Gentlemen:
INTRODUCTION
Jack A. Benaroya Company
5950 Sixth Avenue South
Seattle, Washington 98106
Attention: Mr. Jim Bakke
IDA n' t S 0 C E
CONSULTANTS IN THE ENVIRONMENTAL AND APPLIED EARTH SCIENCES
July 26, 1976
Report of Inspection
Proposed Cut for Railroad Realignment
Giovanneli Property
Tukwila, Washington
BEIRUI MELBOURNE
CALGARY PERTH
JAKARTA SINGAPORE
JOHANNESBURG SYDNEY
LAGOS TEHRAN
LONDON TOKYO
MADRID TORONTO
VANCOUVER,O.C.
1'AIROAN1S SYRACUSE
HONOLULU WASHINGTON,D.C.
WHITE PLAINS
Pat 2 3 ' I t /
SUITE 500,NORTHGATE EXECUTIVE CENTER • 155 N.E.100"_'' STREET • SEATTLE,WASHINGTON 98125 • 1206) 523 -0560
CABLE: DAMEMORE TWX: 910-444 -2021
At the request of Mr. Jim Bakke, we have made a brief reconnaissance of a
hillside cut area on the Giovanneli Property. The cut involves the removal
of material from the nose of a ridge to form the right -of -way for a
realigned railroad spur. We recently developed preliminary comments and
recommendations concerning the proposed cut, based on the results of
borings performed at nearby locations and our general knowledge of the
area. These comments and recommendations were given to you in a letter
dated July 20, 1976. In this letter we recommended a tentative design
slope of 1.25:1 (horizontal to vertical) with 10 -foot wide benches at
approximate 40 -foot intervals in elevation. This recommendation was
made with the understanding that we would provide inspection during the
excavation and that a program of erosion protection would be carried out, •
consisting of initial seeding with grasses followed by planting with
deep- rooted vegetation. Reseeding of exposed soil is to be accomplished
as soon as possible following excavation.
We understand that the City of Tukwila has expressed concern over cutting
the ridge, in view of previous experiences in the vicinity of the Tukwila
Interchange, where cuts of moderate steepness have initiated large -scale
earth movements. On July 21, 1976, an engineer from our staff inspected
soil exposures in limited areas at the base of the ridge where grading
and clearing had been initiated. The purpose of this inspection was to con-
firm the existence of intact, glacially consolidated soils as assumed in our
SITE CONDITIONS
DA%VVIES 0 M COO RE
Jack A. Benaroya Company
July 26, 1976
Page 2
letter of July 20, 1976, to determine the geological relationship of the
exposed soils to the nearby surroundings, and to identify any conditions
which might affect the stability of the slope.
The soil exposures examined during this site visit consist of an initial
cut extending from approximately Elevation 30 at the base of the ridge
up to Elevation 50 to 55, and a small cleared area on the side of the
ridge south and west of this cut lying at approximately Elevation 60.
The soils exposed in the cut consist of very dense to hard silty sands
and sandy silts in the upper portion of the cut, grading to very dense
medium sands near the toe of the ridge. The lower sand contains little
or no fines. All of these soils have been preconsolidated under the
weight of glacial ice. The excavation was started by undercutting the
bank such that, at the time of our inspection, the upper part of the
slope was overhanging the base. As a result of this oversteepening, a
significant amount of the sandy material had sloughed down from the
exposed cut face.
The small cleared area, at approximately Elevation 60, exposes the contact
between a very dense silty fine sand and an underlying hard silt stratum.
The silty sand just above the contact was slightly damp; however, no
trace of seepage could be found in a close examination of the general
area. The near- surface portion of the silt, which was exposed in this
cleared area, is jointed. The joint surfaces are oxidized to a dark
brown and reddish brown color.
Seepage was noted at the toe of the
from a layer of clean, medium sand.
at or below Elevation 30. No other
of the ridge within the area of the
DISCUSSION AND RECOMMENDATIONS
ridge at several locations, emanating
All of the seepage areas occurred
seepage was noted in a reconnaissance
proposed cut.
The results of our inspection, together with previous explorations upslope
from the proposed cut area, indicate that the materials within the area
affected by the cut are of a different geologic sequence than the
relatively unstable, highly fractured silt deposits of Vashon Age which
lie to the north. The hard silt stratum at the site consists of a pre -
Vashon deposit similar to that encountered in the adjacent borrow areas
to the south. This stratum is relatively intact and exhibits good
engineering properties.
We understand that the proposed railroad alignment will lie at approximately
Elevation 22 in the vicinity of the cut, well below the level of seepage
®IA inn ES 8 PAICODIR E
Jack A. Benaroya Company
July 26, 1976
Page 3
noted during our inspection. We therefore recommend the following
measures and procedures to provide control of ground water and maintain
stability of the slope during the excavation.
1. The initial operation should consist of excavating a shallow
trench or a series of trenches down the slope within the planned
cut area to allow an early examination of soil conditions and
stratification. This could be accomplished in conjunction with
access and clearing work; a bulldozer cut would be satisfactory.
2. We strongly recommend that excavation Of the ridge to rough
grade proceed from the top of the'ridge downward, rather than
cutting from the toe.
3. The benches should be cut as the excavation progresses. The
actual location of benches across the cut should be determined
in the field, based on conditions encountered as the face of the
cut slope is approached during excavation. The 40 -foot vertical
interval for benches is intended as a guideline; closer spacing
may be dictated by field conditions. The benches should be cut
at a reverse slope, graded to carry slope runoff to the north
edge of the cut. From this point the water should be carried
downslope in closed pipes or protective channels and routed
into the planned roadbed drainage system.
4. Seepage will encountered as the excavation approaches the toe
of the proposed cut. At this point test pits should be excavated
to the level of the railroad alignment to allow evaluation of
seepage conditions and the most suitable means of controlling
these conditions. This control could be accomplished by
construction of an interceptor drain below the level of the
roadbed or by the installation of horizontal drains at the toe
of the cut. Alternative means may be feasible for the control
of seepage, depending on the conditions which are encountered
during construction. Any trenching or excavation which extends
below the level of seepage along the face of the cut should
be accomplished in a series of horizontal stages so that at any
given time the maximum length of open excavation is 25 feet. A
possible method of seepage control is schematically' illustrated
on Plate 1.
5. Regardless of the method of seepage control, we recommend that
the lowest portion of the cut face be buttressed with a layer
of angular free - draining rock extending up to the level at
which seepage is noted during excavation. The rock should be
IDAIVIIES $ INIOORE
Jack A. Benaroya Company
July 26, 1976
Page 4
separated from the slope face by a graded filter blanket or
a layer of manufactured filter cloth. Quarry spalls or crushed
rock at least 4 inches in average minimum dimension is desired
for the buttress. A suggested buttress configuration is shown
schematically on Plate 1, together with the interceptor drain.
6. As described in our letter of July 20, 1976, we recommend that
protection against erosion from surface runoff and seepage be
acomplished through a phased program of seeding and planting
implemented in conjunction with or immediately following excavation.
We recommend that all phases of the excavation be observed by a competent
soils engineer or geologist, who would provide recommendations for bench
locations, adjustments to the design slope angle, or other measures as
indicated by observed soil and ground water conditions. We further
recommend that the completed slope be inspected on a monthly basis during
the first winter season to check for uncontrolled seepage, erosion, or
other indications of instability which might require attention.
We appreciate the opportunity to assist you on this project and look
forward to working with you during the grading operations. Please
contact us if you have any questions concerning this report or if we .
could be of further assistance.
JKT:WJG:ss
4 copies submitted
4368- 024 -05
Yours very truly,
DAMES & MOORE
By
Jack K. Tuttle
Partner
0
0 . .
W
O
A C GeAAiaa T/c.Ttr .
Oil . = ;C/Tt.4
F,Lr/s ,V r/4 431.IG.
46 of. S - Pok-a - :
I- rZi /6 Cx'G/l✓'i r cm.)
S C NE MAT /G l Lt. cl_Sre4noil OF
PO-5=-3 /Bi 6 $Eg P&, C.f v i .24. >4, A1 -THc .0
Fgeg"- R.ex. -
/MPCiL'Vio b3ALKl= /41,_,
`..... - DR/9 /.Ji4/G
a.m.= ' s moose',
REPORT
SOILS INVESTIGATION
PROPOSED COMMERCIAL DEVELOPMENT
TUKWILA, WASHINGTON
for the
JACK A. BENAROYA COMPANY
f
DAMES & MOORE
4368- 022 -05
June .28, 1976
i
Ay...to PAGE
ATL
LILT HESDA
1111.11105
BOCA RAT011
BOSTON
CHICAGO
CINCINNATI
CRANFORD
GEtIV EP
IROUT70N
LOS ANGE.C'
NEW ORLEANS
NEW YORK
PHOENIX
PORTLAND
SALT LAKE CITY
SAN FRANCISCO
SANTA DARDARA
SEATTLE
FAIRBANKS SYRACUSE
- HONOLULU WASHINGTON, D.G.
WHITE PLAINS
SUITE 500, NORTHGATE EXECUTIVE CENTER • 155 N. E. 100 ?H STREET • SEATTLE, WASHINGTON 98125 • (206) 523-0560
CABLE: DAMEMORE TWX; 910-444 -2021
Jack A. Benaroya Company
5950 Sixth Avenue South
Seattle, Washington 98108
Attention: Mr. Robert Fehnel
Gentlemen:
We submit herewith four copies of our "Report of Soils Investigation,
Proposed Commercial Development, Tukwila, Washington," for the Jack A.
Benaroya Company.
The scope of work was developed in discussions between the writer
and Messrs. Robert Fehnel and Kenneth Long of the Jack A. Benaroya
Company. The scope of work is described in our revised proposal dated
May 21, 1976. Authorization to proceed with the investigation was given
verbally by Mr. Fehnel.
This report deals principally with development of the Parkway Plaza
North site. However, we also have considered the proposed railroad spur
crossing the Giovanelli property. During this study, a test boring was
drilled at the Parkway Plaza West site, supplementing a previous test
pit exploration program at that site.
Our findings and recommendations have been provided to you verbally
as they were developed. A preliminary report giving recommendations for
site preparation and foundation support for the Parkway Plaza North complex
was delivered to you on June 17, 1976. It is our opinion that the site
can be satisfactorily developed by, means of a closely monitored surcharge
program.
We appreciate the opportunity to serve you on this project and look
forward to assisting you in your final studies on the Giovanelli and Parkway
Plaza West sites. If you have further questions concerning our report,
or if we may be of further service, please contact us.
WJM:WJG:
DAMES a ®ARE
CONSULTANTS IN THE ENVIRONMENTAL AND APPLIED EARTH SCIENCES
June 28, 1976
Yours very truly,
DAMES & MOORE
William J.
Associate
BEIRUT MELBOURNE
CALGARY PERTH
J AKARTA SINGAPORE
JOHANNESBURG SYDNEY
LAGOS TEHRAN
LONDON TOKYO
MADRID TORONTO
VANCOUVER, B.C.
REPORT
SOILS INVESTIGATION
PROPOSED COMMERCIAL DEVELOPMENT
TUKWILA, WASHINGTON
for the
JACK A. BENAROYA COMPANY
INTRODUCTION
GENERAL
In this report, we present the results of our soils investigation at
the site of a proposed expansion of the Parkway Plaza complex in Tukwila,
Washington. Our work has been concentrated in the prime area of interest
which consists of approximately 12 acres lying east of Southcenter
Parkway and north of the existing Jafco Store which will be developed
as Parkway Plaza North. Dames & Moore previously performed a soils
investigation for the Jafco development which included two borings
within the present building area and a number of other borings in the general
vicinity of the site. The results of this previous investigation were
given in our report to the Jack A. Benaroya Company dated May 15, 1972.
Because of the available information concerning conditions at the site,
our present exploration was limited to one boring to confirm the extent
and condition of the subsurface materials.
In addition to this area, we have also performed a limited amount of
work for two sites located on the west side of Southcenter Parkway. A
portion of the northern site, known as the Giovanelli property, has been
explored to assess conditions underlying a planned railroad spur realignment.
-1-
DAMES $ MOORE
-2-
A single boring was drilled in the southeast corner of the southern site,
which will be developed as Parkway Plaza West. The purpose of this boring
was to supplement subsurface information developed during a previous
investigation which was summarized in our report dated May 3, 1976.
DESIGN CONSIDERATIONS
We understand that the proposed Parkway Plaza North development
will consist of a continuous one - story, tilt -up concrete structure which
will house a number of retail showroom facilities. Finish floor grades
for the structure will vary from Elevation 21.5 to 22.75, generally on
the order of 1 foot or less above the average existing grade. Floor loads
are expected to be light, on the order of 125 pounds per square foot.
We understand that interior column loads will be on the order of 65
kips or less. Exterior wall loads on the order of 1,300 pounds per linear
foot will be supported on continuous footings.
In 1973, excess material from the Jafco surcharge was stockpiled
within portions of the presently planned building area. The stockpile
presently extends 8 to 12 feet above the surrounding grade and has acted
as a long -term surcharge over the area. The location of the surcharge
stockpile is shown on Plate 1.
Current planning calls for an accelerated building program such
that only a limited time, on the order of 30 days, will be available
for surcharging of the building areas which lie outside of the limits of
the existing fill stockpile.
A railroad track presently crosses the site between the existing
surcharge and the Jafco store, extending across Southcenter Parkway. A
DAMES 8 MOORE
second spur track crosses the site north of the surcharge, terminating
at Southcenter Parkway. Current plans are to extend this second spur to
the west across the currently undeveloped Giovanelli site to service
properties on the west side of Southcenter Parkway. This would permit
removal of the track presently in use.
PURPOSE AND SCOPE OF WORK
The purpose of our investigation is to further delineate soil condi-
tions at the primary site for the areas where existing information is
insufficient, to develop site preparation and foundation support recom-
mendations for this site, and to provide additional information for the
two sites lying west of Southcenter Parkway. Specifically, the scope of
our work includes:
1. Recommendations for site preparation for building areas located
outside of the existing stockpile. These recommendations include
magnitude and duration of a surcharge program together with
special considerations for that portion of the surcharge which
will be placed in close proximity to the existing Jafco building.
2. Criteria for foundation support for buildings supported on
spread footings, including soil bearing pressures.
3. Criteria for placement and compaction of fill material as required
for support of building floor slabs.
4. Estimates of settlement due to fill and building loads which
would occur in conjunction with our recommended surcharge program.
5. Recommendations for a program of monitoring surcharge performance
to permit removal of the surcharge at the earliest possible date.
-3-
'MAMMIES 8 I OORIE
6. Recommendations for preparation of the railroad spur extension
crossing the Giovanelli site.
7. Additional information and comments concerning the sites lying
west of Southcenter Parkway, based on the additional explorations.
SITE CONDITIONS
PARKWAY PLAZA NORTH
Surface Features: The site of the proposed development is situated
on the floor of the Green River Valley, west of the present river channel.
The south portion of the site, covered by an asphalt parking lot for the
Jafco facility, is essentially level at Elevation 22. The pavement
extends approximately 300 feet north of the south property line. A
railroad spur presently crosses the site in this portion of the property,
extending across Southcenter Parkway. A second spur track crosses the
site along the northern property line adjacent to the existing fill stock-
pile. The stockpile occupies an area of approximately 500 feet by 350
feet in plan dimension in the northeastern portion of the site. The
stockpile extends upward to Elevation 29 to 30 feet except in the south-
western corner of the pile where the fill material was placed up to
Elevation 33 to 34 feet. North of the paved area and west of the stock-
pile, the existing ground surface is undeveloped and overgrown with weeds.
The ground surface is relatively level, varying from Elevation 21 to 22
feet except along the western edge of the site, where it slopes downward
slightly to approximately Elevation 20 feet adjacent to Southcenter
Parkway.
Subsurface Conditions: Our present exploration at the Parkway Plaza
North site consisted of drilling Boring 76 -3 to a depth of 40 feet. This
-4-
IDATAES MOORH
C
s
boring was located as shown on the Plot Plan to supplement existing
information from previous explorations within and adjacent to the planned
building area. The log of the boring is given in the appendix, together
with results of laboratory tests and detailed descriptions of the field
explorations and laboratory procedures.
The general area, including the present site,was developed in 1965
and 1966 by placing fill to approximately Elevation 22. At our boring
locations in the general site area, fill ranges from approximately 6
to 9 feet in thickness. Fill appears to be thicker in the southern and
central portions of the site, decreasing to 6 feet beneath the existing
fill stockpile and the undeveloped area in the northwest. Fill soils
encountered in the borings generally are compact. The fill consists
primarily of layered sandy silt and silty sand with occasional clay soils
and pockets of reasonably clean sand. For the most part, the fill is
sufficiently fine - grained to be water sensitive. Consequently, in
exposed areas the surface of the fill may have softened somewhat, probably
on the order of 3 to 6 inches in thickness. However, in local areas, the
thickness of soft material may be somewhat greater. The lowest portion
of this original fill is relatively loose since proper compaction was not
possible immediately above the underlying soft natural soil. This zone
of less compact material is thought to be on the order of 1 to 2 feet
in thickness across the site.
The native soils underlying the site consist of a complex series of
alluvial deposits laid down by the Green River. The alluvium is variable
in its characteristics, ranging from organic silt and peat to relatively
clean sands. The thickness of the alluvium varies significantly across
-5-
IaAPVIES ti YIOORE
c
-6-
the site. The bottom of the alluvium lies at an estimated elevation of
-10 feet or higher in the westernmost portions of the site; whereas, it
may extend as deep as Elevation -90 feet along the eastern property line.
On the basis of borings drilled during this and previous investigations,
we have divided the alluvial deposits into three general units. In order
of increasing depth, these are:
Unit A - Deposits consisting generally of sandy, clayey and organic
silts, and occasional peat. Typically, the various soil types
are interbedded in layers of varying thickness. At the location
of the Parkway Plaza North complex, this unit is believed to
range from approximately 15 to 30 feet in thickness, with the
thickness increasing toward the north and east. This deposit
ranges from moderately compressible to compressible in nature
and is characterized by generally low strength.
Unit B - This unit is a deposit of generally granular material con-
sisting of fine to medium sand with occasional thin layers of
silt or silty sand. At the location of Boring 76 -3, the upper
6 feet consists of interlayered silt, sand, and organic silt.
The unit appears to be discontinuous across the site, occurring
only in the eastern two - thirds. Generally the thickness of the
deposit is on the order of 30 feet or more within the building
area except for the western portion the northern building wing.
This unit possesses'high strength and is only moderately
compressible.
Unit C - This unit consists chiefly of clayey silt and /or organic
silt but also contains occasional layers of silty sand and sandy
DAMES S MOORE
silt. As with Unit B, it is discontinuous across the site,
occurring in the eastern portion. The thickness generally
ranges from 15 to 20 feet, increasing toward the northeast.
In summary, the total thickness of the alluvial deposit increases signifi-
cantly to the east and north, away from Southcenter Parkway. The
alluvium is underlain by relatively incompressible granular marine
deposits in the eastern portion of the site and by glacially preconsoli-
dated material to the west.
Based on the ground water levels observed in the current boring and
in previous borings at the present site, we estimate that the normal
water level ranges between Elevation 9 and 13 except during the wettest
portion of the year when higher levels may occur in conjunction with flood
stages on the Green River.
GIOVANELLI PROPERTY
In order to examine subsurface conditions for the proposed railroad
spur realignment, Boring 76 -1 was drilled and a number of hand probes
were made at the locations shown on Plate 1. The boring log is given in
the appendix; the results of the probes, which were performed to deter-
mine the thickness of soft soils, are summarized on Plate 1. That portion
�f the alignment near the Parkway is relatively level at Elevation 18 to
19, some 2 feet below the street grade. The surface is hummocky with
standing water in low areas. The site is overgrown with weeds and young
trees. Approximately 150 feet away from the street, the ground surface
begins to rise at a moderate slope to the west, up to Elevation 30 to 34
some 250 feet from the street. At this point the toe of the valley wall
is encountered in the form of a steep ridge running to the northwest.
-7-
DAIVI E3 ti MOORE
The near - surface materials in the low -lying area consist of wood and
brush in a matrix of soft silt and sandy topsoil. At the time of our
exploration the condition of the existing surface was such that the
drill rig mounted on an all- terrain vehicle was unable to reach a second
boring location in the interior of the site. This surface material is
underlain by peat with layers of silt and organic silt, extending to a
depth of 24 feet in our boring. The thickness of this soft, very compres-
sible deposit decreases to the west and tapers out in the vicinity of the
toe of the ridge. We expect that conditions along the railroad spur
alignment are generally typical of the site as a whole.
In Boring 76 -1, the peat deposit is underlain by approximately 10
feet of medium dense fine sand. The lower 5 feet of this unit graded
more dense to silty fine to medium sand. The boring was terminated
after penetrating a short distance into a layer of very dense fine gravel
having some coarse sand and a trace of organic matter. All of the granular
deposits below the peat were water- bearing and exhibited a slight artesian
head.
Based on previous explorations of the hillside, we anticipate that
the ridge is composed primarily of glacial deposits ranging from unsorted
till to sorted deposits of silts and sands. These soils should be
relatively strong and incompressible in their undisturbed state; however,
they generally contain enough silt to be susceptible to softening when
exposed to moisture.
PARKWAY PLAZA WEST
Site conditions at this location were described in our report dated
May 3, 1976 and will not be repeated in detail here. In the previous
-8-
DAMES 8 MOORE
report, the site was subdivided into three areas; good soil conditions,
intermediate soil conditions, and poor soil conditions. Our present work
consisted of drilling Boring 76 -2 in the southeast corner of the site in
order to define the depth of poor soil conditions. Test pits excavated
in this area during our previous exploration were terminated in peat or
organic silts at the maximum extent of the backhoe.
Boring 76 -2 encountered fill soils to a depth of approximately
10 feet below the surface. The fill was underlain by a deposit of inter -
layered peat and organic silt extending to a depth of 27 feet. The
lowest 5 feet of this deposit consists primarily of silty sand interlensed
with peat and silt. From this level to a depth of 40 feet, complex deposits
of medium dense to very dense granular soils were encountered. These
soils are believed to have originated from erosion of the adjacent
hillside. The boring was terminated after penetrating 9 feet of stiff
gray silt lying beneath the alluvium.
The thickness of fill soils in Boring 76 -2 is somewhat greater than
encountered in our test pits. We anticipate that this is a localized
condition.
DISCUSSION AND RECOMMENDATIONS
GENERAL
Based on the information obtained from the borings performed during
the present and previous investigations and the results of our current
analyses and evaluations, we conclude that the Parkway Plaza North site
may be satisfactorily developed by means of a closely monitored surcharge
program. On this basis, the footings and floor slabs may be supported
on existing or newly placed compacted fill.
-9-
DAMES 8 MOOR@
Development of the site is complicated by the presence of the
existing surcharge stockpile in the central portion of the planned building
area, and by the presence of the Jafco structure adjacent to the southern
building line. In general, our recommendations consist of using the
stockpiled fill to surcharge those portions of the building area which lie
outside of the present stockpile configuration. The surcharge should
exert loads significantly greater than those imposed by the planned dead
and live loads, to preinduce most of the anticipated settlement prior to
construction of the facility. Under present scheduling, only a limited
time is available for surcharging; however, surcharge heights in the
vicinity of the existing Jafco structure must be limited to prevent
damage or significant settlement from occurring within this structure.
Some postconstruction settlement of buildings and floor slabs will occur
but should be relatively uniform except at those points where the building
crosses the limits of the existing fill stockpile. At these locations,
we anticipate that minor distress may occur in building walls but that no
significant structural damage will occur. Most of the postconstruction
settlement will be long -term areal settlement associated with secondary
compression of the underlying organic soils.
Regarding the Parkway Plaza West site, the conditions encountered in
Ij
1 Boring 76 -2 emphasize the variation in the depth of materials within the
poor soils zone. We anticipate that difficulties may be encountered in
predetermining proper lengths for driven piles, making the use of auger -
cast concrete piles a reasonable alternative. We strongly feel that
further investigation of subsurface conditions will be required, both
for this site and the Giovanelli property, when specific building locations
and development plans are formulated.
-10-
DAMES 8 MOOR
AREAL SETTLEMENTS AND SURCHARGE PROGRAM
The combined weight of structural fill and anticipated structural
and floor loads would cause substantial and variable settlements resulting
from consolidation of compressible subsurface soils. We estimate that
settlement would range from approximately 2 to 5 inches across the site
depending upon the thickness of compressible material and the actual
imposed loads. In order to allow as much of this settlement to occur in
advance of building construction as possible, we recommend that building
areas be surcharged with excess fill. Recommended elevations for the
surcharge fill are shown on Plate 2.
We recommend that the top of the surcharge fill extend horizontally
at least 10 feet beyond the walls of the proposed building in those areas
which lie outside of the existing fill stockpile. In transition areas
between the existing stockpile and the new surcharge, the crest of the new
surcharge should be approximately coincident with the crest of the old
stockpile. Along the southern limits of the planned building area,
adjacent to the existing Jafco facility, the crest of the surcharge should
extend only to the southern building line such that the crest approaches
no closer than 15 feet to the existing Jafco structure. Along the
northern building line, the crest of the surcharge fill should approach
as closely as possible the existing railroad spur without encroaching
upon the railroad easement.
In order to monitor the effect of the surcharge, we have provided our
recommendations for settlement marker locations within the surcharge
areas and established a schedule for reading these settlement markers.
This program is underway and has consisted of taking readings three times a
DAMES S MOORRE
week, both during and after fill and surcharge placement. The settle-
ment marker data should be submitted promptly to our office for review
and evaluation of the effectiveness of the surcharge program. We under-
stand that the existing railroad spur which crosses the southern portion
of the building area will have to remain in service during the full extent
of the surcharge period. The surcharge should be carried as close to the
railroad alignment as possible to minimize the effect of the discontinuity.
Assuming that the surcharge remains in place approximately 30 days,
we estimate that postconstruction settlements will be on the order of
1 inch or less. Because the existing fill stockpile has been in place
for several years, we anticipate that essentially no settlement will
occur in this portion of the building area; therefore, a potential exists
for differential settlement of approximately 1 inch between the edge of
the stockpile and the adjacent newly surcharged areas. We anticipate
that this differential movement would take place across a span of approxi-
mately 30 to 40 feet. Postconstruction differential settlements will
also occur between the recently surcharged building areas and the adjacent
yard areas. Such movement should be anticipated in planning utilities.
We recommend that gradients somewhat steeper than normal be provided for
gravity flow utility lines servicing the structures. Where possible,
gravity lines within the structure should drain away from, rather than
into, the area which had been overlain by the previous stockpile.
FOUNDATION SUPPORT
Following the recommended surcharge program, we recommend that
footings for the proposed structure be founded in the existing compacted
fill or in the newly placed structural fill. The footings should be
-12-
!DAMES 8 MOORE
founded at least 18 inches below the lowest adjacent grade and should be
underlain by at least 4 feet of dense soil. We anticipate that most of
the footings will be founded within or just above the older existing fill.
Some advantage will be gained by the use of a continuous wall footing
under the periphery of the buildings as such a footing would tend to
bridge over any local spots of softer fill. We recommend that all footing
excavatings be examined by a soils engineer to evaluate the adequacy of
the fill material to provide proper footing support. Should soft areas
1 inch or less. The effect of differential settlement between exterior
footings and the adjacent floor slab could be minimized by delaying the
construction of the outermost portions of the floor slab until after the
1 wall panels have been positioned on the footing.
be found in the bottom of footing excavations, we recommend that the
soft material be removed from below the footing location and replaced
with granular fill compacted to at least 95 percent of maximum dry density
based on the AASHTO Compaction Test Procedure (Specification T -180).
Assuming that footings are designed and installed as described above,
we recommend an allowable soil bearing pressure of 2,500 pounds per square
foot. This value is intended to apply to the total of all loads exclusive
of the weight of the footings and any backfill placed over the footings.
For footings designed in accordance with these recommendations, we
estimate that settlements due to structural loads will be on the order of
FLOOR SLAB SUPPORT
We recommend that slab -on -grade floors be supported on a compacted
base consisting of either a minimum of 4 inches of crushed rock or 6 inches
of clean, free - draining granular fill which will serve as a uniform
-13-
DAMES 8 MOORE
c
base and a capillary moisture break. A moisture barrier beneath the floor
slab would be desirable to minimize the potential for condensation along the
bottom of the slab. If no barrier is used, the possibility of condensation
should be considered in selecting floor covering and adhesives.
Some small variations in floor settlement may occur across the slab
as a natural consequence of variations in floor load, as well as the depth
and thickness of compressible layers. More significant variations will
occur in transition areas between the old fill stockpile and the recently
surcharged areas, as described previously. Differential settlements on
the order of 1 inch in 30 or 40 feet could occur in these zones. For
floor slabs in areas such as this, it may be desirable to reinforce the
slab with reinforcing rod rather than wire mesh, particularly since the
surcharge loading is of limited duration.
SITE PREPARATION
We understand that the structural and surcharge fill which was recently
placed in the northwest wing of the building area was installed without
specific compactive effort other than the traffic of the construction
equipment. The subgrade level in this portion of the building will be
very near the original site grade. We recommend that this portion of the
building area be proof rolled with a heavy compactor or similar equipment
after the surcharge has been removed to detect any areas of soft or
loosened soils. These areas should be overexcavated and replaced with
properly compacted granular fill.
We understand that it is presently planned to scarify and pulverize
the existing asphalt pavement within the building area and to incorporate
it within the structural fill. We are of the opinion that a great deal
of effort will be required to reduce the pavement to a size small enough
-14-
DAVI ES 8 11.410014E
ii
(approximately 4 inches maximum dimension) to allow a uniform degree
of compaction to be attained such that no voids exist within this material.
A more effective procedure would be to remove the asphalt and replace it
with compacted soil fill. If the asphalt is to be utilized as fill, we
recommend that all footings be founded below the level of the asphalt
fill.
We recommend that all permanent structural fill be compacted to at
Ii least 95 percent of the maximum density determined by the AASHTO Compaction
Test Procedure T -180. Surcharge fill need not be compacted to any specific
g P Y P
compaction criteria but must be sufficiently firm to support construction
equipment. The subgrade level which is exposed after removal of the
surcharge should be proof rolled prior to the placement of floor slab
base material to identify possible soft or loose areas. The portion of
the building area within the existing stockpile area also should be
1 proof rolled. Any soft areas should be scarified or overexcavated and
replaced, and recompacted to 95 percent maximum density.
RAILROAD SPUR REALIGNMENT
We assume that the realigned railroad spur across the Giovanelli
property site will be placed at approximately Elevation 21. On this basis,
it will be necessary to overexcavate the upper portion of the peat and
backfill it with granular fill. This will serve to distribute the
pressure induced by railroad traffic to reduce stresses in the underlying
organic soils. We recommend that the excavation be carried deep enough
to provide a minimum of 6 feet of compact granular fill beneath the top
of the ballast material. The backfill zone should extend laterally a
distance of 9 feet on either side of the track centerline. To optimize
the stability of the track, we recommend that a pit -run sand or sand and
-15-
IDAVA ES a MQOIR
gravel be used. Unless the water level is maintained below the bottom
of the excavation during fill placement, the backfill should contain less
1 than 5 percent fines (defined as material passing the No. 200 sieve).
We estimate that the placement of granular fill, as described above,
will result in total settlements of up to 2 feet or more in the deepest
portion of the peat deposit. We anticipate that most of this settlement
will occur rapidly; however, secondary compression within these organic
soils will be significant. We anticipate that about 60 percent of the
total settlement will occur within two weeks after the alignment is brought
to grade. We therefore suggest that final grading of the alignment be
delayed for at least this period of time. More rapid settlement could
be induced by surcharging the alignment with 3 to 4 feet of excess fill.
The magnitude of settlement could be reduced significantly by the use
of a competent lightweight fill such as cinders. We understand that the
practice of constructing railroad embankments from cinders has not been
used since the demise of the steam engine; however, if some other source of
lightweight aggregate can be located, there are positive benefits to be
gained in reduced settlements.
Plate 1 - Site Plan
Plate 2 - Recommended Surcharge Program - Parkway Plaza North
Appendix - Field Exploration and Laboratory Testing
June 28, 1976
4368 - 022 -05
c
-o0o-
The following plates and appendix are attached and complete this report:
-
Respectfully submitted,
DAMES & MOORE
By
William J. N4urphy,
Associate
CDAINOES a FtlOOR
SEE INSET A
67 -2
67 -3
L
BORING 76-1-95,
REFERENCE:
UNDATED JACK A. BENAROYA CO.
DRAWING ENTITLED SITE PLAN"
0-72 -8
4 ea::.:: .
TOE OF SLOPE
72 -7
PROPOSED PARKWAY
PLAZA NORTH
GIOVANELLI
PROPERTY
CREST OF EXISTING
FILL STOCKPILE
1
■
PROPO T
GE gy0TH RS
BORING 76 -3
4f: 29 fk
■
{0.72 -4
NOTE:
SOIL CONDITIONS ARE KNOWN ONLY AT
TEST PIT LOCATIONS, SINCE THE ZONE
LIMITS WERE PRIMARILY DERIVED FROM
RELATIVELY FEW EXPLORATIONS, SOME
VARIABILITY IN ACTUAL CONDITIONS
FROM THOSE SHOWN IS TO BE EXPECTED.
ER P
SOUTHCENT
BOP
2.
-3
P Ai kKN°1
tk 1 E
26
It
/NE
loll
It
'ED.
72-I
PARKWAY PLAZA
22
2d•
WESTERN CURB
.NTER FARAWAY
PROPERTY LINE
BORING 76-I
• 23'
•18'
PROBE LOCATION AND
DEPTH OF PENETRATION
•13 •15'
INSET A
FEET
60 0
0
0
KEY:
•
0 BORING DRILLED DURING
THIS INVESTIGATION
41) BORING DRILLED DURING
PREVIOUS INVESTIGATION
•2,5'
TOE OF SLOPE ____y
50
TEST PIT EXCAVATED DURING
PREVIOUS INVESTIGATION
POOR SOIL CONDITIONS
INTERMEDIATE SOIL CONDITIONS
GOOD SOIL CONDITIONS
1-1 PROPOSED RAILROAD TRACKS
4-1-t-4-1- EXISTING RAILROAD TRACKS
SITE PLAN
FEET
100 0 100 200
C11/11101111•111 14001111M
PLATE I
APPENDIX
FIELD EXPLORATION AND LABORATORY TESTING
FIELD EXPLORATIONS
Subsurface conditions underlying the areas in question were explored
by drilling three borings using hollow -stem, auger drilling equipment.
Boring 76 -1, located in the low -lying marshy portion of the Giovanelli
property, was performed using an auger drill mounted on a 4 -wheel drive,
all- terrain vehicle. Borings 76 -2 and 76 -3 were drilled using conventional
truck - mounted equipment. Boring locations and vertical control were based
on the results of a topographic survey by Chadwick Surveying and Engineering
dated May 11, 1976 and on information provided by representatives of the
Benaroya Company.
The field explorations were continuously observed by a member of our
staff, who classified the soils encountered, kept a detailed log of the
borings, and obtained soil samples at frequent intervals for examination
and testing in our laboratory. The logs of the borings are presented on
Plates A -1 and A -2. The soils have been classified in accordance with the
U.S.C.S. which is described on Plate A -3.
Relatively undisturbed soil samples were obtained from the borings
using a Dames & Moore Type U Sampler, which was driven with a weight of
140 pounds falling a distance of 30 inches. The number of blows required
to drive the sampler a distance of 12 inches into undisturbed soil is
shown immediately above the sample notation on the logs.
Observation of water levels were made during the course of drilling
the borings; however, sufficient time was not available to be certain that
the water level had attained equilibrium. The maximum height of water
A -1
DAIWES �. MOo12E
noted in each boring is shown on the appropriate boring log. Artesian
pressures were encountered in the sands underlying the peat in Boring 76 -1.
LABORATORY TESTING
The soils obtained from the borings were examined in our laboratory
and a limited program of testing, consisting of moisture- density deter-
minations, was performed to provide correlation with the strength and
compressibility characteristics which were determined in our previous
investigations. The results of these moisture - density determinations
are shown on each boring log. In addition, one consolidation test was
performed on a sample from Boring 76 -3 to evaluate soil compression
characteristics. The results of this test are presented graphically on
Plate A -4.
A -2
DAMES B MOOV E
20 25
ELEVATION 18.5' t
15
10
5
10
1
-20
170.77 -30
2
72.97 -54 •
2
•
2
480.67 -12 •
2
•
23
•
39
•
121
BORING 76 -1
SP
OL
PT
;
il !
1
WOOD AND BRUSH IN A MATRIX OF SILT
AND SAND TOPSOIL
DARK BROWN FIBEROUS TO SILTY PEAT
WITH LAYERS OF GRAY SILT AND
ORGANIC SILT (VERY SOFT, VERY
COMPRESSIBLE)
FEW SILT LAYERS BELOW ELEVATION 8'
INCREASING SILT LENSES
DARK GRAY -BLACK FINE SAND (MEDIUM
DENSE)(WATERBEARING, UNDER SLIGHT
ARTESIAN PRESSURE)
CRAY SILTY FINE TO MEDIUM SAND WITH
SOME GRAVEL (MEDIUM DENSE TO DENSE)
DARK GRAY GRAVEI. TO 3/4 INCH, WITH
COARSE SAND AND TRACE ORGANIC
MATTER (VERY DENSE)
BORING COMPLETED 5/19/76
KEY:
rBLOWS REQUIRED TO DRIVE SAMPLER ONE FOOT
WEIGHT- 140 LBS.. STROKE- 30 INCHES.
MOISTURE,
72.97-54 • INDICATES DEPTH AT WHICH UNDISTURBED
DRY_ SAMPLE WAS EXTRACTED.
DENSITY
IN PCF ® INDICATES DEPTH AT WHICH DISTURBED
SAMPLE WAS EXTRACTED.
27.17 -92
20
15
-
25.27-93
98.67 -43
10
41.67 -77
5
17.07 -110
0
5
1
20
-25
32.27 -91
12
•
23
•
10
•
15
•
36
68
•
29
•
26
•
10
LOG OF BORINGS
BORING 76 -2
11111
•
•
•o
OL
SOD AND TOPSOIL
NATURE OF THE SUBSURFACE MATERIALS.
GRADES TO DARK BROWN
ELEVATION 24.5' t
SM RED BROWN AND BROWN SILTY SAND
(MEDIUM DENSE)(FILL)
ML GRAY SILT WITH LITTLE SAND AND
ORGANIC MATTER, WITH SAND LENSES
(VERY STIFF)(FILL)
PT ALTERNATING LAYERS OF DARK BROWN
OL PEAT AND DARK GRAY ORGANIC SILT,
WITH OCCASIONAL LAYERS OF GRAY SILT
— (SOFT, COMPRESSIBLE)
WATER LEVEL 5/20/76
SM GRAY SILTY FINE TO MEDIUM SAND WITH
OL OCCASIONAL GRAVEL, WITH NUMEROUS
LENSES OF SILT, ORGANIC SILT AND PEAT
(LOOSE TO MEDIUM DENSE)
SM GRAY -BROWN GRAVELLY SILTY FINE TO
COARSE SAND (MEDIUM DENSE)
SW GRAY FINE TO COARSE SAND WITH GRAVEL
AND OCCASIONAL ORGANIC MATTER
(DENSE)
SM GRAY SILTY FINE SAND WITH OCCASIONAL
ORGANIC MATTER (DENSE)
GRAY FINE TO COARSE SAND WITH GRAVEL,
INTERLAYERED WITH GRAY SILT HAVING
TRACE OF ORGANIC MATTER (DENSE)
SW
ML
ML GRAY. SILT WITH TRACE SAND AND GRAVEL
(STIFF)
BORING COMPLETED 5/20/76
NOTE:
THE DISCUSSION 1N THE TEXT OF TH15 REPORT I5
NECESSARY FOR A PROPER UNDERSTANDING OF THE
imams s nl�oow
PLATE A-1
25
20
18.6X -114
15
69.1X -55
10
5
z
• 88.9%
0
w
-5
-10
-15
20
25.4X -93
141.8%--
73. 9X-54
21.7 %-105
17
•
32
•
11
•
12
8
•
14
61
•
81
•
BORING 76 -3
Ifll
DI €€
r
II €t( i
11
SM
ML
ELEVATION 21.8' 3
2" OF ASPHALT UNDERLAIN BY CRUSHED
ROCK
BROWN SILTY SAND WITH OCCASIONAL
GRAVEL (DENSE)(FILL)
GRAY SILT WITH LITTLE FINE SAND,
TRACE GRAVEL AND ORGANIC MATTER
( DENSE)(FILL)
GRADES TO MEDIUM DENSE
ML GRAY SILT WITH ROOTS AND ORGANIC
OL
MATTER (STIFF)
WATER LEVEL 5/20/76
GRADES WITH INCREASING ORGANIC
CONTENT BELOW ELEVATION II'
SP DARK GRAY -BLACK FINE SAND (MEDIUM
DENSE)
OL DARK BROWNISH GRAY ORGANIC SILT WITH
NUMEROUS LAYERS OF SILTY PEAT (SOFT,
COMPRESSIBLE)
DECREASING ORGANIC CONTENT
ML ALTERNATING LAYERS AND LENSES OF GRAY
Sp SILT, DARK GRAY FINE SAND AND
BROWNISH GRAY ORGANIC SILT (MEDIUM
STIFF)
tllf" }" SP DARK GRAY -BLACK FINE TO MED S AND
AITH OCCASIONAL SMALL SILT POC
(DENSE)
BORING COMPLETED 5/20/76
LOG OF BORINGS
D* U • r00o11114
PLATE A -2
MAJOR D /V /S /ONS GRAPH
SYMBOL
LETTER
SYMBOL
TYPICAL DESCRIPTIONS
•
COA RSE
GRAINED
SOILS
MORE THAN 10 %
OF MATERIAL IS
LAMA THAN NO.
GOO SIEVE SIZE
GRAVEL
AND •
GRAVELLY
SOILS
MORE THAN 00 96
OF COARSE WRAC
TION RETAINED
•i•••
•••
CLEAN GRAVELS i/• s .I• G
(LITTLE OR NO •0 • • • •
SW
WELL - ORADEO GRAVELS, •
SAND MIXTURES, LITTLE ON
NO /INES
dr::
FINE{) .✓i • • �.!'
` - .. / •41
-. '
'a•.•A✓: :•:
GP
POOP LT•GRADED GRAVELS, DRAM.-
SAN MIXTURES, LITTLE OR
FINES
�S •
•
a iI;11l�
••. •`.S
GRAVELS WTfH FINES • I • } •
( APPRECIASLE AMOUNT • •'G'
GM
SILTY , GRAVEL -SAND.
SILT MIXTURES
OF FINEST r / 7 = . A.,
I•• .0 r
•W
GC
GC
CLAYEY , GRAVEL. SAND.
CLAY MIXTURES
ON NO. 4 SIEVE
SAND
AND
SANDY
SOILS
MORE THAN 50%
OF COARSE /RAC•
TI ON fMLtNi
NO. • SIEVE
•
• •.
CLEAN SAND •�•:;�
(LITTLE OR NO • • {�'�.f....._
SW
•ELL- SRADED SANDS,
SANDS, LITTLE OR NO FINES
..
FINES
•.. •.•.••.,•''
° •''
c
SP
POORLY SPADED SANDS, GRAVELLY
SANDS, LITTLE OR NO TIN[{
(
I
SANDS WITH FINES ( ��
(APPRECIABLE AMOUNT I
i �
7 ,j
.l
,(
SM
SILTY SANDS, SAND-SILT MIXTURES
OF FINESI / J • f /
%/f I y am/. � .47 SC
\i
r. j,,.;,'
CL ATEY SANDS, SAND•CLAY MIXTURES
FINE
GRAINED
SOILS
NONE THAN SO %
OP MATERIAL IS
1 TNAM N0.
Goo 00 SIEVE SIZE
ML
INORGANIC SILTS AND VERY PINS
SANDS, ROCK FLOUR, SILTY OR
CLAYEY PINE SANDS OR CLAYEY
SILTS WITH {LIMIT ICITY
SILTS /
AND LIQUID LIMIT
Lam! TNAM SD CL
CLAYS
INORGANIC CLAYS OF LOW TO MEDIUM
ItlTT, ORAVELLr CLArt,
{AHOY cur{, SILTY eLAr{, LEAN
eLAr{
I
1
I I
1 1
1 t
I ■ I j 1
■ • 1 1
1 1 1 1
F1
i,
1 1 OL
1 1
ORGANIC SILTS AND ON•ANIC
SILTY . CLAYS OF LOW PLASTICITY
(s!,
MH
INOR•ANIC SILTS, MICACEOUS' ON
DIATOMACEOUS FINE SAND OW
SILTY SOILS
SILTS 7 ; .
AND LIQUID LIMIT
a1E4j THAN 50 ' ° ? +;
CH
INORGANIC CLAYS Of HIGH
(CITY, FAT CLAYS
CLAYS
�.�
%
OH
ORGANIC CLAYS OP IKOIYY TO SIGN
OR
PL ASTICTY, ORGANIC SILTS
PT
PEAT, HUMUS, SOILS
WITH SIGN ORGANIC CON
HIGHLY ORGANIC SOILS _
-
C
NOTE DUAL SYMBOLS ARE USED TO INDICATE S011OERLINE SOIL CLASSIFICATIONS.
SOIL CLASSIFICATION
CHART
UNIFIED SOIL CLASSIFICATION SYSTEM
SSIAMli i MOOS!!
,o° 2°° e o°° 4P
0 0 /4f °�
� h ho p
` ,
1111116.
gill
I l i ! '
111
k k
6
BORING
ELEVATION
SOIL TYPE
MO STURE CONTENT
DRY DENSITY IN
LBS. /CU.FT.
BEFORE
AFTER
3
-1.7
ORGANIC SILT
73.9
65.1
54
•
1; u
V
.00
.02
. 04
.06
.08
?.l
N
W
0.1
z
Z
2.1
.2
.2
.2
•
LOAD IN LBS. /SQ FT.
0
CONSOLIDATION TEST DATA
OAMI•! S MOOT
PLATE A -4
N
946.7 (REV. 6 -61)
BY JSC DATE -2D - 7t
CHECKED BY. tar tar& ft stn FILE 4 3(R.- o ??
ae ism smsommo m►
PROPOSED BUILDING AREA--
E
(
I
(/: LIMITS OF EXISTING
FILL STOCKPILE
CREST OF SURCHARGE
SCALE: 1" = 100'
RECOMMENDED SURCHARGE PROGRAM
PARKWAY PLAZA NORTH
REVISIONS
BY DATE
CREST OF SURCHARGE
EXISTING
JAFCO
FACILITY
32 INDICATES RECOMMENDED ELEVATION
OF SURCHARGE
GRADE AND FILL PERMIT
PARKWAY PLAZA WAIVER ENVIRONMENTAL IMPACT STATEMENT
Edgar D. Bauch, Mayor
CITY OF TUKWILA
6230 SOUTHCENTER BLVD.
TUKWILA, WASHINGTON 98067
DEPARTMENT OF COMMUNITY DEVELOPMENT
Mr. Robert H. Fehnel
Jack A. Benaroya Company
5950 Sixth Avenue South
Seattle, Washington 98108
Dear Mr. Fehnal:
Sincer
G.ry Crutc
Assistant
GC /cw
Ield
lanner
cc: Kjell Stoknes
Steve Hall
Al Pieper
16 July 1976
This office has reviewed your application for a grading permit at Parkway Plaza
West situated in Tukwila. In conjunction with the Environmental Questionnaire
completed and submitted together with the application drawing, the following in-
formation is requested prior to a decision being made by the Responsible official -
with respect to the proposed excavation.
1. Soils analysis, including consideration of groundwater, completed by
qualified soils engineer, to support the proposed 1:1 slope.
2. Three (3) cross - sections of proposed slope after excavation. One at
center and one for each edge.
3. Detail drawings for benches.
4. Drainage system: Demonstrate manner of surface water channelization
and, if necessary, groundwater. •
5. Restoration plan.
6. Cost estimates on drainage system, benches and restoration plan.
All of the above information is deemed necessary to allow an environmentally sound
decision to be made without an Environmental Impact Statement. Such a decision will
be made as soon as possible upon receipt of the requested information.
The information in this letter pertains only to the proposed slope excavation. The
fill permit on the lowland area has been issued under a separate permit to expedite
that part. Please do not do any further work on the slope until you have received a
grading permit from the City of Tukwila.
Cd
Verbatim transcript of portion of Committee of the Whole Meeting held May 10, 1976
regarding Proposed Ordinance providing for relocation of railroad crossing on South
center Parkway.
MAYOR.: Are you planning on any mining of fill off the hillside?
-SAi46WK : No.
MAYOR: You are going to bring all of your fill in from off -site?
S - CK: Well, they have -- if you recall the site down there there is a very, very
large area of (orn ?). (frcc ?) load under this building now.
-Pre
MAYOR: I am talking about the money you are going to use to get rid of the bog there.
SA# IrK: You are talking about mining it - did you say?
MAYOR: Well, taking it off the side of the hill and putting it down there.
HILL: That is all freeway though isn't it - fill.
S N K: No, the property line runs up to about this point.
STEVE HALL: We have worked with them on this and there would be very minor cuts into
the toe of the slope. This has been resolved.
VAN DUSEN: It looks like they would have to cut right there.
SANfliMik Yes, that one corner happens to jut over into it but they are staying
away from the toe of this - this runs parallel with the bank.
SAUL: Has this been to the Planning Commission yet?
STEVE HALL: Yes, it has.
JACK A. BENAROYA COMPANY
5950 SIXTH AVENUE SOUTH • SEATTLE, WASHINGTON 98108 • (206) 762 -4750
July 16, 1976
City of Tukwila
Planning Department
Tukwila, Washington 98188
Attention: Mr. Gary Crutchfield
Re: Parkway Plaza West
17500 Southcenter Parkway
We hereby request a grading permit for the above mentioned site.
It is our intent to use the excess preload sand currently on the Park-
way Plaza North to fill the peat bog area.
Further, the rail placement will require the tip of the bank to be
cleared, excavated and sloped, and the material will also be used in
the peat bog area.
It is the intent to have a generally level site north to south at the
toe of the hillside at approximately elev. 25 to 27. The site would
slope gently toward Southcenter Parkway at elev. 21 to 23.
We are enclosing a site plat plan and environment questionnaire per
your request.
obert H. Fehnel
GENERAL CONTRACTORS • DEVELOPERS OF COMMERCIAL AND INDUSTRIAL BUILDINGS FOR SALE OR LEASE
- 5246611111F - •
..e..ras n i'S IV 1.1 itliar iI Kr I I In,
(.. 7
t;a.Y 17, 1976
NEW BUSINESS - Contd.
Council Motion 76 -9 the rules be adopted as set forth in the Tukwila Municipal Code.
Rules of Procedures MOVED BY TRAYNOR, SECONDED BY HILL, THAT CITY COUNCIL MOTION NO. 76 -9
for the Board of BE ADOPTED AS READ. CARRIED.
Adjustment- Contd.
Appraisal of
Desimone Property
EXECUTIVE SESSION MOVED BY HILL, SECONDED BY PESICKA, THAT, THE COUNCIL GO INTO EXECUTIVE
7:35 P.M. - 8:35 P.M. SESSION AND DISCUSS THE PERSONNEL PROBLEM. CARRIED. ROLL CALL VOTE:
4 AYES - TRAYNOR, HILL, MS. PESICKA, VAN DUSEN; 3 NOS - GARDNER,
SAUL, MS. HARRIS. Councilman Hill requested that Deputy City Attorney
Hard, Mrs. Shirlee Kinney and her attorney, Mr. Warren, attend the
Executive Session.
Mayor Bauch called the meeting back to order with all Council
Members present as previously listed..
Appointment of MOVED BY TRAYNOR, SECONDED BY SAUL, THAT THE CITY COUNCIL CONCUR
City Clerk Pro Tem WITH THE RECOMMENDATION OF THE MAYOR FOR A CITY CLERK PRO TEMPORE
OR ACTING CITY CLERK. ROLL CALL VOTE: 5 AYES - GARDNER, TRAYNOR,
HILL, SAUL, MS. HARRIS; 2 NOS - MS. PESICKA, VAN DUSEN.
Report on Fire
Fighter Contract
Ni( SECOND READING OF.ORDINANCES
Ord. 1/972 -
Relocation of rail
road crossing on
Southcenter Blvd.
MOVED BY HILL, SECONDED BY TRAYNOR, THAT THE APPRAISAL OF THE DESIMONE
PROPERTY HAS BEEN RECEIVED BUT WILL NOT BE MADE PUBLIC UNTIL IT HAS
BEEN DISCUSSED WITH MR. DESII•IONE. MOTION CARRIED, WITH HARRIS
VOTING NO. After review of the background of the procedure prior to
the appraisal and with a request from Mayor Bauch it was MOVED BY
HILL, SECONDED BY MS. PESICKA,TO AUTHORIZE THE MAYOR TO HAVE THE
DESIMONE PROPERTY APPRAISED. CARRIED.
MOVED BY HILL, SECONDED BY TRAYNOR, TO AMEND THE AGENDA TO ALLOW
ITEM 8.d., A REPORT ON THE FIRE FIGHTER• CONTRACT FROM THE LABOR
ARBITRATOR. CARRIED. Councilman Hill reported there are still a
couple of items in the contract that have not been settled that are
not related to money. MOVED BY HILL, SECONDED BY TRAYNOR, TO HAVE
A COUNCIL MOTION THAT THE COUNCIL CONCURS WITH THE
ARBITRATOR'S MONETARY ALLOTMENT TO EACH INDIVIDUAL FIREMAN AND THAT
THEY BE PAID ON JUNE 5, 1976 UPON RECEIPT OF AN ACCEPTABLE CONTRACT. *
It had been previously suggested by negotiator Cabot -Dow that a
motion was necessary so that if an agreement is received by June 1,
1976 the City Council can review it and the Mayor can institute
payment even if the contract is not signed. * *CARRIED, WITH MS.
HARRIS VOTING NO.
MOVED BY HILL, SECONDED BY TRAYNOR, THAT THE PROPOSED ORDINANCE BE
READ BY TITLE ONLY. CARRIED. Deputy City Attorney Hard Bread proposed
ordinance providing for the relocation of the railroad crossing on
Southcenter Parkway at Minkler Blvd. and repealing Ordinance #617
of the City of Tukwila. Mr. Steve Hall, Public Works Director, read
his letter of May 13, 1976 for the record requesting that Mr. Kenneth
Cottingham of Stevens, Thompson and Runyan, Inc. run a brief study
to see if the traffic warrants are adequate to require automatic sig-
nalization at this crossing. He further requested that the Minutes
show the City would require automatic signalization if the warrants
so justify. Deputy City Attorney Hard stated that no further agree-
ment was necessary as Ordinance 1/534, Section 6, states that all work
shall be in accordance with all rules, regulations, ordinances, and
statutes and shall be under the supervision and inspection of the
City Engineer and they are bound by this Ordinance. MOVED BY HILL,
SECONDED BY VAN DUSEN, TO ACCEPT THE RECOMMENDATIONS OF STEVE HALL
REGARDING SIGNALIZATION OF THE RAILROAD CROSSING. CARRIED, WITH
MS. HARRIS VOTING NO.
MOVED BY TRAYNOR, SECONDED BY HILL, THAT ORDINANCE #972 BE ADOPTED
AS READ. * Discussion as to the 48 inch storm drain crossing under
the railroad ensued. Mr. Steve Hall stated they hoped the timing
would be right so the storm drain (LID 1/27) could be installed at the
> '
JILA CITY COUNCIL REGULAR MEETING
°..:`8 je13, 1976 (../
SECOLID RF .DING OF ORDINANCES - Contd.
Ord. #972 -
Relocation of rail
road crossing on
Southceriter Blvd.
- Contd.
FIRST READING OF ORDINANCES
Ord. #973 -
Establishing
Community Develop-
. ment & Planning
Department
Ord. #974 -
Amending Sec. 3
of Budget Ord. #957
Proposed Ord. -
Estab. Consolidated
LID #21 -22 -24
RESOLUTIONS
Res. #540 -
Authorizing Mayor
to Execute Adden-
dum to Agreement
w /City of Renton
same time as the relocation of the railroad crossing. The question
was raised if this construction would increase the cost of the LID..
Mr. Hall stated the cost of the LID already includes one crossing
with the railroad and explained the proposed construction. *CARRIED,
WITH MS. HARRIS VOTING NO. 6 YES VOTES CAST FOR ORDINANCE #972.
Councilwoman Harris suggested having an ordinance drawn that Benaroya
and /or the railroad shall pay any increased costs to protect the
storm drain lines in LID #27. MOVED BY TRAYNOR, SECONDED BY HILL, TO
HAVE THE ADMINISTRATION DRAW UP AN ORDINANCE FOR THE NEXT COUNCIL
MEETING. CARRIED.
MOVED BY TRAYNOR, SECONDED BY SAUL, THAT THE PROPOSED ORDINANCE BE
READ. CARRIED. Deputy Attorney Hard read the proposed ordinance
establishing'an office of Community Development and Planning and re-
vising Section 2.12.020 of the Tukwila Municipal Code, Chapter 2.12.
MOVED BY TRAYNOR, SECONDED BY SAUL, THAT THE RULES BE SUSPENDED FOR
A SECOND READING AND ORDINANCE #973 BE ADOPTED AS READ. *
MOVED BY HILL, SECONDED BY VAN DUSEN, TO AMEND THE ORDINANCE TO ADD
ITEM (d) UNDER SECTION 6. DUTIES, TO READ "HE SHALL EXERCISE GENERAL
SUPERVISION OVER EQUIPMENT, REPAIR, AND RENTAL OF ALL CITY VEHICLES."
CARRIED.
MOVED BY HARRIS, SECONDED BY SAUL, TO AMEND THE ORDINANCE DELETING TH
BUILDING DEPARTMENT FROM THE COMMUNITY DEVELOPMENT AND PLANNING DEPAR
MENT. MOTION FAILED, WITH MS. HARRIS AND SAUL VOTING YES.
MOVED BY HARRIS, SECONDED BY SAUL, TO AMEND THE ORDINANCE CHANGING
THE WORD "MAYOR" TO "ORDINANCE" IN THE LAST LINE OF SECTION 1. MOTIO
FAILED, WITH MS. HARRIS AND SAUL VOTING YES.
MOVED BY HARRIS, SECONDED BY SAUL, TO AMEND THE ORDINANCE ADDING THE
WORDS "SUBJECT TO THE RECOMMENDATION OF THE PARK BOARD" TO SECTION
3 (c). CARRIED.
*ORIGINAL MOTION CARRIED, AS AMENDED.
MOVED BY HILL, SECONDED BY TRAYNOR, THAT THE PROPOSED ORDINANCE BE
READ BY TITLE ONLY. CARRIED. Deputy City Attorney Hard read propose
ordinance amending Section 3 of Budget Ordinance #957 by reference,
transferring appropriations within and between budgeted funds to
accomodate financial contract compliance as set forth in Resolutions
Numbered 508, 531, and 539, and other financial adjustments deemed f
necessary for the efficient operation of the government of the City .;
of Tukwila.
MOVED BY HILL, SECONDED BY TRAYNOR, THAT THE RULES BE SUSPENDED FOR
SECOND READING AND THAT ORDINANCE NO. 974 BE ADOPTED AS READ. CARRIfj
MOVED BY HILL, SECONDED BY MS. PESICKA, THAT THE PROPOSED ORDINANCE I
PLACED ON FIRST READING BY TITLE ONLY AND REFERRED TO THE COMMITTEE
OF THE WHOLE MEETING OF MAY 24, 1976. CARRIED. Deputy City Attorney
Hard read the ordinance establishing Consolidated Local Improvement w
District No. 21 -22 -24 and "Consolidated Local Improvement Fund,
District No. 21- 22 -24 "; and fixing the amount, form, date, interest
rate, maturity and denominations of the Consolidated Local Improveme}
District No. 21 -22 -24 Bonds and directing the issuance and sale.ther`
to Foster & Marshall Inc. of Seattle, Washington.
MOVED BY TRAYNOR, SECONDED BY PESICKA, THAT THE PROPOSED RESOLUTION
READ BY TITLE ONLY. CARRIED. Deputy Attorney Hard read the propos
resolution authorizing the Mayor to execute addendum to agreement d
August 7, 1975, between City of Tukwila and City of Renton. Resolute
concern the City of Renton imposing its customary use fees as same
May 1U, ly
7:30 P.M.
CALL TO ORDER
ROLL CATS, OF
COUNCIL MEMBERS
MINUTE APPROVAL
DISCUSSION
Transportation/
Utilities Element of
Comprehensive Plan
Ord. - Providing for
relocation of rail-
road crossing on
Southcenter Pkwy.
Res. - Authorizing
agreement between
City of Tukwila and
City of Renton (LID
Sewer Use Fees)
TUKWILA CITY COUNCIL Tukwila City pall
COMMITTEE OF THE WHOLE MEE rG Council Chambers
MINUTES
The meeting was called to order by Council President Hill.
GARDNER, TRAYNOR, HILL, VAN DUSEN.
Councilman Saul arrived at the meeting at 7:35 P.M.
MOVED BY TRAYNOR, SECONDED BY VAN DUSEN, THAT THE MINUTES OF THE
APRIL 26, 1976 COMMITTEE OF THE WHOLE MEETING BE APPROVED AS
PUBLISHED: CARRIED, WITH.GARflNER VOTING NO.
Mayor Bauch explained during the discussion of the proposed
transportation /utilities element of the Comprehensive Plan that the
main concern discussed at the Public Hearing was the movement of
traffic. He added the plans are not to discourage the movement of
traffic on highways, or to set up traffic rules. Council President
Hill stated it was his thought the plans will not require the changing
of truck maneuvering. If there is a change it will be because of
safety and will just up -date the city's land -use. Steve Hall,
Director of Public Works, said this element of the Comprehensive Plan
is aimed towards future problems we may have. This will leave the
door open for future difficulties that may be solved by traffic contro:
rather than restrictions. MOVED BY TRAYNOR, SECONDED BY VAN DUSEN,
THAT A FORMAL MOTION TO ACCEPT OR REJECT THE PROPOSED
TRANSPORTATION /UTILITIES ELEMENT OF THE COMPREHENSIVE PLAN BE ON THE
AGENDA FOR THE NEXT CITY COUNCIL MEETING. CARRIED.
Public Works Director Steve Hall explained reasons for request for re-
location of railroad crossing on Southcenter Parkway. He stated the
Benaroya Company is asking to relocate the crossing back to its origi-
nal position so they can develop the land to the north of the Jafco
building. He added the City Attorney has suggested Ordinance #617
be repealed and Ordinance #534 be adopted. Council President Hill
said atthe time the existing railroad was put in it was brought out
that the now requested revision was too hard to put in because of a
bridge that was necessary. Councilman Traynor remembered there were
all kinds of reasons it had to be moved to its present location. He
added at that time the City Council thought it would be better to put
it in where they are now requesting it to be. Mr. Bob Sandwick of the
Benaroya.Company said his company had recently purchased property for
development that makes the proposed revision feasible and also the
change in ownership of other property has changed which makes the
requested revision more feasible than it was previously. He added
by changing the railroad it will be possible for Mr. Benaroya to
develop the north side of Parkway Plaza as he has the south side.
By changing the railroad it will also solve safety factors. He added
there will be no interruption in services to, the companies involved
while this change is taking place. Councilman Van Dusen said he
agreed with the safety factor. Steve Hall, Director of Public Works,
said LID #27 will be located westerly and it is possible some of the
work on LID #27 can be done at the time of the change. Mr. Sandwick
said it will . take about two months to make the change and they would
like to start at once. Councilman Saul asked if this matter had been
discussed with the Planning Commission and if they had any questions.
Gary Crutchfield, Planning Department, said the Planning Commission hay
some questions and they had all been resolved. MOVED BY TRAYNOR, SEC-
ONDED BY VAN DUSEN, THAT THE PROPOSED ORDINANCE BE ON THE AGENDA FOR
THE NEXT CITY COUNCIL MEETING. CARRIED.
Steve Hall, Director of Public Works, explained the proposed resolutio
authorizing agreement between City of Tukwila and City of Renton re-
garding the sewer use fees., He said there is a question now as to
#l9whom should collect the sewage charge. He said it is logical that
Renton should maintain this and he recommended passage of this resolu-
tion. He added Andy's Diner'is involved and there may be others in
this area as a result of future development. At present the City of
Tukwila and City of Renton both collect. The resolution will clarify
this and the City of Renton will collect and maintain. He said at
time of connection the, fee was paid to the City of Tukwila. Mayor
Bauch said Andy's Diner is located at the end of Tukwila's line and is
beneficial._ to the City. MOVED BY TRAYNOR, SECONDED BY SAUL, THAT
PROPOSED RESOLUTION BE ON THE AGENDA FOR THE NEXT CITY COUNCIL MEETING
CARRIED. .
TUKWILA CITY COUNCIL MEETING
May 3, 1 976
Page 2
PUBLIC HEARINGS - Cont.
"Law Week ", Volunteer
Effort by Steven L.
Robinson
Ordinance No. 966 -
Wages and Benefits,
1976 Department Heads
and Specific
Supervisors
CERTIFICATE OF APPRECIATION
SECOND READING OF ORDINANCES
Proposed Ordinance -
Relocation of Railroad
Crossing on South -
enter parkway
John Sheets, Chief of Police, stated that truck parking and
maneuvering has been a problem in the past and most certainly
would increase in the future with the size of the larger
trucks. There being no further comment from the audience,
Mayor Bauch closed the Public Hearing at 7:37 P.M. MOVED
BY HILL., SECONDED BY PESICKA, TO REFER THE TRANSPORTATION/
UTILITIES ELEMENT OF THE COMPREHENSIVE PLAN TO THE COMMITTEE
OF THE WHOLE ON MAY 10, 1976. CARRIED.
Mayor Bauch presented a Certificate of Appreciation to
Steven L. Robinson, Tukwila Police Officer, for his volunteer
effort to the Tukwila Community in establishing "Law Week"
and its promotion at Tukwila Elementary School during the
week of April 12 - 16. Officer Robinson was commended for his
volunteer efforts and for the rapport he has established
with the youth of the Community and also by the teachers of
Tukwila Elementary School who commented by letter to their
Principal.
MOVED BY HILL, SECONDED BY PESICKA, THAT THE PROPOSED ORDINANCE
BE READ IN ITS ENTIRETY EXCLUDING SECTION 4.* Upon comment
by Councilman Saul of the percentage raise given, IT WAS
MOVED BY SAUL, SECONDED BY HARRIS, TO AMEND THE MOTION AND
PLACE THIS MATTER BACK IN THE COMMITTEE OF THE WHOLE FOR
THEIR NEXT MEETING.* Discussion ensued as to the wage
formula applied. Upon a call for vote on the amendment to
the motion, *MOTION FAILED, SAUL AND HARRIS VOTING NO. Voting
upon the original motion to read the proposed ordinance,
*CARRIED, WITH SAUL VOTING NO. Deputy City Attorney Hard read
proposed ordinance establishing and granting wages and benefits
retroactive to January 1, 1976, transferring appropriations
for the positions of Public Works Director, City Clerk, Planning
Director, City Treasurer, Fire Chief, Police Chief, Police
Lieutenant and Fire Marshal and amending Budget Ordinance
No. 957. MOVED BY HILL, SECONDED BY PESICKA, THAT ORDINANCE
NO. 966 BE ADOPTED AS READ.* Councilwoman Harris questioned
the Deputy City Attorney on the form of the ordinance and
whether it was proper. Mr. Hard stating that he thought the
ordinance was valid and in proper form. *ROLL CALL VOTE:
5 AYES - GARDNER, HILL, PESICKA, TRAYNOR, VAN DUSEN; 2 NOS -
HARRIS, SAUL. MOTION CARRIED.
FIRST READING OF ORDINANCES
Ordinance No. 967 - MOVED BY TRAYNOR, SECONDED BY SAUL, THAT THE PROPOSED
Interdepartmental ORDINANCE BE READ. CARRIED. Deputy City Attorney Hard read
Loan between Water /Sewer proposed ordinance providing for an interdepartmental loan
Construction Fund between Water /Sewer Construction Fund and LID #27 in the
and LID #27 amount of $70,000.00. MOVED BY TRAYNOR, SECONDED BY SAUL,
THAT THE RULES BE SUSPENDED FOR SECOND READING AND THAT
ORDINANCE NO. 967 BE ADOPTED AS READ. CARRIED, WITH HARRIS
VOTING NO.
OVED BY TRAYNOR, SECONDED BY SAUL, THAT THE PROPOSED ORDINANCE
E READ. CARRIED. Deputy City Attorney Hard read the proposed
Ordinance providing for the relocation of the railroad crossing
on Southcenter Parkway at Minkler Boulevard and repealing
Ordinance No. 617 of the City of Tukwila. MOVED BY HILL,
SECONDED BY PESICKA, THAT PROPOSED ORDINANCE BE REFERRED TO
THE COMMITTEE•OF THE WHOLE MEETING OF MAY 10, 1976. CARRIED.