Loading...
HomeMy WebLinkAboutPermit EL08-0403 - GETTY IMAGESGETTY IMAGES 12201 TUKWILA INTERNATIONAL BL ELO8-403 Cityi If Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us ELECTRICAL PERMIT Parcel No.: 0923049120 Permit Number: EL08 -403 Address: 12201 TUKWILA INTERNATIONAL BL TUKW Issue Date: 04/29/2008 Suite No: Permit Expires On: 10/26/2008 Tenant: Name: GETTY IMAGES Address: 12201 TUKWILA INTERNATIONAL BL SUITE 10 , TUKWILA WA Owner: Name: INTERNATIONAL GATEWAY WEST Phone: Address: 12201 TUKWILA INTERNATIONAL BLVD , SEATTLE WA Contact Person: Name: BRETT NORRIS Phone: 206 383 -1285 Address: 900 N 34 ST SUITE 108 , SEATTLE WA Contractor: Name: TITAN ELECTRIC INC Address: 900 N 34 ST, SUITE 108 , SEATTLE WA Contractor License No: TITANEI963OB Phone: 206 - 633 -2811 Expiration Date: 09/02/2008 DESCRIPTION OF WORK: INSTALL BRANCH CIRCUIT POWER TO COMPUTER ROOM RACKS Value of Electrical: $40,000.00 Type of Fire Protection: Electrical Service provided by: SEATTLE CITY LIGHT Permit Center Authorized Signature: Fees Collected: National Electrical Code Edition: $922.50 2005 Date: 4 "1�� I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this pe t does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the on Ice of work. I am authorized to sign and obtain this electrical permit. Signature: Print Name: � �`^- -51/194--e- Date: L/ t 23 /0k This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: EL -4/07 EL08 -403 Printed: 04 -29 -2008 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us PERMIT CONDITIONS Parcel No.: 0923049120 Permit Number: EL08 -403 Address: 12201 TUKWILA INTERNATIONAL BL TUKW Status: ISSUED Suite No: Applied Date: 04/14/2008 Tenant: GETTY IMAGES Issue Date: 04/29/2008 1: ** *ELECTRICAL * ** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296 -46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. I hereby certify that I have read these conditions and will comply with them as outlined. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provision of any other work or local laws regulating const on or the performance of work. Signature: Print Name: ! (Y� S �� Date: e/ / 9 // doc: Cond -Elec EL08 -403 Printed: 04 -29 -2008 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://www.ci.tukwila.wa. us Electrical Permit Na - L($ Ii0_3 Project No. (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: Tenant Name: OR)3o�+- King Co Assessor's Tax No.: 21-191 'Mk w ► ". �f- �7- 4!•hL JL I/D Suite Number: 1 O 0 Floor: 1 II __ New Tenant: .,Er Yes El .. No Property Owners Name: at"4 -ro 4'1 I C7 1 li%PS/— Mailing Address: /)-PO 1 1ickwi It 6/vef. . Tikwe tot 18/4,F City State Zip CONTACT PERSON - Who do we contact when your permit is ready to be issued Name: 6°1e- A • NO (A `lo0 & L30f'�` St. 5,A; 1' 8 E -Mail Address: brDi+n g-1 liwo4 ci-(1c • el Mailing Address: Day Telephone: 10(7 ^ 38.3' /2ers 5 €4:1.80 /l- / g/ 03 City Fax Number: State Zip 206 - 3-71- 212y ELECTRICAL CONTRACTOR INFORMATION Company Name: Mailing Address: Contact Person: TI 'a•t,, e le c Fri L goo lB(e --tf- f. /J0i✓l1 E -Mail Address: D✓LTT r g i /40 4t C�✓,c , r)Ct Contractor Registration Number: (1 L'c E 1 9i 3 o 8 �to7 se g.ffk w,- 112/0 3 City State Zip Day Telephone: v�0 6 — to 33 - 81 / Fax Number: 20i,- 37V- ? /'Z) Expiration Date: Valuation of Project (contractor's bid price): $ Lk1 000 Scope of Work (please provide detailed information): In 4-A Vtbm nickS brittle/1 e. ✓e ued" pawrf Will service be altered? ❑ Yes Type of Use: Type of work: New ❑ Addition ❑ Service Change ❑ Low Voltage ❑ Generator ❑ Fire Alarm ❑ No Adding more than 50 amps? 'l Yes ❑ No Property Served by: Puget Sound Energy ❑ Seattle City Light H:Wpplicanons\Forms- Applications On Line \4 -2007 - Electrical Permit Application.doc bh ❑ Remodel ❑ Telecommunication ❑ Tenant Improvemeit ❑ Temporary Service Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings $140.00 (including an attached garage) ❑ Garages, pools, spas and outbuildings $75.00 ea ❑ Low voltage systems (alarm. furnace thermostat) $55.00 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $75.00 (no added/altered circuits) ❑ Service change with added/altered circuits $75.00 number of added circuits $10.00 ea ❑ Circuits added/altered without service change $50,00 (up to 5 circuits) ❑ Circuits added/altered without service change $50.00 (6 or more circuits) $7.00 ea ❑ Meter /mast repair $65.00 ❑ Low voltage systems $55.00 (alarm, furnace thermostat) MULTI - FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $58.00 ❑ Temporary service (generator) $75.00 ❑ Manufactured/mobile home service $80.00 (excluding garage or outbuilding) ❑ Camivals $75.00 Number of concessions $10.00 ea PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Print Name: &it 4. No ffib� Mailing Address: 'O° A% 3 4'' ct. Date: 4 451. - Day Telephone: 2424 T b 3 3.// City WA . 9g1) =3 State Zip Date Application Accepted: Date Application Expires: I Staff Initials: HAApplications\Penns- Applications On Linel4 -2007 - Electrical Permit Application doc bh Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 0923049120 Permit Number: EL08 -403 Address: 12201 TUKWILA INTERNATIONAL BL TUKW Status: PENDING Suite No: Applied Date: 04/14/2008 Applicant: GETTY IMAGES Issue Date: Receipt No.: R08 -01159 Initials: WER User ID: 1655 Payment Amount: $922.50 Payment Date: 04/14/2008 09:43 AM Balance: $0.00 Payee: TITAN ELECTRIC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 6102 922.50 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR ELECTRICAL PLAN - NONRES 000.322.101.00.0 738.00 000.345.832.00.0 184.50 Total: $922.50 \061/ dnr. RerC.eint.0A Prin ter! • 04- 14.2008 INSPECTION RECORD Retain a cppy with permit eraT-Yo3 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila, WA 98188 PERMIT NO. (206)431 -3670 Project: 6ml Type of Inspection: Address: /74°1 '°r0 Date Called: Special Instructions: 1 Q gio Date Wanted: /,0 . • • Phone No: Approved per applicable codes. Corrections required prior to approval. h COMMENTS: rikiA,,L Inspector: Date: 04 /lope ❑ $60.00 REINSPECTION FEE RE UIRED. Prior to inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Receipt No.: Date: •.�.�. y ...-. ties•• ':..• w�......,et�.. _: 2— .4;•44 . y _s.esS...a INSPECTION NO. INSPECTION RECORD Retain a copy with permit 6u03- Yo3 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION F. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 Project: erri r �� Type of Inspection: 7-100 LZ) A'`IF{X afiCi DleacroQC5lb Pte. Address: / ZZ.t� f -r, ,., ,r`O Date Called: DI 140%110€ Au-c(6 -to G err Special Instructions: f- LAAnit itttiltr oiJ 51 -rE Date Wanted: S 07 .m. La.m. Requester: ,--e Phone No: ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: ` `P GV 'is 1 Z. (t tom: 1 L 1►Jcs 1J(5 ce k LZ) A'`IF{X afiCi DleacroQC5lb Pte. -(4) o k -160-10.14-it, Wit, A6A- 41)cvke-f> camlvirs 14 cfILI^/14 DI 140%110€ Au-c(6 -to G err f- LAAnit itttiltr oiJ 51 -rE Inspector: L6JAJe:I( Date: OS 01 J $58.00 REINSPECTION FEE REQUIRED. Prior o inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: INSPECTION RECORD Retain a copy with permit INSPECTI N NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION Z. 6300 Southcenter Blvd., #100, Tukwila, WA 98188 (206)431 -3670 fO 1' Project: Type of Inspection: Address: .-- WO/ /i'f i)1L4 L Date Called: Special Instructions: Date Wanted: a.m. p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: s yerG iZ -r ter iv/r/ /n1 .3 / 4P Inspemt r: eil Date: r $58.00 REINSPECTION FEE REQUIRED. Prior to inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call the schedule reinspection. Receipt No.: Date: PERMIT COORD COPY • PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: EL08 -403 DATE: 04 -14 -08 PROJECT NAME: GETTY IMAGES SITE ADDRESS: 12201 TUKWILA INTERNATIONAL BL #100 X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: ifetb B v Ing I ision Public Works ❑ Fire Prevention Structural Planning Division Permit Coordinator ❑I DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete DUE DATE: 04 -15-08 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS RO TING: Please Route Structural Review Required ❑ No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 05-13 -08 Not Approved (attach comments) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 Look Up a Contractor, Electrician or Plumber License Detail • Washington State Department of Labor and Industries Electrical Contractor A business licensed by L &I to contract electrical work within the scope of its specialty. Electrical Contractors must maintain a surety bond or assignment of savings account. They also must have a designated Electrical Administrator or Master Electrician who is a member of the firm or a full -time supervisory employee. License Information License TITANEI963OB Licensee Name TITAN ELECTRIC INC Licensee Type ELECTRICAL CONTRACTOR UBI 602250925 Ind. Ins. Account Id 4568600 Business Type CORPORATION Address 1 900 N 34TH STE 108 Address 2 City SEATTLE County KING State WA Zip 98103 Phone 2066332811 Status ACTIVE Specialty 1 GENERAL Specialty 2 UNUSED Effective Date 92/2004 Expiration Date 9/2/2008 Suspend Date Separation Date Parent Company Previous License TITANE *986Q5 Next License Associated License FLING *LH967M9 Master Electrician Information License FUNG *LH967M9 Name FUNG, LAWRENCE H Status ACTIVE Business Owner Information Name Role Effective Date Expiration Date FUNG, LAWRENCE H AGENT 09/02/2004 BURKE, PATRICK D PRESIDENT 09/02/2004 FUNG, LAWRENCE H SECRETARY 09/02/2004 CROOK, TRAVIS J VICE PRESIDENT 09/02/2004 Page 1 of 2 https: // fortress. wa. gov /lni/bbip /printer.aspx ?License= TITANEI963OB 05/02/2008 EXISTING ENTRA SWITCHBOARD LOCATED IN PARKING LE EL P2 PULLI3[7X 'HB1' 24 °3124'x12° PILLBOX 782" 241.24rx12' (4) 4`C., (4)16OOkCMIL + (1)t 4/0G 4"C., (4)i5COkCMIL + (1)i3G 1 LINE DISIRIBUTION PANEL '1HP2' 40A, 480/277V, 30, 4W, 42kAJC r) 400D (4)ICOIt1 1IL + (1)/F3G 1HP1 1HM2 3+, 4Y FULLY RATED 163# 1000 (4) 4•C., (4)kCtaflL + (1)14/0G MAIN ,SWITCHBOARD ligss 277/480V, 30, 4W, 65kNC 1"155 277 /4f10V 40CIA 277 /48Y/ 400A 1HM1 30. 4W 277 /480V 400A 1HP1A 30, 4W 277/4601 ROA T1 112.514VA 1HL1 30, 4W 277/4801 125A 1D GEC (2) 2 °C., (3)12/0, (242/ON + (2)#2G 1 LINE DISITIBUI1ON PANEL "1LD2' 4COA4, 126/2UBY, 3C 4W. 101410 1- 1/4°C„ (4)14 + (1)110G (3V1, (1)14/ON + (2) (1)14/O1N + (2)111;G T p1 i. 0T 1111 31, 4W 120 2013V 125A 1LP'1 3ti+5 41W 12D /208V 125A 2U,A11 3, 4W 120/208V 225A 11.111 3, 4W 120/2D8V G Sly, 4W 12D/208V 60A LOCATED AT GENER TOR (3 )§1, (1)14/ON + (2)16G (3)0/0 + (1)16G (2) 4'C-, (3) #5c0kCMIL + (1)#1/00 T2 300kV.A, K -13 4811120/208V MBE MI38 500A, ITN ISOM L _ ®J _ RIB 60D/3P B18 / 6i /3P E1YPASS PANEL 1413P -A'. 42k IC (2) 4"C., (3)115130kCMu + (1)§1/13C 6020 #3/0 GEC U3A VITTH INTERNAL BYPASS (3) 4 "0.. (3) 400kCMIL (2)I4O0kCI L N + (2)0/00 NICII3/0 GEC UPS -A 3O0wA INTNL BYPASS REMO'T'E FEEDER f3/0 GEC' 1 LINE DISTRIBUTION PANEL "1LDU -A" 1400A, 12-0/208V. 30. 4W, 22kA=C 21.1811 30, 4W 120/206x' 225A APPROVED P' .. .,,, , 11\T �^ 1" t, -,-,- 1!A a U F .:U t'q AL' ERED WITHOUT AUTHOR1 :' \Ti's d F:POM THE PL',w;NQ O r- ^! ALI NPR < SHALL BE n ^NE IN ACCORDANCE Wi TH THE APPROVES PLANS AND IS 71 _"T TO P :F r INSPICTIONO (2) 2 -1/2%1 (3}#4,/D. (2)14/ON + (2jI2G 2U 31 (C1) 30,4W 120/208V 400A r fi F L ) 2U32 (CIA) 3 1 4W 120/205V 225A 21,33 30, 4W 120/208V 225A 2UA34 3r, 4W 12O/206V 400A ZUA35 30,, 4W 120 /205V 400A 2UA36 33, 4W 120/205V 4 21 31 ,30, 4W 20832 30, 4W 120/208V 120 /208V 400A 400A 40 PRATE SEp'RE.DFOR. trienanical Q 1 lectrical plumbing W Gas Piping GM of -'ukWlla �P 211833 2111334 30, 4W 30, 4W 120/208V 120/208V 400A 400A 4190 201335 30, 4W 120/208V 400A 20836 30, 4W 120/208V 400A 2»C., (3) #1, (1) #4 /0N + (2)#6G SW 3, 4W 120/2E1 125A WA 30, 4W 120/205V 20,41 33, 4W 120/208V 225A 21.1841 30, 4W 120/208V 225A FILE COPY Permit No. Plar review approval Is subject to errors and moons. Approval of construction documents does not authorize the violation of any adopted code or ordnance. Receipt of approved Fie! and conditions is acknowledged7 COPPER FEEDER SCHEDULE CODE AMPS CONDUIT SIZE CONDUCTOR SIZE GROUND CONDUCTOR 20C 20 3/4 (3) #12 #12 20D 20 3/4 (4) #12 #12 306 30 3/4 (2) #10 #10 30C 30 3/4 (3) #10 #10 30D 30 3/4 (4) #10 #10 408 40 3/4 (2) #8 #10 40C 40 3/4 (3) #B , #10 .40D A0 314 (4) #B #10 50B 50 3/4 (2) #6 #10 500 50 3/4 (3) #13 #10 513D 50 3/4 (4) #B #10 _ 60B W 3/4 (2) #6 #10 60C 63 3/4 (3) #6 #113 60D 60 1 (4) #6 #10 706 70 1 (2) #4 #s 70C 70 1 (3) #4 #/8 70D 70 1 -1/4 (4)#4 #8 MC 60 1 (3) #4 #S BJD BO 1 -1/4 (4) #4 #B 900 90 1 -114 (3) #2 #3 90D 90 1-1/4 (4) #2 #S 1000 100 1 -1/4 (3) #2 #8 100D 100 1 -114 (4) #2 #8 100E 100 2 (5) #110 #8 1250 125 1 -1/4 (3) #1 #6 125D 125 1 -1/2 (4) #1 #6 125E 125 2 (5) #210 46 150C 150 1 -112 (3) #1113 #6 150D 150 2 (4)41/0 #6 150E 150 2 -112 (5) #3/0 46 1750 175 1 -1/2 (3) #210 #6 175D 175 2 (4) #2/0 #6 175E 175 2 -112 (5)#410 #6 2000 290 2 (3) #310 46 200D 200 2 (4) #3/0 46 200E 200 3 (5) 250 kCMIL #6 225C 225 2 (3) 44/0 ## 225D 225 2 -112 (4)#4/0 #4 225E 225_ 2 -112 (5) 250 kCMIL #14 2500 250 2 (3) 250 kCMIL #4 250D 250 2 -1/2 (4) 250 kCMIL #4 250E 250 3 -1/2 (5)4 00 kCMIL #4 3000 300 2 -112 (3) 350 kCMIL 44 300D 300 3 (4) 350 kCMIL #4 300E 300 3 -1/2 (5) 500 kCMIL #4 35U1D 3513 3 -1/2 (4)4 00kCMIL #3 4000 400 3 (3) 500 kCMIL #2 400D 400 3 -1/2 (4) 500 kCMIL #2 400E 400 (2) 3 (5) 250 kCMIL #2 5000 500 (2) 2 (3) 250 kCMIL 42 590D 500 (2) 2 -1/2 (4) 250 kCMIL #2 500E 500 (2) 3-1/2 (5)4 00 kCMIL #2 600C 600 (2) 2 -1/2 (3) 350 kCMIL #1 600D 600 (2) 3 (4) 350 kCMIL #1 600E 600 (2) 3-1/2 (5) 500 kCMIL ##1 7000 700 (2) 3 (3) 400 kCMIL #110 700D 700 (2) 3 (4) 400 kCMIL #110 700E 700 (3) 3 (5) 350 kCMIL #110 800C 800 (2) 3 (3) 500 kCMIL #110 809D BOO (2) 3-1/2 (4) 500 kCMIL _ #1/0 800E 3130e (3) 3-1/2 (5)4 00 kCMIL #110 1000C 1000 (3) 3 (3) 400 kCMIL #210 1000D 1000 (3) 3 (4) 400 kCMIL #210 1000E 1 000 (3) 4 (5) 600 kCMIL #2/0 1200C 12013 (3) 3-1/2 (3) 600 kCMIL #3/0 1200D 1200 (3) 3-1/2 (4) 600 kCMIL #310 1600C 1600 (4) 3-1/2 (3) 600 kCMIL #11110 16U0D 1600 (4) 3 -1/2 (4) 6130 kCMIL #4/0 2000C 2000 (5) 3-1/2 (3) 6W RCMIL 250 kCMIL 2BOOD 2000 (5) 3-1/2 (4) 600 kCMIL 250 kCMIL 2500D 2500 (6) 4 (4) 600 kCMIL 350 kCMIL 3000D 3000 (B) 4 �(4) 500 kCMIL 400 kCMIL 41300D 4000 (10) 4 (4) 600 kCMIL 500 kCMIL NOTES: 1 ALL CONDUCTORS ARE COPPER WITH THUVNTTHHN INSULATION 2 CONDUIT FILL BASED ON RIGID PVC SCHEDULE 40 RACEWAY (MINIMUM SIZE 3/4 ") 3 ALL GROUNDING CONDUCTOR SIZES BASED ON TABLE 250-95 FOR EOU I PM ENT GROUNDING CONDUCTORS 4 CONDUCTOR AMPACI1IES BASED ON TABLE 310 -16, 75 DEGREE COLUMN, EXCEPTWHERE NOTED. 5 CODE LE TIER °C° INDICATES 3 PHASE, 3W OR 1 PHASE, 3W 6 CODE LETTER °D' INDICATED 3 PHASE, 4W (NO DERAI NG FOR CURRENT - CARRYING NEUTRAL) 7 CODE LE TIER 'E' INDICATES 3 PHASE, 4W, 200% N (CONDUCTORS DERATED FOR CURRENT - CARRYING NEUTRAL) By GENERAL NOTES: Date: 1_ NOT USED City of Tukwila BUILDING DIVISION REVISIONS No changes shall be made to the scow of work without prior approval of Tukwila Building Division ' NOTE: Revisions will require a new plan submittal Tr; may include additional plan review, fees FLAG NOTES: NCrr usim REVIEWED�pA FOR CO COMPLIANCE NEC N APR 25 2.5i Public Works, Bulling Division PERMIT NUMBER ELOBIO3 • 7ECE VED APR 14 2008 PERMIT CENTER TITANT ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206 -633 -2811 Fax: 206-374-2128 Email: Info@titanelectric.net Project Title: GETTY IMAGES CO- LOCATE #3 MZIMA NETWORKS Sheet Title: ONELINE DIAGRAM Designed By: MSC Drawn By: CJP Project No: Date: 04/11/08 Sheet Number EO FILE COPY Titan Electric PANEL SCHEDULE PANEL: MSB Project: Date : Location : Fed From : SCL Section: 1 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Mips L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0� Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 1600 1600 480 277 3 4 0 Amp P Rec Heat Motor Ltg Other Total 1 PANEL 1HP1 A 400 3 2 12.6 43.0 148.1 160.7 3 B B 0 0 0 41.8 0.0 0.0 5 Row B/ Rack #7 C 20 2 2 39.0 0.0 0.0 7 PANEL 1HM2 A 400 3 0 2.2 1.2 279.6 281.8 9 Row 8/ Rack #6 B 0 0 2 0.0 0.0 0.0 11 0 C 0 0 0 0.0 0.0 0.0 13 1LDU-B A 600 3 2 4.1 145.8 145.8 15 Row 8/ Rack #5 B 0 0 0 4.1 0.0 0.0 17 C C 20 2 2 4.1 4.1 0.0 0.0 19 PANEL 1HM1 A 400 3 0 21.3 29.7 303.8 325.1 0 0 21 8 3 0 0 2 0.0 1.2 0.0 0.0 X 1600 23 20 C 0 0 0 0.0 1.2 1.2 0.0 0.0 29.7 A 25 PANEL 1LD2 A 175 3 31.7 5.0 1.2 0.2 34.8 72.7 X El • X 20 27 B B 0 0 1.2 1.2 29 17.7 0.0 0.0 29 C C 0 0 1.2 1.2 31 Row 8/ Rack #3 0.0 0.0 31 1LD2 -A A 600 3 1.0 1.2 33 11.4 149.9 162.3 33 0 B 0 0 1.2 1.2 35 Row B/ Rack #3 0.0 0.0 35 0 C 0 0 1.2 1.2 37 0.0 0.0 0.0 37 PANEL 1HL1 A 125 3 1.2 1.2 39 26.6 0.0 26.6 39 0 B 0 0 1.2 1.2 41 s -ar•P 0.0 0.0 41 qi rir.P C C 1 q.p 1 1.2 0.0 2 Row 8/ Rack #2 p.p f4.14 2 A A 0 0.0 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 74.1 0 0.0 Phase A 25.5 Phase B 25.5 Phase C 23.1 Conn. Kva 74.1 Conn. Mips 206 Demand Kva 74.1 Demand Amps 206 0 4 0.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 32.7 Heat Kva 6.0 Motor Kvo 36.1 Ltg Kva 38.2 Other Kva 1081.2 0 0.0 Phase A 1182.0 Phase B 6.1 Phase C 6.1 Conn. Kva 1194.2 Conn. Amps 1436 Demand Kva 1208.4 Demand Amps 1453 0 4 0 B B 0.0 1.2 1.2 6 Row 8/ Rack #1 0.0 0.0 6 0 C 0 0 4.1 4.1 8 0.0 0.0 0.0 8 A A A 0.0 4.1 4.1 10 0.0 0.0 0.0 10 0 B 0 0 4.1 4.1 12 Row C/ Rack #13 0.0 0.0 12 0 C C 0.0 1.2 1.2 14 0.0 0.0 0.0 14 0 A 0 0 1.2 1.2 16 Row C/ Rack #13 0.0 0.0 16 B B 0 0 1.2 1.2 18 0.0 0.0 0.0 18 0 C 0 0 1.2 1.2 20 Row C/ Rack #12 0.0 0.0 20 0 A A 0.0 1.2 1.2 22 0.0 0.0 0.0 22 0 B 0 0 1.2 1.2 24 Row C/ Rack #12 0.0 0.0 24 0 C C 0.0 1.2 1.2 26 0.0 0.0 0.0 26 0 A 0 0 1.2 1.2 28 Row C/ Rack#11 0.0 0.0 28 B B B 0.0 1.2 1.2 30 0.0 0.0 0.0 30 0 C 0 0 1.2 1.2 32 Row C/ Rack #11 0.0 0.0 32 A A A 0.0 1.2 1.2 34 0.0 0.0 0.0 .34 0 B 0 0 1.2 1.2 36 Row 0/ Rack #10 0.0 0.0 36 0 C C 0.0 4.1 4.1 38 0.0 0.0 0.0 38 0 A 0 0 4.1 4.1 40 0.0 0.0 0.0 40 0 B 0 0 4.1 4.1 42 SPACE 0.0 0.0 42 0 C 0 0 0.0 0.0 REMARKS I first 0.0 0.0 REMARKS 1 first 10 kva rec 8 100% + balance CD 50% = 21.4 largest motor © 125% + balance © 100% = 52.1 lighting CO 125% = 47.8 heating ® 100% = 6.0 other CO 100% = 1081.2 0 0% 0 0.0 0.0 0.0 Titan Electric PANEL SCHEDULE PANEL: A -32 Project: Date : 11/6/2006 Location : Fed From : 1 -LDU -A Section: 2 Ckt No, CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Mips L -- L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 225 225 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row B/ Rack #7 A 20 2 2 43.0 1.2 1.2 3 B B 0 0 0 41.8 1.2 1.2 5 Row B/ Rack #7 C 20 2 2 39.0 1.2 1.2 7 B A 3 0 0 1.2 1.2 1.2 9 Row 8/ Rack #6 8 60 3 2 0.0 4.1 4.1 11 0 C 0 0 0 0.0 4.1 4.1 13 0 A 0 0 2 4.1 4.1 4.1 15 Row 8/ Rack #5 B 20 2 0 4.1 1.2 1.2 17 C C 20 2 2 4.1 4.1 1.2 1.2 19 Row B/ Rack #5 A 20 2 0 29.7 29.7 1.2 1.2 0 0 21 1000 8 20 B 20 2 0.0 1.2 1.2 X 225 23 Row 8/ Rack #4 C 20 2 C 0 0 0.0 1.2 1.2 25 25 29.7 A 20 25 PANEL 2AU35 B 400 3 1.2 1.2 X X 0 X 0 27 Row 8/ Rack #4 B 20 2 B B 0.0 1.2 1.2 29 17.7 C 29 2 C 0 0 0.0 1.2 1.2 31 Row 8/ Rack #3 A 20 2 A A 0.0 1.2 1.2 33 0.0 8 33 0 B 0 0 0.0 1.2 1.2 35 Row B/ Rack #3 C 20 2 C 0 0 0.0 1.2 1.2 37 0.0 A 0 0 A 0 0 0.0 1.2 1.2 39 Row B/ Rack #2 8 20 2 B 0 0 0.0 1.2 1.2 41 s -ar•P C 41 spare c Space C 1 q.p 1 1.2 0.0 2 Row 8/ Rack #2 A 20 2 A ROW B/ RACK #12 0 0.0 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 74.1 0 0.0 Phase A 25.5 Phase B 25.5 Phase C 23.1 Conn. Kva 74.1 Conn. Mips 206 Demand Kva 74.1 Demand Amps 206 0 4 0.0 B 4 0 B B 0.0 1.2 1.2 6 Row 8/ Rack #1 C 60 3 C 0 0 0.0 4.1 4.1 8 0.0 A 8 1.2 A A 0.0 4.1 4.1 10 0.0 B 10 0 B 0 0 0.0 4.1 4.1 12 Row C/ Rack #13 C 20 2 C C 0.0 1.2 1.2 14 0.0 A 14 0 A 0 0 0.0 1.2 1.2 16 Row C/ Rack #13 B 20 2 B 0 0 0.0 1.2 1.2 18 0.0 C 18 0 C 0 0 0.0 1.2 1.2 20 Row C/ Rack #12 A 20 2 A ROW B/ RACK #10 A 0.0 1.2 1.2 22 0.0 B 22 0 B 0 0 0.0 1.2 1.2 24 Row C/ Rack #12 C 20 2 C ROW B/ RACK #9 C 0.0 1.2 1.2 26 0.0 A 26 0 A 0 0 0.0 1.2 1.2 28 Row C/ Rack#11 B 20 2 B ROW B/ RACK #9 B 0.0 1.2 1.2 30 0.0 C 30 0 C 0 0 0.0 1.2 1.2 32 Row C/ Rack #11 A 20 2 A ROW B/ RACK #8 A 0.0 1.2 1.2 34 0.0 8 .34 0 B 0 0 0.0 1.2 1.2 36 Row 0/ Rack #10 C 60 3 C ROW B/ RACK #8 C 0.0 4.1 4.1 38 0.0 A 0 0 A 0 0 0.0 4.1 4.1 40 0.0 B 0 0 B 0 0 0.0 4.1 4.1 42 SPACE C 0 0 C 0 0 0.0 0.0 0.0 REMARKS I first 10 kva rec ® 100% + balance ® 50% = 0.0 largest motor 0 125% + balance © 100% = 0.0 lighting © 125% = 0.0 heating 0 100% = 0.0 other © 100% = 74.1 0 0% 0 0.0 0.0 0.0 largest motor @ 125% + balance Cai 100% = 0.0 Titan Electric PANEL SCHEDULE PANEL! 1LDUA Project: Date : Location : Fed From : UPS -A Section: 1 Ckt No, CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps 1000 Max Mips 1000 L - L Volts 208 L - N Volts 110 Phase 3 Wire 4 A.I.C. 0 0 0 Amp P Rec Heat Motor Ltg Other Total 1 PANEL 2AU31 A 400 3 2 2 43.0 43.0 3 3 B B 0 0 0 41.8 41.8 5 5 C C 20 2 2 39.0 39.0 7 PANEL 2AU11 NO LOAD B 225 3 0 0 1.2 1.2 9 1 Row C/ Rack #8 B 20 2 2 0.0 0.0 11 11 c C C 0 0 0.0 0.0 13 PANEL SW NO LOAD B 125 3 __ 2 2 4.1 4.1 15 15 B B 0 0 0 4.1 4.1 17 17 C C 20 2 2 4.1 4.1 19 PANEL 2AU33 B 400 3 A 0 0 29.7 29.7 M.LO. Main C.B. Main Fu. Hush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 0 0 X 1000 21 20 B 20 2 0.0 1.2 1.2 29.7 29.7 C C 23 0 C 0 0 0.0 1.2 1.2 25 29.7 29.7 x X X _ X 20 25 PANEL 2AU35 B 400 3 1.2 1.2 X X X _ _ X 27 19.7 19.7 27 0 B B 0.0 1.2 1.2 29 17.7 17.7 29 2 C 0 0 0.0 1.2 1.2 31 16.6 16.6 31 1.0 A A 0.0 12 1.2 33 0.0 0.0 33 0 B 0 0 0.0 4.1 4.1 35 0.0 0.0 35 0 C 0 0 0.0 4.1 4.1 37 0.0 0.0 37 0 A 0 0 0.0 4.1 4.1 39 0.0 0.0 39 0 B 0 0 0.0 1.2 1.2 41 0.0 0.0 41 spare c Space C 1 q.p 1 1.2 1.2 2 FP 0.0 2 0 A ROW B/ RACK #12 0 0.0 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 87.1 0 0.0 Phase A 29.7 Phase B 28.7 Phase C 28.7 Conn. Kva 87.1 Conn. Amps 242 Demand Kva 87.1 Demand Mips 242 0 0.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 299.7 0 0.0 Phase A 104.8 Phase B 99.4 Phase C 95.5 Conn. Kva 299.7 Conn. Amps 832 Demand Kva 299.7 Demand Amps 832 0 4 0 B B 0.0 L2 1.2 6 0.0 0.0 6 0 C 0 0 0.0 1.2 1.2 8 0.0 0.0 8 1.2 A A 0.0 1.2 1.2 10 0.0 0.0 10 0 B 0 0 0.0 1.2 1.2 12 0.0 0.0 12 0 C C 0.0 1.2 1.2 14 0.0 0.0 14 0 A 0 0 0.0 1.2 1.2 16 0.0 0.0 16 0 B 0 0 0.0 1.2 1.2 18 0.0 0.0 18 0 C 0 0 0.0 1.2 1.2 20 0.0 0.0 20 0 A ROW B/ RACK #10 A 0.0 1.2 1.2 22 0.0 0.0 22 0 B 0 0 0.0 1.2 1.2 24 0.0 0.0 24 0 C ROW B/ RACK #9 C 0.0 1.2 1.2 26 0.0 0.0 26 0 A 0 0 0.0 1.2 1.2 28 0.0 0.0 28 1.0 B ROW B/ RACK #9 B 0.0 1.2 1.2 30 0.0 0.0 30 0 C 0 0 0.0 1.2 1.2 32 0.0 0.0 32 1.0 A ROW B/ RACK #8 A 0.0 1.2 1.2 34 0.0 0.0 .34 0 B 0 0 0.0 1.2 1.2 36 0.0 0.0 36 0 C ROW B/ RACK #8 C 0.0 1.2 1.2 38 0.0 0.0 38 0 A 0 0 0.0 4.1 4.1 40 0.0 0.0 40 0 B 0 0 0.0 4.1 4.1 42 0.0 0.0 42 0 C 0 0 0.0 4.1 4.1 REMARKS I 0.0 0.0 REMARKS I first 10 kva rec © 1007 + balance ® 50% = 0.0 0.0 largest motor @ 125% + balance Cai 100% = 0.0 lighting @ 125% = 0.0 heating Cat, 100% - 0.0 other © 100% = 299.7 0 0% 0 0.0 Titan Electric PANEL SCHEDULE PANEL: A -33 Project: Date : Location : Fed From : 1 -LOU-A Section: 1 Ckt No. CIRCUIT NAME P 11 Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 110 3 4 0 Amp P Rec Heat Motor Ltg Other Total 1 Row C/ Rack #9 A 20 2 2 43.0 1.2 1.2 3 B B 0 0 0 41.8 1.2 1.2 5 Row C/ Rock #9 C 20 2 2 39.0 1.2 1.2 7 A A 3 0 0 37.9 1.2 1.2 9 Row C/ Rack #8 B 20 2 2 36.3 1.2 1.2 11 c C C 0 0 36.5 1.2 1.2 13 Row C/ Rack #8 A 20 __ 2 2 12.6 1.2 1.2 15 B B 0 0 0 12.6 1.2 1.2 17 Row C/ Rack #7 C 20 2 2 12.6 12.6 1.2 L2 19 A A A 0 0 0.0 0.0 1.2 1.2 0 o 21 Row C/ Rack #7 B 20 2 20 2 0.0 1.2 1.2 X 400 23 C C 0 0 C 0.0 1.2 1.2 25 25 Row C/ Rack #6 A 20 2 ROW A/ RACK #3 A 30 0.0 1.2 1.2 X X X _ _ X 27 B B 0 0 27 B 0.0 1.2 1.2 29 Row C/ Rack #6 C 20 2 29 ROW A/ RACK #3 C 0.0 1.2 1.2 31 A A 2 1.0 31 A 0.0 12 1.2 33 Row C/ Rack #5 B 60 3 33 ROW A/ RACK #1 B 0.0 4.1 4.1 35 0 C 0 0 35 c 0.0 4.1 4.1 37 0 A 0 0 37 ROW A/ RACK #1 A 0.0 4.1 4.1 39 Row C/ Rack #4 B 20 2 39 B 0.0 1.2 1.2 41 7,-1,-... C 1.0 1.0 41 Space C 1 q.p 1 1.2 1.2 2 Row C/ Rack #4 A 20 2 2 ROW B/ RACK #12 A 0.0 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 87.1 0 0.0 Phase A 29.7 Phase B 28.7 Phase C 28.7 Conn. Kva 87.1 Conn. Amps 242 Demand Kva 87.1 Demand Mips 242 0 4 B B 0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 124.6 0 0.0 Phase A 43.0 Phase B 41.8 Phase C 39.0 Conn. Kva 124.6 Conn. Amps 346 Demand Kva 124.6 Demand Amps 346 0 4 B 0.0 L2 1.2 6 Row C/ Rack #3 C 20 2 6 ROW B/ RACK #12 C 0.0 1.2 1.2 8 A A 3 1.2 8 A 0.0 1.2 1.2 10 Row C/ Rack #3 B 20 2 10 ROW B/ RACK #11 B 0.0 1.2 1.2 12 C C 0 4.1 12 C 0.0 1.2 1.2 14 Row C/ Rack #2 A 20 2 14 A 0.0 1.2 1.2 16 B B 0 0 16 ROW B/ RACK #10 8 0.0 1.2 1.2 18 Row C/ Rack #2 C 20 2 18 c 0.0 1.2 1.2 20 A A 0 1.2 20 ROW B/ RACK #10 A 0.0 1.2 1.2 22 Row C/ Rack #1 B 20 2 22 B 0.0 1.2 1.2 24 C C 0 1.2 24 ROW B/ RACK #9 C 0.0 1.2 1.2 26 Row C/ Rack #1 A 20 2 26 A 0.0 1.2 1.2 28 B B 0 1.0 28 ROW B/ RACK #9 B 0.0 1.2 1.2 30 Row D/ Rack #7 C 20 2 30 C 0.0 1.2 1.2 32 A A 0 1.0 32 ROW B/ RACK #8 A 0.0 1.2 1.2 34 Row D/ Rack #7 B 20 2 34 B 0.0 1.2 1.2 36 C C 0 1.0 36 ROW B/ RACK #8 C 0.0 1.2 1.2 38 Row D/ Rack #6 A 60 3 38 A 0.0 4.1 4.1 40 0 B 0 0 40 Spare 8 0.0 4.1 4.1 42 0 C 0 0 42 Spare © 100% @ 125% 0.0 4.1 4.1 REMARKS I first 10 kva rec © 1007 + balance © 50% = 0.0 largest motor © 1257 + balance ® 100% = 0.0 lighting © 125% = 0.0 heating ® 100% = 0.0 other ® 100% = 87.1 0 0% 0 0.0 0.0 0.0 Titan Electric PANEL SCHEDULE PANEL, 1LDUB Project: Date : Location : Fed From : UPS-I3 Section: Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva PANEL DESCRIPTION Panel Amps 1000 Max Amps 1000 L - L Volts 208 L - N Volts 110 Phase 3 Wire 4 A.I.C. 0 0 0 Amp P Rec Heat Motor Ltg Other Total 1 PANEL 29U31 A 400 3 30 2 43.0 43.0 3 1.0 B 0 0 0 0 41.8 41.8 5 Row 0/ Rack #5 C 20 2 30 2 39.0 39.0 7 PANEL 2BU33 A 400 3 0 0 37.9 37.9 9 Row 0/ Rack #4 B 0 0 20 2 36.3 36.3 11 1.0 c C C 0 0 36.5 36.5 13 PANEL 28U35 A 400 3 30 2 12.6 12.6 15 0 B 0 0 0 0 12.6 12.6 17 Row 0/ Rack #3 C 20 2 30 2 12.6 12.6 19 19 A A 0 A 0 0 0.0 0.0 M.LO. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed 0 0 21 Row 0/ Rack #3 B 0 0 B 20 2 0.0 0.0 X 1000 23 1.0 C 0 0 0 C 0.0 0.0 1.1 25 Row D/ Rack #2 A 30 2 25 ROW A/ RACK #3 A 30 0.0 0.0 X X X _ X 27 27 B 0 0 0 27 B 0.0 0.0 29 Row D/ Rack #2 C 0 0 1.0 29 ROW A/ RACK #3 C 0.0 0.0 31 31 A 30 2 1.0 31 A 0.0 0.0 33 0 B 0 0 1.0 33 ROW A/ RACK #1 B 0.0 0.0 35 0 C 0 0 1.0 35 c 0.0 0.0 37 0 A 0 0 1.0 37 ROW A/ RACK #1 A 0.0 0.0 39 0 B 0 0 1.0 39 B 0.0 0.0 41 CP �P C C 1.0 1.0 41 Space C 1 q.p 1 ft 2 PANEL 2UB11 NO LOAD A 225 3 0.0 2 ROW B/ RACK #12 A 0.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 291.6 0 0.0 Phase A 100.6 Phase B 96.8 Phase C 94.2 Conn. Kva 291.6 Conn. Mips 809 Demand Kva 291.6 Demand Amps 809 0 4 0 B 0 0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 124.6 0 0.0 Phase A 43.0 Phase B 41.8 Phase C 39.0 Conn. Kva 124.6 Conn. Amps 346 Demand Kva 124.6 Demand Amps 346 0 4 B 0.0 0.0 6 0 C 0 0 1.2 6 ROW B/ RACK #12 C 0.0 0.0 8 PANEL 2UB41 NO LOAD A 225 3 1.2 8 A 0.0 0.0 10 0 B 0 0 1.2 10 ROW B/ RACK #11 B 0.0 0.0 12 0 C 0 0 4.1 12 C 0.0 0.0 14 0 A 0 0 4.1 14 A 0.0 0.0 16 SPACE B 0 0 4.1 16 ROW B/ RACK #10 8 0.0 0.0 18 0 C 0 0 1.2 18 c 0.0 0.0 20 0 A 0 0 1.2 20 ROW B/ RACK #10 A 0.0 0.0 22 0 B 0 0 1.2 22 B 0.0 0.0 24 0 C 0 0 1.2 24 ROW B/ RACK #9 C 0.0 0.0 26 0 A 0 0 1.2 26 A 0.0 0.0 28 SPACE B 0 0 1.0 28 ROW B/ RACK #9 B 0.0 0.0 30 0 C 0 0 1.0 30 C 0.0 0.0 32 SPACE A 0 0 1.0 32 ROW B/ RACK #8 A 0.0 0.0 34 0 B 0 0 1.0 34 B 0.0 0.0 36 0 C 0 0 1.0 36 ROW B/ RACK #8 C 0.0 0.0 38 0 A 0 0 1.2 38 A 0.0 0.0 40 0 B 0 0 1.2 40 Spare 8 0.0 0.0 42 0 C 0 0 0.0 42 Spare © 100% @ 125% 0.0 0.0 REMARKS 1 first 10 kva rec ® 1007 + balance ® 50% = 0.0 0,0 largest motor © 1257 + balance t 100% = 0.0 lighting @ 125% = 0.0 heating CD 100% = 0.0 other ® 100% = 291.6 0 0% 0 0.0 TITAN ELECTRIC PANEL SCHEDULE PANED A -34 Project: Date : Location : Fed From : 1 -LDU -A Section: 2 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L0. Main C.B. Main Fu. Hush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row D/ Rack #5 A 20 2 30 2 1.0 1.0 3 1.0 8 0 0 0 0 1.0 1.0 5 Row 0/ Rack #5 C 20 2 30 2 1.0 1.0 7 1.0 A 0 0 0 0 1.0 1.0 9 Row 0/ Rack #4 B 20 2 20 2 1.0 1.0 11 1.0 C C C 0 0 1.0 1.0 13 Row D/ Rack#4 A 20 2 30 2 1.0 1.0 15 0 B 0 0 0 0 1.0 1.0 17 Row 0/ Rack #3 C 20 2 30 2 1.0 1.0 19 1.0 A 0 A 0 0 1.0 1.0 x 400 21 Row 0/ Rack #3 B 20 2 B 20 2 1.0 1.0 1.1 23 1.0 C 400 23 0 C 1.0 1.0 1.1 25 Row D/ Rack #2 A 30 2 25 ROW A/ RACK #3 A 30 1.0 1.0 X x _ X 27 27 B 30 2 0 27 B 1.0 1.0 29 Row D/ Rack #2 C 30 2 1.0 29 ROW A/ RACK #3 C 1.0 1.0 31 31 A 30 2 1.0 31 A 1.0 1.0 33 Row 0/ Rack #1 B 60 3 1.0 33 ROW A/ RACK #1 B 1.1 1.1 35 35 C 0 0 1.0 35 c 1.1 1.1 37 37 A 0 0 1.0 37 ROW A/ RACK #1 A 1.1 1.1 39 SPACE 8 B 1.0 1.0 39 B 0.0 41 w6ceE C C 1.0 1.0 41 Space C 0 0.0 2 SPACE A 0 0 0.0 2 ROW B/ RACK #12 A 0.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 19.3 0 0.0 Phase A 7.1 Phase B 6.1 Phase C 6.1 Conn. Kva 19.3 Conn. Amps 54 Demand Kva 19.3 Demand Amps 54 0 4 SPACE B 0 0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 124.6 0 0.0 Phase A 43.0 Phase B 41.8 Phase C 39.0 Conn. Kva 124.6 Conn. Amps 346 Demand Kva 124.6 Demand Amps 346 0 4 B 0.0 0.0 6 SPACE C 0 0 1.2 6 ROW B/ RACK #12 C 0.0 0.0 8 SPACE A 0 0 1.2 8 A 0.0 0.0 10 SPACE 8 0 0 1.2 10 ROW B/ RACK #11 B 0.0 0.0 12 SPACE C 0 0 4.1 12 C 0.0 0.0 14 SPACE A 0 0 4.1 14 A 0.0 0.0 16 SPACE B 0 0 4.1 16 ROW B/ RACK #10 8 0.0 0.0 18 SPACE C 0 0 1.2 18 c 0.0 0.0 20 SPACE A 0 0 1.2 20 ROW B/ RACK #10 A 0.0 0.0 22 SPACE B 0 0 1.2 22 B 0.0 0.0 24 SPACE C 0 0 1.2 24 ROW B/ RACK #9 C 0.0 0.0 26 SPACE A 0 0 1.2 26 A 0.0 0.0 28 SPACE B 0 0 1.0 28 ROW B/ RACK #9 B 0.0 0.0 30 SPACE C 0 0 1.0 30 C 0.0 0.0 32 SPACE A 0 0 1.0 32 ROW B/ RACK #8 A 0.0 0.0 34 SPACE B 0 0 1.0 34 B 0.0 0.0 36 SPACE C 0 0 1.0 36 ROW B/ RACK #8 C 0.0 0.0 38 SPACE A 0 0 1.2 38 A 0.0 0.0 40 SPACE B 0 0 1.2 40 Spare 8 0.0 0.0 42 SPACE C C 0.0 0.0 42 Spare © 100% @ 125% 0 0.0 REMARKS I first 10 kva rec largest motor + balance * 50% = 0.0 + balance ® 100% = 0.0 lighting ® 125% = 0.0 heating ® 100% = 0.0 other © 100% = 19.3 0 0% 0 0.0 0,0 0.0 Titan Electric PANEL SCHEDULE Project: PANED A -31 getty data center Date : Location : Fed From : 1 -LDU -A Section: 1 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 ROW A/ RACK #8 A 30 2 1.1 1.0 1.0 3 B B 0 0 1.1 1.0 1.0 5 ROW A/ RACK #8 C 30 2 1.1 1.0 1.0 7 A A 0 0 1.1 1.0 1.0 9 ROW A/ RACK #8 B 20 2 1.1 1.0 1.0 11 C C 0 0 1.1 1.0 1.0 13 ROW A/ RACK #5 A 30 2 1.1 1.0 1.0 15 B B 0 0 1.1 1.0 1.0 17 ROW A/ RACK #5 C 30 2 1.1 1.0 1.0 19 0 A 0 0 1.1 1.0 1.0 21 21 ROW A/ RACK #5 B 20 2 1.1 1.1 1.0 1.0 X 400 23 0 C 1.1 1.1 1.0 1.0 A 50 25 ROW A/ RACK #3 A 30 2 1.1 1.1 X X X _ 27 1.0 1.0 X X x 0 0 27 B 0 1.1 29 C 1.0 1.0 29 ROW A/ RACK #3 C 30 2 1.1 31 Row H/ Rack #2 A 1.0 1.0 31 A 1.1 1.1 33 B 1.0 1.0 33 ROW A/ RACK #1 B 30 2 1.1 35 C 1.0 1.0 35 c 1.1 1.1 37 Row H/ Rack #1 A 1.0 1.0 37 ROW A/ RACK #1 A 30 2 1.1 39 0 B 1.0 1.0 39 B 1.1 1.1 41 .1,,,,,,.. C 1.0 1.0 41 Space C 0 0 0.0 2 Row I/ Rack #8 A 0,0 0.0 2 ROW B/ RACK #12 A 20 2 1.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 54.0 0 0.0 Phase A 19.7 Phase B 17.7 Phase C 16.6 Conn. Kva 54.0 Conn. Amps 150 Demand Kva 54.0 Demand Amps 150 0 4 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 124.6 0 0.0 Phase A 43.0 Phase B 41.8 Phase C 39.0 Conn. Kva 124.6 Conn. Amps 346 Demand Kva 124.6 Demand Amps 346 0 4 B 1.0 1.0 6 Row I/ Rack #7 C 1.2 1.2 6 ROW B/ RACK #12 C 20 2 1.0 8 A 1.2 1.2 8 A 1.0 1.0 10 Row I/ Rack #6 B 1.2 1.2 10 ROW B/ RACK #11 B 60 3 1.0 12 C 4.1 4.1 12 C 1.0 1.0 14 Row I/ Rack #5 A 4.1 4.1 14 A 0 0 1.0 16 0 8 4.1 4.1 16 ROW B/ RACK #10 8 20 2 1.0 18 Row I/ Rack #4 C 1.2 1.2 18 c 1.0 1.0 20 A 1.2 1.2 20 ROW B/ RACK #10 A 20 2 1.0 22 Row I/ Rack #3 B 1.2 1.2 22 B 1.0 1.0 24 C 1.2 1.2 24 ROW B/ RACK #9 C 20 2 1.0 26 Row I/ Rack #2 A 1.2 1.2 26 A 1.0 1.0 28 B 1.0 1.0 28 ROW B/ RACK #9 B 20 2 1.0 30 Row I/ Rack #1 C 1.0 1.0 30 C 1.0 1.0 32 A 1.0 1.0 32 ROW B/ RACK #8 A 20 2 1.0 34 8 1.0 1.0 34 B 0.0 36 C 1.0 1.0 36 ROW B/ RACK #8 C 20 2 0.0 38 A 1.2 1.2 38 A 0.0 40 8 1.2 1.2 40 Spare 8 0 0 0.0 42 C 0.0 0.0 42 Spare C 0 0 0.0 REMARKS : first 10 kva rec © 1007 + balance © 50% = 0.0 largest motor © 1257 + balance © 100% = 0.0 lighting CO 125% - 0.0 heating @ 100% = 0.0 other @ 100% - 54.0 0 0% 0 0.0 0.0 0.0 REMARKS 1 first 10 kva rec @ 1007 + balance ® 50% = 0.0 largest motor 1 1257 + balance © 100% = 0.0 lighting ® 125% = 0.0 heating ® 100% = 0.0 other © 100% = 124.6 0 0% 0 0.0 0.0 TITAN ELECTRIC PANEL SCHEDULE PANEL: A -35 Project Dote : Location : Fed From : 1 -LDU -A Section: 1 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0_ Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 1Ok Amp P Rec Heat Motor Ltg Other Total 1 Row H/ Rock #9 A 50 3 1.1 1.1 3 B 1.1 1.1 5 C 0 0 1.1 1.1 7 Row H/ Rack #8 A 50 3 1.1 1.1 9 0 B 0 0 1.1 1.1 11 0 C 0 0 1.1 1.1 13 Row H/ Rack #7 A 50 3 1.1 1.1 15 B 0 0 1.1 1.1 17 C 0 0 1.1 1.1 19 Row H/ Rock #6 A 50 3 1.1 1.1 0 0 21 8 0 0 1.1 1.1 X 400 23 C 0 0 1.1 1.1 25 Row H/ Rack #5 A 50 3 1.1 1.1 X X X _ 27 B 0 0 1.1 1.1 29 C 0 0 1.1 1.1 31 Row H/ Rack #2 A 50 3 1.1 1.1 33 B 0 0 1.1 1.1 35 C 0 0 1.1 1.1 37 Row H/ Rack #1 A 50 3 1.1 1.1 39 0 B 0 0 1.1 1.1 41 .1,,,,,,.. C 0.0 2 Row I/ Rack #8 A 30 2 1.0 1.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 54.0 0 0.0 Phase A 19.7 Phase B 17.7 Phase C 16.6 Conn. Kva 54.0 Conn. Amps 150 Demand Kva 54.0 Demand Amps 150 0 4 8 1.0 1.0 6 Row I/ Rack #7 C 30 2 1.0 1.0 8 A 1.0 1.0 10 Row I/ Rack #6 B 30 2 1.0 1.0 12 C 1.0 1.0 14 Row I/ Rack #5 A 30 2 1.0 1.0 16 0 8 0 0 1.0 1.0 18 Row I/ Rack #4 C 30 2 1.0 1.0 20 A 0 0 1.0 1.0 22 Row I/ Rack #3 B 30 2 1.0 1.0 24 C 0 0 1.0 1.0 26 Row I/ Rack #2 A 30 2 1.0 1.0 28 B 0 0 1.0 1.0 30 Row I/ Rack #1 C 30 2 1.0 1.0 32 A 1.0 1.0 34 8 0.0 36 C 0.0 38 A 0.0 40 8 0.0 42 C 0.0 REMARKS : first 10 kva rec © 1007 + balance © 50% = 0.0 largest motor © 1257 + balance © 100% = 0.0 lighting CO 125% - 0.0 heating @ 100% = 0.0 other @ 100% - 54.0 0 0% 0 0.0 0,0 ReVIENNED FOR ODE COMPLIANCE NEC, ' ELO8'-1O!3 RECEIVED APR 14 2008 PERMIT CENTER ririalAtdkINT ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206 -633 -2811 Fax: 206 -374 -2128 Email: Info@ titanelectrie.net Project Title: GETTY IMAGES CO- LOCATE #3 MZIMA NETWORKS Sheet Title: PANEL SCHEDULES Designed By: MSC Drawn By: CJP Project No: Date: 04/11/08 Sheet Number: N,1 TITAN ELECTRIC PANEL SCHEDULE PANEL: A -36 Project: Date : Location : Fed From : 1 -LDU -A Section: 2 Ckt No. CIRCUIT NAME P h Clo /Fu Load Kva DESCRIPTION Panel Mips Max Arnps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Now E/ Rack #8 A 30 2 1.0 1.0 3 Space 0 0 0 1.0 1.0 5 Row E/ Rack #7 C 30 2 1.0 1.0 7 Row H/ Rack #8 A 0 0 1.0 1.0 9 Row E/ Rack #6 6 30 2 1.0 1.0 11 0 C 0 0 1.0 1.0 13 Row E/ Rack #5 A 30 2 1.0 1.0 15 0 B 0 0 1.0 1.0 17 Row E/ Rack #4 C 30 2 1.0 1.0 19 0 A 0 0 1.0 1.0 X 400 21 Row E/ Rack #3 B 30 2 2 1.0 1.0 1.6 23 400 C 20 C 0 0 1.0 1.0 1.0 25 Row E/ Rack #2 A 30 2 A 30 2 1.0 1.0 x X ■ 1 II 1 ■ 27 1.6 B 30 27 Space B 0 1.0 1.0 29 Row E/ Rack #1 G 30 2 ROW A/ RACK #3 C 30 2 1.0 1.0 31 Row B/ Rack #3 A 1.6 31 Space A 1.0 1.0 33 Space B 1.6 33 ROW A/ RACK #1 B 30 2 1.1 0.0 35 Space c 1.6 35 0 C 0 0 1.1 0.0 37 Space A 1.6 37 ROW A/ RACK #1 A 30 2 1.1 0.0 39 Space B 1.6 39 Row C/ Rack #4 B 20 2 1.0 0.0 41 Space C 1.6 41 Space C 0 0 1.0 0.0 2 Space A 0.0 2 ROW B/ RACK #12 A 20 2 1.0 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 16.0 0 0.0 Phase A 6.0 Phase B 5.0 Phase C 5.0 Conn. Kva 16.0 Conn. Amps 44 Demand Kva 16.0 Demand Amps 4-4 0 4 Space B LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 124.6 0 0.0 Phase A 43.0 Phase B 41.8 Phase C 39.0 Conn. Kva 124.6 Conn. Amps 346 Demand Kva 124.6 Demand Arnps 346 0 4 Space B 1.0 0.0 6 Space c 1.2 6 ROW B/ RACK #12 C 20 2 1.0 0.0 8 Space A 1.2 8 Space A 1.0 0.0 10 Space B 1.2 10 ROW 8/ RACK #11 B 60 3 1.0 0.0 12 Space C 4.1 12 Space C 1.0 0.0 14 Space A 4.1 14 Row C/ Rack #2 A 0 0 1.0 0.0 16 Space B 4.1 16 ROW B/ RACK #10 B 20 2 1.0 0.0 18 Space C 1.2 18 Row C/ Rack #2 C 20 2 1.0 0.0 20 Space A 1.2 20 ROW 3/ RACK #10 A 20 2 1 0.0 22 Space 8 1.2 22 Row C/ Rack #1 B 20 2 1.0 0.0 24 Space C 1.2 24 ROW B/ RACK #9 C 20 2 1.0 0.0 26 Space A 1.2 26 Row C/ Rack #1 A 20 2 1.0 0.0 28 Space B 1.0 28 ROW B/ RACK #9 B 20 2 1.0 0.0 30 Space C 1.0 30 Row 0/ Rack #7 C 20 2 0.0 0.0 32 Space A 1.0 32 ROW B/ RACK #8 A 20 2 0.0 0.0 34 Space B 1.0 34 Row D/ Rack #7 B 20 2 0.0 0.0 36 Space C 1.0 36 ROW B/ RACK #8 C 20 2 0.0 0.0 38 Space A 1.2 38 Row 0/ Rack #6 A 60 3 0.0 0.0 40 Space B 1,6 40 Spare B 0 0 0.0 0.0 42 Space c 0.0 42 Spare C 0 © 100% ® 125% 0.0 0.0 REMARKS 1 first 10 kva rec largest motor + balance O 50% = 0.0 + balance ® 100% - 0.0 lighting Cut 125% = 0.0 heating © 100% - 0.0 other 0 100% = 16.0 0 0% 0 0.0 0.0 first TITAN ELECTRIC PANEL SCHEDULE PANED B -31 Project: Date : Location : Fed From : 1 -LDU -B Section: 1 Ckt No. CIRCUIT NAME P h Clo/Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 ROW A/ RACK #8 A 30 2 1.0 1.6 3 Space B 0 0 1.0 1.6 5 ROW A/ RACK #8 C 30 2 1.0 1.6 7 Row H/ Rack #8 A 0 0 1.0 1.6 9 ROW A/ RACK #8 8 20 2 1.0 4.9 _ 11 0 C 0 0 1.0 4,9 13 ROW A/ RACK #5 A 30 2 1.0 4.9 15 0 B 0 0 1.0 1.6 17 ROW A/ RACK #5 C 30 2 1.0 1.6 19 0 A 0 0 1.0 1.6 0 21 21 ROW A/ RACK #5 B 20 2 1.0 1.0 1.6 x 400 23 20 C 0 0 1.0 1.0 1.0 1.6 Row D/ Rack #2 A 25 ROW A/ RACK #3 A 30 2 1.0 1.0 X x _ _ X J 1.0 1.6 x X II Ci • 30 27 Space B 0 1.0 1.0 29 Row 0/ Rack #2 1.0 1.6 29 ROW A/ RACK #3 C 30 2 1.0 1.0 31 Row B/ Rack #3 1.0 1.6 31 Space A 1.0 1.0 33 Row D/ Rack #1 1.0 1.6 33 ROW A/ RACK #1 B 30 2 1.1 1.1 35 Row B/ Rack #3 1.0 1.6 35 0 C 0 0 1.1 1.1 37 Row H/ Rack #1 1.0 1.6 37 ROW A/ RACK #1 A 30 2 1.1 1.1 39 Row E/ Rack #8 1.0 1.6 39 Row C/ Rack #4 B 20 2 1.0 1.0 41 pacP 0 1.0 1.6 41 Space C 0 0 1.0 1.0 2 Row E/ Rack #7 0.0 0.0 2 ROW B/ RACK #12 A 20 2 1.0 1.0 LOAD SUMMARY ( Total, M Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 35.3 0 0.0 Phase A 12.1 Phase B 12.1 Phase C 11.1 Conn. Kva 35.3 Conn. Amps 98 Demand Kva 35.3 Demand Amps 98 0 4 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 124.6 0 0.0 Phase A 43.0 Phase B 41.8 Phase C 39.0 Conn. Kva 124.6 Conn. Amps 346 Demand Kva 124.6 Demand Arnps 346 0 4 Space B 1.0 1.0 6 Row E/ Rack #6 1.2 1.2 6 ROW B/ RACK #12 C 20 2 1.0 1.0 8 1.2 1.2 8 Space A 1.0 1.0 10 Row E/ Rack #5 1.2 1.2 10 ROW 8/ RACK #11 B 60 3 1.0 1.0 12 Row C/ Rack #13 4.1 4.1 12 Space C 1.0 1.0 14 Row E/ Rack #4 4.1 4.1 14 Row C/ Rack #2 A 0 0 1.0 1.0 16 Row C/ Rack #13 4.1 4.1 16 ROW B/ RACK #10 B 20 2 1.0 1.0 18 Row E/ Rack #3 1.2 1.2 18 Row C/ Rack #2 C 20 2 1.0 1.0 20 Row C/ Rack #12 1.2 1.2 20 ROW 3/ RACK #10 A 20 2 1 1.0 22 Row E/ Rack #2 1.2 1.2 22 Row C/ Rack #1 B 20 2 1.0 1.0 24 Row C/ Rack #12 1.2 1.2 24 ROW B/ RACK #9 C 20 2 1.0 1.0 26 Row E/ Rack #1 1.2 1.2 26 Row C/ Rack #1 A 20 2 1.0 1.0 28 Row C/ Rack #11 1.0 1.0 28 ROW B/ RACK #9 B 20 2 1.0 1.0 30 SPACE 1.0 1.0 30 Row 0/ Rack #7 C 20 2 0.0 0.0 32 SPACE 1.0 1.0 32 ROW B/ RACK #8 A 20 2 0.0 0.0 34 SPACE 1.0 1.0 34 Row D/ Rack #7 B 20 2 0.0 0.0 36 SPACE 1.0 1.0 36 ROW B/ RACK #8 C 20 2 0.0 0.0 38 SPACE 1.2 1.2 38 Row 0/ Rack #6 A 60 3 0.0 0.0 40 SPACE 1.2 1,6 40 Spare B 0 0 0.0 0.0 42 SPACE 0.0 0.0 42 Spare C 0 01 0.0 0.0 REMARKS I ® 1007 © 1257 0.0 0.0 REMARKS I first 10 kva rec largest motor + balance ® 50% = 0.0 + balance 0 100% = 0.0 lighting ® 125% = 0.0 heating 0 100% = 0.0 other @ 100% - 124.6 0 0% o o.o 0.0 TITAN ELECTRIC PANEL SCHEDULE PANEL: B -34 Project: Date : Location : Fed From : 1 -LDU -B Section: 2 Ckt No. CIRCUIT NAME P h Cb /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row 0/ Rack #5 A 20 2 1.0 1.0 3 Space B 0 0 1.0 1.0 5 Row D/ Rack #5 C 20 2 1.0 1.0 7 Row H/ Rack #8 A 0 0 1.0 1.0 9 Row D/ Rack #4 B 20 2 1.0 1.0 11 0 C 0 0 1.0 1.0 13 Row 0/ Rack #4 A 20 2 1.0 1.0 15 0 B 0 0 1.0 1.0 17 Row 0/ Rack #3 C 20 2 1.0 1.0 19 Row B/ Rack #5 A 20 2 1.0 1.0 X 400 21 Row D/ Rack #3 B 20 2 2 1.0 1.0 0 o 23 Row 8/ Rack #4 C 20 2 0 0 1.0 1.0 1.2 25 Row D/ Rack #2 A 30 2 A 20 2 1.0 1.0 X x _ _ X J 27 Row 6/ Rack #4 B 30 2 Space B 1.0 1.0 29 Row 0/ Rack #2 C 30 2 Row C/ Rack #6 C 20 2 1.0 1.0 31 Row B/ Rack #3 A 30 2 Space A 1.0 1.0 33 Row D/ Rack #1 B 60 3 Row C/ Rack #5 B 60 3 1.1 1.1 35 Row B/ Rack #3 C 0 0 0 C 0 0 1.1 1.1 37 Row H/ Rack #1 A 0 0 0 A 0 0 1.1 1.1 39 Row E/ Rack #8 B 30 2 Row C/ Rack #4 B 20 2 1.0 1.0 41 pacP 0 C 41 spa�P C 1.0 1.0 2 Row E/ Rack #7 A 30 2 Row C/ Rack #4 A 20 2 1.0 1.0 LOAD SUMMARY ( Total, M Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 35.3 0 0.0 Phase A 12.1 Phase B 12.1 Phase C 11.1 Conn. Kva 35.3 Conn. Amps 98 Demand Kva 35.3 Demand Amps 98 0 4 1.2 B 0 0 Space B 1.0 1.0 6 Row E/ Rack #6 C 30 2 Row C/ Rack #3 C 20 2 1.0 1.0 8 A 0 0 Space A 1.0 1.0 10 Row E/ Rack #5 B 30 2 Row C/ Rack #3 3 20 2 1.0 1.0 12 Row C/ Rack #13 C 0 0 Space C 1.0 1.0 14 Row E/ Rack #4 A 30 2 Row C/ Rack #2 A 20 2 1.0 1.0 16 Row C/ Rack #13 B 0 0 Space B 0 0 1.0 1.0 18 Row E/ Rack #3 C 30 2 Row C/ Rack #2 C 20 2 1.0 1.0 20 Row C/ Rack #12 A 0 0 Space A 1.0 1.0 22 Row E/ Rack #2 B 30 2 Row C/ Rack #1 B 20 2 1.0 1.0 24 Row C/ Rack #12 C 0 0 Space C 1.0 1.0 26 Row E/ Rack #1 A 30 2 Row C/ Rack #1 A 20 2 1.0 1.0 28 Row C/ Rack #11 B 0 0 Space B 1.0 1.0 30 SPACE C 0 0 Row 0/ Rack #7 C 20 2 0.0 0.0 32 SPACE A 0 0 Space A 0.0 0.0 34 SPACE 6 0 0 Row D/ Rack #7 B 20 2 0.0 0.0 36 SPACE C 0 0 Space C 0.0 0.0 38 SPACE A 0 0 Row 0/ Rack #6 A 60 3 0.0 0.0 40 SPACE B 0 0 0 B 0 0 0.0 0.0 42 SPACE C 0 0 0 C 0 © 1007 © 1257 0.0 0.0 REMARKS I first 10 kva rec largest motor + balance ® 50% = 0.0 + balance ® 100% = 0.0 lighting ® 125% = 0.0 heating @ 100% - 0.0 other ® 100% = 35.3 0 0% 0 0.0 0.0 first TITAN ELECTRIC PANEL SCHEDULE PANED B -32 Project: Date : Location : Fed From : 1 -LDU -B Section: 2 Ckt No. CIRCUIT NAME P h Clo/Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.LO. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row B/ Rack #7 A 20 2 1.2 4.9 3 Space B 0 0 1.2 4.9 5 Row B/ Rac #7 C 20 2 1.2 4.9 7 Row H/ Rack #8 A 50 3 1.2 1.6 9 Row B/ Rack#6 B 60 3 4.1 1.6 11 0 C 0 0 4.1 1.6 13 0 A 0 0 4.1 1.6 15 Row B/ Rock #5 B 20 2 1.2 1.6 17 Row C/ Rack #7 C 0 0 1.2 1.6 19 Row B/ Rack #5 A 20 2 1.2 1.6 X 400 21 21 B 0 0 2 1.2 1.6 X 400 23 Row 8/ Rack #4 C 20 2 0 0 1.2 1.6 1.2 25 Row H/ Ruck #5 A 50 3 A 20 2 1.2 1.6 _ x x _ _ _ 27 Row 6/ Rack #4 B 20 2 Space B 1.2 1.6 29 C 0 0 Row C/ Rack #6 C 20 2 1.2 1.6 31 Row B/ Rack #3 A 20 2 Space A 1.2 4.9 33 B 0 0 Row C/ Rack #5 B 60 3 1.2 4.9 35 Row B/ Rack #3 C 20 2 0 C 0 0 1.2 4.9 37 Row H/ Rack #1 A 0 0 0 A 0 0 1.2 1.6 39 Row B/ Rack #2 B 20 2 Row C/ Rack #4 B 20 2 1.2 1.6 41 sraCe C 41 spa�P C 0.0 2 Row B/ Rack #2 A 20 2 Row C/ Rack #4 A 20 2 1.2 1.2 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kvo 74.1 0 0.0 Phase A 25.5 Phase B 25.5 Phase C 25.5 Conn. Kva 74.1 Conn. Amps 206 Demand Kva 74.1 Demand Amps 206 0 4 1.2 B LOAD SUMMARY ( Total, M Sections ) Rec Kva 0.0 Heat Kvo 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 103.1 0 0.0 Phase A 37.9 Phase B 36.3 Phase C 36.5 Conn. Kva 103.1 Conn. Amps 286 Demand Kva 103.1 Demand Amps 286 0 4 Space B 1.2 1.2 6 Row B/ Rack #1 C 60 3 Row C/ Rack #3 C 20 2 4.1 4.1 8 A 1.2 8 Space A 4.1 4.1 10 Row I/ Rack #6 B 30 2 Row C/ Rack #3 3 20 2 4.1 4.1 12 Row C/ Rack #13 C 20 2 Space C 1.2 1.2 14 Row I/ Rack #5 A 30 2 Row C/ Rack #2 A 20 2 1.2 1.2 16 Row C/ Rack #13 B 20 2 Space B 0 0 1.2 1.2 18 Row I/ Rack #4 C 30 2 Row C/ Rack #2 C 20 2 1.2 1.2 20 Row C/ Rack #12 A 20 2 Space A 1.2 1.2 22 Row I/ Rack #3 B 30 2 Row C/ Rack #1 B 20 2 1.2 1.2 24 Row C/ Rack #12 C 20 2 Space C 1.2 1.2 26 Row I/ Rack #2 A 30 2 Row C/ Rack #1 A 20 2 1.2 1.2 28 Row C/ Rack #11 B 20 2 Space B 1.2 1.2 30 Row I/ Rack#1 C 30 2 Row 0/ Rack #7 C 20 2 1.2 1.2 32 Row C/ Rack #11 A 20 2 Space A 1.2 1.2 34 B 1.2 34 Row D/ Rack #7 B 20 2 1.2 1.2 36 Row C/ Rack #10 C 60 3 Space C 4.1 4.1 38 A 0 0 Row 0/ Rack #6 A 60 3 4.1 4.1 40 B 0 0 0 B 0 0 4.1 4.1 42 SPACE C 0 0 0 C 0 0 0.0 0.0 REMARKS I first 10 kva rec ® 100% + balance 0 50% - 0.0 largest motor ® 125% + balance ® 100% = 0.0 lighting ® 125% = 0.0 heating Cal 100% = 0.0 other ® 100% = 74.1 0 0% 0 0.0 0.0 REMARKS I TITAN ELECTRIC PANEL SCHEDULE PANEL: B -35 Project: Date : Location : Fed From : 1 -LDU -B Section: 1 Ckt No. CIRCUIT NAME P h Clo/Fu Load Kva DESCRIPTION Panel Amps Max Mips L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0a Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row H/ Rack #9 A 50 3 1.1 2.5 3 Space B 1.1 2.5 5 Row C/ Rack #9 C 0 0 1.1 2.5 7 Row H/ Rack #8 A 50 3 1.1 2.5 9 0 3 0 0 1.1 2.5 11 0 C 0 0 1.1 2.5 13 Row H/ Rack #7 A 50 3 1.1 2.5 15 Space B 0 0 1.1 2.5 17 Row C/ Rack #7 C 0 0 1.1 2.5 19 Row H/ Rack #6 A 50 3 1.1 2.5 0 0 21 21 B 0 0 2 1.1 2.5 X 400 23 C 0 0 0 0 1.1 2.5 1.2 25 Row H/ Ruck #5 A 50 3 A 20 2 1.1 2.5 x x X _ 27 1.6 B 0 0 Space B 1.1 2.5 29 C 0 0 Row C/ Rack #6 C 20 2 1.1 1.6 31 Row H/ Rack #2 A 50 3 Space A 1.1 1.6 33 B 0 0 Row C/ Rack #5 B 60 3 1.1 1.6 35 C 0 0 0 C 0 0 1.1 1.6 37 Row H/ Rack #1 A 50 3 0 A 0 0 1.1 1.6 39 0 B 0 0 Row C/ Rack #4 B 20 2 1.1 1.6 41 �I, .1, P C 41 spa�P C 0.0 2 Row I/ Rack #8 A 30 2 Row C/ Rack #4 A 20 2 1.0 1.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kvo 38.0 0 0.0 Phase A 12.6 Phase B 12.6 Phase C 12.6 Conn. Kva 38.0 Conn. Amps 105 Demand Kva 38.0 Demand Amps 105 0 4 1.2 B LOAD SUMMARY ( Total, M Sections ) Rec Kva 0.0 Heat Kvo 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 103.1 0 0.0 Phase A 37.9 Phase B 36.3 Phase C 36.5 Conn. Kva 103.1 Conn. Amps 286 Demand Kva 103.1 Demand Amps 286 0 4 Space B 1.0 1.0 6 Row I/ Rack #7 C 30 2 Row C/ Rack #3 C 20 2 1.0 1.0 8 A 1.2 8 Space A 1.0 1.0 10 Row I/ Rack #6 B 30 2 Row C/ Rack #3 3 20 2 1.0 1.0 12 C 1.2 12 Space C 1.0 1.0 14 Row I/ Rack #5 A 30 2 Row C/ Rack #2 A 20 2 1.0 1.0 16 0 B 0 0 Space B 0 0 1.0 1.0 18 Row I/ Rack #4 C 30 2 Row C/ Rack #2 C 20 2 1.0 1.0 20 A 0 0 Space A 1.0 1.0 22 Row I/ Rack #3 B 30 2 Row C/ Rack #1 B 20 2 1.0 1.0 24 C 0 0 Space C 1.0 1.0 26 Row I/ Rack #2 A 30 2 Row C/ Rack #1 A 20 2 1.0 1.0 28 B 0 0 Space B 1.0 1.0 30 Row I/ Rack#1 C 30 2 Row 0/ Rack #7 C 20 2 1.0 1.0 32 A 1.2 32 Space A 1.0 1.0 34 B 1.2 34 Row D/ Rack #7 B 20 2 0.0 36 C 1.2 36 Space C 0.0 38 A 1.2 38 Row 0/ Rack #6 A 60 3 0.0 40 B 4.1 40 0 B 0 0 0.0 42 C 4.1 42 0 C 0 0 0.0 REMARKS I first 10 kva rec @ 100% + balance ® 50% = 0.0 largest motor ® 125% + balance @ 100% = 0.0 lighting 0 125% = 0.0 heating @ 100% = 0.0 other ® 100% = 38.0 0 0% 0 0.0 0.0 REMARKS I TITAN ELECTRIC PANEL SCHEDULE PANED B -33 Project: Date : Location : Fed From : 1 -LDU -B Section: 1 Ckt No. CIRCUIT NAME P h Clo /Fu Load Kva DESCRIPTION Panel Amps Max Amps L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.D. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Row C/ Rack #9 A 20 2 1.2 1.6 3 Space B 1.2 1.6 5 Row C/ Rack #9 C 20 2 1.2 1.6 7 Space A 1.2 1.6 9 Row C/ Rock #8 B 20 2 1.2 1.6 11 Space C 1.2 1.6 13 Row C/ Rack #8 A 20 2 1.2 1.6 15 Space B 1.2 1.6 17 Row C/ Rack #7 C 20 2 1.2 1.6 19 Space A 1.2 1.6 X 400 21 Row C/ Rack #7 B 20 2 1.2 1.6 23 Space C 0 0 1.2 1.6 25 Row C/ Rack #6 A 20 2 1.2 1.6 _ x X X _ _ 27 Space B 1.2 1.6 29 Row C/ Rack #6 C 20 2 1.2 1.6 31 Space A 1.2 1.6 33 Row C/ Rack #5 B 60 3 4.1 4.9 35 0 C 0 0 4.1 4.9 37 0 A 0 0 4.1 4.9 39 Row C/ Rack #4 B 20 2 1.2 41 spa�P C 1.2 1.2 2 Row C/ Rack #4 A 20 2 1.2 1.2 LOAD SUMMARY ( Total, M Sections ) Rec Kva 0.0 Heat Kvo 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 103.1 0 0.0 Phase A 37.9 Phase B 36.3 Phase C 36.5 Conn. Kva 103.1 Conn. Amps 286 Demand Kva 103.1 Demand Amps 286 0 4 Space B 1.2 1.2 6 Row C/ Rack #3 C 20 2 1.2 1.2 8 Space A 1.2 1.2 10 Row C/ Rack #3 3 20 2 1.2 1.2 12 Space C 1.2 1.2 14 Row C/ Rack #2 A 20 2 1.2 1.2 16 Space B 0 0 1.2 1.2 18 Row C/ Rack #2 C 20 2 1.2 1.2 20 Space A 1.2 1.2 22 Row C/ Rack #1 B 20 2 1.2 1.2 24 Space C 1.2 1.2 26 Row C/ Rack #1 A 20 2 1.2 1.2 28 Space B 1.2 1.2 30 Row 0/ Rack #7 C 20 2 1.2 1.2 32 Space A 1.2 1.2 34 Row D/ Rack #7 B 20 2 1.2 1.2 36 Space C 1.2 1.2 38 Row 0/ Rack #6 A 60 3 4.1 4.1 40 0 B 0 0 4.1 4.1 42 0 C 0 0 © 1007 © 1257 4.1 4.1 REMARKS I first 10 kva rec © 100% + balance ® 50% = 0.0 largest motor ® 125% + balance ® 100% = 0.0 lighting @ 125% = 0.0 heating 0 100% = 0.0 other ® 100% = 103.1 0 0% 0 0.0 0.0 0.0 TITAN ELECTRIC PANEL SCHEDULE PANEL: B -36 Project: Date : Location : Fed From : 1- LDU- -B Section: 2 Ckt No. CIRCUIT NAME P h Cla /Fu Load Kva DESCRIPTION Panel Amps Max Mips L - L Volts L - N Volts Phase Wire A.I.C. 0 0 M.L.O. Main C.B. Main Fu. Flush Surface 0 Bond Gnd. Iso. Gnd. Feed Thru Sub Feed Top Feed Btm. Feed PANEL 400 400 208 120 3 4 10k Amp P Rec Heat Motor Ltg Other Total 1 Space A 3 Space B 5 Space C 7 Space A 9 Space B 11 Space C 13 Space A 15 Space B 17 Space C 19 Space A X 400 21 Space B 23 Space C 25 Space A X X ^ _ _ 27 Space B 29 Space C 31 Space A 33 Space B 35 Space C 37 Space A 39 Space B 41 Space C 0.0 2 Space A 0.0 LOAD SUMMARY ( Total, All Sections ) Rec Kva 0.0 Heat Kva 0.0 Motor Kva 0.0 Ltg Kva 0.0 Other Kva 0.0 0 0.0 Phase A 0.0 Phase B 0.0 Phase C 0.0 Conn. Kva 0.0 Conn. Amps 0 Demand Kva 0.0 Demand Amps 0 0 4 Space B 0.0 6 Space C 0.0 8 Space A 0.0 10 Space B 0.0 12 Space C 0.0 14 Space A 0.0 16 Space B 0.0 18 Space C 0.0 20 Space A 0.0 22 Space B 0.0 24 Space C 0.0 26 Space A 0.0 28 Space B 0.0 30 Space C 0.0 32 Space A 0.0 34 Space B 0.0 36 Space C 0.0 38 Space A 0.0 40 Space B 0.0 42 Space C © 1007 © 1257 0.0 REMARKS 1 first 10 kva rec largest motor + balance ® 50% = 0.0 + balance © 100% = 0.0 lighting ® 125% = 0.0 heating © 100% = 0.0 other © 100% = 0.0 0 0% 0 0.0 0.0 ELOB y03 RECEIVED APR 14 20 PERMIT CENTER riI ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206 -633 -2811 Fax: 206- 374 -2128 Email: Info@titanelectric.net Project Title: GETTY IMAGES CO- LOCATE #3 MZIMA NETWORKS Sheet Title: PANEL SCHEDULES Designed By: MSC Drawn By: CJP Project No: Date: 04/11/08 Sheet Number: E2 GENERAL NOTES: L NOT USED FLAG NOTES; > NOT USED EMI MIR ZEN E 1 1 AC If1 1 1 1 1 1 LO9 '1O3 '7 ECE!VED APR 14 2408 PERMIT CENTER rrarrA• ELECTRIC Full Service Electrical Technology Contractor 900 N 34th, Suite 108, Seattle, WA 98103 Phone: 206-633-2811 Fax: 206-374-2128 Email: Info@titanelectric.net Project Title: GE TTY IMAGES CO- LOCATE #3 MZIMA NETWORKS Sheet Title: POWER /COMM FLOOR PLAN Designed By: MSC Drawn By: CJP Project No: Date: 04/11/08 Sheet Number: E3 2}E A2120,22 A2124,26 62120,22 22124 2fi o A1116,18 4 L6!20 A A1/20,22 1500# B4!46i;48-- -_-- -_ 81120,22 40124,26 4 L6.20 A A1128,30 1500# 61124,25 61128,30 A1132,34 A1136,38 �.. 9500# 01132,34 01136,38 A211,3 05,7_. 4Li•20A B211,3 1500# 0 621517 A2136138141 ► 82136,38,41 TITAN ELECTRIC Full Service Electrical Technology Contractor 900 N 34th St, Suite 108 Seattle, WA 98103 Phone: 206 -633 -2811 Fax: 206 - 374 -2128 Email: Info @titanelectric.net kEVIEW ED FOR CODE COMPLIANCE NFPA 70 c ; City Of Tui wii S BUILDING DWI ION A3/9,11 A3/13,15 8319,11 .. 03113,15 A5/13,15,17 65113,15,17 A5/ X5119,21,23 A111i15 A1117,19 B111315 B1117,19 A112•123 81121323 2xL6.30A #5 ' 2xL6.30B 1 x L6.20 A 1 x L6 -20 B A5/25,27,29 85125,27,29 A2115!17 #5 1500# 82119,21 A3/33,35,37 63133,35,37 A1/25,27 A1129,31 B1/25,27 B1129,31 #3 2xL6 -30A 2 x1.6-3013 1500# 82/27,29 A3/39,41 A312,4 83139,41 8312,4 ►316,8 A3110,12 8316,8 83110,12 A3/14,16 A3/18,20 B3114,16 83/18,20 A3/22,24 A3/26,28 B3/22,24 83126,28 A411,3..r A4/5,7 B411,3 0 8415,7 0-A4194:1 0 A4/13,15 .B419,11 B4113,15 (4 \ °A411Zi9 (�1 A4/21,23 (4\ B4/17,19 1,1 B4121,23 2 BOA A4/33,35,37 1500# 0 84133,35,37 Project Title: GETTY IMAGES COLOCATE #3 MIZMA NETWORKS, INC 12101 TUKWILA INTL BLVD SUITE 100 SEATTLE, WA 98168 Sheet Title: FLOOR PLAN X1.08 -'103 Designed By: Drawn By: CP CP Project %COMP 8800 05 APR 14 2008 PERMIT CENTEh Date: 04/11/2008 Sheet Number: