Loading...
HomeMy WebLinkAboutPermit EL15-0840 - 455 BUILDING - ELECTRICAL UPGRADE AND PSE TRANSFORMER455 BLJILDING 455 ANDOVER PARK E EL15-0840 City of Tukwila Department of Community Development • 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.gov ELECTRICAL PERMIT Parcel No: 0223400060 Permit Number: EL15-0840 Address: 455 ANDOVER PARK E Issue Date: 11/16/2015 Permit Expires On: 5/14/2016 Project Name: 455 BUILDING Owner: Name: 445 BUILDING LLC Address: 121 LAKESIDE AVE #6100 , SEATTLE, WA, 98122 Contact Person: Name: JUSTIN BRANSON Phone: (425) 736-2407 Address: 18133 NE 68 ST STE D-120 , REDMOND, WA, 98052 Contractor: Name: PRIDE ELECTRIC INC Phone: (425) 454-3665 Address: 18133 NE 68 ST, STE D120 , REDMOND, WA, 98052 License No: PRIDEE1077DR Expiration Date: 3/19/2017 Lender: Name: Address: DESCRIPTION OF WORK: UPGRADE ELECTRICAL SERVICE TO 1200 AMPS. NEW PSE TRANSFORMER Valuation of single family: $0.00 Fees Collected: $790.54 Valuation of mf/comm: $28,500.00 Type of Work: TENANT IMP Electrical Service Provided by: PUGET SOUND ENERGY Water District: TUKWILA Sewer District: TUKWILA SEWER SERVICE Current Codes adopted by the City of Tukwila: International Building Code Edition: 2012 National Electrical Code: 2014 International Residential Code Edition: 2012 WA Cities Electrical Code: 2014 International Mechanical Code Edition: 2012 WAC 296-466: 2014 Uniform Plumbing Code Edition: 2012 WA State Energy Code: 2012 International Fuel Gas Code: 2012 Lc ( Permit Center Authorized Signature: Date: I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local law re lating construction or the performance of work. I am authorized to sign and obtain this development r an agr to the conditions attached to this permit. r // Signature: Date: Print Name: This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: 'ELECTRICAL PERMIT CONDITIONS' 2: A copy of the electrical work permit shall be posted or otherwise made readily accessible to the Electrical Inspector at each work site. 3: Approved plans shall be maintained at the construction site and shall be readily available to the Electrical Inspector. 4: All electrical work shall be in accordance with NFPA 70 - NEC, and requirements for electrical installations, Chapter 296-46B WAC. 5: When any portion of the electrical installation is to be hidden from view by permanent placement of parts of the building, such equipment shall not be concealed until it has been inspected and approved by the Electrical Inspector. 6: The issuance of an electrical work permit shall not be construed to be a permit for, or an approval of, any violation of the provisions of the electrical code or other ordinances of the jurisdiction. Permits or related documentation that presumes to grant this authority are therefore not valid. 7: Any change in the scope of work described by the electrical work permit shall require additional work permits. Where approved plans have been issued, revisions to the plans and additional review may be required. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 2100 ELECTRICAL FINAL 7003 ROUGH -IN ELECTRICAL 7002 SERVICE 7001 UNDERGROUND/SLAB CITY OF TUKWILA Community Development Department Permit Center • 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA..gov Electrical Permit No. Project No. Date Application Accepted: Date Application Expires:�� (For office use only) ELECTRICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION King Co Assessor's Tax No.: Site Address: 455 ANDOVER PARK EAST Suite Number: Floor: I Tenant Name: 455 ANDOVER BUILDING LLC New Tenant: ❑ .....Yes ®..No PROPERTY OWNER Name: 455 BUILDING LLC Address: 121 LAKESIDE AVE SUITE B100 City: SEATTLE State: WA Zip: 98122 CONTACT PERSON — person receiving all project communication Name: JUSTIN BRANSON Address: 18133 NE 68TH ST D-120 City: REDMOND State: WA Zip: 98052 Phone: (425) 736-2407 Fax: Email: ELECTRICAL CONTRACTOR INFORMATION Company Name: PRIDE ELECTRIC Address: 18133 NE 68TH ST D-120 City: REDMOND State: WA Zip:98052 Phone: (425) 736-2407 Fax: Contr Reg No.: PRIDEEI077DR Exp Date: 03/09/2016 Tukwila Business License No.; BUS-0994339 Valuation of Project (contractor's bid price): $ 28,500 Scope of Work (please provide detailed information): Upgrade electrical service to 1200a. New PSE transformer Will service be altered? m Yes ❑ No Type of Use: Tvpe of work: ❑ New ❑ Addition m Service Change ❑ Low Voltage ❑ Generator ❑ Fire Alarm Property Served by: Puget Sound Energy ❑ Seattle City Light H:WpplicationsTorms-Applications On Line\2014 ApplicationsTlectrical Permit Application Revised 1-1-14.docx Revised: January 2014 bh Adding more than 50 amps? ❑ Yes [Z] No ❑ Remodel ❑ Tenant Improvement ❑ Telecommunication ❑ Temporary Service Page 1 of 2 RESIDENTIAL NEW RESIDENTIAL SERVICE ❑ New single family dwellings ................................... $152.85 (including an attached garage) ❑ Garages, pools, spas and outbuildings ........................ $81.90 ea ❑ Low voltage systems (alarm, furnace thermostat) ................................ $59.85 ea RESIDENTIAL REMODEL AND SERVICE CHANGES ❑ Service change or alteration ...................................... $81.90 (no added/altered circuits) ❑ Service change with added/altered circuits ................. $81.90 number of added circuits ....................... $11.55 ea ❑ Circuits added/altered without service change ........... $54.60 (up to 5 circuits) ❑ Circuits added/altered without service change ........... $54.60 (6 or more circuits) ............................................... $7.65 ea ❑ Meter/mast repair ....................................................... $68.25 ❑ Low voltage systems ................................................. $59.85 (alarm, furnace thermostat) MULTI -FAMILY AND COMMERCIAL Fees are based on the valuation of the electrical contract. MISCELLANEOUS FEES ❑ Temporary service (residential) ................................. $65.00 ❑ Temporary service (generator) ................................... $80.90 ❑ Manufactured/mobile home service ........................... $86.25 (excluding garage or outbuilding) ❑ Carnivals....................................................................$80.60 Number of concessions ......................... $10.80 ea Each ride and generator truck ............... $10.80 ea ***EFFECTIVE JANUARY 1, 2014 EACH PERMIT WILL BE ASSESSED A 5% TECHNOLOGY FEE*** Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 90 days. The extension shall be requested in writing and justifiable cause demonstrated. I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR ELECTRICAL CONTRACTOR: Signature: Date: 09/30/2015 Print Name: Justin Branson Day Telephone: (425) 736-2407 Mailing Address: 18133 NE 68TH ST, SUITE D-120 REDMOND WA 98052 City State Zip H:\Applications\Forms-Applications On Line\2014 ApplicationsTlectrical Permit Application Revised 1-1-14.docx Revised: January 2014 bh Page 2 of 2 DESCRIPTIONS PermitTRAK ACCOUNT QUANTITY PAID $790.54 EL15-0840 Address: 455 ANDOVER PARK E Apn: 0223400060 $790.54 ELECTRICAL $760.13 PLAN CHECK FEE R000.345.832.00.00 0.00 $152.03 PERMIT FEE MULTI-FAM/COMM R000.322.101.00.00 0.00 $608.10 TECHNOLOGY FEE $30.41 TECHNOLOGY FEE TOTALR6301 R000.322.900.04.00 0.00 $30.41 $790.54 Date Paid: Wednesday, September 30, 2015 Paid By: PRIDE ELECTRIC INC Pay Method: CHECK 6884 Printed: Wednesday, September 30, 2015 3:41 1 of 1 I r�' L�' (SYSTEMS PM INSPECTION RECORD 1-7 70vb Retain a copy with permit INSPECTION N0. PERMIT N0. CITY OF TUKWILA BUILDING DIVISION v 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 r L! Corrections required prior to approval. IJ paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Ll City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Fax: 206-431-3665 Web site: http://www.ci.tukwila.wa.us REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: % Plan Check/Permit Number: ❑ Response to Incomplete Letter # ® Response to Correction Letter # I ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: 455 Building Project Address: 455 Andover Park E Contact Person: s�' ��-- Phone Number: Summary of Revision: Sheet Number(s): "Cloud" or highlight all areas of revision including date of Received at the City of Tukwila Permit Center by: ❑ Entered in TRAKiT on EL15-0840 FIECENIM QIT'Y OF TIJKMLA PFPA4fT GFPETF-FJ I \applications\forms-applications on line\revision submittal Created: 8-13-2004 Revised: City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director October 13, 2015 (YP 6( JUSTIN BRANSON 18133 NE 68 ST STE D-120 I b REDMOND, WA 98052 RE: Correction Letter # 1 ELECTRICAL Per a llcation Number EL15-0840 PP 455 BUILDIN - 455 ANDOVER PARK E Dear JU5,,PrN BRANSON, T is letter is to inform you of corrections that must be addressed before your development permit can be approved. All orrection requests from each department must be addressed at the same time and reflected on your drawings. I have LBUILDING omments from the following departments: - E DEPARTMENT: Jim Benner at 206-431-3679 if you h /tions garding these comments. .) MAIN BREAKER AT MDP REQUIRED TO PROVIDE FPE. .) TRANSFORMER SECONDARY CONDUCTORS REQ OCPD WITHIN 10 FEET OF WHERE THEY RECEIVE THEIR SUPPLY. PANEL SCHEDULE SHOW-S.A4L . ___3-.)_NO NEUTRAL REQUIRED FOR TRANSFORMER PRIMARY-- 4.) INCONSIS C1ES BE-JWEEN LA AND LB PANEL RISER DIAGRAM AND PANEL SCHEDULES. ARE THE 200 AMP 0� 1 NFES EEDERS? 5.) WHY ( 2 RANSFORMER SECONDARIES DIFFERENT? SAME TRANSFORMER, SAME PANEL. d 6.) SHO G ING ELECTRODE CONDUCTOR FOR MDP AND TRANSFORMER SECONDARY XO POINTS. 250.66 � � ( j rD - n Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two 2 sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206)431-3655. Sincerely, ---" —41 Bill Rambo2 Permit Technician File No. EL15-0840 fp'j�- � �'� � 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 9 Phone 206-431-3670 9 Fax 206-431-3665 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director October 13, 2015 JUSTIN BRANSON 18133 NE 68 ST STE D-120 REDMOND, WA 98052 RE: Correction Letter # 1 ELECTRICAL Permit Application Number EL15-0840 455 BUILDING - 455 ANDOVER PARK E Dear JUSTIN BRANSON, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - E DEPARTMENT: Jim Benner at 206-431-3679 if you have questions regarding these comments. • 1.) MAIN BREAKER AT MDP REQUIRED TO PROVIDE GFPE. 2.) TRANSFORMER SECONDARY CONDUCTORS REQUIRE OCPD WITHIN 10 FEET OF WHERE THEY RECEIVE THEIR SUPPLY. PANEL SCHEDULE SHOWS MLO. 3.) NO NEUTRAL REQUIRED FOR TRANSFORMER PRIMARY. 4.) INCONSISTENCIES BETWEEN LA AND LB PANEL RISER DIAGRAM AND PANEL SCHEDULES. ARE THESE 200 AMP OR 150 AMP PANELS/FEEDERS? 5.) WHY ARE THE 2 TRANSFORMER SECONDARIES DIFFERENT? SAME TRANSFORMER, SAME PANEL. 6.) SHOW GROUNDING ELECTRODE CONDUCTOR FOR MDP AND TRANSFORMER SECONDARY XO POINTS. 250.66 Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two 2 sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206)431-3655. Sincerely, ---" -41 Bill Rambo2 Permit Technician File No. EL15-0840 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL15-0840 DATE: 10/28/15 PROJECT NAME: 455 BUILDING SITE ADDRESS: 455 ANDOVER PARK E Original Plan Submittal Revision # before Permit Issued X Response to Correction Letter # 1 Revision # after Permit Issued DEPARTMENTS: Building Division 19 Public Works ❑ PRELIMINARY REVIEW: Not Applicable ❑ (no approval review required) REVIEWER'S INITIALS: APPROVALS OR CORRECTIONS: Approved ❑ Corrections Required ❑ (corrections entered in Reviews) Notation: REVIEWER'S INITIALS: Fire Prevention ❑ Structural ❑ Planning Division ❑ Permit Coordinator to DATE: 10/29/15 Structural Review Required ❑ DATE: DUE DATE: 11/26/15 Approved with Conditions Denied ❑ (ie: Zoning Issues) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: I2/19/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: EL15-0840 PROJECT NAME: 455 BUILDING SITE ADDRESS: 455 ANDOVER PARK E X Original Plan Submittal Response to Correction Letter # DATE: 09/30/15 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: A Cove .2z Building Division Fire Prevention ❑ Planning Division ❑ Public Works ❑ Structural ❑ Permit Coordinator PRELIMINARY REVIEW: DATE: 10/01/15 Not Applicable ❑ Structural Review Required ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/29/15 Approved ❑ Approved with Conditions ❑ Corrections Required N— Denied ❑ (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only _ CORRECTION LETTER MAILED:���I� Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 PRIDE ELECTRIC INC Page 1 of 3 ttrnne; IraieioellE;pafiol ("ontact Safety 004 Washington State Department of LALabor & Industries PRIDE ELECTRIC INC Search L&I A-Z.tndex Hetp D4vSecure+t.,ir1 Claims & Insurance Workplace Rights Trades & Licensing Owner or tradesperson 18133 NE 68TH ST D120 REDMOND, WA98052 Principals 425-454-3665 GOAD, CHRISTOPHER J, PRESIDENT KING County GOAD, ROBERT L, VICE PRESIDENT GOAD, KIRK A, SECRETARY GOAD, CHRISTOPHER J, AGENT SEELEY, ROBERT M, PRESIDENT (End: 03/15/2005) SEELEY, KAROLYN J, SECRETARY (End: 03/15/2005) SEELEY, ROBERT M, AGENT (End: 03/15/2005) Doing business as PRIDE ELECTRIC INC WA UBI No. Business type 601 451 700 Corporation License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Electrical Contractor Active. ............................................................... Meets current requirements. License specialties GENERAL License no. PRIDEE1077DR Effective — expiration 03/19/1993— 03/19/2017 Designated administrator GOAD, CHRISTOPHER J License type Master Electrician Bond ............. TRAVELERS CAS & SURETY CO Bond account no. 103366931 Received by L&I 04/01/2005 Savings No savings accounts during the previous 6 year period. Active. Meets current requirements. License no. GOAD'CJ955DG $4,000.00 Effective date 03/17/2005 Expiration date Until Canceled https:Hsecure.Ini.wa.gov/verify/Detail.aspx?UBI=601451700&LIC=PRIDEEI077DR&SAW= 11/16/2015 PANEL: MDP PROJECT NAME: 455 ANDOVER PROJECT #: LOCATION: TUKWILA, WA FED FROM: PSE NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) PANEL DESCRIPTION 6 AMP P R H M I L K O TOTAL 1 PANEL HA A 200 B -- C - - 3 - - 15.7 11.8 6.6 15.7 11.8 6.6 PANEL AMPS : 1200 FEEDER AMPS : 1200 L - L VOLTS : 480 2 PANEL HB A 200 B - - 3 11.7 6.4 11.7 6.4 L - N VOLTS : 277 PHASE : 3 3-POLE SPARE C -- A 200 - 3 4.2 4.2 WIRE: 4 3 - 3-POLE SPARE C Al200 31 M.L.O. 4 - 3-POLE SPARE B -- C - - A 200 - - 3 MAIN CB FLUSH SURFACE X X 5 --- B -- C -- ISO GND FEED-THRU 6 3-POLE SPARE --- A 200 B -- C -- 3 - 7 13 -POLE SPARE A 200 g _ _ 3 LOAD SUMMARY ( TOTAL, ALL SECTIONS) - C REC KVA HEAT KVA 8 MOTOR KVA LIGHTING KVA KITCHEN KVA 9 OTHER KVA : 56.4 10 PHASE A KVA : 27.4 AMPS: 98.9 PHASE B KVA : 18.2 f-12 AMPS: 65.7 PHASE C KVA : 10.8 AMPS: 39.0 CONNECTED LOAD KVA : 56.4 AMPS: 67.8 DEMANDLOAD KVA: 56.4 AMPS : 67.8 1. 2. 3. 4. 5. 6. DEMAND I DIVERSITY FACTORS LOAD DESCRIPTION DEMAND R RECEPTACLES -T010KVA 100% _ REMAINING OVER 10KVA 60% _ H HEATING 100% _ M MOTORS 100% _ LM LARGEST MOTOR 125% _ LM LIGHTING 125% _ K KITCHEN 65% _ 0 OTHER 100% = 56.4 PANEL: HA PROJECT NAME: 455 ANDOVER PROJECT #: LOCATION: TUKWILA, WA FED FROM: MDP NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) PANEL DESCRIPTION 9 AMPI P R H M I L K O TOTAL 1 LTG - LED HIGH BAYS A 20 11 3.9 3.9 PANEL AMPS : 200 3 LTG - LED HIGH BAYS B 20 1 3.9 3.9 FEEDER AMPS : 200 5 LTG - LED HIGH BAYS C 20 1 3.9 3.9 L - L VOLTS : 480 7 LTG - LED HIGH BAYS A 20 1 3.9 3.9 L - N VOLTS : 277 9 B PHASE: 3 11 C WIRE : 4 13 A 15 B 17 C 19 A M.L.O. 21 B MAIN CB X 23 C FLUSH 25 A SURFACE X 27 B ISO GND 29 C FEED-THRU 31 A 33 B 35 C LOAD SUMMARY 37 A 39 B ( TOTAL, ALL SECTIONS) REC KVA 41 C 2 LTG - LED HIGH BAYS A 20 11 1 3.9 3.9 4 LTG - LED 2X4 B 20 1 2.5 2.5 HEAT KVA 6 LTG - LED WALL PACK C 20 1 1 0.3 0.3 MOTOR KVA : 8 PNL LB FEED (VIA 75KVA XFMR) A 100 3 0.0 0.0 LIGHTING KVA : 22.3 10 --- B __ _ 0.0 0.0 KITCHEN KVA: 12 --- C - 0.0 0.0 OTHER KVA: 0.0 14 16 PHASE A KVA : 11.7 18 AMPS: 42.2 20 PHASE B KVA : 6.4 22 AMPS: 23.1 24 PHASE C KVA : 4.2 26 AMPS: 15.2 28 30 CONNECTED LOAD 32 34 KVA : 22.3 36 AMPS: 26.8 38 DEMAND LOAD KVA : 27.9 40 42 AMPS: 33.5 NOTESIREMARKS : DEMAND I DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND R RECEPTACLES -T010KVA 100% 2, 3, REMAINING OVER 10KVA 50% _ H HEATING 100% = M MOTORS 100% _ LM LARGEST MOTOR 125% _ L LIGHTING 125% = 27.9 K KITCHEN 65% _ 0 OTHER 100% = 0.0 PANEL: HB PROJECT NAME: 455 ANDOVER PROJECT M LOCATION: TUKWILA FED FROM: MPD NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) PANEL DESCRIPTION B AMP P R I H I M I L I K O TOTAL 1 PNL LB FEED (VIA 75KVA XFMR) A 100 3 1 4.0 4.0 PANEL AMPS : 200 3 _ _ _ B - - 5.4 5.4 FEEDER AMPS : 200 5 - - C - - - 2.4 2.4 L - L VOLTS : 480 7 A L - N VOLTS : 277 g B PHASE : 3 11 C WIRE: 4 13 A 15 B 17 C 19 A M.L.O. 21 BI MAIN CB X 23 C FLUSH 25 A SURFACE X 27 B ISO GND 29 C FEED-THRU 31 A 33 B 35 C LOAD SUMMARY 37 A 39 B ( TOTAL, ALL SECTIONS) REC KVA 41 C 2 A 4 B HEAT KVA 6 C MOTOR KVA 8 A LIGHTING KVA 10 B KITCHEN KVA 12 C OTHER KVA : 11.8 14 16 PHASE A KVA : 4.0 18 AMPS: 14.4 20 PHASE B KVA : 5.4 22 AMPS: 19.5 24 PHASE C KVA : 2.4 26 AMPS: 8.7 28 30 CONNECTED LOAD 32 34 KVA : 11.8 36 AMPS: 14.2 38 DEMANDLOAD KVA : 11.8 40 42 AMPS : 14.2 NOTES/REMARKS: DEMAND I DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND 2, R RECEPTACLES -TO 10KVA 100% _ 3. REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% _ LM LARGEST MOTOR 125% _ L LIGHTING 125% _ K KITCHEN 65% - 0 OTHER 100% = 11.8 PANEL: LA PROJECT NAME: 455 ANDOVER PROJECT M LOCATION: TUKWILA, WA FED FROM: PNL HB VIA XFMR NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) PANEL DESCRIPTION 9 AMPI P R I H I M L K 0 TOTAL 1 SPARE A 20 1 PANEL AMPS : 200 3 SPARE B 20 1 FEEDER AMPS : 200 5 SPARE C 20 1 L-LVOLTS: 208 7 SPARE A 20 1 L -N VOLTS : 120 9 SPARE B 20 1 PHASE: 3 11 SPARE C 20 1 WIRE : 4 13 SPARE A 20 1 15 SPARE 1120 1 17 SPARE C 20 1 M.L.O. X 19 SPARE A 20 1 MAIN CB 21 SPARE B 20 1 FLUSH 23 SPARE C 20 11 SURFACE X 25 SPARE A 20 1 ISO GND 27 SPARE B 20 1 FEED-THRU 29 SPARE C 20 1 LOADSUMMARY - ( TOTAL, ALL SECTIONS) 2 SPARE A 20 1 REC KVA: 4 SPARE B 20 1 HEAT KVA 6 SPARE C 20 1 MOTOR KVA 8 SPARE A 20 1 LIGHTING KVA: 10 SPARE B 20 1 KITCHEN KVA 12 SPARE C 20 1 OTHER KVA 14 SPARE A 20 1 16 SPARE B 20 1 PHASE A KVA 18 ISPARE C 20 1 AMPS: 20 SPARE A 20 1 PHASE B KVA : 22 SPARE B 20 1 AMPS: 24 SPARE C 20 1 PHASE C KVA : 26 SPARE A 20 1 AMPS: 28 SPARE B 20 1 30 SPARE C 20 1 CONNECTED LOAD KVA: AMPS: DEMANDLOAD KVA: AMPS: NOTESIREMARKS : DEMAND I DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND R RECEPTACLES -TO 10KVA 100% _ 2, 3, REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% _ LM LARGEST MOTOR 125% _ L LIGHTING 125% _ K KITCHEN 65% _ 0 OTHER 100% _ PANEL: LB PROJECT NAME: 455 ANDOVER PROJECT #: LOCATION: TUKWILA, WA FED FROM: PNL HA VIA XFMR NOTE CKT NO. CIRCUIT NAME CB SIZE LOAD (KVA) PANEL DESCRIPTION 9 AMPI P R I H I M L K O TOTAL 1 REFER A 20 1 0.8 0.8 PANEL AMPS : 200 3 MICRO B 20 1 1.5 1.5 FEEDERAMPS : 200 5 DISHWASHER C 20 1 1.2 1.2 L - L VOLTS : 208 7 INSTAHOT A 20 2 1.2 1.2 L -N VOLTS : 120 g ... 13-- - 1.2 1.2 PHASE: 3 11 SPARE C 20 1 WIRE : 4 13 SPARE A 20 1 15 SPARE B 20 1 17 SPARE C 20 1 M.L.O. X 19 SPARE A 20 1 MAIN CB 21 SPARE B 20 1 FLUSH 23 SPARE Cl20 1 SURFACE X 25 SPARE A 20 1 ISO GND 27 SPARE B 20 1 FEED-THRU 29 SPARE C 20 1 LOAD SUMMARY ( TOTAL, ALL SECTIONS) REC KVA 2 REFER A 20 1 0.8 0.8 4 MICRO B 20 1 1.5 1.5 HEAT KVA 6 DISHWASHER C 20 1 1.2 1.2 MOTOR KVA 8 INSTAHOT A 20 2 1.2 1.2 LIGHTING KVA: 10 _-- B -- - 1.2 1.2 KITCHEN KVA : 7.0 12 SPARE C 20 1 OTHER KVA : 4.8 14 SPARE A 20 1 16 SPARE B 20 1 PHASE A KVA : 4.0 18 SPARE C 20 1 1 AMPS: 33.3 20 SPARE A 20 1 PHASE B KVA : 5.4 22 SPARE B 20 1 AMPS: 45.0 24 SPARE C 20 1 PHASE C KVA : 2.4 26 SPARE A 20 1 AMPS: 20.0 28 SPARE B 20 1 30 SPARE C 20 1 CONNECTED LOAD KVA: 11.8 AMPS: 32.8 DEMANDLOAD KVA: 9.4 AMPS: 26.0 NOTESIREMARKS : DEMAND / DIVERSITY FACTORS 1. LOAD DESCRIPTION DEMAND R RECEPTACLES -TO 10KVA 100% _ 2, 3, REMAINING OVER 10KVA 50% _ H HEATING 100% _ M MOTORS 100% _ LM LARGEST MOTOR 125% _ L LIGHTING 125% _ K KITCHEN 65% = 4.6 0 OTHER 100% = 4.8 MAIN BREAKER 211C w/GFPE (4) #3/OCu 2 1/211C (3) #3Cu #2Cu Grd (4) #4rd #4Cu. Grd PNL HA 277/480V 75 KVA PNL LA 7NEW 23PH 4WB XFMR IVIC1200,480V 42 SP 3PH, 4W 14, 173 12,335 #2 Grd ,866 200/3 15,652 5,009 f-% 118,268 200/3 2PNL HB 7/ 80V 200A MCB 3PH 4W 75 KVA XFMR PNL LB 1v UCOA 42 SP - 42 SP #3/0 Grd #2 Grd2 TO PSE XFMR 25,020 211C 1/211C (4) #3/OCu (3) #3Cu (4) #4/OCu #2Cu Grd #4Cu Grd (4) 311C (4) #350Cu #1/OCu Grd RISER DIAGRAM NOT TO SCALE SHORT CIRCUIT CALCULATIONS CIRCUIT DEFINITION CONDUCTOR CIRCUIT IMPEDENCE AVAILABLE MINIMUM DESCRIPTION CONDUIT # IN OHMS/MFT OHMS FAULT PANEL LENGTH MAT'L SIZE PARALLEL R X R X Z CURRENT RATING AVAILABLE FAULT CURRENT @ PSE VAULT 0.00000 0.01061 0.01061 26,100 FEEDER TO PANEL MDP 45 M 350 kCMIL CU 4 0.038 0.040 0.00043 0.00045 0.00062 (AIC SHOWN AT END OF FEEDER) 0.00043 0.01106 0.01107 25,020 FEEDER TO PANEL HA 130 M 3/0 CU 1 0.077 0.042 0.01001 0.00546 0.01140 (AIC SHOWN AT END OF FEEDER) 0.01044 0.01652 0.01954 14,173 FEEDER TO TRANSFORMER T-A 15 M 3 CU 1 0.250 0.059 0.00375 0.00089 0.00385 (AIC SHOWN AT END OF FEEDER) 0.01419 0.01741 0.02246 12,335 TRANSFORMER T-A IMPEDENCE @ 120 VOLTS 0.00266 0.00327 0.00421 75 kVA XFMR @ 3.5% Z 0.00420 0.01972 0.02016 AFC @ XFMR SECONDARY 0.00686 0.02299 0.02399 5,003 FEEDER TO PANEL LA 10 M 4/0 CU 1 0.063 0.051 0.00063 0.00051 0.00081 (AIC SHOWN AT END OF FEEDER) 0.00749 0.02350 0.02466 4,866 FEEDER TO PANEL HB 70 M 3/0 CU 1 0.077 0.042 0.00539 0.00294 0.00614 (AIC SHOWN AT END OF FEEDER) 0.00582 0.01400 0.01516 18,268 FEEDER TO TRANSFORMER T-B 15 M 3 CU 1 0.250 0.059 0.00375 0.00089 0.00385 (AIC SHOWN AT END OF FEEDER) 0.00957 0.01489 0.01770 15,652 TRANSFORMER T-B IMPEDENCE @ 120 VOLTS 0.00180 0.00279 0.00332 75 kVA XFMR @ 3.5% Z 0.00420 0.01972 0.02016 AFC @ XFMR SECONDARY 0.00599 0.02251 0.02330 5,151 FEEDER TO PANEL LB 10 M 4/0 CU 1 0.063 0.051 0.00063 0.00051 0.00081 (AIC SHOWN AT END OF FEEDER) 0.00662 0.02302 0.02396 5,009 NOTES TO CALCULATIONS: 1. CALCULATIONS ARE BASED ON OHMIC METHOD, 277 VOLTS LINE TO GROUND FAULT. 2. CONDUCTOR IMPEDANCE IS BASED ON NATIONAL ELECTRICAL CODE TABLE 9. 3. CONDUIT MATERIAL: M=MAG, N=NON-MAG Electrical Construction & Service 18133 NE 68th St., D120 Redmond, Washington 98052 Phone:425-454-3665 Fax:425-497-8700 www.prideelectric.com .- R!,TEP=-MAT 0 L1 chanicai ❑ Electrical Pt mbing [was Piping City of Tukwila REVISIONS No changes shall he mnde to the scope f of tvn-1 k withniat prior approval of i a Buti,dintg Divisi on. pion. ;S:'G:rm wiii require a new plan submittal and may include additional plan review fees. BILE Permit No, Ttf� 1 �4 0 Plan review approval is subject to errors and omissions. Approval of �ranstruction documents does not authorize tho violation of tiny adol4od code or ordinance. Receipt of approved Fiel dill ns is acknowledged: Date: City of Tukwila BUILDING DIVISION IIEVIEWED .FOR COMPLIANCE WITH NFPA 70 o NEC NOV 0 3 2015 City of Tukwila BUILDING DIVISION ■ Project Title: Electrical Design for: 455 ANDOVER 455 ANDOVER PARK E TUKWILA, WA RECEIVED CITY OF T"If"WILA OCT 2 2 2015 PERMIT CENTER Sheet Title: i � l Date: REV:10/22/2105 r X i°su€' t�`. 3y yt' - ii;, a.,, b st, `� n ( zn r - ,;?•r £ �t', tit; s� i i yf •'fz v ��: ri " {���`Y I��� � tg �� tint r„)g, ` 0) 3 0 0 N 0 0 U N U L a 0 0 0 0 a ill 0 D 0 d- N r-7 0 I 9 I -' TOTAL 4 THIS ELI A CI 1" = 20'-0" NORTH Type Exterior Light Fixture List A Kim Lighting EKG Fixture Arm Fixture Mounted on 25 foot pole, Platinum Silver, 700 mA, 4000K, 11,726 + Lumens, photo cell operated B Kim Lighting EKG Fixture Arm Fixture Mounted Concrete Wall at approx. 25' above paving, Platinum Silver, 700 mA, 4000K, 11,726 + Lumens, photo cell operated C Kim Lighting EKG Fixture Arm Fixture Mounted Concrete Wall at approx. 25' above paving, Platinum Silver, 700 mA, 4000K, 19,530 + Lumens, photo cell operated D Kim Lighting EKG Fixture Arm Fixture Mounted on 15/16 foot pole, Platinum Silver, 700 mA, 4500K, 11,726 + Lumens, photo cell operated with Kim Arche Type X Flood on pole, Wide Flood Pattern, 700mA, 4000K, 11,726 Lumens (verify), photo cell operated E Kim Lighting Wall Director WD14 under man door canopies at Northside, Platinum Silver, 700 mA, 4000K, 3,757 + Lumens, photo cell operated F Kim Lighting Wall Director WD14 under loading door and window canopies at Northside, Platinum Silver, 700 mA, 4000K, 6,328 + Lumens, photocell operated. G Copper Lighting Econ 303-132 Bollard, City Silver finish, 36 inch height, wide flood light, 700 mA, 4000k, 2078 + lumens, Edgelit Tempered Glass Lens i H Lights over south and west man doors— Hubbell 300E Series,18 watts,1204 Lumens, 5000k, Photo Cell controlled, Bronze finish. I Wall packs on south and west building elevations (replace existing fixture) — Hubbell Wall Pack Fixture at 25 feet above finish grade, PGM series, Glass Refractor, 700 mA,19,880 Lumens, 4000k, Photo Cell controlled, Bronze finish. J Front entry canopy— Cava Curved Closed Direct/Indirect pendent at 9'-6" AFF, 700mA, 4000k, 1000(?)Lumens Direct (verify with manufactures rep) and 2000 Lumens indirect 12 feet long, photo cell operated, with battery backup, Aluminum Finish, Closed End Cap K North entry canopy- Cava Curved Closed Direct/Indirect pendent at 9'-6" AFF, 700mA, 4000k, 1000(?)Lumens Direct (verify with manufactures rep) and 20DO Lumens indirect, 8 feet long, photo cell operated, with battery backup, Aluminum Finish, Closed End Cap. M-Recessed-Soffit Lights -Two per recess, Hubbell (Precolite)-Lighting, Wall Wash down Light, 6 Inch aperture LED fixture, White Reflector Trim, with lens, 700mA, 2000 lumens, 4000k, Photo cell operated. N Kim Lighting EKG Fixture Arm Fixture Mounted on 15/16 foot pole, Platinum Silver, 700 mA, 4500K, 11,726 + Lumens, photo cell operated REVIEWED KM COMPLIANCE WITH NFPA 70 - NIE'C NOV 0 3 2015 CitY of Tukwila BUILDING DIVI I('° m RECEIVED CITY OF TUKWILA SEP 3 0 2015