HomeMy WebLinkAboutPermit L95-0018 - PYRAMID POINTE APARTMENTS - PLANNED RESIDENTIAL DEVELOPMENTL95 -0018
PYRAMID POINTE APARTMENTS
PLANNED RESIDENTIAL DEVELOPMENT
15304 47 AV S
(CANCELLED)
PLANNED RESIDENTIAL DEVELOPMENT
City of Tukwila John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
September 4, 1996
Scott Harkey
Kappler, Thomas, Harkey Architects
550 Kirkland Way, Suite 406
Kirkland, WA 98033
RE: Pyramid Point Apartments
L95 -0011 (BAR)
E95 -0005 (SEPA)
Dear Scott:
Since we have not received the BAR/PRD applications we discussed six weeks ago, I am writing
this reminder that in order to comply with the new ordinances that implement HB 1724, that you
will need to submit new complete BAR and PRD applications in order to proceed with the project.
Because the change came upon you unexpectedly, Steve Lancaster, DCD Director, had agreed
to waive the application fee's for new application. However, this offer of a waiver is not for an
indefinite time. If you wish to take advantage of the waiver, you need to submit a complete BAR
and PRD application no later than 5:00 P.M. on September 20, 1996. If no complete application
is submitted by then, the project files will be closed out and any subsequent new applications will
require payment of the fees.
As we discussed before, the new process will not change the number of hearings that will be
conducted .for the project. Before, the project required a public hearing before the City Council
following the already completed hearing before the Planning Commission /Board of Architectural
Review. Under the new process, the only hearing required is through the City Council. Other
changes in the process include increased public notice requirements, limitation on public hearings .
to one, and modified application submittal specifications.
.Don't hesitate to call me if you have any questions. My number is 431 -3663.
Sincerely,
erson
late Planner
cc: Charlie Laboda
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
City of Tukwila John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
June 19, 1995
Charlie Laboda
K.D. Associates
3316 Fuhrman Avenue East
Seattle, WA 98102
NOTICE OF DECISION FOR PLANNED RESIDENTIAL DEVELOPMENT, L95 -0018
AND DESIGN REVIEW APPROVAL, L95 -0011
Dear Mr. LaBoda:
As you aware, your request for Design Review and Planned
Residential Development approval was been forwarded by the Planning
;Commission and Board of Architectural Review to the City Council
;'with a recommendation for approval following their public. hearing
on June 15, 1995. •The ten -day appeal period on this action ends
June 26, 1995.
The project was forwarded to the City Council subject to several
conditions, some of which required additional submittal to be
provided for City Council review, including:
1. Submittal of a detailed plan showing the areas considered to
be impervious surface and with appropriate calculations of the
impervious surface area.
2. Additional elevations /perspective drawings with the design of
the carports.
3. A view analysis that demonstrates that "on- site" landscaping
meets the screening requirements of 18.46.060(f)(1) TMC.
Additional conditions of the recommended approval include:
A. The main entry driveway must be at least twenty feet wide and
located entirely on the property, unless a permanent easement
is recorded allowing access over the property adjacent to the
north.
B. A sidewalk shall be provided from the site to 57th Avenue
South.
C. The applicant shall clarify the location of the trees near the
•
re W :.
.0 O;
co w' .
w o:
IL QC
• ' I- W;
z �.
;O
-,
•
• :w w.
-
u'
• i
o N;.
•
z.._.
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431 -3670 • Fax (206) 431 -3665
south property line. If the existing trees are accurately
located on the landscape plan, the protection and preservation
of the trees shall be coordinated through the Tree Permit
process. This may require relocation of the rockeries, or if
necessary for creating recreation area, replacing the
rockeries with a retaining wall that provides adequate
clearance from the trees. (Note: Since the applicant is
required to revise the view analysis per condition "A" above,
the clarification of the trees will be required prior to
Council review).
If tree replacement is required pursuant to the Tree Ordinance
(18.54.130(3) TMC, the replacement trees shall be in addition
to those shown on the approved landscape plan. The
landscaping on the approved plan are considered to meet the
BAR criteria, but not the tree permit requirements.
D. An automatic irrigation system shall be provided for the new
landscaped areas and sriall include in- ground moisture sensors.
▪ The chain link fences around the spa /gazebo and the swimming
pool shall be vinyl coated'.
• Exterior light levels should be-- -limited to one (1) foot- candle
at the property line and no direct illumination beyond the
property line..
Once the required submittal are made, the project will be scheduled
for a public hearing before. the City Council. If you have any
questions with this matter, feel free to call me at 431 - 3663.
Sincerely,
hn J, 'merson
ssoc. ate Planner
cc: File
Scott Harkey
KAPPLER
THOMAS
HARKEY
ARCHITECTS
550 Kirkland Way Suite 406
Kirkland, WA 98033
(206) 828 -2700
May 29, 1995
John Jimmerson
City of Tukwila
6300 Southcenter Blvd.
Tukwila, WA 98188
Re: Pyramid Pointe PRD Revisions (94103)
RECEIVED
3 0 1995
CiC%IVIIVIUIVI IY
DEVELOPMENT
Dear. John:
Attached are 8 sets of 24x36 blueline drawings and one 8 1/2 x 11 reduced set of the revised
PRD submittal. Per our discussion, the following basic items were revised:
1. One additional parking space was added bringing the total to 167.
2. Reductions in pervious area was reduced to 49.5 % by removing some of the sidewalk
areas and using spaced decking around the pool and spa areas.
3. Recreation areas that you had felt did not meet the minimum requirements were removed
from the calculation areas and a new calculations were done.
4. A site investigation was done regarding the existing entrance driveway. Based on an
existing property corner monument, there appears to be 20 feet of existing paved
driveway within the Pyramid Pointe boundaries.
5. Dumpsters /enclosures were added to meet the minimum requirements.
Misc. other minor revisions were made relating to these items. Sheets that were revised
include A -1, A -2, A -3, L -1, and L -3.
Please let me know ' you have any further questions.
Sincerely, Scott Har ey, Principal
KAPPLER THOMAS HARKE ARCHITECTS
•w
GEOTEC H
CONSULTANTS, INC.
13256 N.E. 20th St. (Northup Way), Suite 16
Bellevue, WA 98005
(206) 747 -5618
FAX 747 -8561
Daily Homes
3240 Eastlake Avenue East, Suite 200
Seattle, Washington 98102
Attention: Charlie Laboda
Subject: Geotechnical Engineering Study
Proposed. Pyramid Pointe II Apartments
5700 Block of South 152nd Place
Tukwila, Washington
March 20, 1995
JN 95062
Dear Mr. Laboda:
We are pleased to present this geotechnical engineering report for the proposed expansion
of the Pyramid Pointe Apartments in Tukwila. The scope of our work consisted of exploring
site surface and subsurface conditions, and then developing this report to provide design
criteria for foundations, retaining walls, and pavements and recommendations for general
earthwork. You authorized our work by accepting our proposal dated March 1, 1995.
The subsurface conditions of the proposed building site were explored with five test pits that
encountered widely varying amounts of fill and old topsoil over native, silty sands that are
• loose and become . denser with depth. Loose, poorly compacted fill was found over the
original topsoil in three of the test pits. This fill is 2 to 7 feet deep.
Based on our test pits, it appears that the new western and central buildings can be
supported, on conventional foundations, with overexcavation probably being necessary.
Augercast concrete piers will be required to support the easternmost new building and its
floors. It may be necessary to use piers to support portions of the western and central
buildings, if the . overexcavation becomes too deep or heavy groundwater seepage is
encountered. The proposed building locations are suitable to protect the buildings from any
future shallow instability that may occur on the steep, tall, cut slopes south of the property.
Pavements for automobiles can be placed on the existing soils, if the subgrade is stable
under a proof -roll following stripping. At least 12 inches of compacted, gravelly sand will be
needed below the pavement sections where the subgrade is soft or pumping under a
proof -roll.
41,41
-.w
O 0
N
:w tu
J
w0..
• Z
en
_ cr.
•f-_
z'
. zt-
. ww.
V 0,
O.N.
;D H:
i
w,
v.
—f
U.
Uj
z•.
z
Dally Homes
March 20, 1995
JN 95062
Cover Letter /Page 2
The on -site soils are silty and very moist to wet. Wet weather grading will be very difficult
and the reuse of the on -site soils as structural fill will only be possible during hot, dry
weather when they can be dried prior to compaction.
The attached report contains a discussion of the study and our recommendations. Please
contact us if there are any questions regarding this report, or if we can be of further
assistance during the design and . construction phases of this project:- - -
Respectfully Submitted,
GEOTECH CONSULTANTS, INC.
04;••■ce.
Marc R. McGinnis, P.E.
Associate
GEOIECI•I CONSULTANTS, INC
GEOTECHNICAL ENGINEERING STUDY
Proposed Pyramid Pointe II Apartments
5700 Block of South 152nd Place
Tukwila, Washington
This report presents the findings and recommendations of our geotechnical engineering
study for the site of the proposed expansion of the Pyramid Pointe Apartments in Tukwila.
The general location of the site is illustrated on the Vicinity Map, Plate 1.
We were provided with a site survey developed by Cramer Northwest and dated March 3,
1995. A site plan showing the location of the existing and proposed structures was also
provided. Based on this information, we anticipate that the existing manager's residence
and the swimming pool will be demolished, and that three new apartment buildings will be
constructed along the southern side of the site. Each building will have two stories over a
daylight basement floor. The middle building will step up, toward the north. Maximum cuts
of 3 to .4 feet below the existing grade are anticipated to reach the proposed finish floor
elevations. Fills up to 2 to 3 feet above the existing grade will be needed along the down -
slope sides of the buildings. Paved parking will be provided along the northern sides of the
• three buildings. It appears that fills of several feet will be necessary along the downslope
sides of these new paved areas. Rockeries are indicated on the site plan in front of these fill
areas.
SITE CONDITIONS
Surface
The site is a large, irregularly - shaped lot located north of the Southcenter Mall, immediately
south of the intersection of South 152nd Place and 57th Avenue South. Current develop-
ment on the property consists of three large, three -story apartment buildings and a
manager's residence. Asphalt parking is provided along the northern sides of these
buildings, and an in- ground swimming pool is located off the southeastern corner of the
westernmost apartment building. The area south of this western building is open grass lawn.
Landscaping and grass cover the unpaved areas around the two eastern buildings. Several
utility easements extend in a general north -south direction through the center of the site.
We understand that these easements contain storm and sanitary sewers. Based on the
utility locate that was conducted prior to our field explorations, a buried natural gas line runs
along the eastern straight portion of the southern property line, and an underground water
line extends along the curved western portion of the southern property line.
The property generally slopes downward toward the. south. The area around the existing
buildings is relatively level to gently sloping. Some steeper slopes are between the two
eastern buildings. The southern portion of the site, where the new buildings are to be
.1:��•.irr„i,�:x'¢i' "vi:LW+w.s i= :Ia/2rY5 & /Ei�Suiy.,.A , .�r:G�. �.u..; rq
GEOTECU CONSULTANTS, 1NC. .
z
,
oi o
c.)
.moo
cn LU
W_
(i) LL:
D.
wo
gal.
= Li
Z
,
Z o, •
:D o
0
o�.
,w W
o:.
iii
:O t-
z
Dally Homes
March 20, 1995
JN 95062
Page 2
constructed, slopes at an inclination of 15 to 25 percent to the southern property line. Near
the western, curving portion of the southern property line, the ground surface drops at an
inclination of about 50 percent to a paved and gravel service road. This road is on city
property, and it has a width of about 10 feet. An open, asphalt -lined storm ditch, located
along the upslope side of the road, flows to a catch basin located at the eastern end of the
curving southern property line. South of the service road, the ground drops steeply at an
inclination of 70 to 80 percent to Macadam Road South. Heavily- covered with blackberry
vines and underbrush, this slope has some small trees scattered about it, and it-appears to
have been created by cutting for the construction of Macadam Road South. The slope
below the eastern half of the'subject site has a similar steep inclination, and it seems to have
resulted at least partially from excavation for the Denny's restaurant and apartment buildings
adjacent to the south. No indications of recent, large -scale instability were observed on the
steep slopes south of the site during our visits.
We noted that water from downspouts or drains is being discharged onto the ground
surface in the expansion area. This had created some wet conditions on the surface of the
lawn.
2
ii. C i
U'
00 :
cn o.
L-1:1
a.
w 0.
u.
= d'
w
z�,,
I-0;
Z 1:
2 uj
8
O The properties surrounding the site are developed with apartment complexes. A Denny's w W
restaurant is south of the site. The Macadam Road South right -of -way borders the south fl -
western
portion of the property. u-
Iii z
U =i
Off`
Subsurface
The subsurface conditions in the area of the proposed new buildings were explored by
excavating five test pits at the approximate locations shown on the Site Exploration Plan,
Plate 2. The field exploration program was based upon the proposed construction and
required design criteria, the site topography and access, the subsurface conditions revealed
during excavation, the scope of work outlined in our proposal, and the time and budget
constraints. Existing buried utilities made it impossible to safely excavate additional test pits
along the southern edge of the property.
The test pits were excavated on March 9, 1995 with a rubber -tired backhoe. A geotechnical
engineer from our staff observed the excavation process, logged the test pits, and obtained
representative samples of the soils encountered. "Grab" samples- of selected subsurface
soils were collected from the backhoe bucket. The Test Pit Logs are attached to this report
as Plates 3 through 5.
The native soils encountered in the test pits consist of a gravelly, silty sand that is loose and
becomes medium -dense to dense with increasing depth. These native soils are similar to
GI3Oi1 CI -I CONSULTANTS, INC.
•
Daily Homes
March 20, 1995
"-JN 95062
Page 3
those that we encountered during our 1994 geotechnical study for •a proposed
condominium project located west of the La Vista Apartments, which are situated due west
of the subject site. Cobbles and occasional boulders were found in the native sands. Test
Pits 1 and 4 found the native sands immediately below the sod and topsoil. The remaining
explorations encountered 2 to 7 feet of loose, silty sand fill over the original topsoil above
the native sands. This fill probably resulted from the excavation of the existing buildings and
swimming pool. In Test Pits 2 and 5, the native sands did not become medium -dense until
about 11 feet below the existing ground surface.
.. Caving of the excavation side walls was observed in several of the test pits.
The final logs represent our interpretations of the field logs and laboratory ,tests. The
stratification lines on the logs represent the approximate boundaries between soil types at
the exploration locations. The actual transition between soil types may be gradual, and
subsurface conditions can vary between exploration locations. The Togs provide specific
subsurface information only at the locations tested. The relative densities and moisture
descriptions indicated on the test pit logs are interpretive descriptions based on the
conditions observed during excavation.
The compaction of backfill was not in the scope of our services. Loose soils will therefore
be found in the area of the test pits. If this presents a problem, the backfill will need to be
removed and replaced with structural fill during construction.
Groundwater
Groundwater seepage was observed in three of the test pits at depths between 3 feet and 9
feet below the grade. The test pits were left open for only a short time period. Therefore,
the seepage levels on the logs represent the location of transient water seepage and may
not indicate the static groundwater level. It should be noted that groundwater levels vary
seasonally with rainfall and other factors. We anticipate that groundwater could be found
throughout the fill and native soils.
CONCLUSIONS AND RECOMMENDATIONS
General
Based on our observations and the soil conditions encountered in our explorations for this
study and our previous study of the condominium site to the west, it is our professional
opinion that the . proposed development is feasible from a geotechnical engineering
standpoint. The steep slopes south of the site have not exhibited recent, large -scale
GEOTI3C(1 CONSULTANTS, INC..
i Y... ,y, rbiniiti •:"l . , +ai■aa . ac... i.. as u.a: n...:».,.,.,,..
Z
h-
:
Ct
u�l D
J O.
o0
0:
011J
W =:
N w:
0}'
J;
N �:
r- 0'
Z17
2
0;
'
H
w W;
20
Z:
U co
Daily Homes
March 20, 1995
JN 95062
Page 4
instability, and the sand soils that comprise the slopes are not typically susceptible to deep
instability. Any future soil movement on the steep slopes should consist of shallow erosion
or ravelling, affecting primarily the near - surface, weathered soils. This type of slope
movement may result in some loss -of- ground at the top of the steep slopes, but it would not
present a hazard to the proposed structures, if they are designed in accordance with the
recommendations of this report. The proposed project should not increase the potential for
instability on the southern slopes, if our recommendations are followed.
Our test pits indicate that all, or a majority, of the western and central buildings can be
constructed on conventional foundations. It is likely that overexcavation will be required to
expose medium -dense to dense, native sands in the footing areas. These overexcavations
can be backfilled with either lean concrete or structural fill. The use of the -lean concrete
backfill would require less excavation and certainly remove the need for the compaction and
density testing . of the backfill. Depending on the conditions _encountered at the time of
construction, it may be necessary to use piers to support portions of these two buildings. If
areas of deep, loose soils are found that make overexcavation impractical, piers will be
necessary. Such areas are likely where footings will bear over old utility trenches.
The easternmost building and its basement floor should be planned to be supported on
concrete piers that extend through the fill and loose, native soils. The conditions observed
in Test Pit 5 indicate that the surface of the native soils drops toward the south, which would
result in competent soils being deeper further south in the eastern building footprint. Due to
the depth of the loose soils and the potential for significant groundwater seepage, piers will
likely need to be installed using augercast methods.
The presence of groundwater in the test pits indicates that good drainage must be provided
for the below -grade portions of the structures. Free - draining gravel wall backfill and a
properly installed foundation drainage system will be necessary. If substantial groundwater
seepage is encountered in the building excavations, we will need to evaluate the potential
need for additional drainage, such as underslab drains. Waterproofing the below -grade
walls would limit the potential for water entering through the building walls.
The plans indicate that the eastern building will be located no closer than 25 feet to the
steep slopes that drop from the property line. The western and central buildings will be at
least 40 feet from the tall cut slope that extends between the service road and Macadam
Road South. It is our opinion that the proposed locations for the three buildings are
acceptable from a geotechnical standpoint to limit the potential hazard from future shallow
slope movement on these tall slopes. Future shallow instability on the short slope . above the
service road should not affect the proposed structures.
GCOTL'•CII CONSULTANTS, INC.
; z
ugp;
00
CO o;
COW;.
W_
N w;
w0
g J"
•
. l- w.
cy
w~
w
H V.
11 0
z:.
O ~.
z
Daily Homes
March 20, 1995
JN'95062
Page 5
The disturbance of the steep slopes must be avoided, so as not to increase the potential for
instability)We recommend erecting a construction fence along the crest of the steep slopes
to define the arpa..of_n�disturbance"IFill and soil or debris resulting from the site clearing
and excavations should not be placed within about 15 feet of the steep sou T ern s opes.
(3j All water from roofs, footing drains, and impervious surfaces should be discharged into the
" existing storm sewer. Drain pipes that currently discharge water onto the ground surface
upslope of the proposed buildings must also be connected to the permanent storm system.
Temporary erosion control will likely be needed, if the earthwork occurs during wet weather.
At a minimum, this would consist of placing a silt fence along the downslope side of the
project and covering the exposed soil outside of the building limits with straw or gravel.
More stringent erosion control measures could be implemented at the time of construction,
if needed.
The high silt and moisture contents of the existing fill and native soils will make wet weather
earthwork more difficult and costly. The silty sands will be difficult to grade when wet, and
they will be totally unusable for structural fill, unless they can be dried prior to compaction.
This drying can be accomplished by aeration in hot, dry weather, or by mixing kiln dust or
lime into each lift of fill. Adequate drying and compaction of the structural fill will be
important to prevent the settlement of on -grade structures, such as pavements and slabs,
that are supported on the fill. This is a major consideration for the backfilling of new utility
trenches, particularly if the excavated soils are to be reused as trench backfill. Imported fill
will be required, if structural fill is placed in wet weather, or if there will be insufficient time to
adequately dry the on -site soils. The earthwork budget should consider this potential import
requirement.
Geotech Consultants, Inc. should be allowed to review the final development plans to verify
that the recommendations presented in this report are adequately addressed in the design.
Such a plan review would be additional work beyond the current scope of work for this
study, and it may include revisions to our recommendations to accommodate site, develop-
ment, and geotechnical constraints that become more evident during the review process.
Conventional Foundations
P Conventional continuous and spread footings should bear on undisturbed, medium - dense,
native sands or on structural fill placed above these competent, native soils. See the later
sub- section entitled General Earthwork and Structural Fill for recommendations
regarding the placement and compaction of structural fill beneath structures. We
recommend that continuous and individual spread footings have minimum widths of 12 and
16 inches, respectively. They should be bottomed at least 12 inches below the lowest
adjacent finish ground surface for frost protection. The local building codes should be
GEOIECH CONSULTANTS, INC.
Daily Homes
March 20, 1995
JN 95062
Page 6
reviewed to determine if different footing widths or embedment depths are required. The
footing subgrade must be cleaned of loose or disturbed soil prior to pouring concrete.
Depending upon site and equipment constraints, this may require removing the disturbed
soil by hand.
Z •
1-
mow:
Overexcavation below the footings should be anticipated to expose competent, native soils. 0 0
Unless lean concrete is used to fill an overexcavated hole, the overexcavation must be at u) w
least as wide at the bottom as the sum of the depth of the overexcavation and the footing N 1-
width. For example, an overexcavation extending 2 feet below the bottom of. a 3- foot -wide u; C
footing must be at least 5 feet wide at the base of the excavation. If lean concrete is used, 2
an overexcavation need only extend 6 inches beyond the edges of the footing. 1 a
N D.
The following allowable bearing pressures are appropriate for footings constructed uJ
z�
1z
Allowable Bearing �?
Bearing-Condition Pressure (psf) °4
:D E-
Placed directly on competent, 3,000 w W!
native soils -- LU
..:iii uj
competent, native soils ;F-
z
. according to the above recommendations.
Supported on structural fill placed 2,000
Where:
(1) - psf is pounds per square foot.
A one -third increase in the above design bearing pressures may be used when considering
short-term wind or seismic loads. For the above design criteria, it is anticipated that the total
post- construction settlement of footings founded on competent, native soils, or on structural
fill up to 5 feet in thickness, will be about three - fourths of an inch, with differential
settlements on the order of one -half of an inch in a distance of 50 feet along a continuous
footing.
Lateral Toads due to wind or seismic forces may be resisted by friction between the founda-
tions and the bearing soils,,_ or by passive earth pressure acting on the vertical, embedded
portions of the foundations. For the latter condition, the foundations must be either poured
directly against relatively level, undisturbed soil, or surrounded by level structural fill. We
recommend using the following design values for .the foundation''s resistance to lateral
loading:
GEOTCC11 CONSULTANTS, INC.
Daily Homes
March 20, 1995
Parameter
Coefficient of Friction
Passive Earth Pressure
Design Value
-. 0.45
300 pcf
Where:_ _.... .
(1) pcf is pounds per cubic foot.
(2) Passive earth pressure is computed using the
equivalent fluid density.
JN 95062
Page 7
If the ground in front of the foundation is loose or sloping, the passive earth pressure given
above will not be appropriate. We recommend a safety factor of at least 1.5 for the
foundation's resistance to lateral loading, when using the above design values.
Augercast Concrete Piers
An allowable compressive capacity of 15 tons can be attained by installing a 12 -inch-
diameter, augercast concrete pier at least 10 feet into medium -dense to dense soils. For
transient loading, such as wind or seismic loads, the allowable pier capacity may be
increased by one - third. We can provide design criteria for different pier diameters and
embedment lengths, if greater capacities are required. The minimum center -to- center pier
spacing should be three times the pier diameter. Based on our test pit information, w
estimate that pier lengths of about 20 to 30 feet below the existing grade will be needed in
the eastern building to achieve adequate penetration into the bearing soil.
We estimate that the total settlement of single piers installed as described above will be on
the order of one -half of an inch. Most of this settlement should occur during the construction
phase as the dead loads are applied. The remaining post- construction settlement.would
be realized as the live loads are applied. We estimate that differential settlements over any
portion of the structures should be less than about one - quarter of an inch.
Ee recommend reinforcing the piers their entire length. Reinforcement typically consists of
an upper cage of reinforcing bars, with one bar extending the full length of the pier. For
computation of lateral load resistance, the piers can be assumed to have a point of fixity at
12 feet below the ground surface. The loose soils against the piers can be assumed to
have a design passive earth resistance of 200 pounds per cubic foot (pcf) acting on two
times the pier diameter. Passive earth pressures on the grade beams will also provide
some lateral resistance. If structural fill is placed against the outside of the grade beams
the design passive earth pressure from the fill can be assumed to be equal to that pressure
exerted by an equivalent fluid with a density of 300 pcf. Battered piers can also be used to
resist lateral building Toads. If the piers are installed at an inclination of 1:5 (Horizontal:
GEOTECI•I CONSULTANTS, INC.
Dally Homes
March 20, 1995
JN 95062
Page 8
Vertical), or steeper, the vertical capacity given above will not need to be reduced. The
allowable lateral capacity of a battered pier is equal to the horizontal component of its axial
capacity.
Augercast Pier Installation
Augercast piers should be installed with continuous flight, hollow -stem auger equip-
ment. Concrete grout must be pumped continuously through the auger as the
auger is withdrawn. Often, the augering action may tend to disturb the soils at the
bottom of the drilled holes, possibly resulting in a decreased end - bearing capacity.
To minimize the effects of this disturbance, we recommend requiring the pile
contractor to rotate the auger while pumping the first few cubic feet of grout prior to
starting auger withdrawal. This will mix any loose cuttings at the bottom of the
hole with concrete, thus developing the end - bearing capacity.
In order to maintain the surface of the pumped grout above the tip of the auger, we
recommend the following:
(1) Maintain.a minimum grout head of 5 feet above the tip of the auger at all-- -
times.
(2) Ensure that the grout pressure at the grout pump is- in-.the,range of 150
to 250 psi, depending on the length of feeder hose used.
(3) Equip the grout pump with a calibrated stroke counter, so pumped grout
volumes per pier may be calculated.
The completed below- ground piers below cannot be observed. Therefore, judgement
and experience must be used as the basis for determining the acceptability of a pier.
The installation of all of the piers should be observed by a representative of Geotech
Consultants, Inc., who can fully evaluate the contractor's operation, collect and
interpret installation data, verify bearing stratum elevations, and understand the
implications of variations from normal procedures with respect to the design criteria.
Seismic Considerations
The site is located within Seismic Zone 3 as illustrated on Figure No. 23 -2 of the 1991
Uniform Building Code (UBC). In accordance with Table 23 -J of the 1991 UBC, the site soil
profile is best represented by Profile Type S2. The undisturbed, native soils are not
susceptible to seismic liquefaction, and deep instability should not occur on the steep
slopes during an earthquake. Some settlement of elements supported in the loose soils can
be expected following an earthquake.
GEOTECI.1 CONSULTANTS, INC.
Dally Homes
March 20, 1995
Slabs -on -Grade
JN 95062
Page 9
The building floors may be constructed as slabs -on -grade atop the native soils that are
under the existing fill and-original topsoil. Where it is• not-possible to remove the unsuitable
soils, the floors should be structurally supported to span between the foundations. The
subgrade soils must be in a firm, non - yielding condition at the time of slab construction or
underslab fill placement. Any soft areas encountered should be excavated and replaced
with select, imported, structural fill.
All slabs -on -grade should be underlain by a capillary break or .drainage layer consisting of a
minimum 4 -inch thickness of coarse, free- draining, structural fill with a gradation similar to
that discussed later in Permanent Foundation_ and Retaining Walls. A vapor barrier,
such as a 6 -mil plastic membrane, should be placed beneath the slabs and in any crawl
space areas. Additionally, sand should be used in the fine - grading process to reduce
damage to the vapor barrier, to provide uniform support under the slab, and to reduce
shrinkage cracking by improving the concrete curing process.
Permanent Foundation and Retaining Wal s
Retaining walls backfilled on only one side should be designed to resist the lateral earth
pressures imposed by the soils they retain. The following recommended design parameters
are for walls less than 12 feet in height that restrain level backfill:
Parameter Design Value
Active Earth Pressure* 35 pcf
Passive Earth Pressure 300 pcf
Coefficient of Friction 0.45
Soil Unit Weight 130 pcf
Where:
(1) pcf is pounds per cubic foot.
(2) Active and passive earth pressures _ are
computed using the equivalent fluid densities.
* For restrained walls that cannot deflect at least
0.002 times their height, a uniform lateral
pressure of 100 psf should be added to the
above active equivalent fluid pressure.
GEOThCI•I CONSULTANTS, INC.
coo.
W
J
w o`
J'
u. a
• 0 d;.
,F=w'
Oi
;w w;: •
:,O
,o
•z;
• U 2.
• z• •t
Daily Homes
March 20, 1995
JN 95062
Page 10
The values given above are to be used to design permanent foundation and retaining walls
only. The passive pressure given is appropriate for the depth of level structural fill placed in
front of a retaining or foundation wall only. We recommend a safety factor of at least 1.5 for
overturning and sliding, when using the above recommended values to design the walls.
The design values given above do not include the effects of any hydrostatic pressures
behind the walls and assume that no surcharge slopes or Toads, such as vehicles, will be
placed behind the walls. If these conditions exist, those pressures should be added to the
above lateral soil pressures. Also, if sloping backfill is desired behind the walls, we will need
to be given the wall dimensions and the slope of the backfill in order to provide the
appropriate design earth pressures. The surcharge due to traffic loads behind the walls can
typically he accounted for by adding a uniform pressure equal to 2 feet multiplied by the
above active fluid density.
Heavy construction equipment should not be operated behind retaining and foundation
walls within a distance equal to the height of the wall, unless the walls are designed for the
additional lateral pressures resulting from the equipment. The compaction of backfill near
the walls should be accomplished with hand - operated equipment to prevent the walls from
being overloaded by the higher soil forces that occur during compaction.
Retaining Wall Backfill
Backfill placed behind retaining or foundation walls should be coarse, free - draining,
structural fill containing no organics. This backfill should contain no more than 5
percent silt or clay particles and have no gravel greater than 4 inches in diameter.
The percentage of particles passing the No. 4 sieve should be between 25 and 70
percent. If the native sand soils are used as backfill, at least 12 inches of drain rock
should be placed against the walls for proper drainage.
The purpose of these backfill requirements is to ensure that the design criteria for the
retaining walls are not exceeded because of a build -up of hydrostatic pressure
behind the walls. The top 12 to 18 inches of the backfill should consist of a relatively
impermeable soil or topsoil, or the surface should be paved. The sub - section entitled
General Earthwork and Structural Fill contains recommendations regarding the
placement and compaction of structural fill behind retaining and foundation walls.
The above recommendations are not intended to waterproof the below -grade walls.
If moist conditions or some seepage through the walls are not acceptable, damp -
proofing or waterproofing should be provided. This could include limiting cold - joints
and wall penetrations, and possibly using bentonite panels or membranes on the
outside of the walls. Applying a thin coat of asphalt emulsion is not considered
waterproofing, but it will help to prevent moisture, generated from water vapor or
capillary action, from seeping through the concrete.
GEOT CII CONSULTANTS, INC.
z
tt
w D
J U:
U O,
Di
S w:
wO.
J
s
O;
off':
DH
w:
ILLZ`
U �;
.O
z;
•
Daily Homes
March 20, 1995
Rockeries
JN 95062
Page 11
We anticipate that rockeries may be used in the site development. A rockery is not intended
to function as an engineered structure to resist lateral earth pressures, as a retaining wall
would do. The primary function of a rockery is to cover the exposed, excavated surface and
thereby retard the erosion process. Rockeries placed in front of unreinforced fill or the
existing fill soils should be limited to a height of 4 feet, and they should be constructed
entirely of four -man rocks. Taller rockeries will need to be constructed with a geogrid-
reinforced fill behind them. This typically requires that geogrids extend behind a rockery in
a compacted fill a minimum distance of at least 70 percent of the rockery's height.
The . construction of rockeries is to a large extent an art not entirely controllable by
engineering methods and standards. It is imperative that rockeries, if used, be constructed
with care and in a proper manner by an experienced contractor with-proven ability in rockery
construction. The rockeries should be constructed with hard, sound, durable rock in
accordance with accepted local practice standards. Soft rock, or rock with a significant
number of fractures or inclusions, should not be used in order to limit the amount of
maintenance and repair needed over time. Provisions for maintenance, such as access to
the rockery, should be considered in the design.
Excavations and Slopes
Excavation slopes should not be greater than the limits specified in local, state, and national
government safety regulations. Temporary cuts to a depth of about 4 feet may be
attempted vertically in unsaturated soils. The loose soils exhibited caving in the test pits.
Based upon Washington Administrative Code (WAC) 296, Part N, the near-surface soil type
at the subject site would be classified as Type C. Therefore, temporary cut slopes greater
than 4 feet in height cannot be excavated in the loose soils at an inclination steeper than
1.5:1 (Horizontal:Vertical), extending continuously between the top and the bottom of the
cut. Deep excavations, or those encountering heavy groundwater seepage, could require
shoring and dewatering to be made safely.
The above recommended temporary slope inclination is based on what has been successful
at other sites with similar soil conditions. Temporary .. cuts are those that will . remain
unsupported for a relatively short duration to allow for the construction of foundations,
retaining walls, or utilities. Temporary cut slopes should be protected with plastic sheeting
during wet weather. The . cut slopes should also be backfilled or retained as soon as
possible to reduce the potential for instability. Please note that loose soils can cave
suddenly and without warning. Contractors should be made especially aware of this
potential danger.
GEO H3CI•I CONSULTANTS, INC.
Z
Z
w,
mo:
DO'
U0
w w;
co ILI
w0
= a:
I- w;'
Z
I- o:
z �.
w w:.
O N:
°
w w`
1-
u' o
wz
0 F'
z
Daily Homes
March 20, 1995
JN 95062
Page 12
All permanent cuts into existing soils should be inclined no steeper than 2.5:1 (H:V). Fill
slopes should not be constructed with an inclination greater than 2:1 (H:V). To reduce the
potential for shallow sloughing, fill must be compacted to the face of these slopes. This
could be accomplished by overbuilding the compacted fill and then trimming it back to its
final inclination. Water should not be allowed to flow uncontrolled over the -top of any
temporary or permanent slope. Also, all permanently exposed slopes should be seeded
with an appropriate species of vegetation to reduce erosion and improve the stability of the
surficial layer of soil.
Any disturbance to the existing slopes outside of the building limits may reduce the stability
of the slopes. Damage to the existing vegetation and ground should be minimized, and any
disturbed areas should be revegetated as soon as possible. Soil from the excavations
should not be placed on the slopes; this may require the off-site disposal of any surplus soil.
Drainage Considerations
We .recommend the use of footing drains at the base . of footings, where (1) crawl spaces or
basements will be below the structure, (2) the slab is below the outside grade, or (3) the
outside grade does not slope downwards from the building. Drains should also be placed
at the base of all backfilled, earth - retaining walls. These . drains should be surrounded by at
least 6 inches of 1- inch -minus washed rock and then wrapped in non - woven, geotextile filter
fabric (Mirafi 140N, Supac 4NP, or similar material). At its highest point, the perforated pipe
invert should be at least_ as low as the bottom of the footing, and it should be sloped for
drainage. All roof and surface water drains must be kept separate from the foundation drain
system. A typical drain detail is attached to this . report . as Plate 6. For the best long -term
performance, perforated PVC pipe is recommended for the footing drains.
Groundwater was observed during our field work. If seepage. is encountered .in the
excavations, it should be drained away by directing it through drainage ditches, perforated
pipe, or French drains, or by pumping it.from sumps interconnected by shallow connector
trenches at the bottom of the excavations.
The excavations and site should be graded so that surface water is directed off the site and
away from the tops of slopes. Water should not be allowed to stand in any area where
foundations, slabs, or pavements are to be constructed. Final site grading in areas adjacent
to buildings should slope away at least 2 percent, except where the area is paved. Water
from roof, stormwater, and foundation drains should not be discharged onto the slopes; it
should be tightlined to a suitable outfall located away.from the slopes.
GEOIECH CONSULTANTS, INC.
z
' w.
JU;
UO0
I.
W =;
:CO TL;
. • w O
• 2
J.
a
w.
z
za
• o •
•
•
w: •
•
•
•
,U N .
z
Daily Homes
March 20, 1995
Pavement Areas
JN 95062
Page 13
All pavement sections may be supported on competent, native soils or existing fill, provided
these soils can be compacted to a 95 percent density and are in a stable, non - yielding
condition at the time of paving. Structural fill or fabric will be needed to stabilize soft, wet,
or unstable areas. Based on the condition of the existing fill soils in the test pits, the use of
structural fill and fabric under at least some areas of the new pavements should be planned.
We recommend using Supac 5NP, manufactured by Phillips Petroleum Company, or a
non -woven fabric with equivalent strength and permeability characteristics. In most
instances where unstable subgrade conditions are encountered, 12 inches of granular
structural fill will stabilize the subgrade, except for very soft areas where additional fill could
be required. The subgrade should be evaluated by Geotech Consultants, Inc., after the site
is stripped and cut to grade. Recommendations for the compaction of structural fill beneath
pavements are given in a later sub - section entitled General Earthwork and Structural
Fill. The performance of site pavements is directly related to the strength and stability of
the underlying subgrade.
The pavement for lightly loaded traffic and parking areas should consist of 2 inches of
asphalt concrete (AC) over 4 inches of crushed rock base (CRB) or 3 inches of asphalt -
treated base (ATB). We recommend providing heavily loaded areas with 3 - inches of AC
over 6 inches of CRB or 4 inches of ATB. Heavily loaded areas are typically main driveways,
dumpster sites, or areas with truck traffic.
The pavement section recommendations and guidelines presented in this report are based
on our experience in the area and on what has been successful in similar situations. Some
maintenance and repair of limited areas can be expected. To provide for a design without
the need for any repair would be uneconomical.
General Earthwork and Structural Fill
All building and pavement areas should be stripped of surface vegetation, topsoil, organic
soils, and other deleterious material. It is extremely important that the foundations and slabs
for the existing structure are also removed. The stripped or removed materials should not be
mixed with any materials to be' used as structural fill, but they could be used in
non - structural areas, such as landscape beds.
Structural fill is defined as any fill placed under the buildings, behind permanent retaining or
foundation walls, or in other areas where the underlying soils need to support Toads. All
structural fill should be placed in horizontal lifts with a moisture content at, or near, the
_ _ GEOTECI•I CONSULTANTS, INC.
1
1- Z
ncw.
u6 D
• :0 O;
• CO O'.1'
w
Ww:•
w
o'
•
w Q;
=d
w.
o
.zI-
Do
�0
• w w`.
H a.'
'
z:.
• • Iii N ..
_..
•0'
Daily: Homes
March 20, 1995
JN 95062
Page 14
optimum moisture content. The optimum moisture content is that moisture content that
results in the greatest compacted dry density. The moisture content of fill soils is very
important and must be closely controlled during the filling and compaction process.
The allowable thickness- of the fill lift will depend on the material type selected, the u� v;.
compaction equipment used, and the number of passes made to compact the lift. In no c.) o
case should the loose lift thickness exceed 12 inches. The following table presents co w
recommended relative compactions for structural fill:
Minimum Relative
Location of Fill Placement Comm ion;
co
g a`
Beneath footings, slabs, or 95% 0
walkways z w,
z o,
Behind retaining walls 90% w LU
Beneath pavements 95% for upper 12 inches 1p N`
of subgrade, 90% below 0 �=
that level _
Where: u.
_p.
Minimum Relative Compaction is the ratio, w Z
expressed in percentages, of the compacted dry D.
density to the maximum dry density, as determined o~
in accordance with ASTPA Test D
1557 -78 (Modified Proctor).
Use of On -Site Soils
s
If grading activities take place during wet weather, or when the silty, on -site soils are
wet, site preparation costs may be higher because of delays due to rains and the
potential need to import granular fill. The on -site soils are-generally silty and overly
moist, .. and they are thus moisture - sensitive. Grading operations will be difficult
during wet weather, or when the moisture content of these soils exceeds the
optimum moisture content.
The moisture content .of the silty, on -site soils must be at or near the optimum
moisture content, as they cannot be consistently compacted to the required density
when the moisture content is significantly greater than optimum. . The moisture
content of the on -site soils was generally above the estimated optimum moisture
content at the time of our explorations. The on -site sand soils could be used as
GEOTLCI•i CONSULTANTS, INC.
Daily Homes
March 20, 1995
JN 95062
,Page 15
structural fill only if grading operations are conducted during hot, dry weather, when
drying the wetter soils by aeration is possible. During excessively dry weather,
however, it may be necessary to add water to achieve the optimum moisture
content.
Moisture - sensitive soils may also be susceptible to excessive softening and
"pumping" from construction equipment, or even foot traffic, when the moisture
content is greater than optimum. It may be beneficial to protect subgrades with a
layer of imported sand or crushed rock to limit disturbance from traffic.
Ideally, structural fill that will be placed in wet weather should consist of a coarse, granular
soil with a silt or clay content of no more than 5 percent. The percentage of particles
passing the No. 200 sieve should be measured from that portion of soil passing the three -
quarter -inch sieve.
LIMITATIONS
The analyses, conclusions, and recommendations contained in this report are based on site
conditions as they existed at the time of our exploration and assume that the soils encoun-
tered in the test pits are representative of subsurface conditions on the site. If the
subsurface conditions encountered during construction are significantly different from those
observed. in our explorations, we should be advised at once so that we can review these
conditions and reconsider our recommendations where necessary. Unanticipated soil
conditions are commonly encountered on construction sites and cannot be fully anticipated
by merely taking soil . samples in test pits. Subsurface conditions can also vary between
exploration locations. Such unexpected conditions frequently require making additional
expenditures to attain a properly constructed project. It is recommended that the owner
consider providing a contingency fund to accommodate such potential extra costs and
risks. This is a standard,recommendation for all projects.
The recommendations presented in this report are directed toward the protection of only the
structures from damage due to slope movement. Predicting the effects of development on
the stability of slopes is an inexact and imperfect science that is currently based mostly on
the past behavior of slopes with similar characteristics. Landslides and soil movement can
occur on steep slopes before, during, or after the development of property. At additional
cost, we can provide recommendations for reducing the risk of future movement on the
steep slopes, which could involve regrading the slopes or installing subsurface drains or
costly retaining structures. However, the owner must ultimately accept the possibility that
some slope movement could occur, resulting in possible Toss -of- ground or damage to the
structures and the facilities around them.
GEOTCCIi CONSULTANTS, INC.
Daily Homes
March 20, 1995
JN 95062
Page 16
This report has been prepared for the exclusive use of Dally Homes and its representatives
for specific application to this project and site. Our recommendations and conclusions are
based on observed site materials, and selective laboratory testing and engineering
analyses. Our conclusions and recommendations are professional opinions derived in
accordance with current standards of practice within the scope of our services and within
budget and time constraints. No warranty is expressed or implied. The scope of our
services does not include services related to construction safety precautions, and our
recommendations are not intended to direct the contractor's methods, techniques,
sequences, or procedures, except as specifically described in our report for consideration in
design. We recommend including this report, in its entirety, in the project contract
documents so the contractor may be aware of our findings.
• ADDITIONAL SERVICES
Geotech Consultants, Inc. should be retained to provide geotechnical consultation, testing,
and observation services during construction. This is to confirm that subsurface conditions
are consistent with those indicated by our exploration, to evaluate whether earthwork and
foundation construction activities comply with the intent of contract plans and specifications,
and to provide recommendations for design changes in the event subsurface conditions
differ from those anticipated prior to the start of construction. However, our work would not
include the supervision or direction of the actual work of the contractor and its employees or
agents. Also, job and site safety, and dimensional measurements, will be the responsibility .
of the contractor.
The following plates are attached and complete this report:
Plate 1 Vicinity Map
Plate 2 Site Exploration Plan
Plates 3 - 5 Test Pit Logs
Plate 6 Footing Drain Detail
GEOTEC11 CONSULTANTS, INC.
0
} N w,
CO
wo
g J:
cli.
z �
I- O
ZF
,w w;
D 0:
1-
iw w'
cx
o.:
Z:
Daily Homes.
March 20, 1995
JN 95062
Page 17
We appreciate the opportunity to be of service on this project. If you have any questions, or
if we may be of further service, please do not hesitate to contact us.
Respectfully Submitted,
GEOTECH CONSULTANTS, INC.
[EXPIRES • 10 / 2519s
Marc R. McGinnis, P.E.
Associate ..
James H. Strange
Geotechnical Engineer
MRM /JHS:jcv
cc: Kappler Thomas Harkey Architects - Scott Harkey
GEOTECI•I CONSULTANTS, INC.
;:ilk :A „iS.:tA.`...A .H .,': i!..: 3,eL ?is�h.f_.x�'ti -a+i9: .•^u `va Ll.'
$ 133RD
SOUTHCENTER
STRANDER
S 167TH ST
ST
VTS
• 172ND
173RD
CORPORAT
DR N
CORPORA
DR S
PAR&I 4 r
PLAZA
SEATAC
1
MARRIOTT v
n
TRI IbIHD R
VICINITY MAP
57XX S 152nd PLACE
TUKWILA, WA
Job No.+
96082
rx...;t�nm.,.r. tnnm na'ir:...�+�' ten• M1 -. ',+ 1.1aly 7if•', .° g1WM1147471 ?'
5mm Drawing#
KAPPLER
THOMAS
HARKEY
ARCHITECTS
550 Kirkland Way Suite 406
Kirkland, WA 98033
(206) 828 -2700
January 26, 1995
Jack Pace, Planning Director c/o
Planning Department
City of Tukwila
6300 Southcenter Blvd.
Tukwila, WA 98188
Re: Pyramid Point Apartments
Dear Mr. Pace:
At the preapplication conference regarding the above mentioned project, it was suggested
that the issue of critical areas be addressed early on in the design process. It is my
understanding from reviewing the sensitive overlay maps, that there are areas of potential
landslide hazards shown within the property boundaries of this proposed project. Generally
these landslide areas are located on the southern edges of the site, on or close to the property
line. The proposed buildings are well back from the steepest portions of the site. It appears
that these steep areas are synonymous with the landslide hazard areas indicated on the
overlay map. We understand that by virtue of these hazard areas being mapped within the
project boundary, the project may be required to be approved through a PRD process.
Because of the visibly minor impact due to the construction of this project, we are requesting
a waiver from this requirement with the condition that approved construction requirements
are established by a licensed Washington State Geotechnical Engineer. I've enclosed a
concept site plan indicating the locations of buildings, parking areas and drives, and
topography contours at 2 foot intervals.
From my conversations with yourself and Mr. Jimerson, I understand that this process is an
administrative process and is relatively simple. Please contact me and confirm the actual
process and estimated timeline that we can expect for this resolution of this issue.
Sincer. y Scott Harkey, Principal
KAPPLER THOMAS HARKEY ARCHITECTS
C0195_79.DOC 1
REcEivr-
jai 3 G 199h
Get T
p�VLa•JJ. .w.... —� o .
z
6,
a:2
Uo
U0`
1.3
w
W• o.
2
J;
=• d
1- W.
z�.
I- o:
z f-;
2D.
tuW'
I U .
rz
o`,
z;
-
0
Z
City of Tukwila
Department of Community Development
August 2, 1995
Scott Harkey
KAPPLER, THOMAS, HARKEY
550 Kirkland Way, #406
Kirkland, WA 98033
John W. Rants, Mayor
Steve Lancaster, Director
RE: Pyramid Pointe Apartments
Dear Scott:
This is to acknowledge that I have received the revised set of
drawings for Pyramid Pointe and your request to pursue a Council
PRD hearing following the adoption of a new Comprehensive Plan and
development regulations.
At the appropriate time, we will schedule the public hearing after
completion of the Plan and regulations. In the interim, I will
review the set of revised plans and provide you with feedback as
necessary.
If you have any questions, don't hesitate to call me at 431 -3663.
Sincerely,
Jimerson
ociate Planner
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
mm Drawing#
1'1 Pi t f L 1 gg 1�CA.F•�F -' 1 r H O G -
SS
• i. f .
,) , b .
D8te Feb 13, 1995
Number of payee including cover sheet 4
•
•
•
5.1;
;; To: • ;s
r '•. . •
1oi: L•,
•• Steve Lancaster
y of Tukwila
•
r
•
el
°���i. •i. Kappler,Thomas Harkey ArChite is
• Ik��i:s{ ''!':;i•�I Is' j ,�.�k,.. s,. is .c;,, r. 4i I'
;w..�; , i i ; • • • 558 kI�klani Waiy� Suite
li„ •
I gip' .Cat r nl�ii'' • ,J t' .. fi • ' • ',Kirkl�Irid, WA:
:From:
.
i. „. ••
4 ECE l
. i ''� �• iii
':
'' : t r
1 t
COMMUNITY'} : .ci nPMENT :
t •.
i
•
•
''
•
Phone , (206) 828 . 2700' . i1=1. •
Fax # (206) 828 -2706; , •
iFi,; ;' • ,
9: , .•••
L.
.I
•1 i
R1-MARKS:
❑ , Urgern .CI .For your tevlevt'
•
ot•
• :4 htl:•
.i.. • :1 �• . is k•. . i
• •k;' ,
! . :it :. • I.
U: • • t. Lt i j �.�':. • ,. ,,�; i • ttry. . i . i
. is „
•: , }. .;i:
_�,, t.. ,:, .,;v't ” .):'• • ' . t 'i I ij • .11r li
Jf : t s•'it
. I i
i
,•,, :
..,,,,,
is 1 y.• , t lir:;:l ! it;jI li r • . ,
: ..
,...,. ,..,„;.....„ . r• i ,,,
:::. •.. .. i;.:.LITY NOTICE: i; ;: ..<�sf;; ; car =' r ,1;' , i' .�
:4+:, ;CONFIDENTIA The materlal'containecnn this FAX transmission Is private,and.contidenfiai`and Intehdedi • i. i
i. i. :4 •,.. only for uae by the indIviduais on this sheet. Use <disc as re ,O'41 n distdbutlo or a ia c u `' '70: "' ' °` "'t'"` :r 11 ' ' i;
,, , : � 'IS a ,; „ 1?yl' 9,• 1 n r I' n a• pen tie fint`o�maticn�co'nta�ne�'�••�•i ,j ,
.: )n this`FAX by anyone other than the Individuals•pai�ne ':P•f�l,'Ibitad.. if you have received this FAX iii'eyror,' ',jeas'e note :us; =;!'' '1 •
. I 4 • • Immediately by calling 206 828=2700 and retur "n:Ihe� i in4I'tr'' ns• issipn to us at Than ,r '' •!,,. :. =i= 'I
D C, ) �i(.9. 8 ,ni u s the above' address. Thank yd �'',: '•
I
M1 '
•
.J
ic4.:041e.Nekt,
c.\:,i.,■',,aN4li
.• .r a.. ..d.ir� ..nf�i i'fl 4F aYl {L3T
•
it
1 ,•
! i
;
Z
1
w
6
U O:
I "IIJIY .. f � L' G 1"‘.. kJ. ►='Y I HSSC'7G .
KAPPLER
• '� THO
• THOMAS
HARKEY ►'iI
:; ; • ' s ARCHITECTS • ' : : • 550 Kirkland Wad Suite 406 1 ''• 1 4..
1• ' i Kirkland WA 98033 ? !' :I ' L i ;ilk,.
3 ; .! . '• • (206)'828.2700 ^';. ' i :� ; • +V,,•t•�- :':•••••• is •ti.
1_. •;° :• •'•_• •t • : ' "....1. ebruary .13,1995 !1: • I; .;..;,: , :: Steve Lane ter :('; :; •
i ;:.t: '_ `' Director of Planning c/o a _
• :. ;; l.. stn _ ..1 !
;, ,t ; .City of Tukwila ` °'' ' !.
'• if' :,u'. ' : ' 6300 Southcenter Blvd. ! ;4;.: •
;# : , .• : Tukwila. WA 98188 .�I•; ' "
f •. • • !1 • •• i? • , •i • •: j
•:..: ''•' ReC' Pyramid Point Apartments- 94144 ; .;,...,. '�1:
• 11' :••• • • •t .• , t ,, 1 .1 f 'Y ,.; , • • ',II,• r li:
' ! "�i': :' •i ?' , ::i'. ` f nay�
: ; • : ' Dear Mr. Lancaster: :10:: ' if
'f'...1;.. ,...i, }.J •': I amthe Architect representing, the ;owners of the Pyramid Point Apartmients. a ate,. . • !! !''• • ''
ter •!i •'s.•• ':t:. ;'�'•. . •.. :. •7i' ,'• :. 1., 11 ..m: , ..,. .•, r , .11
;_: _'.. :currently planning an expansion of, the ezisting projcpt.froit183 units to 4 n,,�oposefd 123 nits.. ,: • t, ' 11 '
,: : ' ' .,, r I i, j• •1 t.44: 5, 1 .. • ,.1:11.;
: ' °`: The proposed plans are designed, around;�meeting all,•of the current btnildin and z inin .,s•' ', •� • •'+ '!•r-'•• •; : ;: • 1.•' : :
• ':
• 7. Could 63.ixid
•
1- C. J. —• 1 J — J
1`1 kJ 14 ▪ • L �F
IS 1'" 1-1 S c ■ G _
• information should be reviewed by a professionally trained staff member or a paid
.: 'tT {. L :''consultant. I dp not believe that the.individuais on the Planning Cornni s i�pr are qualified to
`••• '' ;;r, make technical judgments' aS wuld;.tie,xequilced of them in this case. If the intett •Of:th0
' i ` is ::'•(:: ; , Planning Commission is to comment, ort, the aesthetic issues as defined in,.1 e. City's Multi-
I' :',•:: '' ':i . • • Fairiily Design: Standards, it need .not gocur,again with the Architectural ROview ,Boardy.At
', 'r • worst, I believe that the requh;ement•fai an Architccural•Revicw Board lie nnn Should'be
... C. ` dropped because of it's duplicate nature.
'.
•
• 1.,:!y' • • i•: • 1).4 : _ •: ti • �• t'' : r: ' `.• As you no'doubt understan by now, I'm•concerned about the way this, proccs §:is,moving • • 4 :f; • '' 1 'i . :.i.• : ' ` along. Over the last 18 months,, theenOent owpers of this property have made a;Cpncetytted, ;; ';
•E; ` '`''' effort to'i�evitali7..e this housing tproject from: a very marginal environtnent, io• a decent;.a�2nd , ; '
' '.....;r; ; t'' ▪ respectable place to live. And fn the lglia wrm:planning for this site, it.is„t1C ow ers. Dal to .a E •
'' °• r:' contunue ?sihis process by developing new modern apartments. These new homes are d igned i ;'`
• ::....,:::.:..!:::25:L . „to i eet and exceed the requirements oli•tbeclty,: By virtue of their coexistence;on :the.Site i;;�
n ...:'.41.:'•:* •:4•••••! _ „ ,iii' • • • 3 • ,• ,: 0.4;!:: • 3
:1 :.• - with, older buildings, the enuretprojectcWill,benefit in a positive way. • I'feel,that:it would' be '° i r •
; `. unfortunate to
•3, . }• r.. • r _.: • .. t, is :
• • .,,' • I have a great,appreciation or the issucs,,and necessary processes that the cityrnuse go .
' throu • to rrotect the interests of. the community:, nd I'm interested o in; i or �4' ' •
• �` g1� p i a w, kin�;w�th'ynu to
,••t • find',the most•efficient and,reaspnable ►ay, q, acgomplishing both of our 49' ds on,this.;'•t
;: t:', project.: Please call me.so.that we may;;di,scuss;this further. I'm anxiotis;to mov4, for, r rd.
'.? r' ' ; +l�, �' ;• r: tit.
1 .� • , • Y•
r
•
NE'
•
'I:
Pr IM
i
Sincerely,• Sc, tt Harkey, P.ri ipal
KAPPL.ER"•THQMAS HAxO'Y Al2C.l CTS,
uxt.. " };: • • i . •,
1.:,4,?:
.j
•= ;•• ; 3•
, COIW P3.DOC
r,3
•
• :ii
• t•
•3: • •
, 31
• i
• t
ce
2.
Wes,
JU;
UO`
UU;
:COW
Lir
co
WOE.
u.
a.
Z
Z
ILI Ili':
U 0,
•O�
;W W
u• z .
U
Z
•
1•.._,,.,_.. ✓,... Gr-:- 'iy�;..}�.4.i.el5itsGir1L:"Yxf
City of Tukwila John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
January 31, 1996
Scott Harkey
KAPPLER, THOMAS, HARKEY
550 Kirkland Way, #406
Kirkland, WA 98033
RE: Pyramid Pointe Apartments
Dear Scott:
This is to follow up on phone conversations I've had in the past
couple months with you and an owner of the Pyramid PoinLe project.
As you know, the City Council adopted a new zoning map and
ordinance for the property. The Pyramid Pointe project is now
under one zoning classification - High Density Residential.
The maximum density for HDR property is one unit for orrery 2,000
s.f. of lot area. As a result, the project as reviewed by the
Board of Architectural Review /Planning Commission does not meet the
density standards.
I haven't heard back from either you or the owner since I
originally provided this information. I am writing this to ask you
about the status of the project. If you wish to proceed with a
variation of the project, you should contact me to set up a meeting
so that we may review the necessary revisions and discuss the
appropriate review process. If you do not wish to proceed with this
project, I would appreciate a letter to that effect so that I may
close out the files.
Thank you for your attention in this matter. If you have any
questions or comments, don't hesitate to call me at 431-3663.
Sincerely,
ohn Jimerson
Associate Planner
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
.,r.� ''i >a�.i SYiir {rYN » °.t:;A-rte.'y.w'G'Ai.; :uwF: 6:r .r. ;d:•..• �:r4i;rc.�t.r,swf✓c vih S: 7d_ v .4.Alu.:S.vl:S.ia:lulira+:cearb • 4,
PLANN
SIDENTIAL DEVELOPM
: •
.,•., • :v.
;•••
• • •. • ii.;1:•j. 11.•';•
ICATI
. , . ; :,..:,!' , ..:.II:,-,,,iL... • ,t,...,t4 .:!..,:,'.;:c:i..,'•;; J'S...:!=y.2:..ii". • ,...::i
.. ': 6306 Southcenter Be•Olevir41,. Tuiciv-14,. WA -9$7887.1. .....'
. ,. . , i
. • relephone'(206).431-36i30•„;1! • ..:,
• .,:.: • .,...:!: .t II"- ''....4.N9..::;.4.r...41.:"..4.;•'ili, •.'
"4.744'4
(Aro T•
: •
• NAME OF THE
' 0ROPOSEbi DEVELOPMENT: •
NT,/i/lEik atbINELLING UNITS:
.6tA tiloyl +9 e-ws
si
ZONING OF'4113JECT SITE: g M
•
PROECTI4C.A..TION: .(Give street aiiti./e.
•
• •
division; or ta)t lot rturnber, access street, a'
1:' :::i.3.f. •
.: '.I,'•'''. '
'coij: Xt acapt, indicate lot(s), block, and .Su
•,. • .7F,,,,
i'.; • *.t4,:
ilea:test intersection) •.
p.
IC
.,,
Quarter : • , Section: ToWtShip:).-3 f\i Range'',
• •
• • •(This information rimy be If° d tour tax statement) ••••
;. • .': • .. ••..lt .
: ....••. I.: 1
.. ...::. • .:Il•
! • .,': . ": 31.
: •.•'. : .:'•;:
...
• •I'
1 '• 4;. ' •
,:iii ::...!:: . .
,.. :
... 4
1-..
1 I.,5 ,..
ti.'.,t• :::1:
to,..• • • .
2 . 0,i44(e.)1 ::/,•.;:'
..P.'.:.
:6Wear• , .1... , re e owner ii, c .. fact pigc aser s o -te property invo ved .. - .
.ii., • i.'. it :... • 4n,;tli. iOn..and that the fbogo3.16 •st4feitentS and•ansWers'otitained,Ft thtp •• ••
• ; •,,. • ,
• ....-: - . :....; • -,•,,,,••
'.•:' "It'PpliattOii'ai true and correct to!thiti st.4iity ./otir knOwledgeOid. belief
, . ' .• ■• ..! :.:.;. . ...!...
• ; “ " • .. ' • • . Date:. 1. • ..241,1 .----7.•„••! •• : .: ....L .. ...,
'.1..
. . • . .:.:.; ..... •N: ':-.';...
3.. • . '..i 0 .1.. .CI . . " ' C.. .0 .W 0 .-1 i ...I -.I -0 A G e : e. a i-i ..1. ' c.`;- T `. -
• -...,,,, :,. 41, • ,-...,;•...• • • " • •.• • •'• • t - i ,
.• •
., •
• . I ,1 2;
x• '' •• • '• ' • • •
641 ;APPLICANT:."'..... g_• P Pt
• • .• 046i,v, • Ave- F- • SCA fii-c_S.Wit.
Address: 3 3 lte
0 ! r : .. .. .
• ' . igOature:
• . 77."'
r(dow.. -F 1( 1.q. , • ili.• .. ,
• : .. ..:„ !,:i!.:i; •
• .1;,
• .Ph net
rrhe a licant is the pe son Whotrtihe'S Of contact rega ding the application, an
, .F-• - • .,
to whOiiiili itotiCes and reports sliall is OritUitless'otherwise stipulated by NopilCart
,
v: •
. . .. • . , ..,. 1„, , • . „.. , .•
. .;, . h.
I'l
. AFFIDAV.Ii 00' 0Wgiit.SHIP . ''•
• I'l
i.: • ..; ' W''
OWNER '..': 1 ''''.. : ' . •• • i• : I -: : • : .. :s; • i i.i...,•.• V
:,•ii . :,..: :.: ii.;:
...:., ....:•:, i;'.• , Address: 33/(a R:t.ki .0 ii. Aii&. F7) Se.4 fife,i IA/A-% 1.501. .T.,:.
. .
• . . . , , 11.j
. ..
. 1, 1. : .;•"..i.'. •
:I •
. •.:
":. ,.1 .,.':'..'...,t !.: :,.‘,s.;:::.,,::. :, :,. : .• .1 . . . .., 1':: ':::..,;•I .•14 .:11.11 '1
•
Phone 2g- -70 :2.
i. • .
'
l .1
I ! ‘ 7
•
••••• : •• '
pROPERTY D .
z
<
11-
•
1.■ Z
•IC
6 5
- o
• o
co 0
(o11.1
WI
- i
• u_
W0
u.
D. a
w
g.
I-0
z
w ui
2
n
o -
• up
X
b
. z
Cu u)
-
0 17
z
• •
°P.P APPLI9ATION
11M/MMOAMMMINVIPPOO.11••••••■••■■•••■••••■••••••••••M4*~•••••■
•,• ;
Ppgb 2 . 1
.:- . .
• : • • • ' '
' REQUIZTEP, PLEASE EXPLAIN FloW.THE.P.EQUESTED DENSITY BONUS FOR T
• r • , t!, •k •
I PROPOSAL MEETS TI-IgFOLLOWIN CRItERIA.
. . .
. .• 1'
: : •
, .. A. •: ;; At 404 fifen percent of the iiatti'iat-iegetatitin is retained (in ca:ieS‘vheieSigiiiiiCan
.: . • :i is.'
Stand exit) t)
.s. . • - ,
. .. • ti: • '!. 1;:i,i;':
. • ,:* P •,: •':?;
-.: :•,:i . i. 8§roNsp,:. ! --rh.p.. nro FDSA, _ '1i ., ,:•• , • a d(-: • (41"1_ (.17 " 't • ;• C.'r
• •:5, ;! s: le : +b. A • 40 - ''-f-Dil ..
. ,., .
• . , .. 1-
.: . . . ... i, .. ..,
. .
...*: : 4)10f.47f-11/1:41.-Aglor_e_.6k. sj 4-c ..• A-V : f.ovirhe.te-r- Lot vtats'. ' 1
.:., .4:4-i wc,i .k.s a.- rvIcL,3 or •ct 1 • • 2.__Ect stivi j v-ede-fri*
. • , , I.
..,
.■ toe. trI-E g •
I •
1•11
1.
• ,7,:111;
, •
• 1
.
.5.1 •
II
, . • ' ; .
, •
. ,
isineware • A '
114 -
spo 8E1:: t Airic\s ikw j4.2 12t( .s -P-( .41-khcA") .e-AcL5
.1 - • 7auch as vie*s; streams, or other cltaracteristics.
; •
• v:AdVantagte taken or enhantelneitisichieyed of unusual or significant slii,te
• \ tt.t,t) ')+0 SO(4÷1)\ V anrivICtelltne-7-1,,L
VtS I A:e/Aiticii-- Vvirrc ) utfe4(
,
.:
t
• .
•
• • . • •
. • •i
•••,‘
. • • • i• • 1Q:.
•
•:••ip• •
•
.1
••• ••••••:•;•,1
•i.'•.• •
••••,%
•-•,•., • •■••••:1
' •
1 I.
. . .1•
.C. Sepa6atikm:0 auto and p edes Wan inOventenV e'specially in or near areas of recreatiOn:
„..:..i.
• aiK-C-ctil-- 4, Ve..■ . 19 coin J.: ...
O.
tityh)
ti0J41.,
-1a)
•
barAgi.a.
• 1. 1 • , •
•
•W .G V -4 .2. I all G BrI.1. 1.4
•• • ('
.• •
•
...,•••••••
14
•5;.
1•
•
a•
;:'F D:APPLICATION Page 3,
• D.:..: e'verolirne.nt aspects of the PRD coinplenie it the land use policies of the
• • •.Coiinirehensive Plan.
ee qff
rSrONSE::
• ;r
iADDrr ) N;IORZVIU LTIPLE- FAMILY'DUNSITY :O11■1USREQUESTS:
P. • A va i4:t f. housing types are offered. •
R #SPONSE:..
•
•
•
d
.4 .? I J ../ 1, ?i .Z 't : 5 3 f7 .L
- I - :J'!J W
.z
re 2.
• 0 0'
N
W =:
WO
• LL Q
.
z
O
ZF-!.
0 H .
W
H U.
• Q
•
z.
U N
O
z
PAD APPLICATION
8.. .i:::.WILL.THE PROJECT 13E COMPLETED IN PI-IASS? E]Yes tZ No i• i • 1:1. :1
•:,, • .. . , :%••• i,.. • . •I: ' '`.... ••• ..••'e
.i. • . . .
.....i If yes, please deScribe proposed phases andltiine blames. .,
•,:. •
.. •
. i.:. ..,
omps■••■■140•••••••1111144■■•,.•.1■.■•••■■oromeae.
t .1
i ' ' ‘• . . ' . I '.
...
' ..:
.$
1••'::
• • •
Page 4
... •
• 1 '
•
• „1•••••; 7 I
•
••••••■•■.*.esNallm.**116.64.4.•■•••,
• I
•
•
4.01....1.1•11•16 ■.
•
... i• , .1 h • •
'.:. . If no, *That is the proposed start date arid :finish iliate'LLir -t— ' Att US i- 1 .:5•I
. . V. ..■t
l• 0da..42.1r.e.t.1.9n —ILVL.0.,_f:.....iacisJ_.................
. .
•‘,
- i... ...... 1..• .:.•
• ik:
!..• .. . •..,
.:•,
::. :...,••:••• , .i
...... r•.•••:: •:„.• "
...„. ,::. .: •••, .•:.
.,:,:;: v,,s :..i• 4
,c. • '. •.:... ,,,
• . i ,
9. ':;..;' PLEASE` DESCRIiIE THE OWNERSHIP PATTE". FOR THE PR
.f. -CAA) (0 -c c. (4)1(1
:1
:ay ,..LVI&K___.1/\ ....pA>lej..4.
...., . . . . i :i Y.,:i• , i
•4, .
10.•:r; ,PLEASE DriscRinE THE DETAILS 01t!LISTIANY RESTRICTIVE COVENANTS PRO- Tj • i
c.rosEptoR TI-IE PROP2CT. (This inust be lincorp tilted into your proposal arid rnay **1;.;;• i ;i
,.. .•
' • ).
1/bnly beiecorcled after review and approval by the ty Attorney and City Council) • • Z:.
41
9.1........*•••••■■•••••••■••••■••••••••••••4•••••••••••••••4••..i.....................
• • I.. ' • :e .
. ' ... . . . .....
• '
..1
0..1•■■••••••Ownge•Wai
WW........+P.,..a■••=0:••••■••••••••••■•■••••■•••■•Ma.ww...4.041
•
•
......00.4-v••••:•••••iataa4romorm.
:4
•-■•••••n *Pa/meow...a...MAL* •
• ;t. ; : • 1.
• s• N
•
• t • • •
••■••••■•••••■••••••••••■■■••■••■•••■••••■■■•.....www.ammetargoNIN
.1 • •
•.•■•••■••••••.—:—••••••••■•••••".•••••"••••^••••'•.••••••••••••••.••••••••••''•'••'"••"•^••••"•'••4
1.
•■••••••••••••••••••••••••••••■••■••••■•••■■•••••••••■••••••■•■••■-.
•
:..; •
.• ILIHOWWILL THE:COMMON OPEN ARASIANOitOCREATION AREAS BE i■mi.N-
:•TAINED? V . • ,
e' mzulic
Lerx.k- ,n
•••••■••.••■•••••■•••-.......40.••■■••••••••■•.•■•••••••••■■••■•••
.... : '.r. .
1. ).. i
......". • i . ;.;', ' ......
• ..• i'.....••......• • ....;„ . •,:,
','..; ; • '.....: .....• . i
.: r '.' : ;•.n :1
., ;•... • • .f.
•:.:•.. .; .:**. ..•
;!.....•• i':.;•!. •• .
'::::•••••• ..r...••
. (•••:•:. ••:. .. . ;.',": .. ,
•i
••3
I: •
1.••••■•*••••■•41.1./■••••••••••••••••••••••••■•••■•••••
90-a
• .11 • -•••••••1•■••••••••: ••••••.i ••• ;
• ; • !. **
r 4, • ;•., • :.
i '4',.•
1.'
' ,• '.;:' ..'j . A •
am,. SG —TZ —Jolw
•
•
t!:7
•
•• • . - J- 4TA: ^.1.
P . 02
• • •1;1;I •
•
:si•Ii
+• 1,.I,�,L..•J•::5f .. :' ' ;rrl!+'
'1{ rift,'"'
•
•
•
'50 Pit.rak
r.
}
CI
'•N
•
•
Y��Mj•'Y�'*''A,.1!51K.h�.�.. {Y I.1� -, •«r••1••LM1- ..�•!•4-
•,t .
• :,!.,.r,,. r •
c
♦ s.�. r.a ..,..:. .r ..I w. •
•1
1•..F:1..I.\.I ir.�l�I w.,x 34141....1.1.
{. t` 4, •..•...
.! ,.. • • • r.. -..!..
1............ .. • 7••••• 1•• .•a.. .•.i, •. .._
;i
•
...wl+.- ah�1�•M1...
•
sl
•
ii F:wn.R.�C..r•�...1ir.j..•• .. r ..r, ,.r •
•
Yr!! ai4":' +!nr/7Mri§`*•- wannh+a.•w.+v,'. �••• I. r••... a:..»... v+,•• mve• r. r... w,.. w• rs nww. v.,,.. r•... oenrima�• n•.;- �nw•.•.+ ssz,:` r-• q, nsr ,.u1•!xEw>fit'i?i:p7Q.T,.�,.�, /l.�i�'SSXSYI�Iitb'aA�x,yE�
AFFIDAVIT
XNotice of Public Hearing
Q Notice of Public Meeting
Board of. Adjustment Agenda
Packet
Board of
Packet
Planning
Packet
Appeals Agenda
Commission Agenda
: O Short Subdivision Agenda
Packet
O Notice of Application for
Shoreline Management Permit
0 Shoreline Management Permit
O F D I S T R I B U T I O N
hereby declare that:
0 Determination of Non -
significance
fl Mitigated Determination of
Nonsignificance
0 Determination of Significance
and Scoping Notice
0 Notice of Action
0 Official Notice
O Other
0 Other
was mailed to each of the following addresses on
FM)-1 -t1) "fi'vm-s t)1(
oo€P--1/1,e
Chi
WV mil
Name of Project t4V!ik l giVA.) Signatur
File ~Number LAS- OCAS" p%zi>
City of Tukwila
John W. Rants, Mayor
Department of Community Development Steve Lancaster, Director
City of Tukwila
PUBLIC HEARING NOTICE
Notice is hereby given that the City of Tukwila Planning Commission and Board of
Architectural Review will be holding a public hearing at 8:00 p.m. on June 15, 1995, in
the City Hall Council Chambers, located at 6200 Southcenter Blvd. to discuss the
following:
PLANNING COMMISSION AND BOARD OF ARCHITECTURAL REVIEW
PUBLIC HEARING
CASE NUMBER:
APPLICANT:
REQUEST:
LOCATION:
L95 -0018: Planned Residential Development, Pyramid Pointe Apts.
L95 -0011: Design Review, Pyramid Pointe Apts.
Charles Laboda for K.D. Associates
Planned Residential Development (PRD) and Design Review
approval for a 28 -unit addition to an existing apartment complex.
15304 57 Ave. S., Tukwila.
Persons wishing to comment on the above cases may do so by written statement or by
appearing at the public hearing. Information on the above cases may be obtained at the
Tukwila Planning Division. The City encourages you to notify your neighbors and
other persons you believe would be affected by the above items.
Published:
'Seattle Times
June 2, 1995
Distribution: Mayor, City Clerk, Property Owners /Applicants, Adjacent
Property . Owners, File.
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • (206) 431-3670 • Fax (206) 431-3665
* ** METROSCAN LABELS
Date: 02/14/95
Report: Laser 3 Across
Sort: Parcel Number
Count: 183
* **
Labels
LAVISTA ASSOC LTD PTRSHP
200 W Mercer St #403
Seattle, WA 98119 -3958
Robert & Linda Tjossem
P-10522 NE 187th St
Bothell, WA 98011 -3016
Tom & Kazue Kato
.15419 62nd Ave S
Seattle, WA 98188 -2506
Mar.garete Wilson
15249 Sunwood Blvd #A -1
Tukwila, WA 98188 -2443
Edwin & Treloar Burrus
15255 Sunwood Blvd #A -11
Tukwila, WA 98188 -7854
Maureen Anne Clark
15255 Sunwood Blvd #A -21
Tukwila, WA 98188 -7854
Don & Kay Lowman
..15255 Sunwood Blvd #A24
Tukwila, WA 98188 -7854
Gary Cassidy
15255 Sunwood Blvd #A27
Tukwila, WA 98188-7854
MULTI .COMMUNICATIONS INC
402 S 333rd St
Federal Way, WA
98003 -6309
c,j,vtiJomt o�
RSA ASSOCIATES LIMITED P
444 NE Ravenna Blvd #414
Seattle, WA 98115 -6467
HAMPTON HEIGHTS ASSOC
33430 13th P1 S #300
Federal Way, WA
98003 -6383
.Tony Kato
Lvng Trst Doris
PO. Box 23669
Federal Way, WA
98093 -0669
Gregory Dewar
15249 Sunwood Blvd #A -2
Tukwila, WA 98188 -2443
Sherryl Gunnels •
15255 Sunwood Blvd #A -12
Tukwila, WA 98188 -7854
Ellen Marquardt
15255 Sunwood Blvd
Tukwila, WA 98188
RECEIVED
FEB 2 41995
•
DEVELOPMENT
NORTH HILL APTS INC
85 S Washington St #308
Seattle, WA 98104 -3407
Kenneth & Gloria Levy
Family Levy
160 Rio Robles
San Jose, CA 95134 -1813
Hisako .Kato
9316 39th Ave S
Seattle, WA 98118 -5211
Don Wilson
15249 Sunwood Blvd #A3
Tukwila, WA 98188 -2443
Sharon Pieper
4317 Forest Ave SE
Mercer Island, WA
98040 -3911 •
Beth & Ensign Stanley
#A22 15255 Sunwood Blvd #A -23!
-7854 Tukwila, WA 98188 -7854
Donell & Hideko Tekawa
9923 Beacon Ave S
Seattle, WA 98118 -5623
Rosa Santos
15255 Sunwood Blvd #A -31
Seattle, WA 98188 -7854
. Eugene & Dona Waage
15255 Sunwood Blvd #A -34
Tukwila, WA 98188 -7854
•
Mary Sharon Williamson
-6319 9th St E
Tacoma, WA 98424 -1486,
Clifford Bate
Katherine Bate
15255 Sunwood Blvd #A -32
Tukwila, WA 98188 -7854
Gordon Abshire
15255 Sunwood Blvd #A -36
Tukwila, WA 98188 -7854
W O.
0,
t,. w
F- O
• Z
2 D;
M p:
0 1-:
:11.1 w,
LL 0,
Z:.
L_
0. H±
James Hykes
• 15255 Sunwood Blvd #A -37
'Seattle, WA 98188 -7854
Thomas Lee ,
15255 Sunwood Blvd #A43
Tukwila, WA 98188 -7854
June Wang
• .15203 Sunwood Blvd #B -2
Tukwila, WA 98188 -2443
Luenna Ann Pullman
399 Olympic View Ave NE
Ocean Shores, WA
98569 -9552
..Astrid Harmer.
15209 Sunwood Blvd #B23
Tukwila•, WA 98188 -7855
Martin Overmyer
15209 Sunwood Blvd #B -26
Tukwila, WA 98188 -7855
-Yoshio Shiota
4422 S Myrtle St
Seattle, WA. 98118 -3831
Tetsuo Noyama
125 Hanapepe Loop
Honolulu, HI 96825 -2109
'Phillip Keller
15209 Sunwood Blvd #B -41
Tukwila, WA 98188 -7855
Lowell & Janet •Bieber
1601 Ten Mile Rd
Everson, WA 98247 -9605
Kim Dobbs
14251 58th Ave S
Tukwila, WA 98168 -4526
Roger Galicic
3263 S 137th St
Seattle, WA 98168 -3963
Beverly Lindemann
15203 Sunwood Blvd #B3
Tukwila, WA 98188 -2443
Joel Davison
21123 SE 137th P1
Issaquah, WA 98027 -8489
_.. Mimi Malgarini •
15209 Sunwood Blvd #.B -24
Tukwila, WA 98188 -7855
Don Tsuboi
11003 SE 60th St
Renton, WA 98056
'' Robert Koyamatsu
15209 Sunwood Blvd #B33
Tukwila, WA 98188 -7855
Joan Parish
15255 Sunwood Blvd #A -42
Tukwila, WA 98188 -7854
Patricia Gratton
15203 Sunwood Blvd #B1
Tukwila, WA 98188 -2443
Jose.Valdez
-15209 Sunwood Blvd #B -11
Tukwila, WA 98188 -7855
•
David Kazumora
15209 Sunwood Blvd #B22
Tukwila, WA 98188 -7855
• Rosalie Delora
8489 Whispering Oak Ln
Orangevale, CA
95662 -3867
Terry Pugh
317 Lake Desire. Dr N
Renton, WA 98055
Glenda Bang
15207 Sunwood Blvd #B34
Tukwila, WA 98188-2443
Michael & Louise Maley Yoshio & Betty Shiota
15209 Sunwood Blvd #B -36_ __4422 S Myrtle St
Tukwila, WA 98188 -7855 Seattle, WA 98118 -3831
Roxanna Walker
15209 Sunwood Blvd #B -42
Tukwila, WA 98188 -7855
David & Susan Bell
15278 Sunwood Blvd #C -11
Tukwila, WA 98188 -7851
Naomichi & Eriko Ono
15209 Sunwood Blvd #B43
Tukwila, WA 98188 -7855
Jill Irene Lunn
15278 Sunwood Blvd #C -12
Seattle, WA 98188-7851
Larry Hulvey
15278 Sunwood Blvd #C -13
Tukwila, WA 98188 -7851
Donald Fuller
15278 Sunwood Blvd #22
Tukwila, WA 98188 -7851
Charles Sandifer
Barbara Sandifer
15278 Sunwood Blvd #C31
Tukwila, WA 98188 -7851
Gordon & Joann Elder
15278 Sunwood Blvd #34c
Tukwila, WA 98188 -7851
Lynn Radtke
15278 Sunwood Blvd #C14
Tukwila, WA 98188 -7851
Jon Alan Nagasawa
14818 SE 181st St
Renton, WA 98058 -9649
Rusalyn Melone
626 W Elm Ave
El Segundo, CA
90245 -2956
Kazue Tagami
_..15278 Sunwood Blvd #C21
Tukwila, WA 98188 -7851
David &•Sarah Owens
15278 Sunwood Blvd #C -24
Tukwila, WA 98188 -7851
John Dexter
15278 Sunwood Blvd #C -33
Tukwila, WA 98188 -7851
Herb Baylin John Kosich
15266 Sunwood Blvd #D11.. ..---1821 101st Ave NE
Tukwila, WA 98188 -7852 ' Bellevue, WA 98004 -2704
-.Kenneth & Dorothy Thynes - .Bonnie Molsberry
15266 Sunwood Blvd #D -21 213 4th St S
Tukwila, WA 98188 -7852 Kirkland, WA 98033 -6614
Victor Tarver
Carolyn Love
2997 142nd P1 SE #A
.Bellevue, WA 98007 -6419
- George Nakamura
Marilyn Nakamura
15254 Sunwood Blvd #E -21
Tukwila, WA. 98188-7853
Robert Myers
PO Box 163.9
Tehachapi, CA
93581 -1639
:dames' Simonson
1718 41st Ave SW
Seattle, WA 98116 -2057.
Alice Minster Coday
15236 Sunwood Blvd '
Tukwila, WA 98188 -2444
Geraldine Tarver
15254 Sunwood Blvd #E -11
Tukwila, WA 98188-7853-
Walter Hermann
Hannelore Hermann
1623 W Anderson St
Elma, WA 98541 -9004
Joseph Parente Jr.
15242 Sunwood Blvd #F -11
Seattle, WA 98188 -2444
Marlene Rodriguez
15248 Sunwood Blvd #F22
Tukwila, WA 98188 -2444
Eileen Chikamura
15238 Sunwood Blvd #G -3
Tukwila, WA 98188 -2444
Doris Bassan
15266 Sunwood Blvd #D -31
Seattle, WA 98188 -7852
Henry & Karen Warner
10380 Rainier Ave S
---Seattle, WA 9817.8 -2614
Daniel & Susan Shames
David
6817 Seward Park Ave S
Seattle, WA 98118 -3451
Robert Fort
15246 Sunwood Blvd #F -12
Tukwila, WA 98188 -2444
Janice Rusk
15234 Sunwood Blvd #G -1
Tukwila, WA 98188 -2444
Carolyn Marie Rolfes
15240 Sunwood Blvd #G -4
Tukwila, WA 98188 -2444•
W,
00,
W'
a 0:
J
u. a'
N1
Z (1
Z �,
1- O
Z H;
'la la
iO N:
,0 H'..
'WW
X U"
IL' 10'.
ili Z,
Z
Ryan Thrower
15232 Sunwood Blvd #H1
Tukwila, WA 98188 -2444
Gerald & Lilian Smith
15226 Sunwood Blvd #H -4
Tukwila, WA 98188 -2444
William & Mary McLean
15230 Sunwood Blvd #H -2
Tukwila, WA 98188 -2444
Christina Gordon
14405 25th Ave SW
Seattle, WA 98166 -1014
Richard Hernandez Vern & Glenita Aarhus
15224 Sunwood Blvd #I -21 15220 Sunwood Blvd
"Tukwila, WA 98188 -2444 -"Tukwila, WA 98188 -2444
.Michael Steiner.•
15212 Sunwood Blvd #J2
Tukwila, WA 98188 -2444
• Aubrey Haworth
15185 Sunwood Blvd
#Aa -11
Tukwila, WA 98188 -7895
Margaret Pertricek
• 15185 Sunwood Blvd #A -21
Tukwila, WA 98188 -7895
L.-Ruth Virginia Taisey'
15185 Sunwood Blvd #A31
Seattle, WA 98188 -7895
Joseph & Bertha Hasson
15195 Sunwood Blvd #B11
Tukwila, WA 98188 -7896
Mutual Washington
1201 3rd Ave
Seattle, WA 98101 -3000
Catherine Rocchi
15185 Sunwood Blvd #Al2
Seattle, WA 98188 -7895
Michael & Linda Rismondo
15185 Sunwood Blvd
#Aa -22
Seattle, WA 98188 -7895
H & Marjorie Painter
15112 104th Avenue Ct E
Puyallup, WA 98374 -3703
Perry Gorman
15195 Sunwood Blvd #B -12
Tukwila, WA 98188 -7896
Mary Theresa Lollino Gregory Lew
15195 Sunwood Blvd #B -21 15195 Sunwood Blvd #B -22
7-"Tukwila, WA 98188 -7896 • Tukwila, WA 98188 -7896
Anna Lavelle
15195 Sunwood Blvd
#Bb -31
Tukwila, WA 98188 -7896
Eric Miyamoto
11743 36th Ave NE
Seattle, WA 98125 -5634
Penny Monahan
15228 Sunwood Blvd #H -3
Tukwila, WA 98188 -2444
Alexis Davison
21123 SE 137th P1
Issaquah, WA 98027 - 8489.'
Wayne & Wendy Farmer
15210 Sunwood Blvd #J -1
Tukwila, WA 98188 -2444
Silvia Steed
15216 Sunwood Blvd #J -4
Tukwila, WA 98188 -2444
('Kathleen Hutchinson
15185 Sunwood Blvd
#Aa -13
Seattle, WA 98188 -7895
Erika & Canaday Lochow
15185 Sunwood Blvd #A23
Tukwila, WA 9818:8 -7895'
George Soranaka Jr.
15602 139th Ct SE
Renton, WA 98058 -7816
Nicholas Kuzovich
15195 Sunwood Blvd #B -13
Tukwila, WA 98188 -7896
Susan Kido
15195 Sunwood Blvd #B -23
Tukwila, WA 98188 -7896
Douglas Joy'
E -3540 Mason Lake Dr W
Grapeview, WA 98546
Lisa.Jauregui
975 Murrieta Blvd #311
Livermore, CA
94550 -4065
Carol Mathis
15165 Sunwood Blvd #C -21
Tukwila, WA 98188 -7893
...Gary Henson
15165 Sunwood Blvd #C -31
Tukwila, WA 98188 -7893
.John. P.oetker
15020 -SE 145th P1
•Renton, WA 98059 -7310
Dennis Hostak
15175 Sunwood Blvd #D22
Tukwila, WA 98188 -7894
Leslie Berg
15141 Sunwood Blvd #E11
Seattle, WA 98188 -7891
Nancy Jane Hofferber•
15141 Sunwood Blvd #E22
Tukwila, WA 98188 -7891
Robert McGrath
15153 Sunwood Blvd #F -11
Seattle, WA 98188 -7892
Kathleen Barton
15153 Sunwood Blvd #22f
Tukwila, WA 98188 -7892
Carol Richardson
15123 Sunwood Blvd #G11
Tukwila, WA' 98188 -7890
Dorothy Judge
15165 Sunwood Blvd #C -12
Tukwila, WA •98188 -7893
Morgan Simonds
15165 Sunwood Blvd #C -22
Seattle, WA 98188 -7893
Robert Murrell Lee
.15165 Sunwood Blvd #C -32
Tukwila, WA 98188 -7893
Paul Hardin
15175 Sunwood Blvd
#Dd -12
Tukwila, WA 98188 -7894
Richard Reisinger
15175 Sunwood Blvd #D -31
Seattle, WA 98188 -7894
Steven Autio
15141 Sunwood Blvd #E -12
Tukwila, WA 98188 -7891
John Hammons Jr.
15141.Sunwood Blvd #E -31
Tukwila, WA 98188 -7891
Benny Anderson
3901 56th Street Ct E
Tacoma, WA 98443 -2012
- Deborah Chu
15153 Sunwood Blvd
#Ff -31
Tukwila, WA 98188 -7892
Richard Burleigh Jr.
10247 Waters Ave S
Seattle, WA 98178 -2544
Robert Mays
15165 Sunwood Blvd
#Cc -13
Tukwila, WA 98188 -7893
Pamela Stevenson
15165 Sunwood Blvd #C23
Tukwila, WA 98188 -7893
-Lois Marie Logue
15165 Sunwood Blvd #C -33
Tukwila, WA 98188 -7893
Thomas Beatty
.15175 Sunwood Blvd #D -21
Tukwila, WA 98188 -7894•
Lynne Brady
15175 Sunwood Blvd #D32
Tukwila, WA 98188 -7894
Joan Gessner
15141 Sunwood.Blvd #E -21
Tukwila, WA 98188 -7891
OLD STONE BANK OF WASH •
3605 132nd Ave SE #214
Bellevue, WA 98006 -1333
Thomas & A E Milligan
15153 Sunwood Blvd
#Ff -31
Tukwila, WA 98188 -7892
James & Sharon Masterman
15153 Sunwood Blvd #F -32
Tukwila, WA 98188 -7892
Delbert Murphy
15123 Sunwood Blvd #G -13
Tukwila, WA 98188 -7890
00
O
cp
W }o
J'
LL Q'
co d
I- w.
2
Z�
Z I—
LL! uj-
0;
v
176'';
Z;.
'Z
Ronald Fetter.
1.5123 Sunwood Blvd
#Gg -21
Tukwila, WA 98188 -7890
Mark Schueler
E' J Koster
15123 Sunwood Blvd
#Gg -22
Tukwila, WA 98188 -7890
Jeffrey & Melinda Mikus Lisa Best
15123 Sunwood Blvd #G -31 15123 Sunwood Blvd #G -32
Tukwila, WA 98188 -7890 Tukwila, WA 98188 -7890
Susan Stark
- .,5113 Sunwood Blvd #H -11
Tukwila, WA 98188 -2447
- Carolyn Day Seideman
15123 Sunwood Blvd #Gg
Tukwila, WA 98188 -7890
Todd & Laura Berry
15123 Sunwood Blvd #G -33
Tukwila, WA 98188 -7890
Jeffrey. Anderson ! ; , Joanne Davis
15115 Sunwood Blvd #H -12 15117 Sunwood Blvd #21
Tukwila, WA 98188 -2447 iL_Seattle, WA 98188 -2447
Sandra Ault Jo Etta Smith
.15119 Sunwood Blvd #H -22 15105 Sunwood Blvd
Tukwila, WA 98188 -2447 Tukwila, WA 98188 -2447
Julie Marie Lemay
•15109 Sunwood Blvd #1i21
Tukwila, WA 98188 -2447
1
•
•
Jean Dickson
15103 Sunwood Blvd #J -12
Seattle, WA 98188-2447
Barbara Mjelde
15111 Sunwood Blvd #1-22.
Tukwila, WA 98188 -2447
Gunnel Brydolf
15102 Sunwood Blvd #K -11
Tukwila, WA 98188 -2446
Hung -Chung & Nancy Ho • Adrienne Theophilus
•15108 Sunwood Blvd #L -11 15110 Sunwood Blvd.
Tukwila, WA 98188 -2446 .Tukwila, WA 98188 -2446
Alan & Teresa Frank
15128 Sunwood Blvd
#Nn -12
Tukwila, WA 98188 -2446
Jacqueline Stratton
15120 Sunwood Blvd #0 -11
Tukwila, WA 98188 -2446
Laura Erwin
15132 Sunwood Blvd Elsie McCart
#Pp -11 15134 Sunwood Blvd #Pp12
Tukwila, WA 98188 -2446 Tukwila, WA 98188 -2446
Maria Corzo
.15140 Sunwood Blvd #Q -12
Tukwila, WA 98188 -2446
Carolyn Laviolette
15142 Sunwood Blvd
Tukwila, WA 98188 -2446
Denise Wilham
45 -784 Pookela St
Kaneohe, HI 96744
Henry Nichols
5917 Frances Ave NE
Tacoma, WA 98422 -1430 '
Richard & Judy Walker
15104 Sunwood Blvd #K -12
Tukwila, WA 98188 -2446
William & Bonnie Rogers
15126 Sunwood Blvd #B -43
Tukwila, WA 98188 -2446
Marland &Muriel Larson
15122 Sunwood Blvd #012
Tukwila, WA 98188 -2446
William Robert Brownell
1415 Nob Hill Ave N
Seattle, WA 98109 -3140
Gloria Alamar
Toni Lee Goin
4452 Eastway Dr SE
East Port.Orchard, WA
98366 -8804
z
OC W
U.
UO
U
w
9
cn
W 0.
Q;
- 0
D
H- U
00
Z
.V _CO;
Z ;.
Mario Corzo
15148 Sunwood Blvd #R -11
. Tukwila, WA 98188 -2446
.Frances Gariglio
1515,0 Sunwood Blvd #R -12
Tukwila, WA 98188 -2446
James Goers
15154 Sunwood Blvd
#Ss. -11
Tukwila, -WA 98188 -2446
Linda Kimura
1.15156 Sunwood Blvd #Ss12
Tukwila, WA 98188 -2446
Paulette Foster
15158 Sunwood Blvd #21s
Tukwila, WA 98188 -2446
William Dobson
15160 Sunwood Blvd #S -22
Tukwila, WA 98188-2446
Records .Processed = 187
Dups screened = 4
CRs'Screened = 0
Bad addressees = 0
:Labels produced = 183
a`Od�:::.•mG:Li
TO:
FROM:
DATE:
SUBJECT:
City of Tukwila
John W. Rants, Mayor
Department of Public Works
MEMORANDUM
John Jimerson, Planning Division
Joanna Spencer, PW Development Engineer
April 18, 1995
Pyramid Pointe Apartments
SEPA and BAR Review
Activity No. L95 -0011 and E95 -0005
Review Comments
The above application was reviewed by Public Works at the plan review meeting.
Our comments are as follows:
Ross A. Eamst, P. E., Director
Ps ,- (7
' 1 8 1995
DEVELOPMENT
Fa, Z 111f
Vi
O 0
U) 0.
WuJ
w • 0'
J
u. Q'
co
0.
Z
Page 3 Item A.10. PSAPCA permit for demolition of existing house. 2
p
Page 4 Item B.1.e. Specify area of clearing '0 ;
Quantity of both cuts and fills _ W
Maximum number of feet cut(lesu"` `� w
Maximum number of feet fill u.
'Z
Item B.1.g. Provide a detailed tabulation of impervious surfaces with a dimensional U N
plan. 0_ F t
Page 5
Page 7
Page 8
Item B.1.h. Define temporary erosion control measures A4f44
Item 3.a.1) "NO" is an incorrect answer.
The answer should state: "Associated wetland across Southcenter
Boulevard to Gilliam Creek is one mile discharge into Green River ".
Item 3.c.1) Source of runoff are not catch basins but parking lots and roofs.
Surface water will be detained and metered out at pre - development flow
rates (25 year /24 hour per K.C. Surface Water Design Manual).
Water will flow to city system in Macadam Road.
Item 3.c.2) Oils and heavy metals from vehicles
Item 3.d. "NONE" is an incorrect answer.
Catch basins, bioswales and coalescing plate separators.
5
Show existing utility easements on plan. Maintain )d foot distance between the easement line and edge
of new building foundation.
Driveways need to be less than 15%.
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: (206) 433 -0179 • Fax (206) 431-3665
•ys..unaz.,.,...
VIO N+em9+7t.
Memo to John Jimerson
Apr. 18, 1995
page two
Traffic
Public Works recommends that the Pyramid Pointe Apartments expansion project be constructed as shown
on the site plan with the following traffic impact mitigation measures:
1. Considering the low number of accidents and the low accident rate at the South 152nd St /57th
Avenue South intersection, we recommend that the following improvements be made to the
intersection to improve traffic safety:
JS /cd
A. Remove landscaping obstructions in the southwest corner of the intersection down to the
curb elevation.
Install a Side Road warning sign (W2 -2) on the eastbound approach to the intersection.
Install an Advance Pedestrian Crossing warning sign (W11 -2) on the eastbound approach
to the intersection.
Install a Pedestrian Crossing warning sign (W11A -2) on the southeast corner of the
intersection.
Replace the street name sign located in the northeast corner of the S. 152nd St./Macadam Rd. S.
intersection to read "S 152ND ST ".
No other traffic mitigation should be necessary.
Pyramid Pointe development file
jimerson.mem
... s. _. :.. •
•
••■
4.•
---.111111111111
N 175,000
'J5
a3
u
Cultivated e1d
:..••
•
;7,
Slga
Paved
N 174,000
/98.5 /
N 174.000
S7. 173.0
1/4 Cor.
N 173,525.07
51,650,134. 94 ..
'Fi•F�FYiII(7�ir1��
N 173,000
1220,
•7851:
Paved
N 172,000
N 172,000
1335 \\
SOU7110EN7ER
Paved Pareinq
11
Paved
N 171,000
11 171,000
ee.0
27
• Sec. Cor.
N 171,026.25
E 1,644,763.12
OVERLAP SEC. •26
..s.14I
• 'v •K1
new 23 'PwA 23 AC, •
'? �G:.•. 1..x.1 .' ur,v r': •
1'tn Nl Ir11 v 5., t d�•I, ..
Yl
CONTOUR INTERVAL 5 FEET
See. C6r. ' N 17081(122 "
v , •
. , ;440 144!J*
WALKER A'ASSOCIATES, � INCT
/41-1. +e
USG a c3. DATUM'
1 r 11.7.1
!l1rIffCTANOULAA AIFID .61i 1, 6i!('
^91R6�EcriON41teb'R'
NORTH .LONE:,•,,.:,.
v -1
! 111 III III III III III ICI III III III I�I III III III III III III III III III III III III III
l011: fill 817- L�0; ,05 00 I'7 } 7 00 IIZ. 00 01 8 [ LII 01
111111uluu 11uhul 11uhm 1111hiit uulmi 11uluu u111u11 miluii imlml mlluu 11uliui ullhul uuhul mlhul Ilului
pry. t .nl,� " @f'� ^!. \ ".•.
404.4 .
1
, , • ,
• .• • - • •'• • • •-;/:
" * " • .•
-177-7,1,1177a,71,r-V-
FigetI• Y
it—tgAmti.7
Pi4i12/4/Ny :
UN/f ceildYr.
----, .....--:-, - --tti4te,...1.4.glea."----,
/Z.-- ----- -- ----- ------:— --"-■ s'N ',‹
"---.. \. ,
14z --■. -N.
19' f.490,04 ‘.: 'N.. •.\-N
''-.s.:AzI'moct4
PRe'
fe:vgr
enr-nvb svc05
Propre42 ev-xt.' 9 I Vre-ASS
ohm
40 untrs
C I F ! BF I
19 ; 53 3
16
6? 3 L..1.1_
•
•
JOB NCt • 94133
;1
SITEHPLAN:
trfiliviii3 pli-rfoxj1.111filli.;,frp-ifirl
tY: '17. 17,- 17. . 3t I 47 '17 17
. .‘
4-.11,•.1-.11...;44.:
.
{L
�
PROPOSED TREE WEL L3 WITH TWO' f.ARALLEL PARKING' •
rSTALLS BETWEEN TYPICAL .', ��
PxosiisO(2e) • •
. . . !: :; :•. ' . ri s •t;
id7•p' '"
Qeryq�w, . j. ` ..ti
olgoTououtl
a
9
RECEIVED
FM 24'l9i
COMM Um 1 1
EVELOPMENT •
SITE PLAN
1=gi0T4
711111.: W111111111lfi
OF; 00 '0 L •.._ 7• 9Z iZ 67 •ZZ IS OZ', 01 81 LI
1111 uulm1 md11ii im11111 mduu uuhm uuhm unhui u111uu u11111111111I111111a1111111uhm 11111I11i 11alim iiii i
U
JOB NQ: IK%
PYF1Atvr POI