Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M12-141 - SLEEP TRAIN
SLEEP TRAIN 301 TUKWILA PY M12 -141 City �Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: Address: 0223000010 301 TUKWILA PY TUKW Project Name: SLEEP TRAIN Permit Number: M12 -141 Issue Date: 09/24/2012 Permit Expires On: 03/23/2013 Owner: Name: Address: Contact Person: Name: Address: Email: Contractor: Name: Address: BETA HOLDINGS LTD 18827 BOTHELL WAY NE , BOTHELL WA 98011 JAMES DAHLEN 33530 FIRST WY S # 102 , FEDERAL WAY WA 98003 KDMECI @COMCAST. NET Phone: 253 945 -8204 K & D MECHANICAL INC Phone: 253- 945 -8204 1911 SW CAMPUS DR #321 , FEDERAL WAY 98003 Contractor License No: KDMECI *008CJ Expiration Date: 02/21/2014 DESCRIPTION OF WORK: REPLACE (2) EXISTING UNITS AND REUSE EXISTING DUCTING. ADD (2) NEW RTU UNITS AND NEW DUCTING. Value of Mechanical: $40,000.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complied with, Fees Collected: $673.56 International Mechanical Code Edition: 2009 Date: 0/14 I Z ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. The granting of this permit does not pre •• e to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Date: 112-4 L t Z, This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M12-141 Printed: 09 -24 -2012 • N PERMIT CONDITIONS Permit No. M12-141 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional m responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431 - 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IMC -4/10 M12 -141 Printed: 09 -24 -2012 Site Address: Tenant Name: CITY OF TUKW Community DevelopmWDeportment Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 littp://www.TukwilaWA.gov MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *please print ** 30 l 7a)/d//4 ?,7(49/ S /e ” p Al 7'.i PROPERTY = OWN . :: ;: "1. , .= Name: Vie u1 ` 4V Email: 'K D/VE. CC �� �'UMl�! S1�/V Address: I1 2:1 ` r 60 wt, �b' City: a State: W J Zip: otso` I CON1'ACsT PERSON person receiving all project 4 4.-, . w x :a , :, communication„ ... ;': > OM Name: T4ti4 e S D4 W IeN 4// K/ p / Address:, .. . `. City: State: Zip: Phone: Fax: Email: 'K D/VE. CC �� �'UMl�! S1�/V King Co Assessor's Tax No.: 622W 0- Wi0 Suite Number: Floor: New Tenant: Yes ❑.. No :; mECHANIC4:tit N,TRA`CTOR igebikMAill : ` °; Company Name: k / ecii44; .t4 G Address: 33s'30 / sr[itl Ay SO. 1002 City: Fe Dee./ t.J State( W4 4 Zip: emooi Phone: Ass-79,c -Foioy Fax: S 3 - J `/S -c,p v.S' Contr Reg No.: x DA t!t ,. * o _xp Date: Tukwila Business License No.: (L,l ,,G� „_� Opa ,--'], l a ot Valuation of project (contractor's bid price): $ G/o !6 Describe the scope of work in detail: A- Lk+ ST A j um; 1$ 4. (e ge'f 4 f /Ye %! 1Pe -us c t. £x,'S14) Due ey /�1 t�- ;- j4J'� fru- 044.1 -J 41wJ Pac A �- g15 Use: Residential: New ❑ Replacement Commercial: New - f- Replacement Fuel Type: Electric Gas ❑ Other: H:'Applications'Porms- Applications On Line\20I 1 Applications\Mechanical Permit Application Revised 8- 9- 11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty' Furnace <100k btu L/ Furnace >100k btu /3 Floor furnace Suspended /wall /floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type �.... Qty Air handling unit >10,000 cfm Evaporator cooler /3 Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial ,Unit Type r Qt'• .. Fire damper Diffuser /3 Thermostat Wood /gas stove Emergency generator Other mechanical equipment Boiler /Compi-essorr.': 0 -3 hp /100,000 btu 3 -15 hp /500,000 btu 15 -30 hp /1,000,000 btu 30 -50 hp /1,750,000 btu 50+ hp /1,750,000 btu Value ofconstruction7 in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision .b ? to comply with current fee schedules. Expiration of plan review — 'applic•tions for which no'petmit is issued within 180 days following the date of application shall expire by limitation. The•building official may.grant on xtension pf time for additional periods not to exceed 90 days each The extension shall be requested in writing and justifiable cause demonstrate• ection 15.3.2 Intemational Building Code (current edition). `I HEREBY CERT Y TH PENALTY OF PE ;i URY AD AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING RIZED AGENT: Signature: Date: / — /01-/g Print Nam.. 3Afite -S D4 k tee Day Telephone: 2 s 3� / ��S iA O Y Mailing Address: 3 3s'3 !J / S' IA)", So. %!J J 1 • H:Wpphcattons\Forms- Applications On Lme\2011 Applications\Mechanical Permit Application Revised 8- 9- 11.docx Revised: August 2011 bh Dfrb1 4 „WA c'c -vtz3 City ,. , I State : Zip ^s. Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov Parcel No.: 0223000010 Address: 301 TUKWILA PY TUKW Suite No: Applicant: SLEEP TRAIN RECEIPT Permit Number: M12 -141 Status: PENDING Applied Date: 09/12/2012 Issue Date: Receipt No.: R12 -02591 Initials: JEM User ID: 1165 Payment Amount: $673.56 Payment Date: 09/12/2012 03:39 PM Balance: $0.00 Payee: JAMES L DAHLEN, K D MECHANICAL INC TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 074461 ACCOUNT ITEM LIST: Description 673.56 Account Code Current Pmts MECHANICAL - NONRES PLAN CHECK - NONRES 000.322.102.00.00 538.85 000.345.830 134.71 Total: $673.56 doc: Receiot -06 Printed:. 09 -12 -2012 ..INSPECTION RECORD Retain a copy with permit " INSPECTION NO: PERMIT NO. CITY OF=TUKWILA BUILDING DIVISION I 6300:Southcenter;BIvd.;- #100, Tukwila. WA 98188 (206) 431 -3670 PermitlnspectionRequest Line (206) 431 -2451 Project: - Type of Inspection: Address: . .30 / 7''.?e.t.az /1 Py Called: Special Instructions ji:3O ` 0C..3 1(07-C/ Date Wanted:. /am-., Requester: Phone No: o &-571- 36// Approved per applicable codes. El Corrections required prior to approval. COMMENTS: - 5, / " "7 6/4J //—/A;',7,) INSPECTION FEE REQLIRED. Pr) r to next inspection. fee must be aid at 6300-Southcenter lvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD K ' Retain a copy with permit INSPECTION NO PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300;Southcenter Bivd.;.- #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection .Request Line (206) 431 -2451 ,AA (2-11 Project.: j p• /j . c `""r = r - C(.4---. Type T e ol;Ins {ecttid p tV '{ —\ `�� r Address: 33° ( Date Called: Special Instructions: - J • . Date Wanted:. f� .— (' a.m. (2.___ p:m- Requester: Phone No: S 7` 8/ I i Li Approved 'per applicable codes. COMMENTS:' Corrections required prior to approval. D/A- PA-1:k1 •' o nC■c_, 1 5 (c; t—LJ 3 (LPL o ) UA --e-ki 0A JAMS 0/ Inspe;cttor: ,e,v4,y\ Date: �, n REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300-Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit. INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION Southcenter Blvd., #100, Tukwila. WA 98188 • 1, <e. (206): 431-3670 Permit Inspection Request Line (206) 431 -2451 Project: S1 ... .- r, T C A 1N.1 Type of Inspection: FR A in k NJ (. I 15 Address: r 1r i) 1 Ti (. (‹. g" E- -( Date Called: Special Instructions: Date Wanted:. q -.2G.. _t .: (a.m: p.m: Requester: Phone No: AO Ct,— _? I 32 .. ILApproved per applicable codes. El Corrections required prior to approval: COMMENTS: (D j - Ail/Arco !-7 - A pP3r rxP6 .0 AI A ..ect: R INSPECTION FEE R QUIRED. Prior to next inspection, fee must be n�TM� apaiid at 6300 Southcenter Blvd.. Suite 100. Call to schedule..reinspection:' Date: INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd_, #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: 51,_ €iP (Aif\J T . Type of Inspection: • SM0u €SI- I ZIT` DOW 'NJ Address: -3 0 i Hirt. Date Called: Special Instructions: Date Wanted:. - , /a.mm. Requester: off, 1,,,Jc5 S 416. 0 14C D - (LT ► )e,i tizt Phone No: ) --- C o C ' IA- 3 C, IM U 14.0 G'4lt 1 " P• c' ieo q 111< Approved per applicable codes. © Corrections required prior to approval. COMMENTS: )PPS — I _ voe bb .2.2 oe- A►'o4.j sUoPI V O` .1 e- .1 t R 1\}' A 1 11.. `S l/ 51 —c n/1 i • (A)1.4 '0'i -e 0 6—wt. )11 r*,,} :. 1 I J li-1 0\r- (k. e itt R N j t t r2.. ( i v a't" —, s in oJ . f— ,e6,o-P4) ftQ6_ kcd/rAc6- ` p lPOt lL- SvvIC (-22 +1,JJAIP✓f lid t (2 et;S t'D'1 '43114 PO-71' ) 115-vv‘A 412. r 11vPADAG1id of7St7,�t, 4�,.. t. S, yyt c ti{ f to t.l oN t r\J J r1 C t� S4.1 Luyi I )C,, A,,.,) off, 1,,,Jc5 S 416. 0 14C D - (LT ► )e,i tizt t CZ A w-r . ) --- C o C ' IA- 3 C, IM U 14.0 G'4lt 1 " P• c' ieo q 111< Nr se /AI e +f e (-h own + S i ►ry 5 03. AI 1 4 6. Wit t E=1 evt o t.c t° 0 i' N 43.1` 1 > - - Date El SPECTION FEE REQUIRED. Prior to n6xt'inspection; fee must be pfd at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. r, CITY OF TUKWILA BUILDING DIVISION .4 6300 Southcenter Blvd., #100, Tukwila: WA 98188 (206).431 -3670 Permit Inspection Request Line (206) 431-2451 X11 t2 -i ) Project: 'je.. e j A l -J Type of Inspection: FAR!Nvn)+Ve, l trzGt ;j1- / h! :. Address: O 1 -"t- i l t C W I L'. +( Q (..f Date Called: Special Instructions: ' Date Wanted:. - ?_S-)7: a`.m:, �'n'J Requester: Phone No: ..04› °'S %1 . - 1 Approved per applicable codes. Corrections required'prior to approval.. COMMENTS: 4/ r9°7.ri f--Am% 4ci ''Ate, podt7 6 2( -'b .. ..) A/ A• • n/ i "7 1%/) In pector: N,` n R EN 'PECTION FEE REQUIRED. Prior to/next inspection, fee must be �'ai t 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection, Date: structural calculations for: sleep train T.I. roof -top mechanical 301 tukwila parkway tukwila washington client: k & d mechanical 10 september 2012 index: rf- It- sk- pi.Trf r n- REVIEWED FOR CODE COMPLIANCE APPROVED SEP 19 2012 City of Tukwila BUILDING DIVISION roof framing lateral analysis sketched framing plan and details giraf design po box 75107 seattle wa 98175 -0101 (206) 621 -0060 p (206) 621 -0061 f • girafdesign(c�gmail.com http: / /girafdesign.net REGtiv CITY OF TUKI ";'E SEP 12 2012 PERMIT CENTER EXPIRES 01 /07/ I 37.5' 32,7 TES �'l /¢x ZfiyZ Grl. OM ,( rte, Fri 0 U £ I Q' -P Ot44 WA-0 1 2 ►�Psr 9- -77gek 1 3.67 �a3 • 7oZd kir w /oHMI f 1t1A L = 4. . hP,GH 1.44.4 = t o . to pry . kertex =).(,4k . 11 WINK- t N 042C4S E ✓ .1601 - 00-1 Pr 1 t(k 1.5k t 1.1L t.3Y, I.1.4 Z,g • giraf design po box 75107 seattle wa 98175 -0107 (206) 621 -0060 p (206) 621 -0061 f girafdesignCalgmail.com http: / /girafdesign.net . i .121o1k- 17.W ) �3.Ci• (V project: -`(1 N '(, 1. -ru -w1 LA client: B‹- V M ffA /c-rZ t7,3c, t.IZ t 17,7(. .10 L 1'1.-►c. 25,0 KIN1F«K- IN /IE7e. (.04-1,1..)S.5 Gug (24P -eta) MrL I7`t,3Zr,r,1c ✓ V�� 3ti.3t K .✓ date: 1 -(D -1Z proj #: Lp17._ - 079' sheet: ? j= -1 k-oratcor1 amt 'GUV -va Pq w 4- 7.4to ° N 122 PF•22 40(4csa 1.4Z 5 4rm. Got55 408 (,o kv u-\ ��csncc. y yZc.JE (►) gyp= 0,4gt s95 WIP (1+ Z h\ (f=t) 4f, = 2,5 1Z,P =C,.o _ 1.o - rf =1.o Wp= , -7oz -t) :. .f = •” lc' , 4--- I 1 S- Flo frnit. - t • o1 k . 03.3 -Zi 1 3.- Vi k/N =,ak• j Z giraf design po box 75107 seattle wa 98175 -0107 (206) 621 -0060 p (206) 621 -0061 f girafdesign @Qmail.com http: / /girafdesign.net 51I — FV*Yraf,. 3.0‘ Nor ,5 Fior-,1c dl- _ 1102* 5.47 - 2.0 Pm( Z 3,0 �u 2ri 3,LA - 1.29 prt, ' . - 1 - Na ({r)-1-,O 'Z 4»J [)-5E c ) 9 Fdie M - i fv th2F 6,-,vN W 'CO F-44-01 jN 4 W (Q') "3(0 k `R�`(Pgfr re fi(Ji - Of/h.) project: €,E,v 2 "11/4i1 % T. . date: 9 -10 - IZ- 11,1 LAN proj #: 201 Z - 07+ client: IL. ' 7 h 4-fAN sheet: LT- (7-)1/e' 4 5 -sc Sit -nt-P0r,ie-1-a- *2--1r,40 c () (p--4/4. aye 4x.c# 1 nt-03v41.-acc. leAtirr,w5 .6(.43 i-rtf uN)96f/ t-fr-f-fa.)61 N/ 0.1574-2 i••30 - mfcite..p5 -rerkt. ?'1- UPT 4k(4, •6(A1/43 (Jo/ 1-ruc 4C, /1.10 ( *0epiAe -,/ek-ml, C-0• ± giraf design po box 75107 seattle wa 98175-0107 (206) 621-0060 p (206) 621-0061 f girafdesign@gmail.com http://cirafdesign.net G<A(2A3 e c 9---10-r) project: -cppkiKi T.1. date: 9 — 10 -1 -TU proj #: Z4011- er-m- client: FM64-004( act_ sheet: - Ot-ti 11- UN 1"r 3e cu t (- '"IM' . .`('►0r 5T Z(ZZ �-PnP ch( of UNIT To 400 (pY., <G' . TO UNIT & rod Ght-J �o1c -t-O cu M tt . 'tb (z1 7-K _ w/ 80( c kw C . UNIT* & Am-4-9 4 T- Td Gut -e ev4.- P1 tc N uFA-u O 2rj2 5 vafors , 4 x C. w/ ' 7 ftAiv (y `` co NM ) rDVm4 O VletPi 0 . angy ►N qe-7. (-Z) Zx _rC- PariQ giraf design po box 75107 seattle wa 98175 -0107 (206) 621 -0060 p (206) 621 -0061 f girafdesignc gmail.com htto: /(girafdesign.net ) 6ktAi . a 640,e • project: -10\1 N -r.1. client: date: _(0 - ►Z proj #: U(2.U7q' sheet: L),L - Z 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Summary MECH -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised December 2010 Project Info Project Address Sleep Train TI Date 9/10/2012 301 Tukwila Parkway For. Building Dept. Use � , �, Eir�s r: �, t'�, rimy rft Tukwila WA 98188 Applicant Name: Steven Rainbow, PE Applicant Address: 336 NW 50th St, Seattle, WA 98107 Applicant Phone: 206.235.6002 steven @rainbowconsulting- rGie.com- -.. !+ -, Project Description 1 p Briefly describe mechanical system type and features. .1 Indudes Plans Replace two existing heat pump rfO'oftop units with new and°modify -•• existing ductwork. Two new heat pump rooftop units and associated ductwork. Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 Compliance Option QQ Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' Capacity2 Btu/h OSA CFM or Econo? SEER or EER IPLV3 Econmizer Option or Exceptions Heat Recovery Y/N Sea Plane FOR REVIEWED CODE COMPLIANCh APPROVED Heating Equipment Schedule 19 2012 Equip. ID Equip Type Brand Name' Model No.' Capacity2 Btu/h OSA cfm or Econo? Input Btuh SEF Output Btuh Efficiency.' Heat Recove Y/N See Plana City of Tukw la BUILD NG DIVISION Fan Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' CFM SPA HP /BHP Flow Controls Location of Service See Plans 11f available. 2 As tested according to Table 14 -1A through 14 -1G. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV , or variable speed (VS). 6 Exception number from Section CITY OF TUK'I -p^ SEP 12 2012 PERMIT CENTER M12- ��ll 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Summary (back) MECH -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised December 2010 System Description See Section 1421 for full description of Simple System qualifications. All Systems: ✓ No humidification? ✓ No Reheat? If Heating /Cooling or Cooling Only: ✓ Constant vol? ❑ Split system? • <= 84,000 Btuh? ❑ Economizer ❑ Air cooled? ❑ Packaged sys? ❑ Cooling Cap < =15 Btuh/ft2? IN <= 135,000 Btuh? • Heating Cap. > 0 & < =10 Btuh/ft2 ? If Heating Only: III <1000 cfm? ❑<30% outside air? ❑ Heating Cap. < =10 Btuh/ft2? Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. START ap <=15 B Heat/Cool Eq. with Cap < =10 ft2, or /ft2 ? Yes Yes Heating /Cooling or Cooling Only No • Heating Only r—N Yes Yes - 14eatir4 Cap <= 10}Yes- tuh/ Reference Section 1421 Yes • Yes Yes \ Qties for ,ZEconoN. No � — Economizer Inched? Exception \Y/ (s ion 1 Yes Simple System ► Allowed (section 1420) Yes Use Complex ► Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical P Permit Plans Checklist MECH -CHK A� 2009 Washington State Energy C Project Address sleep Train TI (Date 9 9/10/2012 The following information is necessary to check a mechanical permit application for compliance with the mechanical requiremen is in the Washington State Nonresidential Energy Code. Applicability C Code L Component I Information Required o Location B Building Department HVAC REQUIREMENTS (Sections 1401 -1424) 1411 E Equipment Performance Yes 1 1411.1 M Minimum efficiency E Equipment schedule with type, capacity, efficiency M M -2 N.A. 1 1411.1 C Combustion htg. I Indicate intermittent ignition, flue/draft damper & jacket loss N.A. 1 1411.1 A Air- cooled chiller P Provide total air and water chiller capacity N.A. 1 1411.2.1 W Water - cooled chiller F Full -load and NPLV values adjusted for any non - standard conditions Yes 1 1411.4 P Pkg. elec. htg.& clg. L List heat pumps on schedule M M -2 a a A N.A. 1 1411.5 U Unenclosed Heat I Indicate radiant heat system and occupancy controls p g, t tiu `^ . ( 1412 H HVAC Controls . Yes 1 1412.1 T Temperature zones I Indicate locations on plans M -3 Yes 1 1412.2 D Deadband control I Indicate 5 degree deadband minimum M -1 N.A. 1 1412.3 H Humidity control I Indicate humidistat Yes 1 1412.4 S Setback and Shutoff I Indicate thermostat with 7 day program capability & required setback M -2 Yes 1 1412.4.1 D Dampers I Indicate damper location, leakage rate, control type, & max. leakage M -1 N.A. 1 1412.4.2 O Optimum Start I Indicate optimum start controls i -2 REVIEVVED F i.,�. Yes 1 1412.5 H Heat pump control I Indicate heat pump thermostant & outdoor lockout on schedule - Rtutivtu CITY OF TUKVAji E A SEP 12 2012 1/41 PERMIT CENTER 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Permit Plans Checklist Continued MECH -CHK 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised December 2010 Project Address Sleep Train TI (Date 9/10/2012 The following information is necessary to check a mechanical permit application for compliance with the mechanical requiremen is in the Washington State Nonresidential Energy Code. Applicability (yes, no, na) Code I Section Component Information Required Location I on Plans Building Department I Notes SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. N.A. 1441 Elec. water heater Indicate R -10 insulation under tank . N.A. 1442 Shut -off controls Indicate automatic shut -off of circulators or heat trace N.A. 1443 Pipe Insulation Indicate R -value of insulation on piping N.A. 1444 Pump Energy Indicate method of pump energy management (Sec 1438) N.A. 1445 Heat Recovery Indicate preheat capacity as % of peak service water demand. 1460 Heated Pools N.A. 1452 Heat Pump COP Indicate minimum COP of 4.0 N.A. 1452 Heater Efficiency Indicate pool heater efficiency N.A. 1453 Pool heater controls Indicate switch and 65 degree control N.A. 1454 Pool covers Indicate vapor retardant cover N.A. 1454 Pools 90+ degrees Indicate R -12 pool cover N.A. 1455 Heat Recovery Indicate method and capacity of exhaust air temperature reduction COLD STORAGE (Sections 1460 -1465) 1460 Cold Storage N.A. 1463 Evaporators Indicate motor type and speed control N.A. 1464 Condensors Indicate condenser cooling type, design wb temp and control N.A. 1465 Compressors Indicate design minimum condensing temp and control. If "no" is indicated for any item in Sections 1401 -1424 or 1440 -1465 , provide explanation: 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Economizer MECH -ECO 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised December 2010 Economizer Summary Check box(es) for exceptions being claimed. List the system /equipment that qualifies for each exception. See Section 1433 for full description of Economizer requirements. Decision Flowchart Full Air Econo: 0 E 1: ❑ Ex 2: ❑ Ex3: ❑Ex4: ❑Ex5: ❑Ex6: 0 E 7: Ex 8: Use this flowchart to determine if project complies with Economizer requirements. If not, the Systems Analysis Option must be used. ❑ Ex 9a: ❑ Ex 9b: ❑ Ex 9c: 0 E 10: ( START Reference Section 1433 , 100% Air Economizer Yes PerRs9wq R.A, n 'Full Air Economizer - Complies PZIL Group R Occ. rtified Un m Table 14 -1A, /EER 15% Code xception 8: Unit Cap <20,000 Btuh No Yes xception :: it Cap <54,000 B it not Exterior jace xception . it Cap < 33,000 Bt nit not Exterior o djacen Idg. Cap. w/o economizer <72,000 Btuh or 5 %? Exception 2: Chilled Water Sys hiller 25% over eptio = er Cooled Re Waterside Economize ng chilled b > =m Sys No V xception 3 Syste Cap <= 500 tons SEP 19 2012 No 0 Exception 4: Cooling 75% Site HR or Solar Yes— Exception 5: Special OA iltration Need xception Dehumidification with supporting rgy anal Exception 7: Heat Pump Loop eting All Crit- No No Exception 9: Dedicated Server or Eq Rm e Yes—■ xc. 9a: EER & IPLV Over Ye e No No 0 xc. 9b. Water Econo ER & IPL 5% • ode Yes ote C or bett f cap >85,00 xception 10: VRF System Meeting All Criteria RAE 127 ets 14- 1A/14 - Yes /I P No • Does Not Comply I 0 Yes REL,t1 CITY OF TUKVI A SEP 12 2012 PERMIT CENTER M I Qualifies for Full Air Economizer Exception - Complies '�ERMIT COORD COR1111; PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -141 PROJECT NAME: SLEEP TRAIN SITE ADDRESS: 301 TUKWILA PY DATE: 09/12/12 X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEP RTMENTS: u ding Division I VI— Public Works ❑ Fire Preven`lion Structural Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Incomplete ❑ Complete DUE DATE: 09/13/12 Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire EJ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required n No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions 1`i Not Approved (attach comments) ❑ Notation: DUE DATE: 10/11/12 REVIEWER'S INITIALS: DATE: Permit: Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire El Ping ❑ PW ❑ Staff Initials: Contractors or Tradespeoi ter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with Lli1 to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name K i3 D MECHANICAL INC UBI No. 601994103 Phone 2539458204 Status Active Address 33530 1St Way South License No. KDMECI'0O8CJ Suite #102 Suite /Apt. License Type Construction Contractor City Federal Way Effective Date 2/11/2000 State WA Expiration 2/21/2014 Date Zip 98003 Suspend Date County King Business Type Corporation Parent Company Specialty 1 Heating /Vent /Air - Conditioning And Refrig (Hvac /R) Specialty 2 Unused Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status WESTEMC919QLWESTERN MECH CONTRACTORS INC Construction Contractor General Unused 11/13/2009 1/15/2014 Active WESTEMS9216G WESTERN MECHANICAL SYSTEMS INC Construction Contractor General Unused 1/7/2008 1/7/2014 Active PATRIG1927BN PATRIOT GROUP INC, THE ,Contractor Construction General Unused 1/15/2008 1/15/2010 Inactive Business Owner Information Name Role Effective Date Expiration Date DAHLEN, JIM Agent 02/11/2000 Bond Amount Received Date DAHLEN, JIM L President 10/30/2008 02/01/2012 KACSO, OTTO President 02/11/2000 10/30/2008 DAHLEN, JIM Vice President 02/11/2000 10/30/2008 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 3 CBIC SJ4600 02/01/2012 Until Cancelled 02/01/2013 $6,000.0001/10/2012 2 OHIO CAS INS CO 3508067 02/01/2002 Until Cancelled 02/02/2012 02/01/2012 $6,000.0002/07/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 11 Liberty Northwest Ins Corp BKA52667068 02/01/2012 02/01/2013 $1,000,000.00 01/20/2012 10 LIBERTY NORTHWEST INS CORP BLW1252667068 02/01/2011 02/01/2012 $1,000,000.00 01/28/2011 9 LIBERTY NORTHWEST INS CO BLW1152667068 02/01/2009 02/01/2011 $1,000,000.0012 /28/2009 https://fortress.wa.gov/lni/bbip/Print.aspx 09/24/2012 2009 WSEC COMPLIANCE GENERAL NOTES MECHANICAL LEGEND 1. HVAC EQUIPMENT SHALL HAVE MINIMUM PERFORMANCE AT SPECIFIED RATING CONDITIONS NOT LESS THAN THE VALUES INDICATED IN TABLE 14 -1A THROUGH 14-1G OF THE WSEC AND AS INDICATED ON THE CONTRACT DOCUMENTS. 2. PROVIDE DEADBAND BETWEEN HEATING /COOLING SPACE SENSOR SETPOINTS OF 5 DEGREES AS REQUIRED BY SECTION 1412.2 OF THE WSEC. 3. HVAC SYSTEMS SHALL BE EQUIPPED WITH AUTOMATIC CONTROLS CAPABLE OF ACCOMPLISHING SETBACK OR SHUTDOWN DURING UNOCCUPIED PERIODS AS REQUIRED BY SECTION 1412.4 OF THE WSEC. 4. PROVIDE DAMPERS WITH MAXIMUM LEAKAGE RATES AS REQUIRED BY SECTION 1412.4.1 OF THE WSEC. 5. PROVIDE BALANCING DEVICES IN ALL BRANCH DUCTS AND PIPE RUNS TO TERMINAL DEVICES AS REQUIRED BY SECTION 1412.7 OF THE WSEC AND AS INDICATED ON THE CONTRACT DOCUMENTS. 6. ALL DUCTWORK SHALL COMPLY WITH SMACNA STANDARDS FOR CONSTRUCTION OF GALVANIZED DUCTWORK. • ALL DUCTWORK SHALL BE SEALED AND LEAK TESTED AS REQUIRED BY SECTION 1414.1 OF THE WSEC. 7. ALL DUCTWORK SHALL BE INSULATED AS REQUIRED BY SECTION 1414.2 (MIN R -7) OF THE WSEC. DUCT SIZES SHOWN ON PLANS ARE NET, CLEAR DUCT SIZES. ALL PIPING SHALL BE INSULATED AS REQUIRED BY SECTION 1415.1 OF THE WSEC. 9. INDIVIDUAL ZONE TERMINAL UNITS AND HVAC SYSTEMS SERVING PORTIONS OF THE BUILDING HAVING LESS THAN 24 -HOUR OPERATION SHALL BE SHUT OFF DURING UNOCCUPIED PERIODS AS REQUIRED BY SECTION 1432.1 OF THE WSEC. 10. SUPPLY AIR AND WATER TEMPERATURES SHALL BE AUTOMATICALLY RESET AS REQUIRED IN SECTION 1432.2.1 AND 1432.2.2 OF THE WSEC. 11. ALL AIR SYSTEMS SHALL BE PROVIDED WITH AIR ECONOMIZER CAPABILITY AS REQUIRED BY THE SECTION 1433 OF THE WSEC, UNLESS OTHERWISE INDICATED ON THE CONTRACT DOCUMENTS. 12. AIR ECONOMIZERS OF SYSTEMS GREATER THAN 5 -TONS SHALL BE CAPABLE OF PROVIDING PARTIAL COOLING EVEN WHEN ADDITIONAL MECHANICAL COOLING IS REQUIRED TO MEET THE REMAINDER OF THE COOLING LOAD. 13. SIMULTANEOUS HEATING AND COOLING TO INDIVIDUAL ZONES SHALL BE PROHIBITED EXCEPT WHERE PERMITTED IN SECTION 1435 OF THE WSEC. 14. MINIMUM MOTOR EFFICIENCY SHALL NOT BE LESS THAN TABLE 14 -4 OF THE WSEC. 15. COMPLY WITH ALL COMMISIONING AND COMPLETION REQUIREMENTS OF SECTION 1416 OF THE WSEC. ABBREVIATIONS AFF ARCH BDD CFM CO CONT CW DEG DIA DN EF ESP EXIST (E) F FD FLA FPM FT GPM HW IE ABOVE FINISHED FLOOR ARCHITECTURAL BACKDRAFT DAMPER CUBIC FEET PER MINUTE CLEANOUT CONTINUATION COLD WATER DEGREE DIAMETER DOWN EXHAUST FAN EXTERNAL STATIC PRESSURE EXISTING FAHRENHEIT FLOOR DRAIN FULL LOAD AMPACITY FEET PER MINUTE FEET /FOOT GALLONS PER MINUTE HOT WATER INVERT ELEVATION IN KW LBS MAX MCA MECH MFR MIN MOD OA POC RPM SF SPEC TSP TYP V VTR W WG INCH KILOWATT POUNDS MAXIMUM MINIMUM CURRENT AMPACITY MECHANICAL MANUFACTURER MINIMUM MOTOR OPERATED DAMPER OUTSIDE AIR POINT OF CONNECTION REVOLUTIONS PER MINUTE SUPPLY FAN /SQUARE FEET SPECIFICATION TOTAL STATIC PRESSURE TYPICAL VENT VENT THROUGH ROOF WASTE /WATT WATER GAGE 1. THE MECHANICAL SYSTEM SHALL CONSIST OF ALL WORK SHOWN ON DRAWINGS, DIAGRAMS, AND AS DESCRIBED IN SPECIFICATIONS. 2. INSTALL ALL MECHANICAL WORK AS HIGH AS POSSIBLE, TIGHT TO STRUCTURE ABOVE. 3. THE MECHANICAL PLANS ARE DIAGRAMMATIC IN NATURE AND DO NOT ATTEMPT TO SHOW ALL REQUIRED OFFSETS. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR CONSTRUCTION DETAILS. 4. ITEMS NOTED "TYPICAL" OR "TYP" ON ANY SHEET APPLY TO THAT PARTICULAR SHEET. 5. COORDINATE WITH SPECIFICATIONS. IN CASE OF CONFLICT BETWEEN SPECIFICATIONS AND DRAWINGS THE MORE STRINGENT SHALL APPLY. 6. PROVIDE NEC CODE MINIMUM HORIZONTAL AND VERTICAL WORKING CLEARANCES FOR ALL ELECTRICAL PANELS AND EQUIPMENT. OFFSET MECHANICAL WORK AS REQUIRED. 7. COORDINATE ALL MECHANICAL WORK WITH THAT OF OTHER TRADES TO INSURE PROPER AND ADEQUATE INTERFACE OF THEIR WORK WITH THE WORK OF THIS CONTRACTOR. PROVIDE COORDINATED SHOP DRAWINGS PRIOR TO FABRICATION AND INSTALLATION. 8. MECHANICAL EQUIPMENT SHALL NOT BE USED FOR TEMPORARY HEAT DURING CONSTRUCTION. 9. VERIFY EXISTING CONDITIONS BEFORE COMMENCING ANY WORK ON AN EXISTING MECHANICAL SYSTEM. 10. ALL DUCTWORK SIZES SHOWN ARE INSIDE CLEAR. ADD APPROPRIATE DIMENSION FOR INSULATION OR DUCT LINER TO OBTAIN "TOTAL" DUCT SIZE. 11. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ELEVATIONS FOR EXACT LOCATION OF ALL DIFFUSERS AND GRILLES. 12. PROVIDE TRANSITIONS AS REQUIRED TO CONNECT DUCTWORK TO AIR TERMINAL UNITS, FANS AND OTHER MECHANICAL EQUIPMENT. 13. PROVIDE DIFFUSER AND GRILLE FRAMES COMPATIBLE WITH ARCHITECTURAL CEILING TYPE. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING TYPE. 14. COORDINATE EXACT LOCATIONS OF ALL ROOM THERMOSTATS AND /OR ROOM TEMPERATURE SENSORS WITH ARCHITECT PRIOR TO INSTALLATION. 15. PROVIDE A VOLUME DAMPER FOR EACH SUPPLY, RETURN AND EXHAUST OPENING IN BRANCHES AND ELSEWHERE AS NOTED ON THE DRAWINGS OR SPECIFICATIONS. 16. COORDINATE EXACT LOCATION AND MOUNTING HEIGHTS OF ALL PLUMBING FIXTURES WITH CASEWORK AND ARCHITECTURAL DRAWINGS. GENERAL SYMBOL EF -1 DESCRIPTION HEAVY LINE INDICATES NEW WORK LIGHT LINE INDICATES EXISTING WORK /BACKGROUND CENTERLINE PIPELINE - NORMAL DIRECTION OF FLOW KEY NOTE CALLOUT REVISION CALLOUT POINT OF CONNECTION EQUIPMENT CALLOUT, SEE SCHEDULE CD2 -300 DIFFUSER OR GRILLE CALLOUT, SEE SCHEDULE �- VOLUME FLOW RATE (CFM), NONE INDICATED FOR TRANSFER GRILLE DIFFUSER OR GRILLE TYPE VENTILATION DOUBLE SINGLE 24x12 t t .r• INN MOP %11 INDICATES DIAMETER OR ROUND INDICATES OVAL DESCRIPTION DUCT: 1ST SIZE (IN) INDICATES SIDE SHOWN, 2ND SIZE (IN) INDICATES SIDE NOT SHOWN, INSIDE FREE AREA SOUNDLINED DUCT SUPPLY AIR DUCT - TURNING UP OR TOWARD SUPPLY AIR DUCT - TURNING DOWN OR AWAY RETURN OR EXHAUST AIR DUCT - TURNING UP OR TOWARD RETURN OR EXHAUST AIR DUCT - TURNING DOWN OR AWAY ROUND DUCT - TURNING UP OR TOWARD ROUND DUCT - TURNING DOWN OR AWAY r-4 z TRANSITION 2-4 z TRANSITION - ROUND TO RECTANGULAR TURNING VANES IN RECTANGULAR DUCT TURN 90' ELBOW (RADIUS = 1.5 x ELBOW DIAMETER) 2 RECTANGULAR BRANCH CONNECTION W/ 45 TAPER t t Z Y r t AUTOMATIC CONTROL DAMPER (PROVIDE ACCESS) 2 VOLUME DAMPER 1BDD 2 T� BACKDRAFT DAMPER - OPPOSED BLADE COMBINATION FIRE /SMOKE DAMPER (PROVIDE ACCESS) III 2 FLEXIBLE CONNECTOR 1- -- SUPPLY GRILLE (SIDEWALL) SYMBOL IL I C► EQUIPMENT SYMBOL O • I-iv-RETURN/EXHAUST GRILLE (SIDEWALL) DESCRIPTION CEILING DIFFUSER ROUND DIFFUSER RETURN /EXHAUST GRILLE DESCRIPTION REVIEWED FOR CODE COMPLIANCE APPROVED SEP 19 2012 BUILD NC D VISION THERMOSTAT OR TEMP. SENSOR DRAWING INDEX M -1 LEGEND, DRAWING INDEX, ABBREVIATIONS, NOTES, AND ENERGY CODE COMPLIANCE M -2 WEST ELEVATION, SCHEDULES M -3 HVAC PLAN TAX ID PARCEL NUMBER: 0223000010 DESCRIPTION: ANDOVER INDUSTRIAL PARK # 1 LESS ST REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. • NOTE: Revisions will require a new plan submittal Iand may include additional plan review fees. SEPARATE PERMIT REQUIRED FOR: MechaniCCI Electrical Plumbing O'Gas City of Tukwila BUILDING DIVISION el) Vicinity Plan Scale: No Scale Site Plan Scale: No Scale FILE Y Permit No. w(L-\,-\\ Plan review approval Is subject to errors and omissions. Approval of construction documents does not authoiiz thc. violation of any adopted h• . or ordinance. Recei of approved F'eld Co, , = �' s IS acknowledge . By � 1111■: Date: ct MECHANICAL ENGINEERING 336 NW 50th Street Seattle, WA 98107 Phone: 206.297.5900 rainbowconsulting - me.com I-- Z Flumm City Of lbkwila BUILDING DIVISION REGtiv CITY OFTUK:S. r.ri .A SEP 12 2012 PERMIT CENTER 301 TUKWILA PARKWAY TUKWILA, WA 98188 SUBMITTAL PERMIT DOCUMENTS 09.10.2012 DATE : 09.10.2012 PHASE : PERMIT DOCUMENTS DESCRIPTION: LEGEND, NOTES, CODE ABBREVIATIONS, INDEX M12H1 M-1 PARAPFT ROOF GRADE 16' -6" 20'- 8" HEAT PUMP ROOFTOP UNITS MARK LOCATION SERVES RTU -1 RTU -2 RTU -3 RTU -4 ROOF ROOF ROOF ROOF SLEEPTRAIN SLEEPTRAIN SLEEPTRAIN SLEEPTRAIN DESCRIPTION NOM CLG: TONS 4 4 4 4 CONFIGURATION DOWNFLOW DOWNFLOW DOWNFLOW DOWNFLOW REFRIGERANT R -410A R -410A R -410A R -410A COOLING [3] GROSS COOLING: MBH 49.21 49.21 49.21 49.21 EFFICIENCY: SEER 13.0 13.0 13.0 13.0 HEATING HEATING: MBH [4] 24.9 24.9 24.9 24.9 EFFICIENCY: HSPF 7.8 7.8 7.8 7.8 AUXILIARY HEAT: KW 9 9 9 9 AUX HEAT STAGES 2 2 2 2 SUPPLY FAN FLOW: CFM 1,500 1,600 1,400 1,600 ESP: IN WG 0.50 0.50 0.50 0.50 DRIVE DIRECT DIRECT DIRECT DIRECT SPEED: RPM 1021 1021 1021 1021 FAN MOTOR: HP 1 1 1 1 FAN CONTROL CONSTANT CONSTANT CONSTANT CONSTANT OSA VENTILATION MIN FLOW: CFM 300 300 300 300 FILTER TYPE 2" THROW 2" THROW 2" THROW 2" THROW EFFICIENCY: % 30 30 30 30 MAX FACE VEL: FPM 500 500 500 500 ELECTRICAL MIN CKT AMPACITY 58.8 58.8 58.8 58.8 VOLTS /PHASE 208/3 208/3 208/3 208/3 ACCESSORIES 100% ECONOMIZER YES YES YES YES ROOF CURB [7] [7] [2] [2] OPER. WEIGHT WEIGHT: LBS 627 627 627 627 SOUND POWER OUTDOOR DBA 82 82 82 82 BASIS OF DESIGN MANUFACTURER TRANE TRANE TRANE TRANE MODEL WSC048E3REA WSC048E3REA WSC048E3REA WSC048E3REA REMARKS NOTES [1, 5, 6] [1, 5, 6] [1, 5, 6] [1, 5, 6] NOTES: 1. PROVIDE WITH 7 -DAY PROGRAMMABLE THERMOSTAT CAPABABLE OF BEING SET FOR SEVEN DIFFERENT DAY TYPES PER WEEK. HONEYWELL HONTB8220U1003 OR EQUAL BY RTU MFR. 2. PROVIDE WITH 14 -INCH ROOF CURB. 3. CAPACITY PER ARI STANDARDS. 4. CAPACITY AT LOW TEMP. 5. PROVIDE WITH MOTORIZED RELIEF DAMPER, MOTORIZED OUTSIDE AIR DAMPER. 6. BASIS OF DESIGN: TRANE. OR EQUAL BY CARRIER OR YORK. 7. PROVIDE CURB ADAPTOR. 8. HEAT PUMP CONTROLS: UNITARY AIR COOLED HEAT PUMPS SHALL INCLUDE MICROPROCESSOR CONTROLS THAT MINIMIZE SUPPLEMENTAL HEAT USAGE DURING START -UP, SET -UP, AND DEFROST CONDITIONS. THESE CONTROLS SHALL ANTICIPATE NEED FOR HEAT AND USE COMPRESSION HEATING AS THE FIRST STAGE OF HEAT. CONTROLS SHALL INDICATE WHEN SUPPLEMENTAL HEATING IS BEING USED THROUGH VISUAL MEANS (E.G., LED INDICATORS). HEAT PUMPS EQUIPPED WITH SUPPLEMENTARY HEATERS SHALL BE INSTALLED WITH CONTROLS THAT PREVENT SUPPLEMENTAL HEATER OPERATION ABOVE 40'F. West Elevation Scale: 1/4"=11'-0" REVIEWED FOR CODE COMPLIANCE APPROVED SEP 19 2012 City of Tukwila BUILDING DIVISION GRILLES, REGISTERS & DIFFUSERS MARK CD1 CD2 CD3 RG1 ITEM SERVICE SUPPLY SUPPLY SUPPLY EXHAUST LOCATION LAY IN CEILING LAY IN CEILING HARD LID LAY -IN CEILING TYPE DESCRIPTION MODULAR CORE MODULAR CORE MODULAR CORE EGG CRATE MATERIAL STEEL STEEL STEEL ALUMINUM FACE SIZE: IN 24 x 24 24 x 24 12 x 12 24 x 24 BORDER TYPE - - - - CAPACITY DUCT SIZE: IN 12 0 14 0 6 0 18 0 NECK SIZE: IN 12 x 12 14 x 14 6 x 6 20 x 20 MAX NC: [2] 30 35 30 30 COMPONENTS EQUALIZING GRID - - - - OB DAMPER - - - - PLENUM - - - - BASIS OF DESIGN MANUFACTURER PRICE PRICE PRICE PRICE MODEL AMCD AMCD AMCD ` 80 REMARKS NOTES NOTES: 1. PROVIDE GRILLES WITH BORDER STYLES THAT ARE COMPATIBLE WITH ADJACENT CEILING SYSTEMS, REFER TO ARCH DWGS. 2. NC BASED ON OCTAVE BANDS 2 - 7 SOUND POWER LEVELS MINUS A ROOM ABSORPTION OF 10 DB, MEASURED PER ASHRAE 70 -91. 3. PROVIDE DUCT CONNECTION SIZE EQUAL TO NECK SIZE UNLESS NOTED ON PLANS. X14 RECtivEu CITY OF TUK WJJ SEP 12 2012 PERMIT CENTER 111BOW suLTing MECHANICAL ENGINEERING 336 NW 50th Street Seattle, WA 98107 Phone: 206.297.5900 rainbowconsulting - me.com z Q Qao LLI ce, SUBMITTAL PERMIT DOCUMENTS 09.10.2012 DATE : 09.10.2012 PHASE : PERMIT DOCUMENTS DESCRIPTION: WEST ELEVATION SCHEDULES M -2 1\ J PLAN NOTES: 1. ALL DUCTWORK SHALL BE GALVANIZED SHEET METAL UNLESS OTHERWISE NOTED AND INSTALLED IN ACCORDANCE WITH SMACNA REQUIREMENTS. 2. FLEXIBLE CONNECTORS: PROVIDE UL LISTED 181 FLEXIBLE CONNECTORS AND FLEXIBLE DUCTS PER SEATTLE MECHANICAL CODE SECTION 603.2.1. KEY NOTES: 0 FULL SIZE SUPPLY AND RETURN AIR CONNECTIONS UP TO ROOFTOP UNIT. 0 REPLACE EXISTING HEAT PUMP ROOFTOP UNIT WITH NEW UNIT. PROVIDE CURB ADAPTOR AS REQUIRED FOR TRANSITION FROM ROOFTOP UNIT TO EXISTING DUCT RISER. Q3 RESTROOM EXHAUST IS EXISTING. NO CHANGE. 0 LOCATE SENSORS WITHIN RETURN DUCT; THERMOSTATS IN OFFICE. CD2 -65U RTU -1 ABOVE L _ _ ON ROOF 140 RG1 m 1 1 L___-1 \ / CD2 -800 02 RTU -2 ABOVE ON ROOF CD2 • 800 69 Scale: 1/4"=1'-0" RTU -3 140 7 HVAC Plan GM- /50- L J ' RTU -3 ABOVE ON ROOF 7 CD2 -800 L� nrri 0 RG1 1 r CU1 -75U REVIEWED FOR CODE COMPLIANCE APPROVED SEP 19 2012 City of Tukwila BUILDING DIVISION RTU -4 ABOVE CD2 -800 ON ROOF 0 RE tivt CITY OF TUKWILA SEP 12 2012 PERMIT CENTER MECHANICAL ENGINEERING 336 NW 50th Street Seattle, WA 98107 Phone: 206.297.5900 rainbowconsulting - me.com SUBMITTAL PERMIT DOCUMENTS 09.10.2012 DATE : 09.10.2012 PHASE : PERMIT DOCUMENTS DESCRIPTION: HVAC PLAN M -3