Loading...
HomeMy WebLinkAboutPermit 5833 - Goldstar Acquisition - Move Single Family ResidenceBUILDING PERMIT (POST WITH INSPEV (ON CARD AND PLANS IN A CONSPICUOUS LOCATION) CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDING PERMIT NO. 5? 3 3 DATE ISSUED: PROJECT NAME/TENANT Goldstar Ac uisitions Inc. TYPE OF ■ New Building ■ Addition ■ Tenant Improvement (commercial) ■ Demolition (building) WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) Et Other House Relocation n7-1-89 14835 42 Av S PL FEES DESCRIPTION AMOUNT RCPT P DATE BUILDING PERMIT FEE 207.00 3gq5 )2 -i -$9 PLAN CHECK FEE 135.00 3021 10 -�0 - :' BUILDING SURCHARGE 4.50 'q5" I2- —' ENERGY SURCHARGE SOUAPE FEET OCC. LOAD TOTAL SQUARE FEET OTHER: TOTAL • 346.50 N CHEC 19 .750.00 ASSESSOR ACCOUNT N Grading/Fill DESCRIBE WORK TO BE DONE: Moving a 5 bedroom home from 12525 37 Avenue South to above address. PROPERTY OWNER Goldstar Acquisitions., Inc.. PHONE 391 -8433 ADDRESS 340 Mt. McKinley Drive S.W. , Issaquah, WA ZIP 98027 CONTRACTOR N/A PHONE ADDRESS Z P WA. ST. CONTRACTOR'S LICENSE* EXP. DATE ARCHITECT N/A PHONE ADDRESS ZIP USE 4 / / cow / .it't Inrlct / / CONDITIONS (other than those noted on or attached to permit/plans): FLOOR SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUAFE FEET OCC. LOAD SQUARE FEET OCC. LOAD SOUAPE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD r • 1 TOTAL TYPE OF CONSTRUCTION: -, UBC EDITION near) :: SETBACKS: _ _ _ _ t. FIRE PROTECTION: OSprinklers 0 Detectors ®N /A UTILITY PERMITS REQUIRED (rb is Yes 0 No Public Works) ZONING: R -1 BAR /LAND USE CONDITIONSEyes ® No PRINT NAME: 1., q 0 �. ;. 412 CONDITIONS (other than those noted on or attached to permit/plans): APPHOVED BUILDING ISSUANCE BY: 4o'/ v OFFICIAL DATE: 1/ 7 —?// I hereby certify that I have read and mined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does no presume to giv r . rity to violate or cancel the provisions of any other state or local laws regulating constru on or the , : rf g. - • = or work. I am authorized to sign for and obtain this building permit. SIGNATU - E: R.' - I V ( � DATE: / —/ cS jc PRINT NAME: 1., q 0 �. ;. 412 COMPANY: G01- ►X'792 ACQui s0 *.ls JL -. This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. CERTIFICATE OF A t DATE ISSUED: OCCUPANCY NO. !� Ilt BUILDING PERMIT APPLICATION TRACKING PLAN CHECK NUMBER PROJECT NAME c, 01dst04( Rcrtvisiri0��S SITE ADDRESS SUITE NO. 35 Ufa Rv INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N /A ". BUILDING SQUARE FOOTAGE/OCCUPANCY INFORMATION (to be filled out by Plan Checker) :..'.: ::. ,:}.r:' ,i+ . .•: + ?. ..� i.: : .:: :•:•:•:{....:•:•:4•.... :{£4.,.............. BUILDING - initial review :: : ::: •::?; . : • .:::.. : ........... J:. } »;:{. {2r.v::, : ::{:...:u. : ..: :•::::: :.:.::...:.: :. }' { {::. },.: : { : . S 'I.:: ;::w: :: :.•..: . :.::?:::* ::{ }:, { f:f ?.•, .; J. ;':,•: r0.r....:: ...:. .n�....r.�v.. . :... {4. rrrr ?, r .............: ..::. .r�....;r:•••••.:,>•.%•...:,::::%:: ............ .:. r.: { :: n•: .... ... ... .. ?. :r••. hvr.:rr :...:... • :•.:: :: .. :' :. ; $• ,: n..t i .. ....... : r:. .:.,.,:..:.JfrJFY:.: .. ?:5::. :rv.. f}.: , {:r: .; „$r�r::r: :..Y,..t .r . ?. rA .... . i::::i ? {: . { :44:•' r. :r.: . .•.:''rr,.i' . A. • ,.}:. :. . :..•.r' t:`•;• iJv , ;: <4. .u} f•: Yii':•:u 2+ ...H.: , rf : r.:.$• .l.{.�,,{2�•{{yy ' .'4.•: :S ffik .i.l.::4J .f .w.Y 4rr k:i ^. ?i'Sr i :'�.v ` : `f''''' %”' ''' "�� "' rY,i,Qlj►r SQUARE FEET OCC. LOAD SQUAR: E FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD SQUARE FEET OCC. LOAD TOTAL SQUARE FEET TOTAL OCCU• PANCY LOAD �i /t INIT • ...:., a1 :1 1.1 O OTHER __.. • :,.. ii ` -'1' 'i • •; 1 : 1 r.'` �••.-.. �°ar�' INIT: BUILDING - final review � �v Vf v ii 88 INI , • .I F(1 /1 44:.::. i w;wwi w. We DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. • {::::::: ::::: {•}•:::.v:,v: ••.v.v r:,. •:r : :, .:: ..... .y2 A• i I. SS:• ............ ........... r ..............�.......,.....• .r..2.r {}.:: tO... :S• > :: f' :•:.i •: S $ ..,.•�.,................... 5� •::: ...,•.,}.:•. r:. :........,.. rr...: f.:.: ::., J r: {•iY:;:: •Y •... ..••}:} Y:{ r;:.;..:•:::•::•:•:•:•:::.; ii:' r' �: }Y: {.:;•i::.i }:. }� :. }:. } } }:.: : •. +R4 >:• > r }• 24}f....... ..i..... :J r.} ^. r.J.r., •f::.: �{• Z�' 4: is }ti -0 <4.f... ..r.....v .. :r.,. r4;. ;}, r:A.< S' •• "•r$iri•4:. : {Y;X,.{i•YY f.3: ':'rf: •:••Y;i 1.• } }:{iry�l'i i:'i,4'.•Y`'.• {:X: ,:}. •4 Y�: ry. +i'i'.+v +f}y.:. r. f.. :,;::$1 r. }'::::r v+ • }::: i::: rr• •4 }. ':>'% } • 4J: y: }:: �: ''K .. :r }r.{ .r?:{.� }. M1 nW. .: r..f v. 4Rr .1. .. .. .... .... Y...:..: ........... l.:•. r.,..:::'4: ':r:r{: .v i.: � ...�. f.. t:4�:Jj•Gn:r :np {}.:.....:.: Y:: y: :v :!Y:{�Y f(�'1;v }., {{ liS:.•.'•:•� }i::....2' }f<}J. f ?; :'J..}:..... �. �... •.. BUILDING - initial review 1e "`i0 -Di (ROUTED) Ul�J�r;.;r.....�:�. - bd. �.J•� P. FIRE •-Q. k BY: (Init.) PERMIT EXPIRES FIRE PROTECTION: [ ] Sprinklers [) Detectors [) N/A FIRE DEPT. LETTER DATED: INSPECTOR: INIT: . BY: {init.) PLAN ING 3 db , • `rr2� , # +, r .« e: :n -Tri, 1 1 -1 ere" 1 :��� .a N REFERENCE FILE NOS.: INI ": ■;.∎ ! ..'401 MINIMUM SETBACKS: N- IP 11111ar, * PUBLIC WORKS 1..r. • : .1- •r - •I r -'1 SEMEN! I. �i /t INIT • ...:., a1 :1 1.1 O OTHER __.. • :,.. ii ` -'1' 'i • •; 1 : 1 r.'` �••.-.. �°ar�' INIT: BUILDING - final review � �v Vf v ii 88 INI , • .I F(1 /1 REVIEW COMPLETED PERMIT NO. - CONTACTED DATE READY DATE NOTIFIED BY: (Init.) PERMIT EXPIRES 2nd NOTIFICATION BY: {init.) AMOUNT OWING , • d 3RD NOTIFICATION BY: init. BUILDII� PERMIT APPLICATION CITY OF TUKWILA Department of Community Development - Building Division LoT z. FEES (for staff use only) .,�.,., ....,......,...,V. ✓VW.IV Ii.,M) , v.....,u ...� .,.,..... (206) 433 -1849 DESCRIPTION AMOUNT RCPT # DATE BUILDING PERMIT FEE a:'7 n s PLAN CHECK g NUMBER q" 3 ,2� /1 /'E'L I Ct1 t ION Ill IOW; T BE FILLED OUT COfl1PLE!ELY PLAN CHECK FEE j; 5 s--", ,t, 0 ' t):21 / 0'. fl g,\ BUILDING SURCHARGE h/. 5 -1 SURCHARGE OTHER: OTHER. < °TOTAL - `? / ;srt SITE ADDRESS SUITE # /4/3 5r •4 PJ D A 0 r S".., VALUE OF CONSTRUCTION - $ 'W/% %.�v PROJECT NAME/TENANT GOLDS ?A2- CC)OIs' ?/m)S� /rJC, ASSESSOR ACCOUNT # 00 L /OO - c) 2. z5 00 TYPE OF U New Building Li Addition U Tenant Improvement (commercial) U D em olition,(¢ui ding II WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) Other KO U 'Q CQ tcCi 'I O fl DESCRIBE WORK TO BE DONE: 1,,,f av /03 4 rte- 6Q el) r -oew, Vovine. - }'rb-rn 1,2 6-2g 3*714.40g0.4 S. 7a c)4254-12 m 4.31c) r Q 5 S BUILDING USE (office, warehouse, etc.) NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? .1?.5) No U Yes IF YES, EXPLAIN: SQUARE FOOTAGE - Building:3 i ? 2 i »elo, j nlonst Spaacce:1 Area of Construction: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? ® No 0 Yes IF YES, EXPLAIN: PROPERTY OWNER Gc71.DS?y9CZ A Cz?UISr ?Asvos, /NQ. PHONE 3g /_ 8.y3 3 ADDRESS 3ic 0 M i- Mc. VI\ k,27 'Dr: S .(„1/43. ) SS Atsof1N> jn. ZIP e?r ffO 'CONTRACTOR PHONE ADDRESS ZIP WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT PHONE ADDRESS ZIP 3Y CERTIFY THAT ' AND CORRECT,AN BUILDING OWNER OR AUTHORIZED AGENT SIGNATUR JT MINED APPLY' �J (� 1 •. _/; i (_ PRINT NAME 60-ALC) W I r-- .,AR•T' DATE /o /P -0-S PHONE 3 Fl - & y33 AD D R ESS3 4 o M} M c kwat-../ 5. LtJ CONTACT PERSON R,),,,\ E.wos-4 CITY /ZIP/590()09N Fp) 07 PHONE 9/ _c9 y3 APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. Handouts are available at the Building counter which provide more detailed information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for plan review. VALUATION OF CONSTRUCTION Valuation for new construction and additions are calculated by the Department of Community Development prior to application submittal. Contact the Permit Coord'nator at 133 -1851 prior to submitting application. In all cases, a valuation amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Building Division to comply with current fee schedules. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitations. The building official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Building Code (current edition). No application shall be extended more than once. if you have any questions about our process or plan submittal requirements, please contact the Department of Community Development Building Division at 433 -1849. DATE APPLICATION ACCEPTED ID a DATE APPLICATION EXPIRES LI - SlitIMITTAL CHECAIST COMMERCIAL.........„.„.......„:,......„.:.„..,....,,„:„::;,..,.........,.:::::.......:::::.,.,,..:,...,......,..,.:::, i46i0ii091A . ....,..: .., . ........... ::.::......:..........:::::::,...:.:::;:.........0,i::.: .......::::::::::::......:,.... ..,........" appIceOn fOr „ . ' Aoaciunt Numbr 1.41e0s!' . .•—••:•••••:. ........-;•:,.:. ' ..". I.2�f Sos • Washington 8tita-110) """:•.'• ' ... mte .&,be requfred PriOrta#natinspgoon „.. • doom• ensI�sBof Unirl n ' NOTE 1.• cnenhionl al racks (h Structursi -Calculations ,atam RESIDENTIAL NEWSINGLE.FAMiLf,DWEI.LINGIVADDI cppip0190 00009.'pereot•epoiceo00:•000:iet::0000!:01000,..:, . ....... . • • .. .. Mng end proposed p.rkng • .......................... are :*a i.,jx1stWjWaliind .. waifsto• .dern, .••• oi! • te• ,...:•••$-.snyr end .• •-' 1,771 :jar! no?! 9 7. .. 11,1 • • • 1109t•..1',. ti17 cakpoiltIPO • pefmlt IshaI ..... ....................... •••.' • tor Accou Number ... . • • . tiett:(;):Ot.■vprIt. Foundation pan • • Root Ptak: •Root Plata ngninin.,..ns .1 aukli. ceotti-se941:4: P:.code• ... • at Energy data E.:CO*410 utility pen! •••, •••.•• • si)(0):tets at site plant showing utes • • • ••• • • : NOTE:-..ilulkinfialte plan Auxtutility.ane 040.41ay. be. .:.:7uowpantsltapplication'and checklist for appOlkauk01,1„,..., ',4CitftailatiograpItiaa/ tnci soils infOnatOki.nty .11 . • • • •:. • unique -.• AEBIDENTIAL REMODELS • Roof plan .. 0 Assessor Account Number [1 Two (2) sets 01 worldng . • • • ". ; . !Tr and plans must be aubmlflsd REROOF8 ‘.. :A ... be g No the " • . . . :•••• . • .. one:f0r, 001 ruwnaa,aaeu.v,.•.•. uww..rw rxs r✓xr.uvu Vrn..ww.na`. CITY OF TUKWILA Buildin department 6300 S enter Boulevard Tukwila, .� 98188 (206) 431 -3670 tog toorysr4.v...VrtiPesik,51Tettj INSPECTION RECORD PERMIT # Xr� 3 9 Date j C—t °l0 Date Wanted 9 ~ S Z Project Phone # Type of Inspection Site Address tequestor Special Instructions 1 Inspection Results /Comments: (:I ef)417.:L..„ Tncnnri.nr /L!/ 2-..1,""L, 17 nntn Type of Inspection CITY OF TUKWILA Building oartment 6300 So Ater Boulevard Tukwila, ,n++ (206) 431 -3670 Site Address 14875 f ?' ` Requester � `w` l9vAT INSPECTION RECORD PERMIT # 33 Scab /O Date Date Wanted X"-30. a.m. Project C ,( C6y wr, Phone # mil(#- 017MM Special Instructions Inspection Results /Comments: Inspector /;� -1--i Date e-30-?z) VAIr CITY OF TUKWILA Builds epartment 6300 S .center Boulevard Tukwila, WA 98188 (206) 431 -3670 .....,.- ...a.,...,.,,, :vw,n �:n�a.rr••,. xs£.t"� ,. , �'.`5•'fi.'.: , :'i,'••:2:LL +..2`;:li':::xZr. w•�:it & ?:�?#., "i45' .. INSPECT 4N RECORD PERMIT # Date 3 _24 _..Q/ O Date Wanted 37- 2 2 -%a I. p.m. Project a f %v Phone # .3/ — Type of Inspection ci\lna.,1 Site Address / `�j -. L °-` Allb RA. Requestor _L f �• Special Instructions Inspection Results /Comments: d, .a) i47 /`- / 14e Tncnnni.nt. nata CITY TUKYILA Bu11 'Departiant 6300 thcsnter Boulevard Tukwila, MA 98188 (206) 431 -3670 . ,I, 1 ,‘sa Type of Inspection /( Site Address 14%5 � �lD !1V`� Project C A.V �'C(,,] ■ Requestor `jZ • //J ` ` 7t 't/t)P 1 Phone # '(. °17 I I Special Instructions o,'vi,kraxat+�.i eaaanucva+- mar nky.- .r:r�.u.n »un:r7r, «.r: {�.✓fi;;.: +a:::..:.:.''�' ,: n' 1i�Y. i; �':: �. wt:! 'Y.;1.','�EiP.;w ^.�.4'�A�a ";v�� :+i q.!`4:.. INSPEC SON RECORD PERMIT # 035 Date gr Iq' �n Date Wanted $ —1431 '10 a.m. Inspection Results /Comments: .�— Inspector Date Y's( 5- TO v: r:i"4 : '- JaiGtii?SAV: Permit No. 53'33 Date r•. ':- t.�ir. �'tkr`: a;:';+ :Y.M &e +: <!!r;e;�•�S�t;t::;;;r +, fl CITY OR TUKWILA Building. Division 6200 Southcenter Blvd. Tukwila, WA 98188 433 -1845' 90 Job Address / 035 CORRECTION NOTICE The following items are found to be in violation of c--- and shall be corrected. ►�_�OT w � P.'p�� TO 15N 9-0u. "), ov tr i mac' srA -L4. -- P o5r c.A. N OC-X Pict, ,uK Sv■ P t 10-1". c..0.0 --tsSn bZ 5 W ITlA co arit..A c ro (- gmdu� ate.' iiu,e A 11L cam,. k3 A e P u4,..a cRes 66,szyr raNiC- c -iNe sywilm...e 1)ti'Teva.6 e_ , ►- Signed Building Official /Inspector CITY OF TUKWILA Bu11din9 'artment 6300'Sou 'Ater Boulevard Tukwila, 98188 (206)431 -3670 Type of Inspection` Site Address / L gas �1 Requestor - Special Instructions enovvissu,!444:Am uxeteawarv.e,n r.tI `•. I ,r ed*_ 57 ;tt ' RO..4` .*41W iiM ` tat'ttiE': INSPECT RECORD PERMIT # Date Date Wanted r7— Project6:3 d. Phone # _ --9 r7 a . m .cp --97/) Inspection Results /Comments: Inspector dez". ,,,_ Date 7�--' . INSPECT • N RECORD PERMIT # • Date 6:7-041,—q(7) Type of Inspection Site Address 1 cft Requestor Date Wanted Projectci1d Phone # - -1f% /1 Special Instructions Inspection Results /Comments: Date CITY OF TUKWILA Bulldiny 'artment 630010 rater Boulevard Tukwila, A 98188 (206) 431 -3670 r Type of Inspection (J' Date Wanted (:4,-,?67...-76) Site Address oL r J Project 6,741,51.— Requestor Phone # Special Instructions INSPECTION RECORD PERMIT # Date Inspection Results /Comments: Ga A- (7s �� /� /v .' / , /(r , ' • / 1 6,1-17 c 1 LA i/1 5-0,14-4 J, "/ i rr. i Z., S 7 .✓ `1�-�f � led �. r, . ,j , , � , �� l i �, 4 1 a CITY OF TUKWILA Building Division 6200 Southcentor Blvd. Tukwila, WA 98188 433.1845 Permit No,, r` 3 3 Date —2—, e..) Job. Address / , CORRECTION NOTICE The following items are found to be in violation of Ordinance and shall be corrected.:` ad et, --r, Signed Buliting Offlcial /Inspector 7LC ritall lS4 ..Y!(o:i:C it;?s.".• tImt•nvi i °,K h�4.`;i,'.i' .' % CITY OF TUKWILA BuildingW .irtment 6300 Sou .iter Boulevard Tukwila, 98188 (206) 433 -3670 Type of Inspection +__ra.41/1 l `il Site Address 1 e-03 SS — 6/4, Requestor_I Special Instructions Fh +oA INSPECT N RECORD PERMIT # ;3; %L Date 6? e) 4//// Date Wanted - S •/cJc �� (a, p.m. 1/_6 r Project jD (Lir /"tr l e_9. Phone # (0 d / - / S zS PI e.4,- I 0 ad-vi- e-P€) r e 1 c • P rvt. Ins ection Results /Comments: l 2') F yll •_ ¢ r�65(74 : /00 ��v 1- 4.?/42-L1 . cr,Peu- •�'� Inspector n.__4 '14 yfilefin �i /D� Date (-- c. -4,419 �jS�A�d{ ttMiWay.. tlw4YMU' wVealwnuwu�+ VrNYWrfV.. cSUtlirM�uu+ Y�tnrwn. rvn+ wwsnwm��. w' s�arrM�rr�wn ...rwr�w....w�wr+vwi...r ire- u. �r. r.... r... w�r�w. vwMw. n. we..nauauYSYN ✓i/?fSt3aYTJi�1¢M' 191i1Y1St (4Yi�i�T'✓M�tl{pLINVPjlY���'i. rASU. `+ ^d *`rh`:. CITY OF TUKWILA Building Division 6200 Tukwila,tWashingtonu198188 (206) 433 -1849 Type of Inspection I �1GU1 ch t7 I () Site Address 5 — Requestor / Dr /5o r T Special Instructions INSPECTtON RECORD PERMIT # C5'5'33 Date F--F — v Date Wanted 5-7.-90 a.m. Project Phone # 1/D icy' • /(14/- M f 1 Inspection Results /Comments: /2, (,,- if / (a1 Date 3 " 9_ 90 ilatti " tatt tMaU iittaii VattlA ifttiCiutsdkltiWtM•i;ttlitA .R.Y ding ett<ma,nrklarnnra,.uwm: ....... ,.....,..i f� ii" • - `ii:' w w CITY OF TUKWILA Building Oivision 6200 Tukwila,ltWashington ul98188 (206) 433 -1849 Type of Inspection FbOt►Y"t JFc un do..1 Site Address 11-1.7)5/ 4Z Pv fj Requestor et Ron Yt PERMIT # Y tVix utt�au: �� !.ti�3+�Y¢7k't�Y."a1Cfi#':31d Date -Q-1- q O bozo_ l 0: oo Date Wanted O. 9O (0 p.m. Project Gcald J' P\CQuirt -i 5 Phone # 1-;)10-6v(a1 Special Instructions • Inspection Results /Comments: r.,,7 c�`'��r ,� �� 717/71 � P� Roc', Date 2t'' /111114111111 S (LER MIR CONSULTING Mr ME ENGINEERS 14450 N.E. 291h Place, Suite 104 Bellevue, WA 90007 (206) 885-4473 JOS A4013 Cr 2- -V, 4rnejlt)e- SHEET NO te5-/ CALCULATED SY OF/ DATE 42- 2. 4 -90 CHECKED SY DATE SCALE Aiy - AS-2 •• ■ ..... • IIECEIVED ("IV 0:- TO:'11.1!" A MAR 0 1 1990 PERMIT CE.NTER s-/ L. • -1. -11.- i - i ----11 I ----•• I I i I I . ■ i i , I I I i 7 •-* V) -4. 1.... I t 1 , I I i .14;00.. 1 4"be: ,P4aAgerr ! .. , CITY. CEJU.KW.I.LIA. : . ..1..._................... L.... n.........; ......j........_ , ......_.' , !---I 1. roo TE) .Fitt underStand that the Pia subject to errore and orni t6; its riot-authorize ciopted. code or- ordinanc copy . gj apriroyeci By ti/Sw ions a e yiolatiok (nowleclgeci L. _J/4 .a I SIP* • • • , BUI ' 0 Ovals prove Of 0 any contrctort 5 .oi . . \ • )1c4 11.1 # • • • I I r Permit NO (Sear . .4414 'Noe, ...,...adil . ..0it.'....,,a.air. voce-.........:o .*,........■/.1,4rasie on* Ilt.,. ....,.,...... L. 1 ! ,iiL ...,1 1. .,i, .._. 4 I : ; 4 ITLER WWI CONSULTING _ ENGINEERS 14450 N.E. 29th Place, Suite 104 Bellevue, WA 98007 (206) 885-4473 roe JPCO 6 "_, I - 41.9 1--Lo ,Mt/F S. SHEET HO. S-2 OF CALCULATED SY 5 ' DATE CHECKED SY DATE SCALE (Xis . , /A � /y"dd f 00r4S/0�! _..'._ P.>og.r s rt.w:s r.$,Ati•I4....__._.... `....._..: G IBC /n+A'. 4 C' X iS r;/^ /u' 41Xin e �l8 oo .2xtf3 gcuc.. C /t// JC6","ruJEaS4 01/9 /D`.'� . . . ' D / ( El C O L . es' ....: tvi . .... ..may" d� �$Ij /s'op). iv 42. 24! 11 :/f �.:....... !_ 1 1 1 1 war ?e�/ 6.CC 4.W6 ...boa . i i ' j • SEGTTOJI 11111111_ CJTLER MIN CONSULTING =IPi ENGINEERS 14450 N.E. 29th Place, Suite 104 Bellevue, WA 90007 (206) 885 -4473 (9 Lb JOB /51C. 0 811 +Ler 2- 0'`� (' ` ,idi- SHEET NO. � .J OF 4 CALCULATED SY *775 • DATE 2• A4-96 CHECKED BY SCALE DATE. �.... Epe/S r/ "4 .0it,e:i:li...... ..... 'e : a ! o " jto -8 ", Po Oro/A Of po s 1 Imo, ,ao, AP .1 i..... �.. ...!� .__.....I.�._;.. v1 ' 'j' . . 111?Ilm) fllzl , UUlal�leli/z*I� .. SECT' /oxl C.. peai- co?, `"71_.SiDt : ' p r o w _ . 6 , 0 f ... . •ix/0S , rson/ P.3:.. Po51- LsnsZ.. r•1 . 6,/6d ../✓Ants Wir41 -pt/ MiNQc'07 d F A.7( da'i er . - 6•L�G K //►/X 3i' i ,23E epatr 157 4 &x -/44 p,¢OJ /Z1E SsM Pion 4T M 770.....3l'AtJIp e.,/ 2130P. ex /sr /iJO .. Sari a .. Xe ...TO . Rood`. . t. .. -. XIaT P S .iT . . ' Ed it er E v d-orN o a ' : R.4 Da& 8)9x1. goon TsiST'). • 1 n • �.......s, ps i ye.E... /4-r. , o a p........gt D @i SECT ;•._• . tr • • CJTLER CONSULTING ENGINEERS ENGINEERS 14450 N.E. 29th Place, Suite 104 Bellevue, WA 98007 (206) 885-4473 dos Ac.c B tor- Z. - 449 SHEET NO 05 - ` OF y CALCULATED SV DATE 02` X ' 10 CHECKED SY SCALE DATE 1 i ' I , __. 1 ' ■ . Etc /Srfid6 ;' "v ; I ..4/)"o CTyv7.;..._._...!_.__. ' I • I g. ,�1�7-)1 450 (. 4 L / ' { • _x ,, 10; 0 'WY • { { ; I0 =4'1m { 1 1 I 1 I ; I ._..._r ._.._. .._._...._ /-h7!-� f lC,...... .1(.�w.,.. i 1 i 1 I rl 49. - Nl*al �IlI .I , i { l � � I ...i_._._i_......• I`....._..._1....i...__.._ ...__..i........I.__........ i lI : ` S GT 1 v ).1.; i i • { • ... ...I -6 • 1 Plan Review PROJECT L -e,r LEA AWE ADDRESS 1 4z -Au -o DATE —77 q O PLAN CHECK NUMBER i DHAAJ 6e63a_ ; owns CITY OF TUKWILA 7-111(WlIQ .1 `:*4 -11 °iko DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: , PLANNING DIVISION �! i ' ..,• il. u.4ri!I!'..AJ+c 1 u �-� -r C2'- - ._J o 04 if 3-' i 16k ♦ �t/ I ,_�/i1J i ...�i�i Z. :ILL .., `rra.eLt1 anA,Cat4.413tel 2 YA- RDST 11 z l 0, 5. ' 142- = V = 16100 9,6 °° 4 ÷ (1425 1 5 12�' J • iG - __ q _. 42E ' S--1�5 _ «::: : ..,�.......,r ES F itz IsM •, ...)Co 00 --- 4 le i 0•. -.Pc) M E~V lie? 77r# t r - - .ari ./ i I r w t CC ♦ ,- • /•d .1 . t I r E.' � x,1/1 t ., }�� at .4 .w ; owns CITY OF TUKWILA 7-111(WlIQ .1 `:*4 -11 °iko DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: , PLANNING DIVISION arch 5 1990 .':.. Mr Dave Larson, Building Inspector City of Tukwila 6200 Southcenter Boulevard Tukwila, WA. 98188 RE: Foundation. Plan Goldstar House Move 14835 42nd Avenue South pcibco P.O. BOX 6986 BELLEVUE, WA 98008 (206) 641 -1325 Dear Mr. Larson: The attached sketch is submitted for your review and approval as discussed at the site today. This sketch reflects foundation and beam support required to adjust the Engineering drawings to the actual site conditions. In addition, I have shown the location and configuration of the; stairs connecting the basement garage to the main floor which were not shown on the previously submitted engineering drawings Please let me know if an additional exit from':. the garage is required.. I hope this covers the items we discussed. Sinter Paul A. Butrim enclosure, INCOME PROPERTY • CONSTRUCTION .DEVELOPMENT`.. (PABCO * *1.16M8) „ FILE COPY ,, Pc+lldyalseul 1 underst'rnd that the Pion approval of subieCt t a errors and omissioniola on p any plans rlOos nOt authorize the t off anYactor�s (ar4 -,0ed code or ordinance. Receip 'copy of approved plans acknowledged. 1 Date........ ........................ .............. Permit N As r6(.4.114, `'P.O.BO, 6986„ ': BELLEVIJE, INA 98008. ,';(206) 641•1325`:'l CITY OF TUKWILA APPROVED nJ • '4 P. 1 6.1'44410Th p•P4 • • 4 'riJ,fl. '~rtf .. 'r�T1oN ► `) JOH NAME: SrQL-- DST_.7aR.. 46%k star YYlov. -" JOB a ACLIPI ? 2- tOI:ATION: iL413c- 41 SHEET OF CONSTRUCTION • DEVELOPME Plan Review PROJECT ADDRESS 64,17f,rA"e_cOjocE Iq AZ SUE DATE 37 %- 9 U PLAN CHECK NUMBER f IS 5633 ; V5) = 51 tp /3CO G uNC PC c woo CITY OF TUKWILA 771"q tAlg O'k, ' DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: , PLANNING DIVISION 1/. %il/ . • CJ 41. u,. ///_r 1 _ 1 !i,"J_e.L • . , i �J i�ir..AM z. Slit rt _ t,/i. /J4 r .i • . _..1r11 . I a. r _. - 4,�L 17. X 4 _ ' T 0 . _ - CO = (7)(4) 50).--• 1 425 A • ■ 16100 915 -.. + . 57 42 ', g- I.5 __ c. +-5 a = 2 y►6z = ((V aOO itA-W }IF itz IsM 06...-1.4 6 b NG) �r 2000 — _91-122+ii?>73.P,z C (3)_ 2" z 4z, 55 /0 (4) (70) I' 12# 1 6°3600 I ? co = 4c 2 ols C 75,6Z. o, k. - _:• =_ .; r . - 7e 3 --e,- VFW 2 -r— 4 1-43 <73�- °514ki to 4.S W � f 1. • 0 e IC, / r-- r. Z P4 # •' # ' . rte' I L_ &O..4 4 4 -• — ; V5) = 51 tp /3CO G uNC PC c woo CITY OF TUKWILA 771"q tAlg O'k, ' DEPARTMENT OF COMMUNITY DEVELOPMENT prepared by: , PLANNING DIVISION Plan Check #89 -320: Goldstar Acquisitions, Inc. 14835 42 Av S THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER___�J'2,3, __. 1. No changes will be made to the plans unless approved by the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296- 4732). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (872 - 6363). 4. All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. 5. Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. 6. All construction to be done in conformance with . approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington 8tae Regulations for Barrier Free Facility (1989 Edition). 7. Emergency egress provision is required for basement, per U.B.C. Section 1204. 8. Smoke Detector is required at basement, per U.B.C. Section 1210 (a) 4. 9. 5/8" type 'x' G.W.B. at walls and ceiling on garage side of walls separating garage and basement dwelling area is required. 10. Validity of Permit. The issuance or granting of this permit or approval of plans, specifications and computations shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of this code or of any other regulation or ordinance of this jurisdiction. No permit presuming to give authority to violate or cancel the provisions of this code shall be valid. CITY OF TUKWILA Department of Community Development - Building Division 5200 Southcenter Boulevard, Tukwila WA 98188 (206) 433 -1849 BUILDYNG PERMIT INSPECTION RECORD (Post with Building Permit in conspicuous place) SITE ADDRESS: BUILDING PERMIT NO. DATE ISSUED: SUITE NO.: PROJECT: 14835 42 Av S Gold ar Acquisitions. Inc. CALL FOR INSPECTIONS AT LEAST 24 HOURS IN ADVANCE 'X" REQUIRED INSPECTIONS PHONE APPROVED INITIALS CORRECTION NOTICE ISSUED X 1 Footings 433 -1849 X 2 Foundation 433 -1849 3 Slab and/or Slab Insulation 433 -1849 4 Shear Wall Nailing 433 -1849 5 Roof Sheathing Nailing 433 -1849 6 Masonry Chimney 433 -1849 X 7 Framing 433 -1849 8 Insulation 433 -1849 9 Suspended Ceiling 433 -1849 10 Wall Board Fastening 433 -1849 11 12 13 14 FIRE FINAL Insp: 575 -4404 15 PLANNING FINAL 433 -1849 16 PUBLIC WORKS FINAL 433 -0179 X 17 BUILDING FINAL 433 -1849 (INSPECTOR COMMENT SECTION ON REVERSE) INSPECTION PROCEDURES AND REQUIREMENTS All approved plans and permits shall be maintained available on the site in the same location. 1. FOOTING - When survey stakes and forms are set and rebar is tied in place. 2. FOUNDATION - When forms and rebar are in place. 3. SLAB - If structural slab or if underslab insulation is required. 4. SHEARWALL NAILING - Prior to cover. 5. ROOF SHEATHING NAILING - Prior to cover. 6. MASONRY CHIMNEY - Approximately midpoint. 7. FRAMING - Atter rough -in inspections such as mechanical, plumbing, gas piping, electrical and fire stopping is in place. 8. INSULATION - After framing approval, but before installation of wallboard. Baffles must be installed to keep attic ventilation points clear. 9. SUSPENDED CEILING - Fasten diffusers, lights and seismic bracing. • 10. WALL BOARD FASTENING - Prior to taping (see UBC Chap. 47 and Table 47G). 11. 12. 13. 14. FINAL FIRE INSPECTION - Contact Fire Department for their requirements. 15. FINAL PLANNING INSPECTION - Contact Planning Department for their requirements. 16. FINAL PUBLIC WORKS INSPECTION - Contact Public Works Department for their requirements. 17. FINAL BUILDING INSPECTION - When all work, corrections, reports and other inspections are complete. OTHER AGENCIES: Plumbing (including gas piping) — King County Health Department — 296 -4732 Electrical — Washington State Department of Labor and It — 872 -6363 A preconstruction meeting with the Building Inspector may be scheduled prior to starting the job by contacting the Department of Community Development, Building Division at 433 -1849. Although not required, a meeting of this type can often eliminate problems, delays and misunderstandings as the project progresses. 0.,z8/ao PLAN CHECK NUMBER PA S20 1 "X" REQUIRED INSPECTIONS 1 Footings 2 Foundation 3 Slab and/or Slab Insulation 4 Shear Wall Nailing , 5 Root Sheathing Nailing 6 Masonry Chimney X7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening 11 r13 12 14 FIRE FINAL Insp: 15 PLANNING FINAL r y17 16 PUBLIC WORKS FINAL BUILDING FINAL SoLosilve, . THE FOLLOWING COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER . 0 No changes will be made to plans unless approved by Tukwila Building Department. g Plumbing permit be obtained through King County Health Department and plumbing will be inspected by that agency (including all gas piping). Electrical work 4N\tlbe inspected by State Electrical Inspectors and 011 required electrical permits obtained through that agency. O• All mechanical work to be under separate permit. gAll permits.1411,.be posted at job site prior to start of any construction. OWhen Special Inspection is required either the owner, architect or engineer shall notify the Tukwila Building Department of appointment of the inspection agencies prior to the first building inspection. Copies of ail special inspection reports shall be submitted to the Building Department in a timely manner. Reports shall contain address and permit number of the project being inspected. OAll structural concrete to be special inspected. (Sec. 306, UBC) OAll structural welding to be done by W.A.B.O. certified welder and special inspected. (Sec. 306, UBC) OAll high - strength bolting to be special inspected. (Sec. 306, uaC). 0 Any new ceiling grid and light fixture installation to meet lateral bracing requirements for Seismic Zone 3. OPartition walls attached to ceiling grid must be laterally braced if over eight (8) feet in length. 15 OReadily acce,sibte access to roof mounted equipment/required. OEngineered truss drawings and calculations snail be on site and available to Building Inspector for inspection purposes. yts Any exposed insulation backing material to have Flame Spread Rating of 25 or less. (O Subgrade preparation including drainage, excavation, compaction, J and fill requirements shall conform strictly with recommendations given in the soils report or as directed by the soils engineer. OStatement from roofing contractor verifying fire retardancy of roof will be required prior to final (see attached letter). All construction to be done in conformance with approved plans and requirements of the Uniforrn Building Code .(IctiNg Edition), Uniform Mechanical Code Met/Edition), Washington State Energy Code MEP( Edition), and Washington State Regulations for Barrier Free Facility (NH Edition). �/ O All food preparation establishments must have King County Health Department Sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desired inspection date. On work requiring Health Department approval, it is the contractor's responsibility to have a set of plans approved by that a;ency on the job site. EMERCE:NG(01 Meee66 rt0uvotot4 i5 RtcGZumeD Foy- -PSASEMet i fl Th. a a.c1 ' ,EC ■24)4. Matti', l!.p,G, St G• 1zto 61/4) 4 F - )C• i,` G. U)f Azr WALLS Arlo batL ict, c N GA S •Ar of 02.4c1,.5 .••412Arrtt•1ct OP44646E. AND 1:1ASSIMet4T' 1 e u,.lUc. 4Z€A, is RESU I R= . Validity of l',rmit. 1hr issuance or rrenting of a permit or approval of plans,.pecil ic.ition, and computations %hall not be construed tube apermit fur, or an approval c,t, any violation of any of the provisions of this code or of any other ordinance of the lunsdiction No poling p:csunung to give authority to violate or canoe! the pr,rvi,.iun% of tins code shall be valid City of Tukwila PUBLIC WORKS DEPARTMENT 6300 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -0179 Ross A. Earnst, P.E. Director November 27, 1989 Ronald W. Ewart, President Goldstar Acquisitions, Inc. 340 Mount McKinley Drive S.W. Issaquah, Wa. 98027 RE: Single Family Residential Development Site Address, 14835 42nd Avenue S. - Lot 3 Site Plan Approval Dear Sir: The Public Works Department has reviewed and approves the site plan for the subject single family residential development. Prior to release of these permits, the Planning Director and Building Official shall approve their release. Call Becky Davis, Permit Coordinator at 433 -1851 to have the following permits prepared for pickup: 1. Curb Cut /Access (Permit Fee = S25.00) 2. House Moving Permit (Permit Fee = S25.001 3. Storm Drainage Permit (Permit Fee = S25.00) Included in the House Moving Permit Application shall be the following: a. $5,000 surety bond (filed with City Clerk). b. $1,000,000 minimum property damage /bodily injury liability insurance per other conditions of Tukwila Municipal Code 11.28. c. A routing map through the City of Tukwila. d. House Mover's license in Tukwila (per Tukwila Municipal Code 11.28). You are referred to Water District # 125 and Val Vue Sewer District` for necessary approvals .of permits for your water and sewer connections. Please note that the side sewer as shown on the plans is considered temporary, per T.J. Matelich of Val Vue Sewer District. Mr. Matelich indicated that the existing 10" main will be extended, and this property's side sewer will be tied in, perpendicular to the main, at some future date. If you have any questions or I can be of further assistance do not hesitate to call Ross Heller or myself at 433- 0179. Sincerely, xc: Ron Cameron Alecky Davis, Permit File Development File: 42nd Avenue, 14827 T.J.'.Matelich, Val. Vue Sewer District COMMISSIONERS JAMES I. ANGLE C.H. WALMER GARY,IOHNSON Water 2)is1dcI 7/o. d25, County Telephone: 2124547 P.O. Box 66117, Riverton tits. Br. SEATTLE, WASHINGTON 98168 September 15, 1989 Mr.Ron Ewart Goldstar Acquistions, Inc 340 Mt. McKlinley Dr S W Issaquah, WA 98027 Dear Mr. Ewart: FRANKLIN PEARSON Superintendent ANN WILSON Office Manager OHIc.: 2610 South 1501h This is your Letter -of Water - Availability for property located at Lots 2 & 3 of King County Short Plat No.1080043 recorded under Auditor's File No. 810825 -0691, being a portion of the Southeast quarter of the Northwest quarter of Section 22, Township 23 North, Rage 4 East W.M. The two lots front on the west side of 42nd Ave- nue South between South 148th & South 150th and are separated by a 22 -foot driveway. This property is served by a 12" main 20' from site. The fire hydrant is within 300' and the rate of flow is 1,000 gallons per minute for a duration of 2 hours or more. Sincerely yours, te WATER DISTRICT NO. 125, KING,COUNTY £7J4Jio igcMAah) Franklin Pearson, Superintendent FP:ok August 25, 1989 Godlstar Acquisitions, Inc. 340 Mt. McKinley Dr. SW. Issaquah, WA 98027 Attn: Ron Ewart Subject: Sanitary Sewer Service Availability Legal Description: North 20 ft. of Lot 2 and all of lot 3 of King County Short Plat No. 1080043 recorded under Auditor's File No. 810825 -0691, being a portion of the Southeast quarter of the Northwest quarter of Section 22, Township 23 North, Range 4 East W.M. Sanitary sewer service is available to the above described property upon payment of a connection charge in lieu of assessment, based on the above description. Connection charge contract will be prepared upon request. Payment is required prior to connection to District facilities. North 20 Ft of Lot of Short Plat No. 1080043 -- $950.00 Lot 3 of Short Plat No. 1080043 -- $3,553.07 The owner will be responsible for the connection to the existing stub and extending a 6" line within the W 5 ft of the 42nd Ave. S. Right- of-way North to serve Lot 3. Side sewer permits are $50.00 per each lot., Sincerely, VAL VUE SEWER DISTRICT T. /k a Mat c Manager TJM:dmg P.O. BOX 68063 SEATTLE, WA 98168 14816 MILITARY ROAD SOUTH BETTY LUNZ;. MICHAEL J. WEST DAVID L. RUITER COMMISSIONERS T.J. MATELICH MANAGER 206/242.3236 c CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT ADDRESS 14.48 .. 42..uE �.....__.._._.. PLAN CHECK NUMBER ORDINANCE COMPLIANCE CHECKLIST Uniform Quildin• Code, 194.U5 Edition. OCCIIPANCY_(ROUP x TYPE OF CONSTRUCTION \ -esMT Foe 4 cC6E ) _ LOCATION ON PROPERTY 6441_TeAtz. 6A RIITI TITNG HTFGKT /Nfl of SIORLES. ONE_.._.. • ( FLOOR AREA 1.93(0 4 .... VDT RAL X, OCCUPANT LOAD 19340* ean'Vtt_.L4(rl ......_ r.] l ..J I .(l r] :IN1; RFQII T RFMFNTS !j DETAILED REQUIREMENTS: _IIGf llPANCY TYPE OF CONSTRUCTION ENGRG. REGS. & REQMTS. W.S.F.C. ?4,_CEARIER ;1 -10 .W.45.-C- 11 L] NOTES: L_ PE )( GV013 _G� ..0 e... .. , ..... �rnw ha) d N Nl s 0.5' .1.1"!" � tom' " r n� • 397��w` AVE.4! 1C� . j4' VIM e '1t+ Z.QyC j r- (44 � I. {° 3 • wt V+ ° •r% o N / 2 a° : " /•O; • S''t • • p ift Aar• \• Wo • )• 1, .. ; ii 7.t.�r Or • rep 14 1 '55 `) stn ct 9�J� 1:77'° Q O �� / d 1 _ 7,-... -10 _ Jam;` • 14 '`I!: t r • 0 r 1 C7 •a w 8s 1 L 1 ° 4; N o , . • • vN co x 82 • � unwell ' $r t wN b • $ 1 o iii..sa x m N is•-• I 4-o /r0 j•O \So /S if • - /:74 0 80 N j s Q'3b 4,70.97 69.57 •.. r V O•. Oyu , • '-I 411 ' -1 _A `Ash) 1 dlr N. yo v v O T 1, C eo Z *7 1 69.67 1 4.3,5‘ w -4--7,'N- cs O. • %5 .1 .p1S • a, t 93 U 31.98 eN rs' Nr NO /-03 S.SE . :' 1' ✓. OS •,5_SC / 4 ? r /04 /; cb r KCSP 180040- 8108250691 r /o /7 l or. 97 •'r /32,99 �.. a 'O 57 1a09a7 -,I •+ �G45, th..,10. � ,v Q *11L,4„;;-- 0 o. • 2 go al • • • ty `∎ v o p� w� •. h p 43: d 'tiUOw _ v4 l L' • j 6a5CA/ /r. 55 t. 7 c.)1 V �p eb is c5• o • N y. .4 0J p j .00? .<' 132ii4 4' J sc)K� 03"4 -� I.*'• • ti • dV,!, V • L ..,^ ..— ....y,. ,, .. .. .,,..a• , �.`:,, -... •�' ^ �' ',. .� .�.,_.. • _ " City of Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 (206) 433.1600 Gary 1. VanDusen, Mayor October 10, 1989 Mr. Ronald Ewart Goldstar Acquisitions, Inc. 340 Mt. McKinley Drive S.W. Issaquah, WA 98027 Dear Mr. Ewart: The house located at 12525 37th Avenue South, Tukwila, WA 98188 was inspected an September 19, 1989' on Building Permit No. 5710 This inspection determined that the building may be moved within the City of , Tukwi l a subject to the following: 1. Plans are submitted and a building permit for the new foundation is issued subject to the current Uniform. Building Cade in effect. 2., That an electrical inspection and plumbing inspection are done at the new location to insure that electrical and plumbing currently meets these code requirements. That smoke alarms be installed to comply with Section'- 1210 of the 1988 Edition of the Uniform Building Code.. Sincerely, #&‘'-ef Norm Bray Building Inspector COMMISSIONERS JAMES I. ANGLE C.H. WALMER , GARY JOHNSON Water 2»iIricI no. 725, An County Telephone: 242.9547 P.O. Box 88147, Riverton His. Or. SEATTLE, WASHINGTON 98168 September 15, 1989 Mr.Ron Ewart Goldstar Acquistions, Inc 340 Mt. McKlinley Dr S W Issaquah, WA 98027 Dear Mr. Ewart: FRANKLIN PEARSON Superintendent ANN WILSON Office Manager 011ie: 2849 South 150th This is your Letter -of Water - Availability for property located at Lots 2 & 3 of King County Short Plat No.1080043 recorded under Auditor's File No. 810825 - 0691, being a portion of the Southeast quarter of the Northwest quarter of Section 22, Township 23 North, Rage 4 East W.M. The two lots front on the west side of 42nd Ave- nue South between South 148th & South 150th and are separated by a 22 -foot driveway. This property is served by a 12" main 20' from site. The fire hydrant is within 300' and the rate of flow is 1,000 gallons per minute for a duration of 2 hours or more. Sincerely yours, WATER DISTRICT NO. 125, ijtJDV3 ISeaA44 Franklin Pearson, Superintendent. FP:ok August 25, 1989 Godlstar Acquisitions, Inc. 340 Mt. McKinley Dr. SW. Issaquah, WA 98027 Attn: Ron Ewart Subject: Sanitary Sewer Service Availability Legal Description: North 20 ft. of Lot 2 and all of lot 3 of King County Short Plat No. 1080043 recorded under Auditor's File No. 810825 -0691, being a portion of the Southeast quarter of the Northwest quarter of Section 22, Township 23 North, Range 4 East W.M. Sanitary sewer service is available to the above described property upon payment of a connection charge in lieu of assessment, based on the above description. Connection charge contract will be prepared upon request. Payment is required prior to connection to District facilities. North 20 Ft of Lot of Short Plat No. 1080043 -- $950.00 Lot 3 of Short Plat No. 1080043 -- $3,553.07 The owner will be responsible for the connection. to the existing stub: and extending a 6!' line within the W 5 ft of the 42nd Ave. S. Right- 'of-way North to serve Lot 3. Side sewer permits are $50.00 per each lot. Sincerely, VAL VUE SEWER DISTRICT T. . Matelich Manager TJM:dmg P.O. BOX 68063 SEATTLE, WA 98168 14816 MILITARY ROAD SOUTH BETTYLUNZ MICHAEL J. WEST DAVID L, RUITER COMMISSIONERS T.J. MATELICH MANAGER •., 206/242.3236 vvI&eVUlna rGI nDvI1I (POST WITH INSPE 'ION CARD AND PLANS IN A CONSPICUOUS LOCATION) CITY OF TUKWILA Department of Community Development - Building Division 6200 Southcenter Boulevard, Tukwila WA 98188 (206) 433-1849 BUILDING PERMIT NO. 5.8 3 3 DATE ISSUED: 12 -1-89 FEES DESCRIPTION AMOUNT RCPT # DATE ' BUILDING PERMIT FEE 207.00 lips- )24 1(4 PLAN CHECK FEE 135.00 3021 10- Z0 -.:' BUILDING SURCHARGE 4.50 39‘15- ,Z-/, ENERGY SURCHARGE OTHER: TOTAL - 346.50 PLAN CHECK 89 -32 PROJECT INFORMATION S 14835 42 Av S PROJECT NAME/TENANT Goldstar Ac•uisitions I c. TYPE OF • New Building • Addition • Tenant Improvement (commercial) ■ Demolition (building) Grading/Fill WORK: 0 Rack Storage 0 Reroof 0 Remodel (residential) ER Other: House Relocation DESCRIBE WORK TO BE DONE: Moving a 5 bedroom home from 12525 37 Avenue South to above address. SUI ALU U ASSESSOR ACCOUNT N 19.750,00 11. 11 -, ■ 11 PROPERTY OWNER 1 I . - 1 1/ 1 PHONE 391 -8 3 ADD -ESS 340 Mt. McKinley Drive S.W., Issaquah. WA ZIP 98027 CONTRACTOR NSA PHONE ADDRESS ZIP WA. ST. CONTRACTOR'S LICENSE # EXP. DATE ARCHITECT N/A PHONE ADDRESS ZIP CODE F. .' .1PLIANCE JSE Rocw*' � occ. LOAD -SQUARE FEET occ. LOAD SQUARE FEET OCC. LOAD SQUARE FEEL f' occ. LOAD SQUARE FEET 1 occ. LOAD TOTAL SQUARE FEET TOTAL OCC. LOAD TOTAL TYPE OF CONSTRUCTION: UBC EDITION (year) V -N 88. ' SETBACKS: N— S— E— W- =IRE PROTECTION' i�Sprinklers 0 Detectors ® N/A UTILITY PERMITS REQUIRED ?] Yes 0 No (through Public Works? ?ONING: R -1 BAR/LAND USE CONDITIONSDYes OD No .•N • I IONS (other than those noted on or attached topermit/plans): RI'HOVED FOR • BUILDING iSUANCE BY: .L,� ---, �' OFFICIAL DATE: //-'47—Y1 I hereby certify that I have read and : . mined this permit and know the same to be true and correct. All provisions of law and ordin . es governing this work will be complied with, whether specified herein or not. The granting of this permit does no presume to giv, : .1 • rity to violate or cancel the provisions of any other state or local laws regulating const on or the ., = rf' •• . or work. I am authorized to sign for and obtain this building permit. •IGNATU ' E. ,41.11 AWry 0 ,' DATE: / -/ —S. 2 RINT NAME: ,I q .. D W. 1 _ 4'2- COMPANY: Go ot- t)7i92 ACC 6 S /7iM) idle This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. ERTIFICATE OF CCUPANCY NO. DATE ISSUE SIDE SEWER DtrTFIL (NCB S.GAL£1 NOTES 1. LEGAL DESCRIPTION OF LOT: Lot 2, King County Auditor's File No. 16, 17, 18 and 19 thereof recorded i of King County, Wa quarter of the Nor 23 North, Range 4 lying westerly of County Tax Lot No. Short Plat No. 1 810825 -0691, bei of Adams Home Tra n Volume 12 of Y1 shington and situ thwest quarter of East W. M., in Ki 42nd Ave. South. 004100 -0230. 080043 recorded under ng a portion of Lots cts according to plat ats, page 50, records ate in the Southeast Section 22, Township ng County, Washington, Also known as King 2. DISTANCE, BEARING DATA and ELEVATIONS: nrli Site eleva invert ele drawings•f South 150t nd beari rvey and of surve File No. tions we vations, or 42nd h. Elevations were de each corner of the elevation point is ng data wer from Recor ys recorded 8401279006 e taken from the short plat d of Survey in Volume 38, on January 27, 1984 under ed from Manhol wer District a between South e No. 7 -43 s -built 148th and termined fo single -fam marked wit ✓ the eastern lot corners and ily residence. Each h a black square. 3. CONSTRUCTION: A single - family structure is to be moved from 3404 S. 126th to this site. The home is to be erected on site by the moving contractor and a full- basement foundation, constructed under. it. The structure will then be lowered to the foundation. 5. COMPLIANCE Building must meet requirements, (1) thru (_) , of letter dated from City of Tukwila to GOLDSTAR ACQUISITIONS, INC. T rk.w devek orn nt) - e f ►'e, no de tc rt son rf,d pr no County 511and rds • S. (56TH TOLERANCES IE %CEPT AS NOTFDI GOLDSTAR ACQUISITIONS, INC. 3,1 -84 :33 310 NAT. Nt i.E`t DR. S,W. 1S AQUARi WA. DRAWN BY CHK'D TRACED SCALE 1 " 10 ° MATERIAL DATE APP'O DRAWING NUMBER 11I1I1I1I1IIi1I1I1I1i1I1I1I1I1I1I1f1iN111I1I1HIUIpITHIHiIiI1I1 +111I1Ii1111i11 ITITi11 1111111111111 111111111111i1111 11.1.11111111i 1 111111111 1111111111111111111.11111111111 i 1 0 16 TITS INC.. 2 '3 EA 1 9 1O 11 MADE N GERMANi 12 his 4 5 6 7 • rNOT:ifthernicrcfilrncddocumentisiessc!earthni 2` N • S. 148 r" 0 h 141 la �+r ,I0 'c P N1 r, lJ i q • F OLIN 0A'rIo sL.A 1. SIDE SEW C. I? DETAIL (Na SGALF.'1 NOTES LEGAL DESCRIPTION OF LOT: Lot 2, King County Short Plat No. 108004 Auditor's File No. 810825 -0691, being a 16, 17, 18 and 19 of Adams Home Tracts a thereof recorded in Volume 12 of plats, of King County, Washington and situate i quarter of the Northwest quarter of Sect 23 North, Range 4 East W. M., in King Co lying westerly of 42nd Ave. South. Also County Tax Lot No. 004100 -0230. 2. DISTANCE, BEARING DATA and ELEVATIONS: Distance and bearing data were taken from the short plat 1080043 survey and from Record of Survey in Volume 38,. page 252, of surveys recorded on January 27, 1984 under Auditor's File No. 8401279006. or vex., setkon (,It� skis. rata J^ T W O . s cvl" 01. 21 0 3 5 a k WAT T.5 x - .3 PvC ( -V D S --TIr '4' 1 ,ii 4 1 1 n�� � 1 I i No to e : There is ! S - Thar) 5000 5,F rew devvk pne -it, �ti1e-fore, no &T6r -r- ion ° , recd u; red per King COir1'y S- i3fdrd_ (5O TH i 1- 1 J 2' 1.P, WJ 19,i2 R 6c TACK ,p,1.11111nHl11, , F. rA 0/ r•�J T;4'tij ;. f Tr ... oNn rA� Av.' \\Its w IJ 0 -J 1 3 recorded under portion of Lots ccording to.plat page 50, records n the Southeast ion 22, Township unty, Washington, known as King Site elevations were referenced from Manhole No. 7 -43 invert elevations, Val Vue Sewer District as -built drawings'for 42nd Ave. South; between South 148th and South 150th. Elevations were determined for the eastern lot corners and each corner of the sing -le- family residence. Each elevation point is marked with a black square. 3. CONSTRUCTION: A single- family structure is to be moved from 3404 S. 126th to this site. The home is to be erected on site by the moving contractor and a full- basement foundation constructed under it. The structure will then be lowered to the foundation. 5. COMPLIANCE TCLEFIANCES :¢xc¢F- ,s NOTEOi Building must meet requirements, O° t1) thru �}J' t) , of letter dated ..0111_1/4.12512 from City of Tukwila to GOLDSTAR ACQUISITIONS, INC. 1046,44-- -r-ov e.kloctc,163 DULii CITY OF TUKWILA APPROVED NO V i9 W0 !4 E3 '1LDI 1 !VISION RECEIVED CITY OF TUKWILA OCT 2 0 1989 PERMIT CENTER GOLDSTAR iCQUI I T IO45, INC. (391.8433 BY - .340 i'i i- . Mt.r<; NLE 1)11. S.W. ISSl•1Q11t4143 ACoB LOT 4t�Fti Ve .2. I . ., ,AI.E��i```ti DRAWN BY CHK'O TRACED SCALE DATE APP'D MATERIAL DRAWING NUMBER 10 x 14 MIRED 011 HA 100014 CL E4RPwHT • 11111111111111111111111111111 '1111 III' IIIIIIIITH11111' 1111111111111111111111111111111111111111111111111111111111111111, 11111111111111111111111liliii1111 .1111111.i.1ia1.11111 l`III11ililflil lii 0 1 2 i 5 6 7 8 .1 9 F 11 MADE tN GFPM4NY 12 r- ._ .....:- _�._... -.. �.. ......... __. . -._ _._. �...._.. ._.....__' 441 -O" VERIFY 91- 0" 41 of 9'- Oil FDU N DAT 10K #4 VERTICAL ( 12 "0/ ILO" MINIMUM FREE DRAINING BACK FILL 5CALE° Yf3"= 1' -01 r 1 1 1 J 11 2 A-I NOTES: 1) ALL EXTERIOR FOQ ING`$ TO BE ILO' MIN. BEI-ow L wEs-r ADJACENT GRADE. a) YERIFY ALL PIMEW5V2N5 PRIOR. TO POURING NEW FOLMPATIO IS. 3) VF RIFY ALL WINDOW L POOR LACATlONS IN MEW 6Ae.5En4 EN'T" AREA Vv /OWNER. PRIOR To F•QRm I Nc~ FOLi 4Ofv ' ION WALLS, 4� PROVIDE EMERGENC=Y E&RES5 FRorsl FiS^sEMENT PER. UP6C SECT ION 1.04. HOPz.ONTAL @ IE1ta /G ea 121 o.% 4" CONCRETE ! SL.A[2 a•- 4 COW". - 4I ExIS1-1NJG a" G DECr.IN EXISTING PLAT!~ tossg-ii- '114=M r '/_4A10e 48 % : 4 HQRIZ. 1211 4 VEIZT. G Ia " °k SECTION.] E- 1 SCALE: 34(' ,$ It-01I PROV 117E sr40K E PFT EcTt2f ° itv tASENI ENT WITH PQVVEIZ SUPPLY FROM BLatLPir'4c POWER, (■ w T 11 E -I PRaviDC II'J5UL.ATION PER SECTIOP! 6 016tT TABLE, 6 - I OF WA,5HINGTOi4 STATE ENERGY CODE AT ALL FRAMED WALLS) COI.ICR.ETE FOUNDATION VWALLS ","HAT HAvE I'-Oil OR MORE EXPOSED ABOvE: GR./0\PE. - 2.' -1-6; PECKING MEW GUY, Peg PLAN (TYP.) -- 6x6 WOOD 1705T w /51MP ON C.B6b POST S ASE -� 4 _ o 11N -Z EX I5TJN G HOUSE F R '\MI NG NEW SHEATHING TO FLOOR -- 1 rA P50t.1 CC54- COLUMN CAP 4" CO MC RET E SL/ \a, ---1 RI • . S• 31-0" x 31 -0" FT6. w/ 3 - 4 E, SECTION P -I SCALE: 3/411= 1' -OBI Ex13TING 2.4 T t PECKING SAG T; PLATE Vv/5/800 A.B. e 4e,"% U f--- EXISTING 4)( e= 48 "96 NEW 2x6 E I6'' MODU1_E \v / EXISTING -JOIST SPACING i44 e Ian% E, w. �11.11�=11 •, 4'1 CONCRETE 2--#4 cowl-. A LT' ErZNATE PETAL WHEN EARTH 15 L.E5`5 TH/\N 41-011 AQ >OVE 3�611 PLATE EA. ,510E VV/ 34 " M 4.6x6 x3 /8xl, 0" v.r /t? -*4 X 2. -0" vERT. ,X1`iIING 4xIO C 4&,,c. EXISTING 4x,iO P 401L .r .X{STiNC =I 4-A10 e q 3" C -I C- I F FLOC) ,R. FRA SCALE:. 0" Ex13TINCi 7 FPAMINIG I to VI ! \G PLAN 4 -16,J TOENAILS (TYP.) GLE) PER. PLAI•J SECT►O\• C I I� 3 1/8 x' % GLB 6-1/4") ExIsTNG at T G U>v'. 'C EXISTING DECKING SEC-PO SCALE: 3"= PRJW►ESD *N NO 1000/t C1 EARPRINf 11111WIIIIIIIIIIIIIIIIII 1111 1111I111I111IIIII111I111I111I11 !111111 11111111111111111111111111111 I�II11llil!II�III�III {1111111111111111111111111 I11I11II111I11111111 1111111111II111I1111111I 0 2 :"3 ti 0E: hc• EiG Li 41G �!< +/G EG ez l!G QG f�l el LL 91. SL 471 .. El Zl LL QI, G! 9 L 9 9 fl I Z Il P++N (I� II!!! 1111 !IIIII�III�IIII!I111II11!i1!!!! Nilpill!1I!II HIIIIIIIIII! 1; II11IIi111111 !JIIIIIII!I�l!!►Ii1I! wIlIII! mIl�lldm! I! 1!! I!!! 111110mil1!! i� !!IIlllf!III!!IIII!IlLillllll 0! 111! IIIIIIIII! III111111! IIIIfII! III1IIIII!! Illil !!I!Illil{iifllll�l!!i�ll!!1i1 1111 !!IIIIIII!II!I!!III!1!'ll!!II NOTE: If the microfilmed cocument is less clear then this notice, it is cue to the cuelity et the oripinel c'acurrent. 'sy ,,ran Q_1LN $ R -B..JL !y. g...' .. . CODE: UNIFORM BUILDING CODE, 1988 LI'C LPG?$: ROOF 25 PSF WIND 80 MPH ZONE, EXPOSURE " SEISMIC ZONE ITI FLOOR 40 PSF FOUHDAT1Qt : SOIL BEARING CAPACITY ASSUMED TO BE 2000 PSF. ALL FOOTINGS SHALL REAR ON UNDISTURBED EARTH OR SOIL COMPACTED TO 95% MODIFIED PROC'T'OR PRR ASTM D-- 1557. ALL EXTERIOR FOOTINGS SHALL BR 18 INCHES MINIMUM BELOW LOWEST ADJACENT GRADE. =OEM g : f'c = 2500 psi FOR ALL CONCRETE: MIXING AND PLACING OF ALL CONCRETE SHALL BE IN ACCORDANCE WITH THE tli3C AND ACI CODE 318 --83. PROPORTION OF AGGREGATE TO CEMENT SHALL BE AS SUCH TO PRODUCE A DENSE, WORKABLE MIX, WITH A MAXIMUM SLUMP OF 4 INCHES, WHICH CAN BE PLACED WITHOUT SEGREGATION OR EXCESS FREE SURFACE WATER. 3/4" CHAMFER ON ALL EXPOSED CONCRETE. REINFORCINQ STEEL: ALL REINFORCEMENT SHALL CONFORM TO ASTM A615- 82(S1) . ALL REINFORCING SHALL BE GRADE 60 (Fy = 60,000 psi; Fs = 24,000 psi). LAP CONTINUOUS REINFORCING BARS 36 BAR DIAMETERS IN CONCRETE 1' -7" MINIMUM UNLESS NOTED OTHERWISE. CORNER BARS (1' -7" BEND) WILL BE PROVIDED FOR ALL HORIZONTAL REINFORCEMENT. THE FOLLOWING MINIMUM COVER SHALL BE PROVIDED FOR REINFORCEMENT: A) CONCRETE CAST AGAINST & PERMANENTLY EXPOSED TO EARTH. 3" EARTH FACE B) CONCRETE EXPOSED TO EARTH OR WEATHER (CAST IN FORMS) 06 THROUGH #18 BARS 2" #5 BARS & SMALLER 1 -1/2" C) CONCRRTF NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND SLABS, WALLS & JOIST - #11 BAR & SMALLER 3/4" BEAMS & COLUMNS 1 -1/2" WELDED REBAR TO BE GRADE 40 CONFORMING TO ASTM A615- 82(S1) OR GRADE. 60 CONFORMING TO ASTM A706. (PREHEAT ALL GRADE 60 REBAR PRIOR TO WELDING.) USE FRESH E70XX LOW HYDROGEN ELECTRODES TO WELD GRADE 40' REINFORCING AND E90XX LOW HYDOGEN ELECTRODES TO WELD GRADE 60 REINFORCING; CONFORM TO PROCEDURES OF AWS D1.4 --79, RECABEEDEILERACTICE5 F2R...1ELDINr REINFOI2CIM "ITEE,.. REINFORCING TO BE WELDED SHALL NOT HAVE CARBON CONTENT IN EXCESS OF .45%. ALL WELDS TO BE BY WABO CERTIFIED WELDERS. ST D.E. RE & LEBOI .ONE M 5;(` : WELDS NOT SSPECIFIED SHALL BE 3/16" CONTINUOUS FILLET MINIMUM. ALL WELDS TO BE BY WABO CERTIFIED WELDERS. USE FRESH E70XX LOW HYDROGEN ELECTRODES, MISCELLANEOUS STEEL HANGERS TO BE SIMPSON OR APPROVED EQUAL. NAIL ALL HOLES WITH NAILS AS SPECIFIED BY MANUFACTURER UNLESS SHOWN OTHERWISE ON DRAWINGS. MACHINE BOLTS TO BE A-307; EXPANSION BOLTS INTO CONCRETE MAY BE "KWIK BOLTS ", "PARA BOLTS ", OR APPROVED EQUAL. MINIMUM EMBEDMENT FOR ANCHOR BOLTS PER UBC TABLE 26 -G. FRAMING LWOW: 4 X MEMBERS D F 02 fb 1250 psi. (0 X 6 WOOD POST ....... O. F- 0 1 .. , .. fc Ic$oo psi LUMBER NOT NOTED TO BE D.E. # 2 OR BETTER. ALL GRADES SHALL CONFORM TO WWPA RUTJES FOR WIC TER I�tlt� ER --� t981 EDITION. ALL BOLTS HEADS AND NUTS BEARING AGAINST WOOD SHALL BE PROVIDED WITH STANDARD CUT WASHERS. ALL WOOD IN CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESSURE TREATED. MAXIMUM MOISTURE CONTENT 19% AT INSTALLATION FOR ALL LUMBER. - LAMINATED„WQOU k1BER5: ftABDEACIVEE - MATERIALS, MANUFACTURE CONFORMANCE WITH AMERICAN NATIONAL aIRLUTARALALUED LAMIBATELLALUIRER, AND FOR STRUCTURAL GLUED LAMINATED TIMBER OF STRESS COMBINATION 24F -V4. AND QUALITY CONTROL SHALL BR IN STANDARD ANSI /AITC A190.1- 1983, . AITC 11T-DEUMEMEJIMEACZURINa SOFTWOOD SPECIES. TRE$,5 L11<LUES — THE GLUED LAMINATED TIMBER MEMBER: STRESS VALUES THAT MEET OR EXCEED THE FOLLOWING: BENDING, Fb HORIZONTAL SHEAR, iEv COMPRESSION PERPENDICULAR TO GRAIN Fc (tension face) Fc (compression face) MODULUS OF ELASTICITY, E 2400 psi 165 psi 650 psi 650 psi 1800 ksi FURNISHED SHALL PROVIDE SPEC'.AL CONDITIONS : DURING CONSTRUCTION THE CONTRACTOR SHALL PROVIDE ADEQUATE SHORING, BRACING, AND GUYING IN ACCORDANCE WITH SOUND PRACTICE AND ALL NATIONAL, STATE, AND LOCAL CODES. CONTRACTOR TO COORDINATE ALL TRADES AND VERIFY DIMENSIONS IN FIELD. OBTAIN ARCHITECT'S APPROVAL PRIOR TO ALL FIELD CHANGES. SEE ARCHITECTURAL DRAWINGS FOR ALL FLOOR AND WALL OPENING DIMENSIONS AND LOCATIONS, FLOOR AND WALL FINISHES, ETC. cuY ol` IUKWILI\ rio .219:9 6 ILD 11G DIVISION nderstand that the Plan Check approvals are • • ..,hxt to errors end a ni5sicns app-oval of ..ons • • , muthori;:e the .1 of any ref code Cr orc Dance. R rD �t�til'}at'�nc Date / _. Permit No env OF TUK.WIUk OCT 201 89 PERMIT CENTER of contractors ®YVO .04' 4 J' :,•�e yr •tip 6 ,N +'t 1 �• .40, es, C 1 = 11.1 S r *: 0 � <�' ; '.' -;. � ` r ' SHUTTER _ 1 ~ °14450{N.E.29th Betievue, �� r 3 f CONSULTING ENGINEERS Mace, Suite 104.. WA 98007 (206) 885473 FiR`:,Y FLOOR F Q.Arvf iMG PLAN`S.,. SECT !OHS FOE.. KJDb\TI0NI SCALE: N Crr CF D APPROVED BY: DRAWN BY OK, H DATE: 9 .2 I - 89 HOUSE FLOOD A'OOB f._O"i" REVISED FRAMING -- 42_ AVE FOUMOATION AT: . S ' - _`f" li KW I L A, WA DRAWING N MBER 5- I I