2017-06-06 Bid Tabulation - 2017 Small Drainage Program
CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS 2017 Small Drainage Program BID TABS 06/6/17 No. Sectionii mtity U Unit Cost Toai Cos Unit Cost Total Co Unit Cos Construction: To ROADWAY (SCHEDULE Aj j 1-04 Unexpected Site Changes FA $8,000.00 8,000 $8,000.00 8,000 $8,000.00 8,000 2 1-09 Mobilization LS $42,000.00 42,000 $45,000.00 $ 45,000 $65,000.00 65,000 3 1-10 Project Temporary Traffic Control LS $32,000.00 32,000 $21,000.00 21,000 $60,000.00 60,000 4 2-01 Clearing and Grubbing LS $18,000.00 18,000 $6,500.00 $ 6,500 $40,000.00 40,000 5 2-02 Pavement Removal Incl. Haul 420 SY $25.00 10,500 $25.00 10,500 $24.00 10,080 6 2-03 Unsuitable Foundation Excavation Incl. Haul 40 CY $35.00 1,400 $35.00 $ 1,400 $100.00 4,000 7 2-03 Gravel Borrow Incl. Haul 110 TN $35.00 3,850 $25.00 2,750 $46.00 5,060 8 4-04 Crushed Surfacing Top Course 320 TN $45.00 14,400 $45.00 $ 14,400 $60.00 19,200 9 5-04 HMA Cl. 1/2" PG 64-22 180 TN $175.00 31,500 $185.00 33,300 $225.00 40,500 10 5-04 HMA Thickened Edge 530 LF $10.00 5,300 $5.50 $ 2,915 $10.00 $ 5,300 11 8-01 Temporary Water Pollution / Erosion Control LS $10,000.00 10,000 $3,500.00 3,500 $4,000.00 4,000 12 8-04 Cement Conc. Traffic Curb and Gutter 20 LF $60.00 1,200 $65.00 $ 1,300 $110.00 $ 2,200 13 8-14 Cement Conc. Sidewalk 200 SY $75.00 15,000 $105.00 21,000 $84.00 16,800 14 8-02 Topsoil Type A 70 CY $50.00 3,500 $60.00 4,200 $180.00 12,600 15 8-02 Hydroseed 540 SY $4.00 2,160 $5.00 $ 2,700 $5.00 $ 2,700 16 8-02 Property Restoration FA $10,000.00 10,000 $10,000.00 10,000 $10,000.00 10,000 17 7-04 Storm Sewer Pipe 12 In. Diam 546 LF $75.00 $ 40,950 $85.00 $ 46,410 $100.00 $ 54,600 18 7-04 Storm Sewer Pipe 8 In. Diam 312 LF $70.00 $ 21540 $60.00 $ 18,720 $85.00 $ 26,520 19 7-04 Storm Sewer Pipe 6 In. Diam 68 LF $50.00 $ 3,400 $60.00 $ 4,080 $100.00 $ 6,800 20 7-04 Storm Sewer Pipe 4 In. Diam 65 LF $50.00 $ 5250 $60.00 $ 3,900 $90.00 $ 5,850 21 7-04 Ductile Iron Storm Sewer Pipe 12 In. Diam. 146 LF $120.00 $ 17520 $130.00 $ 18,980 $120.00 $ 17,520 22 7-04 Ductile Iron Storm Sewer Pipe 8 In. Dam. 155 LF $100.00 $ 15500 $85.00 $ 13,175 $110.00 $ 17,050 23 7-04 Remove/Abandon Existing Storm Sewer Pipe 365 LF $20.00 $ 7,300 $15.00 $ 5,475 $100.00 $ 36,500 24 7-04 Remove/Abandon Existing Storm Sewer Structure6 EA $1500.00 $ 6,000 $750.00 $ 4,500 $800.00 $ 4,800 25 7-05 Connection to Drainage Structure7 EA $1500.00 $ 7500 $1,750.00 $ 12,250 $1500.00 $ 7,000 26 7-05 Connection to Drainage Pipe 3 EA $500.00 $ 1500 $1,200.00 $ 3,600 $750.00 $ 2,250 27 7-05 Storm Cleanout 2 EA $500.00 $ 1500 $950.00 $ 1,900 $500.00 $ 1,000 28 7-05 Concrete Inlet 8 EA $1,500.00 $ 12500 $1,450.00 $ 11,600 $1,500.00 $ 12,000 29 7-05 Catch Basin, Type 1 11 EA $2500.00 $ 22500 $1,650.00 $ 18,150 $1,750.00 $ 19,250 30 7-05 Catch Basin, Type 1L5 EA $2,250.00 $ 11,250 $1,700.00 $ 8,500 $1500.00 $ 9,500 31 7-05 Catch Basin Type 2 48 In. Diam.1 EA $3,500.00 $ 3,500 $4,500.00 $ 4,500 $4500.00 $ 4,500 32 7-05 Trench Drain 1 LS $4,000.00 $ 4,000 $5,000.00 $ 5,000 $5000.00 $ 6,000 33 7-06 Pothole Existing Utilities 11 EA $800.00 $ 8500 $750.00 $ 8,250 $600.00 $ 6,600 34 7-10 4' X 15' Modular Wetland Unit 1 EA $60,000.00 $ 60000 $65,000.00 $ 65,000 $65000.00 $ 65,000 35 8-30 Resolution of Utility Conflicts 1 FA $8,000.00 $ 8,000 $8,000.00 $ 8,000 $8,000.00 $ 8,000 A C ONTROL iS (SC :DUCE A 36 8-22 Plastic Stop Line 15 LF $25.00 $ 375 $28.25 424 $40.00 600 37 8-22 Plastic Crosswalk Line 70 SF $8.00 $ 560 $13.50 $ 945 $20.00 $ 1,400 464,555 451,82; 616,180 CITY OF TUKWILA - DEPARTMENT OF PUBLIC WORKS 2017 Small Drainage Program BID TABS 05/13/17 Total Engineer's Estimate McCann R.W. Scott Construction No, Section on Item Quantity Unit Qty Total Cost ROADWAY (SCHEDULE 5) 38 1-04 Unexpected Site Changes 1 FA $2,000.00 $ 2,000 $2,000.00 $ 2,000 $2,000.00 $ 2,000 39 1-09 Mobilization 1 LS $10,000.00 $ 10,000 $5,000.00 $ 5,000 $10,000.00 $ 10,000 40 1-10 Project Temporary Traffic Control 1 LS $10,000.00 $ 10,000 $6,500.00 $ 6,500 $12,000.00 $ 12,000 41 2-01 Clearing and Grubbing 1 LS $6,000.00 $ 6,000 $3,500.00 $ 3,500 $10,000.00 $ 10,000 42 2-02 Remove and Replace Handrail 1 LS $4,000.00 $ 4,000 $3,000.00 $ 3,000 $2,500.00 $ 2,500 43 2-02 Pavement Removal Incl. Haul 30 SY $25.00 $ 750 $25.00 $ 750 $100.00 $ 3,000 44 2-03 Unsuitable Foundation Excavation Incl. Haul 5 CY $35.00 $ 175 $35.00 $ 175 $150.00 $ 750 45 2-03 Gravel Borrow Incl. Haul 5 TN $35.00 $ 175 $25.00 $ 125 $150.00 $ 750 46 4-04 Crushed Surfacing Top Course 5 TN $45.00 $ 225 $45.00 $ 225 $150.00 $ 750 47 5-04 HMA CI. 112" PG 64-22 10 TN $175.00 $ 1,750 $185.00 $ 1,850 $300.00 $ 3,000 48 8-01 Temporary Water Pollution / Erosion Control 1 LS $4,000.00 $ 4,000 $650.00 $ 650 $2,000.00 $ 2,000 49 8-04 Cement Conc. Traffic Curb and Gutter 20 LF $60.00 $ 1,200 $65.00 $ 1,300 $200.00 $ 4,000 50 8-14 Cement Conc. Sidewalk 20 SY $75.00{� $ 1,500 $105.00 $ 2,100 $200.00 $ 4,000 ROADSIDE DEVELOPMENT (SCHEDULE 8) Il 1 I I 51 8-02 Property Restoration 1 FA $2,000.00 $ 2,000 $2,000.00 $ 2,000 $2,000.00 $ 2,000 STORM DRAINAGE (SCHEDULE B) 1 I I 52 7-04 Class ID Reinforced Concrete Sewer Pipe 36 In. Diam 6 LF $450.00 $ 2,700 $665.00 $ 3,990 $350.00 $ 2,100 53 7-05 Connection to Drainage Pipe 1 EA $500.00 $ 500 $2,500.00 $ 2,500 $1,600.00 $ 1,600 54 7-05 Debris Barrier 1 EA $500.00 $ 500 $1,800.00 $ 1,800 $3,000.00 $ 3,000 55 7-05 Catch Basin Type 2 60 In. Diam. W/Overflow Cage 1 EA $7,000.00 $ 7,000 $12,500.00 $ 12,500 $9,000.00 $ 9,000 56 7-20 Temporary Water Bypass System 1 LS $5,000.00 $ 5,000 $2,500.00 $ 2,500 $4,500.00 $ 4,500 57 8-15 Light Loose Riprap 20 CY $150.00 $ 3,000 $235.00 $ 4,700 $100.00 $ 2,000 $ 62,475 $ 57,165 $ 78,950 $ 527,030.00 $ 508,988.75 $ 697,130.00