Loading...
HomeMy WebLinkAboutPermit PG12-200 - OLD NAVYThis record contains information which is exempt from public disclosure pursuant to the Washington State Public Records Act, Chapter 42.56 RCW as identified on the Digital Records Exemption Log shown below. PG 12 -200 Old Navy 17470 Southcenter Parkway RECORDS DIGITAL D- ) EXEMPTION LOG THE ABOVE MENTIONED PERMIT FILE INCLUDES THE FOLLOWING REDACTED INFORMATION F,age # Code Exemption � � �� Brief Explsnatoty Description, Statute /Rule The Privacy Act of 1974 evinces Congress' intent that Personal Information — social security numbers are a private concern. As such, individuals' social security numbers are Social Security Numbers redacted to protect those individuals' privacy pursuant 5 U.S.C. sec. DR1 Generally — 5 U.S.C. sec. to 5 U.S.C. sec. 552(a), and are also exempt from 552(a); RCW 552(a); RCW disclosure under section 42.56.070(1) of the 42.56.070(1) 42.56.070(1) Washington State Public Records Act, which exempts under the PRA records or information exempt or prohibited from disclosure under any other statute. Redactions contain Credit card numbers, debit card Personal Information — numbers, electronic check numbers, credit expiration 14 DR2 Financial Information — dates, or bank or other financial account numbers, RCW RCW 42.56.230(4 5) which are exempt from disclosure pursuant to RCW 42.56.230(5) 42.56.230(5), except when disclosure is expressly required by or governed by other law. OLD NAVY 17470 SOUTHCENTER PY PG12-200 City oPI'ukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: htto://www.TukwilaWA.gov PLUMBING /GAS PIPING PERMIT Parcel No.: 2623049110 Address: 17470 SOUTHCENTER PY TUKW Project Name: OLD NAVY Permit Number: PG12 -200 Issue Date: 02/21/2013 Permit Expires On: 08/20/2013 Owner: Name: KIR TUKWILA 050 LLC Address: C/O KIMCO REALTY CORP , 3333 NEW HYDE PARK RD #100 PO BOX 5020 11042 Contact Person: Name: JAMES MATTHEWS Address: 13400 RIVERSIDE DR #202 , SHERMAN OAKS CA 91423 Email: MMATTHEWS @PERMITPLACE.COM Contractor: Name: PLUMBING EXPRESS INC Address: PO BOX 2226 , SUMNER WA 98390 Contractor License No: PLUMBEI98600 Phone: 818 786 -8960 Phone: 253 826 -4621 Expiration Date: 09/20/2014 DESCRIPTION OF WORK: PLUMBING WORK FOR TENANT IMPROVEMENT TO INCLUDE WORK IN RESTROOM AS WELL AS EMPLOYEE BREAKROOM Value of Plumbing /Gas Piping: $27,665.00 Uniform Plumbing Code Edition: 2009 Fees Collected: $291.38 International Fuel Gas Code Edition: 2009 Electrical Service Provided by: Permit Center Authorized Signature: Date: vv 2l ` 3 I hereby certify that I have read and : amin d this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied ' 'th, hether specified herein or not. The granting of this permit does not pres e to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this plumbing /gas piping permit and agree to the conditions on the back of this permit. Signature: Print Name: U 6)/lv A t ? cL r Date . —g1_/, This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: UPC -4/10 PG 12 -200 Printed: 02 -21 -2013 • • PERMIT CONDITIONS Permit No. PG 12 -200 1: ** *PLUMBING AND GAS PIPING * ** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R -3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor /ceiling assemblies and fire - resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures and fittings in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency and Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments. 13: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. doc: UPC -4/10 PG 12 -200 Printed: 02 -21 -2013 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Plumbing /Gas Permit No. Project No. Date Application Accepted: Date Application Expires: (For office use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: 2623049110 Site Address: 17470 Southcenter Parkway Suite Number: Floor: 1 Tenant Name: Old Navy PROPERTY. OWNER Name: James Matthews (Permit Place Inc) Name: Kimco City: Sherman Oaks State: CA Zip: 91423 Address: Parkway Supercenter Email: jmatthews@permitplace.com City: Tukwila State: WA Zip: 98188 CONTACT PERSON - person receiving all project communication Name: James Matthews (Permit Place Inc) Address: 13400 Riverside Dr #202 City: Sherman Oaks State: CA Zip: 91423 Phone: (8 18) 786 -8960 Fax: (8 18) 688 -8018 Email: jmatthews@permitplace.com New Tenant: ❑ Yes ..No PLUMBING CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of Project (contractor's bid price): $ 27,665 Scope of Work (please provide detailed information): Plumbing fixtures in exist tenant space Building Use (per Int'I Building Code): M Occupancy (per Int'l Building Code): M Utility Purveyor: Water: Public Sewer: Public H:\Applications \Forms - Applications On Line\201 I Applications \Plumbing Permit Application Revised 8.9 -I l.docx Revised: August 2011 bh Page I of 2 Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type Qty Bathtub or combination bath /shower Dishwasher, domestic with independent drain 2 Shower, single head trap 2 Sinks 2 Rain water system — per drain (inside building) Grease interceptor for commercial kitchen ( >750 gallon capacity) Each additional medical gas inlets /outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1 -5) Fixture Type Qty Bidet Drinking fountain or water cooler (per head) 2 Lavatory 2 Urinal 1 Water heater and /or vent Repair or alteration of water piping and /or water treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial 2 Wash fountain Water closet 2 Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Gas piping outlets Fixture Type Qty Dental unit, cuspidor Floor drain 2 Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1 -5 inlets /outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED T. TION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE • ' "ASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHORIZED AGEN Signature: Date: 11/12/2013 Print Name: James Matthews Day Telephone: (818) 786 -8960 Mailing Address: 13400 Riverside Dr #202 H:\Applications \Forma- Applications On Line 2011 Applications \Plumbing Permit Application Revised 8- 9- 11.docx Revised: August 2011 bh Sherman Oaks CA 91423 City State Zip Page 2 of 2 • rw City of Tukwila 4^'2 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 2623049110 Permit Number: PG 12 -200 Address: 17470 SOUTHCENTER PY TUKW Status: APPROVED Suite No: Applied Date: 11/16/2012 Applicant: OLD NAVY Issue Date: Receipt No.: R13 -00862 Initials: JEM User ID: 1165 Payment Amount: $233.10 Payment Date: 02/21/2013 12:58 PM Balance: $0.00 Payee: PLUMBING EXPRESS INC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 8418 233.10 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLUMBING - NONRES 000.322.103.00.00 233.10 Total: $233.10 doc: Receiot -06 Printed: 02 -21 -2013 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: httn: / /www.TukwilaWA.gov RECEIPT Parcel No.: 2623049110 Permit Number: PG12 -200 Address: 17470 SOUTHCENTER PY TUKW Status: PENDING Suite No: Applied Date: 11/16/2012 Applicant: OLD NAVY Issue Date: Receipt No.: R12 -03135 Payment Amount: $58.28 Initials: JEM Payment Date: 11/16/2012 10:21 AM User ID: 1165 Balance: $233.10 Payee: PERMIT PLACE, INC. TRANSACTION LIST: Type Method Descriptio Amount Payment Check 11450 58.28 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 58.28 Total: $58.28 /Inn. RPCaint -(1R Printari. 11-16-2017 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION .. 6300 Southcenter Blvd.,. #100, Tukwila: WA 98188 r, (206) 431 -3670 Permit Inspectibn Request Line (206) 431 -2451 P612,--2e� Project:,.., s) `� /I V L2 ki✓TJ� Type of Inspection: (�( "'[ c, j - t 1 ` j .. Address: 194/10 5 61 Alic-PVA Date Called: Instructions: /V ! Date Wanted: ( >` 21' —' � -- i3 a $1,-1-: Requester: Phone No: 3(..� -304. `3f Approved per applicable codes. COMMENTS: ElCorrections required prior to approval.. r Inspect AI Date: f . n REINSPECTION FEE REQUIRED. Prior to next inspection; fee must be; paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: 01 0 /v,,JL( c 6)e7kilt(--- NAop idi- * L.•ft- A Type of- Inspection: FL' i A. P(' i-1/48 , Address: (2) c_ -4-u \ K 03 liertr. L\ js Q,rs — 1 / Date Called: Special Instructions: ' Date Wanted:. (O rp - a.m .. P.m. Requester: Ph 4Q -3d1-°I93/ ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: c 6)e7kilt(--- NAop idi- * L.•ft- A I'll-03 Q Li p 1';,. L (-CjM -f-i DO . (2) c_ -4-u \ K 03 liertr. L\ js Q,rs — r- A& v S ` - &-? 6\ n4J f---d- _I :Ap ...."..''', is d Inspectt: n REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. G CITY OF TUKWILA BUILDING DIVISION ./� 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Iv.. (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 P 2. -20e Proj/e�jt: A V � AJ A-tJ ( Type of Inspection: �+� /� f d< �t) :) / N Address: Date Called: Special Instructions: Date Wanted '-'7/2---5- .-l3 —P.m. Requester: Phone ass — 182-8 Eir Approved per applicable codes. ElCorrections required prior to approval. COMMENTS: i) lC-- t' T 0 Jam/ c * CJ.O L ✓a 5 1 ) ■ 0-- p i v T a"- S - >fy A . io C A -. s 1.-.) c,Li A. t :so \. S Inspe toc Date: n REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., S I ite 100. Call to schedule reinspection. INSPECTION RECORD. Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 f ".`(206)431 - 3670,` Permit Inspection Request Line (206) 431 -2451 Project: OLt� ,J 6 v 9 Type of Inspection: GI3111Q.6 ' 00Rt Address: I i --7 q-10 col i ,kt- pCl Date Called: Special Instructions: Date Wanted: a. — 22- I pm. Requester: Phone No: b Approved per applicable codes. COMMENTS:. 0 Corrections required priorto approval. tAA) I Date:. - - n(EINSPECTION FEE REiIUIRED. Poor to next inspection. fee must: be a t 6300 Southcenter Blvd.. Suir(e 100. Call to schedu reinspection.. °PERMIi' CORD COP'S r PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: PG12 -200 DATE: 11/16/12 PROJECT NAME: OLD NAVY ,A4,-4SITE ADDRESS: 17470 SOUTHCENTER PY X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # _ Revision # after Permit Issued DEPARTMENTS: Building Division \ \\ • ' (L Public Wor s Fire Prevention Structural Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11/20/12 Complete EXI, Incomplete ❑ Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUESITHURS ROUTING: Please Route t Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions 62 Notation: REVIEWER'S INITIALS: DUE DATE: 12/18/12 Not Approved (attach comments) ❑ DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Contractors or Tradespeople *ter Friendly Page General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company PLUMBING EXPRESS INC 2538264621 Po Box 2226 Sumner WA 98390 Pierce Corporation UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Specialty 1 Specialty 2 602226682 Active PLUMBEI98600 Construction Contractor 9/20/2002 9/20/2014 Plumbing Unused Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status PLUMBE *077PR PLUMBING EXPRESS Construction Contractor Plumbing Unused 10/19/1993 10/19/2003 Archived PRECIM *121KB PRECISION MECHANICAL Construction Contractor Plumbing Unused 5/2/1988 3/17/1989 Archived PLUMBE'162OQPLUMBI EXPRESS, THE Construction Contractor Plumbing Unused 9/18/1984 9/18/1986 Archived Business Owner Information Name Role Effective Date Expiration Date KILDARE, JOHN THOMAS President 09/20/2002 Amount KILDARE, KRISTI KYLE Vice President 09/20/2002 BKA54313254 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 1 GREAT AMER INS CO OF NY 7902865510010 10/19/2001 Until Cancelled 10/18/2010 $6,000.00 09/20/2002 Assignment of Savings Information Savings Assignment of Savings Account Number Effective Date Release Date Assignment Type Impaired Date Amount Received Date 2 10/26/2010 Until Released Bond $6,000.00 10/26/2010 Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 9 AMERICAN FIRE & CASUALTY CO BKA54313254 01/01/2011 01/01/2014 $1,000,000.00 12/26/2012 8 AMERICAN FIRE & CASUALTY CO BKA1154313254 01/01/2010 01/01/2011 $1,000,000.00 12/21/2009 7 FEDERATED MUTUAL INS CO 9215213 01/01/2009 01/01/2011 01/01/2010 $1,000,000.00 11/17/2009 6 FEDERATED MUTUAL INS CO 9215213 01/01/2005 01/01/2009 $1,000,000.00 11/30/2007 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https://fortress.wa.gov/lni/bbip/Printaspx 02/21/2013 'O.NE.' SCOPE OF WORK PARKVVAY SUPERCENTER DRAWING INDEX REDUCTION 1. STOREFRONT - MANAGER'S OFFICE EXPANKO FLOORING SHEET SHEET TITLE REV SIONS e. tl'' ��� iw'a vY ;- � � °� a a ° «��� �� ' .,,,,.a�, r». � y � ' " '�"' � � b ;. 6 ` am ";o �eOee e 1747 0 SOUTHCENTER U T H C E N TE R PKWY - DEMO (E) STOREFRONT AND INSTALL (N) STOREFRONT 9. TOILET ROOMS ARCHITECTURAL X onononn X X X X X X AS SHOWN IN PLANS - REMOVE AND DISPOSE OF (E) TOILET ROOM FIXTUREa, - INSTALL (N) FILM ON ARCH OR TRANSOM WINDOWS AND ACCESSORIES, AND PARTITIONS PER PLAN. REMOVE MUNTINS - BUILD NEW RESTROOMS PER PLAN, PROVIDE PLUMBING FOR (N) FIXTURES, AND INSTALL ALL NEW RESTROOM ACCESSORIES.. 2. SALES AREA - REMOVE AND DISPOSE OF (E) DRINKING FOUNTAINS red TUKWILA WA 981 88 C -0 PROJECT INFORMATION GAP INC. CORPORATE ARCHITECTURE 1 HARRISON STREET SAN FRANCISCO, CA 94105 CO -1 GENERAL NOTES, RESPONSIBILITY MATRIX, SUBMITTALS CO -2 DOOR TYPES, HARDWARE & ROOM FINISH SCHEDULES STORE NO.•. 5 CO -2A EXTERIOR DOOR. SCHEDULES, HARDWARE &DETAILS _ - REMOVE (E) WALLS AS SHOWN IN PLANS - PROVIDE PLUMBING FOR (N) DRINKING FOUNTAIN AND - PATCH AND REPAIR (E) WALLS AFTER DEMO WORK INSTALL PER PLANS. - BUILD (N) FULL HEIGHT WALL BETWEEN SALES AREA - PROVIDE PLUMBING FOR (N) MOP SINK AND WATER AND BACK OF HOUSE HEATER PER PLANS. - BUILD( N) PARTIALHEIGHTWALLSATSALESAREAAND BACK OF HOUSE 10. INTERIOR SIGNAGE CO -3 ACCESSIBILITY COMPLIANCE PROJECT TEAM AUTHORITIES HAVING JURISDICTION C2 -0 EGRESS FLOOR PLAN D1 -Oa DEMO FLOOR PLAN Dl -Ob DEMO FLOOR PLAN - INSTALL (N) MARKETING GRIDS AS SHOWN ON PLANS. - REMOVE (E) FITTING ROOM WAYFINDING SIGNAGE - REMOVE (E) FITTING ROOM HANGING ELEMENT 3. PAINT STORE - INSTALL (N) NON - ILLUMINATED WAYFINDING SIGNAGE: TENANT /CONSTRUCTION: ARCHITECT: BUILDING DEPARTMENT: GAP INC. ' WD PARTNERS ONE HARRISON ST. 7007 DISCOVERY BLVD. SAN FRANCISCO, CA 94105 DUBLIN, OHIO 43017 CONTACT: GREG MORRISON CONTACT: EMMY MCLEES TEL: 415-7134110 TEL (614) 634 7000 EMAIL:GREG_MORR ISSN @GAP.COM FAX (614) 634 7777 EMAIL: EMMY.MCLEES @WDPARTNERS.COM TENANT /STORE DESIGN: ELECTRICAL /PLUMBING/ Dl -1a DEMO REFLECTED CEILING PLAN CITY OF TUKWILA - HIGH DUST, VACUUM & CLEAN ALL SURFACES ABOVE FITTING ROOM, CASHWRAP, RESTROOM & QUICK 1 OW' A.F.F. (INCLUDE TOP OF LIGHT FIXTURES AND HVAC CHANGE, G.C. TO COORDINATE WITH VENDOR 'UNITS/DUCTS PRIOR TO PAINTING) - PAINT (E) SALES AREA WALLS & (E) COLUMNS BELOW 11. EXTERIOR SIGNAGE DEPARTMENT OF COMMUNITY DEVELOPMENT 6300, #100 WA 98188 SOUTH CENTER BLVD, , , TEL: 206- 431 -3670 FAX:206 431 3665 «......r.... REVIEWED FOR CODE COMPLIANCE LIAN(t,,'E ' U TWVLQ NOV 1�1 3 O LUlL Dl-lb DEMO REFLECTED CEILING PLAN Al -Oct CONSTRUCTION FLOOR PLAN Al Ocii CONSTRUCTION FLOOR PLAN JMBER: i9 CATION: <WAY SUPS -ICENTER PKWY ILA, WA FROM FLOOR TO CEILING BEHIND BOOTHSETS. - REPLACE (E) EXTERIOR SIGNAGE WITH (N) SIGNAGE, G.C. - PAINT (E) CEILING STRUCTURE & OTHER CEILING TO COORDINATE WITH VENDOR. (STOREFRONT SIGNS, ELEMENTS AS NOTED. SIDE /REAR SIGN, BLADE SIGNS, MONUMENT AND PYLON - PAINT WALLS @ MANAGER'S OFFICE AND EMPLOYEE SIGNS) AREA /BOHPER DRAWINGS - PAINTGYP. BDWALLSANDCEILINGINTOILETROOMS& 12. GRAPHICS -Ofi FIXTURE FLOOR PLAN Al Ofii FIXTURE FLOOR PLAN CODE INFORMATION ity o U III Al 1a REFLECTED CEILING PLAN Al-lb REFLECTED CEILING PLAN OLD NAVY STORE DESIGN 550 TERRY FRANCOIS BLVD SAN FRANCISCO, CA 94158 STORE DESIGNER: STEPHEN BARONIAN TEL. (415) 832 -1293 FAX: (415) 832 -2901 EMAIL: STEPHEN_BARONIAN @GAP.COM LANDLORD: MECHANICAL ENGINEER: CORRIDOR - INSTALL (N) INTERIOR GRAPHICS PER PLANS, G.G. TO COORDINATE WITH VENDOR 4. FITTING ROOMS WD PARTNERS 7007 DISCOVERY BLVD. BwILCUIN4 VISION Al -2a LOSS PREVENTION PLAN O APPLICABLE BUILDING CODES: Al -2b LOSS PREVENTION PLAN • DUBLIN, OHIO 43017 CONTACTS: JEFF BOLYARD TEL: (614) 634 -7234 FAX: (614) 634 -7777 EMAIL: JEFF.BOLYARD @WDPARTNERS.COM REVISIONS • No changes Shaft be made tO ih@ SCOpA f3'f 4'� °0= tc wi #hOl.;# prior approval of I'uhwiia E3ui e I Division. t - �„ ., �`' J i�3�11,: lull/ rLC(Elire a new /art SUbmi # #aI �; _ p . •t Clad lilwiUde aCthti0llc�I plan review fees. 1. BUILDING CODE: IBC 2009 (W/ WA AMEND.) 2. MECHANICAL CODE: IMC 2009 (W/ WA AMEND.) 3. PLUMBING CODE: UPC 2009 (W/ WA AMEND.) 4. ENERGY CONSERVATION: 2009 WA STATE ENERGY CODE SEPARATE 5. FIRE SAFETY CODE: 2009 INTERNATIONAL FUEL GAS CODE PERMIT AND 6. ACCESSIBILITY CODE: ICC /ANSI A117.1 2003 APPROVAL 7. ELECTRICAL: NEC 2008 (W/ WA AMEND.) OVAL REQUIRED 4 0 BUILDING CLASSIFICATION. 1. CONSTRUCTION TYPE: V- NONRATED 3. PROPOSED OCCUPANCY: M- MERCANTILE 2. BUILDING USE GROUP: RETAIL 4. SEISMIC ZONE: 3 C BUILDING DESCRIPTION: o - REMOVE (E) FITTING ROOM PRE -FAB PARTITIONS, 13. ADDITIONAL SCOPE OF WORK DOORS, BENCHES & MIRRORS - BUILD BARRICADE FOR STOREFRONT WORK PAINT AND - INSTALL (N) FITTING ROOM PARTITIONS, DOORS, GRAB INSTALL BANNER. COORDINATE WITH VENDOR FOR BARS, BENCHES, MIRRORS, HOOKS & INTERIOR GRAPHICS BANNER INSTALLATION - INSTALL (N) FITTING ROOM PODS - BUILD (N) DEMISING WALL - PROVIDE POWER FOR (N) FITTING ROOMS - REMOVE (E) MANAGER'S OFFICE AND INSTALL (N) - INSTALL (N) FLOOR MATS MANAGERS OFFICE (INCLUDES SHELVING &STANDARDS, - INSTALL (N) BLUE METAL PANEL AND LARGE MIRROR SAFE CABINET, MANAGER'S DESK AND BOOTHSETS) - REMOVE (E) EMPLOYEE AREA AND INSTALL(N) 5. BOOTHSETS EMPLOYEE AREA (INCLUDES KITCHENETTE, SINK, A2 -0 DEMO STOREFRONT PLAN & ELEVATION A2-1 NEW STOREFRONT PLAN AND ELEVATION A3 0 A3 1 INTERIOR ELEVATIONS INTERIOR ELEVATIONS CARMEN DECKER KIMCO REALTY PARKWAY SUPERCENTER ' TUKWILA ,WA 98188 TEL:425- 373 -3511 EMAIL: KDECKER @KIMCOREALTY.COM 2013 O.N.E. QI -Q2 PROTOTYPE DATE: 08/10/12 OPENING: 2013 A4 -o PARTITION DETAILS & WALL TYPES A5 0 ENTRY AREA ENLARGED PLAN & DETAILS - REMOVE &SALVAGE (E) BOOTHSETS AS SHOWN IN MICROWAVE, FRIDGE WITH PLUMBING, LOCKERS, TIME SALES AREA CLOCK) - INSTALL BOTH (N) AND (E) BOOTHSETS TO CREATE - INSTALL NEW SELF-LEVELING INTERIOR TOPPING 'O.N.E: LAYOUT, MODIFY AND INSTALL PER DETAILS AS SYSTEM AT SELECTED AREAS SHOWN (ALL BOOTHSETS TO BE ASSEMBLED ON SITE) - REMOVE & RE-INSTALL LP EQUIPMENT. G.C. TO - INSTALL FILLER PANELS PER DRAWINGS COORDINATE WORK& SCOPE W/ VENDOR - INSTALL SHELVES AND BRACKETS PER DETAILS - ADD (N) SPEAKERS BY PLAYNETWORK. G.C. TO .- INSTALL (N) BASICS WALL AND BASICS WALL MIRROR COORDINATE WORK & SCOPE W /VENDOR - INSTALL (N) MID FLOOR FRAMES - GC TO PERFORM FINAL CLEAN OF ALL AREAS AFFECTED BY (N) WORK aQ COMPLETION OF ALL WORK B. LIGHTING A6 -0 EN LARGED CASHWRAP AREA PLAN & CASHWRAP DETAILS A6 -1 CASHWRAP AREA DETAILS ' CONSULTANT INFO: VICINITY MAP A6 -2 CASHWRAP DETAILS A7 -0 ENLARGED FITTING ROOM PLAN & RCP SEPARATE PERMIT REQUIRED FOR: MOChaniCaL Electrical City of # Tutc a Cil.ff I.RD:Pa4iGusmpDblipinvignigs f � (`; _ �'' " " "�� i� NAVY A7-1 FITTING R O A7 2 ENLARGED FITTING NG ROOM POD PLANS & DETAILS A8 -0 BOOTHSET ENLARGED PLANS & DETAILS OLD # 5359 ®N 4 i3.. t 1. NUMBER OF FLOORS IN BUILDING: 01 2. FLOORS OF PROPOSED RENOVATION: 01 3. HISTORIC /ARCHITECTURALLY YES SIGNIFICANT BUILDING? • 4. EXTERIOR STOREFRONT RENOVATION? ►:� 5. PROPOSED STRUCTURAL ALTERATIONS? • 6. ENERGY CALCULATION ATTACHED? • (D SQUARE FOOTAGE: NO YES NO ►./ 7. TOILET FACILITIES PROVIDED? ►.1 ■ ■ 8. AUTOMATIC SPRINKLER SYSTEM? ►�� ■ ►Z/ 9. FIRE SYSTEM MODIFICATIONS? • ►_/ ►Z� - REMOVE & DISPOSE OF (E) PENDANT LIGHTS. - REMOVEHTING&GE(E)FLUON HARDWARE IN TRACK LIGHTING &SUSPENSION HARDWARE IN THE SALES, FITTING ROOM, AND CASHWRAP. • - INSTALL(N)TRACKLIGHTS INSALESAREA. - INSTALL ( N ) /(R) FLUORESCENT LIGHT FIXTURESAS NOTED - INSTALL (N) PENDANTS AT FITTING ROOM AREAS - INSTALL (N} REFLECTORS ON ALL FLUORESCENT LIGHT FIXTURES(SALESAREA)ANDSTOCKROOM - ABANDON (E) FLUORESCENT LIGHTS IN REMIT SPACE ". 7. CASHWRAPS A8 -1 BOOTHSET DETAILS A8 2 BASICS WALL & SHOP DIVIDER DETAILS A9 -Oa STOCK/PROCESSING AREA ENLARGED PLAN, ELEVATIONS & DETAILS A9 -0b STOCK /PROCESSING AREA ENLARGED PLAN, ELEVATIONS & DETAILS A9-1 STOCK/PROCESSNGIAREA ELEVATIONS 8, DETAILS PROFESSIONAL STAMP: A9 2 ENLARGED EMPI_.OYEEAREA PLAN, ELEVATIONS & DETAI , ,, .... ,,.. , . ,�,, mete is uare.t atkdat _ tt a agast :;. ,, ,, .. i�lvt f a . nent�I r. ...., .r,:.:. ...,...€ II .:, tctrc} t r {wllnsa,.? ,. , ., .,.,. ttltt2,3ora.are ..,.,,� Faatse........:, Al A 10 Oa TOILET ROOM OOM ENLARGED: PLAN, ..ELEVATIONS & SCHEDULES REGISTE• ai r . ARCHI r - REMOVE (E) CASHWRAPS (E) CUSTOMER SERVICE O O AREA - INSTALL (N) CASHWRAPS (INCLUDES CREDENZA, ACCESSORY FIXTURES, BOOTHSETS, FASTLANE FIXTURES & STANCHIONS , COORDINATE WITH GST AND CASHWRAP VENDOR - INSTALL (N) VISUAL DISPLAY PLATFORMS AT CASHWRAP - PROVIDE POWER FOR (N) CASHWRAP, CREDENZA, & REFRIGERATORS 8. BACK OF HOUSE i I -I -stairs ' SALES AREA (hcludessalesareas,castwrapareas , displey ndl erdryvosetses )welt as puhlic elevator, BR / Old Navy/ Outlet/ Athleta/Pipeline 16,520 ? 16,520 A10 -0b TOILET ROOM ENLARGED PLAN ELEVATIONS & SCHEDULES *.r GAP (Adult) ° A10 1 TOILET ROOM DETAILS " • I •' y OGOS ATE OF ItVGTON NOV 12 2012 GAP (Body) ° i _.' - I II , �Y '� F r i j ( (. ) GAP Kids 0 i A11 -0 EXTERIOR SIGNAGE DETAILS All -1 INTERIOR SIGNAGE DETAILS ,'; n. x...> A (Baby /Mat) P (B Ma GAP o '� > ,`1 t? m � � ... r it ? -t - 'uesdy Morning A .,. •„ - � , x mug 1 t► '•.�'� mi , .°.. ,,.. , .. ...,...•.:. '� � � ��..... .... _ �' _ 491 Al2 0 APHICS R REF CE N INTERIOR GRAPHICS/PAINT /PAINT (FO REFERENCE ONLY) ,` "" i I p FITTING ROOM AREA 2 hcludes fitti mom areas associated corridor I ( ^�... alcoves and adpENng closets) I i I -_,,, �� , ,,� r)� s �. � 4 ,. � ����t ,,,.. I �< F (imumFt£a =h titL f a =a :. '' •s� a,r �.«° �,��� =; � r � � �� 3' :. '<'. �,:, �q1 ,orpyrTCwUtY., tRkiS'S; �rtat ° A13 -1 SPECIFICATIONS. • ARCHITECT INFO. 7007 DISCOVERY BL BLVD DUBLIN, OH 43017 614.634.7000 T WDPARTNERS.COM . m 1 , i o � - INSTALL (N) KITCHENETTE WITH EMPLOYEE COUNTER. - PROVIDE PLUMBING FOR (N) SINK .- INSTALL N HIGH DENSITY SHELVING UNITS O O T - INSTALL (N) HANGRODS AND WALL STANDARDS AS SHOWN IN DRAWINGS - RELOCATE (E) LOCKERS Al A13 2 . SPECIFICATIONS _ . ".� ...�1'Ifrs,. v- •- . °•••- - -- - -.- .,111.__.. ;,.: �;,- ,111,7;;T. -r�rn±rr:'r:==,t: =E.:. ;. ..: :iti ; :-,, ..., :.�.::,•pp r 1tlTl-116 �/,yy ,,, .;' .... . ;.> 3Y.�1a`'E -b .,e. , SPECIFICATIONS , t E', ,,.,, rrtl _� ;j'i ,EU F. ,: ��'' A13-4 SPECIFICATIONS ,.::... ..., .. <,. �: '''� a'. n�; _ .._ .:... -- � � ": . -. =� .::1:� :. - . �_ .... _ � � , ::�.�. wn _F .. t. M =t•, �? > ham✓ -° ... .- .- ".._•.- ^'~ >' C _ _ SPECIFICATIONS ,�. � .:: ._... h_ g; I ATTACHED STOCK / PROCESSING AREA i (" Back -of - house "area includes stock and or I staging areas, maragers oRice, employze area toilet rooms come r /dumhwai er exit corddors and adjacent MEP /CashRP/irainirg rooms) • :• ... ,. z,aos 3 \,.A 13 6 SPECIFICATIONS , �, .,: ..� 7= °n "= ;. .. a t In s '. °s� nY uU L'e ° - RELOCATE (E) TIMECLOCK • NOTES � t ' iu v !` " _ t. -• "M - ° - - DRAWINGS MAY INCLUDE WORK NOT LISTED IN SCOPE OF WORK. - SIGNAGE UNDER SEPARATE PERMIT, SHOWN HERE FOR REFERENCE ONLY. _ �' , r s `° I Potential Availability - G • • ' 0 .,f :...... - RATE ='~ S uut3�erstEC MECHANICAL AND PLUMBING IT AND - :,, ,; r + ■' OVAL ,.t MO -1 M1 MECHANICAL NOTES AND LEGENDS MECHANICALPEEMN LITTON PLAN ISSUE TYPE: ADA CODE CONFORMANCE FLAME SPREAD RATINGS ICED -o° 0 M4 -0 MECHANICAL SCHEDULES 100% CHECK SET: 10/26/12 BID /PERMIT /LL 11/09/12 „ .......... ...... ... ........ . _,,.,,. EXISTING FULLY NEW /UPGRADE DETAILS COMPLYING TO COMPLYING IN DRAWING GYPSUM BOARD ' • -• _ , i ` •'' ° M5 -0 MECHANICAL DETAILS M8-0 WIRING DIAGRAMS USG 5/8" TYPE "X" GYP. BD WITH 3 -5/8 X 20 GA. METAL STUDS, ASTM E -84 UNDER THE MILL - BURTON ACT. IT HAS A FLAME SPREAD RATING OF 15, FUEL CONTRIBUTION OF 15, AND SMOKE DENSITY OF 0. CONTACT: STEVE MUNOZ, U.S. GYPSUM ASSOCIATION (415) 792-4400 PAINT GAP (Adult) 0 P1 -0 PLUMBING PLANS, NOTES, AND LEGENDS " ( h •` ��L • =•• 0 P1 -1 PLUMBING PLANS, RISERS, AND SCHEDULES � � 1. AT LEAST ONE ACCESSIBLE ENTRANCE. NOTE: THIS SHOULD BE THE PRIMARY ' ENTRANCE. ADDITIONAL UPGRADE MAY BE REQ'D. IF ITS NOT. • C2 -0 P5 -0 A PLUMBING DETAILS . , matrI�ju' !J�___ ° MPF13 -0 MECHANICAL SPECIFICATIONS ON WALL AND OTHER SURFACES: SHERWIN - WILLIAMS PAINT; ASTM E -84 UNDER THE MILL- BURTON ACT. IT HAS A FLAME SPREAD RATING OF 10, FUEL CONTRIBUTION OF 15, AND SMOKE DENSITY OF 0. CONTACT: RYAN SCHNEEMAN (216) 566 -1765 OR CELL (216) 214 -1606 PLASTIC LAMINATE SEE VENDORS BELOW; ASTM E -84 WITH A FLAME SPREAD RATING OF 100 AND SMOKE RATING OF 35. (CAN /ULC BLBT7.R6838 FOR THE FOLLOWING CLASS 1 CHARACTERISTICS: FLAME SPREAD OF 20 AND A SMOKE DEVELOPED OF 15.) CONTACTS: STEVE TYACK, WILSON ART (916) 837 -3831 / SHIRLEY DEHART, NEVAMAR (800) 254 -0778 LIESL HEIL, FORMICA (415) 956 -7742 MEDIUM DENSITY FIBERBOARD • :.. ° MPF13 -1 MECHANICAL SPECIFICATIONS •` • •• -. MPF13 -2 : ; ., MECHANICAL SPECIFICATIONS *V _ +! 2. AN ACCESSIBLE ROUTE TO THE AREA OF REMODEL ■ C2 0 5 . • - -. 0 19,420 F1 -0 FIRE SPRINKLER PLAN proV I Of construction n . :nt3 'o6S of a ;:�!„':" 3. ONLY ONE OF EACH TOILET ROOM UNLESS OTHERWISE REQUIRED • Al Oci o , ELECTRICAL violation adopted Receipt vro,ion of any a code or ordinance. Y i6 I o 4. VISUAUAURAL ALARM • C2 -0 „ r- MaiM� :ILNc1�►Lli�aE-= 1d►U► • , 51 17 «i,Iirslir i ?� t.( �L +. 5. ACCESSIBLE DRINKING FOUNTAIN • ■ CO -3 REVISIONS: 0 -0 ' • • DE E • • •F�� ' 6. ADA - COMPLIANT SIGNAGE • ® CO -3 ED1 -1 H LIGHTING DEMOLITION PLAN � ��'�■��■ ° � 7. OTHERS: DESCRIBE MEANS OF COMPLIANCE: I.E. PARKING SPACES, ELEVATORS, STAIRS, ETC. • G ' - • �.1� - �rI�II��� o G•T 1 • A• l 7 - -• • : • - . � ts,azo � �� , d'T' . 420 E4-0 LIGHT FIXTURE 1. THIS PROJECT WILL COMPLY WITH ALL AMERICAN WITH DISABILITIES ACT REGULATIONS AND ALL LOCAL ACCESSIBILITY AND ENERGY CODE REQUIREMENTS 2. THRESHOLDS SHALL BE NO HIGHER THAN 1/2" ABOVE THE FLOOR, EDGE TO BE BEVELED WITH A SLOPE NO GREATER THAN 1 IN 2. 3. ALONG ACCESSIBLE PATH OF TRAVEL AND AT EMERGENCY EGRESS CONDITIONS, DOOR HARDWARE SHALL BE OF THE LEVER OR PUSH TYPE, MOUNTED 30" TO 44" ABOVE FINISH FLOOR AND OPERABLE WITH A MAXIMUM EFFORT OF 5 LBS FOR INTERIOR DOORS, 8.5 LBS FOR EXTERIOR DOORS. ON 4. PROVIDE INTERNATIONAL SYMBOL OF ACCESSIBILITY (ISA) AT 60" ABOVE FINISH FLOO O AT ACCESSIBLE FITTING ROOM DOOR(S). SYMBOL SHAPE AND. CONTRASTING COLORS SHALL CONFORM WITH ALL LOCAL, STATE AND FEDERAL ACCESSIBILITY AND ENERGY CODE. _•; REQUIREMENTS. 5. ACCESSIBLE DOORS MUST BE A MINIMUM 3' -0" WIDE X 6' -8" HIGH. 6. PROVIDE 18" CLEAR SPACE ON STRIKE /PULL SIDE OF INTERIOR DOORS, 12" CLEAR SPACE ON,' STRIKE /PUSH SIDE OF INTERIOR DOORS. -7. PROVIDE ACCESSIBILITY SIGNAGE ON RESTROOM DOORS TO CONFORM WITH ALL LOCAL STATE AND FEDERAL ACCESSIBILITY AND ENERGY CODE REQUIREMENTS. 8. HOT WATER PIPES AND DRAIN PIPES UNDER LAVATORIES SHALL BE INSULATED TO CONFORM WITH ALL LOCAL, STATE AND FEDERAL ACCESSIBILITY AND ENERGY CODE REQUIREMENTS. 9. PROVIDE CLOTHING HOOK AT 40" ABOVE FINISH FLOOR IN ACCESSIBLE FITTING ROOM(S). 10. FEDERAL ACCESSIBILITY AND ENERGY CODE REQUIREMENTS. CONFORM E CASHWRAP WR P SHEET FOR CLEAR "`" DIMENSIONS AND COUNTER HEIGHTS. .TCHEDULE E5-0 EAS DETAILS ��■■' MEDITE CORPORATION; FORMALDEHYDE -FREE WOOD -BASED PANEL PRODUCT (SHELVING). CONFORMS TO ( ) ASTM ASTM D 2037 87.25 WHEN TESTED IN ACCORDANCE WITH UL TEST 723 OR ASTM E -84 (CAN /ULC BLBT7.R6838 FOR THE FOLLOWING CLASS 1 CHARACTERISTICS: FLAME SPREAD OF 20 AND A SMOKE DEVELOPED OF 25) CONTACT: MEDITE CORPORATION (541) 773 -2522 ) MELAMINE I, OCCUPANCY .. -I u .I Total Stock /Processing Areas divided by Total Improved (section 3 divided • - • L! I ' -"-'-'----- '--- °'- '-- ° °'- '- ' °- ° " " ° - ° "" '-"'--"'""""""--""---'-""°"°°"---"-----°--'-'°---•""'"'-'---"" °- " " ° " " " " ° "'- "- ' ° °-- "-- °- - " °• -- - °- ' °--- '- - " -' -- " " -' - -' °.,,�� ,� APPIR *VAL {� ��n LOAD: O EGRESS REQCJIRE'117n E • • A HWRAP DETAILS ' 41 • , E8-0 ELECTRICAL DETAILS e '! BUILD I� j • 10 -• E9-0 POWER RISER AND SCHEDULES E9-1 PANEL SCHEDULES E9-3 ELECTRICAL DETAILS ON CASHWRAP SURFACES. TESTS CONDUCTED IN ACCORDANCE WITH UL962. IT HAS A FLAME SPREAD RATING OF 75 & SMOKE DEVELOPED INDEX OF 55. (CAN /ULC BLBT7.R6838 FOR THE FOLLOWING CLASS 1 CHARACTERISTICS' FLAME SPREAD OF 15 AND A SMOKE DEVELOPED OF 20) CONTACT: MARK REXROAT (MARK.REXROAT @IDXLOUISVILLE.COM) STAINLESS STEEL PER TABLE: 1004.1.1 (IBC 2009) PER TABLE: 1016.1 (IBC 2009) E9-4 ELECTRICAL DETAILS _.,.. ,.., .- -- _....,.. .....,. ,,.,. ....,.. ......,......,,,... MERCANTILE SALES STORAGE BUSINESS 17011 SOFT / 30 = 567 2238 SOFT / 300 - 7 171 SOFT / 100 = 2 EX ____ ...._.__.._., , -. - - "- ....._ , -.... EXITS PROVIDED: - - • TRAVEL DISTANCE ALLOWED: ...._. _._......,:. 3 - • - - -• - - - -- 250' E9-5 ELECTRICAL DETAILS E13-0 3-0 ELECTRICAL EL CTRICAL SPECIFICATIONS E13 -1 ELECTRICAL SPECIFICATIONS DRAWN BY: EM/ TOTAL 576 '- ; STAINLESS STEEL WAINSCOT PROVIDED SHOULD BE FABRICATED FROM FIRE RATED MATERIALS TESTED IN ACCORDANCE WITH ASTM- E84 -01 (CAN /ULC S102.2 FOR THE FOLLOWING CLASS 1 CHARACTERISTICS: FLAME SPREAD OF 25 OR LESS & SMOKE DEVELOPED OF 450 OR LESS. °PLUMBING FIXTURE REQUIREMENTS: ___INITIOMMIR A/E JOB NUMBER: GAPON0321 PER TABLE: 2902.1 (IBC 2009) • TOTAL OCCUPANCY: 576/ 2 288 MEN & WOMEN TITLE SHEET: PROJECT INFORMATION / SCOPE OF WORK �� R ' R NOTES: FIXTURE REQUIRED PROVIDED - BUILDING IS EQUIPPED WITH (E) SPRINKLER AND FIRE ALARM SYSTEM. ANY CHANGES TO THESE SYSTEMS WILL REQUIRE A SEPARATE PERMIT. W C MALE LAVATORY MALE w C FEMALE LAVATORY FEMALE D . ... _...,..UN ,... MOP SINK FOUNTAINS 1 1 1 1 1. 1 (& 1 URINAL) , 1 1 1 ®I ■�I r IV MI X ii i M `•HEET NUMBER: VI l I ��`�-ai is I lag rsiiiiiiivo co_o Nom ) RIDOR EMPLOYE F.........n. CHANGES TO THE DESIGN OF ANY SYSTEM IDENTIFIED ON THESE DRAWINGS OR SPECIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL PRIOR TO THE FABRICATION AND INSTALLATION. ANY MODIFICATIONS WITHOUT THE ORIGINATING ENGINEER'S WRITTEN AUTHORIZATION AND APPROVAL SHALL BE THE RESPONSIBILITY, AS WELL AS THE COST TO CORRECT SUCH MODIFICATION, OF THE CONTRACTOR. ROOM DOk EXISTING GAS 4" SAN 1-1/2" CW RESPONSIBILITY MATRIX LEGEND TAG STOREFRONT EXTRUSION O GC FACTORY FINISHED SERVICE MFR. HCOMMENTSI L = LANDLORD O =OWNERER (GAP INC.) I FURNISHED BY VOLTS PH. ITEM GC= GENERAL CONTRACTOR WATTS CP -1 AHU -1 NA= NOT APPLICABLE I INSTALLED BY I - 10 RESPONSIBILITY MATRIX 8230 ITEM FURNISHED BY INSTALLED BY COMMENTS WATER LINE TO LEASE SPACE L L SEWER LINE TO LEASE SPACE L L CONDENSATE DRAIN CONNECTIONS, TRAPS AND PIPING 0 GC GAS METER AND MAIN SHUT -OFF VALVE EXISTING EXISTING WATER METER 0 GC GAS PIPING WITH SUPPORTS, DIRT LEGS AND INDIVIDUAL SHUT -OFF VALVES TO EACH HVAC UNIT 0 GC REMARKS: NOTE: 1. THE RESPONSIBILITY MATRIX ONLY DELINEATES ITEMS SUPPLIED AND /OR INSTALLED BY OWNER AND /OR LANDLORD. ANY WORK SHOWN IN THE CONSTRUCTION DOCUMENTS NOT DEFINED AS RESPONSIBILITY OF OWNER OR LANDLORD IS FURNISHED AND INSTALLED BY GENERAL CONTRACTOR. SEE BID CLARIFICATION LETTER FOR ANY VARIATION BY SCOPE OF WORK RESPONSIBILITY. 2. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE UNLOADING OF ANY OWNER SUPPLIED CONSTRUCTION ITEMS. PLUMBING GENERAL NOTES 1. THE ABBREVIATION G.C., WHEREVER IT APPEARS IN THESE PLUMBING DRAWINGS, SHALL REFER TO THE GENERAL CONTRACTOR. 2. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE WORK OF ALL SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL SUB - CONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. 3. ALL ROOF CUTTING, PATCHING AND FLASHING REQUIRED TO INSTALL THE PLUMBING SYSTEMS SHALL BE BY A LANDLORD APPROVED ROOFING CONTRACTOR. COORDINATE ROOF PENETRATIONS WITH LANDLORD AND G.C. 4. ALL PLUMBING FIXTURES SHALL BE INSTALLED WITH STOP VALVES TO ISOLATE EACH FIXTURE. REFER TO RISER DIAGRAM AND PLUMBING SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. 5. ALL SHUT -OFF VALVES LOCATED IN AREAS WITH HARD CEILINGS SHALL HAVE ACCESS PANELS INSTALLED. COORDINATE LOCATION AND TYPE WITH G.C. AND ARCHITECT. 6. CONTRACTOR TO VERIFY THAT ALL ITEMS ON THE CONTRACTOR CHECKLIST ARE COMPLETED PRIOR TO MEP COMMISSIONING. CONTRACTOR WILL RECEIVE CONTRACTOR CHECKLIST IN ..= �,:� �' , _ - • DOCUMENTS. 1 -1/4" EXISTING GAS (120 CFI-j)„_ 1 -1/4" EXISTING 4" SAN ITARY EXISTING 2" WATER LINE (TYP) (TYP) (150 CFH) EXISTING GAS NEW 3/4" WATER LINE TO REMITTED SPACE FOR FUTURE TENANT NEW 4" SANITARY SEWER STUB TO REMITTED SPACE FOR FUTURE TENANT 1' 1 N p" a :1.7L s.4opC d T (1 rk A • -h,:s P h Mft t' . 13 STOC PROCESSING AREA - CONDENSATE LIFT STATION SCHEDULE (BY TENANT) TAG PUMP REMARKS ITEM SYSTEM SERVICE MFR. MODEL ��� GPH VOLTS PH. AMPS WATTS CP -1 AHU -1 COND ASPEN MINI AQUA ASPMA230SP 10 1.5 8230 1 0.11 16 1,2 REMARKS: 1. PUMP KIT PROVIDED BY EQUIPMENT MANUFACTURER, TO BE FIELD INSTALLED INSIDE THE MINI -SPLIT AIR HANDLING UNIT BY G.C. PER MANUFACTURER GUIDELINES. 2. PUMP TO BE POWERED OFF OF THE AIR HANDLING UNIT. CODE COMPLIANCE APPROVED NOV 3 0 2012 City of Tukwila BUILDING DIVISION PLUMBING CODED NOTES CONNECT NEW SANITARY LINE INTO THE LANDLORD'S EXISTING SANITARY SERVICE AS SHOWN. FIELD VERIFY EXACT LOCATION OF LANDLORD'S MAIN PRIOR TO BIDDING. INSTALL CLEANOUT AT CONNECTION TO LANDLORD'S MAIN AND COORDINATE LOCATION AND TYPE OF COVER REQUIRED TO MATCH FLOOR FINISH WITH G.C. REFER TO WASTE AND VENT RISER DIAGRAM AND PLUMBING SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. PLUMBING SYMBOLS LEGEND COLD WATER (CW) D CONDENSATE LINE (D) F FIRE PROTECTION (F) (SPRINKLER /STANDPIPE) G GAS LINE (G) HOT WATER (HW) PLUMBING VENT (V) SANITARY WASTE (SAN) - BELOW SLAB /GRADE AFF /AFG ABOVE FINISHED FLOOR /GRADE BFP BACKFLOW PREVENTER CHECK VALVE CO CLEANOUT Q CONNECT TO EXISTING (E) EXISTING FCO FLOOR CLEAN OUT ® FLOOR DRAIN (FD) ® FLOOR SINK (FS) PIPE TURNING UP /DOWN p REDUCER --41-441— SHUTOFF VALVE (BALL TYPE) TEE TURNING UP /DOWN TP TRAP PRIMER VTR VENT THRU ROOF WHA WATER HAMMER ARRESTOR WCO WALL CLEAN OUT CONNECT NEW COLD WATER LINE INTO THE EXISTING COLD WATER TAP. NOTIFY G.C. IF TAP IS SMALLER THAN SHOWN. REFER TO COLD WATER AND HOT WATER RISER DIAGRAM AND PLUMBING SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. EXISTING WATER METER TO REMAIN. INSTALL DRAWING TUBE HOLDER FOR STORAGE OF ALL CONTRACTORS "AS- BUILT" DRAWINGS. PLACE "AS- BUILT" PLUMBING DRAWINGS IN TUBE. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. INSTALL CONDENSATE DRAINS FROM ALL RTU'S AS SHOWN ON PLANS. 1" MINIMUM DRAIN REQUIRED BY CODE. CONDENSATE DRAIN TO BE TRAPPED WITH A TRAP DEPTH OF 1.5 X PRESSURE (MINIMUM 3" DEEP). DRAINS SHALL BE EXTENDED TO A SPLASH BLOCK ON ROOFTOP /EXTERIOR PIPING TO SPLASHBLOCK SHALL BE UV RESISTANT PVC PIPING. PVC CHEMICALLY WELDED. CONNECTION TO ROOFTOP UNIT SHALL BE SLIP -FIT. SIZE OR LARGER AS UNITS TOTAL STATIC ROOF. JOINTS SHALL BE EXTEND A NEW GAS SERVICE LINE AS SHOWN AND CONNECT TO HVAC EQUIPMENT. SUPPORT GAS PIPES ACROSS ROOF. COORDINATE METER AND REGULATOR REQUIREMENTS WITH UTILITY COMPANY PRIOR TO BID. INCLUDE ALL COSTS IN BID. 304) TIE INTO EXISTING GAS PIPING ON ROOF WITH ISOLATION VALVE. EXTEND A NEW 1" GAS SERVICE LINE THROUGH ROOF TO NEW GAS FIRED UNIT HEATER. SUPPORT PIPING PER DETAIL 302/P5-O. SEAL ROOF PENETRATION TO MAINTAIN ROOF WARRANTY. ALL ROOFING WORK SHALL BE DONE BY LANbLLRD APPROVED ROOFING CONTRACTOR. MINI CONDENSATE PUMP KIT FURNISHED WITH AHU. CONTRACTOR SHALL FIELD INSTALL MINI CONDENSATE PUMP, RESERVOIR WITH FILTER AND FLOAT, AND BREATHER TUBE INSIDE OF WALL MOUNTED AIR HANDLING UNIT PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. POWER FOR THE PUMP TO BE FED FROM AHU. INSTALL 1 AMP INLINE FUSE AND WIRE THE PUMP'S HIGH LEVEL SAFETY SWITCH PER MANUFACTURER'S INSTRUCTIONS TO SHUT DOWN THE AHU IN THE EVENT OF PUMP FAILURE. CONDENSATE DISCHARGE TUBING FROM AHU'S CONDENSATE PUMP TO BE ROUTED UP TO DECK. INSTALL ANTI - SIPHONING DEVICE PROVIDED WITH PUMP PER MANUFACTURER'S INSTRUCTIONS. TRANSITION CONDENSATE DISCHARGE TUBING TO 3/4" COPPER CONDENSATE PIPE AND ROUTE AS HIGH AS POSSIBLE TO MOP SINK MAINTAINING SLOPE AS NOTED ON DRAWINGS. SEE SPECIFICATIONS FOR CONDENSATE PIPING AND INSULATION REQUIREMENTS. RECEIVED CITY OF TUKV LA NOV 1b 2012 PERMIT CENTE PLUMBING PLAN 1/8" = 1' —O" 100 REDUCTION GAP INC. CORPORATE ARCHITECTURE 1 HARRISON STREET SAN FRANCISCO, CA 94105 STORE NUMBER: 0000047990 0) w w U w 0 LC) ce LC) STORE LOCATION: 0 w J Z 2 ots 2013 O.N.E. Q1 -Q2 PROTOTYPE DATE: 08/10/12 OPENING: 2013 CONSULTANT INFO: PROFESSIONAL STAMP: ARCHITECT INFO: 7007 DISCOVERY BLVD DUBLIN, OH 43017 614.634.7000 T WDPARTNERS.COM ISSUE TYPE: 100% CHECK SET: 10/26/12 BID/PERMIT/LL: 11/09/12 REVISIONS: DRAWN BY: DE/JB NE JOB NUMBER: GAPON0321 TITLE SHEET: PLUMBING PLANS, NOTES, AND LEGENDS SHEET NUMBER: P1 -0 r, ALA (TYP.) 3/4 • 3 4"-/° ... 111 I Iii So, c.) dr 48' wi 3/4" 3/ 44 •t■ . it* - REDUCTION PLUMBING SCHEDULE DESCRIPTION FIXTURE VALVE/FAUCET CONNECTIONS ELECTRICAL REMARKS MFR MODEL MFR MODEL WASTE VENT CW HW VOLTAGE PHASE WATTS WC-1 WATER CLOSET HANDICAP AMERICAN STANDARD CADET FLOWISE 2467.100 (1.1 GPF) _ - 4'' 2 " 34 /" - - - - 578 GAP INC. CORPORATE 1 HARRISON SAN FRANCISCO, ARCHITECTURE STREET CA 94105 INC- 2 WATER CLOSET AMERICAN STANDARD CADET FLOWISE 2462.100 (1.1 GPF) - 4" 2" 3/4" - - - - 5,7 UR URINAL AMERICAN STANDARD ALLBROOOK FLOWISE 0.5 GPF SLOAN OPTIMA 186 - 0.5 ES-S 2" 1-1/2" 3/4" - 120 1 - 13 SK-1 SINK DWYER - PHOENIX - 1-1/2" 1-1/2" 1/2" 1/2" - - - 1 STORE NUMBER: REPS. I.D.: 5359 0000047990 LAV LAVATORY AMERICAN STANDARD LUCERNE #0355.012 WHITE AMERICAN STANDARD INN SBROOK 6056.205 „ 1-1/2 1-1/2" 1/2" 1/2" 115 1 - 3,4,6 EWH WATER HEATER TANK A.O. SMITH DEL-6 6 GALLON - - - - 3/4" 3/4" 208 1 1500 10 AP WALL ACCESS PANEL ZURN ZANB-1460-11 11" x 11" - - - _ - - - - - . 300 FCO FLOOR CLEAN OUT JAY R. SMITH SERIES 4000 TO SUIT FLOOR FINISH - - - - - - - - - 9 Lad' EWC 3 4" MO i 5-0 . ,..ir, NNN%\..,.., 3/4"-......„, ...."-..N. ... • WC-1 1 ...."••■.,...,..,. FD FLOOR DRAIN JAY R. SMITH 2005A-P050 _ - 3" 1-1/2" - - - - - 12 CATION: KWAY SUI CENTER PKV ILA, WA MS MOP SINK FIAT PRODUCTS #M SB-2424 AMERICAN STANDARD UTILITY #8354.112.004 „ 3 1-1/2" 3/4" 3/4" - - - 14 EWC ELECTRIC WATER COOLER ELK AY EZTL8C TWO LEVEL - - 1-1/2" 1-1/2" 1/2" - 120 1 325 11 1/2" si . I* ,_ .02 " "NI 1/2" • " " TP - TRAP PRIMER PRECISION PLUMBING PRIME-RITE - - - - 1 /2" - _ - - - - WHA WATER HAMMER ARRESTERS ZURN SHOKTROL - - - - - - - - - WCO WALL CLEAN OUT JAY R. SMITH 4532S - - - - - - - - - 2 /2" 1-1/2" EXISTING WATER- •••.,.., 3/4" WM WATER METER SENSUS 3/4" SR - - - 3/4 - - - - 15 2013 O.N.E. Q1-Q2 PROTOTYPE DATE: • 08/10/12 OPENING: 2013 REMARKS: 1. SINK AND FAUCET PROVIDED WITH PRE-FAB KITCHENETTE. 8. FURNISH RIGHT HAND, AND LEFT HAND MODELS AS REQUIRED PER ADA. 2. CAST IRON CLEANOUT TEE WITH STAINLESS STEEL ROUND COVER. PLUG TO BE GAS 9. PROVIDE POLISHED NICKEL BRONZE COVER WITH ZARB-1470-A CLEANOUT PLUG. AND WATER TIGHT. 10. PROVIDE WITH A WATTS PLT-5 2.1 GALLON POTABLE WATER EXPANSION TANK (ET). 3. PROVIDE WITH TRUEBRO LAV GUARD MODEL #102. 11. PROVIDE WITH DEARBORN 17GA. TRAP, TRAP ADAPTER AND ANGLE STOP. 4. PROVIDE WITH JAY R. SMITH #0700 FLOOR MOUNT LAVATORY CARRIER. 12. FLOOR DRAIN TO BE PROVIDED WITH TRAP PRIMER CONNECTION. 5. PROVIDE WITH BEMIS MANUFACTURING MODEL 1955SSC STANDARD WHITE OPEN FRONT 13. PROVIDED WITH TRANSFORMER MODEL NUMBER EL-154. SEAT, LESS COVER. 14. PROVIED WITH FIAT PRODUCTS VINYL BUMPER GUARD #E-77-AA. 6. PROVIDE WITH MIXING VALVE, AMERICAN STANDARD MODEL #605XTMV. 15. GC TO SUBMIT SHOP DRAWINGS AND CATALOG SUBMITTAL TO GAP INC. FOR 7. PRESSURE-ASSISTED, TANK-TYPE. APPROVAL LINE (BY LANDLORD) N•..% ii ,•••/-•-• 3 4" 1/2- WC-2 IP4 / ..1 wc-i CONSULTANT INFO: y ( PLUMBING CODED NOTES \- 1/2 TO fa ' CHANGES TO THE DESIGN OF ANY SYSTEM IDENTIFIED ON THESE DRAWINGS OR SPECIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL PRIOR TO THE FABRICATION AND INSTALLATION. ANY MODIFICATIONS WITHOUT THE ORIGINATING ENGINEER'S WRITTEN AUTHORIZATION AND APPROVAL SHALL BE THE RESPONSIBILITY, AS WELL AS THE COST TO CORRECT SUCH MODIFICATION, OF THE CONTRACTOR. 101 EXTEND NEW VENT THROUGH ROOF. REFER TO WASTE AND VENT RISER DIAGRAM AND PLUMBING SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. . ALL ROOFING WORK SHALL BE DONE BY LANDLORD APPROVED ROOFING CONTRACTOR. 103 INSTALL 1/2" WATER PIPE FROM TRAP PRIMER DOWN IN WALL UNDER FLOOR TO FLOOR DRAIN. PANELTRAP PRIMER TO BE LOCATED IN AN ACCESSIBLE L ACCESS . OCATION WM-I PROFESSIONALSTAMP: , "6, , 1. s. vAlv. s dovAsi;.. to, let, t fit!' . .1 . ,/•'-'4") . or 4,0037194,,0 A,044. 4P,s7 ow ONAL NOV 1 2 2012 COLD WATER AND HOT WATER RISER DIAGRAM NOT TO SCALE s 1 < 1 SAN1TOR CORM bOR MEN CLOSET (,.1)MENI -------1 , , „- WC-1 WC- -WCO iita : ' WCO 101 • ARCHITECT INFO: V11111 7007 DISCOVERY BLVD DUBLIN, OH 43017 614.634.7000 T WDPARTNERS.COM lin ,... 7,....., .. 101 305 .............. REVIEWED FOR CODE COMPLIANCE APPROVED NOV 3 0 2012 City of Tukwila BUILDING DIVISION NI 3"VTR I I P5-0 fj:/,. -6 (I, c ISSUE TYPE: WkL K-1 ' i - ----A ----- ' c.'".,:„, "::.',-'....;::::;,;, 1 ' ,,,,,,..,,, • , ., ,,,, ,.. -,,,„:,„,,,, ..,, , 1 \Oil 1." a :I FD&TP I <1 1 1 I I I I WCO ,.„.•I'l 100% CHECK SET: 10/26/12 BID/PERMIT/LL: 11/09/12 , , '". / AP 103 ,.. D&TP I I 4. IN( ...11 41 LAV I Is T I 1 c., . - -I II 4 I ! UR I i EK 2 . I - k ti '*-- MS -1 El 1 FCO 1 03 "LOYE REA -.. I\ FD&TP 1111-. " N, N. 9 11°. 401 I ..' • / 1 ,.. 4 x I UR-1 _____ • 1:4 1 '. 1 : : .'4 I . 4 2" ,.• 3 N.-. 1°. 1 '`■••. ■, ...,'m I I I n EN1 I o ., 1 .- ..... i 1 I „.... NI ‘- I T .. . •- _ .. -.-. " wc- ' I WC-1 I SK-1 If" FCO , f , t ' aN I FD&TP -N, , . , ‘.- ' -I I , --- ' ,„ - ' i b A i 5' .,,, , ; b,t,',A.:' REVISIONS: 7 ‘--. I I WC-2 '. I 3" L . ., , ;. :_,,, ' ',- LAV La. CONNECT TO LANDLORD PROVIDED WCO 2) n " LAY , , " ,,-4: EWC ., WCO ; , - 4" SANITARY SEWER --,- " 4" . 9 , 99 RKFJ eny Of 11/MAILA NOV I-6 2012 PERMIT CENTER ,:- ". i \ / i ..---, \ ,..- k , , ; r., , :,2,:::,,Z: ..,:„:::,;: , . . t w ,:; I. 305 .,,, , , , : ,‘ ' ° „, 101 3" VTR ' , . : ; : 1 REFER TO SHEET I , 1 I TOILE'. OM C':=ORRDOR 11 , SALES AREA ' 5-0 \- 1-1/2" CW. DRAWN BY DE/JB NE JOB NUMBER: GAPON0321 TITLE SHEET: PLUMBING PLANS, RISERS, AND SCHEDULES 4" SANITARY SEWER. REFER TO . SHEET P1-0 FOR CONTINUATION P1-0 FOR CONTINUATION N SHEET NUMBER: pi ...1 ENLARGED PLUMBING PLAN 1/4- = '-o NOT TO SCALE 102 WASTE AND VENT RISER DIAGRAM 100 2-1/2" G (20 FT) K. 2-1/2" G (20 Fr) A ' TOTAL METER LOAD: 900 CFH 1" G (57 FT) K. (1.50 CFH) (BY TENANT) 2" G (50 FT) (250 CFH) 1-1/4" (29 FT) K. RTU \2/ (250 CFH) 1-1/4" G 2" G (5 FT) (31 FT) D 1-1/4" G (48 FT) (250 CFH) ••■••IMIMIMMOIMM REVIEVVED FOR CODE COMPLIANCE APPROVED NOV 3 0 2012 City of Tukwila BUILDING DIVISION PIPE SIZE AS REQUIRED SEE DRAWINGS DECK PLATE, RIGID 18 GA. STAINLESS STEEL, MIRO INDUSTRIES MODEL DP-12-SS, SIZE 12" SQ. PILLOW BLOCK PIPE STAND OF POLYCARBONATE RESIN MATERIAL, MIRO INDUSTRIES MODEL 3-R PILLOW BLOCK PIPE STAND DECK PLATE PLAN ROOFING MATERIAL ELEVATION CENTER DECK PLATE BELOW PIPE STAND DRAINAGE PORTS ON TWO SIDES OF PIPE STAND BASE PROVIDE ALUMINUM PIPE STRAPS. FASTEN TO PIPE STAND WITH STAIN STEEL SCREWS PIPE SHALL REST FIRMLY ON PIPE STAND WITHOUT GAPS PIPE STANDS ARE STACKABLE FOR PROPER ELEVATION OF VARIOUS SIZE PIPE TO MAINTAIN LEVEL PIPING. NO SHIMS OR BLOCKS ARE ALLOWED PIPE STAND GOOD FOR 1/2" TO 3 1/2" STEEL PIPE SIZES ONLY. SUPPORT SPACING FOR PIPE SIZE: 1/2"=61; 3/4"-1"=8'; 1 1/4"AND LARGER=10'; PLACE DECK PLATES ON ROOFING, SET PIPE STAND FREE ON DECK PLATES. STACK PIPE STAND WHERE REQUIRED TO ELEVATE PIPING. INSTALL GAS PIPE TO ALLOW FOR EXPANSION AND CONTRACTION. PRIMER COAT AND PAINT EXTERIOR GAS PIPE LIGHT GREEN COLOR. REDUCTION GAP INC. CORPORATE ARCHITECTURE 1 HARRISON STREET SAN FRANCISCO, CA 94105 0000047990 STORE LOCATION: uJ uJ 0 GAS PIPING RISER DIAGRAM NOT TO SCALE 306 GAS SUPPORT NOT TO SCALE 302 2013 O.N.E. Q1-Q2 PROTOTYPE DATE: 08/10/12 OPENING: 2013 #4 LEAD FLASHING - ROLL 1" DOWN INTO PIPE VENT THRU ROOF SET FLANGE IN ROOF CEMENT & STRIP I MULTI-PLY MEMBRANE STRIPPING PLIES BUILT UP ROOFING SYSTEM OVER 3" RIGID INSUL. OVER 1X• MTL. DEC METAL BITUMEN DAM - 6" HIGH 2-)"X2-r414“X41-0" LONG ANGLE (AT PIPE 6" OR LARGER) WELD TO ALL DECK RIBS a 0 VACUUM BREAKER HEAT TRAP 18" MIN CENTER TO CENTER ON CW AND HW GATE/BALL VALVE(TYP.) 3/4" --7C THERMAL 3/4" EXPANSION TANK SECURE TO WALL FOR BRACING DRAIN VALVE SHELF ABOVE MOP SINK CEILING OR IN MOP SINK ROOM TO BE MOUNTED ON THE WALL OR PLATFORM. IF MOUNTED ABOVE MOP SINK, PLATFORM SHALL BE A MINIMUM OF 7-0" A.F.F. REFER TO ARCHITECTURAL DRAWINGS FOR MORE INFO. 3/4" 1111 iifl 1" RUN FULL SIZE TO MOP SINK INSULATE ALL PIPING IN ACCORDANCE WITH SPECIFICATIONS UNION (TYP.) 3/4" T & P RELIEF VALVE WATER HEATER SEE PLUMBING FIXTURE SCHEDULE FOR ADDITIONAL INFO. 2" WIDE, 20 GA. SHEET METAL BAND, SECURE TO WALL FOR SEISMIC BRACING WHERE REQUIRED BY CODE. GALV. DRIP PAN. PROVIDE 6" CLEARANCE BETWEEN WATER HEATER AND GALV. DRIP PAN ON ALL SIDES SEPARATE 1" DRAINS TO MOP SINK. PROVIDE 4" AIR GAP. CONSULTANT INFO: PROFESSIONAL STAMP: TYP. VENT THRU ROOF NOT TO SCALE 305 TANK WATER HEATER NOT TO SCALE 300 ARCHITECT INFO: 7007 DISCOVERY BLVD DUBLIN, OH 43017 614.634.7000 T WDPARTNERS.COM UNION CONNECT TO ROOFTOP UNIT DO NOT PROVIDE TRAP ON UNITS WHICH HAVE AN INTERNAL TRAP, BUT DO DISCHARGE AWAY FROM UNIT SHUT-OFF VALVE (PLUG VALVE) ROOF THREADED PIPE TO PVC ADAPTER ON CONDENSATE WASTE CONNECTION(S) PVC PIPE TRAP (SEE DETAIL BELOW) DISCHARGE AWAY FROM SERVICE AREAS OF UNIT OR WHERE SHOWN ON PLANS -EXTEND GAS PIPING TO EXISTING METER s 6LOCATION 6" LONG, CAPPED DIRT LEG UNIT CONDENSATE DRAIN CONNECTION —\ LOCATE SPLASH BLOCK A MINIMUM OF 6' FROM TRAP- 4" 6' I 1 12"x12" CONCRETE SPLASH BLOCK DRAIN PLUG • , • NEOPRENE -/ PAD R.T.U. TRAP 1 ../-ROOF LINE (•YP. ALL R.T.U. H.V.A.C. UNITS) 1/4" DIAMETER THRU BOLT WITH TOGGLE (TYP. OF 2) PAN HEAD SCREWS TO SECURE STRAPS LOOSE PVC TOP CAP 3/4" X 2" POPLAR PLYWOOD TRIM SCREWED TO 2"X4" METAL STRAP (TYP. OF 2) SECTION NTS ATTACH A LABEL (WITH CLEAR TAPE) STATING: R D crrY LA NOV) 6 2012 ---■,ERtellT CENTER ISSUE TYPE: LABEL EXTENT OF WOOD HOLDER PVC BOTTOM CAP GLUED IN PLACE ROOFTOP UNIT CONNECTIONS (BY LL) NOT TO SCALE 303 DRAWING TUBE THIS TUBE CONTAINS STORE DRAWINGS AND IS NOT TO BE REMOVED WITHOUT THE CONSENT OF THE STORE MANAGER. 26" 24" A.F.F. ELEVATION NTS THANK YOU. -PG NOT TO SCALE 100% CHECK SET: 10/26/12 BID/PERMIT/LL: 11/09/12 REVISIONS: DRAWN BY: DE/JB NE JOB NUMBER: GAPON0321 TITLE SHEET: PLUMBING DETAILS 102 SHEET NUMBER: p5.0 DIVISION 15 - MECHANICAL SECTION 15000 BASIC MECHANICAL REQUIREMENTS A. NOTE 1. THE ABBREVIATION G.C. WHEREVER IT APPEARS IN THESE MECHANICAL DRAWINGS AND SPECIFICATIONS, SHALL REFER TO THE GENERAL CONTRACTOR. 2. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS, APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15. 3. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THEIR WORK AND THE WORK OF THEIR SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVIDE THEIR SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. 4. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THEIR WORK AND THE WORK OF THEIR SUBCONTRACTORS TO COMPLY WITH THE SCHEDULE AND THE PROJECT COMPLETION DATE. 5. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTORS BID. SUBMITTAL OF BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF WORK. 6. REFER TO RESPONSIBILITY SCHEDULE ON THE MECHANICAL DRAWINGS FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT BID. A B. GENERAL REQUIREMENTS 1. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ' ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR OWNER SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE LANDLORD AND THE G.C. CONSTRUCTION MANAGER, AS REQUIRED. 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF CONTRACT. 3. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. 4. ALL MECHANICAL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. 5. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD ENGINEERING AND CONSTRUCTION PRACTICES. 6. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF, SHALL BE NEW, UNDERWRITERS LABORATORIES LISTED AND LABELED AND SIZED IN CONFORMITY WITH REQUIREMENTS OF STATE AND LOCAL CODES, WHICHEVER 1S MORE STRINGENT. C. CODES 1. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, THE STATE'S, COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE CODES AND REQUIREMENTS. THIS CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A ° SEPARATE LINE ITEM IN THE BID AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED BY THE OWNER TO THE CONTRACTOR. D. LICENSES, PERMITS, INSPECTIONS & FEES 1. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO THEIR WORK. 2. FURNISH TO THE G.C.'S CONSTRUCTION MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF PROJECT E. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED AS A MINIMUM FOR THE BASE BID. ANY PROPOSED SUBSTITUTIONS MUST BE PR- QUALIFIED, LISTED IN THIS CONTRACTOR'S BID AND HAVE A COST SAVINGS FOR THE OWNER OF AT LEAST $500 PER TYPE OF EQUIPMENT. ADDITIONALLY, ONLY MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE REVIEWED. ALL SUBSTITUTIONS ARE SUBJECT TO APPROVAL IN WRITING, THROUGH SHOP DRAWINGS PROCESS, BY THE G.C.'S CONSTRUCTION MANAGER PRIOR TO ACCEPTANCE. THE OWNER RESERVES THE RIGHT TO REJECT ANY PROPOSED SUBSTITUTIONS. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 2. MECHANICAL CONTRACTOR SHALL SUBMIT ONLY SUBSTITUTION REQUESTS TO THE G.C.'S CONSTRUCTION MANAGER FOR APPROVAL. SUBMISSIONS SHALL BE MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR (4) WORKING DAYS FOR THE CONSTRUCTION MANAGER'S REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP OF THE G.C.'S OFFICE AND THE SUB - CONTRACTOR SHOWING THAT THEY HAVE REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND H SPE THE SUBMITTALS NS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. F. GUARANTEE 1. THIS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER THEIR CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT THEIR OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY THE GENERAL CONTRACTOR'S ( ) CONSTRUCTION MANAGER. EXTENDED WARRANTIES ARE AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. L PROVIDE A COMPLETE 12 -MONTH WARRANTY FOR ALL PARTS 2. THE OWNER SHALL ON EQUIPMENT PROVIDED BY THE OWNER AND ITS VENDORS. THIS CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE WORKING SYSTEM, AND AS SUCH, NO ADDITIONAL MONIES SHOULD BE INCLUDED IN THE BID. G. RECORD DRAWINGS 1. THIS CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS ON THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS: A. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. B. - REVISIONS, ADDENDUMS, AND CHANGE ORDERS. C. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S COORDINATION WITH OTHER TRADES. 2. , AT COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL, THE CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. ONE COPY OF THE MOST RECENT SET OF DRAWINGS WITH TEMPERATURE CONTROL DRAWINGS INCLUDED SHALL BE STAMPED "DO NOT REMOVE" AND PLACED IN DRAWING TUBE LOCATED NEXT TO THE ELECTRICAL PANELS. (SEE DRAWINGS FOR LOCATION.) H. DISCREPANCIES IN DOCUMENTS 1. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, ADVISE THE G.C.'S CONSTRUCTION MANAGER, IN WRITING OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, THE G.C.'S CONSTRUCTION MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. I. PHASING REQUIREMENTS 1 THIS CONTRACTOR IS TO INCLUDE IN HIS BID ALL NECESSARY SERVICE . REQUIRED TO KEEP THE OPERATING PHASE OF THE STORE'S HVAC, PLUMBING AND SPRINKLER SERVICE IN OPERATION. CONTRACTOR MUST SCHEDULE WITH THE G.C.'S CONSTRUCTION MANAGER AND THE LANDLORD ONE WEEK PRIOR TO ANY SHUT, DOWN OF THE HVAC, PLUMBING OR FIRE PROTECTION SYSTEMS. J. DEMOLITION ' 1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK AND THE DEMOLITION PROVIDED BY THE G.C.. COORDINATE WITH THE G.C. ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT. 2. EACH CONTRACTOR SHALL VERIFY SCOPE OF WORK WITH THE G.C. FOR THE REMOVAL OF ALL EXISTING FIRE PROTECTION, PLUMBING FIXTURES, PIPING, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT BEING REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, DUCTWORK, AND EQUIPMENT PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF NOT APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF /WALL /FLOOR PATCHED /REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND; SEALED BELOW OR WITHIN FLOOR OR WALL •LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BY LANDLORD OR CODES, ABANDONED PIPING AND /OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION WITH THE G.C. PRIOR TO BID AND INCLUDE IN BID PROPOSAL AS DIRECTED BY THE G.C. K. SLEEVES 1. THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2" ABOVE THE FLOOR. CONTRACTOR MUST COORDINATE THROUGH THE LANDLORD ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY FLOORS OR WALLS. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND /OR FLOORS SHALL BE PRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE RATING. 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. L. HANGERS 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C- CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING. HANGING FROM METAL DECK IS NOT PERMITTED. HANGERS MUST BE ATTACHED TO UPPER CHORD OF BAR JOIST. WHERE INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE ALSO SUBJECT TO LANDLORD CRITERIA. 3. HANGERS FOR ALL INSULATED PIPING SHALL BE SIZED AND INSTALLED FOR THE OUTER DIAMETER OF INSULATION. INSTALL 6" LONG SPLIT CIRCLE GALVANIZED SADDLE BETWEEN THE HANGER AND THE PIPE INSULATION. � 4. HANGERS AND PIPING OF DISSIMILAR METALS SHALL BE DI- ELECTRICALLY SEPARATED. END OF SECTION 15000 DIVISION 15 - MECHANICAL SECTION 15200 PLUMBING A. SCOPE OF WORK 1 THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, . TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED . AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL WORK FOR THE PLUMBING SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: A. COMPLETE SANITARY PIPING SYSTEMS OF WASTE, DRAINS, AND VENTS. B. COMPLETE COLD AND HOT WATER PIPING SYSTEMS, APPURTENANCES AND INSULATION. C. FIXTURES AND EQUIPMENT AS SCHEDULED. D. COMPLETE NATURAL GAS PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS). E. TESTS AND ADJUSTMENTS. 2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE PLUMBING SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 3. RELOCATION OF EXISTING WATER, GAS, WASTE, VENT, OR DRAINAGE LINES TO FACILITATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. B. EQUIPMENT AND INSTALLATION 1. REFER TO PLANS FOR EQUIPMENT AND FIXTURE SCHEDULES. �� A. TRAP PRIMERS SHALL BE PRECISION PLUMBING PRIME -RITE " OR EQUAL." B. WATER HAMMER ARRESTERS SHALL BE ZURN "SHOCKTROL" OR EQUAL. 2. SANITARY PIPING A. WASTE, DRAIN AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON SOIL PIPE. VENT PIPING ABOVE FLOOR 2" OR SMALLER MAY BE GALVANIZED STEEL. ALTERNATE PIPING MATERIALS ARE ACCEPTABLE AS A SUBSTITUTION WHEN THEIR USE IS PERMITTED BY THE LANDLORD, LOCAL CODES AND BUILDING DEPARTMENT OFFICIALS AND DOES NOT AFFECT OTHER TRADES. B. INSULATE ALL HORIZONTAL RUNS OF PIPING LOCATED IN CEILING SPACES OF TENANTS IN SPACES BELOW, WHEN APPLICABLE INSULATION TO BE AS SPECIFIED FOR WATER PIPING. 3. POTABLE WATER PIPING SHALL BE AS FOLLOWS: A. BELOW GRADE: TYPE 'K', ANNEALED TYPE TEMPERED COPPER TUBE FOR PIPE SIZES 2 INCHES AND SMALLER BRAZE ALL JOINTS. B. ALL OTHER: TYPE 'L' OR TYPE "M" (IF PERMITTED BY LANDLORD AND LOCAL CODE AUTHORITY) DRAWN COPPER TUBE WITH WROUGHT COPPER FITTINGS AND 95 -5 TIN - ANTIMONY SOLDER 4. PIPING OF DISSIMILAR METALS MUST BE DI- ELECTRICALLY SEPARATED, 5. GENERALLY, SANITARY AND POTABLE WATER TAPS WILL BE PROVIDED BY THE LANDLORD. FIELD VERIFY EXACT CONNECTION POINTS PRIOR TO SUBMITTING BID AND NOTIFY THE G.C.'S CONSTRUCTION MANAGER IF CONDITIONS ARE NOT AS SHOWN ON THE PLANS OR AS STATED IN THE SPECIFICATIONS. CONTRACTOR MUST VERIFY THE OPERATIONS OF ENTIRE SYSTEM PRIOR TO TIE IN AS FOLLOWS: A. SNAKE SANITARY FOR A DISTANCE OF 100 FEET AND REPORT ANY BLOCKAGE. B. TEST WATER PRESSURE TO INSURE MINIMUM PSI MATCHES MOST DEMANDING EQUIPMENT SUPPLIED. 6. INSULATE ALL HOT WATER AND COLD WATER PIPING WITH 1" THICK (K =0.23 0 75 F) PIPE INSULATION WITH AN ALL SERVICE JACKET TO MEET LOCAL CODES AND UL FLAME SPREAD AND SMOKE DEVELOPED RATINGS. 7. INSULATE THE TRAP, SANITARY AND SUPPLY PIPES UNDER LAVATORY WITH TRUEBRO MODEL 102W HANDI LAV GUARD" INSULATION KIT. 8. INSTALL ALL NECESSARY PIPE HANGERS, SADDLES, AND CARRIERS TO PROPERLY SUPPORT ALL PIPING AND FIXTURES. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAY AND SEISMIC BRACING WHERE REQUIRED BY CODES. 9. STERILIZE WATER SYSTEM IN ACCORDANCE WITH LOCAL CODES. 10. CLEAN -OUTS AND FLOOR DRAINS SHALL BE INSTALLED PER LOCAL CODES. FLOOR DRAINS SHALL BE J.R. SMTIH 2005A -P050 OR EQUAL WITH TRAP PRIMER CONNECTION. WALL COVERS ARE TO BE STAINLESS STEEL AND FLOOR COVERS ARE TO BE BRASS. PROVIDE FLOOR COVERS WITH INSET AREA FOR CARPETED LOCATIONS. ALL CLEAN -OUT LOCATIONS SHALL BE APPROVED BY THE G.C.'S CONSTRUCTION MANAGER. 11. ESCUTCHEONS SHALL BE CHROME PLATED, SIZE AS REQUIRED AND PLACED AT ALL PIPE PENETRATIONS AT WALLS, FLOORS, AND CEILINGS IN FINISHED AREAS. 12. LEAKAGE TESTS SHALL BE PER LOCAL CODES, MINIMUM AS FOLLOWS: A. TEST WATER PIPING AT 100 PSIG FOR SIX HOURS. B. TEST DRAIN, WASTE, VENT PIPING BY A 10' WATER COLUMN FOR TWO HOURS. 13. FLASHING SHALL BE SEALED WATERTIGHT AND PERFORMED IN ACCORDANCE TO THE LANDLORD'S CRITERIA. USE A LANDLORD APPROVED ROOFING CONTRACTOR WHERE APPLICABLE. 14. PROVIDE WATER METER AND REMOTE READER PER LANDLORD'S CRITERIA OR LOCAL UTILITIES REQUIREMENTS IF APPLICABLE. REFER TO PLANS TO DETERMINE IF WATER METER, IS REQUIRED. C. GAS PIPING 1. FURNISH AND INSTALL A COMPLETE GAS PIPING SYSTEM IF APPLICABLE. REFER TO PLANS TO DETERMINE IF A GAS SYSTEM IS REQUIRED. 2. GAS LINES SHALL BE BLACK STEEL, SCHEDULE 40, ASTM A -120, WITH MALLEABLE THREADED FITTINGS FOR 2" AND SMALLER, AND WITH WELDED JOINTS FOR 21/2 AND LARGER. 3. FURNISH AND INSTALL A GAS COCK, DIRT LEG, AND UNION CONNECTION TO EACH PIECE OF EQUIPMENT. 1/4" 4. PITCH PIPING AT A UNIFORM GRADE OF 1/4 IN 15 FEET UPWARD IN DIRECTION OF FLOW. SUPPORT PIPING EVERY 5 FEET. SUPPORT AS REQUIRED BY LANDLORD CRITERIA, AS DETAILED ON DRAWINGS, OR BY STANDARD INDUSTRY PRACTICE, WHICHEVER IS MORE STRINGENT. 5. GAS PIPING EXPOSED ON ROOF MUST BE PAINTED WITH RUST- INHIBITING PAINT. 6. GAS PIPING INSTALLED IN RETURN AIR PLENUMS SHALL BE SLEEVED AND VENTED OR WELDED IN ACCORDANCE WITH THE LOCAL GAS COMPANY, LOCAL CODE, AND APPLICABLE NFPA 54 CODES. 7. TESTING AND PURGING OF GAS PIPING SHALL BE DONE PER THE REQUIREMENTS OF THE LOCAL GAS COMPANY, LOCAL CODES, AND APPLICABLE NFPA 54 CODES. 8. CONTACT AND COORDINATE GAS SERVICE, METER AND REGULATOR REQUIREMENTS WITH THE LOCAL GAS COMPANY AND THE MALL'S OPERATIONS MANAGER PRIOR TO BID. INCLUDE INSTALLATION COST OF GAS METER AND REGULATOR IN BID. END OF SECTION 15200 DIVISION 15300- MECHANICAL SECTION 15300 FIRE PROTECTION A. SCOPE OF WORK 1. THIS CONTRACTOR MUST USE A LANDLORD APPROVED FIRE PROTECTION CONTRACTOR TO PERFORM ALL FIRE PROTECTION WORK. ALL COSTS MUST BE INCLUDED IN THIS CONTRACTORS BID. FIRE PROTECTION CONTRACTOR MUST COMPLY WITH ALL SECTIONS OF THIS SPECIFICATION AND INCLUDE SAME IN BID. 2. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE SPRINKLER SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: A. INSTALLATION OF NEW WET SPRINKLER SYSTEM AS REQUIRED TO PROVIDE COVERAGE IN ACCORDANCE WITH EXISTING CONDITIONS, NFPA -13, LOCAL CODES, LANDLORD'S CRITERIA, AND INSURANCE CARRIERS FOR THE MALL AND THE OWNER. B. TAPS, RISERS, LATERALS, BRANCHES, VALVES, ALARMS, SPRINKLER HEADS AND ALL COMPONENTS REQUIRED FOR A COMPLETE SYSTEM. C. DESIGN DRAWINGS, HYDRAULIC CALCULATIONS, SUBMITTALS AND APPROVALS. D. PERMITS, FEES, AND CHARGES. E. TESTS AND TEST CERTIFICATES. 3. BEFORE STARTING WORK, THIS CONTRACTOR SHALL EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE FIRE PROTECTION SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. CONTRACTOR SHALL USE APPROVED INDUSTRY FIRE SPRINKLER STANDARDS FOR REUSING EXISTING FIRE SPRINKLER BRANCHES AND SUBMIT CALCULATIONS TO THE G.C.'S CONSTRUCTION MANAGER UPON REQUEST OR REWORK SYSTEM TO THE G.C. CONSTRUCTION MANAGER'S SATISFACTION. 4. RELOCATION OF EXISTING MAINS, LATERALS, BRANCHES AND RISERS TO FACILITATE STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. CONFIRM REQUIREMENTS WITH THE G.C. PRIOR TO BID. B. SHOP DRAWINGS 1. THIS FIRE PROTECTION CONTRACTOR SHALL PREPARE DETAILED SHOP DRAWINGS AND CALCULATIONS FOR THEIR WORK. SUBMIT SIX (6) COPIES TO THE G.C. FOR ARCHITECTURAL APPROVAL OF HEAD LOCATIONS AND TYPES. 2. THIS FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR SUBMITTING COORDINATED DRAWINGS, HYDRAULIC CALCULATIONS, HEAD TYPES AND COLORS TO ALL AUTHORITIES HAVING JURISDICTION FOR APPROVAL NO WORK SHALL BEGIN UNTIL ALL APPROVALS HAVE BEEN RECEIVED. 3. A COPY OF THE LETTER OF APPROVAL FROM THE LANDLORD'S INSURANCE RATING BUREAU SHALL BE FORWARDED TO THE LANDLORD'S AGENT AND TO THE G.C.'S CONSTRUCTION MANAGER. C. EQUIPMENT AND INSTALLATION 1. SPRINKLER HEADS: A. FUSIBLE LINK TYPE AND STYLE AS INDICATED OR REQUIRED BY THE APPLICATION. UNLESS OTHERWISE INDICATED, PROVIDE HEADS WITH NOMINAL 1/2" DISCHARGE ORIFICE FOR "ORDINARY" TEMPERATURE RANGE. B. CONCEALED AUTOMATIC SPRINKLER HEAD (ALL BRANDS): MODEL #G -1, BRONZE HEAD WITH WHITE COVER PLATE BY RELIABLE AUTOMATIC SPRINKLER COMPANY OR EQUAL C. SEMI - RECESSED AUTOMATIC HEAD (BANANA REPUBLIC CLASSIC ONLY): MANAFACTURER VIKING, MODEL A1- 06662B. ESCUTCHEON (BANANA REPUBLIC CLASSIC ONLY): MANAFACTURER VIKING, MODEL F1- 06911A. D. RECESSED AUTOMATIC SPRINKLER HEAD: MODEL #G WITH BRIGHT CHROME FINISH HEAD AND WHITE ESCUTCHEON BY RELIABLE AUTOMATIC SPRINKLER COMPANY INC. OR EQUAL. E. UPRIGHT AUTOMATIC SPRINKLER HEAD: MODEL #G WITH NATURAL BRONZE FINISH HEAD BY RELIABLE AUTOMATIC SPRINKLER COMPANY INC. OR EQUAL. F. SPRINKLER HEADS BY GLOBE, STAR, GRINNELL, VIKING OR CENTRAL SHALL BE CONSIDERED EQUAL " G. SPRINKLER HEADS LOCATED IN CEILINGS OR WALLS BELOW 8'- 0 ABOVE THE FINISHED FLOOR AND ABOVE STORAGE DECKS ARE TO BE CONCEALED. 2. PIPING: A. COPPER TUBE AND FERROUS PIPE IN ACCORDANCE WITH NFPA -13 SECTION 3 -3 AND LANDLORD AND LOCAL CODE REQUIREMENTS. CPVC AND POLYBUTYLENE IS NOT PERMITTED. 3. A FIRE PROTECTION SYSTEM TAP IS NORMALLY FURNISHED BY THE LANDLORD. VERIFY IN FIELD PRIOR TO BID. SPRINKLER SPACING SHALL NOT EXCEED 130 SQ. FT. IN "SALES" AREAS AND 100 SQ. FT. IN "STOCK" AREAS. COMPLY WITH LANDLORD'S DESIGN CRITERIA AND LOCAL CODES IF MORE STRINGENT. PIPE SIZING SHALL BE BASED ON NFPA ORDINARY HAZARD. 4. ALL SPRINKLER LINES SHALL BE INSTALLED AS HIGH AS POSSIBLE, AVOIDING INTERFERENCE WITH LIGHT FIXTURES, DUCTS, PIPES, STORAGE DECK, ETC. FIRE PROTECTION INDICATING CONTRACTOR THE LOCATIONS SHALL ALL SPRINKLER COORDINATED SPRINKLER DRAWINGS IDICATI THE LOTI OF ALL SPRINKLER HEADS, SPRINKLER LINES, LIGHT FIXTURES, DUCTWORK, DIFFUSERS, GRILLES AND REGISTERS PRIOR TO INSTALLATION. 5. WHERE POSSIBLE, REWORK THE EXISTING SPRINKLER SYSTEM TO MEET THE NEW REQUIREMENTS OF THIS DESIGN. RELOCATE ALL MAINS AND BRANCHES INTERFERING WITH CEILING HEIGHTS, LIGHT FIXTURE PLACEMENT, DUCTWORK, EQUIPMENT, AND MAJOR COMPONENTS INCLUSIVE OF ADJACENT TENANTS AND MALL COMMON AREAS. REMOVE ALL UNUSED PIPING. 6. FURNISH AND INSTALL A VALVED TEST CONNECTION IN AN ACCESSIBLE LOCATION FOR THE SPRINKLER SYSTEM AS REQUIRED OR REQUESTED BY THE MALL, LOCAL INSPECTOR, OR INSURANCE CARRIER. COORDINATE LOCATION WITH THE G.C.'S CONSTRUCTION MANAGER AND LOCAL FIRE PROTECTION ROTECTION OFFICIAL PRIOR TO ROUGH -IN. 7. WHEN COMPLETED, THE ENTIRE FIRE PROTECTION PIPING SYSTEM SHALL BE HYDROSTATICALLY TESTED AS REQUIRED BY THE RULES AND REGULATIONS OF THE AUTHORITIES HAVING JURISDICTION. SYSTEM SHALL SHOW NO SIGNS OF LEAKAGE OR OTHER DEFECTS. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO THE WORK OF THE OTHER CONTRACTORS OR TO THE BUILDING, OR TO ITS CONTENTS, PEOPLE, ETC., CAUSED BY LEAKS IN ANY OF THE EQUIPMENT INSTALLED BY HIM. ALL REPAIRS OR REPLACEMENT OF DAMAGES SHALL BE AT THIS CONTRACTOR'S EXPENSE. 8. PROPERLY COMPLETED AND SIGNED "SPRINKLER CONTRACTOR'S MATERIAL AND TEST CERTIFICATES" SHALL BE FURNISHED TO THE LANDLORD, AUTHORITIES HAVING JURISDICTION, AND THE G.C.'S CONSTRUCTION MANAGER. 9. FURNISH AND INSTALL 10 LB. TYPE "ABC" FIRE EXTINGUISHERS, WITH CABINETS IF REQUIRED, AND AT LEAST A "2A1OBC" RATING. LOCATIONS TO BE ESTABLISHED IN THE FIELD BY THE G.C.'S CONSTRUCTION MANAGER AND THE LOCAL FIRE PROTECTION OFFICIAL. MAXIMUM TRAVEL DISTANCE BETWEEN EXTINGUISHERS SHALL BE 75 FEET OR LESS AS REQUIRED BY LOCAL CODES. F��E END OF SECTION 15300 Ri;IF IU DIVISION 15 - MECHANICAL CITY KMMLA SECTION 15500 HEATING, VENTILATION, AND AIR CONDITIONING NOV 1 b 2012 A. SCOPE OF WORK PERMIT CENTER 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING, INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE MECHANICAL SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: N LES A. HVAC UNITS, EQUIPMENT, AND APPURTENANCES (UNLESS NOTED OTHE� .RATE PERMIT AND , VG pair/ 407,00 APPROVAL REQUIRED REDUCTION \ GAP INC. CORPORATE 1 HARRISON SAN FRANCISCO, \ \ „ \ \ \ \ • ARCHITECTURE STREET CA 94105 STORE NUMBER: REPS. I.D.: 5359 0000047990 ui 2013 O.N.E. Q1-Q2 PROTOTYPE DATE: 08/10/12 OPENING: 2013 CONSULTANT INFO: PROFESSIONAL STAMP: S. VAN ' ST ,.s. �Wns �o 0 :,q, N, 1, I , /, / .+ ,4 0037194 ,,1sBotsz�� SIU Aires . , :- 2012 ARCHITECT INFO: Mid 7007 DISCOVERY BLVD DUBLIN, OH 43017 614.634.7000 T WDPARTNERS.COM ISSUE TYPE: 100% CHECK SET: 10/26/12 " "100% CHECK .. , ".,.. ".........�. ",.... "...... BID /PERMIT/LL: 11/09/12 "" ���"""""""`"" �\ �\" ��" ��" �" �"` " "\ " " "�" " " "" " "�" ," "" " ""\ ""\ " „ ""'"" " °" """""""""""" " " " "" REVISIONS: ,,,,, " " " " "' " " " " "�" "'°°°°'"°°""""°"'°"'"°"" " " " " " "'�' " " " " "'� " " " " "" " " " " " "' "" "" " " " " " " " " " "" "" " " " " " " , " " DRAWN BY: DE/JB A/E JOB NUMBER: GAPON0321 TITLE SHEET: MECHANICAL SPECIFICATIONS SHEET NUMBER: M P F I • B. DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. C. CURBS, ROOFING, AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). D. CONDENSATE PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS). E. TEMPERATURE /LIGHTING CONTROLS 2 BEFORE STARTING WORK, THIS CONTRACTOR SHALL VISIT THE JOBSITE AND EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE. VARIOUS ELEMENTS OF THE HVAC SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 3 RELOCATION OF EXISTING DUCT MAINS OR BRANCHES TO MEET STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. B. HVAC EQUIPMENT 1 PRIMARY HEATING AND AIR CONDITIONING UNITS ARE TO BE FURNISHED BY THE OWNER AS SCHEDULED UNLESS NOTED OTHERWISE. REFER TO PLANS AND SCHEDULES FOR REQUIREMENTS. ALL EQUIPMENT SHALL INCLUDE A FIVE (5) YEAR COMPRESSOR AND O TEN (10) YEAR HEAT EXCHANGER WARRANTY. 2 ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, APPURTENANCES, AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. 3 EQUIPMENT SHALL BE INSTALLED AND START —UP PERFORMED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST BE TRAPPED IN ACCORDANCE WITH MANUFACTURERS DATA. C. METAL DUCTWORK — NO FIBERGLASS DUCT ALLOWED 1. NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE VISIT AND APPROVAL BY THE G.C.. SIGNIFICANT DEVIATIONS IN ROUTING OR SIZING OF THE DUCTWORK /PIPING SYSTEMS MUST BE CLOUDED AND NOTED ON THE SHOP DRAWINGS. THESE SIGNIFICANT DEVIATIONS MUST BE APPROVED BY THE OWNER'S ENGINEER PRIOR TO FABRICATION OR INSTALLATION. 2. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR AND ROUND "HVAC DUCTWORK WITH GALVANIZED STEEL, IN ACCORDANCE WITH SMACNA VAC DUCT CONSTRUCTION STANDARDS" OF THE LATEST EDITION. WHERE OTHER CODES ARE ENFORCED, (IE. UMC, BOCA, ETC.) USE THE MOST STRINGENT CODE FOR DUCT CONSTRUCTION STANDARDS. 3. ROUND AND FLAT OVAL DUCTWORK A. ALL ROUND AND FLAT OVAL SUPPLY, RETURN AND EXHAUST DUCTWORK, EXCEPT SYSTEMS WITH DROP BOX DIFFUSERS, SHALL BE LINDAB, UNITED MCGILL OR SEMCO DUCT SYSTEMS CONSISTING OF FITTINGS THAT ARE FACTORY FITTED WITH SEALING GASKET AND SPIRAL DUCT WHICH, WHEN INSTALLED ACCORDING TO THE MANUFACTURER'S INSTRUCTIONS, WILL SEAL THE DUCT JOINTS WITHOUT THE USE OF DUCT SEALER. B. MATERIAL: ALL DUCT AND FITTINGS SHALL BE G -90 OR G-60 GALVANIZED STEEL IN ACCORDANCE WITH ASTM A -643 AND A -924. C. CONSTRUCTION: ALL DUCT AND FITTINGS SHALL BE CONSTRUCTED PER SMACNA 'S DUCT CONSTRUCTION STANDARDS +10 IN W.G. D. FITTINGS: a. ALL FITTING ENDS SHALL COME FACTORY EQUIPPED WITH A SEALING GASKET. GASKET SHALL BE CLASSIFIED BY UNDERWRITER'S LABORATORIES TO CONFORM TO ASTM E84 -91 A AND NFPA. 90A FLAMESPREAD AND SMOKE DEVELOPED RATINGS OF 25 50. / b. ALL FITTINGS SHALL BE CONTINUOUSLY STITCH WELDED OR SHALL BE STANDING SEAM GORELOCK CONSTRUCTION AND INTERNALLY SEALED. c. THE RADIUS OF ALL 90' AND 45' ELBOWS SHALL BE 1.5 TIMES THE ELBOW DIAMETER. THE RADIUS OF ALL 15', 30'AND 60' ELBOWS SHALL BE 1.0 TIMES THE ELBOW DIAMETER. d. ALL FITTINGS THAT ARE OF EITHER SPOT WELDED OR BUTTON PUNCHED WELDED OR BUTTON PUNCHED CONSTRUCTION SHALL BE INTERNALLY SEALED. WHEN CONTRACT DOCUMENTS REQUIRE DIVIDED FLOW FITTINGS ONLY FULL BODY FITTINGS WILL BE ACCEPTED. ALL BRANCH CONNECTIONS SHALL BE MADE AS A SEPARATE FITTING. FIELD INSTALLATION OF TAPS INTO SPIRAL DUCT SHALL NOT BE ALLOWED. e. ALL VOLUME DAMPERS SHALL BE FITTING SIZED TO SLIP INTO SPIRAL DUCT. DAMPER SHALL HAVE THE FOLLOWING FEATURES: LOCKING QUADRANT WITH BLADE POSITION INDICATOR 2" SHEET METAL INSULATION STAND —OFF INTEGRAL SHAFT /BLADE ASSEMBLY SHAFT MOUNTED, LOAD BEARING BUSHINGS GASKETED SHAFT PENETRATIONS TO MINIMIZE LEAKAGE. E. PERFORMANCE: SELF SEALING DUCT SYSTEM PERFORMANCE SHALL MEET SMACNA'S LEAKAGE CLASS 3 REQUIREMENTS AT -10 IN W.G. TO +10 IN W.G. F. SUBMITTALS: SUBMIT MANUFACTURERS DUCT SYSTEM CATALOG DATA FOR REVIEW AND APPROVAL. SUBMIT SHALL INCLUDE DUCT, FITTING AND SELF SEALING GASKET CATALOG INFORMATION. 4. . RECTANGULAR DUCTWORK A. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: SUPPLY DUCTS: 2" W.G., POSITIVE RETURN AND EXHAUST DUCTS: 2" W.G., NEGATIVE B. EXCEPT WHERE OTHERWISE INDICATED, USE DUCT SEALANTS OF TH E FOLLOWING PRESSURE CLASSIFICATIONS: SUPPLY DUCTS: CLASS B — 3" W.G. 2" RETURN AND EXHAUST DUCTS: CLASS C — 2 W.G. IN ACCORDANCE WITH THESE CONSTRUCTION AND SEALANT PRESSURE CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL NOT EXCEED 5% AS REQUIRED FOR FINAL AIR BALANCE APPROVAL. C. AS A MINIMUM, CROSS BREAK ALL FLAT SURFACES OR REINFORCE WITH A BEAD APPROXIMATELY 3/8" WIDE X 3/16" DEEP ON 12" CENTERS TO PREVENT VIBRATIONS, REGARDLESS OF DUCT GAUGE. D. INSTALL FACTORY MANUFACTURED DOUBLE THICKNESS TURNING VANES IN ALL . 90 DEGREE ELBOWS OVER 36" IN LENGTH. INSTALL FACTORY MANUFACTURED • SINGLE THICKNESS TURNING VANES IN ALL OTHER ELBOWS. E. ALL JOINTS AND SEAMS SHALL BE SEALED WITH 2" WIDE, GLASS — FIBER— FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITH SHEET METAL SCREWS. LIQUID SEALANTS BY UNITED MCGILL CORP., DOW CORNING, MIRACLE ADHESIVES AND SUREBOND INC. WILL BE ACCEPTED IN LIEU OF TAPE. F. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. G. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE. H. PROVIDE ACCESS TO ALL MOTORIZED ZONE DAMPERS, FIRE DAMPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY THE G.C.'S CONSTRUCTION MANAGER PRIOR TO INSTALLATION. LAY —IN SUPPLY AND RETURN AIR DIFFUSERS WITH PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS WHEN WITHIN 3'-0" OF DEVICE. L ALL DUCTWORK SHALL BE INSTALLED WITH INSIDE CLEAR DIMENSIONS AS NOTED ON DRAWINGS. WHERE DUCTWORK SIZE IS LARGER THAN CONNECTED DEVICE (IE. ( DIFFUSER, REGISTER) SMOOTH DUCT TRANSITIONS ARE TO TAKE PLACE JUST PRIOR TO DEVICE CONNECTION. REFER TO DETAILS. SUPPORT SYSTEMS 5. A. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES OR BY LANDLORD. B. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM 1- 1/2 "X1 -1/2" X1/8" STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. DUCTWORK CLEANING FOR PAINT APPLICATION 6. A. ALL DUCTWORK REQUIRING PAINTING AND EXPOSED IN SALES AREAS AND - FITTING ROOMS SHALL BE PHOSPHAITZED OR " PAINTGRIP " SPIRAL GALVANIZED UNINSULATED SHEET METAL EXCEPT FOR SPIRAL DUCTWORK BY LINDAB PRODUCTS WHICH IS TO BE PREPARED ACCORDING TO THE PAINT MANUFACTURES RECOMMENDATIONS FOR THE ADHERENCE OF PAINT. SURFACES SHALL BE CLEAN, DRY AND FREE FROM SPIRAL MANUFACTURER'S LUBRICANTS THAT WILL ADVERSELY AFFECT ADHESION OR APPEARANCE OF APPLIED PAINT COATING. REMOVE ALL DIRT AND GREASE FROM GALVANIZED SPIRAL DUCTWORK WITH A WATER BASED COMMERCIAL DETERGENT AND WIPE DRY WITH DRY CLEAN CLOTHS. SURFACE SHALL BE FREE OF ALL FOREIGN MATERIALS. D. FLEXIBLE CONNECTIONS 1 FLEXIBLE COLLARS SHALL BE FURNISHED AND INSTALLED IN ALL CONNECTIONS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ROOFTOP UNITS, ETC.) AND DUCTS OR CASINGS. ALSO, FURNISH AND INSTALL FLEXIBLE CONNECTIONS WHERE . DUCTS CROSS BUILDING EXPANSION JOINTS. 2 FLEXIBLE CONNECTIONS SHALL BE CONSTRUCTED OF NEOPRENE— COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. E. VIBRATION ISOLATION DEVICES 1 VIBRATION ISOLATION DEVICES SHALL BE FURNISHED AND INSTALLED IN ALL SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ETC.) AND STRUCTURE. 2 VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITION WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID "GROUNDING " THE ISOLATOR. 4 CHECK '.HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. 5 ' CONSULT MANUFACTURER FOR APPLICATION DATA. F. FLEXIBLE AIR DUCT 1 FLEXIBLE AIR DUCT SHALL BE 1 " INSULATED CLASS 1 AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED AS SUCH IN THE BID. 2 FLEXIBLE AIR DUCT SHALL BE ATTACHED PER DETAILS. FLEXIBLE AIR DUCT MAY ONLY BE USED IN CONCEALED VERTICAL APPLICATIONS WITHOUT PRIOR APPROVAL FROM G.C.'S CONSTRUCTION MANAGER UNLESS NOTED OTHERWISE. 3 FLEXIBLE DUCT SHALL NOT EXTEND OVER 10' -0" IN LENGTH AT ANY ONE LOCATION. G. MANUAL DAMPERS 1 FURNISH AND INSTALL MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE OPERATORS AS SHOWN ON PLANS TO FACILITATE AIR BALANCING. H. FIRE DAMPERS & SMOKE FIRE DAMPERS 1 FIRE DAMPERS SHALL BE RUSKIN MODEL NO. FD36, FD6OFA OR FDR25. 2 PROVIDE FIRE DAMPERS WITH ACCESS DOORS INSTALLED WHERE REQUIRED BY ALL LOCAL CODES. 3 COMBINATION SMOKE FIRE DAMPERS SHALL BE RUSKIN MODEL NO. FSD36, FSD6OFA, OR FSDR25. I. DUCTWORK INSULATION & LINING 1 FURNISH AND INSTALL INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH NFPA 90A. 2 DUCTWORK SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. INCREASE DUCTWORK SIZES AS REQUIRED FOR INTERNALLY LINED DUCT TO MAINTAIN INSIDE\ CLEAR DIMENSIONS. 3 ALL RECTANGULAR SUPPLY DUCTWORK WITHIN 15 FEET AND RETURN DUCTWORK WITHIN 10 FEET OF THE HVAC UNIT SHALL BE INTERNALLY LINED. INTERNAL LINING SHALL BE 1 INCH THICK, 1 -1/2 LB DENSITY LINER. LINER SHALL HAVE A COATED SURFACE EXPOSED TO AIRSTREAM TO PREVENT EROSION. APPLY ADHESIVES AND MECHANICAL FASTENERS AS RECOMMENDED BY SMACNA AND THE MANUFACTURER TO PREVENT LINER SEPARATION FROM THE DUCT. ALL TRANSVERSE EDGES SHALL BE COATED WITH ADHESIVE. 4 INSULATE ALL OF THE FOLLOWING DUCTWORK: CONCEALED SUPPLY DUCTWORK THAT IS NOT INTERNALLY LINED, UNTREATED OUTSIDE AIR DUCTWORK LOCATED WITHIN THE INTERIOR, ALL EXTERIOR SUPPLY AND RETURN AIk DUCTWORK INSULATION SHALL BE 1 -1/2" REINFORCED FOIL FACED, VAPOR SEALED FIBERGLASS. INSTALLED THERMAL RESISTANCE SHALL BE AT LEAST 4.5 FOR INTERIOR DUCTWORK AND 6.0 FOR EXTERIOR DUCTWORK, OR AS REQUIRED BY LOCAL CODE, WHICHEVER IS MORE STRINGENT. PROVIDE EXTERIOR DUCTWORK INSULATION WITH WEATHERPROOF JACKETING. 5 ALL INSULATION AND LINING SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 WHEN TESTED IN ACCORDANCE WITH ASTM C 411, OR AS REQUIRED BY LOCAL CODES. J. CURBS AND STEEL FRAMING FOR SUPPORT 1 THIS CONTRACTOR WILL FURNISH AND INSTALL ALL NECESSARY CURBS AND BLOCKING REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBED OR IMPLIED ON THE DRAWINGS. CURBS SHALL BE A MINIMUM OF 14” HIGH OF THE SAME MANUFACTURER OF THE EQUIPMENT SUPPORTED, UNLESS NOTED OTHERWISE. INSULATE UNDER THE COMPRESSOR SECTION. ALL CURBS MUST BE INSTALLED SO THAT TOP OF CURBS ARE "DEAD" LEVEL. ALL PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE IN ACCORDANCE TO THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S EXPENSE. COORDINATE STEEL FRAMING REQUIREMENTS, ROOF PENETRATIONS, AND ROOF FLASHING WITH G.C. TO DETERMINE SCOPE OF WORK PRIOR TO BID. THIS CONTRACTOR MUST RECEIVE WRITTEN APPROVAL BEFORE ANY ADDITIONAL WORK TAKES PLACE. K. CONDENSATE PIPING 1 INTERIOR CONDENSATE PIPING SHALL BE TYPE "L" DRAWN COPPER TUBE WITH 95 -5 TIN— ANTIMONY SOLDERED JOINTS AND WROUGHT COPPER FITTINGS WITH DIELECTRIC • SEPARATION BETWEEN DISSIMILAR METALS. DRAIN SHALL TERMINATE AT A CODE APPROVED LOCATION. ALTERNATE PIPING MATERIALS ARE ACCEPTABLE AS A SUBSTITUTION WHEN THEIR USE IS PERMITTED BY THE LANDLORD, LOCAL CODES AND BUILDING DEPARTMENT OFFICIALS AND DOES NOT AFFECT OTHER TRADES. SUBSTITUTIONS MUST BE LISTED AND QUALIFIED IN BID. 2 EXTERIOR CONDENSATE PIPING SHALL BE SCHEDULE 40 U.V. RESISTANT PVC PIPING. L JOINTS SHALL BE SLIP FIT. DRAIN SHALL TERMINATE AT A CODE APPROVED LOOC CATION. 3 INSULATE ALL INTERIOR CONDENSATE PIPING WITH 1" THICK (K =0.23 ® 75 F) PIPE INSULATION WITH AN ALL SERVICE JACKET TO MEET LOCAL CODES AND UL FLAME SPREAD AND SMOKE DEVELOPED RATINGS. 4 INSTALL ALL NECESSARY PIPE HANGERS, AND SADDLES TO PROPERLY SUPPORT ALL CONDENSATE PIPING. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAY AND SEISMIC BRACING WHERE REQUIRED BY CODES. L. REFRIGERANT PIPING 1 THIS CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE REFRIGERANT PIPING SYSTEM BETWEEN THE INDOOR FAN UNITS AND OUTDOOR FAN UNITS. 2 PIPING A REFRIGERANT PIPING SHALL BE TYPE "L" HARD" DRAWN COPPER TUBING (ASTMBB8). TUBING SHALL BE CLEAN, CAPPED AND NITROGEN CHARGED. B ALL FITTING AND JOINTS SHALL BE WROUGHT COPPER OR CAST BRONZE (ANSI B16.22). ALL COPPER TO COPPER JOINTS SHALL BE BRAZED WITH A COPPER— PHOSPHORUS ALLOY AND ALL OTHER JOINTS SHALL BE BRAZED WITH SILFOS-5 ALLOY. C ALL ELBOWS SHALL BE LONG RADIUS TYPE. 3 INSTALLATION A SUCTION LINES SHALL HAVE ADEQUATE LIFT TRAPS AND /OR DOUBLE SUCTION RISERS TO MEET THE REQUIREMENTS OF FIELD CONDITIONS AND EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. B BRAZE ALL JOINTS WITH SILFOS -5 STARTING AT THE INDOOR UNIT AND WORKING TOWARD THE OUTDOOR UNIT. THE SEALS ON THE OUTDOOR UNIT SHALL BE BROKEN LAST. A NITROGEN BLEED SHALL BE USED DURING ALL BRAZING AND ANY TIME THE SYSTEM IS OPEN. ALL OPEN LINES SHALL BE CAPPED AND SEALED BEFORE LEAVING THE SITE DURING CONSTRUCTION. PRESSURE TEST FOR LEAKS WITH AN INERT GAS UP TO 245 PSIG. REDO LEAKING JOINTS AND RETEST UNIT SYSTEM IS TIGHT. EVACUATE ENTIRE SYSTEM TO 200 MICRONS OF MERCURY. CHARGE SYSTEM WITH 5 PSI OF R -410A AND AN INERT GAS TO 245 PSI AND RETEST SYSTEM WITH HALIDE LEAK DETECTOR. ALL LEAKING JOINTS MUST BE COMPLETELY RESEALED UNTIL NO LEAKS EXIST. TURN ON CRANK CASE HEATERS 24 HRS PRIOR TO STARTING COMPRESSOR TO BE SURE ALL REFRIGERANT LIQUID IS OUT OF THE COMPRESSOR. C UPON COMPLETION OF TESTING, BUT BEFORE THE REFRIGERANT PIPING INSULATION IS APPLIED, THE PIPING MUST BE INSPECTED BY A REPRESENTATIVE OF THE LOCAL GOVERNING AUTHORITY AS NECESSARY. D INSULATE THE REFRIGERANT SUCTION LINES AND CONDENSATE LINES ONLY WITH RUBATEX OR ARMSTRONG 1 INCH THICK PIPE INSULATION WITH FLAME SPREAD RATING OF NOT MORE THAN 50 IN ACCORDANCE WITH INDUSTRY STANDARDS. DO NOT INSULATE THE HOT GAS (LIQUID) LINES OR ANY HOT GAS BYPASS LINES IF APPLICABLE. 4 INSPECTION A CONTRACTOR MUST PREPARE AND SUBMIT A COMPLETE PIPING SCHEMATIC TO THE LOCAL HVAC MANUFACTURER'S FIELD REPRESENTATIVE FOR APPROVAL PRIOR TO BEGINNING INSTALLATION. UPON COMPLETION OF PIPING, THIS CONTRACTOR MUST CALL THE LOCAL HVAC MANUFACTURER'S INSPECTOR FOR FIELD INSPECTION OF WORK PERFORMED AT G.C.'S EXPENSE. ALL ITEMS FOUND TO BE INADEQUATE FOR PROPER PERFORMANCE BY LOCAL HVAC MANUFACTURER'S FIELD REPRESENTATIVE MUST BE CORRECTED AT NO ADDITIONAL CHARGES TO G.C. OR THE OWNER. M. HYDRONIC PIPING 1 FURNISH AND INSTALL A COMPLETE HYDRONIC PIPING SYSTEM AS REQUIRED. 2 PIPING A HYDRONIC PIPING FOR CHILLED WATER, CONDENSER WATER AND /OR HEATING WATER SHALL BE ASTM A53, SCHEDULE 40, STANDARD WEIGHT, BLACK STEEL PIPE OR TYPE "M" COPPER TUBE. BLACK STEEL PIPE SHALL HAVE WELDED FITTINGS FOR PIPE 2 -1/2" AND LARGER AND 300# MALLEABLE IRON FITTINGS FOR PIPE 2" AND SMALLER. COPPER TUBE SHALL UTILIZE WROUGHT COPPER FITTINGS WITH 95 -5 SOLDER OR SILFOS FOR PRESSURES GREATER THAN 50 PSI. PROVIDE DIELECTRIC UNIONS BETWEEN DISSIMILAR METALS. ALL PIPING SHALL BE IN STRICT CONFORMANCE WITH ASTM, ASA, AND LANDLORD'S REQUIREMENTS, WHICHEVER IS MOST STRINGENT. UNIONS OR FLANGES MUST glE USED AT EQUIPMENT CONNECTIONS WHERE SERVICE OR REMOVAL MAY BE REQUIRED. B ALL PIPING AND EQUIPMENT SHALL BE PRESSURE TESTED WITHOUT LEAKAGE AT A MINIMUM PRESSURE OF 125 PSI. C ALL HYDRONIC PIPING AND EQUIPMENT CONNECTED TO THE HVAC PIPING SYSTEM SHALL BE CLEANED AND FLUSHED. REMOVE, CLEAN, AND REPLACE STRAINER SCREENS. FILL TENANT'S SYSTEM WITH DOMESTIC WATER VENT ALL PIPING AND EQUIPMENT PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM. CONTRACTOR SHALL NOT FILL TENANT'S SYSTEM WITH WATER FROM THE LANDLORD'S SYSTEM UNLESS SPECIFICALLY INSTRUCTED TO DO SO FROM THE LANDLORD'S FIELD REPRESENTATIVE. D PRIOR TO CONNECTION TO THE LANDLORD'S SYSTEM, CONTRACTOR SHALL OBTAIN WRITTEN CONFIRMATION FROM THE LANDLORD'S FIELD REPRESENTATIVE, THAT ALL TESTING, FLUSHING, AND PROPER FILLING OF THE TENANT'S SYSTEM HAS BEEN COMPLETED IN ACCORDANCE TO THE LANDLORD'S REQUIREMENTS AND THAT THE TENANT'S SYSTEM IS READY TO BE CONNECTED TO THE LANDLORD'S SYSTEM. 3 5 6 VALVES A GATE VALVES, 2 —INCH AND SMALLER: CLASS 150, BODY AND UNION BONET OF ASTM B62 CAST BRONZE WITH THREADED OR SOLDER ENDS, INTEGRAL SEAT, RENEWABLE SOLID BRONZE WEDGE DISC, RISING STEM, SCREWED BONNET AND RE— PACKABLE UNDER PRESSURE. BALL VALVES ARE ACCEPTED AS AN EQUAL SUBSTITUTION. B GATE VALVE, 2 -1/2 INCH AND LARGER: CLASS 125 IRON BODY, RENEWABLE BRONZE SEATS AND SOLID SEDGE DISC, RISING STEM, FLANGED ENDS, AND RE— PACKABLE UNDER PRESSURE. C SWING CHECK VALVES, 2 —INCH AND SMALLER: CLASS 150, CAST BRONZE BODY AND CAP CONFORMING TO ASTM B62 WITH HORIZONTAL SWING, Y- PATTERN, RENEWABLE BRONZE DISC, AND HAVING THREADED OR SOLDERED ENDS. D SWING CHECK VALVES, 2 -1/2 INCH AND LARGER: CLASS 125, CAST IRON BODY AND BOLTED CAP, HORIZONTAL SWING, RENEWABLE BRONZE DISC, FLANGED ENDS AND CAPABLE OF BEING REFITTED WHILE THE VALVE REMAINS IN THE LINE. E COMBINATION BALANCING AND SHUT —OFF VALVES: BELL & GOSSETT CIRCUIT SETTER WITH LOCKING SET POINT. A CIRCUIT SETTER BALANCE WHEEL MUST BE INCLUDED WITH O&M MANUAL. TACO OR HOMESTEAD ARE CONSIDERED AS EQUAL. PIPING SPECIALTIES A PRESSURE /TEMPERATURE TEST PLUGS (PETE 'S PLUG) — 1/4 INCH NPT FITTINGS TO RECEIVE EITHER A TEMPERATURE OR PRESSURE PROBE, 1/8 INCH O.D. FITTING AND CAPS SHALL BE BRASS WITH VALVE CORE OF NORDEL, RATED AT 400 PSIG AT 0 DEG F TO 200 DEG F B ST RAINERS — "BASKET" STRAINERS, 125 PSIG MIN., CAST IRON BODY WITH PERFORATED STAINLESS STEEL SCREEN, THREADED FOR 2 INCHES AND SMALLER, FLANGED FOR 2 -1/2 INCHES AND LARGER. SCREEN OPENING SIZE AT 0.033 INCH FOR HEATING AND 1/8 INCH FOR CHILLED OR CONDENSER WATER. PROVIDED WITH BLOWDOWN VALVE WITH HOSE END FITTING. C THERMOFLO INDICATOR — BELL & GOSSETT MODEL "TFI" INSULATION A ALL HYDRONIC PIPING FOR CHILLED WATER AND HEATING WATER (NOT INCLUDING ( CONDENSER WATER UNLESS SPECIFICALLY NOTED OTHERWISE), VALVES, FITTINGS, AND ACCESSORIES SHALL BE INSULATED. FOR PIPE SIZES UP TO 2 INCHES, INSULATE WITH 1 INCH THICK (K =0.23 ®75 DEG F) FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. FOR PIPE SIZES 2 -1/2 INCHES AND LARGER, INSULATE WITH 1-1/2 INCH THICK (K=0.23 0 75 DEG F) FIBERGLASS INSULATION WITH ALL SERVICE JACKET AND VAPOR BARRIER. B INSULATION AT ALL HANGERS FOR PIPING 2 -1/2 INCHES AND LARGER SHALL BE HARD AND NON— COMPRESSIBLE. C ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAN 50 TO CONFORM WITH NFPA REQUIREMENTS. D PROVIDE ZESTON OR EQUAL INSULATION FITTINGS FOR ALL TEES, ELLS OR SPECIALTY FITTINGS. GENERAL INSTALLATION A INSTALL WATER MAINS WITHOUT PITCH. USE ECCENTRIC REDUCING COUPLINGS AT CHANGES IN SIZE WITH THE TOP OF PIPES AT SAME ELEVATION. B BRANCHES TO UNITS BELOW MAINS TO BE TAKEN FROM BOTTOM OF MAINS AT A 45 DEGREE ANGLE, PITCH DOWNWARD TOWARD UNITS. BRANCHES TO UNITS ABOVE MAINS TO BE TAKEN FROM TOP OF MAINS AT A 45 DEGREE ANGLE PITCHED UPWARD TOWARDS UNITS. PITCH NOT LESS THAN 1" PER 10 FEET. C REFER TO MECHANICAL DRAWINGS FOR APPLICABLE DETAILS. i) G ( j....... 410 (1) ReCE1VED : CITY OF �UKVMU NOV 1 o 2012 PERMIT CENTER SEPARATE PR11T AND i. REDUCTION GAP INC. CORPORATE 1 HARRISON SAN FRANCISCO, \ „� • ° \ �\\,,,. ARCHITECTURE STREET CA 94105 STORE NUMBER: REPS. I.D.: 5359 0000047990 ui 2013 O.N.E. Q1 -Q2 PROTOTYPE DATE: 08/10/12 OPENING: 2013 CONSULTANT INFO: PROFESSIONAL STAMP: s. viol �-1 oiw' ,t0, : 0�o Ji r. `� y � �r� " 1• � i OF 0037194 o ''ats•raa�" S b `rIONAL NO 12 2012 It, a. ARCHITECT INFO: MCI 7007 DISCOVERY BLVD DUBLIN, OH 43017 614.634.70007 WDPARTNERS.COM ISSUE TYPE: 100% CHECK SET: 10/26/12 1~-•~~~~~~-~~-~~~~~~~•~~~~u~~~.,~~~~~~~~~~~~~~••~•• , ~ ~„ ~,•,• ~ ~,• ~• ~� ~ ~•," ~ ~"1 ~ ~~. BID/PERMIT/LL: " ~µ ~ ~ ~ ~ ~ ~ ~~ ~11/09/12 m ~ ~ ~• ~ ~••• ~•••• ~ ~ ~ ~ ~� ~ ~— ~ ~ -~ -~ REVISIONS: m ~ ~ ~~ ... .......... ~ ~................. ~. ~ ~ ~~ ~ ~~ DRAWN BY: DE/JB NE JOB NUMBER: GAPON0321 TITLE SHEET: MECHANICAL SPECIFICATIONS SHEET NUMBER: MPF1 3 APPROVAL titzPO ` SECTION 15950 TESTING, ADJUSTING, AND BALANCING PART 1 GENERAL 1.1 SUMMARY A. SECTION INCLUDES TESTING, ADJUSTING, AND BALANCING OF AIR, WATER AND REFRIGERATION SYSTEMS AND MEASUREMENT OF FINAL OPERATING CONDITION OF HVAC SYSTEMS. 1.2 REFERENCES A. AABC (ASSOCIATED AIR BALANCE COUNCIL) - NATIONAL STANDARDS FOR TOTAL SYSTEM BALANCE: B. NEBB (NATIONAL ENVIRONMENTAL BALANCING BUREAU) - PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS. 1.3 SUBMITTALS A. TAB REPORT SHALL BE SUBMITTED ELECTRONICALLY TO THE ARCHITECT / ENGINEERING CONSULTANT AND TO GAP ENGINEERING FOR REVIEW. B. TEST REPORTS: THE TAB REPORT SHALL BE IN THE FORMAT OF THE AABC NATIONAL STANDARD REPORT OR THE NEBB CERTIFIED REPORT FORMS AS PUBLISHED IN THEIR MOST CURRENT EDITIONS. C. REPORTS SHALL BE COMPLETE WITH TABLE OF CONTENTS PAGE AND INDEXING TABS AND WITH COVER IDENTIFICATION AT FRONT. INCLUDE SET OF REDUCED INDEX DRAWINGS WITH AIR OUTLETS AND EQUIPMENT TS IDENTIFIED TO CORRESPOND WITH DATA SHEETS, AND INDICATING THERMOSTAT LOCATIONS. D. INCLUDE A COPY OF AABC NATIONAL PROJECT PERFORMANCE GUARANTY OR COPY OF NEBB CERTIFICATE OF CONFORMANCE CERTIFICATION. 1.4 QUALITY ASSURANCE A. PERFORM WORK IN ACCORDANCE WITH AABC NATIONAL STANDARDS FOR FIELD MEASUREMENT AND INSTRUMENTATION, TOTAL SYSTEM BALANCE OR NEBB PROCEDURAL STANDARDS FOR TESTING, BALANCING AND ADJUSTING OF ENVIRONMENTAL SYSTEMS 1.5 QUALIFICATIONS A. THE TESTING, ADJUSTING AND BALANCING (TAB) OF ALL WORK SHALL BE PERFORMED BY AN INDEPENDENT CONTRACTOR THAT IS CURRENTLY LICENSED BY AABC OR NEBB. THE COMPANY SHALL SPECIALIZE IN TAB OF SYSTEMS SPECIFIED IN THIS SECTION AND SHALL HAVE A MINIMUM THREE YEARS DOCUMENTED EXPERIENCE CERTIFIED BY AABC OR NEBB. B. PERFORM WORK UNDER SUPERVISION OF AABC CERTIFIED TEST AND BALANCE ENGINEER OR NEBB CERTIFIED TESTING, BALANCING AND - ADJUSTING SUPERVISOR EXPERIENCED IN PERFORMANCE OF THIS WORK AND LICENSED AT PLACE WHERE PROJECT IS LOCATED. 1.6 TIMING A. THE COMPLETE TAB REPORTS SHALL BE PROVIDED TO THE OWNER NO LATER THAN ONE 1 WEEK PRIOR TO CONSTRUCTION END DATE. O PART 2 PRODUCTS NOT USED. PART 3 EXECUTION 3.1 HVAC CONTRACTOR RESPONSIBILITIES A. THE HVAC CONTRACTOR SHALL VERIFY THAT THE HVAC SYSTEMS ARE COMPLETE AND OPERABLE BEFORE TAB WORK IS STARTED. THE HVAC CONTRACTOR SHALL BE PRESENT DURING THE TEST ADJUSTING AND BALANCING OF THE HVAC SYSTEM TO PROVIDE ASSISTANCE TO THE `TAB CONTRACTOR. REQUIREMENTS INCLUDE THE FOLLOWING: 1. SYSTEMS ARE STARTED AND OPERATING IN SAFE AND NORMAL CONDITION. 2. TEMPERATURE CONTROL SYSTEMS ARE INSTALLED COMPLETE AND OPERABLE. 3. ALL BALANCING DEVICES AND HVAC EQUIPMENT ARE ACCESSIBLE 4. PROPER THERMAL OVERLOAD PROTECTION IS IN PLACE FOR ELECTRICAL EQUIPMENT. 5. NEW AIR FILTERS ARE INSTALLED JUST PRIOR TO AIR BALANCE AND IMMEDIATELY AFTER PROJECT IS COMPLETE. 6. DUCT SYSTEMS ARE CLEAN OF DEBRIS. 7. FANS ARE ROTATING CORRECTLY. 8. FIRE AND VOLUME DAMPERS ARE IN PLACE AND OPEN. 9. AIR COIL FINS ARE CLEANED AND COMBED. 10. ACCESS DOORS ARE CLOSED AND DUCT END CAPS ARE IN PLACE. 11. AIR OUTLETS ARE INSTALLED AND CONNECTED. 12. DUCT SYSTEM LEAKAGE IS MINIMIZED, 13. HYDRONIC SYSTEMS ARE FLUSHED, FILLED, AND VENTED. 14. PUMPS ARE ROTATING CORRECTLY. 15. PROPER STRAINER BASKETS ARE CLEAN AND IN PLACE OR IN NORMAL POSITION. 16. SERVICE AND BALANCING VALVES ARE OPEN. B. IF THE TAB CONTRACTOR DETERMINES THAT A FAN SHEAVE OR BELT REPLACEMENT IS NEEDED TO MEET THE BALANCING REQUIREMENTS, THEN THE HVAC CONTRACTOR SHALL REPLACE THE FAN SHEAVE /BELT AS REQUIRED. THE HVAC CONTRACTOR SHALL NOTIFY THE OWNER IN WRITING OF THE REPLACEMENT WORK. 3.2 INSTALLATION TOLERANCES A. ALL AIR AND WATER SYSTEMS MUST BE BALANCED WITHIN PLUS OR MINUS 10% OF DESIGN. 3.3 ADJUSTING A. VERIFY RECORDED DATA REPRESENTS ACTUAL MEASURED OR OBSERVED CONDITIONS. B. PERMANENTLY MARK SETTINGS OF VALVES, DAMPERS, AND OTHER ADJUSTMENT DEVICES ALLOWING SETTINGS TO BE RESTORED. SET AND LOCK - MEMORY STOPS. C. AFTER ADJUSTMENT, TAKE MEASUREMENTS TO VERIFY BALANCE HAS NOT BEEN DISRUPTED. IF DISRUPTED, VERIFY CORRECTING ADJUSTMENTS HAVE BEEN MADE. LEAVE SYSTEMS IN PROPER WORKING ORDER, REPLACING BELT GUARDS, CLOSING ACCESS DOORS, CLOSING DOORS TO ELECTRICAL SWITCH BOXES, AND RESTORING THERMOSTATS TO SPECIFIED SETTINGS. E. AT FINAL INSPECTION, RECHECK RANDOM SELECTIONS OF DATA RECORDED IN REPORT. RECHECK POINTS OR AREAS AS SELECTED AND WITNESSED BY OWNER. 3.4 AIR SYSTEM PROCEDURE A. ADJUST AIR HANDLING AND DISTRIBUTION SYSTEMS TO OBTAIN REQUIRED OR DESIGN SUPPLY, RETURN, AND EXHAUST AIR QUANTITIES [AT SITE ALTITUDE]. B. MAKE AIR QUANTITY MEASUREMENTS IN MAIN DUCTS BY PITOT TUBE TRAVERSE OF ENTIRE CROSS SECTIONAL AREA OF DUCT. C. MEASURE AIR QUANTITIES AT AIR INLETS AND OUTLETS. D. ADJUST DISTRIBUTION SYSTEM TO OBTAIN UNIFORM SPACE TEMPERATURES FREE FROM OBJECTIONABLE DRAFTS. E. USE VOLUME CONTROL DEVICES TO REGULATE AIR QUANTITIES ONLY TO EXTENT ADJUSTMENTS DO NOT CREATE OBJECTIONABLE AIR MOTION OR SOUND LEVELS. EFFECT VOLUME CONTROL BY VOLUME DAMPERS LOCATED IN DUCTS. F. VARY TOTAL SYSTEM AIR QUANTITIES BY ADJUSTMENT OF FAN SPEEDS. PROVIDE SHEAVE DRIVE CHANGES TO VARY FAN SPEED. VARY BRANCH AIR QUANTITIES BY DAMPER REGULATION. G. PROVIDE SYSTEM SCHEMATIC WITH REQUIRED AND ACTUAL AIR QUANTITIES RECORDED AT EACH OUTLET OR INLET. H. MEASURE STATIC AIR PRESSURE CONDITIONS ON AIR SUPPLY UNITS, INCLUDING FILTER AND COIL PRESSURE DROPS, AND TOTAL PRESSURE ACROSS FAN. MAKE ALLOWANCES FOR 50 PERCENT LOADING OF FILTERS. I. ADJUST OUTSIDE AIR AUTOMATIC DAMPERS, OUTSIDE AIR, RETURN AIR, AND EXHAUST DAMPERS DESIGN CONDITIONS. J. MEASURE TEMPERATURE CONDITIONS ACROSS OUTSIDE AIR, RETURN AIR, AND EXHAUST DAMPERS TO CHECK LEAKAGE. K. AT MODULATING DAMPER LOCATIONS, TAKE MEASUREMENTS AND BALANCE AT EXTREME CONDITIONS. [BALANCE VARIABLE VOLUME SYSTEMS AT MAXIMUM AIRFLOW RATE, FULL COOLING, AND AT MINIMUM AIRFLOW RATE, FULL HEATING. L. FOR VARIABLE AIR VOLUME SYSTEM POWERED UNITS SET VOLUME CONTROLLER TO AIRFLOW SETTING INDICATED. CONFIRM CONNECTIONS PROPERLY MADE AND CONFIRM PROPER OPERATION FOR AUTOMATIC VARIABLE- AIR - VOLUME TEMPERATURE CONTROL. M. ON FAN POWERED VAV BOXES, ADJUST AIRFLOW SWITCHES FOR PROPER OPERATION. 3.5 ' WATER SYSTEM PROCEDURE A. ADJUST WATER SYSTEMS, AFTER AIR BALANCING, TO OBTAIN DESIGN QUANTITIES. B. USE CALIBRATED VENTURI TUBES, ORIFICES, OR OTHER METERED FITTINGS AND PRESSURE GAUGES TO DETERMINE FLOW RATES FOR SYSTEM BALANCE. WHERE FLOW- METERING DEVICES ARE NOT INSTALLED, BASE FLOW BALANCE ON TEMPERATURE DIFFERENCE ACROSS VARIOUS HEAT TRANSFER ELEMENTS IN SYSTEM. C. ADJUST SYSTEMS TO OBTAIN SPECIFIED PRESSURE DROPS AND FLOWS THROUGH HEAT TRANSFER ELEMENTS PRIOR TO THERMAL TESTING. PERFORM BALANCING BY MEASUREMENT OF TEMPERATURE DIFFERENTIAL IN CONJUNCTION WITH AIR BALANCING. D. EFFECT SYSTEM BALANCE WITH AUTOMATIC CONTROL VALVES FULLY OPEN OR IN NORMAL POSITION TO HEAT TRANSFER ELEMENTS. E. EFFECT ADJUSTMENT OF WATER DISTRIBUTION SYSTEMS BY MEANS OF BALANCING COCKS, VALVES, AND FITTINGS. DO NOT USE SERVICE OR SHUT- OFF VALVES FOR BALANCING UNLESS INDEXED FOR BALANCE POINT. F. WHERE AVAILABLE PUMP CAPACITY IS LESS THAN TOTAL FLOW REQUIREMENTS OR INDIVIDUAL SYSTEM PARTS, SIMULATE FULL FLOW IN ONE PART BY TEMPORARY RESTRICTION OF FLOW TO OTHER PARTS. 3.6 REPORTS A. REFER TO PLANS FOR EQUIPMENT DESIGN DATA SCHEDULES. B. REPORT FORMS 1. TITLE PAGE: A. NAME OF TESTING, ADJUSTING, AND BALANCING AGENCY B. ADDRESS OF TESTING, ADJUSTING, AND BALANCING AGENCY C. _ TELEPHONE AND FACSIMILE NUMBERS OF TESTING, ADJUSTING, AND BALANCING AGENCY D. AABC OR NEBB CERTIFICATION NUMBER AND SIGNATURE OF CONTRACTOR E. PROJECT NAME F. PROJECT LOCATION G. PROJECT ARCHITECT H. PROJECT ENGINEER I. - PROJECT CONTRACTOR J. PROJECT ALTITUDE K. DATE TAB WAS PERFORMED: 2. SUMMARY COMMENTS: A. COPY OF CERTIFICATE OF CONFORMANCE WITH NATIONAL STANDARDS (AABC OR NEBB) FOR THIS PROJECT. B. ACTUAL SPACE TEMPERATURES WITH CORRESPONDING THERMOSTAT SET POINTS FOR EACH UNIT. C. DESIGN VERSUS FINAL PERFORMANCE D. NOTABLE CHARACTERISTICS OF SYSTEM E. DESCRIPTION OF SYSTEMS OPERATION SEQUENCE F. SUMMARY OF OUTDOOR AND EXHAUST FLOWS TO INDICATE BUILDING PRESSURIZATION G. NOMENCLATURE USED THROUGHOUT REPORT H. TEST CONDITIONS 3. INSTRUMENT LIST: A. INSTRUMENT B. MANUFACTURER C. MODEL NUMBER D. SERIAL NUMBER E. RANGE F. CALIBRATION DATE 4. AIR DISTRIBUTION TEST SHEET: A. AIR TERMINAL NUMBER B. ROOM NUMBER /LOCATION C. TERMINAL TYPE D. TERMINAL SIZE E. AREA FACTOR F. DESIGN VELOCITY H. DESIGN AIR FLOW N H. TEST (FINAL) VELOCITY I. TEST (FINAL) AIR FLOW J. PERCENT OF DESIGN AIR FLOW 5. DUCT TRAVERSE: A. SYSTEM ZONE/BRANCH B. DUCT SIZE C. AREA D. DESIGN VELOCITY E. DESIGN AIR FLOW F. TEST VELOCITY G. TEST AIR FLOW H. DUCT STATIC PRESSURE I. AIR TEMPERATURE J. AIR CORRECTION FACTOR 6. ELECTRIC MOTORS FOR ALL HVAC EQUIPMENT: A. MANUFACTURER . B. MODEL /FRAME C. HP /BHP AND KW D. PHASE, VOLTAGE, AMPERAGE; NAMEPLATE, ACTUAL, NO LOAD E. RPM F. SERVICE FACTOR G. STARTER SIZE, RATING, HEATER ELEMENTS H. SHEAVE MAKE /SIZE /BORE 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. V -BELT DRIVE: A. IDENTIFICATION /LOCATION B. REQUIRED DRIVEN RPM C. DRIVEN SHEAVE, DIAMETER AND RPM D. BELT, SIZE AND QUANTITY E. MOTOR SHEAVE DIAMETER AND RPM F. CENTER TO CENTER DISTANCE, MAXIMUM, MINIMUM, AND ACTUAL COOLING COIL DATA: A. IDENTIFICATION /NUMBER B. LOCATION C. SERVICE D. MANUFACTURER E. AIR FLOW, DESIGN AND ACTUAL F. ENTERING AIR DB TEMPERATURE, DESIGN AND ACTUAL G. ENTERING AIR WB TEMPERATURE, DESIGN AND ACTUAL H. LEAVING AIR DB TEMPERATURE, DESIGN AND ACTUAL I. LEAVING AIR WB TEMPERATURE, DESIGN AND ACTUAL J. WATER FLOW, DESIGN AND ACTUAL K. WATER PRESSURE DROP, DESIGN AND ACTUAL L. ENTERING WATER TEMPERATURE, DESIGN AND ACTUAL M. LEAVING WATER TEMPERATURE, DESIGN AND ACTUAL N. SATURATED SUCTION TEMPERATURE, DESIGN AND ACTUAL 0. AIR PRESSURE DROP, DESIGN AND ACTUAL HEATING COIL DATA: A. IDENTIFICATION /NUMBER B. LOCATION C. SERVICE D. MANUFACTURER E. AIR FLOW, DESIGN AND ACTUAL F. WATER FLOW, DESIGN AND ACTUAL G. WATER PRESSURE DROP, DESIGN AND ACTUAL H. ENTERING WATER TEMPERATURE, DESIGN AND ACTUAL I. LEAVING WATER TEMPERATURE, DESIGN AND ACTUAL J. ENTERING AIR TEMPERATURE, DESIGN AND ACTUAL K. LEAVING AIR TEMPERATURE, DESIGN AND ACTUAL L. AIR PRESSURE DROP, DESIGN AND ACTUAL ELECTRIC DUCT HEATER: A. MANUFACTURER B. IDENTIFICATION /NUMBER C. LOCATION D. MODEL NUMBER E. DESIGN KW F. NUMBER OF STAGES G. PHASE, VOLTAGE, AMPERAGE H. TEST VOLTAGE (EACH PHASE) I. TEST AMPERAGE (EACH PHASE) J. AIR FLOW, SPECIFIED AND ACTUAL K. TEMPERATURE RISE, SPECIFIED AND ACTUAL AIR MOVING EQUIPMENT A. LOCATION B. MANUFACTURER C. MODEL NUMBER D. SERIAL NUMBER E. ARRANGEMENT /CLASS /DISCHARGE F. AIR FLOW, SPECIFIED AND ACTUAL G. RETURN AIR FLOW, SPECIFIED AND ACTUAL H. OUTSIDE AIR FLOW, SPECIFIED AND ACTUAL I. TOTAL STATIC PRESSURE (TOTAL EXTERNAL), SPECIFIED AND ACTUAL J. INLET PRESSURE K. DISCHARGE PRESSURE L. SHEAVE MAKE /SIZE /BORE M. NUMBER OF BELTS /MAKE /SIZE N. FAN RPM RETURN AIR OUTSIDE AIR DATA: / A. IDENTIFICATION /LOCATION B. DESIGN AIR FLOW C. ACTUAL AIR FLOW D. DESIGN RETURN AIR FLOW E. ACTUAL RETURN AIR FLOW F. DESIGN OUTSIDE AIR FLOW G. ACTUAL OUTSIDE AIR FLOW H. RETURN AIR TEMPERATURE I. OUTSIDE AIR TEMPERATURE J. REQUIRED MIXED AIR TEMPERATURE K. ACTUAL MIXED AIR TEMPERATURE EXHAUST FAN DATA: A. LOCATION B. MANUFACTURER C. MODEL NUMBER D. SERIAL NUMBER E. AIR FLOW, SPECIFIED AND ACTUAL F. TOTAL STATIC PRESSURE (TOTAL EXTERNAL), SPECIFIED AND ACTUAL G. INLET PRESSURE H. DISCHARGE PRESSURE I. SHEAVE MAKE /SIZE /BORE J. NUMBER OF BELTS /MAKE /SIZE K. FAN RPM VAV BOX DATA: A. MANUFACTURER B. TYPE, FAN POWERED, STANDARD C. IDENTIFICATION /NUMBER D. LOCATION E. MODEL NUMBER G. MZE H. H. MINIMUM DESIGN DTATIC ESIGN AIPRRSFURE R FLOW I. MAXIMUM DESIGN AIR FLOW J. MAXIMUM ACTUAL AIR FLOW K. INLET STATIC PRESSURE AIR COOLED CONDENSER: A. IDENTIFICATION /NUMBER B. LOCATION C. MANUFACTURER D. MODEL NUMBER E. SERIAL NUMBER F. ENTERING DB AIR TEMPERATURE, DESIGN AND ACTUAL G. LEAVING DB AIR TEMPERATURE, DESIGN AND ACTUAL H. NUMBER OF COMPRESSORS PUMP DATA: A. IDENTIFICATION /NUMBER B. MANUFACTURER C. SIZE /MODEL D. IMPELLER E. SERVICE F. DESIGN FLOW RATE, PRESSURE DROP, BHP AND KW G. ACTUAL FLOW RATE, PRESSURE DROP, BHP AND KW H. DISCHARGE PRESSURE I. SUCTION PRESSURE J. TOTAL OPERATING HEAD PRESSURE K. SHUT OFF, DISCHARGE AND SUCTION PRESSURES L. SHUT OFF, TOTAL HEAD PRESSURE 17. CHILLERS: A. IDENTIFICATION /NUMBER B. MANUFACTURER C. CAPACITY D. MODEL NUMBER E. SERIAL NUMBER F. EVAPORATOR ENTERING WATER TEMPERATURE, DESIGN AND ACTUAL G. EVAPORATOR LEAVING WATER TEMPERATURE, DESIGN AND ACTUAL H. EVAPORATOR PRESSURE DROP, DESIGN AND ACTUAL I. EVAPORATOR WATER FLOW RATE, DESIGN AND ACTUAL J. CONDENSER ENTERING WATER TEMPERATURE, DESIGN AND ACTUAL K. CONDENSER PRESSURE DROP, DESIGN AND ACTUAL L CONDENSER WATER FLOW RATE, DESIGN AND ACTUAL 18. COOLING TOWER: A. TOWER IDENTIFICATION /NUMBER B. MANUFACTURER C. MODEL NUMBER D. SERIAL NUMBER E. RATED CAPACITY F. ENTERING AIR WB TEMPERATURE, SPECIFIED AND ACTUAL G. LEAVING AIR WB TEMPERATURE, SPECIFIED AND ACTUAL H. AMBIENT AIR DB TEMPERATURE I. CONDENSER WATER ENTERING TEMPERATURE J. CONDENSER WATER LEAVING TEMPERATURE K. CONDENSER WATER FLOW RATE L FAN RPM 19. HEAT EXCHANGER: A. IDENTIFICATION /NUMBER B. LOCATION C. SERVICE D. MANUFACTURER E. MODEL NUMBER F. SERIAL NUMBER G. STEAM PRESSURE, DESIGN AND ACTUAL H. PRIMARY WATER ENTERING TEMPERATURE, DESIGN AND ACTUAL I. PRIMARY WATER LEAVING TEMPERATURE, DESIGN AND ACTUAL J. PRIMARY WATER FLOW, DESIGN AND ACTUAL K. PRIMARY WATER PRESSURE DROP, DESIGN AND ACTUAL L. SECONDARY WATER LEAVING TEMPERATURE, DESIGN AND ACTUAL M. SECONDARY WATER LEAVING TEMPERATURE, DESIGN AND ACTUAL N. SECONDARY WATER FLOW, DESIGN AND ACTUAL 0. SECONDARY WATER PRESSURE DROP, DESIGN AND ACTUAL 20. TAB PROCESS & PROCEDURE TAB CONTRACTOR SHALL PROVIDE INITIAL REPORT TO GENERAL A. CONTRACTOR FOR REVIEW. IF ANY ITEMS ON TAB REPORT ARE NOT WITHIN PLUS OR MINUS 10 % OF DESIGN. TAB AND GENERAL CONTRACTOR SHALL MAKE THE APPROPRIATE CHANGES TO MEET DESIGN SPECIFICATION. IF DESIGN SPECIFICATION CAN NOT BE MET SUBMIT A DEFICIENCY REPORT TO GAP INC. FOR REVIEW. GENERAL CONTRACTOR TO SUBMIT FINAL TAB REPORT TO GAP INC. WHEN ALL ITEMS ARE WITHIN SPECIFICATION. END OF SECTION "" 11) 00 Rectevw CITY OF TUKIMLA NOV 1 b 2012 TER t3iTp�lD ����9F, ER �Lh1 ...,..._„ REDUCTION �,,� GAP INC. CORPORATE 1 HARRISON SAN FRANCISCO, o `• -° o' • \ \ ,.' ARCHITECTURE STREET CA 94105 STORE NUMBER: REPS. I.D.: 5359 0000047990 UI 2013 O.N.E. Q1-Q2 PROTOTYPE DATE: 08/10/12 OPENING: 2013 CONSULTANT INFO: PROFESSIONAL vQrA. �� R 43N ✓ 0 �`rslo STAMP: s. VAN s a 2012 o4wns• ��� ) :. 401" 0037194 �BG13TE�� NA L 'Og ? 2 ARCHITECT INFO: iAd 7007 DISCOVERY BLVD DUBLIN. OH 43017 614.634.7000 T WDPARTNERS.COM ISSUE TYPE: 100% o CHECK SET: 10/26/12 BID /PERMIT/LL: 11/09/12 ....................... ......... .w..uw..w...................... w.._.__.......... ......._._._._......._ ......... .....................__..,..... ...................w..._.. w.... ,............. ..............•.. REVISIONS: .... _____...........__.._.._.............w...._... .____________________e__a..ea.. ....._....................... �........ww........... .........._ .................................. .. .ww..wwwwuwwwwu..ww....w...... .� w_..w............. .w.........w.......w........... ° ° ° ° ° ° ° ° ° ° ° °° ° ° ° °° ° ° °° ° °° "" DRAWN BY: DE/JB A/E JOB NUMBER: GAPON0321 TITLE SHEET: MECHANICAL SPECIFICATIONS SHEET NUMBER: MPFI 3 2 REQtJ�r�� I CORRIDOR JANITOR CLOSE Off' EE MANAGER' °E S PR( L$\ 1 - PROVIDE NEW RECESSED! SPRINKLER HEADS AS ca REQUIRED IN NEW JANITOR' CLOSET, MEN'S RESTROOM AND WOMEN'S RESTROOM. 401 PROVIDE NEW RECESSED SPRINKLER HEA (S) AS REQUIRED IN N MANAGER'S OFFICE. SPRINKLER GENERAL NOTES 1. THE ABBREVIATION GC, WHEREEVER IT APPEARS IN THESE MECHANICAL AND ELECTRICAL DRAWINGS, SHALL REFER TO THE GENERAL CONTRACTOR. 2. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THIS WORK AND THE WORK OF ALL SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THIS CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. 3. FIRE PROTECTION PLANS, SPRINKLER DRAWINGS, MUST BE ENGINEERED AND WET SIGNED BY A LANDLORD APPROVED, LICENSED REGISTERED FIRE PROTECTION CONTRACTOR IN THE LOCAL JURISDICTION. FINAL INSTALLATION MUST COMPLY WITH NFPA 13 AND STATE AND LOCAL AUTHORITIES HAVING JURISDICTION. 4. SPRINKLER HEAD LAYOUT IS A SUGGESTED LAYOUT. COORDINATE SPRINKLER HEAD LAYOUT AND PIPE ROUTING WITH ARCHITECTURAL PLANS, STRUCTURAL PLANS, HVAC CONTRACTOR, ELECTRICAL CONTRACTOR AND THE G.C. THIS CONTRACTOR SHALL INCLUDE IN THE BID AND BE RESPONSIBLE FOR EXACT QUANTITY OF SPRINKLER HEADS REQUIRED FOR COVERAGE AND FINAL APPROVAL. 5. LOCATE SPRINKLER MAIN AND RELATED SHUT OFF VALVES IN AN ACCESSIBLE LOCATION WITHIN THE STOCKROOM. CASH RAs RESPONSIBILITY MATRIX LEGEND STOREFRONT EXTRUSION L 0 FACTORY FINISHED A L = LANDLORD 0 = OWNER (GAP INC.) COMMENTS ITEM FURNISHED BYI — — GC= GENERAL CONTRACTOR INSTALLED BY RESPONSIBILITY MATRIX ITEM FURNISHED BY INSTALLED BY COMMENTS SPRINKLER MAIN TO LEASE SPACE L L SPRINKLER BRANCHES AND LATERAL GRID PIPING L L BACK —FLOW PREVENTOR AND FLOW DETECTOR L L BRONZE UPRIGHT HEADS IN OPEN OR EXPOSED CEILING AREAS L L REMARKS: NOTE: 1. THE RESPONSIBILITY MATRIX ONLY DELINEATES ITEMS SUPPLIED AND /OR INSTALLED BY OWNER AND /OR LANDLORD. ANY WORK SHOWN IN THE CONSTRUCTION DOCUMENTS NOT DEFINED AS RESPONSIBILITY OF OWNER OR LANDLORD IS FURNISHED AND INSTALLED BY GENERAL CONTRACTOR. SEE BID CLARIFICATION LETTER FOR ANY VARIATION BY SCOPE OF WORK RESPONSIBILITY. 2. GENERAL CONTRACTOR IS RESPONSIBLE FOR THE UNLOADING OF ANY OWNER SUPPLIED CONSTRUCTION ITEMS. REDUCTION GAP INC. CORPORATE ARCHITECTURE 1 HARRISON STREET SAN FRANCISCO, CA 94105 3001 000004 STORE LOCATION: w w V w 0 0) ce W J Z oes SOUTHCENTER P 2013 O.N.E. Q1 -Q2 PROTOTYPE DATE: 08/10/12 OPENING: 2013 CONSULTANT INFO: PROFESSIONAL STAMP: NOV 12 2012 ARCHITECT INFO: — PROVIDE NEW UPRIGHT SPRINKLER HEADS (MATCH EXISTING), IF REQUIRED, ON OLI0 NAVY SIDE OF NEW DEMISING WALL TO fr, ENSURE PROPER 7007 DISCOVERY BLVD DUBLIN, OH 43017 614.634.7000 T WDPARTNERS.COM w.....o•pa���$<: STOCK ! PROCESSING AREA -2 100 PLACE "AS- BUILT" SPRINKLER DRAWINGS IN DRAWING TUBE. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. INSTALL SPRINKLER HEADS ABOVE AND BELOW DUCTWORK AS REQUIRED BY NFPA 13. COORDINATE INSTALLATION OF HEADS WITH HVAC CONTRACTOR AND G.C. LANDLORD SPRINKLER MAIN. CONTRACTOR TO PROVIDE NEW UPRIGHT SPRINKLER HEADS, IF REQUIRED, TO ENSURE PROPER COVERAGE ON BOTH SIDES OF NEW FULL HEIGHT WALL. ISSUE TYPE: 100% CHECK SET: 10/26/12 BID /PERMIT/LL: 11/09/12 REVISIONS: PRIOR TO BID, CONTRACTOR SHALL VISIT THE SITE AND FIELD VERIFY THE EXISTING CONDITIONS OF THE SPRINKLER SYSTEM AND DETERMINE EXACT SCOPE/ EXTENT OF SPRINKLER MODIFICATIONS WITH LANDLORD AND LOCAL FIRE MARSHALL. INCLUDE ALL COSTS IN BID FOR REQUIRED SPRINKLER MODIFICATIONS. ENSURE EXISTING UPRIGHT HEADS PROVIDE PROPER COVERAGE OF ENTIRE TENANT SPACE AND MODIFY OR PROVIDE NEW IF REQUIRED. CONFIRM EXISTING SPRINKLER PIPING DOES NOT INTERFERE WITH INSTALLATION OF OTHER TRADES AND IF SO, MODIFY SPRINKLER SYSTEM AS REQUIRED. SPRINKLER HEAD LEGEND SYMBOL DESCRIPTION REMARKS BRONZE UPRIGHT HEAD BRONZE UPRIGHT HEAD — EXISTING BY LL . ® RECESSED HEAD CHANGES TO THE DESIGN OF ANY SYSTEM IDENTIFIED ON THESE DRAWINGS OR SPECIFICATIONS SHALL BE SUBMITTED TO THE ENGINEER OF RECORD FOR REVIEW AND APPROVAL PRIOR TO THE FABRICATION AND INSTALLATION. ANY MODIFICATIONS WITHOUT THE ORIGINATING ENGINEER'S WRITTEN AUTHORIZATION AND APPROVAL SHALL BE THE RESPONSIBILITY, AS WELL AS THE COST TO CORRECT SUCH MODIFICATION, OF THE CONTRACTOR. PG (L12Oci DRAWN BY: DE/JB R�c°w�u cmr i NOV i o 2012 PERMIT CENTER NE JOB NUMBER: GAPON0321 TITLE SHEET: FIRE SPRINKLER PLAN ET NUMBER: FIRE SPRINKLER PLAN 100 VTR A 1 • • • REQUIRED F1 -0