Loading...
HomeMy WebLinkAbout2007 - Storm Water Easement and Maintenance Agreement - Rehabitat Northwest Inc - 20071011001101Return to: City Clerk City of Tukwila 6200 Southcenter Blvd Tukwila, WA 98188 Assessor's Tax Parcel ID 322920 -0090 20071011001101 CITY GF TU EAS 49.00 PAGE001 OF 010 10/11/2007 12:43 KING COUNTY, UA Above this line resen'ed for recording infomtation. 1 STORM WATER EASEMENT AND MAINTENANCE AGREEMENT (L04 -085 PW'03 -106) Reference (if applicable): N/A Grantor: Rehabitat Northwest, Inc Grantee: Cite of Tukwila Legal Description /STR: That Portion of Government Lot 1, Section 15, Township 23 North, Range 4 East, W.M., in King County, Washington, described as follows: Commencing at the Southwest Comer of said Lot 1; Thence N 01 °30'53" for a distance of 30.00 Feet to the Tnte Point of Beginning; Thence S 87 °48'48" E, Parallel with the south line of said Lot 1, a distance of 317.68 Feet; Thence N 59'49'07" E for a distance of 204.79 Feet; Thence N 29'00'36" W for a distance of 168.40 Feet; Thence N 82 °20'06" W for a distance of 244.54 Feet; Thence N 33 °26'06" \V for a distance of 141.82 Feet; Thence S 54 °20'54" W for a distance of 65.26 Feet; Thence N 88 °29'07" W for a distance of 30.00 Feet; Thence S 01 °30'53" W for a distance of 351.95 Feet to the True Point of Beginning. (Also known as Lot 1 of City of Tukwila BLA L04 -033 recorded under King County Recording Number 20060712900003). Storm Water Easement and Maintenance Agreement Pale 1 of 10 T a S EASEMENT AND AGREEMENT made and entered into this /i day of 4. tk v 21007, by and between the City of Tukwila, a municipal corporation of King County, Washington, hereinafter referred to as "CITY" and Rehabitat Northwest, Inc, a Washington State corporation, located at 3601 W Marginal Way SW Seattle, WA 98106, hereinafter referred to as "PROPERTY OWNER WHEREAS, PROPERTY OWNER has applied for certain permits with the CITY for the construction of facilities at 46xx S139th St, Tukwila, WA, which create impervious surface; and WHEREAS, the PROPERTY OWNER has completed a storm system; and WHEREAS, the PROPERTY OWNER and the CITY desire that the storm system be maintained to provide adequate facilities for controlling both the quantity and quality of storm drainage; and WHEREAS, for maintenance of a storm system it is necessary to have appropriate right -of -way to bring in equipment to conduct maintenance functions; and WHEREAS, maintenance requirement is a covenant running with the land and binding upon all heirs, successors and assigns of both parties; and WHEREAS, the parties desire that this Agreement be recorded to advise heirs, successors and assigns of both parties as to the existence of this easement and agreement; and WHEREAS, an easement is needed to bring in maintenance equipment; and WHEREAS, the parties are both desirous of permitting inspection of storm system to make certain that it is functioning properly and for purposes of determining the appropriate repairs. NOW, THEREFORE, BASED UPON MUTUAL COVENANTS TO BE DERIVED THE PARTIES AGREE AS FOLLOWS: Section 1, EASEMENT PROPERTY OWNER hereby provides an easement over, under and on that portion of the property as showing on the approved Record Drawings revised pursuant to construction records for the City of Tukwila under Pemrit No. PW03 -106, which Record Drawings are hereby incorporated by reference as if set out in full. This easement shall be a burden to that real estate which is legally described and depicted, and attached as Exhibit "A -1" and Exhibit "A -2 and incorporated herein by this reference, and shall be of benefit to the City storm utility system. Storm water Easement and Maintenance agreement Page 2 of 10 parties. Section 2, HEIRS, SUCCESSORS AND ASSIGNS This Agreement shall be binding upon the heirs, successors, and assigns of the Section 3, MAINTENANCE The PROPERTY OWNER agrees to maintain the storm s) stem in accordance with the ordinances and all applicable codes of the CITY and the Stormwater Pollution Prevention maintenance and Operation Schedule attached as Exhibit `B" and incorporated herein by this reference. The PROPERTY OWNER does hereby agree that the CITY may enter onto the property of the PROPERTY OWNER via the easement described above to inspect and perform necessary maintenance if after the PROPERTY OWNER is given notice to maintain, the PROPERTY OWNER fails to maintain. Further, the PROPERTY OWNER agrees the CITY may enter onto the property of PROPERTY OWNER via the easement described above to perform emergency maintenance in the event of the storm system's failure which might result in adverse impact(s) on public facilities or private facilities of other property owners, In both events the PROPERTY OWNER agrees he /she /they /it shall reimburse the CITY for the costs incurred by the CITY in maintaining the storm system. Should the CITY incur attorney's fees and/or costs in enforcing the agreement and/or in maintaining or collecting maintenance fees, the PROPERTY OWNER agrees to pay reasonable attorney's fees and all costs incurred by the CITY. Section 4, ACKNOWLEDGMENT OF OTHER ENFORCEMENT ACTIONS PROPERTY OWNER acknowledges that there may be liability for violations of codes that could result in additional fines and/or the possibility of incarceration in addition to the fees for maintenance should violations occur. Storm water Easement and Maintenance Agreement Page 3 of 10 SIGNED AND DATED this it' day of b cJ 2007 GRANTEE: CITY OF TUKWILA ATTEST: Mayor C Qit4 Clerk STATE OF WASHLNGTON ss. COUNTY OF KING sworn, personally appeared before me rnm- I to Storm water Easement and Maintenance Agreement Approved As to Form: City Attorney On this (Q v` day of ris r 2007, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and ,knownto me to be the Mayor, of CITY OF TUKWILA, the municipal corporation that executed the foregoing instrument, and acknowledged it to be the free and voluntary act of said municipal corporation, for the uses and purposes mentioned in this instrument, and on oath stated that heishe authorized to execute said instrument. GIVEN under my hand and official seal this io day of tt- bbec,2c f c.< ,A A-I al b2ra. Print Name N stary Public in and for the State of W'a ington, residing at UKLA. My appointment expires: is /19 lc Page 4 of 10 SIGNED AND DATED this 37—day o 2007 PROP OWNER by aid Chad Detwiller STATE OF WASHINGTON ss. COUNTY OF KING I certify that I know. or have satisfactory evidence that Lii L}tt },^J if is the person who appeared before me, and said person acknowledged that he /she signed this instrument. on oath stated that he /she was authorized to execute the instrument and acknowledged it as the Finance _Manager of Rehabitat Northwest. Inc a corporation, to be the free and voluntary act of such part for the uses and purposes mentioned in this instrument. GIVEN under my hand and official seal thi I d o Storm Water Easement and Maintenance Agreement Page 5 of 10 Notary Public in and the State o ing.ton, residing. at (rat i Ltd My appointment expires: /0 ?t9 _I Printed name:(r't 'a 1 <Chi Exhibit "A -1" Legal Description of Easement Area Storm Drainage Vault Made part of City of Tukwila Short Plat No. L04 -085 That portion of said Government Lot 1, Section 15, Township 23 North, Range 4 East, \V.M., in King County. Washington, Described as follows: Commencing at the Southwest corner of said Lot 1; Thence N O1 °30'53 E along the West line of Said Lot 1 a distance of 302.06 Feet to the TRUE POINT OF BEGINNING: Thence S 66 °39'59 E. 90.1 Feet: Thence S 24°14'33" \V. 40.4 Feet: Thence N 65'21 \V. 73.98 Feet: Thence N 01 °30'53" E. 41.70 Feet to the TRUE POINT OF BEGTh4NING Storm Water Easement and Maintenance Agreement OPEN SPPS_ V.mv\_s Page 6 of 10 Exhibit "A -2" Legal Description of Easement Area Storm Drainage utilities Made part of City of Tukwila Short Plat No. L04 -085 Except as may be others ise set forth herein, Grantee's rights shall be exercised upon that portion of the Propem (the Easement Area" herein) that is five (5) feet in width having two and a half (2.5) feet of such width on each side of the centerline of Grantees systems located as constructed or to be constructed. extended or relocated on the Property, except those portions of the Property occupied by existing building footings, foundations, and/or subsurface structures. That portion of said Government Lot 1, Section 15, Township 23 North, Range 4 Fast, W.M., in King Count v, Washington. Described as follows: Commencing at the Southwest corner of said Lot l; Thence N 01°30'53" E along the \Vest line of Said Lot 1 2853 Feet to the TRUE PO ,NT OF BEGINNING: Thence S 27' 27'59" E. 17.74 Feet; Thence S 65'2'51` E. 54.00 Feet; Thence S 30 °3'52" E. 41.00 Feet; Thence S 69'10'45" W. 47.00 Feet; Thence S 20 °37'32" W. 53.00 Feet: Thence S 1 1 °51'4" E. 42.00 Feet: Thence S 60 E. 43.00 Feet. Storm Water Easement and Maintenance Agreement Page 7 of 10 Site Address Exhibit "B" Stormwater Pollution Prevention Plan for Foster Ridge 6 lot short subdivision SHORT PLAT L04 -085 PW03 -106 The project is located in that Portion of Government Lot 1, Section 15, Township 23 North, Range 4 East, W.M., in King County, Washington, and between S139th St S140th St, in the City of Tukwila. The site address is 46xx S139th St Tukwila, WA 98168. The Tax Parcel Number is 322920 -0090. Introduction This project proposes to develop approximately 0.8 acres of an existing 2.87 acre site, of existing, tall grasses and a few small deciduous trees. The underlying soils vary from medium dense to very dense glacial till soils. Catch basins and storm drainage pipes will be installed within the private street and adjacent areas to convey runoff to a Private Underground Detention/Water Quality Vault located in the Northwestern portion of the site. Roof downspouts and driveways will be tightlined to the catch basins, which are tightlined to the private storm detention system. After development, 0.31 acres of the site is impervious with the remaining 2.56 pervious acres consisting of wetland, open space, lawns, landscaping, etc. Plan Goal The goal of the plan is to treat all on -site runoff for water quality by directing flows to a Detention Water Quality facility. The detention vault is designed to retain runoff volumes up to the 2 and 10 -year storm events with 0.5' of freeboard. Preventative BMP's The catch basins shall have stenciled next to them "DUMP NO WASTE DRAINS TO STREAM Activity that involves pollutants shall be done under a covered area. The private driveways shall be cleaned and swept as necessary to remove debris. Storm Water Easement and Maintenance Agreement Page 8 of 10 Inspection Inspect the storm detention /water quality vault, at least twice a year, especially after periods of heavy runoff. Maintenance records must be kept for five (5) years and available for City Inspector review. Maintenance To ensure proper water quality treatment, the wet vault designed to allow for a minimum of 1 -foot sediment at the bottom of the vault which will be removed at a regular schedule. In the addition for the bottom 1 -foot of sediment, the vault is designed with a minimum dead storage of three feet to allow silt -laden runoff to settle at the bottom of the vault. Person of Responsibility Name: Address: Emergency Contact: Person of Responsibility, Date: Engineer Preparing Plan Name Address Plan and /or Information Updates Rehabitat Northwest, Inc 3601 W Marginal Way SW, Seattle, WA 98106 Phone 206 932 -7355 Mr. Chad Detwiller, October 26, 2007 Penhallegon Associates Consulting Engineers, Inc 750 Sixth Street South Kirkland, WA 98033 The City of Tukwila, Public Works Department, Engineering Division, Storm Drainage Section; is to review and approve any changes to this Stormwater Pollution Prevention Plan prior to changes in its implementation. Additionally, any changes in ownership or person of responsibility are to be reported to the City of Tukwila, Public Works. Storm Water Easement and Maintenance Agreement Page 9 of 10 Structure Storm Water Easement and Maintenance Anreement INSPECTION MAINTENANCE CHECKLIST Date of Inspection Maintenance Page 10 of 10 CB II 2 Type 1 Insp. Results Maint. Done CB 3 1) pe 2 54" Insp. Results Maint. Done CB #4 Type 2 54" Insp. Results Maint. Done CB if 5 Type 1 Insp. Results Maint. Done CB 6 Type 1 Insp. Results Maint. Done CB 7 Type 1 Insp. Results Maint. Done CB 8 Type 1 Insp. Results 4 Maint. Done CB 9 T:spe 1 1 Insp. Results Maint. Done Detention WQ Vault j Insp. Results Maint. Done Structure Storm Water Easement and Maintenance Anreement INSPECTION MAINTENANCE CHECKLIST Date of Inspection Maintenance Page 10 of 10