Issue Date: 03/23/2011
Permit Expires On: 09/19/2011
Project Name: INTERNATIONAL ACADEMY OF DESIGN AND TECHNOLOGY
Owner:
Name: SOUTHCENTER CORPORATE SQUAR
Address: 150 CALIFORNIA ST , SAN FRANCISCO CA 94111
Contact Person:
Name: CHARLIE DEES
Address: 645 ANDOVER PK W , TUKWILA WA 98188
Phone: 206 - 830 -6357
Contractor:
Name: OWNER AFFIDAVIT - CHARLIE DEES Phone:
Address:
Contractor License No: Expiration Date:
DESCRIPTION OF WORK:
ADD CONTROL ROO /EDITING BAY. USE OF EXISTING ELECTRICAL
Value of Construction: $760.40 Fees Collected: $129.24
Type of Fire Protection: SPRINKLERS /AFA International Building Code Edition: 2009
Type of Construction: Occupancy per IBC:
Electrical Service Provided by:
* *continued on next page **
doc: IBC -7/10
D11 -031 Printed: 03 -23 -2011
Public Works Activities:
Channelization / Striping: N
Curb Cut / Access / Sidewalk / CSS: N
Fire Loop Hydrant: N Number: 0 Size (Inches): 0
Flood Control Zone:
Hauling: N Start Time: End Time:
Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y.
Landscape Irrigation:
Moving Oversize Load: St srt Time: End Time:
Sanitary Side Sewer:
Sewer Main Extension: Private: Public:
Storm Drainage:
Street Use: Profit: N Non- Profit: N
Water Main Extension: Private: Public:
Water Meter:
N
l 5 {
Permit Center Authorized Signature: 1 ��J► / . Date: 0 7 ( l'
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized. to sign and obtain this development permit and agree to the conditions attached
to this permit.
I hereby certify that I have read and e
governing this work will be complied
ed this permit and know the same to be true and correct. All provisions of law and ordinances
whether specified herein or not.
Signature:
Print Name: Cl\R f t -Pf
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
Date:
PERMIT CONDITIONS:
1: ** *BUILDING DEPARTMENT CONDITIONS * **
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center
(206/431- 3670).
4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
5: Partition walls that are tied to the ceiling and all partitions greater than 6 feet in height shall be laterally braced
to the building structure.
6: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
doc: IBC -7/10
D11 -031 Printed: 03 -23 -2011
7: Ventilation is required for all new rooms spaces of new or existing buildings and sha in conformance with the
International Building Code and the Washin State Ventilation and Indoor Air Quality Co
8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building
Department (206- 431- 3670).
9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
10: ** *FIRE DEPARTMENT CONDITIONS * **
11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the
following concerns:
12: The total number of fire extinguishers required for a light hazard occupancy with Class A fire hazards is calculated at
one extinguisher for each 3,000 sq. ft. of area. The extinguisher(s) should be of the "all purpose" (2A, 10 B:C) dry
chemical type. The travel distance to any extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3 -2.1)
13: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or
brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation
instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so
that its top is not more than 5 feet (1524 mm) above the floor. Hand -held portable fire extinguishers having a gross
weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the
floor. The clearance between the floor and the bottom of the installed hand -held extinguishers shall not be less than 4
inches (102 mm). (IFC 906.7 and IFC 906.9)
14: Fire extinguishers shall not be obstructed or obscured from view. In rooms or areas in which visual obstruction cannot
be completely avoided, means shall be provided to indicate the locations of the extinguishers. (IFC 906.6)
15: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available
for use. These locations shall be along normal paths of travel, unless the fire code official determines that the
hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5)
16: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that
indicates the month and year that the inspection was performed and shall identify the company or person performing the
service. Every six years stored pressure extinguishers shall be emptied and subjected to the applicable recharge
procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the
inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these
required surveys. (NFPA 10, 4 -3, 4 -4)
17: Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort.
(IFC 1008.1.8.3 subsection 2.2)
18: Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle
is engaged from inside the tenant space. (IFC Chapter 10)
19: Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the
International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. (IFC
1008.1.8.1)
20: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10)
21: Aisles leading to required exits shall be provided from all portions of the building and the required width of the
aisles shall be unobstructed. (IFC 1013.4)
22: Maintain sprinkler coverage per N.F.P.A. 13. Addition/relocation of walls, closets or partitions may require relocating
and/or adding sprinlder heads. (IFC 901.4)
23: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide such as ducts, decks, open grate
flooring, cutting tables, shelves and overhead doors. (NFPA 13- 8.6.5.3.3)
24: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and
approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler
systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer
licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention
Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2050).
doc: IBC -7/10
D11 -031 Printed: 03 -23 -2011
25: Maintain fire alarm system audible /visu tification. Addition/relocation of walls or p ons may require
relocation and/or addition of audible /visual fication devices. (City Ordinance #2051)
26: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire
Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC
104.2)
27: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this
project.
28: The maximum flame spread class of finish materials used on interior walls and ceilings shall not exceed that set forth
in Table No. 803.5 of the International Building Code.
29: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and
#2051)
30: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of
such condition or violation.
31: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at
(206)575 -4407.
doc: IBC -7/10
D11-031 Printed: 03 -23 -2011
CITY OF TUKWILA
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.ci.tukwila.wa.us
Building Permit No. li.--03( •
Mechanical Permit No.
Plumbing/Gas Permit No.
Public Works Permit No.
Project No.
(For office use only)
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION
Site Address: 645 Andover Park West
King Co Assessor's Tax No.: 2623044914308
Suite Number: Build. 7 Floor: 1
New Tenant: ❑ Yes m ..No
Tenant Name:
International Academy of Design and Technology
Property Owners Name: Southcenter Corporate Square LLC
Mailing Address: 635 Andover Park West, Suite 107
Tukwia
City
(06 98188
State Zip
CONTACT PERSON — who do we contact when your permit is ready to be issued
Name: Charlie Dees
Mailing Address: 645 Andover Park West
E -Mail Address: cdees @iadtseattle.com
Day Telephone:
Tukwila
City
Fax Number:
(206) 830-6357
wC
State
98188
Zip
GENERAL CONTRACTOR INFORMATION —
(Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5))
Company Name: OWQ7(- p '
cc-
Mailing Address:
Zip
City
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
Contractor Registration Number: Expiration Date:
State
ARCHITECT OF RECORD — All plans must be stamped by Architect of Record
Company Name:
Mailing Address:
City
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
State
Zip
ENGINEER OF RECORD — All plans must be stamped by Engineer of Record
Company Name:
Mailing Address:
City
Contact Person: Day Telephone:
E -Mail Address: Fax Number:
State
Zip
H: \ApplicationsTomis-Applications On Line\2010 Applications \7 -2010 - Permit Application.doc
Revised: 7 -2010
bh
Page 1 of 6
0-q,JLk
• •
BUILDING PERMIT INFORMATION — 206 -431 -3670
Valuation of Project (contractor's bid price): $ 760.40 Existing Building Valuation: $
Scope of Work (please provide detailed information): Add control room /editing bay. Use of existing electrical.
Will there be new rack storage? ❑ Yes
m.. No If yes, a separate permit and plan submittal will be required.
Provide All Building Areas in Square Footage Below
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑ Yes ❑ No If "yes ", explain:
FIRE PROTECTION /HAZARDOUS MATERIALS:
m Sprinklers m Automatic Fire Alarm ❑ None ❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No
If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x 11 " paper including quantities and Material Sa ty Data Sheets.
SEPTIC SYSTEM
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H:\ApplicationsTonns- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc
Revised: 7 -2010
bh
Page 2 of 6
Existing
Interior Remodel
Addition to
Existing
Structure
New
Type of
Construction per
IBC
Type of
Occupancy per
IBC
lst Floor
9,365
220
TYPE 1 -FR
2nd Floor
10,112
3rd Floor
Floors thru
Basement
Accessory Structure*
Attached Garage
Detached Garage
Attached Carport
Detached Carport
Covered Deck
Uncovered Deck
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard: Compact: Handicap:
Will there be a change in use? ❑ Yes ❑ No If "yes ", explain:
FIRE PROTECTION /HAZARDOUS MATERIALS:
m Sprinklers m Automatic Fire Alarm ❑ None ❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No
If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x 11 " paper including quantities and Material Sa ty Data Sheets.
SEPTIC SYSTEM
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H:\ApplicationsTonns- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc
Revised: 7 -2010
bh
Page 2 of 6
PERMIT APPLICATION NOTES — Applicable to all permits in this application
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
Building and Mechanical Permit
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
Plumbing Permit
The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested
in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition).
I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING 0 ER ORCORIZED„6GENT:
n J \J(- QiJ ^
Print Name: l �Jl )
\Q v- 1( `P � `QS
Signature:
Date:
/ Day Telephone: .2(3C7 l� e)0- Q121 VP
Mailing Address: (( U n /� �2 �d 1 Ta it f� I.CJk `C p( V p
City State Zip
Date Application Accepted:
Date Application Expires: - _ __ 1 I
Staff Initials:
H:\Applicafions\Forms- Applications On Line\2010 Applications\? -2010 - Permit Application.doc
Revised 7 -2010
bh
wvi
Page 6 of 6
• ii,
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http://www.ci.tulcwila.wa.us
RECEIPT
Parcel No.: 2623049143 Permit Number: D11 -031
Address: 645 ANDOVER PK W TUKW Status: PENDING
Suite No: Applied Date: 02/08/2011
Applicant: INTERNATIONAL ACADEMY OF DESIGN AND TECHNOLOGY Issue Date:
Receipt No.: R11 -00240
Payment Amount: $129.24
Initials: WER Payment Date: 02/08/2011 02 :28 PM
User ID: 1655 Balance: $0.00
Payee: DEREK RAINER/CHARLIE DEES
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Credit Crd VISA
Authorization No. 099019
ACCOUNT ITEM LIST:
Description
129.24
Account Code Current Pmts
BUILDING - NONRES
PLAN CHECK - NONRES
STATE BUILDING SURCHARGE
000.322.100
000.345.830
640.237.114
Total: $129.24
75.60
49.14
4.50
doc: Receipt-06 Printed: 02 -08 -2011
• •
1-• • . •
•
INSPECTION NO.
t. itkiiiittk;! ?ir..
• INSPECTION RECORD
Retain a copy with permit
N1-03
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter B1vd., #100, Tukwila. WA 98188 ft. (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project: • • • • •y
. ' 'T 'R0 Per t on) 4L A-OAC
Type of Inspection:
A (, 1:7; NA (-
Address: 1
X445 A hitIoNAs &
Pitk,j
Date Called:
Special linstructions:•
. . •
•
,H.:46
Date Wanted:.
q-1-4b-11
a�"rri�
� .
Requester:
Phone No:
2° 6 - 030-
63 S 7 .
r• '
• ,Anpcoved per, applicable codes.
DCorrections required prior to approval.
COMMENTS:
r
a,•.
,H.:46
l, Iv-f -e1i .JA
aspect
Date
J6_ 1
EINSP
paid at
CTION FEE REQUIRE ' . Prior to next inspection. fee must be-
300 Southcenter Blvd., Suite 100. Call to schedGle reinspection.
•
4'
•
•
RICISPECTION RECORD
etain a copy with ermit
INSPECTION NO. . Py P PERMIT NO. /J�
CITY. QF': =TUKWILA BUILDING DIVISION
6300.5outhcenter Blvd., #100, Tukwila. WA 98188 va., (206) 431 -3670
• Permit Inspection,Request Line (206) 431 -2451
-031
•
}' e
•
4.
Projec •
r
Type of Inspection: ,
6.i 42_ .,1 6,
Address • ..
1 . 4 #J! d 'Jtf lAf
Date Called:
.01
Special Instructions: •-
•
•
Date Wanted: /
`i - /.4 - 1
p.m.
Requester:
Phone l: r 7 0-
(035-1
Approved per applicable codes.
ElCorrections required prior to approval.
COMMENTS:
•r
Inspector:
Date f? _14
REINSPECTIION -FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION RECORD .
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 R (206) 431 -3670:
Permit Inspection Request Line (206) 431 -2451
Dii-
Project:
_2 A/70V Nrq raW4G /9(14
Type of Inspection:
pFrviy , i) /r»m /6
Address:
4 `7!_5 An/.c) d 4,? Px 64'
Date Called:
Special Instructions:
Date Wanted: m.
„ .i.---'ly— // p.m
Requester:
Phone No:
0106- afe, —4,357
Approved per applicable codes.
aCorrections required prior to approval. B.
COMMENTS:
Date:
INSPECTION EE REQUIRE o . Prior to next inspection. fee must, be
aid at 6300 Southcenter Blvd Suite 100. Call to schedule reinspection.
-
r
1
INSPECTION NUMBER f
INSPECTION RECORD
Retain a copy with permit
•
DO-
PERMIT NUMBERS
CITY OF TUKWILA FIRE DEPARTMENT
444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407
Project:
..IN-t- t A cytj-e,ti 0 ..c `(-6s1:1,LJ
Type of Inspection:, /
-,,,,Fif-e._ ST AJA---z_
Address: � U ki
Suite #: ��
Contact Person:
Special Instructions:
Phone No.:
Approved per applicable codes.
rrections required prior to approval.
COMMENTS:
Needs Shift Inspection:
Sprinklers:
Fire Alarm:
Hood & Duct:
Monitor:
Pre -Fire:
Permits: •
Occupancy Type :.
Inspector:
c..,,,,, 5-0--
Date: �7/3///�/
Hrs.:
$100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from
the City of Tukwila Finance Department. Call to schedule a reinspection.
Billing Address
Attn:
Address:
Company Name:
City:
J State:
Zip: •
Word /Inspection Record Form.Doc
6/11/10
T.F.D. Form F.P. 113
MAYES TESTING ENGINEERS, INC.
Project No. L11241
Project Highline SD Raisbeck Aviation High School
Address 9229 East Marginal Way South, Tukwila, WA
Permit No. D10 -031
Bldg Dept. City of Tukwila
Owner Highline School District No. 401
Architect Bassett Architects
Contractor Porter Brothers Construction
Record No. 028
Date 12/15/2011
Weather Cloudy
Inspection Reinforced concrete
Sample(s) (4) 4x8" cylinders
Seal& Office
20225 CedarVaEey Road
&Ate 110
Lyrrrwood, WA 98036
ph 425.742.9360
fax 425.745.1737
Tacoma Office
10029 S. Tacoma Way
Suite E-2
Tacoma, WA 98499
ph 253.584.3720
fax 253.5843707
Portimi Office
7911 NE 33rd Drive
Sate 190
Portland, OR 97211
ph 503281.7515
fax 503281.7579
Onsite to observe and sample 110 cubic yards CalPortland Concrete Mix # 3262 (5000 PSI @ 28
days) for grade beams between building lines 1- 2.2 /A -E. Spoke with Mayes inspector Tom Cain
prior to the placement and learned that he had inspected the reinforcing steel and anchor bolts and
found them all to be per plans and details. Concrete Testing: Slump -5 ", Air - entrainment -N /A,
Concrete Temperature- 61 °F (50% hot water), Ambient Temperature- 40 °F. Cast one set of (4)
4x8" cylinders.
To the best of our knowledge, all items inspected today are in conformance with approved plans
and specifications.
Inspector: Tom Robinson
Reviewed By:
-,
Timothy G. Beckerle, P.E.
Branch Manager
Page 1 of 1
MAYES TESTING ENGINEERS, INC.
Project No. L11241
Project Highline SD Raisbeck Aviation High School
Address 9229 East Marginal Way South, Tukwila, WA
Permit No. D10 -031
Bldg Dept. City of Tukwila
Owner Highline School District No. 401
Architect Bassetti Architects
Contractor Porter Brothers Construction
Record No. 026
Date 12/14/2011
Weather Cloudy
Inspection Rebar, anchor bolts
Sample(s) N/A
Seattle Office
20225 Cedar Valley Road
Sriie 110
Lynnwood, WA 98036
ph 425.742.9360
fax 425.745.1737
Tacoma office
10029 S. Tacoma Way
Site E-2
Tacoma, WA 98499
01 253.584.3720
fax 253.584.3707
Portland dice
7911 NE 33rd Drive
Srite 190
Portland, OR 97211
ph 503281.7515
fax 503281.7579
Final inspection of grade beams and pile caps, grids 1 to2.2 /A to E (excluding elevator pit):
reinforcing steel and anchor bolts. Work is complete and according to plan.
To the best of our knowledge, all items inspected today are in conformance with approved plans
and specifications.
Inspector: Tom Cain
Reviewed By:
Timothy G. Beckerle, P.E.
Branch Manager
Page 1 of 1
MAYES TESTING ENGINEERS, INC. Seat& Office
�h. 20225 Cedar Vafey Road
Si110
Lynnwood, WA 98036
Project No. L11241 fax 425.742.9W 5.745.1 3
� fax425.745.1737
Project Highline SD Raisbeck Aviation High School
Address 9229 East Marginal Way South, Tukwila, WA Tacoma Office
10029 S. Tacoma Way
Permit No. D10 -031 Suite E-2
Bldg Dept. City of Tukwila Tacoma, WA 98499
ph 253.584.3720
Owner Highline School District No. 401 fax 253.5843707
Architect Bassetti Architects Poland Office
Contractor Porter Brothers Construction 7911NE33rdDte
Stiff 190
Record No. 027
Date 12/15/2011
Weather Cloudy
Inspection Rebar
Sample(s) N/A
Portland, OR 97211
ph 503281.7515
fax 503281.7579
Verified installation of slab dowels at grade beams 1 to 2.2/A to E (excluding elevator pit). Slab
dowels installed per details on sheet S3.2.
To the best of our knowledge, all items inspected today are in conformance with approved plans
and specifications.
Inspector: Tom Cain
Reviewed By:
Timothy G. Beckerle, P.E.
Branch Manager
Page 1 of 1
EXITING DIAGRAMS
- . -
• • • '" • -- 114.7.1u-4
;'•
r7.11wir7",
•
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOTE: Revisions will require a new plan submittal
and may include additional plan review fees
t
NCE
1ST FLOOR EXITING DIAGRAM
N.T.S.
19 SEPARATE PERMIT
REQUIRED FOR:
Mechanical
Electrical
(51 Plumbing
a Gas POMO
City of Tukwila
UILDING DIVISION
up eas, eut (r.
PATH OF TRAVEL.
•
FILE COPY
PannitNo. DIA , I
Plan review approval Is ad4scit) einws and omons.
Approval of construction &sands does not Whale
the violation of any a1ophx1 code or onSnance.
of approved Copy Is
rin
Data k,
zz;,./i•
KEY PLAN
City OfildcwNa
WILDING DMSION
2ND FLOOR EXITING DIAGRAM
INCOMPLETE
• • •
• . .,!
• . '
• sz".'&•
. , • ..:
ON
IVED
011
CENTER
21-4-
-r. -'••• -
CODE REVIEWED FOR
COMPLIANCE
iv;A.i' 1 Cl1il
(City ofTukwila
BuflN
RECEIVED
MAR 08 2011
PERMIT CENTER
1
Door Detail
TYPE C: 1 -3/4" SOLID
CORE WOOD DOOR
w/8 "x48" 1/4" CLEAR
TEMPERED LITE, PL -1
FINISH
Pull Down Lever Door Hardware
TYPE
SINGLE DOOR FRAME
Window Detail
0' -5"
2' - 4"
3' -4"
5' -0"
Paint Grade Wood Frame, 1/8" clear glass
Wall Detail
2 "x4" Brace at 45 degree angle - every 8'
2 "x4" top plate
2 "x4" - 2' -0" O.0 Studs
ICSREVIEWED FOR
DE COMPLIANCE
aDD IVV®
City of Tukwila
BUILDING DIVV ()pj
1/2" GWB Each Side
2 "x4" pressure treated bottm plate
To slab with 1/8 DIA. 3/4" MIN.
Pentrate 2' - 0" O.0
RECEIVED
MAR 08 2011
PERMIT CENTER
v
City of Tukwila
•
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
February 11, 2011
Charlie Dees
International Academy of Design & Technology
645 Andover Pk W
Tukwila, WA 98188
RE: Incomplete Letter #1
Development Permit Application D11 -031
International Academy of Design & Technology — 645 Andover Pk W
Dear Mr. Dees,
This letter is to inform you that your permit application received at the City of Tukwila Permit Center on
February 8, 2011 is determined to be incomplete. Before your application can continue the plan review
process the attached/following items from the following department(s) need(s) to be addressed:
Building Department: Allen Johannessen at 206 433 -7163 if you have any questions
concerning the attached comments.
Please address the comment above in an itemized format with applicable revised plans,
specifications, and /or other documentation. The City requires that four (4) sets of revised plans,
specifications and /or other documentation be resubmitted with the appropriate revision block.
In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every
resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will
not be accepted through the mail or by a messenger service.
If you have any questions, please contact me at the Permit Center at (206) 431 -3670.
Bill Rambo
Perniit Technician
Enclosures
File: D11 -031
W:\Permit Center\lncomplete Letters \2011\D11 -031 Incomplete Ltr # 1.DOC
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
Tukwila Building Division
Allen Johannessen, Plan Examiner
Determination of Completeness Memo
Date: February 10, 2011
Project Name: International Academy of Design
Permit #: D11 -031
Plan Review: Allen Johannessen, Plans Examiner
The Building Division has deemed the subject permit application incomplete. To assist the applicant in
expediting the Department plan review process, please forward the following comments.
(GENERAL NOTE)
PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size).
(If applicable) Structural Drawings and structural calculations sheets shall be original signed wet
stamped, not copied.)
1. Provide on the plan (or cover sheet) more specifics about the building type, sprinkled or not and
identify names or use of the surrounding spaces including the new space being created. If sprinkled
show location of sprinklers.
2. Proposed and existing design is reversed making it confusing to compare. Please cloud the area of
work and show side to side views.
3. Provide a reflective ceiling plan and show an elevation cut view providing specific detailed
information about the ceiling, wall construction (type of materials proposed) and a specific detail to
show how the wall bracing is attached at the top of wall and underside of the roof framing.
4. Provide specific information about the glazing and doors with specifications for the door hardware.
5. Provide a reflective ceiling plan for alterations to the ceiling. Show lighting revisions and provisions
for air or ventilation with any alterations for mechanical ventilation.
Should there be questions concerning the above requirements, contact the Building Division at 206 -431-
3670. No further comments at this time.
PE T
PLAN REVIEW
•
ING SLIP
ACTIVITY NUMBER: D11 -031 DATE: 03 -08 -11
PROJECT NAME: INTERNATIONAL ACADEMY OF DESIGN
SITE ADDRESS: 645 ANDOVER PK W
Original Plan Submittal X Response to Incomplete Letter # 1
Response to Correction Letter #
Revision # After Permit Issued
DEPARTMENTS:
Building Division
Buildin
Public Works ❑
Fire Prevention
Structural
n
Planning Division
n
❑ Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Incomplete
n
DUE DATE: 03-10-11
Not Applicable ❑
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES/THURS ROUTING:
Please Route
Structural Review Required
REVIEWER'S INITIALS:
n No further Review Required
DATE:
n
APPROVALS OR CORRECTIONS:
DUE DATE: 04 -07 -11
Approved ❑ Approved with Conditions rg Not Approved (attach comments) ❑
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents/routing slip.doc
2 -28 -02
• •
PLAN EVIEW /ROUTING SLIP
ACTIVITY NUMBER: D11 -031 DATE: 02 -08 -11
PROJECT NAME: INTERNATIONAL ACADEMY OF DESIGN
SITE ADDRESS: 645 ANDOVER PK W
X Original Plan Submittal Response to Incomplete Letter #
Response to Correction Letter #
Revision # After Permit Issued
DEPARTME TS:
dew AVA 2- _t 4I
uiIding Division Fire Pre ention
A),A W' o fk Structural ❑
A >11-111D-1/1
Planning ivision eme
Permit Coordinator fI
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
n
Incomplete
DUE DATE: 02-10-11
Not Applicable
Comments:
Permit Center' Use .Only
INCOMPLETE LETTER MAILED: 2 t1 LETTER OF COMPLETENESS MAi ED:
Departments determined incomplete: Bldg PW Fire ❑ Ping ❑ ❑ Staff Initials: ��/" //
TUES/THURS ROUTING:
Please Route ❑ Structural Review Required n No further Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 03-10-11
Approved Approved with Conditions n Not Approved (attach comments) n
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents/routing slip.doc
2 -28 -02
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Web site: http: / /www.ci.tukwila.wa.us
REVISION
SUBMITTAL
Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through
the mail, fax, etc.
Date: ? - , ._ , () (, l
Plan Check/Permit Number:
Response to Incomplete Letter #
❑ Response to Correction Letter #
❑ Revision # after Permit is Issued
❑ Revision requested by a City Building Inspector or Plans Examiner
Project Name: e, t'lo i.,-3 ( c(16 ocnA �� /) tJ ri t A � f �(�VL.J(()' - -�
Project Address: 4' L( ,r A{�l/ ki—et 1PQG "(Y Lc/ .e.1 /-
Contact Person: CAQ (r ((•e 't?,(2Jj Phone Number: '? O�i i7 3C) C3( 7
Summary of Revision:
nL)O C t,/ u /0/1 EC
evoFTtntwaA
MAR 08 2011
PERMnr CENTER
Sheet Number(s):
"Cloud" or highlight all areas of revision including date of rev'sio
Received at the City of Tukwila Permit Center by:
Entered in Permits Plus on 51 —( 1
H:\Applicattons\Fonns- Applications On Line \2010 Applications \7 -2010 - Revision Submittal.doc
Created: 8-13-2004
Revised: 7 -2010
•
CITY OF TUKWILA
Department of Community Development
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431 -367o FAX (206) 431 -3665
E -mail: tukplan(cr�ci.tukwila.wa.us
Permit Center /Building Division
206 431 -367o
Public Works Department
206 433 -0179
Planning Division
206 431 -367o
AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION
STATE OF WASHINGTON)
) ss.
COUNTY OF KING )
Cl�av�l� �e lJ��s
[please print name]
, states as follows:
PERMIT NO: cD l 03
1. I have made application for a permit from the City of Tukwila, Washington.
2. I understand that state law requires that all building construction contractors be registered with the
State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the
Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have
read or am familiar with RCW 18.27.090.
3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the
City of Tukwila must verify either that the contractor is registered by the State of Washington, or that
one of the exemptions stated under RCW 18.27.090 applies.
4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I
hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090,
I consider the work authorized under this permit to be exempt under number _, and will therefore
not be performed by a registered contractor.
5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to
persons making electrical installations on their own property or to regularly employed employees
working on the premises of their employer. The proposed electrical work is not for the construction
of a new building for rent, sale or lease.
I understand that I may be waiving certain rights that I might otherwise have under state law in any decision
to engage an unregistered contractor to perform construction work.
Owner /Owner'Q
s Agent*
Signed and sworn to before me this
eIVI day of
elovoot
�-
,20
11
NOTARY PUBLIC in and for the State of Washington
Residing at
k -ev�fi,
Name as commissioned:
My commission expires:
W , County
4�Vrnt(IV)I N.Mi11¢V
18.27.090 Exemptions. The regi.. on provisions of this chapter do not apply tip
1. An authorized representative of the United States
government, the state of Washington, or any incorporated
city, town, county, township, irrigation district, reclamation
district, or other municipal or political corporation or
subdivision of this state;
2. Officers of a court when they are acting within the scope
of their office;
3. Public utilities operating under the regulations of the
utilities and transportation commission in construction,
maintenance, or development work incidental to their own
business;
4. Any construction, repair, or operation incidental to the
discovering or producing of petroleum or gas, or the
drilling, testing, abandoning, or other operation of any
petroleum or gas well or any surface or underground mine
or mineral deposit when performed by an owner or lessee;
5. The sale of any finished products, materials, or articles of
merchandise that are not fabricated into and do not become
a part of a structure under the common law of fixtures;
6. Any construction, alteration, improvement, or repair of
personal property performed by the registered or legal
owner, or by a mobile /manufactured home retail dealer or
manufacturer licensed under chapter 46.70 RCW who shall
warranty service and repairs under chapter 46.70 RCW;
7. Any construction, alteration, improvement, or repair
carried on within the limits and boundaries of any site or
reservation under the legal jurisdiction of the federal
government;
8. Any person who only furnished materials, supplies, or
equipment without fabricating them into, or consuming
them in the performance of, the work of the contractor;
9. Any work or operation on one undertaking or project by
one or more contracts, the aggregate contract price of
which for labor and materials and all other items is less
than five hundred dollars, such work or operations being
considered as of a casual, minor, or inconsequential nature.
The exemption prescribed in this subsection does not apply
in any instance wherein the work or construction it only a
part of a larger or major operation, whether undertaken by
the same or a different contractor, or in which a division of
the operation is made into contracts of amounts less than
five hundred dollars for the purpose of evasion of this
chapter or otherwise. The exemption prescribed in this
subsection does not apply to a person who advertises or
puts out any sign or card or other device which might
indicate to the public that he or she is a contractor, or that
he or she is qualified to engage in the business of
contractor;
10. Any construction or operation incidental to the
construction and repair of irrigation and drainage ditches
of regularly constituted irrigation districts or reclamation
districts; or to farming, dairying, agriculture, viticulture,
horticulture, or stock or poultry raising; or to clearing or
other work upon land in rural districts for fire prevention
purposes; except when any of the above work is performed
by a registered contractor;
11. An owner* who contracts for a project with a registered
contractor, except that this exemption shall not deprive the
owner of the protections of this chapter against registered
and unregistered contractors. The exemption prescribed in
this subsection does not apply to a person who performs
the activities of a contractor for the purpose of leasing or
selling improved property he or she has owned for less than
twelve months;
12.* Any person working on his or her own property,
whether occupied by him or her or not, and any person
working on his or her personal residence, whether owned
by him or her or not but this exemption shall not apply to
any person who performs the activities of a contractor on
his or her own property for the purpose of selling,
demolishing, or leasing the property;
13. An owner* who performs maintenance, repair, and
alteration work in or upon his or her own properties, or
who uses his or her own employees to do such work;
14. A licensed architect or civil or professional engineer
acting solely in his or her professional capacity, an
electrician certified under the laws of the state of
Washington, or a plumber certified under the laws of the
state of Washington or licensed by a political subdivision of
the state of Washington while operating within the
boundaries of such political subdivision. The exemption
provided in this subsection is applicable only when the
person certified is operating within the scope of his or her
certification;
15. Any person who engages in the activities herein
regulated as an employee of a registered contractor with
wages as his or her sole compensation or as an employee
with wages as his or her sole compensation;
i6. Contractors on highway projects who have been
prequalified as required by RCW 47.28.070, with the
department of transportation to perform highway
construction, reconstruction, or maintenance work;
17. A mobile /manufactured home dealer or manufacturer
who subcontracts the installation, set -up, or repair work to
actively registered contractors. This exemption only applies
to the installation, set -up, or repair of the
mobile /manufactured homes that were manufactured or
sold by the mobile /manufactured home dealer or
manufacturer;
18. An entity who holds a valid,elettifiliec tractor's
license under chapter 19.28,ReW tha't etr oiy'S4 certified
journeyman electrician, a certified residential'Wesialty
electrician, or an electrical trainee meetingtQ,dm '
requirements of chapte x19.28 RCW to perform pl 4 bing
work that is incidentally^, directly, and immediatel t,
appropriate to the like -1 -kind replacemynt of 4ho1
appliance or other smal1►osehold ufllizati . n1e
that requires limited elect pow and li
ectir
and /or water connections',d N'
supervised by a certified ele
plumbing work.