Loading...
HomeMy WebLinkAboutPermit M15-0116 - BOEING #9-120 - SUBSTATION 5 - DEMOLITION / AHUS, DUCTWORK AND GRDSBOEING 9-120 SUBSTATION 5 9725 E MARGINAL WAY S BLDG 9-120 M15-01 16 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.eov MECHANICAL PERMIT 0003400018 Permit Number: M15-0116 9725 E MARGINAL WAY S BLDG 9-120 Issue Date: 10/5/2015 Permit Expires On: 4/2/2016 Project Name: BOEING 9-120 SUBSTATION 5 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BOEING COMPANY THE PO BOX 3707 M/C 20-00 PROPERTY TAX DEPT, SEATTLE, WA, 98124 CONNIE HARDIN 4600 S 134 PL , SEATTLE, WA, 98168 HOLADAY PARKS, INC. 4600 S 134 PL , SEATTLE, WA, 98168 HOLADPI379NO /11 Phone: (206) 250-4530 Phone: (206) 248-9700 Expiration Date: 9/3/2017 DESCRIPTION OF WORK: DEMO. ADDING 2 AHU'S; ADDING AND RELOCATING DUCTWORK; ADDING AND/OR REPLACING GRD'S, ASSOCIATED PIPING FOR NEW AHU'S. Valuation of Work: $150,000.00 Type of Work: REPLACEMENT Fuel type: Fees Collected: $1,965.22 Electrical Service Provided by: SEATTLE CITY LIGHT Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE,VALLEY VIEW SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2012 2012 2012 2012 2012 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2012 Permit Center Authorized Signature: Vtakit ROI Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this developmeermit and agree to the conditions attached to this permit. Signature: Print Name: 0.14D A v\ t 4 Date: U )— S —{ S This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 2: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 3: The special inspections and verifications for concrete construction shall be as required by IBC Chapter 17, Table 1705.3. 4: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 5: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 6: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 7: Notify the City of Tukwila Building Division prior to placing any concrete. This procedure is in addition to any requirements for special inspection. 8: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center. 11: Preparation before concrete placement: Water shall be removed from place of deposit before concrete is placed unless a tremie is to be used or unless otherwise permitted by the building official. All debris and ice shall be removed from spaces to be occupied by concrete. 12: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 13: ***MECHANICAL PERMIT CONDITIONS*** 14: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431-3670). 15: Manufacturers installation instructions shall be available on the job site at the time of inspection. 16: The attached set of mechanical plans have been reviewed by The Tukwila Fire Marshals Office and are acceptable with the following concerns: 17: H.V.A.C. units rated at greater than 2,000 cfm require auto -shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2437) 18: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air -moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 19: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2437) 20: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2437) 21: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2437) 22: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 23: An electrical permit from the City of Tukwila Building Department Permit Center (206-431-3670) is required for this project. 24: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 25: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 26: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1400 FIRE FINAL 0703 MECH EQUIP EFF 1800 MECHANICAL FINAL 1500 PLANNING FINAL 0701 ROUGH -IN MECHANICAL 0702 SMOKE DETECTOR TEST q-izo '.�eckt, S 43(d{Ll ?DoE( CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http:llwww.lukssila\VA.aov Mechanical Permit No. IV ` Ott (0 Project No. Date Application Accepted: Date Application Expires: (For office use ono ,01.1\611.9 Ite MECHANICAL PERMIT APPLICATION Applications and plans must be,complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION e i ?\c 4-1lb C�King Co Assessor's Tax No.: O tMisi Site Address:CO ��IIa.,Y .J Suite Number: Tenant Name: l7Tn PROPERTY OWNER Name: o s Address: o (.ZS 3,?r 1 � itil w 3 City: sea _Idle Stalk: tat, Zip 06020 CONTACT PERSON — person receiving all project communication Name: A N L.iyArt Le_liar tit Address: LI6CO ‘ vsLek p' City: sed h.P State: Zig:jkw toF "g Phone:lb is 2.'S1D4SFax:? z S7LSD Email: at,A Ai£hp. holarla_o,ocirLs..eom New Tenant: Floor: ❑ Yes MECHANICAL CONTRACTOR INFORMATION Company Name: Ad s, t'Os` _S i,, . �"t 1Gp1.. Address: glom)s , 3 City: e _ w State: - ^‘� Zip kV Phone:2^147r gs.50 Fax: 4.act 2,700 Contr Reg No.: Exp Date: GL17 Tukwila Business License No.: Valuation of project (contractor's bid price): $ `93,3iyb Describe the scope of work in detail: M O , AAAA `�� U S ; a_dc is `i- r°ea...J -1 •mac 444. )14Ar Z.K. t a>�d r C�2 �j s .-SsDC,�a 'e� . �n1 /o rcpletei pip �t�or It I� ICU s . l Use: Residential: New Commercial: New Replacement Replacement Fuel Type: Electric ❑ Gas ❑ Other: H•.AppticationsTorns-Applications 0n Line,201 1 Appbcatwns`Mechanical Pernut Application Re, istd 8.9-11 docc Reused August Pill bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <I OOk btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood/gas stove Emergency generator Other mechanical equipment w S • 1r t � Boiler/Compressor (NY 0-3 hp/100,000 btu 3-15 hp/500,000 btu 15-30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu C-b's i PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING R :'_' ORIZED GENT: Signature: Print Name: NhIA.t t ). • • Yi1/t Mailing Address: tott,bq S 1.3414 pl H:\Applications\Forns-Applications On Line\2011 Applications\ Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Date: —t"" t (0' 4 5 Day Telephone: 2040 • Z rO • 44. S-345 vca-414. Lit O (or City State Zip Page 2 of 2 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PermitTRAK PAID $1,965.22 M15-0116 Address: 9725 E MARGINAL WAY S BLDG 9-120 Apn: 0003400018 $1,965.22 MECHANICAL $1,889.63 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $32.50 PERMIT FEE R000.322.100.00.00 0.00 $1,479.20 PLAN CHECK FEE R000.322.102.00.00 0.00 $377.93 TECHNOLOGY FEE $75.59 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R6172 R000.322.900.04.00 0.00 $75.59 $1,965.22 Date Paid: Wednesday, September 16, 2015 Paid By: CONNIE HARDIN Pay Method: CREDIT CARD 02620G Printed: Wednesday, September 16, 2015 12:05 1 of 1 PM eri SYSTEMS INSPECTION RECORD Retain a copy with permit ECTION NO. PERMIT NO. m/s - al/ CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: ZO6JAJ Type of Inspection: Png!-1/AA0I641, / a /-✓,I L- Date Ile �a na r 4.5- �I ( I' Address: Qi 72.5 6-/4r26-/A ,4AL k) s Special Instructions: q'% Date Want �fl / a�. Reques/grt /� S� Phone No: !tm 6 3 v`t Approved per applicable codes. LJ Corrections required prior to approval. OM M ENTS: pIC Frkfq Inspector: c, Date8 Z `� REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. rair„-in INSPECTION RECORD Retain a copy with permit SP'E 0N NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd.., #100, Tukwila. WA 98188�• (206 3 676 Permit Inspection Request Line (206) 438-9350 1"l�G Pr ject: ( OD a- f 7,© Type of Inspection: s, n ma. Address: , ` i, ( Ula Date Called: S_ppecial Instructions: ✓ (DDatee AAA Wanted: � — t) � 1� a.m. p.m. Requester: Phone No: 206- Lf I-3 2A 7 t A ['Approved per applicable codes. Corrections required prior to approval. COMMENTS: ��r ( �u a Vd -Ft```-c< l �e-r�-r�-.c/ lac lrep0f"( F l2) -rl )t-P Fr "tea l -��� 4Pr°'itt 4/ r(otpwrr. �r�-� I inspector: (____er Date_/ 6 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD �� Retain a copy with permit " d (( PECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Pr ec(T ��� Q f Type oof inspection: A Tess: /% Date Call Special Instructions: F/1-" r Pcvl e-r- y� I !Date Wanted: a.m. ..� -t6 p.m. 17((4CI / i fi d 7.... one No: Appioved per applicable codes. Corrections required prior to approval. COMMENTS: e(A- Inspector: Date: _ Ec;)] REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit SPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Pr clef: jr ` TT q — I z-o Typ of Inspection: i( vj Address: '' R774" ' '' fW 1 L Date Call s'' Speecia�Iner Q r tiion�s:� ( r ( �,�i� (,t J4 r" ' � {� .- iff (1& 1 ate Want d: / a.m. -3- i p.m. Req�es_t r 6tk V %[J�.�% c V Phone N� z.06 26f �2....g7 Approved per applicable codes. Corrections required prior to approval. COMMENTS: V(A- Inspector: Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. NEUDORFER ENGINEERS INC. TEST, ADJUST & BALANCE BALANCE REPORT BOEING BUILDING 9-120 STATION 5 SEATTLE, WASHINGTON 2015-1122 Project Completion Date: 05/11/16 Revision Date: BILL NEUDORFER CERTIFICATION 2465 Exp.3/3ih7 5516 1 ° Ave S Seattle, WA 98108 Phone (206) 621-1810 Fax (206) 343-9820 Revision Number. RECEIVED CITY OF TUKWILA APR 1 3 2016 PERMIT CENTER 2501 SE Columbia Way, Ste. #230 Vancouver, WA 98661 Phone (503) 235-8924 Fax (503) 235-8925 V\4 out N udorfer Engineers. Inc. Consulting Engineers Seattle Portland www NeudorferEngin t ..Corn PROJECT Boeing Building 9-120, Station 5 LOCATION Seattle, WA Cover Report Title Certification Warranty Terms & Abbreviations Executive Summary Air Handling Units Hydronic Pump TAB Drawings Instrument Calibration TABLE OF CONTENTS 4 5 6-7 8-9 10-19 20 21-25 26 2 Neudorfer Engineers. Inc. Consulting Engineers Seattle Portland www NoudorforEngm .com Report Title CERTIFIED TEST: BALANCE REPORT Project: BOEING BUILDING 9-120 STATION 5 SEATTLE, WASHINGTON NEI Job#: 2015-1122 Engineer: Wood Harbinger Contractor: Holaday-Parks TAB Firm: Neudorfer Engineers Inc 5516 1st Avenue South Seattle, WA 98108 Test Engineer: Duc Nguyen Architect: — 5516 1" Ave S Seattle, WA 98108 Phone (206) 621-1810 Fax (206) 343-9820 2501 SE Columbia Way, Ste. #230 Vancouver, WA 98661 Phone (503) 235-8924 Fax (503) 235-8925 3 Neudorfer Engineers. Inc. Consulting Engineers Seattle Portland CERTIFICATION The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems. Any variances from design quantities which exceed NEBB tolerances are noted in the Test -Adjust -Balance Report Project Summary. Significant / Noteworthy Remarks are noted on the General Remarks and General Field Notes pages. Other remarks are noted on individual test sheets. Noted deficiencies are not Neudorfer Engineers responsibility to repair. Prior to issuance of this report, Deficiency Reports are forwarded to our contracted agent. Warranty is limited to one year from date of this report. Within that time, any discrepancies, ambiguities, or omissions found in this report will be retested, adjusted, or balanced as needed. A written notification will be required. Submitted and Certified by: NEBB TAB Firm: Neudorfer Engineers Inc Certification No: 2465 Expiration Date: March 31, 2017 Certification Date: May 11, 2016 (Date completed) Signed and Sealed by: NEBB Supervisor: William C. Neudorfer BILL. NEUDORFER CERTIRCATION 2465 • Exp. a<31n7 4 Neudorfer Engineers. Inc. Como'ling Engineers Seattle Portland Warranty Project: BOEING BUILDING 9-120 Warranty of Services: Neudorfer Engineers, Inc. warrants that the air balancing, evaluated during this performance evaluation are operating at the specified levels as documented within this report. At and only this time, and makes no other warranties, stated or implied, concerning the continued performance, operation or safety in the use of this equipment past this time. Neudorfer Engineers warrants the air and hydronic balancing for 1 year from the date of substantial completion. Neudorfer Engineers reserves the right to correct errors or omissions in the collections of data. Warranty Procedures: For all warranty items, Neudorfer Engineers requires written request. The written request should be specific on the areas of concern, such rooms, or equipment, and the type of issue the occupants are experiencing. Once written notification is received, Neudorfer Engineers will schedule a Technician. It is recommended that an Owner or NE Representative be on site at that time. Voided Warranty and Additional Charges: If a complaint issue is due to a mechanical equipment failure, control or maintenance related, the return trip maybe subject to a service charge, not covered under warranty. Neudorfer Engineers reserves the right to resolve any TAB issue. If a third party or competing Test & Balance Commissioning firm test or adjust any equipment, all project warranty is voided. (This is typical standard for the Mechanical industry, as Manufacture, Mechanical and Control Contractor voids all warranty when a competing firm tests or manipulates their systems.) Any return trips to the job site are subject to a service charge and a purchase order will be required before retuming to the job site. Document Archiving An electronic file of all test documents will be kept on file until the end of the Warranty period. During that time and electronic copy of the test data will be provided a no charge. Any additional hard / bound copies requested will be subject to a fee. 5 ANeudorfer Engineers. Inc. Consulting Engineers Seattle Portland Nww.Neucbrforfngln.: ,.m.. Terms and Abbreviations Project: AC or ACU Air Conditioner or Air Conditioning Unit Act. Actual ACCU Air Cooled Condensing Unit Address Equipment designation number given on the Control Program AH or AHU Air Handler or Air Handling Unit Amps Amperage AP Access Point APP. Application Arr Arrangement AVG Average BHP Brake Horsepower BTU British Thermal Units BTUH British Thermal Units per Hour CAV Constant Air Volume CBV Calbirated Balancing Valve (Circuit Setter) CC Cooling Coil CD Ceiling Diffuser CFLA Correct Full Load Amperage CFM Cubic Feet per Minute CH Chiller CHWS Chilled Water Supply CHWR Chilled Water Return Coeff. Coefficient CP Circulating Pump CR Ceiling Register CRAC Computer Room Air Conditioner CRU Computer Room Unit CT Cooling Tower CU Condenser Unit CUH Cabinet Unit Heater CWS Condenser Water Supply CWR Condenser Water Retum DAT Discharge Air Temperature DB Dry Bulb DD Direct Drive DDC Direct Digital Controls: EMS Control System for the HVAC Delta Difference, net decrease or increase Des. Design Dia. Diameter Disch. Discharge DNL Data Not Listed EA Exhaust Air EAT Entering Air Temperature Economizer Controls and components that allow an air handler to logically utilize outdoor air for cooling as opposed to the use of mechanical cooling. EDC Electric Duct Coil EDH Electric Duct Heater EF Exhaust Fan EG Exhaust Grille EMCS Energy Management Control System ERU Energy Recovery Unit E.S.P. External Static Pressure Evap. Evaporator EWT Entering Water Temperature FCU Fan Coil Unit FD Fire Damper FH Fume Hood FLA Full Load Amperage: Maximum amperage a motor can draw. Flow Hood Instrument that captures air and converts the reading to CFM. FPB Fan Powered Box FPM Feet per Minute FR Field Report FT Foot, Feet FTU Fan Terminal Unit GPM Gallons per Minute HC Heating Coil HD Pressure Difference across the entering and leaving side of a pump. Heater O.L. Thermal overload protection for motors located at the motor starter (starter heaters) HEPA High Efficiency Particulate Arrestance HOA Hand / Off / Auto Switch HP Horsepower 6 Neudorfer Engineers. Inc. Consulting Engineers Seattle Portland Terms and Abbreviations Project: HRC Heat Recovery Coil HUH Hydronic Unit Heater HVAC Heating Ventilation and Air Conditioning HWS Heating Water Supply HWR Heating Water Return HX Heat Exchanger HZ I.D. in. in.w.g. Kfactor KW LAT LWG LWR LWT MAU MBH MAX. MBH MIN NIA N/S OA OBD O.D. PD PH PHC Prim. PSI RA RAT RF RH RHC RPM RTU Hertz, cycle per second Inside Diameter inches inches of water gauge Correction factor to the free area need to calculate CFM. Kilowatts Leaving Air Temperature Low Wall Grille Low Wall Register Leaving Water Temperature Make-up Air Hangling Unit 1,000 BTUH Maximum Flow Requirements for DDC Mega BTUs per hour (1MBH=1,000BTUH) Minimum Flow Requirements for DDC Not Available Not Shown or Specified Outside Air Opposed Blade Damper Outside Diameter Pressure Drop. Phase Preheat Coil Primary Pounds per Square Inch Return Air Return Air Temperature Retum Fan Relative Humidity Reheat Coil Revolutions per Minute Roof Top Unit RVA Rotating Vane Anemometer -reads air velocity in feet per minute SA Supply Air SAT Supply Air Temperature S.F. Service Factor Schedule Design data obtained from the (sched) mechanical prints' schedule of equipment. SCR Silcon Controlled Rectifier Speed Controller SF Supply Fan SFD Smoke/Fire Damper SP Static Pressure Spec(s) Specifications sq.ft. square feet Submittals Submitted data on equipment (subs) capabilities. Suct. Suction SWG Sidewall Grille SWR Sidewall Register TAB Test; Adjust; and Balance Tach Tachometer Tech Technician TSP Total Static Pressure: Difference between the entering and leaving static pressure of a fan. TP Traverse or Test Point UH Unit Heater VAV Variable Air Volume; box that contains a motorized damper that modulates airflow. VD Volume Damper VFD Variable Frequency Drive Velgrid Instrument that reads used to read velocity in feet per minute. VP Velocity Pressure VVT Variable Volume Terminal WC Water Column W.G. Water Gauge WB Wet Bulb 7 Neu•dorl r Engineers. Inc. Consulting Englnasrs Scale Portland PROJECT BOEING BUILDING 9-120 STATION 5 LOCATION SEATTLE, WA # 2015-1122 EXECUTIVE SUMMARY This project has been balanced per plans and specifications using the National Environmental Balancing Bureau (NEBB) standards and procedures. The (2) Air Handling Units have been checked for total airflow, fan data, operating amperage, voltage, rotation, RPM, operating static pressures, and minimum OSA. All outlets and inlets have been proportioned to design airflow as shown on plans and specifications, unless otherwise noted. Besides that, the (2) heating water valves, and the (2) chilled water valves from the (2) Air Handling Units were checked and proportioned to design water flow as shown on plans and specifications unless otherwise noted. The reduced of drawings are attached to this report with the outlets, and the inlets numbered for locations. AIR HANDLING UNITS SF-AHIG1: The supply fan is a constant volume, belt driven unit located in Mechanical 1st Floor, G/1. The design airflow @ the outlets total is 4,695 CFM, and the actual flow is 4,815 CFM (103%) of design with VFD operates at 47 Hz. RF-AHIG1: The return fan is a constant volume, belt driven unit located in Mechanical 1st Floor, G/1. The design airflow @ the inlets total is 4,715 CFM, and the actual flow is 4,275 CFM (91 %) of design with the VFD operates at 60 Hz. SF-AHIF1: The supply fan is a constant volume, belt driven unit located in Mechanical 1st Floor, G/1. The design airflow @ the outlets total is 15,130 CFM, and the actual flow is 15,510 CFM (103%) with the VFD operates at 56 Hz. RF-AHIGI: The return fan is a constant volume, belt driven unit located in Mechanical 1St Floor, G/1. The actual flow that was obtained from the duct traverse is 15,150 CFM with the VFD operates at 54 Hz. NATIONAL ENVIRONMENTAL BALANCING BUREAU 8 N udorf r Engineers. Inc. Consulting Engineers Seattle Portland PROJECT BOEING BUILDING 9-120 STATION 5 LOCATION SEATTLE, WA # 2015-1122 EXECUTIVE SUMMARY (CONTD.) EXISTING CHILLED WATER SYSTEM SF-AH1F1: The coil is designed for 71.3 GPM, and actual flow is 72 GPM (100%) of design. SF-AH1 G1: The coil is designed for 28.5 GPM, and actual flow is 28.5 GPM (100%) of design. EXISTING HEATING WATER SYSTEM SF-AH1 F1: The coil is designed for 36.8 GPM, and actual flow is 36.3 GPM (99%) of design. The circuit balancing valve is full open. SF-AH1G1: The coil is designed for 11.8 GPM, and actual flow is 12 GPM (101%) of design. NATIONAL ENVIRONMENTAL BALANCING BUREAU 9 Neudorfer Engineers. Inc. Consulting Engineers Seattle Portland Air Handling Unit PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11/2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: 9-SF-AHI GI AREA: First Floor, G/1 Unit Data Unit Manufacturer DAIKIN Unit Model Number CAH012GDAC Unit Serial Number FBOU160100374 Unit Discharge Bottom Vertical Fan Rotation Counterclockwise 1-SF AH1G1 / SF Filter Bank Filter Manufacturer AAF Filter Type Pleated Filter Quantity - Size 1 2 Fitter Dimensions - Size 1 12x24x2 in Filter Quantity - Size 2 3 Filter Dimensions - Size 2 20x24x2 in Test Data Total Design Flow - 4695 CFM Total Actual Flow 4815 CFM OA Design Flow 985 CFM OA Actual Flow 970 CFM 1-SF-AH1G1 / Supply Fan Fan RPM Design 2336 RPM Fan RPM Actual 1843 RPM Fan Speed 78% Speed Motor RPM Actual 1370 RPM VFD Setting 47 Hz AHU SP Setpoint 0.35 in. Motor Volts T1-T2 460 Volts Motor Amps T1 5.3 Amps Tested By: Duc Nguyen Test Date: May 02, 2016 Motor Data 1-SF-AH1G1 / Supply Fan Motor Manufacturer Baldor Drive Type BELT Motor Frame 184T Motor HP 5 HP Motor RPM 1750 RPM Motor Rated Volts 230/460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor FL Amps 13.2/6.6 Amps Motor Service Factor 1.15 Motor Efficiency 89.5 % Motor Power Factor 0.80 PF Sheave Data 1-SF-AH1G1 / Supply Fan Motor Sheave MFG Browning Motor Sheave Model BK55 Motor Sheave Bore 1 1/8 in. Motor Sheave Type Fixed Fan Sheave MFG Browning Fan Sheave Model 1TB36 Fan Sheave Bore P1 1 11/16 in. Number of Belts 1 Belt Size BX41 Sheave Center Line 14.7 in. Motor to Extend 1.0 in. Motor to Retract 1.0 in. Test Pressures Pre -Filter Inlet SP - 0.44 in. we Pre -Filter Outlet SP - 0.60 in. wc Pre Heat Coil Inlet SP & Cooling Coil Pre Heat Coil Outlet SP & Cooling Coil SF Suction SP - 1.04 in.'wc SF Discharge SP 0.44 in. wc SF Design Total SP 2.89 in. wc SF Design External SP 1.70 in. wc OA Damper Pos 60 % RA Damper Pos 40 % - 0.60 in. wc -1.04 in. wc NeudorferEngineers, Inc. 10 NEUDORFER tat Neudorfer Engineers. Inc. Consulting Engineers Seattle Portland Air Handling Unit PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11/2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: 1-SF AH1G1(Cont.) AREA: First Floor, G/1 1-SF-AH1G1 Supply Outlet Summary Tested By: Duc Nguyen Test Date: May 02, 2016 System / Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Outlet-01 Oven Room 1F21 Velgrid SG 24X10 1.33 752 1000 1385 1080 108 Outlet-02 Oven Room 1F21 Velgrid SG 24X10 1.33 752 1000 1340 1050 105 Outlet-03 Oven Room 1F21 Velgrid SG 24X10 1.33 752 1000 1180 960 96 (1) Outlet-04 RPM Lab 1G21 Flowhood SG 10X6 1 - 250 285 245 98 Outlet-05 RPM Lab 1G21 Flowhood SG 10X6 1 - 250 255 255 102 (1) Outlet-06 RPM Lab 1H21 Velgrid SG 10x6 0.38 1579 600 485 615 103 Outlet-07 RPM Lab 1H21 Velgrid SG 10x6 0.38 1566 595 455 610 103 (1) Totals : - - - - - 4,695 5,385 4,815 103 % - * Notes 1-SF-AH1G1 1-SF-AH1G1 25-Apr-16 Duc Nguyen (1) Volume damper is full open. 26-Apr-16 Duc Nguyen Amps and volts were taken from VFD. Neudorfer Engineers, Inc. 11 NEUDORFER Neudorfer Engineers. Inc. Consulting Engrnoers Seattle Portland Air Handling Unit PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11/2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: 2-RF-AH1 G1 AREA: First Floor, G/1 Unit Data Unit Manufacturer Unit Model Number Unit Serial Number Unit Discharge Fan Rotation DAIKIN CAH012GDAC FBOU160100374 Bottom Vertical Counterclockwise Test Data EA Design Flow EA Actual Flow 2-RF-AH1G1 / Retum Fan 4695 CFM 4275 CFM 755 RPM 100% Speed 1781 RPM 60 Hz 0.5 in. 460 Volts 3.0 Amps Fan RPM Actual Fan Speed Motor RPM Actual VFD Setting AHU SP Setpoint Motor Volts T1-T2 Motor Amps T1 2-RF-AH1 G1 Return Inlet Summary Tested By: Duc Nguyen Test Date: May 02, 2016 Motor Data 2-RF AH1G1 1 Return Fan Motor Manufacturer Baldor/Reliance Drive Type Belt Drive Motor Frame 182T Motor HP 3 HP Motor RPM 1765 RPM Motor Rated Volts 230/460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor FL Amps 8.4/4.2 Amps Motor Service Factor 1.15 Motor Efficiency 89.5 % Motor Power Factor 0.74 PF Sheave Data 2-RF-AH1G1 / Return Fan • Motor Sheave MFG Browning Motor Sheave Model BK47 Motor Sheave Bore 1 1/8 in. Motor Sheave Type Fixed Fan Sheave MFG Browning Fan Sheave Model AK94 Fan Sheave Bore 1 3/16 in. Number of Betts 1 Belt Size A46 Sheave Center Line 13.5 in. Motor to Extend 1.0 in. Motor to Retract 1.0 in. Test Pressures RF Suction SP -0.24 in. wc RF Discharge SP 0.05 in. we RF Design Total SP 0.29 in. wc RF Actual Total SP 0.34 in. we System / Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocit Design Value Prelim Readin Final Reading Final % Remarks Inlet-01 Oven Room 1F21 Velgrid RG 42X24 6.3 555 3500 2760 3150 90 (1) Inlet-02 RPM Lab 1G21 Flowhood RG 18X18 1.0 - 1215 1185 1125 93 Totals : - - - - - 4,715 3,945 4,275 91 % - * Notes 2-RF-AH1 G1 2-RF-AH1 G1 26-Apr-16 Duc Nguyen Amps and volts were taken from the VFD. 26-Apr-16 Duc Nguyen (1) Volume damper is full open. Neudorfer Engineers, Inc. 12 NEUDORFER Neudorfer Engineers. Inc. Consulting Engineers Seattle Portland Air Handling Unit PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11/2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: 3.0-SF-AHI F1 AREA: First Floor, G/1 Unit Data Unit Manufacturer DAIKIN Unit Model Number CAH035GMAC Unit Serial Number FBOU160100182 Unit Discharge Top Horizontal Fan Rotation Clockwise 3.0SF-AH1F1 / SF Filter Bank Filter Manufacturer AAF Filter Type Pleated Filter Quantity - Size 1 15 Filter Dimensions - Size 1 20x20x2 in Test Data Total Design Flow 15130 CFM Total Actual Flow 15510 CFM OA Design Flow 3185 CFM OA Actual Flow 3150 CFM 3.0SF-AH1F1 / Supply Fan Fan RPM Design 2042 RPM Fan RPM Actual 1883 RPM Motor RPM Actual 1661 RPM Fan Speed 93.3% Speed VFD Setting 56 Hz Motor Volts T1-T2 460 Votts Motor Amps T1 24 Amps Tested By: Duc Nguyen Test Date: May 11, 2016 Motor Data 3.0SF-AH1F1 / Supply Fan Motor Manufacturer Baldor Drive Type BELT Motor Frame 284T Motor HP 25 HP Motor RPM 1770 RPM Motor Rated Volts 230/460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor FL Amps 60/30 Amps Motor Service Factor 1.15 Motor Efficiency 93.6 % Motor Power Factor 0.82 PF Sheave Data 3,0SF-AH1F1 I Supply Fan Motor Sheave MFG Browning Motor Sheave Model 3B5V66 Motor Sheave Bore B 1 7/8 in. Motor Sheave Type Fixed Fan Sheave MFG Browning Fan Sheave Model 3B5V58 Fan Sheave Bore B 2 3/16 in. Number of Belts 3 Belt Size BX64 Sheave Center Line 23.2 in. Motor to Extend 1.5 in. Motor to Retract 1.5 in. Test Pressures Pre -Filter Inlet SP -1.27 in. wc Pre -Filter Outlet SP -1.45 in. we Clg Coil Inlet SP 1.77 in. wc Ctg Coil Outlet SP 1.06 in. wc SF Suction SP - 1.45 in. wc . SF Discharge SP 1.77 in. we SF Design Total SP 3.69 in. wc SF Actual Total SP 3.22 in. wc SF Design External SP 2.00 in. wc SF Actual External SP 2.33 in. wc OA Damper Pos 50 % RA Damper Pos 50 % Neudorfer Engineers, Inc. 13 NEUDORFER Neudorfer Engineers. Inc. Consulting Engineers Seattle Portland Air Handling Unit PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11 /2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: 3.0-SF-AH1F1 (Cont.) AREA: First Floor, G/1 3.0-SF-AH1F1 Supply Outlet Summary Tested By: Duc Nguyen Test Date: May 11, 2016 System / Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks Outlet-01 (ZONE 1) 11C1 Flowhood CD 8"x8" 1 - 300 190 235 78 (1) Outlet-02 (ZONE 1) 11C1 Flowhood CD 8"x8" 1 - 250 205 200 80 Outlet-03 (ZONE 1) 11C1 Flowhood CD 8"x8" 1 - 250 200 200 80 Outlet-04 (ZONE 1) 12C1 Flowhood CD 10"x10" 1 - 385 315 305 79 Outlet-05 (ZONE 1) 12C1 Flowhood CD 10"x10" 1 - 390 305 320 82 Outlet-06 (ZONE 1) 11E2 Flowhood CD 8" RD 1 - 120 170 100 83 Outlet-07 (ZONE 1) 12 El - - Not Accessi ble - - 295 720 800 271 (3) Outlet-08 (ZONE 2) 11E3 Flowhood CD 8" RD 1 - 350 285 305 87 Outlet-09 (ZONE 2) 11E3 Flowhood CD 8" RD 1 - 350 270 275 79 (1) Outlet-10 (ZONE 2) 11E2 Flowhood CD 10" RD 1 - 275 400 475 173 (2) Outlet-11 (ZONE 2) 11E3 Flowhood CD 8" RD 1 - 350 385 290 83 Outlet-12 (ZONE 2) 11E3 Flowhood CD 8" RD 1 - 350 290 260 74 Outlet-13 (ZONE 2) 12E2 Flowhood CD 24"x24" 1 - 390 375 350 90 Outlet-14 (ZONE 4) 11D3 Flowhood CD 10" RD - 1 - 500 210 325 65 (2) Outlet-15 (ZONE 4) 11D3 Flowhood CD 12" RD 1 - 500 290 310 62 Outlet-16 (ZONE 4) 12D2 Flowhood WG 24"X6" 1 - 140 395 525 375 (2) Outlet-17 (ZONE 5) 13C3 Flowhood CD10 24"x24" 1 - 300 270 310 103 Outlet-18 (ZONE 5) 13C3 Flowhood CD10 24"x24" 1 - 300 265 305 102 Outlet-19 (ZONE 5) 13C3 Flowhood CD10 24"x24" 1 - 300 275 290 97 Outlet-20 (ZONE 5) 13C3 Flowhood CD10 24"x24" 1 - 300 280 315 105 (1) Outlet-21 (ZONE 6) 13F3 Flowhood RD 12" RD 1 - 330 640 340 103 (1) Outlet-22 (ZONE 6) 13F3 Flowhood RD 12" RD 1 - 330 455 325 98 Outlet-23 (ZONE 6) 13F3 Flowhood RD 12" RD 1 - 335 345 350 104 (1) Outlet-24 (ZONE 6) 13F3 Flowhood RD 12" RD 1 - 335 600 315 94 Outlet-25 (ZONE 6) 13F3 Flowhood RD 12" RD 1 - 335 800 335 100 Neudorfer Engineers, Inc. 14 NEUDORFER Neudorfer Engineers. Inc. Consulting Engineers Seattle Portland Air Handling Unit PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11/2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: 3.0-SF-AH1F9 (Cont.) AREA: First Floor, G/1 Tested By: Duc Nguyen Test Date: May 11, 2016 Outlet-26 (ZONE 6) 13F3 Flowhood RD 12" RD 1 - 335 70 345 103 Outlet-27 (ZONE 7) 13F3 Velgrid SR 30"X10" 2.08 370 770 965 790 103 Outlet-28 (ZONE 7) 13F3 Velgrid SR 30"X10" 2.08 370 770 870 795 103 Outlet-29 (ZONE 7) 13F3 Velgrid SR 30"X10" 2.08 368 765 955 790 103 Outlet-30 (ZONE 7) 13F3 Velgrid SR 30"X10" 2.08 466 970 960 1010 104 (1) Outlet-31 (ZONE 7) 13F3 Velgrid SR 30"X10" 2.08 466 970 965 1010 104 (1) Outlet-32 (ZONE 7) 13F3 Velgrid SR 30"X10" 2.08 466 970 995 1000 103 (1) Outlet-33 (ZONE 3) 12H3 Flowhood RD 12" RD 1 - 400 460 425 106 Outlet-34 (ZONE 3) 12H3 Flowhood RD 12" RD 1 - 400 380 430 108 (1) Outlet-35 (ZONE 3) 12H3 Flowhood RD 10" RD 1 - 135 275 135 100 Outlet-36 (ZONE 3) 12H3 Flowhood RD 10" RD 1 - 135 240 140 104 Outlet-37 (ZONE 3) 12H3 Flowhood RD 10" RD 1 - 130 155 140 108 Outlet-38 (ZONE 3) 14H3 Flowhood RD 8" RD 1 - 160 190 170 106 Outlet-39 (ZONE 3) 14H3 Flowhood RD 8" RD 1 - 160 130 170 106 Totals : - - - - - 15,130 16,545 15,510 103 % - * Notes 3.0-SF-AH1 F1 3.0-SF-AH1 F1 3.0-SF-A111 F1 3.0-SF-AH1 F1 2-May-16 Duc Nguyen Amps and volts were taken from the VFD. 2-May-16 Duc Nguyen (1) Volume damper is full open. 2-May-16 Duc Nguyen (2) No volume damper installed. 2-May-16 Duc Nguyen (3) Room is not accessible due to security reason. The actual flow was determined by subtracting the measured outlet-1 thru 6 from the duct traverse total. Neudorfer Engineers, Inc. 15 NEUDORFER Neudorfer Engineers. Inc. Consulting Engineers Seattle Portland Air Handling Unit PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11/2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: 3.1-SF-AH1F1 (Zones 1-7) AREA: First Floor, G/1 3.1-SF-AH1F1(Zones 1-7) Supply Outlet Summary Tested By: Duc Nguyen Test Date: May 03, 2016 System / Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocity Design Value Prelim Reading Final Reading Final % Remarks ZONE 1 Outlets 1-7 Flowhood (7) CDs - 1 - 1990 2105 2160 109 (1) ZONE 2 Outlets 8-13 Flowhood (6) CDs - 1 - 2065 2005 1955 95 (1) ZONE 3 Outlets 33-39 Flowhood (7) CDs - 1 - 1520 1830 1610 106 (1) ZONE 4 Outlets 14-16 Flowhood (3) CDs - 1 - 1140 895 1160 102 (1) ZONE 5 Outlets 17-20 Flowhood (4) CDs - 1 - 1200 1090 1220 102 ZONE 6 Outlets 21-26 Flowhood (6) CDs - 1 - 2000 2910 2010 101 ZONE 7 Outlets 27-32 Flowhood (6) CDs - 1 - 5215 5510 5395 103 Totals : - • - - - 15,130 16,345 15,510 103 % - * Notes 3.1-SF-AH1F1 (Zones 1-7) 30-Apr-16 Duc Nguyen (1) Zone damper is full open. Neudorfer Engineers, Inc. 16 NEUDORFER y Neudorfer Engineers. Inc. Consulting Engineers Soattla Portland Air Handling Unit PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11/2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: 4-RF-AH1 F1 AREA: First Floor, G/1 Unit Data Unit Manufacturer Unit Model Number Unit Serial Number Unit Discharge Fan Rotation DAIKIN CA1-1035GMAC FBOU160100182 Top Horizontal Clockwise Test Data EA Design Flow EA Actual Flow 4-RF-AH1F1 / Retum Fan Not specified CFM (4) 15150 CFM 1976 RPM 1598 RPM 90% Speed 54 Hz 460 Volts 16 Amps Fan RPM Actual Motor RPM Actual Fan Speed VFD Setting Motor Volts T1-T2 Motor Amps T1 Tested By: Duc Nguyen Test Date: May 11, 2016 Motor Data 4-RF-AH1F1 / Return Fan Motor Manufacturer Baldor/Reliance Drive Type Belt Drive Motor Frame 256T Motor HP 20 HP Motor RPM 1765 RPM Motor Rated Volts 230/460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor FL Amps 47/23.5 Amps Motor Service Factor 1.15 Motor Efficiency 93 % Motor Power Factor 0.86 PF Sheave Data 4-RF-AH1F1 1 Retum Fan Motor Sheave MFG Browning Motor Sheave Model 2B5V80 Motor Sheave Bore B 1 5/8 in. Motor Sheave Type Fixed Fan Sheave MFG Browning Fan Sheave Model 2B64Q Fan Sheave Bore Q1 2 3/16 in. Number of Belts 2 Belt Size BX60 Sheave Center Line 19.5 in. Motor to Extend 1.0 in. Motor to Retract 1.0 in. Test Pressures RF Suction SP -1.04 in. we RF Discharge SP 0.48 in. wc RF Design Total SP 1.75 in. wc RF Actual Total SP 1.52 in. wc Neudorfer Engineers, Inc. 17 NEUDORFER Neudorter Engineers. Inc. Consulting Engineers Seattle Portland Duct Traverse PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11/2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: RF-AH1 F1/ Total air Unit Data Type of Traverse Rectangular Outer Height 64.00 in. Outer Width 24.00 in. Insulation Width 0 in. Air Flow Area 10.67 sq. ft. Number Of Rows 11 Readings Per Row 4 Total Readings 44 Location of Holes 1 Left NOTES: Tested By: Duc Nguyen Test Date: May 04, 2016 Final Data Sum of Readings 63900 Average Reading 1420 FPM Actual Total Flow 15151 CFM Static Pressure 0.30 in. RF-AH1F1/Total air 3-May-16 Duc Nguyen Shortridge Muttimeter with Pitot Tube was used to obtain velocity readings. Row 1 Row 2 Row 3 Row 4 Rows Row 6 Row 7 Row 8 Row 9 Row 10 Row VI Duct Traverse Data Points r O V O 0 O 0 O 0 9394 1548 1395 1390 1326 1213 1255 1351 1401 1452 1713 1571 1377 1397 1373 1478 9552 J 1606 1471 1539 1425 1381 9330 1368 1270 1372 4527 1491 1523 1544 1558 1398 1841 1246 1163 1207 1398 1516 11512 1306 IE_ 24 ea m Neudorfer Engineers, Inc. 18 NEUDORFER Neudorfer Engineers G Inc; Consulting. Engineers Seattle Portland Air Handling Unit PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11/2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: 4-RF-AH1F1 (Cont.) AREA: First Floor, G/1 4-RF-AH1F1 Return Inlet Summary Tested By: Duc Nguyen Test Date: May 11, 2016 System / Unit Area Served Type of Reading Outlet Type Size LxW / D AK Design Velocit Design Value Prelim Readin Final Reading Final % Remarks Inlet-01 & 02 ` 13F3 Airfoil Duct 30X16 3.33 880 5660 3600 3600 64 (1) Inlet-03 13C3 Airfoil DUCT 19"X12" 1.58 759 1200 1205 1205 100 (2) Inlet-04 11E3 Flowhood RG 24"X24" 1 - 1400 2130 2130 152 (2) Inlet-05 Above ceiling 12E2 Velgrid Openi ng 24"X12" 2 - Not Specifi ed 1240 1240 (2) (5) Inlet-06 Above ceiling 11C1 Airfoil Duct 7"x7" 0.34 - 125 45 45 36 (2) Inlet-07 12C1 Velgrid RG 24X12 1 - 675 235 235 35 (2) Inlet-08 Velgrid Duct 24"X18" 3 - Not Specifi ed 2160 2160 (2) (5) Inlet-09 Above ceiling 12C1 - - - - - - - - Capped Inlet-10 12 El - - - - - Not Specifi ed Not accessi ble Not accessi ble (3) (5) Inlet-11 12H3 Airfoil RG 16x12 1.33 1707 1520 1475 1475 97 Totals : - - - - - 10,580 12,090 12,090 114 % - * Notes 4-RF-AH1 F1 4-RF-AI1 F1 4-RF-A1-11 F1 4-RF-AH1F1 4-RF-AH 1 F1 2-May-16 Duc Nguyen Amps and volts were taken from the VFD. 3-May-16 Duc Nguyen (1) Volume damper is full open. 4-May-16 Duc Nguyen (2) No volume damper installed. 4-May-16 Duc Nguyen (3) Room is not accessible due to security reason. 3-May-16 Duc Nguyen (4) Total actual flow was obtained from the actual duct traverse. 4-RF-AH1F1 4-May-16 Duc Nguyen (5) The design CFM is not indicated on drawing. 4-RF-AH1F1 / Inlet-01 & 02 3-May-16 Duc Nguyen Inlet-1 Volume damper is full open. Inlet-2 No volume damper installed. Neudorfer Engineers, Inc. 19 NEUDORFER Neudorfer Engineers. Inc. Consulting Engineers Seattle Portland Hydronic Pump PROJECT: BOEING BLDG 9-120 STATION 5 LOCATION: Seattle, WA PROJECT #: 2015-1122 DATE: 5/11/2016 CONTACT: Mike Neudorfer SYSTEM/UNIT: EXISTING CHILLED WATER PUMP EXISTING CHILLED WATER PUMP Balance Valve Summary Tested By: Duc Nguyen Test Date: April 28, 2016 System / Unit Area Served Manufacturer Model Number Valve Size Valve Position DP Actual Design Flow Prelim. Flow Actual Flow Valve-01.1 (Top) AH1F1 TA CBV 2 1/2" 2.5T Setting 25ft 35.65 48 36 Valve-01.2 (Bottom) AH1F1 TA CBV 2 1/2" 2.5T Setting 25 ft 35.65 48 36 Valve-02 AH1G1 Seimens Autoflow (5-90 PSI) 2" — 14 PSI 28.5 30 28.5 Totals : - - - - - 99.8 126 100.5 * Notes SYSTEM/UNIT: EXISTING HEATING WATER PUMP EXISTING HEATING WATER PUMP Balance Valve Summary Tested By: Duc Nguyen Test Date: May 03, 2016 System / Unit Area Served Manufacturer Model Number Valve Size Valve Position DP Actual Design Flow Prelim. Flow Actual Flow Valve-01 * AH1F1 Armflow CBV 2" 5.4T Setting 2.15ft 36.8 35.0 36.3 Valve-02 AH1G1 Armflow CBV 1 1/2" 1.5T Setting 0.74 ft 11.8 17 12.0 Totals : - - - - - 48.6 52 48.3 * Notes EXISTING HEATING WATER PUMP / Valve-01 11-May-16 Duc Nguyen Circuit balancing valve "5.4T setting" is full open. Neudorfer Engineers, Inc. 20 NEUDORFER I oI SIAtVp roman u,. 04.07.15 ( ( ( ( N CAH0350MAC, MERV Al2 FILTER, 2VFD [1] A ION 201,1 UNIT IN 20M UNIT - a= AA Ric aia8 I AA _ A - IN CAN012GDAC -MERV Al2 F0.1ER 2VF0 [2] orb rE a 46, ! :yWH MWood r.,; Harbin�er . QQ g 0 1 1 I I << < < I << < SCHEDULES 9-120 STATION 5 AHU REPVCEMENIS BUILDING 9-120 IMECHANIC/J. MASTER DC o WC. DIM, FACE VEL 425 FPM. CE NET. 409 FPM. o PO Nei ISSUE FOR CONSTRUCTION APRIL 7, 2015 m, g8 11111111111- 1NR1 111 g Z11144A 8zA fj 108 A N, ( WgLL`R' 0 11 I 1 3 S S S 4 1 I S 3 S, B S S : LL( 3 I I 1 N ARM. av 3 I I N S N 1 N I N N 3 I I I I♦♦♦♦^ I I_ 1 I r I o gg sg IRRR o F r o, W I I I I i 7 S R i R 3 m _ e. $k 0 a ~ -g (agko, 1 I I I R 3 R R A I g A I E ANN 3 L s ( $ I I 1 1 § §§§ g 8 1 R g§ §1 §§§ R N A 8< ii R s 7 1 1 1 1 c o m m m 1 1 R r R I R I I I I 3 $ g 0�Fj1 ;I 411toTT*TZt,I 12 2 `S I Vitt I C C< R ' < 4 1 AIR HANDLING UNIT (AH) SCHEDULE SUPPLY FAN SECTION COOING COIL ' I I I I R' m m. 1 1 m R a 1' 1 1 1 (• 1 r� CABINET & UNIT HEATER (UH) SCHEDULE 2 1 1 1 1 x n S, 3 3 1 I; S 7, 1' 1 , I a R+ 15 'V1 ^1'i .+.-. 1 1 1 I R R R R R, 13 R ffi I $i I , 1 I R R E6 l 2 1 1 1 , 3 0 3 m 1 1 3 2 3 , 3 1 I I, ,E . °� 11, 1 m ,T.m 6 m 1 1 r , S l x x `(2 x �(R 8 E& X 1 1 1 1 R 3 R R R 1 1 .Ti l X l x x x: 5y' 1 Zece 8 1 1 1 1 R R^^ N I Z h N ^ Z ^, x x x l'-- `' S a 1 I I 1 I i 1 3 n ;::::::::: m 1 1 1 1¢5 J : m 10 ^ $^c $ R r i g 1 1 IA nm 1ittt I ee ciimA eiiocRt >� RE CABINET Sc UNIT HEATER (UH; MARK MAXIMUM NUMBER LOCATION CFM I MEM EAT IF 0AT'F EWT 'F UN IF GPM PD. FT. - WATER PI , 1, 1 5' n m m t oW 1 E R R n s N 0 _NNN i 0, m .; r W R r o r . o o x S o o '' o a ; ' " m r t R 1, 1 $$� S R m 1 1 gg 0 3 ga R M 1 gg� gg 8 1 gg� 1 g a 5 B g 8 a 421-L5 INTERIOR & PERIMEOR E1-06 INTERIOR 01-J6 INTERIOR L1-M3 INTERIOR & PERIMETER NONE - UNIT ABANDONED EAST PERIMETER INTERIOR It NORTH PERIMETER Al , 4 3 1 I 1 13 ff A , Y ... 5 8• ,r,3 6hR 3gg,g l 6 iZ e 5 ggg !:! ' 1•TIT' ��x� igl T m w o > !- GN yid nv nag I St Orhhk ;O. a „RP w 10 L A , e reg_ L\ 1;''C'..11.1 III,. *.�,_.��_._.,.__, 91 1.. �Q4. ��n ' r If•CG!!i7Z,IN ` Q!� 13 0 J DUCTWORK PLAN E 6 " 9 3 s O s s s 13 .15 s a A a a 1 5 of 6 c a s SF 1 1 s s A Jj | 0 CO CNi }� §/ )»LLI HVAC FIRST FLOOR PLAN ( ] ■ ■ | ) ] | ■ M WIN 144/LI/6 ]pip /REGISTAR/GRILL RECTA g 4-WAY EARAIQUAJE BRACING SEE .40§9-x 8 C� Y�o 0 1 d 1 0 U NN 0 A U . � o G- oa LL W N 1 8 8 8 8 d k 8 8 8 s 1 oom 5~0 MOON 0 w J GENERAL NOTE REFERENCE DRAWINGS CONSTRUCTION NOTES a �o O LC) gg� 18 9 0 0 s s s oi r. 8 Instrument Calibrations Instrument Type Air Data Meter with Flowhood Instrument Manufacturer Shortridge Instrument Model Number ADM 870 Instrument Serial # M08421 Calibration Due Date 2/3/2017 Instrument Type Tachometer Instrument Manufacturer Shimpo DT-205L Instrument Model Number Type B Instrument Serial # D069B0080 Calibration Due Date 8/17/2016 Instrument Type Amp Probe Instrument Manufacturer Fluke Instrument Model Number TRUE RMS 902 Instrument Serial # 10820578 Calibration Due Date 10/14/2016 Instrument Type Temperature Probe Instrument Manufacturer Shortridge Instrument Model Number ADM 870 Instrument Serial # M08421 Calibration Due Date 2/3/2017 Instrument Type Air Foil Instrument Manufacturer Shortridge Instrument Model Number ADM 870 Instrument Serial # M08421 Calibration Due Date 2/3/2017 26 erRepsTM 3290146th Place SE, Suite A 425562... 150 t • BeIFevue+ WA 98007 425562.5123 ax FIUE SUBMITTAL EQUIPMENT MANUFACTURER TAGS AIR HANDLING UNIT GOVERNAIR AH1F1 3 Deck Multizone Air Handling Unit; AH1G1 VAV Air Handling Unit PROJECT BOEING 9-120 ENGINEER WOOD/HARBINGER CONTRACTOR Holaday-Parks Contractor Representative: Date of. Submittal: Mark Ojendyk 9/14/2015 NOTES / EXCEPTIONS: Contractor and Engineer to confirm unit voltage prior to release for production. Contractor and Engineer to confirm unit layout, access sides and unit weight prior to release for production. Provided in conjunction with Dave Greece ahPr1 ch of Norby Co. RE WED FOR CODE COMPLIANCE RECEIVED APPROVED CITY OF TUKWILA SEP 3 0 2015 Provided by Others: City of Tukwila - Damper actuators, controls, water valve, CMDM. controls. MIO SEP 16 2015 PERMIT CENTER Ib NOTE: Formal approval from both engineer and contractor are required for release of equipme t iVproduction. DAIKIN VisionTM Air Handler Unit Construction Specification UNIT CONSTRUCTION Fabricate unit with 16 gauge nominal channel posts and panels secured with mechanical fasteners. All panels, access doors, and ship sections shall be sealed with bulb -type gasket. Panels and access doors shall be constructed as a 2-inch (50-mm) nominal thick, thermal broke double wall assembly, injected with foam insulation for an R-value of not less than R-13. The outer panel shall be constructed of G60 painted galvanized 16- gauge steel. Panel deflection shall not exceed L/240 at 125% of design static pressure, minimum +/- 5". Deflection shall be measured at the midpoint of the panel height. Access doors shall be flush mounted to the cabinetry and secured with heavy-duty stainless steel hinges. The door latch handle assembly shall be provided with a full-size grip handle and roller pall for smooth operation. The assembly shall be gasketed and sealed to prevent thermal bridging. The casing leakage rate shall not exceed 0.5 cfm per square foot of cabinet area at 5" static pressure (0.0025 m3/s per square meter of cabinet area at 1.24 kPa static pressure). to. BOEING 9-120 SAMPLE UNIT SIMILAR DAMPERS EXCEPT VERTIAL ARRANGEMENT Opening A Exhaust inlet B Damper C Damper D MZ Hot deck damper E MZ Bypass damper F MZ Hot deck damper G Hot water outlet H Hot water inlet I Cold water outlet J Cold water inlet K Cold water outlet L Cold water inlet M Condensate drain conn. N MZ Cold Deck damper Dimensions measured from NOTE: X Y Z 0.00 2.00 8.00 54.00 2.00 72.00 86.00 2.00 72.00 186.00 7.00 126.38 220.00 7.00 126.38 186.00 7.00 126.38 214.81 -7.00 89.43 187.16 -7.00 89.43 230.60 -7.00 38.19 234.48 -7.00 12.81 230.60 -7.00 67.19 234.48 -7.00 41.81 250.00 -4.90 7.00 242.00 7.00 126.38 W(Width) 98.00 98.00 98.00 88.00 88.00 88.00 1.50ins. MPS 1.50ins. MPS 1.50ins. MPS 1.50ins. MPS 1.50ins. MPS 1.50ins. MPS 1.25ins. MPS 88.00 H(Height) 62.00 28.00 28.00 30.00 18.00 30.00 30.00. Base 6.00 ins deep, Cross members extend 4 ins on each side of the unit. VIEW: 3-D DRAWN: Tuesday, November 25, 2014 3:35 PM JOB NAME: BOEING 9-120 AHU 9-14 UNIT TAGGING: AH1F1 16.6K CFM MZ3 MODEL: CAH035GMAC Y X W W L a) = 0 0 0 0 0 O �No000o6 O =ODNMNM I 100 GO0000rnU) U) U) d d d EL EL 0_ d w Vi Vi Vi to Vi Vi Vi O O 0 0 O .c CS c .c .c .c .e C O OOOOOOOOOOOlf)O a OO 00 O cc;Ln U) Lo. N. co 3 o) o) co Co co 00 MMMMM0)rO)— M O O OOOO4 4 V-CO V-0006 O NNNNO)O)CONt-r-ON Noor-.- V- aoaoc OD v- O o 0 0 0 o O CD 000CD CD 000000000)0 ›-NNN N r 1 `r`tir`-fN o00—cDOCOCao00 OOOOCO '—OD00 0s), 6 6 a5 4 6 4 6 4 ON OflCOCAI 00 CO00M00MLO�} XOOO�CV V• CV NNCAI NN r) vr, C E L L • m o 0 L if)oQ,� E Q E +J O as N o 73 co 13» N 7 3 .O Y fp Z `� Y "O Y 7 O . 0 ._ C N O .L O N• ❑ E 0 C) :L . Q . a) c6 co f0 c0 co Z Q Q J o °im= 3 3 70 .o Li Z~W Q.X oNNN o 0 0 0 0 0 ON c 0 W WmpZO 0W❑2M2i=0UUUUMa) z >❑) 0'94 0 J 0 0 o 0 co C. _ 0 0 N r 0'99 y 0 0 0 0 0 = 0 0 0 0 0 I C — CC') N (0(0 N I Z d d d d 0_ 0_ N Cn N N cl cA N ._00000.c C C C C C C Oo0000o005OC()O 00 00 oO cc;OO to 6f) In Ln N 06 �O)O)co co op co MMCO1MMO)—O)— M O oNNNNd7O)oONfh��N Naof�r •-V-000OMT-O�N.T- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 . O) i'Ni Ni vti OOO—CDO0000000 OOOOOD -CD�(O00 OO�OCO�f�0�0�'ON CDONOO�—OOMMMMIf 4i X000Ni- NNNNNN E eL E O_ (o E Co 73 (9'O 1 Y O O N O C 0) N C) C1 ID c6 13 C N Q .� c co E 2 CO a coNNN 0W0222 q N (D O ZOT O OD m y (D Z W 3 E • 2 0 c Z Q H W Fri 2!s =-. rn a) zz >o�D2 VisionTM Air Handling Unit DA®KIN ob Information .lob Name Date Submitted By Software Version Unit Tag Technical Data Sheet BOEING 9-120 AHU 9-14 November 26 2014 NORBY COMPANY— LDH 10.32 AH1F1 16.6K CFM MZ3 Rev 4-3-15 Unit Overview Model Number Supply Air Volume cfm Static Pressure External inWc Total inWc External Dimensions Height in Width in Length in Return/Exhaust Air Volume cfm Static Pressure External inWc Total inWc External Dimensions Height in Width in l CAH035GMAC 16820 I 1.2 ( 3.69 IF 66* 7 102* l 190 r16820 1.75 1:75 - 66* 102* *Not including base rails, coil connectors, drain connectors and control boxes. Length in 84 Unit Model Number: Approval: Outer Panel: Liner: Insulation: Unit Configuration: Base: Shrink Wrapping: Parts Warranty: CAH035GMAC • TRIPLE DECK MULTIZONE AHU ETL Listed / ETL Listed to Canadian Safety Standards (ETL Label / ETLc Label) Standard G90 Galvanized Steel (unpainted) Galvanized Steel (unless noted per section) R-13 Injected Foam Multizone 6" formed channel Yes Standard One Year Drive (Handling) Location: Wall Thickness: Altitude: Right 2 in 100 ft Page 1 of 6 www.DaikinApplied.com VisionTM Air Handling Unit r Component: 1 Length:52 in Shipping Section: 1 Fan Performance Air Volume Static Pressure Brake Horsepower Speed Outlet Velocity External Total Cabinet Operating Maximum 16820 cfm 1.75 inWc 1.75 inWc 0.00 inWc 16.90 BHP 2216 rpm 2547 rpm 2875 ft/min Fan Data Fan Type Blade Type / Class Quantity of Fans Wheel Diameter Number of Blades Discharge Motor Location Centrifugal DWDI Airfoil / 2 1 21.56 in N/A Bottom horizontal To Side of Fan Motor Data Power Electrical Speed Efficiency Enclosure Frame Size Supplier Number of Lock Rotor Full Load Supply Poles Current Current 20.0 HP 460/60/3 ' 1750 rpm Premium ODP 256 T frame Generic 4 168.2 A 23.5 A V/Hz/Phase Seismic Restraint: With snubbers Fan Sheave Motor Sheave 2B5V50 2B5V62 Belt 5VX570 Fan Options Isolator Type: Spring Drive Package Data* Number of Belts Actual Drive S.F. Bearing Type 2 1.32 Standard - L50 (200K) *Daikin Applied reserves the right to provide a different but equivalent drive package Electrical Connection Notes Selection Type: External 1-Box Vendor: Factory Standard Voltage: 460 V Height x Width x Depth: 4.00 in x 6.00 in x 6.00 in Mounting: Door Side Enclosure: NEMA 1 Door Location Width Opening Window Type Light Drive side 30 in Outward Round Marine light kit with GFI outlet 115/1/60 Req'd Page 2 of 6 www.DaikinApplied.com VisionTM Air Handling Unit \ conomizer Portion Component: 2 Size (length x width) Overall Opening Damper Location Length: 68 in Type Rated CFM Shipping Section:1 & 2 Air Pressure Drop Quantity UltraSeal Low Outside Air 28 in x 98 in 24 in x 88 in Top Leak 16820 cfm 0.10 inWc 1 UltraSeal Low Return Air ' 28 in x 98 in 24 in x 88 in Internal Leak 16820 cfm 0.10 inWc 1 UltraSeal Low Exhaust Air SIDE 26 in x 60 in SDIE 16820 cfm 0.10 inWc 1 Leak Filter Data Type Efficiency Face Velocity Face Area Air Volume Filter Loading Pleated MERV 14 425 ft/min 39.6 ft2 16820 cfm Side Air Pressure Drop Number of Filters Height Width Depth Clean Air Dirty Air 0.30 inWc 0.90 inWc 15 20 in 20 in 2 in Door Location Width Opening Drive side 28 in Outward Special Options Special Text Page 3 of 6 www.DaikinApplied.com VisionTM Air Handling Unit ::.��i �Y upply Fan Air Volume Component: 3 length: 58 in Shipping Section: 3 Fan Performance Static Pressure Brake Horsepower Speed Outlet Velocity External Total Cabinet Operating Maximum 16820 cfm 1.2 inWc 3.69 inWc 0.00 inWc 22.80 BHP 2028 rpm 2255 rpm 2389 ft/min Fan Data Fan Type Blade Type / Class Quantity of Fans Wheel Diameter Number of Blades Discharge Motor Location Centrifugal DWDI Airfoil / 2 1 24.00 in N/A Bottom horizontal To Side of Fan Motor Data Power Electrical Speed Efficiency Enclosure Frame Size Supplier Number of Lock Rotor Full Load Supply Poles Current Current 25.0 HP 460/60/3 1750 rpm Premium ODP 284 T frame Generic 4 185.1 A 30 A V/Hz/Phase Fan Options Seismic Restraint: With snubbers Shaft Grounding Kit: Provided Isolator Type: Spring Drive Package Data* Fan Sheave Motor Sheave Belt Number of Belts Actual Drive S.F. Bearing Type 2B5V58 2B5V68 5VX670 2 1.32 Premium - L50 (1000K) *Daikin Applied reserves the right to provide a different but equivalent drive package Electric Connection Notes Selection Type: External 1-Box Vendor: Factory Standard Voltage: 460 v Height x Width x Depth: 4.00 in x 6.00 in x 6.00 in Mounting: Door Side Enclosure: NEMA 1 Door Location Width Opening Window Type Light Drive side 30 in Outward Round Marine light kit with GFI outlet 115/1/60 Reqd Page 4 of 6 www.DaikinApplied.com VisionTM Air Handling Unit ^V, hree Deck Multizone Discharge Location Vertical / Vertical Component: 4 Number of Zones 11 Length: 96 in Multizone APD* 1.42 inWc Shipping Section: 4 & 5 & 6 & 7 Damper Type Low leak / Low leak Actuation None - damper mechanically linked * Note: Includes coil, balance plate & diffuser Note : Cabinet height for multizone extends 46 inches above 'External cabinet height' referenced above. The damper assembly will add 8.38 inches to the cabinet length for horizontal discharge and 8.38 inches to the height for vertical discharge. Single actuator can control multiple zone dampers sets - coordinate as required for job conditions Cold Deck Coil Coil Model Total Capacity Sensible Capacity Number of Coils Number of Rows Fins per Inch Tube Diameter Tube Spacing (Face x Row) 5WH1204C 507362 Btu/hr 428184 Btu/hr 2 4 12 0.625 in 1.50 in x 1.3 in Air Volume Air Temperature Coil Air Finned Finned Face Area Face Entering Leaving Pressure Height Length Velocity Dry Bulb Wet Bulb Dry Bulb Wet Bulb Drop 16820 cfm 78.0 °F 64.0 °F 54.7 °F 53.8 °F 0.81 inwc 27 in 89 in 33.38 ft2 504 ft/min Water Flow Rate Pressure Drop Velocity Volume Weight Entering Leaving 44.0 °F 58.4 °F 70.30 gpm 15.80 ftHd 4.40 ft/s 18.0 gal 155.00 lb Connection Min. Fin Surface Min. Tube Wall Fouling Factor Type Quantity Size Location Material Temp. Surface Temp. Threaded 2 1.50 in Drive side Carbon steel 44.0 °F 44.0 °F 0.000 Material Drain Pan Drain Side Fin Tube Header Case Aluminum .0075 in Copper .025 in Copper Galv. steel Stainless steel Drive side AHRI 410 Certification Certified in accordance with the AHRI Forced -Circulation Air -Cooling and Air -Heating Coils Certification Program which is based on AHRI Standard 410 within the Range of Standard Rating Conditions listed in Table 1 of the Standard. Certified units may be found in the AHRI Directory at www.ahridirectory.org Hot Deck Coil Coil Model Total Capacity Number of Coils Number of Rows Fins per Inch Tube Diameter Tube Spacing (Face x Row) SWHO901C 373990 Btu/hr 1 1 9 0.625 in 1.50 in x 1.3 in Air Volume Air Temperature Coil Air Pressure Finned Height Finned Length Face Area Face Velocity Entering Leaving Drop Dry Bulb Dry Bulb 16820 cfm 60.0 °F 80.3 °F 0.46 inwc 30 in 86 in 17.92 ft2 939 ft/min Water Flow Rate Pressure Drop Velocity Volume Weight Entering Leaving 160.0 °F 139.7 °F 36.80 gpm 6.60 ftHd 4.10 ft/s 3.0 gal 31.00 lb Connection Min. Fin Surface Min. Tube Wall Fouling Factor Type Quantity Size Location Material Temp. Surface Temp. Threaded 2 1.50 in Drive side Carbon steel 139.7 °F 139.7 °F 0.000 Material Tube Header Case Copper .025 in Copper Galvanized track AHRI 410 Certification Fin Aluminum .0075 in Certified in accordance with the AHRI Forced -Circulation Air -Cooling and Air -Heating Coils Certification Program which is based on AHRI Standard 410 within the Range of Standard Rating Conditions listed in Table 1 of the Standard. Certified units may be found in the AHRI Directory at www.ahridirectory.org Page 5 of 6 www.DaikinApplied.com Vision' Air Handling Unit r ;ILTLL7 nit Sound Power (dB) Type 63 Hz Radiated: 92 Unit Discharge: 98 Unit Return: 96 125 Hz 94 100 98 250 Hz 88 98 96 500 Hz 84 99 97 1000 Hz 75 93 91 2000 Hz 66 87 85 4000 Hz 50 83 81 8000 Hz 41 75 73 Shipping Section Details Section Length Weight Corner Weights (Ib) in Ib P1 P2 P3 P4 1 84 1814 622 440 312 441 2 36 777 194 194 194 194 Center of Gravity (in) xx vy zz 35 42 32 18 51 36 3 58 1820 577 364 340 539 28 39 31 4 48 568 142 142 142 142 24 51 36 5 48 1612 416 390 390 416 24 49 36 6 62 594 373 343 343 373 31 49 26 7 34 261 65 65 65 65 17 51 26 Entire Unit 274 7446 1957 1597 2125 2604 156 46 46 YY P2 Air Flow P1 P3 P4 0 0 ► XX Plan View NOTE: Special components aren't included in the corner weights and center of gravity data. AHRI Certification Supply fan performance is certified in accordance with the Central Station Air -Handling Unit Certification Program, which is based on AHRI Standard 430. Notes Important 1. This unit may not meet ASHRAE Standard 90.1- 2007 fan motor power limitations. If that code applies, alternate fan selections may be required. BY OTHERS IN THIS CONTACT: DISCONNECT, VFD, DAMPER OPERATORS, CONTROLS, WATER VALVES DISCHARGE ZONE DAMPERS PROVIDED WITH LINKAGE TO ALLOW MULTIPLE ZONES SETS — FIELD INSTALLED kCTUATOR PER DUCTED ZONE AS REQUIRED BY OTHERS SEPARATE 115/1/60 SERVICE REQUIRED FOR LIGHTS AND GFI SERVICE OUTLET IN FAN SECTIONS Page 6 of 6 www.DaikinApplied.com DIMENSIONAL DATA 3rtical Discharge Three -Deck Multi -zone Coil Section A 6.00" - 8.00" approx. Plan 3.00" T (CC In I Connection Elevation MPT ;ble 42: Vertical Discharge Three -Deck Multi -zone Coil Dimensions 3.00" Unit size Max # of zones A` In. (mm) 13 In. (mm) C" In. (mm) D" In. (mm) E* In. (mm) G In. (mm) H In. (mm) M In. (mm) 006 5 52.0 (1321) 30.0 (762) 50.0 (1270) 30.0 (762) 58.0 (1473) 8.0 (203) 12.0 (305) 40.60 (1031) 008 6 58.0 (1473) 34.0 (864) 54.0 (1372) 36.0 (914) 64.0 (1626) 8.0 (203) 14.0 (356) 48.60 (1234) 010 7 64.0 (1626) 1 36.0 (914) 54.0 (1372) 36.0 (914) 66.0 (1676) 8.0 (203) 14.0 (356) 56.60 (1438) 012 7 1 66.0 (1676) 42.0 (1067) 64.0 (1626) 36.0 (914) 76.0 (1930) 10.0 (254) 18.0 (457) 56.60 (1438) 014 8 74.0 (1880) 42.0 (1067) 64.0 (1626) 36.0 (914) 76.0 (1930) 10.0 (254) 18.0 (457) 64.60 (1641) 017 9 80.0 (2032) 46.0 (1168) 70.0 (1778) 42.0 (1067) 82.0 (2083) 12.0 (305) 20.0 (508) 72.60 (1844) 021 9 82.0 (2083) 52.0 (1321) 76.0 (1930) 42.0 (1067) 90.0 (2286) 14.0 (356) I 22.0 (559) 72.60 (1844) 025 9 86.0 (2184) 60.0 (1524) I 86.0 (2184) 48.0 (1219) 102.0 (2591) 16.0 (406) 26.0 (660) 72.60 (1844) 48.0 102.0 1G.0 26.0 60.60 030 11 90.0 (2489) G0.0 (1524) 86.0 (2104) (1219)- (2501) (40G) (GCO) (2250) 035 11 102.0 (2591) 1 66.0 (1676) 96.0 (2438) 48.0 (1219) 112.0 (2845) 18.0 (457) , 30.0 (762) 88.60 (2250) 040 13 118.0 (2940) 08.0 (1727) N/A 96.0 (2438) N/A 40.0 (1219) 114.0 (2090) 10.0 (457) 30.0 (702) 104.00 (2057) 050 N/A N/A N/A N/A N/A N/A N/A 065 N/A N/A j N/A N/A N/A N/A N/A N/A N/A 080 N/A N/A N/A N/A N/A N/A N/A N/A N/A 085 N/A N/A N/A N/A N/A N/A N/A N/A N/A 090 N/A N/A N/A N/A N/A N/A N/A N/A N/A ` These are the dimensions of the unit only. A base rail adds 8" (203 mm) to the width. and between 4" to 12" (102 mm to 305 mm) to the unit height. A base rail is mandatory on unit sizes 02 to 065 and adds a minimum of 6" ( 52 mm) to the unit height. Unit sizes greater than 080 require a base rail that adds a minimum of 8" (203 mm) to the unit height. " For 10-row water and DX coils, the C and D dimensions are 6" longer. If additional access is required downstream from the cooling coil, refer to Daikin SelectTools software for available selection options. www.DaikinApplied.com 73 CAT 550-8 VISION AIR HANDLER r7DAIKIN MECHANICAL INSTALLATION uct Connections Use flexible connectors on the outlet and inlet duct connections of all units. Each zone divider has a W-shaped duct clip. Insert ductwork into this clip (Figure 30). Figure 30: Duct Connectors Duct work Duct clip 11111111111111111111111 Zone divider NOTE: Before connecting to ductwork, refer to Multizone Damper Adjustment below. Multizone Damper Adjustment The installer must clear the damper assemblies of construction dirt and debris. These materials result in higher torque requirements and may bend or damage damper components. yfore you begin: 1. Verify that dampers are square and operating smoothly before ducting. 2. Install duct access panels on the downstream damper for inspection and maintenance. If multizone dampers do not close properly, adjust the blades as follows: 1. Loosen set screws in bell arms for all zones. 2. Close all cold deck dampers tightly. 3. Move bell arms so they are at a 45° angle to the vertical center when viewing the zone dampers from the cold deck end of the damper section (Figure 31). a. Two -deck zone dampers —The cold deck closes when the bell arms are 45° from the vertical center. The hot deck closes when the bell arms are 45° clockwise from the vertical center. b. Three -deck zone dampers —The cold deck closes when the bell arms are 45° clockwise from the vertical center. The hot deck closes when the bell arms are 45° counterclockwise from the vertical center. 4. Tighten set screws on bell arms while holding the dampers closed. 5. All zone damper blades should close properly. If one or a few zones do not close completely, repeat the procedure for these zones. Figure 31: Bel! Arms at 45° Angle to Vertical Center Zone damper linkage Conn. link 45°—•- Bell arm Installation modification for multiple zones To divide the damper section into multiple zones, cut and remove sufficient connecting link to allow adjacent zones to operate independently. NOTE: The damper blades on two -deck dampers seal through several degreesof shaft rotation.The damper blades can rotate 360° and do not engage a stop.The hot deck blades are mounted at a 90° to the cold deck blades. Beforeinstalling the zone duct. set up linkages and dampers and adjust. If adjustmentis required and access to the blades is restricted, observe the cold deck bladeposition by removing the cabinet panel on the coil section. www.DaikinApplied.com 17 IM 672-10 • VISION AIR HANDLING UNIT BOEING 9-120 3 a 47, co H DAIKIN VISION INDOOR AIR HANDLER - TRIPLE DECK MULTIZONE PROVIDED TYPICAL - GALVANIZED G90 FINISH IS STANDARD - OPTIONAL PAINTED FINISH IS AVAILABLE • Opening A Exhaust inlet B Damper C Damper D Hot water outlet E Hot water inlet F Cold water outlet G Cold water inlet H Condensate drain conn. I Fan discharge Dimensions measured from NOTE: X Y 2.00 2.00 44.00 2.00 64.00 2.00 90.57 -7.00 90.57 -7.00 102.60 -7.00 107.85 -7.00 108.00 -4.90 130.64 24.85 Z W(Width) H(Height) 46.00 62.00 38.00 46.00 62.00 16.00 46.00 62.00 16.00 40.06 1.50ins. MPS 10.91 1.50ins. MPS 42.19 1.50ins. MPS 10.81 1.50ins. MPS 5.00 1.25ins. MPS 47.00 24.31 22.37 Base 4.00 ins deep, Cross members extend 4 ins on each side of the unit. VIEW: 3-D DRAWN: Tuesday, November 25, 2014 4:24 PM JOB NAME: BOEING 9-120 AHU 9-14 UNIT TAGGING: AH1G1 5.4K CFM VAV MODEL: CAH012GDAC Vision' Air Handling Unit V%DAIKIN ob Information JobName Date Submitted By Software Version Unit Tag Technical Data Sheet BOEING 9-120 AHU 9-14 November 26 2014 NORBY COMPANY - LDH 10.32 AH1G1 5.4K CFM VAV Rev 4-3-15 Unit Overview Model Number AH012GDACx Supply Air Volume cfm Static Pressure External inWc Total inWc External Dimensions Height in Width in 4001V, 0 80 ? 2189 42* 66** *Not including base rails, coil connectors, drain connectors and control boxes. Length in Return/Exhaust Air Volume cfm ',....cw,a 5400. iw Static Pressure External inWc Total inWc 0189 External Dimensions Height in Width in Length in Unit Model Number: Approval: Outer Panel: Liner: Insulation: Unit Configuration: Base: Shrink Wrapping: Parts Warranty: CAH012GDAC ETL Listed / ETL Listed to Canadian Safety Standards (ETL Label / ETLc Label) Standard G90 Galvanized Steel (unpainted) Galvanized Steel (unless noted per section) R-13 Injected Foam Inline horizontal 4" formed channel Yes Standard One Year Drive (Handling) Location: Wall Thickness: Altitude: Right 2 in 100 ft Page 1 of 6 www.DaikinApplied.com VisionTM Air Handling Unit Component: 1 Length: 42 in Fan Performance Shipping Section: 1 Air Volume Static Pressure Brake Horsepower Speed External Total Cabinet Operating Maximum 5400 cfm 0.75 inWc 0.89 inWc 0.00 inWc 2.1 BHP 759 rpm 1328 rpm 2609 ft/min Fan Data Fan Type Blade Type / Class Quantity of Fans Wheel Diameter Number of Blades Discharge Motor Location Centrifugal DWDI Forward Curved / 1 1 15.00 in N/A Bottom horizontal To Side of Fan Motor Data Outlet Velocity Power Electrical Speed Efficiency Enclosure Frame Size Supplier Number of Lock Rotor Full Load Supply Poles Current Current 3.0 HP 460/60/3 1750 rpm Premium ODP 182 T frame Generic 4 28.2 A 4.2 A V/Hz/Phase Fan Options Seismic Restraint: With snubbers Isolator Type: Spring Drive Package Data* Fan Sheave Motor Sheave Belt Number of Belts Actual Drive S.F. Bearing Type AK84H AK44H A45 1 1.26 Standard - LSO (200K) *Daikin Applied reserves the right to provide a different but equivalent drive package Electrcial Connection Data Selection Type: External J-Box Vendor: Factory Standard Voltage: 460 V Height x Width x Depth: 4.00 in x 6.00 in x 6.00 in Mounting: Door Side Enclosure: NEMA 1 Door Location Width Opening Window Type Light Drive side 26 in Outward Round Marine light kit and switch only —115/1/60 POWER BY OTHERS Page 2 of 6 www.DaikinApplied.com VisionTM Air Handling Unit Economizer Portion Component: 2 Damper Size (length x width) Location Overall Opening Outside Air 16 in x 62 in 12 in x 52 in Top Return Air 16 in X 62 in 12 in x 52 in Internal Exhaust Air 16 in x 62 in 12 in x 52 in Top Length: 44 in Type UltraSeal Low Leak UltraSeal Low Leak UltraSeal Low Leak Filter Data Type Efficiency Face Velocity Face Area Pleated MERV 14 409 ft/min 13.2 ft2 Air Pressure Drop Number of Filters Clean Air Mean Air Dirty Air 0.30 inWc 0.64 inWc 0.90 inWc of Water Coil Coil Model Location Drive side 3 2 Door Width 20 in Special Options Special Text Component: 3 Total Capacity 5WB1001C 114739 Btu/hr Number of Coils 1 Rated CFM Shipping Section: 1 Air Pressure Drop Quantity 5400 cfm 0.12 inWc 1 5400 cfm 0.12 inWc 1 5400 cfm 0.12 inWc 1 Height Air Volume Filter Loading 5400 cfm Side Width Depth 24 in 20 in 2in 12 in 24 in 2in Length: 12 in Number of Rows 1 Fins per Inch 10 Opening Outward Shipping Section: 2 Tube Diameter 0.625 in Tube Spacing (Face x Row) 3.00 in X 1.3 in Air Volume Air Temperature Coil Air Pressure Finned Height Finned Length Face Area Face Velocity Entering Leaving Drop Dry Bulb Dry Bulb 5400 cfm 60.0 °F 79.5 °F 0.15 inWc 33 in 50 in 11.46 ft2 471 ft/min Water Flow Rate Pressure Drop Velocity Volume Weight Entering Leaving 160.0 °F 140.5 °F 11.80 gpm 1.20 ftHd 2.20 ft/s 2.0 gal 21.00 lb Connection Min. Fin Surface Min. Tube Wall Fouling Factor Type Quantity Size Location Material Temp. Surface Temp. Threaded 2 1.50 in Drive side Carbon steel 140.5 °F 140.5 °F 0.000 Material Tube Header Case Copper .025 in Copper Galvanized track AHRI 410 Certification Certified in accordance with the AHRI Forced -Circulation Air -Cooling and Air -Heating Coils Certification Program which is based on AHRI Standard 410 within the Range of Standard Rating Conditions listed in Table 1 of the Standard. Certified units may be found in the AHRI Directory at www.ahridirectory.org Fin Aluminum .0075 in Page 3 of 6 www.DaikinApplied.com VisionTM Air Handling Unit Milled Water Coil Coil Model Component: 4 Length: 20 in Total Capacity Sensible Capacity Number of Coils Number of Rows Fins per Inch 5WHO605C 142604 Btu/hr 127644 Btu/hr 1 5 6 Shipping Section: 2 Tube Diameter Tube Spacing (Face x Row) 0.625 in 1.50 in x 1.3 in Air Volume Air Temperature Coil Air Finned Finned Face Area Face Entering Leaving Pressure Height Length Velocity Dry Bulb Wet Bulb Dry Bulb Wet Bulb Drop 5400 cfm 78.0 °F 63.0 °F 56.3 °F 53.9 °F 0.52 inWc 33 in 53 in 12.15 ftx 445 ft/min Water Flow Rate Pressure Drop Velocity Volume Weight Entering Leaving 44.0 °F 54.0 °F 28.50 gpm 7.30 ftHd 2.90 ft/s 9.0 gal 75.00 lb Connection Min. Fin Surface Min. Tube Wall Fouling Factor Type Quantity Size Location Material Temp. Surface Temp. Threaded 2 1.50 in Drive side Carbon steel 44.0 °F 44.0 °F 0.000 Material Fin Tube Drain Pan Drain Side Header Case Aluminum .0075 in Copper .025 in Copper Galv. steel Stainless steel Drive side AHRI 410 Certification Certified in accordance with the AHRI Forced -Circulation Air -Cooling and Air -Heating Coils Certification Program which is based on AHRI Standard 410 within the Range of Standard Rating Conditions listed in Table 1 of the Standard. Certified units may be found in the AHRI Directory at www.ahridirectory.org Panel Width Opening - in Outward Location Removable panels Page 4 of 6 www.DaikinApplied.com VisionTM Air Handling Unit upply Fan Air Volume Component:5 Length:46 in Fan Performance Static Pressure External Total Cabinet 5400 cfm 0.8 inWc 2.89 inWc 0.00 inWc Brake Horsepower 3.5 BHP Shipping Section: 2 Outlet Velocity Operating Maximum 2236 rpm 3457 rpm 1521 ft/min Fan Data Fan Type Blade Type / Class Quantity of Fans Wheel Diameter Number of Blades Centrifugal DWDI Airfoil / 2 1 16.19 in N/A Motor Data Speed Discharge Motor Location Up blast CCW To Side of Fan Power Electrical Speed Efficiency Enclosure Frame Size Supplier Number of Lock Rotor Full Load Supply Poles Current Current 5.0 HP 460/60/3 1750 rpm Premium ODP 184 T frame Generic 4 47.1 A 6.6 A V/Hz/Phase Fan Options Seismic Restraint: With snubbers Isolator Type: Spring Shaft Grounding Kit: Provided Drive Package Data* Fan Sheave Motor Sheave Belt Number of Belts Actual Drive S.F. Bearing Type 1B5V50 AK66H A45 1 1.17 Premium - LSO (1000K) *Daikin Applied reserves the right to provide a different but equivalent drive package Electrcial Connection Data Location Drive side Selection Type: External J-Box Voltage: 460 v Mounting: Door Side Width 30 in Door Opening Outward Vendor: Factory Standard Height x Width x Depth: 4.00 in X 6.00 in x 6.00 in Enclosure: NEMA 1 Window Type Light Round Marine light kit with GFI outlet —115/1/60 POWER BY OTHERS Unit Sound Power (dB) Type 63 Hz Radiated: 73 Unit Discharge: 83 Unit Return: 82 125 Hz 80 85 84 250 Hz 71 83 84 500 Hz 69 84 78 1000 Hz 62 78 76 2000 Hz 52 72 76 4000 Hz 40 68 76 8000 Hz 35 60 71 Page 5 of 6 www.DaikinApplied.com Vision"' Air Handling Unit DAtialif hipping Section Details Section Length in 1 86 2 78 Entire Unit 164 YY Weight Ib P1 1113 332 1497 426 2610 668 ► XX Corner Weights (Ib) P2 P3 267 229 354 325 547 629 Plan View NOTE: Special components aren't included in the corner weights and center of gravity data. Center of Gravity (in) P4 xx YY ZZ 285 40 29 21 391 37 30 22 767 88 30 21 AHRI Certification Supply fan performance is certified in accordance with the Central Station Air -Handling Unit Certification Program, which is based on AHRI Standard 430. Notes Standard 1. As a standalone component, unit meets or exceeds requirements of ASHRAE 90.1- 2007. The approving authority is responsible for compliance of multi -component building systems. BY OTHERS IN THIS CONTACT: DISCONNECT, VFD, DAMPER OPERATORS, CONTROLS, WATER VALVES SEPARATE 115/1/60 SERVICE REQUIRED FOR LIGHTS AND GFI SERVICE OUTLET IN FAN SECTIONS Page 6 of 6 www.DaikinApplied.com 7:75:m OCTOPI 13600 Industrial Park Blvd, Minneapolis, MN 55441 www.DaikinApphed.com Software Version: 10.24 Z0'9Z ><V>< 86'IT 1 0 rn 0 r, m N N Sales Office: Norby Company (Seattle) Sales Engineer: Scale: NTS I Tolerance:+/•0.25" I Dwg Units:in � 78 x 2 n to up 4 cr ..I u1 m T. 6 ,2 Damper 8 I.2 Damper 8 U 4 ; Q;, st U) '° ! I Unit Tag: AH1G1 5.4K CFM VAV Project Name: BOEING 9-120 AHU 9-14 Nov. 26, 2014 I Ver/Rev: I Sheet: 1 of 1 -I U IIM s st K 0 co xJ Pq m , C -{IC f 1 Product Drawing Product: Vision Air Handler Model: CAH012GDAC c 00 m V — ` m m III Y y < X Z0'9Z b X ) 86'IT Zb b I Cr) N N inU)COU) a_a.aaa_ • cc 2 2 2 2 to ui N ui c c c c c ._ �- 000000OOOOIC)c)) NNNtf)LIPtt)tr)N4 COCOCOT— T— TN OOOCOr-Oc- O O O O O r- OD 0 0 CO CO COOOO N9I‹ Nd d'd'�T—Sr—Cn)¢r O CD O O O CD CD O CD CD CD O O O O O i'NNNNi ,i CD CD OOCOo OOO1.0UR(Ni N.:06 c?4400000 XNC400 N c co 'E o as � OCL co as 0 0 130.64 24.85 E oc o o a) w o .= 0 .L Q) iO3 ) mm�E co co c cn co co �-o »��cccn o o 0 0 0 co c II000L 0717 Base 4.00 ins deep, Cross members extend 4 ins on each side of the unit. Z tii zQa� I- 5.QmO 0 W ZZ > 0 O� S8'91 58 17Z 9. L J < X L Jadwep ZS ial�l Z9 99 9 3Sd9 '0'0 bL rn (Ni N X reiX Ln m A CO aJ X E N 00 E (6 0 X tD n Sales Office: Norby Company (Seattle) Sales Engineer: c Tolerance: +/-0.25" Project Name: BOEING 9-120AHU 9-14 Nov. 26, 2014 Product: Vision Air Handler Model: CAH012GDAC O O = O O cci cc; I co O O O 0 O N CO O co O O O O N��� a 0 i' N co X 4) c C v) d � 0c Ow co N co O N 00 U) d 6 O O 0 ti O) 0 L L (ll CD co 00= 0D 3- 2 N c O r N O N 0)V—o000 N O O f O r I 0 O) C •N 0 S 00rn°O . ~ ~ �i COCO 00 occo 0co E c O O w c v a)m b- (1) a) 2 N o o ca ca E C6 (6 c cn to 0 0 0 0 c 0 0 0 u CD Q 1 1 o I9 c i I - G 1 1 I l I 0 O cd I I fco i 1 a i /1 1 v Gt o d a) O a) 0 U N O N c a) X a) L a) E m E u) O 0 ci a) a) 0 0 a) 0 ca 1- 0 Z PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: M15-0116 DATE: 09/21/15 PROJECT NAME: BOEING 9-120 SUBSTATION 5 SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: , C Building Division it Public Works p(tA Am& AO Fire Prevention Structural Planning Division Permit Coordinator El PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) DATE: 09/22/15 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/20/15 Approved Corrections Required Approved with Conditions Denied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 HOLADAY PARKS INC home Inicio en Espanol Contact Search L&I Page 1 of 3 A-Z Index Help My Secure 1.,&I Safety Claims & Insurance Workplace Rights Trades & Licensing ashington State Department of Labor & Industries HOLADAY PARKS INC Owner or tradesperson BECK, DAVID CARL Principals BECK, DAVID CARL, PRESIDENT CONNELL, DANIEL A, PRESIDENT GIRI, BIJIT, PRESIDENT PIZZEY, GRACE K, VICE PRESIDENT FREEL, JERRY LEE, VICE PRESIDENT PARKS, GERALD T JR, PRESIDENT (End: 08/12/2015) NAILON, JUNE ANNETTE, VICE PRESIDENT (End: 08/12/2015) O'CONNOR, BONNY K, SECRETARY (End: 08/12/2015) BECK, DAVID CLARENCE, TREASURER (End: 08/12/2015) VAN DER VEEN, ERIC M, VICE PRESIDENT (End: 08/14/2013) PIZZEY, GRACE KATHERINE, VICE PRESIDENT (End: 08/14/2013) VAN DER VEEN, JULIE ELIZABETH, MEMBER (End: 08/14/2013) CONNELL, DANIEL AARON, MEMBER (End: 08/14/2013) GIRI, BUIT, MEMBER (End: 08/14/2013) KIEL, RINALD HOWARD, MEMBER (End: 08/14/2013) WHITMYRE, CHRISTIAN, MEMBER (End: 08/14/2013) NELSON, MICHAEL, SECRETARY (End: 11/04/2010) PARKS, DAVID L, TREASURER (End: 11/04/2010) TALBOT, PAUL, TREASURER (End: 11/04/2010) WA UBI No, 578 004 089 4600 S 134TH PL SEATTLE, WA98168 206-248-9700 KING County Business type Corporation License https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 10/5/2015 v CI\ TY JA D 0 99 EAST MARGINAL WAY CORPORATE PARK 99 FROM SEATTLE—TACOMA AIRPORT PROJECT SITE FROM DOWNTOWN SEATTLE 599 TUKWILA 900 EXIT 157 rrt m N EXIT 158 FROM KENT & AUBURN EXIT 157 900 \TV VA D 3UILDI\G ADDESS 9725 EAST NAGI\AL WAY SOUTH TU4WILA, WASHI\GTO\ PROJECT SITE 9-078 90 35 9-52 MFC 1067 DROJFCT S VARY DESCRIPTION OF WORK: CONTRACTOR: OWNER: STATION 5 AHU REPLACEMENT ADDRESS AND TELEPHONE NUMBER (WHEN KNOWN) BOEING DEVELOPMENTAL CENTER ArterAlEfArdig ® 9725 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON 98108 PROJECT MANAGER : MARTIN PROBST TEL. 208-852-4985 REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 ?)1_,maziezisv ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED No changes shall bo made to the scope of work without prior ap I Tukwila Building Di - n. NOTE: Revisions writ require a new plan► submi1tat and may Include additional plan rev e w few. l FILE COPY Permit No. M\6 Plan review approval is subject to errors and emissions. Approval of construction documents doss not authorize the violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is acknowledged: By: Date: DRAWN C. PECK City of Tukwila BUILDING DIVISION DATE 03.13.15 SEPARATE PERMIT REQUIRED FOR: CI Mechanical 1eCtrtcal Plumbing D +uas Piping City of Tukwila BUILDING DIVISION \DFX 01- DRAW \CS INCLUDED IN SET SHEET NO. DRAWING TITLE REV DATE • DRAWING NO. ACHITECTUAL • 9-120—GO GO COVER SHEET — 04.07.15 • 9-120-1A11R 1A11R FLOOR PLAN —REMOVAL A 04.07.15 • 9-120-1A11 1A11 FLOOR PLAN H 04.07.15 STUCTU�AL • 9-120—S516 S516 ENLARGED SLAB PLAN VIEW AND DETAILS — 04.07.15 • 9-120-5517 S517 MISC SECTIONS AND DETAILS — 04.07.15 VECHA\ICAL • 9-120—M2C M2C LEGEND AND ABBREVIATIONS — 04.07.15 • 9-120—M1C M1C LEGEND AND ABBREVIATIONS — 04.07.15 • 9-120—M1E M1E LEGEND AND ABBREVIATIONS — 04.07.15 • 9-120—M2D M2D MECHANICAL GENERAL NOTES — 04.07.15 • 9-120—M1R M1R SCHEDULES A 04.07.15 • 9-120-1M11R 1M11R HVAC FIRST FLOOR PLAN L 04.07.15 • 9-120-1M61R 1M61R FIRST FLOOR HVAC PIPING PLAN D 04.07.15 • 9-120—M1 M1 SCHEDULES A 04.07.15 • 9-120—M1A M1A SCHEDULES D 04.07.15 • 9-120-7M10 1M10 DUCTWORK PLAN L 04.07.15 • 9-120-1M11 1M11 HVAC FIRST FLOOR PLAN L 04.07.15 • 9-120-1M13 1M13 HVAC P 04.07.15 • 9-120-1M61 1M67 FIRST FLOOR HVAC PIPING PLAN D 04.07.15 • 9-120-1M111 1M111 FIRST FLOOR PLUMBING PLAN U 04.07.15 • 9-120-1M261 1M261 FIRE PROTECTION PLAN VIEW H 04.07.75 • 9-120—M313 M313 HVAC CONTROLS — 04.07.15 • 9-120—M314 M314 HVAC CONTROLS — 04.07.15 • 9-120—M315 M315 HVAC POINTS LIST — 04.07.15 • 9-120—M450 M450 ENLARGED PLAN REAVVED fOR COOECOMPLIANCP — 04.07.15 • 9-120—M539 M539 HVAC DETAILS APPROVED — 04.07.15 • 9-120—M540 M540 AHU DETAILS SEP 3 0 2015 - 04.07.15 • 9-120—M542 M542 SECTION — 04.07.15 � J �l ELECTRICAL City of T�i►a BUILDING DIVISION • 9-120-1E6BR 1E6BR PARTIAL PAGING, ADT, TELEPHONE PLAN B 04.07.15 • 9-120-1E61R 1E61R PARTIAL 1ST FLOOR 208Y/120V POWER PLAN E 04.07.15 • 9-120-1E111R 1E111R PARTIAL 1ST FLOOR 480Y/277V POWER PLAN P 04.07.15 • 9-120-1E61 1E61 PARTIAL 1ST FLOOR 208Y/120V POWER PLAN E 04.07.15 • 9-120-1E6B 1E6B PARTIAL PAGING, ADT, TELEPHONE PLAN B 04.07.15 • 9-120-1E111 1E111 PARTIAL 1ST FLOOR 480Y/277V POWER PLAN P 04.07.15 R[CF=iV!`n ISSUE FOR CONSTRUCTION APRIL 7, 2015 CITY OF TUKWILA SEP 16 2015 PERMIT CENTER Wood Ai Harbinger 3oog urth Ave NE, Suite leo Bellevue WA 9Bo04 425.628.6000 woodharbinger.com CHECKED C. LARSON 03.13.15 SUBTITLE COVER SHEET CURRENT REVISION 21067 SYMBOL DATE 04.07.15 APPROVED BY DEPT. DATE ENGINEER M. LEHNER 03.13.15 CHECKED C. LARSON 03.13.15 APPROVED APPROVED TITLE GFNFRAI 9-120 STATION 5 AHU REPLACEMENTS BUILDING 09-120 DFV. CFNTFR. WA SHEET GO JOB NO. DWG NO. COMP NO. 21067 09-101—Go CPFCK. 12 /(l9 /14 A\CAL VAC LHCF\D GENERAL SYMBOL DESCRIPTION RECTANGULAR DUCT, FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN 24x12 24x12 24x12-N DUCT SHOWN IN SECTION, ARROW POINTS TO SIDE CALLED OUT FIRST i>.1 ROUND DUCT, NUMBER INDICATES DIAMETER 240 4 240 OVAL DUCT, FIRST NUMBER INDICATES MAJOR DIAMETER, SECOND NUMBER INDICATES MINOR DIAMETER i) 24x120 1 24x120 e AIR DUCT, SQUARE OR RECTANGULAR ELBOW FACING TOWARDS XSUPPLY SUPPLY AIR SQUAREOR RECTANGULAR ELBOWFACING AWAY \' �L. EXHAUST, RETURN OR SUPPLY AIR DUCT ROUND, ELBOW FACING TOWARDS 4H ! I EXHAUST, RETURN OR SUPPLY AIR DUCT ROUND, ELBOW FACING AWAY EXHAUST AIR OR RETURN AIR DUCT, SQUARE OR RECTANGULAR, ELBOW FACING TOWARDS f 71 EXHAUST AIR OR RETURN AIR DUCT, SQUARE OR RECTANGULAR, ELBOW FACING AWAY TRANSITION RECTANGULAR TO RECTANGULAR HEEL TAP OR LOW LOSS TRANSITION AT TAKE OFF FROM OVAL TO ROUND OR ROUND TO ROUND ------+- ,I TRANSITION SQUARE OR RECTANGULAR TO ROUND OR OVAL CONICAL SPIN -IN W/ VOLUME DAMPER (NOT SHOWN) V UP DUCT OFFSET UP OR DOWN I--1 DN BLADE DAMPER rillOPPOSED PARALLEL BLADE DAMPER .T-174-1 VOLUME DAMPER DUCT DAMPER, MOTOR OPERATED (ELECTRIC) tr.+ BACK DRAFT DAMPER (ALLOWS FLOW IN DIRECTION OF ARROW) -0- BDD AD OR AP ACCESS DOOR (AD) OR ACCESS PANEL (AP) FD FIRE DAMPER TFD SFD SMOKE FIRE DAMPER, PROVIDE ACTUATOR ON SIDE INDICATED WITH DIAMOND 1SFD GENERAL SYMBOL DESCRIPTION WITHRECTATURN NG VANENGULAR S SQUARE ELBOW RECTANGULAR DUCT, LONG RADIUS ELBOW ':[))_ SCOOP VPEXTRACTION FLEXIBLE DUCT 14-1 FLEXIBLE DUCT CONNECTION IQ SIDEWALL SUPPLY AIR DIFFUSER, GRILLE OR REGISTER Ell _,_ SIDEWALL RETURN/EXHAUST AIR GRILLE OR REGISTER I.'" _ OPENING T-11.....4__SCREENED (SO) M500 CEILING DIFFUSER, DIRECTION Alili \ / OF FLOW SHOWN M500 � \ — � AI / L. RETURN GRILLE M500 AND GRILLE alk LINEAR DIFFUSER M501 RETURN/EXHAUST REGISTER OR GRILLE HARD DUCT CONNECTION t. Z (4 WALL TRANSFER BOOT, (TB1) ) M500 UNIT HEATER 0 SOUND ATTENUATOR __- INLINE EXHAUST FAN —� SUPPLY AIR FLOW DIRECTION, POSITIVE PRESSURE _,Ii_m_ RETURN, OUTSIDE OR EXHAUST AIR FLOW DIRECTION, NEGATIVE PRESSURE GENERAL SYMBOL DESCRIPTION 0 TEMPERATURE SENSOR THERMOSTAT T QH HUMIDITY SENSOR © CARBON DIOXIDE SENSOR 0 OCCUPANCY SENSOR, CEILING DUCT TYPE SMOKE DETECTOR clo © PRESSURE SENSOR ©H/L PRESSURE SENSOR HIGH/LOW LIMIT DIFFUSER AND GRILLE CALLOUTS CEILING DIFFUSER, MARK CD, SEE SEE SCHEDULE FOR TYPE M500 CDX-200 �-- DESIGN CFM, SEE SCHEDULE FOR DIFFUSER AND GRILLE NECK SIZE, TYPICAL EGX-CFM = EXHAUST GRILLE RGX-CFM = RETURN GRILLE SGX-CFM = SUPPLY GRILLE VAV TERMINAL LEGEND TERMINAL BOX IDENTIFIER: 1ST CHARACTER: V = VARIABLE AIR VOLUME TERMINAL UNIT 2ND CHARACTER: C = SINGLE DUCT F = SERIES FAN POWERED 3RD CHARACTER: C = COOLING ONLY �X W = HOT WATER COIL MARK NUMBER 3RD CHARACTER: # = QTY GREATER THAN ONE 2ND CHARACTER: X# = GRIDLINE 1ST CHARACTER: # = FLOOR PM = PENTHOUSE i-., I SINGLE DUCT TERMINAL UNIT lialik WITH HEATING COIL M500 q li le SINGLE DUCT TERMINAL UNIT Alik WITHOUT HEATING COIL M500 1 d' J SERIES FAN POWERED WITH HEATING COIL TERMINAL UNIT r - M500 ABBREVIATIONS ABBREVIATION DESCRIPTION A AAV AD ADD AF AFF AMS AP APPROX ARCH AUD AVG BI BDD BFP BHD BHP BLDG BOD BOP BOS BTU BTUH BW C Cv °C CAP CC CCW CFM CI COMB CONN CONT COTG CPLG CW DA DB DBD DI DIA 0 DIM DL DN DS DWG dB DP EA EAT EFF ELL ELEC ELEV, EL ESP ETP EVAP EWT EXH EXIST EXT °F F FC FD FLR FCO FOB FOF FOIC FOT FPM FS FT FV FW GAL GPM GALV GA GCO HC HD HORIZ HP HPC HR HVAC HPU HTG ID IE ANCHOR AUTOMATIC AIR VENT ACCESS DOOR ANGULAR DOWN DISCHARGE AIR FOIL WHEEL ABOVE FINISHED FLOOR AIR MEASURING STATION ACCESS PANEL APPROXIMATELY ARCHITECTURAL ANGULAR UP DISCHARGE AVERAGE BACKWARD INCLINED WHEEL BACK DRAFT DAMPER BACKFLOW PREVENTER BOTTOM HORIZONTAL DISCHARGE BRAKE HORSE POWER BUILDING BOTTOM OF DUCT BOTTOM OF PIPE BOTTOM OF STEEL BRITISH THERMAL UNIT BRITISH THERMAL UNIT PER HOUR BUTTWELD COMMON FLOW COEFFICIENT TEMPERATURE - DEGREES CELSIUS CAPACITY COOLING COIL COUNTER CLOCKWISE ROTATION CUBIC FEET PER MINUTE CAST IRON CENTER LINE COMBUSTION CONNECTION CONTINUED/CONTINUATION CLEAN OUT TO GRADE COUPLING CLOCKWISE ROTATION DIRECT ACTING DRY BULB TEMPERATURE DOWN BLAST DISCHARGE DUCTILE IRON DIAMETER DIMENSION DELUGE DOWN DOWNSPOUT DRAWING DECIBELS DRY PIPE EXHAUST AIR / EACH ENTER AIR TEMPERATURE (°F) EFFICIENCY ELBOW ELECTRICAL ELEVATION EXTERNAL STATIC PRESSURE ELECTRONIC TRAP PRIMER EVAPORATOR ENTERING WATER TEMPERATURE EXHAUST EXISTING EXTERIOR / EXTERNAL TEMPERATURE - DEGREES FAHRENHEIT FREEZE STAT FORWARD CURVE WHEEL FIRE DAMPER FLOOR FLOOR CLEAN OUT FLAT ON BOTTOM FACE OF FLANGE FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FLAT ON TOP FEET PER MINUTE FLOW SWITCH, FIRE SPRINKLER (WET PIPE) FEET FACE VELOCITY FPM FIRE WATER GALLONS GALLONS PER MINUTE GALVANIZED GAGE, GAUGE GRADE CLEANOUT HEATING COIL HEAD - FEET OF WATER HORIZONTAL HORSEPOWER HIGH PRESSURE CONDENSATE HOUR HEATING, VENTILATING AND AIR CONDITIONING HEAT PUMP UNIT HEATING INSIDE DIAMETER INVERT ELEVATION REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 iiLAmOE/N ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED ABBREVIATIONS ABBREVIATION DESCRIPTION IGV INSUL IN INT KW KVA LAT LBS, # LWT MA MAX MBH MCC MECH MIN MOV MTD, MTG NC NIC NO NTS NPSH OA OBD OCC OF OS&Y OD OVHD PBD PD/oP PDI PIV PLS POC POS PRESS PRV PS PSIG PSV RA RECT REF REV RH RM ROT RPM RQD RTN SA SCFM SHC SHF SHT SO SOV SP SQ SS STL STRUC SW SUCT TDH TEMP TH THC THD THRD TOD TOS TOP TP TS TSP TV TYP UBD VAV VD VP VERT VTA VTR WB WG WCO WS WSEC WHA INLET GUIDE VANE INSULATION INCHES INTERMEDIATE KILOWATT KILOVOLT -AMPERE LEAVING AIR TEMPERATURE (°F) POUNDS LEAVING WATER TEMPERATURE (°F) MIXED AIR MAXIMUM HEAT CAPACITY BTU PER HOUR X 1000 MOTOR CONTROL CENTER MECHANICAL MINIMUM MOTOR OPERATED VALVE MOUNTED, MOUNTING NORMALLY CLOSED NOT IN CONTRACT NORMALLY OPEN / NUMBER NOT TO SCALE NET POSITIVE SUCTION HEAD OUTSIDE AIR OPPOSED BLADE DAMPER OCCUPANCY SENSOR OVERFLOW OUTSIDE SCREW AND YOKE OUTSIDE DIAMETER OVERHEAD PARALLEL BLADE DAMPER PRESSURE DROP OR DIFFERENTIAL PRESSURE PLBG. & DRAINAGE INSTITUTE POST INDICATOR VALVE DUCT PRESSURE LIMIT SWITCH POINT OF CONNECTION POSITION PRESSURE PRSSURE REGULATING VALVE PRESSURE SWITCH PRESSURE - POUNDS PER SQUARE INCH, GAUGE PRESSURE RELIEF (SAFETY) VALVE REVERSE ACTING (CONTROLLER) / RETURN AIR RECTANGULAR REFERENCE REVISED RELATIVE HUMIDITY ROOM ROTATION REVOLUTIONS PER MINUTE REQUIRED RETURN SUPPLY AIR CUBIC FEET OF AIR, AT STANDARD CONDITIONS SENSIBLE HEAT CAPACITY SENSIBLE HEAT FACTOR SHEET SCREENED OPENING SOLENOID OPERATED VALVE STATIC PRESSURE SQUARE STAINLESS STEEL STEEL STRUCTURAL SOCKET WELD SUCTION TOTAL DYNAMIC HEAD (FEET OF WATER) TEMPERATURE TOTAL HEAD (FEET OF WATER) TOTAL HEAT CAPICITY TOP HORIZONTAL DISCHARGE THREADED TOP OF DUCT TOP OF STEEL TOP OF PIPE TOTAL PRESSURE TEMPERATURE SWITCH TOTAL STATIC PRESSURE TURNING, VANE TYPICAL UP BLAST DISCHARGE VARIABLE AIR VOLUME VOLUME DAMPER VELOCITY PRESSURE VERTICAL VENT TO ATMOSPHERE VENT THROUGH ROOF WET BULB TEMPERATURE WATER GAUGE (INCHES OF WATER) WALL CLEAN OUT WET STAND PIPE WASHINGTON STATE ENERGY CODE 2009 WATER HAMMER ARRESTOR DRAWN DATE APPROVED BY DEPT. DATE CHECKED CHECKED APPROVED APPROVED SUBTITLE TITLE LEGEND AND ABBRE TIO 9-120 STATION 5 AHU REP MFCHANICAI MASTFR BUILDING 9-1 LEG D 1. FOR MECHANICAL LEGENDS AND ABBREVIATIONS SEE SHEETS M2C, M1C, AND M1E. 2 e DESIGNATES EQUIPMENT APPEARING ON MECHANICAL EQUIPMENT SCHEDULES. GE\ EAL \OTES 1. GENERAL NOTES ON SHEET M2D SHALL APPLY. 2. SOME ABBREVIATIONS AND SYMBOLS INCLUDED IN THE LEGENDS MAY NOT BE FOUND ON ANY DRAWINGS. HFEH\CE . AWI\GS CO STD U CTI O \ \OTES NTF REV WED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RL:.CEiVEC CITY OF TUKWILA SEP 16 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 Wood Harbinger CURRENT REVISION 21067 SHEET doov JOB NO. WA DWG NO. SYMBOL DATE 0-M 3oo9 urth Ave NE, Suite ioo Bellevue WA 98004 425.628.6aoo woodharbinger.com 04.07.15 NO. 19 /7 /7014 R:4R34 AEI a c; V 1-C A\ CAS D D I\G LLCF\D GENERAL SYMBOL DESCRIPTION BREAK IN PIPE —4 2— I CROSSING LINES, NO CONNECTION I DIRECTION OF FLOW SLOPE DIRECTION OF SLOPE, DOWN EQUIPMENT MARK NUMBER K5VT)) /--EXIST EXISTING WORK /////// EXISTING TO BE REMOVED HIDDEN OR BELOW GRADE IN -LINE RECIRCULATING PUMP _....„0— INSULATED PIPE g INSULATED PIPE WITH ELECTRIC HEAT TRACING i____* NEW WORK •POC POINT OF CONNECTION PUMP -� FIXTURES SYMBOL DESCRIPTION O CIRCULAR WASHFOUNTAIN DRINKING FOUNTAIN DF la Ewc ELECTRIC WATER COOLER ELECTRIC WATER COOLER FOR HANDICAPPED IM EWCH FLOOR DRAIN O FD FLOOR SINK O Fs Q LAv LAVATORY, ROUND COUNTER MOUNT •I LAV LAVATORY, RECTANGULAR COUNTER OR WALL MOUNT ORD (OFD) ROOF DRAIN (OVERFLOW DRAIN - ROOF) 4 EWF SAFETY EYE WASH FOUNTAIN ED SSEW SAFETY SHOWER AND EYE WASH SEMI -CIRCULAR WASHFOUNTAIN Q7 SERVICE SINK, FLOOR MOUNT ss ss SERVICE SINK, WALL HUNG SHOWER STALL AND FIXTURE �•A EI UR URINAL, WALL HUNG EZ:2)wc WATER CLOSET, FLUSH VALVE, WALL HUNG 0 we WATER CLOSET, FLUSH VALVE, FLOOR MOUNT WASTE FITTINGS SYMBOL DESCRIPTION . 1/4 BEND -h 1 CO CLEAN OUT, EXPOSED FCO CLEAN OUT, FLOOR —I WC0 CLEAN OUT, WALL --� FFD FUNNEL FLOOR DRAIN O FUD FUNNEL DRAIN O LATERAL ICI TRENCH DRAIN iiim � j O wR WASTE RECEPTOR, ROOF WYE AND 1/8 BEND, SHOWN WITH CLEAN OUT I ill co PIPE IDENTIFICATION SYMBOL DESCRIPTION COMPRESSED AIR, PLANT A ARGON GAS AR ACID WASTE AW CONDENSATE RETURN (GRAVITY) C CHEMICAL DRAIN CD CHEMICAL FEED CF CHILLED WATER RETURN —CHWR— CHILLED WATER SUPPLY —CHWS— CLD CLEAR WATER DRAIN COOLING WATER RETURN —CLWR— COOLING WATER SUPPLY —CLWS— CORROSION RESISTANT VENT CRV CRW CORROSION RESISTANT WASTE COOLING TOWER FILTER RETURN —CTFR— COOLING TOWER FILTER SUPPLY — CTFS — CONDENSER WATER RETURN CWR CONDENSER WATER SUPPLY CWS DOMESTIC COLD WATER CW DRAIN D DEIONIZED WATER DI DISTILLED WATER DW FIRE LINE, AHEAD OF ALARM VALVE F FIRE HOSE CABINET PIPING FH FUEL OIL RETURN FOR FUEL OIL SUPPLY FOS FUEL OIL VENT FOV FILTERED WATER FW G NATURAL GAS CONDENSATE, STEAM (HIGH PRESSURE) HPC CONDENSATE RETURN (HIGH PRESSURE) HPR STEAM SUPPLY (HIGH PRESS, 125-250 PSIG) HPS HEAT PUMP WATER SUPPLY —HPWS— HEAT PUMP WATER RETURN —HPWR— HEAT RECOVERY SUPPLY HRS HEAT RECOVERY RETURN HRR DOMESTIC HOT WATER SUPPLY HW DOMESTIC HOT WATER CIRCULATING HWC HWR HEATING WATER RETURN HWS HEATING WATER SUPPLY INSTRUMENT AIR IA ID INDIRECT DRAIN INDUSTRIAL WASTE IW LN2 LIQUID NITROGEN CONDENSATE, STEAM (LOW PRESSURE) LPC LIQUID PETROLEUM GAS LPG STEAM SUPPLY (LOW PRESS, 0-15 PSIG) LPS CONDENSATE, STEAM (MEDIUM PRESSURE) MPC STEAM SUPPLY (MEDIUM PRESS, 15-125 PSIG) MPS OVERFLOW DRAIN OFD PROCESS COOLING WATER SOURCE —PCWS— PROCESS COOLING WATER RETURN —PCWR— CONDENSATE RETURN (PUMPED) PR PIPE IDENTIFICATION SYMBOL DESCRIPTION PROCESS WATER PW ROOF DRAIN RD REFRIGERANT DISCHARGE RDS REFRIGERANT HOT GAS RHG REFRIGERANT LIQUID RL REFRIGERANT SUCTION (GAS) RS RAIN WATER LEADER RWL SPRINKLER LINE S SANITARY WASTE ABOVE GRADE OR FLOOR SAN --SAN-- SANITARY WASTE BELOW GRADE OR FLOOR SUMP PUMP DISCHARGE SPD STEAM SUPPLY STM -- STS -- STORM DRAIN BELOW GRADE OR FLOOR ----TP---- TRAP PRIMER VENT V VACUUM VAC VACUUM PUMP DISCHARGE VPD PIPE FITTINGS SYMBOL DESCRIPTION BELL & SPIGOT ) ) BLIND FLANGE --�I BUSHING D— EXPANSION JOINT FLANGED FITTING -ICI- FLEXIBLE PIPE CONNECTION •:❖; HOSE BIBB B HOSE BIBB — NON FREEZE N HB PIPE ANCHOR X ] PIPE CAP SCREWED OR SOLDER JOINT PIPE CAP, WELDED OR GROOVED D PIPE CROSS 1 t 1 PIPE ELBOW, 90° SHORT RADIUS }sR PIPE ELBOW, 90' LONG RADIUS —} PIPE ELBOW, REDUCING —'Y PIPE ELBOW, 45° \ PIPE ELBOW, TURNED UP OR TOWARD —+0 PIPE ELBOW, TURNED DOWN OR AWAY 0 PIPE GUIDE PIPE HANGER x Y PIPING MATERIAL CHANGE, X TO Y I PIPE PLUG —tea ► PIPE REDUCER CONCENTRIC • PIPE REDUCER ECCENTRIC ' PIPE SUPPORT PIPE TEE, STRAIGHT t' PIPE TEE, UP OR TOWARD — 01 PIPE TEE, DOWN OR AWAY SCREWED FITTING OR AS SPECIFIED SEISMIC HANGER S SEISMIC LOOP A,-E- e- SOLDERED FITTING -e PIPE FITTINGS SYMBOL DESCRIPTION SOLVENT CEMENT E1 SPRING HANGER UNION, FLANGED —�F— UNION, SCREWED Imo— WELDED FITTING HOSE KIT —ICI— PIPING SPECIALTIES SYMBOL DESCRIPTION Wv 2 WAY CONTROL VALVE W/PNEUMATIC ACTUATOR L1 3 WAY CONTROL VALVE W/PNEUMATIC ACTUATOR A / A AIR DROP - HOSE, SIMPLEX / DUPLEX e / e AIR OUTLET - HARD PIPE, SIMPLEX / DUPLEX CS ANGLE GLOBE VALVE, ELEVATION / PLAN 400 AUTOMATIC FLOW CONTROL VALVE (NUMBER INDICATES GPM) MAAv AUTOMATIC AIR VENT (WITH DRAIN) BACKFLOW PREVENTER BFP UT BALANCE VALVE WITH METERING PORTS BALANCE VALVE W/0 METERING PORTS t>Ki -41-/-1 F- BALL VALVE, OPEN / CLOSED BUTTERFLY VALVE p' COOLING COIL CHILLED WATER ram: FLOAT VALVE FLOWMETER, VENTURI TYPE — 1 FLOWMETER ORIFICE t— --/-- ISOLATION VALVE, OPEN / CLOSE A GATE VALVE, OUTSIDE SCREW AND YOKE GATE VALVE, WITH HOSE CONNECTION —0.0 -co:1-/ GLOBE VALVE, OPEN / CLOSED HEATING COIL —--- -VP/ $ LIFT CHECK VALVE -MAV MANUAL AIR VENT (WITH DRAIN) © MOTOR OPERATED VALVE ..4 NEEDLE VALVE A NITROGEN DROP O NITROGEN OUTLET PETCOCK —I FI+HC PETE'S PLUG, WITH BALL VALVE VF— PLUG VALVE/STOP COCK 1-14)10 PRESSURE GAUGE WITH VALVE PRESSURE REGULATING VALVE W/EXT PRESS TAP 01 PRESSURE REGULATING VALVE (SELF CONTAINED) ,:y Al PRESSURE RELIEF VALVE / SAFETY VALVE QUICK OPENING VALVE -Da QUICK CLOSING VALVE, FUSIBLE LINK A SOLENOID OPERATED VALVE STEAM TRAP II SWING CHECK VALVE WITH FLOW --- Xi GAS PRESSURE REGULATOR PIPING SPECIALTIES SYMBOL DESCRIPTION ;12; TEST PLUG Pi THERMOMETER, LINE MOUNT 1 THERMOMETER, SEPARABLE WELL MOUNT T TRAP, FLOAT TRAP SEAL PRIMER VALVE TP UNCLASSIFIED VALVE v-1 A VACUUM DROP (LAB VAC) 0 VACUUM OUTLET (LAB VAC) HARD PIPED v VACUUM CLEANING OUTLET O VALVE BOX -IzCC-I— VALVE IN RISER (TYPE SPECIFIED) WATER HAMMER ARRESTOR WYE STRAINER (WITH DRAIN VALVE) y90; FIRE PROTECTION SYMBOL DESCRIPTION ALV ALARM VALVE, WET RN 4-1— AUTOMATIC SPRINKLER RISER 101 DRY PIPE VALVE ELECTRIC BELL EXISTING SPRINKLER HEADS (TO REMAIN) EXISTING SPRINKLER HEADS (REMOVE) X FIRE HOSE CABINET FHC FDC Y FIRE DEPARTMENT CONNECTION, WALL TYPE .45.FDC °t j FIRE DEPARTMENT CONNECTION, YARD TYPE FDC FIRE DEPARTMENT CONNECTION, FLUSH ■ 4-1 FH FIRE HYDRANT - 2 HOSE OUTLET 041-1 FH FIRE HYDRANT - 2 HOSE OUTLET AND PUMPER CONNECTION FLOW SWITCH FS 1 GC GROOVED COUPLING, GROOVED CAP MONITOR SWITCH M PIV POST INDICATOR VALVE, YARD SPRINKLER HEAD, DRY PENDENT SPRINKLER HEAD, OVER AND UNDER —CS— SPRINKLER HEAD, PENDENT, IN LINE, NEW SPRINKLER HEAD, PENDENT, OFFSET, NEW I I SPRINKLER HEAD, SIDEWALL, PENDENT, NEW __L. V SPRINKLER HEAD, SIDEWALL, UPRIGHT, NEW SPRINKLER HEAD, UPRIGHT, NEW —O THRUST BLOCK }WIV -.$ b WALL INDICATOR VALVE, PLAN / ELEVATION It' WMG WATER MOTOR GONG 0 GAS METER el WATER METER WELDING SYMBOL DESCRIPTION ROOT DEPTH FOR SLOT EFFECTIVE THROAT SIZE STRENGTH CERTAIN OPENING OF FILLING PLUG AND WELDS CONTOUR SYMBOL FINISH SYMBOL F ) GROOVE ANGLE, INCLUDED ANGLE OF COUNTERSINK FOR PLUGWELD LENGTH OF WELD PITCH (CENTER TO CENTER SPACING) OF WELDS FIELD WELD SYMBOL ING (REFERENCE LINE TO ARROW SIDE OR ARROW SIDE MEMBER OF JOINT WELD ALL AROUND SYMBOL REFERENCE LINE NUMBER OF SPOT OR PROJECTION WELDS OR (.'i.- FOR WELDS A R FN (E),{ N `� W �}L-P� BASIC DETAIL TAIL REFERENCE SPECIFICATIONS, OR { m 1 (N) ELEMENTS IN THIS AREA REMAIN AS SHOWN WHEN TAIL AND ARROW ARE REVERSED WELD SYMBOL OR REFERENCE (MAY BE OMMITTED WHEN IS NOT USED PROCESS OTHER REFERENCE p BACK WELD L FILLET WELD PLUG OR SLOT WELD immi II SQUARE WELD O SPOT OR PROJECTION WELD REV " VVED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 16 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 Wood Harbinger 3oo9 13.2th Ave NE, Suite ioo Bellevue WA 98004 425.628.6o00 woodharbinger.com REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DRAWN CHECKED DATE SUBTITLE TITLE LEGEND AND ABBR IATI 9-120 STATION 5 AHU R MEC HIANIC.AI MASTFR BUILDING 9 CURRENT REVISION SYMBOL 06 NO f)FV CFN R WA DWG NO. 21i DATE 04.07.15 OMP NO. 17 /7 /7014 T34! 35 Aid \STR VI- A\Th CO\TROLS LAG INSTRUMENT IDENTIFICATION SYMBOL DESCRIPTION O LOCAL FIELD MOUNTED INSTRUMENT INCLUDING TRANSMITTER FOR SINGLE MEASURED VARIABLE EXISTING INSTRUMENT 00 LOCAL FIELD MOUNTED INSTRUMENT FOR TWO MEASURED VARIABLES OR MORE THAN ONE FUNCTION e PANEL MOUNTED INSTRUMENT FOR SINGLE MEASURED VARIABLE PANEL MOUNTED INSTRUMENT LOCATED ON FACE OF LOCAL CONTROL PANEL es PANEL MOUNTED INSTRUMENT FOR TWO MEASURED VARIABLES OR MORE THAN ONE FUNCTION INPUT OR OUTPUT TO CENTRAL MANAGEMENT CONTROL SYSTEM (CMCS) INDICATING LIGHT DIRECT CONNECTION TEMPERATURE SYMBOL DESCRIPTION TEMPERATURE ELEMENT W/ THERMO-WELL LINES SYMBOL DESCRIPTION CAPILLARY TUBING, (FILLED SYSTEM) X X CONNECTION TO PROCESS MECHANICAL LINK OR INSTRUMENT INPUT ELECTRIC HEAT TRACE D DDC SIGNAL INDEPENDENT POWER SOURCE, 120V POWER 0 o REFERENCE NO. 1.. 2. CONTINUED ON SHEET NO. DASHED LINE INDICATES BEHIND PANEL MOUNTINGS CONTROL METHODS SYMBOL DESCRIPTION Al ANALOG INPUT, SIGNAL TO EMCS AO ANALOG OUTPUT, SIGNAL FROM EMCS RELAY DI DIGITAL INPUT, SIGNAL TO EMCS DO DIGITAL OUTPUT, SIGNAL FROM EMCS ELECTRIC ACTUATED INTERLOCK MOTOR ACTUATED MCC MOTOR CONTROL CENTER VFD VARIABLE FREQUENCY DRIVE AIR MEASURING UNIT ES END SWITCH S SWITCH CONTROL ABBREVIATIONS ABBREVIATION DESCRIPTION 2P TWO POSITION TCV TEMPERATURE CONTROL VALVE FCV FLOW CONTROL VALVE FT FLOW TRANSMITTER YC START STOP YY STATUS YSI SPEED CONTROL SIL SPEED INPUT/FEEDBACK CT CURRENT TRANSDUCER (SENSOR) XA ALARM JT TEMPERATURE CONTROL SIGNAL FS FLOW SWITCH TT TEMPERATURE TRANSMITTER TI TEMPERATURE INDICATOR PD DIFFERENTIAL PRESSURE PI PRESSURE INDICATOR PS PRESSURE SWITCH PT PRESSURE TRANSMITTER IP ETHERNET MSTP BACNET MSTD (ADJ) ADJUSTABLE BY OPERATOR \STRU V E\T SOCIETY OF A V ERICA TA3LE IDENTIFICATION LETTERS FIRST LETTER SUCCEEDING LETTERS MEASURED OR INITIATING VARIABLE MODIFIER READOUT OR PASSIVE FUNCTION OUTPUT FUNCTION MODIFIER A ANALYSIS ALARM B BURNER, COMBUSTION USER'S CHOICE USER'S CHOICE USER'S CHOICE C USER'S CHOICE CONTROL D USER'S CHOICE DIFFERENTIAL E VOLTAGE SENSOR (PRIMARY ELEMENT) F FLOW RATE RATIO (FRACTION) G USER'S CHOICE GLASS, VIEWING DEVICE H HAND HIGH I CURRENT (ELECTRICAL) INDICATE INTERUPT J POWER SCAN K TIME, TIME SCHEDULE TIME RATE OF CHANGE CONTROL STATION L LEVEL LIGHT LOW M USER'S CHOICE MOMENTARY MIDDLE, INTERMEDIATE N USER'S CHOICE USER'S CHOICE USER'S CHOICE USER'S CHOICE 0 USER'S CHOICE ORIFICE, RESTRICTION P PRESSURE, VACUUM POINT (TEST) CONNECTION Q QUANTITY INTEGRATE, TOTALIZE R RADIATION RECORD S SPEED, FREQUENCY SAFETY SWITCH T TEMPERATURE TRANSMIT U MULTIVARIABLE MULTIFUNCTION MULTIFUNCTION MULTIFUNCTION V VIBRATION, MECHANICAL ANALYSIS VALVE, DAMPER, LOUVER W WEIGHT, FORCE WELL X UNCLASSIFIED X AXIS UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED Y EVENT, STATE OR PRESENCE Y AXIS RELAY, COMPUTE CONVERT Z POSITION, DIMENSION Z AXIS DRIVER ACTUATOR, UNCLASSIFIED FINAL CONTROL ELEMENT REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 Q� BOE/N C'- ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN C. PECK CHECKED M. BLOEDEL ENGINEER D. DERSE CHECKED C. LARSON APP-OVED APPROVED DATE 05.09.14 05.09.14 05.09.14 05.09.14 LEGE\D 1. FOR MECHANICAL LEGENDS AND ABBREVIATIONS SEE SHEETS M2C, M1C, AND M1E. GE\EAL \OTES 1. GENERAL NOTES ON SHEET M1E SHALL APPLY. EFE E\CE D AWI \ CC \STUCTIO\ \OTES REAWED VD FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 16 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 SUBTITLE TITLE LEGEND AND AB ' EVI 9-120 STATION 5 AH MFCHANICAI MASTFR BUILDIN NO.ROFIN IFI D. WA ood Harbinger CURRENT REVISION I SYMBOL 06 s, 21, 3009 sixth Ave NE, Suite leo Bellevue WA 98004 425.628.6o00 woodharbinger.com DATE 04.07.15 COMP NO. -M1F 10:53!50 AEI c c a c GE \PAL \OTES: 1. THE FOLLOWING NOTES APPLY TO ALL MECHANICAL DRAWINGS. ADDITIONAL NOTES MAY BE INDICATED ON INDIVIDUAL DRAWINGS. 2. DRAWINGS INDICATE CONNECTIONS FOR EQUIPMENT TO BE FURNISHED BY THE OWNER OR AS THE WORK OF OTHER TRADES. VERIFY LOCATION OF EQUIPMENT, ROUGH -IN LOCATIONS, AND TYPE OF CONNECTIONS PRIOR TO PREPARATION OF SHOP DRAWINGS OR SUBMITTALS, AND PRIOR TO INSTALLATION OF SERVICE CONNECTIONS. DO NOT INTERFERE WITH ACCESS FOR MAINTENANCE AND REMOVAL OR REPLACEMENT OF EQUIPMENT. 3. COORDINATE THE PHASING AND INSTALLATION OF NEW WORK WITH THE WORK OF ALL OTHER TRADES. THE CONTRACTOR SHALL BEAR THE TOTAL EXPENSE FOR ANY ADDITIONAL WORK WHICH MAY BE CAUSED BY IMPROPER SEQUENCING OF CONSTRUCTION ACTIVITIES. 4. REFER TO ARCHITECTURAL DRAWINGS FOR ELEVATIONS OF DEVICES IN FINISHED AREAS. LOCATE PLUMBING FIXTURES AT HEIGHTS INDICATED ON ARCHITECTURAL ELEVATIONS. LOCATE MECHANICAL DEVICES (E.G. TEMPERATURE AND HUMIDITY SENSORS, PANELS, AND SWITCHES), SO THAT THEY DO NOT CONFLICT WITH GENERAL CONSTRUCTION (E.G. WAINSCOT, DOOR HARDWARE), ELECTRICAL DEVICES (E.G. LIGHT SWITCHES, SPEAKERS, OUTLETS), AND THE WORK OF OTHER TRADES. 5. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, EQUIPMENT HOUSEKEEPING PADS, PENETRATION DETAILS, FLASHING AND SEALING DETAILS, AND OTHER ELEMENTS OF GENERAL CONSTRUCTION. COORDINATE THE SIZE AND LOCATION OF EQUIPMENT HOUSEKEEPING PADS WITH APPROVED EQUIPMENT SO THAT HOUSEKEEPING PADS ARE NOMINALLY 7" HIGH UNLESS INDICATED OTHERWISE, AND EXTEND 6" MINIMUM IN ALL DIRECTIONS FROM THE HORIZONTAL LIMITS OF THE EQUIPMENT WHICH THEY SUPPORT. 6. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF CEILING MOUNTED ITEMS. INSTALL CEILING MOUNTED ITEMS IN THE CENTER OF CEILING TILES, IN THE CENTER OF ROOMS, OR WHERE INDICATED ON ARCHITECTURAL DRAWINGS. WHERE LOCATION OF ITEMS ARE NOT INDICATED ON ARCHITECTURAL DRAWINGS, OBTAIN DIRECTION FROM ARCHITECT PRIOR TO ROUGH -IN AND INSTALLATION. 7. MECHANICAL DRAWINGS SHOW APPROXIMATE LOCATIONS FOR FLOOR DRAINS. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS. IN MECHANICAL EQUIPMENT AREAS, COORDINATE THE LOCATIONS OF FLOOR DRAINS WITH THE ACTUAL COORDINATED HOUSEKEEPING PAD LOCATIONS AND MECHANICAL EQUIPMENT DRAIN LOCATIONS. WHERE NECESSARY TO PROVIDE THE VERTICAL HEIGHT NECESSARY FOR DEEP SEAL CONDENSATE TRAPS, PROVIDE MECHANICAL EQUIPMENT SUPPORTS AS REQUIRED TO RAISE THE EQUIPMENT SUFFICIENTLY TO ALLOW TRAP INSTALLATION WITHOUT FLOOR PENETRATION. MECHANICAL EQUIPMENT SUPPORTS SHALL CONFORM TO SEISMIC RESTRAINT REQUIREMENTS AND SHALL MEET ALL SEISMIC DESIGN AND CODE REQUIREMENTS. 8. COORDINATE EQUIPMENT POWER CONNECTION REQUIREMENTS AND ELECTRICAL CHARACTERISTICS WITH ELECTRICAL DRAWINGS AND CONNECTION REQUIREMENTS. COORDINATE VARIATION IN ELECTRICAL CHARACTERISTICS FROM SCHEDULED VALUES. CHANGES TO ELECTRICAL CHARACTERISTICS (E.G. VOLTAGE, AMPS, HORSEPOWER, ETC.) SHALL BE SUBJECT TO APPROVAL. BEAR THE TOTAL EXPENSE FOR REQUIRED REVISION TO THE ELECTRICAL SCOPE OF WORK CAUSED BY VARIATION FROM THE SCHEDULED REQUIREMENTS. 9. COORDINATE THE LOCATION OF WORK TO PROVIDE CLEARANCES OVER LIGHTING FIXTURES AND OTHER CEILING MOUNTED DEVICES AS REQUIRED TO ALLOW FOR REMOVAL AND MAINTENANCE ACCESS. 10. DO NOT RESTRICT ACCESS TO ELECTRICAL CABLE TRAYS. AT A MINIMUM, ALLOW 18" CLEAR ON ONE SIDE OF CABLE TRAYS UP TO AN ELEVATION OF 6" ABOVE THE TOP OF THE CABLE TRAY. MAINTAIN 12" MINIMUM CLEARANCE OVER TOP OF CABLE TRAYS EXCEPT WHERE DUCT, PIPING, OR CONDUIT CROSS PERPENDICULAR TO CABLE TRAY, THIS CLEARANCE MAY BE REDUCED TO 6" OVER A DISTANCE OF NO MORE THAN 36" ALONG THE CABLE TRAY. PROVIDE NO LESS THAN 36" BETWEEN AREAS OF REDUCED CLEARANCE AND MAINTAIN INDICATED ACCESS ON THE SAME SIDE OF THE CABLE TRAY EXCEPT WHERE OTHERWISE APPROVED. DO NOT CONNECT OTHER TRADE ITEMS TO CABLE TRAYS, CABLE TRAY SUPPORTS OR CABLE TRAY SEISMIC RESTRAINTS. 11. PROVIDE SUPPORTS AND SEISMIC RESTRAINTS FOR PIPES, DUCTS, AND EQUIPMENT AS SPECIFIED, AS REQUIRED, AND AS SHOWN ON THE DRAWINGS. IF REQUIRED FOR INSTALLATION OF PIPES, DUCTS, AND EQUIPMENT, DESIGN AND PROVIDE ADDITIONAL STRUCTURAL MEMBERS BETWEEN COLUMNS, JOISTS, AND STRUCTURAL FRAME TO MEET SUPPORT AND SEISMIC RESTRAINT REACTIONS (FORCES, MOMENTS, DEFLECTIONS). STRUCTURAL MEMBERS AND ANCHORAGES SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE IN WHICH THE PROJECT IS LOCATED. REFER TO STRUCTURAL DRAWINGS FOR DESIGN CRITERIA. SUBMIT STRUCTURAL MEMBER SHOP DRAWINGS AND CALCULATIONS FOR REVIEW. STRUCTURAL MEMBERS, BOLTS, AND WELDS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS SHOWN ON THE STRUCTURAL DRAWINGS AND INDICATED IN THE SPECIFICATIONS. NO WELDING, BOLTING, OR OTHER MEANS OF ATTACHMENT TO THE STRUCTURAL MEMBERS SHALL BE MADE ON PORTIONS OF STRUCTURAL MEMBERS AT OR NEAR CONNECTIONS BETWEEN STRUCTURAL MEMBERS ON ANY ELEMENTS DESIGNATED IN THE SEISMIC LOAD RESISTING SYSTEMS UNLESS APPROVED BY THE STRUCTURAL ENGINEER. SUPPORTS SHALL NOT INDUCE TORSIONAL LOADS INTO SUPPORTING STRUCTURAL FRAMING. 12. DO NOT CORE DRILL OR DRILL THROUGH BEAMS, COLUMNS OR SHEAR WALLS UNLESS INDICATED ON STRUCTURAL DRAWINGS OR AS APPROVED BY THE STRUCTURAL ENGINEER. 13. PROVIDE PIPE SLEEVES AND PENETRATION SEALS AS REQUIRED FOR THE INSTALLATION OF PIPING SYSTEMS. REFER TO SPECIFICATIONS FOR REQUIREMENTS. 14. COORDINATE THE LAYOUT OF EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES SO THAT IT FITS INTO THE SPACE ALLOTTED. PROVIDE SERVICE ACCESS AND CLEARANCES AS INDICATED ON DRAWINGS, AS REQUIRED BY CODES, AND AS RECOMMENDED BY THE MANUFACTURER FOR THE INSTALLATION, REMOVAL, ENTRY, SERVICING, AND MAINTENANCE OF EQUIPMENT. PRIOR TO INSTALLATION, COORDINATE LAYOUT OF EQUIPMENT, DUCTWORK, PIPING, AND APPURTENANCES WITH ALL OTHER TRADES TO AVOID BLOCKING SERVICE OR REPLACEMENT ACCESS FOR NEW AND EXISTING EQUIPMENT AND EQUIPMENT INSTALLED BY OTHERS. 15. DRAWINGS ARE DIAGRAMMATIC AND SHOW APPROXIMATE LOCATIONS OF EQUIPMENT, DUCNORK, PIPING, AND APPURTENANCES. DRAWINGS DO NOT SHOW REQUIRED TRANSITIONS, OFFSETS, FITTINGS, AND DEVICES. REFER TO DETAILS, DIAGRAMS, AND SPECIFICATIONS FOR REQUIRED SYSTEM APPURTENANCES, CONTROL DEVICES, ETC. INSTALL DEVICES IN ACCORDANCE WITH DEVICE MANUFACTURER RECOMMENDATIONS. CAREFULLY INVESTIGATE ELEMENTS OF CONSTRUCTION THAT COULD AFFECT THE WORK TO BE PERFORMED AND ARRANGE NEW WORK ACCORDINGLY. PREPARE COORDINATION DRAWINGS FOR NEW WORK, WHICH ARE COORDINATED WITH THE APPROVED AND INSTALLED WORK OF OTHER TRADES. PROVIDE REQUIRED OFFSETS, FITTINGS, TRANSITIONS, SUPPORTS AND OTHER APPURTENANCES AS REQUIRED. BEAR THE TOTAL EXPENSE OF RE -WORK THAT IS CAUSED BY FAILURE TO COORDINATE. 16. PROVIDE MAXIMUM HEADROOM AND CLEARANCE BELOW DUCTWORK, PIPING AND EQUIPMENT AND ASSOCIATED SUPPORTS AND RESTRAINTS. UNLESS OTHERWISE INDICATED, INSTALL TIGHT TO STRUCTURAL SYSTEMS ABOVE. WHERE WALL MOUNTED, INSTALL AS CLOSE TO WALL AS POSSIBLE. PROVIDE ADDITIONAL FITTINGS AND OFFSETS AS REQUIRED. 17. REFER TO EQUIPMENT SCHEDULES FOR DESIGN CAPACITIES. SCHEDULED VALUES SHALL BE CONSIDERED DESIGN CAPACITIES. PROVIDE EQUIPMENT WHICH MEETS OR EXCEEDS THE SCHEDULED VALUES. MARK THE CONTRACT DRAWING EQUIPMENT SCHEDULES TO INDICATE THE MANUFACTURER, MODEL AND CAPACITY OF THE ACTUAL APPROVED EQUIPMENT PROVIDED AND SUBMIT THIS INFORMATION WITH RECORD DRAWINGS AS PART OF PROJECT CLOSEOUT. 18. TO ENHANCE THE CLARITY OF PLAN DRAWINGS, AND WHERE NOT NECESSARY TO DESCRIBE THE REQUIRED SIZE, INDIVIDUAL SEGMENTS OF DUCT AND PIPE BETWEEN CONNECTIONS MAY BE SHOWN WITHOUT A SIZE INDICATED. WHERE SIZE IS NOT SHOWN ON PLANS, THAT SEGMENT SHALL BE THE SAME SIZE AS THE NEXT UPSTREAM SEGMENT WITH A SIZE INDICATED. 19. WHERE NOT INDICATED ON PLANS, REFER TO EQUIPMENT SCHEDULES AND DETAILS FOR INLET AND OUTLET DUCT AND/OR PIPE SIZES. WHERE INDICATED ON PLANS, PLAN SIZES SHALL TAKE PRECEDENCE. 20. DUCTWORK SERVING INDIVIDUAL DIFFUSERS AND GRILLES IS GENERALLY NOT SIZED. WHERE NOT INDICATED ON PLAN DRAWINGS, REFER TO SCHEDULES AND DETAILS FOR NECK AND BRANCH DUCT SIZES BASED ON INDICATED AIRFLOW RATE OR NECK SIZE. 21. INSTALL DRAINS AT ALL LOW POINTS IN PIPING, INCLUDING ANY TRAPPED PORTIONS OF PIPING. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINTS IN CLOSED LOOP (MECHANICAL) PIPING SYSTEMS. IN GENERAL, THESE DEVICES ARE NOT INDICATED ON DRAWINGS. WHERE AUTOMATIC AIR VENTS ARE INDICATED ON DRAWINGS, EXTEND AUTOMATIC AIR VENT (AAV) DISCHARGE TO NEAREST FLOOR DRAIN USING INDIRECT DRAIN PIPING OF SAME SIZE AS AAV DISCHARGE. INDICATE THE ACTUAL LOCATION OF FIELD -LOCATED DRAINS, VENTS AND DRAIN PIPING ON THE RECORD DRAWINGS. 22. PROVIDE A MANUAL VOLUME DAMPER FOR EACH SUPPLY, RETURN, AND EXHAUST OPENING, IN ALL BRANCH DUCTS WHERE THREE OR MORE OPENINGS ARE ASSOCIATED WITH BRANCH, AND ELSEWHERE AS NOTED ON DRAWINGS OR IN SPECIFICATIONS. LOCATE VOLUME DAMPERS AS FAR AS POSSIBLE FROM OPENINGS. FOR THE PURPOSE OF THIS REQUIREMENT, TERMINAL UNIT PRIMARY AIR DAMPERS ARE CONSIDERED A VOLUME DAMPER. VOLUME DAMPERS ARE NOT REQUIRED FOR CEILING RETURN GRILLES THAT TRANSFER AIR TO A RETURN AIR PLENUM UNLESS OTHERWISE INDICATED. 23. PROVIDE CONICAL TAPS FOR 90 DEGREE ROUND DUCT BRANCHES FROM RECTANGULAR SUPPLY DUCTWORK DOWNSTREAM OF TERMINAL UNITS. USE LOW LOSS OR HEEL TAP FITTINGS ON ALL 90 DEGREE BEND ROUND BRANCHES UPSTREAM OF TERMINAL UNITS. DO NOT USE STRAIGHT TEE FITTINGS UNLESS SPECIFICALLY INDICATED ON DRAWINGS. 24. DUCTWORK STATIC PRESSURE AND SEAL CLASS, BASED ON SMACNA HDCS: DUCT SYSTEM A. DOWNSTREAM OF AH1F1 B. DOWNSTREAM OF AH1G1 C. UPSTREAM OF AH1F1 D. UPSTREAM OF AH1G1 E. OUTSIDE AIR INTAKE DUCTS STATIC PRESSURE +3 IN WG +2 IN WG - 3 IN WG -2 IN WG - 2 IN WG SEAL CLASS A A A A A 25. PROVIDE DUCT LINING FOR DUCTWORK AND PLENUMS AS SPECIFIED, WHERE INDICATED ON DRAWINGS AND AS INDICATED BELOW. DUCT SIZES INDICATED ON DRAWINGS ARE NET INSIDE DIMENSIONS REPRESENTING THE MINIMUM DUCT FREE AREA. THICKNESS OF DUCT LINING SHALL BE AS SPECIFIED UNLESS A GREATER THICKNESS IS INDICATED ON DRAWINGS. FOR CLARITY, DUCT LINING MAY NOT BE SHOWN IN ALL REQUIRED LOCATIONS ON DRAWINGS. PROVIDE DUCT LINING FOR THE FOLLOWING: A. ROUND AND RECTANGULAR SUPPLY AIR DUCTWORK AND PLENUMS. B. ROUND AND RECTANGULAR RETURN AIR DUCTWORK AND PLENUMS. C. AIR TRANSFER DUCTS. 26. THE FOLLOWING IS A LIST OF DEFERRED SUBMITTALS ITEMS. DO NOT INSTALL DEFERRED SUBMITTAL ITEMS UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. A. FIRE PROTECTION SYSTEMS. B. MECHANICAL SEISMIC. REVISION 9-120 STATION 5 AHU REPLACEMENTS 21067 BY WH APPROVED MBL DATE 04.07.15 SYM REVISION BY APPROVED gLAntewisr� 27. MOTORIZED DAMPERS SHALL BE PROVIDED FOR OUTDOOR AIR SUPPLY, EXHAUST OPENINGS. DAMPER CONSTRUCTION SHALL IN ACCORDANCE WITH WSEC SECTION C402.4.5.2 Sc C403.2.4 28. DUCTWORK AND PLENUMS SHALL BE SEALED IN ACCORDANCE WITH WSEC SECTIONS C403.2.7.1, C403.2.7.3 AND SPECIFICATION SECTION 23 30 00 HVAC AIR DISTRIBUTION. 29. DUCTWORK AND PLENUMS SHALL BE INSULATED IN ACCORDANCE WITH WSEC SECTION C403.2.7.1 /2. AND SPECIFICATION SECTION 20 70 00 INSULATION FOR PLUMBING AND HVAC. 30. PIPING SHALL BE INSULATED IN ACCORDANCE WITH WSEC SECTION C403.2.8, WASHINGTON STATE PLUMBING CODE (WAC 51-56) AND SPECIFICATION SECTION 20 70 00 INSULATION FOR PLUMBING AND HVAC. PIPING INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED FROM DAMAGE PER WSEC SECTION C403.2.8.1 AND SPECIFICATION SECTION 20 70 00 INSULATION FOR PLUMBING AND HVAC. 31. EQUIPMENT SHORT CIRCUIT CURRENT RATING (SCCR) SHALL BE NOT LESS THAN THE INTERRUPTING RATING OF THE BRANCH CIRCUIT OVERCURRENT PROTECTIVE DEVICE SUPPLYING POWER TO THE EQUIPMENT. REFER TO ELECTRICAL SCHEDULES FOR BRANCH CIRCUIT OVERCURRENT DEVICE INTERRUPTION RATINGS. LEGE\13 1. FOR MECHANICAL LEGENDS AND ABBREVIATIONS SEE SHEETS M2C, M 1 C, AND M 1 E. GE \PAL \OTES 1. GENERAL NOTES ON THIS SHEET SHALL APPLY TO ALL NEW CONSTRUCTION EFEH\CE D AWI SJ� CO\SRI CT10\ \OTES ISSUE FOR CONSTRUCTION APRIL 7, 2015 REVWED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 16 2015 PERMIT CENTER II Wood Harbinger ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN APPROVED BY DEPT. DATE CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE TITLE MECHANICAL GENE 9-120 STATION 5 AHU REP KAFC.HANI(.AI KAAcTFR BUILDING 9- OT fF\/ ('FNTFR CURRENT REVISION SYMBOL JOB NO. DWG NO. a-'ran-Ka9 3oo9 urth Ave NE, Suite xoo Bellevue WA 9Bao4 425.628.6000 woodharbinger.com DATE 04.07.15 NO. 11:37!49 Alf c 1 AIR HANDLING UNIT (AH) SCHEDULE MARK NUMBER LOCATION AREA SERVED �...... SUPPLY FAN SECTION COOLING COIL HEATING COIL 10OM ECONOMIZER OPERATION MINIMUM OUASRIDE (CFM) MAXIMUM UNIT WT. (LBS) REMARKS CFM TOTAL STATIC PRESSURE INCH WG �..... OUTLET VELOCITY PM APPROX RPM MOTOR TOTAL CAPACITY BTU R SENSIBLE CAPACITY B HR FACE VELOCITY PM ENT. AIR LVG. AIR WATER CAPACITY BTU/HR FACE VELOCITY FPM E.A.T. ° F L.A.T. ° F WATER HP VOLT PH RPM DRIVE FRAME ° DB ° W: D: ° W: GPM EWT° FLWT° F GPM ° F ° F > MZ-1 FIRST FLOOR, G/1 .�..����� A1-C6 INTERIOR 8250 3.86 .�..�.� 2000 1505 5 460/3 1760 R.H. 237,000 500 78.5 61.4 50.0 48.2 105 44 48.5 178,000 800 65 90 3.7 240 140 YES - AUSTIN MULTI -ZONE UNIT > MZ-2 FIRST FLOOR, F/1 A1-J1 PERIMETER 11940 3.66 2000 1695 7.5 460/3 1760 L.H. 452,000 500 81.0 64.8 55.8 54.0 67 44 58 760,000 800 40 94 16.0 240 140 YES 1430 AUSTIN MULTI -ZONE UNIT - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - AHU-4 SECOND FLOOR, C/8.5 C6-E11 INTERIOR 12440 1.21 1450 635 10 460/3 1760 BELT 256U 321,000 370 81.8 64.4 56.0 54.2 53 49 61 200,000 366 64 80 4.2 240 140 YES - 4500 AUSTIN 20M UNIT AHU-5 SECOND FLOOR, J2.5 Ja1-L3 INTERIOR & PERIMETR 16200 2.18 1900 718 10 460/3 1760 BELT 256U 388,000 440 81.6 64.4 56.0 54.1 70 49 60 212,000 445 66 80 4.4 240 140 YES - 4500 AUSTIN 20M UNIT AHU-6 SECOND FLOOR, E3.5 E1-G6 INTERIOR 13090 1.30 1530 635 10 460/3 1760 BELT 256U 376,000 430 81.6 64.3 56.0 54.1 68 49 60 205,000 430 66 80 4.3 240 140 YES - 4500 AUSTIN 20M UNIT AHU-7 SECOND FLOOR, G3.5 G1-J6 INTERIOR 8930 1.25 1040 650 10 460/3 1760 BELT 256U 321,000 370 81.8 64.4 56.0 54.2 53 49 61 200,000 366 64 80 4.2 240 140 YES - 4500 AUSTIN 20M UNIT AHU-8 SECOND FLOOR, K/2 L1-M3 INTERIOR & PERIMETER 8655 0.98 1010 640 10 460/3 1760 BELT 256U 279,000 350 82.0 64.5 56.0 54.3 47 49 61 184,000 320 63 80 3.8 240 140 YES - 4500 AUSTIN 20M UNIT AHU-10 FIRST FLOOR, K/5 NONE - UNIT ABANDONED 0 0 0 0 10 460/3 1760 L.H. 256U N/A - - - - - - - - N/A - - - - - - YES - 4500 AUSTIN 20M UNIT AHU-11 FIRST FLOOR, G/9 SOUTH PERIMETER 17500 3.52 2050 800 15 460/3 1760 L.H. 256U 515,756 419,781 557 76.2 63.4 54.3 53.3 93.6 45 56 594,000 700 45 75 12.7 240 140 YES 2090 4500 NEW COOLING COIL - AUSTIN 20M UNIT MCQUAY 5WS0906B-39X116 AHU-12 FIRST FLOOR, E/9 INTERIOR 6380 1.78 750 450 10 460/3 1760 R.H. 256U 249,381 193,230 203 78.6 64.2 50.9 50.7 39.8 45 57.5 594,000 700 45 75 12.7 240 140 YES 1124 4500 NEW COOLING COIL - AUSTIN 20M UNIT MCQUAY 5WS0906B-39X116 AHU-13 FIRST FLOOR, K/6 EAST PERIMETER 15000 0.875 1755 485 10 460/3 1760 L.H. 256U 372,000 500 78.0 65.0 55.0 54.0 93.0 45 53 594,000 525 38 75 13.5 240 148 YES - 4500 AUSTIN 20M UNIT AHU-15 FIRST FLOOR, C/9 INTERIOR 12505 0.72 1460 430 10 460/3 1760 R.H. 256U N/A - - - - - - - - - - - - - - - - 1875 4500 AUSTIN 20M UNIT 3 0 1 Y U AHU-17 FIRST FLOOR, G/1 NORTH PERIMETER 15000 1.00 1755 545 10 460/3 1760 R.H. 256U 392,000 455 76.5 62.8 55.5 54.0 49 44 60 324,000 455 65 85 6.8 240 165 YES - 4500 AUSTIN 20M UNIT AHU-18 THIRD FLOOR 20000 1.00 2340 545 460 3 1760 R.H. X X X - - - - - - Now 230,000 Now Now 700 65 75.5 4.8 240 140 Now Now Now YES Now Now - Now "MI 4500 "1111111V NIII MI NIIIIII NMI `1111111I NIIIIIIIIP' NII III NIIIIIIIr AUSTIN 20M UNIT AHU-19 THIRD FLOOR, A/1 NORTH - WEST 15000 0.75 1755 455 10 460/3 1760 L.H. X X X - - - - - - 230,000 525 63 77 4.8 240 140 YES - 4500 AUSTIN 20M UNIT AHU-20 THIRD FLOOR, C/1 NORTH - EAST 15000 0.75 1755 455 10 460/3 1760 L.H. X X X - - - - - - 230,000 525 63 77 4.8 240 140 YES - 4500 AUSTIN 20M UNIT AHU-21 THIRD FLOOR, C/9 SOUTH - EAST 15000 0.75 1755 455 10 460/3 1760 L.H. X X X - - - - - - 230,000 525 63 77 4.8 240 140 YES - 4500 AUSTIN 20M UNIT AH1 A01 A FIRST FLOOR, A/1 COL A/1 3000 0.5 1800 635 1.5 460/3 1750 R.H. 70,222 549 80.0 64 56.2 56.0 14 46 56 N/A - - - - - - YES - AH1A01B FIRST FLOOR, A/1 COL A/1 3200 0.5 1400 1103 1.5 460/3 1750 BELT 108,342 500 80.0 64 54.1 52.4 31 46 53 N/A - - - - - - YES - CABINET & UNIT HEATER (UH) SCHEDULE MARK NUMBER LOCATION CFM MBH EAT °F LAT °F EWT °F LWT °F GPM MAXIMUM PD. FT. WATER MOTOR REMARKS HP RPM V PH CY UH-1 MECHANICAL ROOM 940 70 110 1.4 1/20 UH-2 MECHANICAL ROOM 1535 70 106 2.1 1/8 UH-3 MECHANICAL ROOM 2250 65 98 2.8 1/3 UH-4 MECHANICAL ROOM 1535 70 106 2.1 1/8 CABINET (Sc UNIT HEATER (UH) SCHEDULE MARK NUMBER LOCATION CFM MBH EAT °F LAT °F EWT °F LWT °F GPM MAXIMUM PD. FT. WATER MOTOR REMARKS HP RPM V PH CY UH-1 MECHANICAL ROOM 940 70 110 1.4 1/20 UH-2 MECHANICAL ROOM 1535 70 106 2.1 1/8 UH-3 MECHANICAL ROOM 2250 65 98 2.8 1/3 UH-4 MECHANICAL ROOM 1535 70 106 2.1 1/8 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ADDED U.H. SCHED. FROM TIFF 6130D-120-222 S.RUDELL 06.09.08 A 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 Q�BOE/NG® ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN M.DITTMAR CO\STUCTIO OTES REMOVE EXISTING MZ-1 AND MZ-2 AIR HANDLING UNITS. REMOVE EXISTING AHU-17. SEE SHEET 1A11R FOR REMOVAL OF STRUCTURAL PLATFORM. REMOVE ALL ASSOCIATED LIGHTING, FIRE PROTECTION, HVAC PIPING AND PLUMBING ASSOCIATED WITH THE PLATFORM. ISSUE FOR CONSTRUCTION APRIL 7, 2015 ii DATE 11-21-94 CHECKED ENGINEER S.ROSSE CHECKED APPROVED APPROVED SUBTITLE TITLE SCHEDULES 9-120 STATION 5 AHU REPLACE MECHANICAL MASTER BUILDING 9-120 REVIEWED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION CITY OF TUKWILA SEP 16 2015 PERMIT CENTER IWoo1 Harbinger 3009 oath Ave NE, Suite ioo Bellevue WA 98004 425.628.6o00 woodharbinger.com CURRENT REVISION SYMBOL 21067 A DWG NO. DATE 9-120°'"" 1R 04.07.15 1 LEGE\ C D E MZ-1 R.A. 6160 CFM ZONE 1 3455 CFM REVISION 26/16 9-120 STATION 5 AHU REPLACEMENTS BOT. OF DUCT 14'-6"A.F.F. (E)EF-9 48/32 AIR RELIEF DAMPER IN BBOTTOM OF DUCT 35/30 22 1411WAILlriAINIM Oven 81 "x48" RELOCATE EQUIPMENT PER J # 701647-00 INSTALL PLANER J # 701746-00 21067 RELOCATE DUST COLLECTION FOR SINTERING 55613200 EXHAUST CONN. FOR METAL SINTERING. MACH. 55603201 Oven 81 "x48" BY WH DMV DMV HARR HARR Large Oven 250 CFM, SG-10 6, TY SG-24x10, TYP 3� APPROVED MBL RWS RWS DATE 04.07.15 06.22.00 06. 08/05/05 08/05/05 SYM F G K 38x20 13x20 14x20 Large SteelcitIg U C1j U Jane: T OnxtheR, Ni o DROP 24" 36X7; 500 CFM 5'x9' LAYUP TBL TUBE STORAGE & LAY L 1. 35) 350 TAE LE 30XE 0 5'x9' LAYUP TBL W cn N m z E7 w m z n U z w co U Z w 24x20 48x30 T.G. BOD 13'-6" AFFI BOD 1 AF STORAGE & LAYUP TBL F 970 CFM 10 TYP. OF 31 32/12 Dr TYR OF 13ENCHI (33D 0( x M N x CD N) OLLING ART ROLLING CART ROLLING CART FROM AHU #10 FLOC), PLA\ SCALE: 1 /8"=1'-0" REVISION CANCELLED REV DUST COLL. IN BREAKOUT ROOM SURPLUS HAMILTON FUME HOOD -�- 22/12 19/18 AHU #17 5,000 C.F.M. BOT. OICXT 12'-10" A.F.F. 4") 36X72 55613204 57576000 4207457 RELOCATED INDUSTRIAL VAC & DUST COL. TO DWG. 1M361 REPLACE UNIT SUBSTATION 11 23904 S.RUDELL WH BOT. OF DUCT 15-0" A.F.F:-/ (ELEV.30'-6") 300 CFM D-115 250 CFM, SG-10x6, TYP 2 APPROVED MBL 04/06/07 06/13/07 05.22.08 04.07.14 ELECT. PANEL 500 CFM D-116 CLEAR 8'-8" B.O.D. UP 120 EXHAUST TO ROOF WITH RAIN COLLAR ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DRAWN M.DITTMAR CHECKED S.ROSSE CHECKED APPROVED APPROVED DATE 11.10.94 PO POINT OF CONNECTION . + FLEXIBLE DUCT WITH VOLUME DAMPER 24/12 4 RECTANGULAR DUCT, FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN. ROUND DUCT, NUMBER INDICATES DIAMETER 1 240 240 5 SUPPLY OUTLET 340 A AIR DIFFUSER/REGISTAR/GRILL. REFER TO CFM 100 SHEET MIA. 4 2-WAY EARTHQUAKE BRACING, SEE 1 M11 M504 4-WAY EARTHQUAKE BRACING, SEE 1M11 M504 -00 I INDICATES GCU DASH NUMBER FOR WORK TASK. OTHERS INDICATES OUTSIDE CONTRACTOR CONSTRUCTION FLAGNOTE. GE\E�AL \OTES 1. ALL NEW DUCTWORK IS TO BE FABRICATED PER DETAIL EFEH \CE ��AWI\GS REF. DRAWINGS : 6130D-120-212, 6130D-120-202, 109-120-4114 CO\STUCTIO\ \OTES COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. REMOVE EXISTING AHU-17, ASSOCIATED SUPPLY/RETURN DUCTWORK AND APPURTENANCES. PROVIDE TEMPORARY CAP AT EXTENT OF REMOVAL. EXISTING OUTSIDE AIR INTAKE LOUVER TO REMAIN. PROVIDE SHEETMETAL BLANK -OFF AND INSULATE TO R-19 MINIMUM. SEE DWG 9-120-1M61R FOR REMOVAL OF EXISTING PIPING ASSOCIATED WITH AIR HANDLER AHU-17. REMOVE AIR HANDLERS MZ-1 AND MZ-2, ASSOCIATED SUPPLY AND RETURN DUCTWORK AND APPURTENANCES AFTER COMPLETION OF ELECTRICAL SUBSTATION PROJECT. EXISTING EXHAUST SYSTEM DUCTWORK AND MISCELLANEOUS EQUIPMENT NOT RELATED TO THE AIR HANDLER SHALL REMAIN. EXISTING DUCTWORK BEYOND THIS LOCATION SHALL REMAIN, AS SHOWN ON 09-120-M450. PROVIDE TEMPORARY CAP AS REQUIRED. SEE DWG 9-120-1M61R FOR REMOVAL OF EXISTING PIPING ASSOCIATED WITH AIR HANDLERS MZ-1 AND MZ-2. REMOVE EXISTING DUCTWORK AS INDICATED. FkE WED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 1 6 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 SUBTITLE TITLE HVAC FIRST FLOOR 9-120 STATION 5 AHU REPLA BUILDING 9-12 MECHANICAL MASTER COL. F-K/1-5 1 1M10 1M12 1M13 8 4 KEY PLAN 0 4 8 16 SCALE: 1/8" = 1'-0" ootl Harbinger CURRENT REVISION 21067 DWG NO. 9-120-1M1 3009 with Ave NE, Suite zoo Bellevue WA 98004 425.628.6000 woodharbinger.com 04.07.15 a cc HWR TO 2ND FLR. RADIATOR 1" HWR TO 1ST FLR. RADIATOR 4"HWR 2' HWS_ N 4''HWR —� 2 HwS / 2"CHWS 1"HWS_& HWR TO AHU-2, 2ND FLR. OVEN ROOM 1 F21 (12F2) CLWS ®CLWR CAP (TYP) 3 CHWS/R It RPM LAB 1G21 CE_11"HWS TO 2ND 1 FLR. RADIATOR 8"COOLING WATER FROM TOWER/PUMP HOUSE FOR CONTIN. SEE DWG. 109-101-4968—M1 (� 8"CLWS 8"CLWR CHWS & CHWR ENLARGED PARTIAL PLAN B 1M161 8" 4"CHWR 8" %'THREDOLET FOR 4" THERMOWELL MAMAC A-500-1 r6" —6" CLWS CLWR 1-1/2" MOIRE TEST 134 DN TO AHU FOR CONTINUATION SEE SHEET 1A13 SHOP 135 WORK ROOM 136 DN TO AHU (11F4) CLWS CHWS® CHWR CHWuHWS STRAIN GAUGE LAB 141 16H 7 RP U 0 M 1 H2 f U A 99 (TUNNEL CLWR--�— CLWS 8" ACCESS) A& 1M61 1M500 ENLARGED PARTIAL PLANS 1 i"HWR 4"HWS 4»HWS '6'VWR BA1 ONE\ "C , �I 4L4" HWS GATE VALVE 5-0" A.F.F. x 11H3 j STM UP 0 11H47— 2" 12H4 1"HWR U 3/4" CH-2 3/4" HWR WJ PLUG COCK 5 —0 A.F.F. 1M505 6" CHWS FROM 9-101 ROOF,_ SEE DWG. 109-101-4954—M1 & 6130D-120-229 6" CHWR FROM 9-101 ROOF,_ SEE DWG. 109-101-4954—M1 & 6130D-120-229 UH-2 3/4" I I H 2" HWS & R TO MAKE—UP AIR UNIT, SEE DETAIL 4" 2„ SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A REPLACE 9-65 COOLING WATER SYSTEM J#557761-01 M.WONG RWS 10.10.06 UPDATED DWG & RELOCATED VAC TO DWG. 1M361 S.RUDELL R RELOCATE ACAL/ASIC LAB 12370682 M.WONG RWS 01.05.12 C REPLACE UNIT SUBSTATION 11 23904 0 9-120 STATION 5 AHU REPLACEMENTS 21067 WH WH MBL MBL 04.07.15 04.07.15 Q�BOE/NG° 1" HWS TO 2ND FLR. RADIATOR TO AHU-3, 2nd FLR. ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE AWN EDDIE P. DUARTE 'EFEE\CE DAWI\GS TIFF 6130D-120-202 TIFF 6130D-120-212 TIFF 6130D-120-214 TIFF 6130D-120-226 TIFF 6130D-120-229 TIFF 6130D-120-230 109-120-1M500 109-120-1M505 109-120-1M506 DATE 03.19.03 FIRST FLOOR PLAN MECHANICAL ROOM PLAN & SECTIONS CONVERTER STATION PLANS CHILLED WATER STATION PLAN CHILLED WATER STATION PLAN CHILLED WATER STATION PLAN CONVERTER STA. 1-4 PLAN & SECTIONS CHILLED WATER PARTIAL PLAN & SECTIONS CHILLED WATER PARTIAL PLAN & SECTIONS 4 0 4 8 16 SCALE: 1 /8"=1'-0" LEGE\ D - CHWS - CHWR - CLWS - CLWR - STM - HWS - HWR II P.O.C. V CHILLED WATER SUPPLY CHILLED WATER RETURN COOLING WATER SUPPLY COOLING WATER RETURN STEAM SUPPLY HEATING WATER SUPPLY HEATING WATER RETURN FLOW METER THERMOWELL POINT OF CONNECTION 2—WAY EARTHQUAKE BRACING, SEE 4—WAY EARTHQUAKE BRACING, SEE GE\PAL \OTES .EFEH\CE DW\WI\ 6" CHWR FROM 9-101 ROOF, SEE DWG. 109-101-4954—M1 & 6130D-120-229 o\ S- U TI 0 \0 T 1. COORDINATE CHWS/R AND HWS/R SHUTDOWN THROUGH BOEING CONSTRUCTION MANAGER AND PROJECT ADMINISTRATOR. 2. COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. REMOVE SECTION OF (E)HWS/R AND (E)CHWS/R PIPING SERVING AHU-17 BACK TO TEE AND CAP. FOR AHU-17 REMOVAL, SEE DWG 9-120-1M11R. REMOVE HWS/R AND CHWS/R PIPING FROM EQUIPMENT CONNECTION BACK TO EXISTING MAIN AND CAP AS INDICATED. FOR AIR HANDLERS MZ-1 AND MZ-2 REMOVAL, SEE DWG 9-120-1M11R. REVIEWED FOR CODE ANCE APPROVE D SEP 3 0 2r15 City of Tul' BUILDING DI ila ISION 1M60 1M62 1M63 CITY OF TUKWILA SEP 16 2015 PERMIT CEN ISSUE FOR CONSTRUCTION APRI L 7, 2015 ER 1M65 KEY PLAN ood Harbinger 3009 with Ave NE, Suite xoo Bellevue WA 98004 425.628.6o00 woodharbinger.com CHECKED GINEE R CHECKED APPROVED APPROVED SUBTITLE TITLE FIRST FLOOR HVAC PIPING 9-120 STATION 5 AHU REPLACE BUILDING 9-120. MECHANICAA MASTFR COI F—K / 1-5 LAN CURRENT REVISION 21067 NO. G NO. SYMBOL DATE 04.07.15 1 AIR HANDLING UNIT (AH) SCHEDULE MARK NUMBER LOCATION AREA SERVED SUPPLY FAN SECTION COOLING COIL HEATING COIL 100% ECONOMIZER OPERATION MINIMUM OUTSIDE (CFM) AIR Adift..i MAXIMUM UNIT WT. (LBS) Aillft‘.AIMMI..AdMilb. REMARKS CFM TOTAL STATIC PRESSURE INCH G OUTLET VELOCITY PM APPROX RPM MOTOR TOTAL CAPACITY BTU R SENSIBLE CAPACITY B HR FACE VELOCITY ENT AIR LVG. AIR WATER CAPACITY BTU/HR FACE VELOCITY FP -._ E.A.T. F L.A.T. F - WATER HP VOLT PH RPM r e DRIVE FRAME PM °F DB °F WB °F DB °F W: GPM a EWT° LWT° F GPM -. F .4d1Oh► ° F Adllb. AIM. AdMOW.411111\ - - - AdIft..4111111111".AdMI\ AIM. AdIft..4111M. 41111ft.IMMI. d.41111111. AIM.�..1111111h..../MMI. 1750 AdElb..- BELT AIM. AM\ 284T 506,300 427,500 504 78.0 64.0 54.7 53.8 71.3 44 58.4 343,400 939 60 80.3 36.8 160 139.7 YES 3185 7446 DAIKIN CAH035GMAC, MERV Al2 FILTER, 2VFD [1] > AH1F1 FIRST FLOOR, G/1 A1-C6 INTERIOR, Al-J1 PERIM. 16820 3.69 2389 2042 25 460/3 AHU-4 SECOND FLOOR, C/8.5 C6-E11 INTERIOR 12440 1.21 1450 635 10 460/3 1760 BELT 256U 321,000 370 81.8 64.4 56.0 54.2 53 49 61 200,000 366 64 80 4.2 240 140 YES - 4500 AUSTIN 20M UNIT AHU-5 SECOND FLOOR, J2.5 Ja1-L3 INTERIOR & PERIMETR 16200 2.18 1900 718 10 460/3 1760 BELT 256U 388,000 440 81.6 64.4 56.0 54.1 70 49 60 212,000 445 66 80 4.4 240 140 YES - 4500 AUSTIN 20M UNIT AHU-6 SECOND FLOOR, E3.5 E1-G6 INTERIOR 13090 1.30 1530 635 10 460/3 1760 BELT 256U 376,000 430 81.6 64.3 56.0 54.1 68 49 60 205,000 430 66 80 4.3 240 140 YES - 4500 AUSTIN 20M UNIT SECOND FLOOR, G3.5 G1-J6 INTERIOR 8930 1.25 1040 650 10 460/3 1760 BELT 256U 321,000 370 81.8 64.4 56.0 54.2 53 49 61 200,000 366 64 80 4.2 240 140 YES - 4500 AUSTIN 20M UNIT AHU-7 AHU-8 SECOND FLOOR, K/2 Ll-M3 INTERIOR & PERIMETER 8655 0.98 1010 640 10 460/3 1760 BELT 256U 279,000 350 82.0 64.5 56.0 54.3 47 49 61 184,000 320 63 80 3.8 240 140 YES - 4500 AUSTIN 20M UNIT AHU-10 FIRST FLOOR, K/5 NONE - UNIT ABANDONED 0 0 0 0 10 460/3 1760 L.H. 256U N/A - - - - - - - - N/A - - - - - - YES - 4500 AUSTIN 20M UNIT AHU-11 FIRST FLOOR, G / 9 SOUTH PERIMETER 17500 3.52 2050 800 15 460 3 / 1760 L.H. 256U 515,756 419,781 557 76.2 63.4 54.3 53.3 93.6 45 56 594,000 700 45 75 12.7 240 140 YES 2090 4500 AUSTIN 20M UNIT NEW COOLING COIL - MCQUAY 5WS0906B-39X116 AHU-12 FIRST FLOOR, E/9 / INTERIOR 6380 1.78 750 450 10 460 3 / 1760 R.H. 256U 249,381 193,230 203 78.6 64.2 50.9 50.7 39.8 45 57.5 594,000 700 45 75 12.7 240 140 YES 1124 4500 AUSTIN 20M UNIT NEW COOLING COIL - MCQUAY 5WS0906B-39X116 AHU-13 FIRST FLOOR, K/6 EAST PERIMETER 15000 0.875 1755 485 10 460/3 1760 L.H. 256U 372,000 500 78.0 65.0 55.0 54.0 93.0 45 53 594,000 525 38 75 13.5 240 148 YES - 4500 AUSTIN 20M UNIT AHU-15 FIRST FLOOR, C/9 INTERIOR 12505 0.72 1460 430 10 460/3 1760 R.H. 256U _ N/A - - - - - - - - - - - - - - - - 1875 4500 AUSTIN 20M UNIT AHU-16 FIRST FLOOR, A/9 WEST PERIMETER 13070 X 1530 X 10 460/3 1760 R.H. 256U 371,400 543 80.0 64.0 58.6 55.8 73 46 56 748,000 525 30 76 21.0 240 165 YES 1438 4500 AUSTIN 20M UNIT AHU-18 THIRD FLOOR ? 20000 1.00 2340 545 10 460/3 1760 R.H. X X X - - - - - - 230,000 700 65 75.5 4.8 240 140 YES - 4500 AUSTIN 20M UNIT AHU-19 THIRD FLOOR, A/1 NORTH - WEST 15000 0.75 1755 455 10 460/3 1760 L.H. X X X - - - - - - 230,000 525 63 77 4.8 240 140 YES - 4500 AUSTIN 20M UNIT AHU-20 THIRD FLOOR, C/1 NORTH - EAST 15000 0.75 1755 455 10 460/3 1760 L.H. X X X - - - - - - 230,000 525 63 77 4.8 240 140 YES - 4500 AUSTIN 20M UNIT H 5 .7 5 0 0 6 7 Y 4 2 NI C 5400 2.89 1521 2336 5 460/3 1750 BELT 184T 142,200 128,200 445 78 63 56.3 53.9 28.5 44 54 118,100 471 60 79.5 11.8 160 140.5 YES 985 2610 DAIKIN CAH012GDAC -MERV Al2 FILTER, 2VFD [2] AH1G1 FIRST FLOOR, G/1 NORTH PERIMETER FIRST FLOOR, A/1 COL A/1 3000 0.5 1800 635 1.5 460 3 1750 R.H. 70,222 549 80.0 64 56.2 56.0 14 46 56 N/A - - - - - - YES AH1 A01 A 1 RST 00 A/1 C A/1 20 .5 1 03 0/ 0 EL 8,3 5 .0 4.1 .4 6 3 N/ - - - - - - YE - [1] TRIPLE [2] VAV UNIT, DECK UNIT, DWDI SUPPLY FAN, DWDI SUPPLY FAN, 1.7" 2.0" W.C. EXTERNAL STATIC (INCLUDES W.C. EXTERNAL STATIC (INCLUDES 0.90" W.C. 0.90" W.C. DIRTY DIRTY FILTER), FILTER). AHU INCLUDES AHU INCLUDES DWDI RETURN DWDI RETURN FAN, FAN, 20 3 HP, 5,400 HP, 16,820 CFM, CFM, 0.87" W.C. 1.75" W.C. TOTAL STATIC TOTAL STATIC PRESS, 460V/3PH, 1750 RPM, BELT DRIVE. MINI PLEATED FILTER, 2", MERV Al2, PRESSURE PRESS, 460/3, 1760 RPM, BELT DRIVE. MINI -PLEATED FILTER, 2", MERV Al2, PRESSURE DROP DROP 1" W.C. DIRTY, FACE VEL 425 FPM. 1" W.C. DIRTY, FACE VEL 409 FPM. CABINET & UNIT HEATER (UH) SCHEDULE MARK NUMBER LOCATION CFM MBH EAT °F LAT °F EWT °F LWT °F GPM MAXIMUM PD. FT. WATER MOTOR REMARKS HP RPM V PH CY UH-1 MECHANICAL ROOM 940 70 110 1.4 1/20 UH-2 MECHANICAL ROOM 1535 70 106 2.1 1/8 UH-3 MECHANICAL ROOM 2250 65 98 2.8 1/3 UH-4 MECHANICAL ROOM 1535 70 106 2.1 1/8 CABINET & UNIT HEATER (UH) SCHEDULE LOCATION CFM MBH EAT °F LAT °F EWT °F LWT °F GPM MAXIMUM PD. FT. WATER MOTOR REMARKS MARK NUMBER HP RPM V PH CY UH-1 MECHANICAL ROOM 940 70 110 1.4 1/20 UH-2 MECHANICAL ROOM 1535 70 106 2.1 1/8 UH-3 MECHANICAL ROOM 2250 65 98 2.8 1/3 UH-4 MECHANICAL ROOM 1535 70 106 2.1 1/8 REVISION ADDED U.H. SCHED. FROM TIFF 6130D-120-222 9-120 STATION 5 AHU REPLACEMENTS 21067 S.RUDELL APPROVED 06.09.08 04.07.15 REVISION APPROVED ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY A M.DITTMAR CHECKED ENGINEER S.ROSSE CHECKED APPROVED APPROVED A 11-21-94 \OTES PROVIDE A TRIPLE DECK AIR HANDLER (AHU 1 F1) IN PLACE OF EXISTING MULTI -ZONE UNITS. SEE DRAWING 09-120-M450 FOR LOCATION. BALANCE SUPPLY AND RETURN FAN TO EQUAL THE SUM OF THE GRILLES/DIFFUSERS ON THE PLANS FOR ALL 7 ZONES. PROVIDE SINGLE AIR HANDLING UNIT TO PROVIDE VARIABLE VOLUME HVAC FOR OVEN ROOM AS REQUIRED. BALANCE SUPPLY AND RETURN FAN TO EQUAL THE SUM OF THE GRILLES/DIFFUSERS ON THE PLANS. ISSUE FOR CONSTRUCTION APRIL 7, 2015 SUBTITLE TITLE SCHEDULES 9-120 STATION 5 AHU REPLACEMENTS MFCHANICAI MASTFR BUILDING 9-120 REVWED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RE:C ET/ED CITY OF TUKWILA SEP 16 2015 PERMIT CENTER Id DW, DC 9-120-M1 Wood Harbinger 3oo9 with Ave NE, Suite too Bellevue WA 98004 425.628.6000 woodharbi nger.com 04.07.15 c DARFNf IA. AIR CONDITIONING UNIT (AC) SCHEDULE MARK NUMBER LOCATION TYPE NOMINAL CAPACITY TONS FAN FAN MOTOR COIL COOLING CAPACITY CHILLED WATER COIL CONN SIZE REMARKS DRIVE TYPE CAPACITY (CFM) ESP IN WG HP VOLTAGE PHASE FLA CAPACITY MBH RM TEMP °F FLOW GPM EWT °F MAX PD © MAX PS1 SENSIBLE TOTAL DB WB AC1D2A DATA CLOSET SPOT COOLER 1 DIRECT 565 0.2 1/5 208/230 1 1.3 15.4 22.3 80 67 4.4 45 6.5 1 /2"FPT LIEBERT MODEL MME023C-P 0 AC1H7A DATA CLOSET SPOT COOLER 1 DIRECT 565 0.2 1/5 208/230 1 1.3 15.4 22.3 80 67 4.4 45 6.5 1/2"FPT LIEBERT MODEL MME023C-P 0 SUPPLY FAN (SF) 8c EXHAUST FAN (EF) SCHEDULE MARK NUMBER LOCATION AREA SERVED (ROOM NO.) EXHAUST FAN REMARKS FAN WHEEL SIZE (INCHES) CFM TOTAL STATIC PRESS. INCHES WG APPROX. RPM DRIVE SIDE MOTOR HP VOLTS/PH EF1J9A SHEET 1M15 PCLET'S LAB PUMP ROOM 15 2000 0.375 1110 V-BELT 1/3 480/3 LOREN COOK,TYPE ACW-B #150W4B CENTRIFUGAL WALL VENTILATOR EF1J9B SHEET 1M15 PCLET'S LAB PUMP ROOM 15 2000 0.375 1110 V-BELT 1/3 480/3 LOREN COOK,TYPE ACW-B #150W4B CENTRIFUGAL WALL VENTILATOR SF1 G9A SHEET 1M15 PCLET'S LAB PUMP ROOM 12 1600 0.375 1725 DIRECT 1/2 480/3 LOREN COOK, SQI-D #120SQ17D CENTRIFUGAL INLINE SF1H9A SHEET 1M15 PCLET'S LAB PUMP ROOM 12 1600 0.375 1725 DIRECT 1/2 480/3 LOREN COOK, SQI-D #120SQ17D CENTRIFUGAL INLINE EF1A9A SHEET 1M12 SOUTH LAB PUMP ROOM 15 2000 0.375 1110 V-BELT 1/3 480/3 LOREN COOK,TYPE ACW-B #150W4B CENTRIFUGAL WALL VENTILATOR EF1A9B SHEET 1M12 SOUTH LAB PUMP ROOM 15 2000 0.375 1110 V-BELT 1/3 480/3 LOREN COOK,TYPE ACW-B #150W4B CENTRIFUGAL WALL VENTILATOR EF1A5A SHEET 1M12 EXHAUST HOODS@F/5 & G/6.5 15 2000 1.375 1555 V-BELT 1.0 480/3 LOREN COOK,SQ1-B #150SQ/-B EF-1F2 SHEET 1M361 OVEN EXHAUST - 200 0.65 - DIRECT 1/4 115/1 GREENHECK SWD-7VG HIGH TEMPERATURE, 300 DEG F BI CENT, SUSPEND FROM CEILING EF-1F3 SHEET 1M361 FUME EXHAUST - 1000 0.5 - DIRECT 0.18 115/1 GREENHECK SQ-130-B, BI CENT INLINE, SUSPEND FROM CEILING, WITH SPEED CONTROL AIR DIFFUSER/REGISTER/GRILL SCHEDULE MARK NUMBER TYPE MATERIAL FINISH INLET /NECK SIZE, INCHES DIFFUSER INLET DUCT SIZE, INCHES FACE SIZE INCHES MAXIMUM NOISE COEFFICIENT MAXIMUM TP INCH WG MAXIMUM SET CFM REMARKS CD-10 LAY IN T-BAR STEEL PAINTED 10 10 24/24 35 0.18 435 NAILOR-HART SERIES 4600, TYPE RNS2 SR-10 ROUND CEILING STEEL PAINTED 10 10 18 X X X KRUEGER, SERIES R1DBR10 SR-12 ROUND CEILING STEEL PAINTED 12 12 22 X X X KRUEGER, SERIES R1DBR10 SR-18/12 SUPPLY REGISTER STEEL PAINTED 18/12 18x12 20x14 <20 .022 900 KRUEGER, SERIES 6880-30-V-OBD-HD SR-30/10 SUPPLY REGISTER STEEL PAINTED 30/10 32x12 32x12 <20 .088 1200 KRUEGER, SERIES 6880-30-V-OBD-HD SR-36/12 SUPPLY REGISTER STEEL PAINTED 36/12 38x12 38x14 <20 .022 1800 KRUEGER, SERIES 6880-30-V-OBD-HD RG-30/18 RETURN GRILL STEEL PAINTED 30/18 30x18 32x20 <30 .05 1600 KRUEGER, SERIES S80-V -- EGGCRATE STEEL PAINTED 24/24 -- 24/24 -- -- 1600 USED FOR RETURN AIR GRILLE, NAILOR-HART 51 ECC OR EQUAL SG-10x6 SUPPLY GRILLE STEEL PAINTED 10x6 -- 12x8 27 .131 250 DOUBLE DEFLECTION, TITUS MODEL 300RL, 22.5 DEGREE DEFLECTION 4 T 6 1 D 5 F CD-A-8x8 SQUARE CEILING DIFFUSER STEEL PAINTED 8x8 -- 24x24 17 .05 300 TITUS MCD, SQUARE INLET DIFFUSER SG-A-18x8 SUPPLY GRILLE STEEL PAINTED 24X10 -- 24x10 26 .10 650 DOUBLE DEFLECTION, TITUS MODEL 300RL, 22.5 DEGREE DEFLECTION RG-48x24 RETURN GRILL STEEL PAINTED 48x24 24x48 48x24 <40 .10 5400 TITUS, 355RL REVISION EXISTING CONDITIONS CDC RELOC-STRAIN GAUGE LAB-PKG 6-SOUTH J#19670-10 B CDC RELOC-STRAIN GAUGE LAB-PKG 6A-NORTH J#19670-10 C CDC RELOC - PKG 6A NORTH - RFI 27 D 9-120 STATION 5 AHU REPLACEMENTS J#19670-10 21067 WH APPROVED MBL 12.16.13 02.17.14 06.11.14 04.07.15 REVISION APPROVED font ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DATE 11-16-94 DRAWN M.DITTMAR CHECKED ENGINEER S.ROSSE CHECKED APPROVED APPROVED SUBTITLE TITLE ISSUE FOR CONSTRUCTION APRIL 7, 2015 SCHEDULES 9-120 STATION 5 AHU REPLACEMENT MFCHANICAI MASTFR BUILDING 9-120 REV1 WED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 16 2015 PERMIT CENTER ood Harbinger CURRENT REVISION 21067 NO. SYMBOL 3oo9 with Ave NE, Suite xoo Bellevue WA 98004 425.628.6000 uwoodharbinger.tom DATE 04.07.15 9-120-M1A 1!3ft77 PSI c L 0 c: LEGE\D ROUND CEILING DIFFUSER I 2 > 4000 CFM FC-1 A01 A 48/12 48/12 3000 CFM 48/28 T2 T5 �"� I 28/12 2 12 T6 24/28 SEE SHEET M527 —' FOR DETAIL ON OVEN VENT (ABAN) T7 28/12 T9 24/28 N N 4 FC-1 A01 B (ABAN) 1000CFM 1000 CFM -1000CFM is] HV-4 ] --1200 CFM HV-5 ] - 1600 CFM L>� SEE 1M210 FOR VENT T10 1600 CFM 36/28 4500 CFM 30/40 RUSSELLS RHD-64-30-30 SN: 74x123 ES COMB FREIGHT ELEV. EF1E1A EXHAUST FAN 1350 CFM DUCT END CUT TO 45' w/ BIRD SCREEN. MAKE-UP FAN GREENHECK # BCF 110 1800 CFM ®1 SP 3/4 HP 480V 30 UH1 NW CORRIDOR 1025 CFM 109 24/10 HV-6 48/12 CO 57 BEHC. No. _30-158849 61 BEHC. No 30-15885 2 58 BEHC. No. _30-158850 T11 25/20 STATIC 30K1 MM. MIN STATIC TEST ARE STATIC 50K18 STATIC 38 1025 CFM 250 CFM r ti 250 CFM 675 CFM 14/10 CEILING DIFFUSER, 600 CFM y/ 350 CFM 20x12 HOOD DETAIL #1 SHT 9-120-M501‘ •10 390 C .AU FAN UF-3 CFM 1® 4 3/4 HP 208/ 30 HOOD DETAIL #2 SHT 9-120-M501 MAKE-UP FAN GREENHECK # BCF 210 3200 CFM ©1 SP 3/4 HP 480V 30 TD-1 R.A. 6160 CFM EXHAUST FA - BUFFALO FOR�r BELTED -VENT 3200 CFM 1-1/2 HP 480/ 800 CFM W CORRIDOR 360 CFM TOILET AREA #2 1000 CFM HAUST FAN EW YORK BLOWER 00 CFM 0 1 ", 1/3 /3 HP 460/30 ZONE 1 .. 3455 CFM CFM II 12"0 r EF1 2EB CORRID&F 137 N 3 MANBARS r=ti 350 CFM 500 CFM 350 CFM SEE 19/12 (RETURN) EPAR EQUIP 18 18 IM►J4/24 HLINE - SEE CONTINUATION ON SHEET 1M12 290 CFM TYP OF 2 CD 300 CFM CD 10 \ TYP OF 2 10 STORAGE 125 OFFICE 128 31 CFM CD 300 CFM 1TifOF2 SION 31 LOAI ROOM r 750 CFM • r 750 CFM 14/8 UI Sintering Mochine 750 CFM d'- \ r 14/8 r y 8x4 WYE W/DAMPER EXIST 2 LOCN 1Or 14/8 r ti 750 CFM 750 CFM \ r 14/0 ZONE 2 2445 CFM ACCESS DOORS WITH MANBARS ✓ \ 750 CFM (0 „}ASTTc/8TES�`01 J' �.Jl 133 20x20 DAMPER W/ ACTUATOR PARTIAL PLA\ VIEW SCALE: 1/8" = 1'-0" EXISTING GRILL 1200 CFM REVISION APPROVED REVISION APPROVED 9-120 RENOVATION J#16054201-02 COFFMAN M. SOTURA 07.12.07 COMBINED DLR & OLD DWG. 1M10 S.RUDELL 07.24.08 Q�BOE/N ty- ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN COFFMAN CHECKED M. SOTURA A 10 l M536 DATE 05.23.07 05.23.07 8" 0 TIED INTO 16x11 DUCT R D P 24" 0 24"0 4. 600 G3) CEILING GRILLE RETURN OR EXHAUST RISE IN DUCTWORK DROP IN DUCTWORK THERMOSTAT - WALL MOUNTED VOLUME DAMPER FLEXIBLE DUCT WITH VOLUME DAMPER DUCT ELBOW WITH TURNING VANES RECTANGULAR DUCT, FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN. ROUND DUCT, NUMBER INDICATES DIAMETER SUPPLY OUTLET 2-WAY EARTHQUAKE BRACING, SEE _ 4-WAY EARTHQUAKE BRACING, SEE DIFFUSER/GRILLE TAG. TOP NUMBER INDICATES TYPE, BOTTOM NUMBER INDICATES CFM. SEE DIFFUSER AND GRILLE SCHEDULE. GE\EAL \OTES EXHAUST FAN: GRAINGER/DAYTON CAT. #1HLB4, DIRECT DRIVE, SHUTTER MOUNTED, SINGLE SPEED, PROPELLER DIA 24 IN, CFM © 0.000-IN SP 3970, © 0.125-IN SP 3240, © 0.250-IN SP 1900, SONES © 0.000-IN. SP © 5 FT. 12.1, VOLTAGE 115, 60 HZ, SINGLE PHASE, FULL LOAD AMPS 5.3, HP 1/3, MAX AMBIENT TEMP 104 F, MOTOR TYPE SHADED POLE, BEARING TYPE SLEEVE, HEIGHT 27 1/8 IN, WIDTH 27 1/8 IN, MAX DEPTH 17 9/16 IN, SQ OPENING REQUIRED 25 IN, PROPELLER MATERIAL STAMPED ALUMINUM, GUARD MATERIAL STEEL, INCLUDES AUTOMATIC SHUTTER M 504 .EFEH\CE DRAW M504 GS REF. DRAWINGS : 6130D-120-212, 6130D-120-202, 109-120-4112 REMOVE EXISTING CEILING DIFFUSER AND PROVIDE NEW CD -A DIFFUSER, BALANCE TO AIRFLOW INDICATED. ADJUST AIRFLOW FOR CEILING DIFFUSER/GRILLE TO AIRFLOW INDICATED. TYPICAL FOR ALL DIFFUSERS AND GRILLES FOR AH1G1 AND AH1F1. 3. CLEAN ALL SUPPLY AIR DUCTWORK, RETURN AIR DUCTWORK, GRILLES, DIFFUSERS AND ALL APPURTENANCES ASSOCIATED WITH AH1F1 AND AH1G1. 4, FOR TYPICAL GRILLE REGISTER DIFFUSER INSTALLATION DETAIL SEE DETAIL 1 M 10 I M539 PROVIDE 24X24 RA GRILLE AND DUCT, CONNECT TO EXISTING 32/20 DUCT REV WED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 16 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 j1M1101M111 1M112 i 1M113 KEY PLAN SCALE: NONE O Wood Harbinger 3009 with Ave NE, Suite too Bellevue WA 98004 425.628.6000 woodharbinger.com SUBTITLE DUCTWORK PLAN ENGINEER CURRENT REVISION 21067 SYMBOL DATE 04.07.15 RECORD DRAWING J#16054201-02 COFFMAN M. SOTURA 06.16.08 INSTALL GROUND -AIR -GROUND TEST CHAMBER W14608806 SAZAN/FW 08.07.13 SURPLUS HAMILTON FUME HOOD WALL EXH. FAN FOR 2 ENVIRO CHAMBERS 4207457 57696401 HARR HARR RWS RWS 6.13.07 01.07.08 K REPLACE UNIT SUBSTATION 11 23904 L 9-120 STATION 5 AHU REPLACEMENTS 21067 MBL MBL 04.07.15 04.07.15 H INSTALL INSPECTION ACCESS DOOR 7289935 DSH RWS 06.13.08 APPROVED BY DEPT. DATE CHECKED APPROVED APPROVED TITLE 9-120 STATION 5 AHU REPLACEMEN BUILDING 9-120 MF(-1ANICAI MASTER Col A-F/1-5 f)FV CENTER WA G NO. (lq-17f-1M1f1 LEGE\ D Po POINT OF CONNECTION -- + FLEXIBLE DUCT WITH VOLUME DAMPER Oven 81"x48" 12/12 i Oven 81 "x48" e1000 CFM, (7iRx19;, 13/20 18/24 Sr 1 25/24 Large Oven N-48x30 T.G., CAPPED 30X16 VD I CAPPED RG-48x24 5280 CFM SANDBLAST AB Large Steel Table Janet Table POC On Whee 40/24 ► 250 CFM, SG-10x6, TYP 2 P 3 X72 LJ -J PO GC 5'x9' LAYUP TBL CFM �TYP.OF 4 TORAGE 12/10 2 5'x9' LAYUP THL 330 CFM R.A. —1r—► 26/1 ZONE 1 BE 36X7 48x30 T.G., CAPPED ;m6" A STORAGE 6 LAYUP TBL K 970 CFM 30/ 10 TYP. OF I 32/12 TYP. OF 3B OLLING ART FROM AHU #10 36X72 SEE ENLARGED PLAN 1 M 11 M450 -0-1/— 22/12 600 CFM 595 CFM _f ELECT. PANEL BOT. OF DUCT \-15'-0" A.F.F. (ELEV.30'-6") 1 RG-1520 120 r., 160 CFM EACH 14/12 " 4 EA F P UPPLY AIR 400 CFM D-116 CLEAR 8'-8" B.O.D. co m ^z l l 120 EXHAUST TO ROOF WITH RAIN COLLAR EL) 24/12 RECTANGULAR DUCT, FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN. ROUND DUCT, NUMBER INDICATES DIAMETER 240 S 240 %71 340 A CFM 100 V f SUPPLY OUTLET -00 AIR DIFFUSER/REGISTAR/GRILL. REFER TO SHEET M1A. 2-WAY EARTHQUAKE BRACING, SEE 4-WAY EARTHQUAKE BRACING, SEE 1M11 M504 . 8c 1M11 M504 INDICATES GCU DASH NUMBER FOR WORK TASK. OTHERS INDICATES OUTSIDE CONTRACTOR CONSTRUCTION FLAGNOTE. GE\E�AL \OTES 1. ALL NEW DUCTWORK IS TO BE FABRICATED PER DETAIL (-2- SPARE DIFFERENTIAL PRESSURE SENSOR, ANCHOR TO BOTH SIDES OF WALL. EFEH\CE D .AWI\GS REF. DRAWINGS : 6130D-120-212, 6130D-120-202, 109-120-4114 CO\STRUCTIO\ \OTES REMOVE EXISTING CEILING DIFFUSER AND PROVIDE NEW ADJUST AIRFLOW FOR CEILING DIFFUSER/GRILLE TO AIRFLOW INDICATED. TYPICAL ALL DIFFUSERS AND GRILLES FOR AH1G1 AND AH1F1. 3. CLEAN ALL SUPPLY AIR DUCTWORK, RETURN AIR DUCTWORK, GRILLES, DIFFUSERS AND ALL APPURTENANCES ASSOCIATED WITH AH1F1 AND AH1G1. REMOVE EXISTING SG AND PROVIDE NEW SG. 5. FOR TYPICAL GRILLE REGISTER DIFFUSER INSTALLATION DETAIL SEE DETAIL 1M10 M539 6> BLANK OFF EXISTING TRANSFER AIR GRILLE. 7. COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ANY REMOVAL OR HANDLING OF ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. PROVIDE 48X24 RG WITH RETURN AIR DUCT AS SHOWN RE/VEINED FOR CODE COMPLIANCE APPROVED SEP 30 2015 City of Tukwila BUILDING DIVISION 1M10 1M12 1M13 REC .;VEO CITY OF TUKWILA SEP 16 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 8 4 KEY PLAN 0 4 8 16 SCALE: 1/8" = 1'—O" 7, Wood As Harbinger 3oo9 urth Ave NE, Suite ioo Bellevue WA 98004 425.628.6000 woodharbingercom SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE K REPLACE UNIT SUBSTATION 11 23904 WH MBL 04.07.15 F CANCELLED 55613204 HARR RWS 2006 L 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 G REV DUST COLL.IN BREAKOUT ROOM 57576000 HARR RWS 04/06/07 C INSTALL PLANER J3701746-00 DMV 06.22.00 H SURPLUS HAMILTON FUME HOOD 4207457 HARR 06/13/07 D RELOCATE DUST COLLECTION FOR SINTERING 55613200 HARR RWS 08/05/05 RELOCATED INDUSTRIAL VAC & DUST COL. TO DWG. 1M361 S.RUDELL 05.22.08 E EXHAUST CONN. FOR METAL SINTERING. MACH. 55603201 HARR RWS 08/05/05 J CDC RELOC—STRAIN GAUGE LAB—PKG 6A—NORTH J#19670-10 WH MBL 02.17.14 QtBOE/N G� ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN M.DITTMAR DATE 11.10.94 APPROVED BY DEPT. _ DATE CHECKED ENGINEER S.ROSSE CHECKED APPROVED APPROVED SUBTITLE TITLE HVAC FIRST FLOOR PLAN 9-120 STATION 5 AHU REPLACEMENT MF(:HANI(.AI MASTER BUILDING 9-120.1 ('.nl F—K /1-5 CURRENT HEET G NO. REVISION SYMBOL 21607 L DATE 9-1 2n— mil 04.07.15 CPFCK! 3/11/7015 LEGE\D FOR CONTINUATION SEE SHEET 1A11 36x1 4 18X11 24X12 31 36x18 w 0 21 1 POC 24X12 ELECTRIC SHOP 139 7" OVEN VENT 500CFM (TYP. 3/ 12 OF 2) 5" OVEN VENT BOD 13-0" AFF x w J m CO U CO U 00 U CO U 0 CO r 350 0 MATCHLINE — SEE I CONTINUATION ON SHEET 1 M 11 ZLX9 z C) X X V N 765 CFM — OVE 770 CF 38 Iii mu 3, • 12 :(�_OF3) z D 'ROLLING CART BOD .OF z w 770 CFM OVEN UTURE) 12'-10" GraniteToble CO m z C) co o z rn X V N CO rm z 3 3,0/1,0' 0 0< R 7o 7=11— C) Granite Table 0"0 OVEN VENT 29930 29030 BM09 TRANSI 5"x13 1/ 10"0 EXH 460 CFM OM] N X N m m = z U �z w N X 1500CFM 36/12 48/24 WALK—IN OVEN F '336 co m z TO O�M J U z Ogs X co MATCHLINE - SEE CONTINUATION 30/22 SR \ 840 CFM 0/ 10 (4 TYP) 32/12 (TYP OF 10) 32/24 i BOD 13'-0 \AL. JI 36/24 AFF SPLITTER DAMPER LSR\ 840 CFM SO/ 10 (6 TYP) BOD 12'-4" AFF OFFSET DOWN —\ AHU 11 17,500 CFM CO CO N N CO N EF-14 2 1/8" I 2 1f8Ji) J 02 C7 02 10" 1300CFM 36/12 V 64/14 1 1690CFM 5" dia —� 1M13 POGO SANDER AHU 10 M511 (UNIT ABANDONED IN PLACE TABLE S 34/18 Irr C) v 02 J 02 C) V CO C) J CO C) CO �300 CFM (4 TYP.) FRESH AIR SUPPLY \I 14/12 r) TURNING VANE 24/24 RET. 18/18 TURNING VANE 3 TON " LIEBERT" 1250 CFM 208V/60N/10 n 36/12 6"dia t 2 1/8" 6"dia TORIT MODEL 90 SERIAL #229619-3 A/C UNIT 4" 0 dia—\ 1400CFM 36/12 24/6FM 3"dia SPENCER TUBING El 12/10 17/15 (,�. ' 17/14 15/12 /2 n 10/9 130CFM 0 1 / 32/24 BOD 12'-4" AFF EXISTING BOTTOM OF DUCT 13'-0" AFF (2) 40/40 FIRE DAMPERS AT FLOOR PENETRATION 16ga SLEEVE WITH S—DRIVE CONNECTIONS TO DUCT ABOVE & BELOW FIRE SEAL TO FLOOR ACCESS DOORS ON SECOND FLOOR �— 200 CFM 10X18 80 CFM 28/24 OFFSET UP 00 80 CFN fl4/24 10/9 9/6 EXHAUth 60 CFM 03 60 CFM FAN 220CFM AHU 13 15,000 CFM HC-5 (EXIST) 12/16 18/18 1 BOD 0" AFF 00 00 PLAN 1 /8" = 1'-0" N 1000 CFM UP TO ROOF TORIT (TYP OF 2) MODEL 84 SERIAL #IG39920 BAND SAW 12/12 36/12 36/12 1900 CFM TOTAL 36/12 36/12 UH-4 18/18 FIRE DAMPER AT WALL PENETRATION 16ga SLEEVE WITH "S" SLIP CONNECTIONS TO DUCT EACH SIDE FIRE SEAL TO WALL ACCESS DOOR ON NORTH SIDE SYM REVISION BY APPROVED L PROPOSAL: SINTERING DUST COLL (CANCELLED) 55613202 HARR DATE 12/22/05 SYM REVISION BY APPROVED DATE F DUST COLLECTOR JOB # 773526—LO SLB RWS EJC 8/26/97 M CDC RELOC— PKG 6—SOUTH — RFI-010 J#19760-10 WH MBL 03.03.14 G NEW SLA ROOM J # 781155-00 DV/RWS DOT 5/21/98 N CDC RELOC— PKG 6—SOUTH — RFI-016 J#19760-10 WH MBL 03.11.14 H EXTEND HOUSEKEEPING VAC. J # 785455-00 P 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 J ROTATE HOUSEKEEPING VAC. OUTLET # 792184-00 DV/RWS DV/RWS DOT DOT 12/15/98 07.22.99 RFI nl`ATF FnI TIP AS INIIIC.ATFT .I 7n1R47 DMv/ R/9n/nn lBOE/N �r- ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE 3"x3" TY UP FOR HOSE ATTACH DRAWN M.DITTMAR CHECKED 24/12 24"5 3 24"4 340 A ,CFM 100 POINT OF CONNECTION FLEXIBLE DUCT WITH VOLUME DAMPER RECTANGULAR DUCT, FIRST NUMBER INDICATES SIZE FOR SIDE SHOWN. ROUND DUCT, NUMBER INDICATES DIAMETER SUPPLY OUTLET AIR DIFFUSER/REGISTAR/GRILL. REFER TO SHEET M1A. 2—WAY EARTHQUAKE BRACING, SEE 4—WAY EARTHQUAKE BRACING, SEE THERMOSTAT GE\E�AL COTES \M504 I M 504 1. ALL NEW DUCTWORK IS TO BE FABRICATED PER DETAIL EFEH\CE DAWI\GS CO\ST3 CTIO\ OTES REMOVE EXISTING CEILING DIFFUSER AND PROVIDE NEW CDA DIFFUSER, BALANCE TO AIRFLOW INDICATED. 2. CLEAN ALL SUPPLY AIR DUCTWORK, RETURN AIR DUCTWORK, GRILLES, DIFFUSERS AND ALL APPURTENANCES ASSOCIATED WITH AH1F1 AND AH1G1. 3. FOR TYPICAL GRILLE REGISTER DIFFUSER INSTALLATION DETAIL SEE DETAIL REVIEWED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION CITY OF TUKWILA SEP 1 6 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 1M10 M539 KEY PLAN 8 4 Au 0 1M15 4 8 16 ood Harbinur 3oog 312th Ave NE, Suite loo Bellevue WA 98004 woodharbinger.com CO DATE 11-9-94 APPROVED APPROVED SUBTITLE 9-120 STATION 5 AHU REPLACEMENTS BUILDING 9-120 CURRENT REVISION SYMBOL 21067 DATE 04.07.15 CPFCK• 9 /19 /9014 4A41 !95 PM sL1 " HWR TO 2ND FLR. RADIATOR 1j" HWR TO 1ST FLR. RADIATOR 4"HWRefiWEL YAMS_ / 2"CHWS 2„ C 4"CH W' MATCHLINE + SEE CONTINUATION ON SHEET 1 M60 SUBSTATION #10 (J14"HWS & HWR _ I TO AHU-2, 2ND FLR. OVEN ROOM 1 F21 (12F2) ®CLWR CLWS--.. RPM LAB 1G21 Q_11"HWS TO 2ND FLR. RADIATOR V) RPIv LAB 1 F2 L 1 rci (\ CLWS CLWR —CLWS CHWS® I%IFC 8"COOLING WATER FROM TOWER/PUMP HOUSE FOR CONTIN. SEE DWG. 109-101-4968-M1 8"CLWS 8"CLWR 8" 8„ E J `g /4 HREDOLET FOR 4" THERMOWELL MAMAC A-500-1 11H3 MOIRE TEST 134 5 DN TO AHU 1-1/2" SHOP 135 WORK ROOM 136 DN TO AHU (11F4) STRAIN GAUGE LAB 141 16H 4" S1M CLWR CLWS 8" VP (TUNNEL ACCESS) ABC 1M61 1M500 ENLARGED PARTIAL PLANS 41"HWR 4"HWS - SLAIHWS MMN CHWS & CHWR ENLARGED PARTIAL PLAN B 1M161 1M505 4 3/4" HWS GATE VALVE 5'-0" A.F.F. e e UP 10 U 11H4 2" (12H4) MATCHLINE SEE CONTINUATION ON SHEET 1M63 U 3/4" CH-2 3/4" HWR WJ PLUG COCK 5 -0 A.F.F. 6" CHWS FROM 9-101 ROOFJ. SEE DWG. 109-101-4954-M1 & 6130D-120-229 6" CHWR FROM 9-101 ROOF,_ SEE DWG. 109-101-4954-M1 & 6130D-120-229 _' eb UH-2 3/4" HWR 1 "HWR 3/4 11 2"HWS &RTO MAKE-UP AIR UNIT, SEE DETAIL 4" 2" III 1" HWS TO 2ND FLR. RADIATOR 1-1 /4" TO AHU-3, 2nd FLR. 5 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A REPLACE 9-65 COOLING WATER SYSTEM J#557761-01 M.WONG RWS 10.10.06 UPDATED DWG & RELOCATED VAC TO DWG. 1M361 S.RUDELL R RELOCATE ACAL/ASIC LAB 12370682 M.WONG RWS 01.05.12 C REPLACE UNIT SUBSTATION 11 23904 WH MBL 04.07.15 n 4-19fl STATION 5 AHII RFPI ACFMFNTS 710f 7 WH MRI 04.07.15 Q�BOE/N tr� ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN EDDIE P. DUARTE . EFE E\CE NAM \ GS TIFF 6130D-120-202 TIFF 6130D-120-212 TIFF 6130D-120-214 TIFF 6130D-120-226 TIFF 6130D-120-229 TIFF 6130D-120-230 109-120-1M500 109-120-1 M505 109-120-1M506 DATE 03.19.03 FIRST FLOOR PLAN MECHANICAL ROOM PLAN & SECTIONS CONVERTER STATION PLANS CHILLED WATER STATION PLAN CHILLED WATER STATION PLAN CHILLED WATER STATION PLAN LEGE\D - CHWS - CHWR - CLWS - CLWR - STM - HWS - HWR CHILLED WATER SUPPLY CHILLED WATER RETURN COOLING WATER SUPPLY COOLING WATER RETURN STEAM SUPPLY HEATING WATER SUPPLY HEATING WATER RETURN FLOW METER THERMOWELL POINT OF CONNECTION 2-WAY EARTHQUAKE BRACING, SEE 4-WAY EARTHQUAKE BRACING, SEE FOR TYPICAL AIR HANDLING UNIT COOLING COIL PIPING DIAGRAM, SEE AND FOR TYPICAL AIR HANDLING UNIT HEATING COIL PIPING DIAGRAM, SEE AND /cam CO\STJCTC \ \TES 1. COORDINATE WITH BOEING FACILITIES DEPARTMENT FOR ANY REMOVAL OR HANDLING OF ASBESTOS CONTAINING MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. POINT OF CONNECTION, EXTEND HWS/R AND CHWS/R PIPING TO AH 1 F1 AND AH 1 G1 AS SHOWN. REVIEWED FC R CODE CQMPLIAINICE APPROVED SEP 3 0 2015 City of Tukwa BUILDING DIVISION 1M60 1M62 1 M63 CONVERTER STA. 1-4 PLAN & SECTIONS CHILLED WATER PARTIAL PLAN & SECTIONS CHILLED WATER PARTIAL PLAN & SECTIONS RECEIVED CITY OF TUKWILA SEP 16 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 KEY PLAN Q 1M65 Ail Wood Harbinger 3oo9 urth Ave NE, Suite ioo Bellevue WA 98004 425.628.6000 woodharbinger.com APPROVED BY DEPT. DATE CHECKED ENGINEER CHECKED APPROVED APPROVED SUBTITLE TITLE FIRST FLOOR HVAC PIPING PLAN 9-120 STATION 5 AHU REPLACEMENT BUILDING 9-120.1 ��FI HANlCtI MAcTFR (..fi F—V / 1—�i CURRENT REVISION 21067 NO. SYMBOL DATE 04.07.15 SYM AIR AMPLIFIER/DRYER FOR SINTERING MACH. 2 WASTE UP 125# PSI COMPRESSED AIR --r/ 3/4" 3/4"CA TO COL. E4 REVISION —HWC C 3/4 ft MATCHLINE - SEE CONTINUATION EL. 15'-4" 3/4" 2" gA OVEN ROOM MOIRE TEST 134 SHOP 135 WORK ROOM 136 FIST FL00; PLU 1 F21 HPA 194) " Vl31\G �3 0+9 FCO 125# PSI C 1/2"A 1/2"A MATCHLINE PLA SCALE: 1/8"= 1'-0" BY APPROVED DATE SYM SUBS ON # 0 REVISION FCO 0 FUD CONDENSING UNIT GAS & LIQ. LINE 2"WASTE & VENT FOR AIR COND. UNITS _2" GAS FREEZER STRAIN GAUGE 3/4"A 141 3/4"A 3" PLUGGED FUD FUD COND. PJMP 3/4" P—TRAP (16H2 FCO 0 2" SAN UP 1 /2" FCO 1/2" SEE CONTINUATION ON SHEET 1M113 BY APPROVED DATE 4"VACUUM EXHAUST DN. 1 1/4" VENT LINES 1" GATE VALVE 1i"0 VENT 3/4" Q 3/4" 2-1/2" 4" REDUCING STATION i"o COND DRAIN 3/4" A 9-120 RENOVATION J#16054201-02 COFFMAN M. SOTURA 07.12.07 S RELOCATE ACAL/ASIC LAB 12370682 M.WONG RWS 01.05.12 RECORD DRAWING J#16054201-02 COFFMAN M. SOTURA 06.16.08 T REPLACE UNIT SUBSTATION 11 23904 WH MBL 04.07.15 Q REMOVE DRINKING FOUNTAIN 6382422 HARR RWS 02.13.08 U 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 — COMBINED DLR WITH OLD 1M111 S.RUDELL 07.24.08 Ann AIR nRnPS 4464 HARR 05 /05 /09 3" ST_ ELEV. 14'-2" 17,E7Ail PRV-300GPM ©100-70 PSI 2"ACID WASTE UP 1st F R SINK 3"CW DN 2"GAS DN W/ VALVE IN RISER 4"AIR DNW/ VALVE IN RISER _g8 FUD 3" VENT-e 3" FUD FCO 0 3"W UP TO FIRE SPRINKLER DR IN 1Jz"A UP TO 1 2ND FL. UP 12 PSI COMP. AIR ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE i3RAWN COFFMAN CHECKED APPROVED APPROVED CD EFEE\ CE DAWI\ LEGE\D HW CW — A HPA — HWC - - STS - - SAN - - IW - - AR - - CD — HOT WATER, DOMESTIC COLD WATER, DOMESTIC COMPRESSED AIR 125# HIGH PRESSURE COMPRESSED AIR HOT WATER CIRCULATING, DOMESTIC STORM DRAIN SANITARY WASTE INDUSTRIAL WASTE ACID RESISTANT WASTE CONDENSATE DRAIN ---V--- VENT 0 ()FCO ., L�J FD FUD t AIR OUTLET, HARD PIPE, DUPLEX AIR DROP - HOSE, DUPLEX FLOOR CLEAN OUT FLOOR DRAIN FUNNEL DRAIN 2-WAY EARTHQUAKE BRACING, SEE 4-WAY EARTHQUAKE BRACING, SEE POINT OF CONNECTION GE\PAL \TES FOR TYPICAL CONDENSATE TRAP DETAIL, SEE 1M111 M539 CO\S-RUCTIO\ \OTES 1M111 M504 COORDINATE WITH BOEING FACILITIES DEPARTMENT F ANY REMOVAL OR HANDLING OF ASBESTOS CONTAINI MATERIAL INVOLVED IN THE CONSTRUCTION OF THIS PROJECT. ROUTE INDIRECT DRAIN AND SECURELY FASTEN WITH UNISTRUT SUPPORT OR EQUIVALENT ALONG SIDE OF CONCRETE PAD TO (E)3"FUD. SLOPE TOWARDS DI"ECTIO OF F OW. 1M110 REV1WED FOR CODE COMPLIANCE APP1tOVED SEP 3 0 2015 City of Tukwila SI 1M112 1M113 LDING DIVISION 6130-D-9-120-102 PLUMBING PLAN MYLAR DRAWING RECEIVED CITY OF TUKWILA SEP 16 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 DATE SUBTITLE 05.23.07 TITLE FIRST FLOOR PLUMBING PL 9-120 STATION 5 AHU REPLACEMENT BUILDING 9-120 AR(:NITF .TI IRAI KAAcTFR (.0 i nFv ('.FNTFR WA SCALE: 1 /8"= 0 Wooll Harbinger CURRENT REVISION SYMBOL 21067 NO. U DATE 11Q-1 7(1-1 KA1 1 1 3oog with Ave NE, Suite ioo Bellevue WA g8004 425.628.6mo woodharbinger com 04.07.15 LEGE\D ZONE 1 22x 18 28" 0 16x20 16x12 DN OA LOUVER 96x40 96x40 F18x14 1 DN 12x8 24x18 1 - 32x96 RA PLENUM SUBSTATION #10 AH 1F1 M450 M542 OUTSIDE AIR TEMP SENSOR PLENUM OA LOUVER 48x40 18x1 24x 18 PLENU 3 4 9 µIi p�\"� AH 1G1 34x 18- M450 M542 M450 M542 24x64 I 18x12 12x12 SUBSTATION #11 28x20 22x14 PT XX RELIEF AIR LOUVER 96x40 PLENUM RELIEF AIR LOUVER 48x40 4 `J 48x40 x CO N 11 N N r H 1 16x12 18x14 CMS PANEL I (BELOW) -� 36x 18 ji "1-42x14 —34x18 — 24/20C P 22/12 ZONE 3 BOT. OF DUCT 15-0" A.F.F. (ELEV.30'-6") VFD'S/FILTERS FOR AH1F1 VFD'S/FILTERS FOR AH1G1 OVEN ROOM 1 F21 RG-3500 CFM, 42x24 OPENING ELAKED PLA SCALE: 1 /4"=1'-0" 42x24 26x18 - HVAC (r) iM111M450 N) N d\- J_ w N CO w 0 N 34x18 UP RPM LAB 1G21 / 42x14 4(% M450M542 M450 M542 1. FOR MECHANICAL LEGENDS AND ABBREVIATIONS SEE SHEETS M2C, M1C, AND M1E. GE\EAL OTES FOR AH1F1 DETAIL, SEE M4501M540 FOR AH1G1 DETAIL, SEE EFEH\CE JAWI\ GS CO\STUCTIO\ OTES POINT OF CONNECTION TO EXISTING SUPPLY AIR DUCT (TYP). POINT OF CONNECTION TO EXISTING RETURN AIR DUCT (TYP). EXTEND HOUSEKEEPING PAD TO ACCOMMODATE AIR HANDLER AH1F1. SEE STRUC DWG. POINT OF CONNECTION TO EXISTING AIR LOUVER. PATCH EXISTING WALL WHERE DUCT RG-1195 FM, PENETRATIONS WERE REMOVED. PATCH TO 18x18 OP NING MATCH EXISTING, REFER TO STRUCTURAL DRAWINGS. EXISTING DUCTWORK 7. PROVIDE 16 GAUGE DUCTWORK FOR ALL PLENUMS. 8. FOR AH1F1, PROVIDE BRANCH BALANCING DAMPERS ON ALL SUPPLY AND RETURN DUCTWORK IN MECHANICAL ROOM. RECEIVED CITY OF TUKWILA SEP 1 6 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 REV WED FOR CODE COMPLIANCE APPIkOVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION ood Harbinger 3oo9 with Ave NE, Suite 100 Bellevue WA 98004 425.628.6000 woodharbinger.com REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 BOE/N ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DDA DATE 12.02.14 APPROVED BY DEPT. DATE CHECKED MBL ENGINEER MBL 12.02.14 12.02.14 CHECKED CEL APPROVED 12.02.14 APPROVED SUBTITLE TITLE ENLARGED PLAN 9-120 STATION 5 AHU REPLACE MECHANIC:AI MASTFR BUILDING 9-120 CURRENT REVISION 1 SFATTI F WA DWG N0. 21, SYMBOL DATE 04.07.15 COMP NO. q-1 2n— 45n DARFNRIA: fl4/f3 /15 119:f8 LEGE 22 GAUGE GALVANIZED STEEL PERFORATED PLATE WITH 63 PERCENT FREE AREA ACROSS PLENUM. TOP OF PLATE AT CENTERLINE OF INLET INLET SIZE 2" DIFFUSER CAP, FABRICATE SAME SIZE AS DIFFUSER NECK 4" ROUND SHEETMETAL DUCT STUB 12"0 & LARGER SHALL HAVE BEAD FLEX DUCT CLAMP FLEXIBLE DUCT 111111111111111111111 1/2" SOUNDLINING EQUALIZING GRID SUPPLY D DIFFUSER CEILING FFUSH 5 SCALE: NONE PROVIDE PLUGGED MANUAL AIR VENT AT HIGH POINT OF EACH COIL BANK PRESSURE INDEPENDENT CONTROL VALVE, GPM INDICATED ON SCHEDULES, 5 PSI MAXIMUM LOW END FOR RANGE OF DIFFERENTIAL PRESSURES > HWS >-id 1-1/2" MIN PIPE SIZE SEE FLOOR PLANS FOR PIPE SIZE DRAIN VALVE WITH CAPPED HOSE END 1M10, 1M11, 1M13 M539 MAV TYPICAL AR HA\DLI\G U \IT SI\GLE HEATI\G COIL PIPI\ UNION OR FLANGE CLEAR OF COIL REMOVAL (TYP) REFER TO PLANS FOR BRANCH DUCT CONNECTION SIZE REDUCER, AS REQUIRED TO MATCH EACH COIL CONNECTION (TYP) HEATING COIL (TYP) NOTES: 1. COORDINATE EXACT QUANTITIES AND ARRANGEMENT OF COILS WITH EQUIPMENT =+0.1-J MANUFACTURER. G DIAGAN PROVIDE PLUGGED DRAIN VALVE WITH CAPPED HOSE END AT LOW POINT OF EACH COIL BANK SCALE: NONE PROVIDE PLUGGED MANUAL AIR VENT AT HIGH POINT OF EACH COIL BANK PRESSURE INDEPENDENT 2-1 /2" MIN CONTROL VALVE, GPM PIPE SIZE INDICATED ON SCHEDULES, 5 PSI MAXIMUM LOW END FOR RANGE OF DIFFERENTIAL PRESSURES CWS SEE FLOOR PLANS FOR PIPE SIZE MAV DRAIN VALVE WITH CAPPED HOSE END TYPICAL AR HA\DL\G U\ SI\GLE COCLI\G COIL PIPI SCALE: NONE it ISOLATION BALANCING MEASURING VALVE REQUIRED FOR TWO OR MORE COILS IN COIL BANK (TYP) PROVIDE PLUGGED MANUAL AIR VENT AT HIGH POINT OF EACH COIL BANK ISOLATION VALVE REQUIRED FOR TWO OR MORE COILS IN COIL BANK (TYP) PRESSURE INDEPENDENT CONTROL VALVE, GPM INDICATED ON SCHEDULES, 5 PSI MAXIMUM LOW END FOR RANGE OF DIFFERENTIAL PRESSURES SEE FLOOR PLANS FOR PIPE SIZES— HWR 1-1/2" MIN PIPE SIZE 1-1/2" MIN PIPE SIZE DRAIN VALVE WITH CAPPED HOSE END MAV PROVIDE PLUGGED DRAIN VALVE WITH CAPPED HOSE END AT LOW POINT OF EACH COIL BANK TYPICAL AR HA\DLI HEATI\G COIL PIPI\ \G U\IT G DIAG�AN REDUCER, AS REQUIRED TO MATCH EACH COIL CONNECTION (TYP) HEATING COIL (TYP) 111111111111111111111 111111111111111111111 UNION OR FLANGE CLEAR OF COIL REMOVAL (TYP) NOTES: 1. COORDINATE EXACT QUANTITIES AND ARRANGEMENT OF COILS WITH EQUIPMENT MANUFACTURER. PROVIDE ISOLATION VALVES FOR EACH COIL SECTION. SEE PLANS FOR SIZES, 1-1/2" MIN UNLESS NOTED OTHERWISE-i 2. BALANCE EACH COIL TO PROVIDE EQUAL DIFFERENTIAL PRESSURE AT FULL FLOW 4 SCALE: NONE 6 1 M61I 1\1539 REDUCER, AS REQUIRED TO MATCH EACH COIL CONNECTION (TYP) COOLING COIL (TYP) HIIIIIIHIHIIIIIIII UNION OR FLANGE CLEAR OF COIL REMOVAL (TYP) If -COOLING COIL DRAIN PAN 1-1/2" MIN FOR AHU COILS SEE TYPICAL TRAP DETAIL M539 NOTES: 1. COORDINATE EXACT QUANTITIES AND ARRANGEMENT OF COILS WITH EQUIPMENT MANUFACTURER. G DIAGA v PROVIDE PLUGGED DRAIN VALVE WITH CAPPED HOSE END AT LOW POINT OF EACH COIL BANK I 1 1 M61 M539 ISOLATION BALANCING MEASURING VALVE REQUIRED FOR TWO OR MORE COILS IN COIL BANK (TYP) PROVIDE PLUGGED MANUAL AIR VENT AT HIGH POINT OF EACH COIL BANK MAV ISOLATION VALVE REQUIRED FOR TWO OR MORE COILS IN COIL BANK (TYP) PRESSURE INDEPENDENT CONTROL VALVE, GPM INDICATED ON SCHEDULES, 5 PSI MAXIMUM LOW END FOR RANGE OF DIFFERENTIAL PRESSURES CWS 1>Q 2-1/2" MIN PIPE SIZE 2-1/2" MIN PIPE SIZE SEE FLOOR PLANS FOR PIPE SIZES DRAIN VALVE WITH 7> CAPPED HOSE END PROVIDE PLUGGED DRAIN VALVE WITH CAPPED HOSE END AT LOW POINT OF EACH COIL BANK TYPICAL AR HA\DLI\ 000LI\C COIL PIPI\ G U G DIA SIT G�Av iM611M539 REDUCER, AS REQUIRED TO MATCH EACH COIL CONNECTION (TYP) COOLING COIL (TYP) 111111111111111111111 PROVIDE REDUCERS FOR POINT OF CONNECTION REMOVABLE CAPS 1 "MIN PLUS FAN TSP 2"MIN PLUS FAN TSP TYPICAL CO\DE\ SCALE: NONE INTERMEDIATE 1/- COOLING COIL DRAIN PAN UNION OR FLANGE CLEAR OF COIL REMOVAL (TYP) MIN COOLING COIL DRAIN PAN COILS \-SEE TYPICAL TRAP DETAIL M539 NOTES: 1. COORDINATE EXACT QUANTITIES AND ARRANGEMENT OF COILS WITH EQUIPMENT MANUFACTURER. PROVIDE ISOLATION VALVES FOR EACH COIL SECTION. 2. BALANCE EACH COIL TO PROVIDE EQUAL DIFFERENTIAL PRESSURE AT FULL FLOW SCALE: NONE 1 M61 M539 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE — 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 gLAP171.1" ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN CHP CHECKED MBL CONTINUE TO EXTEND TO DRAIN SATE TRAP DETAIL � 1M111 M539 FAN OR PUMP MOTOR POWER SUPPLY BY ELECTRICAL (SPEC DIVISION 26) VFD EMERGENCY STOP FROM CIRCIUT DETECTOR DUCT SMOKE, FREEZE STAT, HIGH FAN DPS (AS APPLICABLE) DO DI AO MSTP DI Al FAN FAN FAN CURRENT START/ STATUS SPEED BACNET TRANSDUCER STOP CONNECTION SUMMARY ALARM CMCS TYPICAL VSD - CO\TOLS � SCALE: NONE M313, M314 M539 -EN 'INLER MBL 1. FOR MECHANICAL LEGENDS AND ABBREVIATIONS SEE SHEETS M2C, M 1 C, AND M 1 E. SMOKE DETECTOR ACTUATOR VARIABLE FAN DRIVE King GE\HAL \OTES EFE; \CE D�AWI\GS CO\STUCTIO\ \OTES ISSUE FOR CONSTRUCTION APRIL 7, 2015 DATE SUBTITLE 12.02.14 12.02.14 12.02.14 CHECKED CEL APPROVED 12.02.14 APPROVED TITLE PROVIDE SIEMENS CONTROLS PER SPECIFICATION. REV11WED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RECEIVED C1TV OF TUKWILA SEP 16 2015 PERMIT CENTER HVAC DETAILS 9-120 STATION 5 AHU REPLACEME MFC.HANI(:AI MASTER BUILDING 9-120 Wood Harbinger CURRENT REVISION 21067 SHEET OB SYMBOL A-1 2n-M DATE 30og uxth Ave NE, Suite roo Bellevue WA 98uo4 425.628.6000 woodharbinger.com 04.07.15 DARFN(l IAA 11 /1l3/14 n9!5n LE3E\D 24" DAMPER HOT DECK DAMPER SUPPLY FAN BYPASS DAMPER COLD DECK DAMPER RETURN FAN -\ u DI •II c a a a a c N J-BOX 24" DAMPER J J-BOX HEATING COIL PIPING CONNECTION P_AN 274" 30" DAMPER 18" DAMPER 30" DAMPER 24" DAMPER 24" DAMPER 1 I 62" 34" 30" 18" 30" a HEATING COIL W 0 03 00 N 64 I, r J-BOX 0 0 0 O a 0 0 B O O 0 0 0 0 0 0 0 0 0 0 0 0 9 0 J-BOX 84" 36" AH1F1 ELEVATION 58" 1 SCALE NONE M450, M542 540 48" 48" CONDENSATE DRAIN CONNECTION COOLING COIL PIPING CONNECTION RETURN FAN n U u RELIEF AIR DAMPER OUTSIDE AIR DAMPER SUPPLY FAN I I r. J-BOX 86" 164" PLAN 164" "-J-BOX 78" COOLING COIL PIPING CONNECTION HEATING COIL PIPING CONNECTION 38" RETURN INLET 12" 12" 22.37" 84" 36" AH1F1 ELEVATION 58" 1 SCALE NONE M450, M542 540 48" 48" CONDENSATE DRAIN CONNECTION COOLING COIL PIPING CONNECTION RETURN FAN n U u RELIEF AIR DAMPER OUTSIDE AIR DAMPER SUPPLY FAN I I r. J-BOX 86" 164" PLAN 164" "-J-BOX 78" COOLING COIL PIPING CONNECTION HEATING COIL PIPING CONNECTION 38" RETURN INLET 12" 12" 22.37" 11I III 1 II II a 0 0 o 0� u Z 0 o 0 0 0 0 0 J_ o� o U 0 0� 0 ze'-1., (o ell I ,a J-BOX oot.,J 0o8p , NfV1 4 o= 0 0 (.) o — o I 1 1 r I I J-BOX J 86" ELEVATION AH1 G1 78" 2 SCALE NONE SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE 9-120 STATION 5 AHU REPLACEMENTS 21067 WH MBL 04.07.15 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN CHP M450, M542 M540 DATE 12.02.14 1. FOR MECHANICAL LEGENDS AND ABBREVIATIONS SEE SHEETS M2C, M1 C, AND M1 E. GE\E AL OYES EFHE\CE DAWI\GS CO\STUCTIC\ \OYES ISSUE FOR CONSTRUCTION APRIL 7, 2015 REVS WED FOR CODE COMPLIANCE APPROVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA SEP 1 6 2015 PERMIT CENTER Wood Harbinger 3oog with Ave NE, Suite ioo Bellevue WA 98004 425.628.60o0 woodharbinger.com APPROVED BY DEPT. DATE CHECKED MBL ENGINEER MBL CHECKED CEL 12.02.14 SUBTITLE TITLE 12.02.14 12.02.14 APPROVED APPROVED AHU DETAILS 9-120 STATION 5 AHU REPLACEME MFCHANICAI MASTFR BUILDING 9-120 CURRENT REVISION 21167 SYMBOL DATE 04.07.15 fARFNO,IA: 11 /03/14 f9!50 PLENUM 64x24 4x42 )20x24 )20x14 )20x13 SYM 16x12 22x 14 18x14 28x20 18x12 12x12 18x34 34x 18 22x30 SECTIO SCALE: 1 /4"=1'-0" SQUARE THROAT, RADIUS HEEL, 30x22 RELIEF AIR CONC PAD, SEE STRUC DWG FINISHED FLOOR SECT' 0 \ SCALE: 1 /4"=1'-0" ZONE 1 (E)16/26 ZONE 2 (E)16/20 ZONE 2 (E)12/14 (E)35/24 R.A. 8x12 1 20x16— , 20"0 PLENUM 18x22 (E)10"0 (E)8" 0 (E)14"0 18x24 X 32x14� r30x50 24x86 12x12 E �I� E Ala 20x28 12x12 12x18 PLENUM 0 14x22 20x28 26x12 18x34 20x28 18x12 18x34 22x14 42x14 14x22 36x18 14x42 1- --( 18x36 I I t30x22 14x42 �36x18 CONC PAD, SEE STRUC DWG FINISHED FLOOR SC 20x16 16x20 �12x16 UARE THROAT, RADIUS HEEL, 28x62 SECTIO\ SCALE: 1/4"=1'-0" (E)10"0 (E)8"0 (E)14"0 12x16 50x30 9a„nn 6x40 N / x N I " 1 M450 M542 14x18 12x16 18x14 N 36x18 48x40 PLENUM 1-18x36 64x24 PLENUM 90x40- 14x18 36x18 64x24 111111111 lE>22/,2 (E)17/12 El 40x48 FINISHED FLOOR 64x24 REVISION 9-120 STATION 5 AHU REPLACEMENTS 21067 BY WH APPROVED MBL DATE 04.07.15 M5 M450 42 SYM RELIEF AIR LOUVER 40x48 (BEHIND) RELIEF AIR LOUVER 40x96— REVISION I � 1 M450 M542 -16x12 18x14 28x20 22x1 18x 11-12x12 / 0 l>11 18x34 1 218x36-111 1 \ I 14 1 14x22 20x28 I I , — " (E 20x28 (E)20x13 (E / _ ,� 14x42 (E)20x38 18x36 (E - -42x14 CONC PAD, ©® SEE STRUC DWG FINISHED FLOOR SECTIO SCALE: 1 /4"=1'-0" BY APPROVED DATE { 1 M450 M542 gLavetzEzief 12x1 40x96 (E)OA LOUVER 40x96 --� 20x16 r-18x14 22x18 r12x8 28" DIA 20x16 Tt:-;::7 � .- 64x24` 12x1 AH PLENUM CONC PAD, SEE STRUC DWG FINISHED FLOOR SECTIO\ SCALE: 1 /4"=1'-0" 40x48 (E)OA LOUVER 40x48 36x18 64x24 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DATE 12x2 PLENUM 8x30 M450 M542 18x14 14x32 12x18 II/ 1/I\ /I\ /II/1\/ XI �� I X HI X 111/ \I/ \I/11/\ v SECTIO\ SCALE: 1/4"=1'-0" tTRAWN DDA CHECKED MBL ENGINEER MBL CHECKED CEL APPROVED APPROVED 12x12 18x12 CONC PAD, SEE STRUC DWG FINISHED FLOOR D M4501M542 LEGE\D 1. FOR MECHANICAL LEGENDS AND ABBREVIATIONS SEE SHEETS M2C, M 1 C, AND M 1 E. GE\PAL \OTES FOR AH 1 F1 DETAIL, SEE M5421M540 FOR AH1G1 DETAIL, SEE EFEH\CE D�AWI\GS CO\STRUCTIO\ CTES RECEIVED CITY OF TUKWILA SEP 1 6 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 DATE SUBTITLE 12.02.14 12.02.14 TITLE 12.02.14 12.02.14 SECTION 9-120 STATION 5 AHU REPLACEME MFCHANICAI MASTFR BUILDING 9-120 SFATTI F. WA POINT OF CONNECTION DUCT (TYP). POINT OF CONNECTION DUCT (TYP). 4 TO EXISTING TO EXISTING RE VED FOR CODE COMPLIANCE APOVED SEP 3 0 2015 City of Tukwila BUILDING DIVISION 2 0 2 4 SUPPLY AIR RETURN AIR 8 SCALE: 1 /4"=1'-0" Wood Harbinger CURRENT REVISION 21067 G NO. SYMBOL DATE 9-170—M547 3oo9 u2th Ave NE, Suite roo Bellevue WA g8004 425.628.6000 woodharbinger.com 04.07.15 r fARFNO,IAk 04/(13/15 LEGE\D/SCHEDULE: 4 4 21'-11 3/4" CONCRETE EQUIPMENT PAD TO MATCH THICKNESS OF EXISTING PAD WITH #4 AT 18" 0.C. EACH WAY, TOP A S516 a d 7'-1 1/2" 1G 2'-11" 16'-0" a 4 a 4 a 'a .4 4 4 a d a d G E\LAGED SLA3 PLA\ VIEW SCALE: 3/8" = 1'-0" HILTI HIT HY200 ADHESIVE - EXISTING EQUIPMENT PAD - #4x2'-0" AT 18" 0.C. (2 MIN. EACH DIRECTION) EQUIP PER PLAN vE\T PAD A»ITIO\ SECTIO\ #4 AT 18" 0.C. EACH WAY, TOP 3/4" CHAMFER ALL AROUND SCALE: N.T.S. SYM REVISION BY APPROVED DATE S516 SYM EXISTING CONCRETE SLAB ON GRADE #4 DOWELS AT 18" 0.C. E.W. (2 MIN. EACH DIRECTION) HILTI HIT HY200 ADHESIVE EQUIPvE\T PAD SECTIO\ SCALE: N.T.S. REVISION 9-120 STATION 5 AHU REPLACEMENTS 21067 SITTS AJB 04.07.15 3/4" CHAMFER V) W S516 4 a a a 4 a d <1. ad a 4 as d a a a d d d 41‹ d 4 d 4 d a d da a 4 a a d 4 4 4 a ° a° 0 d 4 .. d a a d 0 A 44 CONCRETE EQUIPMENT PAD TO MATCH THICKNESS OF EXISTING PAD WITH #4 AT 18" 0.C. EACH WAY, TOP - B22A BEAMS AND POSTS, TYPICAL VFD S} PPO SCALE: 1 1 /2" = S516 S516 5'-0" CLEAR EXTEND AND CONNECT NORTHERN END POST TO FLOOR STRUCTURE ABOVE 1 1A11 S516 NOTES: A. PART NUMBERS REFER TO COOPER B-LINE PRODUCTS. EQUIVALENT UNISTRUT PARTS ARE ACCEPTABLE. VFD'S PER MECHANICAL (EXACT ARRANGEMENT MAY VARY) B556 EACH SIDE, EACH END (4 TOTAL) LOWER BEAMS SHALL BE SD- AT ELEVATIONS NECESSARY FOR VFD ATTACHMENT B133, TYPICAL EACH SIDE (8 TOTAL) B281SQ, TYPICAL (2 TOTAL) (4) 1/2" DIAMETER HILTI HY200 ADHESIVE ANCHORS (EMBED 3 1/2") STUCTHE DETAIL ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN L. McVay CHECKED L. Lindell ENGINEER A. Boileau CHECKED APPROVED APPROVED DATE 11.04.14 11.04.14 11.04.14 S516 C AS SHOWN ON PLAN INDICATES NEW CONCRETE SLAB HOUSEKEEPING PAD. FOR ADDITIONAL INFORMATION SEE DETAILS 2/S516 AND 3/S516 AS SHOWN ON PLAN INDICATES EXISTING CONCRETE HOUSEKEEPING PAD FOR ADDITIONAL INFORMATION SEE DETAILS 2/S516 AND 3/S516 \ HAL \TES: SEE ARCHITECTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION. 2. CONTRACTOR TO COORDINATE FINISHED FLOOR COATINGS AND MARKINGS WITH BOEING. 3. CONCRETE: 3,000 PSI MIN. (28-DAY STRENGTH). 4. REINFORCING STEEL: ASTM A615, GRADE 60. VFD SUPPORT STRUCTURE PER DETAIL 1/S516. CO\ST �UCTIO\ OTES: 1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF EXISTING CONSTRUCTION WHICH AFFECT NEW CONSTRUCTION PRIOR TO SUBMITTAL OF SHOP DRAWINGS. SHOP DRAWINGS WITHOUT FIELD VERIFICATION OF DIMENSIONS SHALL BE REJECTED. 2. DO NOT SCALE DRAWINGS 3. PROVIDE SPECIAL INSPECTION FOR CAST -IN -PLACE CONCRETE, REINFORCING STEEL AND ADHESIVE DOWELS. COORDINATE EXACT PLACEMENT OF VFD RACK WITH MECHANICAL AND ELECTRICAL TO PROVIDE MINIMUM 48" CLEAR BETWEEN VFD EQUIPMENT AND AIR HANDLING UNIT. EFE �E\ CE i AWI\CS: CITY OF TUKWILA SEP 16 2015 PERMIT CENTER ISSUE FOR CONSTRUCTION APRIL 7, 2015 SUBTITLE ENLARGED SLAB PLAN VIEW AND ,, Al TITLE STRUCTURAL 9-120 STATION 5 AHU REPLACEMENT BUILDING 9-120.1 COL. F-G.5/1-1.5 1A10 1All 0 1Al2 1 A13 KEY PLAN 0 2 Jq D FOR 0 i E MP1.IANCE A P OVED SEP 3 0 2015 City of Tukwila BUILDING DIVISpN SCALE: 3/8"=1 '-0" SITTS & HILL ENGINEERS, INC. CIVIL • STRUCTURAL a SURVEYING 4815 CENTER STREET I TACOMA, WA. 98409 PHONE: (253) 474-9449 I FAX: (253) 474-9449 http://www.sItts-h111-englneers.comi Project No.: 16244 Project Mgr.: LGL Proj. Engineer: AJB Proj. Drafter: LAM CURRENT REVISION G NO. D.C. 210 DATE 9-120-S516 04.07.15 HA587C: 0 6/ 15/ 11 15: 28