Loading...
HomeMy WebLinkAboutPermit D11-031 - INTERNATIONAL ACADEMY OF DESIGN AND TECHNOLOGY - CONTROL ROOMINTERNATIONAL ACAD EMY OF DESIGN & TECHNOLOGY 645 ANDOVER PK W Dl 1 -031 City oPi'ukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: //www. ci. tukwi la. wa. us Parcel No.: 2623049143 Address: 645 ANDOVER PK W TUKW Suite No: DEVELOPMENT PERMIT Permit Number: D11 -031 Issue Date: 03/23/2011 Permit Expires On: 09/19/2011 Project Name: INTERNATIONAL ACADEMY OF DESIGN AND TECHNOLOGY Owner: Name: SOUTHCENTER CORPORATE SQUAR Address: 150 CALIFORNIA ST , SAN FRANCISCO CA 94111 Contact Person: Name: CHARLIE DEES Address: 645 ANDOVER PK W , TUKWILA WA 98188 Phone: 206 - 830 -6357 Contractor: Name: OWNER AFFIDAVIT - CHARLIE DEES Phone: Address: Contractor License No: Expiration Date: DESCRIPTION OF WORK: ADD CONTROL ROO /EDITING BAY. USE OF EXISTING ELECTRICAL Value of Construction: $760.40 Fees Collected: $129.24 Type of Fire Protection: SPRINKLERS /AFA International Building Code Edition: 2009 Type of Construction: Occupancy per IBC: Electrical Service Provided by: * *continued on next page ** doc: IBC -7/10 D11 -031 Printed: 03 -23 -2011 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: St srt Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non- Profit: N Water Main Extension: Private: Public: Water Meter: N l 5 { Permit Center Authorized Signature: 1 ��J► / . Date: 0 7 ( l' The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized. to sign and obtain this development permit and agree to the conditions attached to this permit. I hereby certify that I have read and e governing this work will be complied ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. Signature: Print Name: Cl\R f t -Pf This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Date: PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Partition walls that are tied to the ceiling and all partitions greater than 6 feet in height shall be laterally braced to the building structure. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. doc: IBC -7/10 D11 -031 Printed: 03 -23 -2011 7: Ventilation is required for all new rooms spaces of new or existing buildings and sha in conformance with the International Building Code and the Washin State Ventilation and Indoor Air Quality Co 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: The total number of fire extinguishers required for a light hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 3,000 sq. ft. of area. The extinguisher(s) should be of the "all purpose" (2A, 10 B:C) dry chemical type. The travel distance to any extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3 -2.1) 13: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand -held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand -held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 14: Fire extinguishers shall not be obstructed or obscured from view. In rooms or areas in which visual obstruction cannot be completely avoided, means shall be provided to indicate the locations of the extinguishers. (IFC 906.6) 15: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 16: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. Every six years stored pressure extinguishers shall be emptied and subjected to the applicable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10, 4 -3, 4 -4) 17: Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (IFC 1008.1.8.3 subsection 2.2) 18: Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the tenant space. (IFC Chapter 10) 19: Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. (IFC 1008.1.8.1) 20: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10) 21: Aisles leading to required exits shall be provided from all portions of the building and the required width of the aisles shall be unobstructed. (IFC 1013.4) 22: Maintain sprinkler coverage per N.F.P.A. 13. Addition/relocation of walls, closets or partitions may require relocating and/or adding sprinlder heads. (IFC 901.4) 23: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide such as ducts, decks, open grate flooring, cutting tables, shelves and overhead doors. (NFPA 13- 8.6.5.3.3) 24: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2050). doc: IBC -7/10 D11 -031 Printed: 03 -23 -2011 25: Maintain fire alarm system audible /visu tification. Addition/relocation of walls or p ons may require relocation and/or addition of audible /visual fication devices. (City Ordinance #2051) 26: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 27: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 28: The maximum flame spread class of finish materials used on interior walls and ceilings shall not exceed that set forth in Table No. 803.5 of the International Building Code. 29: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 30: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 31: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: IBC -7/10 D11-031 Printed: 03 -23 -2011 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Building Permit No. li.--03( • Mechanical Permit No. Plumbing/Gas Permit No. Public Works Permit No. Project No. (For office use only) Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: 645 Andover Park West King Co Assessor's Tax No.: 2623044914308 Suite Number: Build. 7 Floor: 1 New Tenant: ❑ Yes m ..No Tenant Name: International Academy of Design and Technology Property Owners Name: Southcenter Corporate Square LLC Mailing Address: 635 Andover Park West, Suite 107 Tukwia City (06 98188 State Zip CONTACT PERSON — who do we contact when your permit is ready to be issued Name: Charlie Dees Mailing Address: 645 Andover Park West E -Mail Address: cdees @iadtseattle.com Day Telephone: Tukwila City Fax Number: (206) 830-6357 wC State 98188 Zip GENERAL CONTRACTOR INFORMATION — (Contractor Information for Mechanical (pg 4) for Plumbing and Gas Piping (pg 5)) Company Name: OWQ7(- p ' cc- Mailing Address: Zip City Contact Person: Day Telephone: E -Mail Address: Fax Number: Contractor Registration Number: Expiration Date: State ARCHITECT OF RECORD — All plans must be stamped by Architect of Record Company Name: Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: State Zip ENGINEER OF RECORD — All plans must be stamped by Engineer of Record Company Name: Mailing Address: City Contact Person: Day Telephone: E -Mail Address: Fax Number: State Zip H: \ApplicationsTomis-Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: 7 -2010 bh Page 1 of 6 0-q,JLk • • BUILDING PERMIT INFORMATION — 206 -431 -3670 Valuation of Project (contractor's bid price): $ 760.40 Existing Building Valuation: $ Scope of Work (please provide detailed information): Add control room /editing bay. Use of existing electrical. Will there be new rack storage? ❑ Yes m.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: m Sprinklers m Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x 11 " paper including quantities and Material Sa ty Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ApplicationsTonns- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: 7 -2010 bh Page 2 of 6 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC lst Floor 9,365 220 TYPE 1 -FR 2nd Floor 10,112 3rd Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: m Sprinklers m Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x 11 " paper including quantities and Material Sa ty Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ApplicationsTonns- Applications On Line\2010 Applications \7 -2010 - Permit Application.doc Revised: 7 -2010 bh Page 2 of 6 PERMIT APPLICATION NOTES — Applicable to all permits in this application Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. Building and Mechanical Permit The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). Plumbing Permit The Building Official may grant one extension of time for an additional period not exceeding 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 Uniform Plumbing Code (current edition). I HEREBY CERTIFY THAT 1 HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 ER ORCORIZED„6GENT: n J \J(- QiJ ^ Print Name: l �Jl ) \Q v- 1( `P � `QS Signature: Date: / Day Telephone: .2(3C7 l� e)0- Q121 VP Mailing Address: (( U n /� �2 �d 1 Ta it f� I.CJk `C p( V p City State Zip Date Application Accepted: Date Application Expires: - _ __ 1 I Staff Initials: H:\Applicafions\Forms- Applications On Line\2010 Applications\? -2010 - Permit Application.doc Revised 7 -2010 bh wvi Page 6 of 6 • ii, City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tulcwila.wa.us RECEIPT Parcel No.: 2623049143 Permit Number: D11 -031 Address: 645 ANDOVER PK W TUKW Status: PENDING Suite No: Applied Date: 02/08/2011 Applicant: INTERNATIONAL ACADEMY OF DESIGN AND TECHNOLOGY Issue Date: Receipt No.: R11 -00240 Payment Amount: $129.24 Initials: WER Payment Date: 02/08/2011 02 :28 PM User ID: 1655 Balance: $0.00 Payee: DEREK RAINER/CHARLIE DEES TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 099019 ACCOUNT ITEM LIST: Description 129.24 Account Code Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $129.24 75.60 49.14 4.50 doc: Receipt-06 Printed: 02 -08 -2011 • • 1-• • . • • INSPECTION NO. t. itkiiiittk;! ?ir.. • INSPECTION RECORD Retain a copy with permit N1-03 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter B1vd., #100, Tukwila. WA 98188 ft. (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: • • • • •y . ' 'T 'R0 Per t on) 4L A-OAC Type of Inspection: A (, 1:7; NA (- Address: 1 X445 A hitIoNAs & Pitk,j Date Called: Special linstructions:• . . • • ,H.:46 Date Wanted:. q-1-4b-11 a�"rri� � . Requester: Phone No: 2° 6 - 030- 63 S 7 . r• ' • ,Anpcoved per, applicable codes. DCorrections required prior to approval. COMMENTS: r a,•. ,H.:46 l, Iv-f -e1i .JA aspect Date J6_ 1 EINSP paid at CTION FEE REQUIRE ' . Prior to next inspection. fee must be- 300 Southcenter Blvd., Suite 100. Call to schedGle reinspection. • 4' • • RICISPECTION RECORD etain a copy with ermit INSPECTION NO. . Py P PERMIT NO. /J� CITY. QF': =TUKWILA BUILDING DIVISION 6300.5outhcenter Blvd., #100, Tukwila. WA 98188 va., (206) 431 -3670 • Permit Inspection,Request Line (206) 431 -2451 -031 • }' e • 4. Projec • r Type of Inspection: , 6.i 42_ .,1 6, Address • .. 1 . 4 #J! d 'Jtf lAf Date Called: .01 Special Instructions: •- • • Date Wanted: / `i - /.4 - 1 p.m. Requester: Phone l: r 7 0- (035-1 Approved per applicable codes. ElCorrections required prior to approval. COMMENTS: •r Inspector: Date f? _14 REINSPECTIION -FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD . Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 R (206) 431 -3670: Permit Inspection Request Line (206) 431 -2451 Dii- Project: _2 A/70V Nrq raW4G /9(14 Type of Inspection: pFrviy , i) /r»m /6 Address: 4 `7!_5 An/.c) d 4,? Px 64' Date Called: Special Instructions: Date Wanted: m. „ .i.---'ly— // p.m Requester: Phone No: 0106- afe, —4,357 Approved per applicable codes. aCorrections required prior to approval. B. COMMENTS: Date: INSPECTION EE REQUIRE o . Prior to next inspection. fee must, be aid at 6300 Southcenter Blvd Suite 100. Call to schedule reinspection. - r 1 INSPECTION NUMBER f INSPECTION RECORD Retain a copy with permit • DO- PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 Project: ..IN-t- t A cytj-e,ti 0 ..c `(-6s1:1,LJ Type of Inspection:, / -,,,,Fif-e._ ST AJA---z_ Address: � U ki Suite #: �� Contact Person: Special Instructions: Phone No.: Approved per applicable codes. rrections required prior to approval. COMMENTS: Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: • Occupancy Type :. Inspector: c..,,,,, 5-0-- Date: �7/3///�/ Hrs.: $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Address: Company Name: City: J State: Zip: • Word /Inspection Record Form.Doc 6/11/10 T.F.D. Form F.P. 113 MAYES TESTING ENGINEERS, INC. Project No. L11241 Project Highline SD Raisbeck Aviation High School Address 9229 East Marginal Way South, Tukwila, WA Permit No. D10 -031 Bldg Dept. City of Tukwila Owner Highline School District No. 401 Architect Bassett Architects Contractor Porter Brothers Construction Record No. 028 Date 12/15/2011 Weather Cloudy Inspection Reinforced concrete Sample(s) (4) 4x8" cylinders Seal& Office 20225 CedarVaEey Road &Ate 110 Lyrrrwood, WA 98036 ph 425.742.9360 fax 425.745.1737 Tacoma Office 10029 S. Tacoma Way Suite E-2 Tacoma, WA 98499 ph 253.584.3720 fax 253.5843707 Portimi Office 7911 NE 33rd Drive Sate 190 Portland, OR 97211 ph 503281.7515 fax 503281.7579 Onsite to observe and sample 110 cubic yards CalPortland Concrete Mix # 3262 (5000 PSI @ 28 days) for grade beams between building lines 1- 2.2 /A -E. Spoke with Mayes inspector Tom Cain prior to the placement and learned that he had inspected the reinforcing steel and anchor bolts and found them all to be per plans and details. Concrete Testing: Slump -5 ", Air - entrainment -N /A, Concrete Temperature- 61 °F (50% hot water), Ambient Temperature- 40 °F. Cast one set of (4) 4x8" cylinders. To the best of our knowledge, all items inspected today are in conformance with approved plans and specifications. Inspector: Tom Robinson Reviewed By: -, Timothy G. Beckerle, P.E. Branch Manager Page 1 of 1 MAYES TESTING ENGINEERS, INC. Project No. L11241 Project Highline SD Raisbeck Aviation High School Address 9229 East Marginal Way South, Tukwila, WA Permit No. D10 -031 Bldg Dept. City of Tukwila Owner Highline School District No. 401 Architect Bassetti Architects Contractor Porter Brothers Construction Record No. 026 Date 12/14/2011 Weather Cloudy Inspection Rebar, anchor bolts Sample(s) N/A Seattle Office 20225 Cedar Valley Road Sriie 110 Lynnwood, WA 98036 ph 425.742.9360 fax 425.745.1737 Tacoma office 10029 S. Tacoma Way Site E-2 Tacoma, WA 98499 01 253.584.3720 fax 253.584.3707 Portland dice 7911 NE 33rd Drive Srite 190 Portland, OR 97211 ph 503281.7515 fax 503281.7579 Final inspection of grade beams and pile caps, grids 1 to2.2 /A to E (excluding elevator pit): reinforcing steel and anchor bolts. Work is complete and according to plan. To the best of our knowledge, all items inspected today are in conformance with approved plans and specifications. Inspector: Tom Cain Reviewed By: Timothy G. Beckerle, P.E. Branch Manager Page 1 of 1 MAYES TESTING ENGINEERS, INC. Seat& Office �h. 20225 Cedar Vafey Road Si110 Lynnwood, WA 98036 Project No. L11241 fax 425.742.9W 5.745.1 3 � fax425.745.1737 Project Highline SD Raisbeck Aviation High School Address 9229 East Marginal Way South, Tukwila, WA Tacoma Office 10029 S. Tacoma Way Permit No. D10 -031 Suite E-2 Bldg Dept. City of Tukwila Tacoma, WA 98499 ph 253.584.3720 Owner Highline School District No. 401 fax 253.5843707 Architect Bassetti Architects Poland Office Contractor Porter Brothers Construction 7911NE33rdDte Stiff 190 Record No. 027 Date 12/15/2011 Weather Cloudy Inspection Rebar Sample(s) N/A Portland, OR 97211 ph 503281.7515 fax 503281.7579 Verified installation of slab dowels at grade beams 1 to 2.2/A to E (excluding elevator pit). Slab dowels installed per details on sheet S3.2. To the best of our knowledge, all items inspected today are in conformance with approved plans and specifications. Inspector: Tom Cain Reviewed By: Timothy G. Beckerle, P.E. Branch Manager Page 1 of 1 EXITING DIAGRAMS - . - • • • '" • -- 114.7.1u-4 ;'• r7.11wir7", • REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees t NCE 1ST FLOOR EXITING DIAGRAM N.T.S. 19 SEPARATE PERMIT REQUIRED FOR: Mechanical Electrical (51 Plumbing a Gas POMO City of Tukwila UILDING DIVISION up eas, eut (r. PATH OF TRAVEL. • FILE COPY PannitNo. DIA , I Plan review approval Is ad4scit) einws and omons. Approval of construction &sands does not Whale the violation of any a1ophx1 code or onSnance. of approved Copy Is rin Data k, zz;,./i• KEY PLAN City OfildcwNa WILDING DMSION 2ND FLOOR EXITING DIAGRAM INCOMPLETE • • • • . .,! • . ' • sz".'&• . , • ..: ON IVED 011 CENTER 21-4- -r. -'••• - CODE REVIEWED FOR COMPLIANCE iv;A.i' 1 Cl1il (City ofTukwila BuflN RECEIVED MAR 08 2011 PERMIT CENTER 1 Door Detail TYPE C: 1 -3/4" SOLID CORE WOOD DOOR w/8 "x48" 1/4" CLEAR TEMPERED LITE, PL -1 FINISH Pull Down Lever Door Hardware TYPE SINGLE DOOR FRAME Window Detail 0' -5" 2' - 4" 3' -4" 5' -0" Paint Grade Wood Frame, 1/8" clear glass Wall Detail 2 "x4" Brace at 45 degree angle - every 8' 2 "x4" top plate 2 "x4" - 2' -0" O.0 Studs ICSREVIEWED FOR DE COMPLIANCE aDD IVV® City of Tukwila BUILDING DIVV ()pj 1/2" GWB Each Side 2 "x4" pressure treated bottm plate To slab with 1/8 DIA. 3/4" MIN. Pentrate 2' - 0" O.0 RECEIVED MAR 08 2011 PERMIT CENTER v City of Tukwila • Jim Haggerton, Mayor Department of Community Development Jack Pace, Director February 11, 2011 Charlie Dees International Academy of Design & Technology 645 Andover Pk W Tukwila, WA 98188 RE: Incomplete Letter #1 Development Permit Application D11 -031 International Academy of Design & Technology — 645 Andover Pk W Dear Mr. Dees, This letter is to inform you that your permit application received at the City of Tukwila Permit Center on February 8, 2011 is determined to be incomplete. Before your application can continue the plan review process the attached/following items from the following department(s) need(s) to be addressed: Building Department: Allen Johannessen at 206 433 -7163 if you have any questions concerning the attached comments. Please address the comment above in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Bill Rambo Perniit Technician Enclosures File: D11 -031 W:\Permit Center\lncomplete Letters \2011\D11 -031 Incomplete Ltr # 1.DOC 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Tukwila Building Division Allen Johannessen, Plan Examiner Determination of Completeness Memo Date: February 10, 2011 Project Name: International Academy of Design Permit #: D11 -031 Plan Review: Allen Johannessen, Plans Examiner The Building Division has deemed the subject permit application incomplete. To assist the applicant in expediting the Department plan review process, please forward the following comments. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. Provide on the plan (or cover sheet) more specifics about the building type, sprinkled or not and identify names or use of the surrounding spaces including the new space being created. If sprinkled show location of sprinklers. 2. Proposed and existing design is reversed making it confusing to compare. Please cloud the area of work and show side to side views. 3. Provide a reflective ceiling plan and show an elevation cut view providing specific detailed information about the ceiling, wall construction (type of materials proposed) and a specific detail to show how the wall bracing is attached at the top of wall and underside of the roof framing. 4. Provide specific information about the glazing and doors with specifications for the door hardware. 5. Provide a reflective ceiling plan for alterations to the ceiling. Show lighting revisions and provisions for air or ventilation with any alterations for mechanical ventilation. Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. PE T PLAN REVIEW • ING SLIP ACTIVITY NUMBER: D11 -031 DATE: 03 -08 -11 PROJECT NAME: INTERNATIONAL ACADEMY OF DESIGN SITE ADDRESS: 645 ANDOVER PK W Original Plan Submittal X Response to Incomplete Letter # 1 Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Building Division Buildin Public Works ❑ Fire Prevention Structural n Planning Division n ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete n DUE DATE: 03-10-11 Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: n No further Review Required DATE: n APPROVALS OR CORRECTIONS: DUE DATE: 04 -07 -11 Approved ❑ Approved with Conditions rg Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 • • PLAN EVIEW /ROUTING SLIP ACTIVITY NUMBER: D11 -031 DATE: 02 -08 -11 PROJECT NAME: INTERNATIONAL ACADEMY OF DESIGN SITE ADDRESS: 645 ANDOVER PK W X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTME TS: dew AVA 2- _t 4I uiIding Division Fire Pre ention A),A W' o fk Structural ❑ A >11-111D-1/1 Planning ivision eme Permit Coordinator fI DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete n Incomplete DUE DATE: 02-10-11 Not Applicable Comments: Permit Center' Use .Only INCOMPLETE LETTER MAILED: 2 t1 LETTER OF COMPLETENESS MAi ED: Departments determined incomplete: Bldg PW Fire ❑ Ping ❑ ❑ Staff Initials: ��/" // TUES/THURS ROUTING: Please Route ❑ Structural Review Required n No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 03-10-11 Approved Approved with Conditions n Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Web site: http: / /www.ci.tukwila.wa.us REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: ? - , ._ , () (, l Plan Check/Permit Number: Response to Incomplete Letter # ❑ Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: e, t'lo i.,-3 ( c(16 ocnA �� /) tJ ri t A � f �(�VL.J(()' - -� Project Address: 4' L( ,r A{�l/ ki—et 1PQG "(Y Lc/ .e.1 /- Contact Person: CAQ (r ((•e 't?,(2Jj Phone Number: '? O�i i7 3C) C3( 7 Summary of Revision: nL)O C t,/ u /0/1 EC evoFTtntwaA MAR 08 2011 PERMnr CENTER Sheet Number(s): "Cloud" or highlight all areas of revision including date of rev'sio Received at the City of Tukwila Permit Center by: Entered in Permits Plus on 51 —( 1 H:\Applicattons\Fonns- Applications On Line \2010 Applications \7 -2010 - Revision Submittal.doc Created: 8-13-2004 Revised: 7 -2010 • CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -367o FAX (206) 431 -3665 E -mail: tukplan(cr�ci.tukwila.wa.us Permit Center /Building Division 206 431 -367o Public Works Department 206 433 -0179 Planning Division 206 431 -367o AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION STATE OF WASHINGTON) ) ss. COUNTY OF KING ) Cl�av�l� �e lJ��s [please print name] , states as follows: PERMIT NO: cD l 03 1. I have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number _, and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. Owner /Owner'Q s Agent* Signed and sworn to before me this eIVI day of elovoot �- ,20 11 NOTARY PUBLIC in and for the State of Washington Residing at k -ev�fi, Name as commissioned: My commission expires: W , County 4�Vrnt(IV)I N.Mi11¢V 18.27.090 Exemptions. The regi.. on provisions of this chapter do not apply tip 1. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile /manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.70 RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction it only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; 10. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; 11. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; i6. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile /manufactured home dealer or manufacturer who subcontracts the installation, set -up, or repair work to actively registered contractors. This exemption only applies to the installation, set -up, or repair of the mobile /manufactured homes that were manufactured or sold by the mobile /manufactured home dealer or manufacturer; 18. An entity who holds a valid,elettifiliec tractor's license under chapter 19.28,ReW tha't etr oiy'S4 certified journeyman electrician, a certified residential'Wesialty electrician, or an electrical trainee meetingtQ,dm ' requirements of chapte x19.28 RCW to perform pl 4 bing work that is incidentally^, directly, and immediatel t, appropriate to the like -1 -kind replacemynt of 4ho1 appliance or other smal1►osehold ufllizati . n1e that requires limited elect pow and li ectir and /or water connections',d N' supervised by a certified ele plumbing work. ehold ment to st be mg • Per Washington State Department of Labor and Industries, lessee has been interpreted to be equivalent to owner for the purpose of these exemptions.