Loading...
HomeMy WebLinkAboutPermit 89-09-DR - RADOVICH COMPANY - FORT DENT II AND III DESIGN REVIEW89-09-DR 6840 SOUTHCENTER BOULEVARD 6860 SOUTHCENTER BOULEVARD 89-11-DR FORT DENT II AND FORT DENT III CITY OF TUKWILA 6200 SOUTHCENTER BOULEVARD, TUKWILA, WASHINGTON 98188 November 20, 1990 Katie Grief, Development Manager John C. Radovich Development Company 2000 -124th Ave. N.E. Bellevue, WA 98005 Dear Ms. Grief: In reference to your letter of November 5, 1990, the City of Tukwila has approved your request for extension of #88- 3 -SMP. Please be advised that the conditions of this extension (per It 89- 9-DR) require that substantial work for both Fort Dent Two and Three be started by November 21, 1991. All work proposed for these projects must be completed by November 21, 1994. L. Rick Beeler Director, Department of Community Development PHONE q (206) 433.1800 Gary L. • VanI)use'a, Mayor • City of Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 (206) 433 -1800 Gary L. VanDusen, Mayor To: Planning Commission From: Moira Carr Bradshaw Date: 19 October 1989 Subject: Sensitive Area Ordinance (SAO) The City Council requested a draft copy of the proposed SAO to review at their 23 October Committee of the Whole meeting. Although staff has included 15 and 40 percent in the draft copy, the issue of percent slopes to include in the ordinance is unresolved at this time. A copy has also been included in your packet to give you an opportunity to study the proposal prior to Thursday's meeting. As you have probably received one yourself, you are aware of the brochure that has been sent to all property owners within the City of Tukwila as well as to appropriate environmental organizations. A public workshop will be held on the 25th of October to discuss the issues and proposed standards. Staff will then review the SAO with you on the 26th of October to prepare for the 9th of November public hearing. There are five basis elements of the proposed legislation: First, defining what the City considers a sensitive area and restricting development of those areas. Second, requiring special study prior to development of these areas. Staff has incorporated the study requirements and criteria for mitigation in the Environmental Ordinance (TMC 21.) Exemptions from SEPA, single family homes for example, do not apply in sensitive areas. Third, establishing buffer areas adjacent to the sensitive areas to protect them from the adjacent development. Fourth, creating special construction and development standards for these areas. Fifth, providing opportunities for variance from the standards. • PLANNING COMMISSION SENSITIVE AREA ORDINANCE 'OCTOBER 19, 1989 To facilitate review of the attached ordinance, letters in the margin refer to explanatory paragraphs below. A. Amends the Subdivision Ordinance to bring the existing section on unsuitable land up to date on sensitive area regulation and essentially stipulates conformance with the regulations to be established by the SAO. B. Amends the Zoning Code's definition section to explain what are sensitive areas and other terms used within the ordinance. C. Creates a Sensitive Area Zone which overlays on top of existing zoning districts. Similar to the Shoreline Zone it creates special standards and regulations unique to the sensitive areas. D. Requires buffers adjacent to sensitive areas to protect their functions similar to the required river environment adjacent to the Green /Duwamish. E. Restricts use within watercourses and wetlands and establishes criteria for development within these areas for those uses permitted. F. Restricts use on sensitive slopes and establishes standards for uses allowed. G. Establishes conditions for development in the vicinity of abandoned mine areas. H. Establishes an exception process for : *existing development *existing lots of record *use restrictions on sensitive slopes I. Amends the City's Environmental ordinance to define sensitive areas per the new ordinance and to establish specifications for special study in these areas. Cit f Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 (206) 433 -1800 Gary L. VanDusen, Mayor NOTICE OF DECISION FILE NUMBER: 89 -9 -bR: FORT DENT II APPLICANT: John C. Radovich Company REQUEST: Design Review of a 60,000 s.f. office building LOCATION: 6840/6860 Southcenter Boulevard • The Board of Architectural Review (BAR) conducted a review of the above request on September 28, 1989, and approved the request with five conditions (see attached conditions). The BAR adopted the Findings and Conclusions contained in the staff report dated September 20, 1989. Any party aggrieved by this decision may appeal the decision to the City Council by filing an appeal in writing with the City Clerk within ten (10) days of the above date and shall state the reasons for the appeal. NOTDEC NAME: at_e TITLE: 94 A/INJ,- DATE: <) LI1 CONDITIONS OF APPROVAL 1. Substantial work for Fort Dent II (and Fort Dent III) must be started by November 21, 1990. All work proposed for Phase II (and III) must be completed by November 21, 1993 unless an extension is granted by the City. (Shoreline Permit Conditions). Prior to the issuance of a Building Permit, the applicant must submit for review and approval the following: 2. The applicant shall submit for review and approval by the Director of Community Development and the Director of Public Works, a revised site plan which provides the following: a. Revised configuration of access road on shared easement from Southcenter Boulevard which accommodate adjacent development. b. Revised entry to site from shared access and parking layout. c. Provision of differentiated walking /driving surface which can include slight elevation of and contrasting paving materials for walking surface for pedestrian crossing of parking lot between Southcenter Boulevard and the south end of Fort Dent II building. 3. The applicant shall submit for review and approva: by the Director of Community Development, a revised landscape plan which provides the following: a. The planting of London Plane trees, spaced 30 feet on- center along the east property line property line common to the Homewood Suites • the State Farm office project [File: 87 -14 -D distance of approximately 370 feet as measur the property line from the edge of the South Boulevard public right -of -way. The trees to shall be similar in size to those approved d BAR design review for the State Farm office • b. The planting evergreen shrubs a minimum of 3 height at planting and spaced so as to form landscaping screen to buffer the impact of p the adjoining development. A combination of mounding and shrubs to produce a visual Barr inches in height at planting would be accept amount and type of landscaping for the easte the project may be modified based upon the a plan for Homewood Suites. to 35 the roject and ]) for a d along enter be planted ring the roject. inches in dense rking on earth - er 36 ble. The n side of proved Ft. Dent II Conditions Page 2 c 4. A sign plan for Fort Dent II which is similar in size and materials to Fort Dent I. 5. The applicant shall complete a lot line adjustment so that Building II does not straddle a lot line and provide the City with recorded easements granting reciprocal access and use of parking between Lots 1 and 2, or the applicant shall complete lot consolidation (for lots 1 and 2). Prior to the issuance of a Grading Permit, the applicant must submit for review and approval the following: 6. A re- vegetation plan which includes native landscape materials common to a riverbank habitat for the portions of the bank of the Green River which will be disturbed during the construction of the trail and other site work. Prior to the issuance of a Certificate of Occupancy, the applicant must submit for review and approval the following: 7. Approval for Fort Dent III has not been completed. An alternative landscaping plan must be submitted, reviewed and approved with the alternative landscaping installed on the north side of the Fort Dent II portion of the site. The landscaping materials shall be of similar size and species and shall include a minimum of five trees and a 10 -foot width. City of Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 (206) 433 -1800 Gary L. VanDusen, Mayor CITY OF TUKWILA PLANNING COMMISSION SEPTEMBER 28, 1989 The meeting was called to order at 8:30 p.m. by Chairman Jim Haggerton. Members present were Messrs. Haggerton, Hamilton, Cagle, Flesher, Kirsop, Knudson and Gomez. Representing the staff were Jack Pace and Joanne Johnson. APPROVAL OF MINUTES - MR. HAMILTON MOVED AND MR. KNUDSON SECONDED A MOTION TO APPROVE THE AUGUST 24, 1989 MINUTES AS CORRECTED. UNANIMOUSLY APPROVED. 89 -9 -DR FT. DENT II - Request for design approval of an office park development, Phase I, Fort Dent II, 60,000 sq. ft. Jack Pace, Senior Planner, distributed Attachment "C" (revised) and Attachment "E" (revised). He reviewed the staff report and the site design. He pointed out that the applicant has agreed to all conditions as stated in the staff report. He proposed the following as modification to Condition 3.(b): "The amount and type of landscaping for the eastern side of the project may be modified based upon the approved plan for Homewood Suites." Katie Greif, - John Radovich Development Co, 2000 - 124th N.E. (B -103), Bellevue, WA represented the applicant. She added further clarification of the project and concluded that they would comply to each of the conditions and recommendations of the staff report. Public Hearing was closed at 9:00. Discussion ensued on the proposal. MR. KNUDSON MOVED AND MR. CAGLE SECONDED A MOTION TO APPROVE THE REQUEST FOR DESIGN REVIEW OF FT DENT II, WITH THE STAFF'S RECOM- MENDATIONS AND INCLUDING THE MODIFICATION OF CONDITION 3.(B), AS DISCUSSED EARLIER, AND BASED UPON THE FINDINGS AND CONCLUSIONS PRESENTED BY THE STAFF IN THE STAFF REPORT. Planning Commission September 28, 1989 Page 2 Conditions read as follows: CONDITIONS OF APPROVAL 1. Substantial work for Fort Dent II (and Fort Dent III) must be started by November 21, 1990. All work proposed for Phase II (and III) must be completed by November 21, 1993 unless an extension is granted by the City. (Shoreline Permit Conditions). Prior to the issuance of a Building Permit, the applicant must submit for review and approval the following: 2. The applicant shall submit for review and approval by the Director of Community Development and the Director of Public Works, the revised site plan which provides the following: a. /Revised configuration of access road on shared easement from Southcenter Boulevard which accommodate adjacent development.. b. Revised entry to site from shared access and parking layout. c. Provision of differentiated walking /driving surface which can include slight elevation of and contrasting paving materials for walking surface for pedestrian crossing of parking lot between Southcenter BOulevard and the south end of Fort Dent II building. 3. The applicant shall submit for review and approval by the Director of Community Development, a revised landscape plan which provides the following: a. The planting of London Plane trees, spaced 30 to 35 feet on- center along the east property line (the property line common to the Homewood Suites project and the State Farm office project [File: 87- 14 -DR]) for a distance of approximately 370 feet as measured along the property line from the edge of the Southcenter Boulevard public right -of -way. The trees to be planted shall be similar in size to those approved during the BAR design review for the State Farm office project. b. The planting evergreen shrubs a minimum of 36 inches in height at planting and spaced so as to form a dense landscaping screen to buffer the impact of parking on the adjoining development. A combination of earth - mounding and shrubs to produce a visual barrier 36 inches in height at planting would be acceptable. f Planning Commission September 28, 1989 Page 3 The amount and type of landscaping for the eastern side of the project may be modified based upon the approved plan for Homewood Suites. 4. A sign plan for Fort Dent II which is similar in size and materials to Fort Dent I. 5. The applicant shall complete a lot line adjustment so that Building II does not straddle a lot line and provide the City with recorded easements granting reciprocal access and use of parking between Lots 1 and 2, or the applicant shall complete lot consolidation (for lots 1 and 2). Prior to the issuance of a Grading Permit, the applicant must submit for review and approval the following: 6. A re- vegetation plan which includes native landscape materi- als common to a riverbank habitat for the portions of the bank of the Green River which will be disturbed during the construction of the trail and other site work. Prior to the issuance of a Certificate of Occupancy, the applicant must submit for review and approval the following: 7. Approval for Fort Dent III has both been completed . An alternative landscaping plan must be submitted, reviewed and approved with the alternative landscaping installed on the north side of the Fort Dent II portion of the site. The landscaping materials shall be of similar size and species and shall include a minimum of five trees and a 10 -foot width. UNANIMOUSLY APPROVED. DIRECTORS REPORT Jack Pace discussed the schedule for Planning Commission meetings for the coming months. It was established that the meeting dates are November 16, 1989 and December 14, 1989. The October 26th meeting will begin with a work session at 7:00 pm. He reviewed the SEPA process and design review process for the Commission. Planning Commission September 28, 1989 Page .4 • ADJOURNMENT The meeting was adjourned at 9 :35 p. Respectfully submitted, Joanne Johnson, Secretary HEARING DATE: FILE NUMBER: APPLICANT: REQUEST: LOCATION: ACREAGE: City of Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 (206) 433 -1800 Gary L. VanDusen, Mayor COMPREHENSIVE PLAN DESIGNATION: Commercial ZONING DISTRICT: C -2 Regional Retail SEPA DETERMINATION: Mitigated Determination of Nonsignificance - Oct. 10, 1988 ATTACHMENTS: A. Revised Site Plan B. Revised Landscape Plan C. Revised Building II Elevations D. Revised Building II Ground Floor E. Revised Building II Second Floor F. Revised Building II Third Floor STAFF REPORT TO THE BOARD OF ARCHITECTURAL REVIEW Prepared September 20, 1989 September 28, 1989 89 -9 -DR: Fort Dent II John C. Radovich Company Design Review of an office park development, Phase I - Fort Dent II, 60,000 sq. ft. 6840 and 6860 Southcenter Boulevard, Lots 1 and 2, Tukwila Short Plat 79 -7 -SS. Approximately 5 acres. G. Original Site Plan H. Original Building II Elevations I. Original Landscape Plan J. May 17, 1989 letter STAFF REPORT to the B.A.R. I FINDINGS I VICINITY /SITE INFORMATION 1. Project Description: The revised proposal for Fort Dent II includes develop- ment of a three - story, 60,000 square foot office building, associated parking, and landscaping. The project also includes development of approximately 395 lineal feet of trail along the bank of Green River. 2. Existing Land Use: Lot 1 is being used for dirt storage excavated from the Fort Dent 1 site. 3. Surrounding Land Use: Regional park to the north, railroads and industrial use to the east, vacant land to the south, office building to the west. 4. Terrain: Relatively flat until the riverbank where the bank ranges from 1.5 to 1.0 (horizontal to vertical). 5. Vegetation: New growth of grasses and trees. 89 -9 -DR: Fort Dent II Page 2 6. Soils: The majority of the surface is covered with up to five feet of fill, with approximately 20 additional feet of fill on Lot 1. Sub - surface soils consist of dense silt and then silty sand. 7. Access: 40 -foot easement at the east end of the Southcenter Boulevard cul -de- sac and southwest of the subject site. 8. Public Facilities: Fort Dent Regional Park north of the Green River. BACKGROUND The applicant indicated in a letter dated May 17, 1989 (Attachment J) that due to financial constraints, modifications to their design for Fort Dent II and III are being proposed. Subsequent to that letter further modifications were made. The applicant is now limiting their request for approval of Fort Dent II. The BAR reviewed and approved the original design in October 1988. The original Site Plan together with the other development plans are found on Attachments G through I. Listed below are both a narrative summary together with a statistical summary of the basic differences between the proposed Fort Dent II and the approved Fort Dent II: STAFF REPORT to the B.A.R. Page 3 NARRATIVE SUMMARY 1. The redesign of the plaza area in front of the building has been eliminated. 2. The proposed structure has added outdoor decks on the southwest and south- east corners of the building on the second and third floors. 3. The semi - circular glass curtain wall has been eliminated on the rear facade. 4. The front facade on the proposed Fort Dent II has approximately 50% less glass curtain. 5. The freestanding entry arches are eliminated and the entry portals redesigned and scaled down in size. 6. The basement parking has been eliminated and additional surface parking added. 7. Surface parking is pulled back from the river environment approximately five feet with shrubbery and additional picnic tables added. STATISTICAL SUMMARY ORIGINAL DUIIDING II SUBMITTAL Gross floor area 66,465 sq. ft. Parking 103 regular 48 compact 2 handicapped 148 stalls total (48 underground, 100 surface) Loading spaces Ground coverage * Building height * Building setbacks Front yard: Rear yard: ** Side yard: 1 space 70, 524 sq. ft. (68.3 %) 40' (3 stories w /garage) 95 feet from south property line 90 feet 70 feet 89 -9 -DR: Fort Dent II RE- SUBMITTAL 60,000 sq. ft. 193 regular 12 compact 4 handicapped 209 stalls total (all surface) 1 space 75,353 sq. ft. (73.0 %) 39'6" (3 stories) 62 feet from south property line 340 feet 70 feet minimum STAFF REPORT 89 -9 -DR: Fort Dent II to the B.A.R. Page 4 * Shoreline Permit Limitation (WAC 173.14.064) to changes in building height or ground coverage is a 10 percent increase. This assumes the use of Lot 1 and 2 for calculation purposes. * * Currently there are two additional projects which will share both the access drive from Southcenter Boulevard and responsibility for portions of the trail along the green river: a. The State Farm office project which received previous design review approval (File: 87- 14-DR) and has submitted for a building permit, and b. The Homewood Suites project (long -term hotel facilities for use by travel- ing executives) which was recently submitted and is scheduled for design review approval in November. This project will be located adjoining the eastern boundary of the proposed Fort Dent facilities. DECISION CRITERIA The applicable Tukwila Municipal Code (TMC) criteria are listed below in bold, followed by pertinent findings of fact. 18.60.050: GENERAL REVIEW CRITERIA, (1) Relationship of Structure to Site. a. The site should be planned to accomplish a desirable transition with streetscape and to provide for adequate landscaping and pedestrian movements b. Parking and service areas should be located, designed and screened to moderate the visual impact of large paved areas. c. The height and scale of each building should be considered in relation to the site. The proposed Fort Dent II building is in the same location as the original approval. The building scale is similar with a slight decrease in the building height (6 inches). Since the underground parking has been eliminated there is more surface parking which has resulted in more parking in front of the build- ing and less area available for the grassy areas around the building. (2) Relationship of Structure and Site to Adjoining Area. a . Harmony on texture, lines and masses is encouraged. b. Appropriate landscape transition to adjoining properties should be provided. c. Public buildings and structures should be consistent with the established neighborhood character. d. Compatibility of vehicular pedestrian circulation patterns and loading facilities in terms of safety, efficiency and convenience should be encouraged. e. Compatibility of on -site vehicular circulation with street circulation should be encouraged. STAFF REPORT 89 -9 -DR: Fort Dent II to the B.A.R. Page 5 Vehicular access has remained the same. The access from Southcenter Boule- vard will be shared by the State Farm office project and the site immediately adjoining the Fort Dent II site. In the case of the State Farm office project, the City has already approved the use of London Plane trees along their portion of the shared access and that project has recently submitted plans for a building permit. The staff believes that the continuation of the use of London Plane trees along that shared access is important for visual continuity. There is no visual barrier on the east property line to reduce the impact of the parked vehicles and lights from vehicles on the adjoining property (Homewood Suites site and the State Farm office project). The revised site plan (Attachment A) shows a sidewalk leading from Southcen- ter Boulevard along the front of the building. The pedestrian access to the river bank trail is located at the north end of the building. Because of the orientation of the Fort Dent II building (it does not face South - center Boulevard), the pedestrian access from Southcenter Boulevard crosses the parking area at the south end of the building. In the opinion of the Staff, this crossing is in an unusual location (not in front of the building) and pre- sents potential for pedestrian safety problems. The proposed landscaping on the western perimeter of the site next to the river bank trail and the river bank consists of grass and regularly spaced trees (Norway Maples). The river bank should be re- vegetated with typical native species common to a natural setting after the grading for the trail and bench have been accomplished. Ten to twenty feet of perimeter landscaping is proposed as transition to adja- cent properties and contains a combination of grass and Norway Maples. Groupings of shrubs have been added adjacent to the river environment. This area also contains a drainage Swale as noted on the revised site plan (see cross - section). Service areas - loading and dumpster area - are located at the rear entrance to the buildings as shown on the revised site plan (Attachment A). 3) Landscaping and Site Treatment a. Where existing topographic patterns contribute to beauty and utility of a development, they should be recognized, preserved and enhanced. b. Grades of walks, parking spaces, terraces and other paved areas should promote safety and provide an inviting and stable appearance. c. Landscape treatment should enhance architectural features, strengthen vistas and impor- tant axis, and provide shade. d. In locations where plants will be susceptible to injury by pedestrian or motor traffic, miti- gating steps should be taken. e. Where building sites limit planting, the placement of trees or shrubs in paved areas is encouraged. STAFF REPORT C 89 -9 -DR: Fort Dent II to the B.A.R. Page 6 f. Screening of service yards, and other places which tend to be unsightly, should be accom- plished by use of walls, fencing, planting or combination. g. In areas where general planting will not prosper, other materials such as fences, walls and pavings of wood, brick, stone or gravel may be used. h. Exterior lighting, when used, should enhance the building design and the adjoining land- scape. Lighting standards and fixtures should be of a design and size compatible with the building and adjacent area. Lighting should be shielded, and restrained in design. Excessive brightness and brilliant colors should be avoided. The creation of a bench in the riverbank remains as originally proposed. The bank will be cut back to create extra flood storage capacity and eliminating the applicants need to provide the capacity within his site. A twenty foot wide strip that runs linearly along the riverbank is owned by the City of Tukwila for Recreational Trail purposes. The Parks and Recreation Director has discussed swapping of additional land for the trail in exchange for the applicant's use of the City's riverbank. The relocated trail location is shown on Attachment A. The flowering trees and shrubs such as dogwood and rhododendron have been eliminated as accent along the center driveway aisle and around the buildings; and in lieu thereof, the low growing evergreen, Otto Luyken laurel, is proposed as a perimeter foundation planting. Although the amount of landscaping has been reduced and species changed, in general the placement, size and species are adequate and similar in character to Fort Dent I. The eleven foot tall light standards that complemented the building's color and material are no longer used to enhance the axial driveway. Twenty five foot tall pole lights are arranged randomly on the new site plan and according to the applicant are not changed from the original elevation. The exterior lighting of the proposed buildings although not identical with the original plans and ade- quately enhances the proposed buildings. (4) Building Design a. Architectural style is not restricted, evaluation of a project should be based on quality of its design and relationship to its surroundings. b. Buildings should be to appropriate scale and in harmony with permanent neighboring developments. c. Building components- such as windows, doors, eaves, and parapets should have good pro- portions and relationship to one another. Building components and ancillary parts shall be consistent with anticipated life of the structure. d. Colors should be harmonious, with bright or brilliant colors used only for accent. e. Mechanical equipment or other utility hardware on roof, ground or buildings should be screened from view. f. Exterior lighting should be part of the architectural concept. Fixtures, standards, and all exposed accessories should be harmonious with building design. g. Monotony of design in single or multiple buildings projects should be avoided. Variety of detail, form and siting should be used to provide visual interest. STAFF REPORT {" 89 -9 -DR: Fort Dent II to the B.A.R. Page 7 Although the configuration and placement of the elements of the proposed buildings differ, the architectural style of the proposed buildings is similar to that of the original plans. The contemporary style and materials are not changed. There are three primary building materials: tinted glass curtain wall on the entry facade, painted concrete and painted aluminum panels. The proposed entry to each building contains a painted metal freestanding element (labeled portico on the elevation sheets) as in the original plans, but reduced in size and providing more vertical emphasis than horizontal. On the original plans, at the point of entry there were painted metal panels on the building facade, but they have been eliminated in this proposal. In addition, the proposed plans provide an overhang above the entries of both buildings which visually reinforce the entry areas. Although the proposed entries have been substantially modified from the original plans, the proposed entries appear to be well scaled and in harmony with the rest of the facade. The color scheme for the proposed building differs only in that the accent color teal blue will be used instead of yellow. The screening for the rooftop mechani- cal equipment is the same for the proposed building. The amount of glass curtain wall on the entry facade (east elevation — Attach- ment C) has been modified by the applicant to be approximately two - thirds of the length of the entry facade. The ratio of the expanse of glass curtain wall to the painted, tilt -up concrete portion of the main entry facade (east elevation) is perhaps the most prominent design feature when viewed from the surround- ing area. As currently shown in Attachment C, the facade's appearance emphasizes the height of the building. The applicant has agreed with staff that since Fort Dent II will be a three -story structure, it requires the retention of the ratio of two- third's glass curtain wall and one -third painted, tilt -up concrete wall to enhance the horizontal element of the building. (5) Miscellaneous Structures and Street Furniture The freestanding elements at the end of the entry drive and at the entrance to the buildings have been eliminated. The applicant has increased the number of picnic tables along the riverbank from one to six. TMC 18.60.060: SPECIAL REVIEW CRITERIA FOR INTERURBAN SPECIAL REVIEW AREA The guidelines for the Interurban District are listed below and followed with general comments that are relevant and not discussed above. STAFF REPORT to the B.A.R. c (A) Proposed development design should be sensitive to the natural amenities of the area. (B) Proposed development use should demonstrate due regard for the use and enjoyment of public recreational areas and facilities. (C) Proposed development should provide for safe and convenient on -site pedestrian circulation. (D) Proposed property use should be compatible with neighboring uses and complementary to the district in which it is located. (E) Proposed development should seek to minimize significant adverse environmental impacts. (F) Proposed development should demonstrate due regard for significant historical features in the are a. Provided greater landscaped area and picnic tables are more sensitive to the Green River amenity and its use as a recreational trail. No other changes have been made that impact the guidelines for the Interur- ban District. CONCLUSIONS 1 1. The increased "ground coverage" for Fort Dent II was less than 10 percent therefore the modifications to Shoreline Permit are acceptable. 2. Because the joint access easement from Southcenter Boulevard is to be shared with adjoining development, the configuration of the access, the entrance to the site from the shared access, and the parking layout and it's respective land- scaping will need to be revised. 3. The amount of glass curtain wall on the entry facade is two - thirds the length of the east elevation to enhance the horizontal emphasis of the three -story build- ing and retain the appearance of the original approval. 4. The portion of the pedestrian access which crosses the parking lot between Southcenter Boulevard and the south end of the building needs to be rede- signed to include a differentiation of walking /driving surface to to alert drivers and enhance pedestrian safety. 5. To unify and provide visual continuity along the access drive from Southcen- ter Boulevard, the use of London Plane trees shall be installed as approved for the State Farm office project. 6. The straddling of the lot line common to both lots by the Fort Dent II building is not acceptable circumstance to the Staff. The applicant can easily be resolve this situation by accomplishing either a lot consolidation or a boundary line adjustment. 89 -9 -DR: Fort Dent II Page 8 STAFF REPORT to the B.A.R. C 89 -9 -DR: Fort Dent II Page 9 RECOMMENDATIONS I The Community Development Staff recommends approval of Fort Dent II with the following conditions: 1. Substantial work for Fort Dent II (and Fort Dent III) must be started by Novem- ber 21, 1990. All work proposed for Phase II (and III) must be completed by November 21, 1993 unless an extension is granted by the City. (Shoreline Permit Conditions). Prior to the issuance of a Building Permit, the applicant must submit for review and approval the following: 2. The applicant shall submit for review and approval by the Director of Com- munity Development and the Director of Public Works, a revised site plan which provides the following: a. Revised configuration of access road on shared easement from Southcen- ter Boulevard which accommodates adjacent development. b. Revised entry to site from shared access and parking layout. c. Provision of differentiated walking /driving surface which can include slight elevation of and contrasting paving materials for walking surface for pedestrian crossing of parking lot between Southcenter Boulevard and the south end of Fort Dent II building. 3. The applicant shall submit for review and approval by the Director of Com- munity Development, a revised landscape plan which provides the following: a. The planting of London Plane trees, spaced 30 to 35 feet on- center along the east property line (the property line common to the Homewood Suites project and the State Farm office project [File: 87- 14 -DR]) for a distance of approximately 370 feet as measured along the property line from the edge of the Southcenter Boulevard public right -of -way. The trees to be planted shall be similar in size to those approved during the BAR design review for the State Farm office project. b. The planting of evergreen shrubs a minimum of 36 inches in height at planting and spaced so as to form a dense landscaping screen to buffer the impact of parking on 'the adjoining development. A combination of earth - mounding and shrubs to produce a visual barrier 36 inches in height at planting would be acceptable. /'( ' -,,•` 7 a'/ L 4. A sign plan for Fort Dent II which is similar in size and materials to Fort Dent I. STAFF REPORT to the B.A.R. c 89 -9 -DR: Fort Dent II Page 10 5. The applicant shall complete a lot line adjustment so that Building II does not straddle a lot line and provide the City with recorded easements granting recip- rocal access and use of parking between Lots 1 and 2, or the applicant shall complete a lot consolidation (for lots 1 & 2). Prior to the issuance of a Grading Permit, the applicant must submit for review and approval the following: 6. A re- vegetation plan which includes native landscape materials common to a riverbank habitat for the portions of the bank of the Green River which will be disturbed during the construction of the trail and other site work. Prior to the issuance of a Certificate of Occupancy, the applicant must submit for review and approval the following: 7. Approval for Fort Dent III has not been completed An alternative landscaping plan must be submitted, reviewed and approved with the alternative landscap- ing installed on the north side of the Fort Dent II portion of the site. The land- scaping materials shall be of similar size and species and shall include a mini- mum of 5 trees and a 10 -foot width. •• .e� FORT DENT II of nua cotesmocnok --• GREEN RIVER --- -4- - -- SITE PLAN STATISTICS: SOD ACM 27C C -2 r� COO • 60.031 V itrcWC MG. WA . ' 1W3 (f/2p 91 • c COVENC. 1.e x 11.2. WA 73 7 0 x NIA nc n p o. Sf.CCOS TIO ROM OX TVA. CC061111..1011 --- 1 UNDEVELOPED , .1, ,\ 1 } U I I I U ,, -P ° { � IIIIIIli H II1111! ' ,W 2,1OCN1 20A7a V 10.12, V 1.03 Sr MA V 00.112 9 1:•2311 so 00.039 4 0 1.1 1 0 Y 2 :Cr . 21 1 - ,. 11 2 - 7.,' CROSS SECTION AT TRAIL - •••• 1.4••47•s I . L 41•! 4 LAJREL (IS" AT • \ TTi4J9 PRALcOe 'WefIUSTER DlOCM (2 GAL. w• 1'CL) _- I JLEDITSA 'R.ALAUTNDS'S'.It TIi 4, 14E∎L,7C4ST (2 1 4 I cOeUJ! COJSw '.OWa. DOGWOOD f 54LE 1 GREEN RIVER -- L OF wen. • ZS VZDI GIiVC NY /4Dj 1C We're ROCcease (1 OML CT was.) NOTE. 101..PIRAEA INN/SLEW' SPIRAEA OR" AT S'OG) ID1 R OTA R UOOfA_ DU4M RAE 1,;; ;;;To. 1 S' 04) 41 ACER PLATA4401DR, NORWAY MAPLE (* /V+stvcT T) \-- PICNIC TABLES (TYPICAL) TRAIL FORSYTHIA R INTERF.E FORSYTHIA (s&AL AT VOX.) LS PRUNUS 7•r FLOWEaiNG 41.411101LY •NO TREES OVER ( CAL Eri,T ON S■TG •TREES LLYCfC � A OO TW GREEN RWER AIL TR TO DE LOCRIT O AT O OC MN ~HO .CONTRACTOR TO PROVIDE P LILLY AUTOMATIC. VIDOR. - pF414NED IRRIGATION STlTEM PER SPEDiFICATIONS. LOG «.t.Elle yS moss seem . weReeee Ins velour Mt NAM NM Year /1 rilkpRRF.Rm �J�+LCGeL�'I.e.• Wiled M S : FORT DENT IMINCAPS KY 1 '0.q Q IlumuTas %vN 3 I- %6, 4:n_111-1 ELEVATION BUILDING 11 ao.r.n IOT iMeng ••117NRI, &MU C41•2011111114 1.6 era e. ZAT.Ar:;,2 77, • ' A WOONLW allagat:LIA=0 I !'‘; gaN:tilgti iMENEMMINIMEMIMMUM 111 11111111111111111111111 ///. TAram r4Amir - , r 'V A I ' AMIE v' ANIL ry; :• " ELEVATION BUILDING II EAe ELEVATION BUILDING H NORTH ELEVATION BUILDING H 1 1 1 1 11 1 ,k'immr: 'Cl-Tr"..'-''' J1 L : :j::•: M ani NI r.' ; I NNEN' IV= "ooydel NIME: mom IN••I mum immummo Imo Tx- Alt' I 1 lM 13.4.,11/111•Ottl!LI.1=311111■F,.13.4411.34=E11..ialE=1111.Mtlr.tapoosimimLuomm to's 1 MIIT:7-F•r` 74. "!=lirTFM11111■111E;..#.: s .Wi'.'WK :'; ' 11;;AYIEL - 01111L101121.7111:41MIMMIAUSIE imminwom mom iV' yin m. el; onimor wyr l$1. onni■ o on - ta • •••- 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 IL D a. architects a.... SOM. MOND. reb11.141 fla• weetIMI or“. memo WIC woule.yr.O. 130111263.47141 Om: consultants : project tide : NWT DENT PHASE II ormareo MY: JICROINELOPIENT lUOMPAMMISISTON shoot lino : REVISED SEPTEMBER 28, 1989 tool I GROUND FLOOR PLAN — FORT DENT II —4 UYLJ L D r.r — w - ..••«r MM - ma a r M moi.. win IOW - ■•Y prOset : FONT OBIT PHASE MMAIMOV: JON wra oMNMI 111111111AVIMMIIIMON OW INN: ft mi.= r+: A -2 SECOND FLOOR PLAN - FORT DENT II LL D 0. .refuted. o.amo 4.01,• emu.. me Ins Y •HW ww t ..tO t0{ um". 1]011003 4104 COO.Ott.Ot. poj.et UU.: FORT DENT' PHASE II COMOnoa: Jal DEVILMENT TUKVALA vAmNDTON U,..t title : Rs. mall= glaro: W I Z W 4 W REVISED SEPTEMBER 28, 1989 a THIRD FLOOR PLAN — FORT DENT II_ a a IL I erelalteets *MAP V., *MM. MSS ...lie so egos NO •••11•4.1•MIL IMMO- MN --M tS" 11•11MIlt aftudtente : miss. aft : FONT DENT • PHASE N Inatomm ion novammow iumusammres OM MN: IND r A - 4 IL z 2 ce.44. .4 eaNak4 "E/BACK ELEV. (co z / \ V • • /•-• ' rz: —17 .7 I L ••■ "o • Pte4e- o•-• •••• • . : I • — Oa wite■r • • d!:P FEU II:11 1-1717if1111 FT OBIT TWO Fr DENT TRIM (FUTURE) SITE PLAN e r o' MITHUN ..... own In■ OW. 0.0111elore• 88141.00 A-2 On I eneln WOW ..... ••• •••• •• • MI MIMI mom ui • II 1111111111E mum 4 2 EAST ELEVATION 0 1 ?r "1."44 10 I 1• 1111111 .4‘ m kre MIN mon now HMV' 2 SOUTH ELEVATION 2 WEST ELEVATION •••••• • ...-K••■11 - — Mee/t *GREW .04. n•••■•• 0•T) 434.•41.4— It4 - Aztwr sum, MIN/ maninniNEMINNIIIIIMINFAII III -- I IV NI r , I lora_ ' =M am IME= mmiiimm ari - —4.1.•••••• 1' I l••41 .L..411. 1..-1MTEL COM.- Pfta.••1•01 11111111111•111111111111511• 1.111■13 F1=== # MOE: INN MINH 2 NORTH ELEVATION 41.•47110 ••4444.4.•• •ce.a•To.2 VW> •••• • • • 4.4.416. sp. (TM) 1..1• •••Iee 4.1•44.. 1.10147 r 711•4 immiumunloormlemurmin UMW M11111111110111111! ......,,, Tr. 111•1111111111•11111111=11 din/inn 41111111111` ••■■•••■•• 111. 04.1e.. 1114.444SA. .40GMIT 0417 M MIT - ---A-6-- .6•NroCOCT" t) allitaace arm Lee-cr..r4.11.4.1 irii. Few 'UU115 ,A1.0•CXNeRS ...11 F.-1J( e 15' 55 I watuiporir7e e vt• (sr•L cre) /41 •s10 Nx151" 014 SITS. LICATIX aeleVe4.1 GMT ••0. Lo4e.. NG Kr et/ VIA3‘. .4,4144. 4 •fga*cinc- - 27 may' ve. rui., 71014 - (57G.- . 1 o - t °t "PC44 cia".T.E.C.403 JTDiJ — ■-0 , 4 6%. imenrrer) 77 Ace,2 marr4..olve6 C. V (Al. twee_ sot crr) 4.01e1:7 ciAtifia ./vt.oC e..1 IcOUS PLANI-J1 PL-A1-1 IEHOPOOLJ4r21F014 5 L....0Y lb uue L44.101 orro LAI-me/4 W1_ Thom L 1111■••• a ■ ••••1 ....... It •••••• • 1•“•••••••••• ••••■••••••• ••••••••■•■• ..... ••• • ••• Ull■MII••■•••■•• May 17, 1989 cA raw Mr. Jack Pace City of Tukwila Planning Department 6200 Southcenter Blvd. Tukwila, WA 98188 RE: Fort Dent Two and Three Dear Mr. Pace: ti Thank you for meeting with us May 15th. Due to financial constraints this project requires minor revisions. The letter and the attached preliminary site plan, floor plan, and elevation summarize the changes we feel necessary. The parking garage located under building A is too costly and is deleted. More surface parking has to be provided to meet Code requirements. The plaza was redesigned to provide a more efficient parking layout without losing the integrity of the approved site plan. The entry to the site is in the same location. A new driveway has replaced the plaza. This driveway will provide an axis to which the buildings will be parallel. By alternating the buildings from one side of this axis to the other we are creating a dynamic entry to this development and a variety of visual experiences. The additional surface parking is augmented by landscaping so that it does not become a sea of asphalt. The dumpster location, ground lights, pole mounted lights, as well as a detail landscape plan, will be provided later and follow the BAR recommendations. :Landscaping along the North property line and the river bank has been increased. Six picnic table areas have been added along the river bank for tenant use. The building design will be constructed of the same type of materials as the approved design (blue glass and grey concrete). We will follow the BAR recommendation to soften the entry and accent colors. The concrete portals will be incorporated with the plaza design of each building. • J I: 0 11111 00 -124th Ave. N.E. 8-103 BeNevue , WA 980055 (206j 544 -6080 ATTACHMENT J We are proposing the following changes: 1. Provide additional landscaping (approx. 5' -15') along the North property. 2. Delete the plaza between the two buildings and replace it with a driveway accented with a less costly pattern. 3. Relocate building A approx. 20 feet to the South. 4. Shorten buildings A• and B, increase the depth of the buildings, which will decrease floor area by 12,000 square feet. 5. Add terraced balconies along the South elevation of building A to soften the height of the south wall. 6. Add two corners to the East elevation of building A to simplify space planning and comply with Board of Architectural Review recommendations. 7. Delete underground parking at building A and add surface parking. 8. Delete the curved glass wall located along the West elevation of building A and East elevation of building B . 9. Both buildings will be 39'6" high and will be bermed, thus reducing the overall height to 36'0 ". 10. Add overhang by extending the third floor over the second floor at building A. 11. Six picnic table areas have been added. The changes that we are proposing are the "fine tuning" of a great design. Cordially, JOHN C. V DEVELOPME T COMPANY OZ n C. Radovich September 14, 1989 Jack Pace City of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 Subject: Fort Dent Two Dcar Jack: ,) Katie Greif Development Manager 11 ti CRadCiddl Development Company J °11111 2000 -124th Ave. N.E. B -103 Bellevue, WA 98005 (206) 454 -6060 SEP 141989 Enclosed are seven sets of revised plans and one set of P.M.T's for our pending BAR application. The following list describes corrections made or comments regarding conditions or possible conditions of approval. 1. Phase II /Building Three has been removed from our application. We are seeking BAR approval for Building Two only. 2. The impervious surface area for Building Two is 73 %. The impervious surface area for our previously approved application including both buildings was 68 %. 3. Building Two remains as designed. We have not adjusted the quantity or length of the glass curtain wall. 4. A pedestrian trail connection has been provided via a sidewalk on the north side of the building. 5. The recreational trail design has been added to the landscape plan. The Norway Maple trees shown 30 feet O.C. along the property boundary have been relocated into clumps /groups. 6. We understand that a landscape revegetative plan for any disturbed areas of the river bank will be required during the building permit process. 7. The details requested by Phil Frazer have been added to the site plan; a) NGVD datum, b) detail o:: river bank including the 100 year flood elevation, c) the recreational trail and King County maintenance easement areas are more clearly defined. Please contact me if you have any questions. Cordially, cc: Michael Aippersback - 1 set plans, 2 additional site plans August 30, 1989 Jack Pace City of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 rIbi Subject: BAR Revision - Fort Dent 2/3 Additional Submittal Information Dear Jack: Cordially, Kbtie Grei Development Manager CRadovich Development Company J °1111 2000 -124th Ave. N.E. B -103 Bellevue, WA 98005 (206) 454 -6060 AUG P/91989 Enclosed for your review are the two cross sections through the building and river bank areas and a detail on the dumpster enclosure. Kathy Emery of Urban Design, our civil engineering firm, will be getting in touch with you today to summarize her discussions with Phil Frazer. This would pertain to drainage changes made by relocating building 3 and also river bank excavation. We also want to clarify two items for you. The colors originally proposed for buildings 2 and 3 are still being utilized. We do, however, propose to reverse them. The teal blue accents will be used on building 2 and the yellow accent will be used on building 3. Secondly, we still plan to utilize the lighting standards originally proposed by Mithun Partners. A copy of the submittal sheet is attached. Please contact me if you need additional information at this time. August 10, 1989 Jack Pace City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 Subject: FORT DENT TWO & THREE REVISION Amendment to Environmental Checklist Filed 8/25/88 Dear Jack: The following is updated information applicable to the environmental checklist previously filed on this project. Page 3, 11, Project Description; The development will consist of two Class A, multi- tenant buildings. Building Two will be 60,000 sf, Building Three will be 40,000 sf. Page 16, f, Trips Generated; As the buildings have decreased slightly in size, so does the parking generated. Building Two will generate approximately 1,062 daily trips. Building Three will generate approximately 708 daily trips. The peak percentages will not change. Page 12, i, Number of People; The proposed buildings are slightly smaller in size, therefore completed Building Two will be occupied by approximately 510 people, Building Three; 340 people. Page 13, Aesthetics a; The building height for Building Two has been reduced to 39'6" and Building Three has been reduced to 26'6 ". Page 15, Transportation c; The basement parking at Building Two has been eliminated as well as the ground floor parking for Building Three. The total project parking is now 333 stalls which is one stall per 300 sf based on gross square footage. Page 4, g, Impervious Surface; 156,782 sf /71 %. (Both Buildings). Please contact me if you have any questions. Cord'ally, Katie Greif Development Manager 111111 t4 Development Company Ph n -124th Ave. N.E. B -103 Bellevue, WA 98005 (206) 454 -6060 August 10, 1989 Dear Jack: Jack Pace City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 'A r Subject: BAR Revision for FORT DENT BUILDINGS TWO & THREE AUG X01989 Enclosed for your review are four copies of the revised Fort Dent Two and Three plans. The plans include site, landscape, and floor plans, as well as elevations for each building. The phase line separating buildings two and three is hand drawn in yellow. This was a last minute change and assuming the City may request other changes, we did not formally revise the drawing. We plan to construct only that portion of the recreational trail and complete river bank excavation which pertains to each phase. The major changes that are requested under this BAR revision include: Building Two - No basement parking. - Decrease the width and length of the building. - Remove deck from north side of building and add smaller decks at the west end of building. - Add a third floor overhang along the curtain wall (south) portion of the building. Building Three - This building is now the same design as Building Two only reversed and reduced to two stories. The exterior overhang extends over the second floor. Exterior decks are provided on the east side of the building. - Ground floor parking is removed. - Accent colors for the two buildings have been reversed. Building Two will now be teal blue and Three will be yellow. The curtain wall glass color and the concrete colors have not changed. C ,Radov1ch Development Company J °11111n 2000 -124th Ave. N.E. B -103 Bellevue, WA 98005 (206) 454 -6060 Cordially, Katie Greif Development. Manager Site Plan -The interior boulevard has been scaled down but has basically the same flow. Brick pavers as a driveway material are cost prohibitive and have been removed. -Five picnic tables have been added along the river trail area for a total of six tables. We look forward to meeting with you and the hired consultant to discuss this project and answer any questions you may have. June 13, 1989 Moira Bradshaw City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 F`LtL.L)!Nt3 Subject: FORT DENT TWO & THREE Amendment to Environmental Checklist Filed 8/25/88 Dear Moira: The following is updated information applicable to the environmental checklist previously filed on this project. Page 3, 11, Project Description; Development consisting of two class A, multi- tenant buildings. Building Two will be 60,000 sf, Building Three will be 40,000 sf. Page 16, f, Trips Generated; As the buildings have decreased slightly in size, so does the parking generated. Building Two will generate approximately 1,062 daily trips. Building Three will generate approximately 708 daily trips. The peak percentages will not change. Page 12, i, Number of People; The proposed buildings are slightly smaller in size, therefore completed Building Two will be occupied by approximately 510 people, Building Three; 340 people. Page 13, Aesthetics a; Building height and Three, has been reduced to 39'6 ". for both buildings, Two parking at Building Two parking is now 409 Page 15, Transportation c; The basement has been eliminated. The total project stalls which is one stall per 244 sf. Page 4, g, Impervious Surface; 152,556 sf /69 %. (Both Buildings) Please contact me if you have any questions. Cord'ally, 1 Katie Greif Development Manager Development Company 2000 - 124th Ave. N.E B -103 Bellevue, WA 98005 (206) 454 -6060 November 10, 1988 Mr. Ross Earnst _ / � G Public Works Department V �5 4' City of Tukwila 6300 Southcenter Blvd. Tukwila, WA 98188 Subject: Fort Dent 2/ 3 0ivj BalrW S / 4i Dear Ross: regarding stability. Please con Cordially, Katie Greif Development enclosure D 88 'Cr /4, /,0 0\ 4 % 2 ou v��' 1 Enclosed f i -' y �, �thd revis r n tud �� ort Dent BuiSdin Two/and re t C eport full relBBo�r s u 9�.pqn erns e x ;t a a\ it`t� �� /I G e se stoa depam i4 an o pt d Tel) iA �j � l di e1y �yoe�i(e?aCrd r � J 6 c � �'` c ka C, 6c, -&)\ %Sd `c\-13 <( 6 6‘ Q j G7 6 k et \ 3 0 ) \ c Corny 454 -6060 1/4Ve CONCRETE COLOR #5442r1 PARKER PAINT #5442M CONCRETE COLOR #5441W 6; 1C?Sfl7WO • PARKER PAINT #5441W RAL -1018 • ACCENT COLOR TYGER DRYLAC #6RAL 5018 - MITHUN P A R T. N E . 0 S' ARCHITECTURE PLANNING & INTERIOR DESIGN . 2000 112TII AVE NE BELLEVUE WA 96004 ( 206 ) 434 3344 FORT DENTE BUILDING . COLORS AND RAILING:' CONCRETE COLOR FOR BUILDING AND MECHANICAL SCREEN PARKER PAINT #5542M - MEDIUM LIGHT GRAY CONCRETE COLOR FOR ENTRY PORTAL: PARKER PAINT # 5441W - LIGHT GRAY PAINTED ALUMINUM PANELS @ ENTRY, COLUMN COVERS, ACCENT BAND, GLASS TYPE A @ CONCRETE PANELS: TYGER DRYLAC # RAL 5018 - MEDIUM TEAL 'BLUE INSULATED UNIT, INBOARD LIGHT CLEAR, OUTBOARD LIGHT FORD SUNGLASS GRAY.(GRAY TINTED), OUTDOOR REFLECTANCE 6% GLASS TYPE B @ CURTAINWALL: INSULATED UNIT, INBOARD LIGHT CLEAR, OUTBOARD LIGHT FORD SUNGLASS HP (BLUE TINTED), OUTDOOR REFLECTANCE 19% (MODEL.# S5 -08) POLE'MOUNTED AND GROUND MOUNTED LIGHTS: NATURAL ALUMINUM COLOR MITHUN P A R T N E R S FORT DENT 3WOr 7 BUILDING COLORS CONCRETE COLOR FOR BUILDING:AND MECHANICAL SCREEN: PARKER PAINT 1/ 5442M - MEDIUM LIGHT GRAY CONCRETE COLOR FOR ENTRY PORTAL: PARKER PAINT /1 5441W - LIGHT GRAY PAINTED ALUMINUM PANELS @ ENTRY, COLUMN COVERS, ACCENT BAND, AND RAILING: TYGER DRYLAC /1 RAL 1018 - LIGHT YELLOW GLASS TYPE A @'CONCRETE PANELS: GLASS TYPE B @ CURTAINWALL: POLE MOUNTED AND GROUND MOUNTED LIGHTS: ARCHITECTURE PLANNING & INTERIOR DESIGN 2000 112TH AVE NE BEI.'' VUE WA 9$004 (206) 4S4 3344 F AX I,f1A1 A 4 6 4776 NATURAL ALUMINUM COLOR INSULATED UNIT, INBOARD LIGHT CLEAR, OUTBOARD LIGHT FORD SUNGLASS GRAY (GRAY TINTED), OUTDOOR REFLECTANCE 6%. INSULATED UNIT, INBOARD LIGHT CLEAR, OUTBOARD LIGHT FORD SUNGLASS HP (BLUE TINTED), OUTDOOR. REFLECTANCE 19% (MODEL /1 S5 -08) POLE LIGHT GROUND MOUNTED WALL LIGHT • h'�F 8`t -9 -DR 1. BRIEFLY DESCRIBE YOUR PROPOSAL: Development consisting of a 60,000 s.f., . three story office building as phase I and a 40,000 s.t. otf.ice building as phase II. 2. PROJECT LOCATION: (Give street address or, if vacant, indicate lot(s), block, and subdivision; or tax lot number, access street, and nearest intersection) Bldg. Two: 6840 Southcenter Blvd. Bldg. Three: 6860 Southcenter Blvd. Quarter: NW Section: 24 Township: 23 3. APPLICANT :* Name: John C. Radovich Development Company Signature: OWNER (This information may be found on your tax statement.) Address: 2000 -124th NE, B -103, Bellevue, WA 98005 e `454 -60 Ph Address: Phone: 0 4. PROPERTY Name: iTnhn C. Radnvi nb AFFIDAVIT OF OWNERSHIP Range: 4 Date: 6 -13 -89 * Th pplicant is the person whom the staff will contact regarding the application, and to whom all notices and reports shall be sent, unless otherwise stipulated by applicant. 111 . ,1 :— 1 .e •:is W i ntr dir swear that I - are the ow'ner(s] or con rhtt urchaser(s) of the property in elved in this application and that the foregoing statements and answers contained in this application are true and correct to the best of my /our knowledge and belief. Date: R -1R -8q JESIGN REVIEW APPLICATION Page 2 The following criteria will be used by the BAR in its decision - making on your proposed project. Please carefully review the criteria, respond to each cri- terion (if appropriate), and describe how your plans and elevations meet the criteria. If the space provided for response is insufficient, use extra space on last page or use blank paper to complete response and attach to this form. 5. RELATIONSHIP OF. STRUCTURE TO SITE A. The site should be planned to accomplish a desirable transition with the streetscape and to provide for adequate landscaping, and pedestrian movement. B. Parking and service areas should be located, designed, and screened to moderate the visual impact of large paved areas. C. The height and scale of each building should be considered in relation to it site. RESPONSE: The buildings are well placed on the site for ease of transition from street to parking area then building. Pedestrian movement has been planned for. Both architectural and landscape screening is utilized. Building height is consistent with C -2 zoning requirements. 6. RELATIONSHIP OF STRUCTURE AND SITE TO ADJOINING AREA A. Harmony in texture, lines, and masses is encouraged. B. Appropriate landscape transition to adjoining properties should be provided. C. Public buildings and structures should be consistent with the estab- lished neighborhood character. D. Compatibility of vehicular pedestrian circulation patterns and loading facilities in terms of safety, efficiency and convenience should be encouraged. E. Compatibility of on -site vehicular circulation with street circulation should be encouraged. RESPONSE: Access to the project is from a single driveway to minimize congestion. The proposed building(s) will consist of similar construction and building materials as Pert Pent One to the south A smooth flow into the site, around buildings and out of the site has been designed. Landscape requirements have been exceeded. 7. LANDSCAPE AND SITE TREATMENT DESIGN REVIEW APPLICATION Page 3 A. Where existing topographic patterns contribute to beauty and utility of a development, they should be recognized and preserved and enhanced. B. Grades of walks, parking spaces, terraces, and other paved areas should promote safety and provide an inviting and stable appearance. C. Landscape treatment should enhance architectural features, strengthen vistas and important axis, and provide shade. D. In locations where plants will be susceptible to injury by pedestrian or motor traffic, mitigating steps should be taken. E. Where building sites limit planting, the placement of trees or shrubs in paved areas is encouraged. F. Screening of service yards, and other places which tend to be un- sightly, should be accomplished by use of walls, fencing, planting or combinations of these. Screening should be effective in winter and summer. G. In areas where general planting will not prosper, other materials such as fences, walls, and pavings of wood, brick, stone, or gravel may be used. H. Exterior lighting, when used, should enhance the building design and the adjoining landscape. Lighting standards and fixtures should be of a design and size compatible with the building and adjacent area. Lighting should be shielded, and restrained in design. Excessive brightness and brilliant colors should be avoided. RESPONSE: The existing grades are relatively level and will not be altered significant] Due to these somewhat level grades of the site, access to the driveways, parking areas, walkways and building entries are unobstructed physically and have good visibility for safety. The plant material selections were chosen to reflect the types of spaces. larger canopy trees were used in the entry drive and parking areas, a smaller scale tree flanks the interior roadway as it passes between the buildings, and small flowering trees accent the building entry areas.;,. Norway maples'. were selected as the large canopy tree to reflect the same neighborhood character as established by the existing London Plane trees. We avoided using the actual London Plane tree due to its destructive habit. At the building entries, permanent and seasonal plantings are combined to provide year and interest. round Shade trees have been located along the Green River at 30' O.C. with sod providing groundcover. All areas not planted in shrubs will be seeded lawns to create a lush green carpet year round. The dumpsters have been architecturally screened. 8. BUILDING DESIGN ,:SIGN REVIEW APPLICATION Page 4 A. Architectural style is not restricted, evaluation of a project should be based on quality of its design and relationship to surroundings. B. Buildings should be to appropriate scale and be in harmony with per- manent neighboring developments. C. Building components - such as windows, doors, eaves, and parapets - should have good proportions and relationship to one another. Building components and ancillary parts shall be consistent with anticipated life of the structure. D. Colors should be harmonious, with bright or brilliant colors used only for accent. E. Mechanical equipment or other utility hardware on roof, ground or buildings should be screened from view. F. Exterior lighting should be part of the architectural concept. Fix- tures, standards and all exposed accessories should be harmonious with building design. G. Monotony of design in single or multiple buildings projects should be avoided. Variety of detail, form, and siting should be used to provide visual interest. RESPONSE: (spat rare. has hewn taken to provide a campus feeling carrying forth design characteristics from Fort Dent One to the south but also providing individuality for this proposed project. Similar, landtcaping.techrniques will be utilized to create a "Gateway effect. Muted greys are utilized and carried over from Fort Dent One. Teal Blue /Green will be the accent color for building tWo and yellow for building three. The building massing is well proportioned. Equipment is •- . - Ike - - . - . • • I - -. - - •. .- CHANGES MADE FOR THIS APPLICATION: Fort Dent Two has been relocated approx. 20 feet to the south. Each building has been shortened.and the depth has been increased . Floor area is decreased by 12,000 sq. ft. Terraced balconies are added to bldg. two to soften the height of the south wall and add visual interest from the park access road. Two corners have been added to the east elevation of bldg. two. Basement parking has been eliminated and replaced with additional surface parking. The curved glass walls were removed from the west elevation of bldg two and the east elevation of bldg three. The third:.tloor...ot :bldg two :has been extended over the second. floor to create an . overhang:. • 9. MISCELLANEOUS STRUCTURES AND STREET FURNITURE ( ESIGN REVIEW APPLICATION Page 5 A. Miscellaneous structures and street furniture should be designed to be part of the architectural concept of design and landscape. Materials should be compatible with buildings, scale should be appropriate, colors should be in harmony with buildings and surroundings, and pro- portions should be to scale. B. Lighting in connection with miscellaneous structures and street furni- ture: should meet the guidelines applicable to site, landscape and buildings. RESPONSE: A concrete portal is designed at the building entrance to provide visual interest and carry over a campus feeling from Fort Dent One. A picnic table and benches are planned for along the river. Lighting fully meets the needs of the project. CHANGES FOR 'THIS REVISION: We have increased the number of picnic tables from one to six. INTERURBAN SPECIAL REVIEW DISTRICT The following six criteria are used in the special review of the Interurban area in order to manage the development of this area, to upgrade its general appear- ance, to provide incentives for compatible uses, to recognize and to capitalize on the benefits to the area of the amenities including the Green River and nearby recreational facilities, to encourage development of more people - oriented use, and to provide for development incentives that will help to spur growth. Please describe how your proposed development relates to the goals for this District. Use additional response space, if necessary. 10. The proposed development design should be sensitive to the natural amenities of the area. The building is placed on the site to allow views of the Green River and Mount Rainier. The recreational trail will be constructed as part of the project allowing pedestrians to begin enjoying this formerly undeveloped land. Grass lined swales are planned for storm drainage to eliminate some oil type pollutants from entering the river. 11. The proposed development use should demonstrate due regard for the use and enjoyment of public recreational areas and facilities. No adverse impacts should result on adjacent Fort Dent Park as g result of thts development. Many employees will undoubtedly enjoy the park during lunch hours as well as before and after work. and also connect to the street sidewalk. will be developed in accordance with the requirements of this zone. The Dent One. (.:SIGN REVIEW APPLICATION Page 6 12. The proposed development should provide for safe and convenient on -site pedestrian circulation. A sidewalk is located along the Fort Dent access road providing access to the Park. Internal sidewalks provide access from parking areas to the building 13. The proposed property use should be compatible with neighboring uses and complementary to the district in which it is located. All property within the river bend area is zoned C -2. The proposed building building will be of similar shape, size, scale, building material and con- struction type as the only other building in the area at this time: Fort 14. The proposed development should seek to minimize significant adverse environmental impacts. The applicant has addressed any potentially adverse impacts in the environmental checklist. 15. The proposed development should demonstrate due regard for significant historical features in the area. Extensive research was completed when Fort Dent One was developed. It was found that the site and adjacent properties have no historical features to preserve. Fort Dent Park however, is across the Green River from the protect. The placement of the buildings, size and scale of the buildings and land- scaping have been designed in a manner as to create a "gateway" entrance to Fort Dent Park. (29 /DSGN.APP1 -3) DES. aN REVIEW APPL CA ti AUG : 1. BRIEFLY DESCRIBE YOUR PROPOSAL: Development consisting of a 60,000 s.f., three story office building as phase 1 and a 40,000 s.t. ottice building as phase II. 2. PROJECT LOCATION: (Give street address or, if vacant, indicate lot(s), block, and subdivision; or tax lot number, access street, and nearest intersection) Bldg. TWo: 6840 Southcenter Blvd. Bldg. Three: 6860 Southcenter Blvd. Quarter: NW Section: 24 Township: 23 Range: 4 (This information may be found on your tax statement.) 3. APPLICANT:* Name: John C. Radovich Development Company Signature: 4. PROPERTY OWNER Address: 2000 -124th NE, B- 103','Bellevue, WA 98005 Phon : • 6 '1 454-60 0 * The'pplicant is the person whom the staff will contact regarding the application, and to whom all notices and reports shall be sent, unless otherwise stipulated by applicant. Name: ,Tnhn C. RRdmi ph AFFIDAVIT OF OWNERSHIP Address: 900n 194th NE R-i n3, RPi ipvniP, WA gRpoS Phone: 6 454 I WE i n t r s C <. <' "�� swear that I/* are the owners) or contract purchaser(s) of the property inn6lved in this application and that the foregoing statements and answers contained in this application are true and correct to the best of my /our knowledge and belief. Date: A -1a -R9 / '/'°/ 9 Date: 6 -13 -89 / S -/o - 8 9 The following criteria will be used by the BAR in its decision - making on your proposed project. Please carefully review the criteria, respond to each cri- terion (if appropriate), and describe how your plans and elevations meet the criteria. If the space provided for response is insufficient, use extra space on last page or use blank paper to complete response and attach to this form. 5. RELATIONSHIP OF STRUCTURE TO SITE ( REVIEW APPLICATION Page 2 A. The site should be planned to accomplish a desirable transition with the streetscape and to provide for adequate landscaping, and pedestrian movement. B. Parking and service areas should be located, designed, and screened to moderate the visual impact of large paved areas. C. The height and scale of each building should be considered in relation to it site. RESPONSE: The buildings are well placed on the site for ease of transition from street to parking area then building. Pedestrian movement has been planned for. Both architectural and landscape screening is utilized. Building height is — consistent with C - zoning r e q uirements. 6. RELATIONSHIP OF STRUCTURE AND SITE TO ADJOINING AREA A. Harmony in texture, lines, and masses is encouraged. B. Appropriate landscape transition to adjoining properties should be provided. C. Public buildings and structures should be consistent with the estab- lished neighborhood character. D. Compatibility of vehicular pedestrian circulation patterns and loading facilities in terms of safety, efficiency and convenience should be encouraged. E. Compatibility of on -site vehicular circulation with street circulation should be encouraged. • Access to the project is from a single driveway to minimize congestion. P 7 g Y est ion. g The proposed building(s) will consist of similar construction and building It - - ��.... . ... . • - +• . d buildings and out of the site has been designed. Landscape requirements have been exceeded. 7. LANDSCAPE AND SITE TREATMENT ( DESIGN REVIEW APPLICATION Page 3 A. Where existing topographic patterns contribute to beauty and utility of a development, they should be recognized and preserved and enhanced. B. Grades of walks, parking spaces, terraces, and other paved areas should promote safety and provide an inviting and stable appearance. C. Landscape treatment should enhance architectural features, strengthen vistas and important axis, and provide shade. D. In locations where plants will be susceptible to injury by pedestrian or motor traffic, mitigating steps should be taken. E. Where building sites limit planting, the placement of trees or shrubs in paved areas is encouraged. F. Screening of service yards, and other places which tend to be un- sightly, should be accomplished by use of walls, fencing, planting or combinations of these. Screening should be effective in winter and summer. G. In areas where general planting will not prosper, other materials such as fences, walls, and pavings of wood, brick, stone, or gravel may be used. H. Exterior lighting, when used, should enhance the building design and the adjoining landscape. Lighting standards and fixtures should be of a design and size compatible with the building and adjacent area. Lighting should be shielded, and restrained in design. Excessive brightness and brilliant colors should be avoided. RESPONSE: The existing grades are relatively level and will not be altered significant] Due to these somewhat level grades of the site, access to the driveways, parking areas, walkways and building entries are unobstructed physically and have good Visibility for safety. The plant material selections were chosen to reflect the types of spaces. Larger canopy trees were used in the entry drive and parking areas, a smaller scale tree flanks the interior roadway as it passes between the buildings, and small flowering trees accent the building entry areas.:, Norway, maples were selected as the large canopy tree to reflect the same neighborhood character as established by the existing London Plane trees. We aVoided using the actual London Plane tree due to its destructive habit. At the building entries, permanent and seasonal plantings are combined to provide year color and interest. round Shade trees have been located along the Green River at 30' O.C. with sod providing, groundcover. All areas not planted in shrubs will be seeded lawns to create a lush green carpet year round. The dumpsters have been architecturally screenedL 8. BUILDING DESIGN ( ESIGN REVIEW APPLICATION Page 4 A. Architectural style is not restricted, evaluation of a project should be based on quality of its design and relationship to surroundings. B. Buildings should be to appropriate scale and be in harmony with per- manent neighboring developments. C. Building components - such as windows, doors, eaves, and parapets - should have good proportions and relationship to one another. Building components and ancillary parts shall be consistent with anticipated life of the structure. D. Colors should be harmonious, with bright or brilliant colors used only for accent. E. Mechanical equipment or other utility hardware on roof, ground or buildings should be screened from view. F. Exterior lighting should be part of the architectural concept. Fix- tures, standards and all exposed accessories should be harmonious with building design. G. Monotony of design in single or multiple buildings projects should be avoided. Variety of detail, form, and siting should be used to provide visual interest. RESPONSE: (;rant rare. has bean taken to provide a campus feeling carrying forth design characteristics from Fort Dent One to the south but also providing individuality for this proposed project. Similhr ldndtceping techniques will bp utilized to create a "Gateway" effect. Muted greys are utilized and carried over from Fort Dent One. Teal Blue /Green will be the accent color for building two and yellow for building three. The building massing is well proportioned. Equipment is • - ■ - ILO r - - .-. •• •• • -. - -• S. S CHANGES MADE FOR THIS APPLICATION: Fort Dent Two has been relocated approx. 20 feet to the south. Each building has been shortened and the depth has been increased . Floor area is decreased by 12,000 sq. ft. Terraced balconies arq added to bldg. two to soften the height of the south wall and add visual interest from the park access road. Ztao corners have been added to the east elevation of bldg. two. Basement parking has been eliminated and replaced with additional surface parking. The curved glass walls were removed from the west elevation of bldg two and the east elevation of bldg three. The third floor of bldg two has been extended over the second floor to create an overhang. *Buildings Two and Three are now the same design only reversed and Two is three stories and Three is two stories. • 9. MISCELLANEOUS STRUCTURES AND STREET FURNITURE `?ESIGN REVIEW APPLICATION Page 5 A. Miscellaneous structures and street furniture should be designed to be part of the architectural concept of design and landscape. Materials should be compatible with buildings, scale should be appropriate, colors should be in harmony with buildings and surroundings, and pro- portions should be to scale. B. Lighting in connection with miscellaneous structures and street furni- ture should meet the guidelines applicable to site, landscape and buildings. RESPONSE: A concrete aortal is desi:ned at the buildin: entrance to 'rovide visual interest and carry over a campus feeling from Fort Dent One. A picnic table and benches are planned for along.the river. Lighting fully meets the needs of the project. CHANGES FOR PHIS REVISION: We have increased the number of picnic tables from one to six. INTERURBAN SPECIAL REVIEW DISTRICT The following six criteria are used in the special review of the Interurban area in order to manage the development of this area, to upgrade its general appear- ance, to provide incentives for compatible uses, to recognize and to capitalize on the benefits to the area of the amenities including the Green River and nearby recreational facilities, to encourage development of more people- oriented use, and to provide for development incentives that will help to spur growth. Please describe how your proposed development relates to the goals for this District. Use additional response space, if necessary. 10. The proposed development design should be sensitive to the natural amenities of the area. The building is placed on the site to allow views of the Green River and • Mount Rainier. The recreational trail will be constructed as part of the project allowing pedestrians to begin enjoying this formerly undeveloped land. Grass lined swales are Tanned for storm draina:e to eliminate some oil t pollutants from entering the river. 11. The proposed development use should demonstrate due regard for the use and enjoyment of public recreational areas and facilities. No adverse impacts should result on adlacent Fort Dent Park as a result of this development. Many employees will undoubtedly enjoy the park during lunch hours as well as before and after work. SIGN REVIEW APPLICATION Page 6 12. The proposed development should provide for safe and convenient on -site pedestrian circulation. A sidewalk is located along the Fort Dent access road providing access to the Park. Internal sidewalks provide access from parking areas to the building and also connect to the street sidewalk. 13. The proposed property use should be compatible with nelghboring'uses and complementary to the district in which it is located. A1t property within the river bend area is zoned C -2. The proposed building will be developed in accordance with the requirements of this zone. The building will be of similar shape, size, scale, building material and con- struction type as the only other building in the area at this time: Fort Dent One. 14. The proposed development should seek to minimize significant adverse environmental impacts. The applicant has addressed any potentially adverse impacts in the environmental checklist. 15. The proposed development should demonstrate due regard for significant historical features in the area. Extensive research was completed when Fort Dent One was developed. It was found that the site and adjacent properties have no historical features to preserve. Fort Dent Park however, is across the Green River from the protect. The placement of the buildings, size and scale of the buildings and land- scaping have been designed in a manner as to create a "gateway" entrance to Fort Dent Park. (29 /DSGN.APP1 -3) G = - 131.1 17TKG1 � r ;Z, IGG '7Q ;.'7. m 3G °!o = 5 2 PLf}~ I JA - 2 I(o"io - WILD e laer Sc . CfJotEJ -g-`f = 8t rt fi 1 :73170 SC . iMPL4 i l •F R1 HI .'; /tUMt c Si eu es crIttmp - �_ t 1=3i.. 6 Gnu? ukA ( -) - ...'J. 9 -1 =F:11.1;€9 Grigel IV -11111 1'1dM5 S.r/2 N11219/Z 4144‘,;(6410/4812\ 1 nf011.141 ; tiKr56 'IM'LE ¶ IL- tz' 4 . • -- 1-au174t .Pru•q htF rAR-I N ct ait16AL 1 11 p, ( 0 11 4 c� 14s 4WALE TM' L,- IZ' L, vvvr 4irve,N_f 1v;K- • r APR 9 1990 I PLAN ▪ 1 PT. M 10°/e = 5 se ?l,e i . 7. vo:9 PL.L I (10 SF kw FOSE. V21 gAZIT'. 12X = b1 MAWS 150 yr.. PI-14M 'ary PlAt-zra PL .Hi&p.f.'iwpAuctotil atop. _ Q-LR.4.1. j _..1'fhKINGI G�P.44 41.4#1,4 - r14174ctri ei ttYPV4;\1 Yv\ $c mot -7? kittco' *Vs utoce esiote-v*' �'V 6T. 1(-- if' - GIP EI✓F4 PIVEX- APR 9 1990 : CITY 1:;,- PLAN'o',, , fi . LAND 4C, r I •J 1(\n- g9-9 APR 9 1990 LANDSCAPE PLAN LDG ARCHITECTS FORT DENT