HomeMy WebLinkAboutRes 1993 - 2021-2026 Transportation Improvement ProgramA RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF TUKWILA, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM (2021-
2026), AND DIRECTING THE SAME TO BE FILED WITH
THE STATE SECRETARY OF TRANSPORTATION AND
THE TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, the
City Council of the City of Tukwila has previously adopted a Transportation Improvement
Program and thereafter periodically modified said Transportation Improvement Program
by resolution; and
WHEREAS, the City Council has reviewed the work accomplished under said
program, determined current and future City street and arterial needs and, based upon
these findings, has prepared a Six -Year Transportation Improvement Program for the
ensuing six calendar years (2021-2026); and
` WHEREAS, on June 22, 2020, a public hearing was held regarding the City's Six -
Year Transportation Improvement Program;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA,
WASHINGTON, HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. A Six -Year Transportation Improvement Program
for the calendar years 2021 to 2026, attached hereto as Exhibit A, is hereby adopted.
Section 2. Filing of Program. The City Clerk is hereby authorized and directed to
file a copy of this resolution, together with the exhibit attached hereto, with the Secretary
of Transportation and the Transportation Improvement Board of the State of Washington.
WALegislative Development\TIP 2021-2026 5-20-20
CK:bjs Review and analysis by Barbara Saxton Page 1 of 2
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at
a Regular Meeting thereof this 4o- day of 12020.
ATTEST/AUTHENTICATED:
...... .... .... ...
Christy OFlaherty, MMC, City Clerk
APPROVED AS TO FORM BY:
Office of the City Attorney
b� e'S ef'Qui'nn, Council President
�
Filed with the City Clerk:
Passed by the City Council:
Resolution Number: I
Exhibit A: City of Tukwila Six -Year Transportation Improvement Program for 2021 to 2026
WALegislative DevelopmenATIP 2021-2026 5-20-20 Page 2 of 2
CK:bjs Review and analysis by Barbara Saxton
te
Washington of Tr Six Year Transportation Improvement Program
Department of Transportation
From 2021 to 2026
Agency: Tukwila
County: King
MPOIRTPO: PSRC Y Inside N Outside
m
�
a
�
o
A
p
O
-n
=
A. PIN/Project No. B. STIP ID
D
H
0
m
o
'
m
c
C. Project Title
S
3
=_
c1
D. Road Name or Number
m
c
a
o
r
m
1D
m
c
E. Begin &End Termini
vo
3
'
-r
o
1
c
m m
F. Project Description G. Structure ID
c
T
o
m
C
c
05
TUK-62
06/22/20
07/06/20
1993
11
0.100
DCE
Yes
42nd Ave S Bridge Replacement
42nd Ave S over he Duwamish River at the intersection with Interurban Ave S
Interurban Ave S to Northern end of bridge
Replace the existing 42nd Ave S steel truss bridge. The replacement would require
preliminary engineer design, right-of-way, and construction phases. The new
structure would meet current road and bridge design standards. The replacement
structure configuration would be two through lanes, possibly a turn pocket, and
include sidewalks.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2021
0
0
500,000
500,000
P
PE
2022
STP
1,500,000
0
234,000
1,734,000
P
RW
2023
0
0
30,000
30,000
P
CN
2023
0
0
250.000
250,000
P
CN
2024
STP
3,000,000
0
468.200
3,468,200
P
CN
2024
BR
12.500,000
0
2,950,800
15,450,800
Totals
17,000,000
0
4,433,000
21,433,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
500,000
1,734,000
0
0
0
RW
0
0
30,000
0
0
CN
0
0
250.000
9,460,000
9,459,000
Totals
500,000
1,734,000
280,000
9,460,000
9,459,000
Report Date: June 23, 2020 Page 1
Alft
VTWashington State
AF DePartment of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
m
v
3
'
o
v
m
=
A. PIN/Project No. B. STIP ID
D
m
°
<
c
1
'
A
C. Project Title
3
°
c
3
=
°
3
°.
c
D. Road Name or Number
➢
D
Na
E. Begin &End Termini
v°
3
'
-�
o
y d
F. Project Description G. Structure ID
a
o
v
0.
n
v
c,
m
19
WA-1111£
06/22/20
07/06/20
.'°
1993
°
05
w
0.370
m
o-
Yes
461h Avenue Safe Routes to School
46th Avenue S
S 150th Street to S 144th Street
Design and construct curb, gutter and sidewalk on the west side of 46th Avenue S,
including curb bulb -out at the SE comer of 46th Avenue S/S 144th Street with raised
crosswalk across S 144th Street with RRFB.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
SRTS
180,000
90,000
270.000
P
RW
2022
0
SRTS
232,000
24,000
256,000
P
CN
2023
0
SRTS
1,865.000
205,000
2,070,000
Totals
0
2,277,000
319,000
2,596,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
270,000
0
0
0
RW
0
256,000
0
0
0
CN
0
0
2,070,000
0
p
Totals
0
526,000
2,070,000
0
0
Report Date: June 23, 2020 Page 2
PartmtentofTansportation Six Year Transportation Improvement Program
From 2021 to 2026
Agency: Tukwila
County: King
MPO/RTPO: PSRC Y Inside N Outside
v
3
m
�
o
M
v
'o
-
0
-n
=
A. PIN/Project No. B. STIP ID
D
0
a
m
+
o
'
�
c
C. Project Title
3
5.
g
°
0
D. Road Name or Number
=
a
°
'
;a
Ha
E. Begin &End Termini
°
v°
3
'
-t
o
c
N m
!;
F. Project Description G. Structure ID
S
o.
c
v
Q
m
a
m
00
WA-05405
06/22/20
07/06/20
1993
p
06
N
S
0
C.
No
Americans with Disabilities Act (ADA) Improvements
Various locations
to
Design and construct ADA compliant upgrades to City infrastructure in conjunction
with a City developed plan.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds J
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2021
0
01
1,200,0001
1,200,000
Totalsl
0
0
1,200,000
1,200,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
200,000
200,000
200,000
200,000
400,000
Totals
200,000
20D,000
200,000
200,000
400,000
Report Date: June 23, 2020 Page 3
PartmtentofTransprortation Six Year Transportation Improvement Program
From 2021 to 2026
Agency: Tukwila
County: King
MPO/RTPO: PSRC Y Inside N Outside
m
o
o
-n
=
q
A. PIN/Project No. B. STIP ID
D
m
o
c
=
o
C. Project Title
n T,
c
D. Road Name or Number
=
D
o.
T
O
m M
a
E. Begin &End Termini
m
v°
Q.
3
0'
-t
o
m m
F. Project Description G. Structure ID
o,
o
fO
a
ro
16
WA-07746
06/22/20
07/06/20
.�'.
1993
D
03
0
C G O P S
S
D
No
TW
Andover Park E/Minkler Blvd Intersection
Andover Park E
Minkler Blvd to
Construct left turn lanes on Andover Park East and reconstruct traffic signal
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
0
134,000
134,000
P
RW
2022
0
0
10,000
10,000
P
CN
2023
0
0
1,570,000
1,570,000
Totals
0
0
1,714,000
1,714,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
134,000
0
0
0
RW
0
10.000
0
0
0
CN
0
0
1,570,000
0
0
Totals
0
144,000
1,570,000
0
p
Report Date: June 23, 2020 Page 4
AM
Wash
on
Department
Six Year Transportation Improvement Program
Rep�rtmerlt of T�srnsportatiarr
From 2021 to 2026
Agency: Tukwila
County: King
MPO/RTPO: PSRC Y Inside N Outside
m
o
A
o
'o
n
=•
A. PIN/Project No. B. STIP ID
D
°^
°
m
-t
°
'
;U
c
C. Project Title
3
g
=_
'
n
D. Road Name or Number
a
'
`
m
m
c
E. Begin & End Termini
a°
3
'
1
0
M
c,
v, m
',
F. Project Description G. Structure ID
(a
c
o
m
CL
m
a
14
WA-03731
06/22/20
07/06/20
1993
06
No
Annual Bridge Inspections and Repairs
Various City Street
to
Perform load ratings and bi-annual inspections as well as construct necessary
repairs and maintenance
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2021
0
01
2,380,0001
2,380,000
Totals
0
01
2,380,0001
2,380,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
335,000
335,000
405,000
405,000
900,000
Totals
335,000
335,0001
405,000
405,0001
900,000
Report Date: June 23, 2020 Page 5
— Depart entof1rr Six Year Transportation Improvement Program
�f Washington
hingerrt of Tr alsporialian
From 2021 to 2026
Agency: Tukwila
County: King
MPO/RTPO: PSRC Y Inside N Outside
m
T
v
<
0
m
A. PIN/Project No. B. STIP ID
D
0
°
<
°
3
C. Project Title
3
3
=
c12
c
D. Road Name or Number
a
°
'
M
a
o
E. Begin &End Termini
m
'o
3
i
c
1
v w
10F.
Project Description G. Structure ID
o,
o
v
@
S°
a
m
16
WA-03733
06/22/20
07/06/20
1993
P
06
N
C G O P S
T
W
O.
No
TW
Annual Overlay and Repair Program
Various City Streets
to
Repair, rehabilitate, and overlay City streets as needed in an annual program
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
I Total Funds
S
ALL
2021
0
0
11,800,000
11,800,000
Totals
0
0
11,800,000
11,800,000
Expenditure Schedule
Phase
1st
2nd
I 3rd
4th
5th & 6th
ALL
1,850,000
1,850,0001
1,950.000
2,050.000
4,100,000
Totals
1,850,000
1,850,0001
1,950,000
2,050,000
4,100,000
Report Date: June 23, 2020 Page 6
Aft
TUWashington State
Department of Transportation
Agency: Tukwila
County: King
MPOIRTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
v
3
m
`
v
o'
m
`
A. PIN/Project No. B. STIP ID
D
m
°
m
c
=
i
°
°
X
C. Project Title
3
B
00
c
D. Road Name or Number
a
�
q
m
a
E. Begin 8 End Termini
°;
v°
3
°
-i
o
0 EL
F. Project Description G. Structure ID
a
T
o
00
WA05409
06/22/20
07/06/20
1993
08
EIS
No
BNSF Regional Center Access
New Facility
to
Construct a new access to the BNSF Regional Distribution Center, relocating the
900+ daily truck trips from residential streets in Allentown.
Funding
Status
Phase
Phase Start Year (YYYY)
FFederal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2026
101
01
100,000
100,000
Totals
01
0
100,000
100,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
01
0
0
100,000
Totals
01
01
0
0
100,000
Report Date: June 23, 2020 Page 7
Washington State Department of Transportation Six Year Transportation Improvement Program
From 2021 to 2026
Agency: Tukwila
County: King
MPO/RTPO: PSRC Y Inside N Outside
m
�
a
�
O
7]
p
-n
—•
�
A. PIN/Project No. B. STIP ID
D
'°"
°
m
-
—t
°
°
m
M
C. Project Title
3
3
0 n
c
D. Road Name or Number
a
`�
61
m
m
o
E. Begin &End Termini
v
3
'
.%.
i
o
c
H m
F. Project Description G. Structure ID
n
c
v
m
00
WA-1111'
06/22/20
07/06/20
1993
D
28
N
S
0.140
D
DCE
C.
No
Green River Trail
Green River Trail
Christensen Road to Green River
Replace the existing 8-Toot wide Green River Trail with 12-foot wide concrete paved
trail with 2-foot gravel shoulders, including illumination, CCTV, wayfinding, and
pedestrian plaza.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
ALL
2022
0
Ped/Bike Program
1,146,000
128,000
1,274,000
Totalsl
0
1,146,0001
128,000
1,274,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
ALL
74,000
1,200,000
0
01
0
Totals
74,000
1,200,000
0
0
0
Report Date: June 23, 2020 Page 8
Adffjk
Wash
tate
v7v— Depar rnent fTr Six Year Transportation Improvement Program
�J Department of Transportation
From 2021 to 2026
Agency: Tukwila
County: King
MPO/RTPO: PSRC Y Inside N Outside
m
o
;U
o'
-n
—
A. PIN/Project No. B. STIP ID
D
m
°
c
°
°
m
M
C. Project Title
B
T
B
=
m
c
D. Road Name or Number
=
a
D
f
EL
A
0
w
a
E. Begin 8 End Termini
I
v°
3
'
-t
o
F. Project Description G. Structure ID
m'
o•
o
a
m
fO
a
m
17
WA-1111t
06/22/20
07/06/20
1993
.
04
0
0.350
.
DCE
a
No
Macadam Rd S Complete Streets Project
Macadam Road
S 1501h Street to S 144th Street
Design and construction of a complete street on Macadam Road. Road widening
and rechannelization to add 5-foot bike lanes and 5-foot sidewalks on both sides of
the roadway. Includes illumination, curb, and storm drainage.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2022
0
Ped/Bike Program
360,000
40.000
400.000
P
RW
2022
0
Ped/Bike Program
90,000
10,000
100,000
P
CN
2023
0
Ped/Bike Program
2,800,000
300,000
3,100,000
Totals
0
3,250,000
350,000
3,600,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
400,000
0
0
RW
0
0
100,000
0
0
CN
0
0
0
3,100,000
0
Totals
0
0
500,000
3,100,000
p
Report Date: June 23, 2020 Page 9
Washington State
Department of Transportation
Agency: Tukwila
County: King
MPOIRTPO: PSRC Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
m
�
3
�
m
�•
A. PIN/Project No. B. STIP ID
9
o
v
<
c
0
o
3
C. Project Title
3
j
3
T
c
D. Road Name or NumberCL
3
?
A
m 0
3
E. Begin & End Termini
m
°o
Q.
0
m
°—
H m
F. Project Description G. Structure ID
n
o
v
C
S.
14
WA•09873
06/22/20
07/06/20
1993
m
04
m
C G P S T
0.100
m
DCE
c
Yes
W
S 140th St Intersection Improvements
S 140th Street
Tukwila International Blvd to
Design and construct a new traffic signal at the S 140th Slreet[Tukwila International
Blvd intersection
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
P
PE
RW
2023
2023
0
0
0
0
150.000
50,000
150,000
50,000
P
CN
2024
0
0
1,200,000
1,200,000
Totals
0
0
1,400,000
1,400,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
0
0
150,000
0
0
RW
0
0
50,000
0
0
CN
0
0
0
1,200,000
0
Totals
0
0
200,000
1,200,000
p
Report Date: June 23, 2020 Page 10
AM
Washington State Six Year Transportation Improvement Program
Department of Transportation
From 2021 to 2026
Agency: Tukwila
County: King
MPO/RTPO: PSRC Y Inside N Outside
m
�
a
�
o
c
o
-n
=
A. PIN/Project No. B. STIP ID
D
vD
°
`m
c
°
m
C. Project Title
3
3
=
n
c
D. Road Name or Number
a
c
°'
°
m
v
E. Begin & End Termini
m
•°0
3
'
-1
0
M
c,
an d
F. Project Description Structure IDo.
o
CL
w
c
17
WA03782
06/22/20
07/06/20
1993
28
0,250
No
S 1441h St Bridge Sidewalks
S 144th Street
51st Ave S to 53rd Ave S
Widen existing sidewalks on bridge over 1-5 between 51s1 Ave S and 53rd Ave S
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
P
PE
2023
SRTS
400,000
01
43,000
443,000
Totals
400,000
0
43,000
443,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
Sth & 6th
PE
0
0
443,000
p
p
Totals
0
0
443,000
p
0
Report Date: June 23, 2020 Page 11
Washington State
Department of Transportation
Agency: Tukwila
County: King
MPO/RTPO: PSRC
Six Year Transportation Improvement Program
From 2021 to 2026
Y Inside N Outside
m
v
3
`
�•
v
A. PIN/Project No. B. STIP ID
D
`
c
-t
°
'
X
`e
Z
C. Project Title
m
3
=
m
c
D. Road Name or Number
x
D
m
.z
a
A
m M
c
E. Begin &End Termini
v°
3
-r
0
EL
i
S.
m m
F. Project Description G. Structure ID
c
n
o
v
M
°
'm
19
WA-1111,
06/22/20
07/06/20
1993
m
05
m
S
0.300
m
a
No
S 152nd Street Safe Routes to School
S 152nd Street
Tukwila International Blvd to 42nd Avenue S
Design and construct curb, gutter and sidewalks on both sides including widening
pavement width by 3 feet to construct on -street parking lane on north side of street.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
PE
2021
0
0
369,000
369,000
P
CN
2022
0
SRTS
2,340,000
260,000
2,600,000
Totals
0
2,340,000
629,000
2,969,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
5th & 6th
PE
369,000
0
0
0
0
CN
0
2,600,000
0
0
0
Totals
369,000
2,600,000
0
0
0
Report Date: June 23, 2020 Page 12
AM k—
Washington State
Department of Transportation
Agency: Tukwila
County: King
MPOIRTPO: PSRC Y Inside
Six Year Transportation Improvement Program
From 2021 to 2026
N Outside
m
`
v
4
-n
A. PIN/Project No. B. STIP ID
D
°
`m
+
°
'
3
C
c
C. Project Title
D
3
3
=
m
n
D. Road Name or Number
x
°
o•
m
R
�
0
H =
v
E. Begin &End Termini
m
v°
3
'
—q
a
i
c•
m m
F. Project Description G. Structure ID
a
a
a
00
TUK-63
06/22/20
07/06/20
1993
24
N
s
0.000
m
a
No
South King County Regional TDM for Centers and Corridors
South King County
Various to Various
The project will focus on providing TDM services at selected activity centers (e.g.
business parks, commercial and residential multi -tenant buildings, educational
institutions) and/or congested corridors in Tukwila, Renton, SeaTac, and Kent to
reduce drive alone travel and traffic congestion in south King County. A key strategy
will include the development of partnerships with embedded organizations in the
communities we are serving to facilitate more effective outreach and improve long-
term program outcomes.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
ALL
2021
0
OTHER
132.750
15,000
147,750
P
ALL
2021
CMAQ
450,000
OTHER
1,029,860
0
1,479,860
Totals
450,000
1,162,610
15,000
1,627,610
Expenditure Schedule
Phase
1st
2nd
3rd
4th
Sth & 6th
ALL
352,100
312,1001
444,600
357.1001
161,700
Totals
352,100
312,100
444,600
357,1001
161,700
Report Date: June 23, 2020 Page 13
Aft
Wo Washington State Department of TransportationSix Year Transportation Improvement Program
From 2021 to 2026
Agency: Tukwila
County: King
MPO/RTPO: PSRC Y Inside N Outside
T
v
m
<
-n
A. PIN/Project No. B. STIP ID
C.
D
1D
N
0
�
c
o
o
c
Project Title
D
0
rD
3
_
D. Road Name or Number
x
NM
Cr
E. Begin & End Termini
vo
3
-q
0
0
c.
N m
F. Project Description G. Structure ID
o.
0
a
a
C
14
TUK-60
06/22/20
07/06/20
1993
m
28
w
T
0,170
m
DCE
a
No
West Valley Highway/Longacres Way Shared Use Pathways
SR 181 & Longacres Way
W end of planned Green River Bridge to Longacres Way
Improvements will be completed on SR 181 from the west end of the planned Green
River non -motorized Bridge to Longacres Way, including a 12-14 ft. separated
shared use path with a 5 ft. landscaped buffer strip on the west side of the highway.
Design -only will be completed for future improvements on Longacres Way between
SR 181 to the Tukwila Sound Transit Link Station.
Funding
Status
Phase
Phase Start Year (YYYY)
Federal Fund Code
Federal Funds
State Fund Code
State Funds
Local Funds
Total Funds
S
CN
2021
0
TIB
2,179,0001
1,016,0001
3,195,000
Totals
0
2,179,0001
1,016,0001
3,195,000
Expenditure Schedule
Phase
1st
2nd
3rd
4th
Sth & 6th
CN
3,195,000
0
0
0
0
Totals
3,195,000
0
0
0
0
Federal Funds State Funds I Local Funds I Total Funds
Grand Totals for Tukwila 17,850,000 12,354,6101 25,527,0001 55,731,610
Report Date: June 23, 2020 Page 14
Christy O'Flaherty
From:
Christy O'Flaherty
Sent:
Monday, July 20, 2020 2:08 PM
To:
'G regA@TI B.wa.gov'
Cc:
Cyndy Knighton
Subject:
Tukwila Transportation Improvement Program 2021-2026
Importance: High
July 20, 2020
TO: TRANSPORTATION IMPROVEMENT BOARD
RE: CITY OF TUKWILA 2021-2026 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #1993 passed July 6, 2020, adopting the Transportation
Improvement Program for 2021-2026.
• +1111111111 1111111111111111•
Please contact me with any questions at 206 433-1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC, Records Governance Manager/City Clerk
xc: Cyndy Knighton, Transportation Engineer
i
Christy O'Flaherty
From: Christy O'Flaherty
Sent: Monday, July 20, 2020 2:11 PM
To: Andi Markley
Cc: Cyndy Knighton
Subject: Tukwila Transportation Improvement Program 2021-2026
Importance: High
July 20, 2020
TO: PUGET SOUND REGIONAL COUNCIL
RE: CITY OF TUKWILA 2021-2026 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #1993 passed July 6, 2020, adopting the Transportation
Improvement Program for 2021-2026.
Please contact me with any questions at 206 433-1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC, Records Governance Manager/City Clerk
xc: Cyndy Knighton, Transportation Engineer
1
Christy O'Flaherty
From: Christy O'Flaherty
Sent: Monday, July 20, 2020 2:13 PM
To: millarr@wsdot.wa.gov'
Cc: Cyndy Knighton
Subject: Tukwila Transportation Improvement Program 2021-2026
Importance: High
July 20, 2020
TO: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
RE: CITY OF TUKWILA 2021-2026 TRANSPORTATION IMPROVEMENT PROGRAM
Following is a link to City of Tukwila Resolution #1993 passed July 6, 2020, adopting the Transportation
Improvement Program for 2021-2026.
Please contact me with any questions at 206 433-1855.
Please respond to this email to ensure it was received satisfactorily. Thank you.
Sincerely yours,
Christy O'Flaherty, MMC, Records Governance Manager/City Clerk
xc: Cyndy Knighton, Transportation Engineer
1