HomeMy WebLinkAboutPermit DR-16-78 - MCCANN PROJECT #294 - BOEING DESIGN REVIEWDR-16-78
1105 1121 ANDOVER PARK WEST
MCCANN #294
PLANNING DIVISION COMMENTS
SHEET TA -1:
1. Parking:
22 August 1979
BUILDING PERMIT PLAN CHECK - McCANN PROJECT 294 TENANT IMPROVEMENT
a. Per "CM" Ord., office space proposed is assessed for off - street
parking at rate of 3.1 spaces /1,000 sq. ft. G.F.A. = 2.3 spaces
additional parking required to complete this project (Section
18.56.160 TMC).
b. Total on -site parking for building E should equal 102 upon com-
pletion of proposed tenant office space; applicant should submit
a comprehensive parking lot layout detailing location of following:
(1) 100 stalls for proposed warehouse use as required by
Planning Commission approval for basic project granted.
(2) 2 additional stalls for proposed office conversion.
(3) Additional parking for all existing office uses within
the building @ 3.1 spaces /1,000 sq. ft. G.F.A. less
1 space /1,000 sq. ft. G.F.A. credit for the overall
warehouse use already provided.
27 December 1978
Mr. Ken Johnson
McCann Construction Company
950 Ancover Park East
P.O. Box 88314
Tukwila, WA 98188
RE: Landscape Plans/ BLDG. #294
Dear Mr. Johnson:
The Tukwila Planning Commission at their meeting of Wednesday,
20 December 1978, approved the landscaping plans for McCann
building #294 as submitted. If you have any questions please
feel free to call.
cc: P1. Sup.
BLDG. Off.
RJB /cml
CITY of TUKWILA
OFFICE of COMMUNITY DEVELOPMENT
Th
Sincerely,
ete,q:
Roger J. Blaylock
Assistant Planner
6230 Southcenter Boulevard s Tukwila, . Washington 98188 • (206) 242 -2177
9 May 1978
Mr. Manson Bennett
Manson Bennett & Associates
The 1411 Fourth Avenue Building
Seattle, Washington 98101
RE: Project #294
Dear Mr. Bennett:
Sincer
Ga y C r
Assistan
GC /ch
y,
hfield
Planner
cc: Dir, OCD
Bldg. 0ff
CITY of TUKWILA
OFFICE of COMMUNITY DEVELOPMENT
C'
The Tukwila Planning Commission, sitting as the Board of Architectural
Review on 27 April 1978, reviewed the proposed development plans for
your project #294 in Tukwila.
The Commission approved the plans with the following stipulations:
1. Architectural screening of roof - mounted equipment.
2. Provision of 200 useable parking spaces.
3. Planning Commission approval of detailed landscape plan prior
to issuance of occupancy permit.
Should you have any questions, please call.
6230 Southcenter Boulevard is Tukwila, Washington 98188 s (206) 292 -2177
..o....•.....•.y.nuwr... n.+... a+..; atrsc.c�tiunu.nananoUtas�.rww.w�a v:.uncu�srr«r..
Planning Commission
Minutes .
Development Plans: Project #294 (Boeing)
Page 3
27 April 1978
Commissioner Richards excused himself from participation in this item due to con-
flict of interest.
Mr. Crutchfield read the staff report explaining the site and elevation drawings
for the proposed multi - tenant warehouse.
Mr. Jack Link, representing the applicant, noted the building is designed for
multi- tenancy and occupants are unknown at this time. Assured the Commission
that 100 useable parking spaces will be provided as tenants are identified.
Motion by Mr. Sowinski, seconded by Mr. Bowen and carried to approve the develop-
ment plans subject to the following stipulations:
1. Architectural screening of roof - mounted equipment.
2. Provision of 100 useable parking spaces.
3. Planning Commission approval of detailed landscape plan prior to issuance
of occupancy permit.
Commissioner Richards returned to the Commission table.
E. Development Plans: Farwest Garments
Mr. Crutchfield read the staff report explaining the location of the project and
its site and elevation drawings.
Mr. Keith Maehlum, Architect, explained the exterior treatment will be painted
concrete, aluminum store front; architectural screening of roof - mounted equipment
will be provided; and revision required as a result of Shoreline Program should
be no problem since an excess of parking is provided.
Mr. Ed Hunt, McCann Construction Company, noted the property line on the site plan
indicates the inside top edge of dike. Thus, there should be no problem in con-
forming to the Shoreline Program. Also noted the curb cut revisions recommended
by staff would be an improvement to the site plan. Upon inquiry from the Commis-
sion, Mr. Hunt assured the Commission no retail activities would occur.
Motion by Mrs. Avery, seconded by Mr. Sowinski and carried to approve the devel-
opment plans with the following stipulations:
1. Curb cuts be modified in accordance with the staff recommendation.
2. No parking shall be placed within the river zone, as defined by the
Shoreline Program.
3. The river zone shall be treated in accordance with the Shoreline Program;
to be included in a detail landscape plan.
4. Planning Commission approval of a detailed landscape plan prior to issu-
ance of Occupancy Permit.
5. Exterior treatment complement surrounding developments.
. ( 7
CITY OF TUKWILA
PLANNING DIVISION
PLANNING COMMISSION
STAFF REPORT
27 April 1978
AGENDA ITEM l...Q_ Development Plans: Project #294 (Roping)
8:00 P.M.
A reduction of the site and elevation drawing is attached. The proposed
building is the last of 5 multi- tenant warehouses situated immediately south
of the Upland Industrial Park.
The bulk of parking (59 spaces) is provided along the building front and may
be in conflict with truck doors. Landscape strips (2) are provided along the
building front to break the length of the building.
Exterior treatment is typical of the existing 4 warehouses: painted concrete,
metal canopy, aluminum frame store front for tenant entires, and painted truck
doors. Painting is indicated to be similar to Project #293 situated immediately
east of the proposed structure.
Staff recommends approval of the development plans subject to the following
stipulations:
1. Architectural screening of roof - mounted equipment.
2. Provision of 100 useable parking spaces.
3. Planning Commission approval of detailed landscape . plan prior to
issuance of Occupancy Permit.
moon a as ilia
IMlI1111I■ ■1 ■SIUI•II I11•Iu.J■ I
_w dswam%se r.hos-Wait
..�. - .ea+d a
- w..s - avow r-
-sash 460
II II I Il I
Nd1d d002j - SDunhif1 - a115 —..
I
••waiigaitg es, 4,1
DR -16 =78
McCann ,Project #294
1 ' I
L
4.
0
0
to
..1
.1
vmHtire+Hr.ruc.'
..42414 As1242CO2
Me-frAraxoralt14.11..y-
mv.r eikairissfm
,110-aorr.coFk. .tve•
1
Wt.
c4 0 5
rt7.0GA IV a/. ff
EXISTING WAREHOUSE. 214-
EXIST11.16 WAREUOUSE 293
14G WAR-TIC co1.1
RAVIN
NEW F.I4
I/3 2 I
SITE - UTILITIES - ROOF PLAKI
5 as.
'CONTINUOUS CRUSHED ROCK
13.3s 1.-
15
0€ 65 03 35 Vi Ca 13 OE 61 01 LI VI 01 VI 'CI . 51 II ot
IIIIIIIIIA1111111111110111111111111111111111111111111111011111111
...-111111111.11111111141
GAS STUR24re. le WE 2 Me 10/
W FOR HAY RANA R.
HP CT, , A14 . 04 , R , 5TRIRs , IWA T F J WAL Y gAi 6
rAvi NIG
lir. 4'
DRAIN G5. TOI
262
OCAIIJ.TTREG PLATES
,H .2JHLHLL
FIRE LANE !:?. GRADE L 4 Y.
vvr• plow
•41)1•YAWNi
841
HI
15
5202•1 5tH
1
C.134.96 14 2 24 IV 5.
■ wATER LINA (MR TO
294 . NI. R RA.
AMER (TRH. PANG )
r as,
,L... 1JEW RR SPUR PAcK Wargo& ter. 22
c. Mre .11C-1
ex. CHIGATE
VEREahleT A - 10 Zoo ..
tsmuweirzgya - leo .•4=%
1111M11111.111.1111111.111 Illill111111=11111.1111=1.110.111111111M •
1.1 111"1 1M
mummimmmiumwm
I
rf-m- 5cov4 ID smufa-rb pRoJ, els
TRIAGFOR
P3P41.
leas
SPFNASSTIC
RAT IR LINN.
11—
IT imiummuarlEMMIEntilnINGISKFMTHRTSPR. . ..
-11 Plinl I !HARM P ES MIMI um Imp r!ll
\ 11811T1113
ARCHITECT
MANSON 0. SIN NIT?
STATE OF WASHINGTON
, i
.: IF THIS MICROFILMED DOCUMENT IS LESS
' _CLEAR THAN THIS NOTICE, IT IS DUE TO
THE QUALITY OF THE ORIGINAL DOCUMENT
kE.sr-o'
AMNON SAN ' AMMON
0
JR.
oNNIELT
FAB. To ....
H00
SAN
5500.412+422 042
In OTHERS 'SWAGE
AT CV.15•VRAFT, TI0SJ
3• I5
CjASIJA
3033 M.O.B.
•
DR-16.18
1 MA/1 Ing McCAI.11.1 COK.ISTRUCTI OW CO., I k1C.
PROJECT 2.94.
MANSON BENNETT AND ASSOCIATES
THE 1411 FOURTH AVENUE •ulLOIN0 55ATT02. WASHINGTON 0.101
:1' •
AI
11 :Z
'
I
1 .
400 AIM' FANS, i
'0
4 TO 1 PLOW
_24. 47.1P-42_
-1
MIFII
411
1
z I
5
e
• 4 .C., Me
TYR (4) PLACES
•
e _____
SANITARY SWAM
AINS•• GM.
scrAce Mr.rvm
CE1
5
40.1.1P MCC i nun q
WAGS NAM Mt OM
....0 R HVARATIO0
LSI
123
. .;_
CR1
WAREHOUSE.
294- _.
RAC.) 11.PHOLIf
r s7021
■
� 0. O Z1
AD ME 1.142
1 F.N.SHAS4 r.,,,
IFSA - ...
.4.11.LAH A
nu. fl-. row. ah.oc
14 21.2AIL 4T.
.
,..,
• Ad NA
N.
ESC
LEI
i - LASE OF
ROOF H.P. - 1
CO
� 0
I
0
1
2J4 ISAY
- r -
, 0".18 . 2 . 5•ToGe.
cile. la SAY A) IINSTAI • 1 H.P.
. /....--
i sill
Sn
lee!!
tM CM
? .2D,55
60
s \ I
1
I=1
MI
•
Ea)
2)
PRONG
15210V,
1 ZEE 0
U 11102AATT Reer5R
FLOOR 51J
va. A.2 -----_
0 0'1- P. TT P.
/C-'000F1r1HETER
H H
T"----
ti
2
11
2 .03....5
1 ' I
L
4.
0
0
to
..1
.1
vmHtire+Hr.ruc.'
..42414 As1242CO2
Me-frAraxoralt14.11..y-
mv.r eikairissfm
,110-aorr.coFk. .tve•
1
Wt.
c4 0 5
rt7.0GA IV a/. ff
EXISTING WAREHOUSE. 214-
EXIST11.16 WAREUOUSE 293
14G WAR-TIC co1.1
RAVIN
NEW F.I4
I/3 2 I
SITE - UTILITIES - ROOF PLAKI
5 as.
'CONTINUOUS CRUSHED ROCK
13.3s 1.-
15
0€ 65 03 35 Vi Ca 13 OE 61 01 LI VI 01 VI 'CI . 51 II ot
IIIIIIIIIA1111111111110111111111111111111111111111111111011111111
...-111111111.11111111141
GAS STUR24re. le WE 2 Me 10/
W FOR HAY RANA R.
HP CT, , A14 . 04 , R , 5TRIRs , IWA T F J WAL Y gAi 6
rAvi NIG
lir. 4'
DRAIN G5. TOI
262
OCAIIJ.TTREG PLATES
,H .2JHLHLL
FIRE LANE !:?. GRADE L 4 Y.
vvr• plow
•41)1•YAWNi
841
HI
15
5202•1 5tH
1
C.134.96 14 2 24 IV 5.
■ wATER LINA (MR TO
294 . NI. R RA.
AMER (TRH. PANG )
r as,
,L... 1JEW RR SPUR PAcK Wargo& ter. 22
c. Mre .11C-1
ex. CHIGATE
VEREahleT A - 10 Zoo ..
tsmuweirzgya - leo .•4=%
1111M11111.111.1111111.111 Illill111111=11111.1111=1.110.111111111M •
1.1 111"1 1M
mummimmmiumwm
I
rf-m- 5cov4 ID smufa-rb pRoJ, els
TRIAGFOR
P3P41.
leas
SPFNASSTIC
RAT IR LINN.
11—
IT imiummuarlEMMIEntilnINGISKFMTHRTSPR. . ..
-11 Plinl I !HARM P ES MIMI um Imp r!ll
\ 11811T1113
ARCHITECT
MANSON 0. SIN NIT?
STATE OF WASHINGTON
, i
.: IF THIS MICROFILMED DOCUMENT IS LESS
' _CLEAR THAN THIS NOTICE, IT IS DUE TO
THE QUALITY OF THE ORIGINAL DOCUMENT
kE.sr-o'
AMNON SAN ' AMMON
0
JR.
oNNIELT
FAB. To ....
H00
SAN
5500.412+422 042
In OTHERS 'SWAGE
AT CV.15•VRAFT, TI0SJ
3• I5
CjASIJA
3033 M.O.B.
•
DR-16.18
1 MA/1 Ing McCAI.11.1 COK.ISTRUCTI OW CO., I k1C.
PROJECT 2.94.
MANSON BENNETT AND ASSOCIATES
THE 1411 FOURTH AVENUE •ulLOIN0 55ATT02. WASHINGTON 0.101
:1' •
AI