HomeMy WebLinkAboutUtilities 2016-07-26 COMPLETE AGENDA PACKETCity of Tukwila
Utilities Committee
❖ Kathy Hougardy, Chair
❖ Kate Kruller
❖ Thomas McLeod
AGENDA
Distribution:
P. Brodin
K. Hougardy
R. Turpin
K. Kruller
M. Hart
T. McLeod
Clerk File Copy
D. Robertson
2 Extra
Mayor Ekberg
Pg. 1
D. Cline
e-mail cover to: A. Le,
L. Humphrey
C. O'Flaherty, K. Hougardy,
B. Giberson
D. Almberg, B. Saxton,
R. Tischmak
S. Norris, M. Hart,
G. Labanara
L. Humphrey
TUESDAY, .JULY 26, 2016 — 5:30 PM
FOSTER CONFERENCE ROOM - 6300 Building
Item
Recommended Action
Page
1. PRESENTATION(S)
2. BUSINESS AGENDA
a) Andover Park East Water and Sewer Replacement
a) Forward to 8/1/16 Regular
Pg. 1
Bid Award
Consent Agenda
b) 2016 Small Drainage Program
b) Forward to 8/1/16 Regular
Pg. 13
Resolution Rejecting All Bids
Consent Agenda
c) Proposed 2017 -2018 Biennial Budget
c) Committee Approval
Pg. 19
Water, Sewer & Surface Water Enterprise Funds
3. ANNOUNCEMENTS
4. MISCELLANEOUS
Future Agendas:
Next Scheduled Meeting: Tuesday, August 9, 2016
SThe City of Tukwila strives to accommodate individuals with disabilities.
Please contact the Public Works Department at 206- 433 -0179 for assistance.
TO:
FROM:
BY:
CC:
DATE:
C 0
'*I-tv of Tukwila
Public Works Department - Bob Giberson, Director
Utilities Committee 14,
Bob Giberson, Public Works Director Av, --I
Mike Cusick, Senior Program Manager
Mayor Ekberg
July 22, 2016
SUBJECT: Andover Park East Water and Sewer Replacement
Project No. 99940103 (and 91440204)
Bid Award
Allan Ekberg, Mayor
ISSUE
Award contract to Titan Earthwork, LLC for the Andover Park East (APE) Water and Sewer
Replacement Project.
BACKGROUND
The existing water and sewer mains in Andover Park East from Strander Blvd to Tukwila Pkwy that
were installed in the early 1960's. The water and sewer mains need to be replaced with larger
mains to facilitate the development in the Central Business District.
ANALYSIS
Construction bids were advertised on June 29 and July 6, 2016 and four bids were received on July 13
for the APE Water and Sewer Replacement Project. The low bid of $3,504,684.14 was from Titan
Earthwork, LLC. The Engineer's Estimate was $3,996,657.25. Titan Earthwork, LLC has performed
satisfactory work for others in the past.
Titan Earthwork, LLC
Contingency 30%
Grand Total
RECOMMENDATION
Bid Results
$ 3,504,684.14
1,051,405.24
$ 4,556,089.38
Engineer's
Estimate
$3,996,657.25
$3,996,657.25
Water/Sewer
Bud_qet
$4,911,000.00
Council is being asked to approve the contract with Titan Earthwork, LLC in the amount of
$3,504,684.14 for Andover Park East Water and Sewer Replacement Project and consider this
item on the Consent Agenda at the August 1, 2016 Regular Meeting.
Attachments: Bid Tabulation
Recommendation Letter
Proposed 2017 CIP Sheets
WAPW Eng\PROJECTS\A- WT Projects\APE Water Main Replacement (99940103)\Info Memo Bid Award APE Water & Sewer 07-22-16 sb.docx
Owner: City of Tukwila
Project: Andover Park East Water Main and Sewer Improvements
Engineers: PACE Engineers, Inc.
BID TABULATION
Bid Date: 7/18/16
Bid Time: 3 PM
Job No.: 15412
GENERAL
Engineer's Estimate
TITAN Earthwork LLC
Scarsella Bros. Inc.
KC Equipment LLC
McCann Constr. Ent.
ITEM
NO.
ITEM OR
TASK DESCRIPTION
QUANTITY
NO.
UNITS
UNIT
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
G1
Mobilization
1
LS
$250,000.00
$250,000.00
311,054.55
$311,054.55
370,000.00
$370,000.00
400,000.00
$400,000.00
470,000.00
$470,000.00
G2
Temporary Signalization
1
LS
$30,000.00
$30,000.00
35,000.00
$35,000.00
140,000.00
$140,000.00
120,000.00
$120,000.00
125,000.00
$125,000.00
G3
Project Temporary Traffic Control
1
LS
$200,000.00
$200,000.00
220,000.00
$220,000.00
325,000.00
$325,000.00
100,000.00
$100,000.00
225,000.00
$225,000.00
G4
TESC, Detention /Retention & SWPPP Facilities
1
LS
$150,000.00
$150,000.00
65,000.00
$65,000.00
215,000.00
$215,000.00
100,000.00
$100,000.00
30,000.00
$30,000.00
G5
Restoration and Cleanup
1
LS
$20,000.00
$20,000.00
10,500.00
$10,500.00
25,000.00
$25,000.00
25,000.00
$25,000.00
15,000.00
$15,000.00
G6
Removal and Disposal of Contaminated Soil
FORCE ACCOUNT
$25,000.00
$25,000.00
$25,000.00
$25,000.00
$25,000.00
G7
Type B Progress Schedule
1
LS
$2,500.00
$2,500.00
500.00
$500.00
5,000.00
$5,000.00
25,000.00
$25,000.00
10,000.00
$10,000.00
G8
Unexpected Site Changes
FORCE ACCOUNT
$30,000.00
$30,000.00
$30,000.00
$30,000.00
$30,000.00
Subtotal
9.5% STATE SALES TAX
TOTAL BID
$707,500.00
$67,212.50
$774,712.50
$697,054.55
$66,220.18
$763,274.73
$1,135,000.00
$107,825.00
$1,242,825.00
$825,000.00
$78,375.00
$903,375.00
$930,000.00
$88,350.00
$1,018,350.00
w
Error in Bid
Copy of Copy of APE Bid Tab - Tukwila Andover Park East Water Main and Sewer Improvements.xlsx
7/20/2016
Owner: City of Tukwila
Project: Andover Park East Water Main and Sewer Improvements
Engineers: PACE Engineers, Inc.
BID TABULATION
Bid Date: 7/18/16
Bid Time: 3 PM
Job No.: 15412
WATER
Copy of Copy of APE Bid Tab - Tukwila Andover Park East Water Main and Sewer Improvements.xlsx 7/20/2016
Engineer's Estimate
TITAN Earthwork LLC
Scarsella Bros. Inc.
KC Equipment LLC
McCann Constr. Ent.
ITEM
NO.
ITEM OR
TASK DESCRIPTION
QUANTITY
NO.
UNITS
UNIT
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
W1
Construction Survey for Water
1
LS
$12,000.00
$12,000.00
4,000.00
$4,000.00
3,500.00
$3,500.00
20,000.00
$20,000.00
5,500.00
$5,500.00
W2
Resolution of Utility Conflicts for Water
FORCE ACOUNT
$10,000.00
$10,000.00
$10,000.00
$10,000.00
$10,000.00
W3
Deleted
W4
Trench Safety for Water
1
LS
$10,000.00
$10,000.00
3,500.00
$3,500.00
4,000.00
$4,000.00
25,000.00
$25,000.00
5,000.00
$5,000.00
W5
16" D.I. Pipe & Fittings
1,710
LF
$130.00
$222,300.00
120.00
$205,200.00
135.60
$231,876.00
145.00
$247,950.00
350.00
$598,500.00
W6
16" D.I. Pipe & Fittings, Restrained Joint
470
LF
$140.00
$65,800.00
165.00
$77,550.00
181.00
$85,070.00
150.00
$70,500.00
335.00
$157,450.00
W7
10" D.I. Pipe & Fittings, Restrained Joint
110
LF
$125.00
$13,750.00
200.00
$22,000.00
160.20
$17,622.00
150.00
$16,500.00
355.00
$39,050.00
W8
8" D.I. Pipe & Fittings
40
LF
$100.00
$4,000.00
95.00
$3,800.00
145.00
$5,800.00
150.00
$6,000.00
275.00
$11,000.00
W9
8" D.I. Pipe & Fittings, Restrained Joint
310
LF
$110.00
$34,100.00
95.00
$29,450.00
100.00
$31,000.00
150.00
$46,500.00
225.00
$69,750.00
W10
6" D.I. Pipe & Fittings, Restrained Joint
270
LF
$90.00
$24,300.00
80.00
$21,600.00
75.00
$20,250.00
150.00
$40,500.00
200.00
$54,000.00
W11
3" D.I. Pipe & Fittings, Restrained Joint
80
LF
$70.00
$5,600.00
75.00
$6,000.00
86.00
$6,880.00
150.00
$12,000.00
300.00
$24,000.00
W12
16" Butterfly Valve & Box
10
EA
$3,500.00
$35,000.00
3,400.00
$34,000.00
4,300.00
$43,000.00
3,000.00
$30,000.00
4,500.00
$45,000.00
W13
10" Gate Valve & Box
4
EA
$3,000.00
$12,000.00
2,000.00
$8,000.00
2,300.00
$9,200.00
2,000.00
$8,000.00
2,600.00
$10,400.00
W14
8" Gate Valve & Box
10
EA
$1,500.00
$15,000.00
1,400.00
$14,000.00
1,700.00
$17,000.00
1,500.00
$15,000.00
1,700.00
$17,000.00
W15
6" Gate Valve & Box (Mainline)
3
EA
$1,100.00
$3,300.00
1,050.00
$3,150.00
1,365.00
$4,095.00
1,300.00
$3,900.00
1,200.00
$3,600.00
W16
4" Gate Valve & Box
1
EA
$1,000.00
$1,000.00
865.00
$865.00
1,000.00
$1,000.00
1,200.00
$1,200.00
1,000.00
$1,000.00
W17
Connection to Existing Main
9
EA
$4,500.00
$40,500.00
3,850.00
$34,650.00
2,600.00
$23,400.00
1,000.00
$9,000.00
2,800.00
$25,200.00
W18
Connect to Existing Fire Service
7
EA
$2,500.00
$17,500.00
3,500.00
$24,500.00
3,060.00
$21,420.00
2,000.00
$14,000.00
2,200.00
$15,400.00
W19
Abandon Existing Water Main
1
LS
$5,000.00
$5,000.00
2,000.00
$2,000.00
5,000.00
$5,000.00
15,000.00
$15,000.00
10,000.00
$10,000.00
W20
Remove Existing Valve Box
16
EA
$500.00
$8,000.00
200.00
$3,200.00
500.00
$8,000.00
500.00
$8,000.00
600.00
$9,600.00
W21
Fire Hydrant Assembly
9
EA
$4,800.00
$43,200.00
5,200.00
$46,800.00
6,400.00
$57,600.00
7,000.00
$63,000.00
7,000.00
$63,000.00
W22
Remove & Salvage Existing Fire Hydrant
5
EA
$750.00
$3,750.00
300.00
$1,500.00
1,000.00
$5,000.00
1,000.00
$5,000.00
800.00
$4,000.00
W23
2" Water Service
5
EA
$3,000.00
$15,000.00
4,200.00
$21,000.00
4,200.00
$21,000.00
2,000.00
$10,000.00
5,600.00
$28,000.00
W24
1/" Water Service
1
EA
$2,500.00
$2,500.00
4,000.00
$4,000.00
3,300.00
$3,300.00
1,500.00
$1,500.00
5,000.00
$5,000.00
W25
1" Water Service
1
EA
$1,800.00
$1,800.00
2,700.00
$2,700.00
2,300.00
$2,300.00
1,400.00
$1,400.00
3,100.00
$3,100.00
W26
1" Combination Air Valve Assembly
2
EA
$2,200.00
$4,400.00
3,400.00
$6,800.00
2,660.00
$5,320.00
1,000.00
$2,000.00
3,000.00
$6,000.00
W27
Cap & Block Existing Main
1
EA
$750.00
$750.00
1,100.00
$1,100.00
1,220.00
$1,220.00
1,200.00
$1,200.00
2,500.00
$2,500.00
W28
Crushed Surfacing Top Course (CSTC)
5,200
TN
$25.00
$130,000.00
27.50
$143,000.00
18.50
$96,200.00
35.00
$182,000.00
1.00
$5,200.00
W29
Controlled Density Fill (CDF)
50
CY
$110.00
$5,500.00
245.00
$12,250.00
125.00
$6,250.00
300.00
$15,000.00
175.00
$8,750.00
W30
Special thrust block
3
EA
$3,500.00
$10,500.00
5,500.00
$16,500.00
4,500.00
$13,500.00
500.00
$1,500.00
7,500.00
$22,500.00
W31
Additional Water Main Fittings
1,000
LB
$1.00
$1,000.00
2.00
$2,000.00
6.00
$6,000.00
30.00
$30,000.00
7.00
$7,000.00
W32
Off Duty Police Officer
40
HRS
$55.00
$2,200.00
82.00
$3,280.00
75.00
$3,000.00
110.00
$4,400.00
120.00
$4,800.00
W33
Unsuitable Foundation Excavation Incl. Haul
100
CY
$35.00
$3,500.00
32.00
$3,200.00
30.00
$3,000.00
75.00
$7,500.00
54.00
$5,400.00
W34
Gravel for Trench Foundation, Class B
100
TN
$30.00
$3,000.00
28.00
$2,800.00
20.00
$2,000.00
75.00
$7,500.00
54.00
$5,400.00
W35
Quarry Spalls for Trench Foundation
100
TN
$35.00
$3,500.00
34.00
$3,400.00
35.00
$3,500.00
75.00
$7,500.00
64.00
$6,400.00
Subtotal
9.5% STATE SALES TAX
TOTAL BID
$769,750.00
$73,126.25
$842,876.25
$777,795.00
$73,890.53
$851,685.53
$777,303.00
$73,843.79
$851,146.79
$938,550.00
$89,162.25
$1,027,712.25
$1,288,500.00
$122,407.50
$1,410,907.50
Copy of Copy of APE Bid Tab - Tukwila Andover Park East Water Main and Sewer Improvements.xlsx 7/20/2016
Owner: City of Tukwila
Project: Andover Park East Water Main and Sewer Improvements
Engineers: PACE Engineers, Inc.
BID TABULATION
Bid Date: 7/18/16
Bid Time: 3 PM
Job No.: 15412
SANITARY SEWER
Copy of Copy of APE Bid Tab - Tukwila Andover Park East Water Main and Sewer Improvements.xlsx
7/20/2016
Engineer's Estimate
TITAN Earthwork LLC
Scarsella Bros. Inc.
KC Equipment LLC
McCann Constr. Ent.
ITEM
NO.
ITEM OR
TASK DESCRIPTION
QUANTITY
NO.
UNITS
UNIT
UNIT
PRICE COST
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
S1
Construction Survey for Sewer
1
LS
$15,000.00
$15,000.00
1,750.00
$1,750.00
5,000.00
$5,000.00
25,000.00
$25,000.00
2,200.00
$2,200.00
S2
Resolution of Utility Conflicts for Sewer
FORCE ACOUNT
$25,000.00
$25,000.00
$25,000.00
$25,000.00
$25,000.00
S3
Deleted
S4
Trench Safety for Sewer
1
HRS
$40,000.00
$40,000.00
10,000.00
$10,000.00
10,000.00
$10,000.00
100,000.00
$100,000.00
5,000.00
$5,000.00
S5
15" PVC Sewer
910
LF
$190.00
$172,900.00
72.00
$65,520.00
127.00
$115,570.00
200.00
$182,000.00
500.00
$455,000.00
S6
12" PVC Sewer
550
LF
$180.00
$99,000.00
60.00
$33,000.00
87.20
$47,960.00
200.00
$110,000.00
400.00
$220,000.00
S7
10" PVC Sewer
70
LF
$175.00
$12,250.00
44.00
$3,080.00
125.00
$8,750.00
250.00
$17,500.00
400.00
$28,000.00
S8
8" PVC Sewer
30
LF
$175.00
$5,250.00
44.00
$1,320.00
75.00
$2,250.00
200.00
$6,000.00
120.00
$3,600.00
S9
6" PVC Sewer
140
LF
$85.00
$11,900.00
57.00
$7,980.00
80.30
$11,242.00
200.00
$28,000.00
140.00
$19,600.00
S10
8" CIPP Sewer Rehab
1,320
LF
$61100
$79,200.00
49.00
$64,680.00
33.50
$44,220.00
55.00
$72,600.00
45.00
$59,400.00
S11
Reinstate Side Sewer (CIPP)
4
EA
$750.00
$3,000.00
2,725.00
$10,900.00
300.00
$1,200.00
2,000.00
$8,000.00
3,000.00
$12,000.00
S12
Replace Manhole Frame and Cover
5
EA
$1,500.00
$7,500.00
750.00
$3,750.00
600.00
$3,000.00
1,000.00
$5,000.00
950.00
$4,750.00
S13
60" Dia. Manhole
1
EA
$15,000.00
$15,000.00
8,750.00
$8,750.00
19,600.00
$19,600.00
20,000.00
$20,000.00
25,000.00
$25,000.00
S14
48" Dia. Manhole
5
EA
$7,500.00
$37,500.00
7,120.00
$35,600.00
9,715.00
$48,575.00
15,000.00
$75,000.00
15,000.00
$75,000.00
S15
Bypass Pumping
1
LS
$7,500.00
$7,500.00
20,000.00
$20,000.00
15,000.00
$15,000.00
100,000.00
$100,000.00
25,000.00
$25,000.00
S16
Connect to Existing King County Manhole, incl. DI Drop
Structure
1
LS
$35,000.00
$35,000.00
8,800.00
$8,800.00
9,500.00
$9,500.00
20,000.00
$20,000.00
15,000.00
$15,000.00
S17
Connect to Existing Side Sewer
6
EA
$1,000.00
$6,000.00
1,200.00
$7,200.00
2,015.00
$12,090.00
2,000.00
$12,000.00
1,000.00
$6,000.00
S18
Cap /Plug Existing Side Sewer
4
EA
$1,000.00
$4,000.00
400.00
$1,600.00
610.00
$2,440.00
500.00
$2,000.00
500.00
$2,000.00
S19A
Gravel for Trench Foundation, Class B
600
TN
$28.00
$16,800.00
34.00
$20,400.00
20.00
$12,000.00
75.00
$45,000.00
54.00
$32,400.00
S19B
Quarry Spalls for Trench Foundation
200
TN
$35.00
$7,000.00
34.00
$6,800.00
35.00
$7,000.00
75.00
$15,000.00
64.00
$12,800.00
S20
Crushed Surfacing Top Course (CSTC)
9,200
TN
$25.00
$230,000.00
27.50
$253,000.00
18.50
$170,200.00
35.00
$322,000.00
1.00
$9,200.00
S21
Controlled Density Fill (CDF)
30
CY
$110.00
$3,300.00
245.00
$7,350.00
150.00
$4,500.00
300.00
$9,000.00
170.00
$5,100.00
S22
Dewatering and Sediment Treatment
1
LS
$75,000.00
$75,000.00
75,000.00
$75,000.00
130,000.00
$130,000.00
200,000.00
$200,000.00
300,000.00
$300,000.00
S23
Off Duty Police Officer
60
HRS
$55.00
$3,300.00
82.00
$4,920.00
75.00
$4,500.00
110.00
$6,600.00
120.00
$7,200.00
S24
Concrete Sled for Unstable Foundation
75
EA
$1,000.00
$75,000.00
450.00
$33,750.00
650.00
$48,750.00
350.00
$26,250.00
400.00
$30,000.00
S25
Unsuitable Foundation Excavation Incl. Haul
200
CY
$35.00
$7,000.00
33.00
$6,600.00
30.00
$6,000.00
100.00
$20,000.00
54.00
$10,800.00
Subtotal
9.5% STATE SALES TAX
TOTAL BID
$993,400.00
$94,373.00
$1,087,773.00
$716,750.00
$68,091.25
$784,841.25
$764,347.00
$72,612.97
$836,959.97
$1,451,950.00
$137,935.25
$1,589,885.25
$1,390,050.00
$132,054.75
$1,522,104.75
Copy of Copy of APE Bid Tab - Tukwila Andover Park East Water Main and Sewer Improvements.xlsx
7/20/2016
Owner: City of Tukwila
Project: Andover Park East Water Main and Sewer Improvements
Engineers: PACE Engineers, Inc.
BID TABULATION
Bid Date: 7/18/16
Bid Time: 3 PM
Job No.: 15412
STORM DRAINS
0,
Copy of Copy of APE Bid Tab - Tukwila Andover Park East Water Main and Sewer Improvements.xlsx
7/20/2016
Engineer's Estimate
TITAN Earthwork LLC
Scarsella Bros. Inc.
KC Equipment LLC
McCann Constr. Ent.
ITEM
NO.
ITEM OR
TASK DESCRIPTION
QUANTITY
NO.
UNITS
UNIT
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
D1
Construction Survey for Storm Drains
1
LS
$1,500.00
$1,500.00
875.00
$875.00
1,750.00
$1,750.00
10,000.00
$10,000.00
1,000.00
$1,000.00
D2
Resolution of Uitlity Conflicts for Storm Drains
1
FA
$1,500.00
$5,000.00
5,000.00
$5,000.00
5,000.00
$5,000.00
5,000.00
$5,000.00
5,000.00
$5,000.00
D3
Deleted
D4
Trench Safety for Storm Drains
1
LS
$1,000.00
$1,000.00
1,500.00
$1,500.00
1,000.00
$1,000.00
5,000.00
$5,000.00
1,000.00
$1,000.00
D5
Replace CB Castings - Rectangular Vaned
11
EA
$500.00
$5,500.00
500.00
$5,500.00
535.00
$5,885.00
700.00
$7,700.00
850.00
$9,350.00
D6
Replace CB Castings - Rectangular Solid
5
EA
$500.00
$2,500.00
500.00
$2,500.00
535.00
$2,675.00
750.00
$3,750.00
850.00
$4,250.00
D7
Replace DB Castings - Round Solid
6
EA
$500.00
$3,000.00
500.00
$3,000.00
600.00
$3,600.00
700.00
$4,200.00
850.00
$5,100.00
D8
Catch Basin Type -2 48 -in. Dia.
4
EA
$2,500.00
$10,000.00
5,600.00
$22,400.00
4,015.00
$16,060.00
3,000.00
$12,000.00
6,000.00
$24,000.00
D9
12" Reinforced Conc. Storm Pipe
20
LF
$50.00
$1,000.00
135.00
$2,700.00
110.00
$2,200.00
1,000.00
$20,000.00
180.00
$3,600.00
D10
Crushed Surfacing Top Course (CSTC)
30
TN
$25.00
$750.00
27.50
$825.00
18.50
$555.00
75.00
$2,250.00
1.00
$30.00
D11
Controlled Density Fill (CDF)
15
CY
$110.00
$1,650.00
245.00
$3,675.00
150.00
$2,250.00
300.00
$4,500.00
170.00
$2,550.00
Subtotal
9.5% STATE SALES TAX
TOTAL BID
$31,900.00
$3,030.50
$34,930.50
$47,975.00
$4,557.63
$52,532.63
$40,975.00
$3,892.63
$44,867.63
$74,400.00
$7,068.00
$81,468.00
$55,880.00
$5,308.60
$61,188.60
0,
Copy of Copy of APE Bid Tab - Tukwila Andover Park East Water Main and Sewer Improvements.xlsx
7/20/2016
Owner: City of Tukwila
Project: Andover Park East Water Main and Sewer Improvements
Engineers: PACE Engineers, Inc.
BID TABULATION
Bid Date: 7/18/16
Bid Time: 3 PM
Job No.: 15412
ROAD
PROJECT TOTALS
Engineer's Estimate
TITAN Earthwork LLC
Scarsella Bros. Inc.
KC Equipment LLC
McCann Constr. Ent.
ITEM
NO.
ITEM OR
TASK DESCRIPTION
QUANTITY
NO.
UNITS
UNIT
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
UNIT
PRICE
COST
R1
Asphalt Treated Base (ATB)
3,500
TN
$120.00
$420,000.00
80.00
$280,000.00
64.00
$224,000.00
64.00
$224,000.00
67.00
$234,500.00
R2
Hot Mix Asphalt (HMA)
2,350
TN
$140.00
$329,000.00
87.00
$204,450.00
76.00
$178,600.00
76.00
$178,600.00
76.00
$178,600.00
R3
2" Asphalt Grind
2,700
SY
$8.00
$21,600.00
6.00
$16,200.00
3.25
$8,775.00
5.00
$13,500.00
12.00
$32,400.00
R4
Replace Induction Loop Vehicle Detector
46
EA
$1,000.00
$46,000.00
950.00
$43,700.00
660.00
$30,360.00
800.00
$36,800.00
850.00
$39,100.00
R5
Replace ADA Curb Ramp
8
EA
$5,000.00
$40,000.00
2,600.00
$20,800.00
1,750.00
$14,000.00
2,500.00
$20,000.00
3,500.00
$28,000.00
R6
Remove and Replace Curb & Gutter
600
LF
$75.00
$45,000.00
65.00
$39,000.00
55.00
$33,000.00
50.00
$30,000.00
75.00
$45,000.00
R7
Remove and Replace Sidewalk and Driveway
360
SY
$50.00
$18,000.00
120.00
$43,200.00
90.00
$32,400.00
100.00
$36,000.00
125.00
$45,000.00
R8
Channelization & Pavement Markings
1
LS
$50,000.00
$50,000.00
15,000.00
$15,000.00
15,000.00
$15,000.00
20,000.00
$20,000.00
15,000.00
$15,000.00
R9
CSTC
200
TN
$25.00
$5,000.00
27.50
$5,500.00
30.00
$6,000.00
100.00
$20,000.00
65.00
$13,000.00
R10
Replace Monument
2
EA
$1,000.00
$2,000.00
950.00
$1,900.00
700.00
$1,400.00
500.00
$1,000.00
1,850.00
$3,700.00
R11
Pavement Sawcut
1,700
LF
$6.00
$10,200.00
3.00
$5,100.00
2.25
$3,825.00
10.00
$17,000.00
4.00
$6,800.00
R12
Temporary HMA Patch Over Utilities (3 ")
820
TN
$140.00
$114,800.00
250.00
$205,000.00
75.00
$61,500.00
100.00
$82,000.00
180.00
$147,600.00
R13
Roadway Excavation Incl. Haul
3,500
CY
$35.00
$122,500.00
33.00
$115,500.00
38.00
$133,000.00
35.00
$122,500.00
55.00
$192,500.00
R14
Unsuitable Foundation Excavation Inc. Haul
500
CY
$35.00
$17,500.00
33.00
$16,500.00
30.00
$15,000.00
50.00
$25,000.00
54.00
$27,000.00
R15
Gravel for Roadway Foundation, Class B
500
TN
$30.00
$15,000.00
45.00
$22,500.00
20.00
$10,000.00
70.00
$35,000.00
54.00
$27,000.00
R16
Quarry Spalls for Roadway Foundation
400
TN
$35.00
$14,000.00
45.00
$18,000.00
35.00
$14,000.00
50.00
$20,000.00
64.00
$25,600.00
TOTAL BID
$1,270,600.00
$1,052,350.00
$780,860.00
$881,400.00
$1,060,800.00
PROJECT TOTALS
$4,010,892.25
3,561
$3,756,659.38
$4,483,84030
$5,073,350.85
Error in Estimate
An error was discovered in the original Engineers Estimate provided for the bid
opening, increasing the estimate from $399,657.25 to $4,010,892.25.
Error in Bid
Rounding error resulted in a 1 cent difference between the bid and the calculated amount
Bid received was for $3,504,684.14
Error in Bid
The total bid amount shown on sheet P6 was $4,461,940.50
The correct amount should have been $4,483,840.50
Copy of Copy of APE Bid Tab - Tukwila Andover Park East Water Main and Sewer Improvements.xlsx
7/20/2016
. . . . .......
An 5ngIfnedrg Sov*m GE omrfflvY
Mike Cusick
Sienior Proqram Mnqr, - Water/Sewer
Dear Mike,
Fngn,'�-n� I Hanners, i Swveycvr'�d
Four bids for the Andover Park East Water Main and Sewer Replacements project were received and
opened on July 18, 20116. The bids ranged from $3,504,684.13 to $5,073,350i,85, with tile lo)/v b!id
being received from Titan Earthwork LLC,. The engineer's estimate for the work was $4,010,892.25. A
tabulation of all bids received is enclosed with this letter,
ME I
Based on the reference letters and the one other r-eTerence were able to contact in the short time we
had, and on the fact that they were the lowest responsible bidder, we recommenid that the contract for
the Andover Park East Water Main and Sewer Replacements project. be awarded to Titan Earthwork
LLC for the contract amount of $3,504,684.13, including Washington State Sa�es Tax. Pilease let me
know if you have any questions.
Sincerely,
PACE Engineers, Inc.
'00
Dave Hutlefir, PE,,"'/
Vice President
L%��
r PI 151112 Pa 'lovei Ps,14' Vi'
KfrM 8'd VV,r.,-,nmcron 6715
J
r 425,827,504�
��Ii
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Andover Park E Water Main Replacement Project No. 99940103
DESCRIPTION: Design and construct 2,700 LF of new 8" & 16" ductile iron pipe along Andover Park East from Tukwila Pkwy
to Strander Blvd.
JUSTIFICATION: Support future growth within this area of the CBD as aging cast iron system has suffered frequent failures.
STATUS: Survey and design is complete. Construction is scheduled for 2016 from Strander Blvd to Tukwila Pkwy
with final paving in 2017.
MAINT. IMPACT: A new pipe will significantly reduce impact on crews from the risk of cataclysmic events.
COMMENT: PWTF loans were rescinded in 2014 & 2015 by the State Legislature.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
140
59
199
Land(R /W)
0
Const. Mgmt.
284
100
384
Construction
2,100
685
2,785
TOTAL EXPENSES
140
1 2,443
1 785
1 01
01
01
01
01
01
3,368
FUND SOURCES
Awarded Grant
0
Proposed Bond
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
140
2,443
785
0
0
0
0
0
0
3,368
TOTAL SOURCES
140
2,443
785
0
0
0
0
0
0
3,368
2017 - 2022 Capital Improvement Program 60 10
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Andover Park East Sewer Replacement Project No. 91440204
DESCRIPTION: Design and construct 1,600 LF of 15" and 12" sanitary sewer from Strander Blvd. to 1 -405 in Andover Park E.
JUSTIFICATION: Sewer improvement will provide additional capacity for future development along Andover Park East.
STATUS: Project will overlay Andover Park East from Strander Blvd to 1 -405 in 2017.
MAINT. IMPACT:
COMMENT: Construction is scheduled for 2016 from Strander Blvd to Tukwila Parkway.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
47
43
90
Land(R /W)
0
Const. Mgmt.
206
50
256
Construction
1,626
500
2,126
TOTAL EXPENSES
47
1 1,875
1 550
1 0
0
0
0
0
0
2,472
FUND SOURCES
Awarded Grant
0
Proposed PWTF /Bond
0
Mitigation Actual
0
Mitigation Expected
290
290
Utility Revenue
47
1,585
550
0
0
0
0
0
0
2,182
TOTAL SOURCES
47
1,875
550
0
0
0
0
0
0
2,472
2017 - 2022 Capital Improvement Program 77 11
IN
City of Tukwila
Allan Ekberg, Mayor
TO: Utilities Committee
FROM: Bob Giberson, Public Works Director,
BY: Ryan Larson, Senior Program Manager
CC: Mayor Ekberg
DATE: July 22, 2016
SUBJECT: 2016 Small Drainage Program
Project No. 91641201
Resolution Rejecting All Bids
ISSUE
The one bid received for the 2016 Small Drainage Program came in higher than the Engineer's
Estimate and the available surface water budget.
BACKGROUND
The 2016 Annual Small Drainage Program was advertised for bids on July 5 and 12, 2016. One
bid was received and opened on July 19, 2016. The bid was from Westwater Construction
Company for a total bid amount of $785,279.00 (see attached bid tabulation). The Engineer's
Estimate was $519,040.00 and the available budget in the 2015 -2020 CIP for construction in 2016
is $605,000.
Construction Funding Source
Amount
20.1..6... Small Drainage.._ Construction .................. ....._ _.................._...........
2016 Storm Water Quality Retrofit Program
._..._$......_525,000.00......
80,000.00
Available Funding
$605,000.00
ANALYSIS
Staff has certified the bid and did not find any errors. The bid received is significantly higher than
the Engineer's Estimate and an analysis of the project design and bid prices was conducted.
There was no single reason to explain why the bid was more than 25% above the Engineer's
Estimate, but staff and the design consultant, KPG, speculate that the lack of other bidders may
be the reason. An analysis of the Engineer's Estimate was also conducted based on recent bid
results from the area. This analysis did not reveal any significant issues with the estimate nor
reasons to think that it did not accurately reflect the likely cost of constructing the project in a
competitive bid environment.
KPG also looked for reasons that only one bid was received. The bidding climate remains
competitive, which is reducing the number of bidders on projects and leading to increased
construction costs. Two plan holders were contacted and asked why they had not submitted bids
on the project. The two plan holders stated that they did not submit a bid as they were concerned
with completing the project within the allowable timeframe, that their existing work load was too
heavy, and that there were 16 other plan holders and they thought that there would be too much
competition.
Staff recommends rejecting the bid and rebidding the project at a later date. The new bid
document should allow additional time and flexibility to complete the individual projects.
wApw eng \projects \a - dr projects \annual small drainage programs\2016 sdp (91641201) \design \information memo - 2016 sdp bid rejection.docx 13
INFORMATIONAL MEMO
Page 2
FINANCIAL IMPACT
Rejecting the bid does not have a financial impact in and of itself, but it will result in additional
design costs to repackage it as well as the additional costs for advertising. Overall, repackaging
of the pr ject is anticipated to save the City money.
RECOMMENDATION
Council is being asked to approve the Resolution rejecting the bid received at the July 19, 2016
bid opening for the 2016 Small Drainage Program and consider this item on the Consent Agenda
at the August 1, 2016 Regular Meeting.
ATTACHMENTS
Draft Resolution
Bid Tabulation
CIP Sheets
W:\PW Eng\PROJECTS\A- DR Projects\Annual Small Drainage Programs1201s SDP (91641201)\Design\ImFORMATION MEMO '201sSDP Bid Rejection.docx
14
i;
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
TUKWILA, WASHINGTON, REJECTING ALL BIDS SUBMITTED
FOR THE 2016 SMALL DRAINAGE PROGRAM.
WHEREAS, sealed bids were solicited for the 2016 Small Drainage Program; and
WHEREAS, a bid was received from one bidder and was publicly opened and read aloud on
July 19, 2016; and
WHEREAS, a budget was set for the construction of the drainage improvements; and
WHEREAS, the low bid received was over the budgeted amount for construction of the 2016
Small Drainage Program; and
WHEREAS, the City reserved the right to reject all bids in its call for bids, and RCW 35.23.352
provides for the rejection of any or all bids by resolution of the City Council; and
WHEREAS, the City wishes to reject all bids due to budget limitations;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON,
HEREBY RESOLVES AS FOLLOWS:
The bid for the 2016 Small Drainage Program is hereby rejected due to budget limitations.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a
Regular Meeting thereof this day of 12016.
ATTEST/AUTHENTICATED:
Christy O'Flaherty, MMC, City Clerk Joe Duffie, Council President
Filed with the City Clerk:
Passed by the City Council:
Resolution Number:
Rachel B. Turpin, City Attorney
WAWord ProcessingNResolutionsReject bids for 2016 Small Drainage Program 7-20-16
RL:bjs Page 1 of 1 15
CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS
2016 Small Drainage Program
Bid Tabulation
Project No. 91641201
Prepared By: Kelsey Anderson, PE
Checked By: Nelson Davis, PE
7/19/2016
Engineer's Estimate
Westwater Construction
Company
No.
Section on
Item
Quantity
Unit
Unit Cost
Total Cost
Unit Cost
Total Cost
ROADWAY
1
1 -04
Unexpected Site Changes
1
FA
$ 12,000.00
$ 12,000.00
$ 12,000.00
$ 12,000.00
2
1 -09
Mobilization
1
LS
$ 42,500.00
$ 42,500.00
$ 80,000.00
$ 80,000.00
3
1 -10
Project Temporary Traffic Control
1
LS
$ 20,000.00
$ 20,000.00
$ 77,000.00
$ 77,000.00
4
2 -01
Clearing and Grubbing
1
LS
$ 14,000.00
$ 14,000.00
$ 2,000.00
$ 2,000.00
5
2 -02
Remove and Replace Handrail
1
LS
$ 2,000.00
$ 2,000.00
$ 2,000.00
$ 2,000.00
6
2 -02
Pavement Removal Incl. Haul
450
SY
$ 15.00
$ 6,750.00
$ 5.00
$ 2,250.00
7
2 -03
Unsuitable Foundation Excavation Incl. Haul
45
CY
$ 35.00
$ 1,575.00
$ 50.00
$ 2,250.00
8
2 -03
Gravel Borrow Incl. Haul
115
TN
$ 30.00
$ 3,450.00
$ 20.00
$ 2,300.00
9
4 -04
Crushed Surfacing Top Course
335
TN
$ 45.00
$ 15,075.00
$ 20.00
$ 6,700.00
10
5 -04
HMA Cl. 1/2" PG 64 -22
180
TN
$ 200.00
$ 36,000.00
$ 100.00
$ 18,000.00
11
5 -04
HMA Thickened Edge
530
LF
$ 10.00
$ 5,300.00
$ 5.00
$ 2,650.00
12
8 -01
Temporary Water Pollution / Erosion Control
1
LS
$ 9,000.00
$ 9,000.00
$ 10,000.00
$ 10,000.00
13
8 -04
Cement Conc. Traffic Curb and Gutter
40
LF
$ 55.00
$ 2,200.00
$ 150.00
$ 6,000.00
14
8 -14
Cement Conc. Sidewalk
220
SY
$ 60.00
$ 13,200.00
$ 35.00
$ 7,700.00
ROADSIDE DEVELOPMENT
15
8 -02
Topsoil Type A
75
CY
$ 50.00
$ 3,750.00
$ 45.00
$ 3,375.00
16
8 -02
Hydroseed
640
SY
$ 4.00
$ 2,560.00
$ 3.00
$ 1,920.00
17
8 -02
Property Restoration
1
FA
$ 15,000.00
$ 15,000.00
$ 15,000.00
$ 15,000.00
STORM DRAINAGE
18
7 -04
Storm Sewer Pipe 12 In. Diam
692
LF
$ 70.00
$ 48,440.00
$ 177.00
$ 122,484.00
19
7 -04
Storm Sewer Pipe 8 In. Diam
307
LF
$ 50.00
$ 15,350.00
$ 170.00
$ 52,190.00
20
7 -04
Storm Sewer Pipe 6 In. Diam
68
LF
$ 35.00
$ 2,380.00
$ 110.00
$ 7,480.00
21
7 -04
Storm Sewer Pipe 4 In. Diam
65
LF
$ 30.00
$ 1,950.00
$ 100.00
$ 6,500.00
22
7 -04
Ductile Iron Storm Sewer Pipe 12 in. Diam.
21
LF
$ 100.00
$ 2,100.00
$ 270.00
$ 5,670.00
23
7 -04
Ductile Iron Storm Sewer Pipe 8 In. Diam.
156
LF
$ 85.00
$ 13,260.00
$ 260.00
$ 40,560.00
24
7 -04
Class III Reinforced Concrete Sewer Pipe 36 In. Diam
6
LF
$ 450.00
$ 2,700.00
$ 400.00
$ 2,400.00
25
7 -04
Remove /Abandon Existing Storm Sewer Pipe
190
LF
$ 15.00
$ 2,850.00
$ 75.00
$ 14,250.00
26
7 -05
Connection to Drainage Structure
8
EA
$ 1,000.00
$ 8,000.00
$ 1,000.00
$ 8,000.00
27
7 -05
Connection to Drainage Pipe
2
EA
$ 500.00
$ 1,000.00
$ 1,000.00
$ 2,000.00
28
7 -05
Storm Cleanout
2
EA
$ 500.00
$ 1,000.00
$ 700.00
$ 1,400.00
29
7 -05
Concrete Inlet
9
EA
$ 900.00
$ 8,100.00
$ 1,200.00
$ 10,800.00
30
7 -05
Debris Barrier
1
EA
$ 300.00
$ 300.00
$ 2,500.00
$ 2,500.00
31
7 -05
Catch Basin, Type 1
14
EA
$ 1,200.00
$ 16,800.00
$ 1,500.00
$ 21,000.00
32
7 -05
Catch Basin, Type 1L
1
EA
$ 1,500.00
$ 1,500.00
$ 1,700.00
$ 1,700.00
33
7 -05
Catch Basin Type 2 48 In. Diam.
1
EA
$ 3,250.00
$ 3,250.00
$ 2,800.00
$ 2,800.00
34
7 -05
Catch Basin Type 2 60 In. Diam. W /Overflow Cage
1
EA
$ 7,000.00
$ 7,000.00
$ 22,000.00
$ 22,000.00
35
7 -05
Trench Drain
1
LS
$ 2,000.00
$ 2,000.00
$ 5,200.00
$ 5,200.00
36
7 -06
Pothole Existing Utilities
4
EA
$ 800.00
$ 3,200.00
$ 1,000.00
$ 4,000.00
37
7 -10
4' X 17' Modular Wetland Unit
1
EA
$ 44,000.00
$ 44,000.00
$ 75,000.00
$ 75,000.00
38
7 -20
Temporary Water Bypass System
1
LS
$ 5,000.00
$ 5,000.00
$ 15,000.00
$ 15,000.00
39
8 -15
Light Loose Riprap
30
CY
.$ 150.00
$ 4,500.00
$ 40.00
$ 1,200.00
40
8 -30
Resolution of Utility Conflicts
1
FA
$ 10,000.00
$ 10,000.00
$ 10,000.00
$ 10,000.00
STORM DRAINAGE ACCESS IMPROVEMENTS
41
6 -02
Inlet Stair Structure
1
LS
$ 60,000.00
$ 60,000.00
$ 50,000.00
$ 50,000.00
42
6 -20
Outlet Stair Structure
1
LS
$ 50,000.00
$ 50,000.00
$ 50,000.00
$ 50,000.00
BID TOTAL:
$ 519,040.00
$ 785,279.00
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Annual Small Drainage Program Project No. Varies
DESCRIPTION: Select, design, and construct small drainage projects throughout the City.
JUSTIFICATION: Provide drainage corrections for existing /ongoing drainage problems throughout the City, including culvert
replacements, drain extensions, and pavement upgrades.
STATUS: Projects for this annual program are taken from Small Drainage Project List.
MAINT. IMPACT: Reduces maintenance.
Ongoing project, only one year shown in first column. Construction expenses may occur over two calendar
COMMENT: years. Budget for 2014 includes $270k for Thorndyke Safe Routes to School (S 150th St). Grants from State
Municipal Stormwater Capacity Grants.
FINANCIAL Through Estimated
/in Q000'sl 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
60
80
80
80
80
80
80
80
620
Land (R/W)
0
Const. Mgmt.
70
80
80
80
80
80
80
80
630
Construction
279
270
325
525
525
525
525
525
525
4,024
TOTAL EXPENSES
409
270
485
685
685
685
685
685
685
5,274
FUND SOURCES
Awarded Grant
50
50
100
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
409
220
485
635
685
685
685
685
685
5,174
TOTAL SOURCES
409
1 270
1 485
1 685
685
1 685
1 685
1 685
685
1 5,274
0 ' r
Project Location.
Entire System
M
w
Z+'
LOS
2015 - 2020 Capital Improvement Program 82 17
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2015 to 2020
PROJECT: Storm Water Quality Retrofit Program Project No. 91241202
DESCRIPTION: Design and install water quality improvements at selected drainage locations throughout the City.
JUSTIFICATION: Most surface water is discharged directly to receiving water bodies untreated.
STATUS: Additional water quality is being added to Interurban Ave S in 2014 and 42nd Ave S in 2015.
MAINT. IMPACT: Expected to increase maintenance.
COMMENT: Combine with other CIP projects for design and construction, where feasible.
FINANCIAL Through Estimated
(in $000's) 2013 2014 2015 2016 2017 2018 2019 2020 BEYOND TOTAL
EXPENSES
Design
15
15
15
15
15
15
15
15
120
Land (R/W)
0
Const. Mgmt.
15
15
15
15
15
15
15
15
120
Construction
80
80
80
80
80
80
80
80
640
TOTAL EXPENSES
1 01
110
1 110
1 110
1 110
1 110
1 110
1 110
1 110
1 880
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
110
110
110
110
110
110
110
110
880
TOTAL SOURCES
1 0
110
1 110
1 110
1 110
1 110
1 110
1 110
1 110
1 880
2015 - 2020 Capital Improvement Program 83 18
City of Tukwila Allan Ekberg, Mayor
Public Works Department - Bob Giberson, Director
TO:
Utilities Committee
FROM:
Bob Giberson, Public Works Director 1/4
BY:
Gail Labanara, Public Works Analyst
CC:
Mayor Ekberg
DATE:
July 22, 2016
SUBJECT:
Proposed 2017-2018 Biennial Budget
Water, Sewer & Surface Water Enterprise Funds
ISSUE
Utilities Committee to review Proposed 2017-2018 Biennial Budget, Rate Model, and Capital
Improvement Programs for Water, Sewer and Surface Water Enterprise Funds.
DISCUSSION & FISCAL IMPACT
Water Fund
• Rate increases of 5% across the board
• Remains at 7.5 Employees
• CIP includes Andover Park E, Macadam Rd S, 58th Ave S, and 53rd Ave S
• Long range concern includes Water Reservoir
• Facilities debt service is estimated at $400k/year
Sewer Fund
• Rate increases of 3.5% every other year, opposite King County sewer treatment increases
• Adding 1 Full Time Employee from 3.5 to 4.5 employees
• CIP includes CBD Sewer Rehab, Andover Park E, Sewer Lift Station #2, and 53rd Ave S
• Long range concerns include aging infrastructure and replacing sewer lift stations
• Facilities debt service is estimated at $240k/year
Surface Water Fund
• Rate increases of 5% and 3%, alternate years
• Adding .5 Foreman (previously shared with Street dept.) from 12.5 to 13 employees
• CIP includes 42nd Ave S, Chinook Wind, Tukwila 205 Levee, EMW Outfalls, and 53rd Ave S
• Long range concerns include NPDES requirements, aging infrastructure, and levee
• Facilities debt service is estimated at $560k/year
Utilities Committee approval to forward the Water, Sewer, and Surface Water section of the 2017-
2018 Biennial Budget to the Committee of the Whole.
Attachments: Proposed Budget, Rate Model and CIP Sheets
WAShared Copy Only\Gail\Budget 2017-2019\lnfo Memo UC Review 2017-2018 W-S-SWM 07-22-16 gl sb,docx
IF]
ozol
City of Tukwila Proposed Utility Rate Increases
Monthly Fees for Residential Customers
With 10 % City Interfuna Utility Tax
RESIDENTIAL WATER RATES 2005
2006 2007 2008
2009 2010 2011 2012 2013 2014
2015 2016
2017
2018 2019
2020 2021
2022
Total
CWA Purchased Water Pass - through
(Average monthly rate with 10 ccf)
+3%
$2.98 to $3.07
$0.90
+10%
$3.07 to $3.38
$3.10
+15%
+11.7%
$3.38 to $3.77
$3.90
+15%
+10%
+10%
+10%
+5%
+5%
+5
+2.5
$3.90 to $3.98
$0.80
+5%
+2.5
$4.08 to $4.18
51.00
+5
+2.5
$4.28 to $4.38
$1.00
+5
+2.5
$4.48 to $4.59
$1.10
+5
+2.5
$4.70 to $4.80
$1.00
+5
+2.5
$4.92 to $5.04
$1.20
$14.00
City of Tukwila Water
(Average monthly rate with 10 ccf)
+3.3%
$3.77 to $3.90
$1.20
+2.5%
$3.98 to $4.08
$1.00
+2.5
$4.18 to $4.28
$1.00
+2.5%
$4.38 to $4.48
$1.00
+2.5
$4.59 to $4.70
$1.10
+2.5%
$4.80 to $4.92
$1.20
+2.5
$5.04 to $5.16
$1.20
$7.70
City of Tukwila Minimum Monthly
charge per meter /each dwelling unit
Range 3%-20%
$6.00 to $8.00
$2.00
Range 3%-20%
$8.00 to $10.00
$2.00
Range 3%-20%
10.00 to 12.00
$2.00
Range 3%-20%
12.00 to 14.00
$2.00
Range 3%-7%
14.00 to 15.00
$1.00
Range 3%-7%
15.00 to 16.00
$1.00
0%
$16.00
Range 3%-7%
16.00 to 17.00
$1.00
Range 3%-7%
17.00 to 18.00
$1.00
Range 3%-7%
18.00 to 19.00
$1.00
Range 3%-7%
19.00 to 20.00
$1.00
$20.00
$20.00
$14.00
Commercial Water
2005
2006
2007
+15%
2009
Range +66%
Range +50%
Range +33%
+8%
+6.5%
Range +5%
+5%
+5%
+5%
+5%
+5%
+5%
+5%
Total
City of Tukwila Surface Water
+9%
0%
$3.83 to $3.94
$3.94 to $4.33
$4.33 to $4.98
$4.98
$4.98
$4.98
$4.98 to $5.36
$5.36 to $5.72
$5.72 to $6.00
$6.00 to $6.30
$6.30 to $6.62
$6.62 to $6.94
$6.94 to $7.28
$7.28 to $7.64
$7.64 to $8.00
$8.00 to $8.40
Consumption Increase
23.40 to 25.60
$25.60
$0.11
$27.95
27.95 to 31.90
$31.90
31.90 to 36.10
$36.10
$0.38
$0.36
$0.28
$0.30
$0.32
$0.32
$0.34
$0.36
$0.36
$0.40
62.89
Minimum Charge based on Meter Size
$2.20
$4.33 to $5.17
$2.35
$12.00
$12.00
$20 -$360
$30- $480
$40 -$575
$3.69
$8.92 to $9.83
$45 -$600
11.83 to 13.58
$2.19
14.25 to 14.66
$50 -$625
15.42 to 15.83
$1.20
$1.24
$25.57
Monthly Increase for chart
18.86
+15%
Fire lines
+15%
+15%
+15%
Fire lines
+20%
+20%
+15%
Fire lines
0%
0%
+3.5%
Fire lines
+3.4%
0%
+3.2%
$13.16
RESIDENTIAL SEWER RATES
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
Total
City of Tukwila Surface Water
+9%
0%
+9.17%
0%
+14.13%
0%
+13.17%
0%
+10.22%
0%
+5.6%
0%
+5.2%
0%
+5.2%
0%
+2.6%
+2.6%
King County Sewer Treatment
23.40 to 25.60
$25.60
25.60 to 27.95
$27.95
27.95 to 31.90
$31.90
31.90 to 36.10
$36.10
36.10 to 39.79
$39.79
39.79 to 42.03
$42.03
42.03 to 44.22
$44.22
44.22 to 46.53
$46.53
46.53 to 47.73
47.73 to 48.97
62.89
(Monthly Flat Rate)
$2.20
$4.33 to $5.17
$2.35
$0.00
$3.95
$5.92 to $7.08
$4.20
$7.75 to $8.50
$3.69
$8.92 to $9.83
$2.24
11.83 to 13.58
$2.19
14.25 to 14.66
$2.31
15.42 to 15.83
$1.20
$1.24
$25.57
Monthly Increase for chart
18.86
+15%
+10%
+15%
+15%
+15%
+20%
+20%
+20%
+15%
+10%
0%
0%
+3.5%
0%
+3.4%
0%
+3.2%
$13.16
City of Tukwila Sewer
$7
$7 to $8
$8 to $8.80
$8.80 to $10.12
10.12 to 11.64
11.64 to 13.39
13.39 to 16.06
16.06 to 19.26
19.26 to 23.10
23.10 to 26.50
$26.50 to $29
$29.00
$29.00
$29 to $30
$30.00
$30 to $31
$31.00
$31 to $32
+20%
(Monthly Flat Rate)
0.00
$1.00
$0.80
$1.32
$1.52
$1.75
$2.67
$3.20
$3.84
$3.40
$2.50
$1.00
$1.00
$1.00
$25.00
Monthly Sewer Bill (Residential)
$32.60
$33.60
$36.75
$38.07
$43.54
$45.29
$52.16
$55.36
$62.89
$66.29
$71.03
$71.03
$73.22
$74.22
$76.53
$77.53
$78.73
$80.97
Commercial Sewer Rate Increases
+19.7% +15%
+29.3% +15% +33.17% +20% +30.22% +15%
+15.6% 1 +5% +5.2% +3.5%
+5.2
+3.4% +2.6% +5.8
RESIDENTIAL SURFACE WATER
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2021
Total
City of Tukwila Surface Water
2017
+20%
2019
+15%
2021
+20%
+10%
+10%
+5%
+10%
+20%
+15%
+5%
+3%
+5%
+3%
+5%
+5%
Annual Charge (billed Jan & July)
$52 to $62
$62.00
$62 to $71
$71.00
$71 to $85
$85 to $93
$93 to $102
$102 to $107
$107 to $118
$118 to $142
$142 to $163
$163 to $171
$171 to $176
$176 to $185
$185 to $190
$190 to $200
$190 to $200
62.89
Annual Charge divided monthly
71.03
$4.33 to $5.17
$73.22
$5.17 to $5.92
i 78:53
$5.92 to $7.08
$7.08 to $7.75
$7.75 to $8.50
$8.50 to $8.92
$8.92 to $9.83
$9.83 to $11.83
11.83 to 13.58
13.58 to 14.25
14.25 to 14.66
14.66 to 15.42
15.42 to 15.83
15.83 to 16.66
15.83 to 16.66
15.42
Monthly Increase for chart
18.86
$0.84
Rat Fee
$0.75
$ : 93.25
$1.16
$0.67
$0.75
$0.42
$0.91
$2.00
$1.75
$0.67
$0.41
$0.76
$0.41
$0.83
$0.83
$13.16
Commercial Surface Wa ter - Same Increases as Residential
+15%
+20%
+10%
+10%
+5%
+10%
+20%
+15%
+5% r +3%
+5%
+3%
+5%
+5%
Total Monthly
Residential Increase $
$2.20 $
$1.84 $
$4.05 $
$5.17 $
$10.57 $
$4.91 $
$9.54 $
$5.95 $
$9.95 $
$5.31 $
$7.74 $
$1.75 $
$5.66 $
$4.41 $
$6.07 $
$4.61 $
$4.23 $
$5.47 $
$99.43
2016
Water Sewer SSWM
Average 6ccf Bills Bills
Single Family 1,255 968 3,465
Multi Family 172 162 n/a
Commercial 722 641 1,777
2,149 1,771 5,242
N.)
q:gail\ciplrate matrix
Average
Monthly
2011
2012 :
2013
2014
2013
N.)
q:gail\ciplrate matrix
Average
Monthly
2011
2012 :
2013
2014
2013
2016
2017
2018
2019
2020
2021
2021
Residential Bill
Water
$ 33.34
$ 35:34
$ 37.40
$' 38.40
$ 39,40
$ 39.40:
$ 41.48
$ 43.68
;:$ 4588
$ : 4820
$ 49.52
$ 50,96
:6 ccf
Sewer
52.16
; 55.36
62.89
66.29
71.03
71 03
$73.22
74 22
i 78:53
77 -53
7873
80.97
Rat Fee
SWM
7/5
r 8:50
8.92
9,83
111.83
13.58:
14,25
14.66
15.42
! 15.83
18.86
16.88
Rat Fee
Total
$ : 93.25
S 99.20
$ :109.21
$; 114.52
$ 122.26
$ 24.01
128.95
$ `. 132.56
i$ 137.83
$ X141.56
$.' 144.91
$ 148.59
4%
3%
4%
3%
2%
3%
7/20/2016
04
DEPARTMENT: Public Works
FUND: Water FUND NUMBER: 401
RESPONSIBLE MANAGER: Bob Giberson POSITION: Director
Description
The mission of the Water Utility is to operate and maintain a water distribution system that will
provide residential, commercial, and industrial customers with high water quality, adequate capacity
and pressure, at economical costs. The system distributes, on an annual basis, approximately 697
million gallons of water through 41 miles of water mains through approximately 2,100 meters. The
Water Utility maintains relationships with adjoining jurisdictions, cities, water districts, sewer districts,
and the Washington State Department of Health. Additional service is provided with reclaimed water
along the Interurban Avenue South Corridor.
2015 -2016 Accomplishments
♦ Continued monitoring water use efficiency efforts and provided an annual report.
♦ Achieved 10% water savings to meet Water Efficiency Goals established by the Municipal Water
Law.
♦ Began development of the GIS as- builts of city water infrastructure.
2017 -2018 Outcome Goals
♦ Improve water use efficiency. Strategic Goal 1. Utility Comp Plan Goal 12.1
♦ Improve water system reliability. Strategic Goal 1. Utility Comp Plan Goal 12.1
♦ Increase water system capacity. Strategic Goal 1. Utility Comp Plan Goal 12.1
2017 -2018 Indicators of Success
♦ Complete construction of Andover Park E Water Main Replacement.
♦ Complete construction of Macadam Rd S Water Upgrade.
♦ Complete construction of 58th Ave S Water Main Replacement.
♦ Finish design and begin construction of 53rd Ave S.
♦ Finish design and begin construction of Martin Luther King Jr Water Main.
♦ Continued development of the GIS as- builts of city water infrastructure.
23
Performance Measures
Public Works -Water
2014
Actual
2015
Actual
2016
Estimated
2017
Projection
2018
Projection
Ensure a safe supply of drinking water
Number of backflow prevention assemblies (BPA) certified
1,480
1,490
1,500
1,665
1,685
Number of water system samples tested
25
20
25
47
50
Number of zones where mains are flushed
150
147
150
129
135
Bi- monthly tests for coliform & chlorine residual levels
18
18
18
25
25
Number of fire hydrants tested
5761
580
585
570
575
Capital
Number of water meters 2 inches and larger tested for
accuracy
100
125
145
90
100
Number of new water meters installed within 48 hours of
hook -up request
10
10
10
13
15
Customers
Number of water customers
2,126
2,145
2,145
2,150
2,349
Total Gallons of Water Purchased (in thousands)
684,337
697,147
712,000
775,000
776,000
Number of total water system miles
43.00
42.00
43.00
44.00
44.00
Number of fire hydrants
590
591
595
595
600
Number of shut -off notices
435
387
3801
375
370
Number of actual shut -offs for non - payment
75
45
40
40
40
24
Revenue and Expense Summary
Water Fund
Reconcilaiton to Financial Statements
2014
2015
2016
2017
2018
2015 -2016
2017 -2018
Networking capital (Fund Balance)
Actual
Actual
Budget
Budget
Budget
% Change
% Change
Operating Revenue
11,518,390
12,941,256
15,485,759
18,119,008
18,789,808
17.00%
3.70%
Charges for Services
266,713
-
-
-
-
0.00%
0.00%
Water Sales
$ 5,970,578
$ 6,483,866
$ 6,049,000
$ 6,858,000
$ 6,996,000
13.37%
2.01%
Inspection Fe es
225
165
1,000
1,000
1,000
0.00%
0.00%
Total Charges for Services
5,970,803
6,484,031
6,050,000
6,859,000
6,997,000
13.37%
2.01%
Intergovernmental Revenue
61,119
(0)
-
-
-
0.00%
0.00%
Transfers In Hydrant Rental
-
-
-
-
-
0.00%
0.00%
Miscellaneous Revenue
Investment Earnings
25,055
24,040
17,700
21,000
21,000
18.64%
0.00%
Sale of Capital Assets
(4,435)
-
-
-
-
0.00%
0.00%
Other MiscRevenue
6,158
465
300
-
-
0.00%
0.00%
Total Miscellaneous Revenue
26,778
24,505
18,000
21,000
21,000
16.67%
0.00%
Total Operating Revenue
6,058,700
6,508,536
6,068,000
6,880,000
7,018,000
13.38%
2.01%
Capital Project Revenue
State Grant
-
1,102,266
-
-
-
Federal Grant
-
2,957
-
-
-
Capital contributions
61,620
108,387
25,000
25,000
25,000
0.00%
0.00%
Public Works Trust Fund Loan
-
-
-
-
-
0.00%
0.00%
Total Capital Project Revenue
61,620
1,213,611
25,000
25,000
25,000
0.00%
0.00%
Total Revenue
6,120,321
7,722,147
6,093,000
6,905,000
7,043,000
13.33%
2.00%
Operating Expenses
Salaries & Wages
569,802
566,186
611,059
603,860
625,507
- 1.18%
3.58%
Personnel Benefits
218,482
224,979
261,137
258,392
279,362
-1.05%
8.12%
Supplies
2,577,809
2,650,748
2,552,339
2,765,300
2,815,300
8.34%
1.81%
Services
301,765
226,192
277,727
320,249
294,484
15.31%
-8.05%
Intergov't Services & Taxes
868,091
933,085
854,900
968,000
982,000
13.23%
1.45%
Total Operating Expenses
4,535,950
4,601,190
4,557,162
4,915,801
4,996,653
7.87%
1.64%
Capital Expenses
Salaries & Wages
12,391
9,025
-
-
-
0.00%
0.00%
Personnel Benefits
4,366
3,450
0.00%
0.00%
Supplies
49
106
-
-
-
0.00%
0.00%
Services
133,563
143,516
415,000
622,000
317,000
49.88%
-49.04%
Capital Outlay
856,757
1,182,755
2,528,000
2,573,000
1,036,000
1.78%
- 59.74%
Principal
486,480
507,780
134,081
132,334
133,992
-1.30%
1.25%
Interest
75,257
37,683
60,732
15,881
14,499
- 73.85%
-8.70%
Total Capital Expenses
1,568,864
1,884,315
3,137,813
3,343,215
1,501,491
6.55%
- 55.09%
Non -Cash Accounting Adjustments
Operating Prior Period Adjustment
250,180
524,409
-
-
-
Capital Prior Period Adjustment
-
-
-
-
-
Revenue Bond Refunding
-
(162,403)
-
-
-
GASB 68 Pension Adjustment
(24,573)
-
-
-
Indirect cost allocation
523,876
592,248
603,974
616,053
628,374
2.00%
2.00%
Total Non -Cash Accounting Adjustments
774,056
929,681
603,974
616,053
628,374
2.00%
2.00%
Total Expenses
6,878,871
7,415,185
8,298,949
8,875,069
7,126,518
Change in Fund Balance
(758,550)
306,961
(2,205,949)
(1,970,069)
(83,518)
-10.69%
-95.76%
Net working capital (Fund Balance)
$ 5,776,851
$ 6,083,812
$ 3,877,863
$ 1,907,794
$ 1,824,275
- 50.80%
-4.38%
Reconcilaiton to Financial Statements
Networking capital (Fund Balance)
5,776,851
6,083,812
3,877,863
1,907,794
1,824,275
- 50.80%
-4.38%
Net Investment in Capital Assets
11,518,390
12,941,256
15,485,759
18,119,008
18,789,808
17.00%
3.70%
Restricted for Debt Service
266,713
-
-
-
-
0.00%
0.00%
Total Net Position
$17,561,954
$19,025,068
$ 19,363,622
$ 20,026,802
$ 20,614,083
3.42%
2.93%
Depreciation
(reduction in capital assets)
533,999
528,077
593,310
709,966
830,691
19.66%
17.00%
041
Capital Projects
The capital projects listed below are capital projects planned for the 2015 -2016 biennium. The year in
which the project is estimated to be completed has been provided. Additional information on the
projects may be found in the Capital Improvement Program section of the budget document.
Debt Service Requirements
The following chart provides information on debt service requirements, by debt issue, for the
biennium.
2017
2018
Anticipated
Capital Projects
Budget
Budget
Completion
Macadam Rd S Water Upgrade
$ 1,300,000
$ -
2017
APE Water Main Replacement
785,000
-
2017
53rd Ave S Water Main Replacement
572,000
552,000
2018
58th Ave S Water Main Replacement
326000
-
2017
Martin Luther King Jr W S Water Main
70,000
313,000
2019
GIS Inventory of Water System
67,000
100,000
N/A
Interurban Water Reuse
-
25,000
N/A
Water Reservoir 1.5 million Gallon Cap
50,000
-
2021
Minkler Blvd Water Main Replacement
-
60,000
2019
S 52nd Place Waterline Replacement
-
20,000
2022
Total Capital Projects
3,170,000
1,070,000
Debt Service Requirements
The following chart provides information on debt service requirements, by debt issue, for the
biennium.
Amortization of premiums and discounts are not included in this schedule but are
included in the Revenue and Expense Summary statement.
04.1
2017
2018
Debt Service Project
Budget
Budget
2015 Revenue Bonds Allentown Phase II
Principal
37,253
38,911
Interest
9,720
8,849
2015 Revenue Bonds Total Debt Service
46,974
47,760
PWTFL 2001 Duwamish /Valley View
Principal
14,454
14,454
Interest
361
289
PWTFL 2001 Total Debt Service
14,816
14,743
PWTFL 2004 Allentown Phase II
Principal
80,625
80,625
Interest
3,225
2,822
PWTFL 2004 Total Debt Service
83,851
83,447
Total Principal
132,333
133,991
Total Interest
13,307
11,960
Total Debt Service
$ 145,640
$ 145,951
Amortization of premiums and discounts are not included in this schedule but are
included in the Revenue and Expense Summary statement.
04.1
Expenditure Detail - Salaries and Benefits
Salaries for budgeted positions are based on actual costs for existing positions and include a cost of
living adjustment per contract agreements.
Public Works - Water
Postion
Description
2016
FIT
2017
FIT
2017 Budget
Salaries Benefits
2018
FIT
2018 Budget
Salaries Benefits
Maint & Ops Superintendent
1
1
$ 100,488 $ 38,054
1
$102,960 $ 40,933
Maint & Ops Foreman
1
1
77,622 26,187
1
83,432 28,983
Maint & Ops Specialist
4
4
278,322 134,095
4
288,351 145,056
Water Quality Specialist
1
1
76,800 34,329
1
78,672 36,959
Senior Engineer
0.5
0.5
59,628 23,556
0.5
61,092 25,259
Extra Labor
4,000 459
4,000 459
Overtime
7,000 439
7,000 439
Clothing Allowance
1,330
1,330
Department Total
7.5
7.5
$ 603,860 $ 258,449
7.5
$ 625,507 $ 279,419
PAIR
Expenditure Detail - Supplies, Services and Other
Supplies include miscellaneous operating supplies for the water utility and purchased water. Services
including engineering and surveying, repair and replacement charges, insurance, utilities, registrations,
and credit card fees, among others. Intergovernmental includes excise tax and interfund utility tax.
Water - Administration
28
2014
2015
2016
2017
2018
Account Number
Actual
Actual
Budget
Budget
Budget
Supplies
401.01.534.800.31.00
Supplies - Office & Operating
$ -
$ 34
$ -
$ 500
$ 500
401.01.534.800.31.01
Supplies - Office & Safety
2,115
2,519
2,500
2,000
2,000
401.01.534.800.31.02
Supplies - Operating
26,734
20,866
26,028
26,000
26,000
401.01.534.800.31.03
Supplies - Repairs & Maintenance
68,031
67,528
58,500
58,500
58,500
401.01.534.800.31.04
Supplies - Billing
2,106
1,386
2,311
2,300
2,300
401.01.534.800.31.05
Supplies -Large Meters
19,584
43,107
42,000
55,000
55,000
401.01.534.800.31.90
Supplies - Central
-
-
-
-
-
401.01.534.801.31.00
Supplies - Office & Operating
-
-
-
-
-
401.01.534.800.33.01
Supplies - Purchased Water
2,448,940
2,479,973
2,400,000
2,600,000
2,650,000
401.01.534.800.33.04
Supplies - Reclaimed Water
4,003
4,838
10,000
10,000
10,000
401.01.534.800.35.00
Small Tools & Minor Equip -Tools
6,297
30,498
8,500
8,500
8,500
401.01.534.800.35.01
Small Tools & Minor Equip - Traffic
-
2,500
2,500
2,500
Total Supplies
2,577,809
2,650,748
2,552,339
2,765,300
2,815,300
Services
401.01.534.800.41.00
Professional Svcs - Engineering
3,063
1,403
8,000
8,000
8,000
services, water analysis, and
computer programming
401.01.534.801.41.00
Professional Svcs - Project costs
93,841
6,721
-
-
-
401.01.534.800.41.01
Professional Svcs - Utility one call
476
436
400
500
500
services for utility line locates
401.01.534.800.41.02
Professional Svcs -CDL licenses,
376
530
1,000
1,000
1,000
hearing tests
401.01.534.800.42.00
Communication -Phone bills and
-
172
2,500
2,500
2,500
Nextels
401.01.534.800.43.00
Travel - Mileage, meals (for overtime),
1,278
1,704
1,500
1,500
1,500
parking
401.01.534.800.45.00
Rental - Rental of tapping machines,
1,706
1,396
1,500
1,500
1,500
test pumps and other emergency
equipment
401.01.534.800.45.94
Rental - Equipment Replacement
65,508
77,564
97,671
109,461
84,684
Fund
401.01.534.800.45.95
Rental - Equipment Rental O & M
45,181
47,431
73,855
72,420
73,868
401.01.534.800.46.00
Insurance -WCIA Liability
22,754
-
26,901
-
-
401.01.534.800.46.01
Insurance -WCIA Liability
-
-
-
17,433
19,176
401.01.534.800.46.04
Insurance-
-
25,620
-
27,439
27,987
401.01.534.800.47.00
Public Utility -Gas, electricity, water,
18,241
-
19,400
13,400
13,400
and sewer for water facilities
401.01.534.800.47.01
Public Utility - Disposal of spoils
282
521
5,000
5,000
5,000
and asphalt from excavations
401.01.534.800.47.21
Public Utility - Electricy
-
16,945
-
5,000
5,000
401.01.534.800.47.25
Public Utility -Water and Sewer
-
1,675
-
1,000
1,000
401.01.534.800.48.00
R &M - Repairs to reservoir, PRV,
10,552
13,050
3,000
17,096
12,369
water facilities and components by
outside vendors
401.01.534.801.48.00
R &M -
-
(306)
-
-
-
401.01.534.800.49.00
Misc - Registrations, training,
2,731
(20,011)
12,000
12,000
12,000
memberships, computer upgrades,
sm equip. repair
28
Expenditure Detail - Supplies, Services and Other, Continued
Water - Administration Con't
401.01.534.801.49.00
Misc - Project costs
-
-
2016
2017
2018
401.01.534.800.49.01
Misc. - Operating permit from Dept of
4,943
4,943
5,000
5,000
5,000
401.01.534.800.49.04
Misc. - Project costs
-
-
-
-
-
401.01.534.800.49.08
Misc -PPI credit card fees
30,834
46,400
20,000
20,000
20,000
Total Services
301,765
226,192
277,727
320249
294,484
Intergovernmental
401.01.534.800.53.00
Taxes & Assessments - Excise Tax
270,916
284,575
250,000
280,000
280,000
401.01.534.800.54.01
Interfund Taxes - Interfund Utility
597,175
648,510
604,900
688,000
702,000
401.01.588.999.50.00
PPA -Cost of Issuance
-
-
-
-
-
Total Intergovernmental
868,091
933,085
854,900
968,000
982,000
Total Supplies, Services and Other $ 3,747,666
$ 3,810,024
$ 3,684,966
$ 4,053,549
$ 4,091,784
Services include construction management related to capital projects. Capital includes capital projects
specific to the water fund.
Water - Capital Outlays by Expenditure Type
f4 *l
2014
2015
2016
2017
2018
Account Number
Actual
Actual
Budget
Budget
Budget
Supplies
401.98.594.340.31.00
Supplies -Office and Operating
$ 49
$ 106
$
$
$
Total Supplies
49
106
-
-
-
Services
401.98.594.340.41.00
Professional Services - Construction
133,350
143,229
415,000
622,000
317,000
401.98.594.340.44.00
Advertising -Bid ads
4
-
-
-
-
401.98.594.340.45.00
Advertising -Bid ads
209
287
-
-
-
Total Services
133,563
143,516
415,000
622,000
317,000
Other
401.01.534.801.65.00
Capital - Construction Projects
-
-
-
-
-
401.01.594.340.64.00
Capital - Machinery & Equipment
-
20,894
25,000
25,000
-
401.98. 594.340.65.00
Capital - Construction Projects
856,757
1,161,862
2,503,000
2,548,000
1,036,000
Total Other
1
1 856,757
1,182,755
2,528,000
2,573,000
1,036,000
Total Capital $ 990,370
$ 1,326,378
$ 2,943,000
$ 3,195,000
$ 1,353,000
f4 *l
ATTACHMENT D
City of Tukwila
WATER ENTERPRISE FUND
2017 - 2022 Analysis in 000's
REVENUES
2013
Actual
2014
Actual
2015
Actual
2016
Budget
2016
Estimate
2017
2018
2019
2020
2021
2022
Totals
Monthly Water Charges
Base
Base
Base
c 5 % %�
� +5%
+5%
+5%
+5%
+5%
+5%
+5%
Cascade Water Alliance (CWA)
2,331
2,449
2,480
2,400
2,580
2,657
2,710
2,764
2,820
2,904
2,962
16,817
Regular City Water
3,257
3,493
3,986
3,633
4,100
4,182
4,265
4,350
4,438
4,526
4,617
26,378
43,195
Subtotal Water 5,588 5,942 6,466 6,033 6,680
6,839 6,975 7,114 7,258 7,430 7,579
Other Miscellaneous Revenue
151
55
42
35
35
41
43
50
55
60
65
314
Interlocal Ags \PWTF \Grants
127
61
1,105
3,000
0
0
0
0
3,000
3,000
0
6,000
Water Connection Fees (2)
84
62
108
25
25
25
25
10
10
10
10
90
49,599
Total Revenues 5,950 6,120 7,721 9,093 6,740
6,905 7,043 7,174 10,323 10,500 7,654
EXPENDITURES
CWA Purchased Water (3)
2,331
2,449
2,480
2,400
2,400
2,657
2,710
2,764
2,820
2,904
2,962
16,817
Water Operations & Maintenance
1,846
1,861
2,026
2,101
2,101
2,186
2,187
2,250
2,295
2,365
2,433
13,716
Proposed Debt Service for Facilities
400
400
400
400
1,600
Debt Service (4)
536
562
545
162
162
146
146
145
145
144
129
855
Interfund Utility Tax (5) 10%
562
597
648
607
607
688
702
716
731
749
764
4,351
Engineering Labor(')
64
76
66
80
80
83
86
87
89
91
93
529
37,868
Subtotal 5,339 5,545 5,765 5,350 5,350
5,760 5,831 6,362 6,480 6,653 6,781
Water Capital - CIP Program
125
1,084
1,312
2,450
3,445
3,170
1,070
1,356
3,815
3,360
1,085
13,856
51,724
Total Expenditures 51464 6,629 7,077 7,800 8,795
8,930 6,901 7,718 10,295 10,013 7,866
FUND BALANCE
Change in Fund Balance
486
(509)
644
1,293
(2,055)
(2,025)
142
(544)
28
487
(212)
(2,125)
Beginning Balance
6,078
6,542
5,777
6,084
6,084
4,029
2,004
2,146
1,602
1,630
2,117
41 029
1,904
Ending Balance 6,564 6,033 6,421 7,377 4,029
2,004 2,146 1,602 1,630 2,117 1,904
Fund Balance:
Reserved ( b)20 % of revenue 1,070 1,165 1,212 1,323 1,323
1,219 1,381 1,409 1,435 1,465 1,500
1
1,500
Unreserved 5,494 4,868 5,209 6,054 2,706
785 765 193 195 652 404
404
Ending Balance 6,564 6,033 6,421 7,377 4,029
2,004 2,146 1,602 1,630 2,117 1,904
7 ,904
tai Revenues in excess of (less than) expenditures
(b) Annual reserve balance requirement equals 20% of the prior year operating revenues.
2017 - 2022 Financial Planning Model xxx i i i 7/19/2016 30
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2017-2022
WATER ENTERPRISE FUND
401.98
CIP
Page #
PROJECT TITLE
2017
2018
2019
2020
2021
2022
" "Other
TOTAL Sources
After Six
Years
58
Interurban Water Reuse
0
25
0
25
0
25
75
0
0
59
Macadam Rd S Water Upgrade
1,300
0
0
0
0
0
1,300
0
0
60
Andover Park E Water Main Replacement
785
0
0
0
0
0
785
0
0
61
53rd Ave S Water Main Replacement
572
552
0
0
0
0
1,124
0
0
62
58th Ave S Water Main Replacement
326
0
0
0
0
0
326
0
0
63
Martin Luther King Jr Way S Water Main
70
313
156
0
0
0
539
0
0
64
GIS Inventory of Water System
67
100
100
100
100
100
567
0
0
65
Water Reservoir 1.5 million Gallon Capacity
50
0
600
3,500
3,000
0
7,150
6,000
0
66
Minkler Blvd Water Main Replacement
0
60
300
0
0
0
360
0
360
67
S 152nd Place Waterline Replacement
0
20
60
0
0
0
80
0
0
68
Water Comprehensive Plan
0
0
140
140
0
0
280
0
0
69
Highline water district intertie
Water district 75 intertie
Water district #75 intertie
Crystal Springs Intertie with Highline WD
0
0
0
50
180
0
230
0
0
70
S 152nd Street Waterline Replacement
0
0
0
0
80
690
770
0
0
71
57th Ave S Waterline Replacement
0
0
0
0
0
270
270
0
0
S 140th St Waterline Replacement
0
0
0
0
0
0
0
0
260
Minkler Blvd Water Looping
0
0
0
0
0
0
0
0
390
Southcenter Blvd Water Main Replacement
0
0
0
0
0
0
0
0
870
S 180th & W Valley Loop /Renton Turnover
0
0
0
0
0
0
0
0
2,464
Foster Area Water Upgrade
0
0
0
0
0
0
0
0
1,390
West Valley Hwy East Side Water Looping
0
0
0
0
0
0
0
0
1,400
West Valley Deep Water Main Replacement
0
0
0
0
0
0
0
0
690
65th Ave S Water Main Replacement
0
0
0
0
0
0
0
0
2,240
49th Ave S Water Main Replacement
0
0
0
0
0
0
0
0
1,400
S 180th St Water Main Replacement
0
0
0
0
0
0
0
0
1,232
Evans Black Dr Water Main Replacement
0
0
0
0
0
0
0
0
780
S 112 St Water Looping
0
0
0
0
0
0
0
0
1,140
S 153rd St Water Main Replacement
0
0
0
0
0
0
0
0
350
Corporate Dr S Water Main Replacement
0
0
0
0
0
0
0
0
560
Allentown Phase III - Water Revitalization
0
0
0
0
0
0
0
0
560
Foster Playfield Reclaimed Water Extension
0
0
0
0
0
0
0
0
1,680
Duwamish River Crossing Reclaimed Water
0
0
0
0
0
0
0
0
193
Strander Blvd Waterline Upgrade
0
0
0
0
0
0
0
0
3,190
Grand Total
3,170
1,070
1,356
3,815
3,360
1,085
13,856
6,000
16,086
Chanoes from 2015 to 2017 CIP:
Deleted:
Andover Park W /Strander New Water Main, completed in 2015
52nd Ave S Water Main, included in 53rd Ave S Project
Changed name from Poverty Hill Water Revitalization to
Allentown Phase III - Water Revitalization
New:
63 GIS Inventory of Water System
69 S 152nd St Waterline Replacement
66 S 152nd Place Waterline Replacement
70 57th Ave S Waterline Replacement
S 140th St Waterline Replacement
** Denotes other funding sources, grants, or mitigation.
Project sheets scheduled beyond 2022
can be found in the City's website under
Public Works Capital Improvement Program.
01
2017 - 2022 Capital Improvement Program 57 711912016
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
Interurban Water Reuse Project No. 99240106
DESCRIPTION:
Develop water reuse along the Interurban corridor with Class A treated wastewater from the Eastside
Reclamation Facility for irrigation, sewer flushing, sweeping, dust control, and other non - potable uses.
Using reclaimed water is an element of the City's Water Conservation Plan as well as the Cascade Water
JUSTIFICATION:
Transmission and Supply Plan.
STATUS:
These funds will be used for engineering and construction to assist potential connections to the King
5
County reclaimed water line.
MAINT. IMPACT:
Future maintenance and operation of the new meters, tracking and preventing cross - connections.
KC Dept of Natural Resources funded the construction of additional portions for installation of the
COMMENT:
reuse water line.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
5
25
25
25
25
105
Land(R/W)
0
Const. Mgmt.
6
6
Construction
111
111
TOTAL EXPENSES
1 122
1 25
0
25
0
25
0
25
1 0
222
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
122
25
0
25
0
25
0
25
0
222
TOTAL SOURCES
122
25
0
25
0
25
0
25
0
222
2017 - 2022 Capital Improvement Program 58 32
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Macadam Rd S Water Upgrade Project No. 90440105
DESCRIPTION: Design and construct 4,300 LF of 10" waterline in Macadam Rd S from S 144th St to Southcenter Blvd.
JUSTIFICATION: Improve fire flow water quality to the north side of Tukwila Hill.
STATUS: Design began in 2015 with construction to begin in late summer 2016 and continue into 2017.
MAINT. IMPACT: The new waterline will eliminate maintenance time for flushing the dead end line while increasing service reliability.
COMMENT:
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
28
127
155
Land(R /W)
0
Const. Mgmt.
50
200
250
Construction
600
1,100
1,700
TOTAL EXPENSES
28
1 777
1 1,300
1 0
0
0
0
0
0
2,105
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
28
777
1,300
0
0
0
0
0
0
2,105
TOTAL SOURCES
28
777
1,300
0
0
0
0
0
0
2,105
2017 - 2022 Capital Improvement Program 59 33
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Andover Park E Water Main Replacement Project No. 99940103
DESCRIPTION: Design and construct 2,700 LF of new 8" & 16" ductile iron pipe along Andover Park East from Tukwila Pkwy
to Strander Blvd.
JUSTIFICATION: Support future growth within this area of the CBD as aging cast iron system has suffered frequent failures.
STATUS: Survey and design is complete. Construction is scheduled for 2016 from Strander Blvd to Tukwila Pkwy
with final paving in 2017.
MAINT. IMPACT: A new pipe will significantly reduce impact on crews from the risk of cataclysmic events.
COMMENT: PWTF loans were rescinded in 2014 & 2015 by the State Legislature.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
140
59
199
Land(R /W)
0
Const. Mgmt.
284
100
384
Construction
2,100
685
2,785
TOTAL EXPENSES
140
1 2,443
1 785
1 01
01
01
01
01
01
3,368
FUND SOURCES
Awarded Grant
0
Proposed Bond
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
140
2,443
785
0
0
0
0
0
0
3,368
TOTAL SOURCES
140
2,443
785
0
0
0
0
0
0
3,368
2017 - 2022 Capital Improvement Program 60 34
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
53rd Ave S Water Main Replacement Project No. 90540106
Along with Residential street and surface water improvements, install approximately 3,200 LF of new
DESCRIPTION:
12" water line along 53rd Ave S from Interurban Ave S to S 144th St.
This provides a needed loop within the distribution system and will improve water service and fire
JUSTIFICATION:
flows to the north side of Tukwila Hill.
STATUS:
Design in 2016, with construction in 2017 and 2018.
MAINT. IMPACT:
100
20
The water main route will be along 53rd Ave S from Interurban Ave S and 52nd Ave S to 53rd Ave S,
COMMENT:
then along S 137th St to 53rd south to S 144th St.
FINANCIAL Through Estimated
(in Q000'sl 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
5
100
20
125
Land (R/W)
0
Const. Mgmt.
72
72
144
Construction
480
480
960
TOTAL EXPENSES
1 51
100
1 572
1 552
1 01
01
01
01
01
1,229
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
5
100
572
552
0
0
0
0
0
1,229
TOTAL SOURCES
5
100
572
552
0
0
0
0
0
1,229
2017 - 2022 Capital Improvement Program 61 35
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
58th Ave S Water Main Replacement Project No. 90540102
DESCRIPTION:
Design and construct 680 LF of 8" ductile iron waterline to replace the old cast iron waterline in
58th Ave S from S 142nd St to S 144th St. Construction also includes overlay of the street.
JUSTIFICATION:
The existing waterline is cast iron and is subject to cracking and breaking apart with age.
STATUS:
Design completed in 2016 with construction in 2016/2017.
MAINT. IMPACT:
The new waterline will significantly reduce impact on crews from the risk of failure.
COMMENT:
49
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
11
49
60
Land(R /W)
0
Const. Mgmt.
43
43
86
Construction
283
283
566
TOTAL EXPENSES
11
1 3751
326
1 01
01
01
01
01
01
712
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
11
375
326
0
0
0
0
0
0
712
TOTAL SOURCES
11
375
326
0
0
0
0
0
0
712
2017 - 2022 Capital Improvement Program 62 36
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Martin Luther King Jr Way S Water Main Project No. 90640102
DESCRIPTION: Design and construct replacement of 800 LF of 12" water line and hydrants.
JUSTIFICATION: During the construction of Sound Transit light rail along Martin Luther King Jr Way South, the existing
12" D.I.P. waterline was found to be heavily covered with corrosion.
STATUS: Design will begin in 2017 with construction in 2018.
MAINT. IMPACT: A relined pipe will reduce the risk of failure.
COMMENT: Project will require a franchise agreement with WSDOT for existing waterline located in WSDOT right -of -way.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
1
70
71
Land(R/W)
0
Const. Mgmt.
40
40
80
Construction
273
116
389
TOTAL EXPENSES
1
0
70
1 313
1 156
1 0
0
0
0
540
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
1
0
70
313
156
0
0
0
0
540
TOTAL SOURCES
1
0
70
313
156
0
0
0
0
540
2017 - 2022 Capital Improvement Program 63 37
I,:tea1 2101 IF
DESCRIPTION
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
GIS Inventory of Water System Project No. 91640104
The GIS (Geographic Information System ) will provide current as -built data for the Tukwila water system.
The data base will include fire hydrants, valve locations, approximate water line locations, date of installation,
and material type.
The GIS mapping will provide information on the water system that is easily addressable by City staff
and the public. With GIS data, the City will be able to develop an asset management plan to determine
the water assets needed to be upgraded or replaced.
New project for 2017 - 2022 CIP. Combined Asset Management System scheduled for 2017.
The survey will provide staff with -up -date information on the location of water line features.
FINANCIAL Through Estimated
(in Q000's) 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
67
100
100
100
100
100
567
Land (R/W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
1 0
0
67
1 100
1 100
1 100
1 100
1 100
1 0
567
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
67
100
100
100
100
100
0
567
TOTAL SOURCES
1 0
0
67
1 100
1 100
1 100
1 100
1 100
1 0
567
2017 - 2022 Capital Improvement Program 64 38
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Water Reservoir and Pump Station Project No. 91240102
DESCRIPTION: Design and construct a new 1.5 million gallon water storage reservoir with a 3,300 gpm pump station.
JUSTIFICATION: The Department of Health is requiring that the City provide additional water storage in the 360 pressure zone,
which includes the Commercial Business District. A pump station is needed for fire flow.
Design funds in 2017 will study the possibility of using Highline's CrestView Reservoir's extra capacity instead of
STATUS: building a new reservoir. Siting study in 2013 showed optimal site location in the Manufacturing /Industrial Center
(MIC). May also be included in new PW Shop facilities.
MAINT. IMPACT: Additional staff will be needed to provide maintenance for the new reservoir and pumps.
COMMENT: The pump station may not be required depending on the location of the proposed reservoir.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
26
50
500
500
1,076
Land(R /W)
100
100
Const. Mgmt.
400
400
800
Construction
2,600
2,600
5,200
TOTAL EXPENSES
1 26
1 01
50
1 01
600
1 3,500
1 3,000
1 01
01
7,176
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Bond
3,000
3,000
6,000
Mitigation Expected
0
Utility Revenue
26
0
50
0
600
500
0
0
0
1,176
TOTAL SOURCES
26
0
50
0
600
3,500
3,000
0
0
7,176
Location to be determined.
2017 - 2022 Capital Improvement Program 65 39
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Minkler Blvd Water Main Replacement Project No. 90540111
DESCRIPTION: Replace approximately 500 LF of existing 8" water line with a 12" line along Minkler Blvd, east of Industry Dr.
JUSTIFICATION: This replacement will improve fire flows to the area.
STATUS:
MAINT. IMPACT:
COMMENT:
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
60
60
120
Land (R/W)
0
Const. Mgmt.
50
50
100
Construction
250
250
500
TOTAL EXPENSES
1 01
01
01
60
1 300
1 01
01
01
360
1 720
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
60
300
0
0
0
360
720
TOTAL SOURCES
0
0
0
60
300
0
0
0
360
720
2017 - 2022 Capital Improvement Program 66 40
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: S 152nd Place Waterline Replacement Project No. 91640103
DESCRIPTION: Design and construct 150 LF of 8" ductile iron waterline in S 152nd Place to Sunwood Blvd.
JUSTIFICATION: The proposed waterline will also meet fire flow requirements.
STATUS: New project for the 2017 - 2022 CIP.
MAINT. IMPACT: To remove a deadend in South 152nd Place to improve water quality.
COMMENT:
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
20
20
Land(R /W)
0
Const. Mgmt.
5
5
Construction
55
55
TOTAL EXPENSES
1 0
0
0
20
1 60
1 0
0
0
0
80
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
20
60
0
0
0
0
80
TOTAL SOURCES
0
0
0
20
60
0
0
0
0
80
2017 - 2022 Capital Improvement Program 67 41
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Water Comprehensive Plan Project No. 91040101
DESCRIPTION: Prepare the new Water Comprehensive Plan incorporating any regulatory or new Growth Management
Act Comprehensive Plan issues related to running the water utility.
JUSTIFICATION: Plan needs to be consistent with City's Comprehensive Plan and the Department of Health requires
the plan to be updated every 6 years.
STATUS: Current Water update was adopted in 2015. The next update is scheduled for 2021.
MAINT. IMPACT:
COMMENT:
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
234
140
140
514
Land(R /W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
1 234
1 0
0
0
140
1 140
1 0
0
0
514
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
234
0
0
0
140
140
0
0
0
514
TOTAL SOURCES
234
0
0
0
140
140
0
0
0
514
i
,Project Location.,
Entire System
M
w
J1,14
2017 - 2022 Capital Improvement Program 68 42
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Crystal Springs Intertie with Highline Water District Project No. 91040104
DESCRIPTION: Supply an emergency intertie for 10 -12 customers within the Crystal Springs pressure zone
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
An intertie feed from the City's 360 -zone was cut off with the WSDOT reconstruction of Klickitat Drive
JUSTIFICATION:
at the SR 518 off -ramp. If the Seattle supply tap becomes unavailable, there would be no service or fire
flow for customers.
A Parks department meter could be temporarily set up during maintenance closures, but hydrants would
STATUS:
still be unavailable.
MAINT. IMPACT:
Maintenance liabilities would be reduced and temporary measures would save time and prevent vandalism.
COMMENT:
This project may not be required if area transferred to Highline Water District.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
50
50
Land (R/W)
0
Const. Mgmt.
30
30
Construction
150
150
TOTAL EXPENSES
1 01
01
01
01
01
50
1 180
1 01
01
230
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
0
50
180
0
0
230
TOTAL SOURCES
0
0
0
0
0
50
180
0
0
230
2017 - 2022 Capital Improvement Program 69 43
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: S 152nd Street Waterline Replacement Project No. 91640102
DESCRIPTION: Design and construct 1,600 LF of 10" ductile iron waterline to replace the old 6" cast iron waterline in S 152nd St
from Macadam Rd S east to the end of the pipe near 58th Ave S.
JUSTIFICATION: The existing waterline is cast iron and is subject to cracking and breaking apart with age.
STATUS: New project for the 2017 - 2022 CIP.
MAINT. IMPACT: The proposed waterline will also meet fire flow requirements.
COMMENT:
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
80
80
Land(R/W)
0
Const. Mgmt.
90
90
Construction
600
600
TOTAL EXPENSES
1 0
0
0
0
0
0
80
1 690
1 0
770
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
0
0
80
690
0
770
TOTAL SOURCES
0
0
0
0
0
0
80
690
0
770
2017 - 2022 Capital Improvement Program 70 44
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: 57th Ave S Waterline Replacement Project No. 91640105
DESCRIPTION: Design and construct 660 LF of 8" ductile iron pipe waterline to replace the old 6" cast iron waterline
in 57th Ave S from S 152nd St to S 150th PI.
JUSTIFICATION: The existing waterline is cast iron and subject to cracking and breaking apart with age.
STATUS: New project for the 2017 - 2022 CIP.
MAINT. IMPACT: The proposed waterline is required to meet fire flow requirements.
COMMENT:
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
40
40
Land (R/W)
0
Const. Mgmt.
30
30
Construction
200
200
TOTAL EXPENSES
1 0
0
0
0
0
0
0
270
1 0
270
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
0
0
0
270
0
270
TOTAL SOURCES
1 0
0
0
0
0
0
0
270
1 0
270
2017 - 2022 Capital Improvement Program 71 45
2017 - 2022 Capital Improvement Program 72 46
DEPARTMENT: Public Works
FUND: Sewer FUND NUMBER: 402
RESPONSIBLE MANAGER: Bob Giberson POSITION: Director
Description
The mission of the Sewer Utility is to operate and maintain a sewer collection system that will ensure
the health, safety, and welfare of the citizens and visitors of Tukwila. The Sewer Utility is responsible
for the maintenance of approximately 40 miles of gravity sewer main and the operation and
maintenance of 12 lift stations and force mains. These lift stations pump approximately 60% of all
sewage in the City (approximately 460 million gallons). The Sewer Utility maintains relationships with
adjoining jurisdictions, cities, water districts, sewer districts, King County Department of Natural
Resources & Parks, Wastewater Treatment Division, State Department of Ecology, State Department of
Health, and King County Health Department.
2015 -2016 Accomplishments
♦ Evaluated system -wide conditions for potential upgrades for annual sewer repair program.
♦ Ongoing construction of CBD sanitary sewer rehabilitation.
♦ Began design of 53rd Ave S sewer rehabilitation.
♦ Continued development of the GIS as- builts of city sewer infrastructure.
2017 -2018 Outcome Goals
♦ Improve sewer system efficiency. Strategic Goal 1. Utility Comp Plan Goal 12.1
♦ Improve sewer system reliability. Strategic Goal 1. Utility Comp Plan Goal 12.1
♦ Improve sewer system capacity. Strategic Goal 1. Utility Comp Plan Goal 12.1
2017 -2018 Indicators of Success
♦ Evaluate system -wide conditions for potential upgrades for annual sewer repair program.
♦ Ongoing construction of CBD sanitary sewer rehabilitation.
♦ Replace generator, control system and concrete slab at sewer lift station #2.
♦ Complete construction of Andover Park E sewer replacement.
♦ Finish design and begin construction of 53rd Ave S sewer rehabilitation.
♦ Continued development of the GIS as- builts of city sewer infrastructure.
EMA
Performance Measures
Public Works - Sewer
2014
Actual
2015
Actual
2016
Estimated
2017
Projection
2018
Projection
Maintain and Improve Sewer System
Number of linear feet TV inspected
15,000
10,000
10,000
10,000
10,000
Number of linear feet of sewer pipe jet cleaned
200,000
195,000
200,000
200,000
200,000
Number of manholes cleaned
850
850
850
850
850
Capital
Hours of 10 sewer lift stations monitoring of pump hours,
start counts, and generator operation (weekly)
10
10
11
11
11
Customers
Number of sewer customers
1,760
1,742
1,760
1,770
1,950
Number of total sewer system miles
40.30
40.30
40.30
41.00
41.00
48
Revenue and Expense Summary
Seiner Fund
Reconcilaiton to Financial Statements
2014
2015
2016
2017
2018
2015 -2016
2017 -2018
Net working capital (Fund Balance)
Actual
Actual
Budget
Budget
Budget
°/a Change
°/a Change
Operating Revenue
8,391,299
8,139,154
11,488,018
14,685,812
15,957,637
27.84%
8.66%
Charges for Services
126,834
-
-
-
-
0.00%
0.00%
Sewer Sales
$ 8,290,309
$ 9,020,998
$ 7,889,000
$ 8,524,000
$ 8,644,000
8.05%
1.41%
Total Charges for Services
8,290,309
9,020,998
7,889,000
8,524,000
8,644,000
8.05%
1.41%
Miscellaneous Revenue
416,303
373,087
361,877
510,771
652,949
41.15%
27.84%
Investment Earnings
21,055
43,175
20,000
25,000
30,000
25.00%
20.00%
Total Miscellaneous Revenue
21,055
43,175
20,000
25,000
30,000
25.00%
20.00%
Total Operating Revenue
8,311,364
9,064,173
7,909,000
8,549,000
8,674,000
8.09%
1.46%
Capital Project Revenue
Intergovernmental - Grants
261,745
209,180
415,000
125,000
125,000
-69.88%
0.00%
Mitigation
-
-
-
-
-
0.00%
0.00%
Long -Term Debt Proceeds
248,516
501,484
0.00%
0.00%
GASB 65 Implementation
-
-
-
-
-
0.00%
0.00%
Total Capital Project Revenue
510,260
710,665
415,000
125,000
125,000
-69.88%
0.00%
Total Revenue
8,821,624
9,774,838
8,324,000
8,674,000
8,799,000
4.20%
1.44%
Operating Expenses
Salaries & Wages
315,445
310,362
313,582
361,525
375,580
15.29%
3.89%
Personnel Benefits
112,171
120,709
117,103
154,989
167,757
32.35%
8.24%
Supplies
4,175,762
3,885,546
4,027,893
4,224,100
4,374,100
4.87%
3.55%
Services
633,107
1,203,186
271,187
286,163
288,283
5.52%
0.74%
Intergov't Services & Taxes
952,130
1,033,643
895,400
990,000
1,002,000
10.57%
1.21%
Total Operating Expenses
6,188,614
6,553,446
5,625,165
6,016,776
6,207,720
6.96%
3.17%
CIP Expenses
Salaries & Wages
2,011
1,814
-
-
-
0.00%
0.00%
Personnel Benefits
656
677
0.00%
0.00%
Supplies
4,013
-
-
-
-
0.00%
0.00%
Services
57,793
47,798
455,000
622,000
265,000
36.70%
- 57.40%
Capital Outlay
61,649
3,071
2,852,000
2,727,500
1,300,000
-4.37%
- 52.34%
Principal
289,487
321,760
325,261
322,271
326,225
-0.92%
1.23%
Interest
83,626
88,181
78,480
36,794
33,549
- 53.12%
-8.82%
Total Capital Expenses
499,234
463,301
3,710,741
3,708,565
1,924,774
-0.06%
- 48.10%
Non -Cash Accounting Adjustments
Operating Prior Period Adjustment
51,825
304,471
-
-
-
0.00%
0.00%
Capital Prior Period Adjustment
398,495
0.00%
0.00%
Revenue Bond Refunding
-
120,472
0.00%
0.00%
GASB 68 Pension Adjustment
-
(14,269)
-
-
-
0.00%
0.00%
Indirect cost allocation
394,500
451,167
460,100
469,302
478,688
2.00%
2.00%
Total Non -Cash Accounting Adjustments
844,820
861,841
460,100
469,302
478,688
2.00%
2.00%
Total Expenses
7,532,669
7,878,588
9,796,006
10,194,643
8,611,182
4.07%
- 15.530/0
Change in Fund Balance
1,288,956
1,896,250
(1,472,006)
(1,520,643)
187,818
3.30%
-112.35%
Networking capital (Fund Balance)
5,284,920
7,181,170
5,709,164
4,188,520
4,376,338
- 26.64%
4.48%
Reconcilaiton to Financial Statements
Net working capital (Fund Balance)
5,284,920
7,181,170
5,709,164
4,188,520
4,376,338
-26.64%
4.48%
Net Investment in Capital Assets
8,391,299
8,139,154
11,488,018
14,685,812
15,957,637
27.84%
8.66%
Restricted for Debt Service
126,834
-
-
-
-
0.00%
0.00%
Total Net Position
$ 13,803,052
$ 15,320,323
$ 17,197,182
$ 18,874,332
$ 20,333,975
9.75%
7.73%
Depreciation
(reduction in capital assets)
416,303
373,087
361,877
510,771
652,949
41.15%
27.84%
E, RI
Capital Projects
The capital projects listed below are capital projects planned for the 2017 -2018 biennium. The year in
which the project is estimated to be completed has been provided. Additional information on the
projects may be found in the Capital Improvement Program section of the budget document as well as
the Capital Improvement Program document, which is adopted annually.
Capital Projects
Budget
Budget
Completion
CBD Sanitary Sewer Rehabilitation
$ 1,265,000
$ 1,265,000
2019
Sewer Lift Station No. 2 Upgrades
765,000
-
2017
Sewer Repair - Strander Blvd Bridge
160,000
-
2017
Vall View W Hill Sewer Transf Area
50,000
-
2017
APE Sewer Replacement
550,000
-
2017
GIS Inventory of Sewer System
167,000
100,000
2019
53rd Ave S Sewer Rehabilitation
185,000
-
2017
Other (Annual Maint, etc)
200,000
200,000
NA
Total Capital Projects
$ 3,342,000
$ 1,565,000
Sewer Fund - Debt Service Requirements
The following chart provides information on debt service requirements, by debt issue, for the
biennium.
2017 2018
Debt Service Project Budget Budget
2015 Revenue Bonds Allentown Phase II
Principal $ 88,835 $ 92,789
Interest 23,179 21,101
2015 Revenue Bonds Total Debt Service 112,014 113,889
PWTFL 2004 Allentown Phase II
Principal
192,261
192,261
Interest
7,690
6,729
P4VTFL 2004 Total Debt Service
199,951
198,990
PWTFL 2014 CBD Sewer Rehab
Principal
41,175
41,175
Interest
3,294
3,088
P4VTFL 2014 Total Debt Service
44,469
44,263
Total Principal
322,271
326,224
Total Interest
34,164
30,918
Total Debt Service
$ 356,435
$ 357,142
Amortization of premiums and discounts are not included in this schedule but are
included in the Revenue and Expense Summary statement.
6717
Expenditure Detail - Salaries and Benefits
Salaries for budgeted positions are based on actual costs for existing positions and include a cost of
living adjustment per contract agreements.
Sewer Fund
Postion
Description
2016
FIT
2017
FIT
2017 Budget
Salaries Benefits
2018
FIT
2018 Budget
Salaries Benefits
Maint & Ops Superintendent
0.5
0.5
$ 42,033 $ 13,747
0.5
$ 45,227 $ 15,231
Maint & Ops Foreman
1
1
82,656 27,193
1
84,672 29,224
Sr Maint & Ops Specialist
1
1
76,800 34,329
1
78,732 36,957
Maint & Ops Specialist
0.5
1.5
95,966 55,253
1.5
101,415 60,176
Senior Engineer
0.5
0.5
59,628 23,556
0.5
61,092 25,259
Overtime
4,442 340
4,442 340
Clothing Allowance
570
570
Department Total
3.5
4.5
$ 361,525 $ 154,989
4.5
$ 375,580 $167,757
611
Expenditure Detail - Supplies, Services, and Other
Supplies include miscellaneous operating supplies specific to sewer work and Metro Sewer charges.
Services include engineering, surveying, utilities, rental of equipment, repair and maintenance charges,
insurance, and credit card fees, among others. Intergovernmental includes excise tax and interfund
utility tax paid to the general fund.
Sewer - Administration
6%
2014
2015
2016
2017
2018
Account Number
Purpose
Actual
Actual
Budget
Budget
Budget
Supplies
402.01.535.800.31.00
Supplies -
$ 3,796
$ 1,195
$
$
$
402.01.535.801.31.00
Supplies -
8,926
-
402.01.535.800.31.01
Supplies - Office & Safety
1,825
643
2,293
2,000
2,000
402.01.535.800.31.02
Supplies - Operating
15,662
11,682
12,600
12,600
12,600
402.01.535.800.31.03
Supplies - Repairs & Maintenance
2,532
1,474
4,500
4,000
4,000
402.01.535.800.31.04
Supplies - Billing
8,174
1,386
3,000
3,000
3,000
402.01.535.800.31.90
Supplies - Central
-
-
-
-
-
402.01.535.800.33.00
Supplies - Metro Sewage Treatment
4,133,944
3,865,421
4,000,000
4,200,000
4,350,000
402.01.535.800.35.00
Supplies - Small Tools & Minor
902
3,745
3,000
2,500
2,500
Equipment
402.01.535.800.35.01
Supplies - Traffic Control Devices
-
-
2,500
-
-
Total Supplies
4,175,762
3,885,546
4,027,893
4,224,100
4,374,100
Services
402.01.535.800.41.00
Prof Svcs - Consultant engineering
601
4,131
1,000
1,000
1,000
services, surveying
402.01.535.800.41.01
Prof Svcs - Utility one call services for
476
436
300
300
300
utility line locates
402.01.535.800.41.02
Prof Svcs - CDL licenses, hearing tests
238
94
300
300
300
402.01.535.800.41.04
Prof Svcs - TV Equipment Software
-
-
1,000
1,000
1,000
402.01.535.801.41.00
Prof Svcs - Project costs
139,943
131,532
-
-
-
402 .01.535.800.42.00
Communication - Phone bills and Nextels
2,051
1,931
2,500
2,500
2,500
402.01.535.800.43.00
Travel - Mileage, meals, parking
1,666
508
1,000
2,000
2,000
402.01.535.800.44.00
Advertising - Advertising for seasonal
-
-
150
150
150
help and staff replacement
402.01.535.800.45.00
Rental -Rental of backhoes, trackhoes,
267
-
2,000
2,000
2,000
loader, and forklifts
402.01.535.800.45.94
Rental - Equipment Replacement Fund
34,666
107,304
65,431
52,138
52,138
402.01.535.800.45.95
Rental - Equipment Rental O & M
58,338
37,118
65,041
57,110
58,252
402.01.535.800.46.00
Insurance - WCIA
16,464
-
19,465
-
-
402.01.535.800.46.01
Insurance - WCIA
-
-
-
5,811
6,392
402.01.535.800.46.04
Insurance-
-
18,538
-
19,854
20,251
402.01.535.800.47.00
Public Utility - Electrical, gas, water, and
31,221
1,304
35,000
1,000
1,000
sewer from lift stations
402.01.535.800.47.02
Public Utility - Waste Materials Disposal
2,526
635
5,000
4,000
4,000
402.01.535.800.47.21
Public Utility - Electric
-
15,755
-
16,000
16,000
402.01.535.800.47.25
Public Utility - Water and Sewer
-
16,189
-
17,000
17,000
402.01.535.800.48.00
R &M -Pump station repairs and
12,271
12,536
15,000
24,000
24,000
replacement done by outside vendors
402.01.535.800.48.01
R &M - Painting of sewer pump station
-
-
15,000
12,500
12,500
interiors
402.01.535.800.48.03
R &M - Repairs of sewer main lines
-
-
3,000
2,500
2,500
402.01.535.800.48.04
R &M -Sewer pump station computer
8,763
13,971
10,000
10,000
10,000
alarm system
402.01.535.801.44.00
Advertising-
3,230
1,862
-
-
-
402.01.535.801.45.00
Rental -
22,195
-
402.01.535.801.48.00
R &M - Equipment
260,118
794,849
402.01.535.801.49.00
Misc -
-
505
6%
Expenditure Detail - Supplies, Services, and Other, Continued
Sewer - Administration Con't
402.01.535.800.49.00
Misc - Training,classes, minor software
1,293
(8,681)
5,000
5,000
5,000
Account Number
purchases
Actual
Actual
Budget
Budget
Budget
402.01.535.800.49.08
Misc - PPI credit card fees
36,781
52,670
25,000
50,000
50,000
Total Services
Supplies -Office and Operating
633,107
1,203,186
271,187
286,163
288,283
Intergovernmental
Small Tools
4,013
402.01.535.800.53.00
Taxes & Assmnts - Excise Tax
122,790
131,181
105,000
135,000
135,000
402.01.535.800.54.02
Interfund Taxes - Interfund Utility Tax
829,340
902,462
790,400
855,000
867,000
TotalIntergovernmental
1 952,130
1 1,033,643
1 895,400
1 990,000
1,002,000
Total Supplies, Services and Other
1 $ 5,760,998
1 $ 6,122,375
1 $ 5,194,480
1 $ 5,500,263
1 $ 5,664,383
Services include construction management for capital projects. Capital includes capital projects related
to the sewer fund.
Sewer - Capital Outlays
53
2014
2015
2016
2017
2018
Account Number
Purpose
Actual
Actual
Budget
Budget
Budget
Supplies
402.98.594.353.31.00
Supplies -Office and Operating
$ 0
$
$
$
$
402.98.594.353.35.00
Small Tools
4,013
Total Supplies
4,013
-
-
-
-
Services
402.98.594.353.41.00
Prof Svcs - Construction management
57,778
47,798
455,000
622,000
265,000
402.98.594.353.43.00
Travel - Mileage, parking
-
-
-
-
-
402.98.594.353.44.00
Advertising - Bid ads
0
402.98.594.353.45.00
Rental - Equipment
(0)
402.98.594.353.47.00
Public Utility - Misc utility costs
-
402.98.594.353.48.00
R &M - Equipment
0
(0)
402.98.594.353.49.00
Misc -Other
15
-
-
-
-
Total Services
57,793
47,798
455,000
622,000
265,000
Other
402.01.594.350.64.00
Capital - Machinery & Equipment
-
-
-
7,500
-
402.01. 535.801.65.00
Capital - Construction Projects
-
402.98.594.353.61.00
Capital - Land
-
402.98.594.353.64.00
Capital - Machinery & Equipment
30,660
-
-
-
-
402.98.594.353.65.00
Capital - Construction Projects
30,989
3,071
2,852,000
2,720,000
1,300,000
Total Other
1
1 61,649
1 3,071
1 2,852,000
1 2,727,500
1,300,000
Total Capital
1 $ 123,455
1 $ 50,869
1 $ 3,307,000
1 $ 3,349,500
$ 1,565,000
53
ATTACHMENT E
City of Tukwila
SEWER ENTERPRISE FUND
2017 - 2022 Analysis in 000's
REVENUES
2013
2014
2015
2016
2016
2017
2018
2019
2020
2021
2022
Totals
Actual
Actual
Actual
Budget
Estimate
Monthly Sewer Charges
+20%
+15%
+10%
+5%
Commercial
+5%
Corm Idld
KC
+3.5%
KC
+3.4%
KC
+3.2%
King County Metro Sewer (1)
3,447
4,134
3,866
4,191
4,191
4,337
4,337
4,643
4,643
4,735
4,735
27,430
Regular City Sewer (2)
3,759
3,997
4,971
4,000
4,000
4,000
4,120
4,120
4,243
4,243
4,243
24,969
52,399
Subtotal Sewer Revenue 7,206 8,131 8,837 8,191 8,191
8,337 8,457 8,763 8,886 8,978 8,978
Other Misc. Revenue
143
181
228
165
165
212
217
220
225
230
235
1,339
Grant/ Bonds/ PWTF
248
504
290
290
0
0
0
0
0
0
0
Sewer Connection Fees (3)
249
262
206
125
125
125
125
100
100
100
100
650
54,388
Total Revenues 7,598 8,822 9,775 8,771 8,771
8,674 8,799 9,083 9,211 9,308 9,313
EXPENDITURES
Sewer Operations & Maintenance
King County Metro Sewer (4)
3,447
4,134
3,866
4,191
4,191
4,337
4,337
4,643
4,643
4,735
4,735
27,430
Regular City Sewer (5)
1,080
1,100
1,884
1,035
1,035
1,218
1,396
1,432
1,461
1,514
1,560
8,581
Debt Service (6)
353
373
410
395
395
356
357
355
355
353
353
2,129
Proposed Debt Service for Fnciiities
240
240
240
240
960
Interfund Utility Tax (5 10%
737
829
902
836
836
855
867
898
911
921
921
5,374
Engineering Labor (9)
63
86
90
78
78
83
86
87
89
91
93
529
45,003
Subtotal 5,680 6,522 7,152 6,535 6,535
6,849 7,043 7,655 7,699 7,854 7,902
Sewer Capital - CIP Program
527
561
980
4,097
3,665
3,342
1,565
1,474
705
1,528
2,730
11,344
56,347
Total Expenditures 6,207 7,083 8,132 10,632 10,200
10,191 8,608 9,129 8,404 9,382 10,632
FUND BALANCE
Change in Fund Balance (a)
1,391
1,739
1,643
(1,861)
(1,429)
(1,517)
191
(46)
807
(74)
(1,319)
(1,959)
Beginning Balance
2,199
3,599
5,285
7,181
7,181
5,752
4,236
4,426
4,380
5,187
5,113
5,752
3,794
Ending Balance 3,590 5,338 6,928 5,320 5,752
4,236 4,426 4,380 5,187 5,113 3,794
Fund Balance:
Reserved - 20 % of prior year's reve_ 1,322 1,520 1,715 1,854 1,854
1,696 1,735 1,760 1,817 1,842 1,862
1,862
Unreserved 2,268 3,818 5,213 3,466 3,898
2,539 2,691 2,620 3,370 3,271 1,932
1
1,932
Ending Balance 3,590 5,338 6,928 5,320 5,752
4,236 4,426 4,380 5,187 5,113 3,794
3,794
"" Revenues in excess of (less than) expenditures
2017 - 2022 Financial Planning Model XXXV 711912016 54
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2017-2022
SEWER ENTERPRISE FUND
402.98
CIP
Page #
PROJECT TITLE
2017
2018
2019
2020
2021
2022
TOTAL
"Other
Sources
After Six
Years
74
Annual Sewer Repair Program
200
200
200
200
200
200
1,200
0
200
75
CBD Sanitary Sewer Rehabilitation
1,265
1,265
1,214
0
0
0
3,744
0
0
76
Sewer Lift Station No. 2 Upgrades
765
0
0
0
0
0
765
0
7,100
77
Andover Park East Sewer Replacement
550
0
0
0
0
0
550
0
0
78
53rd Ave S Sewer Rehabilitation
185
0
0
0
0
0
185
0
0
79
GIS Inventory of Sewer System
167
100
50
0
0
0
317
0
500
80
Sewer Repair West of Strander Blvd Bridge
160
0
0
0
0
0
160
0
0
81
Valley View West Hill Sewer Transfer Area
50
0
0
0
0
0
50
0
0
82
Sewer Lift Stations & Generator Upgrades
0
0
10
110
910
10
1,040
0
960
83
Southcenter Blvd Sewer Upgrade
0
0
0
180
0
0
180
0
1,647
84
Sewer Comprehensive Plan
0
0
0
140
140
0
280
0
0
85
Sewer Replacement at 14025 Interurban Ave
0
0
0
75
0
0
75
0
865
86
Future Sewer Lift Station No. 13
0
0
0
0
278
2,520
2,798
0
0
Abandon Sewer Lift Station No. 9
0
0
0
0
0
0
0
0
1,120
Sewer Lift Station No. 12
0
0
0
0
0
0
0
0
4,400
APW Sewer connection to KC Metro
0
0
0
0
0
0
0
0
300
Sewer Repair at 14438 59th Ave S
0
0
0
0
0
0
0
0
550
Allentown Phase III - Sewer Revitalization
0
0
0
0
0
0
0
0
1,440
Ryan Hill - Sewer Revitalization
0
0
0
0
0
0
0
0
1,900
Grand Total 3,342 1,565 1,474 705 1,528 2,730 11,344
Denotes other funding sources, grants, or mitigation.
Project sheets scheduled beyond 2022
Changed name from Poverty Hill Sewer Revitalization to can be found in the City's website under
Allentown Phase III - Sewer Revitalization Public Works Capital Improvement Program.
Changed name from Sewer Lift Stations No. 3 & 4 to
Sewer Lift Stations & Generator Upgrades
Lift Station No. 1 -
Master Telemetry Panel
Lift Station No. 2 -
Backup Dialer
Lift Station No. 3
Lift Station No. 4
Lift Station No. 5
Lift Station No. 6
Lift Station No. 7 -
Abandoned in 2011
Lift Station No. 8
Lift Station No. 9
Lift Station No. 10
Lift Station No. 11
Lift Station No. 12
Lift Station No. 13
600 Minkler Blvd. - Shops
1105 Andover Pk W (at Minkler Blvd)
550 Minkler Blvd
6790 Todd Blvd - Southcenter South
6830 Fort Dent Way (entrance to Park)
6820 Fort Dent Way (only serves Park)
was at 14601 Interurban - replaced by gravity sewer
13359 56th Ave S - Foster Point (new in 2007)
12638 Interurban - Suburban Propane
12218 51 st PI S - Allentown (new in 2007)
18799 Southcenter Pkwy (new in 2012)
255 Andover Park W - Key Bank parking lot at mall
Future - Tukwila Pkwy & Andover Park W
0 20.982
55
2017 - 2022 Capital Improvement Program 73 711912016
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Annual Sewer Repair Program Project No. Varies
DESCRIPTION: Reduce sewer line infiltration and inflow (I & 1) through groundwater intrusion or storm events as a
result of damaged deteriorating systems or illicit connections. Include small repairs and capital maintenance.
JUSTIFICATION: Decrease treatment, discharge, and pumping costs.
STATUS: Annual program is determined after pipeline TV inspection reports are completed.
MAINT. IMPACT: Less maintenance costs through rehabilitation of aging system.
COMMENT: Ongoing project, only one year actuals shown in first column.
FINANCIAL Through Estimated
(in Q000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
10
10
Land (R/W)
0
Const. Mgmt.
1
1
Construction
22
159
200
200
200
200
200
200
200
1,581
TOTAL EXPENSES
33
159
200
200
200
200
200
200
200
1,592
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
33
159
200
200
200
200
200
200
200
1,592
TOTAL SOURCES
33
159
200
200
200
200
200
200
200
1,592
Project Location.,
Entire System
I
M
w
ail$
2017 - 2022 Capital Improvement Program 74 56
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: CBD Sanitary Sewer Rehabilitation Project No. 91140203
DESCRIPTION: The asbestos concrete pipe in the CBD (commercial business district) is approximately 45 years old and
becoming soft. Slip lining the pipe will reinforce the strength with little impact to roadways and minimal excavation.
JUSTIFICATION: If the pipe collapses, the street will have to be excavated and the cost of the repairs will be significant. In the
last five years we have had four major pipe failures on Andover Park West and Andover Park East.
STATUS: In 2014 and 2015, over 10,500 feet of asbestos sanitary sewer pipe were relined. In 2016 through 2018,
20,000 feet of asbestos sewer is scheduled to be relined.
MAINT. IMPACT: Reduced maintenance and repair costs.
COMMENT: A Public Works Trust Fund loan was successfully obtained in 2012 for $750k.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
323
37
45
45
45
495
Land(R /W)
1
1
Const. Mgmt.
112
85
120
120
120
557
Construction
736
1,540
1,100
1,100
1,049
5,525
TOTAL EXPENSES
1,172
1,662
1,265
1 1,265
1 1,214
1 01
01
01
01
6,578
FUND SOURCES
Awarded Grant
0
PW Trust Fund
750
750
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
422
1,662
1,265
1,265
1,214
0
0
0
0
5,828
TOTAL SOURCES
1,172
1,662
1,265
1,265
1,214
0
0
0
0
6,578
2017 - 2022 Capital Improvement Program 75 57
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Sewer Lift Station No. 2 Upgrades Project No. 90440205
DESCRIPTION: Install new pumps, motors, control system, backup generator and 2,700 LF of force main from Minkler to Strander
Blvd.
JUSTIFICATION: The lift station upgrade will be required upon full development of Tukwila South.
STATUS: Sewer lines installed in 2010 with Southcenter Pkwy Extension roadway project. Easement in 2016, generator
replacement, concrete slab, and replacement of pump's motor control system are scheduled in 2017.
MAINT. IMPACT: Reduce liability if the existing slab breaks the power connection.
COMMENT: See Tukwila South development agreement for funding and ULID requirements.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
75
16
100
191
Land(R /W)
15
15
Const. Mgmt.
115
1,000
1,115
Construction
35
650
6,000
6,685
TOTAL EXPENSES
1 110
1 31
1 765
0
0
0
0
0
7,100
1 8,006
FUND SOURCES
Awarded Grant
0
Proposed Bond /ULID
7,100
7,100
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
110
31
765
0
0
0
0
0
0
906
TOTAL SOURCES
110
31
765
0
0
0
0
0
7,100
8,006
2017 - 2022 Capital Improvement Program 76 58
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Andover Park East Sewer Replacement Project No. 91440204
DESCRIPTION: Design and construct 1,600 LF of 15" and 12" sanitary sewer from Strander Blvd. to 1 -405 in Andover Park E.
JUSTIFICATION: Sewer improvement will provide additional capacity for future development along Andover Park East.
STATUS: Project will overlay Andover Park East from Strander Blvd to 1 -405 in 2017.
MAINT. IMPACT:
COMMENT: Construction is scheduled for 2016 from Strander Blvd to Tukwila Parkway.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
47
43
90
Land(R /W)
0
Const. Mgmt.
206
50
256
Construction
1,626
500
2,126
TOTAL EXPENSES
47
1 1,875
1 550
1 0
0
0
0
0
0
2,472
FUND SOURCES
Awarded Grant
0
Proposed PWTF /Bond
0
Mitigation Actual
0
Mitigation Expected
290
290
Utility Revenue
47
1,585
550
0
0
0
0
0
0
2,182
TOTAL SOURCES
47
1,875
550
0
0
0
0
0
0
2,472
2017 - 2022 Capital Improvement Program 77 59
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
53rd Ave S Sewer Rehabilitation Project No. 99110301
Rehabilitation of 2,100 LF +/- of sanitary sewer that was installed in 1972 in 53rd Ave S from S 137th St
DESCRIPTION:
to S 144th St. Coordinate with Street, Water, and Surface Water improvements.
JUSTIFICATION:
The rehabilitation of the sanitary sewer will reduce the need to disturb the new roadway.
STATUS:
Current analysis shows that the sewer will just need to be relined at a significant cost savings.
MAINT. IMPACT:
Expected to decrease maintenance.
COMMENT:
22
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
3
22
10
35
Land(R /W)
0
Const. Mgmt.
25
25
Construction
150
150
TOTAL EXPENSES
1 3
22
1 185
0
0
0
0
0
0
210
FUND SOURCES
Awarded Grant
0
Proposed Bond /ULID
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
3
22
185
0
0
0
0
0
0
210
TOTAL SOURCES
3
22
185
0
0
0
0
0
0
210
2017 - 2022 Capital Improvement Program 78 60
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
GIS Inventory of Sewer System Project No. 80540202
DESCRIPTION:
GIS (Geographic Information Systems) provides current as -built data for the sanitary sewer system in the Central
Business District. This project will expand the as -built database for Tukwila's entire sewer system.
GIS mapping of the sewers will provide information that is easily addressable by City staff and the public. With the
JUSTIFICATION:
GIS data, the City will be able to develop an asset management plan to determine the sewer assets that need to
be upgraded or replaced.
STATUS:
In 2007, the Commercial Business District (CBD) was surveyed for GIS mapping. Full data collection should be
167
completed by 2019. Combined Asset Management System in 2017.
MAINT. IMPACT:
The survey will provide staff with up -to -date information on the location of manholes for the sanitary sewers.
COMMENT:
FINANCIAL Through Estimated
(in Q000's) 2015 2016 2017 201E 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
105
50
167
100
50
500
972
Land (R/W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
105
50
167
1 100
1 50
1 01
01
01
500
1 972
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
105
50
167
100
50
0
0
0
500
972
TOTAL SOURCES
105
50
167
1 100
1 50
1 0
0
0
500
1 972
Project Location:
Entire System
w
2lis-i
2017 - 2022 Capital Improvement Program 79 61
PROJECT:
DESCRIPTION:
JUSTIFICATION:
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
Sewer Repair West of Strander Blvd Bridge
Repair cracked sewer line west of Strander Blvd bridge.
If the sewer line collapses, the sewer will back up, causing property damage.
Line was damaged during installation of storm drain in 2004.
Project No. 90840203
Project will require dewatering due to the depth of 25 ft, soils, and the proximity to the Green River.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
2
20
22
Land(R /W)
0
Const. Mgmt.
20
20
Construction
120
120
TOTAL EXPENSES
1 21
01
160
1 01
01
01
01
01
01
162
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
2
0
160
0
0
0
0
0
0
162
TOTAL SOURCES
2
0
160
0
0
0
0
0
0
162
2017 - 2022 Capital Improvement Program 80 62
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Valley View West Hill Sewer Transfer Area Project No. 81240203
DESCRIPTION: The transfer of City of Tukwila service area to the Valley View Sewer District near 52nd Ave S.
JUSTIFICATION: The City of Tukwila has no assets in this area and Valley View Sewer District can better serve this portion of the
City due to existing topography.
STATUS: The West Hill area includes 52nd Ave S & S 152nd St, S 151st St, and S 154th St in the Fostoria area
near Macadam Rd and S 134th St.
MAINT. IMPACT:
COMMENT: This project will clarify the service boundary issues with the Valley View Sewer District.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
2
50
52
Land(R /W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
1 21
01
50
1 01
01
01
01
01
01
52
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
2
0
50
0
0
0
0
0
0
52
TOTAL SOURCES
2
0
50
0
0
0
0
0
0
52
2017 - 2022 Capital Improvement Program 81 63
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Sewer Lift Stations & Generator Upgrades Project No. 90440206
DESCRIPTION: This funding will be used to replace /upgrade the seven sewer lift stations and backup generators in phases.
JUSTIFICATION: Aging system requires the replacement of motors, pumps, and controls at older lift stations to reduce
maintenance. Generators have a lifespan of 15 years and need to be replaced more frequently than pumps.
STATUS: Sewer Lift Stations No. 3 & 4 are at the end of their life cycles and need to be rebuilt with backup generators
and are scheduled for 2020/21. Lift Station No. 5 is in beyond.
MAINT. IMPACT: New pumps will reduce the liability of the existing pumps failing.
COMMENT: Additional right -of -way or property will be required for the new backup generators to be installed.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
100
150
250
Generators
10
10
10
10
10
50
Const. Mgmt.
100
100
200
Construction
800
700
1,500
TOTAL EXPENSES
1 0
0
0
0
10
1 110
1 910
1 10
960
1 2,000
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
10
110
910
10
960
2,000
TOTAL SOURCES
0
0
0
0
10
110
910
10
960
2,000
2017 - 2022 Capital Improvement Program 82 64
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Southcenter Blvd Sewer Upgrade Project No. 99840202
DESCRIPTION: Upgrade 3,200 LF of 8" to a larger capacity 12" system from Macadam Rd to the 1 -405 undercrossing
on Southcenter Blvd.
JUSTIFICATION: Flows have greatly increased with additional connections to the basin from the North Hill apartment
buildings causing the system to be deficient in terms of capacity for peak discharges.
STATUS:
MAINT. IMPACT: Improved service would reduce maintenance liability.
COMMENT: Coordinate with 1 -405 improvements to Southcenter Blvd and Future Lift Station No. 13.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
180
180
Land(R /W)
0
Const. Mgmt.
207
207
Construction
1,440
1,440
TOTAL EXPENSES
1 01
01
01
01
01
180
1 01
01
1,647
1 1,827
FUND SOURCES
Awarded Grant
0
Bond /PWTF Loan
1,380
1,380
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
0
180
0
0
267
447
TOTAL SOURCES
0
0
0
0
0
180
0
0
1,647
1,827
2017 - 2022 Capital Improvement Program 83 65
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Sewer Comprehensive Plan Project No. 91040202
DESCRIPTION: Prepare new Sewer Comprehensive Plan incorporating any new or regulatory Growth Management
Act Comprehensive Plan issues related to sewer.
JUSTIFICATION: Sewer Comprehensive Plan needs to be consistent with City Comprehensive Plan, Department of
Ecology and Department of Health. Update is required every 6 years.
STATUS: 2013 Sewer update was adopted by Council on 6/2/14. Next update is scheduled for 2020.
MAINT. IMPACT:
COMMENT:
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
158
140
140
438
Land (R/W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
1 158
1 01
01
01
01
140
1 140
1 01
01
438
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
158
0
0
0
0
140
140
0
0
438
TOTAL SOURCES
158
0
0
0
0
140
140
0
0
438
I
0 �,,� l ro�ect Location:
�� �° Entire system
EJ
fi ✓�
C�
2017 - 2022 Capital Improvement Program 84 66
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Sewer Replacement at 14025 Interurban Ave S Project No. 90540209
DESCRIPTION: Replace 1,500 LF of 8" sewer line with a 12" line at 14025 Interurban Ave S from the Golden Nugget to
the Foster Green Apartments.
JUSTIFICATION: The existing main has sags and is undersized.
STATUS:
MAINT. IMPACT: Reduced maintenance costs.
COMMENT:
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
75
75
Land(R/W)
0
Const. Mgmt.
115
115
Construction
750
750
TOTAL EXPENSES
1 01
01
01
01
01
751
01
01
8651
940
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
0
75
0
0
865
940
TOTAL SOURCES
0
0
0
0
0
75
0
0
865
940
2017 - 2022 Capital Improvement Program 85 67
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Future Sewer Lift Station No. 13 Project No. 99740205
DESCRIPTION: Due to utility conflicts with existing utilities, a new sewer lift station will be required near 65th Ave S and
Southcenter Blvd. A gravity sewer main is not possible under 1 -405.
JUSTIFICATION: Existing line is undersized and has a severe sag. Increased development on the North Hill exacerbates
the deficiency.
STATUS: Design will be coordinated with WSDOT and Seattle Public Utilities.
MAINT. IMPACT: Less flushing maintenance to clear debris from sag and from the improved HOV manhole alignment.
COMMENT: Other alternatives are being reviewed due to WSDOT requirements. Formerly known as Gravity Sewer
under 1 -405 to Tukwila Parkway.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
77
278
355
Land(R /W)
0
Const. Mgmt.
320
320
Construction
2,200
2,200
TOTAL EXPENSES
1 77
1 0
0
0
0
0
278
1 2,520
1 0
2,875
FUND SOURCES
Awarded Grant
0
Bond
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
77
0
0
0
0
0
278
2,520
0
2,875
TOTAL SOURCES
77
0
0
0
0
0
278
2,520
0
2,875
2017 - 2022 Capital Improvement Program 86 68
DEPARTMENT: Public Works
FUND: Surface Water FUND NUMBER: 412
RESPONSIBLE MANAGER: Bob Giberson POSITION: Director
Description
The surface water program provides for engineering studies, preliminary engineering, construction,
and maintenance of public surface water and drainage facilities to include control and monitoring of
storm and surface water quantity and quality. The Green River Basin management agreement and the
Green River levees are also included in this program. The costs of operating and maintaining the
system are included with the capital projects necessary for system improvements.
2015 -2016 Accomplishments
♦ Completed small drainage project identified on the approved list for 2015 & 2016.
♦ Continued development of the GIS as- builts of city infrastructure that complies with NPDES.
♦ Completed construction of E Marginal Way S storm pipe replacement.
♦ Began design of Gilliam Creek 42nd Ave S culvert (with 42nd Ave S street improvements).
♦ Began design of 53rd Ave S surface water drainage.
♦ Began Tukwila 205 certification effort.
♦ Participated in the Green River system -wide improvement framework process.
2017 -2018 Outcome Goals
♦ Improve surface water system efficiency. Strategic Goal 1. Utility Comp Plan Goal 12.1
♦ Improve surface water system reliability. Strategic Goal 1. Utility Comp Plan Goal 12.1
♦ Improve surface water system capacity. Strategic Goal 1. Utility Comp Plan Goal 12.1
2017 -2018 Indicators of Success
♦ Complete small drainage projects identified on the approved list for 2017 and 2018.
♦ Construct Gilliam Creek 42nd Ave S culvert.
♦ Begin design and construction of Chinook Wind.
♦ Finish design and begin construction of 53rd Ave S surface water drainage.
♦ Construct East Marginal Way S storm water outfalls.
♦ Begin design and construction of Riverton Creek Flap Gate Removal.
♦ Continue development of Tukwila 205 Levee Certification.
♦ Continue development of the GIS as- builts of city infrastructure that complies with NPDES.
69
Performance Measures
Public Works - Surface Water
2014
Actual
2015
Actual
2016
Estimated
2017
Projection
2018
Projection
Maintain & Improve surface waters stem
Number of linear feet TV inspected
10,000
10,000
10,000
10,000
10,000
Number of linear feet of storm lines cleaned
12,000
12,000
12,000
12,000
12,000
Number of linear feet of ditches cleaned
3,000
2,000
2,000
2,000
2,000
Number of manholes /catch basins /or stormceptors
cleaned
1,500
1,000
1,500
1,500
1,500
Number of times cleaned four water quality ponds
Once /yr
Once /yr
Once /yr
Once /yr
Once /yr
Number of times cleaned large pot type water quality
vaults
Once /yr
Once /yr
Once /yr
Once /yr
Number of times clean 10 large trash racks
250
250
250
250
Capital
Hours of 5 storm lift stations monitoring of pump hours,
start counts, and generator operation (weekly)
5
5
5
5
5
NPDES (National Pollutant Discharge Elimination
System)
Number of illicit discharge events
10
13
13
13
13
Number of vehicles washed using the SudsSafe Car Wash
37
50
50
50
50
Customers
Number of surface water customers
5,260
5,250
5,260
5,270
5,275
Number of total drainage system miles
71.00
70.00
71.00
71.00
71.00
rill
Revenue and Expense Summary
Surface Water Fund
Reconcilaiton to Financial Statements
2014
2015
2016
2017
2018
2015 -2016
2017 -2018
Net working capital (Fund Balance
Actual
Actual
Budget
Budget
Budget
% Change
% Change
Operating Revenue
30,550,544
32,270,650
34,858,793
38,706,339
42,828,733
11.04%
10.65
Charges for Services
36,897
-
-
-
-
0.00%
0.00
Surface Water Sales $
4,225,742
$ 5,085,974
$ 5,832,000
$ 6,133,000
$ 6,306,000
5.16%
2.82
Total Charges for Services
4,225,742
5,085,974
5,832,000
6,133,000
6,306,000
5.16%
2.82
Intergovernmental Revenue
1,163,795
55,096
1,105,000
1,256,000
2,656,000
13.67%
111.46
Miscellaneous Revenue
Investment Earnings
22,102
18,905
31,000
24,000
24,000
-22.58%
0.00
Capital contributions
-
11,576
-
-
-
0.00%
0.00
Sale of Capital Assets
(79,860)
(2,487)
0.00%
0.00
Other Misc Revenue
330
225
-
-
-
0.00%
0.00
Total Miscellaneous Revenue
(57,428)
28,219
31,000
24,000
24,000
- 22.58%
0.00
Total Operating Revenue
5,332,109
5,169,289
6,968,000
7,413,000
8,986,000
6.39%
21.22
Capital Project Revenue
Intergovernmental Revenue - Grant
-
734,044
-
-
-
0.00%
0.00
Total Capital Project Revenue
-
734,044
-
-
-
0.00%
0.00
Total Revenue
5,332,109
5,903,333
6,968,000
7,413,000
8,986,000
6.39%
21.22%
Operating Expenses
Salaries & Wages
710,596
856,429
1,015,133
1,070,824
1,113,820
5.49%
4.02
Personnel Benefits
272,261
351,975
458,001
487,212
527,666
6.38%
8.30
Supplies
45,450
74,443
44,530
46,500
43,500
4.42%
-6.45
Services
394,394
908,014
388,054
533,942
477,847
37.59%
-10.51
Intergov't Services & Taxes
474,211
570,177
635,700
668,000
686,000
5.08%
2.69
Total Operating Expenses
1,896,913
2,761,038
2,541,418
2,806,478
2,848,833
10.43%
1.51
Capital Expenses
Salaries & Wages
47,146
77,903
-
-
-
0.00%
0.00
Personnel Benefits
17,243
30,526
-
-
-
0.00%
0.00
Supplies
8,316
24,827
50,000
50,000
50,000
0.00%
0.00
Services
513,214
410,800
1,250,000
2,150,000
1,518,000
72.00%
-29.40
Capital Outlay
2,221,611
1,744,811
1,926,000
2,373,500
3,395,000
23.23%
43.04
Principal
287,753
288,353
288,954
288,148
288,913
-0.28%
0.27
Interest
34,448
27,333
26,495
15,659
13,903
-40.90%
-11.21
Total Capital Expenses
3,129,731
2,604,552
3,541,449
4,877,307
5,265,816
37.72%
7.97
Non -Cash Accounting Adjustments
Operating Prior Period Adjustment
48,379
883,057
-
-
-
0.00%
0.00
Capital Prior Period Adjustment
471,152
-
0.00%
0.00
GASB 68 Pension Adjustment
-
(41,379)
-
-
-
0.00%
0.00
Indirect cost allocation
486,482
498,490
508,361
518,528
528,899
2.00%
2.00
Total Non -Cash Accounting Adjustm
1,006,013
1,340,168
508,361
518,528
528,899
2.00%
2.00
Total Expenses
6,032,657
6,705,758
6,591,228
8,202,313
8,643,547
24.44%
5.38%
Change in Fund Balance
(700,548)
(802,425)
376,772
(789,313)
342,453
- 309.49%
- 143.39
Networking capital (Fund Balance)
2,063,218
1,252,311
1,629,083
839,770
1,182,223
- 48.45%
40.78
Reconcilaiton to Financial Statements
Net working capital (Fund Balance
2,063,218
1,252,311
1,629,083
839,770
1,182,223
-48.45%
40.78
Net Investment in Capital Assets
30,550,544
32,270,650
34,858,793
38,706,339
42,828,733
11.04%
10.65
Restricted for Debt Service
36,897
-
-
-
-
0.00%
0.00
Total Net Position
$ 32,650,659
$ 33,522,961
$ 36,487,876
$ 39,546,109
$ 44,010,956
8.38%
11.29%
Depreciation (capital asset
reduction)
892,873
902,492
953,305
1,029,762
1,143,422
8.02%
11.04
Ifl
Capital Projects
The capital projects listed below are capital projects planned for the 2017 -2018 biennium. The year in
which the project is estimated to be completed has been provided. Additional information on the
projects may be found in the Capital Improvement Program section of the budget.
Gilliam Creek 42 S Srfc Wtr Clvrt
$ 1,035,000
$ 115,000
2018
53rd Ave S Surface Water Drainage
360,000
360,000
2018
East Marg Wy S Stormwater Outfalls
365,000
1,111,000
2018
Soils Reclamation Facility
300,000
-
N/A
Tukwila 205 Levee Certification
447,000
1,360,000
2019
Surface Water GIS Inventory
67,000
100,000
N/A
Riverton Creek Flap Gate Removal
90,000
750,000
2018
Chinook Wind
665,000
15,000
2019
Nelson Side Channel
200,000
-
2017
Gilliam Creek Fish Barrier Removal
40,000
150,000
2018
S 131st PI Drainage Improvements
-
100,000
2019
Other (Annual Maint, etc)
997,000
902,000
N/A
Total Capital Projects
$ 4,566,000
$ 4,963,000
Debt Service Requirements
The following chart provides information on debt service requirements, by debt issue, for the
biennium.
2017 2018
Debt Service Project Budget Budget
2015 Revenue Bonds Allentown Phase H
Principal $ 17,194 $ 17,959
Interest 4,486 4,084
2015 Revenue Bonds Total Debt Service 21,680 22,043
PWTFL 2001 Duwamish/ Valley View
Principal 11,597 11,597
Interest 290 232
PWTFL 2001 Total Debt Service 11,887 11,829
PWTFL 2004 Allentown Phase H
Principal 37,212 37,212
Interest 1,488 1,302
PWTFL 2004 Total Debt Service 38,700 38,514
PWTFL 2004 Cascade View
Principal 222,144 222,144
Interest 8,886 7,775
PWTFL 2004 Total Debt Service 231,030 229,919
Total Principal 288,146 288,912
Total Interest 15,151 13,393
Total Debt Service $ 303,297 $ 302,305
Amortization of premiums and discounts are not included in this schedule but are
included in the Revenue and Expense Summary statement.
73
Expenditure Detail - Salaries and Benefits
Salaries for budgeted positions are based on actual costs for existing positions and include a cost of
living adjustment per contract agreements.
Surface Water Fund
Position
Description
2016
FIT
2017
FIT
2017 Budgeted
Salaries Benefits
2018
FIT
2018 Budgeted
Salaries Benefits
Maint & Ops Superintendent
0.5
0.5
$ 42,033 $ 13,747
0.5
$ 45,227 $ 15,231
Maint & Ops Foreman
1.5
2
164,160 70,577
2
168,708 76,080
Maint & Ops Specialist
5.5
5.5
378,351 192,805
5.5
395,283 209,259
Senior Engineer
1
1
119,256 44,745
1
122,184 47,897
Engineer (NPDES Coord)
1
1
100,800 43,009
1
103,272 46,291
Sr. Maint & Ops Specialist
1
1
76,800 41,602
1
78,672 44,814
Inspector SW
1
1
73,649 35,265
1
77,160 38,321
Project Manager SW
1
1
98,775 42,736
1
106,314 47,049
Extra Labor
8,000 612
8,000 612
Overtime
9,000 688
9,000 688
Clothing Allowance
1,425
1,425
Department Total
12.5
13.0
$ 1,070,824 $ 487,212
13
$ 1,113,820 $ 527,666
74
Expenditure Detail - Supplies, Services, and Other
Supplies include supplies specific to administering the surface water program. Services include
engineering, surveying, repair and replacement costs of equipment, utilities, registrations, and credit
card fees, among others. Intergovernmental includes excise tax and interfund utility tax.
Surface Water - Administration
W.
2014
2015
2016
2017
2018
Account Number
Purpose
Actual
Actual
Budget
Budget
Budget
Supplies
412.01.538.301.31.00
Supplies - Office & Operating
$ 1,861
$ 11,695
$
$
$
412.01.538.301.35.00
Small Tools & Minor Equipment -
590
1,753
412.01.538.380.31.00
Supplies -
-
1,098
412.01.538.380.31.01
Supplies - Community Education
143
-
1,000
1,000
1,000
412.01.538.380.31.02
Supplies - Operating
27,912
53,187
36,030
36,000
36,000
412.01.538.380.31.03
Supplies - Office & Safety
10,232
1,600
1,500
1,500
1,500
412.01.538.380.31.04
Supplies - Billing
1,630
2,801
-
3,000
-
412.01.538.380.31.90
Supplies - Central
-
-
-
-
-
412.01.538.380.35.00
Small Tools & Minor Equipment - Minor
3,082
2,309
5,000
4,000
4,000
tools
412.01.538.380.35.01
Small Tools & Minor Equipment - Traffic
-
-
1,000
1,000
1,000
Control Devices
Total Supplies
45,450
74,443
44,530
46,500
43,500
Services
412.01.538.301.41.00
Prof Svcs - Project expense
46,583
352,546
-
-
-
412 .01.538.301.42.00
Communication -
-
372
412.01.538.301.43.00
Travel - Mileage, parking
-
-
412.01.538.301.44.00
Advertising -
959
412.01.538.301.45.00
Rental - Other
-
-
412.01.538.301.48.00
R &M - Equipment repair
72,962
3,970
412.01.538.301.49.00
Misc - Project expense
2,800
2,354
-
-
-
412.01.538.380.41.00
Prof Svcs - Engineering and surveying
548
147,789
2,000
2,000
2,000
412.01.538.380.41.01
Prof Svcs - Utility one call services
476
436
370
400
400
412.01.538.380.41.02
Prof Svcs - CDLs hearing and physicals
992
751
1,200
1,200
1,200
412.01.538.380.41.05
Prof Svcs - PCB Analysis
-
-
-
-
-
412.01.538.380.42.00
Communication - Phone bills and Nextels
482
483
2,000
2,000
2,000
412.01.538.380.43.00
Travel - Mileage, meals and parking
2,165
1,868
2,000
2,000
2,000
412.01.538.380.44.00
Advertising - Ads for jobs
-
-
500
500
500
412.01.538.380.45.00
Rental - Trackhoes, backhoes, loaders,
1,519
714
5,000
4,000
4,000
forklifts, and surface water supplies
412.01.538.380.45.94
Rental - Equipment Replacement Fund
73,537
200,134
87,553
230,345
154,241
412.01.538.380.45.95
Rental - Equipment Rental O & M
78,559
101,198
84,066
98,275
100,241
412.01.538.380.46.00
Insurance - WCIA
16,464
-
19,465
-
-
412.01.538.380.46.01
Insurance - WCIA
-
-
-
26,150
28,765
412.01.538.380.46.04
Insurance - WCIA
-
18,538
-
-
-
412.01.538.380.47.00
Public Utility - Electrical, gas, water and
12,506
709
16,500
5,000
5,000
sewer utilities for storm lift stations
412.01.538.380.47.01
Public Utility - Hauling dirt asphalt &
27,991
26,647
70,000
60,000
60,000
concrete disposal, garbage disp.
412.01.538.380.47.02
Public Utility - Electrical service
497
539
400
500
500
412.01.538.380.47.03
Public Utility - Storm filter cleaning
-
-
30,000
-
-
412.01.538.380.47.04
Public Utility - Spill Response & Disposal
2,114
49
30,000
30,000
30,000
412.01.538.380.47.21
Public Utility - Electric
-
7,103
-
7,500
7,500
412.01.538.380.47.25
Public Utility -Water
1,006
1,500
1,500
412.01.538.380.47.26
Public Utility - Surface Water
2 332
2,500
2,500
W.
Expenditure Detail - Supplies, Services, and Other, Continued
Surface Water - Administration Con't
412.01.538.380.48.00
R &M -Storm pump station repairs by
27,453
13,264
20,000
32,572
33,000
Account Number
outside vendors
Actual
Actual
Budget
Budget
Budget
412.01.538.380.48.02
R &M -Storm pump station telementry
-
7,710
4,000
4,000
4,000
412.98.594.382.31.00
repairs for alarm monitoring
$ 7,791
$ 24,827
$ 50,000
$ 50,000
$ 50,000
412.01.538.380.49.00
Misc - Reg, tuition, memberships,
5,214
(1,802)
6,000
6,000
6,000
Total Supplies
software upgrades, publications &
8,316
24,827
50,000
50,000
50,000
Services
subscriptions
412.01.538.380.49.01
Misc - King County recording lien fees for
9,000
3,000
-
-
15,000
412.98.594.382.42.00
delinquent surface water bills
-
-
-
-
-
412.01.538.380.49.08
Misc - PPI credit card fees
11,572
1 16,303
7,000
17,500
17,500
Total Services
R &M
394,394
908,014
388,054
533,942
477,847
Intergovernmental
Misc - Other
-
-
-
-
-
412.01.538.380.53.00
Taxes & Assmnts -Excise Tax
49,714
60,050
50,000
50,000
50,000
412.01.538.380.54.12
Interfund Taxes - Utility tax
424,498
510,127
585,700
618,000
636,000
Total Intergovernmental
474,211
570,177
635,700
668,000
686,000
Total Supplies, Services and Other
$ 914,055
$ 1,552,634
$ 1,068,284
$ 1,248,442
$ 1,207,347
Supplies include items for capital projects. Services include construction management costs. Capital
includes construction and purchase of capital assets.
Surface Water - Capital Outlays
ILll
2014
2015
2016
2017
2018
Account Number
Purpose
Actual
Actual
Budget
Budget
Budget
Supplies
412.98.594.382.31.00
Supplies - Office and Operating
$ 7,791
$ 24,827
$ 50,000
$ 50,000
$ 50,000
412.98.594.382.35.00
Small Tools & Minor Equipment -
525
-
-
-
-
Total Supplies
8,316
24,827
50,000
50,000
50,000
Services
412.98.594.382.41.00
Prof Svcs - Construction management
511,876
406,760
1,250,000
2,150,000
1,518,000
412.98.594.382.42.00
Communication - Postage
-
-
-
-
-
412.98.594.382.44.00
Advertising - Bid ads
1,339
1,017
-
-
-
412.98.594.382.48.00
R &M
-
3,023
-
-
-
412.98.594.382.49.00
Misc - Other
-
-
-
-
-
Total Services
513,214
410,800
1,250,000
2,150,000
1,518,000
Other
412.01.594.380.64.00
Capital - Machinery & equipment
-
-
-
7,500
-
412.98.594.382.61.00
Capital - Land
-
-
-
-
-
412.98.594.382.64.00
Capital - Machinery & equipment
14,797
-
-
-
-
412.98.594.382.65.00
Capital - Construction projects
2,206,815
1,744,811
1,926,000
2,366,000
3,395,000
Total Other
2,221,611
1,744,811
1,926,000
2,373,500
3,395,000
Total Capital
$ 2,743,141
$ 2,180,438
$ 3,226,000
$ 4,573,500
$ 4,963,000
ILll
ATTACHMENT F
City of Tukwila
SURFACE WATER ENTERPRISE FUND
2017 - 2022 Analysis in 000's
REVENUES
Actual
Actual
2014
Actual
zois
Actual
Budget
Budget
zm6
Esflmate
2017
2018
2019
2020
2021
2022
Total
+5%
+10%
+20%
+15%
+15%
+5%
+3%
+5%
+3%
+5%
+5%
Annual Billings (Current) (1)
3,845
4,222
5,086
5,825
5,836
6,127
6,300
6,615
6,813
7,154
7,154
40,163
Other Revenues
47
(54)
28
38
30
30
30
40
50
50
60
260
Grants /Bond Proceeds (2)
27
1,164
789
1,212
375
1,256
2,656
10,115
125
165
75
14,392
54,815
Total Revenues 3,919 5,332 5,903 7,075 6,241
7,413 8,986 16,770 6,988 7,369 7,289
EXPENDITURES
Operations & Maintenance
1,556
1,604
1,891
1,940
1,940
2,156
2,105
2,332
2,426
2,523
2,600
14,142
Debt Service 131
315
322
316
312
312
303
302
301
300
298
285
1,789
Proposed Debt Service for Facilities
560
560
560
560
2,240
Interfund Utility Tax (4) 10%
388
424
510
586
587
616
633
666
686
720
721
4,042
Engineering Labor (6l
304
355
452
531
475
558
588
595
635
654
686
3,716
25,929
Subtotal 2,563 2,705 3,169 3,369 3,314
3,633 3,628 4,454 4,607 4,755 4,852
SSWM Capital - CIP Program
1,046
2,808
2,553
4,506
2,300
4,566
4,963
11,902
2,077
1,173
1,627
26,308
52,237
Total Expenditures 3,609 5,513 5,722 7,875 5,614
8,199 8,591 16,356 6,684 5,928 6,479
FUND BALANCE
Change in Fund Balance
(181)
181
(800)
627
(786)
395
415
304
1,441
810
2,578
Beginning Balance
2,329
2,213
2,063
1,252
1,252
1,879
1,094
1,489
1,903
2,207
31648
1 1,879
4,457
Ending Balance 2,639 2,032 2,244 452 1,879
1,094 1,489 1,903 2,207 3,648 4,457
Fund Balance:
Reserved @120 % of revenue 745 778 834 1,023 1,173
1,173 1,231 1,266 1,331 1,373 1,441
1
1,441
Unreserved 1,894 1,254 1,410 (571) 706
(80) 257 637 876 2,275 3,016
3,016
Ending Balance 2,639 2,032 2,244 452 1,879
1,094 1,489 1,903 2,207 3,648 4,457
4,457
(a) Revenues in excess of (less than) expenditures
Nl Annual reserve balance requirement equals 20% of the prior year operating revenues.
2017 - 2022 Financial Planning Model XXXV11 711912016 77
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2017 -2022
SURFACE WATER
412 Fund
CIP
Page #
PROJECT TITLE
2017
2018
2019
2020
2021
2022
" "Other
TOTAL Sources
After Six
Years
88
Annual Small Drainage Program
710
710
710
710
710
709
4,259
0
713
89
Storm Water Quality Retrofit Program
110
110
110
110
110
110
660
0
110
90
NPDES Program
50
50
50
50
50
50
300
100
50
91
WRIA 9 Watershed Planning
12
12
12
12
12
12
72
72
12
92
Gilliam Creek 42 Ave S Surface Water Culvei
1,035
115
0
0
0
0
1,150
0
0
93
Chinook Wind
665
15
5,515
10
10
10
6,225
6,050
0
94
Tukwila 205 Levee Certification
447
1,360
4,600
0
0
0
6,407
5,808
0
95
East Marginal Wy S Stormwater OutFalls
365
1,111
0
0
0
0
1,476
920
0
96
53rd Ave S Surface Water Drainage
360
360
0
0
0
0
720
342
0
97
Soils Reclamation Facility
300
0
0
0
0
0
300
0
1,375
98
Nelson Side Channel
200
0
0
0
0
0
200
150
0
99
Green the Green
115
20
115
20
115
20
405
270
115
100
Riverton Creek Flap Gate Removal
90
750
0
0
0
0
840
550
0
101
Surface Water GIS Inventory
67
100
0
150
0
0
317
0
0
102
Gilliam Creek Fish Barrier Removal
40
150
0
0
0
0
190
130
745
103
S 131st PI Drainage Improvements
0
100
690
0
0
0
790
0
0
104
Northwest Gilliam Storm Drainage System
0
0
100
840
0
0
940
0
0
105
Surface Water Comprehensive Plan
0
0
0
175
0
0
175
0
0
106
S 146th St Pipe & 35th Ave S Drainage
0
0
0
0
166
716
882
0
0
Tukwila Pkwy /Gilliam Creek OutFalls
0
0
0
0
0
0
0
0
230
S 143rd Street Storm Drainage System
0
0
0
0
0
0
0
0
1,096
Nelsen PI /Longacres Surface Water Phase II
0
0
0
0
0
0
0
0
345
Duwamish Rvrbk Stabilization at S 104th St
0
0
0
0
0
0
0
0
595
TUC Surface Water Conveyance
0
0
0
0
0
0
0
0
541
Grand Total
4,566
4,963
11,902
2,077
1,173
1,627
26,308
14,392
5,927
** Denotes other funding sources, grants, or mitigation.
Chanoes from 2015 to 2017 Cl P: Project sheets scheduled beyond 2022
New: can be found in the City's website under
91 WRIA 9 Watershed Planning, moved from Parks to 412 Surface Water Public Works Capital Improvement Program.
98 Nelson Side Channel, moved from Parks to 412 Surface Water
99 Green the Green
103 S 131st PI Drainage Improvements
Deletions:
EMW S Storm Pipe Replacement, Completed in 2016
Surface Water Lift Station Locations
Storm Lift Station No. 15
5910 S 180th St - Mizuki Grill
Storm Lift Station No. 16
7420 S 180th St (underpass)
Storm Lift Station No. 17
530 Strander Blvd - Bicentennial Park
Storm Lift Station No. 18
4225 S 122nd St - Allentown
Storm Lift Station No. 19
Fort Dent Park (Parks Dept.)
78
2017 - 2022 Capital Improvement Program 87 711912016
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
Annual Small Drainage Program Project No. 9XX41201
DESCRIPTION:
Select, design, and construct small drainage projects throughout the City.
Provide drainage corrections for existing /ongoing drainage problems throughout the City, including culvert
JUSTIFICATION:
replacements, drain extensions, and pavement upgrades.
STATUS:
Projects for this annual program are taken from Small Drainage Project List.
MAINT. IMPACT:
Reduces maintenance.
74
Ongoing project, only one year shown in first column. Construction expenses may occur over two calendar
COMMENT:
80
80
years.
FINANCIAL Through Estimated
/in Q000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
74
80
80
80
80
80
80
80
80
714
Strearngages/Monitor
10
10
35
35
36
36
36
36
40
274
Const. Mgmt.
62
80
80
80
80
80
80
80
80
702
Construction
255
515
515
515
514
514
514
513
513
4,368
TOTAL EXPENSES
401
685
710
710
710
710
710
709
713
6,058
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
401
685
710
710
710
710
710
709
713
6,058
TOTAL SOURCES
401
685
710
710
710
710
710
709
713
6,058
0 ' r
Project Location.
Entire System
M
w
Z+'
LOS
2017 - 2022 Capital Improvement Program 88 79
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Storm Water Quality Retrofit Program Project No. 91241202
DESCRIPTION: Design and install water quality improvements at selected drainage locations throughout the City.
JUSTIFICATION: Most surface water is discharged directly to receiving water bodies untreated.
STATUS: Additional water quality is being added to Interurban Ave S in 2015 and 53rd Ave S in 2017.
MAINT. IMPACT: Expected to increase maintenance.
COMMENT: Combine with other CIP projects for design and construction, where feasible.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
9
15
15
15
15
15
15
15
15
129
Land (R/W)
0
Const. Mgmt.
15
15
15
15
15
15
15
15
120
Construction
80
80
80
80
80
80
80
80
640
TOTAL EXPENSES
9
110
110
110
110
110
110
110
110
889
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
9
110
110
110
110
110
110
110
110
889
TOTAL SOURCES
9
110
110
110
110
110
110
110
110
889
2017 - 2022 Capital Improvement Program 89 80
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
NPDES Program Project No. 99341210
Provide programmatic implementation requirements of NPDES. The Master Drainage Program specifies
DESCRIPTION:
a NPDES reporting and action plan for City compliance. The services /supplies funds will also include any illicit
discharge (spill cleanup) costs that may occur in the City's right -of -way.
State NPDES requirements include an annual report, public education and outreach, illicit discharge detection
JUSTIFICATION:
and illumination, approved technical standards, staff training, inspections of public and private systems, and
712
drainage system maps.
STATUS:
All current NPDES requirements have been implemented. LID Gap Analysis in 2016.
MAINT. IMPACT:
Additional cleaning and documentation will require added staff resources.
National Pollutant Discharge Elimination System (NPDES). Additional NPDES requirements will be ongoing.
COMMENT:
Costs shown include emergency supplies, testing equipment, DOE testing, and annual public outreach surveys.
FINANCIAL
Through Estimated
(in $000's)
2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
712
58
770
Services /Supplies
276
50
50
50
50
50
50
50
50
676
Const. Mgmt.
0
Construction
12
12
TOTAL EXPENSES
1,000
108
50
50
50
50
50
50
50
1,458
FUND SOURCES
Awarded Grant
125
50
175
Proposed Grant
50
50
100
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
875
58
50
0
50
0
50
50
50
1,183
TOTAL SOURCES
1,000
108
50
50
50
50
50
50
50
1,458
2017 - 2022 Capital Improvement Program 90 81
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: WRIA 9 Watershed Planning Project No. 91641205
DESCRIPTION:
City participation in an Interlocal Agreement with WRIA 9 jurisdictions and administered by King County.
Endangered Species Act (ESA) related project. Services provided by King County Dept. of Natural
JUSTIFICATION:
Resources (KCDNRP) under an Interlocal agreement between participating jurisdictions in Water
Resource Inventory Area 9 (WRIA 9) and King County. City's contribution is $12,448 per year.
STATUS:
Interlocal Agreement has been adopted by all cities with an extension through 2025.
MAINT. IMPACT:
Policies and recommendations will impact maintenance.
COMMENT:
Ongoing project, only one year actuals are shown in the first column. City parcels are assessed King
12
Conservation District fees directly on their property taxes, approximately $24,000 each year for the City.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
12
12
12
12
12
12
12
12
12
108
Land(R /W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
1 12
1 12
12
1 12
12
1 12
12
1 12
1 12
1 108
FUND SOURCES
King Conservation District
12
12
12
12
12
12
12
84
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
12
12
0
0
0
0
0
0
0
24
TOTAL SOURCES
12
12
12
12
12
12
12
12
12
108
2017 - 2022 Capital Improvement Program 91 82
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
Gilliam Creek 42 Ave S Surface Water Culvert Project No. 99410303
99341208
Design and replace the 36 -inch surface water culvert under 42 Ave S /Gilliam Creek. Combining this project
DESCRIPTION:
with the Residential Street Project 42nd Ave S Phase III.
144
The existing concrete pipe sections are separating and cracked which could erode the 42 Ave S fill and
JUSTIFICATION:
lead to loss of roadway.
STATUS:
Project is currently under design with construction scheduled to begin in 2017.
MAINT. IMPACT:
Expected to decrease maintenance.
State Fish & Wildlife hydraulic project approved (HPA) permit will be required. Replacement will require
COMMENT:
a fish passable structure.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
144
31
175
Land (R/W)
0
Const. Mgmt.
135
15
150
Construction
8
900
100
1,008
TOTAL EXPENSES
152
31
1 1,035
1 115
1 0
0
0
0
0
1,333
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
152
31
1,035
115
0
0
0
0
0
1,333
TOTAL SOURCES
152
31
1 1,035
1 115
1 0
0
0
0
0
1,333
2017 - 2022 Capital Improvement Program 92 83
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
Chinook Wind Project No. 91441202
DESCRIPTION:
Purchase and restore site as a salmon estuary and passive park.
The WRIA 9 Salmon Recovery Plan recommends creating 20 -acres of off - channel habitat within the
JUSTIFICATION:
Duwamish Transition Zone and lists this section of the river as critical habitat for salmon recovery
within the Green / Duwamish Watershed.
Property purchased and site cleared by King County in 2015 using King Conservation Futures and
STATUS:
King County Mitigation Bank. Site scheduled to be turned over to Tukwila in late 2016 /early 2017.
MAINT. IMPACT:
Passive park will require additional maintenance. RCO requires 10 years of monitoring period.
COMMENT:
Site may be developed by King County. Proposed grant funding for construction is from the KC Mitigation
Bank, State Salmon Funding Recovery Board, State ALIA, and King County Flood Control District.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
6
50
650
706
Land(R /W)
27
27
Monitoring
15
15
15
10
10
10
10
85
Const. Mgmt.
500
500
Construction
5,000
5,000
TOTAL EXPENSES
33
1 50
1 665
1 15
5,515
1 10
10
1 10
10
1 6,318
FUND SOURCES
Awarded Grant
0
Proposed Grant
600
5,450
6,050
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
33
50
65
15
65
10
10
10
10
268
TOTAL SOURCES
33
50
665
15
5,515
10
10
10
10
6,318
2017 - 2022 Capital Improvement Program 93
84
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Tukwila 205 Levee Certification Project No. 91341203
DESCRIPTION:
Obtain levee certification for the Tukwila 205 Levee.
The US Army Corps of Engineers no longer provides levee certification services to federally authorized
levees. The existing certification expired in August of 2013. Certification is required for the Federal
JUSTIFICATION:
Emergency Management Agency to accreditate the levee system as providing a 100 -year level of
flood protection.
STATUS:
Consultant hired in 2014 for Phase I that includes an initial study and identification of levee deficiencies.
350
Certification process is expected to lead to additional levee repair projects that are required to meet the
MAINT. IMPACT:
certification criteria. Certification is valid for a 10 -year period.
The initial phase of the certification process will determine needed repairs and cost estimates. Costs
COMMENT:
listed in 2017 through 2019 are estimates for potential repairs that would be grant dependent. King
County Flood Control District's Opportunity Grant Program currently has $63k per year.
FINANCIAL
Through Estimated
(in $000's)
2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Certification Phase 1
350
350
Certification Phase 11
100
217
220
537
Design
275
275
Const. Mgmt.
30
115
600
745
Construction
200
750
4,000
4,950
TOTAL EXPENSES
350
100
447
1 1,360
1 4,600
1 01
01
01
01
6,857
FUND SOURCES
KC Flood Control
113
63
63
63
63
63
63
63
63
617
Proposed Grants
150
780
4,500
5,430
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
237
37
234
517
37
(63)
(63)
(63)
(63)
810
TOTAL SOURCES
350
100
447
1 1,360
1 4600
1 01
01
01
01
6,857
2017 - 2022 Capital Improvement Program 94 85
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: East Marginal Wy S Stormwater Outfalls Project No. 91041204
DESCRIPTION: Establish legal drainage connections from East Marginal Way South to the Duwamish River.
JUSTIFICATION: Drainage from E Marginal Wy S is discharged through outfalls owned and operated by the Boeing Co.,
Jorgensen Forge, and two King County Airport storm systems without easements.
Jorgensen Forge outfall was closed in 2011 under an order from the US EPA. The Boeing Company
STATUS: contacted the City in 2009 requesting that the City take over ownership of their storm line and outfall. A
consultant is preparing design for rerouting the Jorgensen outfall and adding water quality features.
MAINT. IMPACT: Clarifies maintenance responsibility and will ensure reliability of system.
City adopted Boeing's Z Line in 2015. Phase II: Line pipe, add water quality device and connect Jorgenson's
COMMENT: drainage to Boeing's Z Line in 2017 and 2018. DOE design grant awarded in 2015, but withdrawn due to
State budget issues. Project dependent on grant funding.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
200
23
223
Monitoring
3
11
11
11
36
Const. Mgmt.
40
100
140
Construction
291
1,000
1,291
TOTAL EXPENSES
1 203
1 11
1 365
1 1,111
1 0
0
0
0
1 0
1,690
FUND SOURCES
Awarded Grant
120
120
Awarded Grant
0
Proposed Grant
20
900
920
Mitigation Expected
0
Utility Revenue
83
11
345
211
0
0
0
0
0
650
TOTAL SOURCES
203
11
365
1,111
0
0
0
0
0
1,690
2017 - 2022 Capital Improvement Program 95 86
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: 53rd Ave S Surface Water Drainage System Project No. 99110301
DESCRIPTION: As part of the 53rd Ave S Residential Street Improvements, replacing existing storm drainage system
and installing water quality treatment devices to treat storm water runoff.
JUSTIFICATION: New conveyance system will reduce flooding on right -of -way and private property. Existing system is in poor
condition and street runoff flows onto private property.
STATUS: Design began in 2015, with Street, Water, and Sewer improvements. Construction in 2017/2018.
MAINT. IMPACT: Expected to decrease maintenance.
COMMENT: State TIB grant for roadway and storm drainage for a total of $2.14M.
FINANCIAL Through Estimated
/in Q000'sl 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
17
183
200
Land (R/W)
0
Const. Mgmt.
60
60
120
Construction
300
300
600
TOTAL EXPENSES
17
183
1 360
1 360
1 0
0
0
0
1 0
920
FUND SOURCES
Awarded TIB Grant
171
171
342
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
17
183
189
189
0
0
0
0
0
578
TOTAL SOURCES
17
183
360
360
0
0
0
0
0
920
2017 - 2022 Capital Improvement Program 96 87
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Soils Reclamation Facility Project No. 99441202
DESCRIPTION: Construct soils reclamation facility to handle, treat, dispose and /or reuse non - hazardous street sweepings
and catch basin cleanings, etc. (formerly named Drainage/Vactor Waste Facility).
JUSTIFICATION: To meet State NPDES regulations, the City needs facilities to treat & dispose of waste materials resulting from
cleaning /maintenance activities, including street sweepings and Vactor truck wastes.
STATUS: Cost benefit analysis scheduled for 2017 to determine if we build our own facility or continue to transport.
Disposal is now being transported to a King County facility in Renton.
MAINT. IMPACT: Expected to decrease maintenance.
COMMENT: Will be combined with future location of City Maintenance Facility, debt service factored in Rate Model.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
49
300
175
524
Land (R/W)
561
600
1,161
Const. Mgmt.
100
100
Construction
500
500
TOTAL EXPENSES
610
1 0
1 300
1 0
0
0
0
0
1 1,375
1 2,285
FUND SOURCES
Awarded Grant
0
Bond
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
610
0
300
0
0
0
0
0
1,375
2,285
TOTAL SOURCES
610
0
300
0
0
0
0
0
1,375
2,285
* Note: Site Location is still under consideration.
2017 - 2022 Capital Improvement Program 97 88
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Nelsen Salmon Habitat Side Channel Project No. 91641203
DESCRIPTION: Create an off - channel salmon rearing habitat side channel by connecting a segment of historic river
channel with the Green River.
JUSTIFICATION: WRIA 9 has identified this project a proposed action in the Salmon Habitat Plan.
The project area is primarily within State lands. The project will involve adjacent properties, and the need
STATUS: for flood protection will need to be analyzed. The Project scope and project area, including any potential
property acquisition, needs to be defined and a feasibility study performed.
MAINT. IMPACT: Expected to increase maintenance
COMMENT: Property acquisition to the north could create the opportunity for a side channel and additional flood storage.
Grant funding proposed from King County Flood Control District and State.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
50
50
Land (R/W)
150
150
Const . Mgmt.
0
Construction
0
TOTAL EXPENSES
1 01
0
1 200
1 0
1 0
1 01
0
1 0
1 0
1 200
FUND SOURCES
Awarded Grant
0
Proposed Grant
150
150
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
0
0
50
0
0
0
0
0
0
50
TOTAL SOURCES
0
0
200
0
0
0
0
0
0
200
2017 - 2022 Capital Improvement Program 98 89
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Green the Green Project No. 91641202
DESCRIPTION: Interdepartmental effort to provide trees along the Green River and its tributaries in order to provide shade
and cooler water temperatures to threatened salmon and steelhead.
JUSTIFICATION: WRIA 9 has identified warm water temperatures as an impediment to salmon recovery, and has also started
a funding program called, "Green the Green" which aims to support revegetation projects along the river.
STATUS: New Project for 2017 - 2022 CIP. Project sites are being identified in preparation for a call for applications.
Other planting opportunities are being identified in a collaborative effort between Public Works and DCD.
MAINT. IMPACT: Expected to increase maintenance.
COMMENT: Proposed grant funding is from WRIA9 and King County Flood Control District.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
20
20
20
20
20
20
20
140
Land (R/W)
0
Const . Mgmt.
15
15
15
15
60
Construction
80
80
80
80
320
TOTAL EXPENSES
1 01
01
115
1 20
1 115
1 20
1 115
1 20
1 115
1 520
FUND SOURCES
Awarded Grant
0
Proposed Grant
90
90
90
100
370
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
0
0
25
20
25
20
25
20
15
150
TOTAL SOURCES
1 01
01
115
1 20
1 115
1 20
1 115
1 20
1 115
1 520
2017 - 2022 Capital Improvement Program 99 90
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Riverton Creek Flap Gate Removal Project No. 99830103
EXPENSES
Remove two culverts and flap gates at Duwamish River; install pipe arch, create open channel confluence,
DESCRIPTION:
install trail bridge over new channel, restore /revegetate 200 feet of creek channel and 450 ft of pond shoreline.
Increase available salmonid rearing habitat and increase flood refuge in lower Duwamish River. Improve
JUSTIFICATION:
fish access to Riverton Creek and enhance salmon rearing and resting area.
Design at 70% completion in 2011 with a Salmon Recovery Funding Board grant of $42,500 and $30,000
STATUS:
from People for Puget Sound. Construction is grant dependent.
MAINT. IMPACT:
Expected to increase maintenance.
90
Proposed grants include State & Federal habitat grants. Project used as mitigation for East Marginal Way
COMMENT:
Pipe Replacement Project and HPA Control #133763 -1 requires work to be completed by June 11, 2019.
FINANCIAL
Through Estimated
(in S000's)
2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
114
28
90
232
Land(R /W)
0
Const. Mgmt.
100
100
Construction
650
650
TOTAL EXPENSES
1 1141
28
1 901
750
1 01
01
01
01
01
982
FUND SOURCES
Awarded Grant
72
72
Proposed Grant
550
550
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
42
28
90
200
0
0
0
0
0
360
TOTAL SOURCES
114
28
90
750
0
0
0
0
0
982
2017 - 2022 Capital Improvement Program 100 91
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
Surface Water GIS Inventory Project No. 90241201
80241201
The GIS (Geographic Information Systems) inventory establishes citywide as -built drawings for the public
DESCRIPTION:
drainage systems. This is an ongoing project as all CIP and development infrastructure improvements will
need to be mapped.
JUSTIFICATION:
State NPDES requirements include provisions for permitted jurisdictions to compile accurate drainage
1,421
system maps for all outfalls 24" or greater.
STATUS:
GIS mapping was completed citywide in 2013. Future contracts will keep maps up to date as projects
change the existing system. Combined Asset Management System scheduled for 2017.
MAINT. IMPACT:
GIS information will allow maintenance to better track storm facility maintenance needs.
COMMENT: National Pollution Discharge Elimination System ( NPDES). Department of Ecology grants for NPDES permit.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
1,421
100
67
100
150
1,838
Land(R /W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
1,421
100
67
100
0
150
0
0
0
1,838
FUND SOURCES
Awarded Grant
218
218
Proposed Grant
0
Mitigation Actual
100
100
Mitigation Expected
0
Utility Revenue
1,103
100
67
100
0
150
0
0
0
1,520
TOTAL SOURCES
1,421
100
67
100
0
150
0
0
0
1,838
2017 - 2022 Capital Improvement Program
KIM
tiya
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
Gilliam Creek Fish Barrier Removal Project No. 99830105
DESCRIPTION:
Construct fish ladder leading to existing flap gate location and replace flap gate with self - regulating
tide gate to accommodate salmonid passage.
JUSTIFICATION:
Enable fish access to lower Gilliam Creek under wider range of flow conditions.
STATUS:
Analysis of lower Gilliam Creek may be conducted to determine best solution for fish passage and
to address potential flooding.
MAINT. IMPACT:
Expected to have no change in maintenance.
COMMENT:
Grant proposals to State RCO and KC Flood Control District. WSDOT may include this project in
the 1 -405 improvements.
FINANCIAL Through Estimated
(in S000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
40
150
110
300
Land(R /W)
0
Const. Mgmt.
85
85
Construction
550
550
TOTAL EXPENSES
1 0
0
40
1 150
1 0
0
0
0
745
935
FUND SOURCES
Awarded Grant
0
Proposed Grant
130
500
630
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
0
0
40
20
0
0
0
0
245
305
TOTAL SOURCES
0
0
40
150
0
0
0
0
745
935
G) Project Location
9
O
N
W*F"
S
2017 - 2022 Capital Improvement Program 102 93
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: S 131st Place Drainage Improvements Project No. 91641204
DESCRIPTION: Design and replace an existing 36" culvert under S. 131st PI. Raise the roadway approximately 18" and /or
provide a concrete wall or other means to keep Southgate Creek within its banks during storm events.
JUSTIFICATION: Southgate Creek overtops its bank several times per year during storm events and runs through private property.
Debris is deposited within a private driveway and storm system.
STATUS: New Project for 2017 - 2022 CIP. Maintenance is performed annually on the creek to remove excess
sedimentation to reduce the likelihood of flooding.
MAINT. IMPACT: Reduce the frequency of stream sediment removal and storm cleanup.
COMMENT: Project will require an HPA. Look at combining with a future overlay project to reduce overall costs.
FINANCIAL Through Estimated
/in Q000'sl 2015 2016 2017 2018 2019 2020 2021 2022 RFYOND TOTAL
EXPENSES
Design
100
100
Land (R/W)
0
Const . Mgmt.
90
90
Construction
600
600
TOTAL EXPENSES
1 01
01
01
100
1 690
1 01
01
01
01
790
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
0
0
0
100
690
0
0
0
0
790
TOTAL SOURCES
1 01
01
01
100
1 690
1 01
01
01
01
790
2017 - 2022 Capital Improvement Program 103 94
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT:
Northwest Gilliam Basin Storm Drainage System Project No. 90341206
Upgrade existing storm drainage system. Provide water quality treatment manholes at the downstream
DESCRIPTION:
end of the retrofitted drainage systems. Provide asphalt overlay and extruded asphalt curb for all streets.
JUSTIFICATION:
Reduces right -of -way and private property flooding by increasing the hydraulic capacity of the existing
storm drainage system. Water quality manholes remove sediment and oil from street runoff.
S 146th St was completed in 2009 and S 150th in 2015 with Thorndyke Safe Routes to School.
STATUS:
Remaining streets include S 148th St and S 152nd St.
MAINT. IMPACT:
Expected to decrease maintenance.
COMMENT:
Where feasible, combine with future water quality and overlay projects to reduce costs and construction impact.
FINANCIAL Through Estimated
fin tnn0's1 2015 20'16 2017 2MA 20'19 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
100
100
Land(R /W)
0
Const. Mgmt.
40
40
Construction
800
800
TOTAL EXPENSES
0
0
0
0
100
840
0
0
0
940
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
100
840
0
0
0
940
TOTAL SOURCES
0
0
0
0
100
840
0
0
0
940
95
2017 - 2022 Capital Improvement Program 104
PROJECT:
DESCRIPTION
JUSTIFICATION
STATUS:
MAINT. IMPACT:
COMMENT:
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
Surface Water Comprehensive Plan Project No. 91041202
Periodically revise and update the adopted Surface Water Comprehensive Plan to: 1) Incorporate the latest
requirements of the National Pollution Discharge Elimination System (NPDES) and Endangered Species Act
(ESA); 2) Update Capital Improvement Projects to reflect current needs and completed projects; 3) Include GIS
based basin and system maps as they become available; and 4) Revise Storm Water ordinance as needed.
The latest requirements from regulatory agencies as well as newly identified City needs must be included in
a regularly updated Surface Water Comprehensive Plan.
The Surface Water Comprehensive Plan was completed in 2003 and updated in 2013. Future updates are
planned on a 7 -year cycle with the next update in 2020.
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
163
175
338
Land (R/W)
0
Const. Mgmt.
0
Construction
0
TOTAL EXPENSES
1 163
1 0
1 0
0
0
175
0
0
0
338
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
163
0
0
0
0
175
0
0
0
338
TOTAL SOURCES
1 163
1 0
1 0
0
0
175
1 0
0
0
338
2017 - 2022 Capital Improvement Program 105 96
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: S 146th St Pipe and 35th Ave S Drainage System Project No. 90341214
DESCRIPTION: Replace existing storm drainage system on S 146th St and provide new storm drainage system for 35th Ave S.
Provide asphalt overlay and extruded asphalt curb for both streets.
JUSTIFICATION: Reduce right -of -way and private property flooding by increasing the capacity of the storm drainage system.
STATUS: Maintenance is monitoring area during storm events.
MAINT. IMPACT: Expanded system will require additional maintenance.
COMMENT:
FINANCIAL Through Estimated
(in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Design
166
166
Land (R/W)
0
Const. Mgmt.
111
111
Construction
605
605
TOTAL EXPENSES
1 0
0
1 0
0
0
0
166
1 716
1 0
882
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
Utility Revenue
0
0
0
0
0
0
166
716
0
882
TOTAL SOURCES
0
0
0
0
0
0
166
716
0
882
2017 - 2022 Capital Improvement Program 106 97
2017 - 2022 Capital Improvement Program 107 98