HomeMy WebLinkAboutPermit M14-0082 - WASHINGTON CENTER FOR PAIN MAN - FAN, DUCTWORK AND GRILLES/DIFFUSERSWASHINGTON CENTER FO 2
PAIN MANAGEMENT
7200 S 180 ST
M14-0082
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206-438-9350
Web site: http://www.TukwilaWA.gov
MECHANICAL PERMIT
Parcel No: 3623049013 Permit Number: M14-0082
Address: 7200 S 180 ST 102 Issue Date: 4/22/2014
Permit Expires On: 10/19/2014
Project Name: WASHINGTON CENTER FOR PAIN MAN
Owner:
Name: KHK INVESTMENT LLC
Address: 26329 8TH AVE S , DES MOINES, WA,
98198
Contact Person:
Name: ALEX BURKHART Phone: (206) 763-1744
Address: 727 S KENYON ST, SEATTLE, WA,
98108
Contractor:
Name: EVERGREEN REFRIGERATION LLC Phone: (206) 763-1744
Address: 727 S KENYON ST, SEATTLE, WA,
98108
License No: EVERGRL954R2 Expiration Date: 1/6/2016
Lender:
Name:
Address:
DESCRIPTION OF WORK:
INSTALLATION OF (1) EXHAUST FAN, DUCTWORK, AND GRILLES/DIFFUSERS
Valuation of Work: $4,284.00
Type of Work: NEW
Fuel type: ELECT
Fees Collected: $126.76
Electrical Service Provided by: PUGET SOUND ENERGY
Water District: RENTON
Sewer Distric: RENTON SEWER SERVICE
Current Codes adopted by the City of Tukwila:
Internations Building Code Edition:
International Residential Code Edition:
International Mechanical Code Edition:
Uniform Plumbing Code Edition:
2012 International Fuel Gas Code:
2012 WA Cities Electrical Code:
2012 WA State Energy Code:
2012
2012
2012
2012
Permit Center Authorized Signature:
Date: v
ZZH
I hearby certify that I have read and examined this permit and know the same to be true and correct. All
provisions of law and ordinances governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other
state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this
development permit and agree to the conditions attached to this permit.
Signature: Date: iV1
J
Print Name: /'1 13.0-1 h AS
This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or
if the work is suspended or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ***MECHANICAL PERMIT CONDITIONS***
2: All mechanical work shall be inspected and approved under a separate permit issued by the City of
Tukwila Permit Center (206/431-3670).
3: All permits, inspection record card and approved construction documents shall be kept at the site of work
and shall be open to inspection by the Building Inspector until final inspection approval is granted.
PERMIT INSPECTIONS REQUIRED
Permit Inspection Line: (206) 438-9350
1800 MECHANICAL FINAL
0701 ROUGH -IN MECHANICAL
CITY OF TUKW
Community Developmejnt Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Mechanical Perrnit No. dU 1I 1+ 001/,
Project No.
Date Application Accepted:
Date Application Expires:
041 N
ItH
(For office use only)
MECHANICAL PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
**please print**
SITE LOCATION
< King Co Assessor's Tax No.: 3(230'f'f013
Site Address: 7260 5 1 $6- S� = Suite Number: l n Floor:
Tenant Name: W6k;neyhivl av ` / r Chw New Tenant: ❑ Yes ..No
PROPERTY OWNER
Name: V t-t k
vad-,•,h. ,i__ LLL ,
Address: 2..G-3
g At,c... S
City: boQ AApLoi
State:
Zip: tigt,t g
CONTACT PERSON - person receiving all project
communication
Name: ►f ,,
Address:: -/2-7 5vvA"i1 I yj0-e ,
City: 5.64, -
State: 1„ / Zip: 411,4
Phone: ,-24)& 1(.3_
(- 4 q Fax:.Ibnk,----K.-3- 2-3
Email: a( b & e
,„,,ham.,, ,,
MECHANICAL CONTRACTOR INFORMATION
Company Name: Y`eLh r1' �lLit tbh
Address: -72-7 5 ,, 54_ '
City:0- State: Zip: 4 oxig
Phone: -zc 6-`%%3 - 1 r4'4 Fax: v6 -73-- 2.3 8 ci
Contr Reg No.: i-av42,612,05q 2ZExp Date: 1 (
G l 14
Tukwila Business License No.: 13US - MZott911
Valuation of project (contractor's bid price): $ 1
Describe the scope of work in detail:
..I-r'$ . -ib" e (�� eadA- -f d,.v-tt-wk-( cam,
Use: Residential: New
Commercial: New
Fuel Type: Electric ❑
Replacement
Replacement
lekfuse-i5
Gas ❑ Other:
H:\Applications\Forms-Applications On Line \2011 Applications\ Mechanical Permit Application Revised 8-9-1 I.docx
Revised: August 2011
bh
Page 1 of 2
Indicate type of mechanical work being 'installed and the quantity below:
Unit Type
Qty
Furnace <100k btu
Furnace >100k btu
Floor furnace
Suspended/wall/floor
mounted heater
Appliance vent
Repair or addition to
heat/refrig/cooling
system
Air handling unit
<10,000 cfm
Unit Type
Qty
Air handling unit
>10,000 cfin
Evaporator cooler
Ventilation fan
connected to single duct
Ventilation system
Hood and duct
Incinerator — domestic
Incinerator —
comm/industrial
Unit Type
Qty
Fire damper
Diffuser
Thermostat
Wood/gas stove
Emergency generator
Other mechanical
equipment
Boiler/Compressor
Qty
0-3 hp/100,000 btu
3-15 hp/500,000 btu
15-30 hp/1,000,000 btu
30-50 hp/1,750,000 btu
50+ hp/1,750,000 btu
PERMIT APPLICATION NOTES -
Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the permit center to comply with current fee schedules.
Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing
and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OWNER OR AUTHORIZED AGENT:
Signature:
Date: (4 ((L! (Li
Print Name: A"(-4- 130' Day Telephone: SO ' ' 1C 3 14
Mailing Address: i' 7 50101 ke"`1/`-, St
5
City
State Zip
H:\Applications\Fortes-Applications On Line\201 I Applications\Mechanical Permit Application Revised 8-9-1 I.docx
Revised: August 2011
bh
Page 2 of 2
Cash Register Receipt
City of Tukwila
DESCRIPTIONS
PermitTRAK
ACCOUNT QUANTITY
PAID
$195.01
EL14-0339 Address: 7200 S 180 ST 102
Apn: 3623049013
$68.25
ELECTRICAL
$65.00
PERMIT FEE MULTI-FAM/COMM
R000.322.101.00.00
$65.00
TECHNOLOGY FEE
$3.25
TECHNOLOGY FEE
R000.322.900.04.00
$3.25
M14-0082 Address: 7200 5180 ST 102
Apn: 3623049013
$126.76
MECHANICAL
$121.88
PERMIT ISSUANCE BASE FEE
R000.322.100.00.00
$32.50
PERMIT FEE
R000.322.100.00.00
$65.00
PLAN CHECK FEE
R000.322.102.00.00
$24.38
TECHNOLOGY FEE
$4.88
TECHNOLOGY FEE
TOTAL FEES PAID BY RECEIPT: R1789
R000.322.900.04.00
$4.88
$195.01
Date Paid: Monday, April 14, 2014
Paid By: EVERGREEN REFRIGERATION, LLC
Pay Method: CHECK 006435
Printed: Monday, April 14, 2014 10:40 AM 1 of 1
11 SYSTEMS
INSPECTION RECORD
Retain a copy with permit
/111 -6O-
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 5outhcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670
Permit Inspection Request Line (206) 431-2451
Project:
IA .1 • c.< 13 44 -
Type of Inspection: ,-.
AiMQ cY-i • -1-- ,k) AL,
Address: ri--
..-79.40 4 I Ain - sr -
Date Called:
Special Instructions:
/ .) /0, M
/ Y/ -,
Date Wanted: Q `"/4.
Requester: --
Phone No:
i r7F
/10lli .- C07/i-3
Approved per applicable codes.
Corrections required prior to approval.
COMMENTS:
-'rM _ z Q 1 c .to
1
a
inspector:
Date:jo-i4-14
n REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION CI
6300 Southcenter Blvd., #100, Tukwila. WA 98188
Permit Inspection Request Line (206) 431-2451
iY
� f21-v 0
(206) 431-3670
Project: i
r�
Type of Inspe�C�.
v
Address; n
'72-0 0t
, % ,
�,J `
Date Called:
.�.
Special Instructions:
(0 2._
j
Date Wanted:
2
3 '
C---i ` ,
�
.m—.
, p.m.
Requester:
I
Phone No:
-2
/ 1
Approved per applicable codes.
Corrections required prior to approval.
COMMENTS:
V , 1 lam_ o 1,v r
•
Inspector:
A,
Date.. -
REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
Mechanical Summary
MECH-SUM
r. 2012 Washington State Energy Code Compliance Forms for Commercial, Group R1_and > 3 stojr R2 and R3
Revised June 2013
Project Info
FILE
vdt•Applicant
No.th
COPY
Project Address 7200 S 180th St. Suite 102
Date 4/14/2014
i Tukwila, WA 98188
For Building Dept. Use
Applicant Name: Alex Burkhart
Address: 727 SouKenyon St. Seattle, WA 98108
Applicant Phone: 206-763-1744 ext. 247
Project
Briefly
system
Description
describe mechanical
type and features.
Includes Plans
Installation of one (1) exhaust fan.
Drawings must contain notes requiring compliance with commissioning provisions per Section C408
Compliance Option
*Simple System O Complex System O Systems Analysis
Equipment Schedules
The following information is required to be incorporated with the mechanical equipment schedules on
the plans. For projects without plans, fill in the required information below.
Cooling Equipment Schedule
Equip.
ID
Equip
Type
Brand Name'
Model No.'
Capacity2
Btu/h
OSA CFM
or Econo?
SEER
or EER
IPLV3
Econmizer
Option or
Exceptions
Heat
Recovery
Y/N
Heating Equipment Schedule
Equip.
ID
Equip
Type
Brand Name'
Model No.'
Capacity2
Btu/h
OSA cfm
or Econo?
Input Btuh
Output Btuh
Efficiency4
Heat
Recovery
Y/N
Fan Equipment Schedule
Equip.
ID
Equip
Type
Brand Name'
Model No.'
CFM
SP'
HP/BHP
Flow Controls
Location of Service
8F-1
Broan
QTR110
90
0.2"
0.10
CV
Ceiling
Service Water
Heating Equipment Schedule RECEIVFD
tyui
ID
,
,.r..-VJ
�/��
D13r Name,
Model No.'
Input
Capacity
Sub-
Category
EF7
CITY OFIlgwci L�
Location of e i
CODE
COMPLIAN+
APR 1 4 201E
APPROVED
APR 17 201k
PERMIT CENTER
-
If available. 2 As tested accordin to Table C403.2.3(1)A thru C403.2.3(8). 3 If required. ° COP, HSPF, Combustion Efficiency, or AFUE, as
pplicalti}�,77s6li�ai^I es: v iable air volume (VAV), constant volume (CV), or variable speed (VS). 6 Economizer exception number per
D BUILDING DIVISION
k11c1 wz
Mechanical Permit Plans Checklist - Page 1 of 3
MECH-CHK
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3
Revised June 2013
Project Address 7200 S 180th St. Suite 102
Date 4/14/2014
The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012
WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages.
Applicability
(yes,no,na)
Code Section
Code Provision
Information Required
Location on
Plans
Building Department
Notes
GENERAL PROVISIONS
Equipment Sizing & Performance
Yes
C403.2.1
Load calculations
Load calculations performed per ASHRAE Std 183 or equivalent per
Chapter 3
M 1
Yes
C403.2.2
Equipment and system
sizing
Output capacity of heating and cooling equipment and systems do not
exceed calculated loads, note exceptions taken
M 1
Yes
C403.2.5
Minimum ventilation
Ventilation (natural or mechanical) provided per IMC; indicate mechanical
ventilation is capable of being reduced to minimum requirement per IMC
M1
Yes
C403.2.3 &
C403.2.3.2 &efficiency
C403.2.12.1
Equipment minimum
Provide equipment schedules or complete MECH-SUM tables with type,
capacity, efficiency, test standard (or other efficiency source) for all
mechanical equipment
M1
N/A
C403.2.13
Electric motor efficiency
Provide equipment schedule with hp, rpm, efficiency for all motors; note
except.
N/A
C403.2.10
Fan power limitation
Fan system motor hp or bhp does not exceed limits per Table
C403.2.10.1(1)
N/A
C403.2.10.3
& C403.2.13
Fractional hp fan motors
Indicate fan motors 1/12 to 1 hp are ECM type or meet minimum efficiency
req.
N/A
C403.2.3
capacity Maximum air cooled chiller
Indicate air-cooled chiller capacity does not exceed air-cooled chiller limit
N/A
C403.2.1
Non-standard water-cooled
chillers
Full -load and NPLV values for water-cooled centrifugal chiller adjusted for
non-standard operational conditions
N/A
C403.2.12.1.2
Centrifugal fan cooling
towers
Large capacity cooling towers with centrifugal fan(s) meet efficiency
requirements for axial fan open circuit cooling towers
N/A
C403.2.3
Forced air furnace and unit
heaters
Indicate intermittent ignition or (ID, flue/draft damper & jacket loss
N/A
C403.2.3.3
heating/cooling equipment Packaged electric
List equipment required to be heat pumps on schedule
N/A
C403.2.3.4
Humidification
Indicate method of humidification (note requirements for systems with
economizer)
HVAC System Controls & Criteria
Yes
C403.2.4.1
Thermostatic controls
Indicate locations of thermostatic control zones on plans, including
perimeter systems
M 1
Yes
C403.2.4.1.1
Heat pump supplementary
heat
Indicate staged heating (compression/supplemental) & outdoor lock -out
temp
M1
Yes
C403.2.4.2
Setpoint overlap (deadband)
Indicate 5°F deadband minimum for systems controlling both heating &
cooling
M1
Yes
C403.2.4.3
Automatic setback and
shutdown
Indicate zone t-stat controls with required automatic setback & manual
override
M1
Yes
C403.2.4.3.3
Automatic (optimum) start
Indicate system controls that adjust equip start time to match load
conditions
M1
Yes
C402.4.5.2 &
C403.2.4.4
Dampers
Indicate location of OSA, exhaust, relief and return air dampers; include
AMCA rated leakage and control type (motorized or gravity; note exceptions
M 1
Yes
C403.2.11
Heating outside a building
Indicate radiant heat system and occupancy controls
M1
N/A
C403.2.4.5
Snow melt systems
Indicate shut-off controls based on outdoor conditions
N/A
C403.2.4.6
Combustion heating
equii pment
Indicate modulating or staged control
N/A
C403.2.4.7
Group R1 hotel/motel
systems
Indicate method for guest room automatic setback & set-up of 5°F
minimum
N/A
C403.2.4.8 / g
Group R2/R3 dwelling unit
systems
Indicate 5-2 programmable thermostats in primary spaces with minimum of
two setback periods; note exceptions taken
Yes
C403.2.5.1
Demand controlled
ventilation
Indicate high -occupancy spaces and systems requiring DCV
M 1
Yes
C403.2.5.2
Occupancy sensors
Indicate spaces requiring occupancy -based system control and method; or
alternate means provided to automatically reduce OSA when partially
M 1
Yes
C403.2.5.3
Enclosed loading
dock/parking garage
ventilation
Indicate enclosed loading dock and enclosed parking garage ventilation
system activation and control method
M 1
N/A
C403.2.5.4.1
Kitchen exhaust hoods
Indicate kitchen hoods requiring make-up air; indicate make-up air source
and conditioning method
N/A
C403.2.5.4.2
Laboratory exhaust systems
Indicate lab exhaust systems requiring heat recovery, method & efficiency;
or alternative method taken (VAV, semi -conditioned makeup, or GERM
calculation)
N/A
C403.2.6.1
Energy recovery -
ventilation systems
Indicate ventilation systems requiring ER, method & efficiency; note
exceptions
N/A
C403.2.6.2
Energy recovery -
condensate systems
Indicate on -site steam heating systems requiring energy recovery
N/A
C403.2.6.3
Energy recovery -
condenser systems
Indicate remote refrig. condensers requiring ER and use of captured energy
Mechanical Permit Plans Checklist - Page 2 of 3
MECH-CHK
2012 Washington State Energy Code Comp
fiance Forms for Commercial, Group R1, and > 3 story R2 and R3
Revised June 2013
Project Address 7200 S 180th St. Suite 102
Date 4/14/2014
The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012
WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages.
Applicability
(yes,no,na)
Code Section
Code Provision
Information Required
Location
on Plans
Building Department
Notes
GENERAL PROVISIONS, CONTINUED
HVAC System Controls & Criteria, Continued
N/A
C403.2.12
Variable flow control -
fans/pumps
Indicate fan & pump motors requiring VF control & method (VSD or equiv
controls)
N/A
C403.2.12.1
oo clfcontrol -
ling towweers
oonq
Indicate cooling tower fans requiring variable flow control and method
N/A
C403.2.12.2
Large volume fan systems
Indicate fan systems requiring airflow reduction based on heating and
cooling demand; or exception taken
N/A
C403.2.12.2
Single zone AC systems
Indicate method of cooling demand -based fan control for sys. > 110,000
btuh
N/A
C403.2.4.10
DDC system capabilities
Identify all DDC system input/output control points and indicate capability
for trendina and demand response setooint adiustment
Ducting Systems
Yes
C403.2.7.1 &Duct
C403.2.7.3
construction
Indicate all ductwork constructed and sealed per IMC, C402 leakage
requirements and IBC vapor retarder requirements
M 1
N/A
�403.2.7.3.1 ;
Duct pressurecation
classifications
Identify location of low, medium and high pressure ductwork on plans
N/A
C403.2.7.3.3
High pressure duct leakage
test
Indicate high pressure duct leakage testing requirements on plans; provide
test results to jurisdiction when completed
Yes
C403.2.7.1 / 2
Duct insulation
Indicate R-value of insulation on ductwork
Mi
Piping Systems
N/A
C403.2.8
Piping insulation
Indicate R-value of insulation on piping
N/A
C403.2.8.1
Piping insulation exposed to
weather
Indicate method of protection from damage/degredation
SIMPLE SYSTEMS
Qualifying Systems
Yes
C403.3
Qualifying single zone
systems
Verify unitary or packaged equipment does not exceed capacity limits,
does not have active humidifcation or simultaneous heating/cooling
M1
N/A
C403.3
systems Qualifying 2-pipe heating
syst
Verify 2-pipe heating -only system does not exceed capacity limits
N/A
C403.3.2
Hydronic system controls
Refer to Complex Systems Section C403.4.3
Simple System Economizers
Yes
C403.3.1
Air economizer required
Indicate cooling systems requiring economizer controls; note in equip
sched.
M 1
Yes
C403.3.1.1.1
Air economizer capacity
Indicate modulating OSA control capability up to 100% OSA, or exception
M 1
Yes
C403.3.1.1.3
Air economizer high limit
controls
Indicate high limit shut-off control method per Table C403.3.1.1.3(2)
M 1
Yes
C403.1.1.2
Integrated air economizer
operation
Indicate capability for partial air economizer operation for systems with
capacity > 65,000 btuh
M 1
Yes
C403.3.1
Air economizer exceptions
Indicate eligible exception(s) taken and provisions to comply with
exceotion(s)
M 1
COMPLEX SYSTEMS
Complex System Economizers
Yes
C403.4.1
Air economizer required
Indicate cooling systems requiring economizer controls; note in equip
sched.
M 1
Yes
C403.4.1.4
Economizer heating system
impact
Verify control method of HVAC systems with economizers does not
increase building heating energy usage during normal operation
M 1
Yes
C403.4.1.3
Integrated economizer
operation
Indicate capability for partial economizer operation for air or water econo
systems
M 1
N/A
Moved
Water economizer capacity
Indicate water econo capable of 100% cooling capacity at 50°F db/45°F wb
OSA
N/A
C403.4.1.2
Water economizer
maximum pressure drop
Indicate precooling coils and heat exchangers do not exceed pressure
drop limit
N/A
C403.3.1
Air economizer exceptions
Indicate eligible exception(s) taken and provisions to comply with
exceotion(s)
Mechanical
Permit Plans
Checklist - Page 3 of 3 MECH-CHK
Group R1, and > 3 story R2 and R3 Revised June 2013
2012 Washington State Energy Code Compliance Forms for Commercial,
Project Address 7200 S 180th St. Suite 102
Date 4/14/2014
The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012
WSEC. NOTE: Define print area in Excel prior to printing MECH-CHK pages.
Applicability
(yes,no,na)
Code Section
Code Provision
Information Required
Location on
Plans
Building Department
Notes
COMPLEX SYSTEMS, CONTINUED
Specific System Requirements
N/A
C403.4.2 &
C403.2.12
Variable flow control - fans
Indicate fans requiring variable flow control and method
N/A
C403.4.2.1
VAV fan static pressure
sensors
Indicate sensor locations on plans; include at least one sensor per major
duct branch
N/A
C403.4.2.2
VAV fan static pressure
setpoint
Indicate fan system static pressure setpoint based on zone requiring most
pressure
N/A
C403.4.5
VAV systems serving multi-
zones
Indicate supply air systems serving multiple zones that are required to be
VAV, method of primary air control, and zones served; note exceptions
taken
N A
/
C403.4.5.4
VAV system supply air reset
Indicate controls that automatically reset supply air temp in response to
loads
N/A
C403.4
Large capacity cooling
systems
Indicate method of multi -stage or variable control for building cooling
system capacity > 300 tons
N/A
C403.4.7
Hot gas bypass limitation
Indicate cooling equipment unloading or capacity modulation method
N/A
C403.4.3
systems Large capacity boiler
Indicate multi -stage or modulating burner for single boilers > 500,000 btuh
N/A
C403.4.3
Boiler sequencing
Indicate automatic controls that sequence operation of multiple boilers
N/A
C403.4.3.5
Chiller / boiler plant pump
isolation
Indicate capability to automatically reduce overall plant flow and shut-off
flow through chillers & boilers when not in use
N/A
C403.4.2 &
C403.4.3.6
Variable flow control -
pumps
Indicate pumps requiring variable flow control & method
N/A
C404.2.12.103.4.4
& C403.4.4
control -
Varcooling towers flow
cooling
Indicate cooling tower fans requiring variable flow control and method
N/A
C403.4.3.4
Hydronic system part load
controls
Indicate heating & chilled water systems have the capability to automatically
reset supply water temp AND reduce flow by >_ 50% for systems > 300,000
N/A
C403.4.3.2
Two -pipe changeover
systems
Indicate deadband, heating/cooling mode scheduling and changeover
temperature range
N/A
C403.4.3.3.1
Water loop heat pump -
deadband
Indicate capability of central equipment to provide min. 20°F water supply
temp deadband between heat rejection and heat addition modes
N/A
C403.4.3.3
Water loop heat pump -
heat rejection
Provide heat exchanger that separates cooling tower and heat pump loop
in Climate Zone 5
N/A
C403.4.3.3.3
Water loop heat pump -
isolation
Indicate 2-way isolation valve on each heat pump and variable flow control
for systems with total pump power > 10 hp
N/A
C403.4.6
recovery Condenser water heat
Indicate system provided to pre -heat service water and efficiency
N/A
C403.5
Cooler / freezer - anti -sweat
heaters
Indicate w/sf & control method for walk-in cooler/freezer door anti -sweat
heaters
N/A
C403.5 / 6
Cooler / freezer -evaporator
and condenser fans
Indicate motor type for evaporator and condenser fans < 1 hp
SERVICE WATER HEATING
Service Water Systems
N/A
C404.2
Water -heating equip min.
efficiency
Provide equipment schedule or complete MECH-SUM table with type,
capacity, efficiency, test standard (or other efficiency source)
N/A
C404.3
Temperature controls
Indicate temperature controls have required setpoint capability
N/A
C404.4
Heat traps
Indicate piping connected to equipment have heat traps on supply &
discharge
N/A
C404.5
water
Insuheater
Indicateunder
Indicate R-10 insulation under tank
N/A
C404.6
Service water piping
insulation
Indicate R-value of insulation on piping; note exceptions taken
N/A
C404.7 / g
Circulation systems and
heat trace shut-off
Indicate shut-off capability based on occupancy and periods of limited
demand
N/A
C404.9
Group R-2 service hot water
meters
Indicate method of usage metering for dwell. units served by central HW
system
Pools & In -Ground Permanently Installed Spas
N/A
C404.10.1
Pool heating equip min.
efficiency
Provide equipment schedule or complete MECH-SUM table with type,
capacity, efficiency, test standard (or other eff. source); heat pump heaters
>_ 4 COP
N/A
C404.10.1 / 2
Pool heater on / off controls
Indicate automatic on/off control based on scheduling & accessible on/off
switch on heater that operates independent of thermostat setting; or
N/A
C404.10.3
Pool covers
Indicate vapor retardant cover and insulation rating as required
N/A
C404.10.3
Pool assembly insulation
Indicate rating of insulation on sides and bottom of pools heated to > 90°F
N/A
C404.10.4
Heat recovery
Indicate method, exhaust air temperature reduction and recovered energy
use
City of Tukwila
Department of Community Development
10/1/2014
Jim Haggerton, Mayor
Jack Pace, Director
ALEX BURKHART
727 S KENYON ST
SEATTLE, WA 98108
RE: Permit No. M14-0082
WASHINGTON CENTER FOR PAIN MAN
7200 S 180 ST
Dear Permit Holder:
In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building
Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric
Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null
and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if
the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180
days. Your permit will expire on 11/19/2014.
Based on the above, you are hereby advised to:
1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each
inspection creates a new 180 day period, provided the inspection shows progress.
-or-
2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire.
Address your extension request to the Building Official and state your reason(s) for the need to extend your permit.
The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your
extension request is granted, you will be notified by mail.
In the event you do not call for an inspection and/or receive an extension prior to 11/19/2014, your permit will become null and void
and any further work on the project will require a new permit and associated fees.
Thank you for your cooperation in this matter.
Sincerely,
Tha
Bill Rambo
Permit Technician
File No: M14-0082
6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665
AdO0 ati0O0 11Wa3d
PLAN REVIEW/ROUTING SLIP
PERMIT NUMBER: M14-0082 DATE: 04/14/2014
PROJECT NAME: WA CENTER FOR PAIN MANAGEMENT
SITE ADDRESS: 7200 S 180 ST
X Original Plan Submittal
Response to Correction Letter #
Revision # before Permit Issued
Revision # after Permit Issued
DEPARTMENTS:
Building Division II
Public Works
Al4 01;\
Fire Prevention
Structural
Planning Division
Permit Coordinator
PRELIMINARY REVIEW:
Not Applicable
(no approval/review required)
DATE: 04/15/14
Structural Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved
Corrections Required
Approved with Conditions
Denied
(corrections entered in Reviews) (ie: Zoning Issues)
DUE DATE: 05/13/14
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
12/18/2013
EVERGREEN REFRIGERATION T T C
Page 1 of 3
411114 Washington State Department of
Labor & industries
EVERGREEN REFRIGERATION LLC
Owner or tradesperson
PATTON, RODGER
Principals
PATTON, RODGER PATTON, MATTHEW
Patton, Adam Patton, Douglas EVERGREEN
REFRIGERATION LLC PATTON, DAVID
(End: 01/21/2014)
Doing business as
EVERGREEN REFRIGERATION LLC
WA UBI No.
602 512 953
727 S KENYON ST
SEATTLE, WA98108
206-763-1744
KING County
Business type
Limited Liability Company
Governing persons
DAVID A PATTON MATTHEW PATTON;
RODGER PATTON;
License
Verify the contractor's active registration / license / certification (depending on trade) and any past violations.
Construction Contractor
License specialties
GENERAL
License no.
EVERGRL954R2
Effective — expiration
01/06/2006 — 01/06/2016
Bond
Active.
Meets current requirements.
Merchants Bonding Co (Mutual) $12,000.00
Bond account no.
WA15097
Received by L&I Effective date
12/15/2011 01 /01 /2012
https://secure.lni.wa.gov/verify/Detail.aspx?UBI=602512953&LIC=EVERGRL954R2&SAW= 04/22/2014
180ih
EXHAUST FAN
SCHEDULE
MARK
MANF.
MODEL
CFM
S.P.
VOLTS
PHASE
Hp/A
NOTES
EF 1
BROAN
QTR110
90
0.2"
115
1
71 W
LOCATED ON CEILING
RESTROOM
128 SF
113
NEW
-REST-RO6M
112
60 S
NEW STAFF
206 SF
111
250 CFM
EXIST JANITOR
48 SF
105
NEW OFFICE
150 SF
124
HVAC FLOOR PLAN
SCALE : 1/4" = 1'-0"
NEW4 NJECTION
00
109
253 SF
COMMISSIONING PLAN
ALL COMMISSIONING
S ONING OF HEATING VENTILATION AND AIR T CONDITIONING SYSTEMS AS
REQUIRED BY N I SECTION C408 'SYSTEM COMMISSIONING' OF THE 2012 WASHINGTON STATE
ENERGY CODE (WSEC) SHALL BE PERFORMED BY EVERGREEN REFRIGERATI❑N, LLC. THE
ACTIVITIES TO BE ACCOMPLISHED ARE PER THE SECTIONS LISTED IN THE
'C❑MMISSI❑NING COMPLIANCE CHECKLIST' SHOWN BELOW. AT THE COMPLETION OF THE
ACTIVITIES REQUIRED FOR COMMISSI❑NING AS DEFINED BY SECTION C408 OF WSEC
THE 'COMMISSIONING COMPLIANCE CHECKLIST' WILL BE REVIEWED WITH THE
BUILDING OWNER OR THE OWNER'S
E S REPRESENTATIVE AND THIS CERTIFICATION WILL
BE SIGNED AND DATED. THIS WILL SATISFY TO THE CODE OFFICIAL THAT THE REPORT
HAS BEEN ACCEPTED AS REQUIRED BY SECTI❑N C408.1,2.1 OF WSEC,
Project
Information
COMMISSIONING COMPLIANCE CHECKLIST
Project Name:
Project Address:
Commissioning Authority:
Commissioning
Plan
<Section
C408,1.1)
Commissioning Plan was used during construction and Included Items below
• A narrative description of activities and the personnel intended to accomplish each one
• Measurable criteria for performance
• Functions to be tested
Systems
Balancing
(Section
C408,2.2)
Systems Balancing has been completed
• Air and Hydronlc systems are proportionately balanced ki a manner to first minimize throttling losses
• Test ports are provided on each pump for measuring pressure across the pump
Functional
Testing
(Sections
C408.2.3)
• HVAC Equipment Functional Testing has been completed <Section C408.2.3.1)
HVAC equipment has been tested to demonstrate the Installation and
operation of components, systems and
system -by -system Interfacing relationships in accordance with approved
plans and specifications
HVAC Controls Functional Testing has been completed (Section C408.2.3.2)
HVAC controls have been tested to ens re that control devices are.
calibrated, adjusted and operate properly,
Sequence of ope atlon hh ve been functionally tested to ensure they
operate in act trance wit 1 approved
plans and specifications
• Economizers Functional Testing has been completed (Section C408.2.3.3)
Economizers operate in accordance with manufacturer's specifications
Supporting
Documents
(Section
C408.1.3.2)
• Manuals, record documents and training have been completed or are scheduled
• System documentation has been provided to the owner or scheduled dater
• Record documents have been submitted to owner or scheduled dater
• Training has been completed or scheduled dater
Commissioning
Report
(Section
C408a1.2)
Preliminary Commissioning Report submitted to Owner and Includes items below
• Deficiencies found during testing required by this section which have not been corrected at the time of
report preparation
• Deferred tests, which cannot be performed at the time of report preperatlon due to climatic conditions.
Certification
I hereby certify that all requirements for Commissioning have been
completed In accordance with the Washington State Energy Code,
including all Items above,
Building Owner or Owner's Representative
Date
1 NEW HALL II
_ 1-L1ISF
NEW INJECTION
ROOM
200 CFM NEW WAITING /
RECOVERY__
200 SF
300 CFM
107
OPS FROM EXISTING 3 TON
FIB.: COPY
Permit No, ii01-
Plan review approval Is subject to errs and omissions.
,: Ye.1 of construction documents does not authorize
!<<c ..nation of any adopted code or ordinance. Receipt
of approved Feld Copy and ,1 "I .,r ; ',:,,,,, ed:
BY
(fj2.1(L
City Of Tbicwila
BUILDING DIVISION
•
REVISIONS
No changes shall be made to the scope .
of work without prior approval of
Tukwila Building Division.
r T:. •'?'•/;a orls will require a new plan submittal
' may 11,!ude additional plan review fees. i
SEPARATE PERMIT
REQUIRED FOR:
0 Mechanical
iittectrical
(Plumbing
Watts Piping
'y of Tukwila
.'"NtG DIVISION,
REVIEWED FOR
CODE COMPLIANCE
APPROVED
APR 17 2014
City of Tukwila
BUILDING DIVISION
GENERAL NOTES
DUCTWORK
1.1 ALL DUCT DIMENSIONS ON PLAN ARE CLEAR INSIDE DIMENSIONS, ADD 2" TO EACH
DIMENSION TO OBTAIN OUTSIDE DIMENSION. ADD 4"TO EACH DIMENSION IF
DUCTWORK IS ON THE EXTERIOR OF BUILDING.
1.2 THE FIRST NUMBER ON ALL DUCT DIMENSIONS IS THE WIDTH AND THE SECOND
NUMBER IS THE HEIGHT.
1.3 MATERIALS WITHIN DUCTS OR PLENUMS SHALL HAVE A FLAME SPREAD RATING
LESS THAN 25 AND A FLAME SMOKE DEVELOPMENT RATING LESS THAN 50, PER
IMC 602.2.1.
1.4 SEAL ALL TRANSVERSE JOINTS FOR DUCTWORK WITH STATIC PRESSURE BETWEEN
1/2 INCHES AND 2 INCHES. DUCTWORK WHICH IS DESIGNED TO OPERATE AT
PRESSURES ABOVE 1/2 INCH WATER COLUMN STATIC PRESSURE SHALL BE SEALED
IN ACCORDANCE WITH STANDARD RS-7.
1.5 ALL DUCT GAUGES PER SMACNA, IMC 603-4.
1.6 ALL DUCT SUPPORTS PER SMACNA, IMC 603-10.
1.7 ATTACH DIFFUSERS AND GRILLES TO T-BAR GRID PER WA STATE & LOCAL CODES.
1.8 BALANCING DAMPERS ARE TO BE INSTALLED ON ALL BRANCH DUCTS OR DIFFUSERS.
INSULATION
2.1 INSULATE OR LINE DUCTWORK PER WA. STATE ENERGY AND MECHANICAL CODES.
2.2 • INSULATE REFRIGERANT & CONDENSATE PIPING PER STATE & LOCAL ENERGY CODES.
GENERAL CONTRACTOR
3.1 GENERAL CONTRACTOR TO PROVIDE AND CUT OPENINGS FOR ALL ROOFTOP,
CEILING, FLOOR, AND WALL PENETRATIONS, INCLUDING WEATHERPROOF SEALING
AND FIRE PROOF LINING PER IMC & IBC.
3.2 GENERAL CONTRACTOR TO VERIFY PENETRATION LOCATION AND. DIMENSIONS
WITH ERL BEFORE FRAMING OPENINGS.
3.3 GENERAL CONTRACTOR TO PROVIDE ALL DEMOLITION, PATCHING, AND PAINTING
AS REQUIRED FOR MECHANICAL WORK.
3.4 GENERAL CONTRACTOR TO PROVIDE ADEQUATE STRUCTURAL SUPPORT AS
REQUIRED FOR MECHANICAL WORK.
3.5 GENERAL CONTRACTOR TO PROVIDE ADEQUATE ENGINEERING AS REQUIRED FOR
MECHANICAL WORK.
3.6 GENERAL CONTRACTOR TO PROVIDE SERVICE ACCESS PER CODE TO ALL
MECHANICAL EQUIPMENT.
3.7 GENERAL CONTRACTOR TO LEVEL ALL FACTORY CURBS PROVIDED BY ERL PROVIDE
ALL CANT STRIPS AND CURB INSULATION, AND SEAL AGAINST LEAKS.
3.8 GENERAL CONTRACTOR TO PROVIDE ALL CUTTING AND PATCHING OF T-BAR CEILING
AS REQUIRED FOR HVAC INSTALLATION.
3.9 GENERAL CONTRACTOR TO PROTECT ALL OPENINGS THROUGH FLOORS PROVIDED
FOR DUCTWORK INSTALLATION IN ACCORDANCE WITH TABLE 601 OF INTERNATIONAL
BUILDING CODE, WHERE REQUIRED BY SECTION 707 OF IBC.
ELECTRICAL
4.1 ERL TO INSTALL ALL LOW VOLTAGE CONTROL WIRING, CONDUIT WILL BE PROVIDED
BY ELECTRICAL CONTRACTOR.
4.2 ELECTRICAL CONTRACTOR TO PROVIDE ALL ELECTRICAL CONNECTIONS,
DISCONNECTS, AND STARTERS FOR MECHANICAL EQUIPMENT.
4.3 ELECTRICAL CONTRACTOR TO VERIFY EQUIPMENT SIZES LOADS AND LOCATIONS
WITH ERL MECHANICAL PLAN AND WITH FIELD CONDITIONS.
4.4 ELECTRICAL CONTRACTOR TO INTERLOCK BATHROOM EXHAUST FANS WITH LIGHT
SWITCH.
4.5 ERL TO PROVIDE 7-DAY NIGHT SETBACK, PROGRAMMABLE TYPE T-STAT WITH
CAPABILITY OF 5°F DEADBAND.
4.6 ERL TO VERIFY FINAL LOCATION OF THERMOSTAT WITH CUSTOMER.
4.7 ELECTRICAL CONTRACTOR TO PROVIDE ELECTRICAL GCFI OUTLET WITHIN 25 FT
OF EACH PIECE OF MECHANICAL EQUIPMENT.
PLUMBING
5.1 PLUMBING CONTRACTOR TO FURNISH AND INSTALL ALL GAS PIPING FOR
MECHANICAL EQUIPMENT PER CODE.
5.2 PLUMBING CONTRACTOR OFFSET VENTS 10 FEET MINIMUM FROM ALL HVAC FRESH
AIR INTAKES OR 2' ABOVE HIGHEST POINT OF INTAKE, IMC 401.4.1.
5.3 CONDENSATE DRAINS FROM RTU BY ERI TO DRAIN WITHIN 12" OF UNIT.
CONDENSATE DRAINS FOR AIR HANDLERS BY PLUMBER.
ENERGY CODE COMPLIANCE
6.1 AT A MINIMUM, EACH FLOOR IS TO BE CONSIDERED A SEPARATE ZONE. VERIFY
THERMOSTATIC CONTROL FOR EACH ZONE AS INDICATED ON PLANS.
6.2 OUTSIDE AIR INTAKES, EXHAUST OUTLETS, AND RELIEF OUTLETS SERVING
CONDITIONED SPACES SHALL BE EQUIPPED WITH DAMPERS WHICH CLOSE
AUTOMATICALLY WHEN THE SYSTEM IS OFF OR UPON POWER FAILURE,
PER WSEC ;SEC. C402.4.5.4
6.3 AIR ECONOMIZERS WHERE REQUIRED BY CODE ARE INDICATED BY THE EQUIPMENT
SCHEDULE AT 100% CAPABILITY, CONTROL AND OPERATION OF THE ECONOMIZER
SHALL COMPLY WITH WSEC SEC. C403.4.1
MECHANICAL CODE COMPLIANCE
7.1 WHERE REQUIRED PROVIDE AUTOMATIC SHUTOFF ACTIVATED BY SMOKE DETECTORS
IN EACH SYSTEM DELIVERING HEATING OR COOLING AIR IN EXCESS OF 2000 CFM.
DETECTORS SHALL BE LOCATED IN THE MAIN RETURN AIR PER IMC 606.
WA2012
SYMBOL
LEGEND
•
SYMBOL ,
ABBV.
DESCRIPTION
r
DUCT SECTION SUPPLY
DUCT SECTION - RETURN/EXHAUST
14'x8'
RECTANGULAR DUCT
14' 1
ROUND DUCT
`„II
ilit \
FLEXIBLE DUCT
MVD
MANUAL VOLUME DAMPER
I I
❑ BDD
BDD
BACKDRAFT DAMPER
T
r-i3
MD
MOTORIZED DAMPER
FD
FIRE DAMPER
-
FSD
• FIRE/SMOKE DAMPER (120V POWER REQ.)
-®-
CEILING RADIATION DAMPER
sD
SD
SMOKE DETECTOR
0
T
THERMOSTAT
QS
S
SENSOR
R
R
REFRIGERANT LINES
-R
G t
G
NATURAL GAS LINES
-G
el
CEILING DIFFUSER (SUPPLY)
CEILING DIFFUSER (RETURN/EXHAUST)
D }
EXHAUST FAN (CEILING MOUNTED)
.
of
_
INLINE FAN
i
PROPELLER FAN
1 i l
SIDEWALL DIFFUSER
DUCT FITTING
if
ZD
ZONE DAMPER
UNIT TAG
DUCT RISERLA •'
M I Do q
2,
NOT PUBLISHED. ALL RIGHTS RESERVED. THE
DRAWING AND SPECIFICATIONS, IDEAS, DESIGNS
AND ARRANGEMENTS REPRESENTED THEREBY
ARE AND SHALL REMAIN THE PROPERTY OF EVE-
RGREEN REFRIGERATION INC. NO PART THEREOF
SHALL BE REPRODUCED, COPIED, ADAPTED, DISC-
LOSED OR DISTRIBUTED TO OTHERS, SOLD, PUB-
LISHED OR OTHERWISE USED WITHOUT THE PRIOR
WRITTEN CONSENT OF AND APPROPRIA
TE COMPEN-
SATION TO EVERGREEN
R EN REFRIGERATION INC. VISU L A
CONTACT WITH THE ABOVE AB DRAWINGS OR SPECIFIC-
ATIONS SHALL CONSTITUTE CONCLUSIVE EVIDENCE
OF ACCEPTANCE OF THESE RESTRICTIONS.
CO
N
N
Za
N
SEATTLE, WASHINGTON 98108
727 SOUTH KENYON
EVERGRL954R2
DESIGN DEVELOPMENT
AS BUILT DRAWINGS
HVAC COVER SHEET
REVISIONS
NO
DATE
ITEM
RECEIVED
CiTY OF TUKWILA
APR 14 2014
PERMIT CENTER
DWG. BY:
GN
CHK. BY:
DP
JOB NO.:
413213
SHEET:
MI