Loading...
HomeMy WebLinkAboutPermit EL10-0948 - MICROSOFTMICROSOFT 3355 S 120 PL EL1 0-0948 Parcel No.: Address: Tenant Name: Cityt Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.ci.tukwila.wa.us 1023049082 3355 S 120 PL TUKW MICROSOFT ELECTRICAL PERMIT Permit Number: Issue Date: Permit Expires On: EL10 -0948 11/30/2010 05/29/2011 Owner: Name: SABER CORPORATION Address: 12201 TUKWILA INTL BLVD , 4TH FLOOR 98168 Contact Person: Name: BRIAN SKINNER Address: 5005 3 AV S , SEATTLE WA 98134 Contractor: Name: MCKINSTRY ELECTRIC Address: PO BOX 24567 , SEATTLE WA 98124 Contractor License No: MCKINE *982KG Phone Phone Expiration Dat : 206 - 832 -8403 : 206 832 -8513 e: 05/08/2012 DESCRIPTION OF WORK: INSTALLATION OF (24) 3 PHASE 50A 208V BRANCH CIRCUITS AND RECEPTACLES. EACH BRANCH WILL CONSIST OF (1) L15 -50 RECEPTACLE AND (1) #8 -3 (W / #10 GROUND) MC CABLE. EACH CABINET WILL RECEIVE (4) 50A CIRCUITS. Value of Electrical Work: NRES: $15,000.00 Fees Collected: RES: $0.00 Type of Fire Protection: UNKNOWN Electrical Service provided by: SEATTLE CITY LIGHT Permit Center Authorized Signature: I hereby certify that I have read and �xami \ed this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complieowithwhether specified herein or not. $438.13 National Electrical Code Edition: 2008 Date: 1 1 1 970 6 i D The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this electrical permit and agree to the conditions on the back of this permit. Signature: � /�? ':`G "' Date: /7 - e0 Print Name. This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: EL -9/09 ELI 0-0948 Printed: 11 -30 -2010 • • PERMIT CONDITIONS Permit No. EL 10 -0948 * *ELECTRICAL ** 1: ** *ELECTRICAL * ** 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296 -46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. doc: EL -9/09 ELI 0-0948 Printed: 11 -30 -2010 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://www.ci.tukwila.wa.us Electrical Permit No. 11-\ 0- 09 L Project No. (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: 3355 S. 120th PI Tenant Name: Microsoft King Co Assessor's Tax No.: Suite Number: 5,203 Floor: New Tenant: ❑ Yes ® ..No Property Owners Name: Sabey Corporation Mailing Address: 12201 Tukwila International Blvd Tukwila City WA State 98188 Zip °CONT Al- T.PERSON - Who do we contact when your permit is ready to be issued Name: Brian Skinner Mailing Address: 5005 3rd Ave S E -Mail Address: Briansk @mckinstry.com Day Telephone: (206) 832 -8403 Seattle WA 98134 City State Zip Fax Number: (206) 832 -8514 ELECTRICAL CONTRACTOR INFORMATION Company Name: Mailing Address: Contact Person: McKinstry Electric 5005 3rd Ave S Brian Skinner E -Mail Address: Briansk @mckinstry.com Contractor Registration Number: MCKINE *982KG Seattle City Day Telephone: Fax Number: WA 98134 State (206) 832 -8403 (206) 832 -8514 Expiration Date: 05/08/2012 Zip Valuation of Project (contractor's bid price): $ 15,000 Scope of Work (please provide detailed information): Installation of (24) 3 phase 50A 208v , branch circuits and receptaclfl Each branch circuit will consist of (1) L15 -50 Receptacle and (1) #8 -3 (W/ #10 ground) MC Cable. Each cabinet will receive (4) 50A circuits. Will service be altered? ❑ Yes ® No Adding more than 50 amps? ❑ Yes ® No Type of Use: Data Center Type of work: ❑ New ❑ Addition ❑ Service Change ❑ Remodel ® Tenant Improvement ❑ Low Voltage ❑ Generator ❑ Fire Alarm ❑ Telecommunication ❑ Temporary Service Property Served by: ❑ Puget Sound Energy ® Seattle City Light H:\Applications\Fonns- Applications On Line \I -2009 - Electrical Permit Application.doc bh Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings (including an attached garage) ❑ Garages, pools, spas and outbuildings ❑ Low voltage systems (alarm, furnace thermostat) $145.60 $78.00 ea $57.00 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration $78.00 (no added/altered circuits) ❑ Service change with added/altered circuits $78.00 number of added circuits $11.00 ea ❑ Circuits added/altered without service change $52.00 (up to 5 circuits) ❑ Circuits added/altered without service change $52.00 (6 or more circuits) $7.30 ea ❑ Meter /mast repair $65.00 ❑ Low voltage systems $57.00 (alarm, furnace thermostat) PERMIT APPLICATION NOTES MULTI- FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) $60.00 ❑ Temporary service (generator) $75.00 ❑ Manufactured/mobile home service $80.00 (excluding garage or outbuilding) ❑ Carnivals $75.00 Number of concessions $10.00 ea Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: jam Print Name:"----- chi✓ �i� /�/� /�L Mailing Address: 5Z2J 5 4vt? . $ Date: / ///7 /o Day Telephone: Z.06, - 83Z—SVO3 City //4' 9�i3y State Zip Date Application Accepted: l t_ k l ( 0 Date Application Expires: S -1 -7-1 1 Staff Initials: H: Applications\Fonns- Applications On Lme \l -2009 - Electrical Permit Apphcanon.doc bh Page 2 of • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206 - 431 -3665 Web site: http: / /www.ci.tukwila.wa.us RECEIPT Parcel No.: 1023049082 Permit Number: EL10 -0948 Address: 3355 S 120 PL TUKW Status: APPROVED Suite No: Applied Date: 11 /17 /2010 Applicant: MICROSOFT Issue Date: Receipt No.: Initials: User ID: R10 -02392 JEM 1165 Payment Amount: $350.50 Payment Date: 11/30/2010 10:55 AM Balance: $0.00 Payee: MCKINSTRY CO. SERVICE ACCOUNT TRANSACTION LIST: Type Method Descriptio Amount Payment Check 11200 350.50 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.00 350.50 Total: $350.50 doc: Receiot -06 Printed: 11 -30 -2010 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http://www.ci.tulcwila.wa.us Parcel No.: 1023049082 Address: 3355 S 120 PL TUKW Suite No: Applicant: MICROSOFT RECEIPT Permit Number: EL10 -0948 Status: - PENDING Applied Date: 11/17/2010 Issue Date: Receipt No.: R10 -02335 Initials: User ID: WER 1655 Payment Amount: $87.63 Payment Date: 11/17/2010 03:42 PM Balance: $350.50 Payee: MCKINSTRY TRANSACTION LIST: Type Method Descriptio Amount Payment . Check Authorization No. ACCOUNT ITEM LIST: Description 11183 87.63 Account Code Current Pmts ELECTRICAL PLAN - NONRES 000.345.832.00.00 87.63 Total: $87.63 doc: Receiot -06 Printed: 11 -17 -2010 INSPECTION NO. INSPECTION RECORD Retain a copy with permit kio-Nq\F PERMIT NO. ! CITY OF TUKWILA BUILDING DIVISION YL 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: [-Lica c.)4 Fr Type of Inspection: X.--/00 Address: ��"" J��• f'� Le Date Called: Special Instructions: Date Wanted: g /712- m. 43 Requester: / Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: 1414,, Inspector: Date: /1/2?//0 n REINSPECTIdN FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. • `i) F 1 A PE L �,�. r R ini C Y PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: EL10 -0948 DATE: 11 -17 -10 PROJECT NAME: MICROSOFT SITE ADDRESS: 3355 S 120 PL - SUITE 5203 X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: G korIldin Division Public Works n Fire Prevention Structural n Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11-18-10 Complete Comments: Incomplete n Not Applicable ❑ Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 12 -16 -10 Not Approved (attach comments) n DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople Pir Friendly Page • Electrical Contractor A business licensed by Lai to contract electrical work within the scope of its specialty. Electrical Contractors must maintain a surety bond or assignment of savings account. They also must have a designated Electrical Administrator or Master Electrician who is a member of the firm or a full -time supervisory employee. Business and Licensing Information Name Phone Address Suite /Apt, City State Zip County Business Type MCKINSTRY ELECTRIC 2067623311 Po Box 24567 Seattle WA 98124 King Limited Liability Company Parent Company FACILITY ELECTRICAL SRVCS LLC UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Specialty 1 Specialty 2 602198837 Active MCKINE *982KG Electrical Contractor 5/7/2002 5/8/2012 General Unused Master Electrician INFORMATION License ZEHNER'962CJ Name ZEHNER, RICK A Status Active Business Owner Information Name Role Effective Date Expiration Date BLACK, STEPHEN Partner /Member 05/07/2002 Bond Amount ALLEN, DEAN C Partner /Member 05/07/2002 929495258 MOORE, DOUGLAS J. Partner /Member 05/07/2002 ELECTRICAL CITATION TEPLICKY, J. WILLIAM Partner /Member 05/07/2002 TRAVELERS CAS & SURETY CO Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 2 WESTERN SURETY CO 929495258 05/04/2010 Until Cancelled 19.28.101 RCW ELECTRICAL CITATION $4,000.0004/05/2010 $150.00 1 TRAVELERS CAS & SURETY CO 103737415 04/29/2002 Until Cancelled 05/04/2010 $4,000.0005/07/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information No records found for the previous 6 year period Summons /Complaint Information Summons and Complaints are not filed with the department for this contractor type Warrant Information Warrants are not filed with the department for this contractor type Infractions /Citations Information Infraction / Citation Date RCW Code Type Status Violation Amount ESWAT00252 5/11/2009 19.28.010 RCW ELECTRICAL CITATION Satisfied $250.00 ESWAT00251 5/11/2009 19.28.101 RCW ELECTRICAL CITATION Satisfied $150.00 https: // fortress .wa.gov /lni/bbip /Print.aspx 11/30/2010 PANEL NAME / NUMBER: VOLTAGE L -L: 208 PHASE: 3 IER (AMPS): 22,000 COI P ',' TK5 /RPP -1 -8B ` „ .,.,•. VOLTAGE L -N: WIRE: 3 BUS RATING (AMPS): 400 - MAIN BREAKER: 400 AMPS ENCLOSURE: NEMA -1 MAIN LUG ONLY: AMPS MOUNTING: FLUSH CKT NO. LOAD DESCRIPTION LOAD CRITERIA BKR 0 BKR LOAD CRITERIA LOAD DESCRIPTION CKT DEM VA AMPS P AMPS P VA DEM NO. 1 Scale Unit Compute 2E 1.0 4,533 50 3 A B C 50 3 4,533 1.0 Scale Unit Compute 2E -2 Rack 3W94S12 1.0 4,533 3 -1 4,533 1.0 4 C 5 Rack 3W94S12 1.0 4,533 4,533 1.0 lyll 7 SPARE 1.0 0 30 2 A - B 30 2 0 1.0 SPARE 8 9 SPARE 1.0 0 0 1.0 SPARE 10 11 DMX 2 2,034 50 3 C A B 50 3 2,034 1.0 DMX 2 -6 Rack 3W87S29 /BLK 12 1.0 2,034 13 -5 2,034 1.0 14 1.0 2,034 15 Rack 3W87S30/BLK 2,034 1.0 16 17 SPARE 1.0 0 30 2 C A 30 2 0 1.0 SPARE 18 19 SPARE 1.0 0 0 1.0 SPARE 20 21 SPARE 1.0 0 50 3 B C 50 3 0 1.0 SPARE 22 23 SPARE 1.0 0 0 1.0 SPARE 24 25 Scale Unit Compute. IX =1 1.0 4,533 50 . 3 A B C 50 . 3 4,533 1.0 ".. Scale unit Compute 2X 1 3W89S12 _ ,.,r ', 26 1.0 4,533 4,533 1.0 28 27 4,533 1.0 30 29 3W89S11 1.0 4,533 31 Scale Unit Compute 1X -2 1.0 4,533 , ° 50 3 A B C .50 3 .4 ,533 , 1.0 Sca1en,Unit Compute 2X, 2 32 1.0 4,533 4,533 1.0 ,' '�`. 3W89S12 . '• 34 33 ". 4,533 1.0 36 -_39-- 3W8.981-9-----7---- -� 1.0 4,533 533 _3_ SPRR'Iy i- i.�1.1:T�t ! 1.0 0 A 0 1.0 SPARE 1° } R: 1.0 0 30 2 B C 30 2 0 1.0 SPARE itiZ V' 0 1.0 SPARE �Q�p ?� SPARE 1.0 0 le nl� PHASE A CONNECTED: 31,266 VA " A: 260.4 AMPS I1L'9a,PHASE ET{ 1�,_a__w _ of corstruction document Violation of any adopted code c d Cy _.:% �_� �""- Electrical .4Plumbing Gas • ng City of Tukwila ill. r _ DIVISION PHASE B CONNECTED: 31,266 VA PHASE B: 260.4 AMPS F� PHASE C CONNECTED: 31,266 VA PHASE C: 260.4 AMPS TOTAL CONNECTED: 94 kVA AT: 208 = 260.4 AMPS Approval the PHASE A DEMAND: 31,266 VA PHASE A: 260.4 AMPS ' O PHASE B DEMAND: 31,266 VA PHASE B: 260.4 AMPS 111 iastry PHASE C DEMAND: 31,266 VA PHASE C: 260.4 AMPS / 7 o /P D . /1/6c'/G, TOTAL DEMAND: 94 kVA AT: 208 = 260.4 AMPS For Ito 01 Your Building f REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. t PLIO 014 :VIEWED I-UH IIPLIANCE WITH FPA70 -NEC NUV 2 4 2010 ity of ila .DING DIVISION VED NOV 17 2010 PERMIT CENTER ECEIVED NOV 17 2010 PERMIT CENTER PANEL NAME / NUMBER: VOLTAGE L -L: VOLTAGE L -N: MAIN BREAKER: MAIN LUG ONLY: 208 PHASE: 3 WIRE: 3 BUS RATING AMPS AMPS IER (AMPS): 22,000 • TKrJ RPP = 7:- 6B ...: (AMPS) : 400 400 ENCLOSURE: NEMA -1 MOUNTING: FLUSH CKT NO. LOAD DESCRIPTION LOAD CRITERIA BKR 0 BKR LOAD CRITERIA LOAD DESCRIPTION CKT DEM VA AMPS P AMPS P VA DEM NO. 1 Scale Unit Compute 1E -1 Rack 3W83S12 1.0 4,533 50 3 A 50 3 4,533 1.0 Scale Unit Compute 1E -2 Rack 3W83S12 2 3 1.0 4,533 B 4,533 1.0 4 5 1.0 4,533 C 4,533 1.0 6 7 SPARE 1.0 0 30 2 A 30 2 0 1.0 SPARE 8 9 SPARE 1.0 0 B 0 1.0 SPARE 10 '11 DMX 1 -5 Rack 3W82S30 /BLK 1.0 2,034 50 3 C 50 3 2,034 1.0 DMX 1 -6 Rack 3W82S29 /BLK 12 13 1.0 2,034 A 2,034 1.0 14 15 1.0 2,034 B 2,034 1.0 16 17 SPARE 1.0 0 30 2 C 30 2 0 1.0 SPARE 18 19 SPARE 1.0 0 A 0 1.0 SPARE 20 21 SPARE 1.0 0 30 2 B 30 2 0 1.0 SPARE 22 23 SPARE 1.0 0 - C 0 1.0 SPARE 24 25 Seale Unit Compute. 3X , . , :, g 1.0 4,533 50. 3 A 50 3 4,533 1.0 :°- �` 7 ° }%...c t ", g f 'I �CRr � �. t rtr m 3 �S * j' 1r a „. 26 27 3W89S13 : 1.0 4,533 --- B 4,533 1.0 28 29 1.0 4,533 C 4,533 1.0 30 31 Scale Unit Compute 3X 2: a 3W89S13 1.0 4 533 50 3 A 50 `3 4,533 1.0 a d did C t., r r, `��*t� " 33 1.0 4,533 - B 4,533 1.0 �u 34 r b 35 1.0 4,533 C 4,533 1.0 rz. }} ,szw ,. Via. -_. '6d1�.0 �.. Ye4,,yrg4 36 37 SPARE 1.0 0 30 2 A 30 2 0 1.0 SPARE 38 39 SPARE 1.0 0 B 0 1.0 SPARE 40 41 SPARE 1.0 0 20 1 C 20 1 0 1.0 SPARE 42 PHASE A CONNECTED: PHASE B CONNECTED: PHASE C CONNECTED: TOTAL CONNECTED: PHASE A DEMAND: PHASE B DEMAND: Mc ,nstry PHASE TOTAL DEMAND: For IA- He Of roar Building 31,266 VA VA VA kVA AT: VA VA kVA AT: PHASE PHASE PHASE 208 A: 8: C: = A: B: = 260.4 AMPS AMPS AMPS AMPS AMPS AMPS AMPS AMPS GENERAL NOTES: 1. 31,266 260.4 31,266 260.4 94 260.4 31,266 PHASE PHASE 208E 260.4 31,266 260.4 31,266 260:4 94 260.4 ECEIVED NOV 17 2010 PERMIT CENTER ECEIVED OV 17 2010 PERMIT CENTER PANEL NAME / NUMBER: VOLTAGE L -L: VOLTAGE L -N: MAIN BREAKER: MAIN LUG ONLY: 208 PHASE: 3 WIRE: 3 BUS RATING AMPS ' AMPS IER (AMPS): 22,000 TKGJRPP % 4B (AMPS): 400 400 ENCLOSURE: NEMA -1 MOUNTING: FLUSH CKT NO. LOAD DESCRIPTION LOAD CRITERIA BKR 0 BKR LOAD CRITERIA LOAD DESCRIPTION CKT DEM VA AMPS P AMPS P VA DEM N0. 1 Scale Unit Compute 1F -1 Rack 3W83S11 1.0 4,533 50 3 A 50 3 4,533 1.0 Scale Unit Compute 1F -2 Rack 3W83S11 2 3 1.0 4,533 --- B 4,533 1.0 4 5 1.0 4,533 C 4,533 1.0 6 7 SPARE 1.0 0 30 2 A 30 2 0 1.0 SPARE 8 9 SPARE 1.0 0 B 0 1.0 SPARE 10 11 DMX 1 -7 Rack 3W82S28 /BLK 1.0 2,034 50 3 C 50 3 2,034 1.0 DMX 1 -9 Rack 3W82S25 /BLK 12 13 1.0 2,034 A 2,034 1.0 14 15 1.0 2,034 8 2,034 1.0 16 17 SPARE 1.0 0 30 2 C 30 2 0 1.0 SPARE 18 19 SPARE 1.0 0 -- A 0 1.0 SPARE 20 21 DMX 1 -8 Rack 3W82S26/BLK 1.0 2,034 50 3 8 30 2 0 1.0 SPARE 22 23 1.0 2,034 C 0 1.0 SPARE 24 25 1.0 2,034 A 30 2 0 1.0 SPARE 26 27 SPARE 1.0 0 30 2 B 0 1.0 SPARE 28 29 SPARE 1.0 0 C 0 1.0 SPARE 30 31 SPARE 1.0 0 30 2 A 50 3 4,533 1.0 - . Scu1e Unit Compute 5X i Rac10W89S15 :: 32 33 SPARE 1.0 0 --- B 4,533 1.0 34 35 SPARE 1.0 0 30 2 C 4,533 1.0 36 37 SPARE 1.0 0 A '50 • ' 3 4 533 ' 1.0 " Scale Unit Compute 5X *' 2 '71g � ` Rack 3W89,S15_ ", ..:>..i.• 38 39 SPARE 1.0 0 30 2 B 4,533 1.0 40 41 SPARE '1.0 0 C 4,533 1.0 42 PHASE A CONNECTED: PHASE B CONNECTED: PHASE C CONNECTED: TOTAL CONNECTED: PHASE A DEMAND: PHASE B DEMAND: Mc iinstry PHASE C DEMAND: TOTAL DEMAND: For Th: Ile of Tber Balding 24,234 VA VA VA kVA AT: VA VA kVA AT: PHASE PHASE PHASE 208 A: B: C: = A: B: = 201.8 AMPS AMPS AMPS AMPS AMPS AMPS AMPS AMPS GENERAL NOTES: 1. 24,234 201.8 24,234 201.8 73 201.8 24,234 PHASE PHASE PHASE 208 201.8 24,234 201.8 24,234 201.8 73 201.8 ECEIVED OV 17 2010 PERMIT CENTER CEIVED NOV 17 2010 PERMIT CENTER PANEL NAME / NUMBER: VOLTAGE L -L: VOLTAGE L -N: MAIN BREAKER: MAIN LUG ONLY: 208 PHASE: 3 WIRE: 3 BUS RATING AMPS AMPS IER (AMPS): 22,000 TK5 -RPP 7 y86 ,. (AMPS): 400 400 ENCLOSURE: NEMA -1 MOUNTING: FLUSH CKT NO. LOAD DESCRIPTION LOAD CRITERIA BKR 0 BKR LOAD CRITERIA LOAD DESCRIPTION CKT DEM VA AMPS P AMPS P VA DEM NO. 1 Scale Unit Compute 2F -1 Rack 3W94S11 4 1.0 4,533 50 3 A 50 3 4,533 1.0 Scale Unit Compute 2F -2 Rack 3W94S11 2 3 1.0 4,533 B 4,533 1.0 4 5 1.0 4,533 C 4,533 1.0 6 7 SPARE 1.0 0 30 2 A 30 2 0 1.0 SPARE 8 9 SPARE 1.0 0 B 0 1.0 SPARE 10 11 DMX 2 -7 Rack 3W87S28 /BLK 1.0 2,034 50 3 C 50 3 2,034 1.0 DMX 2 -9 Rack 3W87S25/BLK 12 13 1.0 2,034 --- A 2,034 1.0 14 15 1.0 2,034 B 2,034 1.0 16 17 SPARE 1.0 0 30 2 C 30 2 0 1.0 SPARE 18 19 SPARE 1.0 0 - A 0 1.0 SPARE 20 21 DMX 2 -8 Rack 3W87S26/BLK 1.0 2,034 50 3 B 50 3 0 1.0 SPARE 22 23 1.0 2,034 C 0 1.0 SPARE 24 25 1.0 2,034 A 0 1.0 SPARE 26 27 SPARE 1.0 0 30 2 B 30 2 0 1.0 SPARE 28 29 SPARE 1.0 0 C 0 1.0 SPARE 30 31 SPARE 1.0 0 30 2 A 50 3 4,533 1.0 Scale Rack 3W89516 32 33 SPARE 1.0 0 B 4,533 1.0 Unit Compute 6X -1 34 35 SPARE 1.0 0 30 2 C 4,533 1.0 36 37 SPARE 1.0 0 A 50 3 4,533 1.0 Scale Unit Compute 6X; -2' 38 39 SPARE 1.0 0 30 2 B 4,533 1.0 40 41 SPARE - C 4,533 Rack.•3W89S16 42 PHASE A CONNECTED: PHASE B CONNECTED: PHASE C CONNECTED: TOTAL CONNECTED: PHASE A DEMAND: PHASE B DEMAND: Mc instry PHASE C DEMAND: TOTAL DEMAND: Far Th. Ite Ot ritur Building 24,234 VA VA VA kVA AT: VA VA VA kVA AT: PHASE PHASE PHASE 208 A: B: C: = A: B: C: = 201.8 AMPS AMPS AMPS AMPS AMPS AMPS AMPS AMPS GENERAL NOTES: 1. 24,234 201.8 24,234 201.8 73 201.8 24,234 PHASE PHASE PHASE 208 201.8 24,234 201.8 24,234 201.8 73 201.8 CEIVED NOV 17 2010 PERMIT CENTER ECEIVED NOV 17 2010 PERMIT CENTER PANEL NAME / NUMBER: VOLTAGE L -L: VOLTAGE L -N: MAIN BREAKER: MAIN LUG ONLY: 208 PHASE: 3 WIRE: 4 BUS RATING AMPS AMPS IER (AMPS): 22,000 TKrJ / RPP - 5 - 2B 120 (AMPS) : 400 400 ENCLOSURE: NEMA -1 MOUNTING: FLUSH CKT NO. LOAD DESCRIPTION LOAD CRITERIA BKR 0 BKR LOAD CRITERIA LOAD DESCRIPTION CKT DEM VA AMPS P AMPS P VA DEM NO. 1 VMAX 13 -1 1.0 2,034 50 3 A 50 3 2,034 1.0 VMAX 13 -7 .. 2 3 1.0 2,034 - B 2,034 1.0 4 5 1.0 2,034 C 2,034 1.0 6 7 - - : . VM 13 1.0 2,034 50 3 A 0 1.0 SPARE 8 9 -2 1.0 2,034 B 30 2 0 1.0 SPARE 10 11 1.0 2,034 C 0 1.0 SPARE 12 13 VMAX 13 -3 1.0 2,034 50 3 A 30 2 0 1.0 SPARE 14 15 1.0 2,034 B 0 1.0 SPARE 16 17 1.0 2,034 C 0 1.0 SPARE 18 19 VMAX 13 -4 Controller' 1.0 2,134 50 " 3 A 50 3 4,533 1.0 scale <Unit Compute7X 1 Rack 3W155S25' 20 21 1.0 2,134 - B 4,533 1.0 22 23 1.0 2,134. C 4,533 1.0 24 25 VMAX 13 -5 1.0 2,034 50 3 A 50 3 4,533 1.0 Scale Unit Compute A -2 Rack`3W155S25a 26 27 1.0 2,034 - B 4,533 1.0 28 29 1.0 2,034 C 4,533 1.0 30 31 '. VMAX. 13 -6 1.0 2, 034 50: 3, A 50 3 4, 533 1.0 ', .. _ ` ¢.p ,,,. Sgt s. "' Scale Unit Compute S 1 ` ' g. Racky3W15025: 32 33 1.0 2,034 - B 4,533 1.0 34 35 1.0 2,034 C 4,533 1.0 36 37 SPARE 1.0 0 30 2 A 50 3 4,533 1.0 a Scale Rack ,3W156S25 Unit Cothpute 8X2 i,, 38 39 SPARE 1.0 0 - B 4,533 1.0 0 40 41 SPARE 1.0 0 20 1 C 4,533 ` . •,, „ 42 PHASE A CONNECTED: PHASE B CONNECTED: PHASE C CONNECTED: TOTAL CONNECTED: PHASE A DEMAND: PHASE B DEMAND: Mc instry PH DEMAND: Fat Th. 1e Ol InurBulidiag 32,470 VA VA VA kVA AT: VA VA kVA AT: PHASE PHASE PHASE 208 A: B: C: = A: B: = 270.4 AMPS AMPS AMPS AMPS AMPS AMPS AMPS AMPS GENERAL NOTES: 1. 32,470 270.4 32,470 270.4 97 270.4 32,470 PHASE PHASE 2 A8SE 270.4 32,470 270.4 32, 490 32,470 270.4 270.4 ECEIVED NOV 17 2010 PERMIT CENTER RECEIVED NOV 17 2010 PERMIT CENTER PANEL NAME / NUMBER: VOLTAGE L -L: VOLTAGE L -N: MAIN BREAKER: MAIN LUG ONLY: 208 PHASE: 3 WIRE: 3 BUS RATING AMPS AMPS IER (AMPS): 22,000 TK5/.RPP =1. -8D ` (AMPS): 400 400 ENCLOSURE: NEMA -1 MOUNTING: FLUSH CKT NO. LOAD DESCRIPTION LOAD CRITERIA BKR 0 BKR LOAD CRITERIA LOAD DESCRIPTION CKT DEM VA AMPS P AMPS P VA DEM NO. 1 Scale Unit Compute 2E -3 Rack 3W94S12 1.0 4,533 50 3 A 50 3 4,533 1.0 Scale Unit Compute 2E -4 Rack 3W94S12 2 3 1.0 4,533 B 4,533 1.0 4 5 1.0 4,533 C 4,533 1.0 6 7 SPARE 1.0 0 A 0 1.0 SPARE 8 9 SPARE 1.0 0 50 3 B 50 3 0 1.0 SPARE 10 11 DMX 2 5 R Rack 3W87S30 /RED 1.0 2,034 C 2,034 1.0 DMX 2 -6 R Rack 3W87S29 /RED 12 13 1.0 2,034 A 2,034 1.0 14 15 1.0 2,034 B 2,034 1.0 16 17 SPARE 1.0 0 30 2 C 30 2 0 1.0 SPARE 18 19 SPARE 1.0 0 A 0 1.0 SPARE 20 21 SPARE 1.0 0 30 2 B 30 2 0 1.0 SPARE 22 23 SPARE 1.0 0 C 0 1.0 SPARE 24 25 Scale Unit Compute 1X 3 3W89S11 1.0 4,533 ,50 3 A 50 .. 3 4,533 1.0 3W89$12" Scale Unit Compute-2X 3. I" Px ' y 26 27 1.0 4,533 - B 4 a 533 1.0 28 29 1.0 4,533 C 4,533 1.0 , 30 31 Scale Unit Compute 1X -4 ! 3W89S.11 1.0 4,533 50 3 A 50 3 4,533 1.0 Scale UnitCompdte-2X = 4 , 3W89S12-, se" , " "_ 32 33 1.0 4,533 --- B 4,533 1.0 34 35 1.0 4,533 C 4,533 1.0 36 37 SPARE 1.0 0 20 1 A ,30 2 0 1.0 SPARE 38 39 BCMS 1.0 200 15 2 B 0 1.0 SPARE 40 41 1.0 200 C SPACE 42 PHASE A CONNECTED: PHASE B CONNECTED: PHASE C CONNECTED: TOTAL CONNECTED: PHASE A DEMAND: PHASE B DEMAND: Mc ,stry PHASE C DEMAND: TOTAL DEMAND: For Th He 01 Your Bulldleg 31,266 VA VA VA kVA AT: VA VA, VA kVA AT: PHASE PHASE PHASE 208 A: B: C: = A: B: C: = 260.4 AMPS AMPS AMPS AMPS AMPS AMPS AMPS AMPS GENERAL NOTES: 1. 31,466 262.0 31,466 262.0 94 261.5 31,266 PHASE PHASE PHASE 208 260.4 31,466 262.0 31,466 262.0 94 261.5 RECEIVED NOV 17 2010 PERMIT CENTER VED NOV 17 2010 PERMIT CENTER PANEL NAME / NUMBER: VOLTAGE L -L: VOLTAGE L -N: MAIN BREAKER: MAIN LUG ONLY: 208 PHASE: 3 WIRE: 3 BUS RATING AMPS AMPS IER (AMPS): 22,000 TK5 RPP'- % = GD (AMPS) : 400 400 ENCLOSURE: NEMA -1 MOUNTING: FLUSH CKT NO. LOAD DESCRIPTION LOAD CRITERIA BKR 0 BKR LOAD CRITERIA LOAD DESCRIPTION CKT DEM VA AMPS P AMPS P VA DEM NO. 1 Scale Unit Compute 1E -3 Rack 3W83S12 1.0 4,533 50 3 A 50 3 4,533 1.0 Scale Unit Compute 1E -4 Rack 3W83S12 2 3 1.0 4,533 8 4,533 1.0 4 5 1.0 4,533 C 4,533 1.0 6 7 SPARE 1.0 0 30 2 A 30 2 0 1.0 SPARE 8 9 SPARE 1.0 0 B 0 1.0 SPARE 10 11 DMX 1 -5 R Rack 3W82S30 /RED 1.0 2,034 50 3 C 50 3 2,034 1.0 DMX 1 -6 R Rack 3W82S29 /RED 12 13 1.0 2,034 A 2,034 1.0 14 15 1.0 2,034 B 2,034 1.0 16 17 SPARE 1.0 0 30 2 C 30 2 0 1.0 SPARE 18 19 SPARE 1.0 0 A 0 1.0 SPARE 20 21 SPARE 1.0 0 30 2 B 30 2 0 1.0 SPARE SPARE 22 23 SPARE 1.0 0 C 0 1.0 24 25 Scale Unit Compute 3X . 3 > P 3W89313i... a ;. 1.0 4,533 50 . ' 3 A 50 3 4,533 1.0 .,'I. = a.�� a �k.. s c ar . Cad w I k + "r x `` a x k ce ' ; � a , 26 27 1.0 4, 533 _a��U111 B 4, 533 1.0 , '3 " 9 28 29 1.0 4,533 C 4,533 1.0 30 31 Scale Unit Co�epute •3Xi: 4 3W89S13 1.0 4,533 - 50. 3 A '50 3 4,533 1.0 ' t mss ... '3W W 7 . 1, ! . i : ° r 4 �`r „�FKr "�� s�'j * °',,°' 32 33 1.0 4,533 - B 4,533 1.0 34 35 1.0 4,533 C 4,533 1.0 36 37 SPARE 1.0 0 20 1 A 30 2 0 1.0 SPARE 38 39 BCMS 1.0 200 15 2 B 0 1.0 SPARE 40 41 1.0 200 C SPACE 42 PHASE A CONNECTED: PHASE B CONNECTED: PHASE C CONNECTED: TOTAL CONNECTED: PHASE A DEMAND: PHASE B DEMAND: Mc instry PHASE C DEMAND: TOTAL DEMAND: Forth a Ile Of Ibar gal►dlag 31,266 VA VA VA kVA AT: VA VA kVA AT: PHASE PHASE PHASE 208 A: B: C: = A: B: = 260.4 AMPS AMPS AMPS AMPS AMPS AMPS AMPS AMPS GENERAL NOTES: 1. ^ 31,466 262.0 31,466 262.0 94 261.5 31,266 PHASE PHASE 2 8SE 260.4 31,466 262.0 31,466 262.0 94 261.5 VED NOV 17 2010 PERMIT CENTER :IVED 7 2010 PERMIT CENTER PANEL NAME / NUMBER: VOLTAGE L -L: VOLTAGE L -N: MAIN BREAKER: MAIN LUG ONLY: 208 PHASE: 3 WIRE: 3 BUS RATING AMPS AMPS IER (AMPS): 22,000 TK5J' RPP. % ,40 (AMPS) : 400 400 ENCLOSURE: NEMA -1 MOUNTING: FLUSH CKT NO. LOAD DESCRIPTION r LOAD CRITERIA BKR 0 BKR LOAD CRITERIA LOAD DESCRIPTION CKT DEM VA AMPS P AMPS P VA DEM NO. 1 Scale Unit Com ute iF -3 p Rack 3W83S11 1.0 4,533 50 3 A 50 3 4,533 1.0 Scale Unit Compute 1F -4 Rack 3W83S11 2 3 1.0 4,533 B 4,533 1.0 4 5 1.0 4,533 C 4,533 1.0 6 7 SPARE 1.0 0 30 2 A 30 2 0 1.0 SPARE 8 9 SPARE 1.0 0 B 0 1.0 SPARE 10 11 DMX 1 -7 R Rack 3W82S28 /RED 1.0 2,034 50 3 C '50 3 2,034 1.0 DMX 1 9 R Rack 3W82S25 /RED 12 13 1.0 2,034 A 2,034 1.0 14 15 1.0 2,034 B 2,034 1.0 16 17 SPARE 1.0 0 30 2 C 30 2 0 1.0 SPARE 18 19 SPARE 1.0 0 A 0 1.0 SPARE 20 21 DMX 1 -8 R Rack 3W82S26 /RED 1.0 2,034 50 3 B 30 2 0 1.0 SPARE 22 23 1.0 2,034 C 0 1.0 SPARE 24 25 1.0 2,034 A 30 2 0 1.0 SPARE 26 27 SPARE 1.0 0 30 2 B 0 1.0 SPARE 28 29 SPARE 1.0 0 C 0 1.0 SPARE 30 31 SPARE 1.0 0 30 2 A . 50 3 4,533 1.0a Scale Unit Compute;SX 3 ' • Ra2k.3W89Si5' y`, g 32 33 SPARE 1.0 0 - B 4,533 1.0 34 35 SPARE 1.0 0 30 2 C 4,533 1.0 µ : 36 37 SPARE 1.0 0 A 50 3 4,533 1.0 z *•;: Scale Unic Compute,? 5X 4 . _ 1. Rack .;3W89S15 n °�° ` ' * 38 39 BCMS 1.0 200 15 2 B 4,533 1.0 40 41 1.0 200 C 4,533 1.0 42 PHASE A CONNECTED: PHASE B CONNECTED: PHASE C CONNECTED: TOTAL CONNECTED: PHASE A DEMAND: PHASE B DEMAND: Mct PHASE C DEMAND: TOTAL DEMAND: For Th : lle Of Your Bonding 24,434 VA VA VA kVA AT: VA VA VA kVA AT: PHASE PHASE PHASE 208 A: B: C: = A: B: C: 203.5 AMPS AMPS AMPS AMPS AMPS AMPS AMPS AMPS GENERAL NOTES: 1. R E�� V NM A1, 24,234 201.8 24,434 203.5 73 202.9 24,234 PHASE PHASE PHASE 208 201.8 24,434 203.5 24,434 203.5 73 202.9 :IVED 7 2010 PERMIT CENTER ED NOV 17 2010 PERMIT CENTER PANEL NAME / NUMBER: VOLTAGE L -L: VOLTAGE L -N: MAIN BREAKER: MAIN LUG ONLY: 208 'PHASE: 3 WIRE: 3 BUS RATING AMPS AMPS IER (AMPS): 22,000 TK5 ''RPP -.7 8D (AMPS) : 400 400 ENCLOSURE: NEMA -1 MOUNTING: FLUSH CKT NO. LOAD DESCRIPTION LOAD CRITERIA' BKR 0 BKR LOAD CRITERIA LOAD DESCRIPTION CKT DEM VA AMPS P AMPS P VA DEM NO. 1 Scale Unit Compute 2F -3 Rack 3W94S11 1.0 4,533 50 3 A 50 3 4,533 1.0 Scale Unit Compute 2F -4 Rack 3W94S11 2 3 1.0 4,533 --- B 4,533 1.0 4 5 1.0 4,533 C 4,533 1.0 6 7 SPARE 1.0 0 30 2 A 30 2 0 1.0 SPARE 8 9 SPARE 1.0 0 B 0 1.0 SPARE 10 11 DMX 2 -7 R Rack 3W87S28 /RED 1.0 2,034 50 3 C 50 3 2,034 1.0 DMX 2 -9 R Rack 3W87S25 /RED 12 13 1.0 2,034 A 2,034 1.0 14 15 1.0 2,034 B 2,034 1.0 16 17 SPARE 1.0 0 30 2 C 30 2 0 1.0 SPARE 18 19 SPARE 1.0 0 A 0 1.0 SPARE 20 21 DMX 2-8 R Rack 3W87S26 /RED 1.0 2,034 50 3 B 50 3 0 1.0 SPARE 22 23 1.0 2,034 C 0 1.0 SPARE 24 25 1.0 2,034 A 0 1.0 SPARE 26 27 SPARE 1.0 0 30 2 B 30 2 0 1.0 SPARE 28 29 SPARE 1.0 0 C 0 1.0 SPARE 30 31 SPARE 1.0 0 30 2 A 50 3 4,533 1.0 Scale Unit Compute. 6X -3 32 33 SPARE 1.0 0 --- B 4,533 1.0 34 35 SPARE 1.0 0 30 2 C 4,533 1.0 Rack 3W89S16 36 37 SPARE 1.0 0 A : 50. 3' 4,533 1.0 Scale Unit Compute 6X -4. ' Rack .'3W89S16 . 38 39 BCMS 1.0 200 15 2 B 4,533 1.0 40 41 1.0 200 C 4,533 1.0 42 PHASE A CONNECTED: PHASE B CONNECTED: PHASE C CONNECTED: TOTAL CONNECTED: PHASE A DEMAND: PHASE B DEMAND: Ilk =try PHASE C DEMAND: TOTAL DEMAND: For Th !M Or )bur BuidMg 24,234 VA VA VA kVA AT: VA VA VA kVA AT: PHASE PHASE PHASE 208 A: B: C: = A: B: C: = 201.8 AMPS AMPS AMPS AMPS AMPS AMPS AMPS AMPS GENERAL NOTES: 1. C EC E C i 24,434 203.5 24,434 203.5 73 202.9 24,234 PHASE PHASE PHASE 208 201.8 24,434 203.5 24,434 203.5 73 202.9 ED NOV 17 2010 PERMIT CENTER RECEIVE[ NOV 17 2010 PERMIT CENTEF PANEL NAME / NUMBER: VOLTAGE L -L: VOLTAGE L -N: MAIN BREAKER: MAIN LUG ONLY: 208 PHASE: 3 WIRE: 4 BUS RATING AMPS ' AMPS IER (AMPS): 22,000 TK5/RPP -5-2D 120 (AMPS): 400 400 ENCLOSURE: NEMA -1 MOUNTING: FLUSH CKT NO. LOAD DESCRIPTION LOAD CRITERIA BKR 0 BKR LOAD CRITERIA • LOAD DESCRIPTION CKT DEM VA AMPS P AMPS P VA DEM NO. 1 VMAX 13 -1 1.0 2,034 50 :. 3 A 50 3 2,034 1.0 2 3 1.0 2,034 B 2,034 1.0 VMAX 13 -7 4 5 1.0 2,034 C 2,034 1.0 6 7 VMAX -13=2 . . 1.0 2,034 ,. 50 3 A 0 1.0 SPARE 8 9 1.0 2,034 B 30 2 0 1.0 SPARE 10 11 1.0 2,034 C 0 1.0 SPARE 12 13 VMAX 13-3 �. 1 .0 2, 034 50 3 A 30 2 0 1.0 SPARE 14 15 1.0 2,034 B 0 1.0 SPARE 16 17 1.0 2,034 C 0 1.0 SPARE 18 19 .VMAX 13 -4" Controller :. 1.0 2,134 50 3 A 50 3 4,533 1.0 m..Aa.; C ,.0 Scale Unit: Compute'7X 3 ` Rack.;3055525 20 21 1.0 2,134. - B 4,533 1.0 22 23 1.0 2,134 C 4,533 1.0 24 25 VMAX 13 - 5 1.0 2,034 50 3 A 50 ; 3 4,533 1.0 scale :Unit Compute 7X =4„ Rack=3W155325, �y; 26 27 1.0 2,034 --- B 4,533 1.0 28 29 1.0 2,034 C 4,533 1.0 30 31 ' VMAX 13 ;',6 • 1.0 2, 034 .. b 50 ; 3 A . .: • .. " 50 3 4, 533 1.0 q° Fz' 41. 1 - Scale Unit 'Compute SX 3"; y " * Rac0W156S25„ 32 33 1.0 2,034 - B 4,533 1.0 34 35 1.0 2,034 C 4,533 1.0 36 37 SPARE 1.0 0 20 15 1 2 A H50, 3 4,533 1.0 -:•P ,- Scale. +; Rack-; 3W158S25 -,-,,. Unit a 4 38 39 BCMS 1.0 200 B 4,533 1.0 .Compute " t i 40 41 1.0 200 - C 4,533 1.0 ;..wi. . 42 PHASE A CONNECTED: PHASE B CONNECTED: PHASE C CONNECTED: TOTAL CONNECTED: PHASE A DEMAND: PHASE B DEMAND: Mc instry PH TOTAL DEMAND: For Th Ite Of Om BuIWIrtg 32,470 VA VA VA kVA AT: VA VA kVA AT: PHASE PHASE PHASE 208 A: B: C: = A: B: _. 270.4 AMPS AMPS AMPS AMPS AMPS AMPS AMPS AMPS GENERAL NOTES: 1. 32,670 272.0 32,670 272.0 98 271.5 32,470 PHASE PHASE P208 E 270.4 32,670 272.0 32, 272.0 •98 271.5 RECEIVE[ NOV 17 2010 PERMIT CENTEF