Subject: Approval of McCann Projects 427 and 461
28 April 1981
This letter confirms the decision of the Tukwila Board of Architectural
Review at its meeting of 23 April 1981 approving site plan and architec-
tural details for McCann Project 461, in Southcenter Industrial Park, and
McCann Project 427 (office only) at Andover Park East and Midland Drive.
Stipulations pertaining to the approval actions are described in the
enclosed excerpt from the meeting minutes.
MC /blk
xc: Ping. Dir.
McCann Construction
Tukwila Planning Dept.
Mark Caughey
Associate Planner
Page -6-
Planning Commission
23 April 1981
MOVED BY MRS. AVERY, WITH MR. SOWINSKI'S SECOND TO APPROVE MCCANN PROJECT
573/461 AS DEPICTED ON EXHIBITS A, B AND C OF THE APPLICATION SUBJECT TO THE
FOLLOWING CONDITIONS:
1) PRIOR TO ISSUANCE OF BUILDING PERMITS, THE APPLICANT SHALL FURNISH ON-
SITE LANDSCAPING DETAILS FOR STAFF APPROVAL.
NO STORAGE OF HAZARDOUS MATERIALS SUCH AS THOSE REQUIRING I.C.C. TRUCK
PLACCARDING SHALL BE ALLOWED WITHIN THE BUILDING.
MOTION CARRIED 3 -0
E) Alfred Croonquist, Architects (McCann Project 427): Requesting ap-
proval of site and architecture for an office building at the north-
west corner of Andover Park West and Midland Drive.
Mr. Caughey read the staff report; Mr. Croonquist remained present for this
item as well as the last.
Mr. Croonquist presented two scale models depicting alternative architectural
concepts for the building, which were prepared at request of his clients.
The differences of site area and building material between the two proposals
were discussed.
MOVED BY MRS. AVERY, WITH MR. JAMES' SECOND TO APPROVE DEVELOPMENT PLAN FOR
MCCANN 427 ( BUILDING ONLY) AS DEPICTED ON EXHIBITS "A -1ST REVISION"
AND "B -1ST REVISION" ACCORDING TO THE FOLLOWING CONDITIONS:
1) THAT THE TWO PARKING SPACES DEPICTED ON EXHIBIT "A -1ST REVISION"
CLOSES TO THE NORTHEAST CORNER OF THE SITE BE ELIMINATED.AND REPLACED
WITH LANDSCAPING.
) THAT THE APPLICANT SHALL PRESENT A DEFINITIVE LANDSCAPE PLAN FOR THE
PROJECT FOR STAFF APPROVAL PRIOR TO ISSUANCE OF CONSTRUCTION PERMITS.
ALL PLANTING AREAS SHALL BE SERVED BY AUTOMATIC IRRIGATION EQUIPMENT
AS APPROVED BY THE DEPT. OF PUBLIC WORKS. PLANTING AREAS ADJACENT TO
THE PROJECT "S STREET.' FRONTAGES SHALL BE LANDSCAPED WITH MATERIALS
SIMILAR IN SPECIE AND GROWTH HABIT TO THOSE EXISTING ON THE EASTERLY
FRONTAGE OF THE PROPERTY IMMEDIATELY NORTH OF THE SUBJECT SITE.
MOTION CARRIED 3 -0
NEW BUSINESS
Mr. James inquired if the Mayor's office was making progress toward filling
the vacancy which now exists on the Commission. The Commission agreed to -
suggest imformally the name of Ann Altmayer for consideration.
AGENDA ITEM
INTRODUCTION
The applicants are re-
questing approval of the
site layout and architec-
tural concept for a
single -story office build-
ing. Development review
is mandated by provisions
of the "C -M" (industrial
park) zoning district.
DISCUSSION
A) SITE
You will note that
site plan Exhibit
"A" depicts both an
office building and
a 70,000= sq. ft.
warehouse as part
of the proposal.
However, only the
office building -
is under considera-
tion at this time.
CITY OF TUKWILA
PLANNING DIVISION
PLANNING COMMISSION
STAFF REPORT
TMC Section 18.56.055 requires a 15' wide landscaped area on each
thoroughfare frontage of the site (less a 6' wide sidewalk as required
by Ordinance 1158). The applicants satisfy this requirement if the
Board accepts the site plan as drawn, showing a portion of the land-
scape and sidewalk improvements situated within the public right -of -way.
After reviewing Exhibit "A ", the Public Works Department suggests
eliminating the two spaces closest tothe northeast corner of the site
to reduce conflicting vehicle movements with traffic entering the
property from Andover Park West.
B) ARCHITECTURE
Staff has no particular concerns about the proposed architectural con-
cept.
RECOMMENDATION
Page -2-
Staff.Report
McCann .427
Staff recommends that the develop ent plan set for McCann .427 (office building
only), as depicted on Exhibits "A' and "B" be approved according to the following
conditions:
1) That the two parking spaces depicted on Exhibit "A" closest to the north -
east corner of the site be eliminated and replaced with landscaping.
2) That the applicant shall present a definitive landscape plan for the
project for staff approval prior to issuance of construction permits. All
planting areas shall be served by automatic irrigation equipment as
approved by the Dept. of Public Works. Planting areas adjacent to the
project's street frontages shall be landscaped with materials similar in
specie and growth habit to those existing on the easterly frontage of the
property immediately north of the subject site.
site plan
EXHIBIT
PLANNING DEPT
floor plan
MC /blk
City of Tukwila
Alfred Croonquist, Architects
1322 Sixth Avenue
Seattle, WA 98101
Attn:' Tom Croonquist
Planning Division
6200 Southcenter Boulevard
Tukwila, Washington 98188 433 -1845
Office of Community Development
Subject: McCann Projects 427-428
19 February 1981
Per our telephone conversation this morning, I understand that your clients have
elected not to pursue this project, at least for the time being. Therefore, we
shall remove this application from the Board of Architectural Review agenda of
26 February 1981. Please let me know when and if the project is` so that
we can reschedule a B.A.R. hearing for it.
Tukwila manning Department
Mav'k Caughey
Associate Planner
February 4, 1981
Mr. Mark Coffee, Planner
City of Tukwila
6230 Southcenter Blvd.
Tukwila, WA 98188
— erVV1
Tom Croonquist
cc: Mr. Frank Agostino, Coldwell Banker
Mr. Lowell T. Gordon, McCann Construction
Mr. Jack Link, Bill Boeing Jr.
ALFRED CROONQUIST ARCHITECTS
1322 SIXTH AVENUE
SEATTLE, WA 98101 682 -2690
RE: Projects 427 And 428
Board of Architectural Review
Dear Mr. Coffee:
We are submitting two proposals for review:
Proposal #1 72,000 sq. ft. (footprint) warehouse with 10,000 sq. ft.
mezzanine office.
Proposal #2 72,000 sq. ft. (footprint) warehouse
13,940 sq. ft. office building
We have submitted the two proposals because the tenant may elect to separate
their offices from the warehouse, but have not yet decided. The occupancy
deadline requires that we obtain B.A.R. approval in February, as construc-
tion must begin mid - March. We should be able to advise you of which pro-
posal is chosen within two weeks.
Thank you for your cooperation. Call if you have any questions.