Loading...
HomeMy WebLinkAboutPermit 0811 - Cello Bag Company - Silos0811 17100 West Valley Rd Cello Bag Company Belton Construction (2) storage silos $30,200.00 CITY OF TUKWILA BUILDING DEPARTMENT 6230 Southcenter Blvd. Tukwila, Washington 98067 Phone: (206) 242 -2177 LOCATION OF WORK / NUMBER & STREET 17100 West Valley Road LOT OWNER BLOCK PERMIT NUMBER No 811 SUBDIVISION Cello Bag Company, Inc. ADDRESS P. 0. Box 88883 Tukwila, Wash. PHONE 226 -6600 NAME OF BUILDER Belton Fabricating and Construction Co. STATE LICENSE NO. SALES TAX NOC- 600 -160 -290 ADDRESS 260 So. Third St. Chowchilla, Calif. 93610 PHONE 209 -665 -4435 INSPECTION RECORD FOOTINGS BUILDING PERMIT VOID IF WORK IS NOT COMMENCED IN 120 DAYS 11/6/75 ESTIMATED VALUE COMPLETED WORK $ 30,200.00 FOUNDATION PERMIT FEE $ 130.00 FRAMING PLAN CHECK FEE $ 84.50 LATE PERMIT FEE $ TOTAL FEE $ 214.50 TYPE OF CONST. OCCUPANCY GROUP DATE ISSUED 3/6/76 FIRE ZONE USE ZONE EXPIRATION DATE FINAL FIRE SPRINKLERS REQUIRED MAX. OCC. LOAD MI Yes INN° DESCRIPTION OF WORK: Install two Butler Storage Silos on preinstalled concrete slab. THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT-OF-WAY OR ON UTILITY EASEMENTS. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. I HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORPNVANCES. CALL FOR INSPECTION BEFORE WORK IS CONCEALED OR POURING CONCRETE PHONE 242-2177 FINAL INSPECTION BEFORE OCCUPANCY APPLICANT BY •I et SUBJECT TO COMP I- INFORMATIO LED BUILDING DIRECTOR BY NC ITH THE ORDIN EWITH, THIS PER C SOFT TI GRANT CITY OF TU D. AND CITY 0E .TUMILfs4 HELM IE OPTIC: E T 6230 Southcenter Blvd. Tukwila, Washington 98067 Phone: (206) 242 -2177 LOCATION OF WORK / NUMBER & STREET l 7/ f LOT DINNER BLOCK SUBDIVISION VAME OF BUILDER` B p STATE LICENSE NO. E27 -6-i ,eR /C.%3' ;rl/4.Yee //6- 7KC.li°' / /t1J�( �ar SALES TAX MO.0 6CS0760'i LCD 0.DDRESS , e/4o'x C'�t; `, k/ o - ' fPHON7.. ‘‘'--=; f 6— .1 • • . • • S • • . • • . ' • APPLICATION 5 , /, V�/� a 0_ < ESTIMATED VALUE (�, (, ". COMPLETED WORK S • PE' IT FEE 3b--'" ' FOR ; 1' r BUILDING PERMIT . • `PANCHE K EE r.LA EPERMI FEE iv ; TOTAL FEE TYPE OF CONST. OCCUII"ANC*Y GROUP DAM ISSUED FIRE ZONE USE .: ZONE EXPIRATION DAlf � FIRE SPRINKLERS REQUIRED El Yes III No MAX. . _ THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT-OF-WAY OR ON UTILITY EASEMENTS. . SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. 1 HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORDINANCES. APPLICANT 0 0 0 In 0 • ." • . (1, eh • .V. • t• .• r• • esch7 ei • $0': Irlyr • POLES.•PILING -.LUMBER WOOD PRESERVING following Material supplied by us on your above referenced order has been Subscribed and sworn to before me this2.6.t.h.slay of r0V11117111)0r 197+ „ . Notary Public in and for the State of..WaSh1llgt.0.11...and County of,,,) g: • NOTArY rust.iC' .•-r-rszczar.ozPA-2.0.Arz-Q747.-ummstramrozzatua....174:-..e.v..v-ettustwagg.wr-a=r4-r-imt-v.v-sswavargrzznyclmwmpr• .• - • •-• FORM of Q • W to Ira ct w N a. co w '� •. +.... c) �0 O E • O C!i m 1 g Cy ti v k Cr 0 Li t. ( r" t. ., I . l L 3 , t .wM�lt. ..�..+...I.M L'1 Vv !,s J rw.�/n�M'VY. w� ...1 n......•rr..�..� ` n L: t m rl ( N1 t `0 .� A ..�.Y..'.•M ,�boto _ �L\ - r .1.•. is �...� d t"- 00�4bud N1 �ti6E'' M rl X11 r� t^� . I J C' o • d i1 cm s ... u u.... 1.1., ii IIIIII .....w......rw ...._ •*_•_.r+..,... s.....swr..nwn�_ w' wp;t V I E ., UU 1 .r.....urwv ii C r.. C 7 Lo co f�'4 s.: Final Pene. I of last 52 1 B U i . LI&, o rJ T. 7 y 2- •/-02- Q 7" S S.: T {T' - O 0 5y L.. ,- 1 u 11 ... ........ ..� .. .., .................,.,...�., • a `. w t .t v- . ..•-- - -_ -- � r..� •.I• !�i 6...4•01•111.1•5 MMMo N ( . .J♦ fla MMMM X• .J.+�^. . .e+l... ,,>4 ... �... '... M x . � "e K )4 ..,�. x 1 I Y.aurR.w•.•10^l.1111111114fo . ..... _- �..�_.. .. a .i... (WMMM 4..oa .5 NI (� vr.. �- ___ .a rk - 1.1a./. N` I .. ‘4; 1 r >I- ..1..1 Jo' .L... K i...L.r v ..L . * ..l y4 .%. /, G EGG .o $A-� � r ' 3 rocs gi/A � 04 ro tz, Til`ik j,A. <isturLER> BUTLER MANUFACTUR� ING COMPANY ISSUING OFFICE: P.O. Box 917, Kansas City, Mo. 64141 Cello Bag Co., Inc. 17100 West Valley Hwy. P. 0. Box 88883 Tukwila, Washington 98188 Gentlemen: Date 10 -7 -75 Customer's No. 3367 Butler Ref. No. 01- D27077: :1 Job Name Enclosed are j design data as listed below. I R1 drawings specifications These are as requested, j preliminary. C for information or estimating only. return signed approved prints of each. Creleased for production. for your approval. Please QUANTITY DRAWING NUMBER DESCRIPTION 2 D 75- 01- D27077 -1A Master Erection Drawing 2 C 480668 Erection Details 2 C 483377 Pre -Cut Crossover Assembly 2 C 482470 Hipper Details 2 2 C 485977 0 482916 Outside Ladder & Safety Cage Guardrail Details 2 1 B481436 e Remarks: The above drawings are stamped "Approved For Construction." cc: Bob LaRue - Salina Walsh - Ellers, Bellevue + Elev. Dwg. Jack Hunter + Elev. Dwg. FORM NO. 043 1 Cord rs on Product Engineer PLAN BODY STAVES. VERTICAL SEAM HOPPER SECTION 484318 (45') 10 REC)'D. WEAR PLATE ASSEMBLY '"' /FLOW CONVE.N.TE1 4621x15 (4 °) Ida IONS MI ELEVATION HOPPER SECTION 484328 (60. 10 REQ'0. WEAR PLATE ASSEMBLY "" /FLOw CotaVCRYEI. 4821'18 is FTAPER BLOCK 481BBG COMPRESSION; BAR TAPER BLOCK TO BE WEDGED. S IN SLOT AFTER. HOPPER SECTION HAVE BEEN BOLTED IN PLACE: COMPRESSION BAR HIiIPPER" SECTION q' SECTION "C -Cy 1/2 DIA. IV ROUND HEAD FIN NECK BOLTS HOPPER SECTION' •RUBBER STRIP GASKET HOPPER SECTION SECTION "8 -H" a Yj! DISCHARGE FLANGE DETAI • 2. REJt580 HOPPCR Si_CTIOtdS ' /i4 I PEAAoVG C NorE. 4- 2 1`'EV (SIGNS BODY STAVES PLAN S. VERTICAL SEAM HOPPER SECTION 484318 (45') to REQ'D. WEAR PLATE ASSEMBLY w/FLOW CONVHM.TER 4B21r1s (45 °) ELEVATION HOPPER SECTION 48428 (Go)' ID REQ'D. WEAR PLATE ASSEMBLY ""VFIAw CotavcRTE17, 4621'18 TAPER BLOCK I 48IBBG COMPRESSION'S BAR' of TAPER BLOCK TO BE WEDGED. SECURELY • IN SLOT AFTER. HOPPER SECTIONS HAVE BEEN BOLTED IN PLACE; COMPRESSION BAR HOPPER" SECTION SECTION "C -1u 14 DIA.. 1' ROUND HEAD FIN NECK BOLTS HOPPER SECTION' DRUBBER STRIP GASKET HOPPER SECTION SECTION " B- sV2 4' ' RUBBER STRIP GASKET HOPPER SECTION • HOPPER SECTION I/2 %1A. x I1i4 ROUND HEAD FIN NECK BOLTS \1/A A. x 11/4 ROUND HEAD FIN NECK BOLT. SECTION" 0- 0° HOPPER SECTION SECTION "A - Ai1 DISCHARGE FLANGE DETAIL RUBBER STRIP GASKET FILL THIS GAP. WITH B.G.T. CEMENT '2DIA. X Ili ROUND HEAD FIN NECK BOLTS DETAIL "Fs: ERECTION NOTES: I. AFTER PLACING FIRST HOPPER SECTION IN' POSITION, DOLT REMAINING HOPPER SECTIONS TO STAVES, PROCEEDING IN A CLOCKWISE DIRECTION AS VIEWED FROM TOP OF HOPPER. LEAVE ALL DOLTS LOOSE UNTIL ALL BOLTS IN HOPPER ARE IN PLACE. 2 RG415ED HOPPER SECTIONS P/N 6-10 -'13 ,U .,JI:' Il -'13 REAAo 't G 1JOTE• 4- 2 u1/5 T EVISIONS TAPER LOCH HOPPER EFCCT10 DETAILS FOR 15'.45/0" DIA.B.V.T:'' /TLOw zo wI TER 'LITMUS r.wuruTUUIN •01111/11101V NNW N.M.••..M...T. Y.M../ OMNI , 1... "wes I HONG 1 177 ' 7z3 /nt( "..". ICI e,B'Z490 5 1 2 N 4 4 3 4 5 7 8 9 I0 II 12. 13 14 15 16 I"1 18 19 20 2I 22 r•r PM. N $4 MIIMTf*NI U.& • =0 d PARTS 'LIST FOR 2' -Coy, 41-0 E Coy -0" CROSSOVERS PART NO. PART NAME AND DESCRIPTION NO. REQ'D. 4 482814 UPRIGHT - LS" X 3" X 34& 4 4 2 3 4 4 4 483372 HANDRAIL , MIDRAIL- 11f2"0.D.K.0(.5 "TV8INC% 483 373 H AND RAIL MIDR AIL - Ith2'O.D.L.065 "tUbfNG1 4 4 83 374 HANDRAIL, WORM- 11/21O.D.$.065 "TUBING, I8 I8 18 095133 2 2. 2 482815 9 2. 2. 2 075019 WAsNE R, 1 "L' UNDERSUPPORT - L 1 Vei X Ilex I/8 TREAD STIFFENER - L 1)/2' X I q x 1/a I0 1 II 1 12. 13 4 4 482924 075015 I 0750 14 2' -(o" TREAD SECTION -12 GA. 4-0" TREAD SECTION- 12 GA. G'-o" TREAD SECTION -12 GA. 4 07(3725 BOTTOM RAIL PLATE -10 GA. 14 4 4 4 0-15140 LEG -L2 "X2 "x1/8" 15 4 4 4 198322 CHIME CUP - 54Co IG 07Co' IO5 TOEBOARD - 12 GA. 17 2. 07(01 13 TOEBOARD - 12 GA. 18 2. 0-15017 TOEBOARD - 12 GA. 19 2. 07000095 TOE8OARD - 12 GA. 20 2 48282G TOEBOARO SPLICE PLATE - IO GA. 21 22 80 80 80 90 095799 BOLT, So. HD. TANK , /hi' X 1" 80 90 095003 NUT ,FINISHED HEX , ",12" -- TU8UTATED ANT) -SKID SURFACE NOTES 1) CROSSOVERS ARE DESIGNED 10 CONFORM TO THE REQUIREMENTS OUTUNED BY THE FEDERAL REGISTER ON OCCUPATIONAL SAFETY AND HEALTH STANDARDS DATED MAY 29, 1 9'71 ; VOLUME 3Co ; NO. 105 ; PART 3:1. 2), ALL CROSSOVER PARTS ARE EITHER MILL GALV. HOT DIPPED GALV. OR E. GALV. 3)FIELD ADJUST LEGS. BEND FLANGE OF CHIME CLIP UNTIL PARALLEL WITH CENTER LINE. OF TANK. C I 2'- G ",4' -O "AND G'-O" LONG PRE -CUT CROSSOVER ASSEMBLY wiaiii I •UTLIR MANUFACTURING COMPANY •INIAAL OPPICIIB.IIANMS CITY CO. MISIOUM - -Jvr I GT I NONE I-$73M 8•U -'72 2-6-72 C 483377 PAWN* N+ U.S. • RUBBER STRIP GASKET • DECK SH @ET P,EAD CAULKING USE ONE STRIP AT TOP OR FLANGE, AND ANOTHER 'STRIP JUST PbELO\V BOLT I -IDLES FOR THE ENTIRE LENGTH OF SHEET. SEE NOTE "C" BODY STAVE SECTION N -H SUPPORT END CLIP 48013E4 SUPPORT BE,A, 00"E G:1S0 %%Z 480582 SEE NOTE "A" ..J SUPPORT ENO CLIP 48OSBS OF DECK SHEET RADIAL SERA\ SUPPORT END CLIP 48056S'4.' ZDIA. ROUND HEAD FIN NECK ESOLT BODY STAVE RUBBER STRIP GASKET RUEE+ER STRIP GASKET BODY STAVE III -*"-- 2DIA. ROUND HEAD FIN NECK 15OLT Pe G.T.CE,EN-r RUBBER STRIP GASKET ' CHIA\E LAP GASKET�- SEE NoTES 3 *4 RUFSBER STRIP GASKET BODY STAVE ■SECTION "J-J" I" DIA. ROUND HEAD IN NECK FSoLT F30DY STAVE: - DIA. ANCHOR 50LT :SECTION" I -I. STIRRUP O'32"2.50 /BODY 5TA./E SUPPORT CROSS BEAN. 48oS$a SEE NOTE "A" BODY STAVE SECTION "D -D" fSTAVE fi0-1 V V DONE SUPPORT CLIPS 4 6orc20 PLAN VIE \V KITH DECK REA \oVED O L1J L .J W LI.J W \ CHIi\ \E: LAP 80DY GASKET -SEE STAVE NOTES B ipa. DETAIL-ICI 2X•" LEVELING — BOLT -- USE ONE PER POOT ON CIRCUA \PERENC:E SUPPORT END CLIP 45055 4 NOTES: " I. ALL BOLTS IN DECK ARE X I. TANK 5OLT5 VITH FINISHED HEX NUTS UNLESS OTHERVI5E NOTED. 2,1:0R TYPES AND SIZES OF BOLTS FOR CI -IIAE AND VERTICAL SEA^ \9 SEE AASTER ERECTION DRAWING. S. USE HEAVY CHINE LAP GASKETS O- IG'1B4 FOR BGA.THRUX R -ATE HODY STAVES. USE REGULAR CHINE. LAP GASKET-010185 FOR ALL OTHER bODY STAVE G. LAY "MAD SA1ALL 5EADS OF B.G.T. CE/`1.ENT t� DIA. X 4 LG. OVER THE NOTCHED SIDE OF THE CHINE LAP GASKET, ONE ON EACH SIDE OR THE BOLTS, AND A5 CLOSE Tn THE SOLI-: AS POSSIBLE. �lHOOY STAVEr 4tp;c4 CONCRETE "•o c sQ ^, i4 o;�ld�'9 FOUNDATION r ti ;'A: ' S1 isac -rION" F -rF" SUE NOTE b GROUT UNDER Sorran\ CHI/.E AND UNDER ALL HOPPER COLUS\ \NS AND STIFG-19NE3R. BASE PLATE'S RUFSI3ER� STRIP GASKET @-15.1-401 O`ICo'rt DO/ (90 S.( AL 'DECK SHE (50 HOLE) G. DECK SHEET B.E.T: CE.A.ENT AROUND END CLIPS boo)' STAVE SUPPORT END CLIP 480584 SECTION" 1B-187_ EMoVED IJorf?. 4P 5 --13 .1 F/ Ib, M. 11.16111141a MOM.. Walla • SUPPORT END CLIP 4801584 3HEtaT . .O CAULKING ONE STRIP AT TOP OF \NGE, AND ANOTHER STRIP T PPELo \v I°SOLT 1-40LE5 t THE ENTIRE LENGTH OF ?ET. SEE NOTE= "C" SUPPORT BEAM 4805 &2 DOA \E OSO772. SEE NOTE. `A" ��i• SUPPORT ENO CLIP 480585 v SUPPORT END CLIP 480S.95"0.* 4 5`'' Z,WIA. ROUND HEAD FIN NECK ESOLT BODY STAVE RUBBER STRIP GASKET SKET JD HEAD P'OLT a NT rRtP BODY SUPPORT CROSS PbEAN. 48068'' SEE NOTES "A" PLAN VIE \V NITN DECK REMOVED BOOM 6TAV E SECTION "D -D" DO� .J --•—. I O) i DOME SUPPORT CLIPS 4 8crp2O CHIAE LAP CASKET -SEE NOTES 3 f.4 DETAIL" " 2X•" LEVELING BOLT — use owe PER FOOT ON CIRCUA \FERENC:E OF DECIG SHEET RADIAL SEA/\\ • SUPPORT ENO CLIP 48O51E4• NOTE.5 : 1. ALL BOLTS IN DECK ARE% 1' TANK BOLTS KITH rINISHED HEX NUTS UNLESS OTHERV/I5E NOTED. Z,FOR TYPE&AND SIZES OF BOLTS FOR CHIAE AND VERTICAL SEA✓\ \SS SEE RASTER ERECTION DRAV/ING. 9,USE HEAVY CHIAE LAP GASKETS O"1G1E94 FoR BGA.TNRUk PLATE HODY STAVES, USE REGULAR CHIAE LAP GASKET O1618' FOR ALL OTHER Bony STAVES. 4. LAY T's. •4ALL BEADS OF e,.G.T. CEMENT, DIA. X4:'LG. OVER THE NOTCHED SIDE OF THE CHIME LAP GASKET ONE ON EACH SIDE OF THE E.oLTS, AND AS CLOSE TO THB FSOLTs AS POSSIBLE. `/BODY STAVE SEE NOTE 5 '�' 1 GROUT uN06Ft FJoTTOM —iii—.8 �•;tiy,,. CHIA \R AND UNDEFZ ALL ,;;; ,1 •t i4,• . •'�.S., �: HOPPER COLUA \N'5 AND •-,�•1 �':' ;: %\ jig• 'TIRF'ENE:R,'BASE ;r % '' :�'' <•� 'S. PLATES ' q, e'b;; A, I o r Prl a°k'a a',: IN 6 4 ' W. CONCRETE i'v'-'t 4^• ‘p�;'4A1'dFOUNDATIONS?; S•C1: fi .IS: SECTION' F -F' RUSSE R. STRIP GASKET NOTES: A. THE NU"15ER OF CHI/\ \E SPACES BE-M./MEN THE VERTICAL SEAN. AND THE END CLIP ^UST BE THE SA/\ \E AT E.cTH ENDS OF THE SUPPORT'. B. BEFORE SUPPORT END CLIPS ARE PoSITIONED, LAY T \VO S-T-RIPS OF. FSEAD CAULV.ING INSIDE ANO OUT'SI'DE OF Bo LT HOLES ON CHI/\\E. AFTER THE ASSE/\ \FSL• IS IN POSITION1 APPLY f.3GT CEt ENT ALONG THE EDGES OF EACH END CLIP ACROSS THE \\/IDTH OF THE CHI/\ \E. C. SEAL BOTH ENDS OF RADIAL SEA/\\ FLANGES \VITH B.G.T. CE/\ \ENT oR BEAD CAUL141N. DOA \E COVER C2-� HOL.E) GASKET -' CriGrrlp OCIAE OS0772. (''o HOLE FLANGE Do\vN) , RUBBER STRIP GASKET P,.G.T. CEA\ENT ALL L\RCLIND DECK, SHEET (3OHOLE) GASKET 07678 DECK SHEET FS.G T CE/'\ENT AROUND END CLIPS p,,ODY` 'STAVE� SUPPORT END - CLIP 4e e.4 SECTION" B -B' paw SUPPORT CLIP 4 80 620 SUPPORT P EAA 480582 GEMoVED FJorE. 4P S E;- I7 -13 JF 1tA9i5 2E :V11.'I0N5 _5ECTIoN' L -_L" ERECTION DETAILS 15 -45/x9 DIA. Pte. R.T. MYTLAN MANUFACTURING COMPANY ..,..0 wne.. —AA"Y. em, MI.wMO MMO " w.wWL' i& e 176 'A 151-2-61,1 1c 48o G G e .ww.r Ma• • • C ITEM 4TY PART NO. I 2 482b4 2 2 4 3 Q 4��na4� _5 Q 4` • 10...� i�152 • 12 2133 30 x11144. - 015 ib-C) 18. • 7695'133. PART .N %':':i: i, ?it- Dl=5G71: rtoN :: .i ; �S:.:i .21 4:G�.TU51N6 048 WA.1.,L t.28.15; L .; ; : w Ali. , L. 114" x 114" Cy' TUBING X ^.v5A '4ALI.. V1;R• :r:C,At C11A1`11'4El. C 7•..I • �•r.,y __. ti': r.....K..OSA. ' 1.1 PVI 3 X UP'RIGH'T 611E, w M. :.. x; ;. ! nci';3 .� • 4' W1D �!HO GA. UPR,IGF1T 1I f; /�i NX NUT — } EY . got,T 1/2"`;.-11/4-• , . ,SQ. . '�� TANK HE , WASH -: 1/2" n. LADDER .AND 5A�'r," ,y .r , r'0r:E 'DE51GNE1) ' DatirtjGtM TrJ `.'RE, tJ1 cc `r`: ' , `� 7 C;��t3 PAY` TNE_'. r EPAL n :I5TE;, ON 0CGU ,., T+'I,r D'\rE.TY ::AND,' rirA,t::rH 57A ,DARCS', 'DATED .MA't/ 2 .; ,171 VOLUME. 36)) .: t. 105 7 PART .a 11...t. LADDER AND' SAr .T lr '(i�t NARTS 'A r. t4;-.1—\,... t11L1.. CAS'.: OR. H1.7 I;i!P'►::4' r:ALV., F c r ori OUTSIDE'; LADDER' AND. SAFETY': GAG DETAIL. $'. FOR 8 .FT. OF LADDEP, •UTLt1lMANUPACTUI$gNO OINIRA4 OPPICSS!- NANiAR CITY, MISSOURI S419S' N..M.1 . 'arlcat.n Ka•/ .. aR.l un •.4. G . . II .3 )l1:164E pelt i.rl na0i ►. ,'�T�S ` /.1 3.12151 (,G �. 7 �;. • 21 N; '"' , o. — CEIVTER Geri O5O77Z CO 0.50508 BOLT PLACEMENT . ■ 1/2" Dia. Sq. Hd. Tank Bolts With Finished Hex Nuts ■ww.r 1/2" Dia. Rd. Hd. Fin Neck Bolts w /Recess. Thread Hex. Nuts LENGTH LENGTH LOCATION 1" 11" 11/2" 2" 1" 11 /a" 11/2" , 2" Support End Clips cj _ , Dome Support Clips /6 rUt'I "GFCT C.P.G. ; BE_ Am Center Dome and Cover s'u Deck Radial Seams 0/6 Deck Flange Stiffeners Chime Seams Deck to /`f' (Ga. )(PL) 290 14 (Ga. )(P1.) to /¢ (Ga.)(Pl.) 096 /4(Ga.)(Pl.) to /2(Ga.)(Pl.) 090 /2 (Ga. )(Pl.) toll (Ga.)(Pl.) Z90 // (Ga. )(Pl.) to" (Ga.)(Pi.) 270 2b1° 5 (Ga.)(Pl.) to Es (Ga. )(pi. 070 Z4° 8 (Ga. )(Pl.) to5 (Ga. )(Pl.) no 5 (Ga. )(PL) to 4 (Ga.)(Pi.) 37D D'� . (Ga.)(Pl. ) to (Ga. )(Pl. ) , (Ga. )(P1.) to (Ga. )(P1.) (Ga.)(Pl. ) to (Ga.) (Pl. ) Vertical Seams 9 A I.!1 4 1 244o 1/4" Plate thru 8 Ga. /44 Stirru •s /GO Leveling Bolts 4' Compression Ring &O O Ho • •er 6/0 10 V1 T I L/ TO g. Lam. :a Tie I - Lam IV4M/o1-6, ZS 2'l,, CI kn: avt:A; 50 r :at;rchime la oints '-'77!""r",77777777.7.77—T--, .;' • ANthiotc; OCT 7 1975 50/2y STAVE 1(52464,0 //Y L). o' /ve; j'itt 77t TANK DESIGN CONDITIONS:. VOLUME /6640. Cu. Ft. (Shell Full) WIND 4'0.0 p. s. f. on • 6° of the projected area of shell. ROOF Combined live and dead load of 30 p. s. f. , uniformly Distributed. PRESSURE AND VACUUM 0. 5 oz. /Sq. In. vacuum and 2 oz. /Sq. In. pressure. Customer is responsible for proper venting. ,cOLYE P1 YL ENE MATERIAL eLA D5 At 35 lbs. /Cu. Ft. (Free Flowing) SEISMIC ZO t1i 'S FILLING Fill opening should be located to provide for center filling of tank. DISCHARGE Tank should be emptied using center discharge first. Other discharge openings may be located as desired for complete emptying of tank: OPENINGS All field cut openings to be properly reinforced by customer. / ANC/-(Ceti; ,.5"r/ RvP 05225.0 701Y REFERENCE DRAWINGS: For section details, see drawing Cry - its66;,e445 For crossover details, see drawing C' 4 7 For hopper details, see drawing C'' -4s 470 For Safety cage and ladder, see drawing C 4 5 `) 77 For Deck Guard Rail, see drawing i — 4-;,Z9/ 4=, For epoxy caulking details, see drawing FOR Si&. /CONE ;.JOINT r /LLER) SEE CM' 13- 48 /4340- . . 7? ci F /iiisN /fir. - EF:P EXr., -- TANK HEIGHT STAVE GAGE PART NO. NO, REQUIRED 12th Rin_ 11th Ring 10th Ring 9th Ring 8th Ring 7th Ring Q5Z4..9 / /4. a5Z4, 6th Ring /2. 05Z49Z 5th Ring /I 05885 •1 4th Ring 9 05885g 3rd Ring 058553 2nd Ring 48/9/7 .. 1st Ring :4 Use staves listed above unless otherwise noted on elevation