Loading...
HomeMy WebLinkAboutPermit D16-0077 - A-AMERICA - STORAGE RACKSA -AMERICA 18200 OLI'MPIC AVE S D16-0077 Parcel No: Address: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206-438-9350 Web site: http://www.TukwilaWA.eov DEVELOPMENT PERMIT 7888900162 Permit Number: D16-0077 18200 OLYMPIC AVE S Project Name: A -AMERICA Issue Date: 9/21/2016 Permit Expires On: 3/20/2017 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: CPF KENT VALLEY LLC 100 WILSHIRE BLVD #700 , SANTA MONICA, WA, 90401 DAVID NORRIS 3500 W VALLEY HWY N - SUITE 8102 , AUBURN, WA, 98001 RAYMOND HANDLING CONCEPTS CORP 4140 BOYCE RD , FREMONT, CA, 94538 RAYMOHC034KB RAYMOND HANDLING CONCEPTS CORP 4140 BOYCE RD , FREMONT, CA, 94538 Phone: (206) 465-6208 Phone: (253) 333-2109 Expiration Date: 10/5/2017 DESCRIPTION OF WORK: HIGH PILE STORAGE RACK INSTALLATION FOR ADDITIONA INVENTORY AND DEADSTOCK Project Valuation: $16,000.00 Type of Fire Protection: Sprinklers: YES Fire Alarm: YES Type of Construction: IIIB Electrical Service Provided by: TUKWILA Fees Collected: $691.14 Occupancy per IBC: S-1 Water District: TUKWILA Sewer District: TUKWILA Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International Fuel Gas Code: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2014 2014 2014 2015 Public Works Activities: Channelization/Striping: Curb Cut/Access/Sidewalk: Fire Loop Hydrant: Flood Control Zone: Hauling/Oversize Load: Land Altering: Volumes: Cut: 0 Fill: 0 Landscape Irrigation: Sanitary Side Sewer: Number: 0 Sewer Main Extension: Storm Drainage: Street Use: Water Main Extension: Water Meter: No Le ICO Permit Center Authorized Signature: ILe Date: " !� 1 hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Name: /\{ CA) ) )11 r -s, This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Date: 1 2 H �D PERMIT CONDITIONS: 1: ***BUILDING PERMIT CONDITIONS*** 2: Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in accordance with the approved construction documents shall be resubmitted for approval. 3: All permits, inspection record card and approved construction documents shall be kept at the site of work and shall be open to inspection by the Building Inspector until final inspection approval is granted. 4: When special inspection is required, either the owner or the registered design professional in responsible charge, shall employ a special inspection agency and notify the Building Official of the appointment prior to the first building inspection. The special inspector shall furnish inspection reports to the Building Official in a timely manner. 5: A final report documenting required special inspections and correction of any discrepancies noted in the inspections shall be submitted to the Building Official. The final inspection report shall be prepared by the approved special inspection agency and shall be submitted to the Building Official prior to and as a condition of final inspection approval. 6: All construction shall be done in conformance with the Washington State Building Code and the Washington State Energy Code. 7: All rack storage requires a separate permit issued through the City of Tukwila Permit Center. Rack storage over 8 -feet in height shall be anchored or braced to prevent overturning or displacement during seismic events. The design and calculations for the anchorage or bracing shall be prepared by a registered professional engineer licensed in the State of Washington. Periodic special inspection is required during anchorage of storage racks 8 feet or greater in height. 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 12: The total number of fire extinguishers required for an ordinary hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 1,500 sq. ft. of area. The extinguisher(s) should be of the "All Purpose" (3A, 40B:C) dry chemical type. Travel distance to any fire extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 5.4) 10: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand- held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand-held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 11: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 13: Maintain fire extinguisher coverage throughout. 15: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide. (NFPA 13-8.6.5.3.3) 14: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2436). 18: Maintain fire alarm system audible/visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible/visual notification devices. (City Ordinance #2437) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2437) (IFC 901.2) 19: Clearance between ignition sources, such as light fixtures, heaters and flame -producing devices, and combustible materials shall be maintained in an approved manner. (IFC 305.1) 20: Where storage height exceeds 15 feet and ceiling sprinklers only are installed, fire protection by one of the following methods is required for steel building columns located within racks: (a) one-hour fire proofing, (b) sidewall sprinkler at the 15 foot elevation of the column, (c) ceiling sprinkler density minimums as determined by the Tukwila Fire Prevention Bureau. (NFPA 13-16.1.4) 21: Storage shall be maintained 2 feet or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches below sprinkler head deflectors in sprinklered areas of buildings. (IFC 315.3.1) 22: Flue spaces shall be provided in accordance with International Fire Code Table 3208.3. Required flue spaces shall be maintained. 16: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2436 and #2437) 23: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 24: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575-4407. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 1700 BUILDING FINAL** 1400 FIRE FINAL 4046 SI-EPDXY/EXP CONC CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. t'• CA Project No. lgelk Date Application Accepted: Date Application Expires: V/ 1 ce (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: King Co Assessor's Tax No.: 7888900162 18200 Olympic Ave. S., Tukwila, WA 98188 Suite Number: Floor: 1 Tenant Name: A -America PROPERTY OWNER Name: David Norris Name: CPF Kent Valley LLC City: Auburn State: WA Zip: 98001 Address: 18260 Olympic Ave. S. Email: dnorris@raymondhandling.com City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: David Norris Address: 3500 West Valley Highway North Suite B-1( City: Auburn State: WA Zip: 98001 Phone: (206) 465-6208 Fax: Email: dnorris@raymondhandling.com GENERAL CONTRACTOR INFORMATION Company Name: Raymond Handling Concepts Address: 3500 West Valley Highway North City: Auburn State: WA Zip: 98001 Phone: (888) 820-8811 Fax: Contr Reg No.: 601785727 Exp Date: 12/15/2016 Tukwila Business License No.: BUS -0993198 H:Wpplications\Forms-Applications On Line \2011 Applications'Pem»t Application Revised - 8-9-11.docx Revised: August 2011 bh New Tenant: ❑ Yes IZ ..No ARCHITECT OF RECORD Company Name: Structural Concepts Engineering Engineer Name: Ali Abolhassani Company Name: N/A Cin': La Verne State: CA Zip: 91750 Phone: (909) 596-1350 Fax: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Company Name: Structural Concepts Engineering Engineer Name: Ali Abolhassani Address: 1815 Wright Ave. Cin': La Verne State: CA Zip: 91750 Phone: (909) 596-1350 Fax: Email: Melissa <reception@sceinc.net> LENDER/BOND ISSUED (required for projects $5,000 or greater per RCWrr19.27.095) 2 i j j / / Name: N/ ,1 Icy,,,,, ,!' !. d l J5 <Colt2 sr Address: 300 I i G!C 1-4_,,, L< l City: /J ( Sfate: 441.. Zip,, Page 1 of 4 BUILDING PERMIT INFORMATION- 206-431-3670 Valuation of Project (contractor's bid price): $ 16,000 Existing Building Valuation: $ 5,907,800 Describe the scope of work (please provide detailed information): High Pile Storage Pallet Rack Installation for additional inventory and deadstock Will there be new rack storage? m Yes ❑.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? D Yes El No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: VI Sprinklers Z Automatic Fire Alarm 0 None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes 0 No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:Applications Worms -Applications On Line \2011 Applications\Pcrmit Application Revised - 8-9-11.docac Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC In Floor 203,000 III -B S-1 2"' Floor 3'l Floor Floors thru Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? D Yes El No If "yes", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: VI Sprinklers Z Automatic Fire Alarm 0 None 0 Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? 0 Yes 0 No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM 0 On-site Septic System — For on-site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:Applications Worms -Applications On Line \2011 Applications\Pcrmit Application Revised - 8-9-11.docac Revised: August 2011 bh Page 2 of 4 PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 R OltA DAGENT: Signature: �N Print Name: David Norris Mailing Address: 3500 West Valley Highway North, B102 H:\Applications'Fonns-Applications On Line \2011 Applications\Permit Application Revised - 8-9-11.docx Revised: August 2011 bh Date: 03/11/2016 Day Telephone: (206) 465-6208 Auburn WA 98001 City State Zip Page 4 of 4 Cash Register Receipt City of Tukwila DESCRIPTIONS 1 ACCOUNT 1 QUANTITY PermitTRAK I PAID $287.24 D16-0077 Address: 18200 OLYMPIC AVE S Apn: 7888900162 $287.24 DEVELOPMENT $267.04 PLAN CHECK FEE R000.345.830.00.00 0.00 $262.54 WASHINGTON STATE SURCHARGE B640.237.114 0.00 $4.50 TECHNOLOGY FEE $20.20 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R8429 R000.322.900.04.00 0.00 $20.20 $287.24 Date Paid: Tuesday, May 10, 2016 Paid By: RAYMOND HANDLING CONCEPTS CORP Pay Method: CHECK 241920 Printed: Tuesday, May 10, 2016 11:25 AM 1 of 1 OTSYSTEM5 Cash Register Receipt City of Tukwila DESCRIPTIONS ACCOUNT QUANTITY PAID PermitTRAK $403.90 D16-0077 Address: 18200 OLYMPIC AVE S Apn: 7888900162 $403.90 DEVELOPMENT $403.90 PERMIT FEE TOTAL FEES PAID BY RECEIPT: R7992 R000.322.100.00.00 0.00 $403.90 $403.90 Date Paid: Tuesday, March 22, 2016 Paid By: RAYMOND HANDLING Pay Method: CHECK 240108 Printed: Tuesday, March 22, 2016 12:41 PM 1 of 1 CirifWSYSTEMs INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 bke-our7 ProAct: / 14i 6r iCii+ Typ. f Inspection: e 1 t Llli Are,-ArA e_ Address: /920o of inoc Date Ta led: Special Instructions: Date Wanted: 24 /` l�� ap m: • Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: 016 70 F/A%k 2-9/6 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Date: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 Project: A- Amerc4 Type of Inspection: ail £;t)l - .f i— Address:_ /B2c oL /i' it c -S Called: Special Instructions: Date Wanted:l�% 9� / / Requester:. (( Phone No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: �(Oo /-mss _AS(196Z3nal Inspector: 5 Avid Date: ze REINSPECTION FEE REQUIRED. Prior to next ins• ction. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. d INSPECTION RECORD Retain a copy with permit INSP CTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION (206) 431-3670 '6 - 00 77 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 Project /-I - /1-7146e/CA T je of Inspection: l )LbiAk f ...;;i:41.- Address: /& co C'LYr P/C AvV S Date Called: Special Instructions: Date Wavle . U _N 7 m. t Request/ Phone No: DApproved per applicable codes. Corrections required prior to approval. COMMENTS: z vac pre ►b ,- A-0400/41— REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit D/e6 - 0077 PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 206-575-4407 Project: /� In - Sprinklers: Fire Alarm: Type of I , spection: teke. Addres: 7 y 200 Suite #: p/ yf, c five c Contact Person: Special Instructions: Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: — 0 st-L— Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: R77,4, 2_ Date: I/aC/ /6 Hrs.: 1 $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word/Inspection Record Form.Doc 3/14/14 T.F.D. Form F.P. 113 Fireproofing Aggregates Shotcrete Concrete Masonry Asphalt Roofing P iling S t e el S oils Wood September 23, 2016 File No. 16-361 Building Official City of Tukwila Building Department 6300 Southcenter Blvd. Tukwila, WA 98188 Project: Address: Permit: A America 18200 Olympic Ave. S. D16 0077 A.A.R. TESTING LABORATORY, INC. CONSTRUCTION INSPECTION AND MATERIAL TESTING NATIONALLY ACCEPTED LABORATORY This is to advise you that special inspections are completed on the above referenced project. The following inspection was required and copies of our inspection reports are attached. 1. Proprietary anchor installation To the best of our knowledge all work inspected conformed to Tukwila Building Department approved plans, specifications, IBC and related codes and/or verbal or written instructions from the Engineer of Record. Sincerely, A.A.R. TESTING LABORATORY, INC. ,64 Kimberle Anderson President CC: Raymond Handling Concepts -David Norris RECEIVED CITY OF TIUKWILA SEP 23 2016 PERMIT CENTER Tel: (425) 881-5812 Fax (425) 881-5441 • 7126 180th Ave. NE • P.Q. Box 2523 • Redmond, WA 98073 Field Report Report #: 66262 A.A.R. Testing Laboratory, Inc. 7126 980th Ave.N.E., Park 180, Suite C101, Redmond, WA 98052 Phone 425.881.5812 Fax 425.881.5441 Client: Raymond Handling Concepts 3500 VV. Valley Hwy. N, #101 Aubum, WA. 98001 Contact: David Norris Project Number: 16.361 Permit #: D16-0077 Project Name: A America Address: 18200 Olympic Ave. S. Inspection Performed: Proprietary Anchors Date: 6/23/2016 Time: Temperature: Verified anchors to be Hilti KB -TZ, 1/2" x 5 1/2". Verified minimum embedment of 3 1/4". Torque was tested with calibrated wrench #132C and was found meeting the 40 ft. Ib. requirement. All work was completed in conformance with approved plans and calculations, manufacturer's recommendations and ESR #1917. All warehouse racking anchors on plan stamped March 1, 2016 were inspected at this time. RECEIVED CITY OF TUKWILA SEP 2 3 2016 PERMIT CENTER Distribution: 7/, Distribute Client Distribute Contractor Distribute Engineer `] Distribute Owner Distribute Municipality [] Distribute Other r' Distribute Architect [] Distribute Other Inspector: Chandler, Loren Reviewed by: Michele Guerrini All reports are considered confidential and are the property of the client and A.A.R. Testing Laboratory, Inc. Reproduction except in full without the written consent of A.A.R. Testing is strictly forbidden Field Report Report #: 66452 A.A.R. Testing Laboratory, Inc. 7126 180th Ave.N.E., Park 180, Suite C101, Redmond, WA 98052 Phone 425.881.5812 Fax 425.881.5441 Client: Raymond Handling Concepts 3500 W. Valley Hwy. N, #101 Aubum, WA. 98001 Contact: David Norris Project Number: 16-361 Permit #: D16-0077 Project Name: A America Address: 18200 Olympic Ave. S. Inspection Performed: Proprietary Anchors Date: 5/24/2016 Time: Temperature: Verified anchors to be Hilti KB -TZ 1/2° x 5 1/2". Racking was loaded at this time, exterior anchors were inspected, inner anchors were enable to be reached. Dave with Raymond handling was contacted. AAR to return for inspection of remaining anchorage at date scheduled by contractor. RECEIVED CITY OF TU KWILA SEP 23 2016 PERMIT CENTER Distribution: [I Distribute Client ❑ Distribute Contractor ❑ Distribute Engineer ❑ Distribute Owner f Distribute Municipality ❑ Distribute Other C Distribute Architect ❑ Distribute Other Inspector: Chandler, Loren Reviewed by: Michele Guerrini All reports are considered confidential and are the property of the client and A.A.R. Testing Laboratory, Inc. Reproduction except in full without the written consent of A.A.R. Testing is strictly forbidden Fire Sprinklers :101) WA CL#FIRESI"9S1RJ 1524 45th Street E, Suite 102, Sumner, WA 98390.253-826-0099 • Fax 253-826-1033 • www.firesprinklersinc.com Friday, July 15, 2016 Raymond Handling Concepts Corporation Attn: David Norris 3500 West Valley Hwy N, Suite 101 Auburn, WA 98001 Re: A -AMERICA 18200 Olympic Ave S. Tukwila, WA 98188 Mr. Norris, REVIEWED FOR_. CODE COMPLIANCE APPROVED SEP 13 2016 City 4f `tukwi1a BUILDING tiIVISION Based on my inspection of the existing fire sprinkler system I determined that the existing fire sprinkler system resembles a typical Washington Survey and Rating Bureau (WSRB) sprinkler system. The identifying WSRB characteristics seen were 8" looped mains, oversized riser nipples, and large orifice sprinklers. With this information I conclude that the existing fire sprinkler system has a design density of .395 gpm with a remote area of 5,600 square feet (.395/5,600). As the plans dictate, the proposed storage arrangements are Multiple -Row Racks which exceed 16' in depth with a storage height over 12' up to and including 15' and a Double Row Rack consisting of (2) Single Row Back -to -Back Racks not exceeding 12' in depth and a storage height over 12' up to and including 20' with a 12" longitudinal flue space. Additionally, the commodity stored in racks is on wood pallets, non -encapsulated, cartoned, unassembled wood product consisting of various wood compositions i.e. pressboards (fiberboard), wood and plywood's. Expanded plastic protective inserts are located in the corners of the cartoned unassembled wood product commodity. The amount of expanded plastics present consist of less than 1% by weight and less than 10% by volume therefore it is allowed to be recognized by IFC as a Class II commodity. NFPA #13 2013 Edition, Table 16.2.1.3.3.2 dictates that a Multiple -Row Rack which has a depth exceeding 16' and a storage height of 12' up to and including 15' in height, with a non - encapsulated Class II commodity (unassembled wood product) shall be protected per Figure 16.2.1.3.2(b) Curve J (ordinary temperature sprinklers) requiring a 0.420 density over a 3,000 square foot remote area (0.420/3,000) requiring no in -rack sprinklers. Applying Figure 16.2.1.3.4.1 the design density shall be adjusted by 60% for 15' top of stored commodity. Therefore, the required density will be RECEIVED 0.420 x 60% = 0.252 gpm. CITY OF TUKWILA CORRECTION (tr DO�+/�LTR# D JUL 18 2016 PERMIT CENTER Call FSI for all of your Fire Sprinkler Installation, Service, Inspection and Design ne s. NFPA #13 2013 Edition, Table 16.2.1.3.2 dictates that a Double -Row Rack with a storage height of 12' up to and including 20' in height and aisles greater than 8' per 16.2.1.3.2.1(B) with a non - encapsulated Class II commodity (unassembled wood product) shall be protected per Figure 16.2.1.3.2(b) Curve F (ordinary temperature sprinklers) requiring a 0.330 density over a 3,000 square foot remote area (0.330/3,000) requiring no in -rack sprinklers. Applying Figure 16.2.1.3.4.1 the design density shall be adjusted by 60% for 15' top of stored commodity. Therefore, the required density will be 0.330 x 60% = 0.198 gpm. In conclusion, the planned storage of a class II non -encapsulated cartoned commodity (unassembled wood product) in the proposed Multi -Row Racks with a storage height of 15' or less and the Double Row Rack consisting of (2) Single Row Back -to -Back Racks not exceeding a storage height greater than 20' will not require modifications. Sincerely, Mutt .Mowtioon Brett Morrison President Call FSI for all of your Fire Sprinkler Installation, Service, Inspection and Design needs. v FILM August 31, 2016 Ms. Nicole Callais Operations Manager A -America 18255 Segale Park Drive B Tukwila, WA 98188 RE: High -Piled Storage Evaluation —Tukwil Fire Protection System Analysis 18200 Olympic Ave S, Tukwila, WA 98 Dear Ms. Callais: REVIEWED FOR CODE COMPLIANCE APPROVED SEP 13 2016 EWasof Tukwila BUILDING DIVISION JENSEN HUGHES Advancing the Science of Safety RECEIVED CITY OF TUKWILA SEP 012016 PERMIT CENTER JENSEN HUGHES has been retained to evaluate concerns expressed by the City of Tukwila Fire Department as to whether the current method of fire sprinkler protection at the A -America storage warehouse is code compliant. The building has rack storage throughout, arranged in both a Double Row and a Multiple Row configurations. The concern is that the storage arrangement may need additional fire sprinkler protection given the height and combustibility of commodities being stored at the facility. A previously completed analysis was performed on the sprinkler system at the facility, and JENSEN HUGHES was asked to provide a more comprehensive overview of the fire sprinkler system and to determine what system modifications, if necessary, are required to bring the sprinkler system up to code. We utilized the following codes in the analysis of the system: • International Fire Code (IFC), editions 2015 and 2012 as adopted by the State of Washington and amended by the City of Tukwila • NFPA 13, Standard for the installation of Sprinkler Systems, 2016 edition ASSUMPTIONS The first step for this analysis is to determine what commodity classification the IFC considers the product being stored in the warehouse. Per discussions with A -America, the product at the facility consists of wood dining room and bedroom furniture, which also contains small amounts of foam padding (to prevent movement within the packaging), stored in cardboard boxes. From this description, and applying Section 3203.4 of the IFC, we can ascertain that the stored product is of a Class III commodity classification. NFPA 13 Table A.5.6.3.3 concurs with the IFC as to the classification of this stored product. Other parameters were also considered in the analysis. This information was culled from a variety of sources, including City of Tukwila Fire Department, A -America personnel and submitted documentation. We based our analysis on the following: • From discussions with the City of Tukwila Fire Department, the existing WSRB sprinkler system was designed with a design density of 0.39 gpm/ft2 over a design area of 5,600 ft2. • The existing building has a ceiling height of 28' — 4". • The Multiple Row Rack storage areas: o Top of Storage (TOS) height of 13' — 4" CORRECTION LTR# 2 D14- 0o11 0: +1 720-441-6608 4445 Northpark Dr.1 Suite 204 Colorado Springs, CO 80907 USA jensenhughes.com A -AMERICA HIGH -PILED STORAGE FIRE PROTECTION ANALYSIS PAGE 2 OF 4 o Rack depth of 19' — 2" o Aisle width of 10' • Double Row Rack storage areas: o Top of Storage (TOS) height of 16' — 5" o Rack depth of 9' — 1" o Aisle width of 10' • Storage arrangement that consists of wood pallets on wire mesh shelves on racks. Multiple Row Rack Analysis Using the information above to determine if the existing ceiling sprinkler system is adequate for protection of this rack configuration we apply Table 16.2.1.3.3.2 of NFPA 13, "Multiple -Row Rack — Rack Depth Over 16 ft or Aisles More Narrow Than 8 ft". Using a storage height of 13' — 4" and since the product is not encapsulated, we use Figure 16.2.1.3.2(c), curves land J to determine what the ceiling sprinkler system should be designed to in order to adequately protect the multiple row racks in the facility. In addition, per Table 16.2.1.3.3.2, we are allowed to provide a reduced ceiling sprinkler density, per Figure 16.2.1.3.4.1. This Table allows for the required ceiling sprinkler design density to be 60% of that required in Figure 16.2.1.3.2(c) as the storage height is below 15 ft. Per Table 16.2.1.3.2(c) curves I and 1, the ceiling system must be designed to one of the following protection scenarios for the multiple row rack areas: • Curve I: If the existing ceiling system has High Temperature sprinklers installed, the ceiling sprinkler density should be, at a minimum, 0.282 gpm/ft2 over a design area of 2,000 ftZ. The design density if 60% of that required by the Figure (0.47*0.6 = 0.282). • Curve J: If the existing ceiling system has Ordinary Temperature sprinklers installed, the ceiling sprinkler density should be between, 0.282 gpm/ft2 over a design area of 3,000 Wand 0.312 gpm/ft2 over a design area of 2,000 ftZ. The design densities noted are 60% per that required by the Figure. Double Row Rack Analysis Using the information for the double row rack arrangement, we follow the same methodology by applying Table 16.2.1.3.2 of NFPA 13, "Single- or Double -Row Racks — Storage Height Over 12 ft Up to and including 25 ft". Using a storage height of 16' — 5", non -encapsulated product, and an aisle width of 8 ft, we can apply Figure 16.2.1.3.2(c), curves E and F to determine what the ceiling sprinkler system should be designed to. Curves G and H are eliminated from consideration as our aisle widths are greater than 8 ft. In addition, per Table 16.2.1.3.3.2, we are allowed to provide a reduced ceiling sprinkler density, per Figure 16.2.1.3.4.1. This Table allows for the required ceiling sprinkler design density to be 65% of that required in Figure 16.2.1.3.2(c) as the storage height is 16'-5". Per Table 16.2.1.3.2(c) curves E and F, the ceiling system must be designed to one of the following protection scenarios for the double row rack area: • Curve E: If the existing ceiling system has High Temperature sprinklers installed, the ceiling sprinkler density should be between, 0.21 gpm/ft2 over a design area of 3,000 ft2 and 0.24 JENSEN HUGHES A -AMERICA HIGH -PILED STORAGE FIRE PROTECTION ANALYSIS PAGE 3 OF 4 gpm/ft2 over a design area of 2,000 ftZ. The design densities noted are 65% per that required by the Figure. • Curve F: If the existing ceiling system has Ordinary Temperature sprinklers installed, the ceiling sprinkler density should be between, 0.25 gpm/ft2 over a design area of 3,000 Wand 0.27 gpm/ft2 over a design area of 2,000 ft2. The design densities noted are 65% per that required by the Figure. Summary of Findings We compared the existing fire sprinkler system design to what is required by both the Multiple Row and Double Row rack scenarios. To do this we utilized the design curve from the 2002 edition of NFPA 13, Figure 12.3.2.1.2(c). The reason for using this table is that although the figure from the 2016 edition of NFPA 13 is the same, the 2002 edition has an expanded graph of sprinkler design curves needed in this analysis. 6.1 6000 0 5000 0 4000 c o. c 3000 c2000 CA 7 1000 8.2 A BC Ceiling sprinkler density (mm/min)Existing Geirmg System 10.2 12.2 14.3 16.3 3 20.4 1 � Mr, D E FG • '1111111•1111•11111MMINIUMIL % 11111111111111111111111MLIMIMISAIMMINIMr UM IIIIIIIIIIMMII 11111111111M 1111111111110.' 1•111AMEN IN 'w lips1111111111MMINIIMMI Curve F. 65% reduction Double Row • 11..1 .1" Li Curve J. 60% reduction Multiple Row \lam �1\��n iKVo 557 E c 465 0 0.0 372 Q, c c 279 "8 186 Singe point design only 1 1 t 1 93 0.15 117.20 0.25 0.30 0.35 0.40 0.45 0.50 Curve E, 65% Ceilin sprinkler density (gpm/ft2) Curve), 60% reduction Multiple Row FIGURE 12.3.2.1.2(c) Sprinkler System Design Curves — 20 -ft (6.1-m) 1 - Class III Nonencapsulated Commodities — Conventional Pallets. reduction Double Row From the figures above we can clearly identify that the existing system was designed in such a manner that it can supply a more than adequate amount of fire protection to both rack scenarios throughout the facility. JENSEN HUGHES A -AMERICA HIGH -PILED STORAGE FIRE PROTECTION ANALYSIS PAGE 4 OF 4 This analysis is based on storage heights provided to us by the Owner. They have indicated that although the rack structures in place can handle more storage height in the facility, they would like to have the system reviewed before considering more shelving. Any future rack storage additions should be reviewed by a sprinkler contractor and designed accordingly. JENSEN HUGHES appreciates the opportunity to be of assistance. If you have any questions please contact me directly at 720.441.6620. Sincerely, JENSEN HUGHES Carl W. Chappell Senior Fire Protection Engineer JENSEN HUGHES structural Concepts Engineerin REVIEWED FOR .CODE COMPLIANCE .0". APPROVED SEP 13 2016 'City of Tukwila BUILDING DIVISION —1:77-67777-1me • Project Number Dote Street Address City/State Scope of Work FILO 1815 Wright Ave La Verne, Ga. 91750 Tel: 909-596-1350 Fax: 909-5900-7186 ECEIVED CITY OF TUKWILA MAR 2 2 2016 PERMIT CENTER : A AMERICA OFFSITE Q-022516-8LV : 02/29/10 : 18200 OLYMPIC AVE S. : TUKWILLA, WA 98188 : STORAGE RACK EXPIRES 1C/ • Z S •) �-; f'AR 0 1 2016 Str tural oncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE Project #: Q-022516-8LV TABLE OF CONTENTS Title Page 1 Table of Contents 2 Design Data and Definition of Components 3 Critical Configuration 4 Seismic Loads 5 to 6 Column 7 Beam and Connector 8 to 9 Bracing 10 Anchors 11 Base Plate 12 Slab on Grade 13 Other Configurations 14 TYPE I SELECT -AMERICA Page 2 of tY 2/27/20 16 Sttura) rIoncepts _4 r ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE Project #: Q-022516-8LV Design Data 1) The analyses herein conforms to the requirements of the: 2012 IBC Section 2209 2013 CBC Section 2209A ANSI MH 16.1-2012 Specifications for the Design of Industrial Steel Storage Racks '2012 RMI Rack Design Manual" ASCE 7-10, section 15.5.3 2) Transverse braced frame steel conforms to ASTM A570, Gr.55, with minimum strength, Fy=55 ksi Longitudinal frame beam and connector steel conforms to ASTM A570, Gr.55, with minimum yield, Fy=55 ksi All other steel conforms to ASTM A36, Gr. 36 with minimum yield, Fy= 36 ksi 3) Anchor bolts shall be provided by installer per ICC reference on plans and calculations herein. 4) All welds shall conform to AWS procedures, utilizing E70xx electrodes or similar. All such welds shall be performed in shop, with no field welding allowed other than those supervised by a licensed deputy inspector. 5) The existing slab on grade is 5" thick with minimum 2500 psi compressive strength. Allowable Soil bearing capacity is 750 psf. The design of the existing slab is by others. 6) Load combinations for rack components correspond to 2012 RMI Section 2.1 for ASD level load criteria Definition of Components Frame Height A Beam r Product Beam Spacing Beam Length Front View: Down Aisle (Longitudinal) Frame Column Beam to Column Connector Base Plate and Anchors Panel Height Frame Depth Section A: Cross Aisle (Transverse) Frame Horizontal Brace Diagonal Brace TYPE 1 SELECT -AMERICA Page 3 of / 2/27/2016 Structural Concepts Gn •ineerin p. 9 g 1200 N. Jeffer 2.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE Project#: Q-022516-8LV Configuration & Summary: TYPE 1 SELECTIVE RACK 282" 79^ 79" 10" 106" 282' 18" 42" i, 42" 42" 42" 42" 42" 48" —� **RACK COLUMN REACTIONS ASD LOADS AXIAL DL= 105 /b AXIAL LL= 2,100 /b SEISMIC AXIAL Ps=+/- 2,446 /b BASE MOMENT= 0 in -lb Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type Ss=1.458, Fa=1 3 48 in 282.0 in 7 106 in Single Row Component Description STRESS Column Fy=55 ksi Hannibal IF3014-3x3x14ga P=1470 Ib, M=10418 in -Ib 0.35 -OK Column & Backer None None None N/A Beam Fy=55 ksi HMH 41140/4.125" Face x 0.075" thk Lu=106 in Capacity: 5389 Ib/pr 0.26 -OK Beam Connector Fy=55 ksi Lvl 1: 3 pin OK Mconn=6504 in -Ib Mcap=12691 in -Ib 0.51 -OK Brace -Horizontal Fy=55 ksi _ Hannibal 1-1/2x1-1/2x16ga 0.12 -OK Brace -Diagonal Fy=55 ksi Hannibal 1-1/2x1-1/2x16ga 0.13 -OK Base Plate Fy=36 ksi 8x5x3/8 Fixity= 0 in -Ib 0.38 -OK Anchor 2 per Base 0.5" x 3.25" Embed HILTI KWIKBOLT TZ ESR 1917 Inspection Reqd (Net Seismic Uplift=1380 Ib) 0.35 -OK Slab & Soil 5" thk x 2500 psi slab on grade. 750 psf Soil Bearing Pressure 0.25 -OK Level Load** Per Level Beam Spcg Brace Story Force Transv Story Force Longit. Column Axial Column Moment Conn. Moment Beam Connector 1 1,400 Ib 10.0 in 42.0 in 28 Ib 21 Ib 2,205 Ib 1,918 "# 4,792 "# 3 pin OK 2 3 1,400 Ib 79.0 in 1,400 Ib 79.0 in 42.0 in 42.0 in 42.0 in 42.0 in 42.0 in 18.0 in 245 Ib 183 Ib 1,470 Ib 10,418 "# 6,504 "# 3 pin OK 463 Ib 345 Ib 735 Ib 6,810 "# 2,857 "# 3 pin OK ** Load defined as product weight per pair of beams Notes Total: 735 Ib 548 Ib TYPE I SELECT -AMERICA Page `Y of `y 2/27/2016 S tr tural I oncepts rngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE Seismic Forces Configuration: TYPE 1 SELECTIVE RACK Project #: Q-022516-8LV Lateral analysis is performed with regard to the requirements of the 2012 RMI ANSI MH 16.1-2012 Sec 2.6 & ASCE 7-10 sec 15.5.3 Transverse (Cross Aisle) Seismic Load V= Cs*Ip*Ws=Cs*Ip*(0.67*P*Prf+D) Csl= Sds/R = 0.2430 Cs2= 0.044*Sds = 0.0428 Cs3= 0.5*S1/R = 0.0680 Cs -max= 0.2430 Base Shear Coeff=Cs= 0.2430 Level 1 2 3 PRODUCT LOAD P 1,400 Ib 1,400 Ib 1,400 Ib Cs -max * Ip= Vmin= Eff Base Shear=Cs= Ws= P*0.67*PRF1 938 Ib 938 Ib 938 Ib 0.2430 0.015 0.2430 (0.67*PLRF1 3,024 Ib vt Tran verse Elevation * PL)+DL (RMI 2.6.2) Vtransv=Vt= 0.243 * (210 Ib + 2814 Ib) Etransverse= 735 Ib Limit States Level Transverse seismic shear per upright DL 70 Ib 70 Ib 70 Ib hi 10 in 89 in 168 in wi*hi 10,080 89,712 169,344 Ss= 1.458 S1= 0.544 Fa= 1.000 Fv= 1.500 Sds=2/3*Ss*Fa= 0.972 Sd1=2/3*S1*Fv= 0.544 Ca=0.4*2/3*Ss*Fa= 0.3888 (Transverse, Braced Frame Dir.) R= 4.0 Ip= 1.0 PRF1- 1.0 Pallet Height=hp= 48.0 in DL per Beam Lvl= 70 Ib Fi Fi*(hi+hp/2) 27.5 Ib 245.0 Ib 462.5 Ib 935-# 27,685-# 88,800-# sum: P=4200 Ib 2,814 Ib Longitudinal (Downaisle) Seismic Load 210 Ib W=3024 Ib 269,136 735 Ib Z=117,420 Similarly for longitudinal seismic loads, using R=6.0 Cs1=Sd1/(T*R)= 0.1813 Cs2= 0.0428 Cs3= 0.0453 Cs -max= 0.1813 Level PRODUC LOAD P 1 1,400 Ib 2 1,400 Ib 3 1,400 Ib Ws= (0.67 * PLRF2 = 3,024 Ib Cs=Cs-max*Ip= 0.1813 P) + DL PRF2= 1.0 (Longitudinal, Unbraced Dir.) R= 6.0 T= 0.50 sec Vlong= 0.1813 * (210 Ib + 2814 Ib) Elongitudinal= 548 Ib Limit States Level Longit. seismic shear per upright P*0.67*PRF2 938 Ib 938 Ib 938 Ib DL 70 Ib 70 Ib 70 Ib hi 10 in 89 in 168 in wi*hi 10,080 89,712 169,344 Fi 20.5 Ib 182.7 Ib 344.8 Ib Front View sum: 2,814 Ib 210 Ib W=3024 Ib 269,136 548 Ib TYPE I SELECT -AMERICA Page 5 of / Y 2/27/20 16 Str tural oncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE Project #: Q-022516-8LV Downaisle Seismic Loads Configuration: TYPE 1 SELECTIVE RACK Determine the story moments by applying portal analysis. The base plate is assumed to provide no fixity. Seismic Story Forces Vlong= 548 Ib Vco1=Vlong/2= 274 Ib F1= 21 Ib F2= 183 Ib F3= 345 Ib Seismic Story Moments Typical frame made Tributary rea of two columns of rack fr me Nik Front View Conceptual System \\\\\\ Side View Yt Typical Frame made of two columns ` -r — -r Top View COL Mbase-max= 0 in -Ib <=== Default capacity Mbase-v= (Vcol*hleff)/2 = 959 in -Ib <=== Moment going to base Mbase-eff= Minimum of Mbase-max and Mbase-v = 0 in -Ib PINNED BASE ASSUMED M 1-1= [Vcol * hleff]-Mbase-eff M 2-2= [Vcol-(F1)/2] * h2 = (274 Ib * 7 in) -0 in -Ib = [274 Ib - 91.4 Ib]*79 in/2 = 1,918 in -Ib = 10,418 in -Ib hl-eff= hl - beam clip height/2 = 7 In Vcol Mseis= (Mupper+Mlower)/2 Mseis(1-1)= (1918 in -Ib + 10418 in-Ib)/2 Mseis(2-2)= (10418 in -Ib + 6810 in-Ib)/2 = 6,168 in -Ib = 8,614 in -Ib Beam to Column Elevation rho= 1.0000 Summary of Forces LEVEL 1 2 3 hi 10 in 79 in 79 in Axial Load 2,205 Ib 1,470 Ib 735 Ib Column Moment** 1,918 in -Ib 10,418 in -Ib 6,810 in -Ib Mseismic** Mend -fixity Mconn** 6,168 in -Ib 677 in -Ib 4,792 in -Ib 8,614 in -Ib 677 in -Ib 6,504 in -Ib 3,405 in -Ib 677 in -Ib 2,857 in -Ib Beam Connector 3 pin OK 3 pin OK 3 pin OK Mconn= (Mseismic + Mend-fixity)*0.70*rho Mconn-allow(3 Pin)= 12,691 in -Ib **all moments based on limit states level loading TYPE I SELECT -AMERICA Page of / y 2/27/2016 Str tura) I.oncepts Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE Project #: Q-022516-8LV Column (Longitudinal Loads) Configuration: TYPE 1 SELECTIVE RACK Section Properties Section: Hannibal IF3014-3x3x14ga Aeff = 0.643 in^2 Ix = 1.130 inA4 Sx = 0.753 inA3 rx = 1.326 in 4f= 1.67 E= 29,500 ksi Loads Considers loads at level 2 Iy = 0.749 in^4 Sy = 0.493 in^3 ry= 1.080 in Fy= 55 ksi Cmx= 0.85 Kx = 1.7 Lx = 76.9 in Ky = 1.0 Ly = 42.0 in Cb= 1.0 3.000 in x 10.075 10.75 in 3.000 in COLUMN DL= 70 Ib COLUMN PL= 1,400 Ib Mcol= 10,418 in -Ib Sds= 0.9720 1+0.105*Sds= 1.1021 1.4+0.14Sds= 1.5361 1+0.14Sds= 1.1361 0.85+0.14*Sds= 0.9861 B= 0.7000 rho= 1.0000 Axial Analysis Critical load cases are: RMI Sec 2.1 Load Case 5: : (1+0.105*Sds)D + 0.75*(1.4+0.14Sds)*B*P + 0.75*(0.7*rho*E)<= 1.0, ASD Method axial load coeff: 0.806442 * P seismic moment coeff: 0.5625 * Mcol Load Case 6: : (1+0.104*Sds)D + (0.85+0.14Sds)*B*P + (0.7*rho*E)<= 1.0, ASD Method axial load coeff: 0.69026 seismic moment coeff.• 0.7 * Mcol By analysis, Load case 6 governs utilizing loads as such Axial Load=Pax= 1.13608*70 Ib + 0.98608*0.7*1400 Ib Moment=Mx= 0.7*rho*Mcol = 1,046 Ib = 0.7 * 10418 in -Ib = 7,293 in -Ib KxLx/rx = 1.7*76.9375"/1.326" KyLy/ry = 1*42"/1.08" = 98.6 = 38.9 Fe= n^2E/(KL/r)max^2 = 29.9ksi Pn= Aeff*Fn = 19,115 Ib P/Pa= 0.11 < 0.15 Bending Analysis Fy/2= 27.5 ksi Qc= 1.92 Fe > Fy/2 Fn= Fy(1-Fy/4Fe) = 55 ksi*[1-55 ksi/(4*29.9 ksi)] = 29.7 ksi Pa= Pn/4c = 19115 lb/1.92 = 9,956 Ib Check: P/Pa + Mx/Max 1.0 Pno= Ae*Fy = 0.643 in^2 *55000 psi = 35,365 Ib Max= My/Of = 41415 in-lb/1.67 = 24,799 in -Ib px= {1/[1-(Qc*P/Pcr)]}^-1 = {1/[1-(1.92*1046Ib/19232Ib)]}^-1 = 0.90 Combined Stresses Pao= Pno/Qc = 353651b/1.92 = 18,419 Ib Myield=My= Sx*Fy = 0.753 in^3 * 55000 psi = 41,415 in -Ib Pcr= n^2EI/(KL)max^2 = nA2*29500 ksi/(1.7*76.9375 in)^2 = 19,232 Ib (1046 Ib/9956 Ib) + (7293 in-lb/24799 in -Ib) = 0.35 < 1.0, OK (EQ C5-3) ** For comparison, total column stress computed for load case 5 is: 29.0% iizinq loads 1206.163 lb Axial and M= 5469 in -lb TYPE I SELECT -AMERICA Page 7 of ( Y 2/27/201 G Str tural ko on is engineering 1200 N. Jefferson Ste, Ste F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE BEAM Contiguration: TYPE 1 SELECTIVE RACK Project #: Q-022516-8LV DETERMINE ALLOWABLE MOMENT CAPACITY A) Check compression flange for local buckling (B2.1) w= c - 2*t -2*r = 1.75 in - 2*0.075 in - 2*0.075 in = 1.450 in w/t= 19.33 1=lambda= [1.052/(k)^0.5] * (w/t) * (Fy/E)^0.5 [1.052/(4)^0.5] * 19.33 * (55/29500)^0.5 = 0.439 < 0.673, Flange is fully effective B) check web for local buckling per section b2.3 fl(comp)= Fy*(y3/y2)= f2(tension)= Fy*(y1/y2)= Y= f2/f1 Eq. B2.3-5 = -2.054 k= 4 + 2*(1-Y)^3 + 2*(1-Y) Eq. B2.3-4 = 67.08 flat depth=w= yl+y3 = 3.825 in w/t= 51 1=lambda= [1.052/(k)^0.5] * (w/t) * (fl/E)^0.5 = [1.052/(67.08)^0.5] * 3.825 * (49.12/29500)^0.5 = 0.267 < 0.673 be=w= 3.825 in b2= be/2 bl= be(3-Y) = 1.91 in = 0.757 b1+b2= 2.667 in > 1.2525 in, Web is fully effective 49.12 ksi 100.88 ksi Determine effect of cold working on steel yield point (Fva) per Fya= C*Fyc + (1-C)*Fy Lcorner=Lc= (p/2) * (r + t/2) 0.177 in C Lflange-top=Lf= 1.450 in m= 0.192*(Fu/Fy) - 0.068 = 0.1590 Bc= 3.69*(Fu/Fy) - 0.819*(Fu/Fy)^2 - = 1.427 since fu/Fv= 1.18 section A7.2 (EQ A7.2-1) = 2*Lc/(Lf+2*Lc) = 0.196 in (EQ A7.2-4) 1.79 < 1.2 and r/t= 1 < 7 OK then Fyc= Bc * Fy/(R/t)^m (EQ A7.2-2) = 78.485 ksi Thus, Fya-top= 59.61 ksi (tension stress at top) Fya-bottom= Fya*Ycg/(depth -Ycg) = 115.71 ksi (tension stress at bottom) Check allowable tension stress for bottom flange Lflange-bot=Lfb= Lbottom - 2*r*-2*t = 2.450 in Cbottom=Cb= 2*Lc/(Lfb+2*Lc) = 0.126 Fy-bottom=Fyb= Cb*Fyc + (1-Cb)*Fyf = 57.97 ksi Fya= (Fya-top)*(Fyb/Fya-bottom) = 29.86 ksi if F= 0.95 Then F*Mn=F*Fya*Sx= Eq. B2.1-4 Eq. B2.1-1 OK Eq B2.3-2 (EQ A7.2-3) 4.125 in 2.75 in 1.75 in Beam= HMH 41140/4.125" Face x 0.075" thk tt2f y3 depth 1 Ycg V 28.96 in -k Ix= Sx= Ycg= t= Bend Radius=r= Fy=Fyv= Fu=Fuv= E= top flange=b= bottom flange= 2.196 in^4 1.021 inA3 2.723 in 0.075 in 0.075 in 55.00 ksi 65.00 ksi 29500 ksi 1.750 in 2.750 in Web depth= 4.11V, Fy f1 (comp) f2(tension) yl= Ycg-t-r= 2.573 in y2= depth-Ycg= 1.403 in y3= y2 -t -r= 1.253 in Str tural on is ngineering 1200 N. Jefferson Ste, Ste F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE BEAM Contiguration: TYPE 1 SELECTIVE RACK Project #: Q-022516-8LV RMI Section 5.2, PT II Section Beam= HMH 41140/4.125" Face x 0.075" thk Ix=Ib= 2.196 in^4 Sx= 1.021 in^3 t= 0.075 in E= 29500 ksi Fy=Fyv= 55 ksi F= 150.0 Fu=Fuv= 65 ksi L= 106 in Fya= 59.6 ksi Beam Level= 1 P=Product Load= 1,400 Ib/pair D=Dead Load= 70 Ib/pair 1. Check Bending Stress Allowable Loads Mcenter=F*Mn= W*L*W*Rm/8 W=LRFD Load Factor= 1.2*D + 1.4*P+1.4*(0.125)*P RMI 2.2, item 8 FOR DL=2% of PL, W= 1.599 Rm= 1 - [(2*F*L)/(6*E*Ib + 3*F*L)] 1 - (2*150*106 in)/[(6*29500 ksi*2.196 in^3)+(3*150*106 in)] = 0.927 if F= 0.95 Then F*Mn=F*Fya*Sx= 57.82 in -k Thus, allowable load per beam pair=W= F*Mn*8*(# of beams)/(L*Rm*W) = 57.82 in -k * 8 * 2/(106in * 0.927 * 1.599) = 5,888 Ib/pair allowable load based on bending stress Mend= W*L*(1-Rm)/8 = (5888 Ib/2) * 106 in * (1-0.927)/8 = 2,848 in -Ib = 0,677 in -Ib @ 5888 Ib max allowable load @ 1400 Ib imposed product load 2. Check Deflection Stress Allowable Loads 4.125 in 2.75 in 1.75 in IIIIIIIIIIIIIIIIIIIIIIIIIIIII Dmax= Dss*Rd Rd= 1 - (4*F*L)/(5*F*L + 10*E*Ib) = 1 - (4*150*106 in)/[(5*150*106 in)+(10*29500 ksi*2.196 in^4)] = 0.913 in if Dmax= L/180 Based on L/180 Deflection Criteria and Dss= 5*W*L^3/(384*E*Ib) L/180= 5*W*L^3*Rd/(384*E*Ib*# of beams) solving for W yields, W= 384*E*I*2/(180*5*L^2*Rd) = 384*2.196 in^4*2/[180*5*(106 in)^2*0.913) = 5,389 Ib/pair allowable load based on deflection limits Thus, based on the least capacity of item 1 and 2 above: Allowable Deflection= L/180 = 0.589 in Deflection at imposed Load= 0.153 in Allowable load= 5,389 Ib/pair Imposed Product Load= 1,400 Ib/pair IBeam Stress= 0.26 Beam at Level 1 2-- nninoorinn 1200 N. Jefferson Ste, Ste F Anaheim, CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE Project #: Q-0225 16- 3 Pin Beam to Column Connection TYPE 1 SELECTIVE RACK 1 he beam end moments shown herein show the result ot the maximum induced fixed end monents torm seismic + static loads and the code mandated minimum value ot 1.5%(DL+PL) Mconn max= (Mseismic + Mend-fixity)*0.70*Rho = 6,504 in -Ib Load at level 2 Connector Type= 3 Pin Shear Capacity of Pin P2 P3 rho= 1.0000 Pin Diam= 0.44 in Fy= 55,000 psi Ashear= (0.438 in)^2 * Pi/4 = 0.1507 in^2 Pshear= 0.4 * Fy * Ashear = 0.4 * 55000 psi * 0.1507in^2 = 3,315 Ib Bearing Capacity of Pin tcol= 0.075 in Fu= 65,000 psi Omega= 2.22 a= 2.22 Pbearing= alpha * Fu * diam * tcol/Omega = 2.22 * 65000 psi * 0.438 in * 0.075 in/2.22 = 2,135 Ib < 3315 Ib Moment Capacity of Bracket Edge Distance=E= 1.00 in Pin Spacing= 2.0 in Fy= 55,000 psi C= P1+P2+P3 tclip= 0.18 in = P1+P1*(2.5"/4.5")+P1*(0.5"/4.5") = 1.667 * P1 Mcap= Sclip * Fbending =0.127in^3*0.66*Fy = 4,610 in -Ib Pclip= Mcap/(1.667 * d) = 4610.1 in-lb/(1.667 * 0.5 in) = 5,531 Ib C*d= Mcap = 1.667 Thus, P1= 2,135 Ib Mconn-allow= [P1*4.5"+P1*(2.574.5")*2.5"+P1*(0.5"/4.5")*0.5"] = 2135 LB*[4.5"+(2.5"/4.5")*2.5"+ (0.5"/4.5")*0.5"] = 12,691 in -Ib > Mconn max, OK Sclip= 0.127 in^3 d= E/2 = 0.50 in TYPE I SELECT -AMERICA Page C of L 2/27/2016 Str tura) .Joncepts J- •J ngineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE Project #: Q-022516-8LV Transverse Brace Configuration: TYPE 1 SELECTIVE RACK Section Properties Diagonal Member= Hannibal 1-1/2x1-1/2x16ga Area= 0.273 in^2 r min= 0.496 in Fy= 55,000 psi K= 1.0 Qc= 1.92 Frame Dimensions .500 in __121 0.25 in Horizontal Member= Hannibal 1-1/2x1-1/2x16ga Area= 0.273 in^2 r min= 0.496 in Fy= 55,000 psi 1.500 in K= 1.0 Bottom Panel Height=H= 42.0 in Frame Depth=D= 48.0 in Column Width=B= 3.0 in Diagonal Member Clear Depth=D-B*2= 42.0 in X Brace= NO rho= 1.00 0 Load Case 6:: (I±L1 4 5 .85+0.145ds)*B*P + [0.7*rho*EJ<= 1.0, ASD Method Vtransverse= 735 Ib Vb=Vtransv*0.7*rho= 735 Ib * 0.7 * 1 = 515 Ib Ldiag= [(D-B*2)^2 + (H-6")^2]^1/2 = 55.3 in Pmax= V*(Ldiag/D) * 0.75 = 445 lb axial load on diagonal brace member Pn= AREA*Fn = 0.273 in^2 * 23419 psi = 6,393 Ib Fallow= Pn/S2 = 6393 Ib /1.92 = 3,330 Ib Pn/Pallow= Horizontal brace 0.13 <= 1.0 OK (kl/r)= (k * Ldiag)/r min = (1 x 55.3 in /0.496 in ) = 111.5 in Fe= pi^2*E/(kl/r)^2 = 23,419 psi Since Fe<Fy/2, Fn= Fe = 23,419 psi Typical Panel Configuration Check End Weld Lweld= 2.5 in Fu= 65 ksi tmin= 0.060 in Weld Capacity= 0.75 * tmin * L * Fu/2.5 = 2,925 Ib OK Vb=Vtransv*0.7*rho= 515 Ib (kl/r)= (k * Lhoriz)/r min = (1 x 48 in) /0.496 in = 96.8 in Since Fe>Fy/2, Fn=Fy*(1-fy/4fe) = 30,661 psi Pn/Pallow= 0.12 <= 1.0 OK Fe= pi^2*E/(kl/r)^2 = 31,072 psi Pn= AREA*Fn = 0.273in^2*30661 psi = 8,371 Ib Fy/2= 27,500 psi Fallow= Pn/4c = 8371 Ib /1.92 = 4,360 Ib TYPE I SELECT -AMERICA Page / 0f l Y 2/27/201G Str tural oncepts Iv Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Single Row Frame Overturning Project: A AMERICA OFFSITE Project #: Q-022516-8LV Configuration: TYPE 1 SELECTIVE RACK Loads Critical Load case(s): 1) RMI Sec 2.2, item 7: (0.9-0.2Sds)D + (0.9-0.20Sds)*B*Papp - E*rho Vtrans=V=E=Qe= 735 Ib DEAD LOAD PER UPRIGHT=D= 210 Ib PRODUCT LOAD PER UPRIGHT=P= 4,200 Ib Papp=P*0.67= 2,8141b Wst LC1=Wst1=(0.7056*D + 0.7056*Papp*1)= 2,133 Ib Product Load Top Level, Ptop= 1,400 Ib DL/Lvl= 70 Ib Seismic Ovt based on E, £(Fi*hi)= 117,420 in -Ib height/depth ratio= 3.5 in Sds= 0.9720 (0.9-0.2Sds)= 0.7056 (0.9-0.2Sds)= 0.7056 B= 1.0000 rho= 1.0000 Frame Depth=Df= 48.0 in Htop-Iv1=H= 168.0 in # Levels= 3 # Anchors/Base= 2 hn= 4Rnin hp • • T 1 h Df SIDE ELEVATION A) Fully Loaded Rack h=H+hp/2= 192.0 in Load case 1: Movt= £(Fi*hi)*E*rho = 117,420 in -Ib Mst= Wstl * Df/2 T= (Movt-Mst)/Df = 2133 Ib * 48 in/2 = (117420 in -Ib - 51192 in-lb)/48 in = 51,192 in -Ib = 1,380 Ib Net Uplift per Column Net Seismic Uplift= 1,380 Ib Strength Level B) Top Level Loaded Only Load case 1: 0 V1=Vtop= Cs * Ip * Ptop >= 350 Ib for H/D >6.0 = 0.243 * 1400 Ib = 340 Ib Vieff= 340 Ib Critical Level= 3 V2=VDL= Cs*Ip*D Cs*Ip= 0.2430 = 51 Ib Mst= (0.7056*D + 0.7056*Ptop*1) * 48 in/2 = 27,264 in -Ib Movt= [V1*h + V2 * H/2]*0.7*rho = 48,723 in -Ib T= (Movt-Mst)/Df = (48723 in -Ib - 27264 in-Ib)/48 in = 447 Ib Net Uplift per Column Net Seismic Uplift= 447 Ib Strength Level ncnor Check (2) 0.5" x 3.25" Embed HILTI KWIKBOLT TZ anchor(s) per base plate. Special inspection is required per ESR 1917. Pullout Capacity=Tcap= 1,961 Ib L.A. City Jurisdiction? NO Shear Capacity=Vcap= 2,517 Ib Phi= 1 (690 Ib/1961 Ib)^1 + (183 Ib/2517 Ib)^1 = (223 Ib/1961 Ib)^1 + (85 Ib/2517 Ib)^1 = Fully Loaded: Top Level Loaded: Tcap*Phi= 1,961 Ib Vcap*Phi= 2,517 Ib 0.42 <= 1.2 OK 0.15 <= 1.2 OK TYPE 1 SELECT -AMERICA Page 11 of L / 2/27/2016 Str tura) oncepts 4 P- Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE Project #: Q-022516-8LV Base Plate Configuration: TYPE 1 SELECTIVE RACK Section Baseplate= 8x5x3/8 Eff Width=W = 8.00 in Eff Depth=D = 5.00 in Column Width=b = 3.00 in Column Depth=dc = 3.00 in L = 2.50 in Plate Thickness=t = 0.375 in Down Aisle Loads COLUMN DL= COLUMN PL= Base Moment= 1+0.105*Sds= 1.4+0.14Sds= a = 3.00 in Anchor c.c. =2*a=d = 6.00 in N=# Anchor/Base= 2 Fy = 36,000 psi Downaisle Elevation Load Case 5: : (1+0.105*Sds)D + 0.75*((1.4+0.14Sds)*B*P + 0.751-0.7*rho*E/<= 1.0, ASD Method 105 Ib Axial=P= 1.10206 * 105 Ib + 0.75 * (1.53608 * 0.7 * 2100 Ib) 2,100 Ib = 1,809 Ib 0 in -Ib Mb= Base Moment*0.75*0.7*rho 1.1021 = 0 in -Ib * 0.75*0.7*rho 1.5361 = 0 in -Ib B= 0.7000 Axial stress=fa = P/A = P/(D*W) = 45 psi Moment Stress=fb = M/S = 6*Mb/[(D*B^2] = 0.0 psi Moment Stress=fbl = fb-fb2 = 0.0 psi M3 = (1/2)*fb2*L*(2/3)*L = (1/3)*fb2*LA2 = 0 in -Ib S -plate = (1)(t^2)/6 = 0.023 in^3/in fb/Fb = Mtotal/[(S-plate)(Fb)] 0.22 OK Tanchor = (Mb-(PLapp*0.75*0.46)(a))/[(d)*N/2] = -1,067 Ib No Tension Gi ica/ load case RMI Sec 2.1, item 4, (1+0.115ds)DL + (1+0.14505)PL"0.75+EL'0.75 c= 1.0, A50 Medved Axial Load P = 1,809 Ib Mbase=Mb = 0 in -Ib Cross Aisle Loads M1= wL^2/2= fa*L^2/2 = 141 in -Ib Moment Stress=fb2 = 2 * fb * L/W = 0.0 psi M2= fbl*L^2)/2 = 0 in -Ib Mtotal = M1+M2+M3 = 141 in-Ib/in Fb = 0.75*Fy = 27,000 psi Fp= 0.7*F'c = 1,750 psi OK Tallow= 1,961 Ib Pstatic= 1,809 Ib Movt*0.75*0.7*rho= 61,646 in -Ib Frame Depth= 48.0 in P=Pstatic+Pseismic= 3,094 Ib b =Column Depth= 3.00 in L =Base Plate Depth -Col Depth= 2.50 in fa = P/A = P/(D*W) = 77 psi Sbase/in = (1)(t^2)/6 = 0.023 in^3/in fb/Fb = M/[(S-plate)(Fb)] 0.38 OK Pseismic= Movt/Frame Depth = 1,284 lb M= wLA2/2= fa*LA2/2 = 242 in-Ib/in Fbase = 0.75*Fy = 27,000 psi OK Check uplift load on Baseplate Eff( Effe Check uplift forces on baseplate with 2 or more anchors per RMI 7.2.2. 'When the base plate configuration consists of two anchor bolts located on either side f the column and a net uplift force exists, the minimum base plate thickness hall be determined based on a design bending moment in the plate equal o the uplift force on one anchor times 1/2 the distance from he centerline of the anchor to the nearest edge of the rack column" Ta Elevation Uplift per Column= 1,380 Ib Qty Anchor per BP= 2 Net Tension per anchor=Ta= 690 Ib c= 2.50 in Mu=Moment on Baseplate due to uplift= Ta*c/2 = 863 in -Ib Splate= 0.117 inA3 fb Fb *0.75= 0.204 OK TYPE I SELECT -AMERICA Page /1- of ! / 2/27/2016 S tr1.oncepts tural Engineering 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 By: BOB Project: A AMERICA OFFSITE Project #: Q-022516-8LV Slab on Grade Configuration: TYPE 1 SELECTIVE RACK 1111111111111111111111111111111111111111111 SLAB ELEVATION Base Plate Effec. Baseplate width=B= 8.00 in Effec. Baseplate Depth=D= 5.00 in Column Loads • Cross . Aisle • ;4.2 Baseplate Plan View width=a= 3.00 in depth=b= 3.00 in midway dist face of column to edge of plate=c= 5.50 in midway dist face of column to edge of plate=e= 4.00 in Concrete fc= 2,500 psi tslab=t= 5.0 in teff= 5.0 in phi=f= 0.6 Soil fsoil= 750 psf Movt= 82,194 in -Ib Frame depth= 48.0 in Sds= 0.972 0.2*Sds= 0.194 A.= 0.600 3=B/D= 1.600 F'c^0.5= 50 DEAD LOAD=D= 105 Ib per column unfactored ASD load = 1.3944 * 105 Ib + 1.3944 * 0.7 * 2100 Ib + 1 * 1712 Ib PRODUCT LOAD=P= 2,100 Ib per column = 3,908 Ib unfactoredA5D load Load Case 2) (0.9-0.2Sds)D + (0.9-0.2Sds)*B*Papp + rho*E RMI SEC 2.2 EQTN 7 Papp= 1,407 Ib per column = 0.7056 * 105 Ib + 0.7056 * 0.7 * 1407 Ib + 1 * 1712 Ib P-seismic=E= (Movt/Frame depth) = 2,481 Ib = 1,712 Ib per column Load Case 3) 1.2*D + 1.4*P RMI SEC 2.2 EQTN 1,2 unfactored Limit State load = 1.2*105 Ib + 1.4*2100 Ib B= 0.7000 = 3,066 Ib rho= 1.0000 Load Case 4) 1.2*D + 1.0*P + 1.0E ACI 318-11 Sec 9.2.1,EgN 9.5 Sds= 0.9720 = 3,938 Ib 1.2 + 0.2*Sds= 1.3944 Effective Column Load=Pu= 3,938 Ib per column 0. 9 - 0.20Sds= 0.7056 Puncture Load Case 1) (1.2+0.2Sds)D + (1.2+0.2Sds)*B*P+ rho*E RMI SEC 2.2 EQTN 5 Apunct= [(c+t)+(e+t)]*2*t = 195.0 in^2 Fpunctl= [(4/3 + 8/(3*G3)] * *(F'C^0.5) = 90. psi Fpunct2= 2.66 * % * (Pc^0.5) = 79.8 psi Fpunct eff= 79.8 psi Slab Bending fv/Fv= Pu/(Apunct*Fpunct) 0.253 < 1 OK Pse=DL+PL+E= 3,938 Ib Asoil= (Pse*144)/(fsoil) L= (Asoil)^0.5 y= (c*e)^0.5 + 2*t = 756 in^2 = 27.50 in = 14.7 in x= (L -y)/2 M= w*x^2/2 S -slab= 1*teff^2/6 = 6.4 in = (fsoil*x^2)/(144*2) = 4.17 inA3 Fb= 5*(phi)*(fc)^0.5 = 106.8 in -Ib fb/Fb= M/(S-slab*Fb) = 150. psi = 0.171 < 1, OK TYPE I SELECT -AMERICA Page /3 of / Y 2/27/201 G Structural Concepts �- / Engineering By: BOB 1200 N. Jefferson Ste. Ste F Anaheim. CA 92807 Tel: 714.632.7330 Fax: 714.632.7763 Project: A AMERICA OFFSITE Project #: Q-022516-8LV Configuration & Summary: TYPE 2 SELECTIVE RACK 282" 79' 37" 79" 10" 144 282" 18" 42" i` 42" 42" 42" 42" 42" T 48" �f **RACK COLUMN REACTIONS ASD LOADS AXIAL DL= 140 /b AXIAL LL= 2,800 /b SEISMIC AXIAL Ps=+/- 3,872 /b BASE MOMENT= 0 in -lb Seismic Criteria # Bm Lvls Frame Depth Frame Height # Diagonals Beam Length Frame Type Ss=1.458, Fa=1 4 48 in 282.0 in 7 144 in Single Row Component Description STRESS Column Fy=55 ksi Hannibal IF3014-3x3x14ga P=2555 Ib, M=14293 in -Ib 0.53-0K Column & Backer None None None N/A Beam Fy=55 ksi HMH 60140/6" Face x 0.075" thk Lu=144 in Capacity: 7172 lb/pr 0.29-0K Beam Connector Fy=55 ksi Lvl 3: 4 pin OK Mconn=5497 in -Ib Mcap=22664 in -Ib 0.24-0K Brace -Horizontal Fy=55 ksi Hannibal 1-1/2x1-1/2x16ga 0.16-0K Brace -Diagonal Fy=55 ksi Hannibal 1-1/2x1-1/2x16ga 0.18-0K Base Plate Fy=36 ksi 8x5x3/8 Fixity= 0 in -Ib 0.55-0K Anchor 2 per Base 0.5" x 3.25" Embed HILTI KWIKBOLT TZ ESR 1917 Inspection Reqd (Net Seismic Uplift=2450 Ib) 0.6-0K Slab & Soil 5" thk x 2500 psi slab on grade. 750 psf Soil Bearing Pressure 0.36-0K Level Load** Per Level Beam Spcg Brace Story Force Transv Story Force _ Longit. Column Axial Column Moment Conn. Moment Beam Connector 3 4 2,100 Ib 37.0 in 2,100 Ib 79.0 in 42.0 in 42.0 in 42.0 in 42.0 in 18.0 in 336 Ib 251 Ib 2,170 Ib 6,096 "# 5,497 "# 4 pin OK 547 Ib 408 Ib 1,085 Ib 8,060 "# 3,363 "# 4 pin OK ** Load defined as product weight per pair of beams Notes Total: 980 Ib 731 Ib TYPE 2 SELECT -AMERICA Page Pt of ir 2/27/2010 July 28, 2016 City of Tukwila Department of Community Development DAVID NORRIS 3500 W VALLEY HWY N - SUITE B102 AUBURN, WA 98001 RE: Correction Letter # 2 DEVELOPMENT Permit Application Number D16-0077 A -AMERICA - 18200 OLYMPIC AVE S Dear DAVID NORRIS, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: FIRE DEPARTMENT: Al Metzler at 206-971-8718 if you have questions regarding these comments. • 1) The layout of the proposed new racking qualifies as multiple -row racks and must comply with fire sprinkler requirements specified in NFPA 13 Table 16.2.1.3.3.1. Submit an analysis by a fire protection engineer verifying compliance with the code requirements. The analysis must be done by a FIRE PROTECTION ENGINEER as specified in the original correction. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at 206-431-3655. Sincerely, Bill Rambo Permit Technician File No. D16-0077 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 April 14, 2016 City of Tukwila Department of Community Development DAVID NORRIS 3500 W VALLEY HWY AUBURN, WA 98001 RE: Correction Letter # 1 DEVELOPMENT Permit Application Number D16-0077 A -AMERICA - 18200 OLYMPIC AVE S Dear DAVID NORRIS, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size. New revised plan sheets shall be the same size sheets as those previously submitted.) (If applicable) "STAMP AND SIGNATURES" "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front page only will be sufficient. (WAC 196-23-010 & 196-23-020) (BUILDING REVIEW NOTES) 1. Provide an egress plan that shows designated common paths of egress. Dimension common paths of travel and total exit access travel distance. Exit access travel distance shall not exceed 250 feet. Length of common path of egress travel in "S" occupancies (sprinkled building) shall not be more than 100 feet before two separate and distinct paths of egress travel to two exits are available. Emergency illumination shall be provided along the designated common paths of egress. Emergency illumination shall have at least an average 1 foot-candle and a minimum at any point of 0.1 foot candle measured along the "path of egress" at the floor level. Emergency lighting shall also be required for exit discharge doorways. Identify each exterior emergency exit doorways. Egress paths shall be continuous to each exit. Designed egress paths shall be those inspected for egress illumination requirements. In addition provide square footage of the warehouse to determine occupant load. (IBC 107.2.3, Section 1006, 1014.3, 1015.2, TABLE 1016.2 & 1016.3) 2. Only one exit was shown on the plan. Garage doors shall not be counted as an exit door. Show all exits for egress. Provide occupant load for S-1 on the plan. FIRE DEPARTMENT: Al Metzler at 206-971-8718 if you have questions regarding these comments. • 1) The layout of the proposed new racking qualifies as multiple -row racks and must comply with fire sprinkler requirements specified in NFPA 13 Table 16.2.1.3.3.1. Submit an analysis by a fire protection engineer verifying compliance with the code requirements. Bann R,,,,i,,.„va c.,:rn inn . 7„1„„;1,7 ui c:H QQIQQ . DI ')/14 421 2<7n - i ....1114 ,') 3.C« 2) Smoke vents are required by International Fire Code Table 3206.2. Submit a plan showing the location of existing/proposed smoke vents. Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at 206-431-3655. Sincerely, Bill Rambo Permit Technician File No. D16-0077 f?nn cn„thPohtor Pnr,lounrA C,,ito 11 1/111 • T,,1, ,;1n Ial.,el,:rn.,t,,,, OR UR - PI,,,H,, ')/LS 4? 1 ?!7n - r,,.. 1114 A? 1 2r1/C ala PLAN REVIEW/ItO�UTING SLIP PERMIT NUMBER: D16-0077 DATE: 09/01/16 PROJECT NAME: A -AMERICA SITE ADDRESS: 18200 OLYMPIC AVE S Original Plan Submittal X Response to Correction Letter # 2 Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: Building Division Public Works n n Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 09/06/16 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10/04/16 Approved Corrections Required ❑ Approved with Conditions U UDenied (corrections entered in Reviews) (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: ' DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW 0 Staff Initials: 12/18/2013 PERMIT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D16-0077 PROJECT NAME: A -AMERICA SITE ADDRESS: 18200 OLYMPIC AVE S Original Plan Submittal X Response to Correction Letter # 1 DATE: 07/18/16 Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: AT 4 C Building Division in Public Works A' coo?, Fire Prevention Structural Planning Division Permit Coordinator n A PRELIMINARY REVIEW: Not Applicable n (no approval/review required) DATE: 07/19/16 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 08/16/16 Approved Approved with Conditions n Corrections Required (corrections entered in Reviews) Denied (ie: Zoning Issues) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: -1 - !' V- a Departments issued corrections: Bldg 0 Fire Ping 0 PW 0 Staff Initials: 1 12/18/2013 PERMIT CORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: D16-0077 PROJECT NAME: A -AMERICA SITE ADDRESS: 18200 OLYMPIC AVE S X Original Plan Submittal Response to Correction Letter # DATE: 03/26/16 Revision # Revision # before Permit Issued after Permit Issued DEPARTMENTS: kT Cow 12 . -3D--t Building Division Public Works ❑ AK. Cow 2 l Fire Prevention Structural Planning Division ❑ Permit Coordinator El PRELIMINARY REVIEW: Not Applicable ❑ (no approval/review required) REVIEWER'S INITIALS: DATE: 03/29/16 Structural Review Required DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Corrections Required (corrections entered in Reviews Notation: Denied (ie: Zoning Issues) DUE DATE: 04/26/16 n REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: 1 ' 1 14' L Departments issued corrections: Bldgf — Fire te Ping ❑ PW ❑ Staff Initials: 12/18/2013 Date: City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Plan Check/Permit Number: ❑ Response to Incomplete Letter # [ Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: Project Address: /02C0 ObyrnPG We 91 Contact Person: ` 1\JIn tce(C Summary of Revision: AMYS/5 ce-E Ncra) v./ L z AL t) Phone Number: 41.'k,Zof FPE .5u5rn11171L RECEIVED CITY QF TUKWILA SEP 01 2016 PERMIT CENTER Sheet Number(s): 1 1- 4 - "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: Entered in TRAKiT on 41-1-11p W:Wermit Center\Templates\Forms\Revision Submittal Forntdoc Revised: August 2015 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: http://www.TukwilaWA.gov REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 1J)?/20J k7 Plan Check/Permit Number: U' ❑ Response to Incomplete Letter # Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner ❑ Deferred Submittal # Project Name: /-A OO Project Address: 1 b 7VV O L1df )t %i S - Contact Person: i UI7 N ( c) Summary of Revision: t,-00-11 Phone Number: 7A 45 S 5 P015 J&J 7 j i& up -15 Mc w 5/40(42/ Sej iK a, ANAL ;/s (on�ar ('fri-ii afO M �ovf v s I w o r kJ PCPF RECEIVED CITY OF TUKWILA JUL 18 2016 PERMIT CENTER Sheet Number(s): 1. "Cloud" or highlight all areas of revision including date of rev Received at the City of Tukwila Permit'`Center by: M.—Entered in TRAKiT on /-1 ) t (l W:\Permit Center\Templates\FomuUtevision Submittal Formdoc Revised: August 2015 RAYMOND HANDLING CONCET'mS CORP Home Espanol Contact. Safety & Health Claims & Insurance 0 Washington State Department of Labor & Industries Search L&I Page 1 of 2 A -Z Index 1-Ielp My L&1 Workplace Rights Trades & Licensing RAYMOND HANDLING CONCEPTS CORP Owner or tradesperson Principals RAYMOND, STEPHEN KOEL, STEVE STERNBERG, PAUL GABORRO, ALEX Doing business as RAYMOND HANDLING CONCEPTS CORP WA UBI No. 601 785 727 41400 BOYCE ROAD FREMONT, CA 94538 253-333-2100 Business type Corporation Governing persons ALEX GABORRO CATHY HAWKES; MARK DE BOER; STEPHEN RAYMOND; STEVE KOEL; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor Active. Meets current requirements. License specialties GENERAL License no. RAYMOHC034KB Effective — expiration 05/02/1997-10/05/2017 Bond FEDERATED MUTUAL INS CO Bond account no. 1090263 $12,000.00 Received by L&I Effective date 09/28/2001 07/22/2001 Expiration date Until Canceled Insurance Federated Mutual Ins Co $1,000,000.00 Policy no. 9045549 Received by L&I Effective date 08/18/2016 10/01/2015 Expiration date 10/01/2017 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=601785727&LIC=RAYMOHC034KB&SAW= 9/15/2016 APPLICABLE CODES 2012 International Building Code 2012 International Fire Code SCOPE OF WORK PROVIDE AND INSTALL STORAGE RACKS OCCUPANCY CLASSIFICATION S-1 WAREHOUSE STORAGE APN: 042013-4016, 042013-4700, 042013-4706 042013-4707, 042013-4004, 042013-4705 TYPE OF CONSTRUCTION: III -B FIRE SPRINKLERED: YES (SEE BELOW) NUMBER OF STORIES: ONE BUILDING SQUARE FOOTAGE: 203,000 SF WAREHOUSE SQUARE FOOTAGE: 190,000 SF PROJECT SQUARE FOOTAGE: 16,364 SF FIRE SPRINKLER SYSTEM DATA NO. OF SPRINKLERS: 412 BASIS OF DESIGN: 75 PSI (12 SPRINKLER HEADS) SYSTEM DESIGN: 1,584 GPM RESIDUAL PRESSURE AT RISER: 126 PSI VICINITY MAP 80th St S 18Oth St A -AMERICA OFFSITE 18200 OLYMPIC AVENUE SOUTH TUKWILA, WA 98188 DRAWING INDEX SHEET 1 - SITE PLAN & GENERAL NOTES SHEET 2 - PLAN VIEW OF SCOPE OF WORK SHEET 3 - DESIGN DETAILS AND PROFILES iverside Dr: 200 Olympic Ave S, SEPARATE PERMIT REQUIRED FOR: rigilechanical (tectrical &Plumbing G- as Piping City of Tukwila BUILDING DIVISION AREA PHOTO COMMODITIES TO BE STORED CLASS I, 11, 111 - HOME FURNISHINGS AND FURNITURE, STORED DIRECTLY AND NON -DIRECTLY ON NON -SOLID, MESH DECKING AND SHELVES. NOTE: ANY CHANGES TO THE FIRE SPRINKLER SYSTEMS REQUIRES A SEPERATE SUBMITTAL, PERMIT, PLAN REVIEW, INSPECTION AND FEES. THIS FACILITY IS NOT ACCESSIBLE TO THE PUBLIC. PATH OF TRAVEL TO AND WITHIN EXITS IN THE BUILDING SHALL BE IDENTIFIED BY ILLUMINATED EXIT SIGNS. FIRE LANES / EMERGENCY VEHICLE ACCESS ARE AVAILABLE ALL AROUND THE BUILDING (SEE MAPS). ALL PORTIONS OF THE BUILDING SHALL BE WITHIN 75 FEET OF A FIRE EXTINGUISHER. ALL STORAGE RACKS WILL HAVE SIGNS STATING MAXIMUM LOAD CAPACITIES. REVISIONS No changes shall be made to the scope of vtro: c without prior approval of T iZBuilding ypy�kpme i d .TS t! Qivis?Oi1. i3 .v sZcna mil require a new Wan ski ffai l rtd may include attritional pian review tees. PILE COPY Permit N Plan review approval is subject to errors and omissions. Approval of cor°btruciion documents does not authorize the violation of #ny adopted code or ordinance. Receipt of approved Field Copy and conditions 'acknowledged: Py. Date: qr �zr -/‘ City of Tukwila UILDING DIVISION 16.14i IL ulb acsui# hcen DESIGN BY: Raymond Handling Concepts Corporation "IT'S NOT JUST BUSINESS, IT'S PERSONAL" FOR ASSISTANCE CALL: 800.675.2500 DESIGN PREPARED FOR: A -AMERICA 18200 OLYMPIC AVE. S. TUKWILA, WA 98188 STRUCTURAL ENGINEER: STRUCTURAL CONCEPTS 1615 YEAGER AVE. LAVERNE, CA 91750 REVIEWED FOR CODE COMPLIANCE APPROVED SEP 1 3 2016 City of Tukwila BUILDING DIVISION STRUCTURAL ENGINEER STAMP: RECEIVED CITY OF TUKWILA MAR 2 2 2016 PERMIT CENTER PROJECT #: 9787 DRAFTER: DAVID NORRIS REV.# DESCRIPTION DATE TO OUR CUSTOMERS: The information on this drawing is prepared with the intent of communicating a concept and design that is the intellectual property of Raymond Handling Concepts Corporation. It is not intended for other organizations as a means of quoting, designing / and or engineering alternatives. PM: DOUG WILLIAM DATE: 1/12/2016 SCALE: 1/8" = 1'-0" SHEET NO. 1 i- 3'-22" t 3'-22" 3'-22" f 3'-22" 3'-22" 1 282" 106"-- 3 170" 91 TUNNEL 237" 158" 48" X 106" Bulk storage area 48" X 106" �.. 48" X 106" = 48" X 106" 48" X 106" I 48" X 106" 48" X 106" ' 48" X 106" 48" X 106" TUNNEL BAY 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106"- .. 48" X 106" 48" X 106" . 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" TUNNEL BAY 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 5,, 48" X 106" 3S .. c a eb aW eW x . a y _ 48" X 106" x 48" X 106" . v 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" TUNNEL BAY 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" Vb :z 48" X 106" . 4 . c a eb aW eW .Q+ . a y _ 48" X 106" a . 48" X 106" . v 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" TUNNEL BAY 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106"� 1J Y !i i9 ii i�l 1Y 3 Y ii " .. r 48" X 106" 48" X 106" T_ . 48" X 106" 48" X 106" X 48" X 106" 48" X 106" 48" X 106" 1 48" X 106" TUNNEL BAY y _ 48" X 106" . 48" X 106" 48" X 106" 1. 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" TUNNEL BAY 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106", .. r 48" X 106" 48" X 106" 48" X 106" . 48" X 106" 48" X 106" - 48" X 106" -Ii 48" X 106" 48" X 106" 48" X 106" 1 48" X 106" TUNNEL BAY 48" X 106" _ 48" X 106" . 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 4. 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" TUNNEL BAY 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" TUNNEL BAY 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" v r 3 x 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" TUNNEL BAY 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" ai di. 48" X 106" 48" X 106" O 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 3 sr 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 48" X 106" 3 x _ I Od" 2'-82" f 2'-82" s- 5 -102' REV.# DESCRIPTION DATE REVIEWED FOR 'CODE COMPLIANCE -;. APPROVEb SEP 1 3 2016 City of ` ukwila BUILDING DIVISION DESIGN BY: Raymond Handling Concepts Corporation "IT'S NOT JUST BUSINESS, IT'S PERSONAL" FOR ASSISTANCE CALL: 800.675.2500 DESIGN PREPARED FOR: A AMERICA OFFSITE 18200M OLYMPIC AVE S. TUKWILLA, WA 98188 XXXX X)OOC XXXX STRUCTURAL ENGINEER: XXXX XXXX XXXX STRUCTURAL EIs EER STAMP: MAR 0 1 pryECEIVEDILAOF TUKW MAR 2 2 2016 PERMIT CENTER PROJECT #: XXXX DESIGNER: DAVID NORRIS TO OUR CUSTOMERS: The information on this drawing is prepared with the intent of communicating a concept and design that is the intellectual property of Raymond Handling Concepts Corporation. It is not intended for other organizations as a means of quoting, designing / and or engineering alternatives. bio PM: DATE: SCALE: SHEET NO. SHEET NO. 311 3" COLUMN NOTES: USE @ ALL COLUMN/BASE LOCATIONS TYP. 8" DESCRIPTION MATERIAL STEEL YIELD BASE PLATE 8" x 5" 3/8" THICK PLATE ASTM A36, Fy=36,000 PSI DESCRIPTION COLUMN: HMH IF 3014 DESCRIPTION BRACING: HORIZ. & DIAG. MATERIAL 14 GAGE THK. STEEL MATERIAL 16 GAGE STEEL STEEL YIELD ASTM A570, Fy=55,000 PSI STEEL YIELD ASTM A570, Fy=55,000 PSI NOTES: USE @ ALL BRACE LOCATIONS TYP. HORIZ. BRACE DIAG. BRACE GENERAL INFORMATION ROW SPACER OLUMN BEAM 1 CONNECTOR [13ASE PLATE NOT A DEPICTION OF THIS PROJECT GENERAL PROJECT NOTES: 1. DESIGNED PER REQUIREMENTS OF THE 2012 IBC, ASCE 7-10 AND THE 2012 RMI RACK DESIGN MANUAL 2. SEISMIC CRITERIA Ss =1.458, S1 = 0.544, Fa=1.000, Fv = 1.500 Ip = 1.0 (NO PUBLIC ACCESS), Sds = 0.972, Sd1 = 0.544, OCC. CATAG. II, SITE CLASS D, SEISMIC DESIGN CLASS D 3. STORAGE CAPACITY: TYPE 1 = 1400# PER LEVEL TYP. TYPE 2 = 2100# PER LEVEL TYP. 4. ANCHORS : HILTI KWIK BOLT TZ ESR# 1917 OR POWER SD2 ESR# 2502, 1/2" x 3-1/4" MIN. EMBED. AS USED IN CALCULATIONS OR ICC & ENGINEER APPROVED EQUAL. (2) ANCHOR PER BASEPLATE. 5. PERIODIC SPECIAL INSPECTION IS REQUIRED DURING ANCHOR INSTALLATION. 6. CONCRETE THICKNESS & COMPRESSIVE STRENGTH, 5" x 2500 PSI. 7. SOIL BEARING PRESSURE 750 PSF @ GRADE OR BETTER 8. ALL RACK INSTALLATIONS AND RACKS MANUFACTURED IN CONFORMITY WITH THIS STANDARD SHALL DISPLAY IN ONE OR MORE CONSPICUOUS LOCATIONS A PERMANENT PLAQUE EACH NOT LESS THAN 50 SQUARE INCHES IN AREA AND SHOWING THE MAXIMUM PERMISSIBLE UNIT LOAD IN CLEAR, LEGIBLE PRINT. 9. ALL BOLTS GR. 5 OR BETTER. INSTALL TO SNUG TIGHT FIT WITH ALL PLYS IN FLAT CONTACT 10. ALL WELDING PERFORMED IN THE SHOP OF AN APPROVED FABRICATOR BY AWS CERTIFIED WELDERS USING E70XX ELECTRODE OR BETTER. FIELD WELDS, IF ANY, SHALL BE PROVIDED UNDER THE SUPERVISION OF A LICENSED DEPUTY INSPECTOR. 11. THE CLEAR SPACE BELOW SPRINKLERS SHALL BE A MIN. OF 18" BETWEEN TOP OF THE STORAGE AND THE CEILING SPRINKLER DEFLECTOR. DESCRIPTION 1 11/16" 3 -PIN CONNECTOR MATERIAL 7 GAGE STEEL YIELD ASTM A570, Fy=55,000 PSI 5/160 SAFETY PIN \ \ It 7/160 GR 55 RIVET n u 3 3/16" <TYP. TYP. >1/8 / NOTES: USE @ ALL 106" BEAM TO COLUMN CONNECTION LOCATIONS TYP. /160 GR. 55 RIVET DESCRIPTION MATERIAL 4-1/8" BEAM (HMH#41140) 14 GAGE DESCRIPTION MATERIAL 4 -PIN CONNECTOR 7 GAGE YIELD STEEL YIE LD ASTM A570, Fy = 55, 000 PSI NOTES: USE @ ALL 144" BEAM TO COLUMN CONNECTION LOCATIONS TYP. STEEL YIELD ASTM A570, Fy=55,000 PSI NOTES: USE @ ALL 106" BEAM LOCATIONS TYP. • TYPE 1 SELECTIVE RACK 282" 7 " 79" t 106" t 10"— FRONT VIEW DESCRIPTION 6" BEAM (HMH#60140) MATERIAL 14 GAGE NOTES: STEEL YIELD ASTM A570, Fy=55,000 PSI USE @ ALL 144" BEAM LOCATIONS TYP. • • 282" 126" TYPE 2 SELECTIVE RACK 144" FRONT VIEW 2 2" SIDE VIEW 0 lz--1 /214 3 1/4" MIN. EMBED. NOTES: CONFIRM O.A.L. OF ANCHORS WITH INSTALLER TO ENSURE REQUIRED EMBEDMENT IS OBTAINED. DESCRIPTION SIZE ESR# DESCRIPTION HILTI KWIK BOLT TZ ANCHOR 1/2101 X 3-1/4" MIN. EMBED. 1917 REVIEWED FOR ODE COMPLIANCE APPROVED SEP 13 2016 Cid of Tukwit MEM DIVISION 3 3/8" F.F. NOTES: SEE NOTE #4 ABOVE FOR ANCHOR SPECS. 12" MIN. Z 0 cnW cc W cc W d C1 1200 JEFFERSON ST. STE.F ANAEHIM, CA 92807 PH. 714.632.7330 FAX 714.632.7763 3/8"o X 7/8" SLOT 4 PLCS ROW SPACER MATERIAL 14 GAGE DESCRIPTION STORAGE RACK ELEVATIONS STEEL YIELD MAR 0 1 2016 1 1/2"-/ RE -EIVED 3/4" CITY O,ir T U K W I L, MAR 2 2 2016 PERMIT CENTER NOTES: ATTACH WITH (4) 3/8"0 GR_5 ROI TS, 2 • EACH END CLIENT RAYMOND HANDLING CONCEPTS DATE 02/25/16 z Z z 1 5 JOB NO. Q-022516-8 SHEET NO. SCE 1 OF 1 108" EXIT / 108" EXIT 10" 0 0 0 0 0 0 DOCK DOOR DOCK DOOR DOCK DOOR cc 0 0 0 0 0 0 DOCK DOOR DOCK DOOR WC SMOKE VENT EXIT EXIT EGRESS PATH 84'-9" Bulk Storage Area 1 EGRESS PATH 91'-8" EGRESS PATH 95'-7" 106" 1 0" 119" SMOKE VENT r, r Ar SMOKE VENT VISIBLE EXIT SIGN EGRESS PATH 87-0" 36" 41„ 2 .moi teatfwrt w+ff t f rmmc *r. nrrmrr elf a E IT 55" 111 REVIEWED FOR CODE COMPLIANCE APPROVED SEP 13 2016 City of Tukwila BUILDING DIVISION DESIGN BY: Raymond Handling Concepts Corporation "IT'S NOT JUST BUSINESS, IT'S PERSONAL" FOR ASSISTANCE CALL: 800.675.2500 DESIGN PREPARED FOR: A -AMERICA 18200 OLYMPIC AVE. S. TUKWILA, WA 98188 STRUCTURAL ENGINEER: STRUCTURAL CONCEPTS 1615 YEAGER AVE. LAVERNE, CA 91750 STRUCTURAL ENGINEER STAMP: RECEIVED CITY OF TUKWILA JUL 18 2016 CORRECTION PERMIT CENTER LTR# PROJECT #: 9787 DRAFTER: DAVID NORRIS REV.# DESCRIPTION DATE 1 EGRESS PATHS SHOWN WITH EXIT DOORS 7/11 /16 TO OUR CUSTOMERS: The information on this drawing is prepared with the intent of communicating a concept and design that is the intellectual property of Raymond Handling Concepts Corporation. It is not intended for other organizations as a means of quoting, designing / and or engineering alternatives. PM: DOUG WILLIAM DATE: 1/12/2016 SCALE: 1/8" = 1'-0" SHEET NO. 1 106" 282" 160" 81" 8 '10" } FRONT VIEW TYPICAL BAY 282" 144" 168" 11 12" c 197" 122" 12 11 205" SIDE VIEW BACK TO BACK 12" 1-048"---1 REVIEWED FOR CODE COMPLIANCE APPROVED SEP 13 2016 City of Tukwila BUILDING DIVISION FRONT VIEW TUNNEL SIDE VIEW BACK TO BACK bL &- 0077 DESIGN BY: Raymond Handling Concepts Corporation "IT'S NOT JUST BUSINESS, IT'S PERSONAL" FOR ASSISTANCE CALL: 800.675.2500 DESIGN PREPARED FOR: A -AMERICA 18200 OLYMPIC AVE. S. TUKWILA, WA 98188 STRUCTURAL ENGINEER: STRUCTURAL CONCEPTS 1615 YEAGER AVE. LAVERNE, CA 91750 STRUCTURAL ENGINEER STAMP: RECEIVED CITY OF TUKWILA JUL 18 2016 PERMIT CENTER PROJECT #: 9787 DRAFTER: DAVID NORRIS REV.# DESCRIPTION DATE TO OUR CUSTOMERS: The information on this drawing is prepared with the intent of communicating a concept and design that is the intellectual property of Raymond Handling Concepts Corporation. It is not intended for other organizations as a means of quoting, designing / and or engineering alternatives. PM: DOUG WILLIAM DATE: 1/12/2016 SCALE: 1/8" = SHEET NO.