HomeMy WebLinkAboutCOW 2020-06-08 Item 3C - Discussion - 2020 Overlay and Repair OptionsCOUNCIL AGENDA SYNOPSIS
Initials
Meeting Date
Prepared 4
t Mayor's reviear
Council review
06/08/20
GL
ITEM INFORMATION
ITEMNO.
3.C.
STAFF SPONSOR: CYNDY KNIGHTON
ORIGINAL AGENDA DATE: 06/08/20
AGENDA ITEM TITLE Financial Impacts from COVID-19:
2020 Annual Overlay and Repair Program - Options for Partial Funding
CATEGORY ® Discussion
Mtg Date 06/08/20
❑ Motion
Mtg Date
❑ Resolution
Mtg Date
❑ Ordinance
Mtg Date
❑ Bid Award
Mtg Date
❑ Public Hearing
Mtg Date
❑Other
Mtg Date
SPONSOR ❑Council ❑Mayor ❑HR ❑DCD ®Finance ❑Fire ❑']S ❑P&R ❑Police ®PI ❑Court
SPONSOR'S Potential savings from five Capital Improvement Program projects could fund and construct
SUMMARY two sites of the fully designed 2020 Overlay & Repair Program, Sites F and G for $312,500.
Other decision points include the 30% design of the 42nd Ave S Bridge, painting the S 119tn
St Pedestrian Bridge in Allentown, TCC siding repairs, and the City Hall facilities/seismic
study, which will all be brought forward to Council for decisions in the future.
REVIEWED BY ® Trans&Infrastructure ❑ CommunitySvs/Safety ❑ Finance Comm. ❑ Planning/Economic Dev.
❑ LTAC ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm.
DATE: 06/01/2020 COMMITTEE CHAIR: C. DELOSTRINOS JOHNSON
RECOMMENDATIONS:
SPONSOR/ADNIIN. Public Works Department
COMMITTEE Unanimous Approval; Forward to Regular Consent Agenda
COST IMPACT / FUND SOURCE
EXPENDITURE, REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED
$0.00 $0.00 $0.00
Fund Source: 104 FUND ARTERIAL STREETS
Comments: pg 16, 2019 CIP
MTG. DATE
RECORD OF COUNCIL ACTION
06/08/20
MTG. DATE
ATTACHMENTS
06/08/20
Informational Memorandum dated 05/29/20
Overlay & Repair Engineer's Estimate & Map
Active 2020 Projects
Minutes from the Transportation & Infrastructure Committee meeting of 06/01/20
(Distributed separately)
35
36
City of Tukwila Allan Ekberg, Mayor
Public Works Department- Henry Hash, Director
INFORMATIONAL MEMORANDUM
TO:
Transportation and Infrastructure Committee
FROM:
Henry Hash, Public Works Director
Vicky Carlsen, Finance Director
BY:
Cyndy Knighton, Senior Program Manager
Scott Bates, Program Manager
CC:
Mayor Ekberg
DATE:
May 29, 2020
SUBJECT:
2020 Annual Overlay and Repair Program
Project No. 92010401 - Options for Partial Funding
ISSUE
Discussion on potential overlay options for 2020.
BACKGROUND
Every year road segments are identified for possible inclusion in the City's annual Overlay Program.
Tukwila uses a pavement management system (PMS) to rate the condition of the pavement, which is
the first step in identifying street segments for overlay. Using the pavement scores created in the PMS,
staff considers the pavement condition and preliminary cost to overlay, and frequency of ongoing
maintenance needs to develop a "long list" of potential projects for the next overlay cycle. Design of
the "long list" of selected projects is brought to 50% and, at that point, selection of the final list is
generally made based on funding availability for the highest priority segments. This year was no
exception to the standard process. Ten locations were fully designed, and the attached Engineer's
Estimate was developed.
The COVID-19 Pandemic has impacted the City's finances and many programs and projects are being
reduced or eliminated in 2020 to mitigate the City's revenue losses. Construction of the 2020 Annual
Overlay and Repair Program has currently been suspended. At the May 18, 2020 Transportation and
Infrastructure Committee (TIC) meeting, members requested staff develop options in the event that
partial funding became available.
DISCUSSION AND FINANCIAL IMPACT
Potential project savings identified in the table below could be reallocated for use in a truncated 2020
Overlay and Repair Program. Sites F and G on the Engineer's Estimate attachment are recommended
by staff for construction, should funds be allocated. Both 54th Avenue S and S 158th Street are in
immediate need of overlay restoration and service a high amount of traffic. The work would include
asphalt repair, fixing drainage runoff issues, upgraded ADA compliant ramps, and additional guardrail
to a portion of 54th Avenue S.
CIP Reallocation
First Priority Overlay Locations
15
Bridge Inspections 2020
$ 20,000
Site F: 54th Avenue S
(S 166th St to Slade Way) $
165,814
18 ADA Improvements 50,000
19 Annual Traffic Signal 62,500
22
Walk & Roll
75,000
Site G: S 158th St
(39th PI S to 42nd Ave S)
136,213
23 TIB Channelization Study 25,000
Use of Existing fund balance 80,000
Savin s
$ 312,500
Overlay Cost $
302,027
Contingency $
10,473
The second priority for Overlay is Site A: S 200th Street (Southcenter Parkway to Green River Bridge)
is estimated to cost $368,229. Sites B, C and D are not high -volume streets, or a high maintenance
demand compared to other sites.
https:l/tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/Agenda Items/TIC 06-01-2020/f. 2020 Overlay & Repair Options/INFO MEMO - 2020 Overlay Options.docx
37
INFORMATIONAL MEMO
Page 2
Reducing the budget for the projects listed in the table on the previous page will not cancel the projects,
only delay them until a later date, when funding is available.
Decision points for other capital protects
At the May 18, 2020 Transportation and Infrastructure Committee meeting, the status of capital
projects in the residential street, arterial street, and general government improvement funds were
reviewed. The analysis provided status updates on the projects listed in the table above as well as a
few others, including 42"d Ave S Bridge design, S 119th St Pedestrian Bridge painting, siding repair at
TCC, and the facilities study.
42nd Ave S Bridge: Council authorized funding of up to $1 million ($320k general fund, $680k solid
waste utility tax) for 30% design. There is a possibility that a federal infrastructure bill could include
funding for "shovel ready" projects. In order for this project to have the best chance of receiving
funding, the project would need to be at least 30% designed. The City expects to select a design
consultant later this summer to get to 30% design. Since funding for the highest priority areas for
overlay have been identified, staff is recommending that a decision on whether to fund this project or
redirect funds elsewhere, be delayed until the true cost of design is understood.
S 119th St Ped Bridge painting: Not funding this project will only delay the project, not cancel it. There
is a window of opportunity to paint the bridge due to weather and fish cycles. Removing funding for
this project will delay the project until at least 2021.
Siding repair at TCC: Siding repair for TCC has been listed as a project as early as 2018. When the
2019-2020 budget was drafted, the expectation was that $200k in siding and roofing repairs at TCC
would occur. Budget for this project is $120k and funding currently exists in the general government
improvement fund. Continuing to delay this project will only result in higher costs when the repair is
finally completed. Staff is recommending that TCC siding repair occur this year utilizing the existing
budget.
Facilities Study: This project is also funded out of the general government improvement fund and there
is currently adequate funding to complete Phases 1 and 2 for approximately $190k, as currently
proposed. The original request for this project was $300k, however, the final phase could be done at
a later date. By completing Phases 1 and 2 now, the City will have updated seismic information on
City Hall, 6300 building, TCC, and Fire Stations 53 and 54. These phases will also provide a facility
condition assessment and space planning at City Hall. The completion of the Justice Center will occur
in the next few months and many staff members who are currently located at City Hall and the 6300
building will be moving to the new facility, resulting in significant unused space in both buildings. By
completing Phases 1 and 2 now, it will position the City to make informed decisions on the best next
steps for the next phase of facility planning. Staff is recommending that phases 1 and 2 move forward
as planned.
RECOMMENDATION
Discussion only or possible recommendation for full Council for review for June 8 Committee of the
Whole meeting.
Attachments: Engineer's Estimate
2020 Overlay Cover
Active 2020 Projects
38 hitps://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/Agenda Items/TIC 06-01-2020/f. 2020 Overlay & Repair Options/INFO MEMO - 2020 Overlay Options.docx
City of Tukwila - Department of Public Works
2020 Overlay Program
Engineer's Estimate 90%
Project No. 19168 92010401
SCHEDULE A
SCHEDULE B P�SCHEDULE A
S 200th Street
S 126th Street
48th Ave S & S 109th Street
S 150th Street
54th Avenue S
5158th Street
5 150th St & 46th Ave S
South 148th St
(Southcenter Pkwy to
(East Marginal Way to
44th Ave S
(S 109th St, North to Dead End)
(46th Ave S, East to Dead
S 166th St to Slade
(39th PI 5 to 42nd Ave S)
53rd Ave S & Vicinity
Intersection
Green River Bridge)
37th Ave S)
(S 140th St to End)
&(47th Ave S to 48th Ave S
End)
Way)
Re -Route
Improvements
HMA Grind/Overlay: 3"
HMA Grind/Overlay: 2"
HMA Overlay: 2"
One -Way
Raised and Enhanced
Extra Grind Repair: 3"
HMA Grind/Overlay: 2"
3" CSTC Base (48th only)
HMA Grind/Overlay: 2"
HMA Grind/Overlay: 2"
HMA Grind/Overlay: 3"
Channelization
Crosswalk
Curb Ramp Install
Total Cost: $368,229
Total Cost: $92,455
Total Cost: $91,212
Total Cost: $71,753 =7Total
Cost: $98,698 11
Total Cost: $165,814
Total Cost: $136,213
Total Cost: $138,080
Total Cost: $103,384
Total Cost: $19,553
SiteA
Site B
Site C
Site D
Site E
Site F
Site G
Site H
Site I
Site J
Link to full spreadsheet http://records.tukwilawa.gov/WebLink/l/edoc/330628/TIC%202020-06-01%201tem%202F%20-%20Discussion%20-%202020%20Overlay%20and%20Repair%20Options.pdf
W
2020 OVERLAY PROGRAM
PROJECT NO.92010401
MARCH 2O20
MAYOR
ALLAN EKBERG
DIRECTOR OF PUBLIC WORKS
HENRY HASH
CITY ENGINEER
HARI PONNEKANTI, P.E.
SCHEDULE OF DRAWINGS
SHEET NO.
SHEET TITLE
SCHEDULE A
1
COVER
2 — 4
DETAILS
LEGEND
5
44TH AVE S
EXISTING:
6
S 109TH ST & 48TH AVE S
m
7
S 126TH ST
-9-
8
S 126TH ST RAMPS
9
S 150TH ST
10
S 150TH ST & 46TH AVE S IMPROVEMENTS
O
11 — 12
RRFB AND WMINAIRE PLANS & DETAILS
14
S 158TH ST
°
Q
15
S 158TH ST RAMPS
16 — 17
54TH AVE S
18 — 19
S 200TH ST
20
S 200TH ST RAMPS
21
S 148TH ST CURB RAMP (3438 S 148TH ST)
_
SCHEDULE B
— — — —
22 — 23
53RD AVE S RE—ROUTE IMPROVEMENTS
24
CURB RAMP DETAILS
25
DRIVEWAY DETAILS
26
53RD AVE S & VICINITY DETAILS
'J111"0011LN10
DE'SEAN QUINN, PRESIDENT
VERNA SEAL
KATHY HOUGARDY
KATE KRULLER
THOMAS MCLEOD
ZAK IDAN
CYNTHIA DELOSTRINOS JOHNSON
PROPOSED:
WATER VALVE
THICKENED EDGE
GAS VALVE
FIRE HYDRANT
PAVEMENT REPAIR
TELEPHONE MANHOLE
FIBER OPTIC MANHOLE
HMA OVERLAY
POWER POLE
HMA PAVEMENT SECTION
MONUMENT
SANITARY SEWER
CRUSHED GRAVEL
WATER METER
CATCH BASIN
0
CEMENT CONIC. PAVEMENI
TREE
BUTT JOINT OR EDGE PLf
CRUSHED GRAVEL
-- --
SAWCUT
CEMENT CONC. PAVEMENT
INLET PROTECTION PER A
VEGETATION
STD PLAN 1-40.20-00
FENCELINE
ROW LIMITS
PROPERTY LINE
TH AVE S
i & S 137TH ST
EDULE B)
LAY & 46TH AVE S
)VEMENTS
T
Q
7
F
IL
m
}
F
V
by dare
°�"`�" 9 PUBLIC WORKS DL�PT _ a3 °� aM ° °° KPG p 2020 OVERLAY PROGRAM
o �9 d2 MICE 03/2020 1—disciplinary Design BID
z *ENGINEERING*STREETS*WATER*SEWER* checked NJD 030M 3131EIdAva 2'A2kAenonA" 24
Y o en Sum iamM, WA .
�'tls ,�° sean*,wAs31n �es3lsnmso DOCUMENTS file no 1slsecov.Dwc
co'dic Ia3s1zeslMo COVER scale r=aa
field bk no o dare revisions date s3rzszs ,
Project
Fund No. Project
2020 CIP Projects
103, 104, & 303 Funds
A B C D E F G H I
Grant/ 2020 Phase 1 & II 103 Fund
City Funding Dedicated Rev Expenditures Committed Reductions Balance Policy Decision Council
Status Funding 2020 Budget Funding to Date for 2020 5/11/2020 Reduction Go/No Go? Decision
103 Fund - Residential Streets
1 103
99410303
42nd Ave S Phase III
Physically completed, final payments
City
$ 378,000
$ 24,102
$ 353,898
2 103
99110301
53rd Ave
Utility undergrounding, Comcast next
Grant Funded
399,000
120,140
278,860
3 103
Various
(3) Safe Routes to School Projects
Not started, seeking grants, no $ to date
Grant Funded
$ 5,301,000
4 103
81930301
Traffic Calming
On hold due to negative fund balance
City
400,000
9,564
53,504
$ 350,000
5 103
Interfund Loan Repayment
Covers SCL expenditures for 42 & 53
City
336,932
Total 103 Fund $ 1,177,000
104 Fund - Arterial Streets
$ 153,806
$ 1,023,194
$ 350,000
6 104 104 Wages & Benefits Ongoing staff expenses Ciry $ 485,383
$ 93,471 $ 391,912
7 104
98610403
Strander Blvd Extension
Closed, final 2020 grant reimbursement
City
147,362
$ 475,000
622,362
8 104
99310410
West Valley Hwy
Design funds only, underway
Grant Funded
600,000
60,237
539,763
9 104
91310407
BAR Bridge over Airport Way
Construction awarded 5/4/20
Grant Funded
2,614,000
17,861
2,596,139
30 104
91810404
42nd Ave S Bridge Replacement
In-depth bridge inspection
City
39,884
39,884
104
91810404
42nd Ave S Bridge Replacement
30% Design proposals due 5/19/20
City/WM tax
Grant Funded
320,000
-
680,000
$ 1,000,000
12 104
9030404
S 144th St Bridge - Sidewalks
Not started, seeking grants, no $ to date
227,000
13 104
92010401
Overlay & Repair 2020
Design underway, ready to bid, on hold
City
1,400,000
128,453
71,547
$ 1,200,000
14 104
82010403
Traffic Counts 2020
Ongoing, contract began 1/1/20
City
18,750
3,300
15,450
15 104
92010402
Bridge Inspections 2020
4legally required bridge inspections
City
196,000
93,000
2,252
49,444
20,000
16 104
91710406
S 196th St/200th St Br Repair
Completed, retainage to be paid
City
1,304
16,000
17 104
91610407
S 119th St Pedestrian Bridge
Painting of pedestrian bridge on hold
City
200,000
18 104
91510405
ADA Improvements
ADA ramps at 53, 58, on hold w/ Overlay
Ciry
50,000
50,000
19 104
82010404
Annual Traffic Signal
Ongoing, reduced by 50%, deferred maint.
City
125,000
2,549
59,951
62,500
20 104
11301302
Wetland & Envir Mitigation
Ongoing, required by permit
City
40,000
16,219
23,781
21 104
82010405
Transp Element of the Comp Plan
Not started, required by GMA, due by 2021
City
400,000
400,000
22 104
82010406
Walk & Roll
Update not started, on hold
City
75,OG0
75,000
23 104
81730404
TIB Channelization Study
Study completed, $25k balance remaining
City
25,000
25,000
24 304
Park Impact Fees Transfer [0 301
Housekeeping transfer from 304 to 301
City
1,009,000
1,009,000
Total 104 Fund $ 4,331,379 $ 4,462,000
303 Fund - Facilities
$ 325,646
$ 5,835,232
$ 1,200,000
$ 1,432,500
25 Beginning Fund Balance Drawdown offund balance $ 656,000
27 303
91930304
6300 Dry Fire Sprinkler System
Completed
City
30,000
$ 30,000
28 303
91630305
TCC Siding Repairs
Not started, 2 quotes received in 2019
City
200,000
$ 120,000
303
91630305
TCC Siding Repairs -Savings
Savings from bids
City
80,000
303
91630304
City Hall Siding Repairs
No started
Ciry
100,000
$ 100,000
29 303
82030301
2020 Facilities Study/Seismic
RFPs in, not started
City
300,000
110,000
190,000
Total 303 Fund
$ 630,000
$ 30,000
$
$ 210,000
$ 390,000
Total 1 $ 1,822,500
Lines 3 & 12, not added in totals as completely grant funded and no grants to date.
Dedicated revenues include REET, Parking tax, & MVFF
Grant funded
Line 11, Solid Waste Utility tax revenue may be reduced due to COVID-19
a• ro�k.�a...>rereao i_,on✓sm, we �w.kv. a ,•n,v�snarea oxure.nu�xow 420 "-