HomeMy WebLinkAboutReg 2015-08-03 Item 5C - Final Acceptance - Cascade View Safe Routes to School with RL Alia Company for $303,069.94COUNCIL AGENDA SYNOPSIS
nifialf
Meetin Dal, Pre .ptired by_ Mayors re ex Council review
08/03/15 BG C'6
ITEM INFORMATION
ITEM NO.
5-C.
CAS NUMBER:
I STAFF SPONSOR: BOB GIBERSON
I ORIGINAL. AGI,"Nl),kDIl'I'l,": 08/03/15
AGENDA ITEM TITLE, Cascade View Elementary Safe Routes to School Project
Project Completion and Acceptance
C ATE� G 0 R Y ❑ Discussion
Mtg Date
Z Motion
Mtg Date 08103115
❑ Resolution
Mtg Date
❑ Ordinance
Mt
,g Date
F-1 Bid Award
Mtg Date
E:1 Public Hearing
Mtg Date
F Other
Mtg Date
SPONSOR ❑ Council ❑ Major ❑ HR ❑ DCD ❑ Finance ❑ Fire E]IT ❑ P&R ❑ Police Z PW
SPONSOR'S The contract with R.L. Alia Company of Renton, WA is complete for the Cascade View
SUNIMIkRY Elementary Safe Routes to School Project. This contract built an asphalt pedestrian trail to
connect 32nd Ave S with S 140th St through Cascade View Elementary School and Riverton
Park United Methodist Church. Two change orders were issued and unit price over-runs
totaled $23,956.94. Council is being asked to accept and finalize the contract with R.L. Alia
in the amount of $303,069.94.
RjVILWED BY COW Mtg. ❑ CA&P Cmte ❑ F&S Cmte ❑ Transportation Cmte
❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 07/20/15 COMMITTEE CHAIR: JOE DUFFIE
RECOMMENDATIONS:
SPONSOR/ADMIN. Public Works
CoMmIT"'I"' Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
Expi,"NDrrum,' Rj3QUIRI1''D AMOUNT BUDGETED APPROPRIATION REQUIRED
$303,069.94 $320,979.95 $0.00
Fund Source: 103 RESIDENTIAL STREETS (PAGE 3, 2015 CIP)
Comments:
MTG. DATE
RECORD OF COUNCIL ACTION
08/03/15
�MTG.DATE
ATTACHMENTS
08/03/15
Informational Memorandum dated 07/17/15
State of WA Depart of Revenue Notice of Completion 14-129
Minutes from the Transportation Committee meeting of 07/20/15
5
City of Tukwila
Jim Haggerton, Mayor
INFORMATIONAL MEMORANDUM
TO: Mayor Haggerton
Transportation Committee
FROM: Bob Giberson, Public Works Director Ze
BY: Peter Lau, Senior Program Manager
DATE: July 17, 2015
SUBJECT: Cascade View Elementary Safe Routes to School Project
Project No. 91210301, Contract No. 14 -129
Project Completion and Acceptance
ISSUE
Accept construction contract as complete and authorize release of retainage.
BACKGROUND
The Notice to Proceed for Contract No. 14 -129 with R.L. Alia Company of Renton, Washington was issued on
September 22, 2014 for the Cascade View Elementary Safe Routes to School (SRTS) Project. The Cascade
View SRTS construction project built roughly 900 linear feet of asphalt pedestrian trail to connect 32nd Ave
South with S 1401h St, through the Cascade View Elementary School and Riverton Park United Methodist
Church properties. Other project improvements included asphalt pavement removal, grading, storm drainage
improvements, new curb, installation of a water quality treatment system, and property restoration.
DISCUSSION
The Cascade View SRTS Project was physically completed on February 23, 2015. Two change orders were
executed for additional soil excavation in order to eventually install 3 new luminaires and for a contract time
extension.
FINANCIAL IMPACT
The Cascade View SRTS construction budget was $320,979.95. Unit price over -runs were mainly due to native soil
that was saturated with rain water in the winter and required additional crushed surfacing base course for grading
instead of using the saturated soil. Retainage is being held by the City for this project in the amount of $15,153.50.
Expenses
Construction Contract Amount $279,113.00
Change Order Nos. 1 & 2 21,571.00
Unit Price Over -runs 2,385.94
Total Contract and Budget $303,069.94
RECOMMENDATION
Council is being asked to formally accept the Cascade View Safe Routes to School construction contract as
complete and authorize the release of retainage, subject to standard claim and lien release procedures, with
R.L. Alia Company in the final amount of $303,069.94 and to consider this item on the Consent Agenda at the
August 3, 2015 Regular Council Meeting.
Attachment: Notice of Completion
WAPW Eng \PROJECTS\A- RW & RS Projects \Safe Routes to School - Cascade View (91210301) \Construction\ #.700 - Post Construction & Closeout \Info Memo Close out RL Alia 7 -17 -15 gl - sb.docx
7
, WrAr4• oA
yam.
NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT
Contractor's UBI Number: 600149378
Date: May 18, 2015
Name &'- Address of Public Agency D`epartmenf.Use (
City of Tukwila Assigned to:
6200 Southcenter Boulevard
Tukwila, WA 98188 Date Assigned:
UBI Number: 179 000 208
Notice is herebv i;iven relative to the completion of contract or project described below
Project Name
Contract Number
Job Order Contracting
Cascade View Elementary Safe Routes to School Project #91210301
14 -129
❑ Yes X No
Description of Work Done /Include Jobsite Address(es)
Construction of roughly 900 linear feet of asphalt pedestrian trail to connect 32nd Avenue South with South 140th Street, through Cascade View Elementary
School and Riverton Park United Methodist Church properties. Items of work include but are not limited to asphalt pavement removal, grading, asphalt paving,
storm drainage work, water quality treatment system installation, curb installation, property restoration, and other work necessary to complete the Work as
specified and shown in the Contract Documents. Affidavit ID for R.L. Alia Company is 575790.
Federally funded road transportation project? ❑ Yes No
Contractor's Name
Telephone Number
R,L. Alia Company
1425-226-8100
Contractor Address
107 Williams Avenue South, Renton, WA 98057
If Retainage is Bonded, List Surety's Name (or attach a copy)
N /A.
Surety Agent's Address
N /A.
Date Contract Awarded
Date Work Commenced
Date Work Completed
Date Work Accepted
August 18, 2014
1 September 22, 2014
February 23, 2015
NOTE: These two totals must be equal
Contract Amount
$
279,113.00
Hot Mix Pavers
Additions ( +)
$
23,956.94 Liquidated Damages $
0.00
Reductions ( -)
$
0.00 Amount Disbursed $
287,916.44
Sub -Total
$
303,069.94 Amount Retained $
15,153.50
Amount of Sales Tax Paid at 0.0%
(If various rates apply, please send a breakdown)
$
0.00
.-- - TOTAL
$
303,069.94 TOTAL $
303,069.94
NOTE: These two totals must be equal
Please List all Subcontrac rs Below:
Subcontractor's Name:
UBI Number:
Affidavit ID (if known)
Hot Mix Pavers
600 310 693
575792
Apply A Line, Inc.
600 553 941
567678
American Surveying and Engineering
603 226 051
569308
F215- 038 -000 08 -2011
REV 31 0020e (08/25/11)
Continued on page 2
ej`'w
Please List all Subcontractors Below:
Subcontractor's Name: UBI Number: Affidavit ID (if known)
Comments:
Contact Name: Diane Jaber Title: Fiscal Specialist
Email Address: Diane.Jaber @TukwilaWA.gov Phone Number: (206) 433 -i87i xlbtl
Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract.
NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates.
Submitting Form: Please submit the completed form to all three agencies below. For a faster response, please submit by e -mail.
Washington State
Department of Revenue
i Public Works Section
PO Box 47474
Olympia WA 98504 -7474
(360)725 -7588
FAX (360) 6644159
PWC @dor.wa.gov
Washington State
' Department of Labor and Industries
Contract Release
PO Box 44274
Olympia, WA 98504 -4272
(360)902 -4754
FAX (360) 902 -6897
ContractRelease@lni.wa.gov
/1= Washington State
Employment Security Department
Specialized Collections Unit
PO Box 9046
Olympia WA 98507 -9046
(360) 902 -9780
Fax (360) 902 -9267
publicworks@esd.wa.gov
For tax assistance or to request this document in an alternate format, visit http: / /dor.wa.gov or call 1- 800 - 647 -7706.
Teletype (TTY) users may call (360) 705 -6718.
F215- 038 -000 08 -2011
REV 31 0020e (08/25/11)
W
City Of Tukwila
• Transportation Committee
Q
TRANSPORTATION COMMITTEE
Meeting Minutes
July 20, 2015 — 5:15 p.m. — Foster Conference Room, 6300 Building
Councilmembers: Joe Duffie, Chair; Allan Ekberg, Kathy Hougardy
Staff: David Cline, Bob Giberson, Robin Tischmak, Peter Lau, Peggy McCarthy, Gail
Labanara, Laurel Humphrey,
CALL TO ORDER: Committee Chair Duffie called the meeting to order at 5:15 p.m.
I. PRESENTATIONS
11. BUSINESS AGENDA
A. Strander Boulevard Extension Phase III — Proposed 2016 Capital Improvement Program Page
Staff is seeking Council approval of a proposed CIP summary sheet for the Strander
Boulevard Extension Phase III Project. The page has been revised to reflect amounts for
various grant funding, such as the TIGER 2015 grant that was applied for in June. The
proposed CIP page also shows $2 million in City funds spent in 2016. This $2 million, to be
used for design, right-of-way, and wetland mitigation, will be required regardless of any future
funding and lays the groundwork to show the City's commitment to this project. UNANIMOUS
APPROVAL. FORWARD TO JULY 27, 2015 COMMITTEE OF THE WHOLE.
B. Proiect Comr)letion: Cascade View Elementary Safe Routes to School
Staff is requesting Council approval of project completion and release of retainage to R.L. Alia
Company in the amount of $303,069.94 for the Cascade View Safe Routes to School Project.
The project constructed approximately 900 linear feet of asphalt pedestrian trail to connect 32nd
Avenue South with South 140th Street, and was physically completed on February 23, 2015.
Two change orders were executed, and the total budget was $320,979.95. UNANIMOUS
APPROVAL. FORWARD TO AUGUST 3, 2015 REGULAR CONSENT AGENDA.
Ill. SCATBd
Councilmember Hougardy noted highlights from the June 16 meeting including briefings on the 1-405
Express toll lanes, Sound Transit, and the SCATBd letter to King County Metro regarding park and ride
lots.
IV. MISCELLANEOUS
Councilmember Duffie noted that WSDOT is offering to certain drivers with unpaid tolls the opportunity
to waive penalties by paying their outstanding toll balance in full.
Update on 42nd Avenue South/South 160"1 Street Intersection
As follow up to the November 24, 2014 Committee discussion, staff has confirmed that SeaTac has
no current or long-range plans to construct improvements to the southern corners of this intersection.
As part of the 42nd Avenue South Phase Ill project, Tukwila will transition the new ADA ramps to the
existing asphalt shoulders in the northern corners.
11