HomeMy WebLinkAboutPermit M95-0036 - BOEING #9-101i
Si
SoEi6 (1-tol
City of Tukwila
(206) 431 -36 70
Community Development / Public Works • 6300 Southcenter Boulevard, Suite 100 • Tukwila, Washington 98188
MECHANICAL PERMIT
Permit No: M95 -0036
Type: B -MECH
Category: NRES
Address: 9725 EAST MARGINAL WY S
Location:
Parcel #: 000340 -0018
Contractor License No: BOEINC294ML
Status: ISSUED
Issued: 03/15/1995
Expires: 09/11/1995
Suite:
TENANT BOEING *9 -101
9725 EAST MARGINAL WY S, SEATTLE, WA 98124
OWNER BOEING
PO BOX 3707 - M/S 1F -09, SEATTLE WA 98124
CONTRACTOR BOEING INC. Phone: 206 544 -2975
9725 EAST MARGINAL WY S, SEATTLE, WA 981242207
CONTACT TERRY BENNETT Phone: 206 544 -2975
P.O. BOX 3707, M/S 46 -87, SEATTLE, WA 98124
******************************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * ** **
Permit Description:
INSTALL CEILING MOUNTED PROCESS. COOLER.
UMC Edition: 1991
* * *
* * * * * * * * * * * * * **
Permi
Valuation:
Total Permit Fee:
6,000.00
30.00
******************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
'firlaA V0.145
Center Authorized S C' ature Date at
I hereby certify that I have read and examined this permit and know the
same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate
or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign for and
obtain this bui per 1t
Signature:
Print Name: Title:
This permit shall become null and void if the work is not commenced within
180 days from the date of issuance, or if the work is suspended or
abandoned for a period of 180 days from the last inspection.
CITY OF TUKV( 4
Department of Community Development -- Permit Center
6300 Southcenter Boulevard - #100, Tukwila, WA 98188
(206) 431 -3670
Mechanical Permit Application Tracking
PLAN CHECK
NUMBER
I'YlclS -003(0
PROJECT NAME
j o�
;130.�,� 4E-C1101
ADDRESS
`,J
5 a W IM;( ►10`1 Wk-1,
SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so
that the status of the project may be ascertained at any time.
• Plan corrections shall be completed and approved prior to sending to the next department.
• Any conditions or requirements for the permit shall be noted in the Sierra system or summarized
concisely in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N /A ", date and initial.
DEPARTMENTAL REVIEW
"X" in box indicates which departments need to review the project.
PARTMEN
ATE;
:DATE
PR
BUILDING -
initial review
3-3-9S
(RO TED)
REQUIREMENT!
CONSULTANT: Date Sent -
)MMEI
Date Approved -
O FIRE
O PLANNING
FIRE PROTECTION: U Sprinklers U Detectors ON /A
INIT:
FIRE DEPT. LETTER DATED: INSPECTOR:
ZONING:
INIT:
jBAR/LAND USE CONDITIONS? () Yes
SCREENING REQUIRED? 0 Yes 0 No
REFERENCE FILE NOS.:
O OTHER
BUILDING -
final review
BUILDING
OFFICIAL
INIT:
7 Q5
REVIEW COMPLETED
UMC EDITION (year):
OWING: T
4
,�,�
CONTACTED
t _
lam=
�
CyR12-C
DATE NOTIFIED
3-lo-c15
(init.)•
2nd NOTIFICATION
BY:
(init.)
3RD NOTIFICATION
BY:
(init.)
01/07/93
MECHANGJAL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be filled out
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670 NAME kie40.‘,/ JOB tl /c170e/0 -00
PLAN CHECK
NUMBER
rnci5-003(D
APPLICATION MUST BE FILLED OUT COMPLETELY
and attached to this application.
FEES (for staff use only)
..:•:•...:.,.::::::•:.....DEBCRIPTIDIV:g:::::::0.;
:::::::::::'.AMPUNT:Oii:
FICPTili.',;
::::::191::TP .7.TE::::::':::
AS IC , PERMIT FEE
'.:',:::::::::,:.
15.00
/3 re,/ /S-Oden,
UNIT S .:FEE,::::.,:;',:i::::::',00,:;,::::::::::::::::i::::::,4
:,:,.:..,::::::::::::::::.:
i.::::::::::::::::
,::::::•:::::::::::::::::::::::::::pi::0::.:::::::
PLAN CHECK
',:::::;::::::.,:.,:::•::::,:-::::::::::::',:i:•:,:',ii.,::,:,,i.,.:,..,::,::',:',.
WILL THERE BE A CHANGE IN USE? E445fo 0 Yes IF YES, EXPLAIN:
•:,:i.E.:'.:::•::',,,:'e:P.::::.;ii:::::::::•0,.:i:;::
•THER:si!i:',.,:iii..,:'%:.:•:,:.::::;::',.::::::::,::::::!:4,i':,:::'::::::::::::::::::::::',..:::',..,i
.::.,:::::::::::::::::::::::
:,-,:',...:,,:.'.:,:,;,::::::,:,:,•,::::::::::,.:::::::::::.:•::,',:::::::::::::170TAL:i:::::,.:
.:,.::,,i.:x.::::::::..i:::::::::::::::.:,,:,:::
SITE ADDRESS SUITE #
97°25— /e24p-et///
r
VALUE OF CONSTRUCTION - $6
PROJECT NAMETTENA
BOEING DEFENSE AND SPACE GROUP BLDG. II
ASSESSOR ACCOUNT # 00o34/0-60 /8?
TYPE OF WORK: ''',1 New/Addition 0 Modifications 0 Repair 0 Other:
DESCRIBE WORK TO BE DONE:
(4 2;e. deeZjep /-frie-e-ee-se-l'-e, .../i.,--r.. ,g..e._ei__
TypE,::::::P;:::::::4:g::::::::::::::::::::::::::::':ai;;::::::::,i::::.:,::.:;:::::::::::::::::::::ii:::RATINCitSkzEi:::::::vi:o:iii:::::]:::::Mi::::iiiiMme*::::::06::::::::;:::1:00:;i:::NUMBERORINrTSMOMMI•
/3 re,/ /S-Oden,
ioclo
ZIP
WA. ST. CONTRACTOR'S LICENSE #
BOEING :c 294ML
BUILDING USE (office, warehouse, etc.)
__Zinie-te 44,4,1-(1,"
1996
NATURE 0 USINESS:
WILL THERE BE A CHANGE IN USE? E445fo 0 Yes IF YES, EXPLAIN:
WILL THERE BEST fE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING?
IF YES, EXPLAIP U Yes
PROPERTY OWNER
BOE !Nu DEFENSE AND SPACE GROUP
PHONE
544-2975
ADDRESS P.O. BOX 3707 SEATTLE, WA.
ZIP 98124
CONTRACTOR BOE !Nu DEFENSE AND SPACE GROUP
PHONE 544-2975
ADDRESS SAME
ZIP
WA. ST. CONTRACTOR'S LICENSE #
BOEING :c 294ML
EXP. DATE
JAN. 01
1996
• 1:HEREBy:CERTIFy THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAMETO BE.TRI
AND CORRECT;:ANDIAM'AUTHORIZED:TO:APPIXFORIHIS]PER
SIGNATURE --
BUILDING OWNER
OR
AUTHORIZED PRINT NAME TERRY BENNETT
DATE
PHONE 544-2975
0.2/27/9.5—
AGENT ADDRESS PO BOX 3707 M/S 46-87
CONTACT PERSON
TERRY BENNETT
CITY/ZIP SEATTLE, 98124
PHONE 544-2975
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the
application completely and follow the plan submittal checklist on the reverse side of this form. Application and plans
must be complete in order to be accepted for plan review.
BUILDING OWNER/AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed
by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit
application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filed in by the applicant. This
figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall
expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180
days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current
edition). No application shall be extended more than once.
lf you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431-3670.
DETACH TO DISPLAY CERTIFICATE-1
DEPARTMENT OF LABOR AND INDUSTRIES
THIS CafITIFIgS MATTI:1E PERSON NAMED HEREON IS REGISTERED AS PROVIDED BY LAW AS A
,
L. '
L.. DETACH TO DISPLAY CERTIFICATE---t
• RECEIVED
OM( OF TUKWILA
MAR 0 3 1995
PERMIT CENTER
I...7..,,,
/.,••••4. -
• .
' -
; -
:
gt,
! 4,7,Z1.....11,.
:n.
M
64 fi '..
' en.
.. 1.•
' .
,
L. '
L.. DETACH TO DISPLAY CERTIFICATE---t
• RECEIVED
OM( OF TUKWILA
MAR 0 3 1995
PERMIT CENTER
rn;....v,:•fees,�et�t:.�,,.. :'0.rAr..v,^: n' s: xA• Sr:' r. G!.' �t�: �i!. 2:•.. ..t;'".5�<::'k^.�415'- .4',:ti... .
INSPECTION RECORD (:
Retain a copy with permit
I`SPECTIO` `0.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 981
ER
06)-433670
Project :. °) ? .
Type of Inspectiq� ,�-
Address _7
or, 1 n k,
DateCalled: f / �' -
(Q o1 / 9S
Special Instructions; 1,,
ectie.. lS - Y' C
CO— a 1'k� ` -)le rj� �C' •
Date Wanted 5 Jqs...
am. Al
Requester I/
�ci
-�' Wil.
Phone No.;
ci b ~ o9 a q eig
Approved per applicable codes. ❑ Corrections required prior to prdv'aI.
COMMENTS
❑ $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. CaII to schedule reinspection.
ec=
Dale;
�•
0.
0 INSPECTION FIECORD'
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
Ma5
0036
PERMri NO.
(206) 431-3670
• ro e : irt-If2_,c44. 6\ -,41..ci -10 i
ype 0 nspect on: •
A I) IA itn P 1,,n4i OW /5 Aka- ..S-1-16144 Ohl THE fiLAwti4 S' ,
/ ./-
77, to (A/e- Cad.) (.. be---c4--5 T64 tr -5A ft e. 1,cit---
--&
Address!
-q---7-.4 c.plamio 1 bi)ti
Date Called:
6 — 1-7-q5
O.N.s.c.,.1/4„...iii, 1 i,.1 0 gdpi.-(t__ -I-0 C-C■-■N PL1 %.,1 t \--NA
"c-t1/4<...7- V■Yik e••-' • ,
Special Instructions: .._/
LOstd ti Poo 1?_
C.--- (.40
Date Wanted:
— g — 6
m,
.m.
Requester:
1-UcLuKvi Q i
14,,
D Approved per applicable codes.
Corrections required prior to approval.
COMMENTS: ' :-.7.-w..47',IC A L. / m 5e. /e--• 0 t
-2- TN E C..6,419-FrIsfri-E e..4 Ak--3 ,.:1-bl rj A NV 4A 4 I -wile
A I) IA itn P 1,,n4i OW /5 Aka- ..S-1-16144 Ohl THE fiLAwti4 S' ,
/ ./-
77, to (A/e- Cad.) (.. be---c4--5 T64 tr -5A ft e. 1,cit---
e kJ NOrt-IWAC- p Lk o (L... -co fl-'r s CA thl G /-1)("- Pu■ yne
I
CA tAt-t pl 01 A, s -- G 1.1fr4irt-
---Cz i(31-1."— 1 A -"S pa
O.N.s.c.,.1/4„...iii, 1 i,.1 0 gdpi.-(t__ -I-0 C-C■-■N PL1 %.,1 t \--NA
"c-t1/4<...7- V■Yik e••-' • ,
0 $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
•
1 Receipt No.:
Date:
••
1
SPECTIO 0.
INSPECTION RECORD`
Retain a copy with permit
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila, WA 98188
PERMIT NO.
(206) 431 -3670
Project:.2 l i1
44 q _ � O 1
`(1
Type of inspection: rj
-in I
Address:
Irial
Date Called:
L%1( ^'
W
Special Instructions:
Oc j C--)
�/
Date Wanted:
ci L— 6
Requester:
-Da n
Phone Na:
a"1g r 5 ( 55 1
O Approved per applicable codes. ic— Corrections required prior to approval.
COMMENTS: '
ANT
Inspector:
Date: (1.1) I S )
O $30.00 REINSPECTION FEE REQUIRED. Prior to reinspection, fee must be paid at
6300 Southcenter Blvd., Suite 100. Cali to schedule reinspection.
Recept No.:
Date:
•
rt'?rn -+�' 1 �T• •"""1: L�:..t.'v'{yiY.i:y•' }'�
•
**•A ****4 i ***h* *h* **• A***********.* A *MA *******A* *A*k* ******•A*hk*
C7TY OF TUKW3LA, WA TRANSMIT
****** AkkA***•**k• kA**'A**A *k***A * *k* *•*A*** **•k+ * *k*.•kh ***•A** * ** ***
TRANSMIT Number: 94001969 Amount: 30.00 03/15/95 13 :26
Payment Method: CASH Natation :, BOEING COMPANY Indulge
Permit No: 495• -0036 Type :. l3 -MfiCH MECHANICAL PERMIT
Parcel No: 0.00340- •001.8
Site Address: 9725 EAST MARGINAL WY .S
Total Fees: 30.00
This payment 30.00 Total ALL pmts 30.00
Balance .00
A* * ** * * *•k *,4 * *kk•k * * * *.kA• * *A k******* k*** ••k ** *A *A•k *h *•k * * *k * *A *A * *A*
Account Code Description Amount
000/345..830 PLAN CHECK - NONRES 6.00
000/322.100 MECHANICAL -- 'NONREca'; 24.00
GENERA 6.00
GENERA 24.00
TOTAL 30.00
CASH. 30.00
CHANGE 0.00
0981A000 13 :28
CITY OF TUKWILA
Address: 9725 EAST MARGINAL WY S
Suite:
Tenant: BOEING #9 -101 Status:
Type: B -MECH Applied:
Parcel #: 000340-0018 Issued:
k•k k•k ** k*• k**• k******• k•k'k * * *•k•k * * * * * *•k * *•k **'k ** k•k** k k•k•k* * **•k*•k k * **•k•k k•k•k* k k k k *•k k•k*
Permit Conditions:
1. No changes will be made,; t .t fie. 'plwan' "un i,ess;.approved by the
Architect or Engineet;; =the Tukwila'BUlVd;i;ng .D,ivision.
2. All permits, inspect,ioii recor.ds, and approved p,1 an shall be
available at tyre iob site,p�t iorti; to,';.the start.,Yof "'et y on-
' �r I# A 1 �� y l'! �.' S..t•
str-uction, ..The,se dpgb ert,t !aire..,.tco. be,.main;tain,ed ancttavail-
ab le unt i 1 --1 i,na l i;n pec,t i`on approval is granted
3. All construction, to be done ,.in confo'rmence with`n.appr'ov'e ,
plans and requ'i r ernents of the' Uniform Bu i l"d ing Code. 1;199 - -' .
Ed i t i orlt), as arnended,:'. Un i form ,Mecha'ni ca l Code �1 1991 Edition`
and Wa .h,i'ngton State Energy��C, de (19,9,4 Edition)•. , rr ,v
4. 'Jai id, =i`t i off ;Permit.. The - is'suance of a permit or approval ot',
p1ani specl;;f icatiort ,: s'a`nd computations shall not ` "be "Con -"
strueid. tobe•a permit -for, or,,:�a ',appr�oval of, any violation
of ' f of the provisions ".ofr,.- th'e bu i.,1 d i n code or of `;any,::'
othrr ordinance of ,the'"",juris,d'iction ` '`No' permit presuming; to
give'�tauthorityP tor•;violato orq. /cane1, the,ip.r�ov,isions of, th °1`st
code, sha t i be ; ','vel...id•.: .•, , 'id11 , ' :`z'' ? ... . ;.: 4 •,r
5. MA ?`FACTURERS :INSTALLATTONJ I,N4 TRU(TIO�- REOJIRED ON ITE5w`"
ut2 FOTHE B UILDINGINSPECT0RSREVIEW .,., j
6. E l e;c,t'ri`c�a�7';,,_permits .!.ha 1 he .,i to i ned'•thr�ough the Washington
Stat,`e;' Divis,�lon'° of Labor c4nd` Indutrfie,��; ,a~'nd...a1) electr.ic;a1 y"
wor 41 l 1 `5be. inspected by that age`ticy.•! (24'8-6630) ''`r
yr h �' ,,,, r
i
LS
•
Permit No:
M95 -00'36
ISSUED
03/03/1995
03/15/1995
ca
•
•
f
NG M
BOG
VICINITY MAP
99
ist
r.
PROJECT I
SITE
FROM TOWN -I OWN SEATTLE
5
(ARM ORIDCt
o/sa, LOT
99
e
le
t .
1'
EAST MARGINAL RAE
CORPORATE PARK
FROM SEATTLE - TACOMA AIRPORT
900
FYIT
156
S BCE It* ACCESS an
1
EXIT
I5/
599
56
TUKILA FROM KENT
VI
& AUBURN
DEVELOPMENTAL CENTER
EXIT
157
900
5
NO SCALE
9
BOEING DEVELOPMENTAL CENTER
9725 EAST MARGINAL WAY SOUTH
TUKWILA, WASHINGTON 98108
L.
RIP
\ES c=1 SEATT
JET
oc
AREA MAP
BLOC. ADD) E
9Th L. MARLINAI- WAY
HOT A, WA I I N 1 n \i
NO SCALE
9-101 BUILDING LOCATION
GENERAL NOTES
( n ?J;IRUCIION SE r nF DOCU!INr,, kI vtrPIED AN') STAMPI D BY t:'rY 0, RUK1VllA MI)'T
31 IN `;TE DURING CON.`(TRuciio . I)O NOT PROCEED Vilrll CU°J' IRUCHON VIITH0I11
ABOVE- MEN HONE D S;. f UI" DOCUMFN IS.
1, v_Rll Y ALL LINEN' ION; l.N'_I ('(1NNFC IIONS BEFORE ANY WrIRi'..
';UTIFf FACILITY fNGINEER'i Slini)ID r t.tiNPIPON() RIOU;'1'E DESIGN REVISIONS.
S r.)URDNAIL 'T'It)kk WITH O'HrP CRAf
1. Nt 1URN IRIS SAME SF 1 11) TERRY H' Nikki I Al HI DG 9 -51 1,01_ N /1, AF EER COMPLETION
OF (HIS CONSTRUCTION.
PROJECT CHECKLIST
P; )Y
t 3 '' DRAWINGS GONI ORIA, IC) 1H{ 199n1 h'3 0., U.I C U �' C.. AND THE 1990 BART Lk
E•L'IUI A') ADAI3N_i) Or : ,1 Vr;t_U 31 I ()CAL G�t)'.I1�'.� ,, /ICY; (.GGir(l I ANC I 1H
C)' IUf `ill A /O'PNC;
CALCULATIONS (! AI)I', lc ABLE )
.4BELED PER OCCUPANCY PER U.B.C. IABL F 3.3- A
H1' tiro. i �- CUk NUMB, k UN i'r ', I ( (1Id AKF A Or LO'J -, I kLiC 110%.
' LIMNER OF PP: IC REQUIRED r GR r'FRMI1 PAC'rAGL:
1 I, " ;!_RA_ PFI MIl (SHELL & CCRE)
f SE IL; OF t =NERD( CALC(IIATIONS
2 SETS OF CTVil DRAWINGS WITH UNITIES
2 '-)EIS SOILS REPORiti, SIAUPED BY GEOTECHNIC.AI [NGNEER
: ;r r5 S[NUCIURAL CALCULATIONS
2 ',LTS PROJECT CONSTR,J;'rlo;r' IECIFICAT'U'JS
2 E1`., TOPOCRAP-ItCAL SUF?VLY
7 COPIES OF LEGAL DESCRIPTION
2 SE TS OF WORKING DRAWNGS
2. ILNANT IMPROVEMENTS, 2 COMPLETT SETS
3 MECHANICAL, 2 COMPLETE SETS
4. FIRE PROTECTION /SPRINKLERS, 2 COMPLETE SETS
BRIEF PROJECT NARRATIVE
PROVIDE (1) 21,000 BTU SENSIBLE PROCESS GOOIER IN THE NEW MECHANICAL
ROOM FOR THE WATFRJET SUPPORT EQUIPMENT.
1q5 -0c•34D
lat
1
DRAWING INDEX
SHOE F LDRAi'IIN°
NO.
Al 9- 101 -Al
1M33 9-- ll:l'- 11,133
M51,4 9-1t1-M534
SHEFT TITLF
11 TLE
MLCHAN'CAL VAS!i
PLAN
P'EGHAN'CAL SEt HUNS & Dr TAR
SHI_L_ r
No
ORAW,NC
NO.
SHFE r TITLE
CODE_ SUMMARY
LAND UI JE
9111LEMr,?; , 'I`t
n^CUPANT • GROUP
C2NS'RUt 1N rvrpL
LUL'R AR AS:
ifu'IIJNu tDUIPRINI
BLl LOING ;•RO'i5
TUNNEL
FIRST f .00P
!AFL /A', NE
BUILU!NG '.L161, r
STORIES
OCCUPAN ' OAD:
ILY. 'f' A
128R '01, WASIIINGIUN ATE I,V NCY I_;;`.//=, WASHINGTON
`,iAI BARRIER FREE CODE. AND ADDIUO ?.S PER CITY OF TUI ILA
IRO,* B. DIVISION 2, OFFICE & 1- AC FORY
Y '!. 1, NON- COMBUS'net !
1,7 VAPA PO'N 60 FEFT (; 'YOM ALL SIDES)
1,116,5(13
0,'i1P
11 3,R; 9
295,318
1
11rT MAXIMUM
2
NO ( :HANCES
HANDICAP 'r D REOu'REMENTS HART,!; :R ;RE
FIRE PRO.r oTIoN !-ULL 1 AUTOMATIC, F/S CLASS 1 ',PRINKLERS THROUGHOUT
SEISMIC /ONE
.5
FILE COPY
1 undetetend that the Plan Check approvals are
yublectto errors end om' ,onsand apWovalot
not authorize the violation of an•
Rolatto of con'
plans does or ordinance
adopted code roved Ian- acknowledged'
tractorscopVQ .
I_.
APpRpV13)
7
.,►
MAR 0 31995
PEW etnrren
REMSON
BY
APPROVED
DATE
Sal
REVISION
Or
APPROVED
DATE
BOE/AW
FACILITIES DEPARTMENT
AUBURN, WA. 98002
D EVERETT, WA. 98201
1-7 KENT, WA. 98031
PORTLAND, OR. 97220
D RENTON, WA. 98055
■ SEATTLE. WA. 98124
ACCEPTABILITY
MIS OLS!ON A7.3/OR
SPEOF'CA rlO. IS APPROVED
DRAM Or
OR. CNESIFRFIEID
DATE
♦/12/91
CHECKED
S19'T1.E
TITLE SHEET
LAST R'L SIDN I swan.
DATE
APPROVED OY
DEPT
DATE
ERGS?
CHECKED
APPROVED
APPROVED
ARCHITECTURAL MASTER
n, f../. .. .A.
SHEET
Al
.110 N0.
910652
Dee NO.
o_tnt _ Al
- -4
I)
LIEBERT #MME024E -PC1 EVAPORATOR INIT 'WITH
A #MMCO24A -P00 CLOSE - COUPLED AIR COOLED
CONDENSING UNIT.
1
1V
w
OAR
J
PLAN
SCALE: 1/8" a 1' -0"
•
3
IH
r'
:
•
CD)
C6)
OAR
RELOCATE WATER JET JA147040 -01
KGP
soflsn
FACILITIES DEPARTMENT
M'
moti
GENERAL NOTES;
CONSTRUCTION NOTES:
INSTALL A LIEBERT MODELIMME024 PROCESS
COOLER. THE PROCESS COOLER IS PROV.
BY BOEING WITH A SUPPLY RETURN PLENUM. -
MOUNT THE A/C UNIT ON TOP OF THE CAP
AS DETAIL /4 SHEET M534 AND AS PER THE
ARCHITECTURAL AND STRUCTURAL DRAWINGS.
THE UNIT WILL DISCHARGE INTO THE MECH.
ROOM VIA AN ATTACHED SUPPLY /RETURN
PLENUM.
ottutit
05
9-101.1 KEY PLAN
PLAN - HVAC
BLDG. 9 -101.1
MECHANICAL MASTER
w -z 15 -19
1r"
1M33
031995
"A" 2/23
1*rw
147040 -01
wn,
9- 101 -1M
----(
11110
IMII
1M12
1M13
1M14
11115
11116
1M17
1M10
lM19
1020
11111
--i
11122
1M23
1M24
1M25
Ins
11127
1M28
1M29
1M30
1M31
11132
.
1M34
11435
11135
1M37
1M3e
IM39
1M40
11141
1N42
I$13
I
1144
11145
IMO
A
9-101.1 KEY PLAN
PLAN - HVAC
BLDG. 9 -101.1
MECHANICAL MASTER
w -z 15 -19
1r"
1M33
031995
"A" 2/23
1*rw
147040 -01
wn,
9- 101 -1M
SETTUNG BARRELS
D DRAIN PAN
LOCATED FROM
E 7 -250 BLDG.
1' CA (EXIST.)
0
agreIR DRIVEN
DIAPHRAGM PUMP
(RELOCATED)
•
2' CA (EXIST.)
-
IMP ORD
1" CW AT 72" AFF
1" C1V
ON FLR
VCL -45S
OND. PUMP
RED, PRES, BACKFLOW PREVENTER
1/4" HIGH PRES. SUPPLY
EL. Be NT
1 1/4" DRY COOLER
SUPPLY & RETURN
1/4" DRAIN TO VCL -45S
PUMP
1/2" CU PUMPED
WASTE UNE
EL. 84" AFF.
x
1/4" HIGH PRESSURE
WATER JET SUPPLY
UNE RELOCATED FROM
THE 7 -250 BLDG.
EL. 84" AFF
WALL (REF)..--.-4.?
EL 36"
FLOW SY
INC. DRY
COOLER
r�
DICNIZING FILTERS
RELOCATED WITH
SUPPLY MANIFOLD
AND INLET FILTER
FROM THE 7 -250
r_- _BALDING.
AREA DETAIL
1/C a 1' -O•
i
INTENSIFIER
ACCUMULATOR
RELOCATED HOSE
f- FILT &
BOOER STER PUMP
3/4" IW
PVC PIPIN
RELOCATED'
FROM THE
7 -250 BLDG
T.NIMMMIY.IMV w.vmv. \
I
1M1 3 M534
3/8" BODY x 1 /2"MPT (TYP 2)
CEJN MODEL 110- 430 -1455 WITH
3 /6' QUICK DISCONNECT SOCKET,
13-LINE #B-24 -SH FRAMING CHANNEL
TIED TO METAL WALL STUDS WITH (2)
1/4" X 2" TOGGLE BOLTS
WALL MOUNTED C/A DUPLEX OUTLET
NO SCALE
Inc15-CO
CIS
flt
MPP/M0
MU
0
fr
It 1/4 HIGH PRESSURE' SUPPLY
Y�j I I
4- !- ¥
3/4i PVC DIONIZ D
IND. ' WATER PIPING TO
• FILTE� & BOOSTER PUMP
RELOCATED FROM' 7-250.
I,
r
DIONIZING FILTERS
RELOCATED FROM
THE 7 -250 BLDG.
6' O.C. •
BMI PIPE OR CU TUBING
PLAN
it= --
0
PC COATED TUBING CLAMPS
FOR CU TUBING SUPPORT
13-UNE #B-24-SH FRAMING CHANNEL
TIED TO FLOOR, WALL, OR MECH. ROOM CAP
WITH (2) 1/4" x 2" TOGGLE BOLTS
0 T
3/4" COND. DRAIN
1/2". PUMPED _ WASTE
I1
1" OSP
3 4" PVC IND. WATER PIPING
RELOCATED FROM THE 7 -250 BLDG.
1 1/4" SUPPLY &
RETURN DRY COOLER
LINES
3/8" PUMP
DISCHARGE
.. , . . •
CL -45S PUMP
1/2" DRAIN FROM
INTENSIFIER
SECTION: WEST WALL PIPING ce
1,2.=
-.1
3/4" COND. DRAIN FROM !e-L
LIEBERT PROCESS COOLER I
ROUTED BENEATH CAP TO
VCL -45S PUMP. �L
FLOOR
',WEND;
GENERAL NOTES;
CONSTRUCTION NOTES:
D. INCREASE THE SIZE OF THE ACCUMULATOR DRAIN
CONECTION FROM 3/4" BRONZE BODYI BALL VALVE WITH SS TRIM . INSTALL A
AND TEFLON SEATS. ADD TO THE DISCHARGE OF
THE BALI VALVE A 3/4" MPT TO 3/4" MALE HOSE
THREAD ADAPTOR. THIS WILL ALLOW MAINTENANCE
TO DRAIN THE ACCUMULATOR WITH STD. HOSE.
INSTALL A UEBERT MODEL /MME024 PROCESS COOLER
ON TOP OF THE MECHANICAL ROOM. THE PROCESS
COOLER IS PROV. BY BOEING WITH A SUPPLY /RETURN
PLENUM. THE UNIT IS MOUNTED ON TOP OF THE CAP
WITH THE PLENUM INSTALLED IN THE MECH. ROOM.
CONNECT THE PLENUM TO THE UNIT VIA A 20 GA GALV.
SHEET METAL SLEEVE WHICH PASSES THROUGH THE CAP.
PROVIDE A SEPTUM IN THE SLEAVE TO SEPARATE THE
SUPPLY AIR FROM THE RETURN AIR SIDE. ROUTE THE
3/4" CONDENSATE DRAIN TO THE VCL -45S PUMP ALONG
THE WEST WALL OF THE MECHANICAL ROOM.
NOTE: THE INSTALLATION OF THE PROCESS
COOLER AND THE EQUIPMENT DRY COOLER
WILL BE DONE ON A CAPITAL CHARGEUNE
THE REMAINING WORK REQUIRED TO RELOCATE
THE WATER JET FROM THE 7 -250 BLDG. TO
THE 9 -101 WILL BE DONE ON AN EXPENSE
CHARGEUNE.
UEBERT IMME024E -PC1 EVAPORATOR UNIT WITH
A IMMCO24A -P00 CLOSE - COUPLED AIR COOLED
CONDENSING UNIT.
ELEV.
FLR.. WALL. OR CAP MOUNTED SUPPORT f31 PARTIAL HVAC PLAN: MECH. ROOM A/C UNIT
3 4
NO SCALE 1M133, 1M28534 I/4" =1' -0" 1M3tM534
ats
fit
loot/
orreP
ark rai u
MAR 03S95
PIIMAR COMM
h
AM�OIRO
Ma
IOE/A IP
FACIUTIES DEPARTMENT
' acne
aft ft
MR
K. ▪ P▪ ENROD
Ro�ow lOUN
DETAIL AND SECTIONS
M
BLDG. 9 -101.1
MECHANICAL MASTER
w. aS _It
M534
141040 -00
D.C. 9- 101 -M534