HomeMy WebLinkAboutPermit EL10-0948 - MICROSOFTMICROSOFT
3355 S 120 PL
EL1 0-0948
Parcel No.:
Address:
Tenant Name:
Cityt Tukwila
•
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Inspection Request Line: 206 - 431 -2451
Web site: http: / /www.ci.tukwila.wa.us
1023049082
3355 S 120 PL TUKW
MICROSOFT
ELECTRICAL PERMIT
Permit Number:
Issue Date:
Permit Expires On:
EL10 -0948
11/30/2010
05/29/2011
Owner:
Name: SABER CORPORATION
Address: 12201 TUKWILA INTL BLVD , 4TH FLOOR 98168
Contact Person:
Name: BRIAN SKINNER
Address: 5005 3 AV S , SEATTLE WA 98134
Contractor:
Name: MCKINSTRY ELECTRIC
Address: PO BOX 24567 , SEATTLE WA 98124
Contractor License No: MCKINE *982KG
Phone
Phone
Expiration Dat
: 206 - 832 -8403
: 206 832 -8513
e: 05/08/2012
DESCRIPTION OF WORK:
INSTALLATION OF (24) 3 PHASE 50A 208V BRANCH CIRCUITS AND RECEPTACLES. EACH
BRANCH WILL CONSIST OF (1) L15 -50 RECEPTACLE AND (1) #8 -3 (W / #10 GROUND) MC
CABLE. EACH CABINET WILL RECEIVE (4) 50A CIRCUITS.
Value of Electrical Work: NRES: $15,000.00 Fees Collected:
RES: $0.00
Type of Fire Protection: UNKNOWN
Electrical Service provided by: SEATTLE CITY LIGHT
Permit Center Authorized Signature:
I hereby certify that I have read and �xami \ed this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complieowithwhether specified herein or not.
$438.13
National Electrical Code Edition: 2008
Date: 1 1 1 970 6 i D
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the performance of work. I am authorized to sign and obtain this electrical permit and agree to the conditions on the back
of this permit.
Signature: � /�? ':`G "' Date: /7 - e0
Print Name.
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
doc: EL -9/09
ELI 0-0948 Printed: 11 -30 -2010
• •
PERMIT CONDITIONS
Permit No. EL 10 -0948
* *ELECTRICAL **
1: ** *ELECTRICAL * **
2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the
Electrical Inspector at each work site.
3: Approved plans shall be maintained at the construction site and shall be readily available to the
Electrical Inspector.
4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical
installations, Chapter 296 -46B WAC.
5: When any portion of the electrical installation is to be hidden from view by permanent placement of
parts of the building, such equipment shall not be concealed until it has been inspected and
approved by the Electrical Inspector.
6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval
of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction.
Permits or related documentation that presumes to grant this authority are therefore not valid.
7: Any change in the scope of work described by the electrical work permit shall require additional
work permits. Where approved plans have been issued, revisions to the plans and additional review
may be required.
doc: EL -9/09
ELI 0-0948 Printed: 11 -30 -2010
CITY OF TUKWILA
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
htto://www.ci.tukwila.wa.us
Electrical Permit No.
11-\ 0- 09 L
Project No.
(For office use only)
ELECTRICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION
Site Address: 3355 S. 120th PI
Tenant Name:
Microsoft
King Co Assessor's Tax No.:
Suite Number: 5,203 Floor:
New Tenant: ❑ Yes ® ..No
Property Owners Name: Sabey Corporation
Mailing Address: 12201 Tukwila International Blvd
Tukwila
City
WA
State
98188
Zip
°CONT Al- T.PERSON - Who do we contact when your permit is ready to be issued
Name: Brian Skinner
Mailing Address:
5005 3rd Ave S
E -Mail Address: Briansk @mckinstry.com
Day Telephone: (206) 832 -8403
Seattle WA 98134
City State Zip
Fax Number: (206) 832 -8514
ELECTRICAL CONTRACTOR INFORMATION
Company Name:
Mailing Address:
Contact Person:
McKinstry Electric
5005 3rd Ave S
Brian Skinner
E -Mail Address:
Briansk @mckinstry.com
Contractor Registration Number: MCKINE *982KG
Seattle
City
Day Telephone:
Fax Number:
WA 98134
State
(206) 832 -8403
(206) 832 -8514
Expiration Date: 05/08/2012
Zip
Valuation of Project (contractor's bid price): $ 15,000
Scope of Work (please provide detailed information): Installation of (24) 3 phase 50A 208v , branch circuits and receptaclfl
Each branch circuit will consist of (1) L15 -50 Receptacle and (1) #8 -3 (W/ #10 ground) MC Cable. Each cabinet will
receive (4) 50A circuits.
Will service be altered? ❑ Yes ® No Adding more than 50 amps? ❑ Yes ® No
Type of Use: Data Center
Type of work:
❑ New ❑ Addition ❑ Service Change ❑ Remodel ® Tenant Improvement
❑ Low Voltage ❑ Generator ❑ Fire Alarm ❑ Telecommunication ❑ Temporary Service
Property Served by:
❑ Puget Sound Energy
® Seattle City Light
H:\Applications\Fonns- Applications On Line \I -2009 - Electrical Permit Application.doc
bh
Page 1 of 2
RESIDENTIAL
NEW RESIDENTIAL SERVICE
❑ New single family dwellings
(including an attached garage)
❑ Garages, pools, spas and outbuildings
❑ Low voltage systems
(alarm, furnace thermostat)
$145.60
$78.00 ea
$57.00 ea
RESIDENTIAL REMODEL AND SERVICE CHANGES
❑ Service change or alteration $78.00
(no added/altered circuits)
❑ Service change with added/altered circuits $78.00
number of added circuits $11.00 ea
❑ Circuits added/altered without service change $52.00
(up to 5 circuits)
❑ Circuits added/altered without service change $52.00
(6 or more circuits) $7.30 ea
❑ Meter /mast repair $65.00
❑ Low voltage systems $57.00
(alarm, furnace thermostat)
PERMIT APPLICATION NOTES
MULTI- FAMILY AND COMMERCIAL
Fees are based on the valuation of the electrical contract.
MISCELLANEOUS FEES
❑ Temporary service (residential) $60.00
❑ Temporary service (generator) $75.00
❑ Manufactured/mobile home service $80.00
(excluding garage or outbuilding)
❑ Carnivals $75.00
Number of concessions $10.00 ea
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing
and justifiable cause demonstrated.
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR ELECTRICAL CONTRACTOR:
Signature: jam
Print Name:"----- chi✓ �i� /�/� /�L
Mailing Address: 5Z2J 5 4vt? . $
Date: / ///7 /o
Day Telephone: Z.06, - 83Z—SVO3
City
//4' 9�i3y
State Zip
Date Application Accepted: l t_ k l ( 0
Date Application Expires:
S -1 -7-1 1
Staff Initials:
H: Applications\Fonns- Applications On Lme \l -2009 - Electrical Permit Apphcanon.doc
bh
Page 2 of
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Fax: 206 - 431 -3665
Web site: http: / /www.ci.tukwila.wa.us
RECEIPT
Parcel No.: 1023049082 Permit Number: EL10 -0948
Address: 3355 S 120 PL TUKW Status: APPROVED
Suite No: Applied Date: 11 /17 /2010
Applicant: MICROSOFT Issue Date:
Receipt No.:
Initials:
User ID:
R10 -02392
JEM
1165
Payment Amount: $350.50
Payment Date: 11/30/2010 10:55 AM
Balance: $0.00
Payee: MCKINSTRY CO. SERVICE ACCOUNT
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Check 11200 350.50
Authorization No.
ACCOUNT ITEM LIST:
Description
Account Code Current Pmts
ELECTRICAL PERMIT - NONR
000.322.101.00.00 350.50
Total: $350.50
doc: Receiot -06 Printed: 11 -30 -2010
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http://www.ci.tulcwila.wa.us
Parcel No.: 1023049082
Address: 3355 S 120 PL TUKW
Suite No:
Applicant: MICROSOFT
RECEIPT
Permit Number: EL10 -0948
Status: - PENDING
Applied Date: 11/17/2010
Issue Date:
Receipt No.: R10 -02335
Initials:
User ID:
WER
1655
Payment Amount: $87.63
Payment Date: 11/17/2010 03:42 PM
Balance: $350.50
Payee: MCKINSTRY
TRANSACTION LIST:
Type Method Descriptio Amount
Payment . Check
Authorization No.
ACCOUNT ITEM LIST:
Description
11183 87.63
Account Code Current Pmts
ELECTRICAL PLAN - NONRES
000.345.832.00.00 87.63
Total: $87.63
doc: Receiot -06 Printed: 11 -17 -2010
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
kio-Nq\F
PERMIT NO. !
CITY OF TUKWILA BUILDING DIVISION YL
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project:
[-Lica c.)4 Fr
Type of Inspection:
X.--/00
Address: ��""
J��• f'� Le
Date Called:
Special Instructions:
Date Wanted:
g
/712-
m.
43
Requester:
/
Phone No:
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
1414,,
Inspector:
Date: /1/2?//0
n REINSPECTIdN FEE REQUIRED. Prior to next inspection. fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
• `i) F 1 A
PE L �,�. r R ini C Y
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: EL10 -0948 DATE: 11 -17 -10
PROJECT NAME: MICROSOFT
SITE ADDRESS: 3355 S 120 PL - SUITE 5203
X Original Plan Submittal Response to Incomplete Letter #
Response to Correction Letter #
Revision # After Permit Issued
DEPARTMENTS:
G korIldin Division
Public Works n
Fire Prevention
Structural
n
Planning Division
Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11-18-10
Complete
Comments:
Incomplete
n
Not Applicable ❑
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES/THURS ROUTING:
Please Route Structural Review Required ❑ No further Review Required ❑
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved n Approved with Conditions
Notation:
REVIEWER'S INITIALS:
DUE DATE: 12 -16 -10
Not Approved (attach comments) n
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents /routing slip.doc
2 -28 -02
Contractors or Tradespeople Pir Friendly Page
•
Electrical Contractor
A business licensed by Lai to contract electrical work within the scope of its specialty. Electrical
Contractors must maintain a surety bond or assignment of savings account. They also must have a
designated Electrical Administrator or Master Electrician who is a member of the firm or a full -time
supervisory employee.
Business and Licensing Information
Name
Phone
Address
Suite /Apt,
City
State
Zip
County
Business Type
MCKINSTRY ELECTRIC
2067623311
Po Box 24567
Seattle
WA
98124
King
Limited Liability Company
Parent Company FACILITY ELECTRICAL SRVCS LLC
UBI No.
Status
License No.
License Type
Effective Date
Expiration Date
Suspend Date
Specialty 1
Specialty 2
602198837
Active
MCKINE *982KG
Electrical Contractor
5/7/2002
5/8/2012
General
Unused
Master Electrician INFORMATION
License ZEHNER'962CJ
Name ZEHNER, RICK A
Status Active
Business Owner Information
Name
Role
Effective Date
Expiration Date
BLACK, STEPHEN
Partner /Member
05/07/2002
Bond Amount
ALLEN, DEAN C
Partner /Member
05/07/2002
929495258
MOORE, DOUGLAS J.
Partner /Member
05/07/2002
ELECTRICAL CITATION
TEPLICKY, J. WILLIAM
Partner /Member
05/07/2002
TRAVELERS CAS &
SURETY CO
Bond Information
Page 1 of 1
Bond
Bond Company Name
Bond Account Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Bond Amount
Received Date
2
WESTERN SURETY CO
929495258
05/04/2010
Until Cancelled
19.28.101 RCW
ELECTRICAL CITATION
$4,000.0004/05/2010
$150.00
1
TRAVELERS CAS &
SURETY CO
103737415
04/29/2002
Until Cancelled
05/04/2010
$4,000.0005/07/2002
Assignment of Savings Information No records found for the previous 6 year period
Insurance Information No records found for the previous 6 year period
Summons /Complaint Information Summons and Complaints are not filed with the department for this contractor type
Warrant Information Warrants are not filed with the department for this contractor type
Infractions /Citations Information
Infraction / Citation
Date
RCW Code
Type
Status
Violation Amount
ESWAT00252
5/11/2009
19.28.010 RCW
ELECTRICAL CITATION
Satisfied
$250.00
ESWAT00251
5/11/2009
19.28.101 RCW
ELECTRICAL CITATION
Satisfied
$150.00
https: // fortress .wa.gov /lni/bbip /Print.aspx 11/30/2010
PANEL NAME / NUMBER: VOLTAGE L -L: 208 PHASE: 3 IER (AMPS): 22,000
COI
P
','
TK5 /RPP -1 -8B `
„ .,.,•.
VOLTAGE L -N: WIRE: 3 BUS RATING (AMPS): 400
-
MAIN BREAKER: 400 AMPS ENCLOSURE: NEMA -1
MAIN LUG ONLY: AMPS MOUNTING: FLUSH
CKT
NO.
LOAD DESCRIPTION
LOAD CRITERIA
BKR
0
BKR
LOAD CRITERIA
LOAD DESCRIPTION
CKT
DEM
VA
AMPS
P
AMPS
P
VA
DEM
NO.
1
Scale Unit Compute 2E
1.0
4,533
50
3
A
B
C
50
3
4,533
1.0
Scale Unit Compute 2E -2
Rack 3W94S12
1.0
4,533
3
-1
4,533
1.0
4 C
5
Rack 3W94S12
1.0
4,533
4,533
1.0
lyll
7
SPARE
1.0
0
30
2
A
-
B
30
2
0
1.0
SPARE
8
9
SPARE
1.0
0
0
1.0
SPARE
10
11
DMX 2
2,034
50
3
C
A
B
50
3
2,034
1.0
DMX 2 -6
Rack 3W87S29 /BLK
12
1.0
2,034
13
-5
2,034
1.0
14
1.0
2,034
15
Rack 3W87S30/BLK
2,034
1.0
16
17
SPARE
1.0
0
30
2
C
A
30
2
0
1.0
SPARE
18
19
SPARE
1.0
0
0
1.0
SPARE
20
21
SPARE
1.0
0
50
3
B
C
50
3
0
1.0
SPARE
22
23
SPARE
1.0
0
0
1.0
SPARE
24
25
Scale Unit Compute. IX =1
1.0
4,533
50
.
3
A
B
C
50
.
3
4,533
1.0
"..
Scale unit Compute 2X 1
3W89S12 _ ,.,r ',
26
1.0
4,533
4,533
1.0
28
27
4,533
1.0
30
29
3W89S11
1.0
4,533
31
Scale Unit Compute 1X -2
1.0
4,533
,
° 50
3
A
B
C
.50
3
.4 ,533
,
1.0
Sca1en,Unit Compute 2X, 2
32
1.0
4,533
4,533
1.0
,' '�`.
3W89S12 . '•
34
33
".
4,533
1.0
36
-_39--
3W8.981-9-----7---- -�
1.0
4,533 533
_3_
SPRR'Iy i- i.�1.1:T�t !
1.0
0
A
0
1.0
SPARE
1° }
R:
1.0
0
30
2
B
C
30
2
0
1.0
SPARE itiZ V'
0
1.0
SPARE �Q�p
?�
SPARE
1.0
0
le nl�
PHASE A CONNECTED: 31,266 VA " A: 260.4 AMPS
I1L'9a,PHASE ET{
1�,_a__w _
of corstruction document
Violation of any adopted code c
d Cy
_.:%
�_� �""-
Electrical
.4Plumbing
Gas • ng
City of Tukwila
ill. r _ DIVISION
PHASE B CONNECTED: 31,266 VA PHASE B: 260.4 AMPS F�
PHASE C CONNECTED: 31,266 VA PHASE C: 260.4 AMPS
TOTAL CONNECTED: 94 kVA AT: 208 = 260.4 AMPS Approval
the
PHASE A DEMAND: 31,266 VA PHASE A: 260.4 AMPS ' O
PHASE B DEMAND: 31,266 VA PHASE B: 260.4 AMPS
111 iastry PHASE C DEMAND: 31,266 VA PHASE C: 260.4 AMPS
/
7 o /P
D . /1/6c'/G,
TOTAL DEMAND: 94 kVA AT: 208 = 260.4 AMPS
For Ito 01 Your Building
f
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOTE: Revisions will require a new plan submittal
and may include additional plan review fees. t
PLIO 014
:VIEWED I-UH
IIPLIANCE WITH
FPA70 -NEC
NUV 2 4 2010
ity of ila
.DING DIVISION
VED
NOV 17 2010
PERMIT CENTER
ECEIVED
NOV 17 2010
PERMIT CENTER
PANEL NAME / NUMBER:
VOLTAGE L -L:
VOLTAGE L -N:
MAIN BREAKER:
MAIN LUG ONLY:
208
PHASE: 3
WIRE: 3 BUS RATING
AMPS
AMPS
IER (AMPS): 22,000
•
TKrJ RPP = 7:- 6B
...:
(AMPS) : 400
400
ENCLOSURE: NEMA -1
MOUNTING: FLUSH
CKT
NO.
LOAD DESCRIPTION
LOAD CRITERIA
BKR
0
BKR
LOAD CRITERIA
LOAD DESCRIPTION
CKT
DEM
VA
AMPS
P
AMPS
P
VA
DEM
NO.
1
Scale Unit Compute 1E -1
Rack 3W83S12
1.0
4,533
50
3
A
50
3
4,533
1.0
Scale Unit Compute 1E -2
Rack 3W83S12
2
3
1.0
4,533
B
4,533
1.0
4
5
1.0
4,533
C
4,533
1.0
6
7
SPARE
1.0
0
30
2
A
30
2
0
1.0
SPARE
8
9
SPARE
1.0
0
B
0
1.0
SPARE
10
'11
DMX 1 -5
Rack 3W82S30 /BLK
1.0
2,034
50
3
C
50
3
2,034
1.0
DMX 1 -6
Rack 3W82S29 /BLK
12
13
1.0
2,034
A
2,034
1.0
14
15
1.0
2,034
B
2,034
1.0
16
17
SPARE
1.0
0
30
2
C
30
2
0
1.0
SPARE
18
19
SPARE
1.0
0
A
0
1.0
SPARE
20
21
SPARE
1.0
0
30
2
B
30
2
0
1.0
SPARE
22
23
SPARE
1.0
0
-
C
0
1.0
SPARE
24
25
Seale Unit Compute.
3X ,
.
, :, g
1.0
4,533
50.
3
A
50
3
4,533
1.0
:°- �` 7 ° }%...c t ",
g f 'I �CRr �
�. t rtr m
3 �S * j'
1r a „.
26
27
3W89S13 :
1.0
4,533
---
B
4,533
1.0
28
29
1.0
4,533
C
4,533
1.0
30
31
Scale Unit Compute 3X 2:
a
3W89S13
1.0
4 533
50
3
A
50
`3
4,533
1.0
a
d
did C t., r r,
`��*t�
"
33
1.0
4,533
-
B
4,533
1.0
�u
34
r b
35
1.0
4,533
C
4,533
1.0
rz. }} ,szw ,. Via.
-_. '6d1�.0 �.. Ye4,,yrg4
36
37
SPARE
1.0
0
30
2
A
30
2
0
1.0
SPARE
38
39
SPARE
1.0
0
B
0
1.0
SPARE
40
41
SPARE
1.0
0
20
1
C
20
1
0
1.0
SPARE
42
PHASE A CONNECTED:
PHASE B CONNECTED:
PHASE C CONNECTED:
TOTAL CONNECTED:
PHASE A DEMAND:
PHASE B DEMAND:
Mc ,nstry PHASE TOTAL DEMAND:
For IA- He Of roar Building
31,266
VA
VA
VA
kVA AT:
VA
VA
kVA AT:
PHASE
PHASE
PHASE
208
A:
8:
C:
=
A:
B:
=
260.4
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
GENERAL NOTES:
1.
31,266
260.4
31,266
260.4
94
260.4
31,266
PHASE
PHASE
208E
260.4
31,266
260.4
31,266
260:4
94
260.4
ECEIVED
NOV 17 2010
PERMIT CENTER
ECEIVED
OV 17 2010
PERMIT CENTER
PANEL NAME / NUMBER:
VOLTAGE L -L:
VOLTAGE L -N:
MAIN BREAKER:
MAIN LUG ONLY:
208
PHASE: 3
WIRE: 3 BUS RATING
AMPS '
AMPS
IER (AMPS): 22,000
TKGJRPP % 4B
(AMPS): 400
400
ENCLOSURE: NEMA -1
MOUNTING: FLUSH
CKT
NO.
LOAD DESCRIPTION
LOAD CRITERIA
BKR
0
BKR
LOAD CRITERIA
LOAD DESCRIPTION
CKT
DEM
VA
AMPS
P
AMPS
P
VA
DEM
N0.
1
Scale Unit Compute 1F -1
Rack 3W83S11
1.0
4,533
50
3
A
50
3
4,533
1.0
Scale Unit Compute 1F -2
Rack 3W83S11
2
3
1.0
4,533
---
B
4,533
1.0
4
5
1.0
4,533
C
4,533
1.0
6
7
SPARE
1.0
0
30
2
A
30
2
0
1.0
SPARE
8
9
SPARE
1.0
0
B
0
1.0
SPARE
10
11
DMX 1 -7
Rack 3W82S28 /BLK
1.0
2,034
50
3
C
50
3
2,034
1.0
DMX 1 -9
Rack 3W82S25 /BLK
12
13
1.0
2,034
A
2,034
1.0
14
15
1.0
2,034
8
2,034
1.0
16
17
SPARE
1.0
0
30
2
C
30
2
0
1.0
SPARE
18
19
SPARE
1.0
0
--
A
0
1.0
SPARE
20
21
DMX 1 -8
Rack 3W82S26/BLK
1.0
2,034
50
3
8
30
2
0
1.0
SPARE
22
23
1.0
2,034
C
0
1.0
SPARE
24
25
1.0
2,034
A
30
2
0
1.0
SPARE
26
27
SPARE
1.0
0
30
2
B
0
1.0
SPARE
28
29
SPARE
1.0
0
C
0
1.0
SPARE
30
31
SPARE
1.0
0
30
2
A
50
3
4,533
1.0
- .
Scu1e Unit Compute 5X i
Rac10W89S15 ::
32
33
SPARE
1.0
0
---
B
4,533
1.0
34
35
SPARE
1.0
0
30
2
C
4,533
1.0
36
37
SPARE
1.0
0
A
'50 • '
3
4 533
'
1.0
"
Scale Unit Compute 5X *' 2
'71g � `
Rack 3W89,S15_ ", ..:>..i.•
38
39
SPARE
1.0
0
30
2
B
4,533
1.0
40
41
SPARE
'1.0
0
C
4,533
1.0
42
PHASE A CONNECTED:
PHASE B CONNECTED:
PHASE C CONNECTED:
TOTAL CONNECTED:
PHASE A DEMAND:
PHASE B DEMAND:
Mc iinstry PHASE C DEMAND:
TOTAL DEMAND:
For Th: Ile of Tber Balding
24,234
VA
VA
VA
kVA AT:
VA
VA
kVA AT:
PHASE
PHASE
PHASE
208
A:
B:
C:
=
A:
B:
=
201.8
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
GENERAL NOTES:
1.
24,234
201.8
24,234
201.8
73
201.8
24,234
PHASE
PHASE
PHASE 208
201.8
24,234
201.8
24,234
201.8
73
201.8
ECEIVED
OV 17 2010
PERMIT CENTER
CEIVED
NOV 17 2010
PERMIT CENTER
PANEL NAME / NUMBER:
VOLTAGE L -L:
VOLTAGE L -N:
MAIN BREAKER:
MAIN LUG ONLY:
208
PHASE: 3
WIRE: 3 BUS RATING
AMPS
AMPS
IER (AMPS): 22,000
TK5 -RPP 7 y86
,.
(AMPS): 400
400
ENCLOSURE: NEMA -1
MOUNTING: FLUSH
CKT
NO.
LOAD DESCRIPTION
LOAD CRITERIA
BKR
0
BKR
LOAD CRITERIA
LOAD DESCRIPTION
CKT
DEM
VA
AMPS
P
AMPS
P
VA
DEM
NO.
1
Scale Unit Compute 2F -1
Rack 3W94S11 4
1.0
4,533
50
3
A
50
3
4,533
1.0
Scale Unit Compute 2F -2
Rack 3W94S11
2
3
1.0
4,533
B
4,533
1.0
4
5
1.0
4,533
C
4,533
1.0
6
7
SPARE
1.0
0
30
2
A
30
2
0
1.0
SPARE
8
9
SPARE
1.0
0
B
0
1.0
SPARE
10
11
DMX 2 -7
Rack 3W87S28 /BLK
1.0
2,034
50
3
C
50
3
2,034
1.0
DMX 2 -9
Rack 3W87S25/BLK
12
13
1.0
2,034
---
A
2,034
1.0
14
15
1.0
2,034
B
2,034
1.0
16
17
SPARE
1.0
0
30
2
C
30
2
0
1.0
SPARE
18
19
SPARE
1.0
0
-
A
0
1.0
SPARE
20
21
DMX 2 -8
Rack 3W87S26/BLK
1.0
2,034
50
3
B
50
3
0
1.0
SPARE
22
23
1.0
2,034
C
0
1.0
SPARE
24
25
1.0
2,034
A
0
1.0
SPARE
26
27
SPARE
1.0
0
30
2
B
30
2
0
1.0
SPARE
28
29
SPARE
1.0
0
C
0
1.0
SPARE
30
31
SPARE
1.0
0
30
2
A
50
3
4,533
1.0
Scale
Rack 3W89516
32
33
SPARE
1.0
0
B
4,533
1.0
Unit Compute 6X -1
34
35
SPARE
1.0
0
30
2
C
4,533
1.0
36
37
SPARE
1.0
0
A
50
3
4,533
1.0
Scale
Unit Compute 6X; -2'
38
39
SPARE
1.0
0
30
2
B
4,533
1.0
40
41
SPARE
-
C
4,533
Rack.•3W89S16
42
PHASE A CONNECTED:
PHASE B CONNECTED:
PHASE C CONNECTED:
TOTAL CONNECTED:
PHASE A DEMAND:
PHASE B DEMAND:
Mc instry PHASE C DEMAND:
TOTAL DEMAND:
Far Th. Ite Ot ritur Building
24,234
VA
VA
VA
kVA AT:
VA
VA
VA
kVA AT:
PHASE
PHASE
PHASE
208
A:
B:
C:
=
A:
B:
C:
=
201.8
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
GENERAL NOTES:
1.
24,234
201.8
24,234
201.8
73
201.8
24,234
PHASE
PHASE
PHASE
208
201.8
24,234
201.8
24,234
201.8
73
201.8
CEIVED
NOV 17 2010
PERMIT CENTER
ECEIVED
NOV 17 2010
PERMIT CENTER
PANEL NAME / NUMBER:
VOLTAGE L -L:
VOLTAGE L -N:
MAIN BREAKER:
MAIN LUG ONLY:
208
PHASE: 3
WIRE: 4 BUS RATING
AMPS
AMPS
IER (AMPS): 22,000
TKrJ / RPP - 5 - 2B
120
(AMPS) : 400
400
ENCLOSURE: NEMA -1
MOUNTING: FLUSH
CKT
NO.
LOAD DESCRIPTION
LOAD CRITERIA
BKR
0
BKR
LOAD CRITERIA
LOAD DESCRIPTION
CKT
DEM
VA
AMPS
P
AMPS
P
VA
DEM
NO.
1
VMAX 13 -1
1.0
2,034
50
3
A
50
3
2,034
1.0
VMAX 13 -7
..
2
3
1.0
2,034
-
B
2,034
1.0
4
5
1.0
2,034
C
2,034
1.0
6
7
- - : .
VM 13
1.0
2,034
50
3
A
0
1.0
SPARE
8
9
-2
1.0
2,034
B
30
2
0
1.0
SPARE
10
11
1.0
2,034
C
0
1.0
SPARE
12
13
VMAX 13 -3
1.0
2,034
50
3
A
30
2
0
1.0
SPARE
14
15
1.0
2,034
B
0
1.0
SPARE
16
17
1.0
2,034
C
0
1.0
SPARE
18
19
VMAX 13 -4 Controller'
1.0
2,134
50 "
3
A
50
3
4,533
1.0
scale <Unit Compute7X 1
Rack 3W155S25'
20
21
1.0
2,134
-
B
4,533
1.0
22
23
1.0
2,134.
C
4,533
1.0
24
25
VMAX 13 -5
1.0
2,034
50
3
A
50
3
4,533
1.0
Scale Unit Compute A -2
Rack`3W155S25a
26
27
1.0
2,034
-
B
4,533
1.0
28
29
1.0
2,034
C
4,533
1.0
30
31
'. VMAX. 13 -6
1.0
2, 034
50:
3,
A
50
3
4, 533
1.0
', .. _ ` ¢.p ,,,. Sgt s. "'
Scale Unit Compute S 1 ` '
g.
Racky3W15025:
32
33
1.0
2,034
-
B
4,533
1.0
34
35
1.0
2,034
C
4,533
1.0
36
37
SPARE
1.0
0
30
2
A
50
3
4,533
1.0
a
Scale
Rack ,3W156S25
Unit Cothpute 8X2
i,,
38
39
SPARE
1.0
0
-
B
4,533
1.0
0
40
41
SPARE
1.0
0
20
1
C
4,533
` . •,, „
42
PHASE A CONNECTED:
PHASE B CONNECTED:
PHASE C CONNECTED:
TOTAL CONNECTED:
PHASE A DEMAND:
PHASE B DEMAND:
Mc instry PH
DEMAND:
Fat Th. 1e Ol InurBulidiag
32,470
VA
VA
VA
kVA AT:
VA
VA
kVA AT:
PHASE
PHASE
PHASE
208
A:
B:
C:
=
A:
B:
=
270.4
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
GENERAL NOTES:
1.
32,470
270.4
32,470
270.4
97
270.4
32,470
PHASE
PHASE
2 A8SE
270.4
32,470
270.4
32, 490
32,470
270.4
270.4
ECEIVED
NOV 17 2010
PERMIT CENTER
RECEIVED
NOV 17 2010
PERMIT CENTER
PANEL NAME / NUMBER:
VOLTAGE L -L:
VOLTAGE L -N:
MAIN BREAKER:
MAIN LUG ONLY:
208
PHASE: 3
WIRE: 3 BUS RATING
AMPS
AMPS
IER (AMPS): 22,000
TK5/.RPP =1. -8D `
(AMPS): 400
400
ENCLOSURE: NEMA -1
MOUNTING: FLUSH
CKT
NO.
LOAD DESCRIPTION
LOAD CRITERIA
BKR
0
BKR
LOAD CRITERIA
LOAD DESCRIPTION
CKT
DEM
VA
AMPS
P
AMPS
P
VA
DEM
NO.
1
Scale Unit Compute 2E -3
Rack 3W94S12
1.0
4,533
50
3
A
50
3
4,533
1.0
Scale Unit Compute 2E -4
Rack 3W94S12
2
3
1.0
4,533
B
4,533
1.0
4
5
1.0
4,533
C
4,533
1.0
6
7
SPARE
1.0
0
A
0
1.0
SPARE
8
9
SPARE
1.0
0
50
3
B
50
3
0
1.0
SPARE
10
11
DMX 2 5 R
Rack 3W87S30 /RED
1.0
2,034
C
2,034
1.0
DMX 2 -6 R
Rack 3W87S29 /RED
12
13
1.0
2,034
A
2,034
1.0
14
15
1.0
2,034
B
2,034
1.0
16
17
SPARE
1.0
0
30
2
C
30
2
0
1.0
SPARE
18
19
SPARE
1.0
0
A
0
1.0
SPARE
20
21
SPARE
1.0
0
30
2
B
30
2
0
1.0
SPARE
22
23
SPARE
1.0
0
C
0
1.0
SPARE
24
25
Scale Unit Compute 1X 3
3W89S11
1.0
4,533
,50
3
A
50 ..
3
4,533
1.0
3W89$12"
Scale Unit Compute-2X 3.
I" Px ' y
26
27
1.0
4,533
-
B
4 a 533
1.0
28
29
1.0
4,533
C
4,533
1.0
,
30
31
Scale Unit Compute 1X -4
!
3W89S.11
1.0
4,533
50
3
A
50
3
4,533
1.0
Scale UnitCompdte-2X = 4
,
3W89S12-, se" , " "_
32
33
1.0
4,533
---
B
4,533
1.0
34
35
1.0
4,533
C
4,533
1.0
36
37
SPARE
1.0
0
20
1
A
,30
2
0
1.0
SPARE
38
39
BCMS
1.0
200
15
2
B
0
1.0
SPARE
40
41
1.0
200
C
SPACE
42
PHASE A CONNECTED:
PHASE B CONNECTED:
PHASE C CONNECTED:
TOTAL CONNECTED:
PHASE A DEMAND:
PHASE B DEMAND:
Mc ,stry PHASE C DEMAND:
TOTAL DEMAND:
For Th He 01 Your Bulldleg
31,266
VA
VA
VA
kVA AT:
VA
VA,
VA
kVA AT:
PHASE
PHASE
PHASE
208
A:
B:
C:
=
A:
B:
C:
=
260.4
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
GENERAL NOTES:
1.
31,466
262.0
31,466
262.0
94
261.5
31,266
PHASE
PHASE
PHASE
208
260.4
31,466
262.0
31,466
262.0
94
261.5
RECEIVED
NOV 17 2010
PERMIT CENTER
VED
NOV 17 2010
PERMIT CENTER
PANEL NAME / NUMBER:
VOLTAGE L -L:
VOLTAGE L -N:
MAIN BREAKER:
MAIN LUG ONLY:
208
PHASE: 3
WIRE: 3 BUS RATING
AMPS
AMPS
IER (AMPS): 22,000
TK5 RPP'- % = GD
(AMPS) : 400
400
ENCLOSURE: NEMA -1
MOUNTING: FLUSH
CKT
NO.
LOAD DESCRIPTION
LOAD CRITERIA
BKR
0
BKR
LOAD CRITERIA
LOAD DESCRIPTION
CKT
DEM
VA
AMPS
P
AMPS
P
VA
DEM
NO.
1
Scale Unit Compute 1E -3
Rack 3W83S12
1.0
4,533
50
3
A
50
3
4,533
1.0
Scale Unit Compute 1E -4
Rack 3W83S12
2
3
1.0
4,533
8
4,533
1.0
4
5
1.0
4,533
C
4,533
1.0
6
7
SPARE
1.0
0
30
2
A
30
2
0
1.0
SPARE
8
9
SPARE
1.0
0
B
0
1.0
SPARE
10
11
DMX 1 -5 R
Rack 3W82S30 /RED
1.0
2,034
50
3
C
50
3
2,034
1.0
DMX 1 -6 R
Rack 3W82S29 /RED
12
13
1.0
2,034
A
2,034
1.0
14
15
1.0
2,034
B
2,034
1.0
16
17
SPARE
1.0
0
30
2
C
30
2
0
1.0
SPARE
18
19
SPARE
1.0
0
A
0
1.0
SPARE
20
21
SPARE
1.0
0
30
2
B
30
2
0
1.0
SPARE
SPARE
22
23
SPARE
1.0
0
C
0
1.0
24
25
Scale Unit Compute 3X . 3
> P
3W89313i... a ;.
1.0
4,533
50 . '
3
A
50
3
4,533
1.0
.,'I.
= a.�� a �k.. s c ar .
Cad
w I k + "r x `` a
x k ce ' ; � a ,
26
27
1.0
4, 533
_a��U111
B
4, 533
1.0
,
'3 " 9
28
29
1.0
4,533
C
4,533
1.0
30
31
Scale Unit Co�epute •3Xi: 4
3W89S13
1.0
4,533
-
50.
3
A
'50
3
4,533
1.0
' t mss ...
'3W W
7 . 1,
! . i : ° r 4
�`r „�FKr "�� s�'j * °',,°'
32
33
1.0
4,533
-
B
4,533
1.0
34
35
1.0
4,533
C
4,533
1.0
36
37
SPARE
1.0
0
20
1
A
30
2
0
1.0
SPARE
38
39
BCMS
1.0
200
15
2
B
0
1.0
SPARE
40
41
1.0
200
C
SPACE
42
PHASE A CONNECTED:
PHASE B CONNECTED:
PHASE C CONNECTED:
TOTAL CONNECTED:
PHASE A DEMAND:
PHASE B DEMAND:
Mc instry PHASE C DEMAND:
TOTAL DEMAND:
Forth a Ile Of Ibar gal►dlag
31,266
VA
VA
VA
kVA AT:
VA
VA
kVA AT:
PHASE
PHASE
PHASE
208
A:
B:
C:
=
A:
B:
=
260.4
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
GENERAL NOTES:
1.
^
31,466
262.0
31,466
262.0
94
261.5
31,266
PHASE
PHASE
2 8SE
260.4
31,466
262.0
31,466
262.0
94
261.5
VED
NOV 17 2010
PERMIT CENTER
:IVED
7 2010
PERMIT CENTER
PANEL NAME / NUMBER:
VOLTAGE L -L:
VOLTAGE L -N:
MAIN BREAKER:
MAIN LUG ONLY:
208
PHASE: 3
WIRE: 3 BUS RATING
AMPS
AMPS
IER (AMPS): 22,000
TK5J' RPP. % ,40
(AMPS) : 400
400
ENCLOSURE: NEMA -1
MOUNTING: FLUSH
CKT
NO.
LOAD DESCRIPTION
r
LOAD CRITERIA
BKR
0
BKR
LOAD CRITERIA
LOAD DESCRIPTION
CKT
DEM
VA
AMPS
P
AMPS
P
VA
DEM
NO.
1
Scale Unit Com ute iF -3
p
Rack 3W83S11
1.0
4,533
50
3
A
50
3
4,533
1.0
Scale Unit Compute 1F -4
Rack 3W83S11
2
3
1.0
4,533
B
4,533
1.0
4
5
1.0
4,533
C
4,533
1.0
6
7
SPARE
1.0
0
30
2
A
30
2
0
1.0
SPARE
8
9
SPARE
1.0
0
B
0
1.0
SPARE
10
11
DMX 1 -7 R
Rack 3W82S28 /RED
1.0
2,034
50
3
C
'50
3
2,034
1.0
DMX 1 9 R
Rack 3W82S25 /RED
12
13
1.0
2,034
A
2,034
1.0
14
15
1.0
2,034
B
2,034
1.0
16
17
SPARE
1.0
0
30
2
C
30
2
0
1.0
SPARE
18
19
SPARE
1.0
0
A
0
1.0
SPARE
20
21
DMX 1 -8 R
Rack 3W82S26 /RED
1.0
2,034
50
3
B
30
2
0
1.0
SPARE
22
23
1.0
2,034
C
0
1.0
SPARE
24
25
1.0
2,034
A
30
2
0
1.0
SPARE
26
27
SPARE
1.0
0
30
2
B
0
1.0
SPARE
28
29
SPARE
1.0
0
C
0
1.0
SPARE
30
31
SPARE
1.0
0
30
2
A
.
50
3
4,533
1.0a
Scale Unit Compute;SX 3
'
•
Ra2k.3W89Si5' y`, g
32
33
SPARE
1.0
0
-
B
4,533
1.0
34
35
SPARE
1.0
0
30
2
C
4,533
1.0
µ :
36
37
SPARE
1.0
0
A
50
3
4,533
1.0
z *•;:
Scale Unic Compute,? 5X 4 .
_ 1.
Rack .;3W89S15
n
°�°
` '
*
38
39
BCMS
1.0
200
15
2
B
4,533
1.0
40
41
1.0
200
C
4,533
1.0
42
PHASE A CONNECTED:
PHASE B CONNECTED:
PHASE C CONNECTED:
TOTAL CONNECTED:
PHASE A DEMAND:
PHASE B DEMAND:
Mct PHASE C DEMAND:
TOTAL DEMAND:
For Th : lle Of Your Bonding
24,434
VA
VA
VA
kVA AT:
VA
VA
VA
kVA AT:
PHASE
PHASE
PHASE
208
A:
B:
C:
=
A:
B:
C:
203.5
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
GENERAL NOTES:
1.
R E��
V
NM A1,
24,234
201.8
24,434
203.5
73
202.9
24,234
PHASE
PHASE
PHASE
208
201.8
24,434
203.5
24,434
203.5
73
202.9
:IVED
7 2010
PERMIT CENTER
ED
NOV 17 2010
PERMIT CENTER
PANEL NAME / NUMBER:
VOLTAGE L -L:
VOLTAGE L -N:
MAIN BREAKER:
MAIN LUG ONLY:
208
'PHASE: 3
WIRE: 3 BUS RATING
AMPS
AMPS
IER (AMPS): 22,000
TK5 ''RPP -.7 8D
(AMPS) : 400
400
ENCLOSURE: NEMA -1
MOUNTING: FLUSH
CKT
NO.
LOAD DESCRIPTION
LOAD CRITERIA'
BKR
0
BKR
LOAD CRITERIA
LOAD DESCRIPTION
CKT
DEM
VA
AMPS
P
AMPS
P
VA
DEM
NO.
1
Scale Unit Compute 2F -3
Rack 3W94S11
1.0
4,533
50
3
A
50
3
4,533
1.0
Scale Unit Compute 2F -4
Rack 3W94S11
2
3
1.0
4,533
---
B
4,533
1.0
4
5
1.0
4,533
C
4,533
1.0
6
7
SPARE
1.0
0
30
2
A
30
2
0
1.0
SPARE
8
9
SPARE
1.0
0
B
0
1.0
SPARE
10
11
DMX 2 -7 R
Rack 3W87S28 /RED
1.0
2,034
50
3
C
50
3
2,034
1.0
DMX 2 -9 R
Rack 3W87S25 /RED
12
13
1.0
2,034
A
2,034
1.0
14
15
1.0
2,034
B
2,034
1.0
16
17
SPARE
1.0
0
30
2
C
30
2
0
1.0
SPARE
18
19
SPARE
1.0
0
A
0
1.0
SPARE
20
21
DMX 2-8 R
Rack 3W87S26 /RED
1.0
2,034
50
3
B
50
3
0
1.0
SPARE
22
23
1.0
2,034
C
0
1.0
SPARE
24
25
1.0
2,034
A
0
1.0
SPARE
26
27
SPARE
1.0
0
30
2
B
30
2
0
1.0
SPARE
28
29
SPARE
1.0
0
C
0
1.0
SPARE
30
31
SPARE
1.0
0
30
2
A
50
3
4,533
1.0
Scale
Unit Compute. 6X -3
32
33
SPARE
1.0
0
---
B
4,533
1.0
34
35
SPARE
1.0
0
30
2
C
4,533
1.0
Rack 3W89S16
36
37
SPARE
1.0
0
A
: 50.
3'
4,533
1.0
Scale Unit Compute 6X -4.
'
Rack .'3W89S16 .
38
39
BCMS
1.0
200
15
2
B
4,533
1.0
40
41
1.0
200
C
4,533
1.0
42
PHASE A CONNECTED:
PHASE B CONNECTED:
PHASE C CONNECTED:
TOTAL CONNECTED:
PHASE A DEMAND:
PHASE B DEMAND:
Ilk =try PHASE C DEMAND:
TOTAL DEMAND:
For Th !M Or )bur BuidMg
24,234
VA
VA
VA
kVA AT:
VA
VA
VA
kVA AT:
PHASE
PHASE
PHASE
208
A:
B:
C:
=
A:
B:
C:
=
201.8
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
GENERAL NOTES:
1.
C EC E C i
24,434
203.5
24,434
203.5
73
202.9
24,234
PHASE
PHASE
PHASE
208
201.8
24,434
203.5
24,434
203.5
73
202.9
ED
NOV 17 2010
PERMIT CENTER
RECEIVE[
NOV 17 2010
PERMIT CENTEF
PANEL NAME / NUMBER:
VOLTAGE L -L:
VOLTAGE L -N:
MAIN BREAKER:
MAIN LUG ONLY:
208
PHASE: 3
WIRE: 4 BUS RATING
AMPS '
AMPS
IER (AMPS): 22,000
TK5/RPP -5-2D
120
(AMPS): 400
400
ENCLOSURE: NEMA -1
MOUNTING: FLUSH
CKT
NO.
LOAD DESCRIPTION
LOAD CRITERIA
BKR
0
BKR
LOAD CRITERIA
•
LOAD DESCRIPTION
CKT
DEM
VA
AMPS
P
AMPS
P
VA
DEM
NO.
1
VMAX 13 -1
1.0
2,034
50
:.
3
A
50
3
2,034
1.0
2
3
1.0
2,034
B
2,034
1.0
VMAX 13 -7
4
5
1.0
2,034
C
2,034
1.0
6
7
VMAX -13=2 . .
1.0
2,034
,.
50
3
A
0
1.0
SPARE
8
9
1.0
2,034
B
30
2
0
1.0
SPARE
10
11
1.0
2,034
C
0
1.0
SPARE
12
13
VMAX 13-3
�.
1 .0
2, 034
50
3
A
30
2
0
1.0
SPARE
14
15
1.0
2,034
B
0
1.0
SPARE
16
17
1.0
2,034
C
0
1.0
SPARE
18
19
.VMAX 13 -4" Controller :.
1.0
2,134
50
3
A
50
3
4,533
1.0
m..Aa.; C ,.0
Scale Unit: Compute'7X 3 `
Rack.;3055525
20
21
1.0
2,134.
-
B
4,533
1.0
22
23
1.0
2,134
C
4,533
1.0
24
25
VMAX 13 - 5
1.0
2,034
50
3
A
50
;
3
4,533
1.0
scale :Unit Compute 7X =4„
Rack=3W155325, �y;
26
27
1.0
2,034
---
B
4,533
1.0
28
29
1.0
2,034
C
4,533
1.0
30
31
' VMAX 13 ;',6
•
1.0
2, 034
..
b 50
;
3
A
. .: • ..
" 50
3
4, 533
1.0
q° Fz' 41. 1 -
Scale Unit 'Compute SX 3";
y " *
Rac0W156S25„
32
33
1.0
2,034
-
B
4,533
1.0
34
35
1.0
2,034
C
4,533
1.0
36
37
SPARE
1.0
0
20
15
1
2
A
H50,
3
4,533
1.0
-:•P ,-
Scale.
+;
Rack-; 3W158S25
-,-,,.
Unit a 4
38
39
BCMS
1.0
200
B
4,533
1.0
.Compute "
t i
40
41
1.0
200
-
C
4,533
1.0
;..wi. .
42
PHASE A CONNECTED:
PHASE B CONNECTED:
PHASE C CONNECTED:
TOTAL CONNECTED:
PHASE A DEMAND:
PHASE B DEMAND:
Mc instry PH TOTAL DEMAND:
For Th Ite Of Om BuIWIrtg
32,470
VA
VA
VA
kVA AT:
VA
VA
kVA AT:
PHASE
PHASE
PHASE
208
A:
B:
C:
=
A:
B:
_.
270.4
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
AMPS
GENERAL NOTES:
1.
32,670
272.0
32,670
272.0
98
271.5
32,470
PHASE
PHASE
P208 E
270.4
32,670
272.0
32,
272.0
•98
271.5
RECEIVE[
NOV 17 2010
PERMIT CENTEF