HomeMy WebLinkAboutPermit M15-0115 - BOEING #9-120 - SUBSTATION 11 - DEMOLITION / CHILLDED WATER PIPING, AIR PIPING AND DUCTWORKBOEING #9-120 - SLJBSTATION 11 9725 E MARGINAL WAYS 9-120 EXPIRED 09/26/16 M15-01 15 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov 0003400018 MECHANICAL PERMIT Permit Number: M15-0115 9725 E MARGINAL WAY S BLDG 9-120 Issue Date: Project Name: BOEING #9-120 - SUBSTATION 11 9/28/2015 Permit Expires On: 3/26/2016 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BOEING COMPANY THE PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 CONNIE HARDIN 4600 S 134 PL , SEATTLE, WA, 98168 HOLADAY PARKS, INC. 4600 S 134 PL , SEATTLE, WA, 98168 HOLADP1379NO Phone: (206) 250-4530 Phone: (206) 248-9700 Expiration Date: 9/3/2017 DESCRIPTION OF WORK: DEMO - ADDING AND RELOCATING CHILLED WATER PIPING, RELOCATION COMPRESSED AIR PIPING AND ASSOCIATED DUCT WORK Valuation of Work: $20,000.00 Type of Work: REPLACEMENT Fuel type: Fees Collected: $454.94 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE,VALLEY VIEW SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Permit Center Authorized Signature: WwJL&' PP(11 Date: 1 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this developme t p .rmit anedagree to he conons attached to this permit. Signature: Print Name: l l—nvV'1L rC `i t This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ***MECHANICAL PERMIT CONDITIONS*** 9: All mechanical work shall be inspected and approved under Permit Center (206/431-3670). 10: Manufacturers installation instructions shall be available on PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 0703 1800 0609 0701 0702 MECH EQUIP EFF MECHANICAL FINAL PIPE/DUCT INSULATION ROUGH -IN MECHANICAL SMOKE DETECTOR TEST a separate permit issued by the City of Tukwila the job site at the time of inspection. L-I-L4 • (.ck CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http://vvww.TulcwilaWA.gov Mechanical Permit No. Project No. � � Date Application Accepted: Date Application Expires: 111P1' (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. t n applications will not be accepted through the mail or by fax. IG// **please print** SITE LOCATIO 1/41 n /�041114.‘ CKing Co Assessor's Tax No.: '�_____ Site Address:CO II10.Y +� Suite Number: Floor: Tenant Name: L,Qeb on I New Tenant: ❑ Yes PROPERTY OWNER Name:' /r _ 1,,� Address:^.3A O gout) City:,,,, �,�,�,�.w Sta : tat Zipi,244 CONTACT PERSON — person receiving all project communication Name: A►n i . ` u to Address:460o S 1+, tk P1 City: Spa trot State: Zi4ki 10G Phone:,l w,o Z.D 30Fax:.� ^6 2.=C � '76DI {(1.0ii Email: r11Ch P 11.0 DAr6S . !L,vn MECHANICAL CONTRACTOR INFORMATION Company Name: UO' ` 40ks .lnc.,, Address: ' OD s t3Li'i' Ai City: Seeutta State: zip4,2%60, Phone:' I SSZ 4S50 Fax: 74(. Z K 14 f 700 Contr Reg No.:4sL/• Nho,"pxp Date: q`0 Tukwila Business License No.: Valuation of project (contractor's bid price): $ Z 1 Describe the scope of work in detail: +;rj AAA (AS "4" kao tea .c%. p:fv; re oca.9-) oeThdP4.Po•A Use: Residential: New ❑ Replacement ❑ Commercial: New 1310."---- Replacement ei,%.43212LeP assm,t-4 Fuel Type: Electric ❑ Gas ❑ Other: H:Application\Forns•Applications On Line\2011 Applications Mechanical Perrnit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment dtilid4441I Pp' Boiler/Compressor Qty 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu � 5,0+hhp/�1,7�50,0,000 btu i,n titoae-,e9 PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDI 0 I +D AGEN : ff Signature: Date: _ 1 (O Print Name: N A .7c 'k G►.l,d L Day Telephone:'ZaZ-uS 0 • Mailing Address: GOD "rj� LLIk City State Zip H:\Applications\Fonts-Applications On Line\2011 Applications\Mechanical Permit Application Revised 8-9-11.doc; Revised: August 2011 bh Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $454.94 M15-0115 Address: 9725 E MARGINAL WAY 5 BLDG 9-120 Apn: 0003400018 $454.94 MECHANICAL $437.44 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $317.45 PLAN CHECK FEE R000.322.102.00.00 0.00 $87.49 TECHNOLOGY FEE $17.50 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R6171 R000.322.900.04.00 0.00 $17.50 $454.94 Date Paid: Wednesday, September 16, 2015 Paid By: CONNIE HARDIN Pay Method: CREDIT CARD 06325G Printed: Wednesday, September 16, 2015 12:02 1 of 1 PM CRWSYSTEMS City of Tukwila Department of Community Development 8/2/201'6 CONNIE HARDIN 4600 S 134 PL SEATTLE, WA 98168 RE: Permit No. M 15-0115 BOEING #9-120 - SUBSTATION 11 9725 E MARGINAL WAY S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 9/26/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 9/26/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, rn achelle Ripley Permit Technician File No: M 15-0115 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director April 13, 2016 Connie Hardin Holaday Parks Inc. 4600 S 134 P1 Tukwila, WA 98168 RE: Request for Extension #1 Permit Number M15-0115 Dear Ms. Hardin, This letter is in response to your written request for an extension to Permit M15-0115. The Building Official, Jerry Hight, has reviewed your letter and considered your request to extend the above referenced permit. It has been determined that the City of Tukwila Building Division will be granting an extension to the permit through September 26, 2016. If you should have any questions, please contact our office at (206) 431-3670. Sincerely, Bill Rambo Permit Technician File: Permit No. M15-0115 W:\Per,nit Center\Extension Letters\P.errnits\20151M15-0115 Permit Extension #1.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Bill Rambo From: Sent: To: Subject: fyi Jerry Hight Friday, March 18, 2016 2:22 PM Bill Rambo FW: Permit extension requests Jerry E Hight MCP Building Official ( City of Tukwila 630o Southcenter BLVD, Suite too I Tukwila, WA 98188 T: 2o6/431-3675 I F: 2o6/431-3665 Jerry.Hight@TukwilaWA.gov I http://www.TukwilaWA.gov The City of opportunity, the community of choice. **My incoming and outgoing email messages are subject to public disclosure requirements per RCW 42.56 ** From: Connie Hardin [mailto:connieh@holadayparks.com] Sent: Friday, March 18, 2016 2:01 PM To: Jerry Hight Cc: Derek Hart Subject: Permit extension requests Hi Jerry. I have 3 permits about to expire and would like to extend them. M15-0115 Boeing 9-120 Substation 11 This job is running late due to construction delays. M15-0123 Boeing 9-101 Sewer Lift Station This is running late due to delays in funding and acquiring equipment. PG15-0115 Boeing 9-101 Sewer Lift Station This too is running late due to delays in funding and acquiring equipment. Thank you for your consideration. Connie Hardin Holaday-Parks RECEIVED CITY OF TUKWILA MAR 2 1 2016 PERMIT CENTER Request for Extension # I Current Expiration Date: 3—.2-1P-1 % Extension Request: XApproved for le d days ❑ Denied (provide explanation) Signature/Initials b / 1 City of Tukwila Department of Community Development 2/2/2016 CONNIE HARDIN 4600 S 134 PL SEATTLE, WA 98168 RE: Permit No. M15-0115 BOEING #9-120 - SUBSTATION 11 9725 E MARGINAL WAY S Dear Permit Holder: Allan Ekberg, Mayor Jack Pace, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 3/26/2016. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206-438-9350 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven(7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 3/26/2016, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, kkA. � Rachelle Ripley Permit Technician File No: M15-0115 6300 Southcenter Boulevard Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 ?ERMI� COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0115 DATE: 09/18/15 PROJECT NAME: BOEING 9-120 SUBSTATION 11 SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: , - 41A)( Building Division Public Works AAA 'J�%1- q''��-`•l S Fire Prevention Structural Planning Division Permit Coordinator El PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 09/22/15 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/20/15 Approved Corrections Required n (corrections entered in Reviews) Notation: Approved with Conditions Denied (ie: Zoning Issues) REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2O13 HOLADAY PARKS INC Verify the contractor's active registration / licen =rtification (depending on trade) and any past violations Construction Contractor Active. Meets current requirements. Page 2 of 3 License specialties GENERAL License no. HOLADPI379NO Effective — expiration 01/21/1983— 09/03/2017 Bond ................. LIBERTY MUTUAL INS CO Bond account no. 23000452 $12,000.00 Received by L&I Effective date 08/23/2002 09/01 /2002 Expiration date Until Canceled Insurance .............................. Charter Oak Fire Ins Co Policy no. DTCO1F465357C0F14 $1,000,000.00 Received by L&I Effective date 10/28/2014 11/01/2014 Expiration date 11/01/2015 Insurance history Savings ......................... No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts .......................................... No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations ......................................................... No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 177,231-00 .._........_................... Doing business as HOLADAY PARKS INC Estimated workers reported Quarter 2 of Year 2015 "Greater than 100 Workers" L&I account representative T4 1 CARIE PICKETT (360)902-5592 - Email: PICC235@Ini.wa.gov Account is current. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Citation issue date 06/11/2014 Inspection no. 317319382 Location 1011 Dexter Ave Seattle, WA 98102 Citation issue date 05/08/2014 No violations No violations https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 09/28/2015 HOLADAY PARKS INC Page 1 of 3 Hone Inicio en Espanol Contact Search L&I A-Z. Index Help My Secure LA.I Safety Claims & Insurance Workplace Rights Trades & Licensing Washington State Department of Labor & industries HOLADAY PARKS INC Owner or tradesperson BECK, DAVID CARL Principals BECK, DAVID CARL, PRESIDENT CONNELL, DANIEL A, PRESIDENT GIRI, BIJIT, PRESIDENT PIZZEY, GRACE K, VICE PRESIDENT FREEL, JERRY LEE, VICE PRESIDENT PARKS, GERALD T JR, PRESIDENT (End: 08/12/2015) NAILON, JUNE ANNETTE, VICE PRESIDENT (End: 08/12/2015) O'CONNOR, BONNY K, SECRETARY (End: 08/12/2015) BECK, DAVID CLARENCE, TREASURER (End: 08/12/2015) VAN DER VEEN, ERIC M, VICE PRESIDENT (End: 08/14/2013) PIZZEY, GRACE KATHERINE, VICE PRESIDENT (End: 08/14/2013) VAN DER VEEN, JULIE ELIZABETH, MEMBER (End: 08/14/2013) CONNELL, DANIEL AARON, MEMBER (End: 08/14/2013) GIRI, BUIT, MEMBER (End: 08/14/2013) KIEL, RINALD HOWARD, MEMBER (End: 08/14/2013) WHITMYRE, CHRISTIAN, MEMBER (End: 08/14/2013) NELSON, MICHAEL, SECRETARY (End: 11/04/2010) PARKS, DAVID L, TREASURER (End: 11/04/2010) TALBOT, PAUL, TREASURER (End: 11/04/2010) WA UBI No. 578 004 089 4600 S 134TH PL SEATTLE, WA 98168 206-248-9700 KING County Business type Corporation License https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 09/28/2015 v CI \ I T Y v AP 99 ❑ 14-01 PROJECT SITE 7-127 %KING COUNT AIRPORT 0 FICE CENTER ( AA) 99 FROM DOWNTOWN SEATTLE EAST MARGINAL WAY CORPORATE PARK FROM SEATTLE-TACOMA AIRPORT DEVELODN E\TAL CE 900 v EXIT 158 OEING ACCESS RD EXIT 157 599 TUKWILA FROM KENT & AUBURN \TES, WAS HI\ GTO NO SCALE EXIT 157 900 1 :OEI G 'EVELOPMET'LCENTER 9725 EAST A GINAL AY SOUTH T KWILA,WASHIN TI 98108 AREA v A D 3LDG. A: DRESS: 9725 E. v AKI \AL WAY S. TU<WILA,WASHI\GTO\ NO SCALE 09-12C 3UIL31\G LOCATIO\ SEPARATE PERMIT REQUIRED FOR: 0 Mechanical atiecdic al ola \ OTES A CONSTRICTION SET OF DOCUMENTS, REVIEWED AND STAMPED BY THE CITY OF TUKWILA MUST BE ON SITE DURING CONSTRUCTION. DO NOT PROCEED WITH CONSTRUCTION WITHOUT THE ABOVE MENTIONED SET OF DOCUMENTS POSTED ON SITE. CODE SUN vA. Y LAND USE CODE CITY OF TUKWILA, WASHINGTON BUILDING CODES * IBC - INTERNATIONAL BUILDING CODE, ADOPTED EDITION * IFC - INTERNATIONAL FIRE CODE, ADOPTED EDITION * NFPA 101 NATIONAL LIFE SAFETY CODE * NEC - NATIONAL ELECTRICAL CODE, ADOPTED EDITION * NPFA 241 STANDARD SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS * WAC - STATE OF WASHINGTON ADMINISTRATIVE CODE * WCEC - THE WASHINGTON CITIES ELECTRICAL CODE, 2009 EDITION * CITY OF TUKWILA, WA. ORDINANCES AND ZONING MECHA\ICAL SCOPE OF WOR NARRATIVE: RELOCATE EXISTING MECHANICAL UTILITIES THAT ARE ROUTED ABOVE THE NEW SUBSTATIONS 10 AND 11. WORK INCLUDE BUT LIMITED HEATING WATER PIPING, CHILLED WATER PIPING, AND HVAC DUCTWORK. COORDINATE WORK WITH OTHER '9-120 STATION 5 AHU REPLACEMENTS'. ELECTI CAL SCOPE OF WO BRIEF PROJECT NARRATIVE: REPLACE A SINGLE -ENDED UNIT SUBSTATION AND A SECTION OF 15kV CABLING WITH A DOUBLE -ELIDED UNIT SUBSTATION. PROVIDE PANELBOARDS AND MOTOR CONTROL CENTERS. LENGTHY OUTAGES ARE NOT ACCEPTABLE. SUBSTATIONS 11 & 35 ARE BOTH SINGLE -ENDED WITH A TIE CIRCUIT BETWEEN THEM. REPLACE SUBSTATION 11 WITH A DOUBLE -ENDED UNIT AND REPLACE SUB 35 WITH A LARGE PANELBOARD (PANEL 1A6). FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCING WORK. PHASE 1: PANELBOARDS: PROVIDE 1200A MAIN CIRCUIT BREAKER, 480Y/277V, 30, 4-W, 42KAIC RATED PANELBOARD BY IEM. FEED 1200A PANELBOARD FROM NEW SUB 11. (PANEL 1A6) PROVIDE 800A MAIN CIRCUIT BREAKER, 480Y/277V, 30, 4-W, 42KAIC RATED PANELBOARD BY IEM (PANEL 1G2). LOCATE PANEL 1G2 ADJACENT TO EXISTING MCC9. REMOVE 1 SECTION OF EXISTING MCC9 TO ACCOMMODATE PANEL 1G2 INSTALLATION. PROVIDE 100A MCB, 480Y/277V, 30, 4-W, 42KAIC RATED PANELBOARD BY IEM (PANEL 1F2-1). REFER TO PLAN FOR PANEL 1 F2-1 LOCATION. MOTOR CONTROL CENTER (MCC-9): PROVIDE 225A MAIN CIRCUIT BREAKER, 480V, 30, 3-W, 60HZ, CLASS 1B WIRING, 65KAIC BRACING, TOP FEED, NEMA 1 GASKETED 21" FRONT MT ONLY ENCLOSURE. MOTOR CONTROL CENTER SHALL BE BY EATON: (RICHARD TURNER) INTERCEPT EXISTING MOTOR CONTROL CENTER MECHANICAL EQUIPMENT CONNECTION AND EXTEND TO NEW MOTOR CONTROL CENTER. CIRCUIT BREAKER: PROVIDE 100A/3P CIRCUIT BREAKER IN EXISTING PANEL H8 SPACE 25,27,29. it REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. FILE COPY Permit No, Mrs- Qiis Plan review approval is subject to errors and omissions. Approval of construction documents does not authorize the violation of any adopted code or ordinance. Receipt of approved Fief C nd co ditions is acknow! R - d: By: Date: Dt. a7 -1 City of Tukwila BUILDING DIVISION ELECTRICAL SCOPE CF WO CO\ TI\UE3 PHASE 2: DISCONNECT FEEDER #4: REMOVE 15KV CABLING OUT OF CONDUIT FROM SUBSTATION 11 SWITCH TO 15KV TAP BOX, THEN REMOVE CONDUIT FROM SAME SWITCH TO 15KV TAP BOX OFF-LOAD SUBSTATION 11: REFEED 9-80 BUILDING PANEL 32R VIA TRANSFER SWITCH #7 FROM 9-120 PANEL H8/25,27,29. INSTALL AN 800A, 480V PANEL IN PUMP ROOM ADJACENT TO MOTOR CONTROL CENTER 9. TEMPORARY SERVE NEW PANEL USING TIE FROM SUB 35 [600A BUS DUCT AND (2) 4"C, 4#350MCM EA.] PERMANENTLY SHIFT LOADS OFF SUB TO 800A PANEL PANEL B5 (400A) [(2) 3"C, 4#350KCMIL, 1#3G EA.] MCC-9 (200A) [(1) 2"C, 3#3/0, 1#6G], LIGHTING PANELS EAST -2 PANELS- [(1) 1-1/2” 4#2, 1#6G] TEMPORARILY SERVE EMERGENCY TRANSFER SWITCH (FINAL SERVICE WILL BE SUB 11) 150A CIRCUIT APPROX 5OLF1 TEMPORARILY SERVE [9-65] PANEL 2 & MCC-8 CIRCUIT (FINAL SERVICE WILL BE SUB 11) 225A CIRCUIT APPROX 50LF TEMPORARILY SERVE BUS #1 (FINAL SERVICE WILL BE SUB 11) 225A CIRCUIT APPROX 200LF/ TEMPORARILY SERVE BUS #2 (FINAL SERVICE WILL BE SUB 11) i225A CIRCUIT APPROX 300LFi REMOVAL OF SUB 11 DISCONNECT 15KV FDR #1 CABLING FROM SUB 11, AND UNPLUG IN VAULT CABLE TO BE RE -USED DISASSEMBLE AND REMOVE ALL OF SUB 11 REMOVE FEEDER #4 SPLICE BOX DISCONNECT INCOMING 15KV CABLING IN SPLICE BOX, AND UNPLUG IN VAULT CABLE TO BE RE -USED PULL OUT 15KV CABLING OUT OF CONDUIT FROM SPLICE BOX TO SUB 35 REMOVE SPLICE BOX RE -USED) ASSEMBLE NEW SUB 11/10 FILL IN ABANDONED CONTAINMENT TRENCH IN FRONT OF SUBSTATION POUR HOUSE KEEPING PAD FOR NEW SUBSTATION FOOTPRINT [APPROX 40'-8" X 6'-4" X 4"THICK] ASSEMBLE NEW SUBSTATION. INSTALL SUBSTATION PER MANUFACTURES INSTALLATION REQUIREMENTS. INSTALL (1) 15KV FEEDER BETWEEN DUPLEX SWITCHES (FDR 4) [(1) 4"C, 3#4/0 15KV CABLING] CONNECT SAVED 15KV CABLING FDR #1 TO DUPLEX SWITCH CONNECT SAVED 15KV CABLING FDR #4 TO DUPLEX SWITCH EXTEND 4" CONDUIT FROM SUB 35 TO EAST END DUPLEX SWITCH. CABLE TO BE PULLED LATER PHASE COMMISSION IN VAULT PLUG BACK IN FDRS #1 & #4 ACTIVATE NEW SUB 11 INSTALL PERMANENT SERVICE FROM SUB FOR BLDG 9-65, EMERG TRANSFER SWITCH, BUS #1 & BUS #2 INSTALL PERMANENT SERVICE FROM SUB FOR 800A PANEL {SAVE TIE FEEDER FOR RE-USEi REFEED PANEL 2F2-1 FROM SUB 11 RE-ESTABLISH TIE FOR SUB 75 (OLD PNL 2F2-1 FEEDER) FROM SUB 11 WILL NEED ADDITIONAL CAPACITY FOR 1200Ai RETIRE SUB 35 INSTALL A NEW 1200A PANELBOARD IN SUB 35 ROOM. USE TIE FEEDER AS SERVICE. FEED NEW 1200A PANELBOARD FROM SUB 11 PERMANENTLY SHIFT LOADS OFF SUB TO 1200A PANELBOARD 800A BUSWAY BUS #3 BUS #4 PANEL 2A7-1 PANEL B3-1 PANEL B6 DISASSEMBLE AND REMOVE ALL OF SUB 35 REARRANGE 15KV FEEDERS REROUTE FEEDER 4 FROM SUB 11 EAST SWITCH TO SUB 75 ! DECEIVED REROUTE FEEDER 3 TO SUB 11 WEST SWITCH CITY OF TUKWILA IN VAULT #6, SWITCH CABLE FROM FEEDER #3 TO FEEDER #7 SEP 1 6 2015 PERMIT CENTER ISSUED FOR CONSTRUCTION 04.07.15 REWED FOR g.QDE,CMPLIANCE APP 'Q11D SEP 2 4 2015 City ofTukwila I`LDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 ® Tel 206.267.1700. Fax 206.267.1701 SAZAN # 444-1443 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE REPLACE UNIT SUBSTATION 23904 SAZAN/SL 04.07.15 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN SOPHIE LIM DATE 04.07.15 APPROVED BY DEPT. DATE CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE TITLE ELECTRI COVER SHEET RCEU► SUBSTA I► 11 0 CURRENT REVISION 23904 SYMBOL DATE 04.07.15 SHEET JOB NO. DWG NO. GO COMP NO. 09-120-GO SLIM: 2/27/2015 8:36:16 AM ISSUE LEGEND NOT YET ISSUED INCLUDED IN SET SHEET NO, DRAWING TITLE REV DATE DRAWING NC, GENERAL 09-120-GO GO COVER SHEET - 04.07.15 09-120-G1 G1 INDEX OF DRAWINGS - 04.07.15 MECHANICAL . 09-120-1 M 11 R 1 M 11 R HVAC FIRST FLOOR PLAN - REMOVAL K 04.07.15 0 09-120-1M61R 1 M61 R FIRST FLOOR HVAC PIPING PLAN - REMOVAL C 04.07.15 0 09-120-1M111R 1M111R FIRST FLOOR PLUMBING PLAN - REMOVAL T 04.07.15 09-120-1 M361 R 1 M361 R INDUSTRIAL VENTILATION FIRST FLOOR PLAN- REMOVAL F 04.07.15 0 09-120-1 M 11 1 M 11 HVAC FIRST FLOOR PLAN K 04.07.15 09-120-1M61 1M61 FIRST FLOOR HVAC PIPING PLAN C 04.07.15 0 09-120-1 M 111 1 M 111 FIRST FLOOR PLUMBING PLAN T 04.07.15 09-120-1 M261 1M261 FIRE PROTECTION PLAN VIEW G 04.07.15 09-120-1M361 1M361 INDUSTRIAL VENTILATION FIRST FLOOR PLAN F 04.07.15 ELECTRICAL o 09-120-1E2R 1E2R 480Y/277V POWER 1ST FLOOR MAIN FEEDERS BUSWAYS AND PANELS - REMOVAL C 04.07.15 09-120-E2AR E2AR 13.8KV FEEDERS - REMOVAL B 04.07.15 09-120-1 E61 R 1 E61 R 120/208 VOLT POWER - REMOVAL A 04.07.15 09-120-1 E 11 ' R 1 E 111 R 480Y/277VOLT POWER - REMOVAL K 04.07.15 09-YD-E4BR E4BR SINGLE -LINE DIGRAM - 13.8KV - REMOVAL L 04.07.15 0 09-120-E4S1 ' R E4S11R ONE LINE DIAGRAM SUBSTATION 11 - REMOVAL B 04.07.15 09-120-E4S35R E4S35R ONE LINE DIAGRAM SUBSTATION 35 - REMOVAL F 04.07.15 0 09-120-E4S75R E4S75R ONE LINE DIAGRAM SUBSTATION 75 - REMOVAL C 04.07.15 0 09-120-1E9R 1E9R GROUNDING PLAN - REMOVAL B 04.07.15 09-120-1E2-SK 1E2-SK 480Y/277V POWER 1ST FLOOR MAIN FEEDERS BUSWAYS AND PANELS - TEMPORARY - 04.07.15 09-120-E2A E2A 13.8KV FEEDERS B 04.07.15 0 09-120-1E2 1E2 480Y/277V POWER 1ST FLOOR MAIN FEEDERS BUSWAYS AND PANELS C 04.07.15 09-120-1E61 1E61 120/208 VOLT POWER A 04.07.15 09-120-1E111 1E111 480Y/277VOLT POWER K 04.07.15 0 09-120-1E112 1E112 480Y/277VOLT POWER E 04.07.15 09-120-E4-SK E4-SK 15KV CONNECTION - SUBSTATION 10 AND 11 - ELEVATION - TEMPORARY - 04.07.15 09-120-1E9 1E9 GROUNDING PLAN B 04.07.15 09-YD-E4B E4B SINGLE -LINE DIGRAM - 13.8KV L 04.07.15 09-120-E4S1 I -SK E4S11-SK ONE LINE DIAGRAM SUBSTATION 11 - TEMPOROARY - 04.07.15 09-120-E4S10 E4S10 ONE LINE DIAGRAM SUBSTATION 10 B 04.07.15 09-120-E4S1I E4S11 ONE LINE DIAGRAM SUBSTATION 11 B 04.07.15 09-120-E4S75 E4S75 ONE LINE DIAGRAM SUBSTATION 75 C 04.07.15 09-120-2E2 2E2 480Y/277V POWER 2ND FLOOR MAIN FEEDERS BUSWAYS AND PANELS - 04.07.15 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE REPLACE UNIT SUBSTATION 23904 SAZAN/SL 04.07.15 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN SOPHIE LIM DATE 04.07.15 0 PREVIOUSLY ISSUED, • NOT IN THIS RELEASE IN THIS ISSUE REV A ORIGINAL ISSUE FOR CONSTRUCTION DRAWING REVISION - SEE SPECIFIC DRAWING FOR NATURE OF REVISION I E.CE1VED CITY OF TUKWILA SEP 1 6 2015 PERMIT CENTER ISSUED FOR CONSTRUCTION 04.07.15 APPROVED BY DEPT. DATE CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE TITLE ELECTRICAL MASTER DRAWING INDEX REPLACE UNIT BUILDIN ENTER, P WED FOR MPL.IANCE OVED SEP 2 4 2015 City of7ukwila ILDING DIVISION SAZAN GROUP 600 Stewart St., Ste 1400 Seattle, Washington 98101 • CURRENT REVISION 23904 Tel 206.267.1700 Fax 206.267.1701 SAZAN # 444-1443 SYMBOL DATE 04.07.15 SHEET COMP NO. 120-G 1 SUM: 2/27/2015 8:31:32 AM Expires: 09/26/16 SYM MZ-1 R.A. 26 6160 CFM ZONE 1 3455 CFM REVISION CD SEE CONTINUATION ON SHEET LLJ J U a BOT. OF DUCT ZONE 4 1300 CFM 22/18 24/12 IRE EST 12/12 1 BY 48/32 AIR RELIEF DAMPER IN BBOTTOM OF DUCT 500 CFM 35/30 22/12 1 12/10 E. 1 12/10 1( 1131 12/10 1( APPROVED DATE 17/12 SYM DROP 24" 13//20 14/20 24/20 POC 12/10 19 12/10 tD -41-'1, - 22/12 120x18 GRILL-15,000 CFM BOT. OF GRILL 14'-9" A.F.F. (ELEV. 30'3") BOT. OF DUCT 12'-10" A.F.F. (ELEV. 28'-4") 18/24 48x30 T.G. BOD 13'-6" AFFI BOD 12'-6" AFF 970 CFM 30/ 10 TYP. OF 1 32/12 TYP. OF 3 96x24 GRILLE '` 14 18 BOT. OF DUCT d \-15-0" (ELEV.30'-6") 300 CFM D-115 MATCHLINE + SEE CONTINUATION ON SHEET 1 M13 FROM AHU #10 FLOO PLA\ SCALE: 1/8"=1'-0" REVISION BY APPROVED DATE A RELOCATE FUME HOOD J#490021 KB/RAD 9.3.99 F CANCELLED 55613204 HARR RWS 2006 B RELOCATE EQUIPMENT PER J # 701647-00 DMV 06.22.00 G REV DUST COLL. IN BREAKOUT ROOM 57576000 HARR RWS 04/06/07 C INSTALL PLANER J # 701746-00 DMV 06. H SURPLUS HAMILTON FUME HOOD 4207457 HARR 06/13/07 D RELOCATE DUST COLLECTION FOR SINTERING 55613200 HARR RWS 08/05/05 RELOCATED INDUSTRIAL VAC & DUST COL. TO DWG. 1M361 S.RUDELL 05.22.08 E EXHAUST CONN. FOR METAL SINTERING. MACH. 55603201 HARR RWS 08/05/05 K REPLACE UNIT SUBSTATION 11 23904 WH MBL 04.07.15 ELECT. PANEL �14/12 MAKE UP SUPPLY AIR 500 CFM D-116 3'-6" CLEAR BREAKOUT TABLES 120 EXHAUST TO ROOF WITH RAIN COLLAR (1) ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN M.DITTMAR DATE 11.10.94 CHECKED ENGINEER S.ROSSE CHECKED APPROVED APPROVED LEGE\D ppC POINT OF CONNECTION --MArE FLEXIBLE DUCT WITH VOLUME DAMPER 24/12 240 s 240 / RECTANGULAR DUCT, FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN. ROUND DUCT, NUMBER INDICATES DIAMETER UPP OU EXISTING DUCTWORK TO BE REMOVED 340 A /CFM 100 -00 OTHERS AIR DIFFUSER/REGISTAR/GRILL. REFER TO SHEET M1A. 2-WAY EARTHQUAKE BRACING, SEE 4-WAY EARTHQUAKE BRACING, SEE 1M11 M504 1M11 M504 INDICATES GCU DASH NUMBER FOR WORK TASK. INDICATES OUTSIDE CONTRACTOR CONSTRUCTION FLAGNOTE. GE\HAL CTES 1. ALL NEW DUCTWORK IS TO BE FABRICATED PER DETAIL 1M11 M502 EFRE \CE 2RAW\ GS REF. DRAWINGS : 6130D-120-212, 6130D-120-202, 109-120-4114 CO\STRUCTIO\ \OTES 1. COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ANY REMOVAL OR HANDLING OF ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. REMOVE EXISTING AHU- 17, ASSOCIATED DUCTWORK AND APPURTENANCES AS INDICATED. THIS WORK IS PART OF 9-120 STATION 5 AHU REPLACEMENTS PROJECT. SECTION OF RETURN AIR DUCTWORK TO REMAIN. PROVIDE TEMPORARY CAP FOR FUTURE CONNECTION. THIS WORK IS PART OF 9-120 STATION 5 AHU REPLACEMENTS PROJECT. REMOVE EXISTING DUCTWORK AS SHOWN. EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN. PROVIDE SHEETMETAL BLANK -OFF AND INSULATE TO R-19 MINIMUM. THIS WORK IS PART OF 9-120 STATION 5 AHU REPLACEMENTS PROJECT. EXISTING SUPPLY DUCTWORK TO REMAIN. PROVIDE TEMPORARY CAP FOR FUTURE CONNECTION. THIS WORK IS PART OF 9-120 STATION 5 AHU REPLACEMENTS PROJECT. REVIWED FOR ODE APPROVED A SEP 2 4 2015 City of Tukwila ILDING DIVI51ON 8' 4' 0 4' SCALE: 1 /8"= 1 '-0" RECE;VED CITY OF TUKWILA 16' SEP 1 6 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 SUBTITLE TITLE HVAC FIRST FLOOR PLAN REPLACE UNIT BUILDIN MECHANICAL MASTER COL. SYMBOL 3oo9 u2th Ave NE, Suite um Bellevue WA 98004 425.628.6000 woodharbinger.com DATE 04.07.15 STAT 11 1M10 1M12 KEY PLAN 1M13 Iill,. ,,ilh II III Wood Harbinger CURRENT REVISION 23904 SHEET cs LC nePFtin.ie• n') /1 R /1 c LEGE\ D 1 HWR TO 2ND ' FLR. RADIATOR CL lj" HWR TO 1ST FLR. RADIATOR 4"HWR 2''HWS rL4"HWR� 2 WS / 2"CHWS rL 2 "CNWR_Z—I as 4"CHWS II C� q4"CEIWfF1 / Ct MZ-1 "HWS& HWR TO AHU-2, 2ND FLR. OVEN ROOM 1 F21 12F2 CLWS---0 CLWR If CHWR CHWS RPM LAB 1G21 CHWR CHWS �_1"HWS TO 2ND 1 FLR. RADIATOR INN 4"CHWR RPM 1 1 re." CLWS f— MOIRE TEST 134 DN TO AHU 1-1/2" SHOP 135 WORK ROOM 136 t FOR CONTINUATION DN TO AHU (11F4� CLWR CLWS CHWsv CHWR CHW�H SEE SHEET 1A13 REVISION BY APPROVED DATE SYM STRAIN GAUGE LAB 141 REVISION 16H 8" 8"COOLING WATER FROM TOWER/PUMP HOUSE FOR CONTIN. SEE DWG. 109-101-4968—M1 8"CLWS 8"CLWR w J J U0 w J J 0 U (11H3 8" %4"THREDOLET FOR 4" THERMOWELL MAMAC A-500-1 STM CLWR CLWS 8" (TUNNEL ACCESS) A& 1M61 1M500 ENLARGED PARTIAL PLANS 1 -l'HWR SL4'TiLNS_ _COWS UP 0 11H4 2" BY �12H4� APPROVED DATE REPLACE 9-65 COOLING WATER SYSTEM J#557761-01 M.WONG RWS 10.10.06 UPDATED DWG & RELOCATED VAC TO DWG. 1M361 S.RUDELL RELOCATE ACAL/ASIC LAB 12370682 M.WONG RWS 01.05.12 REPLACE UNIT SUBSTATION 11 23904 WH MBL 04.07.15 CHWS & CHWR ENLARGED PARTIAL PLAN B 1M161 1M505 L_L4" HWS GATE VALVE 5'-0" A.F.F. Ib UP 3/4" CH-2 q. 3/4" HWR WJ PLUG COCK 5.17) A.F.F. 6" CHWS FROM 9-101 ROOF,_ SEE DWG. 109-101-4954—M1 & 6130D-120-229 6" CHWR FROM 9-101 ROOF_ SEE DWG. 109-101-4954—M1 Sc 6130D-120-229 t 3/4" H UH-2 1"HWR — 3/4" 2" HWS & R TO MAKE—UP AIR UNIT, SEE DETAIL 4" 2" 0' C' 1i"HWS TO2ND FLR. RADIATOR TO AHU-3, 2nd FLR. ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN EDDIE P. DUARTE DATE 03.19.03 CHECKED ENGINEER CHECKED APPROVED APPROVED 8' 4' 0 4' SCALE: 1 /8"=1'-0" WED FOR WQ.E COMPLIANCE APPROVED SEP 2 4 2015 City of Tukwila BUILDING DIVISION 8' 16' — CHWS - CHWR - CLWS - CLWR - STM - HWS CHILLED WATER SUPPLY CHILLED WATER RETURN COOLING WATER SUPPLY COOLING WATER RETURN STEAM SUPPLY HEATING WATER SUPPLY //, EXISTING PIPING TO BE REMOVED GE THERMOWELL POINT OF CONNECTION 2—WAY EARTHQUAKE BRACING, SEE 4—WAY EARTHQUAKE BRACING, SEE 1 M 61 PAL \OTES CO\STUCTIO\ \OTES M504 COORDINATE CHWS/R SHUTDOWN THROUGH BOEING CONSTRUCTION MANAGER AND PROJECT ADMINISTRATOR. 2. COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ANY REMOVAL OR HANDLING OF ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. REMOVE SECTION OF (E)CHWS/R PIPING AND APPURTENANCES AS SHOWN TO PROVIDE ACCESS FOR NEW ELECTRICAL SUBSTATION. REINSTALL PIPING AT NEW LOCATION INDICATED ON DWG 09-120-1M61. RELOCATE EXISTING VALVE CONNECTIONS 3'-0" EAST. SEE DWG 09-120-1 M61 FOR NEW LOCATION. REMOVE HEATING (E)HWS/R PIPING SERVING AHU-17 BACK TO TEE AND CAP AS INDICATED. THIS WORK IS PART OF 9-120 STATION 5 AHU REPLACEMENTS PROJECT. FOR (E)AHU-17 AND ASSOCIATED DUCTWORK REMOVAL, SEE DWG 09-120-1M11R. THIS WORK IS PART OF THE 9-120 AHU STATION 5 REPLACEMENTS PROJECT. HFEK\CE SAW GS TIFF 6130D-120-202 TIFF 6130D-120-212 TIFF 6130D-120-214 TIFF 6130D-120-226 TIFF 6130D-120-229 TIFF 6130D-120-230 109-120-1M500 109-120-1M505 109-120-1M506 REC1~ EVEIj CITY OF TUKWILA SEP 1 & 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 SUBTITLE TITLE FIRST FLOOR HVAC PIPING PLAN REPLACE UNIT SUBST N BUILDING 9— MECHANICAL MASTER COL. F-K CENT 1M60 1M62 FIRST FLOOR PLAN MECHANICAL ROOM PLAN & SECTIONS CONVERTER STATION PLANS CHILLED WATER STATION PLAN CHILLED WATER STATION PLAN CHILLED WATER STATION PLAN CONVERTER STA. 1-4 PLAN & SECTIONS CHILLED WATER PARTIAL PLAN & SECTIONS CHILLED WATER PARTIAL PLAN & SECTIONS 1M63 0 --) 1M65 KEY PLAN f O Wood Harbinger CURRENT REVISION 23904 SHEET SYMBOL DATE 3oo9 il2th Ave NE, Suite ioo Bellevue WA 98004 425.628.6000 woodharbinger.com 04.07.15 COMP NO. 1M61R LECE\D SYM AIR AMPLIFIER/DRYER FOR SINTERING MACH. 2"WASTE UP 125# PSI COMPRESSED AIR 3/4"CA TO COL. E4 REVISION 3/4" -HWC 3/4'' z 0 MATCHLINE SEE CONTINUATION OVEN ROOM MOIRE TEST 134 SHOP 135 WORK ROOM FAST FLCOPLUV31 FCO 125# PSI C ®-1/2" 1/2"A 1/2"A MATCHLINE G PLA\ SCALE: 1/8"= 1'-0" BY APPROVED DATE SYM REVISION FREEZER 2"WASTE & VENT FOR AIR COND. UNITS RPM LAB STRAIN GAUGE 3/4"A 141 3/4"A 4"VACUUM EXHAUST DN. —\ ` 1 1/4" VENT LINES ■, ■■ VI ' I 1" GATE VALVE .jummill!___ IV rain 1 COND. P 3/4" P (16H2 FCO O 2" SAN UP 1/2" 0FCO 1/2" SEE CONTINUATION ON SHEET 1M113 BY APPROVED MP TRAP DATE 14" 0 VENT 3/4" 2-1/2" 4" A REDUCING STATION '0 COND DRAI r (1 1-1/2" 3/4" A 9-120 RENOVATION J#16054201-02 COFFMAN M. SOTURA 07.12.07 S RELOCATE ACAL/ASIC LAB 12370682 M.WONG RWS 01.05.12 RECORD DRAWING Q REMOVE DRINKING FOUNTAIN J#16054201-02 6382422 COFFMAN HARR M. SOTURA RWS 06.16.08 02.13.08 T REPLACE UNIT SUBSTATION 11 23904 WH MBL 04.07.15 COMBINED DLR WITH OLD 1M111 S.RUDELL 07.24.08 R ADD AIR DROPS 4464 HARR 05/05/09 11) PRV-300GPM ®100-70 PSI �EWAR STATION w Y"OD SS-304 UP TO 2ND FL. 2"ACID WASTE UP 1st F. R.SINK 3"CW DN 2"GAS DN W/ VALVE IN RISER 4"AIR DNW/ VALVE IN RISER 3" —FU B8D 3" VENTS 3" FUD El FCO 0 3"WUPTOFI; SPRINKLER DR 1Y"A UP TO 2ND FL. UP 2 PSI COMP. AIR AIN ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN COFFMAN C2D DATE 05.23.07 /1) CHECKED M. SOTURA N `1NE1_R CHECKED APPROVED APPROVED 05.23.07 HW CW• A HPA HWC STS SAN Iw AR CD HOT WATER, DOMESTIC COLD WATER, DOMESTIC COMPRESSED AIR 125# HIGH PRESSURE COMPRESSED AIR HOT WATER CIRCULATING, DOMESTIC STORM DRAIN SANITARY WASTE INDUSTRIAL WASTE ACID RESISTANT WASTE CONDENSATE DRAIN ---V--- VENT ® AIR OUTLET, HARD PIPE, DUPLEX AIR DROP - HOSE, DUPLEX FLOOR CLEAN OUT FLOOR DRAIN FUNNEL DRAIN GE A �FCO ri r � FD FUD 2-WAY EARTHQUAKE BRACING, SEE 1M111 M504 4-WAY EARTHQUAKE BRACING, SEE POINT OF CONNECTION RAL TES EFRE\ CE DAWI\GS 6130-D-9-120-102 PLUMBING PLAN MYLAR DRAWING WED FOR C MPLIANCE P OVED RECEIVED CITY OF TUKWILA SEP 1 6 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 SUBTITLE TITLE FIRST FLOOR PLUMBING PLAN REPLACE UNIT S ATIO ARCHITECTURAL MASTER BUILDIN COL. TER, S-RUCTIO\ \OTES COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ANY REMOVAL OR HANDLING OF ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. REMOVE EXISTING FUNNEL DRAIN AND PLUG EXISTING WASTE PIPING, PROVIDE COVER PLATE, FLUSH WITH FINISHED FLOOR. 1M110 KEY PLAN SCALE: NONE 8' 4' 0 1M113 4' K 8' 16' :--77_7NM-- SCALE: 1 /8"=1'-0" i Wood ` Harbinger CURRENT REVISION 23904 SHEET SYMBOL DATE 3oo9 with Ave NE, Suite ioo Bellevue WA 98004 425.628.6000 woodharbinger.com 04.07.15 COMP NO. 1M111R nePFNn.ie• n9 /9-4 /1 c 11.4. SYM REVISION 8"0 UP 10"0 UP 1490 UP '1"---14"0 EXHAUST DUCT, DOUBLE WALL, TYP FUME HOOD EXHAUST DUCT EF 1 F2 12'-0" EF 1 F3 v 81 x 60"x30" FUME HOOD 1000 CFM I SEE CONTINUATION ON SHEET 1 M360 81"x 1 1 M3661M537 '-14" 0 OV=N ROOM ProcessTable 1 F2 ProcessTable 1> Large Oven Large Part Processing EL.15'-4" VAC O O 6" sc SANDBLAST ,-- 4"VAC () BPoO(EPORT Large Steel Table LAB 1 G21 0 PPED O ,- 3"VAC n,.:t Table Whr 08"VAC 0 aalndwo3 15HP SPENCER g MOIRE TEST 134 BY SHOP 135 APPROVED WORK ROOM 136 DATE SYM 0) 0) 0) _ U z m N x M 0 gx N0 M Ws P 9 Pgt N X O tv r 11 F4 w m x a BENCH 36X72 w p u09fi j- t TUBE STORAGE & LAYUP TBL 5'x9' LAYUP TBL 8" 0 TIED INTO 16x11 DUCT ABOVE FUME HOOD REVISION 0 X BENCH 36X72 STRAIN GAUGE LAB 141 TABLE 30X60 0 X 0 N P1 z 0 z 0 U z W m ROLLING CART ROLLING CART BY (16H2) TUBE STORAGE & LAYUP TBL (TEMPORARY CONSTRUCTION DETAIL) 2OHP SPENCER 0'= \ - 3-1 21 }C 5", t M USTA NSES 5 5 f 2 TO SPENCER 5" TORIT D.C. 1500 CFM 208 v 5 HP. �4" ABANDONED 4" ABANDONED T...-1:) a 0 „9S/KOUT -1/8 VA CART SIISAIX ODD BUST BEM MIST 1-1/4" (16H3) oQo BENCH' 36X72 a) rn z 0 U z W W X X N 0J m z n _ U z W m ROLLING CARM /I— Q UP EYE WASH (11H4 -1/2" C APPROVED g DATE (12H4) SEE CONTINUATION ON SHEET 1M363 INDUST. VAC RELOCATED FROM DWGS. 1 M11 &1 M61 S.RUDELL 05.22.08 E CDC RELOC - PKG 6A NORTH - RFI 27 J#19670-10 WH MBL 06.11.14 A PROVIDE HK VAC PORT 10897801/9710861 HARR 07/21/10 F REPLACE UNIT SUBSTATION 11 23904 WH MBL 04.07.15 B CDC RELOC-STRAIN GAUGE LAB-PKG 6-NORTH J#19670-10 WH MBL 02.17.14 C CDC RELOC- PKG 6-SOUTH - RFI-016 J#19670-10 WH MBL 03.11.14 D ADDENDUM 02 - PKG 6A-NORTH J#19670-10 WH MBL 05.20.14 ap UP PP 20" DISC SANDER Del 5" PP PP If 8 5 4" 6"X9" 6'"�J -VERTICAL BAND SAW /JOINER PLANER ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN S.RUDELL 3 Go TORIT DUST COLLECTOR DATE 05.22.08 CHECKED ENGINEER CHECKED APPROVED APPROVED 8' 4' 0 4' Re " WED FOR cL19E,MPLIANCE APPROVED 8' SCALE: 1 /8"=1'-0" SEP 24 2015 �ft, filikwIla DIVISION 16' LEGE\ D GE\HAL \OTES CONICAL HOOD OVER OVEN EXHAUST PORT. DUCT EXHAUST UP TO ROOF WITH DRAIN AT BOTTOM OF RISER. 7 FEET BEYOND ROOF LEVEL. ABANDONED DUCTWORK FUME EXHAUST UP TO ROOF; EXTEND TO ONE FOOT BEYOND ROOF LEVEL. EFRE \CE DAWI\GS CO\STUCTO\ OYES 1. COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ANY REMOVAL OR HANDLING OF ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. RECEVE C9TV OF TUK REROUTE EXISTING 8" 0 EXHAUST DUCT TO ALLOW REQUIRED CLEARANCE FROM TOP OF NEW SUBSTATION. PROVIDE NEW DUCTWORK AS REQUIRED. COORDINATE WITH EXISTING CONDITIONS. SEE DWG 01-120-1M361. t—i /Q 1M162 1M163 r SEP 1 6. 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 SUBTITLE TITLE INDUSTRIAL VENTILATION FIRST FLOOR PLAN REPLACE UNIT SU TIO BUILDIN MECHANICAL MASTER COL. KEY PLAN Wood Harbinger CURRENT REVISION 23904 SYMBOL F DATE 3oo9 with Ave NE, Suite xoo Bellevue WA 98o04 425.628.6oao woodharbinger.com 04.07.15 SHEET G NO. COMP NO. 9-120 361R TInUNCTnti• nc/9n/ie. 19.1R, MZ-1 R.A. , 6160 CFM 26/161 ZONE 1 3455 CFM 35/24 BOT. OF DUCT 14'-6"A.F.F. 35/24 48/32 AIR RELIEF DAMPER IN BBOTTOM OF DUCT 48 3 M Z - 1 ZONE 4 1300 CFM SUBSTATION #10 SEE CONTINUATION ON SHEET 1 M10 13 /20 N 35/30 22/12 00 18/24 r' 1 25/24 17 12 MZ-2 J Xr I/► 7 SUBSTATION #11 31 LL- U 00 11 II DN N 0 N) w 0 E)OA LOUVER BLANKED OFF) DN I 00 c-) 0 N 00 10 w 0 11 11 0 N N 56/24 —0—'1,— 22/12 17/12 CAP FOR FUTURE CONNECTION BOT. OF DUCT \-15'-0" A.F.F. (ELEV.30'-6") 120x18 GRILL-15,000 CFM BOT. OF GRILL 14'-9" A.F.F. (ELEV. 30'3") CAP FOR FUTURE CONNECTION 18/24 22/18 CD 24/12 IRE NEST 10 SR CAPPEDn 1131 12/10 10i SR 240 10 CFM 12/12 1 DROP 24" :0 48x30 T.G. BOD 13'-6" AFFI /29 24/20 (11 12/10 1( r Q1 12/10 0 500 CFM / SR TYP.OF 6 12 12/10 1 r r BOD 12'-6" AFF 970 CFM 30/ 10 TYP. OF 1 32/12 TYP. OF 3 300 CFM D-115 N N ELECT. PANEL 230 CFM �� D-115r �• 230 CFM co- / D-115r- N 230 CFM D-115r� —14/12 MAKE UP SUPPLY AIR 28/10 8 14/8 500 CFM D-116 120 UP 24 N 10 N 96x24 GRILLE FROM AHU #10 3'-6" BREAKOUT TABLES STAIR #2 8' -8" B.O.D. CLEAR 8. 15 28/10 UP 0 N rr 60/18 MATCHLINE SEE CONTINUATION ON SHEET 1M13 C2) 120 EXHAUST TO ROOF WITH RAIN COLLAR (4) LECE\D pp C POINT OF CONNECTION -NW-E- FLEXIBLE DUCT WITH VOLUME DAMPER 24/12 240 9 240 u SUPPLY OUTLET 340 A CFM 100 -00 OTHERS GE RECTANGULAR DUCT, FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN. ROUND DUCT, NUMBER INDICATES DIAMETER AIR DIFFUSER/REGISTAR/GRILL. REFER TO SHEET M1A. 2-WAY EARTHQUAKE BRACING, SEE 4-WAY EARTHQUAKE BRACING, SEE 1M11 M504 1M11 M504 INDICATES GCU DASH NUMBER FOR WORK TASK. INDICATES OUTSIDE CONTRACTOR CONSTRUCTION FLAGNOTE. \E�AL \OTES 1. ALL NEW DUCTWORK IS TO BE FABRICATED PER DETAIL 1M11 M502 EFRE\CE DAWI GS REF. DRAWINGS : 6130D-120-212, 6130D-120-202, 109-120-4114 CO ST UCTIO\ OTES COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ANY REMOVAL OR HANDLING OF ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. POINT OF CONNECTION. COORDINATE ROUTE OF DUCTWORK WITH EXISTING CONDITION. EXISTING LIGHTING FIXTURE TO BE RELOCATED BY ELECTRICAL FOR CLEAR ACCESS OF SUPPLY DUCTWORK AT THIS LOCATION. SEE ELECTRICAL DRAWINGS. EXISTING WALL DUCT PENETRATION TO BE PATCHED TO MATCH EXISTING. THIS WORK IS PART OF 9-120 STATION 5 AHU REPLACEMENTS PROJECT. WED FOR Cq MPLIANCE APPROVED SEP SEP 24 2015 f CE. /E.0 Crry OF TUi WILA SEP 1 6.2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 8' 0 1M10 1M12 1M13 4' 0 KEY PLAN 4' SCALE: 1 /8"=1'-0" 8' 11-1 1M15 16' Wood Harbinger 3oog u2th Ave NE, Suite ioo Bellevue WA 98o04 425.628.6o00 woodharbinger.com SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE K REPLACE UNIT SUBSTATION 11 B RELOCATE EQUIPMENT PER 23904 J#701647-00 WH DMV MBL 04.07.15 F CANCELLED 06.22.00 G REV DUST COLL. IN BREAKOUT ROOM 55613204 57576000 HARR HARR RWS RWS 2006 04/06/07 C INSTALL PLANER J#701746-00 DMV 06.22.00 H SURPLUS HAMILTON FUME HOOD 4207457 HARR 06/13/07 D RELOCATE DUST COLLECTION FOR SINTERING 55613200 HARR RWS 08/05/05 RELOCATED INDUSTRIAL VAC & DUST COL. TO DWG. 1 M361 S.RUDELL 05.22.08 E EXHAUST CONN. FOR METAL SINTERING. MACH. 55603201 HARR RWS 08/05/05 J CDC RELOC—STRAIN GAUGE LAB—PKG 6A—NORTH J#19670-10 WH MBL 02.17.14 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN M.DITTMAR DATE 11.10.94 CHECKED APPROVED APPROVED SUBTITLE TITLE MECHANICAL MASTER HVAC FIRST FLOOR PLAN REPLACE UNIT SUBST BUILDING 9 COL. F-K SYMBOL DATE 04.07.15 CURRENT REVISION 23904 SHEET LECE\D HWR TO2ND FLR. RADIATOR 4_11' HWR TO 1ST FLR. RADIATOR 4j4'HWS_& HWR TO AHU-2, 2ND FLR. Q_1"HWS TO 2ND FLR. RADIATOR 4"CHW .4"CNWR 4"HWR fE__-4,>HHWR_ HW L2"» S_� (L 2CHWS �2"CNWR / MZ-1 SUBSTATION #10 SEE CONTINUATION ON SHEET 1M60 (12F2) OVEN ROOM 1 F21 Is CLWS —rl CLWR r7 N IP ,> CHWR CHWS (E)CHWS/R TO AHU-17 RPM LAB 1G21 fn U RP(v fl » CLWS 6 CLWR i—CLWS CHWS® 1 8"COOLING WATER FRCM TOWER/PUMP HOUSE =0R CONTIN. SEE DWG. 109-101-4968—M1 8"CLWS 8"CLWR 8" 8" UU (11H3 0 MOIRE TEST 134 DN TO AHU 1-1/2" SHOP 135 WORK ROOM 136 DN TO AHU (11F4� STRAIN GAUGE LAB 141 16H 2 ,, ( 3/"THREDOLET FOR 4" THERMOWELL MAMAC A-500-1 STM CLWR-0-- 8" (TUNNEL ACCESS) A& 1M61 1M500 ENLARGE DPARTIAL PLANS 1 i"HWR SkA"HWS ••••••••••M { 3/4" HWS CHWS & CHWR ENLARGED PARTIAL PLAN B 1M161 1M505 "I- f GATE VALVE J 5'-0" A.F.F. a a U UP 11H4 (12H4) 7— 2" MATCHLINE SEE CONTINUATION ON SHEET 1M63 1"HWR UP 3/4" CH-2 3/4" HWR Wl PLUG COCK 5 —0 A.F.F. 6" CHWS FROM 9-101 ROOF,_ SEE DWG. 109-101-4954—M1 & 6130D-120-229 (1 6" CHWR FROM 9-101 ROOF_ SEE DWG. 109-101-4954—M1 & 6130D-120-229 a i t II 3/4" HWR UH-2 f- 3/4" u 71 2" HWS & R TO MAKE—UP AIR UNIT, SEE DETAIL 4" 2" CI of I I 1i" HWS TO 2ND FLR. RADIATOR 1-1 /4" TO AHU-3, 2nd FLR. 8' 4' C c5) 0 4' 8' 16' _—_ SCALE: 1 /8"=1'-0" - CHWS - CHWR - CLWS - CLWR - STM - HWS - HWR II s P.O.C. 1 X CHILLED WATER SUPPLY CHILLED WATER RETURN COOLING WATER SUPPLY COOLING WATER RETURN STEAM SUPPLY HEATING WATER SUPPLY HEATING WATER RETURN FLOW METER THERMOWELL POINT OF CONNECTION 2—WAY EARTHQUAKE BRACING, SEE 4—WAY EARTHQUAKE BRACING, SEE GE\HAL OTES 1M61 CONS-RUCTIC \OTES COORDINATE CHWS/R SHUTDOWN THROUGH BOEING CONSTRUCTION MANAGER AND PROJECT ADMINISTRATOR. 2. COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ANY REMOVAL OR HANDLING OF ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. PROVIDE CHWS/R PIPING INDICATED. LOCATE AT AN ELEVATION OF NO LESS THAN 14'-10" AFF AT THIS LOCATION. PROVIDE INSULATION TO MATCH EXISTING. COORDINATE WITH EXISTING CONDITIONS. RELOCATE (E)CHWS/R PIPING WITHIN THIS AREA TO AN ELEVATION OF NO LESS THAN 14'-2" AFF AND A MINIMUM OF 6'-0" ABOVE TOP OF NEW SUBSTATION AS REQUIRED. PROVIDE ADDITIONAL PIPING, FITTINGS, INSULATION, HANGERS AND ACCESSORIES AS REQUIRED. COORDINATE WITH EXISTING CONDITIONS. KEEP INSULATION INTACT, OTHERWISE REPAIR OR PROVIDE NEW INSULATION IF FOUND DAMAGED. RELOCATE EXISTING LIGHTING FIXTURE TO CLEAR ACCESS OF PIPING AS NECESSARY. POINT OF CONNECTION. EFRE\CE DAW\GS TIFF 6130D-120-202 TIFF 6130D-120-212 TIFF 6130D-120-214 TIFF 6130D-120-226 TIFF 6130D-120-229 TIFF 6130D-120-230 FIRST FLOOR PLAN MECHANICAL ROOM PLAN & SECTIONS CONVERTER STATION PLANS CHILLED WATER STATION PLAN CHILLED WATER STATION PLAN CHILLED WATER STATION PLAN 109-120-1 M500 CONVERTER STA. 1-4 PLAN & SECTIONS 109-120-1M505 CHILLED WATER PARTIAL PLAN & SECTIONS 109-120-1M506 CHILLED WATER PARTIAL PLAN & SECTIONS WED FOR MPL1ANQE , f P OVED SEP 24 2015 elty orrukvvila ILD1NG DIVISION RECEIVED 1M60 1M62 1M63 CITY OF TUKWILA SEP 1 6 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 1M65 KEY PLAN 0 0 Wood Harbinger 3009 "nth Ave NE, Suite ioo Bellevue WA 98004 425.628.60o0 woodharbinger.com SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A REPLACE 9-65 COOLING WATER SYSTEM J#557761-01 M.WONG RWS 10.10.06 UPDATED DWG & RELOCATED VAC TO DWG. 1M361 S.RUDELL R RELOCATE ACAL/ASIC LAB 12370682 M.WONG RWS 01.05.12 C REPLACE UNIT SUBSTATION 11 23904 WH MBL 04.07.15 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN EDDIE P. DUARTE DATE 03.19.03 APPROVED BY DEPT. DATE CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE FIRST FLOOR HVAC PIPING PLAN TITLE MECHANICAL MASTER REPLACE UNIT SUBST BUILDING 9- COL. F-K CURRENT REVISION 23904 SYMBOL DATE 04.07.15 SHEET COMP NO. 0-1 M61 19•19•9d PkA !`PFrt!• 1 /1 1 /9(11 C SYM REVISION AIR AMPLIFIER/DRYER FOR SINTERING MACH. 2"WASTE UP 125# PSI COMPRESSED AIR 3/4"CA TO COL. E4 3/4" -HWC C 3/4 0 V) Ld J FIST FL00 SCALE: 1/8"= 1'-0" BY APPROVED SUBSTATION #10 OVEN ROOM MOIRE TEST 134 SHOP 135 WORK ROOM DATE SYM FCO 125# PSI C �— 1/2' 1/2"A 1/2"A MATCHLINE SUBSTATION #11 A REVISION 2"WASTE & VENT FOR AIR COND. UNITS GAS & LIQ. LINE FREEZER STRAIN GAUGE 3/4"A 141 3/4"A COND. P /4" P— (16H2) FCO O 2" SAN UP 1/2" FCO 1/2" SEE CONTINUATION ON SHEET 1M113 BY APPROVED MP TRAP DATE 4"VACUUM EXHAUST DN. 1 1/4" VENT LINES 1" GATE VALVE 0 VENT 3/4" 3/4" 2-1/2" REING ;TION '0 COND DRAI 3/4" A 9-120 RENOVATION J#16054201-02 COFFMAN M. SOTURA 07.12.07 S RELOCATE ACAL/ASIC LAB 12370682 M.WONG RWS 01.05.12 RECORD DRAWING J#16054201-02 COFFMAN M. SOTURA 06.16.08 T REPLACE UNIT SUBSTATION 11 23904 WH MBL 04.07.15 REMOVE DRINKING FOUNTAIN 6382422 HARR RWS 02.13.08 COMBINED DLR WITH OLD 1M111 S.RUDELL 07.24.08 R ADD AIR DROPS 4464 HARR 05/05/09 PRV-300GPM ©100-70 PSI DEWAR STATION W Y"OD SS-304 UP TO 2ND FL. FUD y„ 3" ST ELEV. 14'-2" 3"CW DN 2"GAS DN W/ VALVE IN RISER 4" AIR DN W/ VALVE IN RISER 2"V UP 3"V UP 3" VENT- 3"W UP TO FRE SPRINKLER DRAIN 1Y"A UP TO 2ND FL. UP 2 PSI COMP. AIR ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN COFFMAN 2' 3) U DATE 05.23.07 APPROVED BY DEPT. DATE CHECKED M. SOTURA ENGINEER 05.23.07 CHECKED APPROVED APPROVED LEGE\D HW CW - A HPA - HWC - - STS - - SAN - - IW - - AR - - CD - HOT WATER, DOMESTIC COLD WATER, DOMESTIC COMPRESSED AIR 125# HIGH PRESSURE COMPRESSED AIR HOT WATER CIRCULATING, DOMESTIC STORM DRAIN SANITARY WASTE INDUSTRIAL WASTE ACID RESISTANT WASTE CONDENSATE DRAIN - - -V- - - VENT GE OFCO W r, L/ FD FUD 4 AIR OUTLET, HARD PIPE, DUPLEX AIR DROP - HOSE, DUPLEX FLOOR CLEAN OUT FLOOR DRAIN FUNNEL DRAIN 2-WAY EARTHQUAKE BRACING, SEE 1M111 M504 4-WAY EARTHQUAKE BRACING, SEE POINT OF CONNECTION \RAL COTES CO\ STUCTIO\ VOTES 1. COORDINATE COMPRESSED AIR PIPING SHUTDOWN THROUGH BOEING CONSTRUCTION MANAGER AND PROJECT ADMINISTRATOR. COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ANY REMOVAL OR HANDLING OF ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. RELOCATE EXISTING AIR AMPLIFIER/DRYER, ASSOCIATED PIPING, DEVICES AND APPURTENANCES 6'-0" NORTH TO ALLOW REQUIRED CLEARANCE FROM SIDE OF NEW SUBSTATION. PROVIDE NEW SECTION OF PIPING AS REQUIRED. RELOCATED (E)3/4" COMPRESSED AIR PIPING AND APPURTENANCES WITHIN THIS AREA TO AN ELEVATION OF NO LESS THAN 14'-6" AFF AND A MINIMUM OF 6'-0" ABOVE TOP OF NEW SUBSTATION AS REQUIRED. PROVIDE ADDITIONAL PIPING, FITTINGS, INSULATION, HANGERS AND ACCESSORIES AS REQUIRED. COORDINATE WITH EXISTING CONDITIONS. EFRE\CE NAWI\ GS 6130-D-9-120-102 PLUMBING PLAN MYLAR DRAWING WED FOR MPLIANCE APOVD SEP 2 4 2015 . City arTukwila • , 'WING DIVISION R. CEtVED CITY OF TUKWILA SEP 1 6 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 SUBTITLE TITLE FIRST FLOOR PLUMBING PLAN REPLACE UNIT SUB ARCHITECTURAL MASTER BUILDING COL. F 1M110 1M112 KEY PLAN SCALE: NONE 8' 4' 0 1M113 4' SCALE: 1 /8"=1'-0" 8' 16' Wood All Harbinger CURRENT REVISION 23904 SYMBOL DATE 3009 with Ave NE, r Suite zoo Bellevue WA 98004 425.628.6000 woodharbinger.com 04.07.15 SHEET COMP NO. 1M111 newnin ie• n') /17 /1 F na•4.-4 8"0 UP 10" 0 UP 14"0 UP 14"0 r9 EXHAUST DUCT, DOUBLE WALL, TYP FUME HOOD EXHAUST DUCT EF 13 SUBSTATION #10 SUBSTATION #11 ff 12'-0" 10"o� EF 1 F3 60"x30" FUME H00 v 81 '"x� f'9 C N 1000 CFM I - > SEE CONTINUATION ON SHEET 1 M360 81 "x 1 1M361 M537 —OVEN ROOM 1 F2 ProcessTable 1 ProcessTable 1 Large Oven Large Part Processing EL.15'-4" VAC 01 O 00 6" ALUM RAIC SANDBLAST �- 4"VAC () Large Steel Tahlto LAB 1 1PPED—\ �0,,-3"VAC G21 r..t Table 92ei 8 VAC 5 wjuao�eviDi 15HP SPENCER y- ufg, g MOIRE TEST 134 SHOP 135 WORK ROOM 136 2 2 0) L _ U z w m o 5 co 0 X X C1 LJ J F- N O CO CO 0 -'C O —I co r x CO I1J r 1 1 F4 8"0 TIED INTO 16x11 DUCT ABOVE FUME HOOD BENCH 36X72 5'x9' LAYUP TBL TUBE STORAGE & LAYUP TBL 5'69' LAYUP TBL T BL 0 M BENCH 36X72 STRAIN GAUGE LAB 141 0 0 350 D D 350 O TABLE 30X60 16H2 TUBE STORAGE B LAYUP TBL (USIA NSES 7— (TEMPORARY CONSTRUCTION DETAIL) D 2 20HP SPENCER i 3-1 2" )C_a,5___t TO SPENCER 3-1/2" CO N 5" TORIT D.C. 1500 CFM 208 v 5 HP. 4' I.NdR SM i 41OR 0W1 sm (-0.-___42*-2-1 /8 4" ABANDONED 4" ABANDONED a VA �0 1-1/4" (16H3 BENCH' 36X72 co c.1 EA X O I( I( 11 Q(e) m =z z M ` �D O`� ) 84, = z X w X m Q(M ) x co m z 0 _ U z w m N N x ROLLING CART ROLLING CART ROLLING CART 0 z w 0) X J co m z 0 _ v z m ff D N a UP WASH 11H4 -1/2" (12H4) MATCHLINE - SEE CONTINUATION ON SHEET 1 UP 20" DISC SANDER 1f " ff ff V363 ff 11 11 ff 5 If fl •3•Y 6" 6"X9" -t VERTICAL I BAND SAW JOINER PLANER 8' 4' 0 4' (3) 8' TORIT DUST COLLECTOR 16' SCALE: 1 /8"=1'-0" LEGE\ D GE PAL \OTES CONICAL HOOD OVER OVEN EXHAUST PORT. DUCT EXHAUST UP TO ROOF WITH DRAIN AT BOTTOM OF RISER. 7 FEET BEYOND ROOF LEVEL. ABANDONED DUCTWORK FUME EXHAUST UP TO ROOF; EXTEND TO ONE FOOT BEYOND ROOF LEVEL. EFHE\ CE D. AWINGS CO\ST�UCTIO\ \OYES 1. COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. WED FOR SAMPLIANCE PROVED SEP 24 2015 f EC;E,`JED CITY OF TUKWILA 1 SEP 1 6 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 POINT OF CONNECTION. PROVIDE NEW DUCTWORK AS REQUIRED. 1M160 1M162 KEY PLAN 1M161 1M163 Wood " Harbinger wog u2th Ave NE, Suite ioo Bellevue WA 980o4 425.628.6000 woodharbinger.com SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE INDUST. VAC RELOCATED FROM DWGS. 1M11 &1M61 S.RUDELL 05.22.08 E CDC RELOC - PKG 6A NORTH - RFI 27 J#19670-10 WH MBL 06.11.14 A PROVIDE HK VAC PORT 10897801/9710861 HARR 07/21/10 F REPLACE UNIT SUBSTATION 11 23904 WH MBL 04.07.15 B CDC RELOC-STRAIN GAUGE LAB-PKG 6-NORTH J#19670-10 WH MBL 02.17.14 C CDC RELOC- PKG 6-SOUTH - RFI-016 J#19670-10 WH MBL 03.11.14 D ADDENDUM 02 - PKG 6A-NORTH J#19670-10 WH MBL 05.20.14 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN S.RUDELL DATE 05.22.08 APPROVED BY DEPT. DATE CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE TITLE INDUSTRIAL VENTILATION FIRST FLOOR PLAN REPLACE UNIT SUBST , ,' N 1 BUILDING 9 MECHANICAL MASTER COL. F-K CURRENT REVISION 23904 SYMBOL F DATE 04.07.15 SHEET COMP NO. 9- 2t► M361 Lt T.inum rnJ• nc/9n/1d