HomeMy WebLinkAboutRes 1867 - 2015-2016 Consolidated Permit Fee Schedule / Building Permit Fee Deferral Process (Repealed by Res 1894)%`. T 1
Washington
Cover page to Resolution 1867
The full text of the resolution follows this cover page.
A RESOLUTION OF THE CITY" COUNCIL OF THE CITY OF
TiUK ILA, WASHINGTON, REPEALING RESOLUTION LUTION N .
1845, ADOPTING A CONSOLIDATED PERMIT FEE
NIIEI0,ULE; AND PROVIDING IN FOR BUILDING PERMIT
FEE DEFERRAL (PROCESS TO ENCOURAGE RESIDENTIAL
DEVELOPMENT ENT 'WITHIN CERTAIN PORTIONS OF THE
SOUTHCENT R AREA F THE CITY.
Resolution 1867 was amended or repealed by the
following resolutions.
7Secfion!(S7),R7eFPeA1ed Repealed by Res #
1894
Resolution No 1867
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, REPEALING RESOLUTION NO.
1845; ADOPTING A CONSOLIDATED PERMIT FEE
SCHEDULE; AND PROVIDING FOR A BUILDING PERMIT
FEE DEFERRAL PROCESS TO ENCOURAGE RESIDENTIAL
DEVELOPMENT WITHIN CERTAIN PORTIONS OF THE
SOUTHCENTER AREA OF THE CITY.
WHEREAS, the City Council adopted Resolution No. 1845 in 2014, establishing the
City's current consolidated construction fee schedule, and
WHEREAS with adoption of the Southcenter Plan, the City laid out a vision to
encourage more housing within certain portions of the Southcenter area of the City; and
WHEREAS, market data indicates placement of housing within the Southcenter
area is difficult to accommodate under traditional financing methods; and
WHEREAS, developers often must make significant cash outlays prior to
commencing construction on projects; and
WHEREAS, restructuring the timing of payment of building permit fees may assist
in making residential development within the Southcenter area of the City more
successful,
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Repealer. Resolution No. 1845 is hereby repealed, effective October
20, 2015.
Section 2. For 2015 and 2016, the Technology Fee shall be set at 5% of the
applicable permit fee.
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 1 of 12
Section 3. Public Works fees will be charged according to the following schedule:
PUBLIC WORKS FEE SCHEDULE
PERMIT DESCRIPTION
FEE
Type A (Short -Term Non - profit)
$ 50.00 + Technology Fee
Type B (Short -Term Profit)
$100.00 + Technology Fee
Type C
$250.00 application base fee, Technology Fee, plus
(Infrastructure and Grading on Private Property
four components based on construction value:
and City Right -of -Way and Disturbance of City
1) Plan Review
Right -of -Way)
2) Construction Inspection
3) Pavement Mitigation
Appeal of Sign Code Decision
4 Grading Plan Review
Type D (Long -Term)
$100.00 + Technology Fee
Type E (Potential Disturbance of
$100.00 +Technology Fee
Cit Ri ht -of -Wa
$591
Type F (Blanket Permits)
$250.00 processing fee, plus $5,000.00 cash deposit,
withdraw $100.00 per instance for inspection
Franchise — Telecommunications
$5,000.00 administrative fee
Franchise — Cable
$5,000.00 plus 5% of total revenue
Street Vacation
$1,200.00
$602
$500.00 processing fee, plus 17% administrative fee,
Latecomer's Agreements
lus $500.00 segregation fee
Flood Zone Control Permit
$50.00 + Technology Fee
Section 4. Land use permit and processing fees will be charged according to the
following schedule:
LAND USE FEE SCHEDULE
All peer review fees will be passed through to the applicant per TMC Section 18.50.200.
Decision Type
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee TF
Appeal
Type 1, 2 and 4 Decisions
$591
$602
SEPA MDNS Appeal
$591
$602
Appeal of Sign Code Decision
$591
$602
Impact Fee Appeals:
Fire
$591
$602
Parks
$591
$602
Transportation
$591
$602
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 2 of 12
Decision Type
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee F
Sign Permit (TMC Chapter 19)
Permanent
$243
$248
+ TF
Temporary
$106
$108
+ TF
Pole /Banner Initial Application
$243
$248
+ TF
Special Event
$106
$108
+ TF
Pole /Banner Annual Renewal
$53
$54
+ TF
New Billboard
$591
$602
+ TF
Master Sign Program —Admin
$2,173
$2,216
+ TF
Master Sign Program —BAR
$3,479
$3,549
+ TF
TUC Zone Modifications
Modification to TUC Corridor Standards
(TMC Section 18.28.130. C)
$591
$602
+ TF
Modification to TUC Open Space Regulations
(TMC Section 18.28. 250 D. 4. d)
$591
$602
+TF
Transit Reduction to Parking Requirements
(TMC Section 18.28.260. B. 5. b
$591
$602
+ TF
Design Review (TMC Section 18.60.030)
Administrative
$2,236
$2,281
+ TF
Public Hearing
$4,006
$4,086
+ TF
Major Modification
$1,370
$1,397
+ TF
Minor Modification
$622
$635
+ TF
Parking Variances and Special Permissions
Administrative Parking Variance
(Type 2 —TMC Section 18.56.140)
$591
$602
+ TF
Parking Variance
(Type 3 —TMC Section 18.56.140)
$969
$988
+ HE
+ TF
Parking Standard for use not specified
(TMC 18.28.250 D. 4. d.1 and TMC 18.56. 100)
$579
$591
+ TF
Residential Parking Reduction
(TMC Section 18.56.065)
$591
$602
+ TF
Shared, covenant, Complementary Parking
Reduction (TMC Section 18.56.070)
$591
$602
+ TF
Parking Lot Restriping
(TMC Section 18.56.120)
$591
$602
+ TF
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 3 of 12
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 4 of 12
Plus
2015
2016
Hearing
Plus
Decision Type
Fee
Fee
Examiner
Technology
Fees
Fee (TF)
Variances, Special Permissions and Site Plan Review
Variances
$2,825
$2,882
+ HE
+ TF
(TMC Section 18.72)
Environmentally Sensitive Areas Deviation,
$1,495
$1,525
+ TF
Buffer Reduction (TMC Chapter 18.45)
Reduced fee for LDR homeowners, no
$591
$602
associated short plat
Reasonable Use Exception
$2,991
$3,050
+ HE
+ TF
(TMC Section 18.45.180)
Exception from Single Family Design Standard
$591
$602
+ TF
(TMC Section 18.50.050)
Special Permission Cargo Container
$591
$602
+ TF
(TMC Section 18.50.060)
Landscape Perimeter Averaging
$591
$602
+ TF
(TMC Section 18.52.060)
Tree and Landscape Modification Permit and
$105
$107
+ TF
Exceptions (TMC Chapter 18.54)
Lot Creation and Consolidation
Boundary Line Adjustment
$1,677
$1,710
+ TF
(TMC Chapter 17.08)
Lot Consolidation
$622
$635
+ TF
(TMC Chapter 17.08)
Short Plat (2-4 lots)
$3,817
$3,893
+ TF
(TMC Chapter 17.12)
Short Plat (5 -9 lots)
$4,344
$4,431
+ TF
(TMC Chapter 17.12)
Subdivision:
Preliminary Plat (10+ lots)
$4,986
$5,085
+ HE
+ TF
(TMC Section 17.14.020)
Final Plat (10+ lots)
$2,991
$3,050
+ TF
(TMC Section 17.12.030)
Binding Site Improvement Plan
$3,817
$3,893
+ TF
(TMC Chapter 17.16)
Planned Residential Development:
Administrative (TMC Section 18.46. 110)
$2,173
$2,216
+ TF
Public Hearing (TMC Section 18.46. 110)
$4,986
$5,085
+ TF
Minor Modification (TMC Section 18.46.130)
$591
$602
+ TF
Major Modification (TMC Section 18.46.130)
$2,425
$2,473
+ TF
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 4 of 12
Decision Type
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee F
Wireless Communication Facility (TMC Chapter 18.58.050)
Minor (Type 1)
$591
$602
+ TF
Administrative (Type 2)
$1,677
1,710
+ TF
Major or Height Waiver (Type 3)
$3,352
$3,419
+ HE
+ TF
SEPA and Environmental
Checklist
$1,709
$1,743
+ TF
SEPA EIS
$2,991
$3,050
+ TF
SEPA Planned Action
$591
$602
+ TF
SEPA Addendum
$591
$602
+ TF
SEPA Exemption Letter
$348
$355
+ TF
Sensitive Area Master Plan Overlay
(TMC 18.45.160)
$4,986
$5,085
+ TF
Shoreline Permits
Substantial Development Permit: (TMC Chapter 18.44)
Project value: $5,000-$10,000
$1,181
$1,205
+ TF
$10,001 - $50,000
$2,763
$2,818
+ TF
$50,001 - $500,000
$4,406
$4,495
+ TF
More than $500,000
$5,588
$5,699
+ TF
Permit Exemption Letter, Shoreline
$243
$248
+ TF
Conditional Use Permit, Shoreline
(TMC 18.44.050)
$3,879
$3,957
+ HE
+ TF
Shoreline Tree Permit
(TMC Chapter 18.44
$105
$107
+ TF
Shoreline Environment Redesignation
$2,991
$3,050
+ TF
Noise Variance (TMC Section 8.22.120)
Type I
$485
$494
+ TF
Type II
$654
$667
+ TF
Type III
$1,454
$1,483
+ HE
+ TF
Use Permits
Conditional Use Permit
(TMC Section 18.64.020)
$3,879
$3,957
+ HE
+ TF
Unclassified Use Permit
(TMC Chapter 18.66)
$4,986
$5,085
+ TF
TSO Special Permission Use
(TMC Section 18.41.060)
$969
$988
+ HE
+ TF
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 5 of 12
Decision Type
2015
Fee
2016
Fee
Plus
Hearing
Examiner
Fees
Plus
Technology
Fee (TF)
Comprehensive Plan Changes (TMC Chapter 18.84)
Rezone (Map Change)
$3,489
$3,559
$129.50 for the first $2,000, plus $19.60 for each additional $1,000, or
+ TF
Comprehensive Plan Amendment
$3,988
$4,068
+ TF
Zoning Code Text Amendment
$4,533
$4,624
fraction thereof, to and including $100,000 + Technology Fee
+ TF
Miscellaneous Services and Charges
Development Agreement
$1,994
$2,034
$4,906.30 for the first $500,000, plus $7.00 for each additional $1,000, or
+ TF
Code Interpretation (TMC Section 18.90.010)
$348
$355
+ TF
Zoning Verification Letter
$348
$355
thereof + Technology Fee
+ TF
Legal Lot Verification
$559
$570
+ TF
Preapplication Meeting
$485
$494
+ TF
Mailing Fee to Generate Labels, per project
$458
$467
Public Notice Mailing Fee per address for each
mailing
$1
$1
Section 5. Building permit fees will be charged according to the following
schedule:
BUILDING PERMIT FEE SCHEDULE
Total Valuation
Building Permit Fees
$1 to $500
$65.00 + Technology Fee
$501 to $2,000
$65.00 for the first $500, plus $4.30 for each additional $100, or fraction
thereof, to and including $2,000 + Technology Fee
$2,001 to $25,000
$129.50 for the first $2,000, plus $19.60 for each additional $1,000, or
fraction thereof, to and including $25,000 + Technology Fee
$25,001 to $50,000
$600.40 for the first $25,000, plus $15.30 for each additional $1,000, or
fraction thereof, to and including $50,000 + Technology Fee
$50,001 to $100,000
$983.25 for the first $50,000, plus $10.60 for each additional $1,000, or
fraction thereof, to and including $100,000 + Technology Fee
$100,001 to $500,000
$1,511.60 for the first $100,000, plus $8.50 for each additional $1,000, or
fraction thereof, to and including $500,000 + Technology Fee
$500,001 to $1,000,000
$4,906.30 for the first $500,000, plus $7.00 for each additional $1,000, or
fraction thereof, to and including $1,000,000 + Technology Fee
$1,000,001 to $5,000,000
$8,443.25 for the first $1,000,000, plus $4.70 for each additional $1,000,
or fraction thereof, to and including $5,000,000 + Technology Fee
$5,000,001 and up
$27,243.25 for the first $5,000.000, plus $4.50 for each $1,000 or fraction
thereof + Technology Fee
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 6 of 12
A. Non - Structural Plan Review Fee. A non - structural plan review fee shall be
paid at the time of submitting plans and specifications for review. The non - structural
plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee
schedule. The non - structural plan review fee specified herein is a separate fee from the
permit fee and is in addition to the permit fee.
B. Structural Plan Review Fee. Where a structural plan review is deemed
necessary, a structural plan review fee shall be charged. The structural plan review fee
shall be 35% of the calculated non - structural plan review fee.
C. Southcenter Building Permit Fee Deferral Program
1. In order to encourage residential and mixed -use development within the
Tukwila Urban Center Transit - Oriented Development (TUC -TOD) zoning district, fee
deferral of all or a portion of a required building permit fee for a project may be granted
provided the following criteria are met:
a. The property owner must submit a technically- complete building permit
application clearly depicting the project for which the fee deferral agreement will apply
and pay all required plan review fees. The building permit fee being considered for
deferral must be greater than $300,000.
b. Before issuance of the building permit, the property owner must submit
a written letter requesting that the building permit fee be deferred. The City will not
consider any fee deferral request from a tenant, contractor, or other third party. The
request must be submitted to the City no later than December 31, 2016. A parcel is
only eligible to have one fee deferral granted for one building permit for a project.
c. The project must be located west of the Green River and be within the
TUC -TOD zoning district per Figure 18 -16, District Map, in Title 18 of the Tukwila
Municipal Code.
d. The project must include at least 100 residential units and at least 50
percent of the gross building square footage must be used for residential purposes. For
purposes of this section, the term "residential" does not include hotels, motels, bed and
breakfasts or other similar transient lodging accommodations.
e. A fee deferral agreement between the City and the property owner
must be executed prior to issuance of the building permit. The Mayor is authorized to
execute such agreements on behalf of the City. Provisions must be included in the
agreement to secure payment of the deferred building permit fee, plus accrued interest,
in the case of default by the property owner. Provisions may include, but are not limited
to, a lien against subject property, letter of credit and /or surety bond.
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 7 of 12
2. The Mayor may consider other relevant information in approving the fee
deferral request including, but not limited to, the ability of the property owner to satisfy
the obligations of the agreement and pay the deferred building permit fee. The Mayor is
authorized to include any other provisions or requirements in the deferral agreement
that he /she deems necessary to meet the intent of this resolution, to protect the financial
interest of the City, and /or to protect the public welfare.
3. The building permit fee may be deferred up to 24 months after issuance of
the building permit and must be paid before the City will issue a certificate of occupancy
for the building.
4. Interest shall be charged on the deferred building permit fee. The interest
rate shall be the same as the stated interest rate on the Two Year US Treasury Note on
the date the building permit is issued (or closest date thereof). Interest shall be
compounded annually and shall begin to accrue upon issuance of the building permit.
5. The building permit fee deferral agreement may be consolidated with any
agreements to defer transportation, fire, or park impact fees as outlined in TMC
Chapters 9.48, 16.26, and 16.28.
6. Only the building permit fee due at time of issuance of the building permit is
eligible for deferral. All other fees including, but not limited to, building permit plan
review fees, utility connection fees, and fees related to mechanical, plumbing, land use,
sign, and public works fees are due in the normal course of business, as typically
charged to other applicants.
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 8 of 12
Section 6. Mechanical permit fees will be charged according to the following
schedule:
MECHANICAL PERMIT FEE SCHEDULE
Valuation of
$32.50 + Technology Fee
Work (Total
Mechanical Permit Fee
Contract Amount
For each additional fixture
$14.00 + Technology Fee
$32.50 for issuance of each permit (base fee) + Technology Fee
$250 or less
$65.00 + Technology Fee
$251 to $500
$65.00 for first $250, plus $7.83 for each $100 or fraction thereof, to
$14.00 + Technology Fee
and including $500 + Technology Fee
$501 to $1,000
$84.60 for the first $500, plus $8.70 for each $100 or fraction thereof, to
$29.10 + Technology Fee
and including $1,000 + Technology Fee
$1,001 to $5,000
$128.10 for the first $1,000, plus $9.65 for each $1,000 or fraction
$14.00 + Technology Fee
thereof, to and including $5,000 + Technology Fee
$5,001 to $50,000
$166.70 for the first $5,000, plus $10.05 for each $1,000 or fraction
thereof, to and including $50,000 + Technology Fee
$50,001 to $250,000
$639.20 for the first $50,000, plus $8.40 for each $1,000 or fraction
thereof, to and including $250,000 + Technology Fee
$250,001 to $1,000,000
$2,319.20 for the first $250,000, plus $7.40 for each $1,000 or fraction
thereof, to and including $1,000,000 + Technology Fee
$1,000,001 and up
$7,869.20 for the first $1,000,000, plus $6.70 for each $1,000 or
fraction thereof + Technology Fee
Section 7. Plumbing permit fees will be charged according to the following
schedule:
PLUMBING PERMIT FEE SCHEDULE
Permit Issuance — Issuance of each permit (base fee)
$32.50 + Technology Fee
Unit Fee Schedule (in addition to base fee above:
For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.)
$65.00 + Technology Fee
For each additional fixture
$14.00 + Technology Fee
For each building sewer and each trailer park sewer
$24.80 + Technology Fee
Rain water system — per drain (inside building)
$14.00 + Technology Fee
For each water heater and /or vent
$14.00 + Technology Fee
For each industrial waste pretreatment interceptor, including its
trap and vent, except for kitchen type grease interceptors
$28.00 + Technology Fee
For each grease interceptor for commercial kitchens
$29.10 + Technology Fee
For each repair or alteration of water piping and /or water treating
equipment, each occurrence_ _
$14.00 + Technology Fee
_
For each repair or alteration of drainage or vent piping, each
fixture
$14.00 + Technology Fee
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 9 of 12
PLUMBING PERMIT FEE SCHEDULE (continued)
For each medical gas piping system serving one to five
$82.00 +Technology Fee
inlets /outlets for a specific gas
$81.90 + Technology Fee
For each additional medical gas inlets /outlets
$16.20 + Technology Fee
For each lawn sprinkler system on any one (1) meter including
$29 10 + Technology Fee
backflow protection devices therefor.
For atmospheric -type vacuum breakers not included in lawn
sprinkler backflow protection:
1 to 5 .... $14.00 + Technology Fee
Over 5... $14.00 for first 5 plus $3.25 for each additional
+ Technoloqv Fee
For each backflow protective device other than atmospheric type
vacuum breakers:
2 -inch diameter and smaller... $29.10 + Technology Fee
Over 2 -inch diameter: ............ $32.25 + Technology Fee
Section 8. Fuel Gas Piping permit fees will be charged according to the following
schedule:
FUEL GAS PIPING PERMIT FEE SCHEDULE
1. Permit Issuance:
For issuing each permit (base fee): ($0 if permit is in conjunction with $32.50 + Technology Fee
a plumbing permit for an appliance with both plumbing and gas
connection.
2. Unit Fee Schedule (in addition to item in subparagraph 7.1.):
For each gas piping system of one to five outlets $65.00 + Technology Fee
For each additional gas piping system outlet, per outlet $14.00 + Technology Fee
Section 9. Electrical permit fees will be charged according to the following
schedule:
ELECTRICAL PERMIT FEE SCHEDULE
1. NEW SINGLE - FAMILY DWELLINGS
New single - family dwellings (including a garage)
$152.85 + Technology Fee
Garages, pools, spas and outbuildings
$81.90 + Technology Fee
Low voltage systems
$59.85 + Technology Fee
VV: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 10 of 12
ELECTRICAL PERMIT FEE SCHEDULE (continued)
2. SINGLE - FAMILY REMODEL AND SERVICE CHANGES
Service change or alteration -no added /altered circuits
$81.90 + Technology Fee
Service change $81.90 with added /altered circuits, plus $11.55 for
$81.90 + Technology Fee
each added circuit (maximum permit fee $152.85)
$86.25 + Technology Fee
Circuits added /altered without service change (includes up to 5
_
$54.60 + Technology Fee
circuits
$65.00 for the first $250 plus $4.30 for each $100 or fraction thereof, to and
Circuits $54.60 added /altered without service change (more than
$54.60 + Technology Fee
5 circuits); $7.65 for each added circuit (maximum permit fee $98.70
$97.00 for the first $1,000 plus $21.60 for each $1,000 or fraction thereof,
+ Technology Fee)
to and including $5,000 + Technology Fee
Meter /mast repair
$68.25 + Technology Fee
Low voltage systems
$59.85 + Technology Fee
MULTI - FAMILY AND COMMERCIAL (including low voltage)
Valuation of
$65.00 + Technology Fee
Work (Total
Permit Fee
Contract Amount)
$86.25 + Technology Fee
$250 or less
$65.00 + Technology Fee
$251 - $1,000
$65.00 for the first $250 plus $4.30 for each $100 or fraction thereof, to and
_ $
including $1,000 + Technology Fee
$1,001 - $5,000
$97.00 for the first $1,000 plus $21.60 for each $1,000 or fraction thereof,
_ $
to and including $5,000 + Technology Fee
$5,001 - $50,000
$183.30 for the first $5,000 plus $17.70 for each $1,000 or fraction thereof,
Disaster recovery emergency repair permit (residential structures $
to and including $50,000 + Technology Fee
$50,001 - $250,000
$979.15 for the first $50,000 plus $12.90 for each $1,000 or fraction thereof,
to and including $250,000 + Technology Fee
$250,001 - $1,000,000
$3,567.20 for the first $250,000 plus $9.15 for each $1,000 or fraction thereof,
to and including $1,000,000 + Technology Fee
Over $1,000,000
$10,440.70 plus 0.5% of cost over $1,000,000 + Technology Fee
MISCELLANEOUS ELECTRICAL PERMIT FEES
Temporary service (residential) $
$65.00 + Technology Fee
Temporary service /generators $
$80.90 + Technology Fee
Manufactured /mobile home parks and RV park sites, each service $
$86.25 + Technology Fee
Carnivals: _
_
• Base fee _
$80.60 + Technology Fee
_ $
$10.80 + Technology Fee
_ $
$10.80 + Technology Fee
_ $
$66.50 /hour
Adult family home inspection (paid at the time of scheduling the $
$66.50
Disaster recovery emergency repair permit (residential structures $
$20.00
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 11 of 12
Section 10. Other inspections and fees will be charged according to the following
schedule:
OTHER INSPECTIONS AND FEES
Inspections outside of normal business hours (three hour minimum charge)
$100.00 /hour
Re- inspection fee
$66.50 /hour
Inspection for which no fee is specifically indicated — investigations or safety
$66.50 /hour
inspection
Additional plan review required by changes, additions, or revisions to approved
$66.50 /hour
tans minimum charge one -half hour)
Work commencing before permit issuance shall be subject to an investigation fee
100% of the permit
equal to 100% of the permit fee.
fee
Plan review fee — Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee
for review shall be 25% of the total calculated permit fee. The plan review fee is a
separate fee from the permit fee and is required when plans are required in order
to document compliance with the code.
Work covered without inspection or work not ready at the time of inspection may
be charged a re- inspection fee of $66.50.
Expired permit final – includes two inspections
$133.00
Expired permit final – each additional inspection
$66.50
Minor residential remodel plan review and permit (projects up to $20,000)
$20.00
Section 11. Effective Date. This resolution and the fee schedules contained
herein shall be effective as of October 20, 2015.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this day of C; e)ba% / 2015.
ATTEST /AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk
Rachel B. Turpin, City Attorney
Filed with the City Clerk: icy- 1'q-1
Passed by the City Council: 0 -1.
Resolution Number:
W: \Word Processing \Resolutions \Bldg permit fee sched -fee deferral process 10 -15 -15
BM:bjs Page 12 of 12