Loading...
HomeMy WebLinkAboutTIC 2020-11-16 Item 2A - Bid Award - Andover Park East Water Main Pavement Repair Icon Materials https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/2020 Agenda Items/TIC 11 -16-2020/1. APE Water Main Pav Repair Bid Award/Info Memo APE Water Main Pavement Repair Bid Award.docx INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Hari Ponnekanti, Interim Public Works Director BY: Scott Bates, Traffic Engineering Project Manager CC: Mayor Ekberg DATE: November 13, 2020 SUBJECT: Water Fund - Andover Park East Water Main Pavement Repair Project Project No. 92040102 Bid Award ISSUE Award the bid for construction of the Andover Park East Water Main Pavement Repair Project. BACKGROUND On June 17, 2020, the City’s 10” water main failed at 455 Andover Park East causing damage to the roadway and area driveways. ANALYSIS A call for bids was advertised for the Andover Park East Water Main Pavement Repair Project on October 20 and 27, 2020. Seven bids were opened on November 3, 2020. The confirmed lowest bidder was ICON Materials with a bid of $141,546.00. The Engineer’s Estimate was $143,155.00. There were no bidding errors. FINANCIAL IMPACT AND BID SUMMARY (All amounts include sales tax) Bid Amount Engineer’s Water Fund Estimate Budget ICON Materials $141,546.00 Contingency 10% 14,154.60 Total $155,700.60 $143,155.00 $155,700.60 RECOMMENDATION Council is being asked to award construction of the Andover Park East Water Main Pavement Repair Project to Icon Materials for a total contract amount of $141,546.00 and to consider this item that same night under New Business at the November 16, 2020 Regular Meeting. Attachments: Vicinity Map Award recommendation letter Bid Tabulation 1 2 3131 Elliott Avenue North  Seattle, WA 98121  Phone (206) 286-1640  Fax (206) 286-1639 2502 Jefferson Avenue  Tacoma, WA 98402  Phone (253) 627-0720  Fax (253) 627-4144 www.kpg.com November 04, 2020 Scott Bates City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 RE: Andover Park East Water Main Pavement Repair [Project No. 92040102] Dear Mr. Bates, As requested, KPG has completed the verification for Icon Materials for the Andover Park East Water Main Pavement Repair for their bid in the amount of $141,546.00. We have also checked the status of Icon Materials on the Washington State Labor and Industries web page to confirm they are currently insured, bonded, and licensed. Additionally, no strikes or debarment records arose federally or statewide regarding Icon Materials. It is KPG’s recommendation that the Andover Park East Water Main Pavement Repair be awarded to Icon Materials. We have enclosed the contractor verification package for your review. Sincerely, KPG, Inc. Bryce Corrigan, P.E. cc: Enclosures: Icon Materials Verification Package 3 CI T Y O F T U K W I L A DE P A R T M E N T O F P U B L I C W O R K S An d o v e r P a r k E a s t W a t e r M a i n P a v e m e n t R e p a i r Ap p a r e n t L o w B i d BI D T A B U L A T I O N Tu k w i l a P r o j e c t # 9 2 0 4 0 1 0 2 No v e m b e r 0 4 , 2 0 2 0 RO A D W A Y 1 1 - 0 4 U n e x p e c t e d S i t e C h a n g e s 1 F A 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5 , 0 0 0 . 0 0 $ 5,000.00 $ 5,000.00 $ 5,000.00 $ 2 1 - 0 7 S P C C P l a n 1 L S 1, 0 0 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 10 7 . 0 0 $ 10 7 . 0 0 $ 25 0 . 0 0 $ 25 0 . 0 0 $ 23 7 . 5 2 $ 23 7 . 5 2 $ 1, 0 0 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 102.00 $ 102.00 $ 1,000.00 $ 1,000.00 $ 3 1 - 0 9 M o b i l i z a t i o n 1 L S 10 , 00 0 . 0 0 $ 10 , 0 0 0 . 0 0 $ 12 , 0 2 1 . 0 0 $ 12 , 0 2 1 . 0 0 $ 13 , 0 0 0 . 0 0 $ 13 , 0 0 0 . 0 0 $ 14 , 3 9 8 . 1 7 $ 14 , 3 9 8 . 1 7 $ 17 , 6 4 0 . 0 0 $ 17 , 6 4 0 . 0 0 $ 12 , 0 0 0 . 0 0 $ 12 , 0 0 0 . 0 0 $ 9,100.00 $ 9,100.00 $ 32,000.00 $ 32,000.00 $ 4 1 - 1 0 P r o j e c t T e m p o r a r y T r a f f i c C o n t r o l 1 L S 12 , 0 0 0 . 0 0 $ 12 , 0 0 0 . 0 0 $ 20 , 7 5 0 . 0 0 $ 20 , 7 5 0 . 0 0 $ 7, 5 0 0 . 0 0 $ 7, 5 0 0 . 0 0 $ 13 , 6 9 5 . 6 7 $ 13 , 6 9 5 . 6 7 $ 12 , 0 0 0 . 0 0 $ 12 , 0 0 0 . 0 0 $ 12 , 0 0 0 . 0 0 $ 12 , 0 0 0 . 0 0 $ 22,533.00 $ 22,533.00 $ 30,000.00 $ 30,000.00 $ 5 2 - 0 2 C e m e n t C o n c . S i d e w a l k a n d D r i v e w a y R e m o v a l I n c l . H a u l 10 0 S Y 60 . 0 0 $ 6, 0 0 0 . 0 0 $ 43 . 0 0 $ 4, 3 0 0 . 0 0 $ 25 . 0 0 $ 2, 5 0 0 . 0 0 $ 65 . 7 1 $ 6, 5 7 1 . 0 0 $ 65 . 0 0 $ 6, 5 0 0 . 0 0 $ 35 . 0 0 $ 3, 5 0 0 . 0 0 $ 59.60 $ 5,960.00 $ 25.00 $ 2,500.00 $ 6 2 - 0 2 C e m e n t C o n c . C u r b R e m o v a l I n c l . H a u l 13 0 L F 25 . 0 0 $ 3, 2 5 0 . 0 0 $ 13 . 5 0 $ 1, 7 5 5 . 0 0 $ 15 . 0 0 $ 1, 9 5 0 . 0 0 $ 30 . 8 1 $ 4, 0 0 5 . 3 0 $ 28 . 0 0 $ 3, 6 4 0 . 0 0 $ 22 . 0 0 $ 2, 8 6 0 . 0 0 $ 20.75 $ 2,697.50 $ 20.00 $ 2,600.00 $ 7 2 - 0 2 R o a d w a y E x c a v a t i o n I n c l . H a u l 33 0 C Y 48 . 0 0 $ 15 , 8 4 0 . 0 0 $ 58 . 0 0 $ 19 , 1 4 0 . 0 0 $ 40 . 0 0 $ 13 , 2 0 0 . 0 0 $ 40 . 8 2 $ 13 , 4 7 0 . 6 0 $ 72 . 0 0 $ 23 , 7 6 0 . 0 0 $ 10 4 . 0 0 $ 34 , 3 2 0 . 0 0 $ 52.70 $ 17,391.00 $ 50.00 $ 16,500.00 $ 8 2 - 0 3 U n s u i t a b l e F o u n d a t i o n E x c a v a t i o n I n c l . H a u l 60 C Y 60 . 0 0 $ 3, 6 0 0 . 0 0 $ 10 9 . 0 0 $ 6, 5 4 0 . 0 0 $ 50 . 0 0 $ 3, 0 0 0 . 0 0 $ 94 . 5 9 $ 5, 6 7 5 . 4 0 $ 72 . 0 0 $ 4, 3 2 0 . 0 0 $ 13 0 . 0 0 $ 7, 8 0 0 . 0 0 $ 34.20 $ 2,052.00 $ 50.00 $ 3,000.00 $ 9 4 - 0 4 C r u s h e d S u r f a c i n g B a s e C o u r s e 38 0 T O N 45 . 0 0 $ 17 , 1 0 0 . 0 0 $ 20 . 0 0 $ 7, 6 0 0 . 0 0 $ 35 . 0 0 $ 13 , 3 0 0 . 0 0 $ 22 . 9 3 $ 8, 7 1 3 . 4 0 $ 58 . 0 0 $ 22 , 0 4 0 . 0 0 $ 40 . 0 0 $ 15 , 2 0 0 . 0 0 $ 41.60 $ 15,808.00 $ 25.00 $ 9,500.00 $ 10 5 - 0 4 H M A C l . 1 / 2 " P G 5 8 H - 2 2 47 0 T O N 11 0 . 0 0 $ 51 , 7 0 0 . 0 0 $ 95 . 5 0 $ 44 , 8 8 5 . 0 0 $ 17 5 . 0 0 $ 82 , 2 5 0 . 0 0 $ 11 5 . 6 3 $ 54 , 3 4 6 . 1 0 $ 16 0 . 0 0 $ 75 , 2 0 0 . 0 0 $ 16 4 . 0 0 $ 77 , 0 8 0 . 0 0 $ 128.25 $ 60,277.50 $ 110.00 $ 51,700.00 $ 11 7 - 1 2 A d j u s t S e w e r M a n h o l e 1 E A 50 0 . 0 0 $ 50 0 . 0 0 $ 44 7 . 0 0 $ 44 7 . 0 0 $ 1, 0 0 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 1, 7 0 7 . 3 8 $ 1, 7 0 7 . 3 8 $ 1, 0 0 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 1, 5 0 0 . 0 0 $ 1, 5 0 0 . 0 0 $ 1,710.00 $ 1,710.00 $ 1,150.00 $ 1,150.00 $ 12 8 - 0 1 I n l e t P r o t e c t i o n 3 E A 80 . 0 0 $ 24 0 . 0 0 $ 26 . 0 0 $ 78 . 0 0 $ 70 . 0 0 $ 21 0 . 0 0 $ 68 . 4 8 $ 20 5 . 4 4 $ 10 0 . 0 0 $ 30 0 . 0 0 $ 10 0 . 0 0 $ 30 0 . 0 0 $ 90.00 $ 270.00 $ 25.00 $ 75.00 $ 13 8 - 0 4 R e i n f o r c e d C e m e n t C o n c . C u r b a n d G u t t e r 13 0 L F 50 . 0 0 $ 6, 5 0 0 . 0 0 $ 43 . 0 0 $ 5, 5 9 0 . 0 0 $ 50 . 0 0 $ 6, 5 0 0 . 0 0 $ 10 3 . 9 2 $ 13 , 5 0 9 . 6 0 $ 45 . 0 0 $ 5, 8 5 0 . 0 0 $ 30 . 0 0 $ 3, 9 0 0 . 0 0 $ 44.80 $ 5,824.00 $ 45.00 $ 5,850.00 $ 14 8 - 1 3 R e m o v e a n d R e p l a c e M o n u m e n t C a s e a n d C o v e r 1 E A 1, 0 0 0 . 0 0 $ 1, 0 0 0 . 0 0 $ 2, 7 8 0 . 0 0 $ 2, 7 8 0 . 0 0 $ 2, 5 0 0 . 0 0 $ 2, 5 0 0 . 0 0 $ 2, 6 7 2 . 1 1 $ 2, 6 7 2 . 1 1 $ 2, 0 0 0 . 0 0 $ 2, 0 0 0 . 0 0 $ 1, 8 0 0 . 0 0 $ 1, 8 0 0 . 0 0 $ 684.50 $ 684.50 $ 1,000.00 $ 1,000.00 $ 15 8 - 0 6 C e m e n t C o n c . D r i v e w a y E n t r a n c e 80 S Y 80 . 0 0 $ 6, 4 0 0 . 0 0 $ 80 . 2 5 $ 6, 4 2 0 . 0 0 $ 85 . 0 0 $ 6, 8 0 0 . 0 0 $ 71 . 2 6 $ 5, 7 0 0 . 8 0 $ 95 . 0 0 $ 7, 6 0 0 . 0 0 $ 13 4 . 0 0 $ 10 , 7 2 0 . 0 0 $ 72.00 $ 5,760.00 $ 70.00 $ 5,600.00 $ SI D E W A L K 16 8 - 1 4 C e m e n t C o n c . S i d e w a l k 30 S Y 65 . 0 0 $ 1, 9 5 0 . 0 0 $ 69 . 5 5 $ 2, 0 8 6 . 5 0 $ 70 . 0 0 $ 2, 1 0 0 . 0 0 $ 47 . 5 0 $ 1, 4 2 5 . 0 0 $ 11 5 . 0 0 $ 3, 4 5 0 . 0 0 $ 17 8 . 0 0 $ 5, 3 4 0 . 0 0 $ 53.90 $ 1,617.00 $ 50.00 $ 1,500.00 $ TR A F F I C C O N T R O L D E V I C E S 17 8 - 0 9 R a i s e d P a v e m e n t M a r k e r T y p e 1 10 0 E A 4. 0 0 $ 40 0 . 0 0 $ 8. 5 6 $ 85 6 . 0 0 $ 8. 5 0 $ 85 0 . 0 0 $ 8. 9 1 $ 89 1 . 0 0 $ 12 . 0 0 $ 1, 2 0 0 . 0 0 $ 10 . 0 0 $ 1, 0 0 0 . 0 0 $ 9.13 $ 913.00 $ 8.00 $ 800.00 $ 18 8 - 0 9 R a i s e d P a v e m e n t M a r k e r T y p e 2 25 E A 8. 0 0 $ 20 0 . 0 0 $ 12 . 8 4 $ 32 1 . 0 0 $ 13 . 0 0 $ 32 5 . 0 0 $ 11 . 8 8 $ 29 7 . 0 0 $ 20 . 0 0 $ 50 0 . 0 0 $ 10 . 0 0 $ 25 0 . 0 0 $ 13.75 $ 343.75 $ 12.00 $ 300.00 $ 19 8 - 2 2 P a i n t L i n e 70 L F 2. 5 0 $ 17 5 . 0 0 $ 3. 2 5 $ 22 7 . 5 0 $ 3. 2 0 $ 22 4 . 0 0 $ 5. 9 4 $ 41 5 . 8 0 $ 5. 0 0 $ 35 0 . 0 0 $ 6. 0 0 $ 42 0 . 0 0 $ 3.45 $ 241.50 $ 3.00 $ 210.00 $ 20 8 - 2 2 P l a s t i c T r a f f i c A r r o w 3 E A 10 0 . 0 0 $ 30 0 . 0 0 $ 21 4 . 0 0 $ 64 2 . 0 0 $ 21 5 . 0 0 $ 64 5 . 0 0 $ 29 6 . 9 0 $ 89 0 . 7 0 $ 25 0 . 0 0 $ 75 0 . 0 0 $ 50 0 . 0 0 $ 1, 5 0 0 . 0 0 $ 228.00 $ 684.00 $ 200.00 $ 600.00 $ T O T A L ES T I M A T E 14 3 , 1 5 5 . 0 0 $ TO T A L B I D 14 1 , 5 4 6 . 0 0 $ TO T A L B I D 16 3 , 1 0 4 . 0 0 $ T O T A L BI D 15 3 , 8 2 7 . 9 9 $ T O T A L BI D 19 4 , 1 0 0 . 0 0 $ T O T A L BI D 19 7 , 4 9 0 . 0 0 $ TOTAL BID 158,968.75 $ TOTAL BID 170,885.00 $ Pr o p o s a l 14 7 , 1 1 7 . 1 0 $ No . S e c t i o n N o . It e m R W S c o t t C o n s t r u c t i o n C o U n i t C o s t T o t a l C o s t I c o n M a t e r i a l s U n i t C o s t T o t a l C o s t N P M C o n s t r u c t i o n C o U n i t C o s t T o t a l C o s t E n g i n e e r ' s E s t i m a t e Qt y U n i t U n i t C o s t T o t a l C o s t P u g e t P a v i n g U n i t C o s t T o t a l C o s t N o r t h w e s t A s p h a l t Miles Resources Lakeside I ndustries U n i t C o s t T o t a l C o s t U n i t C o s t T o t a l C o s t U n i t C o s t T o t a l Cost 1 o f 1 4