Transportation _2A15��7mrk Plan
City of Tukwila
Updated 6/8/15
3
Design contr ct (to COW only)
1
PW
A
Complete
Design[ontractSupp|ement — dexignunderQnmundinB
2
PW
A
Seattle City Light underground agreement . �
4
PW
A
FoIIow-up on potential for coordination with SeaTac `
2
PW
B
Design contract and bid award
2
PW
A
��
����/���`^�,���Q��������M�0�����r
C�
Bid Award .
2
PW
A
Funding and Design contract
` 2
PW
A
53rd Ave S Water Main Replacement, Sewer Rehab (from
Utilities)
� �
'
A
Closeout
3
PW
A
Closeout .
3
PW
A
Closeout
3
� PW
A
taelWairettiriffiMAWAFIrlifeliakifeirag
Bid Award
3
PW
A
Design contract '
2
PW
A
Safety-based priority list
4` �
PW
B
Program update
4
PW
B
ght-of-way and easement acquisition
1
PW
A
Complete
Bid Award
4
PW
A
��
Status update
4 '
PW
B
Bid award
4
PW
A
Present engineering analysis
3
PW
B
TIB pedestrian bulb replacemerit (test locations)
2
PW
B
Allentown Roadside Barriers — outreach and design alternatives
2
PW
B
Complete
Duwamish/ s 1l9 Ped Bridge — present condition and repairs
'
1
PW
B
Complete
(briefing)
Transit plan update contract `
4
PW
A
TIP Resolution
` 2
PW
A
Complete
'
Facility Tours .
As needed
PW
SCATBD
Semimonthly
PW
Committee Work PIan ' '
��
Council, Staff
City of Tukwila
Updated 6/8/15
3