HomeMy WebLinkAboutPermit 0383-M - Bates Residence!Fr, lid'
MECHAKCAL PERMIT
(POST WITH PLANS IN A CONSPICUOUS LOCATION)
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431-3670
MECHANICAL
PERMIT NO.
DATE ISSUED:
05"S-3-in
gES
:till
Unit Fee
Other
Plan Check No.:
MUTER
WilitritainkLata
MEIN
NENE
90-150-M
PROPERTY OWNER:
Dwight Bates
SITE ADDRESS: 4446 S 160
SUITE NO.
PROJECT NAME/T N NT' Bates, Dwight
IVALUE OF WORK: $2,679.00
TYPE OF WORK: X New/Addition ( ) Modifications (D Repair
( Other:
DESCRIPTION OF WORK: Install new gas furnace and hot water tank.
G & M Mechanical Contractors
PROPERTY OWNER:
Dwight Bates
PHONE: 854-8500
ADDRESS:
P.O. Box 1078, Auburn, WA
1ZIP:
98071-1078
CONTRACTOR:
G & M Mechanical Contractors
PHONE: 630-1932
ADDRESS:
P.O. Box 6147, Kent, WA
ZIP:
98064
WA. ST. CONTRACTOR'S LICENSE NO, QtdECC*1131j1'
lEXPIRATION DATE:
1-31-91
CONDITIONS (other than noted on or attached to petmItlplans):
IAPPROVED FOR
ISSUANCE BY:
BUILDING
OFFICIAL
DATE: /6 -100
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions
of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of
this permit.does not presume to give authority to violate or cancel the provisions of any other state or local laws
regulating construction or the performance of work. I am authorized to sign for and obtain this mechanical permit.
SIGNATUR
PRINT N E:
DATE:
COMPANY: 6:7; f-t /-7ece/hGuic....4 4--
1MINSOMMINGNI
DATE DATE(S)
REQUIRED INSPECTIONS PHONE NO. APPROVED INSPECTOR CORRECTION NOTICE ISSUED
1 - Rouah-InNents/Ducts
2 - Fire Final
3 - Planning Final
4 -
431-3670
575-4407
.431-3680
5 - Mechanical Final 431-3670
OTHER AGENCIES: Plumbing/Gas Piping - King County Health Department (296-4732)
Electrical - Washington State Department of Labor and Industries (277-7272)
• • ", • • • • : ••• • • " •:.:.
• Thls .peem...itshailbecoMe..,:nuitapcliVO:itth#:::;ivo*lopotCOMMOrs' .
.uance, or if the work is suspended ,OriallandOn , for a penod 0(180 days from the Iast.
07/17410
� MECHANICAL PERMIT
APPLICATION TRACKING
PLAN CHECK
NUMBER
q0 —) 50--in
PROJECT NAME
hi-
SITE ADDRESS
SUITE NO.
INSTRUCTIONS TO STAFF
• Contacts with applicants or requests for information should be summarized in writing by staff so that
any time the status of the project may be ascertained.
• Plan corrections shall be completed and approved prior to sending on to the next department.
• Any conditions or requirements for the permit shall be noted on the plans or summarized concisely
in the form of a formal letter or memo, which will be attached to the permit.
• Please fill out your section of the tracking chart completely. Where information requested is not
applicable, so note by using "N/A ".
DEPARTMENTAL REVIEW
"X" In box Indicates which departments need to review the project.
::.
}:. :.:
....
:,
..:.. �. .:. }.:{.
:.� .
AFB:::::::
�:• Y:;{; n;.;: y;:•> y; v,:.•. n: v' 2y}}}}: r:'::^' i;•}' :.::'.::::h:;:�ii::::n:Y: {:i: } }n}
... Y:
�:::: }: +::: :•. }�;.••. �: rv::; +•:•:: w.
.:: }•::::::. .:::• _:::.::::::<.::}::: :::.: >.:.r::.:.:...:........, :. .... r....:.....:.::.:.:..:, ii.<: i<.}:•:< i< i< ii•} :.<:. }:. }:.:. }: «; } } } }:«:: <.< }.>
BUILDING -
initial review
��� ���
+�` gl�a
%
(ROUTED)
6ONSLLTI}NT: Date lent - Dht. Approved -
PERMIT EXPIRES
O FIRE
2nd NOTIFICATION
FIRE PROTECTION: [1 Sprinklers (_ 1 Detectors KN/A
FIRE DEPT. LETTER DATED: INSPECTOR:
INIT:
ZONING: i D USE CONDITIONS? [ )Yes Z'No
0 PLANNING
SCREENING REQUIRED? f 7Y•s No
INIT:
REFERENCE FLE NOS.:
O OTHER
INIT:
X BUILDING -
final rRviAw
I 4a
l
4o/z
UMC EDITION (year):
t eG413.6
INIT: k 101
REVIEW COMPLETED
PERMIT NO.
CONTACTED
� �1��
9
DATE READY
DATE NOTIFIED
,
Err —(4.6
�'' �� (Init.) -�
PERMIT EXPIRES
2nd NOTIFICATION
BY:
(Ink.)
AMOUNT OWING
,-y _ b¢
�l�J +
3RD NOTIFICATION
BY:
(Ink.)
O•17lO
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
MECHANCAL PERMIT
APPLICATION
Mechanical Fee Worksheet must also be /filed out
and attached to this application.
PLAN CHECK
NUMBER
0 150-M
APPLICATION MUST BE FILLED OUT COMPLETELY
FEES (for staff use only)
NITS
SITE ADDRESS SUITE #
1// /lt& r / (on
VALUE OF CONSTRUCTION - $ �_
if /.9C7jn,
PROJECT NAME/TENANT %
.//: / /ei ,L' // 7 &,- 5 r /�rc)!Crtf r AA- t -`
TYPE OF WORK: (1 New /Addition /b Modifications Q Repair Q Other:
DESCRIBE WORK TO BE DONE:
f�TIIVG131ZE::<.:<;: • < >::. »:::.: <: <::. >:: >:: �..: »:::::. >:> ::: >::::::: « <:::
:<: >•,; > >:;.:<:; >:::< .... NtlfiABf» RoF:.:UNIT#`::;::<:::; :<< >>
/ 1E/ r'1 ( - A - s %- t i 4 evil C c Faa-r, 09r le /.. - fCC,,_sre, o ec r
i, ii,, ,..7, , /i o i (...) 4 <<: '-2 T014.11' 1 /(P/000 r4-/ S,-, 6iEi-1...0 el) 1'
WA. ST. CONTRACTOR'S LICENSE # 6 ‘ �„ ,, ,_,- ,_ �. ll 3 8 -
EXP. DATE
BUILDING USE (office, warehouse, etc.)
Xf:::, / /0 /.:=-,A, 4. ,m
NATURE OF BUSINESS:
WILL THERE BE A CHANGE IN USE? b No Q Yes IF YES, EXPLAIN:
WILL THERE BE STORAGE OR USE OF FLAMMABLE, COMBUSTIBLE OR HAZARDOUS MATERIALS IN THE
BUILDING? Q No Q Yes IF YES, EXPLAIN:
PROPERTY OWNER i1, . ('.�?, _ I
�L lu.� 1 C-:r1 7 %� l r.- 5 �1. iE? //tot, �� `j�Db��r.S
PHONE
Fs' /r. _- so o
ADDRESS is /3cX it- 7 A ‘,..3 ce /0. 4' i 1 4
PHONE
ZIP n
c.,- -C., / c1 3 ;.1_
CONTRACTOR r „ f /L! / / 4 L , ' / : 6Y /1150A 6 io,Q 5
ADDRESS / D 67, f- 6. /, 7 J c A r, L34
ZIP 924-06,e/
j_3,_ i. /
WA. ST. CONTRACTOR'S LICENSE # 6 ‘ �„ ,, ,_,- ,_ �. ll 3 8 -
EXP. DATE
BUILDING OWNER
OR
AUTHORIZED
AGENT
DATE
/-
PHONE
f�
PRINT N . Ve, / /.t." /. to , N
ADDRESS ,vk (- !I, -7
CONTACT PERSON `)
f/`'
1jUA- A4t1,i�”
PHONE
CITY /ZIP
PHONE -
APPLICATION SUBMITTAL In order to ensure that your application is accepted for plan review, please make sure to fill
out the application completely and follow the plan submittal checklist on the reverse side of this form. A completed
"Mechanical Permit Fee Worksheet" must accompany this permit application. Handouts are available at the Building
counter which provide more detailed Information on application and plan submittal requirements. Application and
plans must be complete in order to be accepted for oian review.
BUILDING OWNER / AUTHORIZED AGENT If the applicant is other than the owner, registered architect/engineer, or
contractor licensed by the State of Washington, a notarized letter from the property owner authorizing the agent
to submit this permit application and obtain the permit will be required as part of this submittal.
VALUATION OF CONSTRUCTION The valuation is for the work covered by this permit and must be filled in by the
applicant. This figure is used for budget reporting purposes only and not to calculate your fees.
EXPIRATION OF PLAN REVIEW Applications for which no permit is issued within 180 days following the date of
application shall expire by limitation. The Building Official may extend the time for action by the applicant for a
period not exceeding 180 days upon written request by the applicant as defined in Section 304(d) of the Uniform
Mechanical Code (current edition). No application shall be extended more than once.
if you have any questions about our process or plan submittal requirements,
please contact the Department of Community Development at 431 -3670.
DATE APPLICATION ACCEPTED
DATE APPLICATION EXPIR
4
SS�MITTAL CHECILIST
•
MECHANICAL
Ei Completed mechanical permit application (one for each structure or tenant)
Two (2) sets of mechanical plans, which include:
• Floor plan
• System layout
• Elevations (for roof mounted equipment)
• Heat Loss Calculations
Structural calculations stamped by a Washington State licensed engineer may be
required if structural work is to be done (2 sets)
Note: Hood and duct systems require a building permit for the duct shaft.
MECHANICAL PERMIT
FEE WORKSHEET
CITY OF TUKWILA
Department of Community Development - Building Division
6300 Southcenter Boulevard, Tukwila WA 98188
(206) 431 -3670
THIS WORKSHEET MUST ACCOMPANY
YOUR MECHANICAL PERMIT APPLICATION.
DESCRIPTION
UNIT COST
NO. OF
UNITS
X
TOTAL
COST
$15.00
BASIC FEE
SUPPLEMENT PERMIT FEE
$4.50
1
Installation or relocation of each forced -air gravity -type fumace or
burner, including ducts and vents attached to such appliance, up to and
Including 100,000 Btu/h.
$9.00
X
2
Installation or relocation of each forced -air or gravity -type fumace or
bumer, including ducts and vents attached to such appliance over
100,000 Btu /h.
$1 1.00
X
3
Installation or relocation of each floor fumace, including vent.
$9.00
X
4
Installation or relocation of each suspended heater, recessed wall heater
or floor- mounted unit heater.
$9.00
X
5
Installation, relocation or replacement of each appliance vent installed and
not included In an appliance permit.
$4.50
x
8
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by this code.
$9.00
X
7 Installation or relocation of each boiler or compressor to and Including
three horsepower, or each absorption system to and Including 100,000
Btu /h.
$9.00
X
8 Installation or relocation of each boiler or compressor over three
horsepower to and including 15 horsepower, or each absorption system
over 100,000 Btu /h and including 500,000 Btu /h.
$16.50
X
9 Installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or each absorption system
over 500,000 Btu /h to and including 1,750,000 Btu/h.
$22.50
X
10 Installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu /h to and including 1,750,000 Btu /h.
$33.50
x
1 1 Installation or relocation of each boiler or refrigeration compressor over
50 horsepower, or each absorption system over 1,750,000 Btu /h.
$56,00
X
1 2 Each air - handling unit to and including 10,000 cubic feet per minute,
including ducts attached thereto. (NOTE: This fee shall not apply to an
air - handling unit which is a portion of a factory- assembled appliance,
cooling unit, evaporative cooler or absorption unit for which a permit is
required elsewhere in this code.)
$6.50
i
X
(p .53
13 Each air - handling unit over 10,000 cfm.
$11.00
X
14
15
15
Each evaporative cooler other than a portable type.
$6.50
X
Each ventilation fan connected to a single duct.
$4.50
x
Each ventilation system which is not a portion of any heating or
air - conditioning system authorized by a permit.
$6.50
X
17
installation of each hood which is served by mechanical exhaust, including
the ducts for such hood.
$6.50
X
18
Installation or relocation of each commercial or industrial -type incinerator.
$1 00
X
19
Installation or relocation of each commercial or industrial -type incinerator.
$45.00
X
20
Each appliance or piece of equipment regulated by the code but not
classed in other appliance categories, or for which no other fee is listed In
this code.
$6.50
X
c,? i •O
awarao
SUBTOTAL
• _ I
PLAN CHECK PEE t>ISs d
subtotal)
��
GRAND TOTAL
$ Otn.tt
CITY OF TUKWILA
6200 SOUTHCENTER!BOULEVARD, TUKWILA, WASHINGTON 98188
Plan Check #90- 150 -M: Bates, Dwight
4446 S 160
PHONE k (2061433.1800
Gary L. VanInsrn, Mayor
THE FOLLOWING COMMENTS APPLY TO AND BECOME PART TH APPROVED
PLANS UNDER TUKWILA MECHANICAL PERMIT NUMBER CY 3 -/V)
1. No changes will be made to the plans unless approved by
the Architect and the Tukwila Building Division.
2. Plumbing permit shall be obtained through the King County
Health Department and plumbing will be inspected by that
agency, including all gas piping (296 - 4732).
3. Electrical permit shall be obtained through the
Washington State Division of Labor and Industries and all
electrical work will be inspected by that agency (277-
7272).
All permits, inspection records, and approved plans shall
be posted at the job site prior to the start of any
construction.
• Any exposed insulations backing material to have Flame
Spread Rating of 25 or less, and material shall bear
identification showing the fire performance rating
thereof.
▪ All construction to be done in conformance with approved
plans and requirements of the Uniform Building Code (1988
Edition), Uniform Mechanical Code (1988 Edition),
Washington State Energy Code (1990 Edition), and
Washington State Regulations for Barrier Free Facility
(1990 Edition).
7. Validity of Permit. The issuance of a permit or approval
of plans, specifications and computations shall not be
construed to be a permit for , or an approval of, any
violation of any of the provisions of this code or of any
other ordinance of the jurisdiction. No permit presuming
to give authority or violate or cancel the provisions of
this code shall be valid.
YrAy
y044 .4.301,21t i-AvsN:er,
CITY OF TUKWILA
Building Department
6300 S rcenter Boulevard
Tukwil l 98188
(206) 4 03670
xM�NSPECTU
'iR i%rtiM.,� aeit 1Cecra3c..:emAvill•t avrAr `.,
PERMIT # ).S8 3 - kY
Date / r /0 -1'l
Type of Inspection F-11.J4N-1---
Site Address 4444(1 3 • f (p0
Requestor
Special Instructions
Date Wanted
Project r3/t -; hS
Phone #
Inspection Results /Comments:
1/41\ti- v4
T . A
t( pins f.3 01-- O c cA.A.l0 " 0.11A 1 C4% / N IC ft S 1 l 0 vi N472—
tldc tic —+114
Date 1'' /0'cr/
CITY OF TUKWILA
Bu11d 'i Department
6300 ,Fhcenter Boulevar
Buill(T
Tukwi; WA 98188 d
(206) 431 -3670
INSPECTION RECORD
PERMIT #
Date 10 2 `l 0
Type of Inspection -j Vii' (,C �.� Date Wan d �.�,'a
� /5—
Project ��J ,
Phone # 'PO (9 32-)
Site Address L
Requestor oh, n
Special Instructions
p.n
Inspection Results /Comments:
,z24-
Inspector Ava.../
Date l(i�' %--Gi%�
Terhune Homes Inc
Po Box 1078
Auburn, Wa 98071
Dwight Bates
4446 S 160th
Tukwila, Wa
Gas heat
RECEIVED
CITY OF TUKWILA
O C r 2 1990
PERMIT CENTER
Building
component
Description including
U value or F value
Heat Loss
Factor
(HLF ■U
x 46 DT)
Component
Square Ft
Linear Ft
Cubic Ft
Component
Heat loss
(HLF x SF,
LF or CF)
Window
Skylight
Sliding
Glass Door
Single (U =1.20 )
55.2/SF SF
BTU
Double (U■ .90 )
-- -.
41.4/SF SF
BTU
--
(U= .75 )
34.5/SF 355 SF
12248 BTU
(U- .56 )
27.6/SF SF
BTU
Other (U■ .49 )
22.5/SF SF
BTU
Opaque
Door
Wood (U- .47 )
21.6/SF 59 SF
1274 BTU
- ---- --
W /storm (U- .32 )
14.7/SF SF
-
BTU
Insul Metal (U -.20 )
9.2 /SF SF
BTU
Roof/
Ceiling
Insulation
None (U- .40 )
18.4 /SF •SF
BTU
R -19 (U= .055)
2.5 /SF SF
BTU
R -30 (U- .035)
1.6 /SF 1170 SF
1872 BTU
R -38 (U- .026)
1.2 /SF SF
BTU
R -49 (U- .020)
.9 /SF SF
BTU
Wall
Insulation
above and
below grade
None (U- .25 )
11.5/SF SF
BTU
R -11 (U- .07 )
3.5 /SF 1906 SF
6671 BTU
R -19 (U= .053)
2.4 /SF SF
BTU
R -27 (U■ .037)
1.7 /SF SF
BTU
Floor over
unheated
space
None (U- .25 )
11.5 /SF SF
BTU
R -11 (U- .08 )
3.7 /SF SF
BTU
R -19 (U- .055)
2.5 /SF 1170 SF
2925 BTU
R -30 (U- .035)
1.6 /SF SF
BTU
(CONTINUED NEXT PAGE)
TOTAL TH :B PAGE ou
1 1
24990 BTU
Page 1
Slab on
grade /
Floor
perimeter
insulation
None (Fm .81 )
37.3/LF
LF
BTU
R -5 (F.. .61 )
28.1/LF
LF
BTU
R -8 (F- .56.)
25.8/LF
LF
BTU
R -10 (F. .54 )
24.8/LF
LF
BTU
Infiltra-
tion
Pre 1980
(.018x1.2ach)
1.0 /CF
CF
BTU
--
---
Post 1980
(.018x.6ach)
.5 /CF
16944
CF
8472
BTU
Heat Loss.
Duct Loss
Outside Fresh air 1.08 x 0 cfm x 46dt.
Total. Heat Loss.
Minimum Allowed Equipment Size (THL x .9)
Maximum Allowed. Equipment Size (THL x1.5)
Equipment: Rheem RGLD08EEGR 64,000: btu gas
A.F.U.E. 75.7%
33462 BTU
3346 BTU
0 BTU
36808 BTU
33127 BTU
55212 BTU
furnace.
Furnace Rheem RGLD08EEGR .120 VOLT 1ph/60
Thermostat White Rodgers 1F -90 -51 Digital programmable
All heating load calculations per 1985 ASHRAE handbook
of fundamentals and the 1986 WSEC.
All duct work to be installed in
UMC Chapter 10 Section 1001 thru
All duct work to be insulated in
1986.WSEC. Table 4 -16
accordance with
PLAN CHECK
NUMBER
/�A
, ` �% ) ISOM
"X"
REQUIRED INSPECTIONS
1 Footings
2 Foundation
3 Slab and/or Slab Insulation
4 Shear Wall Nailing
5 Roof Sheathing Nailing
6 Masonry Chimney
7 Framing
8 Insulation
9 Suspended Ceiling
10 Wall Board Fastening
X.,11
�
Maio I N
1 2
13
14 FIRE FINAL Imp:
15 PLANNING FINAL
16 PUBLIC WORKS FINAL
17 BUILDING FINAL
PROJECT: _l 1 IE w t GK 7
THE FOLLOW(N8 COMMENTS APPLY TO AND BECOME PART OF THE APPROVED PLANS UNDER
TUKWILA BUILDING PERMIT NUMBER
(No changes will be made to the pions unless approved by the
Architect and the Tukwila Building Division.
f1 Z� J f� Plumbing permit shall be obtained through the King County Health
�� Department and plumbing will be inspected by that agency,
including all gas piping (296 - 4732).
Electrical permit shall be obtained through the Washington State
Division of Labor and Industries and all electrical work will oe
inspected by that agency (872-6363),
OAll mechanical work shall be under separate permit through the
City of Tukwila.
`sC/ 11 permits, inspection records, and approved plans shall be
posted at the job site prior to the start of any construction.
When special inspection is required either the owner, architect or
engineer shall notify the Tukwila Building Division of appointment
of the inspection agencies prior to the first building inspection.
Copies of all special inspection reports shall be submitted to the
Building Division in a timely manner. Reports shall contain
address, project name and permit number of the project being
inspected.
O
OAl.L..structural concrete to be special inspected (Sec. 306, UBC).
O8 All structural welding to be done by W.A.8.0. certified welder and
special inspected (Sec. 306, UBC).
O9 All high- strength bolting to be special inspected (Sec. 306, UBC).
10 Any new ceiling grid and light fixture installation is required to
fleet lateral bracing requirements for Seismic tone 3.
11 Partition walls attached to ceiling grid must be laterally braced
if over eight (81 feet in length.
12 Readily accessible access to roof mounted equipment is required.
13 Engineereed truss drawings and calculations shall be on site and
available to the building inspector for inspection purposes.
Documents shall bear the seal and signature of a Washington State
rofessional Engineer.
Any Imposed insulations backing material to have Flame Spread
Rating of 25 or less, and material shall bear identification
showing the fire performance rating thereof.
Subgrade preparation including drainage, excavation, compaction,
and fill requirements shall conform strictly with recommendations
given in the soils report prior to final inspection (see attached
procedure.).
1'3
16
A statement from the roofing contractor verifying fire retardancy
of roof wail be required prior to final inspection (see attached
procedure).
LAll construction to be dons in conformance with approved plans and
requirements of the Uniform Building Code (1988 Edition), Uniform
Mechanical Code (1988 Edition), Washignton State Energy Code (1989
Edition), and Washington Stae Regulations for Barrier Free
Facility (1989 Edition/.
le
All food preparation •stablishsents must have King County Health
Department sign -off prior to opening or doing any food processing.
Arrangements for final Wealth Department inspection should be made
by calling King County Health Department, 296 -4787, at least three
working days prior to desire inspection date. On work requiring
Wealth Department approval, it is the contractor's responsibility
to have a set of plans approved by that agency on the job site.
19 Fire retardant treated wood shall have a flame spread of not over
25. All materials shall bear identification showing the fire
performance rating thereof. Such identification shall be issued
by an approved agency having a service for inspection at the
factory.
20 Notify the City of Tukwila Building Division prior to placing any
concrete. This procedure is in addition to any requirements for
special inspection.
21 All spray applied fireproofing as required by U.I.C. Standard No.
43 -8, shell be spacial inspected.
22 All wood to remain in placed concrete shall be treated wood. '.
23 All structural masonry shall be special inspected per U.I.C.
Section 306 (a) 7.
Validity of Permit. The issuance of a permit or approval of
plans, specifications and computations shall not be construed to
be a persit for , or an approval of, any violation Of any of the
provisions Of this code or of any other ordinance Of the
Jurisdiction. No persit prosusing to give authority or violate or
cancel the provisions of this code shall be valid.
`°'t"v tip r c t5 }l��.a�'"y`'�
t 17•c nee , ts • ^'
fin 'i7 MKS •-.. • f
fie- ,x-rr -.,. _•■... _ •• ,r......e .,,.-
•
. %. .I
"4.'L. ''b. •..
•r ,
1s
3t4
t lit- to"
4178
r.
4t
•
3
i /an .Vf,�,
vVA y -vV 'L.6 4'. l P
\ \' .re./A ,. `.l r.L,? ' T,�
I understand that the Pia
subject to er�rc rs and omi,
Mans does not authoizs-
adopted code or or�dirm
tractor's c ± of a * ,�.. 0 `
k app oualt. are
a,nd approval: of
iotation of any
eceipt of con-
ackno` ,rle jged,
•..
•
iIIIII1IIIII1I1IIl1lli1lll1lll12l1lll1lf l 1�l�� :l�l�lli�ll�1l1i °�I�I1I1I�I ! III)1511 11111 III1116f1lll1lll1l
10 THSINCH
1
0 1
v j
'
'1M ' . ;
`
Ys r C
..
^°
f;
( f i
i
I !�i
a�I
ii..(
I I
II
III
; I L.�.,
1I. !
IIF I, ..
I:
7
8
10
1IIIIl111lj1I! 111 IlIll�lll�i!
11 MADE IN GERMANY 12
NOTE: If the microfilmed document is less clear than this
notice. it is due to the ouality of the (Original dntunwnt_
ah
• • • • ` • • , „
•
0
N
511
Lot
L.- 4
S "
1,1 - 0 "
0" z"
oP
/
y1 ,
a:Lo'1 us
40's°
4 r•Sc7
AO To
51.p1-
10t— 21'
151., •
_
40 30 t2
4,0
• ....
4.1" YES 14 TN,
(tie/_ *
frJ
/A -51^4 R BED? A
it* )(1.-.e. cAR Pv.:r
1
,_.
Q 1
-
;41,--1----- ----t
i, • Xe, 14-
9 ;j Ji 14.■(:)1-w.
FE5/E. DI) P/A
D 1?_kr 111 9 019- GAR PET
z1I-cl'
---4
kA,LL
w'17 Po &IL.fes - A'sq
1-
le,)
"-.- rr 2 e° 3
tC
• L. • ,
----- 711 o '
° } ,,,... _..,....43
1
v i 14 YL iN ' ''''' --/01 's 0 pe ?-...,
,- \ /KS ,;1,
re 1 :--- id T';' T';' -
:(.r- • y •
!....1 . v tc . In 1,•
,..i
• lc iqf a I
1
411
PI.P_L I
"ft \ IK1
I CAR PT
'
1 I 4/11,014
(1' T
0
,- t•-•
t I
1/1!
Z.P "
i1 f
Co
IS E:
•Qo
-4 0 t-,1
• DEr 'Rao' 2 i4
,...0
X 8 14 1212, (PF/L4 (-ryp)
z x 5 LE -ro P PLATE_ W/4 g/..7
1.4 Pg c,v Po ,4v ct
•
31.... Cy%
if ,
; r "
UPPER FL. ,C).P) PL \\,/ 17090\E[2,
L 1 VIK161 14,17,E,N, • 948,514
- eJ ,
A
—1
1,141 " 1. LO
111111111111111
eo
0.
111110111111111—
-o ..z: Is at, .1c
0 .5. c •. 2
SS to. go sj 6
0 0 0 . .0
0 s.
eg ea al c -0 I*
11 so
a i
10 i .6. 6,
.0 L
co f.. - • c r.
„,
es -f. E 15 .3 c
..c ••• i. 8 a•
. :
..
..„. ., ....
.0 :
o>....
..-
•c td
2 V .4' E 2
_
>,• I" — 41 0 :6 se
s.
es
la 1
3s 46 33 "0
-----.111111111111111
o
Lt)
CO
tcr
Le)
CO
N.
C) to
•D x
ri)
0
Z
CC1
*4C
co 6
o
X
0
CO
RECEIVED
CITY OF TUKWILA
OCT 2 1990
PERMIT CENTER
111111111111111
IIII1111111111/111111111111111111111111IVIIIII1111111111111111 11111111111111111111111111111111111111111111111111111111111111111111 IIII11.1101111111/1111111111111111111111111111111111111
0 16 THS IHCH
2 t 3 4
5 6
7 8 9 10 11 MADE IN GERMANY 12
NOTE: If the microfilmed document is less clear than this e
•
tr.z.T.sr
'