE DES CKD BY DATE LANCE BANASZEK 3/17 /05 APPROVED BY DATE AC PANEL AUX POWER TRANSFORMER 26kV SWITCHGEAR, INCOMING /METERING SECTION 26kV SWITCHGEAR, AUXILIARY POWER SECTION 26kV SWITCHGEAR, CIRCUIT BREAKER SECTION BATTERY CHARGER CENTRAL CONTROL INTERFACE CABINET EXTERNAL POWER TRANSFORMER DC CONTACTOR DC PANEL 72 -11 DC MAIN BREAKER 72-1 FEEDER BREAKER 72 -2 FEEDER BREAKER 72 -3 FEEDER BREAKER 72-4 FEEDER BREAKER NEGATIVE DISCONNECT SWITCH WYE CONNECTED RECTIFIER DELTA CONNECTED RECTIFIER TRACTION POWER TRANSFORMER DRAWING NUMBERING METHOD XXX -S 101 -01 T DRAWING SHT. NUMBER DRAWING SERIES SUBSTATION NAME DRAWING SERIES SHEET CONTINUATION METHOD 2. 09 (USED ONLY WITHIN A DRAWING SERIES) DRAWING COLUMN NUMBER DRAWING SHEET NUMBER COMPONENT IDENTIFICATION K11 COMPONENT NUMBER DEVICE ID LINK LIGHT RAIL PROJECT RECEIVED JUN 2.8 ?097 I� td18 CENTER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION SYMBOLS AND ABBREVIATIONS ABBREVIATIONS CONTRACT DRAWING No. RTA /LR 82 - / C807 NO. TPS- S001 -02 REV. 01 w U. u- 11/14/05 10/10/05 3/17/05 DATE • PINE STREET TPSS N00 i N60 0 A 11 � 6000A ` K 0A r r P.< P.<1 a:' ) =o °° SA 1500VDC Revised for CNRFP -012 N00 -W-406 1200A ANSI C34.2 _ (-) CIRCUIT NO 31 A REVISED PER COMMENTS REVISED PER COMMENTS 2 • 0 H -6131 DESCRIPTION p 26kV 26kV 2x1174V A Y H -624/- SA 4, 0 00S SECTION NUMBER J 26 KV FROM1 PINE STREET SUBSTATION I N00 -N -901 6000A TO RAIL SA S 3 P.10 PJ0 PJ0 BY 1500VDC (4 I O4 TRANSFER TRIP = off ) OQT = U . U/ ENG CEILING MOUNTED FEEDER CABLES (1100S) LB LB LB • CHK LB LB LB APP 4 L • I SA SA 1 L INTERNATIONAL DISTRICT /CHINATOWN ( TPSS C11 2 6 KV FROM SCL p 3.0MW 26kV rn4V A Y ANSI C34.2 (•) CIRCUIT NO 31 5 C11 -W-401 1200A h • / n / d Ay _ 6 4_ I WESTLAKE UNIVERSITY ( 1100N) TUNNEL PIONEER SQUARE INTERNATIONAL DISTRICT/ CiINATOWN C11 -H -7111 C11 -N -901 6000A -- - G000A TO RAIL en C■F 0 <T =o) =o) U UT SA SA • 3000SWEGOPO,NTEDRNE, SUITE 106 LAKEOSWEGO,, OREGON 97034 SIEMENS m m TRANSPORTATION SYSTEMS, INC. TRANSFER TRIP C14 -H -604 NO ( 14P 7 C1• -H -602 C14 -H -605 C14 -H-601 N = o = REVIEWM F CODE COMPLIAN NFPA70 -NEC AUG 2 7 ;001 C14 -H-603 • L SOUNDTRANSrr FOREST STREET TPSS C16 T 26 KV FROM SC-L-1 ANSI C34.2 CIRCUIT NO 31 1500VDC SAS PAT O•HOGAN DRN BY C16 -W-401 1200A C16 -H•711 6000A SA S 0 H -613 E DRN CKD BY PAT O•HOGAN DES BY p s. DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE H-624� 3/17/05 DATE 3/17/05 DATE 3/17/05 DATE • C 16- N -901 433-- 6000A f TO RAIL • in r- • <1 7 I <I I < `2p uso o) o" � 0 U U 5 - SA SA; CD P? CD ( TO WEST YARD TRACKS DWG. S010 -04.4 DATE 3/17/05 DATE p 3.0MW 26kV 2TiT 4V g C') '1• O O t Ody_ U U J 2316N) • TRANSFER TRIP (,231 LINK LIGHT RAIL PROJECT 10 TPS OCS NB — OCW BEACON HILL SB — OCW —(73 N VED /� Cis' ". \AAA JUN 2 8 70( _ 1 lJ . _ TO EAST G �,fi'v`I I l a I O YARD YARD TRACKS TPSS Y1 DWG. SO10 -04.4 DWG. S010 -04.3 TRACTION ELECTRIFICATION SYSTEM SYSTEM SINGLE LINE DIAGRAM CONTRACT DRAWING REV. NO. RTA/LR 82 -03 / C807 I NO. TPS- 5010 -01 03 C 0 11 1 . E E eo O� O 0. O O �• w 0 u o E o c WO O. i< 03 0 11/14/05 02 10/10/05 TPS OCS • 2 • TPSS C23 T J. C23 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 1500VDC SA SA L (231 Revised for CNPFP -012 C23 -FI -71 01 3/17/05 REVISED PER COMMENTS 6000A N O (O • McCLELLAN STREET 26 KV FROM SCL 3.0MW 26kV 2x1174V p Y 1 T C23 -N -901 >HE - --\ 6000A TO RAIL r ( -) c7 \J � ° QT =0" Z SAS I SA C+1 O (9 0 O M U U C24 -H-601 3 REVISED PER COMMENTS I I 1500VDC I TRANSFER TRIP 2316N MT BAKER IMUNDS OTHELLO AUG 2 7 2007 SB -OCW H-613 C24 -H -602 RIO • NC C24 -H -603 LB 1 L LB P./0 LB LB P.I0 LB LB BY ENG CHK APP EDMUNDS STREET TS C25 -- • - -• -- SAS I SA N U 4 N O (9 (25245) C25 -H -612 NC • 5 in j i�V A Soo) = o° ) U r U `` SA ,j I S A O N N j • TRANSFER TRIP 6 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINTE GRIM SUITE 106 LAKE OSWEGO, OREGON 97034 _ _ OTHELLO _ _ TPSS C27 T 26 KV FROM SCL ANSI C34.2 CIRCUIT NO 31 A • C27 -W-401 1200A 1500VDC ▪ N f; x0 ▪ a ) Via 0/ 7 3.0MW 26kV x'F Y (-) C 60 0A C 60 0A �� �TO RAIL SA • L� SouNnikaNSrr 8 I I TRANSFER TRIP j DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE _ _ RAINIER BEACH _ _ TPSS C29 T 26 KV FROM SCL SA S (2927S) • ANSI C34.2 CIRCUIT NO 31 1500VDC PAT O'HOGAN 3/17/05 DPW BY DATE 3/17/05 DRN CKD BY DATE PAT O'HOGAN 3/17/05 DES BY DATE DATE 3/17/05 DATE C29 -W-401 1200A p C29 -H•711 6000A N o o °L 0/ 2927N, ER BEACH I y 9 A p 26kVW 2x1174V Y ( -) • (3229S C29 -N -901 f )-t 600 T O 0A RAIL o < ' <T 'TRANSFER TRIP m o) '0) U t C ` LINK LIGHT RAIL PROJECT 10 CONTRACT DRAWING NO. RTA/LR 82 -0310807 NO. TPS - 5010'02 N TPS OCS RECEIVED CITy JUN 2 8 7007 !_l j E11; l4 CEI`a E R TRACTION ELECTRIFICATION SYSTEM SYSTEM SINGLE LINE DIAGRAM — ci 'REV. 03 REV DATE DESCRIPTION 11/14/05 3/17/05 DATE TPSS C32 BOEING ACCESS ROAD C32 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 Revised for CNRFP -012 REVISED PER COMMENTS DESCRIPTION �lw p Y 26 KV FROM SCL I C 60 0A C 60 0A I 1500VDC l j TO RAIL I I 1500VDC o��, o l cO 1 F 1 N ti¢I r ¢T ll A �A o ° o x ° o 2 °0 2 °0T I TRANSFER TRIP 1 x ±,S3 0 I SA SA SA SA ! I I I I L 3.0MW 26kV 2x1174V PJO PJO BY ENG LB LE CHK LB LB APP SOUTH 133rd STREET _ TPSS C33 26 KV FROM SCL ANSI C34.2 CIRCUIT NO 31 SA C33 -W-401 1200A SA p H-613 12, SA 0 H -624 L 3.0MW 26kV 2x 11T4V Y (-) C 60 0A C 6000A 01 T TO RAIL f'1 , -- o <T' o xS ) x ) 8 \ co 'O 4C U �� S` •• SA 4- 3000SWEGO POINTEOR/VE SUITE f06 IAKEOSWEGO, OREGON 97034 SIEMENS TRANSPORTATION SYSTEMS, INC. TRANSFER TRIP (3633N) (3336s) L TUKWILA INTERNATIONAL BOULEVARD F ri" TS C36 26 KV FROM SCL — 1 cO co U SOUNDTRANSIT C36 -W -401 1200A C36 -H -711 6000A SA S SA S p Y ANSI C34.2 _!•1.. ( -) CIRCUIT NO 31 1500VDC x oo) Zoo ) °O � U Li/ AU 6 2 7 2007 3.0MW 26kV x1 4V SA SA 0 H -613 REV EWED FOR o O DE OMPLIANCR N 70 -NEC Ci Of Tukwila UILD NG DIVISION PAT O'HOGAN 3/17105 DRN BY DATE 3/17/05 DRN CKD BY DATE PAT O'HOGAN 3/17/05 DES BY DATE DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE C36 -N -901 - - 6000A TO RAIL DATE 3/17/05 DATE 0 H -624 CONTRACT NO. RTAILR 82 -03 / C807 TRANSFER TRIP (FUTURE) (FUTURE) NB -pCW I TUKWILLA INTERNATIONAL BOULEVARD LINK LIGHT RAE. PROJECT DRAWING NO. TPS-S010-03 TPS OCS (FUTURE) S9CW 1a w LL RFCE-!VED JUN 2 81f187 TRACTION ELECTRIFICATION SYSTEM SYSTEM SINGLE LINE DIAGRAM REV. 02 DC SWGR NEG RECT DC BRKRS ENCLOSURES 02 10/10 /05 01 3/17 /05 AUXILIARY POWER TRANSFORMER AC PANEL (NOTE 4) AP1 BATTERY CHARGER GND MAT II 25kVA 26kV 1240 -120 1 0, 60 HZ 125VDC BATTERY DC PANEL DPI GND PAD (2) - 3E <EH IIH> __J INTERNAL J EXTERNAL ADD 76 TRIP DEVICE TO 72 -11 REVISED PER COMMENTS EXTERNAL TO TPSS PAD MOUNT APT LA A.J 55 kVA �v �v 1 0, 60 HZ 26kV / 240 -120 25AE AC PANEL L (FEED BY OTHERS) SIGNAL BUNGALOW (NIC) PJO PJO I I (C807) DC NEGATIVE BUS, 6000A 100 AMP CONTACTOR AND SWITCH (FUTURE DRAINAGE CABLES) LB LB -J LB LB r SA 1 ' UTILITY -3 -+ `ill i I METERING VT , I (NOTE 2) CT I L _I (METERING CTS AND PTS ARE REVENUE ACCURACY) 26 kV, 3PH, 3W FROM SCL 2 G�> II 3E OTE4L J 33A C32 - W - 401 NC 33T 3.0 MW 26 kV I — — — 2x1148V)T - RECTIFIERr ANSI C34.2 33R 3MW 1 CIRCUIT NO 31 - 1 NEGATIVE RETURN CABLES TO RUNNING RAILS OR IMPEDANCE BONDS L 100:5 100:5 L 1 50� C J — J 6kAl 50 mV o r BA L 33N 6000A (NOTE 3) t 6000A - — 89N \ 72 -11-- ( C32 -N -901 i I C32 -H -711 TRIP, LOCAL & SCADA ALARM 761 Z • [ (NOTE 8) SCALE SCALE 0 -6000A 0 -2000V 00 VD S -T &C J 0 -100A 0-30KV LJ i— TRANSFER TRIP TO/FROM ADJ. TPSSs T (NOTE 5) A I 1 722 S -T &C _ _ 1 ( 72 1 1 ( � C32 -H -702 I C32 -H -701 0 I 1 DPU I DPU SCALES A=- 4k..0. +4kA. V =0 -2kV L SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRNE, SUITE /06 LA/(EOSWEGO, OREGON 97034 OP 270 ANNUNCIATOR / PLC / ` 18 / (NOTE 7) 32 / OI SCADA CLOSE/RECLOSE TO OCW (TYP. ALL FEEDERS) DC POSITIVE BUS, 1500VDC, 6000A T J= N 0 ll � s m LEGEND SCADA ALARM 76 AL LOCAL ALARM & SCADA S -T &C SCADA TRIP & CLOSE 0 LOCAL ALARM S -A 4kA 60mV SCADA ANALOG VIA S7 PLC (NOTE 1) N O N a) U SOUNDTRANSrr \ II' 76 1 M O N 0 SA 1 PAT O'HOGAN 3/17/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY NOTES: 1. PROTECTIVE DEVICES, INSTRUMENTS AND INTERLOCKS FOR FEEDER BREAKERS F2 THRU F4 ARE IDENTICAL TO FEEDER 1. 2. CTs, VTs, SAs & METERING PROVIDED BY SCL AND INSTALLED UNDER THIS CONTRACT. 3. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS MAIN DC BREAKER IS OPEN. 4. KEY INTERLOCK PREVENTS ACCESS TO FUSES UNLESS API MAIN BREAKER IS OPEN. 5. K# INTERLOCK PREVENTS OPENING DISCONNECT SWITCH. UNLESS F# BREAKER IS OPEN. 6. 86 ENERGIZED FOR: -REV CURRENT -DC EQUIPMENT DOOR OPEN - RECTIFIER TRIP FUNCTIONS - XFMR TRIP FUNCTIONS - 59, 64L, 64G 7. THE FOLLOWING ARE FUNCTIONS OF THE PLC: 7a. DEVICE 32 PROGRAM SEQUENCE: - ENERGIZE AC LOCKOUT - 86 -TRIP & LOCKOUT AC BREAKER -OPEN MAIN DC BREAKER 7b. DEVICE 48 PROGRAM SEQUENCE: -TRIP & LOCKOUT DC FEEDERS -OPEN MAIN DC BREAKER 7c. 186 ENERGIZED FOR: - ETS/FIRE -48, 64L, 64G, 64V 7d. TRANSFER TRIP -TRIP & LOCKOUT FOR ETS, 48, 64G, 64L & 64V -TRIP & RECLOSE FOR didt -COMM. FAILURE IF HAND SHAKE FAILS NOTIFY SCADA 8. ELECTRICAL INTERLOCK OPENS CONTACTOR WHEN 89N OPENS AND CLOSES WHEN 89N CLOSES DATE 3/17/05 DATE ff (72 -3 ( -4 C32 -H -703 J C32 -H 76 DES CKD BY DATE LANCE BANASZEK 3/17105 APPROVED BY DATE SCALE: NONE I ,sAV 0 I C )) U COD ED FOR NFPA70 C EC o I AUG 2 7 2007 I City Of Tukwila B ILDING D SION 76 1 RECEIVED C! . \f ;ti�(LA JUN 2 8 7007 J �11`ril l OLIN ttl LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM BOEING ACCESS ROAD TPSS C32 SINGLE LINE DIAGRAM TDRAWING I No. C32 - 5020 - 01 CONTRACT NO. RTA I IR 82 -03 02 RFV DATE DESCRIPTION RY ENG CHK APP DC SWGR ENCLOSURES 10/10/05 3/17/05 fIATF AC PANEL AP1 BATTERY CHARGER AL AUXILIARY POWER TRANSFORMER 25 kVA 26kV ! 240 -120 1 0, 60 HZ NEG RECT DC BRKRS )- GND MAT ADD 76 TRIP DEVICE TO 72 -11 REVISED PER COMMENTS f1F( DIDTIlIN (NOTE 4) 125VDC BATTERY DC PANEL DP1 (2)•3E «I 1 1 H> L J 125AE- 1 AC PANEL L 2 <H ► 1 H> EXTERNAL TO TPSSI 3E PAD MOUNT APT r �t 55 kVA 1 0, 60 HZ 26kV / 240 -120 (C807) -1 SIGNAL BUNGALOW (NIC) PJO PJO RV FN(: J DC NEGATIVE BUS, 6000A 100 AMP CONTACTOR AND SWITCH (FUTURE DRAINAGE CABLES) LB L8 (:HK LB LB APP I UTILITY 4 i — I SA METERING VT , I (NOTE 2) CT L J v (METERING CTS AND PTS ARE REVENUE ACCURACY) L (NOTE 41_ J NC 26 kV, 3PH, 3W FROM SCL \/ 33A C33 -W-401 33T 3.0 MW L -- -- 26 kV 2x1148V T T E vTIFIERE ANSI 33R 1 i CIRCUIT NO 31 +1- L -- - - - - 1500VDC I , J L 33N 6000A (NOTE 3) T 6000A - - — — 89N -0- -{ 72 -11- - 1 C33 -N -901 I C33 -H -711 J TRIP, LOCAL & SCADA ALARM 'T • [E (NOTE 8) SA — J 1 NEGATIVE RETURN CABLES TO RUNNING RAILS OR IMPEDANCE BONDS L 100:5 100:5 A <H 1 4 1)--3 ?>-11 2 11 7330 6kA 50mV S -T &C 1200A 76 0.5E 6A, 600V BA SCALE 0-6000A 0 SCALE 0 -2000V 0 3000SWEGO P0#17EOR/VE SUITE 106 LAKE OSWEGO, OREGON 97034 DPU- DPU SCALES A = -4k.. 0.. +4kA V =0 -2kV 2005, TRANSFER TRIP TO /FROM ADJ. TPSSs OP 270 ANNUNCIATOR " 186 PLC / 32 j (NOTE 7) \ OI SCADA 0 -100A 0 -30KV t (NOTE 5) = I CLOSE/RECLOSE ® I � `� I 4000 — -I- - I In r I S -T &C _ _ — . ( \ 72 1 I al 1 1--- I DPU C33 -H -701 T I 48 l i�� J I T ) 1 L L —_I I I (h J SIEMENS TRANSPORTATION SYSTEMS, INC. TO OCW ( IS A (TYP. ALL FEEDERS) lr S -A (NOTE 1) DC POSITIVE BUS, 1500VDC, 6000A ,SA v LEGEND 30 SCADA ALARM 76 <> LOCAL ALARM & SCADA S•T &C SCADA TRIP & CLOSE e LOCAL ALARM S -A 4kA 60mV SOUNDThANSIT SCADA ANALOG VIA 97 PLC 1 — — — — -1 1 /I\C33 -H -702 T 233 -H -703 23 -H -704 (12 -2 r — � I r { I 1 N Lo (7 (D (9 (9U (?? (9 m = = o o ? = O U U U PAT O'HOGAN DRN BY ORN CKD BY PAT O'HOGAN DES BY SCALE: NONE NOTES: 1. PROTECTIVE DEVICES, INSTRUMENTS AND INTERLOCKS FOR FEEDER BREAKERS F2 THRU F4 ARE IDENTICAL TO FEEDER 1. 2. CTs, VTs, SAs & METERING PROVIDED BY SCL AND INSTALLED UNDER THIS CONTRACT. 3. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS MAIN OC BREAKER IS OPEN. 4. KEY INTERLOCK PREVENTS ACCESS TO FUSES UNLESS AP1 MAIN BREAKER IS OPEN. 5. K# INTERLOCK PREVENTS OPENING DISCONNECT SWITCH. UNLESS F# BREAKER IS OPEN. 6. 86 ENERGIZED FOR: -REV CURRENT -DC EQUIPMENT DOOR OPEN - RECTIFIER TRIP FUNCTIONS XFMR TRIP FUNCTIONS - 59, 641, 64G 7. THE FOLLOWING ARE FUNCTIONS OF THE PLC: 7a. DEVICE 32 PROGRAM SEQUENCE: - ENERGIZE AC LOCKOUT - 86 -TRIP & LOCKOUT AC BREAKER -OPEN MAIN DC BREAKER 7b. DEVICE 48 PROGRAM SEQUENCE: -TRIP & LOCKOUT DC FEEDERS -OPEN MAIN DC BREAKER 7c. 186 ENERGIZED FOR: -ETS /FIRE -48, 64L, 64G, 64V 7d. TRANSFER TRIP -TRIP & LOCKOUT FOR ETS, 48, 64G, 64L & 64V -TRIP & RECLOSE FOR dildt -COMM. FAILURE IF HAND SHAKE FAILS NOTIFY SCADA 8. ELECTRICAL INTERLOCK OPENS CONTACTOR WHEN 89N OPENS AND CLOSES WHEN 89N CLOSES (+1 0 3/17/05 DATE DATE 3/17/05 DATE DES CKD BY DATE LANCE BANASZEK 3/17105 APPROVED BY DATE 6 C NO. c RTA / LR 82-03 / C80 LINK LIGHT RAIL PROJECT RECEIVED `� Cis' ._ / ►I Ly JUN 2 8 71107 L'LI tliilT vLN t` @ TRACTION ELECTRIFICATION SYSTEM SOUTH 133RD STREET TPSS C33 SINGLE LINE DIAGRAM 1 DRAWING NO. C33S020 -01 02 SIMATIC OP 270 HMI - SCREEN O ABB DPU 2000R AC PROTECTION RELAY 27, 46, 49, 50/51, 50/51N © SWARTZ FRAME FAULT RELAY ® S7 -300 PLC 0 0 REV DATE O SITRAS DPU DC DIGITAL PROTECTION UNIT 48, 82, 83, 85, 150R, 151 L 0 0 1 1 000 6.411C OrSt 88888888 • 0• .w w w w ° l 0 11931861 0 °° 0 0 CPU 0 m 0 0 N 0 POWER METER ION 7330 S7 BUS CONNECTOR FOR PROFIBUS X3: INPUT /OUTPUT TERMINAL BLOCK OPTICAL LINK MODULE (OLM) COPPER TO FIBER CONVERTER DESCRIPTION ANALOG SIGNALS (COMM LINK 1 SUPPLIED BY OTHERS) m 0 n 70 i PROTOCOL CONVERTER CCIC BY ENG CHK APP AC SWITCHGEAR AC CIRCUIT BREAKER A03 0 11 E J- I ®1 ©00 26kVAC 52 RECTIFIER TRANSFORMER PT NEGATIVE DISC. SWITCH F/O TRIP & ALARM { u14 89N TO RAIL SIGNALS RECTIFIER R1 & R2 SIEMENS m m TRANSPORTATION SYSTEMS, INC. 300 OSWEGOPO/NTEDRIV& SUITE 106 LAKEOSWEGO, OREGON 97034 MAIN FEEDER 72 -1 BREAKER 72 -0 TRIP &.- ALARM SIGNALS MPI BUS OBT XTRIP TO /FROM ADJ TPSs 0 A 0 0u 1; Lit 1.5kVDC 1 AC & DC STATION SERVICE I -_ FIRE & EMERGENCY TRIP BLDG DATA DC SWITCHGEAR 0 X3 FO rg °00 u0 ( F /01 RX SOUNDTRANSIT RAIL F1 F/O VPD & F/O TX FEEDER 72 -2 FEEDER 72 -3 1 0 C SCALE DRN CKD BY PAT O'HOGAN DES BY F2 1 F/0 V & F/0 PD TX REYED FOR CODE COMPLIANCE NFPA70 - NEC . AUG 2 7 2007 City Of Tukwila BUILD NG DIVISION PAT O'HOGAN 1026/2004 DRN BY DATE DATE 10/26/2004 DATE DES CKD BY DATE LANCE BANASZEK 10/26/2004 APPROVED BY DATE 0CS F3 PROFIBUS ( DP �ocs F/O VPD & F/O TX RAIL l CONTRACT NO. RTA /LR 82 -031 C807 FEEDER 72-4 ° ODO uo t ( F/0 RX LINK LIGHT RAIL PROJECT 1/412 & F10 TX RAIL DRAWING NO. TPS- S021 -0 F4 0CS RECEIVED CIT" • n!I JUN 2 8 7007 r11v11 TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION TPSS PROTECTION DEVICES REV. 00 3 01 REV 9/6/05 DATE NEG CUB. REC. AMIEMMIA FRAME FAULT PROTECTION GROUND BUS DC SWGR ENCLOSURES DESCRIPTION L GROUND MAT S100 I (FO) Revised per comments 1500VDC, 6000A POSITIVE BUS SCALE 0 -2kV D.C. SWGR M041 SCALE 0...6KA 30 (;) BA ® PLC 32 VD T TRACTION POWER XFMR I FROM AC BREAKER SO40 P.10 BY o— LB ENG CHK APP 6000A (NOTE 1) S101 (F1) DPU ® 4000A T BA S102 (F2) DPU 4000A _ S1 (F3) I (F4) iti:J3-4 4000A I I DPU CID DPU LB S060 ,30 RECTIFIER 3.0MW S/30 1500Vdc L2 L1 NEGATIVE RETURN CABLES TO RUNNING RAILS OR IMPEDENCE BONDS 00 (® CD ( 85 ) A= -4k..0.. 4k V= 0..2k SA •III-. CMD 6000A I NEG. S050 DISC. SW. (N) (NOTE 1) VD NEGATIVE RETURN BUS 6000 • * • 1 100 AMP CONTACTOR AND SWITCH • TO OCW 3000SWEGO POINTEDRIVS SUITE 106 LAKE OSWEGO,'OREGON 97034 CEO QED CEO ( 85 ) A= -4k..0.. 4k V= 0..2k CABLE VAULT SIEMENS TRANSPORTATION SYSTEMS, INC. BA VD SA 2 in O 0 U iP1 :11 CEO aD ® C GED A= -4k..0.. 4k V= 0..2k T BABA VD 411-• A• • • TO OCW TO OCW PAT O'HOGAN 10/26 /2004 DRN BY DATE 10/26 /2004 DRN CKD BY DATE PAT O'HOGAN 10 /26 /2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 10/26 /2004 APPROVED BY DATE SCALE: NONE CED CID A= - 4k..0.. +4k V= 0..2k REVIEWED FOR DEV CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION 1 . f 4000A T BA VD SA •III TO OCW NOTES: 1 KFY INTERLOCK PREVENTS OPENING OF E UNLESS DC MAIN BREAKER IS OPEN. LINK LIGHT RAIL PROJECT IRFCE!VED chi'' , .- LA JUN 2 8 7007 I CE _'N { t TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR ONE LINE DIAGRAM CONTRACT DRAWING REV. NO. RTA/LR 82 -03 1 0807 I NO. TPSS022 -01 01 or IJTIUTY) • 1 f 5 6 w2_ VERSA SWITCH 200A, 27KV (BY ABB) FUSES (BY UTILTY) 1E1 PT'S (BY i XI 11111 4 • 1 ■1 1 T T I 1 SURGE ARRLSILN (BY mum - • -i 1 I I 0A 0B 0C UTILITY INCOMING • 2 POWER COMPANY METERING • MAIN BUS 27kV. 1200A. 25KA 3 • 4 • 1 MECHANICAL INTERLOCK 26000-120/240V K- � 325f PRIMARY TAPS 2 +/ -2.5% r E,25..81N 1 3 I3E,25.8KV T 5 H2 X3 xl 3 4 MAIN BUS 27W. 1200A. 25KA MECHANICAL INTERLOCK I • 6 125A. 240V X4 1 +2 CP1 a X2 CPN CP2 0 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINT EDRIVE,, SUITE 106 LAKE OSWEGO, OREGON 97034 • TO AC PANEL TO REMOTE 55KVA PAD MOUNTED TRANSFORMER 100: C50 CTs 100:5A 7 v v v I 27ADV25 1200A 52 -3B n n n SOUNDTRANSIT • MAIN BUS 27kV. 1200A. 25KA III 112 12 121 122 BUS Prs 2 RA y TIO 220:1 fly — 1 H1 X1 IS 6a 600V PAT O'HOGAN DRN BY RON ALBERT DRN CKD BY PAT O HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE 8 • 17 3 - 4 DPU2000R 3A, 600V 7330 33 VI V3 VRE 4 d 3 3A, 600V 2.i ®1 4 - 3 MAIN BUS 27kV 12001. 25KA NFPA70 -NEC AUG 2 7 2007 City Of Tukwila P BUILDING D1 SION 7112105 DATE 7112105 DATE 711210S DATE DATE 7112 /05 DATE 9 • 10 �N B 2UV 1 0A mB TO TRANSFORMER RECTIFIER OC fFf"FI' /I=D 01--,_, r�l.A JUN 2 8 7007 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR ELEMENTARY FOR TPSS C32 & C33 CONTRACT DRAW ' REV. NO. RTA/LR 82 -03 / C807 I NO. SO40-03 1 • 2 • 3 ( -) a 15A 300VDC DIME DEWY m n 3 15k 300VDC TIME DELAY 11 11 Alb T� DELAY 3 r „ 4 3 15A, 300VDC TIME DELAY 52b 4 A17 12 43 12 43 1 11 L 13 R ORB /1 16 C X3/47 17 C REMOTE 'CLOSE 13 O RP1 Ai A4 CHARGE CLOSE 52 I BREAKER CHARGE AND CLOSE I SEE DRAWING 19901F10 FOR BREAKER INTERNAL WIRING ! _ �� A3 A A5 A n ❑ RP3 O RP5 86 RP4 X3/48 ERB /2 A8 \ 15 _ 52a 16 A9 • 22 43 21 I 5100 -07 FO F L 4 RB /3 X3/45 REMOTE TRIP 0 X3/46 OERB /4 • 16_ 43 1 R 12 11_L I _ -86 18 T 18 ❑ RP6 A6 v TRIP 52 BREAKER TRIP SEE DRAWING 19901f10 FOR BREAKER INTERNAL WIRING _ A7 A ❑ RP7 CERB /5` 0E743 186 TRIP 0X3/54 oERB /6 03 5 TRIP 86 A24 29 30 • 6 102,, b � g g g 30 RE i?- 6 a o 8 8 z 0 z SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 o z 9 • 8 z z 7 L� SouNnrwwsrr • 12 27 POWER OUT1 OUT2 28 13 2 CND ( -) O O N PAT O'HOGAN DRN BY RON ALBERT DRN CKD BY PAT O'HOGAN DES BY 8 DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE 7112/05 DATE 7712105 DATE 7/12/05 DATE DATE 7/12/05 DATE • 9 5 8 0 a d n. z 0- 25 OUT3 2 21 OUTS 19 OUT6� SELF- -CHECK 26 T24 T22 T 20 18 RS -232 REVIEWED FOR CODE COMPL NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila BUILD NG D 0 14615.16 IO CONTRACT NO. RTA/LR 82 -03 / C807 • 10 PML -7330 6 ( +) ( -) G SC S1 S2 S3 S4 4 O O O O O 8 W 8 8 8 Cr NE NE NE z z z `� a-a- a a0- N N N N N fF-fF1' /ED en" ,11I JUN 2 8 707 r LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR CONTROL SCHEMATIC I DRAWING I NO. SO40-04 REV. 00 Nz30 CONTACTS HANDLE END X = SPRING RETURN SPRING RETURN X 11 X ri 12 � X 13 X X 1 X 15 X X 1617 X 21 X 22 � 23 X 2 X 25 X 26 � 27 X N330 CONTACTS HANDLE END POSITIONS = t... N SPRING RETURN °z ri „ CHH� t8 X 1 160— 17 X 1 125VDC CONTROL POWER( o EXTERNAL { CV L_ 120VAC CONTROL POWER EXTERNAL A9 • 0 PH NU (—) L PLUG 1 15 51 55 ( INTERNAL ° 52a 52a BREAKER WRING 16'f 52 56 ( +) LA2 40A, 250V D 1 2 1 3 4 A8 AtOV Al2 M4 A16 Al Y A13 � A15 A17 2 • 15 1 (2) PER CUB. (TOTAL 300W 0120V PER CUB.) 2 59 13 52a ° 52a 60 14 ( +) DC BUS ( +) ( BUS DC BUS I 1 )15A, 120V 1 2 lir/ 2 23 2 1 2 1 2 1 2 1 CUB. 1 CUB. 2 CUB. 3 HEATER CIRCUIT 125VDC 3 • 23 2 A2 102 52b 52b A24 52 BREAKER AUXILIARY CONTACTS - All contacts are shown with the breaker in the OPEN POSITION & READY — READY Contact is CLOSED when the breaker is ready for operation. — NOT READY Contact is CLOSED when the breaker is not ready for operation. II I ) 15A, 120V )15A, 120V 2 2 O 1 1,". / J 23 2 Bt u. 4 ❑� ❑c PLUG 2 INTERNAL BREAKER I a , WRING 816° L_ N o l� B2T B4 15k 120V 1 w 0 o� • LIGHTS SWITCH LIGHT FLUORESCENT INTERIOR LIGHTS (LOCATED INSIDE INSTRUMENT COMP.) 5 16 27DC —C 3� 2 5 CUB. 1 CUB 2 N V) N ❑� ❑� ❑� B3\./ B5v 87 u B9W B1 813 B15 ; 817 1 5 5 8 16 T L C a 0 N VI t] 1- O) N p� O ❑� ❑� ❑ g 815 851 85 859 863 813 853 857 861 o • ° °— 52o ° 52a _ 52a = 52a ° 52a 52b 52b 52b 8 ? 856 860 864 8141 854 858 862 B6 B8 B10"\ 6121" B14/N B1 B1 B20" 822^ 824" B1 6 55 B21 • O O N N N ix 0 ce CI ex 0 cc SIEMENS TRANSPORTATION SYSTEMS, INC. i 3000SWEGO POINT EDRIVE,, SUITE 106 LAKEOSWEGO, OREGON 97034 • SELECTOR SWITCH ELECTROSWITCH SERIES 24 CAT. NO. 242028 CONTROL SWITCH ELECTROSWITCH SER CAT. N POSITIONS 7 CLOSE TRIP SCADA CONTACTS 52b I OPERABLE IN READY, CONNECTED AND . J TEST POSITIONS TRIP CLOSE 704 52b 705 City Of Tukwila LDIN DIVI ION EWED FOR CODE COMPLIANCE NFPA AUG 2 7 2007 B2 SOUNDTRANSIT 86 1 1 • 11 241+ 8 SCALE: NONE 25 12Eli 86 26 27 13 Y 14 Y 15 T 16 T 17 L L L _ � X3 I 10 ' (1) 37 14) 38 0 39 H /CWO7O-O4O4 - RECEIVED CITY JUN 2 8 ?097 I;- i=.BMtT GElyE R DES CKD BY LANCE BANASZEK APPROVED BY PAT O'HOGAN DRN BY RON ALBERT DRN CKD BY PAT O'HOGAN DES BY 7/12/05 DATE 7/12/05 DATE 7/12/05 DATE DATE 7/12/05 DATE • 22 .. 23 26 43R 51 53 22 28 47 J24 1 27 52a ° 52b T 12 54 LEGEND: AUXILIARY SWITCH CONTACT, CLOSED ONLY WHEN a BREAKER IS CLOSED AND IN THE CONNECTED OR TEST POSION. b 52H v 161 233 28 9 CONTRACT NO. RTA/LR 82 -03 I C807 Al 0 \./ A18 Al A19 RP11 • 10 RP18 RP19 18 Y19 20 1 1 1 (11 40 41 41 11 42 1 - FO J S100 -07 AUXILIARY SWITCH CONTACT, CLOSED ONLY WHEN BREAKER IS OPEN AND IN THE CONNECTED OR TEST POSION. POSmON SWITCH CONTACT, CLOSED ONLY WHEN BREAKER IS IN THE CONNECTED POSmON. POSION SWITCH CONTACT, CLOSED ONLY WHEN BREAKER IS IN THE TEST OR DISCONNECTED POSITION. DISCONNECTING CONTACT, CLOSED ONLY WHEN BREAKER IS IN THE CONNECTED OR TEST POSFON. 15 14 21 22 25 241 31 321 35 341 X1 1 27 26T 33 38T 37 36T LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR DEVICES I DRAWING 5040-05 EV. 00 I SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) LOSS OF DC VOLTAGE ALARM LOSS OF DC VOLTAGE ALARM LOSS OF DC VOLTAGE ALARM 86 TRIP IND. TO DPU CLOSE CIRCUIT 01 4.07 11/17/05 on/ nATC 1 • •-•11•• 1 3.05 SON 3 11 21 1222 4 ( 64 ) 2 (100) FRAME BONDING BUS Cu 1 -1/2" X 3/8" SWARTZ (103) 11 3 11 21 I I� 12122 4 50K fl 4 • SOR 1 2 50K DC GROUND BUS • •1 9 I 1U 3.06 11 -1 3.06 !! .44.V.SSSS ! il ititiIMiti/i! i! i! i! i!:S SI i! i! i! i! i! i! ii! i! i! i! ii! i! i! i! i! i! i! i! i! 14 4i!i! if.:ST:S ST i! i! i! i! i! i! i! SS A TiSSSSti!i!i!i!!i!i!i ?i!i!SSSW. !"4.W. !.SSWAVW.M.!� .!.StiSSI; Revised per comments 3 11 i 21 4 PJO 3 12 122 SOF LB (101) LB • 4 1/4" GLASTIC R1 I • R2 5 • 6 - (102) FOl I SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINTEDRN£, SUITE 106 LAKEOSWEGO, OREGON 97034 INSULATED MATERIAL • F1 I F2 7 F3 SouninTwwsrr • B F4 — F - 51 I (TPSS C16 ONLY) REVIEW= , FOR ODE COMPLIANCE NFPA 70 NEC AUG 2 7 1 2007 City Of Tu wila ILDING D ION NOTE: DRN CKD BY PAT O'HOGAN DES BY PAT O'HOGAN 12/03/2004 ORN BY DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE • 9 (L) XE 6 1.2 T -STATS SET TO 55F 1XH • � 1.2 1 0 2 TO AC PNL. E ISOLATION TRANSFORMER I I 120/120VAC. 1200W 1 I ! MOUNTED IN J BOX BY API F11. 10 AMP, 120V AC 1.2 1v EG CUBICLE MIME 2 72-0 CUBICLE 1 1,2 1 2 I 72 -3 CUBICLE MEM 72 -4 CUBICLE 1. ALL WIRES ON THIS SHEET #14 AWG, 2kV UNLESS OTHERWISE NOTED. (WN 100 -109) 2. HEATERS RATED AT 240V, 400W. HEATERS OPERATED AT 120V, 150W. 3. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 4. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 5. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. • 10 XE 5 • N) 7 1 I ')12 1 0 • 2 — 7 _ – H 2 - 1 CUBICLE I 1-4–----J--..07_,.._j_____IBR � 72 - CUBICLE 1 � DC SWITCHGEAR HEATER CIRCUIT NOTES 2 THRU 5 RECEIVED Cr' JUN 2 8 207 { CE I ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE FRAME FAULT SCHEMATIC CONTRACT DRAWING REV. NO. RTA / LR 82 -03 f 08071 NO. TPS- S050 -01 01 I %O RI-9 EXTRA HEAVY TRACTION SERVICE "III" Technologies 12 -PULSE RECTIFIER 3000KW.1500VDC SiAb(41 ., Corporation WYTHEVILLE VA. USA 24382 INTERPHASE TRANSFORMER SN 120270L02BC01 JOB 3511 DATE 1/05 CU COND KVA 270 PHASE 1 HERTZ 360 CLASS H 220'C INS TYPE AA RISE 80 'C @100% LOAD INPUT 135 VAC 1000 AMPS DC BIL 20 (N1 -N2) OUTPUT 2000 AMPS DC BIL 20 (NO) RAIL OVER VOLTAGE TIME DELAY BEFORE TRIP 40 NO TRIP 50 2 SEC 80 200 mS 120 10 mS 01 11/17/05 (89N) (NOTE 1 I N1 L- DC NEGATIVE BUS CABLE VAULT V 0 SA 1 � 1 FROM RECTIFIER 6000A S060 -01 INTERPHASE TRANSFORMER NO 6000A 3.07 3.07 L2- NEGATIVE RETURNS TO RAIL N2 \ Revised per comments 4 3.02 PJO C ACTIVATED WHEN I SWITCH FULLY CLOSED S100 -01 T (XV F01 ?_1 DC NEGATIVE BUS REFERENCE POTENTIAL LB 100 AMP CONTACTOR AND SWITCH (FUTURE DRAINAGE CABLES) LB ACTIVATED WHEN SWITCH FULLY OPENED E (3.04) j (NOTE 5) 300A (TYP) 60A (TYP) 6 6 6 6 ❑ ❑ ❑ ❑ TO REMOTE TRACK RESISTANCE TEST STATION (NIC) SIEMENS TRANSPORTATION SYSTEMS, INC. 307OSWEGO POINT EDRIVE SUITE 106 LAKE CSWEG CIRCUITRY IN SHADED AREA TO BE DETERMINED RAIL OVERVOLTAGE L ix! SOUND11i/W5R GROUND BUS REVIEWED NCE CODE COMP NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION PAT O'HOGAN ORN BY 12/03/2004 DATE ORN CKD BY DATE PAT O'HOGAN 12/03/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE NOTES: 1. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS DC MAIN BREAKER IS OPEN. 2. ALL WIRES ON THIS SHEET #14 AWG, 2kV UNLESS OTHERWISE NOTED. (WN 110 -119) 3. RAIL OVERVOLTAGE (64V) SET POINTS REC,FEIVFD ARE ADJUSTABLE VIA THE PLC. "PIA "PIA INITIAL SET POINTS SHOWN IN TABLE. `' G'I �� JUN 2 8 ?007 c rt�lvil I GEN I L 4. USED AT TPSS C11, C27 & C36 ONLY 5. ELECTRICAL INTERLOCK OPENS CONTACTOR WHEN 89N OPENS AND CLOSES WHEN 89N CLOSES. LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE GENERAL SCHEMATICS TRACT RAWING REV. NO. RTA I LR 82 - 03 1 08071 D NO. TPS S050 - 02 01 CON arm 11/17/05 Revised per comments 4.04 — (89N ) (2.03) (C I I H1 (24L -) NC XN 7 SWITCH . OPEN H2 SWITCH CLOSED P..10 100 A CONTACTOR cnir_ LB LB ADD Al --II— 2.04 DRAINAGE CONTACTOR r SOR (1.02) c%) N SON (1.02) DlOB -I 0 48 CEO ILI 11 4 0 4 I0.1 I0.2 10 FRAME DCSWGR FAULT FRAME ISOLATED ENERGIZED VC W070 -05.03 N 05 I0.3 DC SWGR FRAME GROUNDED SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIV& SUITE 106 LAKEOSWEGO, OREGON 97034 ICMED (2.02) �- ( O 64 I I 1 3 I (1.02 8 I I 1896 189A I T ) l NO NC NO J) 11 I0.4 CLOSED 06 12 13 - (FF1) (64L) (64G) (89B) (89A) 0 49 0 50 0 51 0 52 PLC L� SounmihAwsrr F12 0 08 I0.5 I0.6 OPEN LOSS OF CTRL PWR (4.04) 11 12 14 S100-05 (LOP) FO 0 53 PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY S09 DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE TPT TB1 'DD 2 I M041 -02 13 XN 17 1. ALL WIRES ON THIS SHEET #14 AWG V I` UNLESS OTHERWISE NOTED. (WN 120- 1RECr: ,/..-D ' A CI Ty ' ApLA JUN 2 8 ? !7 "�i'►iVll ci t'V TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE GENERAL SCHEMATICS T TD RA ING NO. TPS- 5050 -03 E CONTRAC NO. RTAILR82 -031C80 LINK LIGHT RAIL PROJECT 10 01 #10 AWG r „XP (1L +) 125 VDC FROM 1 DC DIST PNL DP1 #10 AWG 0 2 G01 XN 5 F20 6A (1L-) F12 6A )-- 3.02 () 24V () 3 3.08 J J 0X 3 0 4 11 12 ( +) (24-) 21 22 G02 F21 6A N O N FO CUBICLE POWER SUPPLY (12L +) SIEMENS TRANSPORTATION SYSTEMS, INC. 300OSWEGO POINT EORIV& SUITE 106 LAKEOSWEGO, OREGON 97034 (12L -) 1.01 L� SouiuuTkantsrr PAT O'HOGAN 7/14/2005 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 7/14/2005 DATE DES CKD BY DATE LANCE BANASZEK 7/14/2005 APPROVED BY DATE SCALE: NONE RECEIVED ere n.NILA JUN 2 8 ? GE=N f ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE 24VDC CONTROL POWER CONTRACT D RA WING REV. NO. RTA / LR 82 -03 / C8071 NO. TPS- S050 -04 I 00 P C\/ 1 • RECTIFIER TRANSFORMER 11/17/05 neTF T E - -- I R5 - 1 -t -� I I R6❑ t I J - T ❑ I- - R3 R4 R1 T R2 - J 3323kVA AA/FFA' 3 0, 60HZ, 12 PULSE 26.4kV - 1178VAC Y- 1178VAC HVTAPS:2@ 1 1/4 %; 2 @21/2% r f - -L a = #14AWG, 5KV, FEP, Insulated b = Filter mounting plate attached to heat sink. c = Cu bus R111.1...R113.2 100 OHMS, 500 WATT C111...C113 0.47uF, 2100V R130.1...R130.2 6 OHMS, 200 WATT C130 16uF, 3200V. R170.1...R171.2 3.9 kOHMS, 500 WATT Revised per comments fFRCPIPTIr1N - - -� 0L31 A V111...V163 Rectifier Diode SW4OCXC1170- P;3600A;4000V F111...F163 High Speed Fuse 170M6723; 1000A; 1400V S111...S163 Fuse Micro Switch, 2 -NO /NC contacts 170 H0099 Contact arrangement shown on SHT 2 L11 cc C111 L21 ._ PJO Cv b C112 L31 cc O L21 C111 L- tt 1 b�l N FNr: b, LB C113 ri M a C113z a LB APP S1 11 1 S112 F113 S 113 c c c V111 V112 V113 r.) V141 M c F141 S141- V142 V143 c F142 S142 S1 11 1 1 S 112 F112 S113 c c c V111 V112 V113 V141 c F141 S141 V142 C F142 S 142 c F143 S143 V143 C F143 S 143 F 131 S132 S131 V131 j, V132 V161 V162 F161 S161 c -r C F131 F132 S131 _ S132 c V131 V161 C RECTIFIER #1 -y c F162 S162 RECTIFIER #2 - A c V132 V162 C F161 fj F162 S161 - i-1 S162 300 OSWEGOPOINTEDRTVE SUITE 106 LAKE OSWEGO, OREGON 97034 F133 S133 c V133 V163 SIEMENS TRANSPORTATION SYSTEMS, INC. c F163 S163 F133 S133 c V133 V163 C F163 S163 S151 I S152 ! S153 c V151 V121 c F121 S121- F151 S151 c V151 c V152 V153 V122 c F122 S122 • F153 C V123 c F123 S123- F152 S153 3 S152 V152 V153 R I EWED F CODE COMP NF'A70 -N AU 2 7 2007 Ci Of Tukwil NGDIVI ON V121 V122 V C F121 S121 c F122 S122 C F123 S123 1500VDC PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY 1500VDC DES CKD BY LANCE BANASZEK SOUNDTRANSIT APPROVED BY SCALE: NONE R NCE C 12/03/2004 DATE DATE 12/03/2004 DATE DATE 12/03/2004 DATE • 9 AL HEAT SINK I CU 3/8" X 5' a O t` N. a N O ti a -4 a —Nc AL HEAT SINK a—a a-•� a =, L1- • L2- LINK LIGHT RAIL PROJECT 10 TO MAIN DC BREAKER S 100-01 r CU 3/8" X 5" JUN 2 8 7 11n7 ,.4.1i srsol i ° e TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R1 & R2 CUBICLES GENERAL SCHEMATICS CONTRACT DRAWING ND. RTA / LR 82 - 03 ! C807 No. TPS SO60 REV. 01 02 01 12/05/05 9/10/05 311, 114 1 S112 114 S113 1 14 S131 114 S132 1 11 'a 11 S133 14 S 114 151 11 S152 114 11 S153 a Issued For Construction 24 1 _ S111 • 2 F S112 24 2 S113 • 24 1 2 ) 1 - . S131 24 21 S132 •� I--• 24 21 S133 I 24 1 21 S151 • 24 2 1 — � S152 24 2� S153 Control Wirinci #16 AWG, 5kV, FEP Insulation I/C W070 -05.03 RECTIFIER #2 - — - I/C W070 -04.09 - S121 114 111 S122 14 111 S123 14 T" S161 114 11 S162 14 111 S163 14 T S141 114 11 114 S142 1 1 S143 14 T " RJA RJA RJA JA 24 S121 •1 21 S122 24 21 S123 24 S161 24 21 S162 2421 S163 24 S141 • 24 i , 21 S142 24 21 S143 ( IL - - - - - - 1 — 55 ( 98-1 ) ALARM PJO PJO purr --- - - - --1 n LB LB A OD DIODE FAILURE (12) F291 20°C 2 F191 120° C XR1 (14) 1 F292 35 C 14 F192 35° SO8 13 2 I I L I____-_- -- S07 in N cC co 6 XR1 _ _ - -- S100-05 I - 58 FO u 54 (26R2) (33R) TRIP RECTIFIER O/T SIEMENS TRANSPORTATION SYSTEMS, INC. 300 0 S W EG O P O I N T E DRIVE, SUITE 10 B LA/(EOSWEGO, OREGON 97034 L_ EQUIP DOOR OPEN (NOTE 2) S111 11 S112 114 T11 S113 14 T " S050 -03 I IV (s cX 1 (33N) I S131 114 S132 1 11 'a 11 S133 14 S151 1'a 1 11 S152 14 111 S153 'a exR, R 04.09 c w 1 NFPA 70 _ NEC I - - - - — J AUG 2 7 1007 SOUNDTRANSIT 14 24 „21 S111 • 2 4 , 21 S112 2421 S113 24 1 ° S131 24 21 S132 •--I 1--- 24 21 S133 --11— 242 1 S151 24, 21 S152 — 24 1 S153 NOTES: 1. ALL RECTIFIER INTERNAL WIRES: #16AWG, 5KV, TEFLON INSULATED 2. COMPLETE 33 CIRCUIT SHOWN ON S100 -04 (WN 10 -20) PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DES CBI) BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE I DRA WING Np, TPS- S060-02 SCALE: NONE 12/03/2004 DATE S121 114 11 5122 14 11 3123 T 14 " S161 1 ' a 1 3162 14 11 S163 'a S141 114 1 114 S142 ,1 114 S143 T11 REVIEWED F PLIANCE Cif Of Tukwila B ILD NG DIVI ION CONTRACT NO. RTA / LR 82 -031 24 S121 24 S122 24 FF 21 S123 24 11 21 S161 X S162 24 tt 21 S163 24 21 1 • S141 . 24 { 2 F � — . S142 24 21 S143 LINK LIGHT RAIL PROJECT (18) TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R1 & R2 CUBICLES TRIP & ALARM SCHEMATICS 02 LINK UEL(mV) UAUV) 15 -14 60 0000 15 -13 90 15 -12 150 300 01 11/17 /05 Revised per comments PJO LB LB 4 5 • 300 OSWEGO N1 PORN& SUITE 106 (AKEOSWEGO OREGON 97034 6 SIEMEN TRANSPORTATION SYSTEMS, INC. • T 117 SOUNDTRANSIT • ORN CKD BY PAT O'HOGAN DES BY SCALE: NONE 8 PAT O'HOGAN 12/03/2004 DRN BY DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE • 9 • I 0 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE GENERAL SCHEMATICS I DRAWI NG NO. TPS- S100-0 1 E CONTRACT NO. RTAILR 82 -031080 01 REV DATE 1.02 (125VDC) #12 AW ,,XP 1L+ 1 #12A 1L 3 125VDC FROM DC DIST PNL DPI CKT DP1 -FO S050 -03 I I 24VDC 1 N r • (11L +) (11L-) ( 72-0 ) r — J10 15 A TB1 15 TB1 22 ° 22 1.01 125VDC CONTROL POWER DESCRIPTION • R10 250 OHM, 225 WATTS 1 5 110 1 5 2 6 K02 K11 (5.02) (5.03) K02 NORMALLY ENERGIZED AND IS DE- ENERGIZED TO TRIP BREAKER. AFTER TRIP CONDITIONS ARE CLEARED K15 (5.03) IS ENERGIZED, K02 IS ENERGIZED, THEN K11 IS ENERGIZED TO CLOSE BREAKER. AFTER TIME DELAY K11 OPENS AND HOLDING COIL CURRENT FLOWS THRU R10. XF XF (24L +) O 14 0 1 -13 O (24L -) 28 15-27 0 BY ENG CHK APP F 2.01 1.09 X30 (24L +) F6.01 1 -14 • IE l (111) o TB1 21 L ( 76 BREAKER (L +) 1500V DC POSITIVE BUS,6000A X01 6000 A • ✓ 1 3 - 1 r1 b F all b 72 I II � L 2 4 J L (-) R1 6KA/50mV ( +) (POSITIVE) 2.09 S060 -01 I I I J 31r aII II 4 J L 10 T12 DI ' � 31r, 5 all b b all 2 T II II III J I ? T J L T 9 1 1 BREAKER TRUCK BT) X02 u J10v W 7 9 11 18 v25 — -- - -( —'— — — - - -�— -- - I --- - - - - -- Y ( 3.08 #14 AWG, 2KV, TW PR f S050 -02 12 #14 AWG, 2KV ±10V 29 (150 A2) VOLTAGE DIVIDER 15 10 6 (102) (103) <4000V <2000V <1000V ±300mV 0 0 rn C, M . 0 <10V OV Al I b al 25 27 3 Y N 2 #14 AWG, 2KV (L -) —1 �XV 2 DC NEGATIVE BUS REFERENCE POTENTIAL H01 (OP CTR) 0 UE1 17 17 18 (150 Al) E10433- E9509 -H100 UEU 24 ( c ? ) N I $ I I RELAY BOARD I I N I 1 10V /20mA ±10V /20mA UAU OV UAI OV 7 8 I 11 NOT 5 USED u 0 3.03 3.0Z DC BUFFER AMPLIFIER F/O TEST ±10V U OV +24V II AUG 2 7 2007 OV COM 2 (24L +) 3 (24L -) 1 15 14 13 12 REVIEWED FOR CODE COMPLIANC NFPA 70 - NEC,. 2. 3. 4. City Of Tukwila BUILDING DIVISION /77 1.03 #14 AWG, 2KV i E VDT T3A f I I 1150 -A2 1 0 1J (NOTE 1) MOUNTING DETAIL • MC UNT IN H.V. AREA OF CUBICLE W THIN 18" OF SHUNT R1 KE ( INTERLOCK PREVENTS OPENING OF 891 DEVICE UNLESS DC MAIN BREAKER IS OPEN. ALL WIRES THIS SHEET #14 AWG t)IILESS OTHERWISE NOTED. (WN 100 -119) SE E DWG. M101 -03 FOR TRUCK WIRING DIAGRAM RECEIVED DT" ;,1/lILA JUN 2 8 ?n07 01 11/17/05 SIMATIC OP 270 (24L -) A105 ) ISIEMENSI SIMATIC OP270 ❑ ❑ 0 ❑ 00000000 43 C 00000000 C CE IN +S U.. • • ■■■ IS I}- M L+ OLM TRANSFER TRIP VIA F/O CABLE MPI 1.03 -j 1 2 0 XF 15 Revised per comments ( A100 ) MPI 0 16 PJO CPU LB DC FDRS LB I- F- D a- I- D 0 0 0 J z N F- a z_ 0 0 J z v PROFIBUS Dl OA (SHT 3) DC SWITCHGEAR RECTIFIER & RECT. XFMR ,OBT t [OBT CCIC DlOB (SHT 4 & 5) tD F/O CABLE BLDG. ALARMS D11 (SHT 6) AC SWITCHGEAR 012 (SHT 7) SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOFOIN7EDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 NOTES: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. SOUNDTRANSIT (24L+) (24L -) ( 72 -0 ) REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILD NG D ION PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DES GKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE DATE 12/03/2004 DATE 17 CB OPENED CB CLOSED (24L +) (24L -) —3.06 IRFOE!VED ., /ALA JUN 2 8 7097 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT (DRAWING ( REV. No RTA / LR 82 -03 / C807 NO TPSS100-02 01 vc ncC!`D I0TI(1N CV FN(: (:e-or( APP PLC INPUT CONNECT 1 SEC TEST 0 SEC DISCON. TBD (502) 0 (OPEN) 1 (CLOSED) 1 (CLOSED) (S01) 1 (CLOSED) 0 (OPEN) 1 (CLOSED) PLC SETTING TIME DELAY BEFORE FO TRIP 0 -50A 1 SEC OVER 50A 0 SEC 6000A TBD a ° ° e« s2L w'c 'c 29 a vs_ E z a; w� c y 0 - owl= a 0 2 0 of ca o +:28 0 a 6 cE— o C A100 -D 10A) RAIL OVER VOLTAGE 11/17/05 01 REV DATE CIRCUITRY IN SHADED AREA TO BE DETERMINED -T i — — 11 OT • 0 31 D10A * 2 * 3 0 4 "5 "6 7 "8 * 9 0 10 x '11 no 13 * 14 0 15 * 16 * 17 0 20 *18 p. go Co Co on o Co _ • o 1W66 IW68 IW70 (V /A= VOLT /AMP) SPARE 2 • REVERSE CURRENT I MAX TRIP DC MAIN CURRENT PROTECTION Revised per comments DESCRIPTION 1.07 1.07 PJO 3 MAIN DC BUS VOLTS LB 0 35 LB BY ENG CHK APP • 1W72 SPARE 4 BUS VOLTAGE 0...2 kV QW64 ( +) ( -) 37 P1 BUS CURRENT 0...6 kA QW66 ( + ( -) 3 5- ANALOG INPUTS & 2- OUTPUTS MAIN DC BUS VOLTS MAIN DC BUS AMPS P2 2.1 (24L+) (24L -) SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO PO /NTE DRIVE SUITE 106 CAKE OSWEGO, OREGON 97034 XF 4 43 cs 116 o16 S1 I 117 0017 CD XF 0 40 I 0 41 22 0 2 3 .. -I I2.0 Z 1 1 - 7 CS 011 S3 I 018 0 42 0 2 4 • 1 cCI 22 SO2 SO1 21 0 0 43 0 2 5 1 • DRN CKD BY PAT O'HOGAN DES BY SOUND SCALE NONE 22 I2.4 4 PAT O'HOGAN 12/03/2004 DRN BY DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12103/2004 APPROVED BY DATE TB1 TB1 5 J10 J10 5 `./ 7 \/ • 0 27 t I I2.5 1 (1.05) BT TOT \ TB1 8 TB1 L/R CLOSE OPEN BREAKER BREAKER RESET IN REMOTE BREAKER BREAKER TEST CONNECT CLOSED IND. OPEN IND. SUBSTATION TROUBLE PLC TRUCK POSITION INPUTS (TOC) • (24L +) (24L -) ,, X 1 0 2 8 0 29 0 30 1� 1 l DIGITAL INPUTS 8 X 0.5A 10 —4.01 NOTES: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE N(5YELZ(\ 30 -149) crcv In LA JUN 2 8 719 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT DRAYNNG REV. NO. RTA I LR 82-03 I C807I NO. TPS- S100-03 01 FU RY FN( CHK APP 01 3.10 — 12/06/05 (24L -) (24L +) D1OB 0 XF (Al 00 -D10B) tO V SPARE I0.0 0 FRAME FAULT ISOLATED Revised per comments F;; —.21 711 I 0 H I0.2 'I I0.3 I0.4 DC SWGR FRAME ENERGIZED PJO DC SWGR FRAME GROUNDED RJA 0 LB 0 0 CLOSE OPEN NEG DISC SW (0 0 . � - 10 S11 9 I 14 v 13 o S10 1 TPT TB1 13 L 1=I PI (� "I N S050 -03 I ( 0 14 TB1 — 2 — I DIGITAL INPUTS FROM NEGATIVE CUBICLE I/C W070 -05.03 3 IR1 &R2 a XR1 I v v v co co q c0 `° f �10 ?10 ?11 ?112 ?13 141 S08 IN __.7 — T I 13 14 I c 13 0 I I I I 1 S07 14 I I I I I XF II 0 48 0 49 0 50 0 51 0 52 01I 53 6 DC SWGR EQUIPMENT DOOR OPEN LOSS OF N CUB DC CTRL PWR XF 0 19 0 10 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE SUITE 106 LAKE OSWEGO, OREGON 97034 0 11 U) -1 r I 1 N c, I I - - 1- I m u 0 0 1 1 � 14. ' XR2 m - ii ; XR1 TB2 2 i g I i 5 J t---r _ 1 I I I I I I I I I I • 55 12 U) DIGITAL INPUTS FROM RECTIFIERS R1 & R2 I/C W070 -05.03 0 56 0 13 ALARM TRIP RECT DIODE FAILURE 0 57 0 14 ALARM TRIP RECT OVER TEMP SouniuThAwsrr S060 -02 R1 & R2 TB1 (0 0 58 0 15 I I I I 1 II DIGITAL INPUTS FROM RECTIFIER XFMR I/C W070 -05.03 0 59 0 16 PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY D G BY LANCE BANASZEK APPROVED BY SCALE: NONE M041-02 TPT J I (0 0 17 ALARM TRIP RECT XFMR TEMP 12/03/2004 DATE DATE 12/03/2004 DATE DATE 12/03/2004 DATE SPARE SPARE NO I LR 82 -03 I C807 I1.7 (24L +) 0 18 0 19 0 20 DIGITAL INPUTS 16 X 0.5A - 5.01 ED '.111 NOTE: JUN 2 8 9997 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 150 -169) Er.l itvli i �✓L:.i'3 !3 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS I DRAWING N p. TPS- 5100 -04 EV. 01 0 1 4.10 11/17/05 GFV OATF (24L -) (24L +) • (A100 -D1 OB 2 K15 (5.03) 3 XF 65 CO • J10 J10 25 y 18 \/ XF D- OPEN BREAKER 20 OPERATION COUNTER Revised per comments DESCRIPTION OK TO CLOSE BREAKER PJO • J10/\ B1' 23 LB LB RV ENO (-AK APP II -1.03 6 t i l' I I -5.02 5 1 7.08 CLOSE I j(1 SCADA CLOSE BREAKER AC BREAKER SCADA TRIP AC BREAKER 4 11 -7.07 • 5 00.6 00.7 0 0 29 SPARE SPARE • 300 OSWEGO PO/NTEOR/V6 SURE 106 LAKE OSWEGO, OREGON .97034 b SIEMENS TRANSPORTATION SYSTEMS, INC. SPARE • HSO rn n L SUBSTATION TROUBLE INDICATION 7 01.2 01.3 1 34 0 35 SPARE I I• -7 2 TRIP & LOCKOUT FO & AC BREAKER SouNUlkanisir • SPARE PAT O'HOGAN DRN BY ORN CKD BY PAT O'HOGAN DES BY 8 01.4 3 12/03/2004 DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE 01.5 3 SPARE SCALE: NONE • 01.6 3 01.7 0 3 SPARE SPARE NOTES: 1. 186 ENERGIZED FOR: -REV CURRENT -DC EQUIPMENT DOOR OPEN - RECTIFIER DIODE FAILURE (TRIP) - RECTIFIER OVERTEMP (TRIP) -ANY XFMR TRIP FUNCTIONS -ETS /FIRE - INCOMPLETE SEQUENCE -FRAME FAULT • DIGITAL OUTPUTS (16 X 0.5A) REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila BUI LDING D M ION 4 2. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 170 -189) LINK LIGHT RAIL PROJECT (24L +) (24L -) 10 - 6.01 RG71VED JUN 2 8 9997 GCIN I s; TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT DRAWING R EV. NO. RTA / LR 82 -03 / C8071140. TPS- S100 -05 01 C 1 V neap 12/06/05 1.03 -I 5.10 — • rI rI rI .6 o 4 (24L +) .. X (24L -) D11 0 1 1 C A100 -D11 2 • (24L +) X3 p 1 I ETS SSS 0 0 (ETS) (SSS) Cr) X3 © 20 0 0) 0 21 0 FIRE SMOKE Revised per comments npACRIPTInN N O) PJO RV 3 0 22 0 S14 TPSS ACCESS DOOR S13 ALARM (F -S) (DA) H I4.2 4.3 I 1 S12 0) 8001 -01 --1— 0 23 0 13 RLA LB FN(: rHK APP • 14 13 SURGE ARRESTOR ALARM 14 0) Q1 0 24 0 EMERGENCY SUBSTATION FIRE TPSS ACCESS SA SHUTDOWN SHUTDOWN AND DOOR ALARM (WITH XTRIP) (NO XTRIP) INTRUSION ALARM ALARM 4 2 (SAF)I I L (BCF) I (27) —1 (59) 0) 0 25 0 ' I I4.4 t' I I4.5 1 SYS FAIL • 0) BATTERY CHARGER 27 59 0 26 0 I I4.6 BATTERY CHARGER 0) 5 1 27 0 0 0 U, o f U 125VDC LOSS OF SHORTED TO VOLTAGE 1500VDC • XF 23 0 10 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 © 11 6 1 a 1 Cd I27A. a - I J I a- O 0) 0 28 • II 11 0 aII cc tei ° I127B 2 " II a 0 CO J I a.. 0) 2 1'2( i(27A)II 1(27B)I 0 29 LOSS OF AC AUX PWR LOSS OF DC AUX PWR O N 0 30 © 14 0 13 3!" DIGITAL INPUTS 16 X 0.5A H I5.2 • SOUNDTRANSIT SUMP PUMP I a oI 0 I (RG) 1 (CF) O N • 0 31 0 15 SUMP PUMP CLOGGED FILTER _ N O N 0 32 HIGH PUMP CLOGGED WATER RUNNING FILTER PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE 8 DATE 12/03/2004 DATE • 9 0 17 0 18 0 19 !' \ IC 1 5.6 1 � (24L +) I5.7 • REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila B ILDING D SION • (24L -) 0 20 CONTRACT D RAWING NO RTA / LR 82 -03 I C807I NO. TPS- 5100 -O6 t — 7.01 F 1 - �.) -' f C, n rI SPARE SPARE SPARE JUN 2 8 7 997 NOTE: 1. ALL WIRES ON THIS SHEET #14 AWG+ i6 I CEt 4 I UNLESS OTHERWISE NOTED. (WN 190 -209) LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS REV. 01 01 1 11/17/05 6.10 D12 • (24L +) .. X 24L- 1 ( A100 -D12 ) (24L +) X3 ?10 r 2 �- ERB 13 • 00 OHERB 0 m 1 14 I15 X © 3 36 0 • 0 37 0 , I Revised per comments DIGITAL INPUTS FROM AC BREAKER I/C W070 -05.07 PJO c I CO c 0 0 116 117 1— —L 0 38 r. 0 H I6.2 AC AC 43 IN UV LOCKOUT PHASE SEQ. REMOTE M LB 0 39 0 LB • v N N N. tO 0 � 0 ?18 t 19 120 J 0 40 0 4 I I6.4 0 41 0 I I6.5 OPEN CLOSED • SO40 -03 A03 1 0 42 0 HI6.6 5 LOSS OF DC CTRL SPARE AC BREAKER VOLTAGE • XF 4 0 10 3000SWEGOPOINTEDRNE, SUITE 106 LAKEOSWEGO, OREGON 97034 0 11 6 SIEMENS TRANSPORTATION SYSTEMS, INC. 0 12 • 0 13 7 0 14 1 ' \I7.0 = 17.1 = SPARE SPARE SPARE SPARE SPARE SOUNDTRANSIT 0 15 I7.2 '! I7.3 0 16 URN CKD BY PAT O'HOGAN DES BY SCALE: NONE rn CO N N 45 SCri SC/ (5.04) 3 46 l ERB I 1- I7.4 = (5.04) 0 17 PAT O'HOGAN 12/03/2004 DRN BY DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03 /2004 APPROVED BY DATE U �1 M • 2 U I/C W070 -04.05 I7.5 SO40 -02 A03 I 75 186 (5.07) 0 18 47 49 5 15 CV N 48 Y 50 SO I I7.6 9 03 -02 SPARE SPARE SPARE REVI EWED FO NFp CO MPLIANC E NEC AUG 2 7 2001 City Of Tukwila B ILD y 0 19 © 20 I7.7 • 10 • I " rr DIGITAL INPUTS 16 X}0. ^,1! AIN 2 8 70,07 I);A IL, NOTE: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 210 -239) LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT NO. RTA / LR 82 -031 C8071 D 'REV. No. TPS- S100-07 01 J PM/ f1CTF IIFRCRIPTIfN RY FNG CHK APP LINK LtL(mV) UAL(V) 15 -14 60 10000 15 -13 90 15-12 150 300 0 E0. « u u .,5•2 a v3 o a o$ E n�N eo C c� ° .c o02 one 03 0 C « ca o rn oL "e E you 02 01 1 12/05/05 11/17/05 • Revised per comments 1.02 (125VDC) _ #12.4W 0)(1,3 I -112 m 0 24 125VDC FROM DC DIST PNL DP1 CKT DP1 -F1 New Line Test Resistors Circuit F1 1 1 OA J 2 (11L +) (11L-) 125VDC CONTROL POWER 1.02 St • 1 XP 3-6— 0 6 • 1 J10 0 TB1 15 15 K02 NORMALLY ENERGIZED AND IS DE- ENERGIZED TO TRIP BREAKER. AFTER TRIP CONDITIONS ARE CLEARED K15 (4.06) IS ENERGIZED, K02 IS ENERGIZED, THEN K11 IS ENERGIZED TO CLOSE BREAKER. AFTER TIME DELAY K11 OPENS AND HOLDING COIL CURRENT FLOWS THRU R10. 22 TB1 22 3.06 — F12 10A 11 121 12122 1 5 K02 (4.05) (1L +) (1L-) PJO 3 C7 —J CNI 107 2.02 R10 250 OHM, 225 WATTS 0 }- 4 LB 1 5 • 2 6 (4.07) S102-01 0XP— F • 0 3,4 i0 3,4 _ I RJA RJA PJO LB LB • 4 (108) . 21 (BREAKER TRUCK (BT)) BREAKER SA (NOTE 3) 5 X01 T 76H I'> ( 7 36 00A \ X02 u R1 TO OCW TB1 TB1 r L1. 4 KA/60mV 3 • 1500V DC POSITIVE BUS, 6000A (L +) 1 l O ▪ 2 (100) 1OA (103) 6 r 1 F #14 AWG, 2KV, 1W PR + (105) (106) #14 AWG, 2KV 15 ,10 6 6 J10 9 VOLTAGE DIVIDER <4000V <2000V <1000V 10 12 3.06 <10V XV S_100 - 1 — S.102-01 172 -0 I 72-21 ixV DC NEGATIVE BUS REFERENCE POTENTIAL SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE SUITE 106 LAICEOSWEGO, OREGON 97034 3 r1 3 r 3 r 3-1 I I C 11 I I Al b ate b �a�� b air b al _ 4JL Tj� _ T 1 (150 Al) 0 0 x U1 m w r%1 M 0 O ±300mV 0V 25 27 ±10V 29 3 E10433- E9509 -H100 N 150 A2) 2 #14 AWG, 2KV UE1 UEU 7 8 7 1 (101) KO (4.08) KO (4.08) 4 1 H01 (OP CTR) 2 017 UAU UE1 ±10V /20mA ±10V /20mA OV OV L� SounmTkAwsrr • 13 N C1 I Q • N _ Y Y Y I RELAY/RESISTOR BOARDS '1 I I 18 �19 0 14 16 0 25 (102) u18 x/14 v16 u25 DC BUFFER AMPLIFIER F/O 2.03 2 20 OUTPUT TO DPU 96 8 TEST ±10V OV DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE +24V OV COM 3 24 - -_ � 023 2 (24V) 3 (OV) 1 15 14 13 12 PAT O'HOGAN 12/0312004 DRN BY DATE 24 DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE • i i i RO1 R02 R03 2.02 #14 AWG, 2KV 9 • 10 LINE /BUS VOLTAGE MEASURING 3 -100 OHM, 300 W RESISTORS ALL WIRES #14AWG, 2KV L 1_50-A2 j50_A1 /r._ (NOTE 1) 150 -A11 MOUNTING DETAIL NOTES: 1. MOUNT IN H.V. AREA OF CUBICLE r_ fl P !E WITHIN 18" OF SHUNT R1 2. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 100 -119) JUN 28 70() 3. SA LOCATED IN CABLE VAULT LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F1 CUBICLE GENERAL SCHEMATICS CONTRACT DRAWING NO. RTA / LR 82-03 I 0807 NO. TPS- 5101 -01 'REV. 02 RF\/ f1 ATP f1FSCRIPTIr1N RV FNr: r:HK APP PI REV DATE 1.03 (12L -) (12L+ 0 10A 125 VDC INPUT DO NOT USE (C -TRIP) VOLTAGE SUPPLY TO BA +24V OV A20 A21 X2 0 27 0 1 1.09 #14AWG, 2KV, SIS 1.07 X F/O INPUT FROM BUFFER AMPLIFIER PG /PC PROFIBUS X3 U 150 -A1 DESCRIPTION 9 X4 PROFIBUS CONNECTION SEE INTERCONNECTION TPS- W070 -07 18 L+ 24V AUXILIARY VOLTAGE A19 El E2 E3 E4 E5 E6 E7 E8 E9 El0 Ell Ell Eli El4 E15 E16 E17 E18 E19 E20 E21 A23 0 csi X1 1 -7 0 3.02 L+ 24V M Al9 A19 A22 A22 Al A2 A3 A4 A5 A6 A7 A8 A9 A24 X2 0 16 0 1 RY FNC: C:HK APP AUXILIARY VOLTAGE OUTPUT 8 -14 0 T 4.01 0 19 2 • A 0 22 0 23 0 24 ©25 0 IEMEN ❑ ❑ ❑ SITRAS DPU 96 ®*® SEE SHT 3 0 0 41 0 42 0 43 0 44 0 45 0 46 0 47 - • • • DIGITAL INPUTS DIGITAL OUTPUTS M SEE SHT 4 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPONTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 • • • Xl� 1 13 14 0 X2 26 II 27 39 40 52 X3 X ate• X4 0 FRONT SECTION A -A BOTTOM VIEW • 1 A24 A10 All Al2 Al3 A14 A15 A16 0 11 0 29 0 30 0 31 0 32 0 33 0 34 0 35 0 36 0 37 0 38 0 39 0 3 0 4 0 5 © 6 07 08 0 SOUNDTANSIT © 51 0 52 0 12 • A23 A24 (150 A0) � P • ANALOG OUTPUT ±10 MAX. 2 OmA A24 A17 A25 ( +) (-) 15 REVIEWED FOR CODE P COMPLIANCE O N NEC E AUG 2 7 2007 City O f Tukwila B ILDIN D ION PAT O'HOGAN 12/03/2004 DRN BY DATE URN CKD BY PAT O'HOGAN DES BY DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE POLE MOUNTED EQUIPMENT r 1 ; RY VOLTAGE PRESCENCE DETECTOR TX I cy —F/0 CABLE I CVPD RX T 3.07 RF''7.1ED C!Tv rI NOTES: JUN 2 8 2007 1. ALL WIRES ON THIS SHEE�j1T #14 AWG ; UNLESS OTHERWISE NOTED : ZWN 1 120' / 120 1 1 . -. , LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F1 CUBICLE DPU SCHEMATICS CONTRACT I DRAWING NO. RTA / LR 82 - 03 / C8071 NO. TPS - 5101 - 02 IREV. 00 DPU INPUT CONNECT TEST DISCON. E8 (S02) 0 (OPEN) 1 (CLOSED) 1 (CLOSED) E9 (S01) 1 (CLOSED) 0 (OPEN) 1 (CLOSED) 01 1 11/17/05 DFl/ r ATF • 2.03 —{ (24D +) (1.08) K02 2 (4.05) 6 TB1 16 J10 16 FAULT 2 BT) El ACKNOWLEDGE 43 R /16 S1 I 117 X1 0 15 ®16 E2 • Revised per comments 11FCf`DIPTIAN 24 VDC CS CS /16 Ill S2 I S3 I X 1 118 DPU96 DIGITAL INPUT BLOCK 16X24V DC REMOTE CLOSE OPEN BREAKER SPARE BREAKER BREAKER DIRECT ON ( BYPASSES LINE TEST) PJO 3 c•� 0 18 E LB LB ov =non rule ADO 13 14 • 4 • (24D +) 21 SO2 SO1 22 19 21 22 0 20 TRUCK POSITION 5 • 11 F11 r 12 (1.02) • SPARE TEST CONNECT SPARE LOSS OF CONTROL VOLTAGE FROM A9 4.05 = ,IE10 ,IE11 1 1 " 6 TRANSFER TRIP FROM ADJ. TPS SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE SUITE 105 LAKE OS WEGO, OREGON 97034 -T 9 0 21 • J10� TB1 © T61 12 #b (1.06) TB1 9 J10 11 11 / 22 0 23 BT TB1 KO — 13 (4.08)T 14 14 14 J BREAKER BREAKER LINE VPD OPENED CLOSED TEST CONTACTOR ON SOUNDTRANSIT 2.09 • SPARE SPARE SPARE PAT O'HOGAN ORN BY DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE 8 12/03/2004 DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE • NOTES: 1. DPU TRUCK POSITION INPUTS (TOC) 2. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 140 -169) FROM A7 4.04 1E21 El9 ,,IE20 TRANSFER TRIP TO ADJ TPSS 9 SPARE • 10 PC' f-,r' 1 1� p p ��oo JUN 2 8 7nn? .rri'ri1 • C LI sNi i t LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F1 CUBICLE DIGITAL INPUT SCHEMATICS I DRAWING NO. TPS- S101 -03 CONTRACT NO. RTA /LR 82 -03 /C80 EV. 01 2.04 --I °c,i 061 3.07_I (24D +) - K24 (4.03) 1 - K24 3 5 (4.03) 5 - H10 0 34 0 35 0 36 0 37 0 3 0 0 9 5 0 0 6 0 0 0 0 N. X2 0 29 0 30 0 31 X1 26 24VDC 0 X1 8 GROUP ALARM Al DPU96 DIGITAL OUTPUT BLOCK (16 X 0.5A) (24D -) nccr°i°rine, 32 "'3 SPARE SPARE SPARE SPARE 7 �9 TRANSFER TRANSFER 1U CB CLOSE CB TRIP TO TRIP FROM OPERATION CLOSED CIRCUIT OPENED ADJ TPSS ADJ TPSS COUNTER BREAKER OPEN OK TO SYSTEM SUSTAINED CIRCUIT CLOSE 1 t I 1 1.04 READY SHORT BREAKER BREAKER `f� — f• -4 02 CIRCUIT 1 • ' �5 1.03 5 t I [ ? - t F - 1.04 I-f-1 -4.01_ 1 rr O 6 1 6 t I f-4 -4.08 I�• - Z -•*- -I f --3.02 L�.� -L (NOTE 1) (NOTE A6 f` A7 f-/A8 I 25 TO E20 3.09 0 V f - /A9 f--/ A10 f- / All f-/ Al2 T / A13 f-/ A14 T / A15 TO E12 3.06 l K15 (4.06) (1.08) J10.\ J10, BT I 24 17 TB1 24 N a, 25 O 3 4 31 H01 miTi 2 J10 ' J10 25 ! " 18 co m 17 18 0 27 7 SIEMENS `=" ° 1 TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUI1E 106 LAKE OSWEGO, OREGON 97034 H2 u /AA a, 28 CO CO J10„ 23 TB1 23 0 29 P a, SOUNDTRANSIT 8 30 0 K15 — (4.06) J10, 20 20 3 Al I 19 A16 32 BT LINE TEST F~4- I -1.07 131f �4 3.07 2 -- 3 2 2 2 _ 1 _44 (NOTE 2) PAT O'HOGAN 12/03/2004 ()RN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/03/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE NOTES: 1. K24, IS ENERGIZED FOR THE FOLLOWING ALARMS: OVERCURRENT TRIP MCB TRIP UNSUCCESSFUL RECLOSURE FRAME FAULT CB TROUBLE TRUCK TROUBLE TEST CONTACTOR TROUBLE OUTPUT TROUBLE DELAY TRIP dl /dt INSTANT TRIP di /dt SYSTEM FAULTED TRANSFER TRIP FAILURE 2. LINE TEST SEQUENCE SETTINGS: PRE.- PAUSE: 5 SEC. TEST TIME: 2 SEC. TEST PAUSE: 10 SEC. DELAY BEFORE CLOSE: 3 SEC. SEQUENCE RESET AFTER CLOSE: 5 SEC. AFTER 3 FAILED ATTEMPTS WITH NO RECLOSURE: LOCKOUT DC BREAKER 3. TRIP & LOCKOUT DC BREAKER FOR: FRAME FAULT EMERGENCY TRIP /FIRE REVERSE CURRENT ON DC MAIN INCOMPLETE SEQUENCE 4. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 170 -199) REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION 1'i I-f I I,-; ✓11 E.1 JUN 2 8 MN Yl.:,I LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F1 CUBICLE DIGITAL OUTPUT SCHEMATICS CONTRACT D RAWING REV. NO. RTA / LR 82 .03 I C807! NO. TPS -S1 D 1 O4 00 01 11/17/05 REV DATE AC SWITCHGEAR r 0 1 ---- --- - - T a02 I 26KV.600A Revised per comments INCOMING UTILITY DESCRIPTION SA TO GND MAT 2.03 O 0 O 0 cD 0 N • (O # # CO . 25KVA 26KV/240Vac 7E PJO BY CU BUS GROUND BAR LB G A LB ENG CHK APP A03 RECTIFIER TRANSFORMER C I H3 0 g I H2 q. H1 I O _ GROUND BUS TO GROUND MAT NEGATIVE DISCONNECT L R5 L32 66iL31 • R 1 L22 i i L21 R1 'L12 0 • R �L11 4 GND. PAD • � #410, CU BARE V TO G MAT D N1 I GND BUS I I ▪ (L-1 — TO RAIL N2 89N SIEMENS TRANSPORTATION SYSTEMS, INC. 300 0 S W EG O P O I N T E O R!V . SUITE 106 CAKE OSWEGO, OREGON 97034 } CU BUS DUCT 2KV CU BUS DUCT � 2KV Y L1- Y O L31 0 L21 0 L11 i L O L32© 22 N •I4 H • ►I 1 It• H N I1 • H-• • N IN. (L + CU BUS L2- RECTIFIERS R1 CABLE VAULT REVIEWED CODE CODE COMP NECCE NFPA 70 - AUG 27 2001 City Of Tukwila B ILD1NG DI ION SOUND1kANSIi O 1 • GROUND DC MAIN BREAKER PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 2/15 /2005 DES BY DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE DC FEEDER BREAKERS - - -- - -- -- - - - 1 I I ! I I ICU BUS I I I I i i i / 1 i 1 i 1 i • IF, ( I F2 ( I F3 1 I ( I F5 r ` I I I I I I I I I I I I 1 I I. I I I I I I I I I I I. I. I. i I. I SA I SA SA SA SA c J U is r JUN 2 8 ?f07 TO OCW pt 51i`r1 19 4.r'. N 1 LINK LIGHT RAIL PROJECT TPSS C16' ONLY I J TRACTION ELECTRIFICATION SYSTEM MAINELINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM HV AC & DC CABLING CONTRACT DRAWING REV. NO. RTA/LR 82 - / C807 I NO. TPS- W070 -01 01 11/17/05 01 REV DATE • 2 (2.06) API -BC 3cc #10 BATTERY CHARGER API -TIM 3cc #12 TRK ISO MONITORING (3.05) API -EL 3cc #12 EMERGENCY LIGHTS (3.05) API -S &I 3cc #12 FIRE AND INTRUSION PANEL (4.04) API -TPT 3cc #12 TPT HTRS (4.04) API -A03 3cc #12 120VAC CTRL PWR SPARE PROVISION (3.05) API -HTR 3cc #12 DC SWGR HTRS API -TIPS 3cc #12 TRACK TST PWR SUPPLY (NOTE 1) 1 1 SPARES PROVISION — LEGEND: A03: AC BREAKER API: 240/120 VAC DISTRUBITION PANEL BC: BATTERY CHARGER CCIC: CENTRAL CONTROL INTERFACE CABINET DP1: 125 VDC DISTRUBITION PANEL EL: EMERGENCY LIGHT ETS: EMERGENCY TRIP SWITCH FO: MAIN DC BREAKER F1: FEEDER BREAKER #1 S &I: SMOKE AND INTRUSION PANEL SSS: SUBSTATION SHUTDOWN SWITCH TPT: RECTIFIER TRANSFORMER V1: VENTILATOR UNIT #1 V2: VENTILATOR UNIT #2 • (1.03) O Revised per comments DESCRIPTION 3 30A T 1 3 2rn 5 /N7 20A n 9 20A 20A 2^ 19 20A n 21 23 25 27 L1 n 11 2^ 13 20A ''\ 15 n 17 29_ ( n 1 2 26 30 7 P.10 LB LB BY ENG CHK APP • 28 L21 - -150A 40A T 3�OA 20A 10 n 20A 12 n 14 2 i1 20A 16 n 18 2^ 20 ' -' 22 30A 30A 4 n 4 DISTRIBUTION PANEL API, 120/240VAC BUS RATING 225 A • 5 (3.08) AP1 -HTR, 3cc # 10AWG UNIT HEATERS AP1 -ST, 3cc # 10AWG STAIR TOWER (TPSS C16 ONLY) (3.02) AP1 -LI, 3cc # 12AWG LIGHTS, INTERIOR (3.02) AP1 -LE, 3cc # 12AWG LIGHTS, EXTERIOR AP1 -LV, 3cc # 12AWG LIGHTS, VAULT (EXCEPT TPSS C11) (3.02) AP1 -RI, 3cc # 12AWG RECEPTACLES, INTERIOR (3.02) AP1 -RE, 3cc # 12AWG RECEPTACLES, EXTERIOR (3.08) AP1 -V1, 3cc # 10AWG VENTILATOR UNIT #1 (3.08) AP1 -V2, 3cc # 10AWG VENTILATOR UNIT #2 (3.05) AP1 -SP, 3cc # 12AWG SUMP PUMP F SPARES PROVISION (5.07) AP1 -FO, 2cc # 20AWG LOSS OF AC CTRL PWR • SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOIN7EDR/VE, SU /TE 106 LAKE OSWEGO, OREGON 97034 6 ( +) • �YTB1 L1 BK .TB1-L2 AP1 -BC, BK . 3cc #10 AWG, (2 02) BC -F0, 4cc #14 AWG, BATTERY (6.02) CUBICLE 2cc #12 AWG CTRL PWR (4.02) DPI- CCCCIC 2cc #12 AWG CTRL PWR (4.04) DP1 -A03, 2cc #12 AWG A03 CUBICLE CTRL PWR TB2 ( +)u #12AWG BATTERY CHARGER TB2 (} 4�2AWG • BATTERY CHARGER ALARM (5.07) () l SPARES PROVISION — REV C CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2001 City Of Tukwila B ILDING D ION -r CKT 100-P 2 -1 /C #2 IN CONDUIT ( + 8 1 2 ( DRN CKD BY PAT O'HOGAN DES BY SOUNDTRANSIT SCALE: NONE (-) 1 DISTRIBUTION PANEL DP1,.125VDC BUS RATING 250 A PAT O'HOGAN 2/15/2005 DRN BY DATE DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE • 9 — SPARES PROVISION CONTRACT NO. RTM R 82-03/C807 • (5.02) DP1 -FO, 2cc #12 AWG FO CUBICLE CTRL PWR (4.07) DP1 -N, 2cc #12 AWG N CUBICLE CONTROL POWER (3.05) DP1 -ACDC, 2cc #12 AWG AC /DC TEST PANEL (5.07) DP1 -FO, 2cc #14 AWG LOSS OF DC CTRL PWRs,-1vprj CI 10 JUN 2 8 7n o7 tl 'rli B C;L:t'b I :st NOTES: 1. REQUIRED FOR INTERNATIONAL DISTRICT /CHINATOWN, OTHELLO AND BOEING ACCESS TPSSs ONLY. LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM AC AND DC STATION SERVICE NO. WINGTPS- W070 -02 I REV. 01 (2.02) AP1 -RI, 3cc #12 AWG (5.07) SAF -FO, 2cc #14 AWG ALARMS AUTO (2.04) AP1 -LE, 3cc # 12AWG B OFF ° HAND (2.02) AP1 -RE, 3cc #12 AWG (2.04) AP1 -LI, 3cc # 12AWG B • H ° N H EXTERIOR GFI RECEPTACLES INTERIOR GFI RECEPTACLES 1 1 L - - J SURGE ARRESTOR ALARM SW #2 EL • (6) EXTERIOR HPS LIGHTS INTERNAL PHOTO CELL 1 INTERIOR LIGHTS .95A EACH (TYP 10) • (2.02) AP1 -EL, 3cc #12 (2.02) AP1 -S &I, 3cc #12 AWG L_:-1 ACCESS DOOR T.P.S. (2.02) AP1 -HTR, 3cc #12 AWG 120VAC (2.04) AP1 -SP, 3cc #12 AWG 120VAC 5 • L I EMERGENCY LIGHT FIRE & INTRUSION PANEL ALARM L_— ACCESS DOOR T.P.S. L_J (MOUNT IN J B OX AT TO PNL API) AC DC TEST STATION (2.09) DP1 -ACDC, 2cc #12 AWG R , P+ 125VDC CTRL PWR BK N- L' _ J L — _J SIEMENS °° TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEGRIM SU17E 106 LAKE OSWEGO, OREGON 97034 FA FO. 2cc #14 AWG (5.07) ALARM CXT 100 -C10 2cc #14 AWG SHD TW PR INTRUSION ALARM (CONTACTS SHOWN WITH DOOR OPEN) DC HTR ISOLATION TRANSFORMER B B (4.07) HTR - N, 2cc #14AWG, 2KV IW (5.07) SP -F0, 4cc #14AWG ALARMS REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION soUuDTkAwsR (2.04) AP1 -V1. 3cc #10 AWG 120VAC (2.04) AP1 -V2. 3cc #10 AWG 120VAC (2.04) AP1 -HTR, 3cc #10 AWG 120VAC (5.07) BL -FO, 2cc #12 AWG CONTROL (5.07) DO -FO, 2cc # 14 AWG ALARM SSS —7 SSS R�-fr'1',1ED (5.07) SSS -F0, 2cc #14 AWG _ i L.D iJUN 28 ?007 AN SSS IS LOCATED INSIDE EACH ENTRY DOOR PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2/15 /2005 APPROVED BY DATE SCALE NONE (5.07) ETS -FO, 2cc #14 AWG VENTILATOR 1 VENTILATOR 2 HEATER L - - - J BLUE LIGHT L, ACCESS PANELS EMERGENCY TRIP SWITCH ETS _ ETS IS LOCATED OUTSIDE PERSONNEL ENTRY DOOR SUBSTATION SHUTDOWN SWITCH LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM BUILDING AUXILIARIES CONTRACT DRAWING NO. RTA/LR 82 -03 / C807 NO. TPS•W070 -03 IREV. 01 01 REV 11/17/05 DATE Revised per comments DESCRIPTION PJO BY ENG LB CHK LB APP (2.02) AP1 -RI, 3cc #12 AWG (5.07) SAF -FO, 2cc #14 AWG ALARMS AUTO (2.04) AP1 -LE, 3cc # 12AWG B OFF ° HAND (2.02) AP1 -RE, 3cc #12 AWG (2.04) AP1 -LI, 3cc # 12AWG B • H ° N H EXTERIOR GFI RECEPTACLES INTERIOR GFI RECEPTACLES 1 1 L - - J SURGE ARRESTOR ALARM SW #2 EL • (6) EXTERIOR HPS LIGHTS INTERNAL PHOTO CELL 1 INTERIOR LIGHTS .95A EACH (TYP 10) • (2.02) AP1 -EL, 3cc #12 (2.02) AP1 -S &I, 3cc #12 AWG L_:-1 ACCESS DOOR T.P.S. (2.02) AP1 -HTR, 3cc #12 AWG 120VAC (2.04) AP1 -SP, 3cc #12 AWG 120VAC 5 • L I EMERGENCY LIGHT FIRE & INTRUSION PANEL ALARM L_— ACCESS DOOR T.P.S. L_J (MOUNT IN J B OX AT TO PNL API) AC DC TEST STATION (2.09) DP1 -ACDC, 2cc #12 AWG R , P+ 125VDC CTRL PWR BK N- L' _ J L — _J SIEMENS °° TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEGRIM SU17E 106 LAKE OSWEGO, OREGON 97034 FA FO. 2cc #14 AWG (5.07) ALARM CXT 100 -C10 2cc #14 AWG SHD TW PR INTRUSION ALARM (CONTACTS SHOWN WITH DOOR OPEN) DC HTR ISOLATION TRANSFORMER B B (4.07) HTR - N, 2cc #14AWG, 2KV IW (5.07) SP -F0, 4cc #14AWG ALARMS REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION soUuDTkAwsR (2.04) AP1 -V1. 3cc #10 AWG 120VAC (2.04) AP1 -V2. 3cc #10 AWG 120VAC (2.04) AP1 -HTR, 3cc #10 AWG 120VAC (5.07) BL -FO, 2cc #12 AWG CONTROL (5.07) DO -FO, 2cc # 14 AWG ALARM SSS —7 SSS R�-fr'1',1ED (5.07) SSS -F0, 2cc #14 AWG _ i L.D iJUN 28 ?007 AN SSS IS LOCATED INSIDE EACH ENTRY DOOR PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2/15 /2005 APPROVED BY DATE SCALE NONE (5.07) ETS -FO, 2cc #14 AWG VENTILATOR 1 VENTILATOR 2 HEATER L - - - J BLUE LIGHT L, ACCESS PANELS EMERGENCY TRIP SWITCH ETS _ ETS IS LOCATED OUTSIDE PERSONNEL ENTRY DOOR SUBSTATION SHUTDOWN SWITCH LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM BUILDING AUXILIARIES CONTRACT DRAWING NO. RTA/LR 82 -03 / C807 NO. TPS•W070 -03 IREV. 01 L_ DATE 11/17ros • (2.07) DPI -CCIC, 2cc #12 AWG, B 125VDC CTRL PWR W Revised p er comments DESCRIPTION 2 1 + P.10 BY ENG LB CHK --------------------- �r- - - - - -- --fir -- I ( I! 5.03) TPT -F0, 7cc #14 AWG v I I TRIP & ALARM SIGNALS 3SP 1! • II II j I80'c, ALARM 1! ,® !I 200 °c, TRIP I I I I ( 202 C CTR PwR #12 AWG, R L L N i B 10 II ,I I, i I, 11 11 11 11 !I RECTIFIER TRANSFORMER II !L REFERENCE DRAWING: M041 -02 TPT'I I I (2.02) AP1 -A03, 3cc #12 AWG, 12OVAC CTRL PWR I I , LB APP TB2 TB1 24L 33T 49T1 24L+ 49T2 SIEMENS TRANSPORTATION SYSTEMS, INC. 3GOOSWEGOPOINTEORIVE SUITE 106 LAKE OSWEGO, OREGON 97034 (2.09) DPI -N, 2cc #12 AWG, 125VDC CTRL PWR (3.06) HTR -N, 2cc #12 AWG, 110VAC HTR PWR (5.02) N -F0.1, 2cc #14 AWG, W 24VDC CTRL PWR 2 (5.04) N -F0. #14 SH TW PR I A ROV INPUT (5.04) N -F0.3, 7cc #14 AWG, PLC DATA INPUTS 2SP TERMINAL BLOCK DIVIDER XP W 2 4 5 6 7 12L- L N L2 N2 XN I3 I 4 5 6 7 I 12L+ 8 9 10 11 12 13 14 15 21 22 23 24 25 24L+ 24L- 24L+ 24L- 64V+ 64V- FF1 64L 64G 89B 89A (5 07) N -F0.4, 2 -1 /C #12AWG, 2KV SOUNDTRANSIT • I ' ,I PAT 01-lOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY , I� -= I , I I DES CKD BY DATE LANCE BANASZEK 2/15 /2005 APPROVED BY DATE SCALE: NONE 8 • I ,I II I I I II (5.04)R1- ,4cc #1 AWG RECTIFIER FO ALARMS C� tVIEWEu FOR NFPA COMPLIANCE 70 N AUG 2 7 2007 I City Of Tukwila B ILDING D (5.04) R2 -F0, 7cc #14 AWG RECTIFIER ALARMS 2/15/2005 DATE DATE DATE ION 2SP 3SP 9 XR1 2 3 4 5 6 7 8 9 10 11 12 XR2 6 7 8 9 10 11 12 24L+ 98 -1 98 -2 26R -1 26R -2 33R -2 12 14 -- 33N • ECTIFIER #1 REFERENCE DRAWING SERIES: S060 — - ID I LA ,I I I 125VDC DP1-A03, 2cc CTRL PWR k. AWG. ,- W !I 1/c #14AWG 16 33N 17 33T I. I ' 19 20 I ,I I ;I I I ' (5.07) A03 -FO, 7cc #14AWG �E R BC ' I I TRIP & CLOSE SIGNALS 1cP C ' , • WA 4TT !I B XH B I El TP II ( I 1 II KM 186 I' T -STAT a nal 1 ! El ,I $ I • NOTE: ni HTR ' W W I I 1. HEATERS RATED AT 240V. HEATERS OPERATED AT 1V. 100W. I! LU ' ' O i 2. RUN HEATER CIRCUIT IN INSULATED • I CONDUIT IN DC SWITCHGEAR mu I . _..__ ..._....- 1SP � I 27 IN 43R 86 47 N -F0, 1/C #12AWG, 2KV • +'I, i VOLTAGE DIVIDER MOUNT HEATERS ON INSULATED` / ?� 52a ! REF. POT. (5.07) I I 3. STANDOFFS IN DC SWITCHGEAR. CI ^ nL 4. USE #14AWG. 2kV WIRE FOR HEATER CIRCUIT. PLC DATA INPUTS 52b CENTRAL CONTROL INTERFACE CABINET CCIC ' 26kV AC BREAKER NEGATIVE CUBICLE _ REFERENCE DRAWING SERIES: SO40 A01] REFERENCE DRAWING SERIES: S050 L REFERENCE DRAWING SERIES;LS060 CA 2 3 4 98 -1 98 -2 24L+ 24L+ 33R 12 14 33R -2 24L+ LINK LIGHT RAIL PROJECT CONTRACT DRAWING NO. RTA/LR 82 -03 / C807 NO. TPS W070 - TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM AC AND DC SWITCHGEAR REV. 01 11/17/05 01 (2.09) DP1 -F0, 2cc #12 AWG, 125VDC CONTROL POWER (4.07) N -F0.1, 2cc #14 AWG, 24VDC CONTROL POWER TO PLC DlOA (S100 -03) TO PLC DlOB (S100 -04) W XP lB I' 2 I 3 4 I 6 I 7 8 1L+ 1L+ 1 L- 1L- 11L+ 11L- 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 61 62 63 64 65 XF 2 3 4 5 6 7 8 9 10 11 12 13 14 15 24L- 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 24L+ 30 64V+ 31 64V- 32 48 FFI 49 64L 50 64G 51 89A 52 89B 53 LOP 54 33R 55 98 -1 56 98 -2 57 26R1 58 26R2 59 49T1 60 49T2 Revised per comments PJO LB R2 -F0, 7cc #14 AWG, RECTIFIER ALARMS (4.09) 3SP LB TERMINAL BLOCK DIVIDER JUMPER, 1c #14 TPT -F0, 7cc #14 AWG, TRIP & ALARM SIGNALS (4.04) N-F0.2, 4cc #14 AWG, SH TW PR, (4.07) 2SP PLC ROV INPUT N -F0.3, 7cc #14 AWG (4.07) 23P PLC DATA INPUTS R1 -F0, 4cc #14 AWG, RECTIFIER ALARMS (4:09) 2SP TO PLC D11 (S100 -06) TO PLC D12 (S100 -07) DC MAIN BREAKER FO REFERENCE DRAWING SERIES: S100 SIEMENS m m TRANSPORTATION SYSTEMS, INC. 300 OSWEGO ROME DRIVE, SURE 105 LAKE OSWEGO, OREGON 97034 X3 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 P 50 186 51 52 53 54 55 56 57 58 59 60 (4.07) N -F0.4, 2 -1 /C #14AWG, 2KV g SOUNDTRANSIT 1SP ETS -FO, 2cc #14 AWG EMERG. TRIP SWITCH (3.08) SSS -FO, 2cc #14 AWG (3.08) FA -F0, 2cc #14 AWG, FIRE & INTRUSION ALARM (3.06) DO-FO, 2cc #14 AWG TPSS ACCESS DOOR ALARM (3.08) SAF -FO, 200 #14 AWG, SURGER ARRESTOR FUSE BLOWN (3.02) BC-F0, 4cc #14 AWG, BATTERY CHARGER ALARM (2.07) AP1 -FO, 2cc #14 AWG, LOSS OF AC CONTROL POWER (2.05) DP1 -FO, 2cc #14 AWG, LOSS OF DC CONTROL POWER (2.09) SP -F0, 4cc #14 AWG, SUMP PUMP ALARMS (3.06) A03 -F0.1, 2cc #14 AWG, AC BREAKER ALARM VOLTAGE (4.04) A03 -F0.2, 7cc #14 AWG PLC DATA INPUTS (4.04) A03 -FO, 7cc #14 AWG TRIP & CLOSE SIGNALS (4.04) 1SP (4.07) N -F0, 1/C #14AWG, 2KV VOLTAGE DIVIDER REF. POT. W I XH 1 I PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY PAT 01-lOGAN DES BY SCALE: NONE DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE COD REVIEWED OC FOR _ONCE NFPA 70 NEC AUG 2 7 2007 City Of Tukwila B ILDING DIVISION XV T -STAT� HTR VD (6.02) FO -F1, 1/C #14AWG, 2KV (6.02) FO -F1.1, 2 -1 /C #14AWG, 2KV JUN 28 ? 7 C4 L.I iz LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINELINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM DC SWITCHGEAR tCNTRACT DR NO. RTAILR 82 -03 / C807 I T NO . AWING RE'• TPS- W070 -05 I 01 REV DATE DESCRIPTION BY ENG CHK APP • (2.06) DP1 -F1, 2cc #14 AWG, 125VDC CONTROL POWER W • TERMINAL BLOCK DIVIDER XP SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 L NT SouxnikEwsrr PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 2/15/2005 DES BY DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM DC SWITCHGEAR CONTRACT DRAWING REV. NO. RTA/LR 82 -03 / C807 I NO. TPS W070 01 • • • I — -------------------- - - - - -- — �r------------------ _Ir------------ - - - - -- r .._.-------- - - - - -- - --- ---- ------ - - - --_I 1 11 i II " 2cc #14AWG W XP W 2cc #14AWG W XP 1 W ` 2cc #14AWG W XP 1L+ W I W 1 XP ems , ' '__ II B L� 1L+ 1 II 1 j 2 , II 1 i 1I. 4 .� I! 2cc #14AWG ii 4 _ t 3 1L I I OM 1 L- II 5 11L+ I 5 11L+ �� 5 11L+ 5 11L* v II 6 11L- II 6 11L- II 6 11L- II 6 11L 11 �� 6 II II II II 1 1 �� II II II II I „ II 11 II II II If 11 II II II II 11 II II II II 11 �� II II II II 11 II II II II S C16 ONLY „ 11 !! II II II II II " 11 II II II II I. II II II II II Ij II II II II II II II VD II VD II VD II VD II j1 .. ,. 11 I 1 II 1 II II II xv xv —° 11 xv II Xv I I (5.09) FO -F1, 1/C #14AWG, 2KV, II , I I I 1 1c #14AWG 2kV i . VOLTAGE DIVIDER REF. POT. 1 1c #14AWG, 2kV,1 12 1c #14AWG, 2 / 1 1c #14AW 2kV 11 2 I II II II 11 11 (5.09) F0 - F1.1, 2 - /C #14AWG, 2KV B XH 1c #14AWG, 2kV u XH 1c #14AWG, 2kV I I XH 1c #14AWG, 2kV I I X2 1c #14AWG, 2kV , I 11 If 11 11 2 —71 T -STAY I I 2 T -STAY , I 2 T -STAY I I T-STAT 191 ' II II II II HTR I I HTR I I HTR I I HTR I I 1 II II II II (� Rr^r91 FEEDER BREAKER Fl FEE BREAKER F2 FEEDER BREAKER F3 FEEDER BREAKER F4 FEEDER BREAKER F5 1I II 2 g nn7 REFERENCE DRAWING SERIES: S101 I REFERENCE DRAWING SERIES: S102 II REFERENCE DRAWING SERIES: S103 I I REFERENCE DRAWING SERIES: S104 REFERENCE DRAWING SERIES: 11 H.... d i V i l 1 G L I I_,. Il II xv 3 ' XH 11L- REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDIN D I0 , v T -STAT HTR 1 01 11/17/05 Revised per comments PJO LB LB REV DATE DESCRIPTION BY ENG CHI APP • (2.06) DP1 -F1, 2cc #14 AWG, 125VDC CONTROL POWER W • TERMINAL BLOCK DIVIDER XP SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 L NT SouxnikEwsrr PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 2/15/2005 DES BY DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM DC SWITCHGEAR CONTRACT DRAWING REV. NO. RTA/LR 82 -03 / C807 I NO. TPS W070 01 • • • I — -------------------- - - - - -- — �r------------------ _Ir------------ - - - - -- r .._.-------- - - - - -- - --- ---- ------ - - - --_I 1 11 i II " 2cc #14AWG W XP W 2cc #14AWG W XP 1 W ` 2cc #14AWG W XP 1L+ W I W 1 XP ems , ' '__ II B L� 1L+ 1 II 1 j 2 , II 1 i 1I. 4 .� I! 2cc #14AWG ii 4 _ t 3 1L I I OM 1 L- II 5 11L+ I 5 11L+ �� 5 11L+ 5 11L* v II 6 11L- II 6 11L- II 6 11L- II 6 11L 11 �� 6 II II II II 1 1 �� II II II II I „ II 11 II II II If 11 II II II II 11 II II II II 11 �� II II II II 11 II II II II S C16 ONLY „ 11 !! II II II II II " 11 II II II II I. II II II II II Ij II II II II II II II VD II VD II VD II VD II j1 .. ,. 11 I 1 II 1 II II II xv xv —° 11 xv II Xv I I (5.09) FO -F1, 1/C #14AWG, 2KV, II , I I I 1 1c #14AWG 2kV i . VOLTAGE DIVIDER REF. POT. 1 1c #14AWG, 2kV,1 12 1c #14AWG, 2 / 1 1c #14AW 2kV 11 2 I II II II 11 11 (5.09) F0 - F1.1, 2 - /C #14AWG, 2KV B XH 1c #14AWG, 2kV u XH 1c #14AWG, 2kV I I XH 1c #14AWG, 2kV I I X2 1c #14AWG, 2kV , I 11 If 11 11 2 —71 T -STAY I I 2 T -STAY , I 2 T -STAY I I T-STAT 191 ' II II II II HTR I I HTR I I HTR I I HTR I I 1 II II II II (� Rr^r91 FEEDER BREAKER Fl FEE BREAKER F2 FEEDER BREAKER F3 FEEDER BREAKER F4 FEEDER BREAKER F5 1I II 2 g nn7 REFERENCE DRAWING SERIES: S101 I REFERENCE DRAWING SERIES: S102 II REFERENCE DRAWING SERIES: S103 I I REFERENCE DRAWING SERIES: S104 REFERENCE DRAWING SERIES: 11 H.... d i V i l 1 G L I I_,. Il II xv 3 ' XH 11L- REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDIN D I0 , v T -STAT HTR 1 01 CKT 110 -C2 11/17/05 REV DATE XTRIP ON OFF EON OST A1,81 A2,B2 OFF 4__, ` GN fI IA 1 Al % RDI i B • B I I I I I I ON I- - -I- - -I L —L XJ FEEDER #1 4 PR CAT 5 (ETHERNET) BLUE WIRE A1_B1 A2,B2 r GN IA XTRIP Revised per comments DESCRIPTION FEEDER 1 DPU -96 S7300 B ON OFF — i o i L —LXJ PROFIBUS CABLE TERMINATION PROCEDURES FIGURE 2 BUS CONNECTION FOR THE FIRST AND LAST NODE ON THE PROFIBUS. THE CABLE MUST ALWAYS BE CONNECTED ON THE LEFT (SEE CONNECTOR MARKING AI,B1) pt SWITCH SETTING FOR THE FIRST AND LAST NODE ON THE PROFIBUS. ^ON• (TERMINATING RESISTOR CONNECTED) 2®THE CABLE SHIELD MUST LIE BARE ON THE METAL GUIDE. BUS CONNECTION FOR ALL OTHER NODES ON THE PROFIBUS. THE FEED CABLE SHOULD ALWAYS BE CONNECTED ON THE LEFT. (A1,81). THE CONTINUATION CABLE SHOULD ALWAYS BE CONNECTED ON THE RIGHT (A2,B2) pt SWITCH SETTING FOR ALL OTHER NODES ON THE PROFIBUS: - OFF' (TERMINATING RESISTOR DISCONNECTED) O THE CABLE SHIELD MUST LIE BARE ON THE METAL GUIDE. TIP: WHEN THE SWITCH IS IN THE *OW POSITION, THE PROFIBUS TO THE OTHER NODES IS DISCONNECTED AT THIS POINT (e.g. FOR SERVICES PURPOSES). PJO LB BY ENG CHK LB APP OPEN CKT 110 -C3 — GN / GN I A OPEN CKT 110 -C1 GN MAIN FEEDER FO FEEDER 2. DPU -96 B ON - 1- --I L —L FEEDER #2 A1B1 A2132 OPEN CKT 110 -C4 r — GN I N IA F/O CKT 110 -A3 r - - --1 r - - -1 GN(I IA 1 I I I AI ,RD I B B I I I I I I I I I 1 ON + OF F-1 �ON+O LXL —J L X _L _J FIGURE 1 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDR/VE, SUITE 106 [AKEOSWEGO, OREGON 97034 FEEDER 3 DPU -96 AI B ON OFF 1 L —L X FEEDER #3 OPEN GN RD CKT 110 -05 GN AC SWITCHGEAR FIGURE 1. O CABLE SHIELD O BUS CABLE e.g. 6XV1 830 -0AH10 O SCREW -TYPE TERMINAL BLOCK ON CONNECTOR P.C.B. FOR CONNECTING THE BUS CABLE SOUNDTRANSIT DPU -2000R CKT 110 -A2 N A AI r ON T OFF I L —J_XJ - STRIP THE CABLE INSULATION WITH CABLE STRIPING TOOL - INSERT THE GREEN AND RED CORES IN THE SCREW TERMINAL BLOCK (Al,B1 bzw. A2, B2) - PRESS THE CABLE SHEATH BETWEEN TWO CABLE CLIPS - SCREW THE GREEN AND RED CORES TIGHT IN THE SCREW TERMINAL. PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 2/15 /2005 DES BY DATE DES CKD BY DATE LANCE BANASZEK 2/15 /2005 APPROVED BY DATE SCALE: NONE FEEDER 4 DPU -96 r IA _ , AI I _ON+OFF_I LXL_J FEEDER #4 CKT 110 -Al REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila �B ILDING _U D IVISION LINK LIGHT RAIL PROJECT CCIC r - 1 IA 1 I I bc1I6 I I LXL —J CENTRAL CONTROL INTERFACE CABINET C s ; . rI JUN 28 7 Ire 1t'dI L,Lt\ I L5 c TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM PROFIBUS CONTRACT DRAWING ' NO. RTA/LR 82 -03 / C807 I No. TPS- W070 -07 01 Rev # Date Apv'd Description Initial Issue Sound Transit Central Light Rail Link J SIEMENS Transportation Systems, Inc. MAINLINE TPSS TPSS BLDG. ELEC. EQUIP. BILL OF MATERIAL 00 3/17/05 LB 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L001 Pg. 1 of 1 REVIEWED FOR CODE COMPLIANCE NI-PA 76 - NEC AUG 2 7 2007 ' City Of Tukwila ; BUILDING DIVISION 11 Item Descri • tion 1 AC Panelboard, 120/240, 1 phase, 3 wire, 30 circuits, 225 amp main circuit breaker, 225 amp bus, bolt -on branch breakers, Siemens type BL 2 DC Panelboard, 125V, 1 phase, 2 wire, 30 circuits, 200 amp main circuit breaker, 250 amp bus, bolt -on branch breakers, Siemens type BQD 3 Voltage Monitoring Relay, Auto Reset For measuring 220 VAC supply w/ 8 -pin DIN rail socket. Set to 160. 6 NOT USED 7 Battery Charger, 120 VAC in, 125 VDC @ 20 ADC out 8 Batteries, 6VDC, 50AH 9 ETS lockable pull box with padlockable kit 9 Emergency Trip Switch consisting of: 40mm push lock, twist reset red mushroom head 1 NC contact block enclosure, NAMA type 1 10 Station Shutdown Switch, pull to reset consisting of: 40mm push lock, twist reset red mushroom head 1 NC contact block enclosure, NAMA type 1 protective shroud SURGE ARRESTOR, 1500V Complete with non - metallic enclosure 12 Cuirrent relay, 74SA Complete with non - metallic enclosure 13 See TESLA BOM 05008101B01 for additional building equipment and accessories. 5 1 DP1 1 27A 1 AC Voltage Monitoring 4 Voltage Monitoring Relay, Auto Reset 1 27B DC Voltage For measuring 125 VDC supply Monitoring w/ 8 -pin DIN rail socket. Set to 90. 1 5 Eye wash 1 — Eye care Dw' . S mbol Function Manuf. Part No. AP1 AC control power SENTRON Type SI distribution P2A30QJ150EBS 1 — DC power 10 — DC Power 1 — ETS box 1 ETS TPS Mass Trip & XTRIP 2 SSS SA DC control power SENTRON Type SI Siemens distribution P1 N3OFX200CTS TPS Mass Trip Without XTRIP Lightning Su AC260B- 160 -250 Time Mark 51X120 DC260BM -90 -150 Time Mark 51X120 7602.1 Haws 1SCRF-130-020E ALCAD 12SLA50 ALCAD AHXE6X6X4 Hoffman 3SB series Siemens 3SBO3P4R 3SB1430 -OC 3SB0221 3SB series 3SBO3P4R 3SB1430 -0C 3SB0221 3SB1902 -2BM 6007 -004 Manufacturer Siemens Siemens SMC ression 74SA Lightning MAS -2. Elektroba Detector CLLR Stock # JUN 2 8 7n is - 1• tl I d.i r:Lt d c. Manuf. Part No. MA3Q1100000001 P Item 1 AMVAC Circuit Breaker, 27kV, 1200A, 25kA control voltage 125V DC 2 3 -Phase Power Meter, model 7330 with integrated display, 5A nominal, 120VAC input voltage, 125VDC power supply 60Hz, , 4- internal digital inputs, 4 digital out•uts, two 2 RS485 sorts Multifunctional Solid State Relay 1 50/51, 50/51N, 51T, Circuit protection, 587R1412 -61004 DPU2000 4 NOT USED 5 Circuit breaker control switch 6 NOT USED 7 Lockout relay, 3 decks, 125VDC 8 Kirk Key Interlock, Type D, LC, DOE, Single Lock 1 K Kirk Key KDL000010SC Kirk Key Interchange Al, mounted on CPT frame rear door Interlock Co. 9 Kirk Key Interlock, Type F, LO, FOE, Single Lock 1 K Kirk Key KFL00001 OS Kirk Key Interchange Al, mounted in CPT fuse truck Interlock Co. 10 Indicating light, red 1 RIL Breaker closed 116B6708G43 -R4 General Electric Red LED 1 1835L3 -R -CR DDP 11 Indicating light, green 1 GIL Breaker open 116B6708G43 -G4 General Electric Green LED 1 1835L3 -G -CG DDP 12 Indicating light, Blue 1 LOC Local Position 116B6708G43 -W4 General Electric White LED 1 1835L3 -W-CW DDP 13 NOT USED 14 Current transformer, Ratio 100:5SR 3 CT 923A332G19 -M ABB Rating C100 15 Potential transformer, 26400/26400, ratio (220:1) 2 PT 677C452G05 Cuttler Hammer with 2 -0.5E fuses 38kV 16 Control power transformer, 25KVA, 1 CPT House Power CS00979A01 E11 AFP Transformers 2600 - 120/240, 10kV BIL 17 NOT USED 21 NOT USED 23 Strip heater, 150W 24 NOT USED Descri tion 18 Control Fuse 6A. 600VDC. Timedelay. Class CC 20 Control fuse, 15A, 300V DC, time delay class CC 22 CPT primary fuse, 27kV, 3E amp 7330 1 CS Breaker control 2438D 19 Fuse block, double pole, pullout type, 30A 3 FU 1 86 Breaker lockout 7803D Electroswitch 6 2FU 2 FU -CL 2 3FU 6 HTR Dw•. S mbol Function 52 Main breaker Metering 27, 47, 59, A, V Ammeter, Voltmeter Circuit protection USCC2 Circuit protection ATDR15 P7330AOBOBOAOAOA ATQR6 Manufacturer ABB PML ABB Electroswitch Ferraz Shawmut Ferraz Shawmut Ferraz Shawmut CPT protection 9F60DMJ003 General Electric 279010H00 Omega CLLR Stock # REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila BUILDING DJ ISION Rev # 00 Date 6 -3 -05 Apv'd LB Description Preliminary Release Sound Tr Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS AC SWITCHGEAR BILL OF MATERIAL Dwg. TPS -L040 Pg. 1 of 1 prnr-"ll -D JUN 2 8 9n97 L tL i it i c.;LI\ I e' I Item Descri ption 1 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 10A 2 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts 3 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -•ole, C characteristics Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -•ole, C characteristics DC to DC Converter Input voltage: 90 -350 VAC or DC Output: 24 VDC @ 5 AMPS 6 DC to DC Converter Input voltage: 90 -350 VAC or DC Output: 24 VDC @ 5 AMPS 7 Space heater150W, 120VAC 8 Lamp Module, 22mm, Green Complete with lampholder and 24 VDC LED 9 Lamp Module, 22mm, Red Complete with lampholder and 24 VDC LED 10 Interphase Transformer,12- pulse, RI -9 rated, 5% DC Unbalance Routine Tested, Open Core and Coil Copper VPI, 1500VDC, 2000ADC Max Dims: 36.37" H x 24" W x 20.5" D, Wt. 950 lbs. 11 Negative Drainage Circuit, consisting of: a) 1 -DC Contactor, 24VDC coil, 1NO +1NC 100ADC contacts b) 1 -Knife Switch, 1 pole,300A, 600VDC 12 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts 13 MicroSwitch, 1 NO + 1 NC Contact 14 Thermostat, single pole, snap action contacts: 22amps @ 120/240VAC. Wall mount. 15 Track Resistance Test Station Reference, consisting of: a) 4- Silicon Power Rectifier Diodes, If(av) = 300A, Vrrm = 1.6 kV b) 4 -Knife Switches, 1 pole, 60A, 600VDC 16 Structure Grounding Relay High Resistance 17 DC DISCONNECT SWITCH -- 89N, 6000A, 1500 VDC DPST non - fusible, manually operated, bolted pressure silver contacts 4 form "C" contacts, 2activated when switch open & 2 when switch closed. 18 Kirk key interlock, Type 'BL ". key interchange with main DC breaker. Base mounted, 3/8" bolt projection when withdrawn, 1 cylinder key removable in extended position. 19 Cubicle enclosure, complete with: busing, device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray Q 1 1 1 1 1 1 1 1 N Dw F11 F12 F20 F21 G01 1 H1 1 H2 1 IT G02 HTR 1 ND 1 TSTAT 1 TSR 89N .S mbol Function Control Voltage heater • rotection Control Voltage 24VDC •wr su I Control Voltage 24VDC •wr su Control Voltage 24VDC •wr su Control voltage •• 1 64G & 64L Control voltage Switch Open Switch Closed Interphase Transformer Neg. Dm. Circuit 3 SON, SOR, SOF Frame fault isolation 1 S11 Cubicle Door 0 e Heater Control Test Sta. Ref. Frame Fault Negative Disconnect Switch Kirk Key Manuf. Part No. 5SX5210 -7 5SX5206 -7 5SX9102 5SX5206 -7 5SX5206 -7 QUINT -PS -100 240AC/24DC/5 QUINT -PS -100 240AC/24 DC /5 2E919 3SB3244 -6BA40 3SB3244 -6BA20 14- 193 - 791 -52 -6 Ty •e A 5SX5206 -7 5SX9102 3SE30201A 2E815 NTE6364 A 7713 C4280 -600 Negative Cubicle 8MF94 MP- 6011- 1.5KVDC- NF -SH -K1 K2 Dw • B88785 K -BL -0 -037 -1 E -S Manufacturer Siemens Siemens Siemens Siemens Phoenix Phoenix Grainger (Vulcan) Siemens Siemens MTC P /N. 120270L02BC01 Magnetic Technologies Siemens Filnor Siemens Siemens Grainger (Dayton) NTE Electronics Filnor Swartz Pringle CLLR Stock # _RED IEWED -FOR- CODE COMPLIANCE NFPA 70 - NEC_ -CMG 2 7 20 City Of Tukwila LOAD ION Kirk Key Interlock Co. Siemens pLA JUN 2 ?WY Rev # Date Apv'd Description I Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. p MAINLINE TPSS NEGATIVE DISCONNECT SWITCH BILL OF MATERIAL 00 3/17/05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS- L050 Pg. 1 of 1 r Item Descri ption 1 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 10A 2 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts 3 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -•ole, C characteristics Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -•ole, C characteristics DC to DC Converter Input voltage: 90 -350 VAC or DC Output: 24 VDC @ 5 AMPS 6 DC to DC Converter Input voltage: 90 -350 VAC or DC Output: 24 VDC @ 5 AMPS 7 Space heater150W, 120VAC 8 Lamp Module, 22mm, Green Complete with lampholder and 24 VDC LED 9 Lamp Module, 22mm, Red Complete with lampholder and 24 VDC LED 10 Interphase Transformer,12- pulse, RI -9 rated, 5% DC Unbalance Routine Tested, Open Core and Coil Copper VPI, 1500VDC, 2000ADC Max Dims: 36.37" H x 24" W x 20.5" D, Wt. 950 lbs. 11 Negative Drainage Circuit, consisting of: a) 1 -DC Contactor, 24VDC coil, 1NO +1NC 100ADC contacts b) 1 -Knife Switch, 1 pole,300A, 600VDC 12 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts 13 MicroSwitch, 1 NO + 1 NC Contact 14 Thermostat, single pole, snap action contacts: 22amps @ 120/240VAC. Wall mount. 15 Track Resistance Test Station Reference, consisting of: a) 4- Silicon Power Rectifier Diodes, If(av) = 300A, Vrrm = 1.6 kV b) 4 -Knife Switches, 1 pole, 60A, 600VDC 16 Structure Grounding Relay High Resistance 17 DC DISCONNECT SWITCH -- 89N, 6000A, 1500 VDC DPST non - fusible, manually operated, bolted pressure silver contacts 4 form "C" contacts, 2activated when switch open & 2 when switch closed. 18 Kirk key interlock, Type 'BL ". key interchange with main DC breaker. Base mounted, 3/8" bolt projection when withdrawn, 1 cylinder key removable in extended position. 19 Cubicle enclosure, complete with: busing, device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray Q 1 1 1 1 1 1 1 1 N Dw F11 F12 F20 F21 G01 1 H1 1 H2 1 IT G02 HTR 1 ND 1 TSTAT 1 TSR 89N .S mbol Function Control Voltage heater • rotection Control Voltage 24VDC •wr su I Control Voltage 24VDC •wr su Control Voltage 24VDC •wr su Control voltage •• 1 64G & 64L Control voltage Switch Open Switch Closed Interphase Transformer Neg. Dm. Circuit 3 SON, SOR, SOF Frame fault isolation 1 S11 Cubicle Door 0 e Heater Control Test Sta. Ref. Frame Fault Negative Disconnect Switch Kirk Key Manuf. Part No. 5SX5210 -7 5SX5206 -7 5SX9102 5SX5206 -7 5SX5206 -7 QUINT -PS -100 240AC/24DC/5 QUINT -PS -100 240AC/24 DC /5 2E919 3SB3244 -6BA40 3SB3244 -6BA20 14- 193 - 791 -52 -6 Ty •e A 5SX5206 -7 5SX9102 3SE30201A 2E815 NTE6364 A 7713 C4280 -600 Negative Cubicle 8MF94 MP- 6011- 1.5KVDC- NF -SH -K1 K2 Dw • B88785 K -BL -0 -037 -1 E -S Manufacturer Siemens Siemens Siemens Siemens Phoenix Phoenix Grainger (Vulcan) Siemens Siemens MTC P /N. 120270L02BC01 Magnetic Technologies Siemens Filnor Siemens Siemens Grainger (Dayton) NTE Electronics Filnor Swartz Pringle CLLR Stock # _RED IEWED -FOR- CODE COMPLIANCE NFPA 70 - NEC_ -CMG 2 7 20 City Of Tukwila LOAD ION Kirk Key Interlock Co. Siemens pLA JUN 2 ?WY Rev# Date Apv'd Description Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc MAINLINE TPSS RECTIFIER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release Dwg. TPS- L060 Pg. 1 of 1 Item Descri•tion 1 Capacitor .47uf, 2100V 2 Capacitor 16uf, 3200V MP (metalized- dielectric capacitor 3 THERMOSTAT Opens @120C, Closes @105C 4 THERMOSTAT Opens @135C, Closes ©120C 5 NOT USED 6 Semiconductor fuse,1400V,1000A. With support for microswitch 170H0067 7 Resistor, vitreous enamel, wirewound 200W. 6 ohm, + -10% tolerance 8 Resistor, vitreous enamel, wirewound 200W 6 ohm + -10% tolerance 9 Resistor, vitreous enamel, wirewound 500W a, 40 C, 3.9 kohm, + -10% tolerance 10 Mounting bracket for Draloric resistors 11 Micro - switch for Bussmann fuses, 250V/2A. 2 N/O contacts. C/w Micro - switch bracket. 12 MicroSwitch, 1 NO + 1 NC Contact 13 Rectifier diode 4000V. 3600A 14 Diode clamp black coated 15 Heat sink, mounting rail, SITRAS REC -D black coated 16 Heat sink, SITRAS REC -D black coated 17 Cubicle enclosure, complete with: busing, device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray 1 C130 1 F191 1 F192 Dw . S mbol Function C111...C113 Suppression 18 F111...F163 Suppression 6 R111.1...113.2 Suppression 2 R130.1...130.2 Suppression 4 R170.1....171.2 Discharge 4 18 S111...S163 1 S08 18 V111...V163 18 6 18 1 R Temperature 2670143 Monitor Temperature 2670144 Monitor Diode Protection 170M6753 Blown Fuse Indicator Door Interlock Rectification Manuf. Part No. KA2100- 0,47SAY GMKP3200 -161 B GWK150100R10 %.M4 Draloric GBS30/133- 6R0 -10% Draloric GWS500SB- 3K9 -10% Draloric 424339 170H0099 170H0067 3SE30200A Rectifier Cubicle 8MF94 SW4OCXC1170 -P U1192/137 JK2186- 890 -AL -807 J K2186- 200 -AL -803 Manufacturer ROE ROE Elmwood Sensors Elmwood Sensors Bussmann Draloric Bussmann Siemens WCS WCS JKK JKK Siemens CLLR Stock # JUN 2 8 ?nn7 REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 . City Of Tukwila . BUILDING DIVISION Item Descri•tion 1 Capacitor .47uf, 2100V 2 Capacitor 16uf, 3200V MP (metalized- dielectric capacitor 3 THERMOSTAT Opens @120C, Closes @105C 4 THERMOSTAT Opens @135C, Closes ©120C 5 NOT USED 6 Semiconductor fuse,1400V,1000A. With support for microswitch 170H0067 7 Resistor, vitreous enamel, wirewound 200W. 6 ohm, + -10% tolerance 8 Resistor, vitreous enamel, wirewound 200W 6 ohm + -10% tolerance 9 Resistor, vitreous enamel, wirewound 500W a, 40 C, 3.9 kohm, + -10% tolerance 10 Mounting bracket for Draloric resistors 11 Micro - switch for Bussmann fuses, 250V/2A. 2 N/O contacts. C/w Micro - switch bracket. 12 MicroSwitch, 1 NO + 1 NC Contact 13 Rectifier diode 4000V. 3600A 14 Diode clamp black coated 15 Heat sink, mounting rail, SITRAS REC -D black coated 16 Heat sink, SITRAS REC -D black coated 17 Cubicle enclosure, complete with: busing, device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray 1 C130 1 F191 1 F192 Dw . S mbol Function C111...C113 Suppression 18 F111...F163 Suppression 6 R111.1...113.2 Suppression 2 R130.1...130.2 Suppression 4 R170.1....171.2 Discharge 4 18 S111...S163 1 S08 18 V111...V163 18 6 18 1 R Temperature 2670143 Monitor Temperature 2670144 Monitor Diode Protection 170M6753 Blown Fuse Indicator Door Interlock Rectification Manuf. Part No. KA2100- 0,47SAY GMKP3200 -161 B GWK150100R10 %.M4 Draloric GBS30/133- 6R0 -10% Draloric GWS500SB- 3K9 -10% Draloric 424339 170H0099 170H0067 3SE30200A Rectifier Cubicle 8MF94 SW4OCXC1170 -P U1192/137 JK2186- 890 -AL -807 J K2186- 200 -AL -803 Manufacturer ROE ROE Elmwood Sensors Elmwood Sensors Bussmann Draloric Bussmann Siemens WCS WCS JKK JKK Siemens CLLR Stock # JUN 2 8 ?nn7 Rev # Date 6 -3 -05 Apv'd LB LB Description Preliminary Release Revised for ckt changes I Sound Transit ', - Central Light Rai Li SIEMENS Transportation Systems, Inc. p y MAINLINE TPSS DC MAIN BREAKER BILL OF MATERIAL 00 01 12/7/05 Dwg. TPS -L100 Pg. 1 of 3 Item 1 SIMATIC S7 CPU 314C -2 DP Control System; with PROFIBUS -DP master /slave interface 64 KB RAM, integrated 24 VDC power supply, c/w 4 Analog Inputs, 2 Analog Outputs, 16 Digital Inputs & 16 Digital Outputs Standard temperature range W/2 Mbyte FEPROM memory card 2 SIMATIC S7 -300 Digital Input module 16 inputs, 24 VDC with labeling strip and bus connector 3 PROFIBUS bus connector, 12 Mbit/s data XSFR 90 degree outgoing cable, terminating resistor, with isolation function, without PG socket 4 530mm S7 DIN Rail 5 PROFIBUS bus cable, 2 wire, shielded for interconnecting PROFIBUS terminals. 6 PROFIBUS bus cable, plastic fiber optic for interconnecting PROFIBUS terminals. 7 NOT USED 8 OLM /G12 -1300 Optical Link Module for distances uo to 15kM 9 OBT Optical Bus Terminal 10 SIMATIC OP -270 HMI 5.7" color STN display, incl. mounting accessories. 11 NOT USED 12 PROFIBUS bus connector, 12 Mbit/s data XSFR 90 degree outgoing cable, terminating resistor, with isolation function, with PG socket 13 PROFIBUS bus connector, 12 Mbit/s data XSFR 35 degree outgoing cable, terminating resistor, with isolation function, without PG socket 14 SITRAS BUFFER AMPLIFIER DIN RAIL MOUNTING 15 SITRAS VOLTAGE DIVIDER DIN RAIL MOUNTING 16 NOT USED 17 NOT USED Descri ' tion 18 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 16A 19 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts 20 NOT USED 21 Space heater, 150W, 120VAC 1 2 A100 -D11 1 A101 1 A102 40 A103 meters 50 A104 meters 1 A105 1 A106 1 A107 1 A108 1 A109 1 A110 1 F11 1 F12 1 HTR Dw'.S mbol A100 -D10 Function Master PLC 6ES7 314- 6CF02 -0ABO and SCADA Interface Extends 110 of S7 PLC Accessory PLC Accessory PLC Accessory PLC Accessory PLC Accessory PLC Accessory Operator Interface Panel OP Accessory OP Accessory Bus Voltage & Rectifier Current Bus Voltage & Rectifier Current Control Voltage for FO Control Voltage for PLC Manuf. Part No. 6ES7 953- 38LL11 -0AA0 6ES7 321- 1BH02 -0AA0 6ES7 972- 0BAl2 -OXAO 6ES7 390- 1AF30 -0AA0 6XV1 830 -0EH10 6XV 1 821 -0AN50 6GK1- 502 -3CC10 6G K1- 500 -3AA00 6AV6 542- 0CA10 -0AX0 6ES7 972- OBB12 -OXAO 6ES7 972- 0BA41 -OXAO E10433- E9509 -H100 E10433- E9511 -H100 5SX5216 -7 5SX5206 -7 5SX9102 2E919 Made B Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Grainger (Vulcan) CLLR Stock # REVIEWED FOR - CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 Li .3 City Of Tukwila UCRNGD ION rr I‘ fED cr v VILA JUN 2 8 ?flc7 j` t��vl11 G EE l r a Rev # Date Apv'd Description Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. P y MAINLINE TPSS DC MAIN BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L100 Pg. 2 of 3 Item Descri • tion 22 Electromechanical Counter, 6 Digit Operation Voltage 24V DC, Mounting: Snap -in. 23 Lamp Module, 22mm, Green Complete with lampholder and 24 VDC LED 24 Lamp Module, 22mm, Red Complete with lampholder and 24 VDC LED 25 Lamp Module, 22mm, White Complete with lampholder and 24 VDC LED 26 Lamp Module, 22mm, Blue Complete with lampholder and 24 VDC LED 27 Relay, Heavy Duty w /Magnetic Blowout DPDT 10A contacts @ 110VDC DC Operation @ 24V DC. 28 Plystyrene enclosure for K02 & K11 w /translucent cover 28 Relay, Heavy Duty w /Magnetic Blowout DPDT contacts @ 110VDC DC Operation © 24V DC. 29 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation © 24V DC, 1.2W. w/ socket 30 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 31 Analog Voltmeter 4.25 "X4.25 ", Black Input: 0 to 20 mADC. Scale: 0.. +2kV. 32 Analog Ammeter 4.25 "X4.25 ", Black Input: 0 to 20 mADC. Scale: +6kA..0.. +6kA. 33 Shunt, Silver Plated. 6000A/50mV with 3/8" fins. 34 Resistor, 250 OHMS, 175 WATTS Variable with screwdriver ad'ustable lu• s 35 Resistor Mounting Kit for R10 Centering Washers & Bolt 36 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO + 1 NC contacts. 37 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO + 1 NC contacts. _ 38 Local Remote Switch, Pistol Grip Handle, 1 deck w /engraved escutcheon LOCAL left 45deg., REMOTE vert 39 Breaker Control Switch, Open - Close, Pistol Grip Handle spring return to center, 1 deck, no target w /engraved escutcheon 1 H1 1 H3 ' Local/Remote 1 HSO Substation Trouble 1 K02 ; Trip Breaker Aux. Relay 1 1 P1 R1 R10 1 SO1 1 SO2 1 S1 Dw . S mbol Function Manuf. Part No. H01 Breaker SR8 -4016 Operation Counter Breaker Open P2 Rectifier DC Output Current Measuring R10 Auxiliary Local /Remote Switch • 1 H2 ' Breaker Closed 3SB3244 -6BA20 1 K02, K11 Relay enclosure TK -2518 116 -508 1 K11 Close Breaker 3TX7130 -ORCO3 Aux. Relay 1 K15 Ok to Close 3TX7114 -5LCO3 Circuit Breaker 3TX7144-1E6 1 K50 Ok to Close 3TX7114 -5LCO3 Circuit Breaker 3TX7144 -1 E6 Main DC Bus 103 11 1 xxxx Voltage Measuring Reverse Current Dwg 90000 -973 Measurin Breaker Holding D225K250 Coil Current Path 7PA200 Truck In Test 3SX3102 Position 3SE3020 -1A Truck In Connect 3SX3102 Position 1 S3 Breaker On /Off 2438D Switch Made B Redington Siemens Siemens 3SB3244 -6BA60 Siemens 3SB3244 -6BA50 Siemens 3TX7130 -ORCO3 Siemens 103 11 2 xxxx 3SE3020 -1A 24201D Altech Siemens Siemens Siemens Yokogawa Yokogawa CLLR Stock # REVIEWED -FR- Canadian Shunt CODE COMPLIANCE Ohmite EC Ohmite Siemens Siemens Electroswitch Electroswitch City Of Tukwila B IL JUN 2 8 ?n97 y <,T Item Descri•tion 40 Pushbutton, Flat, 22mm Black Knob, Plastic Front Ring and 1 N0 +1 NC Contact Block 41 Thermostat, single pole, snap action contacts: 22amps © 120/240VAC. Wall mount. 42 Auxiliary Plug -in Relay, 3 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 43 DC High Speed Circuit Breaker with: HSCB HPB60 82S 6000A, 2000VDC Five auxiliary switches with connector pin Tripping range: 9 -15 kA With Magnetic Overcurrent device defeated Draw-Out Circuit Breaker w/o Carriage Solenoid Operated, Electrically Held Arc Chute Type 82S Aux Operating Voltage 125V DC 44 DC High Speed Circuit Breaker accessories: 1 72 -0 Aux 1 ea HSHR430547R0001 Position Indicator 1 ea VEAM connector (Aux) CIRO8F- 32- 8S- F80 -T12- 696 -MOD 2 ea HAK4300 -G50 Ferraz Contact Plates 1 set HAK3200 -F180 Ferraz Finger Clusters - X1 1 set HAK3200 -F110 Fen Fin er Clusters - X2 45 Kirk key interlock, Type 'FL ". key interchange with negative disconnect switch. Flat mounted, no bolt projection, 1 cylinder key removable in extended position. 46 Cubicle enclosure, complete with: busing, 1 device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray 1 1 1 1 1 K Dw•. S mbol S50 TSTAT 186 72 -0 Function PLC Reset Heater Control Mass Trip Aux. Relay DC Breaker DC Breaker Kirk Key FO Main DC Breaker 8MF94 and Master PLC Cubicle Manuf. Part No. 3SB1201 -0AB20 2E815 3TX7115 -5NCO3 3TX7144 -1E4 AUR448211A800212 UR 26.81S -50 -5S K -FL -0 -000 -1 E -S Made B Siemens Grainger (Dayton) Siemens Secheron Ferraz Kirk Key Interlock Co. Siemens CLLR Stock # — REVIEWED — FOR CODE COMPLIANCE NFPA 70 — NEC AUG 2 7 2007 City Of Tukwila B UILDING DIVISION Apv'd LB LB Rev # 00 01 Date 6 -3 -05 12/7/05 Description Preliminary Release Revised for ckt changes Sound Tr Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS DC MAIN BREAKER BILL OF MATERIAL Dwg. TPS -L100 Pg. 3 of 3 Rrn7.71 / F-) "LA JUN 2 8 2 nn7 ►,o�,l, C .i\t, zi- Rev # Date Apv'd Description ( Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS DC FEEDER BREAKER BILL OF MATERIAL 00 6 -3 -05 LB LB Preliminary Release Revised for ckt changes 01 12/7/05 Dwg. TPS -L101 Pg. 1 of 3 Item 1 Descri • tion SITRAS DPU96 PU CENTRAL UNIT, V3 (V3.11) 24 DIGITAL INPUTS, 16 DIGITAL OUTPUTS INPUT 125 VDC, OUTPUT 24 - 90VDC, 5A, MAX. INST. 7.5A OPERATING TEMP. RANGE 0... +50 DEGC DIN RAIL MOUNTING 2 SITRAS DPU96 X2 Connector Set 3 SITRAS DPU96 X1 Connector 4 PROFIBUS bus cable, 2 wire, shielded for interconnecting PROFIBUS terminals. 2 meters 5 DPU96 bus connector for PROFIBUS, 90, w/o PG 6 SITRAS DPU96 Control Function w /Intertripping Function 7 SITRAS DPU96 BA BUFFER AMPLIFIER DIN RAIL MOUNTING 8 Fiber- Optic Cable With Plug, Length 3meters For connectin • BA to SITRAS DPU96 PU 9 SITRAS DPU96 VD VOLTAGE DIVIDER MODULE DIN RAIL MOUNTING UNIT lOcmX7cmX12cm 10 Top Hat DIN rail forSITRUS DPU mounting. 11 DC Fuse with trip indicator, 10 A, 1500 VDC, 30kA CC 1591 CPgRD 20X127/10 12 Fuse Holder, 1 pole, 1500 VDC, 63 A PSI 20X127 PRE 13 Miniature Circuit Breaker, N -Type, AC /DC, AC 400V, DC 440V, 4.5 kA, 2 -•ole, C characteristics, 10A w /Aux. Contacts 14 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 10A 15 Space heater, 150W, 120VAC 16 Electromechanical Counter, 6 Digit Operation Voltage 24V DC, Mounting: Snap -in Panel Mount. 17 Lamp Module, 22mm, Green Complete with lampholder and 24 VDC LED 18 Lamp Module, 22mm, Red Complete with lampholder and 24 VDC LED 19 Lamp Module, 22mm, White Complete with lampholder and 24 VDC LED 20 Lamp Module, 22mm, Yellow Complete with lampholder and 24 VDC LED 21 Contactor, Size 1, 2 Pole, DC-4 Rated Operating Current 32A. 2N0 +2NC Contacts w /Screw Terminals. DC Operation © 24V DC, 3W. 22 Relay, Heavy Duty w /Magnetic Blowout DPDT 10A contacts © 11(' DC Operation @ 24V DC. 1 1 150-Al 1 150-Al 1 150-Al 1 150-Al 1 150-Al 1 1 150 -A2 1 150 -A2 1 150 -A3 1 FO 1 FO Auxiliary 1 F11 F12 1 HTR 1 H01 1 H1 1 H3 Local /Remote 1 H10 1 KO 1 K02 Dw • . S mbol 150 -AO (di/dt, Line Test, Bus Voltage Measuring, & Monitoring) Manuf. Part No. Function Feeder Control E10433- E9702 -H311 and Protection Unit Process Interface E10433- E9502 -H510 Supply Interface E10433- E9502 -H520 PLC Interface 6XV1 830 OAH10 PLC Interface 6ES7972 -0BA11 -OXAO Breaker Control XTRIP Feeder Volt Am • & Line Test F/O Cable Feeder Volt Amp & Line Test Measuring Line Test Line Test Control Voltage for F x DPU -96 Control Power Line Test Contactor ; Trip Breaker Aux. Relay E10433- E9705 -F001 E10433- E9705 -F002 E10433- E9509 -H100 El 0433- E9502 -HSO6 E10433- E9511 -H100 6ES7390- 1AF30 -0AA0 F081655 F097203 5SX5210 -7 5SX9102 5SX5205 -7 2E919 Breaker SR8 -4016 Operation Counter Breaker Open 3SB3244 -6BA40 1 H2 Breaker Closed 3SB3244 -6BA20 3SB3244 -6BA60 Group Alarm 3SB3244 -6BA30 3TC4417 -0AB4 3TX7130 -ORCO3 Manufacturer Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Ferraz Ferraz Siemens Siemens Grainger (Vulcan) Redington Siemens Siemens Siemens Siemens SIEMENS Siemens CLLR Stock # 7 2007 City Of Tukwi NG DMSION • pE COMPLIANCE ST -F6R -- !ILA JUN 2 8 7nig r tidsl GiLl\ i ,` Rev # Date Apv'd Description So und Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS DC FEEDER BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L101 Pg. 2 of 3 Item Descri tion 23 Polystyrene enclosure for K02 & K11 w /translucent cover 23 Relay, Heavy Duty w /Magnetic Blowout DPDT contacts @ 110VDC DC Operation @ 24V DC. 24 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 25 Auxiliary Plug -in Relay, 4 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 1 26 Auxiliary Plug -in Relay, 2 Form C Contacts 1 K24 DC Operation @ 24V DC, 1.2W. w/ socket 27 DC High Speed Circuit Breaker with: 1 172 -x HPB45 82S Manual Tripping Device M3 (x =1,2,3 &4) 4500A, 2000VDC Five auxiliary switches with connector pin Tripping range: 3 -7 kA With Magnetic Overcurrent device set to a value of 5kA Draw -Out Circuit Breaker w/o Carriage Solenoid Operated, Electrically Held Arc Chute Type 82S Aux Operatin • Volta • e 125V DC 28 DC High Speed Circuit Breaker accessories: 1 ea HSHR430547R0001 Position Indicator 1 ea VEAM connector (Aux) CIRO8F- 32- 8S- F80 -T12 -696 -MOD 2 ea HAK4300 -G50 Ferraz Contact Plates 1 set HAK4300 -F180 Ferraz Finger Clusters - X1 1 set HAK4300 -F110 Ferraz Finger Clusters - X2 Without tri • counter switch 29 POWER RESISTOR, 100 ohm, 300 watt withstand rated wattage for 5 seconds 30 Shunt, Silver Plated. 4000A/60mV 31 Resistor, Variable, 250 OHMS, 225 WATTS 32 Resistor Mounting Kit for R10 33 Resistor, Wirewound, Variable, 5 %, 50 watt, 500 ohm 34 NOT USED 35 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO & 1 NC Contacts 36 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO & 1 NC Contacts 1 1 1 1 K11 Dw•. S mbol Function Manuf. Part No. K02, K11 Relay enclosure TK -2518 116 -508 K15 1 K20 RO R1 R10 1 R10 Auxiliary 1 R85P 1 S01 1 SO2 Close Breaker 3TX7130-ORCO3 Siemens Aux. Relay Ok to Close Circuit Breaker Lockout DC Feeder Group Alarm DC Breaker 172 -x Aux DC Breaker Line Test S E300K16R Measurin • di /dt Current Dwg. 90000 -972 Measurin • Breaker Holding D225K250 Coil Current Path Transfer Trip Circuit Truck In Test 3SX3102 Position Truck In Connect 3SX3102 Position Manufacturer Altech 3TX7114 -5LCO3 Siemens 3TX7144 -1 E6 3TX7111 -3PCO3 3TX7144 -1 E5 3TX7114 -5LCO3 3TX7144 -1 E6 Siemens Siemens UR26 E125D1xxxE81 Secheron O 7PA200 D50K500 3SE3020 -1A 3SE3020 -1A Ferraz RARA Canadian Shunt Ohmite Ohmite Ohmite Siemens Siemens CLLR Stock # REVIEWED FOR CODE COMPLIANCE NFPA70 —NEC City Of Tukwila < < 1 /ILA JUN 2 8 7n97 :r l isal l '�lt6 Rev# Date Apv'd - Description Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS DC FEEDER BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L101 Pg. 3 of 3 Item Description 37 Local Remote Switch, Pistol Grip Handle, 1 deck w /engraved escutcheon LOCAL left 45deg., REMOTE vert Qty Dwg. Symbol Function Manuf. Part No. Local/Remote 24201D Switch 1 S1 Manufacturer Electroswitch 37 Actuator, 22mm, Bks Safety LockSeq. 1 S2 Breaker Direct On 3SB1000 -5BA01 Siemens 0-I Momentary Contact. Key Withdraw at Position O. Closure No. S1, w/ Metal Front Ring c/w 22mm,1 NO +1 NC Contact Block 1 3SB 1320 -0A 38 Breaker Control Switch, Open - Close, Pistol Grip Handle 1 S3 Breaker On/Off 2438D Electroswitch spring return to center, 1 deck, no target Switch w /engraved escutcheon 39 Actuator, 22mm, O. M. R. Safety Lock Seq. 1 S4 Line Test 3SB3500 -3AJ01 Siemens 0-I Maintained Contact. Key Withdraw in Left Position. Disable w/ Metal Front Ring c/w 22mm,1 NO +1 NC Contact Block 1 3SB3400 0A 40 Thermostat, single pole, snap action 1 TSTAT Heater Control 2E815 Grainger (Dayton) contacts: 22amps @ 120/240VAC. Wall mount. 41 Cubicle enclosure, complete with: busing, 1 Fx Feeder Cubicle SEA -FCUB Siemens device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray CLLR Stock # REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDIN D ION ,ALA JUN 2.8 ?f197 SCL METER FIRE & INTRUSION "DET. A" 1'' SSS PANEL 3070 DOOR REMOTE UTILITY METERING CPT XFMR & FUSE AC BREAKER 1 `\\ / \. : ' FLOOD HATCH (INS)JIAZED) i � '- AC PANEL --20 16-4 20 -713 BLUE LIGHT ETS IN LOCKED BOX FOR FIRE DEPT CARD ACCESS KNOX BOX APT & FUSE BKR TEST STATION 20-- T- - -43 "DET A" NOTE: REMOVABLE PANELS BEHIND TRANSFORMER ONLY FOLD UP WORK BENCH 72 ABOVE 8 BATTERY DC PANEL 20 BAT CHGR 9- 2 lC 37 RECTIFIER TRANSFORMER /\ / \ 5300CFE ROOF MTD. VENTILATOR r— BATTERY RACK EAT 30 EYE WASH ' ^ � 282- --- r-- 19 —r-16 594 —31 N CUBICLE x • WALL MTG. FILTRATION SYSTEM • 48 300 OSWEGO POINT DRIVE, SUITE 106 L4KEOSWEGO, OREGON 97034 1 /4 "•GLASTIC (NOTE 3) • SIEMENS TRANSPORTATION SYSTEMS, INC. —35 31 ' 'TELEPHONE PROVIDED BY . SOUND TRANSIT. ' .CONTROL CENTER -INTERFACE CABINET • CC IC • 18-- r- - 36 44 238 SOUNDTRANSR 23 8 23 Fl F2 F3 F4 (72 -1) : (72-2) :(72-3) (72.4) EPDXY INSULATED FLOOR 5300CFE 'ROOF MTD. VENTILATOR . C33 =H=613 SCALE: C33 -H -624 MOTOR OPERATED TRANSFER SWITCHES 81 PAT O'HOGAN 9/29/05 URN BY DATE ORN CKD BY PAT O'HOGAN DES BY DATE 9/29/05 DATE DES CKD BY • DATE LANCE BANASZEK 9/29/05 APPROVED BY DATE 858 r 1 /8" INSULATED WALLS . i . FLOOVATCH (INS,NLA -ED) f `. I 84 • . SSS,{ • • 6080 DOOR CARD ACCESS 174 NOTES: 1. ALL DIMENSIONS IN INCHES. 2. LIGHTING RECEPTACLES AND SWITCHES WILL BE PROVIDED ON CONDUIT PLAN. 3. INSTALLER TO SUPPLY, SUPPORT AND PROTECT GLASTIC EXTENSIONS BETWEEN RECTIFIER AND RECTIFIER TRANSFORMERF(7!1 /T J JUN 2 8 7n97 s-LI'I V11 1 GEI i I • LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM SOUTH 133RD STREET TPSS C33 SUBSTATION BUILDING EQUIPMENT ARRANGEMENT PLAN CONTRACT NO. RTA /LR 82 -03/ C807 I NONGC33- B001 -01 RE 00 CEILING I® DISCONNEC METERING COMPARTMENT IDE 132 ------------ BUS DUCT WITH PROTECTIVE DIELECTRIC SCREENING mv omm MAIN BREAKER FEEDER 72-1 FEEDER72 -2 FEEDER72.3 FEEDER 72-4 72 -0 APT FUSES - D VV REMOTE CPT FUSES 1 ©') POTENTIAL TRANSFORMF w n • FIXED PANEL 1111111 PINGED ACCESS DOOR TAP ACCESS 136 RECTIFIER TRANSFORMER T TINGED ACCESS DOOR TAP ACCEBS FIXED PANEL MON 594 mamas M111=111 300 OSWEGOPOINTEDRIVE SUITE 106 LAKEOSWEGO, OREGON 97034 --- NEM 1111111111111111 MIN _IIM NMI BMW NMI 0111111.111 NOM MIN MEI MIN MIN NUM 1111111111.1111 MIN NUM MUM NOM -- I--MO MCI A UMW 1/4" GLASTIC 1/4" GLASTIC — 1 6 SIEMENS TRANSPORTATION SYSTEMS, INC. CI 3 5 6 1/4" GLASTIC 31 2 SOUNDTRANSIT 238 - Q - 238 REVIEWED ODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2001 City Of Tukwila B ILDIN DI SION ORN CKD BY PAT O'HOGAN DES BY SCALE: --P 23 8 -V NOTES: 1. ALL DIMENSIONS IN INCHES. PAT O'HOGAN 12/07/2005 DRN BY DATE DATE 12/07/2005 DATE DES CKD BY DATE LANCE BANASZEK 12/07/2005 APPROVED BY DATE 23 8 CONTRACT NO. RTA /LR 82 -03 / C80 EPDXY INSULATED FLOOR COVERING 85 8 LINK LIGHT RAIL PROJECT n r 7 t �. /I LA JUN 2 8 7 (..;:k It::' TRACTION ELECTRIFICATION SYSTEM AC & DC SWITCHGEAR EQUIPMENT ELEVATION FOR SUBSTATION BUILDINGS TPSS C32 & C33 DRAWING NO. TPS B001 - 05 EV. 00 TPSS MODs DISPATCHER NUMBER C32 NONE C33 TWO C33 -H -613 & C33 -H -624 115 CEILING 84 N UMW I• Cxx -H -624 w N 81 m Cxx -H -613 m 44 CCIC 36 18 594 FILTRATION SYSTEM 588 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE,, SUITE 106 HTR EYE WASH FOLD UP WORK BENCH ABOVE \ BATTERY \ 48 ---I 16 [ --19 -- --282 0000 BATTERY ❑❑❑❑❑ 37 BATT. CHGR DC PNL 192 20 REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDING DIV ION PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY 12/07/2005 DATE 43 16 DATE 12/07/2005 DATE DES CKD BY DATE LANCE BANASZEK 12/07 /2005 APPROVED BY DATE ISOLATION F IRE & INTRUSION TRANSFORMER PANEL J BOX (NIC) AC & DC BRK TEST PNL 20 3 C AC PNL 20 4 16 II JUN 2.8 7 1197 �'t tiiviI i GLIB! I L, NOTES: 1. ALL DIMENSIONS IN INCHES. 2. AUXIARY EQUIPMENT ARRANGEMENT IS TYPICAL FOR ALL MAINLINE TYPES. 20 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM AUXILIARY EQUIPMENT ELEVATIONS FOR SUBSTATION BUILDINGS TPSS C32 & C33 LAKEOSWEGO. OREGON 97034 SCALE: 114•=1' EONTRACRT 1 % DRAWING TA ll R R9J I (`R07 N(1 TPS- 8001 -0fi REV. 00 1524.00 914.40 914.40 [60.00] [36.00] [36.00] 1270.00 [50.00] 660.40 [26.00] 63.50 2 •00 (2.50] 110.00] 254.00 [10.00] 635.00 [25 1 BOTTOM ENTRY 11420 TO UTILITY [4 �� 00] METERING FRAME 1295.40 [51.00] II j [ UTILITY METERING 1 � APT 1 l AC BREAKER CONTROL CABLE ENTRY AREAS TOP OR BOTTOM 11 II I 01 9/2/05 REV DATE ANCHOR POINT (12 PLACES) (NOTE 2) 127.00 [5.Oi3J� 25. [1.0040 1 T 114.20 [4.50] Revised Per Customer Comments - STME00203 DESCRIPTION FRAME 1 SWITCHGEAR & TRANSFORMER ANCHORING TO METAL FLOOR DETAIL PO FRAME DS LB BY ENG CHK APP FRAME 2 ANCHOR POINT FRAME 3 6807.26 [268.001 SIEMENS m TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVM SUITE 106 LAKEOSNECO, OREGON 9703/ 3454.40 (136.001 REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION r. ANCHOR POINT (6 PLACES) 139.70 (NOTE 2) [5.50] Air 0 1587.50 [62.50] 1587.50 [62.50] RECTIFIER TRANSFORMER 0 1828.80 [72.00] 0 762 [30] 0 PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY NOTES: 1. ALL DIMENSIONS IN MILLIMETERS [INCHES] 2. 2" STITCH WELD AT ALL ANCHOR POINTS. 3. WIRE BRUSH, COLD GALVANIZE AND PAINT ALL WELDS. TOUCH UP PAINT TO MATCH EQUIPMENT. 4. INSTALLER TO SUPPORT AND PROTECT � t�!W tt�r GLASTIC EXTENSION BETWEEN RECTIFIER TRANSFORMER AND N CUBICLE CI - -' ' 111 p 6/17/05 6/17/05 DATE LANCE K / DATE SCALE: 1:16 139.70 [5.501 114' GLASTIC (NOTE 4) JUN 2 8 7n97 „- .itvIli Ci :lea it UNK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR ANCHORING PLAN No. RTA 1LR 82 .03 / C807 NO. PRD 6001 -01 • 01 304.44 [11.99] 186.31 [7.34) 110.00 [4.33] 0 1 W2/05 REV DATE 1/4• GLASTIC 110.00 580.00 [4.33] [22.83] BOLT -UP DETAIL - A FOR INSULATED CONNECTION SHT4 N CUBICLE CABLE ENTRANCE (NEGATIVE RETURN CABLES) 328.60 328.60 \ f % 225.94 [8.90] B� FO 225.94 [8.90) 220.00 [8.66] DESCRIPTION IKON RECTIFIER #1 T -UP DETAIL- B MECHANICAL CONNE SHT4 11111111111 INN! RECTIFIER #2 BOLT -UP DETAIL - A R INSULATED CONN SHT 4 680.00 [26.77] LECTRICALLY INSULATED MOUNTINGS TO FLOOR (TYP) PO DS ON LB Revised Per Customer Comments- STME 00203 BY ENG CHK APP 220.00 [8.66) 1/4• GLASTIC 680.00 [26.77] 680.00 [26.77] TION 10.00 [4 33] 115.94 [4.56] 5811.89 [228.81] 225.94 580.00 220.00 (8.90] [22.83) (8.66] 1 5/8' UNISTRUTS (TYP) BOLT -UP DETAIL - B FOR MECHANICAL CONNECTION SHT4 FO (72 -11) 40.00 1.57 [22.83] 220.00 [8.66] PLAN VIEW SIEMEN TRANSPORTATION SYSTEMS, INC. 300OSWEGOPOINTEDR1V4 SUITE 106 CAKEOSIIEGO, OREGON 97534 CABLE ENTRANCE AREA (POSITIVE CABLES TO OCW) (TYP) 380.00 [14.96) [8.66] F1 (72 -1) 380.00 [14.96 220.00 380.00 220.00 220.00 L� Sounekaaar [14.96) F2 (72 -2) 380.00 E1ERsR CODE COMPLIANCE E NFPA 70 - AUG 2 7 2007 City Of Tukwila Q� �T[ QIN DWISION � � le..v+ [8.66) SCALE: 1:16 380.00 (14.96) O f F3 (72 -3) 220.00 380.00 66) [14.96] PAT O'HOGAN 6/17/05 DRN BY DATE DRN CKD BY DATE PAT 01iOGAN 6/17/05 DES BY DATE DES CKD BY DAT E LANCE BANASZEK 6/17/05 DATE 220.00 [8.66) (14.96] 4.331 [8.66) O 225.00 [8.86] (TYP) 220.00 " 380.00 380.00 110.00 [14.96] 225.00 [8.86] (TYP) F4 (72-4) NOTES: 1. ALL DIMENSIONS IN MILLIMETERS [INCHES] 2. ANCHORING DETAILS ON SHT. 3 3. BOLT -UP DETAILS ON SHT. 4 CONM PACT - NO RTA /LR 82 - 03 1 C80 [110.00 [4.33] 252.50 [9.94] 310.00 [12.20] 56.14 [2.21] 40.00 [1.57] 741.36 1400 129 191 [55.12] RPr'. 1 1 /ED ClT IIL JUN 2 U ?nn7 r t'ilvf GL I�tIt � LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR ANCHORING PLAN I N NG PRD- 8001 -02 I REV. 01 01 11/15/05 REV DATE UNISTRUTJ ANCHORING CUTOUT IN FLOOR SEE DETAIL - A STITCH WELD BOTH SIDES TO FLOOR ANCHOR CUTOUT IN FLOOR DETAIL (NTS) DC SWITCHGEAR ANCHORING DETAIL FOR METAL BUILDINGS ONLY DETAIL "A" 76.2 1 Revised Per Customer Comments, Add Note 2 DESCRIPTION RA PO LB BY ENG CHK APP (0.981 25mm ANCHOR HOLE IN EQUIPMENT DC SWITCHGEAR ANCHOR BOLT, HEX HEAD 3/8 - 16 X 2 1/4, SS INSULATING BUSHING (STS SUPPLIED) 50.8 ( INSULATED FLOOR NYLON RETAINER CHANNEL NUT UNISTRUT SIEMENS TRANSPORTATION SYSTEMS, INC. 30005 EGOFOINTEEN VE SPATE 109 LAKE Q511FGQ 0REG0w 97034 i 35.81 (1.41) 34.92 (1.375) CHANNEL NUT WITHOUT SPRING (Side View) 1 5/8" UNISTRUTS BETWEEN JOISTS CAP ENDS AND STITCH WELD TO UNDERSIDE OF FLOOR NOTES: 1. ALL DIMENSIONS IN MILLIMETERS [INCHES) 2. Mounting Details Shown on This Drwaing Is Typical For All DC Switchgear Mounted In Prefabricated Buildings Only. Soutelkivisrr S 11 9.525 (.3751 21.59 (•851 CHANNEL NUT WITHOUT SPRING (Top View) INSULATED FLOOR CHANNEL NUT WITHOUT SPRING (End View) PAT O'HOGAN 6/17105 DRN BY DATE PAT DES BY LANCE K 6/17/05 APPROVED BY DATE SCALE NONE _____6117/05 DATE SECTION A —A COINING DETAIL REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila BUILDING D ION LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR ANCHORING DETAILS NO RTA /LR 82 -0 / C807 NO. PRD- B001 -03 . 01 JUN 2 8 7 9/2/05 DATE 25.00 [ 700.00 [27.56] 016.00 [00.63] BOLT UP POINT (10 PLACES) Reviesed Per Customer Comments - STME 00203 DESCRIPTION 1400.00 [55.12] PO BY ENG DS CHK 700.00 [27.56] SIDE VIEW OF DC SWITCHGEAR LB APP 9.52 [0 200.00 [7.87] 680.00 [26.77] 520.00 [20.47] 600.00 [23.62] 200.00 [7.87] 2200.00 [86.61] SIEMENS TRANSPORTATION SYSTEMS, INC. XVO511EGOkiN7EDRIVE SURE /AS MIT asWEGD, OREGON 97034 SourvoTRArisff DETAIL A (NTS) DETAIL B (NTS) SCALE 1:16 114' GLASTIC M8X35 NYLON FASTENER 23.00 PAT OHOGAN 6/ DRN BY PARTITION WALL SHEET METAL. GALV M8X25 FASTENER 23.00 [.906] NOTES: I. ALL DIMENSIONS IN MILLIMETERS [INCHES] E PAT 0 BY 6 11 7 //0 5 _ DES BY LANCE BANASZEK 6/17/05 APPROVED BY DATE REVIEWED FOR C ODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDING pM ION PARTITION WALL SHEET METAL, GALV STANDARD MECHANICAL MAKEUP NO. RTA /LR 82 -03 / C807 Frr-4"Eri C - t .... °, /I LA JUN 2 8 9(1x17 ' 4 1iVllI CLN ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR BOLT -UP DETAILS 01 REV DATE DESCRIPTION U, CD 0 0 0 ABB FRAME NO. SUBSTATION LO AY curs rkK ■00 LC N1 UTILITY PT DISCONNECT & METERING COMPARTMENT N2 FUSE VIEWING WINDOW UTILITY PT COMPARTMENT 1 60" P 1 c SIEMENS 0 0 00 00 APT FUSES z 1 REMOTE CPT FUSES I=kO — i 2 36" TRANSPORTATION SYSTEMS, INC. 306 OSWEGOPO/NTECR/VE; SUITE1AS LAKEOSWEGO, OREGON 92U34 7330 POTENTIAL TRANSFORMERS D Soun►uTkAwsrr 3 36" m PAT O'HOGAN 7/12/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE: 1:16 CO ED FOR NFPA 70 -NEC C AUG 2 7 2007 B it Of Tukwila ILDING D ION JUN 2 8 7(197 t:ilvtl Gtz! `r� - :96 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR ELEVATIONS FOR C32 & C33 CONTRACT DRAWING REV. NO. RTA /LR 82 -03 / C807 I NO. TPS- M040 -07 00 n .v UNISTRUT CHANNEL FRAME 1 POWER COMPANY METERING FRAME GROUND STUDS GROUND STUDS INSTRUMENT COMPARTMENT APT FUSES SIEMENS TRANSPORTATION SYSTEMS, INC. 300OSWEGOPO/NTEDRIVE; SUITE 106 ME E O S W EG O.OREGON 9703 4 NATVAR INSUtATED COPPER ROO FRAME 2 APT & APT FUSES REMOTE CPT FUSES L� SOUNriIIt/WSR COD R EVIEWED FOR NFPA 7 E AUG 2 7 2007 City Of Tukwila B ILDXNG DWI ION INSTRUMENT COMPARTMENT 1200A BREAKER SCALE: FRAME 3 MAIN BREAKER PAT O'HOGAN 7/12/05 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 7/12/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE ii NOTES: 1. POWER COMPANY TO PROVIDE REVENUE METERING CTs & VT's. 2. ALL DIMENSIONS IN INCHES LINK LIGHT RAIL PROJECT CONTRACT 1 -DRAWING NO. RTA /LR 82 07 NO - F'r+^,r-1v ^ J C ;, ,nLA JUN 2 F3 ?nn7 I d - G.t Ivli! c .N f?7;1 TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR SECTION VIEWS FOR C32 & C33 I REV -03 / CS s 4 ITEM N1 N2 N3 N4 N5 N6 N7 N8 N9 QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE (ENGRAVING TO BE DETERMINED BY SOUND TRANSIT) SIEMENS TRANSPORTATION SYSTEMS, INC. 300 0SWEGOPO/NTEORNE, SUITE 106 tAKE OSWEGO, OREGON 97034 Sounmikanisrr PAT O'HOGAN 7112/05 DRN BY DRN CKD BY PAT O'HOGAN DES BY SCALE: DATE DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE LINK LIGHT RAIL PROJECT JUN 2 6 21;11 ; TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR NAMEPLATE SCHEDULE FOR C32 & C33 CONTRACT DRAWING REV. NO. RTA /LR 82-031 C807 I NO. TPS- M040-09 I 00 sM1s1BSIMP=azs= MENEM EEEEEEE FIXED PANEL WEEMS EEEEEEE m agglamigia IM�IMIM:=�SZSZ:=sEISEMMitIssR1 EEEEEEEEEEEEEEE EEEEEEEEEEEEEEE S�SMSaSM1asa WEEMS§ MISSES§ REMOVABLE PANEL 0 00 SWISS ammo =minim= REMOVABLE PANEL 00 EEEEM EEEEE gigm lam REMOVABLE PANEL 0 EEEEEEE EEEEEEe InImsugslgila Mai Imam =====1 9 Q10 ir REAR VIEW TOLERANCE: TERMINATION LOCATION DIMENSIONS + OR - 1/4" DRY TYPE TRACTION TRANSFORMER THREE PHASE, 60 HZ, FOR USE W/12 -PULSE EXTRA HEAVY TRACTION RECTIFIER RATED 3000KW, 1500VDC 3223/4296 KVA AA/FA PRI: 26,400V DELTA (3223 KVA) 150 kV BIL PRI TAPS: +2 X 1 -1/4 % & -2X 2 -1/2% OUT OF COIL FOR SOLID TAP LINK SEC #1: 1178 WYE (1665 KVA) 45 kV BIL SEC #2: 1178 DELTA (1665 KVA) 45 kV BIL IMPEDANCE: 9.0% AT 1/2 KVA, 16% AT FULL KVA COPPER WINDINGS 220 °C INSULATION CLASS, 65 °C TEMPERATURE RISE @ 100% LOAD PERCENT LOAD 25% 50% 75% 100% 150% EFFICIENCIES: 98.7% 99.1 99.2 99.1 98.3 TOTAL LOSSES: 10.7KW 14.1 19.7 29.2 58.0KW SOUND LEVEL: 70dB AT 1 FOOT FROM TRANSFORMER ENCLOSURE IMPREGNATION: DOUBLE CYCLE VPI QUALITROL, 3 PHASE, WINDING TEMPERATURE MONITOR WINDING TEMPERATURE INDICATOR WIRING DIAGRAM 3501 -21A FAN WIRING DIAGRAM 3501 -21B CONTROL WIRING IN GALVANIZED STEEL GRS CONDUIT 1/2 X 4.00 COPPER LV BUS SUPPORTED WITH PORCELAIN INSULATORS NEMA 1 INDOOR ENCLOSURE BASE MATERIAL: 6" X 3 -1/2" STRUCTURAL STEEL ANGLE BASE FINISH: BLACK MACRO -PDXY FINISH DOUBLE HINGED FRONT DOORS, REMOVABLE REAR PANELS STAINLESS STEEL LIFT HANDLES ON REMOVABLE PANELS ALL OTHER PANELS FIXED TAMPERPROOF HARDWARE ON REMOVABLE PANELS ENCLOSURE HARDWARE TO BE 3/8 -16 STAINLESS STEEL DOORS HAVE PADLOCKABLE HANDLE WITH DOOR STOP & LIMIT SWITCHES ENCLOSURE MATERIAL: HINGED DOORS 11 GUAGE AND OTHER PANELS 14 GAUGE ENCLOSURE FINISH: ANSI 61 GRAY ELECTROSTATIC POWDER PAINT PROVISIONS PROVIDED FOR FUTURE FANS APPROXIMATE WEIGHT: 22,000 LB. AOO 014 38 F— LIFT LUG DETAIL 3/4" THICK 'GROUND PAD DETAIL' 1/2' STAINLESS STEEL 112 -13 TAP r 1.125 1.75 FIXES PANEL 1.75 1- .75 HV TERMINATION DETAIL 1/4" X 4.00" TIN PLATED COPPER BUS 300OSWEGOPOINTEDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 0EEE0EEE_NOMEg l HINGED ACCESS DOOR TAP ACCESS Elaelal� DEEMS EE ®E® =rte_ 2 -HOLE NEMA GROUND PAD 9/16 x 13/16 SIEMENS TRANSPORTATION SYSTEMS, INC. 136 MINCED ACCESS DOOR TAP ACCESS FRONT VIEW BASE DETAIL F irm- LIFT LUGS 08 ANCHOR POINT (6 PLACES) 1.125 L� SOUNDiIP/WSff 1.75 I— .75 LV BUS DETAIL 1/2 x 4" COPPER 90 96 LIFT LUG 9/16 x 13/16 PAT O'HOGAN 7/12/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE: NONE R1 R5 R4 R3 R2 R6 32 52 — „ I FIXED PANEL 72 c ED FOR COD NF q 70 COMPLIANCE NEC AL G 2 7 2007 City Of Tukwila B ILDING DM ION A. START 8= FINISH FIXED PANEL HV TAPS SET FOR SOLID LINK ADJUSTMENT CANNOT BE CROSS CONNECTED , /I LA JUN 2 8 ?Rn7 NOTE: ALL DIMENSIONS IN`-INCHES _ i zg m LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER EQUIPMENT LAYOUT CONTRACT DRAWING NO. RTA /LR 82 - 03 / C807 1 NO. TPS M041 - 01 I REV. 00 72 r11 7 1 2 1 H1 I H2 1 H3 12— 3 5 ° 8 FIXED PANEL 448 48 0 p Q10 ir REAR VIEW TOLERANCE: TERMINATION LOCATION DIMENSIONS + OR - 1/4" DRY TYPE TRACTION TRANSFORMER THREE PHASE, 60 HZ, FOR USE W/12 -PULSE EXTRA HEAVY TRACTION RECTIFIER RATED 3000KW, 1500VDC 3223/4296 KVA AA/FA PRI: 26,400V DELTA (3223 KVA) 150 kV BIL PRI TAPS: +2 X 1 -1/4 % & -2X 2 -1/2% OUT OF COIL FOR SOLID TAP LINK SEC #1: 1178 WYE (1665 KVA) 45 kV BIL SEC #2: 1178 DELTA (1665 KVA) 45 kV BIL IMPEDANCE: 9.0% AT 1/2 KVA, 16% AT FULL KVA COPPER WINDINGS 220 °C INSULATION CLASS, 65 °C TEMPERATURE RISE @ 100% LOAD PERCENT LOAD 25% 50% 75% 100% 150% EFFICIENCIES: 98.7% 99.1 99.2 99.1 98.3 TOTAL LOSSES: 10.7KW 14.1 19.7 29.2 58.0KW SOUND LEVEL: 70dB AT 1 FOOT FROM TRANSFORMER ENCLOSURE IMPREGNATION: DOUBLE CYCLE VPI QUALITROL, 3 PHASE, WINDING TEMPERATURE MONITOR WINDING TEMPERATURE INDICATOR WIRING DIAGRAM 3501 -21A FAN WIRING DIAGRAM 3501 -21B CONTROL WIRING IN GALVANIZED STEEL GRS CONDUIT 1/2 X 4.00 COPPER LV BUS SUPPORTED WITH PORCELAIN INSULATORS NEMA 1 INDOOR ENCLOSURE BASE MATERIAL: 6" X 3 -1/2" STRUCTURAL STEEL ANGLE BASE FINISH: BLACK MACRO -PDXY FINISH DOUBLE HINGED FRONT DOORS, REMOVABLE REAR PANELS STAINLESS STEEL LIFT HANDLES ON REMOVABLE PANELS ALL OTHER PANELS FIXED TAMPERPROOF HARDWARE ON REMOVABLE PANELS ENCLOSURE HARDWARE TO BE 3/8 -16 STAINLESS STEEL DOORS HAVE PADLOCKABLE HANDLE WITH DOOR STOP & LIMIT SWITCHES ENCLOSURE MATERIAL: HINGED DOORS 11 GUAGE AND OTHER PANELS 14 GAUGE ENCLOSURE FINISH: ANSI 61 GRAY ELECTROSTATIC POWDER PAINT PROVISIONS PROVIDED FOR FUTURE FANS APPROXIMATE WEIGHT: 22,000 LB. AOO 014 38 F— LIFT LUG DETAIL 3/4" THICK 'GROUND PAD DETAIL' 1/2' STAINLESS STEEL 112 -13 TAP r 1.125 1.75 FIXES PANEL 1.75 1- .75 HV TERMINATION DETAIL 1/4" X 4.00" TIN PLATED COPPER BUS 300OSWEGOPOINTEDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 0EEE0EEE_NOMEg l HINGED ACCESS DOOR TAP ACCESS Elaelal� DEEMS EE ®E® =rte_ 2 -HOLE NEMA GROUND PAD 9/16 x 13/16 SIEMENS TRANSPORTATION SYSTEMS, INC. 136 MINCED ACCESS DOOR TAP ACCESS FRONT VIEW BASE DETAIL F irm- LIFT LUGS 08 ANCHOR POINT (6 PLACES) 1.125 L� SOUNDiIP/WSff 1.75 I— .75 LV BUS DETAIL 1/2 x 4" COPPER 90 96 LIFT LUG 9/16 x 13/16 PAT O'HOGAN 7/12/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE: NONE R1 R5 R4 R3 R2 R6 32 52 — „ I FIXED PANEL 72 c ED FOR COD NF q 70 COMPLIANCE NEC AL G 2 7 2007 City Of Tukwila B ILDING DM ION A. START 8= FINISH FIXED PANEL HV TAPS SET FOR SOLID LINK ADJUSTMENT CANNOT BE CROSS CONNECTED , /I LA JUN 2 8 ?Rn7 NOTE: ALL DIMENSIONS IN`-INCHES _ i zg m LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER EQUIPMENT LAYOUT CONTRACT DRAWING NO. RTA /LR 82 - 03 / C807 1 NO. TPS M041 - 01 I REV. 00 POWER IN FANS ON ALARM TRIP TRANSFORMER TEMPERATURE RISE 80 -265 VAC 20 -280 VDC 180•C 190'C 200'C 65'C Q 100% LOAD 135'C AFTER RI -9 c Q . E 8 S $ ;g• T L� ttp O O tvo 413 c.. MATC 1 OTI 1N TRANSFORMER ENCLOSURE NORMALLY OPEN CONTACTS HELD CLOSE WHEN DOORS ARE COMPLETELY CLOSED. TERMINAL BLOCK TO BE MOUNTED IN TEMPERATURE MONITOR ENCLOSURE. DOOR SWITCHES DOOR- BOTTOM OV COO (NO( ADO DOORS DOOR -TOP SIEMENS TRANSPORTATION SYSTEMS, INC. 3L0OSWEGOPOINTEDRIVE SUITE 106 LAKEOSWEGO, OREGON 97034 L� SOUNDTRANSIT CAUTION MAKE ALL EXTERNAL CONNECTIONS BEFORE APPLYING POWER TO INSTRUMENT. CONTROL VOLTAGE= 20- 220VDC 20- 286VAC 3 PH MONITORING STORED MAXIMUM TEMPERATURE FAN /ALARM/TRIP RELAYS MANUAL FAN CONTROL TYPE "K "THERMOCOUPLES FAN CONTROLLER SPECIFICATIONS MODEL 118P U-K -0-1 NOTE: REFER TO QUALITROL INSTRUCTION MANUAL FOR FURTHER INSTRUCTIONS AND FEATURES THERMOCOUPLE LENGTH: 10.0' MOUNTED IN NON - REMOVEABLE PANEL NEMA -1 ENCLOSURE WITH FRONT HINGE PANEL FOR CONTROL WIRING ACCT WIRING SHALL BE 600V SIS, 14 -GUAGE MIN. ALL WIRING ENCLOSED IN GALVANIZED GRS STEEL CONDUIT PAT O'HOGAN 7/12/05 (RN BY DATE DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE: REAR OF FAN CONTROLLER Cam. REVIEWED FO CODE COMPLIAN NFPA 70 - NFC D SS AUG 2 7 2007 City Of Tukwila B UILDING DIVISION DATE 7/12/05 DATE TEMPERATURE MONITOR LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER DETAILS NO. R TA /LR 82 -03 / C807 I No. WING M041 -02 C' Fr-n.'711/r.7 JUN 2 8 ?nn7 �' 1Irr�11;Ii ; 7 I REV. 00 A ' 64"4 4 w,�4 s � Technologies Co MANUFACTURED WITH PRIDE IN WYTHEVILLE, VA , USA 24382 DRY TYPE TRACTION TRANSFORMER SN 373223K15AC01 JOB 3501 DATE 12/04 IMP X.XX % @ 85 °C KVA 3223/4296 PHASE 3 HERTZ 60 TYPE AA /FA RISE 65 °C CLASS H 220 °C INS PRI: 26400 AMPS 70.48 BIL 150 CU COND SEC:1 1178 AMPS 816 BIL 45 Xc= .XXX SEC:2 1178 Y/680 AMPS 816 BIL 45 Xc= .XXX TAPS VOLTS AMPS -FA CAUTION: DE- ENERGIZE TRANSFORMER R4 BEFORE CHANGING TAPS R2 1 -2 27060 91.7 2 -3 26730 92.8 H2 R3 R6 3-4 26400 94.0 4 -5 25740 96.4 5 -6 25080 98.9 H1 H3 RI -9 EXTRA -HEAVY DUTY TRACTION TRANSFORMER CAPABLE OF 100% LOAD CONT., 150 %FOR 2 HRS WITH (5 )-300% 1 -MIN LOADS &(1) 450% 15 SEC LOAD R1 R5 APPROXIMATE WT: 22000 LBS. Q C V u 4 1 S N EV DATE DESCRIPTION AV e. ADD SIEMENS TRANSPORTATION SYSTEMS, INC. XOOSWEGOPOINTEDRNE, SUITE IO LAKEOSWEGO, OREGON 97034 a� SOUNDTRANSIT LANCE BANASZEK 7112105 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY SCALE: DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Tukwila B ILDTNG DIVISION LINK LIGHT RAIL PROJECT Pr n,7:11 vILA JUN 2 8 21197 J'L >' CLi I 1- ki TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER NAME PLATE CONTRACT DRAWING NO. RTA ILR 82 - 031 C807 I NO. M041 - 03 I REV. 00 00.1 nal= OTC 0 000 RECTIFIER TRANSFORMER 0 03 00 00 Ni H1 p a ( SWARTZ) RELAY nto•010TIau 0■000 000000000 omcooc 1= 1 10 00 0 0 0 0 COOCOOG100 ^ 0000000 000000000 EGATIVESMTDI 11!1:0 I RECTiFIERFI•V I 1/4" GLASTIC 3`� J� OODOOO UIIIIIIIIIIIII IIIIIIIIIIIIIII 11111111111011 1111111101101 IIIIIIIIIIIIIII IIIIIIIIIIIIIII 11111111111110 IIIIIIIIIIIIIII IIIIIIIIIIIIIII IIIIIIIIIIIIIII IIIIIIIIIIIIIII IIIIIIIIIIIIIII IIIIIIIIIIIIIII IIIIIIIIIIIIIII IIIIIIIIIIIIIII IIIIIIIIIIIIIII 111111111111111 IIIIIIIIIIIIIII 111111111111111 IIIIIIIIIIIIIII IIIIIIIIIIIIIII IIIIIIIIIIIIIII IIIIIIIIIIIIIII IIIIIIIIIIIIIII 0 0 0 0 _ 0 0 Q. 0 0 Q. 0 0 0 � G �00 " 0 Th0o 0V Ca10 null A00 OCOOOCC CO 000000000 0000000■• 0000■0000 000000000 I RECT.ER$2 A I 35 .1 7 6 Ht0 0K2 MAIN BREAKER L J cs L sl 31i NS OP 270 1/4" GLASTIC FRONT VIEW SO 303OSWEGO POINTE DRIVE, SURF 106 fAKEOSWEGO, OREGON 97034 H3 (you LIJJ sI -II SIEMENS TRANSPORTATION SYSTEMS, INC. 238 FEEDER Fl 1 p 1 A M HI O H2 ( emu (J' SI LaiS3 DPU I It I 238 FEEDER F2 238 FEEDER 3 FI wF1� H3 rI A H'O K3 Fu 0 2 1 (7 ISi 1 fl ISi I U 1 1119' 1 N ISl SounroTwwsrr DPU ( REVIEWED CO MPUANCE DE NFPA 70 - NEC AUG 2 7 2001 City Of Tukwila B IL.DYN D SION 1 DRN CKD BY PAT O'HOGAN DES BY DPU PAT O'HOGAN 11/22/05 DRN BY DATE DATE 11/22/05 DATE DES CKD BY DATE LANCE BANASZEK 11122/05 APPROVED BY DATE SCALE: 238 FEEDER 4 1 H30 ■I 2 sl DPU I 238 FEEDER 5 (NOTE 5) � HtOp 1 rI H30 HI 0 1* [!1n Y YS ��lfFl �� sl DPU NOTES: 1. EQUIPMENT FRAMES ARE 11GA. GALVANIZED STEEL; DOORS & PANELS ARE 14GA. GALVANIZED STEEL. 2. PAINT FINISH: ANSI 61 GRAY TEXTURED POWDER COAT. 3. OVERALL DEPTH OF DC SWITCHGEAR IS 561/2 ". 4. ALL DIMENSIONS IN INCHES 5. FEEDER F5 AT FOREST TPSS ONLY. LINK LIGHT RAIL PROJECT n LA JUN 2.8 7(197 TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR ELEVATION NO. NTRAC /LR 82 -03 / C807 I DRAWING ENO TPS- M042 -01 REV. ITEM QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE NP1 1 NEGATIVE SWITCH 7/8" 12" x 1 5/8" NP2 1 RECTIFIER #1 - Y 7/8" 12" x 1 5/8" NP3 1 RECTIFIER #2 -A 7/8" 12" x 1 5/8" NP4 1 MAIN BREAKER FO 7/8" 12" x 1 5/8" NP5 1 FEEDER BREAKER Fl 7/8" 12" x 1 5/8" NP6 1 FEEDER BREAKER F2 7/8" 12" x 1 5/8" NP7 1 FEEDER BREAKER F3 7/8" 12" x 1 5/8" NP8 1 FEEDER BREAKER F4 7/8" 12" x 1 5/8" N1 6 (SEE DETAIL C) 1/4" 5 1/2" x 5/8" N2 5 REMOTE 1/4" 2" x 5/8" N3 1 MAIN CURRENT 1/4" 2" x 5/8" N4 1 MAIN VOLTAGE 1/4" 2" x 5/8" N5 1 STATION TROUBLE 1/4" 2" x 5/8" N6 1 TROUBLE RESET 1/4" 2" x 5/8" N7 4 GROUP ALARM 1/4" 2" x 5/8" N8 4 DIRECT ON 1/4" 2" x 5/8" N9 1 64 - FRAME FAULT 1/4" 2" x 5/8" QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE NAMEPLATE SIZE NP9 1 FEEDER BREAKER F5 7 TPS -N00 5/8" 4" x 7/8" 7 TPS -C11 5/8" 4" x 7/8" 8 TPS -C16 5/8" 4" x 7/8" 7 TPS -C23 5/8" 4" x 7/8" 7 TPS -C27 5/8" 4" x 7/8" 7 TPS -C29 5/8" 4" x 7/8" 7 TPS -C32 5/8" 4" x 7/8" 7 TPS -C33 5/8" 4" x 7/8" 7 TPS -C36 5/8" 4" x 7/8" ITEM QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE NP9 1 FEEDER BREAKER F5 7/8" 12" x 1 5/8" N1 1 (SEE DETAIL C) 1/4" 5 1/2" x 5/8" N2 1 REMOTE 1/4" 2" x 5/8" N7 1 GROUP ALARM 1/4" 2" x 5/8" N8 1 DIRECT ON 1/4" 2" x 5/8" 0 �= v 3 : 1 1 1 414 NEGATIVE SWITCH SWARTZ RELAY DETAIL A — J MAIN BREAKER FO N3 © N4 © HSO OP 270 ITPS-X ## FEEDER BREAKER Fl H3 ® H1© 1 H2 TPS -X ## 784mm NOTE 1:- STATION NAME PLATES FOLLOWING ADDITIONAL NAMEPLATES FOR FOREST ST. — C16 ONLY 784mm SIEMENS TRANSPORTATION SYSTEMS, INC. 300 O S W EG O P0/ N T E OR ORIV SUITE 105 LAKE OSWEGO, OREGON 97034 SOUNDTRANSIT SCALE: 40 40 40 40 40 40 40 40 584mm 100 • tt*S50 DETAIL A I 100 • a S2 DETAIL B N6 N8 I 30 I 40 I 40 130 I I. OPEN CLOSED "I DETAIL C (DETAIL DIMENSIONS IN mm) PAT O'HOGAN 11/22/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 11/22/2005 DES BY DATE DES CKD BY DATE LANCE BANASZEK 11/22/2005 APPROVED BY DATE N1 CS S3 43 S1 LINK LIGHT RAIL PROJECT rr l l V �. -. CI /l JUN R 2 n 8 ?nnl t1 TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR NAMEPLATE SCHEDULE CONTRACT DRA NO. RTA ILR 82 I CS07 I WING N() TPS M042 - n7 REV. 00 ° ° ° 1 3 ° . s 2 704 597 465 333 257 160 0 FEEDER CUBICLE 584 H10 • == Q J N2 Nil I REMOTE4 I. OPEN CLOSED 4 PANEL LAYOUT DPU NTS DETAIL "B" 22 mm DEVICE DRILLING DIMENSIONS DIMENSIONS IN MILLIMETERS 704 597 465 333 257 160 0 NTS H3 H14 17 - - n 1 ,� 1 S11 " 1 L ° J FEEDER CUBICLE 584 41 150 -H10 t 3 FIXING HOLES DETAIL "C, 05.61 SWITCH DRILLING DIMENSIONS 41 DETAIL "B" 6 TYP. H2 DETAIL "C" TYP. 1 4 I S3 L 1 PANEL DRILLING QUANTITY 49 DPU CUTOUT 21 REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila 6 ILDING D ION r. r "..-I -., . n JUN 2 8 ?Orr rtzniv111 ,L I 12/05/05 Layout Change St E S3 - Add H3 PJO PJO RJA L8 SIEMENS TRANSPORTATION SYSTEMS, INC. 307OSWEGOPOINTEDRIVE SUITE 106 LAKEOSWEGO, OREGON 97074 L� Souxnikaxsrr PAT O'HOGAN 11/22/2005 DRN BY DRN CKD BY PAT O'HOGAN DES BY DATE DATE 11/22/2005 DATE DES CKD BY DATE LANCE BANASZEK 11/22/2005 APPROVED BY DATE SCALE: LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR INSTRUMENT PANELS FEEDER BREAKER 600mm DRILLING TEMPLATE REV. CONTRACT (DRAWING NO. RTA /LR 82 -03 / C807 1 No. TPS- M042 -03 00 REV DATE DESCRIPTION 704.0 540 391 352 300 140 0 N3 Nil E over. a. 05E04 MAIN BREAKER H1 ©I ®H2 I H3 5.8 DETAIL "A" METER DRILLING DIMENSIONS NTS OP 270 8Y ENG CHK APP 784.0 5 HSO PANEL LAYOUT N4 I. a N12 4 FIXING HOLES 08 DETAIL "B" 22 mm DEVICE DRILLING DIMENSIONS NTS 704.0 540- 391 300 140 0 DIMENSIONS IN MILLIMETERS SIEMENS m TRANSPORTATION SYSTEMS, INC. X? O1SWEGOPO/NTEORIVE SUITE 106 LAKEOSWE'GO, OREGON 97034 41 H1 r7 S3 L ° J SOUNDTRANSIT MAIN BREAKER 784.0 150.0 150.0 -- HSO -41.0 H2 H3 OP270 CUTOUT 283 PANEL DRILLING QUANTITY 10 r I J S 1 L '_ 3 FIXING HOLES DETAIL "C" 05.61 SWITCH DRILLING DIMENSIONS NTS DETAIL 'A" 2 TYP. DETAIL "B" 4 TYP. DETAIL "C" 2 TYP. PAT O'HOGAN 11/22/05 ORN BY DATE DRN CKD BY DATE PAT O'HOGAN 11/22/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 1122/05 APPROVED BY DATE SCALE: REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila B ILDIN DIVI ION pr_nr:71 -, MLA JUN 2 8 7rtn7 v ..1 d�Jdl d�.l I LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR INSTRUMENT PANELS MAIN BREAKER 800mm DRILLING TEMPLATE CONTRACT DRAWING REV NO. RTA /lR 82 -03 / C807 I NO. TPS M042 - I 00 M N 1 1e 413 Pau ne•C 704.0 352.0 333.0 122.0 0 CENTER LINE IICRPOIOTIAN NEGATIVE SWITCH SWARTZ RELAY i1V CNA /NA( APP 784.0 Ni OPEN aosED.I H1© ®H2 N9 PANEL LAYOUT DETAIL "B" 22 mm DEVICE DRILLING DIMENSIONS NTS 704.0 352.0 333.0 122.0 0 DIMENSIONS IN MILLIMETERS SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPO /MEDRIVE, EU/iF 106 LAKEOSWEGO, OREGON 97034 CENTER LINE NEGATIVE SWITCH 784.0 SounmTwwsrr SWARTZ RELAY CUTOUT PANEL DRILLING QUANTITY 10 DETAIL "B" 2 TYP. 16 DETAIL "C" SWARTZ RELAY CUTOUT DRILLING DIMENSIONS NTS PAT O'HOGAN 11/22/05 ORB BY DATE ORB CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 11/22/05 APPROVED BY DATE SCALE DETAIL "C" 4 FIXING HOLES f PJ6.0 DATE 11/22/05 DATE REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDAN D ION LINK LIGHT RAIL PROJECT F37- ir-< JUN 2 8 7nn7 tzs levil I Lai_N f re B TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR INSTRUMENT PANELS NEGATIVE SWITCH 800mm DRILLING TEMPLATE CONTRACT D REV. NO. RTA /LR 82-03 / C807 I NO. TPS- M042 -05 00 3 3 It BACK PANEL TRANSLUCENT COVER 74SA ) fl 2 10 14 62 13 2 16 BACK PANEL TRANSLUCENT COVER 10 14 • EWED FOR • r COMPLIANCE NFPA 70 - NEC AUG 2 7 2.001 City Of Tukwila B ILDIN D I N 62 1 3 2 1 6 MOUNTING PANEL SPACER U -BOLT W /NUTS SURGE ARRESTOR \.r . _ JUN 2 8 91197 1 7 )iV E Lasii'li! C.+LI + I SIEMENS TRANSPORTATION SYSTEMS, INC. ?000SWEGO PO/NT EORNE, SUITE 106 LAKE OSWEGO, OREGON 97034 SOUNDTRANSIT RON ALBERT 12/07/05 DRN BY ATE PAT 01-lOGAN 1 7/05 ORN CKD BY DATE RON ALBERT 12/07/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/08/05 APPROVED BY DATE ALE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM LIGHTNING ARRESTOR BOX AND CURRENT RELAY BOX DETAILS D V VIET= f1 CRr1410T1l1N OV GM" P.J./ Atoll CONTRACT DRAWING NO. RTA /LR 82 - 031 C807 I NO TPS- M041 -01 IREV. nn j j 1 I 1 � 1 � j C n I 1 74SA • $.--ffi. - 1 1 1 Lo_ � 1 j REV ATE DESCRIPTION CONNECTION TO Fl LOAD BUS CONNECTION TO F2 LOAD BUS CONNECTION TO F3 LOAD BUS CONNECTION TO F4 LOAD BUS CONNECTION TO F5 LOAD BUS (C16 Only) 4 -� STAND OFF INSULATOR COMMON LIGHTNING ARRESTOR BUS NOTES: 1. 2kV Cable from DC Switchgear to Arrestor Provided By C807 Installation Contractor 2. Common Ground Bus and Stand -off Insulators Provided By C807 Installation Contractor 3. Control / Signal Cable from Sensing Relay to Annunciator Provided By C807 Installation Contractor 12 CH APP 2 I 34 0 0 0 0 CONTROL WIRING TO ANNUNCIATOR 1 3 38 16 3oOSWEGO /NTEDRNE, SUITE 1016 LAKEOSWEGO. OREGON 97O34 SIEMENS TRANSPORTATION SYSTEMS, INC. 0 0 0 0 CONNECTED TO GROUND MAT SOUNDTRANSIT 3 RON ALBERT 12/07/05 DEN BY DATE PAT O'HOGAN DRN CKD BY DATE RON ALBERT 12/07/05 . DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/07/05 APPROVED BY DATE SCALE: Copper Bus Bar a 2 CODE C MPLI � CE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila D ION , A JUN 2 8 7097 i ia':il I I Li'N LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM LIGHTNING ARRESTOR & CURRENT RELAY EQUIPMENT LAYOUT TYPICAL CONTRACT NO. RTA /LR 82 - 03 / C807 NO. TPS M043 - 02 REV. CD DRAWING REV 8110/05 D 08/0.L 1 05 FRONT VIEW NEGATIVE N1 H1 0H2 N2 312 Updated Disconnect 8 Return Bussing NEW 1PT DIMENSIONS DESCRIPTION SWARTZ RELAY 86$ RJA RJA 1111111111111111111111111 semi II ►'r�:1 RJA RJA ENO FRONT VIEW (WITHOUT DOORS) PJO PJO CHI< B A B A LB LB APP KEY INTERLOCK (NOTE 1) STRAY CURRENT DRAINAGE PANEL r • (COTES 2 THRU I XOOSWEGOPO /N7EORIVE,, SURE 106 LAKE OSWEGO, OREGON 97034 SECTION A -A SIEMENS TRANSPORTATION SYSTEMS, INC. O o O0 0o N2 O 0 0 0 0 0 11 INTERPHASE TRANSFORMER 5 9 fil SOUNDTRANSIT A 1. • • A .' • I f REVIEWED FO CODE COMPLIANCE NFPA70_NE AUG 2 7 2007 Tukwila SION 11111116111•111...1 I • I N2 O 00 00 00 00 0 Nl 0 11 I NOTES: 1. TO PREVENT SWITCH FROM BEING OPERATED UNDER LOAD, IT IS INTERLOCKED WITH THE MAIN BREAKER. THE SWITCH MUST BE CLOSED BEFORE THE MAIN BREAKER CAN BE CLOSED OR OPENED. 2. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 3. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 4. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. 5. ALL DIMENSIONS IN INCHES PAT O'HOGAN 12/23/2004 DRN BY DATE ERN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: SECTION B -B 11 DATE 12/23/2004 DATE a LINK LIGHT RAIL PROJECT COMPONENT PANEL DETAIL "D" M050 -02 LEGEND F11 - MINI CKT BRKR FOR HTR CKT H1 - GREEN LIGHT H2 - RED LIGHT Nxx - NAMEPLATE Xx - TERM I NAItSTRIP, ,1_ , 1 5:.... _..J C a � nI� JUN 2 8 7r1n7 U "tii�Vflf Ali TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE EQUIPMENT LAYOUT NON RTA /LR 82 -03 f C8071 NO WING TPS•M050-01 r. 02 -3s 1 11 1 REV 400 AMP BUS 100 AMP KNIFE SWITCH INSULATING PANEL 100 AMP CONTACTOR DATE STRAY CURRENT DRAINAGE CONTACTOR AND SWITCH REQUIRED AT ONLY REQUIRED AT ALL TPSSs C1, C27 8 C36 DESCRIPTION 15 16 DETAIL "D" NTS COMPONENT PANEL 60 AMP DIODE 60 AMP KNIFE SWITCH 222 PADS FOR CABLE CONNECTIONS — AVAILABLE CONTACT SURFACE L Y 1 I - 8 _1 I 8 SILVERED LINE AND LOAD TERMINALS 9/16 DIA. HOLES ENG 2- FORM "C" AUXILIARY r1cv CONTACTS. ACTUATED WHEN THE SWITCH IS CLOSED • 0 CHK APP i ron IIII 1 N 19 9 10 b4 1/2 1 ---31- 1r - 1/2 4 -5/8 DIA. MOUNTING HOLES FOR 1/2 DIA. BOLTS 1 ACCOMMODATIONS FOR KIRK INTERLOCK TYPE "B" LOCKING BOLT PROJECTION TO BE 3/8" LONG 2- FORM "C" AUXILIARY WHEN WITHDRAWN. KEY REMOVABLE WHEN LOCKING CONTACTS. ACTUATED WHEN BOLT IS EXTENDED AND SWITCH IS LOCKED IN SWITCH IS OPEN EITHER THE CLOSED OR OPEN POSITIONS. SIEMENS TRANSPORTATION SYSTEMS, INC. 300OSWEGOPOINTEORA& SURE 106 LIKE OREGON 97034 SouiuuTiuwsrr INSULATED —\ STUD HANDLE SCALE: 5 PAT O'HOGAN 12123/2004 ORN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE 16 3/8 12i 1 6 Kt VIEWED FOR CODE COMP NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila ILDING DM ION INSULATING BASE x-- 1/2 X 1 1/2 ALUMINUM SPACERS NOTES: FOR INDOOR USE FOR VERTICAL UPRIGHT MOUNTING AUXILIARY CONTACTS RATING: 15A ® 125VAC OR 1 /2A ® 125VDC APPROXIMATE WT. 73 LBS. DO NOT OPERATE UNDER LOAD TYPE MP DISCONNECTING SWITCH 6000A. 1500V.D.C. S.P. S.T. NON- FUSIBLE LIVE FRONT -STUD HANDLE OPERATED BOLTED PRESSURE SILVER CONTACTS 01-r. J (II A \ \ JUN 2 8 2f107 1 riavlil+.l`� d It p LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE EQUIPMENT LAYOUT DETAILS CONTRACT DRAWING NO. RTA /LR 82 - 03 / C807 I No. TPS M050 - 02 I REV. 00 I� �� RI -9 EXTRA HEAVY TRACTION SERVICE 12 -PULSE RECTIFIER 3000KW, 1500VDC 1�1U�1� L Technologies • Corporation �`�� WYTHEVILLE, VA, USA 24382 INTERPHASE TRANSFORMER SN 120270L02BC01 JOB 3511 DATE 1/05 CU COND KVA 270 PHASE 1 HERTZ 360 CLASS H 220 °C I4S TYPE AA RISE 80 ° C @100% LOAD INPUT 135 VAC 1000 AMPS DC BIL 20 (N1 -N2) JU OUTPUT 2000 AMPS DC BIL 20 (NO) 2 0 gal 11ATF 36 37 N1 N1 11C Cr IDTIA O 0 O 0 NO 10.0 O 0 O 0 NO 0.00 21.50 1/2" VIBRATION PAD FRONT VIEW N2 O 0 O 0 .75-- eV N2 cun_ nuV •DD N21 NO 1.50 --- 2.00 .00 F---- 7.00 14.00 17.00 SIDE VIEW 307 OSWEGO POINTEORM,, SL /lrE 106 LAKE OSWEGO, OREGON 97134 21 50 0.75 DIA 7 ---- MOUNTING HOLE(4) SIEMENS cci TRANSPORTATION SYSTEMS, INC. TERMINAL DETA L 1/2" X 5" COPPER BUS ANSI STD PATTERN 0 TOP VIEW NOTES: DRY TYPE INTERPHASE TRANSFORMER - VENTILATED FOR USE IN 12 -PULSE RI -9 X -HEAVY TRACTION RECTIFIER RATED 3000 KW, 1500 VDC 270 EQU. KVA 1 PHASE 360 HERTZ 80 °C RISE@ 100% LOAD 135V AC L -N 20 kV BIL , 1000 ADC (N1 -N2), 2000 ADC (NO) .56 DIA 5% MAX UNBALANCE. LOW NOISE DESIGN COPPER CONDUCTOR TOTAL WEIGHT 950 LBS 00 7 J 12.0 L� SomunTwwsrr PAT 01-IOGAN 12/23/2004 DRN BY DATE DRN CKD BY DATE PAT 01 - lOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila ° BUILDYNG DIVISION LINK LIGHT RAIL PROJECT ;1 N 28 ?(197 wil CEIN lfw TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE EQUIPMENT LAYOUT INTERPHASE TRANSFORMER CONTRACT DR AWI NG REV. NO. RTA /LR 82 -031 C807 NO TPS- M050 -03 00 9(10/05 Ar AL I RECTIFIER #1 -V 000000000000000 000000000000000 000000000000000 00001100 II 01100 000000000000000 0011 1101111000 11 0000 V 00011 110000000000 00001101111 001100011 111111El 1111110000000 000000000000000 000000000000000 11000 110110110000110 Issued for Construction FRONT VIEW RJA RJA PJO LB 868 L -1 FRONT VIEW (WITHOUT DOORS) SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO PO/NTEDRNE, SUITE 106 LAKE OSWEGO, OREGON 97034 FLEX CABLE FROM BUS DUCT 1+1 SOUNDTRANSIT PAT 01-lOGAN 12/23/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: 408 [1032.61] 55 [1400.03] 56 [1429.84] SECTION A -A (SIDE REMOVED) DATE 12/23/2004 DATE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R1 CUBICLE EQUIPMENT LAYOUT WYE CONNECTED RECTIFIER CONTRAC D REV. NO. R TA 2R 82 -03 / C807 I NO. TPS- M060 -01 01 V • '. AL. j SIEMENS 01100 110000000000 1111 11 11 H0011000001 000000000000000 000000000000000 000000000000000 000000000000000 I RECTIFIER #2 L I 000000000000000 11 0011 11 0 11 110110 111110 000000000000000 10000000000 11000 000000000000000 000000000000000 FRONT VIEW ITPS•x 86$ L -2 FRONT VIEW (WITHOUT DOORS) FLEX CABLE FROM BUS DUCT 55 $ 562 SECTION A -A (SIDE REMOVED) _ f. JUN 2 8 9 t t - i� 11) — 6 III A n7 01 9/10/05 Issued for Construction C,J n A VC f1CCe`OIOtiflk RJA R./A PJQ LB can rule AOn SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINT ORN E, SUITE 106 LAKE OSWEGO, OREGON 97034 Ers SOUNDTRANSIT PAT 01-lOGAN ORN BY ORN CKD BY PAT O'HOGAN DES BY 12/23/2004 DATE , DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R2 CUBICLE EQUIPMENT LAYOUT DELTA CONNECTED RECTIFIER CORACT DING REV. NO. RTA !LR 82 - 03 / C807 I NO. RAW TPS- M060 -02 01 NT REVIEWED o FOR DE COMPLIANCE s • N FPA 70 - NEC ; I AUG 2 7 2007 City Of Tukwila - ILDIN DIVISION s C o T V go- C nd o 1 11 fge E g b 01 DCU IN IIiI.g w_mui,.1.2.► w, 1 , I wi!ui.• I1Wriar 11� .. .t11111��1rip =I I IIIY1111-. iNonni 11' 1117A 1 11' 1 1.A 1 Mill "If IIR11 1►1iJII 1111111 1 = 11 i1,1� 11,1 Ii1.1A 11'1 I IC,I* II Nina Hine' n1 _ n1 _ t1n 1111• IWO "WAIN TIT.7111 TOP VIEW RECT #1 - Y Issued For Construction RJA RJA PJO LB TOP VIEW RECT #2 - DELTA SIEMENS MI 8 �1 AC CONNECTION PADS DIODE TRANSPORTATION SYSTEMS, INC. 3000SWEGOEOINTEDRIYE, SUITE 106 LAKEOSWEGO,, OREGON 97034 AC HEAT SINK BUS - R130.1 TYPICAL DIODE ASSY. -R170.1 (-R170.2) - R130.2 -R171.1 (-R171.2) DEVICE PANEL FOR DC - RC NETWORK L� SouninikEwsrr DIODE HEAT SINK 0 Y N —J PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK .12/23/2004 APPROVED BY DATE SCALE -- 11--11 K K N —J - R111.1 - R113.2 -F291 -F292 b K e QES -F191 N J Ih J COMPONENT MOUNTING DIAGRAM - C111 -C113 KJ K K DEVICE PANEL FOR AC - RC NETWORK C,. - i_ ., ;', LA JUN 2 8 ?Or" „WTI CLN i• y LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R CUBICLE EQUIPMENT LAYOUT DETAILS CONTRACT DRAWING NO. RTA /LR 82 -03 / C807 NO TF REV. 01 9/10/05 rs eTeT ncC•oiotlna nv t.,/! nuv .nA 01 10/17/0 REV DATE A A 31 2 FRONT VIEW Revise Panel UO DESCRIPTION PJO f 0 I- 0 o' X 0 • Cu 2x(7' X 3/8') VD BA + , X01 Cu 2x(7' X 3/8") S7 -PLC D_ U O 0 m O a a O 0 1 XPg PANDUIT 2 X 3' iiiiiiitiiiiiiiiiiviiiiiniiiiniillli u iiiiiiiiiiiiiiiiiiiiiiii 65 PANDUIT 2 X 3" 0 �. X02 O 1 O 4H BUSS G TO RECTIFIER R2 0 O i H SHUNT HTR • of I FRAME BOND BUS Cu 1 -1/2" x 3/8" 4 4 a S4 RLA LB RV PNC4 CHK APP FRONT VIEW (WITHOUT COVERS AND TRUCK) SIEMENS cm TRANSPORTATION SYSTEMS, INC. 307OSWEGOPOINTEDRNE, SUITE 106 LAKE OSNEGO, OREGON 97034 16 SECTION A -A (SIDE REMOVED) SOUNDTRINSIT PAT O'HOGAN 12/23/2004 ORN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE /114AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND: BA - BUFFER AMPLIFIER F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR PLC H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT HSO - BLUE LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAUREMOTE SWITCH S3 - CONTROL SWITCH S50 - RESET STATION ALARM VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS 131 61.1 -X01 5 5 8 31 1 Rr7-14 --t 2 2 /ILA TOP VIEW JUN 2 P 'n97 "k:.r-1 vi) f OT..-N:'---ii LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT CONTRACT DRAWING REV. No. RTA /LR 82 -03 / C807 NO. TPS- M100 -01 01 8 6' 1 MAIN BREAKER I ITPS -X an N5 N4 N3 E= O ® HSO 0 N1 2 �> H1© ®H2 H3® S3 I rI S1 rtri CS �43 1 X3. a Et E OP 270 • ++ ' 60 I I + + + OR + E� EWED NCE R Cw s NEC CODE A 7 C 01 10/17/0 REV DATE A A 31 2 FRONT VIEW Revise Panel UO DESCRIPTION PJO f 0 I- 0 o' X 0 • Cu 2x(7' X 3/8') VD BA + , X01 Cu 2x(7' X 3/8") S7 -PLC D_ U O 0 m O a a O 0 1 XPg PANDUIT 2 X 3' iiiiiiitiiiiiiiiiiviiiiiniiiiniillli u iiiiiiiiiiiiiiiiiiiiiiii 65 PANDUIT 2 X 3" 0 �. X02 O 1 O 4H BUSS G TO RECTIFIER R2 0 O i H SHUNT HTR • of I FRAME BOND BUS Cu 1 -1/2" x 3/8" 4 4 a S4 RLA LB RV PNC4 CHK APP FRONT VIEW (WITHOUT COVERS AND TRUCK) SIEMENS cm TRANSPORTATION SYSTEMS, INC. 307OSWEGOPOINTEDRNE, SUITE 106 LAKE OSNEGO, OREGON 97034 16 SECTION A -A (SIDE REMOVED) SOUNDTRINSIT PAT O'HOGAN 12/23/2004 ORN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE /114AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND: BA - BUFFER AMPLIFIER F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR PLC H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT HSO - BLUE LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAUREMOTE SWITCH S3 - CONTROL SWITCH S50 - RESET STATION ALARM VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS 131 61.1 -X01 5 5 8 31 1 Rr7-14 --t 2 2 /ILA TOP VIEW JUN 2 P 'n97 "k:.r-1 vi) f OT..-N:'---ii LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT CONTRACT DRAWING REV. No. RTA /LR 82 -03 / C807 NO. TPS- M100 -01 01 + ik 1 X3. a Et E II 2516 • ++ ' 60 = + + + OR + E� EWED NCE R Cw s NEC CODE A 7 P1/4k 2 ILDIN p I MIa: . = � L:r : III . W �' II I11 i MIN 0 110 HTR 1}IIIII} I (NO ESITHRU 1 ---- ; + � t f 558 as 9 01 10/17/0 REV DATE A A 31 2 FRONT VIEW Revise Panel UO DESCRIPTION PJO f 0 I- 0 o' X 0 • Cu 2x(7' X 3/8') VD BA + , X01 Cu 2x(7' X 3/8") S7 -PLC D_ U O 0 m O a a O 0 1 XPg PANDUIT 2 X 3' iiiiiiitiiiiiiiiiiviiiiiniiiiniillli u iiiiiiiiiiiiiiiiiiiiiiii 65 PANDUIT 2 X 3" 0 �. X02 O 1 O 4H BUSS G TO RECTIFIER R2 0 O i H SHUNT HTR • of I FRAME BOND BUS Cu 1 -1/2" x 3/8" 4 4 a S4 RLA LB RV PNC4 CHK APP FRONT VIEW (WITHOUT COVERS AND TRUCK) SIEMENS cm TRANSPORTATION SYSTEMS, INC. 307OSWEGOPOINTEDRNE, SUITE 106 LAKE OSNEGO, OREGON 97034 16 SECTION A -A (SIDE REMOVED) SOUNDTRINSIT PAT O'HOGAN 12/23/2004 ORN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE /114AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND: BA - BUFFER AMPLIFIER F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR PLC H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT HSO - BLUE LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAUREMOTE SWITCH S3 - CONTROL SWITCH S50 - RESET STATION ALARM VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS 131 61.1 -X01 5 5 8 31 1 Rr7-14 --t 2 2 /ILA TOP VIEW JUN 2 P 'n97 "k:.r-1 vi) f OT..-N:'---ii LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT CONTRACT DRAWING REV. No. RTA /LR 82 -03 / C807 NO. TPS- M100 -01 01 1 Pi FRONT VIEW ,Q KIRK KEY LOCKOUT TAGOUT HARDWARE + WARNING SIGN I + + + O OPERATION COUNTER + 2f;8 544 SIDE VIEW 13 30 16 SIEMENS °' m TRANSPORTATION SYSTEMS, INC. 3000.51WOOP 1 7EDRIVE SUH7E 106 [AKEOSiYEGO, O4EGOY VAN 1 PAT O HOGAN 12/23/2004 DR/I BY DAE DRN CEO BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 SoumiThatisr APPROVED BY DATE SCALE: REAR VIEW DATE 12/23/2004 28 16 7 N LINK LIGHT RAIL PROJECT JUN 2 ; 7nm L L110111 GL :1 I C. e BY ENO CHK APP RE V 11 New LayaA Fa RN Bola lPTION o. RTA lLR 82 -031 C807 NO. TPS- M100 -02 TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT BREAKER TRUCK • 01 li ft A A FRONT VIEW S2 IIIIIpIII11I1IIIIII111I11IIIIIIIl1 FRONT VIEW (WITHOUT COVERS AND TRUCK) Cu 2x (7' X 3/8 ") Cu 6" X 3/8" 2901g. Cu 1 5/8" X 3/16" St 3 11/16" X 23/8" X 5/32" (NOTES 1 THRU 3) SIEMENS' TRANSPORTATION SYSTEMS, INC. 3Yk OSWEGOPOINIEDIN& SINE 106 LAKE OSWEGO. OREGON 97014 I T r �5 REVIEWED FOR C NFP 7 - NEC N AUG 2 7 2001 City Of Tukwila D ION . g ILDYN� 55$ 5 4 SECTION A - (SIDE REMOVED) Sounmikanor PAT OHOGAN 12123/2004 ORN BY DATE CNN CK0 BY DATE PAT OIIOGAN 12/23/2004 DES BY DATE SCALE: DES CKD BY DATE LANCE BANASZEK 12/23/2004 APP '•VEDBY DATE NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE #14AWG. 2kV WIRE FOR HEATER CIRCUIT. LEGEND BA - BUFFER AMPLIFIER FO - LINE TEST FUSE F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CIO' BRKR FOR DPU HTR - HEATER H1 - GREEN LIGHT H2 - RED UGHT H3 - WHITE LIGHT H10 - YELLOW LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAL/REMOTE SWITCH S2 - DIRECT ON KEYED SWITCH S3 - CONTROL SWITCH VD - VOLTAGE DIVIDER Xx- TERMINAL STRIP Xxx- BREAKER STABS 238 •; r= r"-'4 /r, CIS JUN 2 9nn L I: iiivll i Cs:N TOP VIEW LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F CUBICLE EQUIPMENT LAYOUT •T • NO NTRAC . RTA /LIT 82-03 / C807 NO. ^ TPS- M101 -01 01 IIIA I 81 1 I FEEDER BREAKER #1 I N7 H10 0 N1_ 1 ft H3 0 ®H2 Iti H1 43 CS nSt n S3 DPU I I 4 -_ - ::1 li ft A A FRONT VIEW S2 IIIIIpIII11I1IIIIII111I11IIIIIIIl1 FRONT VIEW (WITHOUT COVERS AND TRUCK) Cu 2x (7' X 3/8 ") Cu 6" X 3/8" 2901g. Cu 1 5/8" X 3/16" St 3 11/16" X 23/8" X 5/32" (NOTES 1 THRU 3) SIEMENS' TRANSPORTATION SYSTEMS, INC. 3Yk OSWEGOPOINIEDIN& SINE 106 LAKE OSWEGO. OREGON 97014 I T r �5 REVIEWED FOR C NFP 7 - NEC N AUG 2 7 2001 City Of Tukwila D ION . g ILDYN� 55$ 5 4 SECTION A - (SIDE REMOVED) Sounmikanor PAT OHOGAN 12123/2004 ORN BY DATE CNN CK0 BY DATE PAT OIIOGAN 12/23/2004 DES BY DATE SCALE: DES CKD BY DATE LANCE BANASZEK 12/23/2004 APP '•VEDBY DATE NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE #14AWG. 2kV WIRE FOR HEATER CIRCUIT. LEGEND BA - BUFFER AMPLIFIER FO - LINE TEST FUSE F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CIO' BRKR FOR DPU HTR - HEATER H1 - GREEN LIGHT H2 - RED UGHT H3 - WHITE LIGHT H10 - YELLOW LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAL/REMOTE SWITCH S2 - DIRECT ON KEYED SWITCH S3 - CONTROL SWITCH VD - VOLTAGE DIVIDER Xx- TERMINAL STRIP Xxx- BREAKER STABS 238 •; r= r"-'4 /r, CIS JUN 2 9nn L I: iiivll i Cs:N TOP VIEW LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F CUBICLE EQUIPMENT LAYOUT •T • NO NTRAC . RTA /LIT 82-03 / C807 NO. ^ TPS- M101 -01 01 IIIA ►. + FRONT VIEW I KIRK KEY LOCKOUT TAGOUT II HARDWARE r WARNING SIGN L + 0 OPERATION COUNTER 202 J 54 16 SIDE VIEW HPB45/82S R10 304 K02 REVIEWED CODE COMPLIANCE NFPA 7 - NEC AUG 2 7 2u01 City Of Tukwila g IL�� 11 DIV SION REAR VIEW 0 LL. IL RO IL IL X01 KO RF(7, 1VPf e JUN 2' 99" r ` bjEhMIT cl , 01 12/05/05 0CV fATF New layout of tine Test & Relay Board rluf rRIPTu iN RJA AY RJA PJO LB FN(, CHK APP SIEMENS, TRANSPORTATION SYSTEMS, INC. 300 QSWEGOPOINTEDRIVE,, SUITE 106 LAKEOSWEGO, OREGON 97024 SOUNDTRANSITT PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F CUBICLE EQUIPMENT LAYOUT R BREAKER TRUCK LAYOUT NO. CONTRACT TA /LR 82 - / C807 NO WINGTPS- M101 -02 REV. 01 So ss L Dwg Number Sht Title I Rev. 1 Date Dwg Number I Sht Title I Rev. Date CDRL 12 - STS 30.001_R03 CDRL 28 - STS 30.0064_R01 TPS -D001 -01 Substation Drawing List 100 12/05 TPS -W070 -01 I tetconaecMonQlagram, HV AC &_ACC2b't • ' 11/05 TPS -S001 -01 S mbols & Abbreviations S mbols '01 3/05 TPS - W070 - 02 , ercpnnectlon C i gram AC &J C 1 terconnection i ram. Building It-erconnectionQLagram, AC Switchgear , - . onnection D�gram, O $wi Sta nSeLvice • • 11/05 TPS -5001 -02 S mbols & Abbreviations Abbreviations 01 3/05 TPS - W070 - 03 -04 - 05 Auxiliaries hgear S Q 0 11/05 11/05 11/05 TPS -S010 -01 System Single Line Diagram 03 11/05 TPS -W070 TPS -S010 -02 S stem Sin • le Line Dia.ram 03 11/05 TPS - W070 TPS - S010 - 03 S stem Sin. le Line Diagram 02 11/05 TPS - W070 - 06 Jpiietr>leetLAtl_Diagiapl, DC SwitQbgesal • 11/05 TPS -S010 -04 S stem Sin. le Line Dia.ram 03 11/05 TPS -W070 -07 tteLCOnnectiojagram, Pram ' 11/05 C11 -S020 -01 International District/Chinatown TPSS C11, Single Line Diagram -01 Forest Street TPSS C16, Single Line Diagram 02 03 10/05 12/05 C16 -S020 CDRL 123 - STS 30.0045 C23 -S020 -01 McClellan Street TPSS C23, Single Line Diagram -01 Othello Street TPSS C27 Sin • le Line Dia.ram 02 02 10/05 10/05 TPS - L001 - 01 - ��g�Fq�ijp I 12/05 C27 -S020 TPS - L040 - 01 :C Jcbgear, l3�Uszfl�latetial '' 6/05 C29 -S020 -01 Rainier Beach TPSS C29 Sin • le Line Dia • ram 02 10/05 TPS - L050 - 01 ■ Cubicle, BiILQLMaterial ' 12/05 C32 -S020 -01 B • - • - R • .. P 32 S •r( 02 10/05 TPS - L060 - 01 ; ubicle, l iiLQLMaterial '' 6/05 C33 -S020 -01 South 133rd TPSS C33 Smile Line Dia • ram 02 10/05 TPS - L100 - 01 s Ciib 1eJ lLgLMaterial 0 12/05 C36 -S020 -01 Tukwilla International Boulevard TPSS C36, Single Line Diagram -01 TPSS Protection Devices 02 00 10/05 10/04 TPS - L100 - 02 -03 - 01 -02 0 Cubjcle,Bill of Material • bicle,jjll of Material tucle, Bill of Material F Cubicle, Bill of Material 0 0 01 01 12/05 12/05 12/05 12/05 TPS -S021 TPS -L100 TPS -S022 -01 DC Switch • ear One Line Dia • ram 01 9/05 TPS - L101 CDRL 21 - STS 30.039_R01 C TPS -L101 TPS-SO40 -01 AC Switchgear Elements TPSS C11 C23 C27 & C29 00 7/05 TPS -L101 -03 F Cubicle, Bill of Material 0 1 2/05 TPS-SO40 -02 AC Switchgear, Elementary, TPSS C16 & C36 00 7/05 TPS-SO40 -03 AC Switchgear, Elementary, TPSS C32 & C33 00 7/05 REVIEWED FOR TPS-SO40 -04 AC Switchgear, Control Schematic 00 7/05 CODE COMPLIANCE _ TPS-SO40 -05 AC Switchgear, Devices 00 7/05 CDRL 20 - STS 30.0026.02_R02 —NFPA 70 - NEC _ TPS -S050 -01 N Cubicle Schematics 01 11/05 TPS -S050 -02 N Cubicle Schematics 01 11/05 2 7 1001 TPS -S050 -03 N Cubicle Schematics 01 11/05 TPS -S050 -04 N Cubicle 24VDC Control Power 00 7/05 = • : 4:- _ —City TPS -S060 -01 R1 & R2 Cubicles General Schematics 01 11/05 Of Tukwila TPS -S060 -02 R1 & R2 Cubicles, Trip & Alarm Schematics 02 12/05 rat NM .i B IL DING D SION[ TPS -5100 -01 FO Cubicle General Schematics 01 11/05 TPS -5100 -02 FO Cubicle General Schematics 01 11/05 � ir TPS -5100 -03 FO Cubicle General Schematics 01 11/05 ze TPS -S100 -04 FO Cubicle, PLC Schematics 01 12/05 -C TPS -5100 -05 FO Cubicle PLC Schematics U1 11/05 TPS -5100 -06 FO Cubicle PLC Schematics 01 12/05 TPS -5100 -07 FO Cubicle PLC Schematics 01 11/05 TPS -S101 -01 Fl Cubicle General Schematics 02 12/05 TPS -S101 -02 Fl Cubicle, DPU Schematics 00 12/04 _ - , .,� : . .. I .. TPS -S101 -03 Fl Cubicle, Digital Input Schematic 01 11/05 PERlu1T NUMBER TPS -S101 -04 F1 Cubicle Di•italOut•utSchematic CO 12/04 - - --- - - 1 1 • . - s MIN 14kY A\ <Y 02 ,a' .S102.0 • =S 10 ,,, � 4S1 OZ sysk P 10 P 10.. A•4 k :S 03 T�?S - S 03- S j� a L Sde°R -Sl 0 ° S S10,� ���� TI?S -S 04,E l?: 10 8�1 , 2 C. Sic e Genera :Schematics �` �$ a _ °h � � � 02 . ,2Cubice DPUiSc'emati' ttv b ��� a` r ::` w 3��t , D � v �* Off , a �` :� Cubici }± `1p er ii 1nuSca ahc � 1'2�C �� •ita �ilt•LIt SGT Qt�P'A �'`xa ��uv 3������\ � a�a � ` 3 a � r € � 8 t w. ^.2 .. :,a. ��. � r � . � � r �1 V �? 0 is a e Sc emat a `mod \� ?� *�" ' � ,�\ ® l = Cubicle DPUISc e' atib � r �� a CUla'cle4Di• a n•t+ Sc a i T L .a , ' � LCu•t�I��Di•ita Out =Ot`SC � �� � �� �.�.� � , �l y ��. \'��', . �..S R ti � '.,�>ce \ � \ m YA� \�L��`,T�Ewe` �"2k �'�`L ��� - 0 .F4�Cubicl i e eral Sc a atica.N fi k� .,, m `@ a� �§ '. "die, " � 2�� F �subicle �� 3 �5c em�trc �.���� � ��`Q �,- U� W ��.�� �� a3 t:ibicleiaDl ltal,ln•`ut C em tic a s �; a 4 • • f l" Ybk 2 §\.a�0� f 3 �^+.xf4�,d,�aE °. Y., !~4 Cubicle ' ital utScherliatic � �. s n..�... ® 00 s ° 0 �'� 00 ot7' QOa�ti` . ; j�4 ! t k `0 o e 0.0= 00 00 ,0 � "�00��' g 1 00 \ 5 ,' ?' a o o ��• m 0 • Q 10 ; 't �%N: ®- \ O ��'���� Y 7. • r. • J t• Alliiirall ��SiT'rT'i9w . .. • o •nor a rova ► • i Y f' r!!!� /f/yJL�I ��� � ��r�t :�.�. mni aiimamaseiii . . . jll•L" •.t• t • IIIL•llrl�•1C:IIlIi'Ll- i'iilti 1� } a/r ,-i i -- '''J+JI Ct JUN 2 (1f17 - ., '� ` n n f i' (� r = ' \IT � ti.. r7� - ' \ / � '/ NE =C111. ►`MI i _ SOUND TRANSIT Mainl' e Substation 1D C '° Drawl List . FILE COP Y Drawing o T 01 -01 - ' Aooroved R# Revision Date So ss L C11-B001 C23-B001 C27-B001 C29-B001 C32-B001 C33-B001 C36-B00 -01 -01 -01 -01 -01 -01 -01 Title TPSS Buildin • E"ui"men1 Arran "ementPlan International District TPSS Bu TPSS Bu nAEgui ent Arra • ement Plan McClellan St. ent Arran • ement Plan Othello St. TPSS Buildin • E•ui•ment Arran •ement Plan Rainier Beach TPSS Buildin• Elul •ment Arran •ement Plan South 133rd St. - 1 SS Bui din ment Arran emen P an ukwi|la Intl Blvd Rev. Date 9/05 7/05 9/05 9/05 9/05 9/05 9/05 7/05 Approved R# Revision Dwg Number TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M041 TPS-M041 TPS'MO41 TPS-M042 TPS-M042 TPS-M042 TPS-M042 TPS-M042 TPS-M043 TPS-M043 TPS-M050 TPS-M050 TPS-M050 TPS-M060 TPS-M060 TPS-M060 TPS-M100 TPS-M100 TPS-M101 TPS-M101 Sht -01 - 02 AC SvNtchgear, Section Views for ull.uu3.uu/,uuy - 03 AC Swi1 Mqma:Namendztesdhedu|efn,Ci1'C23 C27. CZ9 - 04 A.Ce_awitobszear—El_e_vatIon_forSelal ^« -06 AC SwitchaearalarnePlate schedule for C1G8 CO6 - 08 AC Switchaear. Section Views_fgr C32 kC333 - 01 Rectifier -02 Rectifier Details - 03 Rectifier Transformer. Nameplte -01 DC Switchgear, Line-Up Arrangement -02 DC Switchgear, Nameplate Schedule -03 DC Switchgear Instrument Panels, Feeder Breaker Drilling Template -04 DC Switchgear, Instrument Panels,Main Breaker Drilling Template - DC Switchgear. Instrument Panels. Negative Switch Drilling Template -01 LighhnuAnestor Box and Current Relay Box Details -02 Liahtinq Arrestor and Current Relay. Equipment L/O -01 N Cubicle. EgWprinerALUO -02 N -03 N Cubicle. Interphase Transformer -01 -02 -03 -01 Title ,� R1 Cubicle EouipmentUO R2 Cubicle. Equipment L/O R Cubicle Equipment U0 Details FO Cubicle. Equipmen L/O FO Cubicle. Truc Layout -01 F Cubicle. Equipment UD -02 F Cubicle. Feede Truck Layou REVIEWED FOR- CODE COMPLIANCE ~ �' �/ 7��� . . ItY,OF Tukwila 'WING Dnxmr SOUND TRANSIT Mainline Substation 1DECO5 Drawing List Drawing No. Tpe'o001-02 Rev. 01 00 00 00 00 00 00 00 00 OD 00 00 00 00 00 00 00 00 00 02 00 00 01 01 01 01 00 01 01 1-1 • "°" «."..^. Date 8/05 705_ 00 7/05 OO 7/05 7/05 11/05 11/05 11/05 11/05 12/05 12/05 8/05 12/04 12/04 9/05 9/05 10/05 12/05 10/05 12/05 TPS'B001 -01 TPSS Building Switc,hgear Equipment Elevations for C11, C23, 10X05 TPS-B001 -02 -03 TPSS BuUdin"Aux|b E"ui"merd Elevations for C11 C23 C27 C29 TPSS Building Switch | U for C16 & C36 01 00 10/05 12/05 TPS-B001 TPS'B001 '04 TPSS Buildinq Auxiliary Equipment Elevations for C16 & C36 00 12/05 TP8'B001 -05 TPSS Building Swihohgear Equipment B tions for C32 & C33 00 12/05 TPS-B001 -06 TPSS Buildinq Auxiliary Equipment Elevations for C32 & C33 00 1 2/ 05 CDRL 28-STS 30.0020 ` _ PRC-8001 '01 AC8v��hgeorAnnhohngPhon 04 9/05 PRD'B001 -02 DC Switchgear Anchoring Plan 01 9/05 PRO'B001 -03 DC Switchgear Anchoring Details 01 9/05 PRD'B001 DC Switchgear Bolt-Up Details 01 905 / \ ; / ( ) C11-B001 C23-B001 C27-B001 C29-B001 C32-B001 C33-B001 C36-B00 -01 -01 -01 -01 -01 -01 -01 Title TPSS Buildin • E"ui"men1 Arran "ementPlan International District TPSS Bu TPSS Bu nAEgui ent Arra • ement Plan McClellan St. ent Arran • ement Plan Othello St. TPSS Buildin • E•ui•ment Arran •ement Plan Rainier Beach TPSS Buildin• Elul •ment Arran •ement Plan South 133rd St. - 1 SS Bui din ment Arran emen P an ukwi|la Intl Blvd Rev. Date 9/05 7/05 9/05 9/05 9/05 9/05 9/05 7/05 Approved R# Revision Dwg Number TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M040 TPS-M041 TPS-M041 TPS'MO41 TPS-M042 TPS-M042 TPS-M042 TPS-M042 TPS-M042 TPS-M043 TPS-M043 TPS-M050 TPS-M050 TPS-M050 TPS-M060 TPS-M060 TPS-M060 TPS-M100 TPS-M100 TPS-M101 TPS-M101 Sht -01 - 02 AC SvNtchgear, Section Views for ull.uu3.uu/,uuy - 03 AC Swi1 Mqma:Namendztesdhedu|efn,Ci1'C23 C27. CZ9 - 04 A.Ce_awitobszear—El_e_vatIon_forSelal ^« -06 AC SwitchaearalarnePlate schedule for C1G8 CO6 - 08 AC Switchaear. Section Views_fgr C32 kC333 - 01 Rectifier -02 Rectifier Details - 03 Rectifier Transformer. Nameplte -01 DC Switchgear, Line-Up Arrangement -02 DC Switchgear, Nameplate Schedule -03 DC Switchgear Instrument Panels, Feeder Breaker Drilling Template -04 DC Switchgear, Instrument Panels,Main Breaker Drilling Template - DC Switchgear. Instrument Panels. Negative Switch Drilling Template -01 LighhnuAnestor Box and Current Relay Box Details -02 Liahtinq Arrestor and Current Relay. Equipment L/O -01 N Cubicle. EgWprinerALUO -02 N -03 N Cubicle. Interphase Transformer -01 -02 -03 -01 Title ,� R1 Cubicle EouipmentUO R2 Cubicle. Equipment L/O R Cubicle Equipment U0 Details FO Cubicle. Equipmen L/O FO Cubicle. Truc Layout -01 F Cubicle. Equipment UD -02 F Cubicle. Feede Truck Layou REVIEWED FOR- CODE COMPLIANCE ~ �' �/ 7��� . . ItY,OF Tukwila 'WING Dnxmr SOUND TRANSIT Mainline Substation 1DECO5 Drawing List Drawing No. Tpe'o001-02 Rev. 01 00 00 00 00 00 00 00 00 OD 00 00 00 00 00 00 00 00 00 02 00 00 01 01 01 01 00 01 01 1-1 • "°" «."..^. Date 8/05 705_ 00 7/05 OO 7/05 7/05 11/05 11/05 11/05 11/05 12/05 12/05 8/05 12/04 12/04 9/05 9/05 10/05 12/05 10/05 12/05 01 REV 3/17/05 DATE 600/200 -5 MR SINGLE LINE DIAGRAM SYMBOLS 0 Y CT • -1 o o I-- DC SHUNT LIGHTNING OR —OSAol II SURGE ARRESTOR w/ GROUND CONNECTION A 3 PHASE, DELTA, / TRANSFORMER CONNECTION 3 PHASE, WYE, TRANSFORMER CONNECTION OPEN DELTA CONNECTION TRANSFORMER rrrrm -3 REVISED PER COMMENTS DESCRIPTION AMMETER VOLTMETER VOLTAGE OR CURRENT TEST TERMINALS CURRENT TRANSDUCER Fl ELECTRICAL INTERLOCK KEY INTERLOCK VOLTAGE TRANSDUCER CABLE STRESS CONE TERMINATION DIRECTION OF CONTROL OR RELAY INFLUENCE LINE RECTIFIER TRANSFORMER, 12 PULSE (TYPICAL FOR ANSI - CIRCUIT No. 31) CURRENT TRANSFORMER, NUMBER INDICATES QUANTITY VOLTAGE TRANSFORMER, NUMBER DENOTES QUANTITY MULTI -RATIO 600:5 CURRENT TRANSFORMER CONNECTED ON THE 200:5 TAP PJO BY ENG CHK APP SINGLE LINE DIAGRAM SYMBOLS 400 1 300 ISOLATING DEVICE (TYPICAL) MEDIUM VOLTAGE AC CIRCUIT BREAKER, 3 -POLE, DRAW -OUT TYPE PANEL CIRCUIT BREAKER, FRAME SIZE INDICATED ABOVE LINE AND TRIP VALUE BELOW LINE IN AMPS CIRCUIT BREAKER DC CIRCUIT BREAKER DRAW -OUT TYPE w/ SERIES TRIP DEVICE 1 - I I FUSE NUMBER INDICATES QUANTITY O- O— FUSED DISCONNECT NUMBER INDICATES QUANTITY MANUAL, NO -LOAD BREAK TYPE DISCONNECT SWITCH O- MOTORIZED, NO -LOAD BREAK TYPE DISCONNECT SWITCH GROUNDING DISCONNECT SWITCH --I I--- OCS SECTION BREAK —��- OCS INSULATED OVERLAP 1 « 3 E--4i DRAWOUT VT WITH FUSE NUMBER INDICATES QUANTITY SCHEMATIC DIAGRAM SYMBOLS 6-1/c 500kCMIL QUANTITY AND SIZE OF CONDUCTOR (kCMIL SAME AS MCM) /a / h CONDUCTOR CONNECTION -40--04- EXTERNAL CABLE CONNECTION - GROUND CONNECTION /7/ CHASSIS CONNECTION BATTERY DEVICE AUXILIARY SWITCH CONTAT - CLOSED WHEN ACTUATING DEVICE IS 1"1 NON - OPERATED OR DE- ENERGIZED TAT EVIEWED FO _p I MANUAL PUSHBUTTON SWITCH - NORMALLY CLOSED J- _O O.___ MANUAL PUSHBUTTON SWITCH - NORMALLY OPEN —�- TEST BLOCK S03 COMPONENT IDENTIFICATION City Of Tukwila C=am 1 EQUIPMENT WITHIN ENCLOSURE L---J SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINT EDRIVE SURE 106 L4KEOSWEGa OREGON 97034 POWER RECTIFIER OR DIODE TERMINATION (30 MADE UP NEUTRAL) TEFLON INSULATED CONDUCTOR >2KV FLEXIBLE Cu CONDUCTOR (OR) BRAID >120mm AUXILIARY RELAY COIL TRANSDUCER VOLTAGE OR CURRENT DEVICE AUXILIARY SWITCH CONTACT - OPEN WHEN ACTUATING DEVICE IS NON - OPERATED OR DE- ENERGIZED STATE El EQUIPMENT ENCLOSURE OUTLINE4 BUILDING DIVISIOk ISOLATED FROM EARTH /GROUND ais SOUNDTRANSIT CODE COMP NFPA70 -N AUG 2 7 2007 PAT O'HOGAN 3/17/05 DRN BY DATE DRN CIO BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE SCALE: SCHEMATIC DIAGRAM SYMBOLS DATE 3/17/05 DATE III I II -I RES }- or -AAAr RESISTOR - or - VARIABLE RESISTOR LED \ / \ • (Oft': C �- - - - - -� INTERCONNECT WIRE 0 TERMINALBLOCK TERMINAL TWISTED PAIR Q0.1 DPU OUTPUT RECE'JF_) CITY _';•JKWIlA JUMPER ON JUN 2; 8 ?ON TERMINAL BLOCK THERMOCOUPLE E61k1 I 1 CEN IEi Al MICRO SWITCH SELECTOR SWITCH MANUAL SWITCH KEY OPERATED OPTO ISOLATOR DEVICE OPERATION COUNTER INDICATOR, G- GREEN, R -RED, Y- YELLOW, BL -BLUE SHIELDED CABLE INTERPHASE TRANSFORMER (TYPICAL FOR ANSI CIRCUIT No. 31) PLC INPUT PLC OUTPUT DPU INPUT LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION SYMBOLS AND ABBREVIATIONS SYMBOLS CONTRACT DRAWING NO RTA /LR 82 -031 C807 I NO. TPS- S001 -01 I REV. 001 01 REV 3/17/05 DATE ANSI DEVICE TABLE NUMBER DESCRIPTION 5 EQUIPMENT SHUTDOWN DEVICE 26R1 RECTIFIER DIODE OVERTEMPERATURE, ALARM 26R2 RECTIFIER DIODE OVERTEMPERATURE, TRIP 27 UNDERVOLTAGE RELAY 30 ANNUNCIATOR 32 REVERSE CURRENT INSTANTANEOUS RELAY 33 EQUIPMENT DOOR INTERLOCK DEVICE 43 SCADA LOCAL / REMOTE SWITCH 47 PHASE SEQUENCE VOLTAGE RELAY 48 INCOMPLETE SEQUENCE RELAY 49T1 TRANSFORMER WINDING OVERTEMPERATURE, ALARM 49T2 TRANSFORMER WINDING OVERTEMPERATURE, TRIP 51A RECTIFIER OVERLOAD RELAY 50/51 PHASE FAULT TIME OVERCURRENT RELAY WITH INSTANTANEOUS ELEMENT 50/51 N GROUND FAULT TIME OVERCURRENT RELAY WITH INSTANTANEOUS ELEMENT 52 AC CIRCUIT BREAKER 59 1500VDC TO 125VDC POTENTIAL RELAY 64G FRAME FAULT RELAY, FRAME GROUNDED 64L FRAME FAULT RELAY, FRAME LIVE 64V RAIL TO EARTH VOLTAGE DETECTION 72 DC FEEDER BREAKER 76 DC FEEDER DIRECT ACTING TRIP DEVICE 82 DC FEEDER LOAD MEASURING FOR LINE TEST 83 LINE TEST RECLOSING RELAY 85RX TRANSFER TRIP RECEIVE 85TX TRANSFER TRIP TRANSMIT 86 AC LOCKOUT RELAY, HAND RESET 89N NEGATIVE DISCONNECT SWITCH 95X TRANSFORMER TEMPERATURE AUXILIARY RELAY 98 -1 DIODE FUSE MONITOR ALARM 98 -2 DIODE FUSE MONITOR TRIP 150 MAIN DC BREAKER MAX OVERCURRENT 150R DC FEEDER RATE OF RISE RELAY 186 DC LOCKOUT RELAY REVISED PER COMMENTS DESCRIPTION PJO BY ENG CHK APP DIAGRAM, DEVICE ABBREVIATIONS NUMBER DESCRIPTION A AL APS BA BT CTR CS /C CS/T DPU DS E ETM ETS F F/O FMR G Hx H I I/C J K LOR MOC NB OBT OCS OCW OLM OP P PLC PM R RGD S SA S -A SB SCADA SCL S-N & R SSS S -T & C TOC TPSS V VD WN X W AMPERE ALARM, LOC L AND SCADA AUXILIARY POWER STATION BUFFER AMPLIFIER DC CIRCUIT BREAKER TRUCK COUNTER, CONTROL CONTROL SWITCH /CLOSE CONTROL SWITCH/TRIP DIGITAL PROTECTION UNIT DOOR SWITCH DC CIRCUIT BREAKER OPERATING SOLENOID ELECTRONIC TEMPERATURE MONITOR EMERGENCY TRIP SWITCH FUSE, CIRCUIT BREAKER FIBER OPTI0 FEEDER MONITORING RELAY DC TO DC CONVERTER INDICATOR DC BREAKER OR LINE DISCONNECT SWITCH CURRENT INTER CONNECT JACK (CONNECTOR) AUXILIARY RELAY OR KEY INTERLOCK LOCAL - OFF REMOTE MECHANISM OPERATED CELL SWITCH (BREAKER STATUS) NORTH BOUND OPTICAL BUS TERMINAL OVERHEAD CONTACT SYSTEM OVERHEAD CONTACT WIRE OPTICAL LINK MODULE OPERATOR PANEL PLUG (CONNECTOR) PROGRAMABLE LOGIC CONTROLLER PANEL METER RESISTOR RAIL GROUNDING DEVICE SWITCH SURGE ARRESTOR SCADA- ANALOG SOUTH BOUND SUPERVISORY CONTROL AND DATA ACQUISTION SEATTLE CITY LIGHT SCADA- NORMAL & RELEASE STATION SHUTDOWN SWITCH SCADA TRIP & CLOSE TRUCK OPERATED CELL SWITCH (TRUCK POSITION) TRACTION POWER SUBSTATION VOLTAGE ■ VOLTAGE DIVIDER WIRE NUMBER TERMINAL BLOCK OR DC BREAKER DISCONNECT DEVICE 26kV CIRCUIT BREAKER SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINTEDRIVE,, SUITE 106 LAKEOSWEGO, OREGON 97034 SounroTrranisrr DRN CKD BY PAT O'HOGAN DES BY EQUIPMENT ABBREVIATIONS API APT A01 A02 A03 BC CCIC EPT DCC DP1 FO F1 F2 F3 F4 N R1 R2 TPT PAT O'HOGAN 3/17/05 DRN BY DATE DATE 3/17/05 DATE DRAWING NUMBERING METHOD XXX -S 101 -01 T DRAWING SHT. NUMBER DRAWING SERIES SUBSTATION NAME DRAWING SERIES SHEET CONTINUATION METHOD DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE SCALE: AC PANEL AUX POWER TRANSFORMER 26kV SWITCHGEAR, INCOMING /METERING SECTION 26kV SWITCHGEAR, AUXILIARY POWER SECTION 26kV SWITCHGEAR, CIRCUIT BREAKER SECTION BATTERY CHARGER CENTRAL CONTROL INTERFACE CABINET EXTERNAL POWER TRANSFORMER DC CONTACTOR DC PANEL 72 -11 DC MAIN BREAKER 72 -1 FEEDER BREAKER 72 -2 FEEDER BREAKER 72 -3 FEEDER BREAKER 72-4 FEEDER BREAKER NEGATIVE DISCONNECT SWITCH WYE CONNECTED RECTIFIER DELTA CONNECTED RECTIFIER TRACTION POWER TRANSFORMER 2.09 COMPONENT IDENTIFICATION 11 (USED ONLY WITHIN A DRAWING SERIES) DRAWING COLUMN NUMBER DRAWING SHEET NUMBER COMPONENT NUMBER DEVICE ID LINK LIGHT RAIL PROJECT RECEIVED CM( `( riAwI(A JUN 2,8.1007 pat-iwii r CEA EF TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION SYMBOLS AND ABBREVIATIONS ABBREVIATIONS CONTRACT DRAWING REV. NO. RTA /LR 82 -03 / C807 I Pr WING 01 W 7 U- LL TPS OCS O = • • 2 PINE STREET TPSS N00 I N0O -W-406 1200A ANSI C34.2 CIRCUIT NO 31 1500VDC CN F).a`f Pat a ) o °L Z Z■ SA S SA 4. H -613A LAI 3.0MW A 26kV 2x1174V N00 -H -711 T N00 -N -901 6000A -\ 6000A Y TO RAIL 0 H-624 SECTION NUMBER • 26KVFRO PINE STREET SUBSTATION cn I , — v •0 ' Pal =o) 20 ) 8,4=1, V O 0 ' V ■ ` \ Z • z SA, SA, CO O el /L� :I. /L7 O g ' OO4 Z z z 00 3 J • TRANSFER TRIP 4 L • L 5 TPSS C11 C11 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 SA SAS • WESTLAKE UNIVERSITY (1100N) TUNNEL PIONEER SQUARE • IN I - RNATIONAL DISTRICT/ CHINATOWN CEILING MOUNTED FEEDER CABLES (1100S) • INTERNATIONAL DISTRICT /CHINATOWN LiLL 3OMW A 26kV 2x1174V Y C11 -H -711 6000A �- T TO RAIL 1500VDC M V O .t TTt� ° Q �Q1� � = 0) . = 0 ) ` SA 26 KV FROM SCL l O CO s • TRANSFER TRIP 7 COR FOR _ NFP�� CE AUG 2 7 2007 B City O f Tukwila rNG p S ION I C14 -H-604 C14 -H -602 Sul NO 14P C14 -H -605 C14 -H -601 • L TPSS C16 SAS 8 FOREST STREET C16 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 15 tt cv _S) =o) U U/ SAS H -6 N O IOC C6 U V C14 -H -603 RECEIVED CITY T [JKWILA JUN 2,8 2007 PFiiivilf CENT 1 LA p 3.0MW 26kV 2x1174V p Y C16-H-711 6000A „ f SA SA 0 H -624 CO O _ / 5J2 O U • lu ( -) 6000A I TO RAIL . TO WEST YARD TRACKS DWG. S010 -04.4 26 KV FROM SCL I C16 -N -901 M O = c0 .4 9 2316N TO EAST YARD TRACKS DWG. SO10 -04.4 • TRANSFER TRIP 2316S) 1 TPS OCS NB — OCW BEACON HILL SB —OCW TO YARD TPSS Y1 DWG. SO10 -04.3 03 02 01 11/14/05 10/10/05 3/17/05 REV DATE Revised for CNRFP -012 REVISED PER COMMENTS REVISED PER COMMENTS DESCRIPTION PJO PJO PJO BY LB LB LB LB LB LB ENG CHK APP SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTEDRNE, SUITE 106 LANEOSWEGO, OREGON 97034 SounroTtuwsrr PAT O'HOGAN 3/17/05 DRN BY DATE 3/17/05 DEN CKD BY DATE PAT O'HOGAN 3/17/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM SYSTEM SINGLE LINE DIAGRAM CONTRACT DRAWING NO. RTA/LR 82 -03 / C807 I NO. TPS- S010 -01 I REV. 03 1 0 2316N MT BAKER 2524N IMUNDS H -613 OTHELLO ER BEACH L L • McCLELLAN STREET TPSS C23 I 26 KV FROM SCL TPS OCS O 2 (N (N C23 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 C23 -H -71 SA I SA; 6000A (2316S) N 0 (0 N 0 2 0 3.0MW 26kV 2x1174V Y ( -) 1 T C23 -N -901 )-� --\ 6000A TO RAIL r<T I thg) *§)\ I . V 0 • • • ` J SAS SA • O O t9 b N N 0 0 C24 -H -601 3 TRANSFER TRIP C24 -H-602 • C24 -H -603 L EDMUNDS STREET 4 C25 -H -612 1500VDC NC 1 0 0 N 1 1 /--� i O P r Sr oQ P.4 = O O ) = ±8 o ° i o ) ±8) SA SA; 2524S) • SAS SA O O ( 9 N O N U 5 • TRANSFER TRIP (2725N) 6 • 7 _ _ _OTHELLO _ _ TPSS C27 T 26 KV FROM SCL C27 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 SA C27 -H -711 6000A 1500VDC N '- f—< ^ ^ o° ) N ' N ., 0 U/ t 3.0MW 26kV 24V Y (-) C27 -N -901 TO RAIL el 1 nQ e pQT =o o) -O° N � N, `\ U U �.` • 8 TRANSFER TRIP (2927S) RAINIER BEACH TPSS C29 T 26 KV FROM SCL C29 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 9 T p 3.0MW 26kV 2x1174V 0 (-) • 10 C 60 OA i)_40......\ C60 0A01 f TO RAIL I f 1500VDC 2 ° 0 20 =) _ °° T ) 'TRANSFER TRIP U U/ U 0 ° U o \\ 1 cl) SA 0 H -613 eg, SA TPS OCS (3229s) RECEIVED CITY TUKWILA JUN 2.5 ?Off PEHIViif CENTER — o ri 03 02 01 11/14/05 10/10835 3/17/05 REV DATE Revised for CNPFP -012 REVISED PER COMMENTS REVISED PER COMMENTS DESCRIPTION P.10 PJ0 PJ0 BY LB LB LB LB LB LB ENG CHK APP SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINT EDRIVE, SUITE 106 L4KEOSWEGO,, OREGON 97034 �r SOUNDTRANSIT PAT O'HOGAN 3/17/05 DRN BY DATE 3/17/05 ORN CKD BY DATE PAT O'HOGAN 3/17/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM SYSTEM SINGLE LINE DIAGRAM CONTRACT DRAWING REV. NO. RTA/LR 82 -031 C807 I NO. TPS - 5010 -02 03 1 02 01 REV 11114/05 3/17/05 DATE TPSS C32 I I I I C32 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 I I 1500VDC 2 So cn I I L SA SA BOEING ACCESS ROAD C32 -H -711 T C32 -N -901 6000A 6000A ' RAIL A Revised for CNRFP -012 REVISED PER COMMENTS DESCRIPTION Laki 3.0MW 26kV 2x1174V Y D3 I I°�, QT' Pat = o) o l oo ) N V N. • U I U r � . SAS SA 26KVFROMSCL M I N U ( -) O c0 N U J PJO PJO BY ENG TRANSFER TRIP LB LB CHK LB LB APP L _ SOUTH 133rd STREET TPSS C33 26 KV FROM SCL C33 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 1500VDC A C33 -H -711 6000A o ) o Q) 1 " c ol ) a U W SAS SAr H -613 % H -624{ A 3.0MW 26kV 2x1174V Y ( T C33 -N -901 6000A TO RAIL v °<T °<T =O) =o ) 0 01 A SAS SIEMENS'; °° TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SU /IE 106 CAKE OSWEGO, OREGON 97034 TRANSFER TRIP (3633N) L TUKWILA INTERNATIONAL BOULEVARD TPSS C36 T 26 KV FROM SCL I U SOUNDTRANSIT C36 -W-401 1200A ANSI C34.2 CIRCUIT NO 31 1500VDC o� o A. SA A C36 -H -711 6000A (3336s) SCALE: NONE A 3.0MW 26kV 2x1174V Y O PAT O'HOGAN 3/17/05 DRN BY DATE 3/17/05 ()RN CKD BY DATE PAT O'HOGAN 3/17/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE C36 -N -901 j 6000A TO RAIL SA SA H -613 ,•, M H -624 TUKWILLA INTERNATIONAL BOULEVARD TRANSFER TRIP (FUTURE) LINK LIGHT RAIL PROJECT (FUTURE) N9CW (FUTURE) SIBOCW RECEIVED CIS!' TUKWILA JUN 2.1 1007 PEiliiviir CENTER TRACTION ELECTRIFICATION SYSTEM SYSTEM SINGLE LINE DIAGRAM 10 CONTRACT DRAWING REV. NO. RTA/LR 82 -03 / C807 I NO. TPSS010 -03 02 02 01 1 10/10/05 3/17/05 REV DATE • AC PANEL AP1 BATTERY CHARGER AL GND MAT AUXILIARY POWER TRANSFORMER DESCRIPTION 2 25 kVA 26kV / 240 -120 1 0, 60 HZ DC SWGR L NEG RECT DC BRKRS ENCLOSURES � j` 125VDC BATTERY DC PANEL DP1 • (2) -3E (NOTE 4) J ADD 76 TRIP DEVICE TO 72 -11 REVISED PER COMMENTS 125A(- AC PANEL L (FEED BY OTHERS) SIGNAL BUNGALOW (NIC) PJO PJO 3 EXTERNAL TO TPSS PAD MOUNT APT' 55 kVA 1 0, 60 HZ 26kV / 240 -120 y SNOTE4Z DC NEGATIVE BUS, 6000A 100 AMP CONTACTOR AND SWITCH (FUTURE DRAINAGE CABLES) LB LB (C807) 1 J LB LB BY ENG CHK APP • r UTILITY -3 E—' I I )--•—. A ►IIII I METERING vr I (NOTE 2) I L NC 4 26 kV, 3PH, 3W FROM SCL 2 GE- E II 3E 33A C32 -W-401 I SA NEGATIVE RETURN CABLES TO RUNNING RAILS OR IMPEDANCE BONDS L • 100:5 100:5 -J 3 CT J 33T 3.0 MW 0 - - -- 26 kV 2x1148V � RECTIFIER ANSI C34.2 3MW CIRCUIT NO 31 I 33R L 1500VDC 6kA 50mV o (NOTE 3) T 76 5 (METERING CTS AND PTS ARE REVENUE ACCURACY) 4 2 � G 0.5E 6A, 600V BA A L 33N - - 6000A 6000A 89N - K� —( 72 -11�— I C32 -N -901 1 C32 -H -711 TRIP, LOCAL & SCADA ALARM - r I E (NOTE 8) - VD • SCALE SCALE 0 -6000A 0 -2000V O O S -T &C J 300 OSWEGO POINTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 II IL L DPU SCALES A = -4k.. 0. ±4kA. V =0 -2kV 6 TRANSFER TRIP TO /FROM ADJ. TPSSs SIEMENS m m TRANSPORTATION SYSTEMS, INC. • OP 270 ANNUNCIATOR 0.100A 0 -30KV / 86 PLC 18 % (NOTE 7) \ 32 O I SCADA I' J N M 0 TOOCW ( II SA (TYP. ALL FEEDERS) I S -A 7 7 4kA 60mV S -A SOUNDTRANSIT (NOTE 1) DC POSITIVE BUS, 1500VDC, 6000A i (NOTE 5) (4-1 �I CLOSE /RECLOSE /� ml S -T &C 4000A oI I .N ( 72 -1 0 I _ r DPU I C32 -H -701 I 1 - - I I I I 48 �� -J SA N 0 cn x N M 0 S LEGEND SCADA ALARM <> LOCAL ALARM & SCADA S -T &C SCADA TRIP & CLOSE e LOCAL ALARM SCADA ANALOG VIA S7 PLC 1 ( 72 -2 ( -3 C32 -H -702 C32 -H -703 76 76 SAV r1 0 x N U 1 DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE NOTES: PAT O'HOGAN 3/17/05 DRN BY DATE DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE • 9 • 1. PROTECTIVE DEVICES, INSTRUMENTS AND INTERLOCKS FOR FEEDER BREAKERS F2 THRU F4 ARE IDENTICAL TO FEEDER 1. 2. CTs, VTs, SAs & METERING PROVIDED BY SCL AND INSTALLED UNDER THIS CONTRACT. 3. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS MAIN DC BREAKER IS OPEN. 4. KEY INTERLOCK PREVENTS ACCESS TO FUSES UNLESS AP1 MAIN BREAKER IS OPEN. 5. K# INTERLOCK PREVENTS OPENING DISCONNECT SWITCH. UNLESS F# BREAKER IS OPEN. 6. 86 ENERGIZED FOR: -REV CURRENT -DC EQUIPMENT DOOR OPEN - RECTIFIER TRIP FUNCTIONS - XFMR TRIP FUNCTIONS - 59, 64L, 64G 7. THE FOLLOWING ARE FUNCTIONS OF THE PLC: 7a. DEVICE 32 PROGRAM SEQUENCE: - ENERGIZE AC LOCKOUT - 86 -TRIP & LOCKOUT AC BREAKER -OPEN MAIN DC BREAKER 7b. DEVICE 48 PROGRAM SEQUENCE: -TRIP & LOCKOUT DC FEEDERS -OPEN MAIN DC BREAKER 7c. 186 ENERGIZED FOR: -ETS /FIRE -48, 64L, 64G, 64V 7d. TRANSFER TRIP -TRIP & LOCKOUT FOR ETS, 48, 64G, 64L & 64V -TRIP & RECLOSE FOR di /dt -COMM. FAILURE IF HAND HAKE FAILS NOTIFY SCADA 8. ELECTRICAL INTERLOCK AND CLOSES WHEN 89N C DATE 3/17/05 DATE (� 2-4 C32 -H- 76 LINK LIGHT RAIL PROJECT 10 ONTACTOR WHEN 89N OPENS RECEIVED cm 11JKILn JUN 2,8.77 �" tit ll 0 CENTER TRACTION ELECTRIFICATION SYSTEM BOEING ACCESS ROAD TPSS C32 SINGLE LINE DIAGRAM CONTRACT D RAWING - REV. NO. RTA / LR 82 -03 / C6071 NO. C32- S020 -01 02 10/10/05 3/17/05 DATE DC SWGR ENCLOSURES AC PANEL AP1 BATTERY CHARGER AL NEG RECT DC BRKRS GND MAT GND PAD ADD 76 TRIP DEVICE TO 72 -11 REVISED PER COMMENTS DESCRIPTION AUXILIARY POWER TRANSFORMER 25 kVA 26kV / 240 -120 10, 60 HZ (NOTE 4)J 125VDC BATTERY ( DC PANEL DP1 INTERNAL EXTERNAL (2) - 3E _ ___ EXTERNAL TO TPSS PAD MOUNT APT 500 kVA 30, 60 HZ 26kV/480 L TO O &M BLDG. (C807) SIGNAL BUNGALOW (NIC) PJO PJO BY ENG DC NEGATIVE BUS, 6000A TO REMOTE TRACK RESISTANCE TEST _J STATION (NIC) 100 AMP CONTACTOR AND SWITCH (FUTURE DRAINAGE CABLES) LB LB CHK 26 kV, 3PH, 3W FROM SCL \ 1 UTILITY SA . II l I METERING I (NOTE 2) CT I MS O/C 1 — _ (TYP ) 3 LB LB APP m J (TYP) NC 1200A NEGATIVE RETURN CABLES TO RUNNING RAILS OR IMPEDANCE BONDS 4 • 100:5 3 x (METERING CTS AND PTS ARE REVENUE ACCURACY) 1 50� _ 2 1 an �4 i «' 05E J 100:5 33A C36 -W-401 100:5 L A S -T &C 1200A 33T 3.0 MW - - -- 26 kV 2x1148V /\ I / RECTIFIERF ANSI C34.2 3MW CIRCUIT NO 31 33R TA 1500VDC 50mV A 33N — 6000A (NOTE 3) T 6000A 89N \ - fB — —{ 72 -11- -- 1 C36 -N -901 J TRIP, LOCAL & SCADA ALARM 76 - r (NOTE 8) SA BA C36 -H -711 2 >—I1 I 6A, 600V TRANSFER TRIP TO /FROM ADJ. TPSSs SCALE SCALE 0 -6000A 0 -2000V 00 C VD S -T &C J 3000SWEGOPOINTEDRTVE, SUITE 106 LAKE OSWEGO, OREGON 97034 DPU- 2005 ) I 7330 DPU SCALES A = -4k.. 0. ±4kAf V =0 -2kV SIEMENS TRANSPORTATION SYSTEMS, INC. OP 270 ANNUNCIATOR ( 186 \ PLC ( 32 (NOTE 7) k_ of J SCADA 1 0 -100A 0 -30KV DC POSITIVE BUS, 1500VDC, 6000A TOOCW ( iI SA (TYP. ALL FEEDERS) S -A 4kA 60mV LEGEND SCADA ALARM 0 . LOCAL ALARM & SCADA S -T &C SCADA TRIP & CLOSE e LOCAL ALARM S -A r i 1(NOTE 5) v11 CLOSE /RECLOSE _ A of 1 S -T &C _ _ � 1( < 72 -1 r C36 -H -701 ._ _ _ a I 1 DPU I 76 I I � 7_J II 1L L_ _ _ � SOUNDTRANSIT SCADA ANALOG VIA S7 PLC (NOTE 1) A TC36 -H -702 C36 -H -703' C36 -H -7' ( '2 -2 r — -( 72 -3 r — 472-4 :11 76 1 1 I I\I �Av I I ., I I •III.SA 1 M DRN BY 1 PAT O'HOGAN 3/17/05 DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE NOTES: DES CKD BY DATE LANCE BANASZEK 3/17/05 APPROVED BY DATE 1. PROTECTIVE DEVICES, INSTRUMENTS AND INTERLOCKS FOR FEEDER BREAKERS F2 THRU F4 ARE IDENTICAL TO FEEDER 1. 2. CTs, VTs, SAs & METERING PROVIDED BY SCL AND INSTALLED UNDER THIS CONTRACT. 3. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS MAIN DC BREAKER IS OPEN. 4. KEY INTERLOCK PREVENTS ACCESS TO FUSES UNLESS API MAIN BREAKER IS OPEN. 5. K# INTERLOCK PREVENTS OPENING DISCONNECT SWITCH. UNLESS F# BREAKER IS OPEN. 6. 86 ENERGIZED FOR: -REV CURRENT -DC EQUIPMENT DOOR OPEN - RECTIFIER TRIP FUNCTIONS - XFMR TRIP FUNCTIONS - 59. 64L, 64G 7. THE FOLLOWING ARE FUNCTIONS OF THE PLC: 7a. DEVICE 32 PROGRAM SEQUENCE: - ENERGIZE AC LOCKOUT - 86 -TRIP & LOCKOUT AC BREAKER -OPEN MAIN DC BREAKER 7b. DEVICE 48 PROGRAM SEQUENCE: -TRIP & LOCKOUT DC FEEDERS -OPEN MAIN DC BREAKER 7c. 186 ENERGIZED FOR: -ETS /FIRE -48, 64L, 64G, 64V 7d. TRANSFER TRIP -TRIP & LOCKOUT FOR ETS, 48, 64G, 64L & 64V -TRIP & RECLOSE FOR di /dt -COMM. FAILURE IF HAND SHAKE FAILS NOTIFY SCADA 8. ELECTRICAL INTERLOCK OP NS CONTACTOR WHEN 89N OPENS AND CLOSES WHEN 89N CL DATE DATE 3/17/05 DATE 76 LINK LIGHT RAIL PROJECT 10 RECEIVED TIJ KWILA JUN 2,8 7007 ��1 6 tiY O .;EI II R TRACTION ELECTRIFICATION SYSTEM TUKWILLA INTERNATIONAL BLVD TPSS C36 SINGLE LINE DIAGRAM CONTRACT I DRAWING I REV. NO. RTA I LR 82 -03 / C8071 NO. C36- S020 -01 02 REV O SIMATIC OP 270 HMI - SCREEN O ABB DPU 2000R AC PROTECTION RELAY 27, 46, 49, 50/51, 50/51N O SITRAS DPU DC DIGITAL PROTECTION UNIT 48, 82, 83, 85, 150R, 151 DATE 0 a I I 000 5.441S OPP 88888888 +4 0 � 0 (I 19318611 00 O 00 SWARTZ FRAME FAULT RELAY 0 0 0 6 O 0 O o 0 O O 0 0 0 © S7 -300 PLC CPU O 0 O 0 0 N 0 DESCRIPTION POWER METER ION 7330 0 S7 BUS CONNECTOR FOR PROFIBUS X3: INPUT /OUTPUT TERMINAL BLOCK OPTICAL LINK MODULE (OLM) COPPER TO FIBER CONVERTER ANALOG SIGNALS 1 (COMM LINK SUPPLIED BY OTHERS) CCIC no PROTOCOL CONVERTER BY ENG CHK APP AC SWITCHGEAR AC CIRCUIT BREAKER A03 O 26kVAC ":„ 52 RECTIFIER TRANSFORMER F/O T NEGATIVE DISC. SWITCH _F TRIP & ALARM ic El 89N TO RAIL SIGNALS RECTIFIER R1 & R2 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOIh7EDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 MAIN BREAKER 72 -0 TRIP &. ALARM SIGNALS OBT XTRIP TO /FROM ADJ TPSs OU AC & DC STATION SERVICE I -_ FIRE & EMERGENCY TRIP 1 BLDG DATA DC SWITCHGEAR FO FEEDER 72 -1 Fl FEEDER 72 -2 F2 FEEDER 72 -3 F3 FEEDER 72-4 F4 CPU 1.5kVDC X3 SOUND7kANSR VPD & F/O TX RAIL OCS PAT O'HOGAN DRN BY URN CKD BY PAT O'HOGAN DES BY SCALE: r agc0;1 4 10/26/2004 DATE DATE 10/26/2004 DATE DES CKD BY DATE LANCE BANASZEK 10/26/2004 APPROVED BY DATE OCS RAIL OCS I F/O RX LINK LIGHT RAIL PROJECT F/O VPD & F/O TX RAIL OCS +� RECEIVED CI S i UI \`✓4ILA JUN 2.8.7n07 Pail dii CENTER Erb TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION TPSS PROTECTION DEVICES CONTRACT DRAWING NO RTA /LR 82 -03 / C807 NO. TPS- S021 -01 REV 00 01 REV 9/6/05 DATE NEG CUB. GROUND BUS Revised per comments DC SWGR ENCLOSURES REC. FRAME FAULT PROTECTION DESCRIPTION GROUND MAT S100 I (FO) L+ D.C. SWGR SCALE 0 -2kV £ NOIMI1 AAA M041 PLC T TRACTION POWER XFMR FROM AC BREAKER SO40 PJO BY r ENG SCALE 0...6KA E p 32 o — LB CHK LB APP ,r30 RECTIFIER 3.0MW .r30 1500Vdc L2 L1 BA \ —o VD S060 6000A • NEGATIVE RETURN CABLES TO RUNNING RAILS OR IMPEDENCE BONDS NEG. DISC. S050 SW. (N) (NOTE 1) S101 DPU V 150R ( 82 ) ( ( 85 ) A= - 4k..0.. +4k V= 0..2k IAA 100 AMP CONTACTOR AND SWITCH BA VD NEGATIVE RETURN BUS 6000 4000A TO OCW j 1500VDC, 6000A POSITIVE BUS STD S102 (F2) DPU CEED ( 85 ) A= -4k..0.. 4k V= 0..2k CABLE VAULT SIEMENS TRANSPORTATION SYSTEMS, INC. i 300 OSWEGO PO/NTEDR /VE SUITE 106 LAKE OSWEGO, OREGON 97034 BA VD • TO OCW S103 (F3) 4000A A= -4k..0.. 4k V= 0..2k SounmTkaysrr DPU CMD O1� (® VD T BA BA • TO OCW 4000A CEO PAT 0•HOGAN 10/26/2004 DRN BY DATE 10/26/2004 DRN CKD BY DATE PAT O•HOGAN 10/26/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 10/26/2004 APPROVED BY DATE SCALE: NONE S 104 (F4) DPU il}3�77 A V (® CAD ( 85 ) A= -4k..0.. 4k V= 0..2k LINK LIGHT RAIL PROJECT L+ NOTES: KEY INTERLOCK PREVENTS OPENING OF 9N DEVICE UNLESS DC MAIN BREAKER IS OPEN. RECEIVED CM' = ItIi< 1ILA JUN 2 8- ?007 fliVi if GE` N I ER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR ONE LINE DIAGRAM CONTRACT DRAWING NO. RTA/LR 82 -03 / C607 NO. TPS- S022 -01 REV. 01 $ (BY UTILITY) • T. . 4.3 VERSA SWITCH 200A, 2710 FUSES PT'S (BY ABB) (BY UTILITY) (B H1 X1 1.1 • 1 1 • I.I 4 11 SURGE ARRESTER T To' uTUTY) • = • T POWER COMPANY MEI EKING CTs 100: C50 • v v v I 27ADV25 1200A 52 -38 MSOG MAIN BUS 27kV, 1200A, 25KA MECHANICAL INTERLOCK 26000- 120/ PRIMARY TAPS 2 +1-2.5% 1 COCA 240V 3 PE,25.13KV CPN 4 CP2 TO AC PANEL 100 5A C50 • • DPU2000R o 0A 54ti53 0 08 52 V51 0C v v 27ADV25 1200A1 52 -38 J 4- 7330 OA 08 OC UTlUTY INCOMING MAIN BUS 27kV, 1200k 25KA OA OB OC TO 500KVA EMERGENCY POWER TRANSFORMER G H2 X1 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SU ITE 106 LAKEOSWEGO, OREGON 97034 a CTs 100:5A 4 0 All 111 1 112 ^I2 121 x /122 13 y --=- 2 5 6 0 1 131 132 SOUNDTRANSIT • BUS PT'$ 26400V -120V RATIO 220:1 0 SE, 3810 1 H1 X1 15 6A, 600V I1 16 17 MAIN BUS 27kV, 1200A, 25KA PAT O'HOGAN DRN BY RON ALBERT DRN CKD BY PAT O'HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE 8 D PU2000R 3A, 600V 31 2 .1 32 33 7330 - 3 - 4 V1 V2 V3 VREF d 7/12/05 DATE 7/12/05 DATE 7/12 /05 DATE DATE 7/12/05 DATE 2 4 3A, 600V 2 1 4 MAIN BUS 27kV 1200k 25KA 10 MAIN BUS 27kV, 1200k 25KA 0A 0B TO TRANSFORMER RECTIFIER 0C CONTRACT NO. RTA/LR 82 -03 / C807 RECEIVED G6 = TUKWILA JUN 2, ?fl 7 l :al►vli) GEN i Ea LINK LIGHT RAIL PROJECT TRACTION ELECTRIFJCATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR ELEMENTARY FOR TPSS C16 & C36 DRAWING NO. SO40-02 EV. 00 REV DATE ( +) • 15A, 300VDC TIME DELAY I54 300VDC 1 (1 1 TINE DEIAY 16_ 43 1 R CS T RB /3 CERB /5` X3/45 0X3/41 REMOTE 186 I TRIP TRIP X3/46 X3 /5cj ERB /4 ERB /6 303 A24 ( +) ( +) o 4 5 6 7 8 9 10 12 1 29 27 25 23 21 19 t 7 SELF -CHECK TRIP —30 ® ® ® ® POWER OUT1 28 UT2T26 UT UT4T22 UT5T200UT6T18 _ 11 ( 3 ) 2 GN RS-232 (-) D O O 17 2 m 0 a DESCRIPTION A16 u 3 52b 4 (3 Q A17 — 3 1 [J H- ( ) T IME o 3 15A, 300VDC TIME DELAY • 12 43 12 43 1 11 L 13T R 16 17 1 13 86 RP1 ■ RP4 Al A4 CHARGE CLOSE 52 BREAKER CHARGE 410 CLOSE SEE DRAWING 19901F10 FOR BREAKER INTERNAL WIRING A3 A A5� ❑ RP3 ❑ RP5 ERB /1 X3/47 C'REMOTE I CLOSE X3/48 ERB /2 FNo.. r.HK A8 u 15 °_ 52a 16 A9 rn 0 19 PP S100-07 FO 11 18 RP6 C� RP7 • A6 TRIP 52 BREAKER TRIP SEE DRAWING 19901F10 FOR BREAKER INTERNAL WIRING A7 A • SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINT EDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 • SOUNDTRANSIT PAT O'HOGAN ORN BY RON ALBERT DRN CKD BY PAT O'HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE 7/12/05 DATE 7/12/05 DATE 7/12/05 DATE DATE 7/12/05 DATE CONTRACT NO. RTA/LR 82 -03 / C807 PML -7330 LINK LIGHT RAIL PROJECT DRAWING NO. SO40-04 10 ( + ) ( -) G SC S1 S2 S3 S4 Q Q O O O O O O O O O O 0 0 0 0 0 W W W W 1- 0 0 O 0 Z Z Z Z Z Q 0 Q 0 Q d a O_ d D_ N N N V1 V1 RECEIVED cry T #1KWILA JUN 2,3 ?(107 (� lle'Yli) G N 1 'a TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR CONTROL SCHEMATIC REV. 00 N330 CONTACTS HANDLE END I wool I 310f'01 SPRING RETURN = z ° 12 0—IH 16���� -H - I Ho 17 - I HO X 11 0_0 I-0 X X X --1 1 X 2 22°-11- 26� �� '-( 1_021 i--o 23 X 27 -� X X X X N330 CONTACTS POSITIONS HANDLE END = z ° v, v SPRING RETURN 11 0_0 I-0 X --1 1 16 0-- H I -0t7 X RFV 125VDC CONTROL POWER( o EXTERNAL j > L_ OATF 120VAC CONTROL POWER EXTERNAL A8 A9 P PLUG 1 15 51 I INTERNAL ° BREAKER 52a WIRING 16� 52 ❑ ❑c 0 NU PH ( +) LA2 40A, 250V o— 1 2 (—) 55 52a 56 f)FCf:RIPTIf1N 1 3 4 A1O Al2 A14 A16 150W, 120V (2) PER CUB. (TOTAL 300W @120V PER CUB.) 2 ( DC BUS ( ( DC BUS DC BUS I 1 15A, 120V 2 23 2 125VDC A11 \ A13 A15" A17 \ A19 A21 A23" A24" L n Q) ❑c Oc 0E 0 ❑ � ❑� ❑2e f1 15A, 120V 2 ji 23 2 I ; 2 1 1 2 i 1 CUB. 1 CUB. 2 CUB. 3 HEATER CIRCUIT A2 \/ 102 52b = _ 52b 303 READY I I 15A, 120V 2 23 52 BREAKER AUXILIARY CONTACTS - All contacts are shown with the breaker in the OPEN POSITION & READY - READY Contact is CLOSED when the breaker is ready for operation. - NOT READY Contact is CLOSED when the breaker is not ready for operation. 5 8 ▪ LO ❑E ❑E 15A, 120V LIGHTS 16 r act SWITCH UGHT FLUORESCENT INTERIOR LIGHTS (LOCATED INSIDE INSTRUMENT COMP.) 27DC -C B1 B3 B5 B7 89 P UG 2 E!) INTERNAL n. o (BREAKER f- o WIRING N o B2 4` B4 B6" B8 815 851 855 =_ 52a =_ 52a 816 8 ? 856 CUB. 1 CUB. 2 B1 ° d ° d ° d N N U) N M ❑ ❑� ti ❑� 859 8631 813 853 857 52a 52a z g 52a 52b 52b 860Y 864T 8141' 854Y 858 B1O'I' 812" B14"' 816!\ 818 B20T 822 N '4 cc ce ❑E ❑o_' B1 5 8 81 16 T 817✓ E31 300 OSWEGO POINTEORNE, SUITE 106 LAKE OSWEGO, OREGON 97034 55 DEV. 43LR B21 cc ce cc 0 cc SIEMENS TRANSPORTATION SYSTEMS, INC. • POSITIONS SELECTOR SWITCH ELECTROSWITCH SERIES 24 CAT. NO. 242028 DEV. CS CONTROL SWITCH ELECTROSWITCH SERIES 24 CAT. NO. 2438D B231 704 52b 705 B24> 1 CONTACTS NOT I OPERABLE IN READY CONNECTED AND I TEST POSITIONS N ❑ E CLOSE TRIP SCADA SOUNDTRANSIT 86 1 1cj 151 141 • I- U Q. CC 13 18 24L+ 14 R< X3 I (1) 36 LJ/2 PAT O'HOGAN DRN BY RON ALBERT ORN CKD BY PAT O'HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY SCALE: NONE W070 -04.04 25 86 26 7/12/05 DATE 7/12/05 DATE 7/12 /05 DATE DATE 7/12/05 DATE 52 a • 53 27DC 22 CPU 28 47 LEGEND: 23 26 24 43R 21 22 25 241 31 RP1O A10 A18 51 27 52a = 52b X 52 Al v A19 RP11 15 1 16 7 17 18 7 19 - 20 L I I I ) 37 ' Cb 39 (1) 40 (1 41 11 42 I AUXILIARY SWITCH CONTACT, CLOSED ONLY WHEN BREAKER IS CLOSED AND IN THE CONNECTED OR TEST POSITION. AUXILIARY SWITCH CONTACT, CLOSED ONLY WHEN 2 BREAKER IS OPEN AND IN THE CONNECTED OR b TEST POSITION. 52H POSITION SWITCH CONTACT, CLOSED ONLY WHEN a BREAKER IS IN THE CONNECTED POSITION. 5,2{I POSITION SWITCH CONTACT, CLOSED ONLY WHEN b BREAKER IS IN THE TEST OR DISCONNECTED POSITION. v DISCONNECTING CONTACT, CLOSED ONLY WHEN v BREAKER IS IN THE CONNECTED OR TEST POSITION. LINK LIGHT RAIL PROJECT CONTRACT DRAWING NO. RTA/LR 82:03 / C807 NO. 5040 -05 — F9J S100 -07 10 R =11 32 i - v3 1 �'L . 1 NILA 161 233 28 27[ 261 33 38TJUN3 8 7097 P &iivi6I GEN° TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR DEVICES I REV. 00 SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) SPARE (NOT WIRED OUT) LOSS OF DC VOLTAGE AIARM LOSS OF DC VOLTAGE ALARM 86 TRIP IND. TO DPU CLOSE CIRCUIT 1 4.07 • • (100) 3 111 121 4 3.05 SON 12 122 2 FRAME BONDING BUS Cu 1 -1/2" X 3/8" (103) 1 03.06 • SOR 50KC1 DC GROUND BUS 3 1- � 3.06 SOF • (101) 4 1/4" GLASTIC R1 • R2 - 5 (102) I FO • Fl 6 INSULATED MATERIAL • 7 F2 I F3 1 F4 I 7 I I I (TPSS C16 ONLY) 1 1 1 • � � � W SSM! !"! 4 SS T SI•rw-wvw w "SS•wv-•"*•viv- rrr •vrw rvIM•vW v-w :SSrrrr! vw r� �•� � w v�•v�•� rrrr� � vr� � 4/•- p • N pq oMP q 7p , NEC CE AUG 2 7 1 001 'LD of Tu� ,yila rNG D SI • N • OTE: 8 1 • 4 3 fXH 1 .2 1 6 9 I ISOLATION TRANSFORMER I 120/120VAC. 1200W 1 , MOUNTED IN J BOX BY API xP 4 (1) y _ F11. 10 AMP. 120V AC T -STATS SET TO 55F 1 1 MEE 2 XH 1.2 1 2 XH 1,2 TO AC PNL. 2 NEC CUBICLE 72 -0 CUBICLE 72-1 CUBICLE I H _ 2 I I _ 72 -2 CUBICLE XH 1,2 2 I _ 72 -3 CUBICLE 72 -4 CUBICLE 1. ALL WIRES ON THIS SHEET #14 AWG, 2kV UNLESS OTHERWISE NOTED. (WN 100 -109) 2. HEATERS RATED AT 240V, 400W. HEATERS OPERATED AT 120V, 150W. 3. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 4. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 5. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT • 1 I " 1 2 1 • 2 L DC SWITCHGEAR HEATER CIRCUIT NOTES 2 THRU 5 1U �'1 - 7•� CI ! -' • TEJKWILA . JUN 2 $ MN PahivilicaNTER 01 11/17/05 REV DATE Revised per comments DESCRIPTION PJO LB LB BY ENG CHK APP SIEMENS m m TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTEDRIVE,, SUITE 106 SOUNDTIRANSIIT PAT O'HOGAN 12/03/2004 DRN BY DRN CKD BY PAT O'HOGAN DES BY DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE FRAME FAULT SCHEMATIC NONTRACR I LR 82 -03 / C807 NO. DRAWING REV. 01 LAKEOSWEGO, ORE 1 -i` � �3 ` � 7 2 4 f11 12 21 22 1 1 r . 12 3 � 4 111 12 21 22 1 4.07 • • (100) 3 111 121 4 3.05 SON 12 122 2 FRAME BONDING BUS Cu 1 -1/2" X 3/8" (103) 1 03.06 • SOR 50KC1 DC GROUND BUS 3 1- � 3.06 SOF • (101) 4 1/4" GLASTIC R1 • R2 - 5 (102) I FO • Fl 6 INSULATED MATERIAL • 7 F2 I F3 1 F4 I 7 I I I (TPSS C16 ONLY) 1 1 1 • � � � W SSM! !"! 4 SS T SI•rw-wvw w "SS•wv-•"*•viv- rrr •vrw rvIM•vW v-w :SSrrrr! vw r� �•� � w v�•v�•� rrrr� � vr� � 4/•- p • N pq oMP q 7p , NEC CE AUG 2 7 1 001 'LD of Tu� ,yila rNG D SI • N • OTE: 8 1 • 4 3 fXH 1 .2 1 6 9 I ISOLATION TRANSFORMER I 120/120VAC. 1200W 1 , MOUNTED IN J BOX BY API xP 4 (1) y _ F11. 10 AMP. 120V AC T -STATS SET TO 55F 1 1 MEE 2 XH 1.2 1 2 XH 1,2 TO AC PNL. 2 NEC CUBICLE 72 -0 CUBICLE 72-1 CUBICLE I H _ 2 I I _ 72 -2 CUBICLE XH 1,2 2 I _ 72 -3 CUBICLE 72 -4 CUBICLE 1. ALL WIRES ON THIS SHEET #14 AWG, 2kV UNLESS OTHERWISE NOTED. (WN 100 -109) 2. HEATERS RATED AT 240V, 400W. HEATERS OPERATED AT 120V, 150W. 3. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 4. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 5. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT • 1 I " 1 2 1 • 2 L DC SWITCHGEAR HEATER CIRCUIT NOTES 2 THRU 5 1U �'1 - 7•� CI ! -' • TEJKWILA . JUN 2 $ MN PahivilicaNTER 01 11/17/05 REV DATE Revised per comments DESCRIPTION PJO LB LB BY ENG CHK APP SIEMENS m m TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTEDRIVE,, SUITE 106 SOUNDTIRANSIIT PAT O'HOGAN 12/03/2004 DRN BY DRN CKD BY PAT O'HOGAN DES BY DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE FRAME FAULT SCHEMATIC NONTRACR I LR 82 -03 / C807 NO. DRAWING REV. 01 LAKEOSWEGO, ORE •I����t• RI -9 EXTRA HEAVY TRACTION SERVICE 12 -PULSE RECTIFIER 3000K. 1500VDC ` ' Q e"'•i?; a Technolog W •• •• Corporation ♦ �� ♦ WYTHEVILLE. VA. USA 213e2 INTERPHASE TRANSFORMER SN 120270L02BC01 JOB 3511 DATE 1/05 CU COND KVA 270 PHASE 1 HERTZ 360 CLASS H 220 °C INS TYPE AA RISE 80 °C (0100% LOAD INPUT 135 VAC 1000 AMPS DC BIL 20 (N1 -N2) OUTPUT 2000 AMPS DC BIL 20 (NO) RAIL OVER VOLTAGE TIME DELAY BEFORE TRIP 40 NO TRIP 50 2 SEC 80 200 mS 120 10 mS ( 89N ) • i 1 (NOTE 1 L1- N1 L- DC NEGATIVE BUS 6000A CABLE VAULT V SA 1 � 1 I 1 01 11/17/05 Revised per comments REV DATE DESCRIPTION 2 FROM RECTIFIER INTERPHASE TRANSFORMER S060 -01 NO • 3.07 3.07 L2- N2 \ NEGATIVE RETURNS TO RAIL If _ S 100 -01 fl I FO LU '1XV ( I J DC NEGATIVE BUS REFERENCE POTENTIAL PJO BY 3 3.02 • ACTIVATED WHEN SWITCH FULLY CLOSED ACTIVATED WHEN SWITCH FULLY OPENED LB LB ENG CHK APP_ (3.04) t i 4 300A E 100 AMP CONTACTOR AND SWITCH (FUTURE DRAINAGE CABLES) • (NOTE 5) 300A (TYP) 60A (TYP) 5 CSI (NOTE 4) • o 0 0 o TO REMOTE TRACK RESISTANCE TEST STATION (NIC)', 6 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTEDRIVE, SUITE 106 LAKE OSWEGO OREGON 97034 • CIRCUITRY IN SHADED AREA TO BE DETERMINED RAIL OVERVOLTAGE SOUNDTRANSIT • PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY 5 12/03/2004 DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE • 9 NOTES: 1. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS DC MAIN BREAKER IS OPEN. 2. ALL WIRES ON THIS SHEET #14 AWG, 2kV UNLESS OTHERWISE NOTED. (WN 110 -119) 3. RAIL OVERVOLTAGE (64V) SET POINTS ARE ADJUSTABLE VIA THE PLC. INITIAL SET POINTS SHOWN IN TABLE. RECEIVED = T1 MILA JUN 28 7n17 • LINK LIGHT RAIL PROJECT 10 U EtlM 6 GEN ( Eel 4. USED AT TPSS C11, C27 & C36 ONLY 5. ELECTRICAL INTERLOCK OPENS CONTACTOR WHEN 89N OPENS AND CLOSES WHEN 89N CLOSES. TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE GENERAL SCHEMATICS CONTRACT DRAWING NO. RTA / LR 82 -03 I C8071 NO. TIPS S050 - 02 I REV. 01 01 1 11/17/05 REV DATE • 4.04 — 2 (24L +) ( 89N ) (2.03) H1 (24L -) N NC XN 7 • 2 1 �l 1 c NO 8 SWITCH . SWITCH OPEN CLOSED Revised per comments DESCRIPTION PJO BY 3 100 A CONTACTOR ENG LB CHK LB APP • —I I— 2.04 DRAINAGE CONTACTOR 4 • 5 SOF x11 (1.03) 12 cv SOR - (1.02) Z- N SON (1.02) 11 2 12 CV DlOB 4 I0.1 FRAME FAULT ISOLATED I/C W070 -05.03 10 S100-05 ---- ---- (----- G-- - - -G -- —)- -- (FF1) (64L) (64G) (89B) (89A) (LOP) FO 0 48 0 49 0 50 0 51 0 52 0 53 0 I0.2 DC SWGR FRAME 1NERGIZED 6 11 0 I0.3 DC SWGR FRAME GROUNDED SIEMENS' TRANSPORTATION SYSTEMS, INC. 3000SWEGOPO /N1EDR /VE SU/TE 105 LAKEOSWEGO, (7REGON 97034 (24L +) N N • (2.02) �- 1 ( l 64 I I 1 3 1 (1.0 8 I I __(_89B __( 1 9 � NO NC NO NJ) 12 0 I0.4 CLOSED N 7 07 I0.5 OPEN 13 PLC SOUNDTRANSIT F12 (4.04) • 11 12 14 08 I0.6 LOSS OF CTRL PWR SCALE: NONE 8 TPT I 1 S09 PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/03/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE (33T) TB1 2 — rM041 02 XN 17 a, N 13 (33) 1 14 • 16 1 I S060 -02 (33N)6 X i 7 s R1 9 • 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 120 -139) 10 RECEIVED CITY V TUKWILA JUN 23 7007 LINK LIGHT RAIO'F4 JE'CT J{..I.g tZri TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE GENERAL SCHEMATICS CONTRACT DRAWING NO. RTA / LR 82 - 031 C807 NO. TPS- S050 -03 REV. 01 1 • 2 125 VDC FROM DC DIST PNL DP1 3 APP • 4 • 5 • 6 FO CUBICLE POWER SUPPLY SIEMENS. TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINTEDRIVE,, SUITE 106 LAKEOSWEGO, OREGON 97034 • 7 1.01 a� SouiwikAwsrr • SCALE: NONE 8 PAT O'HOGAN 7/14/2005 DATE DRN BY DRN CKD BY PAT O'HOGAN DES BY DATE 7/14!2005 DATE DES CKD BY DATE LANCE BANASZEK 7/14/2005 APPROVED BY DATE • 9 10 RECTIVED CITY - 1 - 1.11\ I LA JUN 2,8 7007 ��Ebtile <I� ► C� :� TEi LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE 24VDC CONTROL POWER CONTRACT DRAWING REV. NO. RTA / LR 82 -03 / C8071 NO. TPS- S050 -04 00 REV DATE DESCRIPTION BY_ ENG CHK 0 REV 3323kVA AA/FFA' 3 0, 60HZ, 12 PULSE 26.4kV - 1178VAC Y- 1178VAC A HV TAPS: 2 @ 11/4%; 2 @ 2 1/2% 11/17/05 DATE RECTIFIER TRANSFORMER Revised per comments DESCRIPTION r T R5 —�— —fig R6 ■ _ 1 4 • J L a = #14AWG, 5KV, FEP, Insulated b = Filter mounting plate attached to heat sink. c = Cu bus R111.1...R113.2 100 OHMS, 500 WATT C111...C113 0.47uF, 2100V R130.1...R130.2 6 OHMS, 200 WATT C130 16uF, 3200V R170.1...R171.2 3.9 kOHMS, 500 WATT 1 I I I I L11 L A L11 cc ♦ C113— L21 C111•-•= a C112 L31 F112 S112 F113 S113 L21 b V111...V163 Rectifier Diode SW4OCXC1170- P;3600A;4000V F111...F163 High Speed Fuse 170M6723; 1000A; 1400V 3111...S163 Fuse Micro Switch, 2 -NO /NC contacts 170 H0099 Contact arrangement shown on SHT 2 b C112 L31 T NO LgP BY ENG CHK LB ri C113 M a F111= F112 F113 S111 S112 I S113 V111 V112 V113 N V141 N CO c F141 S141- V141 C F141 S141 V142 c F142 S142 V142 C: F142 S 142- V143 c F143 S143- V143 C F143 S143 F131 F132 S131 I S132 c4 V131 t V132 cam, c F161 S161 S162 RECTIFIER #2 - A F131 F132 S131 I S132 V131 V132 V161 *; V162 F161 S161 RECTIFIER #1 -y F162 S162 F133 F151 F152 — F153 - S133 ! S151 1 S152 ! S153 --\- c c c C—* V133 V151 V152 V153 I F133 S133 c V133 V163 F163 S163- SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUITE 106 LAKECSWEGO, OREGON 97034 C V121 C F121 S121 F151 - F152 F153 S151 ! S152 I S153 c V151 V121 c F121 S121 V122 C F122 S122 C V152 V122 SOUNDThANSIT C F122 S122 V123 c� F123 = S 123- c V153 V123 C F123 S123 1500VDC DRN CKD BY PAT O'HOGAN DES BY 1500VDC 0 C7 o co a a PAT O'HOGAN 12/03/2004 DRN BY DATE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE 0 CO 0130 — AL HEAT SINK CU 3/8" X 5" -r 0 C.) C130— • r- 0 n N 0 t` a —+ a N C- f j L2 rEIVED CITY ..s unvILA AL HEAT SINK CU 3/8" X 5" JUN 2 3• ?I197 PEr; Ivit I CENTER EdR LINK LIGHT RAIL PROJECT F TO MAIN DC BREAKER S 100 -01 O ED F OR 70 N N C,E 7 200? :►kwll N TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R1 & R2 CUBICLES . GENERAL SCHEMATICS CONTRACT DRAWING NO RTA I LR 82 -03 / 0807 NO TPS- S060 -01 REV. 01 02 01 REV 12/05/05 9/10/05 DATE S111 114 11 5112 1 14 5113 14 T S131 114 S132 1 11 'a S133 14 11 S151 1'a 1 5152 14 111 S153 T 14 " Control Winnq #16 AWG, 5kV, FEP Insulation Issued For Construction DESCRIPTION 24 2 1 _ 1 S111 24 21 • ° S131 24 21 � Si32 24 21 S133 --I I 24 S151 • 24 2 1 S152 24 21 S153 RECTIFIER #2 I/C W070 -04.09 I/C W070 -05.03 RJA RJA BY 512, 114 11 5122 14 11 S123 'a S161 1'a 11 S162 14 111 S163 'a S141 1'a 1 S142 14 11 5143 14 T„ RJA RJA ENG 24 S121 • S122 24 21 S123 24 S161 • 24 S162 24 21 S1 63 24 21 S143 PJO PJO CHK 24 11 21 S141 21 S142 (17) LB LB APP 55 (98-1) ALARM (18) © 4 ) --1- I IL 56 (98 -2) TRIP DIODE FAILURE 2 XR1 XR2 7 (12) F291 h!` 120 ° C 2 1 F191 20° C F291 20° C F292 F191 120° C F192 2 -- J--- 1 ---- - - -- 57 (26R1) ALARM - r --- -- -- F292 135° C i 2 • F192 _ 135° C 2 (14) RECTIFIER OTT 300 OSWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 135° C 135° C S08 S07 SIEMENS m m TRANSPORTATION SYSTEMS, INC. 14 13 cC 14 13 XR1 I- I 0 L XR1 J 1 I 5100 -05 II _ � S050 -03 d1 58 FO 0 54 I [171 (26R2) (33R) I (33N) T6 TRIP I I EQUIP DOOR OPEN (NOTE 2) S131 S132 14 S133 'a S151 I'a 11 5152 14 11 5153 14 T SOUNDTRANSIT 24 21 1 S111 • 24 1 S112 24 1 2 1 1 — • S113 24 1 S131 24 21 • I FF 2 24 21 S133 — I F—• 24 21 1 S1 • 24 1 21 � S152 24 21 S1 53 RECTIFIER #1 I/C W070 -04.09 PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE S122 11 S123 1 S161 114 11 S162 14 111 S163 'a T 11 S141 I,4 11 14 S142 1 5143 14 T '1 24 2�1 - S1 •— 21 14 S122 24 21 S123 24 1 S161 • 21 S162 (17) RECEIVE® NOTES: CITE' . :..! 1JI (1i/ILA 1. ALL RECTIFIER INTERNAL WIRES: #16AWG, 5KV, TEFLON Ifg&II E - 2. COMPLETE 33 CIRCUIT SHOWN ON 5100-04 �JJ ( (WN 10 -20) rlibl)) GEl 1 ER LINK LIGHT RAIL PROJECT (18) J 10 TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R1 & R2 CUBICLES TRIP & ALARM SCHEMATICS CONTRACT DRAWING REV. NO RTA / LR 82 - I C8071 NO. TPS- 5060 -02 02 LINK L1EL.(mV) UAL(V) 15 -14 60 0 0 0 0 15 -13 90 15 -12 150 300 L ° u o � • Eo n o� o r a 9 •` s • r' • u$ E n co �o a a spa V 174 8o = Du u ° oE 0.a u o v. 6 28 ot .2 E U 1 125VDC FROM DC DIST PNL DP1 CKT DP1 -F0 REV DATE 1.02 (125VDC) • S050 -03 N 1 24VDC 1 (11L +) (11L-) 01 11/17/05 Revised per comments ( 72 -0 ) J10 0 TB1 15 15 22 1.01 2 TB1 22 125VDC CONTROL POWER • X 3-0 1 -14 DESCRIPTION 3 • R10 250 OHM, 225 WATTS 1 I 5 110 1 I 6 (111) TB1 K02 K11 (5.02) (5.03) K02 NORMALLY ENERGIZED AND IS DE- ENERGIZED TO TRIP BREAKER. AFTER TRIP CONDITIONS ARE CLEARED K15 (5.03) IS ENERGIZED, K02 IS ENERGIZED, THEN K11 IS ENERGIZED TO CLOSE BREAKER. AFTER TIME DELAY K11 OPENS AND HOLDING COIL CURRENT FLOWS THRU R10. XF XF (24L +) • 14 0 1 -13 O XF XF 0 (24L -) 28 15 -27 PJO (24L +) F 6.01 LB 2.01 1.09 LB BY ENG CHK APP. 21 4 r ; - i L (BREAKER TRUCK (BT)) ( 76 x01 6000 A BREAKER R1 • (L +) 1500V DC POSITIVE BUS,6000A ( +) (POSITIVE) 5 2.09 6KA/50mV S060 -01 1 t I I J 10 T12 3.08 • 31E 1 E f 1 0 - f1 C 3Fig- 3 1 A a I b all b all b i ll ) it b a t l l 11 4 II 2 - �- i1 2 it I JL JL JL—JL_J #14 AWG, 2KV, TW PR S050 -02 3000SWEGOPOINTEDR/VE,, SUITE MS MKEOSWEGO, OREGON 97034 11 12 11 #14 AWG, 2KV \ t1OV 29 (150 A2) VOLTAGE DIVIDER 0 15 10 6 (102) SIEMENS TRANSPORTATION SYSTEMS, INC. (103) 3300 27 <4000V <2000V <1000V CD _ U, rn W c%1 ct 0 <10V OV • 25 3 2 #14 AWG, 2KV 1 1 (L -) 1 XV (L )_ z DC NEGATIVE BUS REFERENCE POTENTIAL 7 0) (150 Al) E10433- E9509 -H100 7 UE1 UEU 8 to 0 10 SOUNDTRANSIT 1• N 0 1 • 25 10V /20mA ±1OV /20mA UAU OV UAI OV 3.03 3.03 N Y 24 RELAY BOARD F/O NOT 5 USED PAT O'HOGAN ORN BY ORN CKD BY PAT O'HOGAN DES BY SCALE: NONE 8 m J DC BUFFER AMPLIFIER TEST±1OV U OV 6 DATE +24V DATE 12/03/2004 DATE COM 12/03/2004 DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE OV 2 (24L +1 3 (24L -) 1 15 14 • 9 I • 1.03 #14 AWG, 2KV 13 E VDT BA 12 I I 1150_A2 1 0 -A1J (NOTE 1) MOUNTING DETAIL 10 NOTES: 1. MOUNT IN H.V. AREA OF CUBICLE WITHIN 18" OF SHUNT R1 2. KEY INTERLOCK PREVENTS OPENING OF 89N DEVICE UNLESS DC MAIN BREAKER IS OPEN. 3. ALL WIRES THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 100 -119) 4. SEE DWG. M101 -03 FOR TRUCK WIRING DIAGRAM RECEI'JED CITY = T?.J KWILA JUN 2 7007 i a i` %el I OE N) Ea LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE GENERAL SCHEMATICS CONTRACT DRAWING REV. NO. RTA / LR 52 -03 / C8071 NO. TPS- S100 -01 01 01 REV 1.03 11/17/05 DATE SIMATIC OP 270 (24L +) (24L -) ( A105 ) IEMENS 0 o + . t om ❑ E8 00000000 OPO E 00000000 ❑C M L+ 0 XF 15 0 XF SIMATIC OP270 OLM TRANSFER TRIP VIA F/O CABLE MPI Revised per comments DESCRIPTION ( A100 ) MPI PJO BY ENG LB CHK DC FDRS LB APP PROFIBUS DC SWITCHGEAR RECTIFIER & RECT. XFMR OBT t OBT CCIC F/O CABLE BLDG. ALARMS AC SWITCHGEAR SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOIN7EDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 NOTES: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. SOUND11tANSR (24L -) ( 72 -0 ) PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE (24L -) —3.06 RECEIVED On-v TUMILA JUN 2,3-7007 t rciiii CENT EAR LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT DRAWING No. RTA I LR 82 -03 / C807 NO. TPS S100 - 02 I REV. 01 PLC INPUT CONNECT 1 SEC TEST 0 SEC DISCON. TBD (S02) 0 (OPEN) 1 (CLOSED) 1 (CLOSED) (S01) 1 (CLOSED) 0 (OPEN) 1 (CLOSED) PLC SETTING TIME DELAY BEFORE FO TRIP 0 -50A 1 SEC OVER 50A 0 SEC 6000A TBD ANA •G I ' UTS GA E C (A100 -D10A (24L -) I2.0 Y CS X 011 I S3 I o17 o18 I2.1 22 SO2 S01 21 I2.2 v T51 TB1 RECEIVED CIT" TUKWQA JUN 2:3 ?O07 (mss`.IN(t (24L -1 0 XF 18 01 REV CIRCUITRY IN SHADED AREA TO BE DETERMINED DATE r1 11/17/05 I XF 30 0 31 1W64 RAIL OVER VOLTAGE c•1 Revised per comments DESCRIPTION SPARE 0 1.07 1.07 1W66 IW68 IW70 (V /A= VOLT /AMP) REVERSE CURRENT I MAX TRIP 0 33 DC MAIN CURRENT PROTECTION PJO BY 0 MAIN DC BUS VOLTS ENG LB CHK 0 35 LB APP IW72 SPARE BUS VOLTAGE 0...2 kV QW64 MAIN DC BUS VOLTS ( +) ( -) 3 P1 BUS CURRENT 0...6 kA (0 QW66 5 ANALOG INPUTS & 2 OUTPUTS MAIN DC BUS AMPS ( +) ( -) 39 P2 2.10— SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPO /A7EDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 (24L +) - XF (24L +) L/R CLOSE OPEN BREAKER BREAKER RESET IN REMOTE BREAKER BREAKER TEST CONNECT CLOSED IND. OPEN IND. SUBSTATION TROUBLE PLC TRUCK POSITION INPUTS (TOC) SOUNDTANSIT PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE DIGITAL INPUTS 8 X 0.5A LINK LIGHT RAIL PROJECT 4.01 NOTES: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 130 -149) TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT 03 / C DRAWING NO RTA / LR 82-807 NO. TPS- S100 -03 3.10 — (24L -) • (24L +) _ XF 8 2 SPARE • 9 3 DC SWGR FRAME ENERGIZED FRAME DC SWGR FAULT FRAME ISOLATED GROUNDED • 4 3 DIGITAL INPUTS FROM NEGATIVE CUBICLE I/C W070 -05.03 P S11 S10 1 TPT T81 13 _ I N 4 14 a 1 4 L F = I ch 1 r - 1 N S050 -03 I I I 1 1 I 13 0 I S09 IN co 14 XN I 16 1 - 1 I ^ I z1 R1 &R2 �I I 9 v v v <-t- a) a O I 9 co m co Co ?10 ?10 ?11 ? 12 ? 13 ? 141 S08 13 I N 4 I I I I I ^ ^_ 13 ( u) I I I I I I I I I 14 XF XR2 0 48 0 49 0 50 0 51 0 52 0 53 6 J M 1f) U, D1OB 0 1 0 LO 3 0 If) LO 4 0 U) 0 0 U, 7 0 0 0 XF 0 19 FXR2 <n rn 10 0 11 0 12 0 U) 13 0 S060 -02 M041 -02 R1 870 — ITTB1 TPT 1 0 II I DIGITAL INPUTS RECTIFIERS R1 & R2M ( I DIGITAL FROM I I/C W070 -05.03 RECTIFIER XFMR I/C W070 -05.03 I I ^ I Ec I- I I I w CO m CO I (11/ a) [ xR2 v XR1 v `" TB2 2 � 3 I ? 5 1 �� CO N U) CD 0 55 0 56 0 57 0 58 0 59 0 60 14 0 15 0 16 0 1 7 0 18 0 19 (Al 00 -D10B) Z� Z� V Z� l 1 1 1 a • I IO.5 � ' I I0.6 '!' 1 1 H 1 L0 HI1.2 ' ( I 1.3 '� I1.5 �' I1.6 1' I I1.7 1 1 1 1 a • • • a a a DIGITAL INPUTS 16 X 0.5A (24L -) 0 20 CLOSE OPEN NEG DISC SW • 5 DC SWGR EQUIPMENT DOOR OPEN LOSS OF N CUB DC CTRL PWR • 6 1 • 7 ALARM TRIP ALARM TRIP RECT DIODE FAILURE RECT OVER TEMP • 8 ALARM TRIP RECT XFMR TEMP • SPARE 9 SPARE (24L +) NOTE: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 150 -169) t 0 5.01 CI Ty CITv - :~ UKVYILPI JUN 21 ?OFF PEI- viiI CENTER 01 12/06/05 REV DATE Revised per comments DESCRIPTION PJO RJA LB BY ENG CHK APP SIEME m �m TRANSPORTATION SYSTEMS, INC. 30005WEGOPOINTEDR/VE, SUITE 106 LAKEOSWEGO OREGON 97034 Sounm7kaNSrr PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/03/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT �1 DRAWING REV. NO. RTA / LR 82 -03 / C807 No. TPS -S100 04 Ot 01 REV 4.10 — 11/17/05 DATE (24L -) (5.03) (1.05) /J10 24 J10 25 1/ J10 n TB1 17 TB1 24 0 17 3 �► H01 J10 X ITN TB1 3 (24L+) (Al 00 -D 10B D10B OPEN BREAKER OPERATION COUNTER Revised per comments DESCRIPTION PJO BY 21 H- 3 -5.02 5 OK TO CLOSE BREAKER ENG LB CHK LB APP H- CLOSE BREAKER 26 0 27 I I- 1 -7 . 07 T it 1 7.08 SCADA CLOSE AC BREAKER SCADA TRIP AC BREAKER 0 28 Q0.7 0 29 SPARE SPARE 0 30 0 22 0 31 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPO /NTEDR/VE, SUITE 106 LAKE OSWEGO, OREGON 97034 0 32 SPARE rn 0 33 SUBSTATION TROUBLE INDICATION 0 34 5 T II-1 -7.09 TRIP & LOCKOUT FO & AC BREAKER SouiunikEwsrr 0 35 0 36 01.5 0 37 SPARE SPARE SPARE PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE DIGITAL OUTPUTS (16 X 0.5A) J 0 38 SPARE Q1.7 39 SPARE NOTES: 1. 186 ENERGIZED FOR: -REV CURRENT -DC EQUIPMENT DOOR OPEN - RECTIFIER DIODE FAILURE (TRIP) - RECTIFIER OVERTEMP (TRIP) -ANY XFMR TRIP FUNCTIONS -ETS /FIRE - INCOMPLETE SEQUENCE -FRAME FAULT ?40 (24L +) (24L -) — 6.01 RECEIVED CITY •_ T i iKWIL..A JUN 29 ?fin? L:.btiiVi6i GL I 2. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 170 -189) LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT DRAWING REV. NO. RTA / LR 82 -03 / C807 NO. TPS- S100 -05 01 01 1 12/06/05 REV DATE 5.10 — • q 1.03 -I (24L +) .. XF (24L -) D11 13 C A100 -D11 I ETS X3 0 20 • (24L +) X3 " p 4 " " ri SSS = 0 (ETS) __(SSS) L' 14.0 • • I4.1 EMERGENCY SUBSTATION FIRE TPSS ACCESS SA SHUTDOWN SHUTDOWN AND DOOR ALARM (WITH XTRIP) (NO XTRIP) INTRUSION ALARM ALARM DESCRIPTION TPSS 14 FIRE ACCESS 13 SURGE SUORE DOOR S13 ARRESTOR ALARM ,- ALARM 14 0 21 0 22 0 23 0 24 0 25 0 26 11) O N M V E 0) O) O) 0) O) C) m 0 0 0 0 0 0 RIO —t— r 13 14 (F -S) (DA) I4.2 Y )14.3 • I S14 S12 RLA 13 • LB Revised per comments BY ENG CHK APP 8001 -01 4 T I IBC 2 I ri L (BCF) 1 • BATTERY CHARGER 5 BATTERY CHARGER I f h l o I 27 1 59 (27) (59) \ 1' \I4.6 14.7 125VDC SYS LOSS OF SHORTED TO FAIL VOLTAGE 1500VDC 1 • XF 23 6 I I a Lit O_ 127A. a J < —J la O) SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 • 0 W D_ 7 T t �UU I� UU I L (HW) L� L(27A) I a L(27B)I 0 H 15.0 HI5.1 =HI5.2 DIGITAL INPUTS 16 X 0.5A O N • SountuTkANsrr z CLOGGED Zr FILTER 8 I (RG) ? (CF)J 0 28 0 29 0 30 0 31 0 32 I5.3 • 0 11 0 12 0 13 0 14 0 15 0 16 0 17 0 18 0 19 0 20 I5.4 I5.5 9 (24L +) RECEIVED CITY UINVILA JUN 23 711n7 'EFiMU G N [Ea 24L- 15.6 t' \I5.7 • 10 LOSS OF HIGH PUMP CLOGGED SPARE SPARE SPARE AC AUX PWR WATER RUNNING FILTER NOTE: LOSS OF I 1. ALL WIRES ON THIS SHEET #14 AWG DC AUX PWR SUMP PUMP UNLESS OTHERWISE NOTED. (WN 190 -209) PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/03/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT — 7.01 TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS CONTRACT NO. RTA / LR 02-03 / CaOI Er WING REV. 01 1 • 2 6.10— (24L +) X3 ?10 (241 +) XF I AC • .3 AC 43 IN UV LOCKOUT PHASE SEQ. REMOTE • 4 OPEN I CLOSED AC BREAKER • 5 LOSS OF DC CTRL SPARE VOLTAGE • b • 7 - • SPARE SPARE SPARE SPARE SPARE 8 • 9 • RECEIVED C1TY iUK�N.ILA JUN 2,3 ?MP 1 �`SiVil> CENTER SPARE SPARE SPARE (241 -) 14 TERB 13 co cD "ERB I 14 ?15 ?16 ? 17 1_ 0 N X3 © 36 0 37 DIGITAL INPUTS FROM AC BREAKER I/C W070 -05.07 0 38 0 39 v EO N N r-- 0 to N I 18 119 ? 20 1 I —J —f 0 40 0 41 SO40 -03 A03 7 CD N 0 42 XF D12 0 1 ( A100 -D12) 0 2 ')16.0 0 H I6.1 0 0 I I6.2 !HI6.3 6 0 0 7 0 8 0 \I6.7 0 24 Lr v od 45 SC/T-L'' SC/ (5.04) 3 46 (5.04) CD N SO40 -02 ^ A03 U ' F I 75 J �1 47 5 3 48 2 U I/C W070 -04.05 _A031 SO40 -02 10 0 11 0 12 0 13 0 14 H 17.O l 1 0 15 0 16 I I7.4 0 17 -• 0 18 0 19 I I7.5 "")17.6 I DIGITAL INPUTS 16 X © 20 0.5A NOTE: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 210 -239) 10 01 11/17/05 REV DATE Revised per comments DESCRIPTION PJO BY LB LB ENG CHK APP SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE,, SUITE 106 CAKE OSWEGO, OREGON 97034 Ia SOUNDTRANSIT PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE PLC SCHEMATICS NO. NTRAC / LR 82 -03 / C807 NO w TPS- S100 -07 IREV. 01 LINK UEL(mV) UAL(V) 15 -14 60 0000 15 -13 90 15-12 150 300 02 1 13 12.A Q 125VDC FROM 24 DC DIST PNL DP1 CKT DP1 -F1 12/05/05 01 11/17/05 Revised per comments RFV f1ATF • 1.02 (125VDC) 11WG © XP 1_# 0 F11 1 OA OFRCRIPTION 2 (11L +) (11L-) I 125VDC CONTROL POWER 1.02 ( 72 -1 ) _J • 05P 06 ( J10 O TB1 15 15 22 • K02 NORMALLY ENERGIZED AND IS DE- ENERGIZED TO TRIP BREAKER. AFTER TRIP CONDITIONS ARE CLEARED K15 (4.06) IS ENERGIZED, K02 IS ENERGIZED, THEN K11 IS ENERGIZED TO CLOSE BREAKER. AFTER TIME DELAY K11 OPENS AND HOLDING COIL CURRENT FLOWS THRU R10. TB1 22 3.06 F12 I 10A 11 121 12 122 New Line Test Resistors Circuit 1 5 107 K02 (4.05) (1L +) (1L-) RJA PJO 3 V RJA R10 250 OHM, 225 WATTS J 2.02 • PJO LB 1 5 2 6 K11 (4.07) LB LB ray FNC CHK APP • 4 (108) � 21 i E (BREAKER TRUCK (BT)) S102 -01 XP XP F2 0 1,2 j� 1,2 I 0 34 r00 34 I ( 76 ) r T1 I I 36 -A 72 BREAKER X01 (L+) 1 u 0 2 (100) • X02;; R1 SA (NOTE 3) 5 TO OCW 1500V DC POSITIVE BUS, 6000A TB1 TB1 4 KA/60mV 3 • (103) 1OA 6 #14 AWG, 2KV, TW PR + (105) (106) #14 AWG, 2KV � b 0 15 10 6 r II a II - I t 4 11 J L 6 J10 9 VOLTAGE DIVIDER <4000V <2000V <1000V XV 1 10 SIEMENS m m TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINT E' DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 O il 1 1 r - 1 r 1r 1 D 3 1 11 1 111 6 3111 b all b a � a t1 b a lt — II I II —II �ll It ; — 4112 — 1'J L 2 T JL 2 • I 72 -2 3.06 (150 Al) ±300mV <10V XV 25 27 ±10V w OV 29 3 2 #14 AWG, 2KV DC NEGATIVE BUS REFERENCE POTENTIAL N m 150 A2) 7 1 (101) KO (4.08) E10433- E9509 -H100 UE1 UEU KO (4.08) 4 UAU UE1 ±10V /20mA ±10V /20mA OV OV 017 1 H01 (OP CTR) 2 SouNn7wuusrr 17 j20 20 0 13 8 Q ▪ N ' M M CV N i Y Y -- Y Y I RELAY /RESISTOR BOARDS 1 N 18 19 \ \/ 14 \4/16 `/ 25 DC BUFFER AMPLIFIER — 2.03 OUTPUT TO DPU 96 1 N Y 16 TEST ±10V OV 0 23 25 24 (102) 2 (24V) 3 (0V) 1 15 14 13 12 T77 PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY SCALE: NONE DATE 12/03/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE • 23i 24 R01 R02 R03 9 2.02 #14 AWG, 2KV VD I BA 3. SA LOCATED IN CABLE VAULT LINE /BUS VOLTAGE MEASURING 3 -100 OHM, 300 W RESISTORS ALL WIRES #14AWG, 2KV • 150 -A2 150 -A1 (NOTE 1) 150 -Al 1 MOUNTING DETAIL 10 NOTES: 1. MOUNT IN H.V. AREA OF CUBICLE WITHIN 18" OF SHUNT R1 2. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 100 -119) RECEIVED CI T ` , c TUKWILA JUN 21 7119 :.E -ihtil CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION Fl CUBICLE GENERAL SCHEMATICS CONTRACT DRAWING REV. NO. RTA / LR 82 -03 / C807 NO. TPS- 5101 -01 02 REV DATE 1.03 • (12L -) (12L+ DO NOT USE (C -TRIP) X1 04 05 2 LLJ 02 0 1 0 X6 X2 0 18 0 19 0 20 0 21 0 22 0 23 El E2 E3 E4 E5 1 12 V_ • • • • • E6 E7 E8 E9 El0 E • E18 E19 E20 • 10A 125 VDC INPUT VOLTAGE SUPPLY TO BA +24V OV PG /PC PROFIBUS A20 A21 X2 X3 X4 0 27 0 1 1.09 #14AWG, 2KV, SIS • 1.07 i AMPLIFIER 150 -A11 DESCRIPTION 9 3 PROFIBUS CONNECTION SEE INTERCONNECTION TPS- W070 -07 VOLTAGE 1 0 8 - T T 3.02 4.01 0 N AUXILIARY VOLTAGE OUTPUT L+ 24V M Al 9 X2 0 0 RY FNG CHK APP • A19 A22 0 N 1 4 0 A • 3 IEMENS ❑ ❑ ❑ SITRAS OPD 96 ®P® 9 0 30 0 31 0 32 0 33 0 34 DIGITAL OUTPUTS • 0 DIGITAL INPUTS 35 • SEE SHT 3 • M 7 SEE SHT 4 6 9 0 3 0 4 0 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 • X1 O X2 1 13 14 X3 6,1 G = X4 26 27 39 40 52 e FRONT SECTION A -A BOTTOM VIEW A22 Al A2 A3 A4 A5 A6 A7' A8 A9 A24 A24 A10 All Al2 7 A13 A14 A15 A16 07 0 L� SOUNDTIiANSR A23 • 2 0 43 0 44 0 45 0 46 0 47 ° 48 0 49 0 50 0 51 0 52 11 E12 E13 E14 E15 E16 E17 E21 1 A23 M 09 0 13 0 14 AA 4 A24 SCALE: NONE 8 (150 A0) DPU 96 ANALOG OUTPUT ±10V MAX. 20mA All A25 ( +) (-) 0 28 0 2 PAT O'HOGAN 12/03/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/03/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE • 9 • 10 POLE MOUNTED EQUIPMENT CATENARY VOLTAGE PRESCENCE DETECTOR TX CVPD RX F/O T 3.07 CABLE RECEIVED CITy i . j Inl11I JUN 2$ ? 1197 CENTER NOTES: 1. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 120 -129) LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F1 CUBICLE DPU SCHEMATICS CONTRACT DRAWING NO. RTA / LR 82 - 03 / C8071 NO. TPS S101 - 02 IREV_ 00 DPU INPUT CONNECT TEST DISCON. E8 (S02) 0 (OPEN) 1 (CLOSED) 1 (CLOSED) E9 (S01) 1 (CLOSED) 0 (OPEN) 1 (CLOSED) 01 RFV 11/17/05 DATF 2.03 Revised per comments (24D +) (1.08) �� - - - BT K02 1 (4.05) 6 TB1 16 J10 16 OFSCRIPTION O FAULT X2 19 * 1E1 ACKNOWLEDGE 43 R 116 S1 017 * 1E2 24 VDC 0 0 CS CS C -r o16 o11 I S3 I o17 018 X1 0 15 0 16 0 17 0 18 20 0 21 0 22 = �I 1 E3 �IE4 " 1 DPU96 DIGITAL INPUT BLOCK 16X24V DC REMOTE CLOSE OPEN BREAKER SPARE BREAKER BREAKER DIRECT ON ( BYPASSES LINE TEST) PJO aV FN0 S2 LB PI-IIC LB ADO 13 14 23 0 24 0 2 E6 21 21 SO2 SO1 22 22 E7 E8 11 F11 7 12 (1.02) 0 40 0 41 0 42 0 4 E9 E10 * IE11 1 SPARE TEST CONNECT SPARE LOSS OF TRUCK POSITION CONTROL VOLTAGE FROM A9 4.05 TRANSFER TRIP FROM ADJ. TPS SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPO/NTEDRNE, SUITE 106 LAKEOSWEGO, OREGON 97034 (1.08) J10" 0TB1 12 TB1 10 12 b (1.06) © TB1 9 "J10 \, 9 0 21 0 44 E12 * 1E13 " 1 11 11 0 22 0 23 45 0 46 BT TB1 0 13 KO - (4.08)T 14 14 14 * IE14 * IE15 " 1 =' BREAKER BREAKER LINE OPENED CLOSED TEST CONTACTOR ON SOUNDTRANSfT 2.09 to 4.01 0 47 0 48 0 49 E16 1 IE17 * IE18 * IE19 �IE20 * IE21 VPD SPARE SPARE SPARE REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY NOTES: 1. DPU TRUCK POSITION INPUTS (TOC) DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE 2. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 140 -169) 12/03/2004 DATE DATE 12/03/2004 DATE 0 50 FROM A7 4.04 05 TRANSFER TRIP TO ADJ TPSS 0 52 SPARE RECEIVED CITY C ±= T UKWILA JUN 2.8 2007 PERMIT CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F1 CUBICLE DIGITAL INPUT SCHEMATICS CONTRACT DRAWING NO. RTA / LR 82 -03 / C8071 Er WING RE V. 01 2.04 1 3,07 _1(24D+) - K24 (4.03) • 0 N- 1 -K24 — 5 (4.03) 5 N- X1 26 / - H10 24VDC X1 8 GROUP ALARM 2 (24D -) • DPU96 DIGITAL OUTPUT BLOCK (16 X 0.5A) A3 3 X2 0 29 0 30 0 31 0 32 0 33 SPARE SPARE SPARE SPARE N- • A6 SYSTEM READY 5 t 11 - 4.02 C 1 4.01 6 - I � 4 (NOTE 1) A7 4 • A8 / A9 34 0 35 0 36 0 37 rn I 25 TO E20 3.09 a) TO E12 3.06 5 (4.06) 25 CO K15 — (1.081_ / I J10.. 24 , 17 TB1 24 ► 3 4 31 J10 2 TRANSFER TRANSFER 0 10 CB CLOSE CB TRIP TO TRIP FROM OPERATION CLOSED CIRCUIT OPENED ADJ TPSS ADJ TPSS COUNTER BREAKER OPEN OK TO SUSTAINED CIRCUIT CLOSE 1 t 11 ---1.04 SHORT BREAKER BREAKER CIRCUIT 1 5 • 11-. -4,05 1.04 t 111.03 L�,� �-1.f� - 11- ¢-3.02 6 t I F- A10� J10 H01 17 18 CO • 1 film 2 All f-/ Al2 t A13 f-/ A14 2 BT J10 18 6 • J10„ 23 TB1 23 7 / \ / • A15 f--/ A16 0 r` 0 a) cc w 28 0 29 ► '30 K15 (4.06) 4 3. TRIP & LOCKOUT DC BREAKER FOR: FRAME FAULT EMERGENCY TRIP /FIRE 32 REVERSE CURRENT ON DC MAIN INCOMPLETE SEQUENCE H2 fl H1 20 rn J10 20 3 Al I 19 LINE TEST (NOTE 2) BT F~4— I- --1.07 _ 22 3.07 _ 32 1 43 1 44 8 • NOTES: 1. K24, IS ENERGIZED FOR THE FOLLOWING ALARMS: OVERCURRENT TRIP MCB TRIP UNSUCCESSFUL RECLOSURE FRAME FAULT CB TROUBLE TRUCK TROUBLE TEST CONTACTOR TROUBLE OUTPUT TROUBLE DELAY TRIP di /dt INSTANT TRIP di /dt SYSTEM FAULTED TRANSFER TRIP FAILURE • 2. LINE TEST SEQUENCE SETTINGS: PRE.- PAUSE: 5 SEC. TEST TIME: 2 SEC. TEST PAUSE: 10 SEC. DELAY BEFORE CLOSE: 3 SEC. SEQUENCE RESET AFTER CLOSE: 5 SEC. AFTER 3 FAILED ATTEMPTS WITH NO RECLOSURE: LOCKOUT DC BREAKER 4. ALL WIRES ON THIS SHEET #14 AWG UNLESS OTHERWISE NOTED. (WN 170 -199) RECEIVED CITY - TUJKWI A JUN 2.8 2007 PEHMff CENTER 10 REV DATE DESCRIPTION BY ENG CHK APP SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINT EDRIVE, SUITE 106 LAKEOSWEGO, OREGON .97034 SOUNDTRANSIT PAT O'HOGAN DRN BY 12/03/2004 DATE DRN CKD BY DATE PAT O'HOGAN 12/03/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/03/2004 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F1 CUBICLE DIGITAL OUTPUT SCHEMATICS CNTRACT DRAWING N RTA I LR 82-03 I C807 No. TPS- S101 -04 REV. 00 11/17/05 DATE Revised per comments AC SWITCHGEAR 70-1- -- -- - -- -- -1 02 6KV, 600A INCOMING UTILITY DESCRIPTION TO GND MAT 2.03 0 0 0 0 O O ¢ Tk It r� 7E 117E --i— --- - - - - -- PJO BY CU BUS 25KVA 26KV/240Vac ENG LB CHK G A03 A GROUND BAR LB APP RECTIFIER TRANSFORMER CI O R5 1 L32 g I H2 L I G I °GND. PAD GROUND BUS - #4/0, CU BARE L—+ •7 TO GROUND MAT NEGATIVE DISCONNECT 4 2 4 GND BUS 0 GROUND MAT R R 1L22 R4iL21 R1 iL12 a R IL11 N1 (L- 2 0 0 0 TO RAIL SIEMENS m m TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOIN7EDR/VE, SUITE 106 LAKEOSWEGO, OREGON 97034 CU BU DUCT 2KV CU BUS DUCT �2KV y Y ©31L21© „ I L N • N i r►f L1- L2- RECTIFIERS N-• CABLE VAULT RT (L +) CU BUS L32 L22 L12 SOUNDTRANSIT 0 V T GROUND MAT DRN BY DC MAIN BREAKER i 1 F1 SA DRN CKD BY PAT O'HOGAN DES BY PAT O'HOGAN 2/15/2005 DATE DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE DC FEEDER BREAKERS I I I CU BUS I • .1 F2 ( I F3 ( I I I I I I I I I I SA Y TO OCW I Y I I I j I / IF4 ( I' ` I I I I I I I I i I I SA �� Y SA RECEIVED CITY ' I I,JKIWILA JUN 2 8 2007 PERMIT CENTER LINK LIGHT RAIL PROJECT .1 J 10 TRACTION ELECTRIFICATION SYSTEM MAINELINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM HV AC & DC CABLING CONTRACT D RAWING REV. NO RTA/LR 82 -03 / C807 I NO. TPS- W070 -01 01 0 FL, T� 0° 00 Op of – v3_ 0 , . n E 0.00 . cod 0o 0 a vo c u C o = 00 o "o E 0 ( . © € E c ov 0`o 1 • 2 (2.06) API -BC 3cc #10 BATTERY CHARGER API -TIM 3cc #12 TRK ISO MONITORING (3.05) API -EL 3cc #12 EMERGENCY LIGHTS (3.05) API -S &I 3cc #12 FIRE AND INTRUSION PANEL (4.04) API -TPT 3cc #12 TPT HTRS (4.04) API -A03 3cc #12 120VAC CTRL PWR SPARE PROVISION (3.05) API -HTR 3cc #12 DC SWGR HTRS API-UPS 3cc #12 TRACK TST PWR SUPPLY (NOTE 1) • (1.03) 0 SPARES PROVISION — LEGEND: A03: AC BREAKER API: 240/120 VAC DISTRUBITION PANEL BC: BATTERY CHARGER CCIC: CENTRAL CONTROL INTERFACE CABINET DP1: 125 VDC DISTRUBITION PANEL EL: EMERGENCY LIGHT ETS: EMERGENCY TRIP SWITCH FO: MAIN DC BREAKER F1: FEEDER BREAKER #1 S &I: SMOKE AND INTRUSION PANEL SSS: SUBSTATION SHUTDOWN SWITCH TPT: RECTIFIER TRANSFORMER V1: VENTILATOR UNIT #1 V2: VENTILATOR UNIT #2 3 • 3 2rn 5 7 20A /\ 9 20A 20A 20A 20A 20A 20A L1 30A T 1 • I � /\ 11 /\ 13 /\ 15 /\ 17 /\ 19 /\ 21 23 25_ 27 29, 1 2 26 28 30 7 • L2� - -150 A 40A rn 30A rn 20A 10 /\ 20A 12 /• 14 2 i1 20A 16 /\ 20A 18 /\ 30A 20 /-\ 30A 22 /\ 30A 24 /-\ 4 DISTRIBUTION PANEL API, 120/240VAC BUS RATING 225 A • (3.08) AP1 -HTR, 3cc # 10AWG UNIT HEATERS AP1 -ST, 3cc# 10AWG STAIR TOWER (TPSS C16 ONLY) (3.02) AP1 -LI, 3cc # 12AWG LIGHTS, INTERIOR (3.02) AP1 -LE, 3cc # 12AWG LIGHTS, EXTERIOR AP1 -LV, 3cc # 12AWG LIGHTS, VAULT (EXCEPT TPSS C11) (3.02) AP1 -RI, 3cc # 12AWG RECEPTACLES, INTERIOR (3.02) AP1 -RE, 3cc # 12AWG RECEPTACLES, EXTERIOR (3.08) AP1 -V1, 3cc # 10AWG VENTILATOR UNIT #1 (3.08) AP1 -V2, 3cc # 10AWG VENTILATOR UNIT #2 (3.05) AP1 -SP, 3cc # 12AWG SUMP PUMP — SPARES PROVISION 5 (5.07) AP1 -FO, 2cc # 20AWG LOSS OF AC CTRL PWR • 6 (6.02) DP1 -F1, 2cc #12 AWG F1 CUBICLE CTRL PWR (4.02) DP1 -CCIC, 2cc #12 AWG CCIC CTRL PWR (4.04) DP1 -A03, 2cc #12 AWG A03 CUBICLE CTRL PWR BATTERY CHARGER • K�TB1L1 BK ,TB1 -L2 AP1 -BC, BK GND 3cc #10 AWG, (2.02) BC -F0, 4cc #14 AWG, BATTERY CHARGER ALARM (5.07) 7 1 • 2 -1 /C #2 IN CONDUIT 20A 13 TB2 ( +)� tj- #/1 - 2AWG I 15 TB2 ( -} (1- #12AWG SPARES PROVISION — 8 • 9 • DISTRIBUTION PANEL DP1,_ 125VDC BUS RATING 250 A (5.02) DP1 -FO, 2cc #12 AWG FO CUBICLE CTRL PWR (4.07) DP1 -N, 2cc #12 AWG N CUBICLE CONTROL POWER (3.05) DP1 -ACDC, 2cc #12 AWG AC /DC TEST PANEL ON (5.07) DP1 -FO, 2cc #14 AWG LOSS OF DC CTRL PWR_ CEIVED CITY TUKWILA JUN 2 ?007 PEHN11 CENTER NOTES: 1. REQUIRED FOR INTERNATIONAL DISTRICT /CHINATOWN, OTHELLO AND BOEING ACCESS TPSSs ONLY. 10 01 11/17/05 REV DATE Revised per comments DESCRIPTION PJO LB LB BY ENG CHK APP SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINTEDRIVE, SUITE 106 LAKEOSWEGO, OREGON .97034 �r SOUNDTRANSIT PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CK0 BY PAT O'HOGAN DES BY DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM AC AND DC STATION SERVICE NO. WINGTPS- W070 -02 REV. 01 NO CONTRACT TA/LR 82 -03 / C807 0 av r0 C 5° Eat' 00 Y •C•C vs_ O u $ mo o.; Ou V' °o0 s o. 6 . vo o o 2;6_, 5 u 0 o E o v' 2 oc 0 .20 r ao 0. C U 01 REV 1 11/17/05 DATE • (2.04) AP1 -LE, 3cc # 12AWG B (2.02) AP1 -RE, 3cc #12 AWG (2.04) AP1 -LI, 3cc # 12AWG (2.02) AP1 -RI, 3cc #12 AWG (5.07) SAF -FO, 2cc #14 AWG ALARMS Revised per comments DESCRIPTION 2 AUTO OFF ° HAND • H ° N 3 EXTERIOR GFI RECEPTACLES B Q O O #1v SW W G H ° N INTERIOR GFI RECEPTACLES I L_ -_J SURGE ARRESTOR ALARM (6) EXTERIOR HPS LIGHTS INTERNAL PHOTO CELL PJO BY ENG LB CHK EL LB APP • 4 INTERIOR LIGHTS .95A EACH (TYP 10) • (2.02) AP1 -EL, 3cc #12 (2.02) AP1 -S &I, 3cc #12 AWG (2.02) AP1 -HTR, 3cc #12 AWG 120VAC (2.09) DP1 -ACDC, 2cc #12 AWG 125VDC CTRL PWR (2.04) API -SP, 3cc #12 AWG 120VAC 5 • L _ J EMERGENCY LIGHT FIRE & INTRUSION PANEL ALARM _ _ _ 1 ACCESS DOOR T.P.S. fi L— - INTRUSION ALARM ACCESS DOOR T.P.S. (CONTACTS SHOWN WITH DOOR OPEN) DC HTR ISOLATION TRANSFORMER g B (4.07) HTR -N, 2cc #14AWG, 2K" L___J (MOUNT IN J BOX ATTACHED TO PNL API) AC DC TEST STATION R I_ +__ N LJ _ SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINT DRIVE SUITE 106 LAKE OSWEGO, OREGON 97034 • FA FO, 2cc #14 AWG (5.07) ALARM CXT 100 -C10 2cc #14 AWG SHD 1W PR (5.07) SP -F0, 4cc #14AWG ALARMS REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION 7 SOUNDTRANSIT • 8 (2.04) AP1 -V1, 3cc #10 AWG 120VAC (2.04) AP1 -V2, 3cc #10 AWG 120VAC (2.04) AP1 -HTR, 3cc #10 AWG 120VAC (5.07) BL -FO, 2cc #12 AWG CONTROL (5.07) DO -FO, 2cc # 14 AWG ALARM (5.07) SSS -F0, 2cc #14 AWG PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 2/15/2005 DES BY DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE • 9 VENTILATOR 1 VENTILATOR 2 HEATER BLUE LIGHT L- - -1 XFMR ACCESS PANELS EMERGENCY TRIP SWITCH ETS (5.07) ETS -FO, 2cc #14 AWG L_J • ETS IS LOCATED OUTSIDE PERSONNEL ENTRY DOOR SUBSTATION SHUTDOWN SWITCH 10 SSS_ SSS I- RECEIVED pr r' . uKAAJILA JUN 2& 7.007 AN SSS IS LOCATED INSIDE EACH ENTRY DOOR LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM BUILDING AUXILIARIES CONTRACT DRAWING REV. NO. RTA/LR 82-03 / C807 I NO. TPS- W070 -03 01 01 11/17/05 REV DATE (2.07) DP1 -CCIC, 2cc #12 AWG, 125VDC CTRL PWR w 2 B Revised per comments DESCRIPTION PJO BY ENG i (5.03) TPT -F0, 7cc #14 AWG I I TRIP & ALARM SIGNALS 3SP 1 1 11 (2.02) AP1 -TPT, 3cc #12 AWG. I I 120VAC CTRL PWR I' •I /// 11 11 11 11 11 I! II 11 !I RECTIFIER TRANSFORMER 11 IL REFERENCE DRAWING: M041 -02 TPT JI I LA ,i I ,I i ! It9 186 WI !I i ! in Ill El In 24L+ !I i ! i ! I ! (5.07) AO 24 3 V -F D 0 C .1 C , T 2c R c L # P 1 W 4A R WG isc tal L7 lira lin La 47 !I !I i I (2.02) AP1-A03. 3cc #12 AWG. i7.1111 PH MIMI !i I! !I i I ERB !I • LI 4c3C !I i ! SIM T Li TP !I 52b I , 'a 27B 1 I I (2.07) DP1 -A03, 2cc #12 AWG, 125VDC CTRL PWR • • : 120VAC CTRL PWR LB CHK LB APP B k W TB1 24L+ 33T TB2 j 180 °c, ALARM 200 °c, TRIP (5.04) N -F0.3, 7cc #14 AWG, PLC DATA INPUTS 2SP XH 1 (5.02) N -F0.1, 2cc #14 AWG, 24VDC CTRL PWR (5.04) N -F0.2, #14 SH 1W PR PLC ROV INPUT 1/c #14AWG j 1(5.07) A03 -F0.2, 7cc #14AWG L • PLC DATA INPUTS 26kV AC BREA KER NEGATIVE CUBICLE SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPO /NTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 XP (2.09) DP1 -N, 2cc #12 AWG, W 1 125VDC CTRL PWR l B 2 3 (3.06) HTR -N, 2cc #12 AWG, 4 110VAC HTR PWR W 5 HTR a T -STAT 4 TERMINAL BLOCK DIVIDER XN 12L+ 12L- L N L2 N2 1 24L+ 2 24L - I 3 24L+ 3 1 4 24L- 4 64V+ 64V- 8 9 FFI 10 64L 11 64G 12 89B 13 89A 14 15 16 33N 17 33T 18 19 20 21 22 23 24 25 g (5 N -F0.4, 2 -1 /C #12AWG, 2KV I I • • i , REF. POT. (5.07) L 111 11 SOUNDTRANSIT I I I 1 11(5.04) R1 -F0, 4cc #14 AWG • RECTIFIER ALARMS I ' ,I , • NOTE: I I PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 2/15/2005 DES BY DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE 2SP 1 #14REVIEWED FOR NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila BUILDING DIVISION j I (5.04) R2 -F0, 7cc #14 AWG RECTIFIER ALARMS 3SP t� 1 1 XR1 1 I 7 8 9 24L+ 98 -1 98 -2 26R -1 26R -2 33R -2 12 14 33N 11 Ij 1 , RECTIFIER #1 2 3 4 5 10 12 REFERENCE DRAWING SERIES: S060 XR2 5 6 7 8 9 10 11 24L+ 33R 12 14 33R -2 12 1. HEATERS RATED AT 240V. 400W.1. HEATERS OPERATED AT 120V. 100W. 2. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. N -F0, 1/C #12AWG, 2KV I • 3. MOUNT HEATERS ON INSULATED VOLTAGE DIVIDER STANDOFFS IN DC SWITCHGEAR. • 4. USE #14AWG, 2kV WIRE FOR HEATER CI 24L+ R1 RECEIVED I CITY ' ': TU Mil LA; JUN 2,31407 P EHiviii CENTER' RCUIT. • RECTIFIER #2 — - CENTRAL CONTROL INTERFACE CABINET CCI� L - — - — REFERENCE DRAWING SERIES: SO40 A03 _IL_ REFERENCE DRAWING SERIES : S050 IV — — - L_ — - REFERENCE DRAWING SERIES: S060 R2 I LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM AC AND DC SWITCHGEAR NTRACT DRAWING CO REV. NO. RTAILR 82 -03 I C807 NO. TPS- W070 -04 I 01 (2.09) DP1 -FO, 2cc #12 AWG, 125VDC CONTROL POWER (4.07) N -F0.1, 2cc #14 AWG, 24VDC CONTROL POWER TO PLC Dl OA (S100 -03) TO PLC Dl0B (S100 -04) DESCRIPTION W XP TERMINAL BLOCK DIVIDER X3 I ' 2 3 4 5 6 I 7 8 1L+ 1L+ 1L- 1L- . 11L+ 11L- XF 1 24L+ 2 3 4 5 6 7 8 9 10 11 12 W 13 T - 14 15 16 17 18 19 20 21 22 23 24 25 26 B 27 `- 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 FFI 49 64L 50 64G 51 89A 52 53 54 55 56 57 58 59 60 61 62 63 64 65 24L- 64V+ 64V- 89B LOP 33R 98 -1 98 -2 26R1 26R2 49T1 49T2 • TPT -F0, 7cc #14 AWG, TRIP & ALARM SIGNALS (4.04) R2 -F0, 7cc #14 AWG, RECTIFIER ALARMS (4.09) 3SP JUMPER, 1c #14 N-F0.2, 4cc #14 AWG, SH TW PR, (4.07) 2SP PLC ROV INPUT N -F0.3, 7cc #14 AWG (4.07) 2SP PLC DATA INPUTS f v R1 -FO, 4cc #14 AWG, RECTIFIER ALARMS (4.09) 2SP TO PLC D11 (S100 -06) TO PLC D12 (S100 -07) 2 3 4 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 DC MAIN BREAKER FO 1 24L+ ETS SSS F -S DA SAF BCF 27 59 27A 27B HW RG CF 27 86 47 43R 52a 52b 27B 43T T 43C C TP 186 J • (4.07) N -F0.4, 2 -1 /C # c) cS PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 2/15/2005 DES BY DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE DATE SCALE: NONE LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINELINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM DC SWITCHGEAR DRAWING NO. TPS W070 - 05 CONTRACT NO. RTAILR 82 - 03 / C807 REV. 01 BY ENG CHK APP REFERENCE DRAWING SERIES: S100 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGOPO/.V7EOR/VE, SU /7E /OS LAKE OSWEGO, OREGON 97034 SOUNDTRANSIT 1SP 1SP A03 -F0.2, 7cc #14 AWG PLC DATA INPUTS (4.04) A03 -FO, 7cc #14 AWG TRIP & CLOSE SIGNALS (4.04) VD (4.07) N -F0, 1/C #14AWG, 2KV VOLTAGE DIVIDER REF. POT. 4AWG, 2KV g ETS -FO, 2cc #14 AWG EMERG. TRIP SWITCH (3.08) SSS -FO, 2cc #14 AWG (3.08) FA -FO, 2cc #14 AWG, FIRE & INTRUSION ALARM (3.06) DO -FO, 2cc #14 AWG TPSS ACCESS DOOR ALARM (3.08) SAF -FO, 2cc #14 AWG, SURGER ARRESTOR FUSE BLOWN (3.02) BC -F0, 4cc #14 AWG, BATTERY CHARGER ALARM (2.07) AP1 -FO, 2cc #14 AWG, LOSS OF AC CONTROL POWER (2.05) DP1 -FO, 2cc #14 AWG, LOSS OF DC CONTROL POWER (2.09) SP -F0, 4cc #14 AWG, SUMP PUMP ALARMS (3.06) A03 -F0.1, 2cc #14 AWG, AC BREAKER ALARM VOLTAGE (4.04) W I X V I 1 (6 XH o (6.02) F0 -F1.1, 2 -1 /C #14AWG, 2KV T -STAT HTR .02) FO -F1, 1/C #14AWG, 2KV 10 RECEIVED CITY `= !_11�1V1 JUN 2,3 2007 ENNIA 6 CEN7-E8' 01 REV 11/17/05 DATE (5.09) F0 -F1.1, 2 -1 /C #14AWG, 2KV B XH (2.06) DP1 -F1, 2cc #14 AWG, 125VDC CONTROL POWER (5.09) FO -F1, 1/C #14AWG, 2KV, VOLTAGE DIVIDER REF. POT. Revised per comments DESCRIPTION W I XV • TERMINAL BLOCK DIVIDER W XP I I 2 3 4 5 6 -8 1L 11L+ 11 L- PJO BY II I I i t II I I i t II II 1, I I I I , 1 I I II II II II „ 1 o I 1c #14AWG, 2kV I I 1 L- VD lc #14AWG, 2kVII - T -STAT II II HTR II FEEDER BREAKER Fl ENG LB CHK LB APP XP XP 1./ ,., XP I II II II / AI 2cc #14AWG XP 2cc #14AWG XV XH 1 B- 4 1L+ 1 L- FEEDER BREAKER F2 II I I II II II II ,1 II II II II 1 II II II II I 1c #14AWG, 2kV I • lc #14AWG, 2kV I I 11 L+ 11 L- VD 1 T -STAT ! I I HTR II 1, 2cc #14AWG 1, XV I' XH t 1 3000SWEGOPo /NTEDRIVE, SUI1E 106 LAKEOSWEGO, OREGON 97034 1 2 SIEMENS TRANSPORTATION SYSTEMS, INC. I 1 II I I I II II ,1 II II 1, I , I II II II i t 1c #14AWG, 2kV l i II 1 c #14AWG, 2kV I I VD T -STAT II I I HTR II 2cc #14AWG II I XV 1 2 XH I 1 2 ,1 it REFERENCE DRAWING SERIES: S101 " REFERENCE DRAWING SERIES: S102 REFERENCE DRAWING SERIES: S103 " REFERENCE DRAWING SERIES: S104 " REFERENCE DRAWING SERIES: S105 FEEDER BREAKER F3 FEEDER BREAKER F4 SOUNDThANSIT 1L+ II I it I 1 I II II I 1 II II ,1 II II I , I II 1c #14AWG,2kVl 1c #14AWG, 2kV , 1L- 11L+ 11L- VD T -STAT II II HTR II PAT O'HOGAN 2/15/2005 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE XV I 1 2 XH 1 1 4 RECEIVED CITY • TUKWILA JUN 2 8 7007 ?E vil i CENTER 1 T -STAT HTR FEEDER BREAKER F5 LINK LIGHT RAIL PROJECT 10 TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM DC SWITCHGEAR CONTRACT DRAWING REV. NO RTA/LR 82 - / C807 I NO TPS- W070 -06 01 0 0 o • �� Eau oa a« r o'c '[ • vs_ o$ E o Co u c a� •-o c2 Y O L " V G c I Ll ° c© `cE Co C O 08 U 01 1 CKT 110 -C2 11/17/05 REV DATE • XTRIP / GNfl IA 1 AI R D l) I B B I 1 1 1 I ON XJ FEEDER #1 4 PR CAT 5 (ETHERNET) BLUE WIRE ON OFF Al_BI A2,02 ON DESCRIPTION OFF A1,B1 A2,82 • XTRIP FIGURE 2 FEEDER 1 DPU -96 S7300 PROFIBUS CABLE TERMINATION PROCEDURES BUS CONNECTION FOR THE FIRST AND LAST NODE ON THE PROFIBUS. THE CABLE MUST ALWAYS BE CONNECTED ON THE LEFT (SEE CONNECTOR MARKING A1,B1) pt SWITCH SETTING FOR THE FIRST AND LAST NODE ON THE PROFIBUS "ON" (TERMINATING RESISTOR CONNECTED) 0THE CABLE SHIELD MUST LIE BARE ON THE METAL GUIDE. BUS CONNECTION FOR ALL OTHER NODES ON THE PROFIBUS. THE FEED CABLE SHOULD ALWAYS BE CONNECTED ON THE LEFT. (A1,B1). THE CONTINUATION CABLE SHOULD ALWAYS BE CONNECTED ON THE RIGHT (A2,132) pt SWITCH SETTING FOR ALL OTHER NODES ON THE PROFIBUS: "OFF" (TERMINATING RESISTOR DISCONNECTED) O THE CABLE SHIELD MUST LIE BARE ON THE METAL GUIDE. TIP: WHEN THE SWITCH IS IN THE "ON" POSITION, THE PROFIBUS TO THE OTHER NODES IS DISCONNECTED AT THIS POINT (e.g. FOR SERVICES PURPOSES). PJO 3 LB Revised per comments LB BY ENG CHK APP • OPEN GN CKT 110 -C3 GN MAIN FEEDER FO • FEEDER 2. DPU -96 r I B ON k ON 4 FF O I L J FEEDER #2 OBT A101 A2B2 F/0 • OPEN GN CKT 110 -A3 6 CKT 110 -C4 r - GN IA FIGURE 1 OBT SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO ROME DRIVE,, SUITE 106 LAKEOSWEGO, OREGON 97034 • FEEDER 3 DPU -96 - 1 AI B ON XJ FEEDER #3 7 OPEN GN RD • AC SWITCHGEAR FIGURE 1. pt CABLE SHIELD O BUS CABLE e.g. 6XV1 830 -0AH10 O SCREW -TYPE TERMINAL BLOCK ON CONNECTOR P.C.B. FOR CONNECTING THE BUS CABLE L IT N SOUNDTRANSIT 8 CKT 110 -05 DPU -2000R - STRIP THE CABLE INSULATION WITH CABLE STRIPING TOOL - INSERT THE GREEN AND RED CORES IN THE SCREW TERMINAL BLOCK (A1,B1 bzw. A2, B2) - PRESS THE CABLE SHEATH BETWEEN TWO CABLE CLIPS - SCREW THE GREEN AND RED CORES TIGHT IN THE SCREW TERMINAL. • 9 FEEDER 4 DPU -96 GN I A AI —T — 1 t _ON + OFF A LXJ- -J FEEDER #4 CKT 110-Al / GN(l / RDy REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDIN DIVI ION PAT O'HOGAN 2/15/2005 ORN BY DRN CKD BY PAT O'HOGAN DES BY DATE DATE 2/15/2005 DATE DES CKD BY DATE LANCE BANASZEK 2/15/2005 APPROVED BY DATE SCALE: NONE • LINK LIGHT RAIL PROJECT 10 CCIC IA 1 I I I I I t_ ON T OFF 1 I- -I- - -I LXJ_ -J CENTRAL CONTROL INTERFACE CABINET RECEIVED CITY - i i.JKWILA JUN 2 g 2007 ?Eh IA c;EN rE R TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION INTERCONNECTION DIAGRAM PROFIBUS CONTRACT D REV. NO. RTA/LR 82 -03 / C807 I NO AWING TPS- W070 -07 01 Rev # Date Apv'd Description Sound Transit :' Central Light Ra Link SIEMENS T rans Inc. Transportation Systems, p y MAINLINE TPSS TPSS BLDG. ELEC. EQUIP. BILL OF MATERIAL 00 3/17/05 LB Initial Issue 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L001 Pg. 1 of 1 Item 1 AC Panelboard, 120/240, 1 phase, 3 wire, 30 circuits, 225 amp main circuit breaker, 225 amp bus, bolt -on branch breakers, Siemens type BL 2 DC Panelboard, 125V, 1 phase, 2 wire, 30 circuits, 200 amp main circuit breaker, 250 amp bus, bolt -on branch breakers, Siemens type BQD 3 Voltage Monitoring Relay, Auto Reset For measuring 220 VAC supply w/ 8 -pin DIN rail socket. Set to 160. 4 Voltage Monitoring Relay, Auto Reset For measuring 125 VDC supply w/ 8 -pin DIN rail socket. Set to 90. 5 Eye wash 6 NOT USED Descri tion 7 Battery Charger, 120 VAC in, 125 VDC @ 20 ADC out 8 Batteries, 6VDC, 50AH 9 ETS lockable pull box with padlockable kit 9 Emergency Trip Switch consisting of: 40mm push lock, twist reset red mushroom head 1 NC contact block enclosure, NAMA type 1 10 Station Shutdown Switch, pull to reset consisting of: 40mm push lock, twist reset red mushroom head 1 NC contact block enclosure, NAMA type 1 protective shroud 11 SURGE ARRESTOR, 1500V Complete with non - metallic enclosure 12 Cuirrent relay, 74SA Complete with non - metallic enclosure 13 See TESLA BOM 05008101 B01 for additional building equipment and accessories. 1 1 1 1 10 1 1 DP1 1 27A 1 27B 1 ETS 2 SSS 5 SA 1 74SA Dw• . S mbol AP1 Function AC control power distribution DC control power SENTRON Type S1 distribution P1 N3OFX200CTS AC Voltage Monitoring DC Voltage Monitoring Eye care DC power DC Power ETS box TPS Mass Trip & XTRIP TPS Mass Trip Without XTRIP Lightning Supression Lightning Detector Manuf. Part No. SENTRON Type S1 P2A30QJ150EBS AC260B- 160 -250 51X120 DC260BM -90 -150 51X120 7602.1 1SCRF- 130 -020E 12SLA50 AHXE6X6X4 3SB series 3SBO3P4R 3SB1430 -OC 3SB0221 3SB series 3SBO3P4R 3SB1430 -OC 3SB0221 3SB1902 -2BM 6007 -004 MAS -2. Manufacturer Siemens Siemens Time Mark Time Mark Haws ALCAD ALCAD Hoffman Siemens Siemens SMC Elektroba CLLR Stock # RECEIVED / �� I CI ri ii`,y�!ILA JUN 2,3 7007 �=k:r 1v�11 GENTER Rev # Date Apv'd Description I Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS AC SWITCHGEAR BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release Dwg. TPS -L040 Pg. 1 of 1 Item 1 Description Qty Dwg. Symbol Function Manuf. Part No. AMVAC Circuit Breaker, 27kV, 1200A, 25kA 1 52 Main breaker MA3Q1100000001P control voltage 125V DC 2 3 -Phase Power Meter, model 7330 with integrated display, 7330 Metering 5A nominal, 120VAC input voltage, 125VDC power supply 60Hz, , 4- internal digital inputs, 4 digital outputs, two (2) RS485 ports 3 Multifunctional Solid State Relay 1 50/51, 50/51N, 51T, Circuit protection, 587R1412 -61004 DPU2000 27, 47, 59, A, V Ammeter, Voltmeter 4 NOT USED 5 Circuit breaker control switch 6 NOT USED 7 Lockout relay, 3 decks, 125VDC 8 Kirk Key Interlock, Type D, LC, DOE, Single Lock Interchange Al, mounted on CPT frame rear door 9 Kirk Key Interlock, Type F, LO, FOE, Single Lock Interchange Al, mounted in CPT fuse truck 10 Indicating light, red Red LED 11 Indicating light, green Green LED 12 Indicating light, Blue White LED 13 NOT USED 14 Current transformer, Ratio 100:5SR Rating C100 15 Potential transformer, 26400/26400, ratio (220:1) with 2 -0.5E fuses 38kV 16 Control power transformer, 25KVA, 2600 - 120/240, 10kV BIL 17 NOT USED 18 Control Fuse 6A. 600VDC. Timedelay. Class CC 19 Fuse block, double pole, pullout type, 30A 20 Control fuse, 15A, 300V DC, time delay class CC 21 NOT USED 22 CPT primary fuse, 27kV, 3E amp 23 Strip heater, 150W 24 NOT USED 1 CS 1 86 1 K 1 K 1 RIL 1 1 GIL 1 1 LOC 1 3 CT 2 PT 1 CPT 6 2FU 3 FU 2 FU -CL 2 3FU 6 HTR Breaker control 2438D Breaker lockout 7803D Kirk Key Kirk Key Breaker closed Breaker open Local Position REVIEWED FOR CODE COMPLIANCE —N EPA -7 0 NEC AUG 7 2007 I ° Tukwila ION House Power Circuit protection USCC2 Circuit protection ATDR15 CPT protection P7330A0BOBOAOAOA KDL000010SC KFL00001OS 116B6708G43 -R4 1835L3 -R -CR 116B6708G43 -G4 1835L3 -G -CG 116B6708G43 -W4 1835L3 -W -CW 923A332G19 -M 677C452G05 CS00979A01E11 ATQR6 9F6ODMJ003 279010H00 Manufacturer ABB PML ABB Electroswitch Electroswitch Kirk Key Interlock Co. Kirk Key Interlock Co. General Electric DDP General Electric DDP General Electric DDP ABB Cuttler Hammer AFP Transformers Ferraz Shawmut Ferraz Shawmut Ferraz Shawmut General Electric Omega CLLR Stock # RECEIVED DIY T H W!IA JUN 2 ?007 ' riot/ "Bl f CENTER Rev # Date Apv'd Description I Sound Transit Rail Central Light Rail L SIEMENS T rans ortation S stems, Inc. p y MAINLINE TPSS NEGATIVE DISCONNECT SWITCH BILL OF MATERIAL 00 3/17/05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS- L050 Pg. 1 of 1 Item 1 Description Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 10A 2 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts 3 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics 4 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics 5 DC to DC Converter Input voltage: 90 -350 VAC or DC Output: 24 VDC © 5 AMPS 6 DC to DC Converter Input voltage: 90 -350 VAC or DC Output: 24 VDC @ 5 AMPS 7 Space heater150W, 120VAC Qty Dwg. Symbol 1 F11 1 F12 1 F20 1 F21 1 G01 1 G02 1 HTR 8 Lamp Module, 22mm, Green 1 H1 Switch Open Complete with lampholder and 24 VDC LED 9 Lamp Module, 22mm, Red 1 H2 Switch Closed Complete with lampholder and 24 VDC LED 10 Interphase Transformer,12- pulse, RI -9 rated, 5% DC Unbalance 1 IT Routine Tested, Open Core and Coil Copper VPI, 1500VDC, 2000ADC Max Dims: 36.37" H x 24" W x 20.5" D, Wt. 950 lbs. 11 Negative Drainage Circuit, consisting of: 1 ND a) 1 -DC Contactor, 24VDC coil, 1 NO +1 NC 100ADC contacts 1 -Knife Switch, 1 pole,300A, 600VDC 12 Miniature Circuit Breaker, N -Type, DC 440V, 3 SON, SOR, SOF Frame fault 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts isolation 13 MicroSwitch, 1 NO + 1 NC Contact 1 S11 Cubicle Door Open 14 Thermostat, single pole, snap action 1 TSTAT contacts: 22amps @ 120/240VAC. Wall mount. 15 Track Resistance Test Station Reference, consisting of: 1 TSR a) 4- Silicon Power Rectifier Diodes, If(av) = 300A, Vrrm = 1.6 kV b) 4 -Knife Switches, 1 pole, 60A, 600VDC 16 Structure Grounding Relay 1 64G & 64L High Resistance 17 DC DISCONNECT SWITCH -- 89N, 6000A, 1500 VDC DPST 1 89N non - fusible, manually operated, bolted pressure silver contacts 4 form "C" contacts, 2activated when switch open & 2 when switch closed. 18 Kirk key interlock, Type 'BL ". 1 K key interchange with main DC breaker. Base mounted, 3/8" bolt projection when withdrawn, 1 cylinder key removable in extended position. 19 Cubicle enclosure, complete with: busing, 1 N device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray Function Control Voltage 5SX5210 -7 heater protection Control Voltage 5SX5206 -7 24VDC pwr supply 5SX9102 Control Voltage 5SX5206 -7 24VDC pwr supply Control Voltage 5SX5206 -7 24VDC pwr supply Control voltage QUINT -PS -100 240AC/24DC /5 Control voltage QUINT -PS -100 240AC /24DC /5 Interphase Transformer Neg. Dm. Circuit Heater Control Test Sta. Ref. Frame Fault Negative Disconnect Switch Kirk Key Negative Cubicle 8MF94 2E919 Manuf. Part No. 3SB3244 -6BA40 3SB3244 -6BA20 14- 193- 791 -52 -6 Type A 5SX5206 -7 5SX9102 3SE30201A 2E815 NTE6364 A 7713 C4280 -600 MP- 6011 - 1.5KVDC- NE -SH -K1 K2 (Dwg B88785) K -BL -0 -037 -1 E -S Manufacturer Siemens Siemens Siemens Siemens Phoenix Phoenix Grainger (Vulcan) Siemens Siemens MTC P /N. 120270L02BC01 Magnetic Technologies Siemens Filnor Siemens Siemens NTE Electronics Filnor Swartz Pringle Kirk Key Interlock Co. Siemens CLLR Stock # RECEIVE® -i7' /VILA JUN 23 7(197 I� 6Pi 6iY G Et' IEli Rev # Date Apv'd Description Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc MAINLINE TPSS RECTIFIER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release Dwg. TPS- L060 Pg. 1 of 1 Item 13 Rectifier diode 4000V, 3600A Description 1 Capacitor .47uf, 2100V 2 Capacitor 16uf, 3200V MP metalized - dielectric ca•acitor 3 THERMOSTAT Opens @120C, Closes @105C 4 THERMOSTAT Opens @135C, Closes @120C 5 NOT USED 6 Semiconductor fuse,1400V,1000A. With support for microswitch 170H0067 7 Resistor, vitreous enamel, wirewound 200W, 6 ohm, + -10% tolerance 8 Resistor, vitreous enamel, wirewound 200W, 6 ohm, + -10% tolerance 9 Resistor, vitreous enamel, wirewound 500W p 40 C, 3.9 kohm, + -10% tolerance 10 Mounting bracket for Draloric resistors 11 Micro - switch for Bussmann fuses, 250V/2A. 2 N/O contacts. C/w Micro - switch bracket. 12 MicroSwitch, 1 NO + 1 NC Contact 14 Diode clamp black coated 15 Heat sink, mounting rail, SITRAS REC -D black coated 16 Heat sink, SITRAS REC -D black coated 17 Cubicle enclosure, complete with: busing, device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray Qty Dwq. Symbol Function 3 C111...C113 Suppression 18 F111...F163 Diode Protection 170M6753 Bussmann 4 R170.1....171.2 Discharge 4 18 S111...S163 1 S08 18 V111...V163 Rectification SW4OCXC1170 -P WCS 18 6 18 1 C130 1 F191 1 F192 1 R Manuf. Part No. KA2100- 0,47SAY ROE Suppression GMKP3200 -161B ROE Temperature 2670143 Elmwood Sensors Monitor Temperature 2670144 Elmwood Sensors Monitor 6 R111.1...113.2 Suppression GWK150100R10 %.M4 Draloric 2 R130.1...130.2 Suppression GBS30/133- 6R0 -10% Draloric GWS500SB- 3K9 -10% Draloric 424339 Blown Fuse 170H0099 Indicator 170H0067 Door Interlock 3SE30200A Draloric Siemens U1192/137 WCS JK2186- 890 -AL -807 JKK JK2186- 200 -AL -803 JKK Manufacturer Bussmann Rectifier Cubicle 8MF94 Siemens CLLR Stock # RECEIVED CITY 17.1KWILA JUN 2.3 7007 t ii �l t GEWER Rev# Date Apv'd Description Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS DC MAIN BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L100 Pg. 1 of 3 Item Description 1 SIMATIC S7 CPU 314C -2 DP Control System; with PROFIBUS -DP master /slave interface 64 KB RAM, integrated 24 VDC power supply, c/w 4 Analog Inputs, 2 Analog Outputs, 16 Digital Inputs & 16 Digital Outputs Standard temperature range W/2 Mbyte FEPROM memory card 2 SIMATIC S7 -300 Digital Input module 16 inputs, 24 VDC with labeling strip and bus connector 3 PROFIBUS bus connector, 12 Mbit/s data XSFR 90 degree outgoing cable, terminating resistor, with isolation function, without PG socket 4 530mm S7 DIN Rail 5 PROFIBUS bus cable, 2 wire, shielded for interconnecting PROFIBUS terminals. 6 PROFIBUS bus cable, plastic fiber optic for interconnecting PROFIBUS terminals. 7 NOT USED 8 OLM /G12 -1300 Optical Link Module for distances up to 15kM 9 OBT Optical Bus Terminal 10 SIMATIC OP -270 HMI 5.7" color STN display, incl. mounting accessories. 11 NOT USED 12 PROFIBUS bus connector, 12 Mbit/s data XSFR 90 degree outgoing cable, terminating resistor, with isolation function, with PG socket 13 PROFIBUS bus connector, 12 Mbit/s data XSFR 35 degree outgoing cable, terminating resistor, with isolation function, without PG socket 14 SITRAS BUFFER AMPLIFIER DIN RAIL MOUNTING 15 SITRAS VOLTAGE DIVIDER DIN RAIL MOUNTING 16 NOT USED 17 NOT USED 18 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 16A 19 Miniature Circuit Breaker, N -Type, DC 440V, 4.5 kA, 2 -pole, C characteristics, 6A w /Aux. Contacts 20 NOT USED 21 Space heater, 150W, 120VAC Qty Dwg. Symbol 1 A100 -D10 1 2 A100 -D11 1 A101 1 A102 40 A103 meters 50 A104 meters 1 A105 1 A106 1 A107 1 A108 1 A109 1 A110 1 F11 1 F12 1 HTR Function Manuf. Part No. Master PLC 6ES7 314- 6CF02 -0AB0 and SCADA Interface Extends I/O of S7 PLC Accessory 6ES7 972- 0BAl2 -0XAO Siemens PLC Accessory 6ES7 390- 1AF30 -0AA0 PLC Accessory 6XV1 830 -0EH10 PLC Accessory 6XV1 821 -0AN50 PLC Accessory 6GK1- 502 -3CC10 PLC Accessory 6GK1- 500 -3AA00 Operator Interface 6AV6 542- 0CA10 -0AX0 Panel OP Accessory OP Accessory Bus Voltage & Rectifier Current Bus Voltage & Rectifier Current Control Voltage for FO Control Voltage for PLC 6ES7 953- 38LL11 -0AA0 Siemens 6ES7 321- 1BH02 -0AA0 Siemens 6ES7 972- OBB12 -OXAO 6ES7 972- 0BA41 -0XA0 E10433- E9509 -H100 E10433- E9511 -H100 5SX5216 -7 5SX5206 -7 5SX9102 2E919 Made B Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Siemens Grainger (Vulcan) CLLR Stock # RECEIVED CITY TI JI WILA JUN 2.3 ?007 Rev # Date Apv'd Description Sound Transit I Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS DC MAIN BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L100 Pg. 2 of 3 Item Description 22 Electromechanical Counter, 6 Digit Operation Voltage 24V DC, Mounting: Snap -in. 23 Lamp Module, 22mm, Green Complete with lampholder and 24 VDC LED 24 Lamp Module, 22mm, Red Complete with lampholder and 24 VDC LED 25 Lamp Module, 22mm, White Complete with lampholder and 24 VDC LED 26 Lamp Module, 22mm, Blue Complete with lampholder and 24 VDC LED 27 Relay, Heavy Duty w /Magnetic Blowout DPDT 10A contacts @ 110VDC DC Operation @ 24V DC. 28 Plystyrene enclosure for K02 & K11 w /translucent cover 28 Relay, Heavy Duty w /Magnetic Blowout DPDT contacts © 110VDC DC Operation @ 24V DC. 29 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation © 24V DC, 1.2W. w/ socket 30 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation © 24V DC, 1.2W. w/ socket 31 Analog Voltmeter 4.25 "X4.25 ", Black Input: 0 to 20 mADC. Scale: 0.. +2kV. 32 Analog Ammeter 4.25 "X4.25 ", Black Input: 0 to 20 mADC. Scale: +6kA..0.. +6kA. 33 Shunt, Silver Plated. 6000A/50mV with 3/8" fins. 34 Resistor, 250 OHMS, 175 WATTS Variable with screwdriver adjustable lugs 35 Resistor Mounting Kit for R10 Centering Washers & Bolt 36 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO + 1 NC contacts. 37 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1NO + 1 NC contacts. 38 Local Remote Switch, Pistol Grip Handle, 1 deck w /engraved escutcheon LOCAL left 45deg., REMOTE vert 39 Breaker Control Switch, Open - Close, Pistol Grip Handle spring return to center, 1 deck, no target w /engraved escutcheon Qty Dwg. Symbol 1 H01 1 H1 1 H2 1 H3 1 HSO 1 K02 1 K02, K11 1 K11 1 K15 1 K50 1 P1 1 R1 1 R10 Auxiliary 1 SO1 1 SO2 1 S1 R10 Function Breaker Operation Counter Breaker Open Breaker Closed Local /Remote Substation Trouble Trip Breaker Aux. Relay Relay enclosure Close Breaker Aux. Relay Ok to Close Circuit Breaker Ok to Close Circuit Breaker Main DC Bus Voltage Measuring 1 P2 Rectifier DC Output Current Measuring Reverse Current Measurin Breaker Holding Coil Current Path Truck In Test Position Truck In Connect Position Local /Remote Switch 1 S3 Breaker On /Off Switch Manuf. Part No. SR8 -4016 3SB3244 -6BA20 3SB3244 -6BA60 3SB3244 -6BA50 3TX7130 -ORCO3 TK -2518 116 -508 3TX7130 -ORCO3 3TX7114 -5 LCO3 3TX7144 -1 E6 3TX7114 -5 LCO3 3TX7144 -1 E6 103 11 1 xxxx 103 11 2 xxxx Dwg 90000 -973 D225K250 7PA200 3SX3102 3SE3020 -1 A 3SX3102 3SE3020 -1 A 24201D 2438D Made B Redington Siemens Siemens Siemens Siemens Siemens Altech Siemens Siemens Siemens Yokogawa Yokogawa Canadian Shunt Ohmite Ohmite Siemens Siemens Electroswitch Electroswitch CLLR Stock # REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUK - 2007 City Of Tukwila EDINUWSION RECE!VEb r'' fJWILA JUN 23 7007 Cr' Erliwi l G 1 Rev # Date Apv'd Description Sound Transit Central Light Rail Link SIEMENS Trans Systems, Inc. MAINLINE TPSS DC MAIN BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS - L100 Pg. 3 of 3 Item Descri • tion 40 Pushbutton, Flat, 22mm Black Knob, Plastic Front Ring and 1 NO +1 NC Contact Block 41 Thermostat, single pole, snap action contacts: 22amps @ 120/240VAC. Wall mount. 42 Auxiliary Plug -in Relay, 3 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 1 TSTAT 1 186 1 1 72 -0 Dw. S mbol S50 43 DC High Speed Circuit Breaker with: HSCB HPB60 82S 6000A, 2000VDC Five auxiliary switches with connector pin Tripping range: 9 -15 kA With Magnetic Overcurrent device defeated Draw -Out Circuit Breaker w/o Carriage Solenoid Operated, Electrically Held Arc Chute Type 82S Aux Operating Voltage 125V DC 44 DC High Speed Circuit Breaker accessories: 1 72 -0 Aux 1 ea HSHR430547R0001 Position Indicator 1 ea VEAM connector (Aux) CIRO8F- 32- 8S- F80 -T12- 696 -MOD 2 ea HAK4300 -G50 Ferraz Contact Plates 1 set HAK3200 -F180 Ferraz Finger Clusters - X1 1 set HAK3200 -F110 Ferraz Finger Clusters - X2 45 Kirk key interlock, Type 'FL ". 1 K key interchange with negative disconnect switch. Flat mounted, no bolt projection, 1 cylinder key removable in extended position. 46 Cubicle enclosure, complete with: busing, 1 FO device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray Function PLC Reset Heater Control Mass Trip Aux. Relay DC Breaker DC Breaker Kirk Key Main DC Breaker 8MF94 and Master PLC Cubicle Manuf. Part No. 3SB1201 -0AB20 2E815 3TX7115 -5NCO3 3TX7144 -1 E4 AUR448211A800212 UR 26.81S -50 -5S K -FL -0 -000 -1 E -S Made B Siemens Grainger (Dayton) Siemens Secheron Ferraz REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG - 2007 Kirk Key Interlock Co. Siemens CLLR Stock # City Of Tukwila B ILDIN D ION RECERIED cm/ T IJKWILA JUN 28 7007 PalivisicENTER Rev # Date Apv'd Description Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS DC FEEDER BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L101 Pg. 1 of 3 Item Descri • tion 1 SITRAS DPU96 PU CENTRAL UNIT, V3 (V3.11) 24 DIGITAL INPUTS, 16 DIGITAL OUTPUTS INPUT 125 VDC, OUTPUT 24 - 90VDC, 5A, MAX. INST. 7.5A OPERATING TEMP. RANGE 0... +50 DEGC DIN RAIL MOUNTING 2 SITRAS DPU96 X2 Connector Set SITRAS DPU96 X1 Connector 4 PROFIBUS bus cable, 2 wire, shielded 1 150-Al for interconnecting PROFIBUS terminals. 2 meters 5 DPU96 bus connector for PROFIBUS, 90, w/o PG 1 150-Al 6 SITRAS DPU96 Control Function w/lntertripping Function 7 SITRAS DPU96 BA BUFFER AMPLIFIER DIN RAIL MOUNTING 8 Fiber- Optic Cable With Plug, Length 3meters For connecting BA to SITRAS DPU96 PU 9 SITRAS DPU96 VD VOLTAGE DIVIDER MODULE DIN RAIL MOUNTING UNIT lOcmX7cmX12cm 10 Top Hat DIN rail forSITRUS DPU mounting. 11 DC Fuse with trip indicator, 10 A, 1500 VDC, 30kA 1 FO Line Test CC 1591 CPgRD 20X127/10 12 Fuse Holder, 1 pole, 1500 VDC, 63 A 1 FO Auxiliary Line Test PSI 20X127 PRE 13 Miniature Circuit Breaker, N -Type, AC /DC, AC 400V, DC 440V, 1 F11 Control Voltage 4.5 kA, 2 -pole, C characteristics, 10A w /Aux. Contacts for F(x) 14 Miniature Circuit Breaker, N -Type, DC 440V, 1 F12 DPU -96 4.5 kA, 2 -pole, C characteristics, 10A Control Power 15 Space heater, 150W, 120VAC 1 HTR 16 Electromechanical Counter, 6 Digit Operation Voltage 24V DC, Mounting: Snap -in Panel Mount. 17 Lamp Module, 22mm, Green Complete with lampholder and 24 VDC LED 18 Lamp Module, 22mm, Red Complete with lampholder and 24 VDC LED 19 Lamp Module, 22mm, White Complete with lampholder and 24 VDC LED 20 Lamp Module, 22mm, Yellow Complete with lampholder and 24 VDC LED 21 Contactor, Size 1, 2 Pole, DC-4 Rated Operating Current 32A. 2NO +2NC Contacts w /Screw Terminals. DC Operation @ 24V DC, 3W. 22 Relay, Heavy Duty w /Magnetic Blowout DPDT 10A contacts © 11(' DC Operation © 24V DC. 1 1 150-Al Process Interface E10433- E9502 -H510 Siemens 1 150-Al Supply Interface E10433- E9502 -H520 Siemens 1 150-Al Breaker Control 1 XTRIP 1 150 -A2 Feeder Volt Amp & Line Test 1 150 -A2 F/O Cable 1 150 -A3 Feeder Volt Amp & Line Test Measuring 1 H01 1 H1 1 H2 1 H3 1 H10 1 K02 Dw• S mbol 150 -AO Function Manuf. Part No. Feeder Control E10433- E9702 -H311 and Protection Unit (di /dt, Line Test, Bus Voltage Measuring, & Monitoring) PLC Interface PLC Interface Breaker Operation Counter Breaker Open Breaker Closed Local /Remote Group Alarm 1 KO Line Test Contactor Trip Breaker Aux. Relay 6XV1 830 OAH10 Siemens 6ES7972- 0BA11 -0XAO Siemens E10433- E9705 -F001 E10433- E9705 -F002 E10433- E9509 -H100 E10433- E9502 -HSO6 E10433- E9511 -H100 COD�ECOMP FOR NFPA 70 - NEC AUG 2 7 2007 aty Of Tukw alai BI I1 1 1 • r1.i• 6ES7390- 1AF30 -0AA0 Siemens F081655 5SX5210 -7 5SX9102 5SX5205 -7 2E919 SR8 -4016 3SB3244 -6BA40 3TX7130 -ORCO3 Manufacturer Siemens Siemens Siemens Siemens Siemens Ferraz F097203 Ferraz Siemens Siemens Redington Siemens 3SB3244 -6BA20 Siemens 3SB3244 -6BA60 Siemens 3SB3244 -6BA30 Siemens Grainger (Vulcan) 3TC4417 -0AB4 SIEMENS Siemens CLLR Stock # RECEIVED CiTY si ±K'MLA JUN 2..3- ?OP Rev # Date Apv'd Description 1 Sound Transit 1`` Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS DC FEEDER BREAKER BILL OF MATERIAL 00 6 -3 -05 LB Preliminary Release 01 12/7/05 LB Revised for ckt changes Dwg. TPS -L101 Pg. 2 of 3 Item Descri 'tion 23 Polystyrene enclosure for K02 & K11 w /translucent cover 23 Relay, Heavy Duty w /Magnetic Blowout DPDT contacts @ 110VDC DC Operation @ 24V DC. 24 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 25 Auxiliary Plug -in Relay, 4 Form C Contacts DC Operation © 24V DC, 1.2W. w/ socket 26 Auxiliary Plug -in Relay, 2 Form C Contacts DC Operation @ 24V DC, 1.2W. w/ socket 27 DC High Speed Circuit Breaker with: HPB45 82S Manual Tripping Device M3 4500A, 2000VDC Five auxiliary switches with connector pin Tripping range: 3 -7 kA With Magnetic Overcurrent device set to a value of 5kA Draw -Out Circuit Breaker w/o Carriage Solenoid Operated, Electrically Held Arc Chute Type 82S Aux Operating Voltage 125V DC 28 DC High Speed Circuit Breaker accessories: 1 ea HSHR430547R0001 Position Indicator 1 ea VEAM connector (Aux) CIRO8F- 32- 85- F80 -T12 -696 -MOD 2 ea HAK4300 -G50 Ferraz Contact Plates 1 set HAK4300 -F180 Ferraz Finger Clusters - X1 1 set HAK4300 -F110 Ferraz Finger Clusters - X2 Without trip counter switch 29 POWER RESISTOR, 100 ohm, 300 watt withstand rated wattage for 5 seconds 30 Shunt, Silver Plated. 4000A/60mV 31 Resistor, Variable, 250 OHMS, 225 WATTS 32 Resistor Mounting Kit for R10 33 Resistor, Wirewound, Variable, 5 %, 50 watt, 500 ohm 34 NOT USED 35 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO & 1 NC Contacts 36 Limit Switch, Momentary Roller Lever head w/ Metal Enclosed w/ 1 NO & 1 NC Contacts 3 1 K11 1 K15 1 K20 1 1 K24 1 1 172 -x (x =1,2,3 &4) RO R1 R10 1 R10 Auxiliary 1 R85P 1 S01 1 SO2 Dw• . S mbol K02, K11 172 -x Aux Function Relay enclosure Close Breaker Aux. Relay Ok to Close Circuit Breaker Lockout DC Feeder Group Alarm DC Breaker Line Test Measurin. di /dt Current Measurin • Breaker Holding Coil Current Path Transfer Trip Circuit Truck In Test Position Manuf. Part No. TK -2518 116 -508 3TX7130 -ORCO3 3TX7114 -5LCO3 3TX7144 -1 E6 3TX7111 -3PCO3 3TX7144 -1 E5 3TX7114 -5LCO3 3TX7144 -1 E6 UR26 E125D1xxxE81 E300K16R Dwg. 90000 -972 D225K250 7PA200 D50K500 3SX3102 3SE3020 -1A Truck In Connect 3SX3102 Position 3SE3020 -1A Manufacturer Altech Siemens Siemens Siemens Siemens Secheron REVIEWED FOR CODE COMPLIANCE DC Breaker NFPA 70 - NEC Ferraz AUG 2 7 2007 RARA Canadian Shunt Ohmite Ohmite Ohmite Siemens Siemens CLLR Stock # City Of Tukwila B I DIN D N RECEIVED CITY =, JUN 29 9007 r E6�ii6'ii l CEl� ;;� j Item Description 37 Local Remote Switch, Pistol Grip Handle, 1 deck w /engraved escutcheon LOCAL left 45deg., REMOTE vert 37 Actuator, 22mm, Bks Safety LockSeq. 1 S2 Breaker Direct On 3SB1000 -5BA01 Siemens 0-I Momentary Contact. Key Withdraw at Position O. Closure No. S1, w/ Metal Front Ring c /w22mm,1NO +1NC Contact Block 1 3SB1320 -0A 38 Breaker Control Switch, Open - Close, Pistol Grip Handle 1 S3 Breaker On /Off 2438D spring return to center, 1 deck, no target Switch w /engraved escutcheon 39 Actuator, 22mm, O. M. R. Safety Lock Seq. 1 S4 Line Test 3SB3500 -3AJ01 Siemens 0-I Maintained Contact. Key Withdraw in Left Position. Disable w/ Metal Front Ring c/w22mm,1NO +1NC Contact Block 1 3SB3400 -0A 40 Thermostat, single pole, snap action 1 TSTAT Heater Control 2E815 contacts: 22amps @ 120/240VAC. Wall mount. 41 Cubicle enclosure, complete with: busing, 1 Fx Feeder Cubicle SEA -FCUB Siemens device mounting panels, wiring raceways, DIN rail terminal blocks, DIN rails, hinged doors and associated hardware 12 ga. steel frame. 14 ga. steel doors, sides and back Paint finish: ANSI 61 Gray Qty Dwg. Symbol 1 S1 Function Manuf. Part No. LocalRemote 24201D Switch Manufacturer Electroswitch Electroswitch Grainger (Dayton) CLLR Stock # REVIEWED FOR CODE COMPLIANCE NFPA70 -NE AUG 2 7 2007 City-Of Tukwila BUILD N D S N Rev # 00 01 Date 6 -3 -05 12/7/05 Apv'd LB LB Description Preliminary Release Revised for ckt changes Sound Transit Central Light Rail Link SIEMENS Transportation Systems, Inc. MAINLINE TPSS DC FEEDER BREAKER BILL OF MATERIAL Dwg. TPS -L101 Pg. 3 of 3 SCL METER "DET. A" FIRE & INTRUSION PANEL 60 36 2 5 36 36 I 'Az 0 / / � :%/////// / / / / / / / /K .J / 11i: .. '7-" •.�- .a --- _ - - -_. . sA� -- •__ -js s s c - . • r• SSS 3070 DOOR FE1 UTILITY METERING 20 16 ,. FLOOR HITCH (INSy ED) . . BLUE LIGHT ETS IN LOCKED BOX FOR FIRE DEPT CARD ACCESS KNOX BOX AC PANEL 4 20 REMOTE CPT AC BREAKER 49 "DET A" APT & FUSE BKR TEST STATION 20 NOTE: REMOVABLE PANELS BEHIND TRANSFORMER ONLY XFMR AC BREAKER 481 FOLD UP WORK BENCH 72 ABOVE 8 BATTERY DC PANEL 20 BAT CHGR 9� 2 136 RECTIFIER TRANSFORMER / \ 30 5300CFE ROOF 1 MTD. VENTILATOR BATTERY RACK 37 EYE WASH 1 EATER 654 20 --r -19 —i6- 48 312_ 1 35 1 6 4 N CUBICLE • RECTIFIER #1 X 1/4" GLASTIC (NOTE 3) . • • .WALL MTG: • FILTRATION SYSTEM • RECTIFIER • #2 46 7 35 31 1 2 CCIC 36 238 238 238 • Fl (72-1) TELEPHONE PROVIDED BY SOUND TRANSIT . . • CONTROL CENTER . INTERFACE. CABINET . • 44 .F2 (72-2) AUG 2 7 2007 City Of Tukwila B ILDING D SI N F3 (72-3) EPDXY INSULATED - FLOOR. COVERING . 530bCFE ROOF . MTG. VENTILATOR REVIEWED FOR CODE COMPLIANC NFPA 70 - NEC 238 F4 (72-4) 5 •8 MOTOR OPERATED TRANSFER SWITCHES 81 1098 .1/8" INSULATEb WALLS % A S. .• . FLOOR 14\TCH (INS, AZED) 84 SSS ,{ 6080 DOOR FE2 CARD ACCESS 174 NOTES: 1. ALL DIMENSIONS IN INCHES. 2. LIGHTING RECEPTACLES AND SWITCHES WILL BE PROVIDED ON CONDUIT PLAN. 3. INSTALLER TO SUPPLY, SUPPORT AND PROTECT GLASTIC EXTENSIONS BETWEEN RECTIFIER AND RECTIFIER TRANSFORMER. RECEIVED C11Y' = ! iK WILA JUN 2; 3 ?no7 E - v t GENIzj 02 01 7/19/05 3/30/05 0 W nAT. Revised per Customer Comments Revised per Customer Comments PJO PJO nv LB LB SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE,, SUITE 106 LAKEOSWECO, OREGON 97034 wit SOUNDRtANSR PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY 12/23/2004 DATE DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM TUKWILLA INTERNATIONAL BOULEVARD TPSS C36 SUBSTATION BUILDING EQUIPMENT ARRANGEMENT PLAN CONTRACT DRAWING REV. NO. RTA /LR 82-03 / C807 I NO. C36- B001 -01 02 95 EMI DT MY PT DISCONNECT & MEIERRID COMPARTMENT CEILING 168 NT FUSES acEI ,oD fl ED FIXED PANEL PANEL III1I1IIIIIllll uttli HINGED ACCESS DOOR TAP ACCESS 136 5 <� ` gyp RECTIFIER TRANSFORMER HINGED ACCESS DOOR T TAP ACC ESS BUS DUCT WITH PROTECTIVE DIELECTRIC SCREENING @ CII= ■ _n ® �r� I la FIXED PANEL IX" 654 HI 1/4" GLASTIC 312 1/4" GLASTIC 7 35 16 IMO MU. __. ■.n.I. N EM MIT. Mau MUM • . MINIM 111111111111 MIMI= I .1 111111111111 111111111111 MBA MEM 11111111111 a Mr MEM MEIN 35 16 MAIN BREAKER 72-0 31 2 1/4" GLASTIC 7 AUG 2 7 2007 FEEDER 72.1 F 23 8 REVIEWED FOR CODE COMPLIANC NFPA 70 - NEC City Of Tukwila B ILDING DIV ION FEEDER 72-7 .t. F 238 F FEEDER 72-3 23 NOTES: FEEDER 724 SI 238 FEEDER 724 F 23 8 1. ALL DIMENSIONS IN INCHES. rr - —,7 EPDXY INSULATE FLOG OVERING 109a- rr RECEIVED CITY Till <WIL.A JUN 23 1007 (>✓�t Div i i CEI I E? 1 REV DATE DESCRIPTION BY ENG CHK APP SIEMENS m m TRANSPORTATION SYSTEMS, INC. 3000SWEGO POINT EDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 SOUNDTMtANSR PAT O'HOGAN 12/07/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/07/2005 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/07/2005 APPROVED BY DATE SCALE: LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM AC & DC SWITCHGEAR EQUIPMENT ELEVATION FOR SUBSTATION BUILDINGS TPSS C16 & C36 CONTRACT DRAWING REV. NO. RTA /LR 82 -03 / C807 f NO. TPS- B001 -03 00 TPSS MODs DISPATCHER NUMBER C33 TWO C32 -H -613 & C32 -H -624 C33 TWO C33 -H -613 & C33 -H -624 REV 115 DATE CEILING S S5 654 84 0 I. - 1 Cxx -H -624 81 DESCRIPTION m 0 .w Cxx -H -613 BY 44 CHK APP CCIC 36 46 FILTRATION SYSTEM HTR FOLD UP WORK BENCH ABOVE \ BATTERY X EYE WASH 48 -I 16 I- --19-- I--- 20-- I---37 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTEDRIkE, SUITE 106 LAKE OSWEGO, OREGON 97034 ❑❑❑❑❑ BATTERY ❑❑❑❑❑ BATT. CHGR DC PNL 192 20 48 16 PAT O'HOGAN 12/07/2005 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 12/07/2005 DATE DES CKD BY DATE LANCE BANASZEK 12/07/2005 APPROVED BY DATE REVIEWED FOR CODE C OMP� NCE' . A -NEC AUG 2 7 2007 C' Of T kjj rl� TIN AC & DC BRK TEST PNL 20 SouNUikanisrr SCALE: 1/4 " =1' ISOLATION TRANSFORMER JBOX 49 AC PNL 20 FIRE & INTRUSION PANEL (NIC) 16 F- - 20 - -1 RECE!VED NOTES: 1. ALL DIMENSIONS IN INCHES. cry 2. AUXIARY EQUIPMENT ARRANGEMENJUN 9 R ?nn IS TYPICAL FOR ALL MAINLINE TYPE . FEhMVll1 QG,N ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM AUXILIARY EQUIPMENT ELEVATIONS FOR SUBSTATION BUILDINGS TPSS C16 & C36 CONTRACT DRAWING REV. NO. RTA /LR 82 -03 / C807 I NO. TPS- 8001 -04 00 I i i c t S E 10 ZE 01 REV 9/2105 DATE ANCHOR POINT (12 PLACES) (NOTE 2) 127.00 [ 25.40 [1.00] 114.20 [4.50] 1 63.50 [2.50] DESCRIPTION 1524.00 [60.00] 1270.00 [50.00] 635.00 [2500] BOTTOM ENTRY TO UTILITY METERING FRAME 114.20 [4.50] 1295.40 [51.00] UTILITY METERING CONTROL CABLE ENTRY AREAS TOP OR BOTTOM FRAME 1 STITCH WELD FLOG LINE SWITCHGEAR & TRANSFORMER ANCHORING TO METAL FLOOR DETAIL PO FRAME DS Revised Per Customer Comments - STME00203 LB BY ENG CHK APP 254.00 [10.00] B— J 914.40 [36.00] 660.40 [26.00] 254.00 [10.00] APT FRAME 2 ANCHOR POINT 914.40 [36.00] AC BREAKER FRAME 3 6807.26 [268.00) SIEMENS TRANSPORTATION SYSTEMS, INC. 3G0OSWEGOPo/NTEDRIVE, SUITE ft* LAKE OSWEGO. OREGON 97034 1587.50 [62.50] 3454.40 [136.00] 1587.50 [62.50] (NOTE 2) RECTIFIER TRANSFORMER REVIEWED FOR CODE COMPLIANCE NFPA70 -NEC AUG 2 7 2001 City Of Tukwila BUILDING DIVISION Souxnikanatr ANCHOR POINT (6 PLACES) 139.70 [5.50] PAT O'HOGAN DRN BY DRN CIO BY PAT 01iOGAN DES BY ._ LANCE BANASZEK APPROVED BY SCALE: 1:16 1828.80 [72.00) 762 [30] 139.70 [5.50) N CUBICLE 1/4" GLASTIC (NOTE 4) RECE!VFD KIAnLA JUN 2 3 ?007 rfivl) LA.:Nl g� NOTES: 1. ALL DIMENSIONS IN MILLIMETERS [INCHES] 2. 2" STITCH WELD AT ALL ANCHOR POINTS. 3. WIRE BRUSH, COLD GALVANIZE AND PAINT ALL WELDS. TOUCH UP PAINT TO MATCH EQUIPMENT. 4. INSTALLER TO SUPPORT AND PROTECT GLASTIC EXTENSION BETWEEN RECTIFIER TRANSFORMER AND N CUBICLE 6/17/05 DATE DATE 6/17/05 DA DATE 6/17/05 DATE I DRAWING PRD-B001 -01 IRE,/ LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR ANCHORING PLAN CON . R TA /LR 82-03 / 0807 01 304.44 [11.99] 186.31 [7.34] 110.00 [4.33] 9/2/05 DATE • LECTRICALLY INSULATED MOUNTINGS TO FLOOR (TYP) RECTIFIER #2 BOLT -UP DETAIL -A R INSULATED CONNE SHT 4 0 f 1/4" GLASTIC 110.00 580.00 225.94 680.00 [4.33] [22.83] [8.90] [26.77] BOLT -UP DETAIL - A FOR INSULATED CONNECTION SHT 4 CABLE ENTRANCE (NEGATIVE RETURN CABLES) 328.60 328.60 12.94] 1 [12.94 O N CUBICLE DESCRIPTION 0 Revised Per Customer Comments - STME 00203 RECTIFIER #1 B T-UP DETAIL - B FO MECHANICAL CONNE SHT 4 PO BY ENG DS CHK ON LB APP 220.00 [8.66] 1/4' GLASTIC 680.00 [26.77] TION • 225.94 [8.90] 680.00 [26.77] 220.00 [8.66] 680.00 [26.77] 1 115.94 [4.56] 110.00 [4 33] 5811.89 [228.81] CABLE ENTRANCE AREA (POSITIVE CABLES TO OCW) (TYP) 225.94 580.00 220.00 380.00 220.00 380.00 220.00 380.00 220.00 380.00 [8.90] [22.83] 1 5/8" UNISTRUTS (TYP) BOLT -UP DETAIL - B FOR MECHANICAL CONNECTION SHT4 FO (72 -11) 40.00 [1.57] (8.66) (14.96] F1 (72 -1) X0.00 220.00 " - 380.00 [22.83] [8.66] [14.96] PLAN VIEW SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO RO/N7E DRIM SUITE 106 LAKEOSWEGO, OREGON 97034 O [8.66] [14.96] [8.66] F2 (72 -2) 220.00 " 380.00 220.00 I L 8.b . T D-E 6) CODE COMPLIANC NFPA70 -NEC AUG 2 7 2007 Sourn7kannrr PAT O'HOGAN 6/17/05 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 6/17/05 DES BY DAZE - 61 RIM7 DATE LANCE BANASZEK 6/17/05 APPROVED BY DATE SCALE 1:16 (14.96] F3 (72 -3) 380.00 [14.96] 0 [8.66] [14.96] [4.33] 220.00 [8.66] 225.00 (8.86] (TYP) F4 (72-4) 380.00 [14.96] NO. RTA /LR 82 - 03 / C807 225.00 [8.86] (TYP) 110.00 110.00 [4.33] LINK LIGHT RAIL PROJECT 252.50 [9.94] 56.14 [2.21] 40.00 [1.57] 74 .36 1400.00 (29 19] [55.12] 310.00 [12.20] N ?TES: . ALL DIMENSIONS IN MILLIMETERS [INCHES] RECEIVED ?. ANCHORING DETAILS ON SHT. 3 City Of Tukwila i. BOLT -UP DETAILS ON SHT. 4 CITY IG _BU__ILDNG D IVISION JUN 23 7007 PEkial CENTER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR ANCHORING PLAN 01 01 REV 11/15/05 DATE Revised Per Customer Comments, Add Note 2 DESCRIPTION ANCHORING CUTOUT IN FLOOR SEE DETAIL- A STITCH WELD BOTH SIDES TO FLOOR RA BY ENG PO CHK 76.2 131 UNISTRUT ANCHOR CUTOUT IN FLOOR DETAIL (NTS) DETAIL "A" LB APP [0.981 25mm ANCHOR HOLE IN EQUIPMENT DC SWITCHGEAR ANCHOR BOLT, HEX HEAD 3/8 - 16 X 2 1/4, SS INSULATING BUSHING (STS SUPPLIED) DC SWITCHGEAR ANCHORING DETAIL FOR METAL BUILDINGS ONLY 50.8 [ INSULATED FLOOR NYLON RETAINER CHANNEL NUT UNISTRUT SIEMENS DC SWITCHGEAR INSULATED FLOOR I m TRANSPORTATION SYSTEMS, INC. 300OSWEGOPO/NTEDRIVE SURE 106 LAKEOSWEGO, OREGON 97034 r 34.92 [1.375) CHANNEL NUT WITHOUT SPRING (Side View) Soutelkmsff CHANNEL NUT WITHOUT SPRING (Top View) 11 9.525 1.3751 CHANNEL NUT WITHOUT SPRING (End View) 1 5/8' UNISTRUTS BETWEEN JOISTS CAP ENDS AND STITCH WELD TO UNDERSIDE OF FLOOR NOTES: 1. ALL DIMENSIONS IN MILLIMETERS [INCHES] 2. Mounting Details Shown on This Drwaing Is Typical For All DC Switchgear Mounted In Prefabricated Buildings Only. PAT O'HOGAN 6117/05 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 6/17/05 DES BY DATE LANCE BY N A SZEK 611 E APPROVED BY DATE SCALE NONE SECTION A —A COINING DETAIL RECEIVE D CITY _i tinVILA JUN 21 2007 PEhI i i C;EN9 F LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR ANCHORING DETAILS CON' RACE 'DRAWING REV. NO. RTA /LR 82 -03 / C807I NO. PRO- B001 -03 I 01 8 V vs f Ft I . F® ZIS 01 REV 9/2/05 DATE 25.00 [ 700.00 [27.56) 016.00 [00.63) BOLT UP POINT (10 PLACES) Reviesed Per Customer Comments - STME 00203 DESCRIPTION 1400.00 [55.12] SIDE VIEW OF DC SWITCHGEAR PO BY DS ENG CHK 700.00 [27.56) LB APP 9.52 ( 1 7) 200.00 [7.87] 680.00 [26.77) [20. 600.00 [23.62] 200.00 [7.87] 2200.00 520.00 [86.61 ] SIEMENS TRANSPORTATION SYSTEMS, INC. JW OSWEGO POINT EDRIVE SUITE 106 L 4KEOSWEGO OREGON 97034 Sours i AN ■ DETAIL A (NTS) 114' GLASTIC M8X35 NYLON FASTENER 23.00 (.906) * DETAIL B (NTS) PAT O'HOGAN 6/17/05 DRN BY DATE SCALE 1:16 PARTITION WALL SHEET METAL, GALV M8X25 FASTENER 23.00 NOTES: 1. ALL DIMENSIONS IN MILLIMETERS [INCHES) DRN CKD BY DATE PAT O'HOGAN 6/17/05 DES BY AT E — — LANCE BANASZEK 6/17105 APPROVED BY DD TE PARTITION WALL SHEET METAL, GALV STANDARD MECHANICAL MAKEUP CONTRAC NO. RTA/LR82 -03!C80 LINK LIGHT RAIL PROJECT RECEIVED CITY _ TUKVVI JUN 23 ?nm u=6[v�l i GEN I I 'R TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION DC SWITCHGEAR BOLT -UP DETAILS NO. IN PRD- B001 -04 REV. 01 1 DESCRIPTION ABB FRAME NO. 1 N1 UTILITY PT DISCONNECT & METERING COMPARTMENT N2 FUSE VIEWING WINDOW UTILITY PT COMPARTMENT 36" 2 300OSWEGOPOINTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 SIEMENS TRANSPORTATION SYSTEMS, INC. 36" 3 ani SOUNDTRANSIT 00 00 7330 u :nn BREAKER DRN CKD BY PAT O'HOGAN DES BY SCALE: 1:16 POTENTIAL TRANSFORMERS DPU2000R u u ct!a 36" 4 PAT O'HOGAN 7/12/05 DRN BY DATE DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE m (9 RECEIVEC CIS' I IKwILA JUN 2.3 711 Paiivil b✓s:.tV t ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR ELEVATIONS FOR C16 & C36 CONTRACT DRAWING NO RTA /LR 82 - / C807 NO. TPS- M040 -04 REV DATE UNISTRUT CHANNEL DFSCRIPTION FRAME 1 POWER COMPANY METERING FRAME cur_ ruv GROUND STUDS GROUND STUDS ADO INSTRUMENT COMPARTMENT 1200A . BREAKER FRAME 2 FEEDER BREAKER SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEORNE, SUITE 105 LAKEOSWEGO, OREGON 97034 INSTRUMENT COMPARTMENT FRAME 3 APT & APT FUSES SOUNDTRANSIT NOTES: 1. POWER COMPANY TO PROVIDE REVENUE METERING CTs & VTs. 2. ALL DIMENSIONS IN INCHES PAT O'HOGAN 7/12/05 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE: BUS PT'S INSTRUMENT COMPARTMENT • 1200A . BREAKER FRAME 4 MAIN BREAKER iF iF RECEIVED CITY C F TUKVVILA JUN 2 8 2007 PERMIT CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR SECTION VIEWS FOR C16 & C36 CONTRACT DRAWING NO. RTA /LR 82 -03 / C807 NO. TPS- M040 -05 REV. 00 ITEM N1 N2 N3 N4 N5 N6 N7 N8 N9 QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE (ENGRAVING TO BE DETERMINED BY SOUND TRANSIT) RECEIVED CITY I: TuKINIIA JUN 28 2007 PE6W CENTER ocv OCTF f1FCCDIDTIIIN Dv cur_ ruv ADD SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 souNuiivwsR PAT O'HOGAN 7/12/05 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 7/12/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE: LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION AC SWITCHGEAR NAMEPLATE SCHEDULE FOR C16 & C36 CONTRACT DRAWING REV. NO. RTA /LR 82 -03 / C807 I NO. TPS- M040 -06 00 sami∎n zszsssz WHIMS MEMIS I II FIXED PANEL MMEE IM mammas SEMBISSE ;x432=141laZE 6:110121MIMIlitSitSingiliatIWIMIUtliirlii SEE II I' BEESSOSESEEMEME am000m000n 11101110111E011111 111E011101 1111111.011M11111 011113111:1111 Ilm11[011111ma 1111(0111:031 IIMII IIMIIIc amooalua iimumnooanU amooanmou nmuU lIPB111a 11111031101 111111031110 11111 REMOVABLE PANEL 0 00 NNNNN . moss MISSES sZllTigl>n REMOVABLE PANEL 00 $mElI s . Enos SEEM Mititnsigi REFAOVABLE PANEL 0 mEiE s MEMO MESS ESS gliZIZIlaCI 5 El nCCrPIP TIAN REAR VIEW TOLERANCE: TERMINATION LOCATION DIMENSIONS + OR - 1/4" DRY TYPE TRACTION TRANSFORMER THREE PHASE, 60 HZ, FOR USE W/12 -PULSE EXTRA HEAVY TRACTION RECTIFIER RATED 3000KW, 1500VDC 3223/4296 KVA AA/FA PRI: 26,400V DELTA (3223 KVA) 150 kV BIL PRI TAPS: +2 X 1 -1/4 % & -2X 2 -1/2% OUT OF COIL FOR SOLID TAP LINK SEC #1: 1178 WYE (1665 KVA) 45 kV BIL SEC #2: 1178 DELTA (1665 KVA) 45 kV BIL IMPEDANCE: 9.0% AT 1/2 KVA, 16% AT FULL KVA COPPER WINDINGS 220 °C INSULATION CLASS, 65 °C TEMPERATURE RISE @ 100% LOAD PERCENT LOAD 25% 50% 75% 100% 150% EFFICIENCIES: 98.7% 99.1 99.2 99.1 98.3 TOTAL LOSSES: 10.7KW 14.1 19.7 29.2 58.0KW SOUND LEVEL: 70dB AT 1 FOOT FROM TRANSFORMER ENCLOSURE IMPREGNATION: DOUBLE CYCLE VPI QUALITROL, 3 PHASE, WINDING TEMPERATURE MONITOR WINDING TEMPERATURE INDICATOR WIRING DIAGRAM 3501 -21A FAN WIRING DIAGRAM 3501 -21B CONTROL WIRING IN GALVANIZED STEEL GRS CONDUIT 1/2 X 4.00 COPPER LV BUS SUPPORTED WITH PORCELAIN INSULATORS NEMA 1 INDOOR ENCLOSURE BASE MATERIAL: 6" X 3 -1/2" STRUCTURAL STEEL ANGLE BASE FINISH: BLACK MACRO -PDXY FINISH DOUBLE HINGED FRONT DOORS, REMOVABLE REAR PANELS STAINLESS STEEL LIFT HANDLES ON REMOVABLE PANELS ALL OTHER PANELS FIXED TAMPERPROOF HARDWARE ON REMOVABLE PANELS ENCLOSURE HARDWARE TO BE 3/8 -16 STAINLESS STEEL DOORS HAVE PADLOCKABLE HANDLE WITH DOOR STOP & LIMIT SWITCHES ENCLOSURE MATERIAL: HINGED DOORS 11 GUAGE AND OTHER PANELS 14 GAUGE ENCLOSURE FINISH: ANSI 61 GRAY ELECTROSTATIC POWDER PAINT PROVISIONS PROVIDED FOR FUTURE FANS APPROXIMATE WEIGHT: 22,000 LB. V /:HK APP 0 _ 014 4.5 38 ~ LIFT LUG DETAIL 3/4" THICK "GROUND PAD DETAIL" 1/2" STAINLESS STEEL 6 1/2 -13 TAP TYP 51 re FIXED PANEL 2 -HOLE NEMA GROUND PAD —I `—.75 HVTERMINATION DETAIL 1/4" X 4.00" TIN PLATED COPPER BUS 9/16 x 13/16 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON .97034 sammseNNeNNN 1 I .,,.h HINGED ACCESS DOOR TAP ACCESS 136 HINGED ACCESS DOOR y TAP ACCESS Na NNN NNNNN Mamma NNNNN FRONT VIEW 621 13 BASE DETAIL NNNN NEM LIFT LUGS 622 SG aaa= BMW Easesam 08 ANCHOR POINT (6 PLACES) 1.125 SOUNDTRANSIT 1.75 — F— .75 LV BUS DETAIL 1/2 x 4" COPPER 90 96 CODE C0 OR NFPA 70 - NEC AUG 2 7 2007 72 9/16 x 13/16 DRN CKD BY PAT O'HOGAN DES BY PAT O'HOGAN 7/12/05 DRN BY DATE DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE: NONE FIXED PANEL R1 R5 R4 R3 - R2 R6 y — 1116 A" START B" FINISH FIXED PANEL 2 HV TAPS SET FOR SOLID LINK ADJUSTMENT CANNOT BE CROSS CONNECTED NOTE: ALL DIMENSIONSMIIt� RECEIVED CITY 17 i U MEW I LA (I !:k; 7 CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER EQUIPMENT LAYOUT CONTRACT DRAWING REV. No. RTA /LR 82 -03 / C807 I NO. TPS- M041 -01 00 72 1" Z ' t2 5 H1 FIXED PANEL H2 H3 44 8 —12 - 3 48 o nCCrPIP TIAN REAR VIEW TOLERANCE: TERMINATION LOCATION DIMENSIONS + OR - 1/4" DRY TYPE TRACTION TRANSFORMER THREE PHASE, 60 HZ, FOR USE W/12 -PULSE EXTRA HEAVY TRACTION RECTIFIER RATED 3000KW, 1500VDC 3223/4296 KVA AA/FA PRI: 26,400V DELTA (3223 KVA) 150 kV BIL PRI TAPS: +2 X 1 -1/4 % & -2X 2 -1/2% OUT OF COIL FOR SOLID TAP LINK SEC #1: 1178 WYE (1665 KVA) 45 kV BIL SEC #2: 1178 DELTA (1665 KVA) 45 kV BIL IMPEDANCE: 9.0% AT 1/2 KVA, 16% AT FULL KVA COPPER WINDINGS 220 °C INSULATION CLASS, 65 °C TEMPERATURE RISE @ 100% LOAD PERCENT LOAD 25% 50% 75% 100% 150% EFFICIENCIES: 98.7% 99.1 99.2 99.1 98.3 TOTAL LOSSES: 10.7KW 14.1 19.7 29.2 58.0KW SOUND LEVEL: 70dB AT 1 FOOT FROM TRANSFORMER ENCLOSURE IMPREGNATION: DOUBLE CYCLE VPI QUALITROL, 3 PHASE, WINDING TEMPERATURE MONITOR WINDING TEMPERATURE INDICATOR WIRING DIAGRAM 3501 -21A FAN WIRING DIAGRAM 3501 -21B CONTROL WIRING IN GALVANIZED STEEL GRS CONDUIT 1/2 X 4.00 COPPER LV BUS SUPPORTED WITH PORCELAIN INSULATORS NEMA 1 INDOOR ENCLOSURE BASE MATERIAL: 6" X 3 -1/2" STRUCTURAL STEEL ANGLE BASE FINISH: BLACK MACRO -PDXY FINISH DOUBLE HINGED FRONT DOORS, REMOVABLE REAR PANELS STAINLESS STEEL LIFT HANDLES ON REMOVABLE PANELS ALL OTHER PANELS FIXED TAMPERPROOF HARDWARE ON REMOVABLE PANELS ENCLOSURE HARDWARE TO BE 3/8 -16 STAINLESS STEEL DOORS HAVE PADLOCKABLE HANDLE WITH DOOR STOP & LIMIT SWITCHES ENCLOSURE MATERIAL: HINGED DOORS 11 GUAGE AND OTHER PANELS 14 GAUGE ENCLOSURE FINISH: ANSI 61 GRAY ELECTROSTATIC POWDER PAINT PROVISIONS PROVIDED FOR FUTURE FANS APPROXIMATE WEIGHT: 22,000 LB. V /:HK APP 0 _ 014 4.5 38 ~ LIFT LUG DETAIL 3/4" THICK "GROUND PAD DETAIL" 1/2" STAINLESS STEEL 6 1/2 -13 TAP TYP 51 re FIXED PANEL 2 -HOLE NEMA GROUND PAD —I `—.75 HVTERMINATION DETAIL 1/4" X 4.00" TIN PLATED COPPER BUS 9/16 x 13/16 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON .97034 sammseNNeNNN 1 I .,,.h HINGED ACCESS DOOR TAP ACCESS 136 HINGED ACCESS DOOR y TAP ACCESS Na NNN NNNNN Mamma NNNNN FRONT VIEW 621 13 BASE DETAIL NNNN NEM LIFT LUGS 622 SG aaa= BMW Easesam 08 ANCHOR POINT (6 PLACES) 1.125 SOUNDTRANSIT 1.75 — F— .75 LV BUS DETAIL 1/2 x 4" COPPER 90 96 CODE C0 OR NFPA 70 - NEC AUG 2 7 2007 72 9/16 x 13/16 DRN CKD BY PAT O'HOGAN DES BY PAT O'HOGAN 7/12/05 DRN BY DATE DATE 7/12/05 DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE: NONE FIXED PANEL R1 R5 R4 R3 - R2 R6 y — 1116 A" START B" FINISH FIXED PANEL 2 HV TAPS SET FOR SOLID LINK ADJUSTMENT CANNOT BE CROSS CONNECTED NOTE: ALL DIMENSIONSMIIt� RECEIVED CITY 17 i U MEW I LA (I !:k; 7 CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER EQUIPMENT LAYOUT CONTRACT DRAWING REV. No. RTA /LR 82 -03 / C807 I NO. TPS- M041 -01 00 POWER IN FANS ON ALARM TRIP TRANSFORMER TEMPERATURE RISE 80 -265 VAC 20.280 VDC 180'C 190'C 200'C 65'C (4) % LOAD 135'C AFTER RI -9 n me f1CCCPIDT1/IKI TRANSFORMER ENCLOSURE 1 2 chin CHI( APP DOORS DOOR -TOP NORMALLY OPEN CONTACTS HELD CLOSE WHEN DOORS ARE COMPLETELY CLOSED. DOOR SWITCHES DOOR- BOTTOM TERMINAL BLOCK TO BE MOUNTED IN TEMPERATURE MONITOR ENCLOSURE. SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 SOUNDTRANSR CAUTION MAKE ALL EXTERNAL CONNECTIONS BEFORE APPLYING POWER TO INSTRUMENT. CONTROL VOLTAGE= 20- 220VDC 20- 286VAC 3 PH MONITORING STORED MAXIMUM TEMPERATURE FAN /ALARM/TRIP RELAYS MANUAL FAN CONTROL TYPE "K" THERMOCOUPLES FAN CONTROLLER SPECIFICATIONS MODEL 118P- U -K -0.1 NOTE: REFER TO QUALITROL INSTRUCTION MANUAL FOR FURTHER INSTRUCT' AND FEATURES THERMOCOUPLE LENGTH: 10.0' MOUNTED IN NON - REMOVEABLE PANEL NEMA -1 ENCLOSURE WITH FRONT HINGE PANEL FOR CONTROL WIRING ACC WIRING SHALL BE 600V SIS, 14 -GUAGE MIN. ALL WIRING ENCLOSED IN GALVANIZED GRS STEEL CONDUIT PAT O'HOGAN DRN BY DRN CKD BY DATE PAT O'HOGAN 7/12/05 DES BY DATE DES CKD BY LANCE BANASZEK APPROVED BY SCALE: REAR OF FAN CONTROLLER 7/12/05 DATE DATE 7/12/05 DATE TEMPERATURE MONITOR RECEIVED CITY Tt JK' !ILA JUN 28 2007 PE.hivin CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER DETAILS CONTRACT DRAWING NO RTA /LR 82 - 03 / C807 NO M041 - 02 I REV. 00 /e`!i �� Technologies VOW Corporation MANUFACTURED WITH PRIDE IN `et WYTHEVILLE, VA , USA 24382 DRY TYPE TRACTION TRANSFORMER SN 373223K15AC01 JOB 3501 DATE 12/04 IMP X.XX % @ 85 °C KVA 3223/4296 PHASE 3 HERTZ 60 TYPE AA /FA RISE 65 °C CLASS H 220 °C INS PRI: 26400 AMPS 70.48 BIL 150 CU COND SEC:1 1178 AMPS 816 BIL 45 Xc= .XXX SEC:2 1178 Y/680 AMPS 816 BIL 45 Xc= .XXX TAPS VOLTS AMPS -FA CAUTION: DE- ENERGIZE TRANSFORMER R4 BEFORE CHANGING TAPS R2 1 -2 27060 91.7 H2 R3 R6 2 -3 26730 92.8 3-4 26400 94.0 4 -5 25740 96.4 5 -6 25080 98.9 H1 H3 RI -9 EXTRA -HEAVY DUTY TRACTION TRANSFORMER CAPABLE OF 100% LOAD CONT., 150 %FOR 2 /MS WITH (5) -300% 1 -MIN LOADS &(1) 450% 15 SEC LOAD R1 R5 APPROXIMATE WT: 22000 LBS. TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINT E DRIVE, SUITE 106 1AKE OSWEGO, OREGON 97034 SOUNDTRANSIT LANCE BANASZEK 7/12/05 DRN BY DATE ORN CKD BY DATE PAT O'HOGAN 7112/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 7/12/05 APPROVED BY DATE SCALE: RECEIVED TH KVV!LA JUN 2 8 2007 CEI;1v1►1 CEN (ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION RECTIFIER TRANSFORMER NAME PLATE CONTRACT DRAWING REV. NO. RTA /LR 82 -031 C807 I No. M041 -03 00 0 CI CI 0 0 CV 00 RECTIFIER TRANSFORMER 000000000 0000000 0000■000■ CCO =CC00Co FEEDER fI 1 11011011011011 110 1 11111111111111 111 110110181101 810 10110101111 1111111111 1111111111 81 111 111111111111 1111111 11111 1111 11 111111111 1111111 1101111011 010011 11111111111111 111111111111 11111111 01110 1 1111110111 1101 01111111 OP 270 0m00o0 ,-- +0•00•00 000■0000 1=1C1=1C=ODC=3C.:=1 l� l° N o 0 ` ° m oo 7\0 0 Q. moo mo o ° `. 00 00 L. 00 ■00000000 00000000 000000000 0000■0000 1/4" GLASTIC . 1/4" GLASTIC 312 ,,v rAir. ruv A00 7 35 16 35 16 3 12 MAIN BREAKER 1/4" GLASTIC FRONT VIEW SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 23R FEEDER Fl 238 FEEDER F2 SOUNDTRANSIT 238 FEEDER 3 PAT O'HOGAN 11/22/05 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 11/22/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 11/22/05 APPROVED BY DATE SCALE: 238 FEEDER 4 238 FEEDER 5 (NOTE 5) NOTES: 1. EQUIPMENT FRAMES ARE 11GA. GALVANIZED STEEL; DOORS & PANELS ARE 14GA. GALVANIZED STEEL. 2. PAINT FINISH: ANSI 61 GRAY TEXTURED POWDER COAT. 3. OVERALL DEPTH OF DC SWITCHGEAR IS 56 1/2 ". 4. ALL DIMENSIONS IN INCHES 5. FEEDER F5 AT FOREST TPSS ONLY. RECEIVED CITY = 1 1 KAJVI LA JUN 2 -8 2007 PENVII I C NT F LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR ELEVATION NONR TRACTTA /LR 82 -03 / C807 I NO wINO TPS- M042 -01 REV. 00 NO. ITEM QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE NP1 1 NEGATIVE SWITCH 7/8" 12" x 1 5/8" NP2 1 RECTIFIER #1 - Y 7/8" 12" x 1 5/8" NP3 1 RECTIFIER #2 -p 7/8" 12" x 1 5/8" NP4 1 MAIN BREAKER FO 7/8" 12" x 1 5/8" NP5 1 FEEDER BREAKER F1 7/8" 12" x 1 5/8" NP6 1 FEEDER BREAKER F2 7/8" 12" x 1 5/8" NP7 1 FEEDER BREAKER F3 7/8" 12" x 1 5/8" NP8 1 FEEDER BREAKER F4 7/8" 12" x 1 5/8" N1 6 (SEE DETAIL C) 1/4" 5 1/2" x 5/8" N2 5 REMOTE 1/4" 2" x 5/8" N3 1 MAIN CURRENT 1/4" 2" x 5/8" N4 1 MAIN VOLTAGE 1/4" 2" x 5/8" N5 1 STATION TROUBLE 1/4" 2" x 5/8" N6 1 TROUBLE RESET 1/4" 2" x 5/8" N7 4 GROUP ALARM 1/4" 2" x 5/8" N8 4 DIRECT ON 1/4" 2" x 5/8" N9 1 64 - FRAME FAULT 1/4" 2" x 5/8" QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE NAMEPLATE SIZE NP9 1 FEEDER BREAKER F5 7 TPS -N00 5/8" 4" x 7/8" 7 TPS -C11 5/8" 4" x 7/8" 8 TPS -C16 5/8" 4" x 7/8" 7 TPS -C23 5/8" 4" x 7/8" 7 TPS -C27 5/8" 4" x 7/8" 7 TPS -C29 5/8" 4" x 7/8" 7 TPS -C32 5/8" 4" x 7/8" 7 TPS -C33 5/8" 4" x 7/8" 7 TPS -C36 5/8" 4" x 7/8" ITEM QTY ENGRAVING LETTER SIZE NAMEPLATE SIZE NP9 1 FEEDER BREAKER F5 7/8" 12" x 1 5/8" N1 1 (SEE DETAIL C) 1/4" 5 1/2" x 5/8" N2 1 REMOTE 1/4" 2" x 5/8" N7 1 GROUP ALARM 1/4" 2" x 5/8" N8 1 DIRECT ON 1/4" 2" x 5/8" DON/ 0IATC EICC•DIDTIl1M NP1 NEGATIVE SWITCH N1 E OPEN CLOSED © ® H2 N9 SWARTZ RELAY 784mm NOTE 1:- STATION NAME PLATES (NOTE 1) ITPS -X # #I FOLLOWING ADDITIONAL NAMEPLATES FOR FOREST ST. — C16 ONLY DV CAI/: /`DV ADD DETAIL A J NP4 N3 F OPEN N 1 CLOSED. H1 �4 H2 MAIN BREAKER FO CS S3 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOIN1EDRIVE, SUITE 106 LAKEOSWEGO,, OREGON 97034 5 N4 HSO WIF OP 270 784mm H3 N2 IREM0, I TPS -X ## J rfil 43 S1 DETAIL BI SOUNDUANSR NP5 FEEDER BREAKER Fl 40 40 40 40 40 40 40 40 H10 100 100 N7 I. 'I N2 N1 IREMOiq OPEN H3 ® H1 © ®H2 43 CS 51 ■Y■ S3 584mm • S50 DETAIL A • S2 DETAIL B N6 N8 130 I 40 I 40 130 I OPEN CLOSED .1 DETAIL C (DETAIL DIMENSIONS IN mm) PAT O'HOGAN 11/22/2005 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 11/22/2005 DES BY DATE DES CKD BY DATE LANCE BANASZEK 11/22/2005 APPROVED BY DATE SCALE: (TPS -X ## DPU N1 (TYP 4) REMOTE LOCAL I RECEIVED CITY -11 i viLA JUN 2.8 2607 PERMIT' CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR NAMEPLATE SCHEDULE CONTRACT D NO. RTA /LR 82 -03 / C807 NO. TPS- M042 -02 00 01 12/05/05 704 597 465 333 257 160 0 Layout Change S1 8 S3 - Add H3 N2 Ni I IREMOTLI H3 (i H1 I L ✓J \% ''. 4 ) 'PI 1 / l_ t: ■ z I I PJO PJO FEEDER CUBICLE 584 PANEL LAYOUT RJA H10 I. OPEN I CLOSED .1 LB =a ` J `J H2 I CS /S3 DPU DETAIL "B" 22 mm DEVICE DRILLING DIMENSIONS NTS DIMENSIONS IN MILLIMETERS 300 OSWEGO POINTE DRIVE, SU /7E 106 LAKE OSWEGO, OREGON 97034 704 597 465 333 257 160 0 SIEMENS TRANSPORTATION SYSTEMS, INC. FEEDER CUBICLE 584 41 -H10 3 FIXING HOLES DETAIL "C" 05.61 SWITCH DRILLING DIMENSIONS NTS 41 DETAIL "B" 6 TYP. H2 DETAIL "C" r' - -, TYP. I I S3 - Et } L DPU CUTOUT 21 -1 50 150—^ PANEL DRILLING QUANTITY 49 I SOUNDTRANSIT PAT O'HOGAN 11/22/2005 D RN BY DATE D RN CKD BY PAT O'HOGAN DES BY SCALE: DATE 11/22/2005 DATE DES CKD BY DATE LANCE BANASZEK 11/22/2005 APPROVED BY DATE CODE REVIEWED FOR NFpq CO MPLIANCE NEC AUG 2 7 2007 B it Of Tukwila ILDIN D ION RECEIVED : .. TIJ KWILA JUN 23 7007 pl�H (J EN I ER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR INSTRUMENT PANELS FEEDER BREAKER 600mm DRILLING TEMPLATE CONTRACT DRAWING NO RTA /LR 82 -03 / C807 No. TPS- M042 -03 I REV. 00 704.0 540 391 352 300 140 0 N3 Nil I. OPEN CLOSED4 H10 I ® H2 — L-818 4 FIXING HOLES DETAIL "A" 08 METER DRILLING DIMENSIONS NTS MAIN BREAKER OP 270 PANEL LAYOUT 784.0 5 MINE N4 HSO H3 M2 IoeMoTE4 DETAIL "B" 22 mm DEVICE DRILLING DIMENSIONS NTS 3G0OSWEGO POINT DRIUE, SUITE 106 LAKE OSWEGO, OREGON 97034 704.0 540— 391 300 140 0 DIMENSIONS IN MILLIMETERS SIEMENS TRANSPORTATION SYSTEMS, INC. 41. MAIN BREAKER Glop S3 L— J HSO 41.0 784.0 H1 H2 H3 OP270 CUTOUT 283 PANEL DRILLING QUANTITY 10 Souiunikaxsrr \ 3 FIXING HOLES DETAIL "C" 05.61 SWITCH DRILLING DIMENSIONS NTS DETAIL "B" 4 TYP. DETAIL "C" 2 TYP. DETAIL "A" 2 TYP. PATO'HOGAN 11/22/05 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 11/22/05 DES BY DATE DES CKD BY DATE LANCE BANASZEK 11122/05 APPROVED BY DATE SCALE: R EVIEWED FOR CO DE COMPLIANC NFPA70_N AUG 2 7 2007 City Of Tukwila B ILD NG D ION RECEIVED clry 7 rteKWILA JUN 2 87007 PEtiiviii l GEN E LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR INSTRUMENT PANELS MAIN BREAKER 800mm DRILLING TEMPLATE CONTRACT DRAWING NO. RTA /LR 82 - I C807 NO TPS- M042 -04 I REV. 00 704.0 352.0 333.0 122.0 0 CENTER LINE f OCe•AIOTInN OV NEGATIVE SWITCH H1 ® H2 SWARTZ RELAY I. OPEN CLOSED.' PANEL LAYOUT Cm!_ rUm? DPP 784.0 N1 N9 DETAIL "B" 22 mm DEVICE DRILLING DIMENSIONS NTS 300 OSWEGO POINTE DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 704.0 352.0 333.0 122.0 0 DIMENSIONS IN MILLIMETERS SIEMENS TRANSPORTATION SYSTEMS, INC. CENTER LINE SOUNDTRAANSIT NEGATIVE SWITCH 784.0 SWARTZ RELAY CUTOUT c . PANEL DRILLING QUANTITY 10 1 sz DETAIL "C" SWARTZ RELAY CUTOUT DRILLING DIMENSIONS NTS PAT O'HOGAN DRN BY TRACTION ELECTRIFICATION SYSTEM TYPICAL MAINLINE SUBSTATION DC SWITCHGEAR INSTRUMENT PANELS NEGATIVE SWITCH 800mm DRILLING TEMPLATE CONTRACT DRAWING NO. RTA /LR 82 - 03 / C807 I NO. TPS M042 - 05 I REV. 00 ORN CKD BY PAT O'HOGAN DES BY DETAIL "B" 2 TYP. DETAIL "C" 11/22/05 DATE DATE 11 /22/05 DATE DES CKD BY DATE LANCE BANASZEK 11/22/05 APPROVED BY DATE SCALE: 4 FIXING HOLES 78.0 C R E WED FOR NFpq �� P(1gNCE NEC AUG 2 7 1007 B(/ it Of Tukwila IN D SI RECEIVED Ti 1 M.r<I JUN 2 8 71107 PE i MI E Cr`EN fER LINK LIGHT RAIL PROJECT BACK PANEL TRANSLUCENT COVER 74SA REV DATE 10 DESCRIPTION 14 RV PNP. f.HK APP 74SA 62 s 2 13 2 16 BACK PANEL TRANSLUCENT COVER SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OS WEGO P0/N 7E DR V. SUITE 106 LAKE OSWEGO, OREGON 97034 10 SOUNDTRANSIT 14 RON ALBERT DRN BY PAT O'HOGAN DRN CKD BY RON ALBERT DES BY SCALE: REVIEWED FOR CODE COMPLIA NFPA70_NE AUG 2 7 2007 City Of Tukwila B ILDXNG D ION 62 12/07/05 DATE 12/07/05 DATE 12/07/05 DATE DES CKD BY DATE LANCE BANASZEK 12/08/05 APPROVED BY DATE 2� 1s MOUNTING PANEL SPACER U —BOLT W /NUTS SURGE ARRESTOR RECEIVED C T"' "= TJKWILA JUN 28 2007 To. ivii CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM LIGHTNING ARRESTOR BOX AND CURRENT RELAY BOX DETAILS CONTRACT DRAWING REV. NO. RTA /LR 82 -03 / C807 I NO. TPS- M043 -01 00 I i 1 1 ! — 0 I ! 1 ! 1 t ! I ! i ! 1 1 1 1 j I 1 ! I ! 1 1 � r j 1 I 1 � C f l 1 C .. BJ 1 I � ! ! I 1 I i 1 1 ! — 0 ! ! ! 74SA IF-''ii'•'' i i 1 I 0 — t ! I ! i ! v 0 s o� o 00 Eau 00 � C� L v3_ o a G, fn O 0 p 0' 0 0� 0 0 C 0 o .°.d 2 0 a "o co 0 o VI p jj • t r y ou REV DATE DESCRIPTION CONNECTION TO F1 LOAD BUS CONNECTION TO F2 LOAD BUS CONNECTION TO F3 LOAD BUS CONNECTION TO F4 LOAD BUS CONNECTION TO F5 LOAD BUS (C16 Only) L r BY ENG -- 'n CHK 1 2 APP L f O O O CONTROL WIRING TO ANNUNCIATOR NOTES: 1. 2kV Cable from DC Switchgear to Arrestor Provided By C807 Installation Contractor 2. Common Ground Bus and Stand -off Insulators Provided By C807 Installation Contractor 3. Control / Signal Cable from Sensing Relay to Annunciator Provided By C807 Installation Contractor 3 4 3 381 16 STAND OFF INSULATOR COMMON LIGHTNING ARRESTOR BUS SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGO POI/SITE DRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 r. 1 CONNECTED TO GROUND MAT SOUNDTRANSIT RON ALBERT DRN BY PAT O'HOGAN DRN CKD BY RON ALBERT DES BY DES CKD BY DATE LANCE BANASZEK 12/07/05 APPROVED BY DATE SCALE: 33 DATE Copper Bus Bare x 2 x 38 12/07/05 DATE 12/07/05 DATE REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDING D ION RECEIVED CITY ' '' - ' i i_ KWI LA JUN 2.8 ?fO7 PERMIT' CENTER LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM LIGHTNING ARRESTOR & CURRENT RELAY EQUIPMENT LAYOUT TYPICAL CONTRACT I DRAWING NO. RTA /LR 82 - 031 C807 I NO. TPS M043 - 02 I REV. 00 8/10/05 06/03/05 REV DATE FRONT VIEW NEGATIVE N1 H1 o' H2 N2 312 SWARTZ RELAY 868 Updated Disconnect & Return Bussing NEW IPT DIMENSIONS DESCRIPTION RJA RJA FRONT VIEW (WITHOUT DOORS) PJO PJO BY ENG CHK B RJA RJA LB LB _ APP KEY INTERLOCK (NOTE 1) STRAY CURRENT DRAINAGE PANEL SECTION A -A (f TOTES 2 THRU') I N1 INTERPHASE TRANSFORMER 0 O 0 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUITE 106 LAKE OSWEGO, OREGON 97034 O 0 0 NO 0 O N2 11 a CODE COMPLIANCE NFPA 70 AUG 2 "7 2001 Cit Of Tukwila B ILD NG D ION SOUNDTRANSIT N2 I I O 0 O 0 r1 NOTES: 1. TO PREVENT SWITCH FROM BEING OPERATED UNDER LOAD, IT IS INTERLOCKED WITH THE MAIN BREAKER. THE SWITCH MUST BE CLOSED BEFORE THE MAIN BREAKER CAN BE CLOSED OR OPENED. 2. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 3. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 4. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. 5. ALL DIMENSIONS IN INCHES PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY O 0 O O O 0 NO N1 DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: SECTION B -B •17 •• 4• CO II CONTRACT NO. RTA /LR 82 -03 / C807 LEGEND F11 - MINI CKT BRKR FOR HTR CKT H1 - GREEN LIGHT H2 - RED LIGHT N)(x - NAMEPLATE Xx - TERMINAL STRIP RECEIVE® CITY IKIAIILA JUN 2.8 1007 OEM ER LINK LIGHT RAIL PROJECT COMPONENT PANEL DETAIL "D” M050 -02 TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE EQUIPMENT LAYOUT DRAWING NO. TPS-M050-01 REV. 02 400 AMP BUS 100 AMP KNIFE SWITCH INSULATING PANEL 100 AMP CONTACTOR PPV OATF STRAY CURRENT DRAINAGE CONTACTOR AND SWITCH REQUIRED AT ONLY REQUIRED AT ALL TPSSs C1, C27 & C36 IIF 15 16 DETAIL "D" NTS COMPONENT PANEL 60 AMP DIODE 60 AMP KNIFE SWITCH 221 PADS FOR CABLE CONNECTIONS — AVAILABLE CONTACT SURFACE 18 r 2- FORM "C" AUXILIARY " CONTACTS. ACTUATED WHEN THE SWITCH IS CLOSED -- 4 SILVERED LINE AND LOAD TERMINALS 9/16 DIA. HOLES RV FNO (.HK APP O rIN 71,N N O cOI A N N — 1 9 2- FORM "C" AUXILIARY CONTACTS. ACTUATED WHEN SWITCH IS OPEN 10 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOINTEDRIVE, SUITE 106 LAKEOSWEGO, OREGON 97034 4 -5/8 DIA. MOUNTING HOLES FOR 1/2 DIA. BOLTS ACCOMMODATIONS FOR KIRK INTERLOCK TYPE "B" LOCKING BOLT PROJECTION TO BE 3/8" LONG WHEN WITHDRAWN. KEY REMOVABLE WHEN LOCKING BOLT IS EXTENDED AND SWITCH IS LOCKED IN EITHER THE CLOSED OR OPEN POSITIONS. SOUNDTRANSIT INSULATED —\ STUD HANDLE REVIEWED FOR CODE COMPLIANCE E NFPA AUG 2 7 2001 City Of Tukwila B ILDING D SIS N DRN CKD BY PAT O'HOGAN DES BY NOTES: FOR INDOOR USE FOR VERTICAL UPRIGHT MOUNTING AUXILIARY CONTACTS RATING: 15A © 125VAC OR 1/2A © 125VDC APPROXIMATE WE 73 LBS. DO NOT OPERATE UNDER LOAD PAT O'HOGAN 12/23/2004 DRN BY DATE DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE 5 16 3/8 SCALE: 1 28 ll 1 3 8 INSULATING BASE TYPE MP DISCONNECTING SWITCH 6000A. 1500V.D.C. S.P. S.T. NON— FUSIBLE LIVE FRONT —STUD HANDLE OPERATED BOLTED PRESSURE SILVER CONTACTS RECEIVED CITY T[_,E;WILA JUN 2_.8 ?007 E6 til ii 1 CENTER ER LINK LIGHT RAIL PROJECT X1/2 X 1 1/2 ALUMINUM SPACERS TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE EQUIPMENT LAYOUT DETAILS CONTRACT DRAWING REV. NO. RTA /LR 82 -03 / C807 I NO. TPS- M050 -02 00 l ' 6:1 ft '`�%,C,li41 ., .1��� � RI -9 EXTRA HEAVY TRACTION SERVICE i l f ' Technologies 12 -PULSE RECTIFIER 3000KW, 1500VDC Corporation WYTHEVILLE, VA , USA 24382 I NTERPHASE TRANSFORMER SN 120270L02BC01 JOB 3511 DATE 1/05 CU COND KVA 270 PHASE 1 HERTZ 360 CLASS H 220 °C Ngt TYPE AA RISE 80 °C @100% LOAD INPUT 135 VAC 1000 AMPS DC BIL 20 (01=142)' OUTPUT 2000 AMPS DC BIL 20 (NQJUN 28 D [fi 11 T 36 37 N1 N1 nCCCD IDTm1N O O o O NO 10.00 O O O o NO 10.00 21.50 1/2" VIBRATION PAD FRONT VIEW N2 O O O o r . .75 -- N2 Ov CLU^_ rum ADD 1.50 --- 12.00 NO n 00 I1� 4- 7.00 14.00 17.00 SIDE VIEW 0.75 DIA 7 ---- MOUNTING HO 21 50 SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OS WEGOPOINTEORIVE SUITE 106 LAKE OSWEGO, OREGON 97034 TERMINAL DETA L 1/2" X 5" COPPER BUS ANSI STD PATTERN TOP VIEW .56 DIA E(4) REVIEWED FOR CODE COMPLIANCE NFPA O AUG 27 20111 City Of Tukwila B ILDIN D SION .00 12.0 SOUNDTRANSIT NOTES: DRY TYPE INTERPHASE TRANSFORMER - VENTILATED FOR USE IN 12 -PULSE RI -9 X -HEAVY TRACTION RECTIFIER RATED 3000 KW, 1500 VDC 270 EQU. KVA 1 PHASE 360 HERTZ 80 °C RISE@ 100% LOAD 135V AC L -N 20 kV BIL , 1000 ADC (N1 -N2), 2000 ADC (NO) 5% MAX UNBALANCE, LOW NOISE DESIGN COPPER CONDUCTOR TOTAL WEIGHT 950 LBS PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DES BY DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: LINK LIGHT RAIL PROJECT VED iU KWI LA ?007 E-HMO CENTER ER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION N CUBICLE EQUIPMENT LAYOUT INTERPHASE TRANSFORMER CONTRACT DRAWING REV. NO. RTA /LR 82 -03 / C807 I NO. TPS- M050 -03 00 REVIE CODE CO NFPA 7 AUG 2 I 0 I , W c-,-, FOR A NCE EC 07 City Of ' ila BUILDING ' SION A L 000000000000000 000000000000000 0011111100011011 11011 000000000000000 000000000000000 000000000000000 RECTIFIER #1 -Y I 000000000 000000000000000 011001100011 11[1001111 000000000000000 000011 1100000110DD 000000000000000 FRONT VIEW 01 9/10/05 Issued for Construction 1TPS -x RJA RJA PJO LB 868 L -1 FRONT VIEW (WITHOUT DOORS) 3000SWEGO POINT EDRIVE, SUITE 106 CAKE OSWEGO, OREGON 97034 FLEX CABLE FROM BUS DUCT L +1 SIEMENS TRANSPORTATION SYSTEMS, INC. SOUNDTRANSIT PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: 408 [1032.61] 55 [1400.03] 56T-6 [1429.84] SECTION A -A (SIDE REMOVED) LINK LIGHT RAIL PROJECT JUN 23 /0(i7 ?ERLv l CENTER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R1 CUBICLE EQUIPMENT LAYOUT WYE CONNECTED RECTIFIER CONTRACT DRAWING REV. NO. RTA /LR 82 -03 I C807 I NO. TPS- M060 -01 01 01 9/10/05 A L_ SIEMENS 0111111 D000000110110 D000D Ill 00000000 0110011 1111110111111011 D1111D00000000000 00001101100001100D 0000011000000000 I RECTIFIER #2 Q I 110000011000001100D 0000000000000000 1111000000011011011011 0000100000000011 11 00000011000D0011011 110110000011110 DD 1100 FRONT VIEW ITPS - Issued for Construction RJA PJO LB RJA 868 L -2 r' -1 0 -F2. 1 I�I — .II I -Fl 61 -F 92 -F292 u 0 1 l1 4 + I� - -YI if 4J -423 .0, r • - L. b oo L31 L21 L11 FRONT VIEW (WITHOUT DOORS) 300 OSWEGO PO /NTE DRIVE,, SUITE 106 LAKE OSWEGO, OREGON 97034 FLEX CABLE FROM BUS DUCT eec E; L +2 SIEMENS TRANSPORTATION SYSTEMS, INC. REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC 1 AUG 2 7 200 City Of Tukwila • gel ILDYNG D ION L� SOUNDTtANSR L -2 + I I PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY DES CKD BY LANCE BANASZEK APPROVED BY SCALE: 12/23/2004 DATE DATE 12/23/2004 DATE DATE 12/23/2004 DATE 558 56 -F291 2 SECTION A —A (SIDE REMOVED) L - 2 8 [715.0] 4 L- LINK LIGHT RAIL PROJECT fly = TIJvvv LA JUN 23 107 ?ERivte I CEN 1 ER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R2 CUBICLE EQUIPMENT LAYOUT DELTA CONNECTED RECTIFIER CONTRACT I DRAWING NO. RTA !LR 82 - 03 I C807 I NO. TPS M060 - 02 I REV. 01 01 ii Is � a i III II IILerail111.m- 11trilll w:tlll.ilaii .1ire : I' Ill A � VIM 11' N1 1 A �..,us "till .li li' ■Y■ ■Y■ mil tN � u �w 1� Il .LIm�■ 1� olir 11H 1 111 .IhU=6'T111 °.!Sll 11w nrn:r lU1A II 'IILA fl 0 ': :.21 • 55 8 9/10/05 L -1 7 35 16 TOP VIEW RECT #1 - Y Issued For Construction RJA PJO LB RJA L +1 7 35 16 L +2 TOP VIEW RECT #2 - DELTA 3000SWEGOPO /NTEORIV . SUITE 106 LAKEOSWEGO, OREGON 97034 AC CONNECTION PADS DIODE SIEMENS TRANSPORTATION SYSTEMS, INC. - R130.1 -C130 I O C Ira I IV MP i "=�, ED FOR MPLIANCE RK NFPA 70 - NECaEVI AUG 2 7 2007 City Of Tuki B ILDIN DM ION - R130.2 TYPICAL DIODE ASSY. DEVICE PANEL FOR DC - RC NETW SOUNDTANSIT AC HEAT SINK BUS - R170.1 (- R170.2) -R171.1 (-R171 DIODE HEAT SINK PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: A J C N N —J N —J -F191 -F192 -F291 N J M J C C K COMPONENT MOUNTING DIAGRAM - R111.1 - R113.2 �' -C111 -C113 LINK LIGHT RAIL PROJECT E PANEL FOR AC - RC NETWORK RECEIVED UN -= Ti <tn/ILA JUN 2. ?1197 l �v�i I CEI 1 ER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R CUBICLE EQUIPMENT LAYOUT DETAILS NONTRAC /LR 82 -03 / C807 I DRAWING wiNO TPS- M060 -03 IREV. 01 NO. F2 i A `r—r '*=-' • ''=- 01 ii Is � a i III II IILerail111.m- 11trilll w:tlll.ilaii .1ire : I' Ill A � VIM 11' N1 1 A �..,us "till .li li' ■Y■ ■Y■ mil tN � u �w 1� Il .LIm�■ 1� olir 11H 1 111 .IhU=6'T111 °.!Sll 11w nrn:r lU1A II 'IILA fl 0 ': :.21 • 55 8 9/10/05 L -1 7 35 16 TOP VIEW RECT #1 - Y Issued For Construction RJA PJO LB RJA L +1 7 35 16 L +2 TOP VIEW RECT #2 - DELTA 3000SWEGOPO /NTEORIV . SUITE 106 LAKEOSWEGO, OREGON 97034 AC CONNECTION PADS DIODE SIEMENS TRANSPORTATION SYSTEMS, INC. - R130.1 -C130 I O C Ira I IV MP i "=�, ED FOR MPLIANCE RK NFPA 70 - NECaEVI AUG 2 7 2007 City Of Tuki B ILDIN DM ION - R130.2 TYPICAL DIODE ASSY. DEVICE PANEL FOR DC - RC NETW SOUNDTANSIT AC HEAT SINK BUS - R170.1 (- R170.2) -R171.1 (-R171 DIODE HEAT SINK PAT O'HOGAN 12/23/2004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: A J C N N —J N —J -F191 -F192 -F291 N J M J C C K COMPONENT MOUNTING DIAGRAM - R111.1 - R113.2 �' -C111 -C113 LINK LIGHT RAIL PROJECT E PANEL FOR AC - RC NETWORK RECEIVED UN -= Ti <tn/ILA JUN 2. ?1197 l �v�i I CEI 1 ER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION R CUBICLE EQUIPMENT LAYOUT DETAILS NONTRAC /LR 82 -03 / C807 I DRAWING wiNO TPS- M060 -03 IREV. 01 NO. F2 r � - I S7 -PLC ° la CO £X£ llflONYd I MAIN BREAKER I ITPS -X &p ndO doLa aoIa <<a zLa 01 Ivz> f.... 1-110 0 H2 H3® I U I S3 tl rTh ILLd 1 XP 8 /11111111 •',. OP 270 PANDUIT2X3' I I N11 o I 1II1111111FII1 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 1 P ANDUIT2X3" 65 o 1 Cu 2x(7' X 3/8 ") El VD BA i . IX01 + + i . 4 1 + ; 1 1 +) . 4 I ._. I Cu 2x(7' X 3/8 ") '_ i + i X02 0; 1 1 t SH a I P H4 = 1 BUSS G TO RECTIFIER R2 0 0 4 • 0 HTR I `I FRAME BOND BUS Cu 1-1/2" x 3/8" —� l 4 r" _- 1= f I 11 01 A 10117/05 Revise Panel U0 FRONT VIEW 5 PJO Pv Con S4 RLA !`Nl• LB APP FRONT VIEW (WITHOUT COVERS AND TRUCK) I I! X3. SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE /06 LAKE OSWEGO, OREGON 97034 7 5 16 I SECTION A -A (SIDE REMOVED) SOUNDTRANSIT City Of Tukwila (__BUI DIN DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DATE DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND: BA - BUFFER AMPLIFIER F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR PLC H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT HSO - BLUE LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT Si - LOCAUREMOTE SWITCH S3 - CONTROL SWITCH S50 - RESET STATION ALARM VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS LINK LIGHT RAIL PROJECT CONTRACT I DRAWING NO RTA /LR 82 -03 / C807 I NO TPS- M100 -01 558 RECEIVED TOP VIEW CIT" T1 EWILA JUN 2 3 ?Mg r'E H,vlf d CaN fER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT I REV. 01 861 I MAIN BREAKER I ITPS -X &p °_ N5 N4 N3 © HSO ■_ 0 ® 01 f.... 1-110 0 H2 H3® I U I S3 tl rTh ins 43 S1 •',. OP 270 I I 4x+ 4, -). a J� I C 31, 01 A 10117/05 Revise Panel U0 FRONT VIEW 5 PJO Pv Con S4 RLA !`Nl• LB APP FRONT VIEW (WITHOUT COVERS AND TRUCK) I I! X3. SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE /06 LAKE OSWEGO, OREGON 97034 7 5 16 I SECTION A -A (SIDE REMOVED) SOUNDTRANSIT City Of Tukwila (__BUI DIN DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DATE DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND: BA - BUFFER AMPLIFIER F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR PLC H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT HSO - BLUE LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT Si - LOCAUREMOTE SWITCH S3 - CONTROL SWITCH S50 - RESET STATION ALARM VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS LINK LIGHT RAIL PROJECT CONTRACT I DRAWING NO RTA /LR 82 -03 / C807 I NO TPS- M100 -01 558 RECEIVED TOP VIEW CIT" T1 EWILA JUN 2 3 ?Mg r'E H,vlf d CaN fER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT I REV. 01 °_ ■_ .1-1,1-1,- xo1 • ins •',. 4x+ 4, -). a J� + .+. I, 1 i P = 1 4 ---- ... --- + E 31� 01 A 10117/05 Revise Panel U0 FRONT VIEW 5 PJO Pv Con S4 RLA !`Nl• LB APP FRONT VIEW (WITHOUT COVERS AND TRUCK) I I! X3. SIEMENS TRANSPORTATION SYSTEMS, INC. 300 OSWEGO POINTE DRIVE, SUITE /06 LAKE OSWEGO, OREGON 97034 7 5 16 I SECTION A -A (SIDE REMOVED) SOUNDTRANSIT City Of Tukwila (__BUI DIN DRN CKD BY DATE PAT O'HOGAN 12/23/2004 DATE DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE: NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE #14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND: BA - BUFFER AMPLIFIER F11 - MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR PLC H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT HSO - BLUE LIGHT Kxx - CONTROL RELAY Nxx - NAMEPLATE RX - RESISTOR OR SHUNT Si - LOCAUREMOTE SWITCH S3 - CONTROL SWITCH S50 - RESET STATION ALARM VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx - BREAKER STABS LINK LIGHT RAIL PROJECT CONTRACT I DRAWING NO RTA /LR 82 -03 / C807 I NO TPS- M100 -01 558 RECEIVED TOP VIEW CIT" T1 EWILA JUN 2 3 ?Mg r'E H,vlf d CaN fER TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT I REV. 01 It n$ 00 KIRK KEY LOCKOUT TAGOUT HARDWARE WARNING SIGN + +1 + O OPERATION COUNTER + FRONT VIEW 28 8 544 SIDE VIEW K1 R10 30 3 1 K02 REVIEWED FOR COQE COMPLIANC NF PA 70 - NEC E UG 2 7 2007 f -H ity Of Tukwila BS) LDING DIVISI N REAR VIEW 28 7 16 77C: 'IVED CST`'" i f I KW JUN 2 -9 7097 is -k;irii IT r ILL(€ 01 REV 12/05/05 DATE New Layout For Relay Board DESCRIPTION BY ENG APP CHK SIEMENS TRANSPORTATION SYSTEMS, INC. 327 OSWE00 POW EOR/VE SURE 125 LAKE OSWEGO, OREGON 97031 a� Soumil PAT O7-IOGAN 12/232004 DRN BY DATE DRN CKD BY PAT O'HOGAN DES BY LANCE BANASZEK APPROVED BY TAM - 12232004 ATE D ��004 DATE SCALE: LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION FO CUBICLE EQUIPMENT LAYOUT BREAKER TRUCK CONTRACT D RAWING REV. NO. RTA /LR 82-03 / C807120. TPS M100 01 �Y i! -' DPU I' [I 8 E 11- 1 A 01 10/17/05 REV DATE FRONT VIEW 5 Revise Panel L/O DESCRIPTION PJO S FRONT VIEW (WITHOUT COVERS AND TRUCK) RLA LB BY ENG CHK: APP Cu2x(7'X3 /8 ") Cu 6' X 3/8" 290 lg. Cu 1 5/8" X 3/16" St 3 11/16" X 2 3/8' X 5/32" SIEMENS TRANSPORTATION SYSTEMS, INC. 300 0 0 S W EC+ O P O I W E D R N E$ U /T E 10 6 LAKE OSWEGO. OREGON 97074 (NOTES 1 THRU 3) RECEIVED 017 TUKWILA JUN 29 ?On? ?EHM I CEN ER 558 56 16 9 SECTION A -A (SIDE REMOVED) SOUND � PAT Q - IOGAN DRN BY DRN CRC BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE WED FO OMPLTA 70 -NE City Of Tukwila 12/23/2004 DATE 1 DATE NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE t/14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND BA - BUFFER AMPLIFIER FO - LINE TEST FUSE F11- MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR DPU HTR - HEATER H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT H10 - YELLOW LIGHT Kxx - CONTROL RELAY Mot - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAL/REMOTE SWITCH S2 - DIRECT ON KEYED SWITCH S3 - CONTROL SWITCH VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx- BREAKER STABS C NO. TOP VIEW 558 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F CUBICLE EQUIPMENT LAYOUT TA 1LR 82 - 031 0807 NO. TPS M101 -01 01 L FEEDER BREAKER #1 I r — " - Pandu' 17C T' — I i Fr H3O H 1 XP &.u_ Di 1 14Z>I I IIIIIIII� Panduit 2 X 3" 1 X1 35 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIP Panduit2X3" DPU (150 -AO) I ' • . xv 4 VD BA I] . + 4. T « O , + . . X01 O ` X02 , ' + -I- R1 : ® el • HTR . ii !JIIJ iii !J �Y i! -' DPU I' [I 8 E 11- 1 A 01 10/17/05 REV DATE FRONT VIEW 5 Revise Panel L/O DESCRIPTION PJO S FRONT VIEW (WITHOUT COVERS AND TRUCK) RLA LB BY ENG CHK: APP Cu2x(7'X3 /8 ") Cu 6' X 3/8" 290 lg. Cu 1 5/8" X 3/16" St 3 11/16" X 2 3/8' X 5/32" SIEMENS TRANSPORTATION SYSTEMS, INC. 300 0 0 S W EC+ O P O I W E D R N E$ U /T E 10 6 LAKE OSWEGO. OREGON 97074 (NOTES 1 THRU 3) RECEIVED 017 TUKWILA JUN 29 ?On? ?EHM I CEN ER 558 56 16 9 SECTION A -A (SIDE REMOVED) SOUND � PAT Q - IOGAN DRN BY DRN CRC BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE WED FO OMPLTA 70 -NE City Of Tukwila 12/23/2004 DATE 1 DATE NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE t/14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND BA - BUFFER AMPLIFIER FO - LINE TEST FUSE F11- MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR DPU HTR - HEATER H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT H10 - YELLOW LIGHT Kxx - CONTROL RELAY Mot - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAL/REMOTE SWITCH S2 - DIRECT ON KEYED SWITCH S3 - CONTROL SWITCH VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx- BREAKER STABS C NO. TOP VIEW 558 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F CUBICLE EQUIPMENT LAYOUT TA 1LR 82 - 031 0807 NO. TPS M101 -01 01 L FEEDER BREAKER #1 I r N7 H10 N1 Fr H3O H F� F - A 01 10/17/05 REV DATE FRONT VIEW 5 Revise Panel L/O DESCRIPTION PJO S FRONT VIEW (WITHOUT COVERS AND TRUCK) RLA LB BY ENG CHK: APP Cu2x(7'X3 /8 ") Cu 6' X 3/8" 290 lg. Cu 1 5/8" X 3/16" St 3 11/16" X 2 3/8' X 5/32" SIEMENS TRANSPORTATION SYSTEMS, INC. 300 0 0 S W EC+ O P O I W E D R N E$ U /T E 10 6 LAKE OSWEGO. OREGON 97074 (NOTES 1 THRU 3) RECEIVED 017 TUKWILA JUN 29 ?On? ?EHM I CEN ER 558 56 16 9 SECTION A -A (SIDE REMOVED) SOUND � PAT Q - IOGAN DRN BY DRN CRC BY PAT O'HOGAN DES BY DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE SCALE WED FO OMPLTA 70 -NE City Of Tukwila 12/23/2004 DATE 1 DATE NOTES: 1. RUN HEATER CIRCUIT IN INSULATED CONDUIT IN DC SWITCHGEAR. 2. MOUNT HEATERS ON INSULATED STANDOFFS IN DC SWITCHGEAR. 3. USE t/14AWG, 2kV WIRE FOR HEATER CIRCUIT. LEGEND BA - BUFFER AMPLIFIER FO - LINE TEST FUSE F11- MINI CKT BRKR FOR FEEDER BREAKER F12 - MINI CKT BRKR FOR DPU HTR - HEATER H1 - GREEN LIGHT H2 - RED LIGHT H3 - WHITE LIGHT H10 - YELLOW LIGHT Kxx - CONTROL RELAY Mot - NAMEPLATE RX - RESISTOR OR SHUNT S1 - LOCAL/REMOTE SWITCH S2 - DIRECT ON KEYED SWITCH S3 - CONTROL SWITCH VD - VOLTAGE DIVIDER Xx - TERMINAL STRIP Xxx- BREAKER STABS C NO. TOP VIEW 558 LINK LIGHT RAIL PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F CUBICLE EQUIPMENT LAYOUT TA 1LR 82 - 031 0807 NO. TPS M101 -01 01 FRONT VIEW ,Q KIRK KEY LOCKOUT TAGOUT FIEF HARDWARE r WARNING SIGN L + OPERATION COUNTER 202 J + 01 12/05/05 New layout of Line Test & Relay Board 54 16 RJA r r RJA PJO LB SIDE V IEW R10 304 K02 SIEMENS TRANSPORTATION SYSTEMS, INC. 3000SWEGOPOIN7EDRIVE, SUITE 106 LAKEOSWE'O, OREGON 97034 SOUNDTRANSIT REVIEWED FOR CODE COMPLIANCE NFPA 70 - NEC AUG 2 7 2007 City Of Tukwila B ILDING D ION PAT O'HOGAN DRN BY DRN CKD BY PAT O'HOGAN DES BY SCALE: DATE .4$ O 12/23/2004 DATE 12/23/2004 DATE DES CKD BY DATE LANCE BANASZEK 12/23/2004 APPROVED BY DATE ! 0 LL REAR VIEW RO I V 1L _IL X0 1 r RECEIVED CI T f T IJKVVILA JUN a3 ?0 PER Mi l CENTER LINK LIGHT RAIL. PROJECT TRACTION ELECTRIFICATION SYSTEM MAINLINE TRACTION POWER SUBSTATION F CUBICLE EQUIPMENT LAYOUT BREAKER TRUCK LAYOUT CONTRACT R TA /LR 82 -03 / C807 I NO wiNG TPS- M101 -02 I REV. 01 Substation/Tie Station DSN MSN Location Tukwila FBS 41755 05008 -109 15426 35 Ave. S. October 20, 2009 Mr. John Harvey Department of Labor and Industries PO Box 44430 Olympia, WA 98504 -4430 Re: Sound Transit — Traction Power Sub-Station Bungalows Mr. Harvey, This letter is to inform you that the below listed bungalow was inspected by the City of Tukwila and was found to be in compliance with the applicable codes as adopted by the City of Tukwila. The installation and inspection of the bungalow was authorized by Electrical Permit Number EL07 -253. The location of the bungalow is as follows. Sincerely, City of Tukwila Department of Community Development Jack Pace, Director Bill Buterbaugh Chief Electrical Inspector - Consultant City of Tukwila 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 -2554 wbuterba ug h ©ci. seatac.wa. us 206 - 973 -4758 Jim Haggerton, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Substation/Tie Station DSN MSN Location 133rd FBS 41761 05008 -108 4522 S. 133 St October 20, 2009 City of Tukwila Department of Community Development Jack Pace, Director Mr. John Harvey Department of Labor and Industries PO Box 44430 Olympia, WA 98504 -4430 Re: Sound Transit — Traction Power Sub - Station Bungalows Mr. Harvey, This letter is to inform you that the below listed bungalow was inspected by the City of Tukwila and was found to be in compliance with the applicable codes as adopted by the City of Tukwila. The installation and inspection of the bungalow was authorized by Electrical Permit Number EL07 -253. The location of the bungalow is as follows. Sincerely, g4 Bill Buterbaugh Chief Electrical Inspector - Consultant City of Tukwila 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 -2554 wbuterbaugh@ci.seatac.wa.us 206- 973 -4758 Jim Haggerton, Mayor 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Substation/Tie Station DSN MSN Location Boeing FBS 41756 05008 -101 11103 E. Marginal Way S October 20, 2009 Mr. Harvey, City of Tukwila Department of Community Development Jack Pace, Director Mr. John Harvey Department of Labor and Industries PO Box 44430 Olympia, WA 98504 -4430 Re: Sound Transit — Traction Power Sub - Station Bungalows Jim Haggerton, Mayor This letter is to inform you that the below listed bungalow was inspected by the City of Tukwila and was found to be in compliance with the applicable codes as adopted by the City of Tukwila. The installation and inspection of the bungalow was authorized by Electrical Permit Number EL07 -253. The location of the bungalow is as follows. Bill Buterbaugh Chief Electrical Inspector - Consultant City of Tukwila 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 -2554 wbuterbaugh@ci.seatac.wa.us 206 - 973 -4758 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 07 -29 -2008 JIM TELEPAK 3223 THIRD AV S, SUITE 100 SEATTLE WA 98134 RE: Permit No. EL07 -253 3651 SOUTHCENTER BL TUKW Dear Permit Holder: Ciz of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director In reviewing our current records the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Codes, Uniform Plumbing/Fuel Gas Code and/or the National Electrical Code, every permit issued by the Building Division under the provisions of the code shall expire by limitation and become null and void if the building or work authorized by such permit is not commenced within 180 days from the date of such permit issuance, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 days. Based on the above, you are hereby advised to: Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. This inspection is intended to determine if substantial work has been accomplished since issuance of the permit or last inspection; or if the project should be considered abandoned. If such determination is made, the International Codes, Uniform Plumbing/Fuel Gas Code and/or the National Electrical Code does allow the Building Official to approve one extension of time for an additional period not exceeding 180 days. Extension requests must be in writine and provide satisfactory reasons why circumstances beyond the applicants control have prevented action from being taken. In the event you do not call for the above inspection and receive an extension prior to 09/03/2008 , your permit will become null and void and any further work on the project will require a new permit application and associated fees. Thank you for your cooperation in this matter. Sincerely, xc: er Marshall t Technician Permit File No. EL07 -253 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 September 20, 2007 Jim Telepak 3223 Third Avenue S, Suite 100 Seattle, WA 98134 RE: Permit No. EL07 - 253 Dear Mr. Telepak: Sincerely, Brenda Holt Permit Coordinator Xc: $ob Benedicto, Building Official 'Permit File H:'Sound Transit\EL07 -253 - Permit Fee Letter.doc bh City of Tukwila Steven M Mullet, Mayor Department of Community Development Steve Lancaster, Director In reviewing our monthly permit transactions, an error was found in the fee calculations for the above referenced permit for the Sound Transit project. Based on the project valuation of $6,720,764.00, for the scope of work outlined in the permit, the electrical permit fees are as follows: Total Fees Fees Paid Balance Owing Plan review fee $ 9,570.21 $ 2,419.25 $ 7,150.96 Permit fee $ 38,280.82 $ 9,677.00 $ 28,603.82 $ 47,851.03 $ 12,096.25 $ 35,754.78 Prior to scheduling any further inspections, the balance owing will need to be paid. If it would be more convenient for you to mail the check to our office, please send it to my attention. I've enclosed a copy of the ordinance which adopted the fee schedule for electrical permits. We apologize for the miscalculation. Please contact either myself or Bob Benedicto, Building Official at 206 - 431 -3670 if you should have any questions. Thank you for your cooperation in this matter. 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 ACTIVITY NUMBER: EL07 -253 DATE: 6 -28 -07 PROJECT NAME: SOUND TRANSIT SITE ADDRESS: 3651 SOUTHCENTER BL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: 1 114 i Builaing Division Comments: APPROVALS OR CORRECTIONS: Documents /routing slip.doc 2 -28-02 PER w i COOT L) COPY PLAN REVIEW /ROUTING SLIP Fire Prevention DETERMINATIO OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ Structural Review Required ❑ REVIEWER'S INITIALS: TUES/THURS ROUTING: Please Route REVIEWER'S INITIALS: DATE: Planning Division Public Works ❑ Structural ❑ Permit Coordinator ❑ DUE DATE: 7-3-07 Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: No further Review Required ❑ DUE DATE: 7 -31 -07 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) n Notation: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: License Information License MASSECC044QQ Licensee Name MASS ELECTRIC CONSTRUCTION CO Licensee Type ELECTRICAL CONTRACTOR UBI 601684861 Ind. Ins. Account Id AGENT Business Type CORPORATION Address 1 180 GUEST ST Address 2 City BOSTON County OUT OF STATE State MA Zip 021352046 Phone 6172541015 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 11/18/1996 Expiration Date 11/18/2008 Suspend Date Separation Date Parent Company Previous License Next License Associated License BREENWP035LG Business Owner Information Name Role Effective Date Expiration Date BROKKE, GREGORY D 01/01/1980 BREEN, WILLIAM P J AGENT 01/01/1980 LANOHA, RICHARD A PRESIDENT 11/18/2004 Look Up a Contractor, Electri'ian or Plumber License Detail Page 1 of 2 Washington State Department of Labor and Industries Electrical Contractor A business licensed by L &I to contract electrical work within the scope of its specialty. Electrical Contractors must maintain a surety bond or assignment of savings account. They also must have a designated Electrical Administrator or Master Electrician who is a member of the firm or a full -time supervisory employee. Electrical Administrator Information License Name Status BREENWP035LG BREEN, WILLIAM P ACTIVE https:// fortress. wa. gov /lni/bbip /printer.aspx ?License= MASSECC044QQ 09/07/2007