Loading...
HomeMy WebLinkAboutPermit 0383-M - Bates Residence!Fr, lid' MECHAKCAL PERMIT (POST WITH PLANS IN A CONSPICUOUS LOCATION) CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431-3670 MECHANICAL PERMIT NO. DATE ISSUED: 05"S-3-in gES :till Unit Fee Other Plan Check No.: MUTER WilitritainkLata MEIN NENE 90-150-M PROPERTY OWNER: Dwight Bates SITE ADDRESS: 4446 S 160 SUITE NO. PROJECT NAME/T N NT' Bates, Dwight IVALUE OF WORK: $2,679.00 TYPE OF WORK: X New/Addition ( ) Modifications (D Repair ( Other: DESCRIPTION OF WORK: Install new gas furnace and hot water tank. G & M Mechanical Contractors PROPERTY OWNER: Dwight Bates PHONE: 854-8500 ADDRESS: P.O. Box 1078, Auburn, WA 1ZIP: 98071-1078 CONTRACTOR: G & M Mechanical Contractors PHONE: 630-1932 ADDRESS: P.O. Box 6147, Kent, WA ZIP: 98064 WA. ST. CONTRACTOR'S LICENSE NO, QtdECC*1131j1' lEXPIRATION DATE: 1-31-91 CONDITIONS (other than noted on or attached to petmItlplans): IAPPROVED FOR ISSUANCE BY: BUILDING OFFICIAL DATE: /6 -100 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit.does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit. SIGNATUR PRINT N E: DATE: COMPANY: 6:7; f-t /-7ece/hGuic....4 4-- 1MINSOMMINGNI DATE DATE(S) REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE ISSUED 1 - Rouah-InNents/Ducts 2 - Fire Final 3 - Planning Final 4 - 431-3670 575-4407 .431-3680 5 - Mechanical Final 431-3670 OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732) Electrical - Washington State Department of Labor and Industries (277-7272) • • ", • • • • : ••• • • " •:.:. • Thls .peem...itshailbecoMe..,:nuitapcliVO:itth#:::;ivo*lopotCOMMOrs' . .uance, or if the work is suspended ,OriallandOn , for a penod 0(180 days from the Iast. 07/17410 � MECHANICAL PERMIT APPLICATION TRACKING PLAN CHECK NUMBER q0 —) 50--in PROJECT NAME hi- SITE ADDRESS SUITE NO. INSTRUCTIONS TO STAFF • Contacts with applicants or requests for information should be summarized in writing by staff so that any time the status of the project may be ascertained. • Plan corrections shall be completed and approved prior to sending on to the next department. • Any conditions or requirements for the permit shall be noted on the plans or summarized concisely in the form of a formal letter or memo, which will be attached to the permit. • Please fill out your section of the tracking chart completely. Where information requested is not applicable, so note by using "N/A ". DEPARTMENTAL REVIEW "X" In box Indicates which departments need to review the project. ::. }:. :.: .... :, ..:.. �. .:. }.:{. :.� . AFB::::::: �:• Y:;{; n;.;: y;:•> y; v,:.•. n: v' 2y}}}}: r:'::^' i;•}' :.::'.::::h:;:�ii::::n:Y: {:i: } }n} ... Y: �:::: }: +::: :•. }�;.••. �: rv::; +•:•:: w. .:: }•::::::. .:::• _:::.::::::<.::}::: :::.: >.:.r::.:.:...:........, :. .... r....:.....:.::.:.:..:, ii.<: i<.}:•:< i< i< ii•} :.<:. }:. }:.:. }: «; } } } }:«:: <.< }.> BUILDING - initial review ��� ��� +�` gl�a % (ROUTED) 6ONSLLTI}NT: Date lent - Dht. Approved - PERMIT EXPIRES O FIRE 2nd NOTIFICATION FIRE PROTECTION: [1 Sprinklers (_ 1 Detectors KN/A FIRE DEPT. LETTER DATED: INSPECTOR: INIT: ZONING: i D USE CONDITIONS? [ )Yes Z'No 0 PLANNING SCREENING REQUIRED? f 7Y•s No INIT: REFERENCE FLE NOS.: O OTHER INIT: X BUILDING - final rRviAw I 4a l 4o/z UMC EDITION (year): t eG413.6 INIT: k 101 REVIEW COMPLETED PERMIT NO. CONTACTED � �1�� 9 DATE READY DATE NOTIFIED , Err —(4.6 �'' �� (Init.) -� PERMIT EXPIRES 2nd NOTIFICATION BY: (Ink.) AMOUNT OWING ,-y _ b¢ �l�J + 3RD NOTIFICATION BY: (Ink.) O•17lO CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 MECHANCAL PERMIT APPLICATION Mechanical Fee Worksheet must also be /filed out and attached to this application. PLAN CHECK NUMBER 0 150-M APPLICATION MUST BE FILLED OUT COMPLETELY FEES (for staff use only) NITS SITE ADDRESS SUITE # 1// /lt& r / (on VALUE OF CONSTRUCTION - $ �_ if /.9C7jn, PROJECT NAME/TENANT % .//: / /ei ,L' // 7 &,- 5 r /�rc)!Crtf r AA- t -` TYPE OF WORK: (1 New /Addition /b Modifications Q Repair Q Other: DESCRIBE WORK TO BE DONE: f�TIIVG131ZE::<.:<;: • < >::. »:::.: <: <::. >:: >:: �..: »:::::. >:> ::: >::::::: « <::: :<: >•,; > >:;.:<:; >:::< .... NtlfiABf» RoF:.:UNIT#`::;::<:::; :<< >> / 1E/ r'1 ( - A - s %- t i 4 evil C c Faa-r, 09r le /.. - fCC,,_sre, o ec r i, ii,, ,..7, , /i o i (...) 4 <<: '-2 T014.11' 1 /(P/000 r4-/ S,-, 6iEi-1...0 el) 1' WA. ST. CONTRACTOR'S LICENSE # 6 ‘ �„ ,, ,_,- ,_ �. ll 3 8 - EXP. DATE BUILDING USE (office, warehouse, etc.) Xf:::, / /0 /.:=-,A, 4. ,m NATURE OF BUSINESS: WILL THERE BE A CHANGE IN USE? b No Q Yes IF YES, EXPLAIN: WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE BUILDING? Q No Q Yes IF YES, EXPLAIN: PROPERTY OWNER i1, . ('.�?, _ I �L lu.� 1 C-:r1 7 %� l r.- 5 �1. iE? //tot, �� `j�Db��r.S PHONE Fs' /r. _- so o ADDRESS is /3cX it- 7 A ‘,..3 ce /0. 4' i 1 4 PHONE ZIP n c.,- -C., / c1 3 ;.1_ CONTRACTOR r „ f /L! / / 4 L , ' / : 6Y /1150A 6 io,Q 5 ADDRESS / D 67, f- 6. /, 7 J c A r, L34 ZIP 924-06,e/ j_3,_ i. / WA. ST. CONTRACTOR'S LICENSE # 6 ‘ �„ ,, ,_,- ,_ �. ll 3 8 - EXP. DATE BUILDING OWNER OR AUTHORIZED AGENT DATE /- PHONE f� PRINT N . Ve, / /.t." /. to , N ADDRESS ,vk (- !I, -7 CONTACT PERSON `) f/`' 1jUA- A4t1,i�” PHONE CITY /ZIP PHONE - APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed "Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building counter which provide more detailed Information on application and plan submittal requirements. Application and plans must be complete in order to be accepted for oian review. BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent to submit this permit application and obtain the permit will be required as part of this submittal. VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the applicant. This figure is used for budget reporting purposes only and not to calculate your fees. EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may extend the time for action by the applicant for a period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform Mechanical Code (current edition). No application shall be extended more than once. if you have any questions about our process or plan submittal requirements, please contact the Department of Community Development at 431 -3670. DATE APPLICATION ACCEPTED DATE APPLICATION EXPIR 4 SS�MITTAL CHECILIST • MECHANICAL Ei Completed mechanical permit application (one for each structure or tenant) Two (2) sets of mechanical plans, which include: • Floor plan • System layout • Elevations (for roof mounted equipment) • Heat Loss Calculations Structural calculations stamped by a Washington State licensed engineer may be required if structural work is to be done (2 sets) Note: Hood and duct systems require a building permit for the duct shaft. MECHANICAL PERMIT FEE WORKSHEET CITY OF TUKWILA Department of Community Development - Building Division 6300 Southcenter Boulevard, Tukwila WA 98188 (206) 431 -3670 THIS WORKSHEET MUST ACCOMPANY YOUR MECHANICAL PERMIT APPLICATION. DESCRIPTION UNIT COST NO. OF UNITS X TOTAL COST $15.00 BASIC FEE SUPPLEMENT PERMIT FEE $4.50 1 Installation or relocation of each forced -air gravity -type fumace or burner, including ducts and vents attached to such appliance, up to and Including 100,000 Btu/h. $9.00 X 2 Installation or relocation of each forced -air or gravity -type fumace or bumer, including ducts and vents attached to such appliance over 100,000 Btu /h. $1 1.00 X 3 Installation or relocation of each floor fumace, including vent. $9.00 X 4 Installation or relocation of each suspended heater, recessed wall heater or floor- mounted unit heater. $9.00 X 5 Installation, relocation or replacement of each appliance vent installed and not included In an appliance permit. $4.50 x 8 Repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code. $9.00 X 7 Installation or relocation of each boiler or compressor to and Including three horsepower, or each absorption system to and Including 100,000 Btu /h. $9.00 X 8 Installation or relocation of each boiler or compressor over three horsepower to and including 15 horsepower, or each absorption system over 100,000 Btu /h and including 500,000 Btu /h. $16.50 X 9 Installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu /h to and including 1,750,000 Btu/h. $22.50 X 10 Installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu /h to and including 1,750,000 Btu /h. $33.50 x 1 1 Installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu /h. $56,00 X 1 2 Each air - handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto. (NOTE: This fee shall not apply to an air - handling unit which is a portion of a factory- assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in this code.) $6.50 i X (p .53 13 Each air - handling unit over 10,000 cfm. $11.00 X 14 15 15 Each evaporative cooler other than a portable type. $6.50 X Each ventilation fan connected to a single duct. $4.50 x Each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit. $6.50 X 17 installation of each hood which is served by mechanical exhaust, including the ducts for such hood. $6.50 X 18 Installation or relocation of each commercial or industrial -type incinerator. $1 00 X 19 Installation or relocation of each commercial or industrial -type incinerator. $45.00 X 20 Each appliance or piece of equipment regulated by the code but not classed in other appliance categories, or for which no other fee is listed In this code. $6.50 X c,? i •O awarao SUBTOTAL • _ I PLAN CHECK PEE t>ISs d subtotal) �� GRAND TOTAL $ Otn.tt CITY OF TUKWILA 6200 SOUTHCENTER!BOULEVARD, TUKWILA, WASHINGTON 98188 Plan Check #90- 150 -M: Bates, Dwight 4446 S 160 PHONE k (2061433.1800 Gary L. VanInsrn, Mayor THE FOLLOWING COMMENTS APPLY TO AND BECOME PART TH APPROVED PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER CY 3 -/V) 1. No changes will be made to the plans unless approved by the Architect and the Tukwila Building Division. 2. Plumbing permit shall be obtained through the King County Health Department and plumbing will be inspected by that agency, including all gas piping (296 - 4732). 3. Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will be inspected by that agency (277- 7272). All permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. • Any exposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. ▪ All construction to be done in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washington State Energy Code (1990 Edition), and Washington State Regulations for Barrier Free Facility (1990 Edition). 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a permit for , or an approval of, any violation of any of the provisions of this code or of any other ordinance of the jurisdiction. No permit presuming to give authority or violate or cancel the provisions of this code shall be valid. YrAy y044 .4.301,21t i-AvsN:er, CITY OF TUKWILA Building Department 6300 S rcenter Boulevard Tukwil l 98188 (206) 4 03670 xM�NSPECTU 'iR i%rtiM.,� aeit 1Cecra3c..:emAvill•t avrAr `., PERMIT # ).S8 3 - kY Date / r /0 -1'l Type of Inspection F-11.J4N-1--- Site Address 4444(1 3 • f (p0 Requestor Special Instructions Date Wanted Project r3/t -; hS Phone # Inspection Results /Comments: 1/41\ti- v4 T . A t( pins f.3 01-- O c cA.A.l0 " 0.11A 1 C4% / N IC ft S 1 l 0 vi N472— tldc tic —+114 Date 1'' /0'cr/ CITY OF TUKWILA Bu11d 'i Department 6300 ,Fhcenter Boulevar Buill(T Tukwi; WA 98188 d (206) 431 -3670 INSPECTION RECORD PERMIT # Date 10 2 `l 0 Type of Inspection -j Vii' (,C �.� Date Wan d �.�,'a � /5— Project ��J , Phone # 'PO (9 32-) Site Address L Requestor oh, n Special Instructions p.n Inspection Results /Comments: ,z24- Inspector Ava.../ Date l(i�' %--Gi%� Terhune Homes Inc Po Box 1078 Auburn, Wa 98071 Dwight Bates 4446 S 160th Tukwila, Wa Gas heat RECEIVED CITY OF TUKWILA O C r 2 1990 PERMIT CENTER Building component Description including U value or F value Heat Loss Factor (HLF ■U x 46 DT) Component Square Ft Linear Ft Cubic Ft Component Heat loss (HLF x SF, LF or CF) Window Skylight Sliding Glass Door Single (U =1.20 ) 55.2/SF SF BTU Double (U■ .90 ) -- -. 41.4/SF SF BTU -- (U= .75 ) 34.5/SF 355 SF 12248 BTU (U- .56 ) 27.6/SF SF BTU Other (U■ .49 ) 22.5/SF SF BTU Opaque Door Wood (U- .47 ) 21.6/SF 59 SF 1274 BTU - ---- -- W /storm (U- .32 ) 14.7/SF SF - BTU Insul Metal (U -.20 ) 9.2 /SF SF BTU Roof/ Ceiling Insulation None (U- .40 ) 18.4 /SF •SF BTU R -19 (U= .055) 2.5 /SF SF BTU R -30 (U- .035) 1.6 /SF 1170 SF 1872 BTU R -38 (U- .026) 1.2 /SF SF BTU R -49 (U- .020) .9 /SF SF BTU Wall Insulation above and below grade None (U- .25 ) 11.5/SF SF BTU R -11 (U- .07 ) 3.5 /SF 1906 SF 6671 BTU R -19 (U= .053) 2.4 /SF SF BTU R -27 (U■ .037) 1.7 /SF SF BTU Floor over unheated space None (U- .25 ) 11.5 /SF SF BTU R -11 (U- .08 ) 3.7 /SF SF BTU R -19 (U- .055) 2.5 /SF 1170 SF 2925 BTU R -30 (U- .035) 1.6 /SF SF BTU (CONTINUED NEXT PAGE) TOTAL TH :B PAGE ou 1 1 24990 BTU Page 1 Slab on grade / Floor perimeter insulation None (Fm .81 ) 37.3/LF LF BTU R -5 (F.. .61 ) 28.1/LF LF BTU R -8 (F- .56.) 25.8/LF LF BTU R -10 (F. .54 ) 24.8/LF LF BTU Infiltra- tion Pre 1980 (.018x1.2ach) 1.0 /CF CF BTU -- --- Post 1980 (.018x.6ach) .5 /CF 16944 CF 8472 BTU Heat Loss. Duct Loss Outside Fresh air 1.08 x 0 cfm x 46dt. Total. Heat Loss. Minimum Allowed Equipment Size (THL x .9) Maximum Allowed. Equipment Size (THL x1.5) Equipment: Rheem RGLD08EEGR 64,000: btu gas A.F.U.E. 75.7% 33462 BTU 3346 BTU 0 BTU 36808 BTU 33127 BTU 55212 BTU furnace. Furnace Rheem RGLD08EEGR .120 VOLT 1ph/60 Thermostat White Rodgers 1F -90 -51 Digital programmable All heating load calculations per 1985 ASHRAE handbook of fundamentals and the 1986 WSEC. All duct work to be installed in UMC Chapter 10 Section 1001 thru All duct work to be insulated in 1986.WSEC. Table 4 -16 accordance with PLAN CHECK NUMBER /�A , ` �% ) ISOM "X" REQUIRED INSPECTIONS 1 Footings 2 Foundation 3 Slab and/or Slab Insulation 4 Shear Wall Nailing 5 Roof Sheathing Nailing 6 Masonry Chimney 7 Framing 8 Insulation 9 Suspended Ceiling 10 Wall Board Fastening X.,11 � Maio I N 1 2 13 14 FIRE FINAL Imp: 15 PLANNING FINAL 16 PUBLIC WORKS FINAL 17 BUILDING FINAL PROJECT: _l 1 IE w t GK 7 THE FOLLOW(N8 COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER TUKWILA BUILDING PERMIT NUMBER (No changes will be made to the pions unless approved by the Architect and the Tukwila Building Division. f1 Z� J f� Plumbing permit shall be obtained through the King County Health �� Department and plumbing will be inspected by that agency, including all gas piping (296 - 4732). Electrical permit shall be obtained through the Washington State Division of Labor and Industries and all electrical work will oe inspected by that agency (872-6363), OAll mechanical work shall be under separate permit through the City of Tukwila. `sC/ 11 permits, inspection records, and approved plans shall be posted at the job site prior to the start of any construction. When special inspection is required either the owner, architect or engineer shall notify the Tukwila Building Division of appointment of the inspection agencies prior to the first building inspection. Copies of all special inspection reports shall be submitted to the Building Division in a timely manner. Reports shall contain address, project name and permit number of the project being inspected. O OAl.L..structural concrete to be special inspected (Sec. 306, UBC). O8 All structural welding to be done by W.A.8.0. certified welder and special inspected (Sec. 306, UBC). O9 All high- strength bolting to be special inspected (Sec. 306, UBC). 10 Any new ceiling grid and light fixture installation is required to fleet lateral bracing requirements for Seismic tone 3. 11 Partition walls attached to ceiling grid must be laterally braced if over eight (81 feet in length. 12 Readily accessible access to roof mounted equipment is required. 13 Engineereed truss drawings and calculations shall be on site and available to the building inspector for inspection purposes. Documents shall bear the seal and signature of a Washington State rofessional Engineer. Any Imposed insulations backing material to have Flame Spread Rating of 25 or less, and material shall bear identification showing the fire performance rating thereof. Subgrade preparation including drainage, excavation, compaction, and fill requirements shall conform strictly with recommendations given in the soils report prior to final inspection (see attached procedure.). 1'3 16 A statement from the roofing contractor verifying fire retardancy of roof wail be required prior to final inspection (see attached procedure). LAll construction to be dons in conformance with approved plans and requirements of the Uniform Building Code (1988 Edition), Uniform Mechanical Code (1988 Edition), Washignton State Energy Code (1989 Edition), and Washington Stae Regulations for Barrier Free Facility (1989 Edition/. le All food preparation •stablishsents must have King County Health Department sign -off prior to opening or doing any food processing. Arrangements for final Wealth Department inspection should be made by calling King County Health Department, 296 -4787, at least three working days prior to desire inspection date. On work requiring Wealth Department approval, it is the contractor's responsibility to have a set of plans approved by that agency on the job site. 19 Fire retardant treated wood shall have a flame spread of not over 25. All materials shall bear identification showing the fire performance rating thereof. Such identification shall be issued by an approved agency having a service for inspection at the factory. 20 Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 21 All spray applied fireproofing as required by U.I.C. Standard No. 43 -8, shell be spacial inspected. 22 All wood to remain in placed concrete shall be treated wood. '. 23 All structural masonry shall be special inspected per U.I.C. Section 306 (a) 7. Validity of Permit. The issuance of a permit or approval of plans, specifications and computations shall not be construed to be a persit for , or an approval of, any violation Of any of the provisions Of this code or of any other ordinance Of the Jurisdiction. No persit prosusing to give authority or violate or cancel the provisions of this code shall be valid. `°'t"v tip r c t5 }l��.a�'"y`'� t 17•c nee , ts • ^' fin 'i7 MKS •-.. • f fie- ,x-rr -.,. _•■... _ •• ,r......e .,,.- • . %. .I "4.'L. ''b. •.. •r , 1s 3t4 t lit- to" 4178 r. 4t • 3 i /an .Vf,�, vVA y -vV 'L.6 4'. l P \ \' .re./A ,. `.l r.L,? ' T,� I understand that the Pia subject to er�rc rs and omi, Mans does not authoizs- adopted code or or�dirm tractor's c ± of a * ,�.. 0 ` k app oualt. are a,nd approval: of iotation of any eceipt of con- ackno` ,rle jged, •.. • iIIIII1IIIII1I1IIl1lli1lll1lll12l1lll1lf l 1�l�� :l�l�lli�ll�1l1i °�I�I1I1I�I ! III)1511 11111 III1116f1lll1lll1l 10 THSINCH 1 0 1 v j ' '1M ' . ; ` Ys r C .. ^° f; ( f i i I !�i a�I ii..( I I II III ; I L.�., 1I. ! IIF I, .. I: 7 8 10 1IIIIl111lj1I! 111 IlIll�lll�i! 11 MADE IN GERMANY 12 NOTE: If the microfilmed document is less clear than this notice. it is due to the ouality of the (Original dntunwnt_ ah • • • • ` • • , „ • 0 N 511 Lot L.- 4 S " 1,1 - 0 " 0" z" oP / y1 , a:Lo'1 us 40's° 4 r•Sc7 AO To 51.p1- 10t— 21' 151., • _ 40 30 t2 4,0 • .... 4.1" YES 14 TN, (tie/_ * frJ /A -51^4 R BED? A it* )(1.-.e. cAR Pv.:r 1 ,_. Q 1 - ;41,--1----- ----t i, • Xe, 14- 9 ;j Ji 14.■(:)1-w. FE5/E. DI) P/A D 1?_kr 111 9 019- GAR PET z1I-cl' ---4 kA,LL w'17 Po &IL.fes - A'sq 1- le,) "-.- rr 2 e° 3 tC • L. • , ----- 711 o ' ° } ,,,... _..,....43 1 v i 14 YL iN ' ''''' --/01 's 0 pe ?-..., ,- \ /KS ,;1, re 1 :--- id T';' T';' - :(.r- • y • !....1 . v tc . In 1,• ,..i • lc iqf a I 1 411 PI.P_L I "ft \ IK1 I CAR PT ' 1 I 4/11,014 (1' T 0 ,- t•-• t I 1/1! Z.P " i1 f Co IS E: •Qo -4 0 t-,1 • DEr 'Rao' 2 i4 ,...0 X 8 14 1212, (PF/L4 (-ryp) z x 5 LE -ro P PLATE_ W/4 g/..7 1.4 Pg c,v Po ,4v ct • 31.... Cy% if , ; r " UPPER FL. ,C).P) PL \\,/ 17090\E[2, L 1 VIK161 14,17,E,N, • 948,514 - eJ , A —1 1,141 " 1. LO 111111111111111 eo 0. 111110111111111— -o ..z: Is at, .1c 0 .5. c •. 2 SS to. go sj 6 0 0 0 . .0 0 s. eg ea al c -0 I* 11 so a i 10 i .6. 6, .0 L co f.. - • c r. „, es -f. E 15 .3 c ..c ••• i. 8 a• . : .. ..„. ., .... .0 : o>.... ..- •c td 2 V .4' E 2 _ >,• I" — 41 0 :6 se s. es la 1 3s 46 33 "0 -----.111111111111111 o Lt) CO tcr Le) CO N. C) to •D x ri) 0 Z CC1 *4C co 6 o X 0 CO RECEIVED CITY OF TUKWILA OCT 2 1990 PERMIT CENTER 111111111111111 IIII1111111111/111111111111111111111111IVIIIII1111111111111111 11111111111111111111111111111111111111111111111111111111111111111111 IIII11.1101111111/1111111111111111111111111111111111111 0 16 THS IHCH 2 t 3 4 5 6 7 8 9 10 11 MADE IN GERMANY 12 NOTE: If the microfilmed document is less clear than this e • tr.z.T.sr '