HomeMy WebLinkAboutPermit PG08-098 - WESTFIELD SOUTHCENTER MALL - KUDO BEANSKUDO BEANS
2600 SOUTHCENTER MALL
PG08-098
Parcel No.: 6364200010
Address:
Suite No:
Cityif Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http://www.ci.tukwila.wa.us
PLUMBING /GAS PIPING PERMIT
2600 SOUTHCENTER MALL TUKW
Permit Number:
Issue Date:
Permit Expires On:
PG08 -098
06/09/2008
12/06/2008
Tenant:
Name:
Address:
Owner:
Name:
Address:
KUDO BEANS
2600 SOUTHCENTER MALL FC -14 , TUKVVILA WA
WESTFIELD PROPERTY TAX DEPT
PO BOX 130940 , CARLSBAD CA
Contact Person:
Name: RYAN O'NAN
Address: 633 SOUTHCENTER MALL FC -14 , TUKWILA WA
Contractor:
Name: WOODBURN CONSTRUCTION
Address: PO BOX 129 , WOODBURN OR
Contractor License No: WOODBC *201PL
Phone:
Phone: 626 - 216 -6156
Phone: 503 - 981 -9504
Expiration Date: 11/02/2009
DESCRIPTION OF WORK:
PLUMBING SYSTEMS FOR FOOD COURT KIOSK
Value of Plumbing /Gas Piping:
Fees Collected:
$10,000.00
$241.00
Plumbing
Bathtub or combination bath/shower
Bidet
Clothes washer, domestic
Dental unit, cuspidor
Dishwasher, domestic, with independent drain
Drinking fountain or water cooler (per head)
Food -waste grinder, commercial
Floor drain
Shower, single head trap
Lavatory
Wash fountain
Receptor, indirect waste
Sinks
Urinals
Water Closet
Uniform Plumbing Code Edition: 2006
International Fuel Gas Code Edition: 2006
FIXTURE TYPE AND QUANTITY
Plumbing (cont.)
0 Building sewer and each trailer park sewer 0
0 Rain water system - per drain (inside bldg) 0
0 Water heater and/or vent 1
0 Industrial waste treatment interceptor, including
1 its trap and vent, except for kitchen type
0 grease interceptors 0
0 Repair or alteration of water piping and/or water
0 treatment equipment 0
0 Repair or alteration of drainage or vent piping 0
0 Medical gas piping system serving (1 -5)
0 inlets /outlets for a specific gas 1
0 Medical gas piping (6 +) inlets /outlets 1
6 Gas Piping
0 Gas piping outlets (0 -5) 0
0 Gas piping outlets (6 +) 0
* *continued on next page **
doc: UPC -10/06
PG08 -098 Printed: 06 -09 -2008
City ("Tukwila
ement of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206-431-3665
Web site: http://www.ci.tulcwilawa.us
Permit Number: PG08 -098
Issue Date: 06/09/2008
Permit Expires On: 12/06/2008
Permit Center Authorized Signature:
-�L
Date: (01-‘t-00
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign and obtain this plumbing /gas piping permit.
Signature:
Print Name:
Date: li " /`- ' O=e/
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
doc: UPC -10/06
PG08 -098 Printed: 06-09 -2008
Parcel No.: 6364200010
Address:
Suite No:
Tenant:
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206- 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
PERMIT CONDITIONS
2600 SOUTHCENTER MALL TUKW
KUDO BEANS
Permit Number:
Status:
Applied Date:
Issue Date:
PG08 -098
ISSUED
03/28/2008
06/09/2008
1: ** *PLUMBING AND GAS PIPING * **
2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila
Building Division.
3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing
inspector.
4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas
Code.
5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved.
6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code.
Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to
make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection.
7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless,
adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the
conditioned space shall be insulated to minimum R -3.
8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be
protected by steel nail plates not less than 18 guage.
9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing
piping shall be directly embedded in concrete or masonry.
10: All pipes penetrating floor /ceiling assemblies and fire- resistance rated walls or partitions shall be protected in
accordance with the requirements of the building code.
11: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the
jurisdiction.
12: ** *PUBLIC WORKS DEPARTMENT CONDITIONS * **
13: Grease waste line shall connect to the ouside grease interceptor furnished by the mall.
* *continued on next page **
doc: Cond -10/06
PG08 -098 Printed: 06-09 -2008
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206- 431 -3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing
this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating
construction or the performance of work.
Signature:
Print Name:
defiee
finny /9GG
Date:
doc: Cond -10/06
PG08 -098 Printed: 06-09 -2008
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.ci.tukwila.Wa.us
Building Permit No IND -15 B
Mechanical Permit No.
Plumbing /Gas Permit No. 1360 •-Q q9
Public Works Permit No.
Project No. Fate) - 011
(For office use only)
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION
King Co Assessor's Tax No.; _ 636420 -0010
Site Address: 2600 Southcenter Mall, Space #FC -14 Tukwila, WA 98188
Tenant Name:
Property Owners Name: Seong H. Kim
Mailing Address: 2340 - 130th Avenue NE, D #150
Kudo Beans
Suite Number:
New Tenant:
Floor:
Yes ❑ ..No
Bellevue;
City
WA 98005
State Zip
CONTACT PERSON — who do we contact when your permit is ready to be issued
Name:
Ryan O'nan
Mailing Address:
E -Mail Address:
633 Southcenter Mall, Trailer #3
Day Telephone: (626) 216 -6156
Tukwila, WA 98188
ronan @us.westfield.com
City State Zip
Fax Number:
GENERAL CONTRACTOR INFORMATION —
(Contractor Information for Mechanical (pg 4) for:Plumbing and Gas Piping (pg 5))
Company Name: TBD - TO BE FINALIZED BEFORE PERMIT IS PICKED UP
Mailing Address:
City State Zip
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
Contractor Registration Number: Expiration Date:
ARCHI•TECT OF RECORD — All plans, must bewet stamped by Architect of Record
Company Name: Arai Jackson Ellison Murakami
Mailing Address: 2300 7th Avenue
Seattle,
Contact Person: Yuko Kunugi
E -Mail Address: ykunugi @araijackson.com
WA 98121
City State Zip
Day Telephone: (206) 323 -8800
Fax Number:
(206) 323-8518
ENGINEER OF 1 ECO 2D — Alhplatis must be wet stamped by, Engmeer„of Record
Company Name:
Mailing Address:
Contact Person:
E -Mail Address:
N/A
Q:\Applications\Forms- Applications On LineO -2006 - Permit Application.doc
Revised: 9 -2006
bh
City State Zip
Day Telephone:
Fax Number:
Page 1 of 6
• 4�
PLUMBING AND GAS PIPING PERMIT INFORIVIATION -- 206- 431 -3670
PLUMBING AND GAS PIPING CONTRACTOR INFORMATION
Company Name: Mr Tp b e Z e n
Mailing Address:
City State Zip
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
Contractor Registration Number: Expiration Date:
Valuation of Plumbing work (contractor's bid price): $ /® 0 G d
Valuation of Gas Piping work (contractor's bid price): $
Sco e of Work (please provide detailed information): 114
o- 1-
b,l
1
Building Use (per Intl Building Code):
Occupancy (per Intl Building Code):
Utility Purveyor: Water:
Sewer:
Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below:
Fixture Type:
Qty
Fixture Type:
Qty
Fixture Type:
Wash fountain
Qty
Fixture Type:
Gas piping outlets
_
Qty
Bathtub or combination
bath /shower
Drinking fountain or water
cooler (per head)
Bidet
Food -waste grinder,
commercial
Receptor, indirect
waste
Clothes washer, domestic
Floor drain
Sinks
c
Dental unit, cuspidor
Shower, single head trap
Urinals
Dishwasher, domestic,
with independent drain
Lavatory
Water Closet
Building sewer or trailer
sewer
Rain water system — per
drain (inside building)
Water heater and/or
vent
%
Additional medical gas
inlets /outlets — six or more
_park
Industrial waste
pretreatment interceptor,
including its trap and vent,
except for kitchen type
grease interceptors _
Repair or alteration of water
piping and/or water treating
equipment
/
Repair or alteration
of drainage or vent
piping
I
!
Medical gas piping system
serving one to five
inlets/outlets for specific gas
Q:\Applications'P'orms- Applications On Line'3 -2006 - Permit Application.doc
Revised: 9 -2006
bh
Page 5 of 6
•
PERMIT APPLICATION NOTES — Applicable to all permits in this application
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbing Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OW»J R AUTHOR' D AGENT:
Signature:
//7".4..j,
Print Name: 412113 Ls /7,7,01;7.
Mailing Address: '9Zt A/2„p1_ p I, ermfrt -,s' j Ale
Date: x "' 2 2'
Day Telephone: 73Z — 5 99e
6":" 7 z_
City State Zip
Date Application Accepted: &- Date Application Expires:
- o
Staff Initials:
Q`.Wpplications\Forms- Applications On Line \32006 - Permit Application.doc
Revised: 9 -2006
bh
Page 6 of 6
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: http: / /www.ci.tukwila.wa.us
RECEIPT
Parcel No.: 6364200010 Permit Number: PG08 -098
Address: 2600 SOUTHCENTER MALL TUKW Status: APPROVED
Suite No: Applied Date: 03/28/2008
Applicant: KUDO BEANS Issue Date:
Receipt No.: R08 -02027
Payment Amount: $560.00
Initials: BLH Payment Date: 06/09/2008 12:07 PM
User ID: ADMIN Balance: $0.00
Payee: WOODBURN CONSTRUCTION
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 2707 560.00
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
PLAN CHECK - NONRES
PLUMBING - NONRES
000/345.830 360.00
000.322.103.00.0 200.00
Total: $560.00
3881 06/20 9711 TOTAL 2554.50
doc: Receiot -06
Printed: 06-09 -2008
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -431 -3670
Fax: 206 -431 -3665
Web site: http://www.ci.tukwila.wa.us
RECEIPT
Parcel No.: 6364200010 Permit Number: PG08 -098
Address: 2600 SOUTHCENTER MALL TUKW Status: PENDING
Suite No: Applied Date: 03/28/2008
Applicant: KUDO BEANS Issue Date:
Receipt No.: R08 -00962 Payment Amount: $41.00
Initials: WER Payment Date: 03/28/2008 02:38 PM
User ID: 1655 Balance: $200.00
Payee: RYAN O'NAN
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Cash 41.00
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
PLAN CHECK - NONRES
000/345.830 41.00
Total: $41.00
0528 03/28 $711 TOTAL 143.50
doc: Receiot -06 Printed: 03 -28 -2008
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION IR..
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3
3
Project:
(t 7 (e)o 6 fAA.) S
Type of Inspection:
' I-- 1,v A
Date Called:
\J
Address:
z &oO wlA11
Special Instructions:
Date Wanted:
7 _ Z c{ QE
a.
p. j
Requester:
Phone No:
Ke/i "i.r Cvd.,
® Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
p
Y�f,r r!f'
�[,/ n
(r �*S1,I !'/ C+R 17A( FlGw-
T {-1, : k(# Kitt,-
0ti 1/705/
Ke/i "i.r Cvd.,
�,1 Q
(r.,,,.%,,
1
Inspector:
Date: 74g—Pr
$60.00 Rf�FLSPECTION FEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
17170 119
PERMIT NO.
h
CITY OF TUKWILA BUILDING DIVISION R
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
Project
Type of Inspection:
L
Address:
2.G f
Date Called:
Special Instructions:
Date Wanted: / v
Requester:
Phone No: 5-0 ?V 34,33
0 Approved per applicable codes. El Corrections required prior to approval.
COMMENTS:
Date:
El $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
1
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
oge
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION F.
6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670
Project:
Type o InspectiPPn: .
o !c
Address:
' c) in 4- i I
Date Called:
Special Instructions:
Date Wanted:
j
a.m.
Requester:
‘!h 1..11
5 74 rc ,...41 f a Leci
PhomNo:
%,v3--
75'3
- ?(33
((
0 Approved per applicable codes. El Corrections required prior to approval.
cOM
TS: 0.✓ v
o !c
j
—
i e 4I
‘!h 1..11
5 74 rc ,...41 f a Leci
14nn
1"
t i+r/
((
(/4
,rZr Ore Aki rich-t
Date:
❑ $60.00 REINSPECTION FEE REQUIRED. Prior to inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
Receipt No.:
Date:
ti
BACKFLOW PREVENTION ASSEMBLY TEST_ REPORT
6
ACCOUNT #
NAME OF PREMISE 6tid .Ltr `3 �%� G2 /„.--"'efiefr Commercial ❑ Residential ❑
SERVICE ADDRESS _ _v d , e G4% /fl-toft, - CITY /-d- iti ZIP eMLFF
CONTACT PERSON LJe i",f t/Aipi''. "�'trHONE (6--a.1) 745- 8' FAX ( )
LOCATION OF ASSEMBLY £ z-r-e I ce ef,®3ei
DOWNSTREAM PROCESS 40 c.TGC 4.0 L4S ✓
NEW INSTALLXISTING ❑ REPLACEMENT ❑ OLD SER. #
MAKE OF ASSEMBLY
DCVA ❑ RPBA lid' PVBA ❑ OTHER
PROPER INSTALLATION? YES 2110 ❑
5 MODEL 4/6? SERIAL NO. #;;Io 3 c7 l0 P SIZE ? N
INITIAL
TEST
PASSED
DCVA / RPBA
DCVA / RPBA
RPBA
PVBA /SVBA
CHECK VALVE NO.1
CHECK VALVE NO.2
OPENED AT 2'Y PSID
AIR INLET
OPENED AT PSID
,
#1 CHECK e--- Z,PSID
EAKED •
O / O PSIDQ�
LEAKED •
DID NOT OPEN •
AIR GAP OK?
PSID
FAILED •
NEW
PARTS
AND
REPAIRS
CLEAN REPLACE PART
CLEAN REPLACE PART
CLEAN REPLACE PART
CHECK VALVE
HELD AT PSID
• •
• •
• •
•
•
LEAKED
• •
• •
—_-
• •
CLEANED •
• •
• •
• •
REPAIRED •
--
TEST AFTER
REPAIRS
OPENED AT PSID
AIR INLET PSID
LEAKED •
PSID
LEAKED •
PSID
#1 CHECK PSID
CHK VALVE PSID
PASSED •
FAILED •
AIR GAP INSPECTION: Required minimum air gap separation provided? Yes ❑ No ❑ Detector Meter Reading
,.LINE PRESSURE- 6Or PSI
CONFINED SPACE?
REMARKS:
TESTERS SIGNATURE:
CERT. NO. B5035 DATE 7,- 17--64.'
TESTERS NAME PRINTED: _Kurt Muller TESTERS PHONE # ( 206) 396 -4391
REPAIRED BY: DATE
FINAL TEST BY: CERT. NO. DATE
CALIBRATION DATE 5 /14 /08 GAUGE # 06041259 MODEL 845 SERVICE RESTORED? YES ❑ NO ❑
I certify that this report is accurate, and I have used WAC 246 -290 -490 approved test methods and test equipment.
Joanna Spencer - RE: Westfield tenants thook up to a grease trap and not toanout
From:
To:
Date:
Subject:
interceptor
grease interceptor
Page 1
"Marcia Peddicord" <mpeddicord @us.westfield.com>
"Joanna Spencer" <jspencer @ci.tukwila.wa.us>
04/04/2008 4:38 pm
RE: Westfield tenants that hook up to a grease trap and not toanoutside grease
Same situation although Kudo Beans would be connected to Landlord's
grease waste vault serving the East side of the Food Court. Kudo Beans
is not a "cooker ", so shouldn't generate very much grease, but will
still have food prep.
Marcia Peddicord
Southcenter Expansion - Seattle
633 Southcenter, Trailer #3
Seattle, WA 98188
Phone: 206 - 802 -6071
Fax: 206 - 246 -7043
Cell: 818 -402 -8923
Personal Cell: 724 - 321 -6541
mpeddicord @westfield.com
PERMANENT FILE COPS
Original Message
From: Joanna Spencer [mailto :jspencer @ci.tukwila.wa.us]
Sent: Friday. April 04, 2008 4•30 PM
To: Marcia Peddicord
Subject: RE: Westfield tenants that hook up to a grease trap and not
toanoutside grease interceptor
Marcia:
Thanks, this clarifies my concerns.
How about KUDO BEANS @ FC -14 ?
Joanna
»> "Marcia Peddicord" <mpeddicord @us.westfield.com> 04/04/2008 4:28 pm
»>
Chicken Now, FC -11, is connecting to the line that runs to Landlord's
grease waste vault that serves the west side Tenants of the Food Court
and is exterior of the building.
I have requested that list (who goes to which grease waste vaults) and
should have it for you - hopefully - by next City meeting. But, as a
rule, all Restaurants and all Food Court Tenants will connect to one
of
several grease waste vaults. Also, the Tenants on the east side close
to JC Penney's (such as Starbucks 1047 and Auntie Anne's 1120) will be
connected to their own Landlord provided grease waste vault. Only a
few
Tenants, who have very little to no grease, are in -line and not close
to
a connection point for the grease waste vaults (i.e. 555 Godiva, 546
Auntie Anne's and 856 Teavana) and possibly a few "wet kiosks" will
have
their own small "under the sink" interceptors.
Joanna Spencer - RE: Westfield tenants took up to a grease trap and not toanoutiegrease interceptor
Marcia Peddicord
Southcenter Expansion - Seattle
633 Southcenter, Trailer #3
Seattle, WA 98188
Phone: 206 - 802 -6071
Fax: 206 - 246 -7043
Cell: 818- 402 -8923
Personal Cell: 724 - 321 -6541
mpeddicord @westfield.com
Page 2
Original Message----- -
From: Joanna Spencer [mailto :jspencer @ci.tukwila.wa.us]
Sent: Friday, April 04, 2008 4:05 PM
To: Marcia Peddicord
Subject: Westfield tenants that hook up to a grease trap and not to
anoutside grease interceptor
Marcia:
PW is reviewing CHICKEN NOW @ FC -11 plumbing permit PG08 -044.
Application shows that they are connecting to the grease line which
is connected to the grease trap provided by the landlord.
Please confirm that they are hooking up to the grease trap and not to
the outside grease interceptor.
It would be helpful for us to get a list of "restaurant/tood serv.
tenants" not hooking up to
existing outside grease interceptor(s).
Thanks for your cooperation.
Joanna Spencer
Development Engineer
City of Tukwila
Public Works Department
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188 -2544
phone: 206 - 431 -2440
fax: 206 - 431 -3665
jspencer @ci.tukwila.wa.us
•
PERMIT COORD COPY
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: PG08 -098 DATE: 03 -28 -08
PROJECT NAME: KUDO BEANS
SITE ADDRESS: 2600 SOUTHCENTER MALL FC -14
X Original Plan Submittal
Response to Correction Letter #
Response to Incomplete Letter #
Revision # After Permit Issued
DEPARTMENTS:
Bu' • n Division
Fire Prevention
❑ Planning Division
Public W;p,�ks 'r! Structural ❑ Permit Coordinator
t 04 r2
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Comments: '
Incomplete
DUE DATE: 04 -01-08
Not Applicable
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUESITHURS RO TING:
Please Route Structural Review Required
REVIEWER'S INITIALS:
❑ No further Review Required
DATE:
APPROVALS OR CORRECTIONS:
Approved ❑ Approved with Conditions
Notation:
REVIEWER'S INITIALS: DATE:
DUE DATE: 04 -29 -08
Not Approved (attach comments) ❑
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents/routing slip.doc
2-28-02
Look Up a Contractor, Electri or Plumber License Detail
Washington State Department of Labor and Industries
General/Specialty Contractor
A business registered as a construction contractor with L &I to perform
construction work within the scope of its specialty. A General or Specialty
construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
License Information
License
WOODBC *201 PL
Licensee Name
WOODBURN CONSTRUCTION CO.
Licensee Type
CONSTRUCTION CONTRACTOR
UBI
600377351
Ind. Ins. Account Id
#5
Business Type
CORPORATION
Address 1
PO BOX 129
Address 2
City
WOODBURN
County
OUT OF STATE
State
OR
Zip
97071
Phone
5039819504
Status
ACTIVE
Specialty 1
GENERAL
Specialty 2
UNUSED
Effective Date
10/13/1980
Expiration Date
11/2/2009
Suspend Date
Separation Date
Parent Company
Previous License
Next License
WITHELC044OF
Associated License
Business Owner Information
Name
Role
Effective Date
Expiration Date
WITHERS, TERRENCE C
Cancel
Date
01/01/1980
Bond
Amount
PARKER, WILLIAM E
#5
01/01/1980
6358479
WITHERS, ROBERT L
Until
Cancelled
01/01/1980
0
Bond Information
Bond
Bond
Company
Name
Bond
Account
Number
Effective
Date
Expiration
Date
Cancel
Date
Impaired
Date
Bond
Amount
Received
Date
#5
SAFECO INS
CO
6358479
10/25/2005
Until
Cancelled
$12,000.00
09/19/2005
Page 1 of 3
https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= WOODBC *201PL 06/09/2008
TO BUILDING
MAIN WATER
SUPPLY PLUMBING DIAGRAM
3/8" = 1I-0"
0 1 2 3 4 5
NORTH
LEGEND:
WASTE
SUPPLY
WASTE LINE
GREASE WASTE LINE
COLD WATER
HOT WATER
FOt1 Oqei
(E) MAIN WASTE LINE AND (E) 3"
VENT PIPE CONNECTION BELOW
FLOOR TO MAIN BUILDING SYSTEM
(E) GREASE LINE CONNECTION
BELOW FLOOR TO MAIN BUILDING
SYSTEM, THEN TO (E) LANDLORD
PROVIDED GREASE TAW SYSTEM
l> L i
WASTE PLUMBING DIAGRAM
3/8" =
0 1 2 3 4 5
NORTH
PLUMBING PLAN NOTES
1. ALL SUPPLY, WASTE AND VENT PIPING ON THIS PLAN IS SHOWN AS A
DIAGRAM AND CONTRACTORS SHALL INSTALL THEM IN ACCORDANCE
WITH THE MOST CURRENT CODE PER LOCAL JURISDICTION.
2. SEE KITCHEN SHEETS FOR ADDITIONAL PLUMBING INFORMATION AT
KITCHEN EQUIPMENT.
V 14-14[- 1
3. GREASE LINE AND GREASES IS PROVIDED BY LANDLORD UNDER
SEPARATE PERMIT.
Permit No.
By
REVISIONS
" hanpes shall be made to the scnpP
, ,vithout prior approval of
•l - t. kwi!a Building Division.
7 7: visions will require a new plan submittal
r ; : ^v include additional plan revirw fees
FILE COPY
CS
Date:
City of Tuimila
B DNIS1ON
'P6og -o98
hr ABATE PERMIT
REQUIRED FOR:
Mechanical
Etectricai
❑ Plumbing
❑ Gas Piping
City of Tukwila
BUIL,= if f DIVISION
REVIEWED FOR .h
CODE COMPLIANCE
APPROVED
APR 1 2OgF
Of Tukwila
BUILDING DIVISION
mar review approval is subject to errors and onions.
Approval of construction documents does not authorize
the violation of any adopted code or order. Receipt
of approved Field Copy and conditions is a owdec ed:
RECEIVED
MAR 2 8 2008
PERMIT CENTER
0
arai jackson unison murakami LLP
ARCHITECTURE I URBAN DESIGN I INTERIORS
2300 seventh avenue
seattle, washington 98121
phone: 206.323.8800
fax: 206.323.8518
Internet: www.araijackson.com
Kudo Beans coffee & tea
Westfield Southcenter Mall
2600 Southcenter Mall, Space #FC-14
Tukwila, WA 98188
Owner
Innovated Consulting LLC
928 Arnold Avenue
Point Pleasant, NJ 08742
Telephone 732.899.8411
Architect
ARAI JACKSON ELLISON MURAKAMI
2300 7th Avenue
Seattle, WA 98121
Telephone 206.323.8800
Facsimile 206.323.8518
Food Supply & Dgn
Bargreen Ellingson, INC.
3627 1st Avenue South
Smite, WA 98134
Telephone 206.682.1472
Facsimile 206.682.2367
Electrical Engineering
j Omega Engineering, Inc.
815 First Avenue, #333
Seattle, WA 98104
Telephone 206.682.1472
Facsimile 206.6822367
KEY PLAN
MCISEN1fl
REVISIONS
No. Date
PLUMBING DIAGRAMS
Scale AS NOTED
In Charge
Drawn By
4393
2DC18008
REGISTERED l
ARCHITECT I
l
STATE OF WASHINGTON
Description
RM Checked By
JO Approved By
A201
o
CW -COLD WATER
•
HW -HOT WATER
•
CLOSED DRAIN - DIRECT WASTE
FS
7 �
W M
REVISIONS
# DATE
I
? ?/ ? ? / ? ? ??
2
3
4
5
6
DRAWN BY:
M.TABOR
PROJECT MANAGER
C. ALLERS
PROJECT NUMBER:
SCALE:
1/4" =1' -0"
SHEET TITLE:
PLUMBING ROUGH -IN
PLAN
SHEET NUMBER
K...4
4of4
o
CW -COLD WATER
•
HW -HOT WATER
•
CLOSED DRAIN - DIRECT WASTE
FS
12" X 12" FLOOR SINK - INDIRECT WASTE
PLU
V
B I N G LEGE
\D
F6[02'
Ot a pt
1. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO SIZE, SUPPLY AND INSTALL A GREASE INTERCEPTOR /TRAP IF ONE IS REQUIRED.
PLUv1Bl\
G
OTES
3. THE PLUMBING CONNECTIONS, SPECIFICATIONS AND DIMENSIONS SHOWN ON THESE PLANS ARE FOR FOOD SERVICE EQUIPMENT ONLY. SEE
ARCHITECTS PLAN SET FOR ALL OTHER PLUMBING REQUIREMENTS FOR THIS PROJECT.
4. ALL PLUMBING ROUGH -IN WORK AND FINAL CONNECT1OINS FOR ALL ITEMS SHOWN AND SPECIFIED ON THESE PLANS BY BARGREEN
ELLINGSON SHALL BE PERFORMED BY THE PLUMBING CONTRACTOR.
5. THE PLUMBING CONTRACTOR SHALL PROVIDE AND INSTALLA11OIN MATERIAL ON ALL DRAIN LINES FROM ICE BINS, ICE PANS, ETC., SO AS TO
ELMININATE CONDENSATION FORMATION.
6. UNLESS OTHERWISE SPECIFIED IN THESE PLANS OR OTHER WRITTEN CONTRACTS, IT SHALL BE THE RESPONSIBILITY OF THE PLUMBING
CONTRACTOR TO PROVIDE ALL PLUMBING -TYPE MATERIALS INCLUDING VALVES, TRAPS, TUNE STRAINERS, FLOOR SINK COVERS, PRESSURE
REGULATORS, SIPHON BREAKERS, ETC.
REVIEWED FOR
CODE COMP
APP OVE
Opp ; C , ,
7. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO VERIFY THAT THE LOCATIONS FOR ALL MECHANICAL REQUIREMENTS
WHICH REQUIRE FLOOR PENETRATIONS DO NOT CONFLICT WITH STRUCTURAL MEMBERS IN THE FLOOR.
8. THE GENERAL CONTRACTOR SHALL SUPERVISE THE LOCATION OF ALL FLOOR DRAINS ON THE JOB SITE SO AS TO ENSURE THE BEST SLOPE
POSSIBLE OF THE SURROUNDING FLOOR TO THESE DRAINS.
9. ALL DRAIN LINES FROM EQUIPMENT REQUIRING CONDENSATION REMOVAL SHALL BE RUN IN COPPER.
10. PLUMBING CONTRACTOR TO SUPPLY WATER PRESSURE REDUCING VALVE SET AT 20 PSI FOR EACH DISHWASHER AND GLASS WASHER.
SE1
p312 5108 ?EIC*11
Z�ON
t4 01 FA R CpN
RECEIVED
MAR 2008
PERMIT CENTER