HomeMy WebLinkAboutTrans 2015-07-20 Item 2A - Review - Proposed 2016 Capital Improvement Plan Sheet for Strander Boulevard Extension Phase IIICity of Tukwila Jim Haggerton, Mayor TO: Mayor Jim Haggerton Transportation Committee FROM: Bob Giberson, Public Works Director DATE: July 17, 2015 SUBJECT: Strander Blvd Extension Phase III Project No. 98610403 Proposed 2016 CIP Sheet ISSUE Review and approve the Proposed 2016 CIP sheet for Strander Blvd Extension Phase III. BACKGROUND The City of Tukwila submitted a TIGER 2015 grant application for $20 million on June 5, 2015 for the Strander Blvd Extension Phase III Project. The City matching requirement for the $37 million project is $2 million and the other funding sources include; $3 million - State Transportation Improvement Board (anticipated), $2 million - STP Grant (Federal through PSRC - anticipated), $5 million - Freight Mobility Strategic Investment Board (committed), $5 million - Northwest Arena (committed). The current 2015 CIP shows only $20,000 in 2015 and 2016 to cover updated cost estimates and grant applications with design occurring in 2018 and construction beyond 2020. The attached Proposed 2016 CIP sheet shows $2 million in City funds being spent in 2016 with $1.5 million in design, $450,000 in right -of -way and $50,000 for wetland mitigation. DISCUSSION The proposed 2016 CIP funding for the Strander Blvd Extension Phase III Project will serve as a catalyst for future grant funding. The $2 million City match proposed in 2016 would be required in the future regardless of the funding and provides an early start to demonstrate that the City of Tukwila is committed to complete this critical transportation link. Before right -of -way acquisition plans can be formulated with any accuracy, design needs to be advanced beyond Renton's current 30% conceptual design. The 2016 funding will allow the roadway and bridge designs to get beyond preliminary design stage. The 2017 CIP will be modified to reflect the phasing of the final design and right -of -way acquisition. The current stormwater pump station, stormwater pond, and wetland mitigation are only sized for current impervious surfaces. These drainage facilities need to be expanded for the UPRR temporary relocation (shoofly) during construction that also will impact additional wetlands and may require offsite mitigation. RECOMMENDATION Council approval of the proposed 2016 CIP sheet for the Strander Blvd Extension Phase III Project and consider this item at the July 27, 2015 Committee of the Whole and subsequent August 3, 2015 Regular Meeting. Attachments: Current 2015 CIP page 28 Proposed 2016 CIP Page 28 w:\pw eng\projects \a- rw & rs projects \strander extension (98610403)\phase iii\inlo memo cip 2016 proposal 07 -17 -15 gl.docx CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2015 to 2020 Project No. 98610403 DESCRIPTION: Design and construct arterial improvements for a new roadway extending Strander Blvd /SW 27th St from West Valley Highway to Oaksdale Ave. JUSTIFICATION: East/west capacity between 1 -405 and S 180 St is needed to serve Tukwila and Renton access. ggs This project will be constructed in three phases. Phase 1 extended Stander Blvd /SW 27th St from Oaksdale STATUS: Ave to Naches Ave SW. Phase 2 constructed a 2 lane roadway from Naches to the new Sounder's Tukwila Longacres Station's parking lot. Phase 3 will construct the undercrossing of the UPRR and complete the 1,000 4 lane roadway from West Valley Hwy to Naches Ave SW. MAINT. IMPACT: New street. Project partners include the City of Renton, Boeing, WSDOT, FMSIB, Sound Transit, Metro, Amtrak, and COMMENT: BNSF and UP Railroads. Funds in 2015 -16 are for updated cost estimates and grant applications. STP (PSRC) and TIGER grants were unsuccessful in 2014. FINANCIAL Through Estimated (in 9000'sl 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL EXPENSES ice y ggs Tukwila's Share Rent 1,000 t81 � a w Iytl 's � 1,000 Design 41 5 20 20 { � �Inklor BNd r Q 5 p N 5,000 5,086 Land (R /W) 104 Trllantl Dr � rye S! S S1808 e 1,329 1,433 Const. Mgmt. 5,000 5,000 Construction 46,000 46,000 TOTAL EXPENSES 1,145 5 20 20 0 5,000 0 0 52,329 58,519 FUND SOURCES Awarded Grant 0 Proposed FMSIB Grant 5,000 5,000 Proposed TIGER Grant 20,000 20,000 Proposed STP Grant 4,325 4,325 City Oper. Revenue 1,145 5 20 20 0 675 0 0 27,329 29,194 TOTAL SOURCES 1,145 5 20 20 0 5,000 0 0 52,329 58,519 ,f Project Locationtsa ice y ggs S 160 St it �O Tukwl ®akwy � ka a � t81 � a w Iytl 's � � a { � �Inklor BNd r Q 5 p N n� nnlalane Dr WE sa.on m Trllantl Dr � rye S! S S1808 e 2 2015 - 2020 Capital Improvement Program 28 CITY OF TUNW|LA CAPITAL PROJECT SUMMARY 2016 to 2021 PROJECT: 8tmanderBlvd Extension Phase U| Project No. DESCRIPTION: --"'----------`'~'~^'~^~'~' ~^~~'~~~~~' extending ^ I from West Valley Highway LoOaksdm|o Ave iothe City of Ren e-0 JUSTIFICATION: East/west capacity between | Renton access. Pu4m�wiUbmouns�u�odinthme phases. F�mso| extended Shander Blvd/SW 27thGt from Oahsda|e Ave 0nNaohmn Ave SVV Phase ||oonatm^tedo2 lane madwayfrom Nauhoa10 the navv5ounde�sTuhv�|e GT/��V�� � LonguomxS�tinn's parking lot. Phase |U will construct the onderomsoingof the UPRR and complete the 4 lane roadway from West Valley Hwy in Tukwila toNaches Ave SVVinRenton. MAJNT.|MPACT: New street. Project partners include the City of Renton, Boeing, WSDOT, FMSIB, Sound Transit, Metro, Amtrak, and COMMENT: BNSF and UP Railroads. Funds in 2015-16 are for updated cost estimates and grant applications. STP(P8RC) and TIGER grants were unsuccessful in2O14. FINANCIAL Through Estimated (in $000's) 2014 2015 2016 2017 2018 2019 2n2n 2n2i RFYONn TOTAI EXPENSES Tukwila's Share 1,000 Tukwila's Share of Renton's Phases I & 1,000 Design 41 14 1,500 3,000 4,555 Land (RNV) 104 450 1,000 1,554 Wetland Mitigation 50 500 550 Const. Mgmt. 3,750 1,050 4,800 Construction 20,500 6,700 27,200 FUND SOURCES Proposed TIGER Grant 20,000 20,000 Proposed State TIB Grant 3,000 3,000 Proposed STP Grant 2,000 2,000 Proposed FMSIB Grant 5,000 5,000 NW Arena Mitigation 3,000 2,000 5,000 City Oper. Revenue 1,145 14 2,000 750 750 0 0 0 0 4,659 a 2016 xoz1 Capital Improvement Program 28