18-049 - BN Builders - Public Safety Plan: Justice Center Construction Management (Amendment U-V)
TO: 18-049(v) Council Approval N/A Sheet 1 of 1 CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 017 DATE: 1212212020 PROJECT NO.: 91630501 PROJECT NAME: PSP — Justice Center BUDGET NO.: 305.98 CONTRACT NO.: 18-049.1 ( v ) You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: See Attached Exhibit "A" We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACCEP ED: Date 1/14/21 By Ori inal Contract (without tax)* Previous Change Order This Change Order (without tax) REV. CONTRACT AMOUNT B Contractor BNBuilders Title Proje t Manager $ 34,049,999.00 $ 2,769,567.00 $ 86,025.00 By $ 36,905,591.00 APPROVED BY THE CITY OF TUKWILA Date 212j 70z1 ayor Deputy City Administrator 7; c-- riginal Contract Time: 546 days (December 18, 2020) SOJ Program Director 'Additional Contract Time for this Change Order: 133 days Updated Contract Time: 679 days (April 30, 2021) ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) cc: Finance Department (w/encumbrance) Project Management File PW Project Finance File / *The original contract value is construction only and does NOT include preconstruction or amendments to preconstruction. Exhibit "A" CHANGE ORDER CITY OF TUKWILA Project Name Project# TO CONTRACTOR: - SUMMARY OF CHANGE - PUBLIC SAFETY PLAN Justice Center CO # 17 91630501 Contract # 18-049.1 (v ) Date 12/22/20 BNBuilders 2601 Fourth Ave, Suite 350 Seattle, WA 98121 COP/CCD # Description Reason Code Amount COP 5157 Added Soap Dispensers at Restrooms (RFI 448). Added 12 wall mounted soap dispensers per RFI 448. DC $2,857.00 COP 5180 Furnished and Installed Distributed Antenna System (DAS) for Emergency Radio Coverage. Added scope to GC/CM contract per owner direction to facilitate system installation on schedule. Included additional conduit, painting and installing an access panel as required by the DAS system. OC $52,674.00 COP 5206 Moved Exterior Camera Up from Exterior Sign. Removed, replaced and reinstalled panels around camera above the exterior sign per owner direction. Conduit extended to location above for relocated camera. OC $5,694.00 COP 5217 Added Fire Department Knox Box. Provided and installed Knox Box per Fire Marshal's direction. AD $826.00 COP 5221 Revised Evidence Storage Area (RFI 534). Evidence area storage changes per owner direction: added a soffit in A141/A142 with impact board, changed the diffuser size down to accommodate the soffit and added impact board to the west wall of the drugs room A143, per RFI 534. OC $5,309.00 COP 5225 Added Exit Signs (RFI 520). Added electronic exit sign fixtures as directed by Building Inspector for C of 0 on 7/28/20. Included temporary fixtures installed initially due to permanent fixture lead times. AD $3,943.00 COP 5229 Added Toilet Room Accessories (ASI 039). Furnished and installed additional restroom accessories: seat cover dispensers and surface mounted soap dish at shower enclosures per owner direction. OC $3,145.00 COP 5237 Added Galley Equipment. Added (1) mini -fridge and (11) microwaves per owner direction. OC $6,524.00 COP 5248 Revised Sign for Gun Locker Room. Room ID sign change at C102: remove "gun locker" text and replace with new sign "storage" text per owner direction. OC $596.00 COP 5251 COP 5278 Revised Court Lobby Exit Door (ASI -48.1). Revised Door C103 per owner direction: added battery powered door exit alarm; replaced glazing in door with spandrel metal to match adjacent anodized frame; added interior and exterior signage indicating "Emergency exit only, alarm will sound!" in prominent white -on -red background. OC $4,457.00 No Cost Time Extension. Revising the contract's date of Final Completion from December 18, 2020 to April 30, 2021. The contract time is extended primarily to account for Owner directed changes issued after occupancy of the building. The Substantial Completion is unchanged and was acheived ahead of schedule on August 28, 2020. UFC $0.00 Change Order No. 17 $86,025.00 B BN Builders April 24, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI -448 Dear Ethan, In accordance with RFI 448 dated 04/23/20, BNBuilders hereby submits our proposal for 12 additional wall mounted soap dispensers. The total proposal of this subject work is two thousand eight hundred and fifty-seven dollars $2,857.00. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5157 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek(@,soseaj.com) Geri Urbas (qeri.urbas(@.bnbuilders.com) Steve Schmitz (sschmitzdIrgroup.com) BNBuilders 2601 4' Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 $2,8! 13NBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 448 COP #: 5157 GENERAL CONTRACTOR: BNBuilders, Inc. DATE: 4124/2020 DESCRIPTION OF CHANGE: Added 12 wall mounted soap dispensers per RFI 448. IBP 09.20 Northwest Partition lst-tier Subcontractor Cost Total (Direct Construction Costs) GC/CM Mark-up on MACC Costs Rounding Adjustment $2,72 $2,72 Total Change Request To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date gell NORTHWEST IIMMO PARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle, WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Description: RFI #448 - added soap dispeners Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR -0052 External/RCO# GC Ref# Date Job # Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 **REVISED** Revision# 1 Apr 24, 2020 2066 Labor Installation of Restroom Accessories Stock D/W - Onsite Material Restroom Accessory 12 soap dispensers Total Miscellaneous Charges Size EACH Quantity UOM Unit Total 12.00 Hrs 12.00 5.00 Hrs 5.00 Quantity UOM 1.00 EA Rate 73.76 72.31 Total $885.12 $361.55 Total Labor Unit Price 1,089.00 EA $1,246.67 Total $1,089.00 Total Material $1,089.00 Total B&0 Tax .48% GL Insurance 1% $11.21 $23.47 Total Miscellaneous Charges $34.68 AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers 20006 - 144th Avenue NE, Woodinville, WA 98072 Run on: April 24, 2020 10:40 AM T 425-375-2500 Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: $1,246.67 $1,089.00 $0.00 $0.00 $34.68 Sub Total: Overhead 15%: Sub Overhead: $2,370.65 $350.35 15.00% $0.00 8.00% Total: $2,721.00 F 425-375-2540 http://www.nwpart.com Chris Ayers From: Nick Rogers <NickR@bdap.com> Sent: Friday, April 24, 2020 10:34 AM To: Chris Ayers Subject: RE: TJC RFI ap Dispenser (SD) & Restroom Sink (L-2) Clarifications (Responded & Closed).pdf (12)EA for $1,089.00 FOB job/your shop This is an extended lead time due to COVID19 currently,3-4 weeks From: Chris Ayers <ChrisA@nwpart.com> Sent: Friday, April 24,2O2DlO:IlAK4 To: Nick Rogers <NickR@bdap.com> Subject: RE: TJC RFI #448_Soap Dispenser (SD) & Restroom Sink (L-2) Clarifications (Responded & Closed).pdf Hi Nick, BNB just called and they are telling me to make sure we add 12 in total. Can you give me the revised price please for 12? Thank you, ���� ����!OWESW ����l���� ����������|D���� www.nwpart.com SENIOR T /��Ty�A� ------------'-----'''---'-/______ P: 425.375.2500 D: 425.375.2519 20006 144th Ave NE, Woodinville, WA 98072 t Lets go GREEN, save the planet! (Please do not printemaH.unleoayou need IL) From: Nick Roger<uickR@bdap.com> Sent: Thursday, April 23,3O2O3:l9PM To: Chris Ayers <ChrisAnwpart.com> Subject: RE: TJC RFI #448_Soap Dispenser (SD) & Restroom Sink (L-2) Clarifications (Responded & Closed).pdf (l1)EAfor $99O.UOFOB job/your shop This is an extended Iead time due to COVID19 currently,3-4 weeks From: Chris Aye Sent: Thursday, April 23, 2020 1:52 PM To: Nick Rogers <NickRbdap.com> Subject: FW: TJC RFI#448_Soap Dispenser (SD) & Restroom Sink (L-2) Clarifications (Responded & Closed).pdf Importance: High Hi Nick 1 DLR Group RFI T DLR Group PROJECT: SUBJECT: TYPE: PURPOSE: QUESTION: City of Tukwila Justice Center DATE SENT: 4/33/2020 73-17158-00 TJC RFI #448_Soap Dinser (SD) & Restroom Sink (L-2) Clarifications RFI Answered RFI ID: TRANSMITTAL ID: 448 02265 al VIA: Info Exchange Please review the following questions below and clarify the requirements for the soap dispensers and the sinks in several restrooms: 1. Rooms A149 & A150 — Currently, no soap dispenser 15 called out and a Kohler K-5027-1 sink is installed with single hole for faucet. Please confirm that no soap dispenser 15 required. Z. Jury Room C119 — Currently, no soap dispenser is called out for this room and a Kohler K-5027-1 sink is installed with single hole for faucet in restroom. Please confirm no soap dispenser is required for these rooms. 3. C104 & C105 — Currently, only 1 soap disperiser 15 called out for C105 but not for C104 on A2.1. The soap dispenser 15 spec'd out to be deck mounted but 15 shown to be located on the wall in A2.1. The sink spec'd out for this area is a Kohler K-5027-1 sink and only has a single hole for a faucet. Please confirm the intent for these restrooms. We do not recommend using deck mounted soap dispensers, as new custom sinks will need to be ordered. 4. A241 & A242 — Currently, a wall mounted soap dispenser is shown in both A241 & A242 but spec'd out to be surface mounted. The sink spec'd out for these areas 15 a Kohler K-5027-1 sink and only has a single hole for a faucet.Please confirm the intent for these restrooms. We do not recommend using deck mounted soap dispensers, as new custom sinks will need to be ordered. 5. C125 & C126 — Currently, a deck mounted soap dispenser is shown in the drawings to be Iocated in both restrooms. However,the sink spec'd out for these areas is a Kohler K-5027-1 sink and only has a single hole for a faucet. Please confirm the intent for these restrooms. We do not recommend using deck mounted soap dispensers, as new custom sinks will need to be ordered. G. B113 (Staff WC) — A soap dispenser is shown in the drawings to be wall mounted but spec'd out to be surface mounted. However, the sink spec'd out for these areas is a Kohler K-5027-1 sink and only has a single hole for a faucet. Please confirm the intent for these restrooms. We do not recommend using deck mounted soap dispensers, as new custom sinks will need to be ordered. Page 1 of 3 SUGGESTION: ANSWER: FRONI NAME Michelle Javan RFI T DATE: ID: s tt:n� 4/23/2020 02265 7. C11O (Public WC) - A soap dispenser is shown in the drawings to be wall mounted but spec'd out to be surface mounted. However, the sink spec'd out for these areas is a Kohler K-5027-1 sink and only has a single hole for a faucet. Please confirm the intent for these restrooms. We do not recommend using deck mounted soap dispensers, as new custom sinks will need to be ordered. O. C140 — A soap dispenser 15 shown in the drawings to be wall mounted but 15 not called out. The only soap dispenser spec'd out is a deck mounted soap dispenser. The sink spec'd out for these areas is a Kohler K-5027-1 sink and only has a single hole for a faucet. Please confirm the intent for these restrooms. We do not recommend using deck mounted soap dispensers, as new custom sinks will need to be ordered. Response (Answered) from: Steven Schmitz (DLR Group) Remarks: Soap Dispensers (SD) are required at ALL public/staff WC per Wash Dept. of Health and L&I. Specified SD was meant to be provided at all lavatories or counter -mount rooms. 1) SD is required. Replace specified deck -mounted faucet with wall - mount. 2) SD is required. Replace specified deck -mounted faucet with wall - mount. 3) SD (2) are required. Replace specified deck -mounted faucet with wall - mount. 4) SD (2) are required. Replace specified deck -mounted faucet with wall - mount. 5) SD (2) are required. Replace specified deck -mounted faucet with wall - mount. 6) SD is required. Replace specified deck -mounted faucet with wall - mount. 7) SD is required. Replace specified deck -mounted faucet with wall - mount. 8) SD is required. Replace specified deck -mounted faucet with wall - mount. Steve Schmitz - DLR Group 04.22.20 DLR Group javaO@d|rgroupxcorn PHONE 206-461- 6065x736065 Page 2 of 3 TO Bill Brown | BNBuilders Ethan Bernau Geri Urbas Jeff Clark Michelle Javan Steven Schmitz Taras Yaremchuk DESCRIPTION OF CONTENTS ShkalsOb|etz Johnsen BNBuilders BNBuilders DLR Group BNBuilders RFI Tr DATE: ID: EMAIL om ethanb@sojsea.com om om taras.yaremchuk@bnbui QTY DATED TITLE 1 TJC RFI #448 Soap 1 4/13/2020 Dispenser (SD) & Restroom Sink (L-2) NUMBER SCALE PHONE 206- 82-34 S M^���K 4/23/2020 02265 206-838-3705 206-382-3443 206-382-3443 206-461- 6065x736065 206-461- 6044x73-6044 206-382-3443 SIZE Page 3 of 3 BiN BN0mi|ders Request for Information RFI No: 448 Tukwila Justice Ctr Construct. 15005 Tukwila InterBlvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: April 13, 2020 Submftted To: Steve Schmitz Submitted By: Bill Brown DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Soap Dispenser (SD)&Restroom Sink (L2)Onhficatios Discipline: Architectural BN Buliders, Inc. 2601 4th Avenue, Suite 350 Seattle, WA 08121 Tel: (206)382-3443 Subcontractor: Subcontractor RFI Question Date Required: 4/20/2020 Please review the following questions below and clarify the requirements for the soap dispensers and the sinks in several restrooms: 1.Rooms A149 &A15O- Currently, no soap dispenser is called out and a Kohler KS0Z7-1sink is installed with single hole for faucet. Please confirm that no soap dispenser is required 2.Jury Room C119 - Currently, no soap dispenser is called out for this room and a Kohler K5027-1 sink is installed with single hole for faucet in restroorn. Please confirm no soap dispenser is required for these rooms 3.C104 & C105 - Currently, only 1 soap dispenser is called out for G05 but not for C104 on A2.1. The soap dispenser is specd out to be deck mounted but is shown to be located on the wall in N.1. The sink speod out for this area is a Kohler K-5027-1 sink and only has a single hole for a faucet Please confirm the intent for these restrooms We do not recommend using deck mounted soal dispensers, as new custom sinks will need to be ordered 4.A241 & A242 - Currently, a wall mounted soap dispenser is shown in both N41 & A242 but specd out to be surface mounted The sink specd out for these areas is a Kohler K5027'1 sink and only has a single hole for a faucet Please confirm the intent for theyeretmomsVVodonotnacummendusingdeckmounhadooapdiypenserpasnewcustomsinksvWUneedtnbeovdenod 5.C125 &C136-Cunentk\ a deck mounted soap dispenser is shown in the drawings to be located in both restroomsHowever, the sink speai out for these areas is a Kohler K5027-1 sink and only has a single hole for a faucet Please confirm the intent for these restrooms. We do not recommend using deck mounted soap dispensers as new custom sinks will need to be ordered 6.3113 (Staff WC) - A soap dispenser is shown in the drawings to be wall mounted but sped out to be surface mounted However the sink specd out for these areas is a Kohler K5027-1 sink and only has a single hole for a faucet Please confirm the intent for these restrooms. We do not recommend using deck mounted soap dispensers as new custom sinks will need to be ordered 7.C110 (Public WC) - A soap dispenser is shown in the drawings to be wall mounted but sped out to be surface mounted However, the sink specd out for these areas is a Kohler K5027-1 sink and only has a single hole for a faucet Please confirm the intent for these restrooms We do not recommend using deck mounted soap dispensers as new custom sinks will need to be ordered. 8.C140 - A soap dispenser is shown in the drawings to be wall mounted but is not called outThe only soap dispenser specd out is a deck mounted soap dispenser. The sink specd out for these areas is a Kohler K5027-1 sink and only has a single hole for a faocet Please confirm the intent for these restrooms We do not recommend using deck mounted soap dispenseras new custorr sinks will need to be ordered Page 1 of 2 BNB BN Builders Request for Information RFI No: 448 Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Answer Soap Dispensers (SD) are required at ALL public/staff WC per Wash Dept. of Health and L&I. Specified SD was meant to be provided at all lavatories or counter -mount rooms. 1) SD is required. Replace specified deck -mounted faucet vvith wall -mount. 2) SD is required. Replace specified deck -mounted faucet with wall -mount. 3) SD (2) are required. Replace specified deck -mounted faucet with wall -mount. 4) SD (2) are required. Replace specified deck -mounted faucet with wall -mount. 5) SD (2) are required. Replace specified deck -mounted faucet with wall -mount 6) SD is required. Replace specified deck -mounted faucet with wall -mount. 7) SD is required. Replace specified deck -mounted faucet with wall -mount. 8) SD is required. Replace specified deck -mounted faucet with wall -mount. Answered by: Steve Schmitz - DLR Group Date Answered: 04/22/2020 Copies To: Company & Contact Fax Notes Page 2 of 2 TECHNICAL rONCEPTS AutoFoam Touch -Free Skin Care System FG7uwn Auto Foam sets the standard for quality and reliability in wall -mounted soap and sanitizer dispensing. Luxurous foam delights your customers, n an attractive touch -free dspenser that delivers superior cost savings. Touch -free delivery eliminates cross -contamination to hep reduce the spread of germs and encourages use RePiabe, controlled dispensing of concentrated soaps eliminates costly overuse and waste High yield of hand washes—up to 2,750 hand washes per refill Disposable, hygienic reflhl keeps soap fresh and germ free Low waste—refill evacuates fully Contemporary "dean look" dispenser available in a variety of color combinations to enhance the image of any washroom decor /"a..���,"d/"" �"v~�//�"+�"mnn, Industry-leading 120,000 hand washes longer bat life Preferred environmental choi,e—boxearefills, than other tou '-ees\otems' radable and Green Seal"'* soaps— vpu,uompamagingwastceuucuon' Helps earn LEED credits Up to Hand Washes Per Refill DLR Group: _Sohxtit/te 1000 — ------- deCk-DlOVntedVVith —VVaU mounted where indicated in RFI 448 Up to outm no, 1;0 more solids than other soap systems' AutoFoam System F9750138 Other Automatic Foam Systems UxoomU Liquid Bag -in -Box Luxurious Skin Care Products . . . More Than You Expect Auto Foam systems feature our premium quality Enriched Foam hand soaps and sanitizers for a luxurious experience that delights users and encourages healthy hand hygiene. Highly concentrated soaps deliver thicker, denser foam lather. All are formulated with extra mild ingredients, pH ba|anoe6, and enriched with effective moisturizers to leave hands feeling soft and refreshed. Biodegradeable and Green Sea I'' certified soaps meet higher environmental standards. Hand Soap with Moisturizers Green Seal '"*certified Enriched with skin conditioners Hypoallergenic for sensitive skin Fresh hght citrus fragrance Rich teal color Biodegradable Antibacterial E2 Soap Kills unu,99y9%ofgerms Effective ogainst Staph, E. coli, 5a|mundb. Shigella, C. jejuni, and more Enriched with skin conditioners Hypoatergenic for sensitive skin NSF E2 rated, one-step cleansing and sanitizing for food handlers Effective degreasing/cleansing of food residue Dye -free and fragrance -free Biodegradable Alcohol Hand Sanitizer Contains 67% ethyl alcohol Kills over e9.y9yofgerms Effective against mnSA. VRE, Candida, K. pneumoniae, Pseudomonas a, and more Enriched with Glycerin & Aloe Vera Hypoallergenic for sensitive skin NSF E3 rated, sanitizing for food handlers Dye -free and fragrance -free Alcohol -Free Hand 5anitizer Contains 0.1% Benzalkoniurn Chloride for alcohol -free sanitizing Safe, non-flammable Kills over 99.9%ofgerms Effective against Staph, MxSA, Strep, E. coli, Solmonella, & more Enriched with Glycerin & Aloe Vera Hypoallergenic for sensitive skin 'Based on inteinal testing. FVs. traditional bartiin-box and bulk gallons. Au ADA COMPLIANT AutoFoam Dispensers No. Description, U.5, 9 U.S. Ship WUCase U.S. Case Cube Metric Dimensions FG750411 Metric Ship WUCase Metric Case Cube Case Pack t h 4 1.2,ux17a_ 1.7 10 FG750138 AutoFoam Dispenser - White/Black Pearl 5.25" 1 x 5.18" w x 10.86" h F0750139 AutoFoam Dispenser - BlackIGrey Pearl 525" I x 5.18" w x 10.86" h FG750140 AutoFoam Dispenser- White/Grey Pearl 5.25" I x 5.18" w x 10.86" h F0750411 AutoFoam Dispenser - Blad Chrome 5.25" I x 5.18" w x 10.86"' h FG1892265 AutoFoam Drip Tray 4.3"1 x 3.9" w x 5.7" h Requires 4 "C" alkaline batteries (not included) unless otherwise stated. Hand Sanitizing Station No Description U.S Dimensions FG750824 Hand Sanitizer Station (Metal Stand) - Black 4" dia x 59.25" h Enriched Foam Refills NSF & Green Seal"`apply to specific refills only; see below. Foam Hand Wash No. Description • FG750112 Enriched Foam Hand Soap with Moisturizers O FG750111 Enriched Foam Antibacterial E2 Hand Soap 02 Foam Han No. Description Q FG750591 Enriched Foam Alcohol Hand Saniti FG750593 Enriched Foam Alcohol -Free He Distributed by: 24.75 Ib 25.25 ft 13.3 cm x 13.2 cm x 27.6 cm 11.2 kg 0.72 m1 24.751b 25.25 ft' 13.3cmx13.2cmx27.6cm 11.2 kg 0.72m3 24.75 Ib 25.25 ft' 13.3 cm x 13,2 cm x 27.6 cm 11.2 kg 0.72 m' 24.75 Ib 25.25 ft' 13.3 cm x 13.2 cm x 27.6 cm 11.2 kg 0.72 m1 10 10.1 Ib 0.44 ft' 10.9 cm x 9.9 cm x 14.5 cm 4.6 kg 0.01 m' 6 'Based on internal testing. 10 10 10 D.S.Ship Wt/Case U.S. Case Cube Metric Dimensions 32,0 Ib 2,73 ft' 35.6 cm dia x 150.5 cm Size 1100 mL 1100mL SANITIZE ! U.S. Ship Wt/Case 10.9 Ib 10.9 Ib U.S. Case Cube 0.031 ft' 0.031 ft' Size A NewellRubbermaid Brand ©2015 by Rubbermaid Commercial Products LLC 3124 Valley Avenue, Winchester, VA 22601 05/15 RCP-SMSB773 .r Printed on Recycled Paper 'this prad.ut institutional aquatic toxlci 1100 mL 1100 mL Case Cube 031 ft' 10.91b 0,031 ft :ts the Green Seal'" standard Tar d cleaners based on its reduced human and Ind. reduced smog produalon potential. Metric Ship WUCase Metric Case Cube Case Pack 14.5 kg 0.08 m' 1 FG750112 Metric ShipWUCase Metric Case Cube 4.9 kg 0.01 m3 4.9 ky 0.01 m' FG750593 Case Pack 4 4 Metric ShipWt/Case Metric Case Cube Case Pack 4.9 kg 0.01 m' 4 Work Smarter. You Commercial. Products TECHNICAL CONCEPTS 1-800-347-9800 - www.rubbermaidcommercial.com ab i3O- Ll L N CD nth, L- cn O JI / \ o LL N I I co 1 0 E):>_ 0 CI- CO 0 L.L1 Lu Z Z Lu 0_ 1— L.L.. 0< =. Lu 0 I— uj z 02: 2 0 00 c.u- 0 0 0 0 Lu z w >0 cc < z < < C.1 0 0 z I— w w I— 0 < ce z 0 m 0 w Z Z <0 -3 0 C.) < Z < 0 0 1 •e DISHWASHER CONNECTION 0 1 0 Z'sd u , 2 a w 0) PUMP HEAD C) PUMP TYPE INLINE CIRCULATOR LOCATION 0 UJ 0 1 0 WATER HEATER SCHEDULE - GAS J W co a. L) GAS PRESSURE ca LO c) J CL, cn Qc 0 0 z 0) 0) r LL W 0 CO N C) v z ci J _ w U w 2 0 N w 0 _ w O 1uj 0 -- Z LU UJ 2 CD UJ w aw • O • Lt CD 0 OD 0 cr 0= c) F- CL • to ~mow O Q wLu ® w Z 1" a 0 0 0 LU 0 UJ Lu - w 0 z z O 0000 ®062® » I-- > 00:20 acL0a wY-NC,- 0 z NK SCHEDULE. .EXPANSION T. PRESSURE z CO 0 N (1) LLIcc GHW-1, GWH-2 X B BNBuilders October 30, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for Providing and Installing DAS System Dear Ethan, BNBuilders hereby submits our proposal for providing the DAS system as requested. Cost includes installing additional conduit, painting and installing an access panel as required by the DAS system. The total proposal of this subject work is Forty -Five Thousand Two hundred Eighteen dollars $52,674.00. There is a zero -day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5180 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim austinek(@,soseaj.com) Geri Urbas (geri.urbasAbnbuilders.com) Steve Schmitz (sschmitz@dlrgroup.com) BNBuilders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 B ,B BNB uilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: GENERAL CONTRACTOR: BNBuilders, Inc. DESCRIPTION OF CHANGE: DAS System - Day Wireless COP #: 5180 DATE: 10130/2020 Install and paint additional conduit required for DAS System Install access panel for DAS System Day Wireless BP 09.20 Northwest Partition BP 09.90 Northwest Complete Contracting BP 26.00 Valley $47,631.00 $673.00 $384.26 $1,477.00 lst-tier Subcontractor Cost Total (Direct Construction Costs) GC/CM Mark-up on MACC Costs ( Insurance, B&O and Bond ONLY) Rounding Adjustment $50,165.26 $2,508.26 $0.48 Total Change Request $52,674.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date 5.00% Tukwila Justice Center SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center Contractor Name: BNBuilders DESCRIPTION OF CHANGE: CCD/ASI #: COP #: DATE: 47 8120/2020 Prep prime and paint 11/4" conduit for RFI #516 Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractors Total Direct Cost Subcontractor's Mark-up (Excludes Labor Premium) Labor Premium $274.00 $60.14 $0.00 $50.12 $0,00 Total Subcontractor Direct Costs + Mark-up + Labor Premium $384.26 Total Sub -tier Subcontractor Costs 15% Subcontractor's Mark-up on Sub -tier Subcontractor(s) $0.00 8% Total Subcontractor Change Request $384.26 To the best of my knowledge and belief, I certify that all costs listed above are correct. Brian Biermanski 8/20/2020 Contractor Signature Date COP Cost Breakdown Project Name: Tukwila Justice Center Project No. 118021.100 Contractor BNBuilders, Inc. Work Description: Prep Prime and Paint 1 1/4" conduit for RFI# 516 CCD/RFI: CP#: 47 Date: 8/20/20 Description Quantity Unit Prod. Hours A.1. Labor A.1. Labor Premium B. Material C. Equipment $/hour Cost $/hour Cost $/Unit Costs $/Unit Costs $ - - - Labor 4 68.50 $ 274 $ - - Primer 1 Gallon - 36.14 $ 36 - Paint 1 Gallon $ - 24.00 24 $ - $ - $ - - $ - $ - - $ - - - $ - $ - $ - $ - $ - $ - $ - - - - - $ - - - - $ - - . $ - - _ $ - - _ $ - $ - . $ - $ - _ $ - - $ - $ - $ - . $ - . _ Total Cost of Work A. $ 274 $ - - B. 60 C. - VALLEY "The Electrical Solution"s VALLEY ELECTRIC CHANGE ORDER PROPOSAL Tukwila Justice Center Contract: 118021.1-05 PROPOSAL DESCRIPTION: Additional Rough In For DAS Installation - This includes labor and installation of conduit for pathway and will be done on overtime. Excludes any painting and patching of walls. SL # DATE 7/21/2020 Addendum# VE JOB # 19146 Time Ext Rqrd (days): 5 RFI# 516 VE CP # 035 Self Performed Work LABOR COST 8.00 hrs $123.78 $ 990.24 SUPERVISION 0.0% Ibr $ SAFETY 0.0% Ibr $ - SMALL TOOLS 0.0% Ibr $ MATERIAL COST $ 294.37 EQUIPMENT COST 24' Scissor Lift Month $ OH & PROFIT - SELF 15.0% Subcontractor Quotes Quote Quote Quote Quote SUBTOTAL COST: SUBTOTAL DIRECT COST QUOTES: OH & PROFIT - SUBS 8.0% Bond Permit Fee BIM hrs 85.00 $ 1,284.61 192.69 TOTAL CHANGE PRICE: $ 1,477.00 NOTE: 1) Proposal valid for acceptance within 30 days. 2) While Valley Electric considers our proposal amount full compensation for this change, we expressly reserve the right to seek additional time and compensation at a later date for the impact of multiple changes, if any, or for indirect costs that were not reasonably foreseen by Valley Electric at the time of settlement on this change. 3) This construction change has been estimated using the drawings furnished; an engineering evaluation of the drawings, for function and compatibility with the vendor furnished equipment, has riot been performed. 4) Permit costs are specifically excluded. Should this change, or it become necessary to procure/pay for an increased permit fee this would become an added cost to the change price reflected above. Our proposal amount does not include the following: - Overtime / Shift Work - Fireproofing Repairs - Concrete/GWB Repairs - Shutdown Costs - Painting and Patching Valley Electric Co. Job #19146 Detailed Labor and Material Breakdown Contract # 19146 - CP #035 - RFI 516 Additional Rough In For DAS Page 1 of 1 Print: 7/21/2020 Description Qty Net Price U Labor U Total Mat($) Total Hours 1" CONDUIT - EMT 40 117.02 C 0 C $46.81 0.00 1 1/4" CONDUIT - EMT 80 194.79 C 0 C $155.83 0.00 1" CONN COMP STL - EMT 4 72.15 C 0 C $2.89 0.00 1 1/4" CONN COMP STL - EMT 3 139.08 C 0 C $4.17 0.00 1" COUPLING COMP STL - EMT 4 96.41 C 0 C $3.86 0.00 1 1/4" COUPLING COMP STL - EMT 8 152.65 C 0 C $12.21 0.00 1" TYPE LB STD CONDUIT BODY 2 12.11 E 0 E $24.22 0.00 1 1/4" TYPE LB STD CONDUIT BODY 2 19.55 E 0 E $39.10 0.00 1" 1-H STRAP - EMT- STEEL 5 21.05 C 0 C $1.05 0.00 1 1/4" 1-H STRAP - EMT - STEEL 9 34.89 C 0 C $3.14 0.00 #8x 1 P/H SELF -TAP SCREW 14 7.76 C 0 C $1.09 0.00 SUB COORDINATION (As Needed) 0 1 E $0.00 0.00 POSTING/RECORD DWGS 0 0 E $0.00 0.00 CLEAN UP (.5% Lbr) 0 0 E $0.00 0.00 TESTING (.75% Lbr) 0 0 E $0.00 0.00 WARRANTY (As Needed) 0 0 E $0.00 0.00 Totals: $294.37 0 CONFIDENTIAL PUB CQUOTE SOLUTION SAFETY Y DAS ���~��_�� � ������ JUNE 3, 2020 „ Presented to: Eric Compton Technology & Franchise Specialist City of Tukwila (206) 454-7574 Presented by: Tony Arreola Strategic Account Manager Day Wireless Systems (206) 473-2965 Day Wireless Systems is pleased to offer the following proposal to City of Tukwila for the Emergency Responder Radio Coverage System (ERRCS) for the Tukwila Justice Center located at 15045 Tukwila International Blvd. in Tukwila, WA. IFC 510 requires all new buildings to have radio coverage for emergency responderswithin the building. This proposal is intended to provide City of Tukwila with the system needed to ensure code compliance. Each building and sftuation is unique,and each solution we provide is tailored to our customer's needs This is why we have put together the following to outline the Tukwila Justice Center project. Included in this proposal is an estimated bill of materials and reflects the proposed system design. Upon purchase and review of the system design by City of Tukwila, any changes made will result in a change order. This includes, but is not limited to: changing cable pathways, changing headend locations, and changing donor mounting. For contracting concerns, please email co ritr acts @ci and reference Project #1501-19607. We look forward to working with you on this important communications project. DAY WIRELESS SYSTEMS PROJECT #1501-19607 PROJECT BACKGROUND The project is to design a single -band Public Safety DAS for a new construction, two-story building in Tukwila. The proposed building will include a courthouse and new police station. The total area to be covered by the DAS is roughly 47,000 square feet. The radio system used by the AHJ is King County/Valley Communications (KC/VC). The KC/VC system has 24 channel pairs in the 800 MHz band to be carried in the DAS. The nearest donor site is Skyway,roughly 2.5 miles to the NE at about 48 degrees true. This Day Wireless quote design includes one (1) 800 MHz BDA and one (1) associated battery backup unit (BBU) cabinet which will be installed in the MDF Room located on Floor 1. Donor RF signals will be provided by a Yagi antenna installed on the roof and transmitted to the BDA on Floor 1 via coaxial cable that is located within a code -compliant vertical shaft to be provided by others. Coaxial distribution cable will also feed up and down the building in code -compliant shafts to be provided by others. 6/3/2020 Confidential to City ofTukwila WIRELESS SYSTEMS PROJECT #1501-19607 Tasks necessary for the successful completion of this project include, but are not limited to, the following: Provide a point of contact for project communication Provide detailed floor plans including tenant improvements Conduct a detailed design review based on plan sets Generate equipment Iist based on detailed design Approve revised design Order equipment Coordinate with donor site system managers (AHJ) Procure ERRCS and low voltage electrical permits � Select donor site Receive and inventory equipment Stage and program BDA system «y Receive AHJ approval and/or contract Install BDA and B8U Install coaxial cable along demarked pathways and terminate Perform distance tofault /DTF\ and return loss (RL) cable line (DTF) ` '�^ sweeps Install passive DAS components (jumpers, antennas, etc.) Conduct isolation testing and generate report �r Install active DAScomponents ^� Conduct donor antenna and equipment weather proofing ^� and grounding per R56 standards Optimize BDA and perform commission test Coordinate BDA and battery backup alarm connections to the FACP ‘," and facilitate testing with fire alarm vendor Perform post -installation 20-Qrid acceptance coverage test Conduct AHJ walkthrough Provide closeout documentation to AHJ �* Confirm system acceptance and sign -off ."( 6/3/2020 Confidential to City of Tukwila DAY WIRELESS SYSTEMS ASSUMPTIONS Day Wireless assumes the following applies to this scope: PROJECT #1501-19607 • Day Wireless working hours are Monday through Friday, 8:00 am to 5:00 pm. • Work is Prevailing Wage (PVW) and reflects current PVW rates as of 5/15/2020. • DAS scope does not generally qualify for a discount from OCIP/CCIP enrollment. Our quote is for total project amount, and we do not apply any deductions for OCIP/CCIP upon award. • Pricing is based on agreement between City of Tukwila and Day Wireless for project schedule. For projects that greatly exceed the agreed upon schedule, Day Wireless may issue a change order to cover increased administrative and project management costs. • Both Day Wireless and City of Tukwila will provide POC for work to be completed. • City of Tukwila to provide AutoCAD files of building for timely design submittal. • Day Wireless has set forth the expectation of a two -hour -rated equipment room and two -hour -rated riser per applicable AHJ / fire or building code requirements. Day Wireless is not responsible for any cost or labor impacts that arise if these expectations are not adhered to. • Donor signal of sufficient strength and quality exists on the building roof to be enhanced. • Ground wire (#2 THHN), per electrical code, will be brought to the headend and donor locations by others. • Interface to the fire alarm panel to be provided by others. • Distribution cable can run above, and antennas can be installed in, corridor ceilings where a suspended or sheetrock/GWB ceiling structure exists. • Distribution cable can run in existing ceiling trays and/or be attached to the ceiling or ceiling/roof structure in areas where no Iowered ceiling exists. • Access panels will be provided by others, as required by low voltage electrical code in hard -lid ceiling areas. • Antennas can be installed to existing ceiling trays and/or be attached to the ceiling/ceiling-roof structure as needed in areas where no Iowered ceiling exists. • Antennas mounted on building trusswork or other irregular interior roof structure (such as that found in garages or high-bay/atrium areas) musbe mounted in such a way as to have a clear view oftheRFcuverageareabe|ovv.Antenna"sight|ines"moynotbeobstructedbyanystructure' ductwork, plumbing, etc. • In areas of pinned insulation (such as garages), junction boxes must be provided (by others) of sufficient depth to allow each antenna to mount such that the antenna baseplate is clearly below any surrounding obstruction or insulation material. 6/3/2020 Confidential to City of Tukwila ,�� WIRELESS SYSTEMS PROJECT #1501-19607 • A vertical pathway that extends from the bottom floor to the roof will be provided by others to carry DAS and roof antenna cables. • The headend equipment room is of sufficient size to hold all the equipment and has adequate air conditioning for proper operation of the equipment. • The equipment in the headend room will be provided with a dedicated 120VAC,20A circuit terminating in a junction box fitted with a single dupiex outlet. The outlet must be capable of being secured against plug removal or unauthorized use ofthe circuit. DESIGN -SPECIFIC ASSUMPTIONS • Drawings provided do not show a verticaly identified for donor and distribution coaxial cables. For the purposes of this design quoteit is assumed that a two-hour fire rated vertical shaft will be provided by others from the MDF Room on floor 1 vertically to the 2nd Floor, terminating at the roof. w Drawings provided do not identify a specific room to be used for the headend equipment. For the purposes of this quote design, it is assumed that the BDA and BBU can be installed in the MDF Room on Floor 1 near the stairwell. This room must: o Be fire rated as required per national, state, and/or Iocal codes. o Have sufficient wall and/or floor space to support one (1) 800 MHz BDA and one (1) associated BBU cabinet. o Have a dedicated 120V 20A circuit (provided by others) for the DAS hardware that terminates in one (1) NEMA 5-15R or 5-20R outlet which is located in close proximity to the BBU cabinet. = The outlet must be capable of being secured against unauthorized plug removal or use of the circuit. • The outlet mushave a water-resistant cover (splash guard) installed. ▪ The outlet must be capable of being converted to a hard -wired hookup if required. o Have air conditioning or ventilation (such as automatic fans and/or louvers, fire rated as required) sufficient to maintain an ambient room temperature of 35C or less when the DAS equipment heat Ioad is introduced. o 6/3/2020 Confidential to City of Tukwila Have connectivity (provided by others) from the headend location to an appropriate FACP (building FACP or DAS-specific FACP) as required per state or local code. DAY WIRELESS SYSTEMS PROJECT #1501-19607 EXCLUSIONS The following are not included in this proposal: • This proposal does not consider any specialized cable routing that may result from any specialized construction methods, materials, or requirements. • Any additional equipment needed due to customer's design change is excluded. • Day Wireless is not responsible for any core drilling, roof penetrations, or other structural modifications. � Conduit is excluded. • Firestop and penetrations to be provided by others. • Raceway to be provided by others. • Back boxes/j-boxes required (only in hard lid ceilings) to be provided by others. • Electrical circuits to be provided by others. • This proposal does not include an Antenna Component Monitoring System. If antenna component monitoring is required, additional equipment and services will be added to the design at a cost not reflected in this quote. • Day Wireless is not responsible for managing the AHJ's schedule. We will do everything in our power to complete system sign -off, but ultimately the scheduling is done by the AHJ. Please note that any installation work not performed by Day Wireless Systems must be performed by appropriately trairled and certified technicians. Day Wireless Systems is not responsible for installation work performed by customer or Owner...appointed contractors and is not financially ii.able for errors resultir‘g from installation by LiritiLialified and/or failure to folliovv design. specifications and industry best practices. 6/3/2020 Confidential to City of Tukwila D y WIRE SS SYSTEMS PROJECT #1501-19607 DescriPtlarl Equipment & Shipping Notes $18,210.00 800 MHz Class A Public Safety System Professional Services $28,717.09 Includes: system design; conduit installation; coaxial cable installation; line sweeps; DAS hardware installation; system commissioning and optimization; coverage testing; alarm coordination; permitting; and project management Subtotal $46,927.09 Bonding (1.5%) $703.90 Payment and performance bond Please note that pricing Iisted above includes estimated taxes.Final tax rates will be calculated at the time of purchase. TERMS AND CONDITIONS Unless otherwise negotiated, the following shall apply. Terms shall be Net 30. We accept check or funds transfer. Payments will be as follows: • Equipment as received in our SeaTac office • Services as performed with monthly progress billing Work will begin upon execution of a mutually agreed upon contract referencing this document. Any additional expenses will be reviewed prior to being incurred. Contracts shall be to Day Management Corp., dba Day Wireless Systems For contracting concerns, please email and reference Project #1501-19607. This quote will expire 90 days from the proposal date. 6/3/2020 Confidential to City of Tukwila WIRELESS SYSTEMS PROJECT #1501-19607 PROPOSAL ACCEPTANCE If this proposal is accepted as presented, please complete this section. If a purchase order is provided, that shall be the tracking reference. Otherwise, the date and name will be the reference. Customer: Name: Title: Signature: Date: Contract / PO #: Amount:: 6/3/2020 Confidential to City of Tukwila WIRELESS SYSTE NORTHWEST IMMO PARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle, WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Description: Additional 24"x24" flange type access panel Hage 1 ot 1 REQUEST FOR CHANGE ORDER Ref.# COR -0070 External/RCO# GC Ref# Date Jul 21, 2020 Job # 2066 Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 Labor Frame Interior Stock D/W - Onsite Material 24" X 24" NON -RATED FLUSH MOUNT ACCESS DOOR Total Miscellaneous Charges Size Quantity UOM Unit Total 4.00 Hrs 4.00 3.00 Hrs 3.00 Quantity UOM 1.00 PCS Rate 72.31 72.31 Total $289.24 $216.93 Total Labor $506.17 Unit Price 71.28 EA Total $71.28 Total Material $71.28 Total BM) Tax .48% GL Insurance 1% $2.77 $5.80 Total Miscellaneous Charges $8.57 AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers Run on: 20006 - 144th Avenue NE, Woodinville, WA 98072 July 21, 2020 8:28 AM Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: Sub Total: Overhead 15%: Sub Overhead: $506.17 $71.28 $0.00 $0.00 $8.57 $586.38 $86.62 $0.00 15.00% 8.00% Total $673.00 T 425-375-2500 F 425-375-2540 http://www.nwpart.com � R � �� Group DLR Group PROJECT: SUBJECT: TYPE: PURPOSE: QUESTION. SUGGESTION: ANSWER: FROM NAME Michelle Javan TO NAME Bill Brown Ethan Bernau Geri Urbas Jeff Clark Michelle Javan Phillip Tracy City of Tukwila Justice Center 73-17158-00 TJC RFI #516Additional Rough -in for DAS Installation RFI Answered RFI T DATE SENT: RFI ID: TnxmSMI/ /ALID: ans 7/22/2020 516 02503 VIA: Info Exchange Additional rough -in that was not shown on RFI 349 or the contract documents is required to compiete the installation of the DAS System. Please reference the following markups of where this rough -in is located. To remain on schedule, this work has already proceeded but will have additional cost associated with the change. Response (Answered) from: Sean Avery (DLR Group) Remarks: Acceptable. Provide invoices for total associated costs. Steve Schmitz - DLR Group 07.22.20 COMPANY DLR Group COMPANY BNBuilders Johnsen BNBuilders BNBuUUers DLR Group BN Builders, nc. EMAIL EMAIL om ethanb@sojsea.com om om PHONE 2OO-4O1' 6OO5x73-6UO5 PHONE 206-382-3443 206-838-3705 206-382-3443 206-]83-]443 206-461- 6065x73-6065 206-382-3443 Page 1 of 2 NAME Steven Schmitz Taras Yaremchuk BNBuilders COMPANY EMAIL DLR Group DESCRIPTION OF CONTENTS QTY DATED TITLE .com 206-461- sschmitz@dlrgroup.com 6044x73-6044 taras.yaremchuk@bnbui 206-382-3443 Iders.com RFI Trans ittal DATE: 7/22/2020 ID: 02503 PHONE TJC RFI #516 Additional 7/20/2020 Rough -in for DAS Installation.pdf NUMBER SCALE SIZE Page 2 of 2 BN BN Builders B Request for Information RFI No: 516 Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: July 20, 2020 Submitted To: Steve Schmitz DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Additional Rough -in for DAS Installation Discipline: Electrical Subcontractor Valley Electric Co. Question Submitted By: Bill Brown BN Builders, Inc. 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor RFI Ncr Date Required: 7/27/2020 Additional rough -in that was not shown on RFI349 or the contract documents is required to complete the installation of the DAS System. Please reference the following markups of where this roughin is located. To remain on schedule, this work has already proceeded but will have additional cost associated with the change Answer Acceptable. Provide invoices for total associated costs. Answered by: Steve Schmitz - DLR Group Date Answered: 07/22/2020 Copies To: Company & Contact Fax Notes Page 1 of 1 A AS A 1111111111111111.0111111111 111111111 I= cw Jeff Clark From: Ethan Bernau «ethanb@j zonnx Sent: Wednesday, May 20 2020 2:24 PM To: tarreola@daywireless.com; Jeff Clark; Steve Schmitz; Eric Compton Cc: Joseph Todd; JoeI Bush; Rachel Bianchi; Justine Kim Subject: Tukwia Justice Center DAS Attachments: Standard Subcontract Agreement.pdf; 1501-19607 Tukwila Justice Center PS OoS v1.O.pdf Tony, Our team has reviewed the Day Wireless proposal for the Emergency Responder Radio Coverage System (ERRCS) at the Justice Center. In order to get this work started as soon as possible, I'd like to set up a videoconference so we can: • Review the scope of work, assumptions and questions (including attached comments/markups) • Discuss Day Wireless contracting as a sub to our general contractor, BNBuilders, including insurance requirements (this is the quickest method to get started so let's make it happen) • Discuss schedule and next steps Let's get this set up for next week. Here are some options so we can narrow down to a time that works for you, City TIS (Eric Compton?), Jeff (BNBuilders)Steve (DLR Group) and me. • Tuesday, May 26 — 1:00-2:00 pm • Wednesday, May 27 — between 1:00 and 5:00 pm • Thursday, May 28 — 9:00-10:00 am • Friday, May 29 — anytime All, please chime in with your availability. Ethan 0ernmu| Project ManagerLEED APAssoc.DBIA l0lYeslerWay | Suite G06|Seattle, VyA98lO4 T%O6838.3TO5|[IO6715.55S8�1scjyea.cwnm Shiels|°Meto|Johnsen Project Focused. Community Driven. From: Jeff Clark <Jeff.Clark@bnbuilders.com> Sent: Tuesday, May 19, 2020 10:53 AM To: Ethan Bernau <ethanb@sojsea.com>; Steve Schmitz <sschmitz@DLRGROUP.com> Subject: RE: ERRCS Reports Tukwila Justice Center and Station 51 Ethan, See my attached comments in GREEN. Also I went ahead and attached our Standard Subcontract Agreement for this project. Since this project has higher than usual insurance requirements1 would want to make sure that Day Wireless is aware of the limits as included in Attachment A. Jeff Clark 1 BNBuilders 2601 4th AvenueSuite 350 1 Seattle, vmse1z1 206.382.3443 office 1 206.550.0960 cell 1 From: Ethan Bernau <ethanb@njsea.com> Sent: Monday, May 18, 2020 3:04 PM To: Steve Schmitz <sschmitz@DLRGROUP.com>; Jeff Clark <Jeff.Clark@bnbuilders.com> Subject: FW: ERRCS Reports Tukwila Justice Center and Station 51 Steve and Jeff, Please review the attached proposal from Day Wireless. Let me know if you have any comments, esp. on scope and assumptions. Ethan 0ennau|ethanb.sn*seacnnn Project Manager, LEED AP, Assoc. DBIA 101YesierWay | Suite 6D6|Seattle, VVA98lO4 T2U6.838.37O5|C2O6.7lS.SS58|scv$ea.comm Shiels|Obleta|Johnsen Project Focused. Com mu nity Driven. From: Tony Arreola <tarreola@daywireless.com> Sent: Friday, May 15, 2020 2:18 PM To: Ethan Bernau<ethanb@»oisea.conn» Cc: Joseph Todd <]0scph.Todd@Tukuvi|ayyA,gov>; Rachel Bianchi <Rache|-8ianchi@TukVvi|ayV4.gou^;Justine Kim <iusdnek@so|sao.com»;Steve Schmitz tsschmitz@DLBGROUp,conn> Subject: RE: ERRCS Reports Tukwila Justice Center and Station 51 Ethan, IhaVe attached the proposal for the justice center. After you have had the opportunity to review it, let's discuss next steps to completing this project. .1 Strategic Account Manager 206_473-2965 From: Ethan 8erneu«ethanb4osoisea-com> Sent: Monday, May 11, 2020 4:05 PM To: Tony Arreola <tarreola@daywireless.com> Cc: Joseph Todd <Joseph.Todd@TukwilaWA.gov>; Rachel Bianchi <Rachel.Bianchi@TukwilaWA.gov>; Justine Kim <iustinek0asoisea/com>;Steve Schmitz <sschmitz@DLRGROUp`com» Subject: RE: ERRCS Reports Tukwila Justice Center and Station 51 Tony, I'm the project manager for the Tukwila Justce Center. | received Day Wirelesscoverage study via Julie. Can you please prepare a proposal to furnish and install a Distributed Antenna System to cover the noncompliant areas? I'm copying architect Steve Schmitz in the event you need the design drawings. 2 Ethan Bermau|ethanbPsoixeacom Project Manager, LEED AP, Assoc. DBIA 101YesierVVay13uite60613eottie'VVA98104 TJO6.838.37O5|[2OG715.5558|sujsea,cmnn Shiels|Obletu|Johnsen Project Focused. Community Driven. Frmnn:/d@ancorap d@ancmraproects-com> Sent: Monday, May 11, 2020 3:08 PM To: Ethan Bernau<ethaob@sniseazom» Subject: FW: ERRCS Reports Tukwila Justice Center and Station 51 JC is attached. From: jd@ancpraproiectscom^jd@anunraprojectscom» Sent: Thursday, May 7, 2020 11:17 AM To: 'Joseph Todd' <Joseph.Todd@TukwilaWA.gov> Cc: Eric.Compton@TukwilaWA.gov; 'Rachel Bianchi' <Rachel.Bianchi@TukwilaWA.gov>; 'Justine Kim' <iustinek@soisea.com>;'Ethan 8ernau'<ethan6@soisea.com> Subject: FW: ERRCS Reports Tukwila Justice Center and Station 51 Hi Joseph — See attached Day Wireless report for Justice Center and 51 sent to me and Eric only. For 51the report states that the fire station is not compliant with code. I do not understand what that means for 51. Can we set up a call so we can talk as a group about what needs to happen? I'm open most of the day tomorrow. Please suggest a time that works for you. Julie DeDonato 206-409-8086 ancora PROJECTS LLC From: Tony Aneota<tarreo1a@daywineles»zonn> Sent: Wednesday, May 6, 2020 8:15 AM To: EricComptnn@Tukwi|aVVA.Rov Cc: Julie DeDonato<jd@ancorapro|ects.conn> Subject: ERRCS Reports Tukwi!a Justice Center and Station 51 Eric, After you have had a chance to review, let's discuss next steps to complete these projects. All the Best, 7opsfr&ier8* Strategic Account Manager 24I5South 2OO`hStreet Sem7rac.lwu.g819n 206-473-2965 Cell 206-878-3750 Office N±ps://daS.dayvxire|ess.coOM/ 3 DAY w//pcLESS SYSTEM� This message has originated from outside your organization. Do not click links, open attachments or Respond to this message unless you are confident of its Iegitimacy 4 m,,,,,,, ''.',?' :,,,,:.‘""„!",',•,",,,, ,n d,:, ; '"'', ' '••'.' • ••!..1..', : •!;" 50. N BNBui ders August 6, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for Moving Exterior Camera Up from Exterior Sign Dear Ethan, BNBuilders hereby submits our proposal for Moving Exterior Camera Up from Exterior Sign. The total proposal of this subject work is five thousand six hundred and ninety-four dollars $5,694.00. This proposal does not include potential additional costs relating to NSS activities. BNB reserves the right to pursue additional costs at a later time for NSS related activities as it pertains to this change. There is a zero day impact to the Project Schedule. BNB has not proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5206 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justineksoseaj.com) Geri Urbas (cieri.urbasbnbuilders.com) Steve Schmitz (sschmitzdIrgroup.com) BN Bu ilcl ers 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 B 13NBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center GENERAL CONTRACTOR: BNBuilders, Inc. CCD/ASI #: COP #: 5206 DATE: 81512020 DESCRIPTION OF CHANGE: Option C as discussed in OAC meeting on 7/29120 to remove, replace and reinstall panels around camera above the exterior sign. Conduit to be extended to location above for relocated camera. BP 07.40 Northshore Exterior BP 09.90 Northwest Complete Contracting BP 26.00 Valley lst-tier Subcontractor Cost Total (Direct Construction Costs) GC/CM Mark-up on MACC Costs Rounding Adjustment $4,206.36 $181.19 $1,035.00 $271.13 $0.32 Total Change Request $5,694.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date 5.00% Itemized Change Order Proposal Attention: Jeff Clark Date: 8/3/2020 Project: Tukwila Justice Center NSE Ref: NSE 57 REVISED COP / RFI #: By: Kristi Gouy Work Description Remove/reinstalUreplace AL panels for one camera replacement (replace 3 panels, remove and reinstall approximately 13 panels) - does not include any work at insulated metal panels. Requires two mobilizations or down time while electrician re-routes conduit behind panels. QUANTITIES LABOR MATERIALS EQUIPMENT No of Unit Units Description $/Hour Total $/Unit Total Rate Total Labor Shop Journeymen 2 Per Hr $ 82.43 $ 164.85 Shop Foreman Per Hr $ 87.95 $ Field Journeymen 40 Per Hr $ 79.23 $ 3,169.20 Field Foreman Per Hr $ 85.22 Apprentice Per Hr $ 59.13 Delivery Driver Material Per Hr $ 43.77 .050" Flat Sheet 3 Sheets 71.70 $ 215.10 Equipment 20 ft flat bed 0 Per Hr $ 57.00 8 ft 1/2 ton Per Hr $ 32.29 Finn Power Shear Genius Per Hr $ 396.14 RAS 90 Break Per Hr $ 74.28 $ 74.28 CNC Router Per Hr 89.51 Salvagnini Per Hr $ 342.57 45 ft boom Manlift (Rented) Day $ 450.00 65 ft Boom Manlift (Rented) Day $ 500.00 26 Ft Scissor Lift 1000 (rented) Month $ 3,000.00 Exclusions: Note: Subtotals Safety act expense @ 2% of direct labor Small tools expense @ 3% of direct labor Transportation $4.76 per Field Foreman Hour Subtotals without overhead & profit Other Expense: $ 3,334.05 215.10 $ 74.28 3,334.05 215.10 74.28 Subtotal of all expenses (labor, materials, & equipment) Contractor liability insurance = 1.75% of labor, materials, & equipment Total value of work for this contract before overhead & profit 15 % overhead & profit Total Value of work for this contract including overhead & profit $ 3,623.43 63.41 3,686.84 543.52 4,230.36 All owned equipment rates are from the National Roofing Contractors Association's, "Roofing Contractors Equipment Cost Schedule", Ninth Edition, Copvright 2003. Rented equipment as quoted. Contractor agrees that by ordering Northshore to proceed on such above mentioned work, contractor agrees that such work is above and beyond the scope of the original contract, and accepts this itemized breakdown in its entirety as fair compensation for such work. Contractor further agrees that by ordering such extra work, it shall issue a change order as soon as possible, regardless of whether or not owner approves such changes. CONTRACTOR APPROVAL The Contractor/Owner by signing below hereby orders Northshore Exteriors, Inc. to proceed with the above mentioned extra work, and will issue a formal Change Order as soon as possible. Signature Name (printed) Date Title NORTHSHORE EXTERIORS, INC. 11831 BEVERLY PARK ROAD, BLDG C * EVERETT, WA 98204 * 425.740.3700 * Fax 425.740.3701 wvrw.northshoreext.com Tukwila Justice Cenber SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center CCD/ASI #: COP #: Contractor Name: Northwest Complete Contracting DATE: DESCRIPTION OF CHANGE: Paint exterior Junction box to match exterior color 5206 8/512020 Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractors Total Direct Cost Subcontractors Mark-up (Excludes Labor Premium) Labor Premium $157.56 $0.00 $0.00 $157.56 $23.63 $0.00 Total Subcontractor Direct Costs + Mark-up + Labor Premium $181.19 Total Sub -tier Subcontractor Costs 15% Subcontractor's Mark-up on Sub -tier Subcontractor(s) $O.00 8% Total Subcontractor Change Request $181.19 To the best of my knowledge and belief, 1 car* that all costs listed above are correct. ContractorSignMum Date COP Cost Breakdown Project Name: Tukwila Justice Center Project No. 118021.100 Contractor Northwest Complete Contracting Work Description: Paint exteriorJ-box CCD/RFI: 0 CP #: 5206 Date: 8/5/20 Description Quantity Unit Prod. Hours Al. Labor Al. Labor Premium B. Material C. Equipment $/hour Cost $/hour Cost $/Unit Costs $/Unit Costs Paint exterior J -box 1 2 78.78 $ 158 $ - $ - $ - $ - $ - $ - - $ - $ - $ - - $ - $ - $ - $ - $ - - $ - $ - $ - $ - - - $ - - - $ - $ - $ - $ - $ - _ $ - $ - $ - - $ - $ - $ - $ - $ - $ - - - $ - - $ - $ - $ - - $ - $ - - $ - $ - $ - $ - - - $ - - - $ - - $ - $ - $ - $ - $ - $ - $ - $ - _ $ - $ - - $ - $ - $ - $ - Total Cost of Work A. $ 158 - $ - B. $ - C. - VALLEY "The Electrical Solution",� VALLEY ELECTRIC CHANGE ORDER PROPOSAL Tukwila Justice Center Contract: 118021.1-05 PROPOSAL DESCRIPTION: Moving Exterior Camera - All work will be done on overtime SL # DATE 8/3/2020 Addendum# VE JOB # 19146 Time Ext Rqrd (days): 5 RFI# VE CP # 036 Self Performed Work LABOR COST 6.00 hrs $130.47 $ 782.82 SUPERVISION 0.0% Ibr $ - SAFETY 0.0%a Ibr SMALL TOOLS 0.0% Ibr MATERIAL COST $ 27.18 EQUIPMENT COST 24' Scissor Lift Month $ 90.32 OH & PROFIT - SELF 15.0% Subcontractor Quotes Quote Quote Quote Quote SUBTOTAL COST: SUBTOTAL DIRECT COST QUOTES: OH & PROFIT SUBS 8.0% Bond Permit Fee BIM hrs 85.00 900.32 $ 135.05 TOTAL CHANGE PRICE: $ 1,035.00 NOTE: 1) Proposal valid for acceptance within 30 days. 2) While Valley Electric considers our proposal amount full compensation for this change, we expressly reserve the right to seek additional time and compensation at a later date for the impact of multiple changes, if any, or for indirect costs that were not reasonably foreseen by Valley Electric at the time of settlement on this change. 3) This construction change has been estimated using the drawings furnished: an engineering evaluation of the drawings, for function and compatibility with the vendor furnished equipment, has not been performed. 4) Permit costs are specifically excluded. Should this change, or it become necessary to procure/pay for an increased permit fee this would become an added cost to the change price reflected above. Our proposal amount does not include the following: Overtime / Shift Work - Fireproofing Repairs - Concrete/GWB Repairs - Shutdown Costs - Painting and Patching Valley Electric Co. Job #19146 Contract # Detailed Labor and Material Breakdown 19146 - CP #036 - Moving Exterior Camera Page 1 of 1 Print: 8/3/2020 Description Qty Net Price U Labor U Total Mat($) Total Hours 3/4" CONDUIT - EMT 20 67.7 C 0 C $13.54 0.00 3/4" COUPLING COMP STL - EMT 2 99.76 C 0 C $2.00 0.00 3/4" 1-H STRAP - EMT - STEEL 3 12.15 C 0 0 $0.36 0.00 #8x 1 P/H SELF -TAP SCREW 10 7.76 C 0 0 $0.78 0.00 TELESCOPING BRACKET 3 3.5 E 0 E $10.50 0.00 SUB COORDINATION (As Needed) 0 1 E $0.00 0.00 POSTING/RECORD DWGS 0 0 E $0.00 0.00 CLEAN UP (.5% Lbr) 0 0 E $0.00 0.00 TESTING (.75% Lbr) 0 0 E $0.00 0.00 WARRANTY (As Needed) 0 0 E $0.00 0.00 Totals: $27.18 0 CONFIDENTIAL December 2, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for Provide and Install Knox box Dear Ethan, In accordance with the Owners request, BNBuilders hereby submits our proposal for providing and installing the knox box. The total proposal of this subject work is Eigh Hundred Twenty -Six dollars $826.00. This proposal does not include potential additional costs relating to NSS activities. BNB reserves the right to pursue additional costs at a later time for NSS related activities as it pertains to this change. There is a zero -day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5217 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinekAsoseai.com) Geri Urbas (geri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dIrgroup.com) BNBuilders 2601 4'11 Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382,3440 BNB BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: COP #: 5217 GENERAL CONTRACTOR: BNBuilders, Inc. DATE: 12/2/2020 DESCRIPTION OF CHANGE: Provide and Install Knox Box per Owner Request lst-tier Subcontractor Cost Total (Direct Construction Costs) GCCM Costs GC/CM Mark-up on MACC Costs Rounding Adjustment $0.00 $787.04 $39.35 -$0.39 Total Change Request $826.00 To the best of my knowledge and belief, 1 certify that all costs listed above are correct. ContractorSipMum Date 5.00% COP Cost Breakdown r•-• L) Hours 1 $/hour Cost $/hour Cost $/Unit Costs I $/Unit Costs 2 79.52 $ 159 1$ 628 1$ - 1111111111111111111111111 69- 04 69- 64 69- 69- 64 64 04 69- 64 64 Eft 64 64 64 69- 04 $- $ - $ - $ 159 $ - $ - B. $ 628 C. $ ... • 11111111111111111111111111 EA- 64 64 69. 69, 6/4 V4 V4 69- 64 64 64 64 64 64 64 69- 601 69- 1111111111111111111111111 64 64 60 V4 64 64 64 64 64 V4 V4 64 Total Cost of Work A. Jeff Clark From: Ethan Bernau <ethanb@sojsea.com> Sent: Thursday, August 13, 2020 3:21 PM To: Jeff Clark; Austin Proctor Subject: FW: Order Confirmation: 667307 FYI — thanks for getting the order in. From: Ben Hayman <Ben.HaymanTukwiIaWA.gov> Sent: Thursday, August 13, 2020 2:28 PM To: Ethan Bernau <ethanb@sojsea.com> Cc: Rachel Bianchi <Rachel.Bianchi@TukwilaWA.gov>; Brian Lucero <Brian.Lucero@TukwilaWA.gov>; Aaron Johnson <Aaron.Johnson@TukwilaWA.gov> Subject: RE: Order Confirmation: 667307 Hi Ethan, Thank you for the confirmation. I have cc'd Capt. Johnson and Capt. Lucero, so they are aware that the Knox box is ordered and it will not hold up occupancy of the Justice Center. Ben From: Ethan Bernau nnx Sent: Thursday, Augus13, 2020 14:18 To: Ben Hayman<8en.Hayman0oTukwi|aVVA.gox> Cc: Rachel Bianchi <Rachel.BianchiTukwilaWA.gov> Subject: FW: Order Confirmation: 667307 For your records. Ethan Bernau 1 Project Manager, LEED AP, AssocDBIA 101YeskerVVay13uhe6061Seatde'VVA98104 T 206.838.37051C 206.715.55581 sojsea.com Shiels|Ob&etz|Johnsen Project Focused. Community Driven. From: Jeff Clark <Jeff.Clark@bnbuilders.com> Sent: Thursday, August 13, 2020 1:19 PM To: Ethan Bernau <ethanb@soisea.com>; Rachel Bianchi <Rachel.Bianchi@TukwilaVVA.gov> Cc: Austin Proctor <Austin.Proctor@bnbuilders.com>; Taras Yaremchuk <Taras.Yarernchuk@bnbuilders.com>; Bill Brown <Bill.Brown@bnbuilders.com>; sschmi/@d|rgnoup.com Subject: FW: Order Confirmation: 667307 For your recordsbelow 15 the confirmation for the purchase of the Knox box. It will be shipped out in 5-10 business days. Jeff Clark 1 BNBuilders zoV14th Avenue, Suite asn|Seattle. wmoazz1 zoasaz,s4oaoffice |uoo�5oosoocell From: o<orders@knoxbox.com> Sent: Thursday, August 13, 2020 1:15 PM To: Jeff Clark <Jeff.Clark@'bnbuilders.com> Subject: Order Confirmation: 667307 (800) 552-5669 Order Confirmation Knox Company 1601 W. Deer FROM: Valley Road Phoenix, AZ 85027 EmaiLOrdars0�knoxboxzVnl Phone: 800-552-5669 Fax: 623- 687-2290 ORDERED BY: Jeff Clark 23896 Bruckners Ct 208-550-0800 Order Date: August 15.2020 Order Number: 667307 Invoice Number: 1144931907 Credit Card: °^^°°^°°°°°°0209 Model Description Price Quantity Amount Total KnoxBox Model KLS-3261 — KnoxBox 3200 3200 Surface Mount, Hinged Door, Black International Blvd, Tukwila, WA 98188 Shipping $29.00 '- Tax $0 Total $628.00 Department No e : Tax ExemptCustomers IMPORTANT: Please FAXa copy of your tax exempt certificate AND order number to Knox at 623-687-2309. If we do not receive your 2 certificate within 24 hours, your order will be automatically taxed in the amount shown in the table above. Brcpwse Our S te Knox Company C) 2020 All Rights Reserved. CAUTION: This email originated from outside the city of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. 3 August 28, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 534 Evidence Storage Area Additions Dear Ethan, BNBuilders hereby submits our proposal for RFI 534 Evidence Storage Area Additions. The total proposal of this subject work is five thousand three hundred and nine dollars $5,309.00. This proposal does not include potential additional costs relating to NSS activities. BNB reserves the right to pursue additional costs at a later time for NSS related activities as it pertains to this change. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5221 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek(@,soseaj.com) Geri Urbas (geri.urbasbnbuilders.com) Steve Schmitz (sschmitz(@,dIrqroup.com) BNBui ders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 BNB BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center GENERAL CONTRACTOR: BNBuilders, Inc. CCD/ASI #: RFI 534 COP #: 5221 DATE: 8/28/2020 DESCRIPTION OF CHANGE: Evidence storage additions added a soffit in A1411A142 with impact board, changed the diffuser size down to accommodate the soffit and added impact board to the west wall of the drugs room A143 BP 09,20 Northwest Partition BP 09.90 Northwest Complete Contracting BP 22.00 Johanesen 1st -tier Subcontractor Cost Total (Direct Construction Costs) GC/CM Mark-up on MACC Costs Rounding Adjustment $4,330.00 $396.05 $329.99 $5,056.04 $252.80 $0.16 Total Change Request $5,309.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date 5.00% Mia NORTHWEST 114.10 PARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle, WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Description: RFI #534 - Added soffit at guns cabinet room A141 Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR -0072 External/RCO# GC Ref# Date Aug 05, 2020 Job # 2066 Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 Labor Frame Interior Hang Interior GWB Finish Tape Stock D/W - Onsite Clean -Up D/W Onsite Foreman Material 2 1/2" STUD 1 5/8" FLANGE (43MILS) 18GA 2 1/2" TRACK 1 1/4" LEG (43MILS) 18GA 5/8" VERY HIGH IMPACT DRYWALL X L -SHAPED 1/2" NB PAPER FACED TAPE ON METAL 90 DEG PAPER BEAD WITH METAL EXTRA WIDE EVEN LEG LITE TAPING COMPOUND LITE ALL PURPOSE COMPOUND Total Miscellaneous Charges Size 14' 10' 4'X12' 10' 10' BOX BOX Quantity UOM Unit Total Rate 6.00 Hrs 6.00 72.31 10.00 Hrs 10.00 73.76 15.50 Hrs 15.50 70.77 3.50 Hrs 3.50 72.31 1.00 Hrs 1.00 72.31 2.50 Hrs 2.50 77.57 Quantity UOM 10.00 PCS 4.00 PCS 6.00 SHT 4.00 EA 5.00 EA 1.00 EA 2.00 EA Total $433.86 $737.60 $1,096.94 $253.09 $72.31 $193.93 Total Labor $2,787.73 Unit Price .4476 LF .5196 LF 1.2564 SQFT .364 LF .364 LF 11.82 EA 11.82 EA Total $62.66 $20.78 $361.84 $14.56 $18.20 $11.82 $23.64 Total Material $513.50 Total B&O Tax .48% GL Insurance 1% Total Other Labor Charges $17.84 $37.35 Total Miscellaneous Charges $55.19 Total Overtime Premium D/W $416.00 Total Other Labor Charges $416.00 Notes: Adding a soffit at A141 and A142 running north & south between rooms A127 and A143. This soffit includes high impact board installation and drywall full height at both sides and level 4 finish is included. High impact drywall is also included from the new soffit down the west face of the west wall of drugs room A143. There is a previously installed door in this wall and we will keep the high impact board within 1/4" reveal around the door frame. Tracked on EWA #35973 & 40358. AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers Run on: 20006 - 144th Avenue NE, Woodinville, WA 98072 August 20, 2020 7:20 AM T 425-375-2500 Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: Sub Total: Overhead 15%: Sub Overhead: $3,203.73 $513.50 $0.00 $0.00 $55.19 $3,772.42 $557.58 $0.00 15.00% 8.00% Total: $4,330.00 F 425-375-2540 http://www.nwpart.com tiarne NORTHWEST PARTITIONS C actor° L3N EXTRA WORK AUTHORIZATION Na 35973 EWA Completed By: Job Number. 20 6 Ref. Number(s) (RFI, ASI, CI, etc): Area: Aran .._._ ......._ �' ION OF WORK (Be Specific): i4C74 e.5_ ..... ware?. A.1.Y l Al ERi• 0 00 ,. „ ..„ „....„,....„.::::.,..,....,..,....,:„ „„,, ,:„::„:.:::::',',:::.:...::',";:::',.:::,'..':',..";':i;,',::::,":....!..,:,-,1.;;);.1.';;;z,,.!'i,:;'::.;:::':;:":'''''':::::::::'::':,:::::'.«i(:,:,:,::114...,',.'.....„ .,,,,,,,,,.,,,:!,:,,,,,•,,,,,:,!;;.,.,,,,:,,,g;,,,,,,,,,„:,0,i,,;',•',".•,',.•':,•...'!,,,!„';',1!i:,,,,r ',,';',,,,,,0 •---"" • '" " •Y"'• t . , !,, '',:,.• ,ait,r" +••••,:",,, ,,j,, NORTHWEST EXTRA WORK AURI d! PARTITIONS No. 40358 k of Excellence ate: ob Name: general Contra EWA Completed By, Job Number: ,. Ref. Number(s) (RFI, ASI CI, E 1' h CamScanner Tukwila Justice Center SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center Contractor Name: B DESCRIPTION OF CHANGE: NWCC CCD/ASI #: COP #: 52 DATE: 8/21/2020 Prime and Paint new wall. See attached extra work authorization form Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractors Total Direct Cost Subcontractors Mark-up (Excludes Labor Premium) Labor Premium $344.39 $51.66 $0.00 Total Subcontractor Direct Costs + Mark-up + Labor Premium $396.05 Total Sub -tier Subcontractor Costs 15% Subcontractor's Mark-up on Sub -tier Subcontractor(s) $0.00 8% Total Subcontractor Change Request $396.05 To the best of my knowledge and belief, I certify that all costs listed above are correct. Sheila Rost 8/21/2020 Contractor Signature Date COP Cost Breakdown Project Name: Tukwila Justice Center Project No. 118021.100 Contractor ENBuilders, Inc. Work Description: Prime and paint new wall. See attached extra work authorization form CCD/RFI: CP #: 52 Date: 8/21/20 Description Quantity Unit Prod. Hours A.1. Labor A.1. Labor Premium B. Material C. Equipment $/hour Cost $/hour Cost 8/Unit Costs $/Unit Costs - - $ - Labor 4 68.50 $ 274 - $ - $ - $ - - Paint 1 Gallon - 24.00 $ 24 $ - 1.5 Tape 1 Roll $ - 6.97 7 $ - Primer 1 Gallon - 36.14 36 - Paper 1 Roll - 3.28 $ 3 - 6" Roller 0 Each - 4.97 - - Sanding Sponge 0 Each - 4.87 - $ - $ - $ - $ - _ _ _ $ - - _ $ - - - - _ - $ - - - $ - $ - _ $ - - _ $ - - $ - - - - $ - - $ - $ - - $ - $ - $ - - $ - - $ - $ - $ - - $ - $ - " Total Cost of Work A. $ 274 - - B. $ 70 C. $ - 0 CO w 0 p 0 0 0 €:v 0 Cost Unit Price 0 Qty Material 0 Johansen Mechanical, Inc. PHONE 4zo-481-22VsFAX 4un-4us-6nux CHANGE ORDER DETAIL JOB NAME Tukwila Justice Center BILLING CONTRACTOR BN Builders, Inc. JOHANSEN JOB # P11060 DATE: [ 8042 DESCRIPTION: !Diffuser nextto soffitto be reduced in size to accommodate sofflt in A142 I. LABOR: A. LABOR (FIELD FOREMAN) B. LABOR (FIELD JRNYMAN) C. LABOR (SHOP MECH) O. LABOR (DELIVERY) E. LABOR (SERVICE) F. DETAILING Q. SUPERVISION H. PROJECT STAFF |i MATERIAL AND EQUIPMENT A. MATERIALS B. EQUIPMENT C. FREIGHT D. RENTALS E. VEHICLES (l0morLABOR ^x") III. SUBCONTRACTORS A. ALL SUBS 2.0011 -IRS @ 0.0011 -IRS OHRS@ HRS@ HRS @ HRS@ 0.00 HRS @ 0.00 HRS @ LABOR TOTAL $ 97.49 = $ $ 91.35 = $ $ 104.95 = $ $ 79.69 = $ $ 104.92 = $ $ 97.78 = $ $ 103.73 = $ $ 103.43 = $ 194.98 20 x 20 Diffuser (5-daybuUd)1$ 70.0O| |* — - 1 |$- - o 19.50 MATERIAL EQUIPMENT TOTAL SUB SUBTOTAL IV. OTHER DIRECT COSTS A. SAFETY @ B. SMALL TOOLS AND CONSUMABLES @ C. PERMITS OTHER DIRECT COSTS TOTAL 0% OF LABOR 0Y6 OF LABOR- - � 89.50 � REFERENCE: 1TJC RFI #534 Evidence Storage Area Additions SCHEDULE IMPACT: iYes V. TOTAL ITEMS I, II, III, AND IV VI. OVERHEAD & FEES A. OVERHEAD B. PROFIT C. SUBCONTRACTOR MARKUP O. B&OTAX @ VALID FOR 30 DAYS TOTAL AMOUNT FOR THIS CHANGE ORDER PROPOSAL 2.84 This change proposal only includes costthat can be identified at this time. This change proposal does not include any amount for changes in the sequence of workdelays, disruptions, rescheduling, extended overhead, acceleration or impact costs. Johansen Mechanical expressly reserves the right to address any and all of these and related items of cost prior to final settlement of the contract. pruii Submittal Sheet SPD, ASPD SQUARE PLAQUE DIFFUSER CM CEILING MODULE X1 CEILING OPENING: SEE SCHEDULE 10D = NOM. DUCT .D. = D 1 /8" (3) MIN. 1 1"(25) fJ I I 1l DIFFUSER PLAQUE IMPERIAL UNITS (inches) CM CEILING OPENING B DUCT SIZE 24x24 22x22 21/2 6,8,10,12,14,15 20x20 18x18 21/2 6,8 10 12x12 101/2x101/2 11/8 45,67,8 SI UNITS (mm) CM CEILING OPENING B DUCT SIZE 600x600 549x549 64 152,203,254 305,356,381 500x500 449x449 64 152,203,254 300x300 249x249 29 102,127,152,178,203 MATERIAL: X SPD — STEEL CONSTRUCTION 0 ASPD — ALUMINUM CONSTRUCTION (STYLE 31 & 17 ONLY) OPTION: FINISH: X B12 WHITE (OPTIONAL FINISHES AVAILABLE) B ❑ AFI — 1/2" FIBERGLASS WITH FOIL/SCRIM VAPOR BARRIER INSULATED BACKPAN (31 T— BAR, 20x20 & 500x500 ONLY) ❑ R6 — MOLDED INSULATED BACKPAN (31 T— BAR, 12x12, 300x300, 24x24 & 600x600 OR 4TS CLIP ON RECESSED SPLINE 24x24) ❑ BN — BEADED INLET NECK, WITH EXTENDED DEPTH (212") (AVAILABLE FOR SPD ONLY) NOTE: 20x20 & 500x500 AVAILABLE IN STYLE 31 ONLY. ALL METRIC DIMENSIONS ( ) ARE SOFT CONVERTED. IMPERIAL DIMENSIONS ARE CONVERTED TO METRIC AND ROUNDED TO THE NEAREST MILLIMETER. PROJECT: prIE® ENGINEER: CUSTOMER: 21 86 SUBMITTAL DATE: SPEC. SYMBOL: 2014/09/15 SPD, ASPD SQUARE PLAQUE DIFFUSER d Copyright PRICE INDUSTRIES 2014 SHEET 1 OF 2 REV L prico Submittal Sheet SPD, ASPD SQUARE LADIFFUSER 2 SNAP -IN ❑ 31 SURFACE MOUNT CM CM OPENING 13/16" r (21) MA .44 ....did111111111 CM — 1/4"(6) ❑ 31 T -BAR A = 1"(25) or 9/16"(14) ❑ 4 SPLINE CM 3/8„ (9) CM AVIJON 4 !!/rA ® /07/ t ---I I ------Al SPLINES ON TWO OPPOSITE SIDES ONLY ❑ 4TS CLIP ON RECESSED SPLINE (24x24 ONLY) 0 17 NARROW MEMBER 1 1/5' (29) CM CM I-} 1/8"(3) • — 5/16" (8) 'T. jr/rA ------- I — -•1 1...- 1/4" (6) _-..] _,- 9/16" (14) ❑ 17 TEGULAR 9/16" T -BAR -- 5/16" (8) CM f 1/8" (3) 1//4 f --I 9/16"(14) ALL METRIC DIMENSIONS ( ) ARE SOFT CONVERTED. IMPERIAL DIMENSIONS ARE CONVERTED TO METRIC AND ROUNDED TO THE NEAREST MILLIMETER. PROJECT: price° SPD, ASPD SQUARE PLAQUE DIFFUSER ENGINEER: CUSTOMER: 21 686 SUBMITTAL DATE: SPEC. SYMBOL: 2014/09/15 Copyright PRICE INDUSTRIES 2014 SHEET 2 OF 2 REV L prime Su • mittal Sheet SPD/P SQUARE PLAQUE PANEL DIFFUSER PANELS: 0 2P SNAP -IN CM = CEILING MODULE PANEL = CM 1/4"(6) 0 0 DIFFUSER PLAQUE DIFFUSER SIZE PLAN VIEW CM = NOM. PANEL SIZE MODULES 24x24 IMPERIAL SI (mm) 6,8,10,12,14,15 48x24 1200x600 (152,203,254,305,356,381) 12x12 11/8 4,5,6,7,8 300x300 (29) (102,127,152,178,203) .1,An 30x30 750x750 4P SPLINE 3/8" (9) --.-- CM 12x12 IMPERIAL SI (mm) ZAN 24x12 600x300 IL 0 17P NARROW MEMBER CM 48x12 1200x300 1/8(3) ArAPFAM 174.4 20x20 24x24 500x500 600x600 DIFFUSER SIZE B DUCT SIZE 24x24 21/2 6,8,10,12,14,15 600x600 (64) (152,203,254,305,356,381) 12x12 11/8 4,5,6,7,8 300x300 (29) (102,127,152,178,203) MATERIAL: • SPD/P - STEEL CONSTRUCTION FINISH: 0 B12 WHITE (OPTIONAL FINISHES AVAILABLE) ALL METRIC DIMENSIONS ( ) ARE SOFT CONVERTED. IMPERIAL DIMENSIONS ARE CONVERTED TO METRIC AND ROUNDED TO THE NEAREST MILLIMETER. PROJECT: price® ENGINEER: CUSTOMER: 21W151 SUBMITTAL DATE: SPEC. SYMBOL: 2014/09/30 SPD/P SQUARE PLAQUE DIFFUSER PANEL MOUNTED (:) Copyright PRICE INDUSTRIES 2014 REV 0 CM 13/16" r (21) _AJ 0 3P T -BAR A = 1(25) or 9/16'' (1 4 CM II .1,An 0 4P SPLINE 3/8" (9) --.-- CM A/ Ad ZAN tSPLINES ON TWO OPPOSITE SPECIFY WHICH SIDES SIDES ONLY 0 17P NARROW MEMBER CM IIII 5/16"(8) 1/8(3) ArAPFAM 174.4 t - 9/16(1 4) 0 17P TEGULAR 9/16" T -BAR CM 5/16" (8) 1/8"(3) I Ar.rmL Aro -.-- 9/16' (1 4) ALL METRIC DIMENSIONS ( ) ARE SOFT CONVERTED. IMPERIAL DIMENSIONS ARE CONVERTED TO METRIC AND ROUNDED TO THE NEAREST MILLIMETER. PROJECT: price® ENGINEER: CUSTOMER: 21W151 SUBMITTAL DATE: SPEC. SYMBOL: 2014/09/30 SPD/P SQUARE PLAQUE DIFFUSER PANEL MOUNTED (:) Copyright PRICE INDUSTRIES 2014 REV 0 prHEs Submittal Sheet Q e////// STYLE 36 T— BAR MOUNT SMDP 24" X 24" MODULAR PLAQUE FACE CEILING DIFFUSER CEILING MODULE = 24.00 x 24.00 SPRING LOADED REMOVABLE PLAQUE OPTIONAL VCS3 DAMPER INLET SIZE CEILING OPENING = 21.50 x 21.50 (SURFACE MOUNT) 1 • • • • 2.250 CENTER PLAQUE SPOTWELDED TO DIFFUSER FACE PLAQUE SIZE = B x B OVERALL DIFFUSER FACE = 23.75 x 23.75 TYP. 2 SLOT SHOWN 3 SLOT 4.500 12.675 2 SLOT 3.000 15.675 1 SLOT 1.500 18.675 Slot Qty. A B MATERIAL: ❑ DIFFUSER & PLAQUE: STEEL CONSTRUCTION ❑ PLENUM: SATINCOAT STEEL INLET ►� , O 6", 8", 9", 10", 12", 14", AND 15" (SR SUPPLIED) ❑ SQUARE 18"x18" (SUPPLIED WITHOUT PLENUM) FNSR O DIFFUSER & PLAQUE: B12 WHITE (OPTIONAL FINISHES AVAILABLE) ❑ PLENUM: MILL FINISH 4.000 E .250 SURFACE MOUNT OPTIONAL D ROUND ❑ SR8E FULL FLOW DAMPER DIFFUSER MOUNTED (6" TO 15" ROUND) O SR9 RADIAL TYPE DAMPER DIFFUSER MOUNTED (6" TO 12" ROUND) ❑ SR3 — VCS3 WITH SR DAMPER OPTIONAL D :•':ARE ❑ 3 (18"x18") OPPOSED BLADE DAMPER STEEL. NOTES: • FACTORY TOLERANCE : t 1/32" PR• CT: pries t?i T 242146 DATE C. S DEC 2004 SMDP 24"x 24" MODULAR PLAQUE FACE CEILING DIFFUSER © Copyright E.H.PRICE UM D 2004 REV A prico- Submittal Sheet SPD HI SQUARE PLAQUE DIFFUSER HIGH INDUCTION D = NOM. DUCT OD = D — YEs" (3) rT 0...2rrn arc -1 rern 01 0" 1111 11 1 00 00 00 00 11 1111 1 II 1 1 11 1111 11 1 11 11 11 II 1111 1 t, 11 1 1 ir 1 I 1111 11 1 ID 111 II II 00 11 1111 1 0.10II U. - J I I -La MIN. 1" (25) REF INDUCTION CHAMBER DIFFUSER PLAQUE DIFFUSER OVERALL = 23 V (603) NOTES: • T—BAR ONLY MATERIAL: STEEL CONSTRUCTION CEILING MODULE CBUNG MODULE NOMINAL ROUND DUCT 24 X 24 6 8 10 12 14 600 X 600 152 203 254 305 356 FINISH: LI B12 WHITE (OPTIONAL FINISHES AVAILABLE) OPTIONS: R6 — INSULATED BACKPAN 2 Yi j (64) ALL METRIC DIMENSIONS ( ) ARE SOFT CONVERTED. IMPERIAL DIMENSIONS ARE CONVERTED TO METRIC AND ROUNDED TO THE NEAREST MILLIMETER. PROJECT: prima® ENGINEER: CUSTOMER: 244510 SUBMITTAL DATE: SPEC. SYMBOL: 2009/09/30 SPD HI SQUARE PLAQUE DIFFUSER HIGH INDUCTION © Copyright E.H.PRICE LIMITED 2009 SHEET OF 1 REV A Submittal Sheet SPDAS - ALUMINIZED STEEL SQUARE PLAQUE DIFFUSER E CM = CEILING MODULE CEILING OPENING: SEE SCHEDULE D = NOM. DUCT C-- O.D. = D — 1/8" (3) 1 i-(25) I 1 0 0 0 0 II IL— I°I II J B IMPERIAL UNITS (inches) DIFFUSER PLAQUE CM CEILING OPENING B DUCT SIZE 12x12 101/2x101/2 11/8 4,5,6,7,8 24x24 22x22 21/2 6,8,10,12,14,15 I UNITS (mm CM CEILING OPENING B DUCT SIZE 300x300 249x249 29 102,127,152,178,203 600x600 549x549 64 152,203,254,305,356,381 MATERIAL: • ALUMINIZED STEEL OUTER CONE AND OUTER PLAQUE WITH STEEL INNER PLAQUE ON 24"x24" (600x600) • 12"x12" (300x300) SUPPLIED AS ALUMINUM CONSTRUCTION WITH HEAVY GAUGE SINGLE LAYER PLAQUE OPTION: ❑ R6 — MOLDED INSULATED BACKPAN (T—BAR ONLY) FRAMES: FINISH: 0 B12 WHITE (OPTIONAL FINISHES AVAILABLE) ❑ 31 T -BAR A = 1"(25) or 9/16"(14) i CM 0 31 SURFACE MOUNT r______ OPENING CM �--- CM — 1/4"(6) ALL METRIC DIMENSIONS ( ) ARE SOFT CONVERTED. IMPERIAL DIMENSIONS ARE CONVERTED TO METRIC AND ROUNDED TO THE NEAREST MILLIMETER. PROJECT: pruIE® ENGINEER: CUSTOMER: 24 34 SUBMITTAL DATE: SPEC. SYMBOL: 2015/04/17 SPDAS ALUMINIZED STEEL SQUARE PLAQUE DIFFUSER Copyright PRICE INDUSTRIES 2015 SHEET 1 OF 1 REV E 111 1111 MEM MOM Submittal Sheet PLAQUE DIFFUSER EXTENDED FACE NOM. SIZE NOM. SIZE - )18" (3) VCS3 LEVER OPERATED DAMPER (OPTIONAL) 4Y2" (1 1 4) AVAILABLE SIZES: FRAME NOM. SIZE CEILING MODULE 36 0 6 x 6 x 12" (305x305) 0 9 x 9 x 24" (610x610) 0 12 x 12 x 24" 0 15 x 15 x 24" 0 18 x 18 x 24" 0 21 x 21 PATTERN: C'SUNK SCREW FASTENING OVERALL - NOM. SIZE + 5 34" (146) SURFACE MOUNT SHOWN FRAME NOM. SIZE CEILING MODULE 36 0 6 x 6 12" x 12" (305x305) 0 18 x 18 24" x 24" (610x610) 3P 0 6 x 6 24" x 24" (610x610) 0 9 x 9 24" x 24" (610x610) 0 12 x 12 24" x 24" (610x610) 0 15 x 15 24" x 24" (610x610) FINISH: 0 B12 - WHITE POWDER COAT (OPTIONAL FINISHES AVAILABLE) NOTES: • FACTORY TOLERANCE ±031 OPTIONS: 0 SR SQUARE TO ROUND ADAPTOR O VCS3L - LEVER OPERATED OPPOSED BLADE DAMPER MATERIAL: • STEEL CONSTRUCTION 1(25) OPENING FRAMES: 0 1 SURFACE MOUNT CEILING OPENING = NOM. SIZE + 3 1i"(89) 345(5) OVERALL = NOM. SIZE + 5 3/4" (146) o 36 T -BAR CEILING MODULE = NOM. SIZE + 6"(152) 11 (5) mil. :1111111111 OVERALL = NOM. SIZE 5 3/4"(146) PANELS: 0 3P T -BAR CEILING MODULE = 24" X 24" (610x610) 3/4'' (19) L. PANEL OVERALL = 23 3/4" (603) ALL METRIC DIMENSIONS ( ) ARE SOFT CONVERTED. IMPERIAL DIMENSIONS ARE CONVERTED TO METRIC AND ROUNDED TO THE NEAREST MILLIMETER. PROJECT: price® ENGINEER: CUSTOMER: 25 27 SUBMITTAL DATE: SPEC. SYMBOL: 2013/07/30 PDE PLAQUE DIFFUSER © Copyright PRICE INDUSTRIES 2013 REV A AIR FLOW DIRECTION OPTIONAL STANDARD 0 1 WAY 0 2 WAY 0 CORNER 0 3 WAY 04 WAY '4 I. 4 rr, A iIIA I 4IFI !1!iI 15 25 2G T 3A • 4A • FINISH: 0 B12 - WHITE POWDER COAT (OPTIONAL FINISHES AVAILABLE) NOTES: • FACTORY TOLERANCE ±031 OPTIONS: 0 SR SQUARE TO ROUND ADAPTOR O VCS3L - LEVER OPERATED OPPOSED BLADE DAMPER MATERIAL: • STEEL CONSTRUCTION 1(25) OPENING FRAMES: 0 1 SURFACE MOUNT CEILING OPENING = NOM. SIZE + 3 1i"(89) 345(5) OVERALL = NOM. SIZE + 5 3/4" (146) o 36 T -BAR CEILING MODULE = NOM. SIZE + 6"(152) 11 (5) mil. :1111111111 OVERALL = NOM. SIZE 5 3/4"(146) PANELS: 0 3P T -BAR CEILING MODULE = 24" X 24" (610x610) 3/4'' (19) L. PANEL OVERALL = 23 3/4" (603) ALL METRIC DIMENSIONS ( ) ARE SOFT CONVERTED. IMPERIAL DIMENSIONS ARE CONVERTED TO METRIC AND ROUNDED TO THE NEAREST MILLIMETER. PROJECT: price® ENGINEER: CUSTOMER: 25 27 SUBMITTAL DATE: SPEC. SYMBOL: 2013/07/30 PDE PLAQUE DIFFUSER © Copyright PRICE INDUSTRIES 2013 REV A price Grilles/Registers/Diffusers Submittals Job Name: TJC CO P11960 JMI Date Printed: 8/17/2020 Spec Section: 15 - HVAC Contact: 6100 SIXTH AVENUE S SEATTLE, WA 98108 Date Printed: 8/17/2020 Job Name: TJC CO P11960 JMI Qty 1 Model SPD Inlet Size 10 All -In -One Detailed Submittal Schedule Unit Size 10 Border - 31 NC N/A Desc: 31 - 15/16" T -Bar Lay -In and Surface Mount Application [AUserdj0aohaUN\AopData\Loca|\Temp\tmpE9A0.tmp price®. Submittal Sheet SPD -1-1 Square Plaque Diffuser SPD Square Plaque Diffuser Duct Diameter (in.): 10 Backpan Height (B): Nom Ceiling Module: Nom Ceiling Opening: (Surface Mount App) 2.5" 18"x18" Border: 31 15/16" T -Bar Lay -In and Surface Mount Application CM Frame Detail: CEILING MODULE CEILING OPENING CM - Notes: • 360° radial horizontal air pattern • Removable face panel • Factory tolerance ± 1/32" (1) Material: e Diffuser: Steel Finish: • B12 - Standard White PROJECT: TJC CO P11960 JMI ENGINEER: DESCRIPTION: Square Plaque Diffuser SPD -1-1//1/10//20/20/31/////B12 SUBMITTAL NO: 258503 SUBMITTAL DATE: 8/17/2020 CUSTOMER: Copyright Price Industries 2020 All metric dimensions () are soft converted. Imperial dimensions are converted to metric and rounded to the nearest millimeter. 1arketina Release version: 2.20.8.1. All In One version: 3.20.8 Information within this document is subject to chance without notice. �0-� � RGroup DLR Group PROJECT: SUBJECT: TYPE: PURPOSE: QUESTION: SUGGESTION: ANSWER: FROM NAME Michelle Javan TO City of Tukwila Justice Center 73-17158-00 TJC RFI #534Evidence Storage Area Additions RFI Answered 'ee F Trans DATE SENT: RFI ID TRANSMII AL ID: VIA: 8/19/2020 534 02566 al Info Exchange After a waik between Tukwila Police Dept. (Rebecca Hixon & Eric Drever) & BNBuilders (Jeff Clark & Taras Yaremcuk)p|easeconfimnthefoUmmin8mretobe added; - Soffit is to be built above the gates in property storage cabinet A142 along with impact board - Added faucet nozzle for hose in A134 - Impact board along west wall of A143 - Diffuser next to soffit to be reduced in size to accommodate soffit Response (Answered) from: Steven Schmitz (DLR Group) Remarks: Concur. Steve Schmitz - DLR Group 08.19.20 COMPANY DLRGroup NAME COMPANY Bill Brown Ethan Bernau Geri Urbas BNBuilders Shiels Obletz Johnsen BNBuilders EMAIL | PHONE | | 2O6-461- �avan��d|rgroupconn | | ��" ' 6065x73-0065 EMAIL taras.yaremchuk@bnbui om ethanb@sojsea.com PHONE 206-382-3443 206-382-3443 206-838-3705 206-382-3443 Page 1 of 2 NAME Jeff Clark Michelle Javan Phillip Tracy Steven Schmitz DESCRIPTION OF CONTENTS COMPANY BNBuilders DLR Group BN Builders, Inc. DLR Group QTY DATED TITLE DATE: ID: EMAIL om Jeff.Clark@bnbuilders.c , om mjavan@dlrgroup.com Phillip.tracy@bnbuilders .com sschmitz@dlrgroup.com TJC RFI #534 Evidence 1 8/18/2020 Storage Area —Additions.pdf 0, a PHONE aminal 8/19/2020 02566 206-382-3443 206-461- 6065x73-6065 206-382-3443 206-461- 6044x73-6044 NUMBER SCALE SIZE Page 2 of 2 BN 0NBui|ders Request for Information �F�U� No: 534 "=�"°�"==-� Tukwila Justice Ctr Construct. 15U05Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: August 17, 2020 Submitted To: Steve Schmitz DLR Group, Inc. 51 Univerity Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Evidence Storage Area Additions Discip/ine: Architectural Subcontractor: BNBuilders Question Submitted By: Taras Yaremchuk BNBuUdms 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Fax: (206)382-3440 Subcontractor RFI Na Date Required: 8/24/2020 After a walk between Tukwila Police Dept (Rebecca Hixon & Eric Dreyer) & BNBuilders (Jeff Clark & Taras Yarennchuk) please confirm the following are to be added - Soffit is to be built above the gates in property storage cabinet A42 along with impactboard - Added faucet nozzle for hose in P134 - Impact board along st wall of A143 - Diffuser next to soffit to be reduced in size to accomodate soffit Answer Concur. Answered by: Steve Schmitz - DLR Group Date Answered: 08/19/2020 Copfes To: Company & Contact Fax Notes Page 1 of 1 BNBuilders October 30, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 520 Exit Signs per Inspector Walk Dear Ethan, In accordance with RFI 520 Exit Signs per Inspector Walk, BNBuilders hereby submits our proposal for new added exit fixtures from site walk on 7/28/20 with building inspector. The total proposal of this subject work is Three Thousand Nine Hundred Forty -Three dollars $3,943.00. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5225 in the forthcoming change order. Sincerely, Mary Chan Project Manager CC: Justine Kim austineksoseal.com) Geri Urbas (geri.urbasbnbuilders.com) Steve Schmitz (sschmitzdIrgroup.com) BNBuilders 2601 01 Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: GENERAL CONTRACTOR: BNBuilders, Inc. COP #: 5225 DATE: 10130/2020 New added exit fixtures from site walk on 7128120 with building inspector. Temporary fixures installed due DESCRIPTION OF CHANGE: to permanent lead times. BP 26.00 Valley $3,515.00 lst-tier Subcontractor Cost Total (Direct Construction Costs) GCCM Costs GC/CM Mark-up on MACC Costs Rounding Adjustment $3,515.00 $240.00 $187.75 $0.25 Total Change Request $3,943.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date 5.00% COP Cost Breakdown 0 0 v: z co co 2 a"" F. a— d E E Z 15 2 z 11 g g I C. Equipment $/Unit Costs I MEI IIIIIIIIIIIIIIIIIEIIII.III 64 69 69 69 6963 69 64 69 6363 89 6963 6969 63 69 63 64 64 64 69 63 69 69 Al. Labor Premium I B. Material II $/hour Cost $/Unit sCosts 1 11111111/1 69 63636363696969 89 6389 ,I1,111111111111 63 69 69 69 63 63 63 69 69 6963 69696369 th. 69 63 A.1. Labor $/hour Cost 120 I $ 240 111111111.1111111IIIIIIII 6969636969636363636969636363636369636369636963636369 V' N 1 Total Cost of Work A. Quantity Unit Prod. Hours 1 1 I 2 c 3 00 Project Management V4LLEY "The Electrical Sdution"is VALLEY ELECTRIC CHANGE ORDER PROPOSAL Tukwila Justice Center Contract: 118021.1-05 PROPOSAL DESCRIPTION: New added exit fixtures from site walk on 7/28/20 with building inspector. Temporary fixures installed due to permanent lead times. SL # DATE 10/27/2020 Addendum# VE JOB # 19146 Time Ext Rqrd (days): 5 RFI# 520 VE CP # 045 Self Performed Work LABOR COST- OT 8.00 hrs $130.47 $ 1,043.76 LABOR COST- ST 4.00 hrs $107.84 $ 431.36 SUPERVISION 0.0% Ibr $ SAFETY 0.0% Ibr $ SMALL TOOLS 0.0% Ibr $ MATERIAL COST $ 1,581.16 EQUIPMENT COST 24' Scissor Lift Month $ OH & PROFIT - SELF 15.0% Subcontractor Quotes Quote Quote Quote Quote SUBTOTAL COST: SUBTOTAL DIRECT COST QUOTES: OH & PROFIT - SUBS 8.0% Bond Permit Fee BIM hrs 85.00 $ 3,056.28 $ 458.44 TOTAL CHANGE PRICE: $ 3,515.00 NOTE: 1) Proposal valid for acceptance within 30 days. 2) While Valley Electric considers our proposal amount full compensation for this change, we expressly reserve the right to seek additional time and compensation at a later date for the impact of multiple changes, if any, or for indirect costs that were not reasonably foreseen by Valley Electric at the time of settlement on this change. 3) This construction change has been estimated using the drawings furnished; an engineering evaluation of the drawings, for function and compatibility with the vendor furnished equipment, has not been performed. 4) Permit costs are specifically excluded. Should this change, or it become necessary to procure/pay for an increased permit fee this would become an added cost to the change price reflected above. Our proposal amount does not include the following: - Overtime / Shift Work - Fireproofing Repairs - Concrete/GWB Repairs - Shutdown Costs - Painting and Patching Valley Electric Co. Job #19146 Contract # Detailed Labor and Material Breakdown 19146 - CP #045 - RFI 520 Added Exit Fixtures Page 2 of 2 Print: 10/27/2020 Description Qty Net Price U Labor U Total Mat($) Total Hours REWORKAND REPLACEMENT LABOR 1 0 E 12 E $0.00 12.00 TEMPORARY EXIT FIXTURES 3 20 E 0 E $60.00 0.00 LIGHTING QUOTE 1 1521.16 E 0 E $1,521.16 0.00 SUB COORDINATION (As Needed) 0 1 E $0.00 0.00 POSTING/RECORD DWGS 0 0.6 E $0.00 0.00 CLEAN UP (5% Lbr) 0 0.06 E $0.00 0.00 TESTING (.75% Lbr) 0 0.09 E $0.00 0.00 WARRANTY (As Needed) 0 0.12 E $0,00 0.00 Totals: $1,581.16 12 CONFIDENTIAL Date: Oct 26, 2020 Quote: GRASB20-21007-2 works o your advantage Project Tukwila Justice Center Lighting Location Tukwila WA Quote GRASB20-21007-2 Quote Page 1/2 Graybar Electric Company, Inc. 1919 6th Avenue South Seattle WA 98134 Phone: Fax: From: Jodi Gabriel Quoter Ph: (206) 701-2671 email: jodi.gabriel@graybar.com To: Collin Tuthill For Valley Electric Bid Date Oct 21, 2020 1100 Merrill Creek Parkway Expires Nov 20, 2020 Everett WA 98203 Phone: (425) 405-0832 Fax: (425) 407-0578 EMail: collint@velectric.com QTY Type MFG Part ****TJC RFI 520 EXIT 3 3 SIGNTEX CRSNB1GWBAXT/W CUSTOM GRAPHIC C22 ARROW POINTING UP Line Note: 4 TO 5 WEEK LEAD TIME Total for: ****TJC RFI 520 EXIT *** REPLACEMENT FIXTURE**** SIGNTEX CRSNB1GWBAXT/W CUSTOM GRAPHIC C19 SINGLE WALL MOUNT LEFT ARROW Line Note: 4 TO 5 WEEK LEAD TIME Total for: *** REPLACEMENT FIXTURE**** Notes: "'INCOMING FREIGHT INCLUDED"' Price UQ ExtPrice $380.29 $380.29 $1,140.87 $1,140.87 $380.29 $380.29 Total: $1,521.16 Graybar Electric Company, Inc. Jodi Gabriel Page 1/2 'DLR Group DLR Group PROJECT: SUBJECT: TYPE: PURPOSE: QUESTION: SUGGESTION: ANSWER: FROM NAME Michelle Javan TO NAME Bill Brown Ethan Bernau Geri Urbas Jeff Clark Michelle Javan City of Tukwiia Justice Center 73-17158-00 TJC RFI #520_Exit Signs per Inspector Walk RFI Answered ����� �m� �~m �� DATE SENT: RFI ID: TRANSMITTAL ID: � 8/13/2020 520 02543 al VIA: Info Exchange During a site waik with the Buiiding inspector on 7/28/20, it was requested to add hard wired exit fixtures in the iocations noted on the attached drawings. Please confirm that these exit fixtures are to ultimately match the existing type installed on site (these fixtures have a longer iead team). Please also confirm iftemporary fixtures should be purchased and installed in order to minimize schedule disruption. Response (Answered) from: Sean Avery (DLR Group) Remarks: See markups per individuai sheet. Steve Schmitz - DLR Group 8.11.20 COMPANY | EMAIL DLR Group COMPANY BNBuilders Johnsen BNBuilders 8N8uUder - EMAIL [ -- bU|.br0VVD@bnbVi|dBrs.0 orn ethanb@soisen.cnrri [ om om DLR Group | njavan@d|rgroup.conl PHONE 206 -461 - PHONE 206-382-3443 206-838-3705 206-382-3443 206-382-3443 206-461- 6065x73-6065 Page 1 of 2 NAME Phillip Tracy Steven Schmitz QTY DATED COMPANY EMAIL BN Builders, Inc. .com DLR Group BNBu||ders TITLE RFI Tran-ttaU DATE. 8/13/3020 ID 02543 T]CRFI #52O_Exit Signs 7/29/2030per Inspector Walk.pdf i PHONE 206-382-3443 3OO-4G1- 6044x73-6044 206-382-3443 Page 2 of 2 B N0ui|ders Request for Information RFI No: 520 Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tulwika,VvA 98188 BNB Project # 118021.100 Date: July 29, 2020 Submitted To: Steve Schmitz DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6040 Subject: Exit Signs per Inspector Waik Discipline: Electrical Submitted5y Bill Brown BN BuildersInc. 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor: VaIIey Electric Co. Subcontractor R/INo 56 Question Date Required: 8/5/2020 During a site walk with the Building Inspector on7/28/20, it was requested to add hard wired exit fixtures in the locations noted on the attached drawings Please confimnthat these exit fixtures are to ultimately match the existing type installed on site (these fixtures have alonger lead teal. Please also confirm if temporary fixtures should be purchased and installed in order to minimize schedule disruption Answer NFPA 101 - 7.10.3.2* Where approved by the authority having jurisdiction, pictograms in compliancewith NFPA17O. Standard for Fire Safety and Emergency Symbols, shall be permitted. &7.10�.2 Pictograms are permitted to be used in lieu of, or in addition to, signs with text. Answered by: Steve Schmitz - DLR Group Date Answered: 08/1 1/2020 Copies To: Conipany & Contact Fax Notes Page 1 of 1 11 NFPA 170: Standard for Fire Safety and Emergency Symbols, 2015 t,laks,T,' Chapter 4: Symbols for General Use Section 4.2*: Symbols for General Use. 4.2*Symbols for General Use. The symbols for general use shall be as given in Table 4.2. Table 4.2 Symbols for General Use Symbol Characteristics Application Example Emergency Exit Square field Background green Door opening white Image in green The identification and location of The location of exit for use in a fire an emergency exit emergency Ski REQUEST FOR INFORMATION VALLEY "The Electrical SolutionC GENERAL CONTRACTOR RFI NUMBER: TO: BNB PROJECT: Tukwila Justice Center JOB NUMBER: ITEM: 19146 Exit Signs ATTN: Bill Brown REQUEST NUMBER: SPEC SECTION: DRAWING(S): 056 E1.1A, E1.1B, E1.1C, E1.2A DESCRIPTION OF REQUEST During a site walk with the Building Inspector on 7/28/20, it was requested to add hard wired exit fixtures in the locations noted on the attached drawings. Please confirm that these exit fixtures are to match the existing type installed on site. Please also confirm that temporary fixtures should be purchased and installed in order to minimize schedule disruption. RECOMMENDATION POSSIBLE COST IMPACT IBLE In order to maintain project schedules, we request this information within 7 days. In the event that we are not in receipt of the required information within the specified time, we cannot be responsible for delays or extra costs resulting there from. SIGNED: Collin Tuthill DATE: 7/28/20 OWNER REPRESENTATIVE'S RESPONSE RECEIVED: APPROVED: DATE: DATE: VALLEY ELECTRIC COMPANY OF MT. VERNON, INC. 1100 MERRILL CREEK PARKWAY EVERETT, WA 98203 425.407.0832 ILI 0 fa (t) x .52 0 0 t 2ooE ocn E 02 0 -,-. .03 8 E 2 c c.°) 2 a0 4.- 0 TD4 ‘2.) o .0 0 >S:9-0 c 3 120 m'z 11) 1.1.? "*" E 0 .5,2 c x 0 >, co 0. E 98 c0 c a3. x 0.- c. 0 0.0 asecx .0 To 5 a' c 0 as o a3'5BEE cs) .2 ›, 0 2 0 IR 0 „,0 0) 0 0 0 ti) KV ..It E57i -- 0 E > v a ca 0) ca -a c (13 0.) E 0 0°EcE -.Ec '46 ra 0 5 0 'I"4I) x 70- 0 0.) w > 0 V E ... X 0) > .= 0 0 ifs '-0 -se`- gr 0 oa00(4E5. c= ,o) 00c -S 2 0) <5 u 0 c 0 .0 t0o>3.=- t3, .. c0 II).22 0. ..,-E v=0 a) ,0.c0c'lT00caaoan..) — .5.40020v2dE2auo00D.,r Ac2 41EE>00c00Ec 19o.).. 0.0 c 0 c0 500) 6 c 0 00 0)a. 0)2c ) 0 en0 00 v ySE ° 0 5„5 t 515E5.2 0 aa E a 2 052 9'8.9 0 0 *a7 !0 c ° ac( ,c v0 ° C'0,(0.0 ccc0)o55cmE2°050°01'.o. w 0o 06 0 00:13.2'6°0. E Z.0—.0 C0CCC0.0C 0 a co 0 .9 C3 a/ 2 75. 71,.e- -3 cv) LLI X "5- X° Uj 2 Uj Uj j -C (Dal COW 0 LU C' 0) ui 0, 5 <0 w 0 C.9 0 00,,c 0 GC 01 C Ti _ _;•-•< LLLI < CO < < LU < < w 0 w z J 0 z J c E 0 c 2 c 2 2 co ?° 0 • C 20- too co ' coo 0 0 c E asc 4a 7 ago E o ci E o aa� Q cn w 0aEo 2. usa ua i156# x Q co fa 8 CO E a oEcE E 0 RII U a 73 w L. o COKJ 0 10 2 23 (Pj U CTO 2)c c. 4: X c 2. °m O a? mow,- .�.. O I- j Qi 4% c ,c E wIli Co0 cnw1' 0 0 x w rp (NI Ui 10. CiF ww BNBuilders October 26, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for ASI 039 - Additional Toilet Room Accessories Dear Ethan, In accordance with ASI 039 dated 8/25/2020, BNBuilders hereby submits our proposal to install additional restroom accessories. The total proposal of this subject work is $3,145.00. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5229 in the forthcoming change order. Sincerely, Mary Chan Project Manager CC: Justine Kim (justineksoseaj.com) Geri Urbas (geri.urbas(@.bnbuilders.com) Steve Schmitz (sschmitz(dIrgroup.com) BNBuilders 2601 4th Avenue, Suite 350 Seattle, WA 98121 206.382.3443 F: 206.382.3440 BNBuiiders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: ASI 039 GENERAL CONTRACTOR: BNBuilders, Inc. COP #: 5229 DATE: 10/28/2020 install additional restroom accessories seat cover dispeners and surface mounted soap dish at shower DESCRIPTION OF CHANGE: enclosures. 1 113P 09.20 Northwest Partition $2,515.001 1st -tier Subcontractor Cost Total (Direct Construction Costs) GCCM Costs GC/CM Mark-up on MACC Costs Rounding Adjustment $2,515.00 $480.00 $149,75 $0.25 'Total Change Request $3,145.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Dale 5.00% COP Cost Breakdown $/Unit Costs 69 696969696964696969696969696964696969619 Ili. t Vi 69696969 6969 U $/Unit Costs 1 69 696969 E9 11 EA f9 EA 6969 Ee 696969 III V}6969 1111 V9 69 69 69 69 69 69 69 69 69 m A.1. Labor Premium $/hour Cost 69 A.1. Labor $/hour Cost 00 69 11 EA Vi u) V9 69 V3 f9 69 111 69 E9' f9 F9 69 69 69 69 69 69 69 69 69 69 EA 69 CO 69 V; 0 N Quantity Unit Prod. Hours Description 'Project Management Total Cost of Work MI NORTHWEST ow PARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle, WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Description: ASI #39 - added restroom accessories Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR -0086 External/RCO# GC Ref# Date Sep 04, 2020 Job # 2066 Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 Labor Installation of Restroom Accessories Stock DNV - Onsite Material Restroom Accessory 12 soap dispensers Total Miscellaneous Charges Size EACH Quantity UOM Unit Total 16.00 Hrs 16.00 4.00 Hrs 4.00 Quantity UOM 1.00 EA Rate 73.76 72.31 Total $1,180.16 $289.24 Total Labor Unit Price 690.00 EA $1,469.40 Total $690.00 Total Material $690.00 Total BO Tax .48% GL Insurance 1% Notes: ASI #39 - supply and install additional restroom accessories. $10.37 $21.70 Total Miscellaneous Charges $32.07 AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers Run on: 20006 - 144th Avenue NE, Woodinville, WA 98072 September 4, 2020 12:40 PM Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: Sub Total: Overhead 15%: Sub Overhead: $1,469.40 $690.00 $0.00 $0.00 $32.07 $2,191.09 $323.91 $0.00 15.00% 8.00% Total: $2,515.00 T 425-375-2500 F 425-375-2540 http://www.nwpart.corn Quote No: USMTO001478-1 Quote Date: 9/3/2020 Job Name: Tukwila Justice ADD Item Description 221 Seat Cover Dispenser 680 Soap Dish Brite Bobrick Washroom Equipment, Inc. Washroom Accessory Submittal BARCLAY DEAN ARCHITECTURAL PRODUCTS 22029 23RD DR SE BOTHELL, WA 98021 (425) 368-2020 8 6 Technical Data ClassicSeries® SURFACE -MOUNTED SEAT -COVER DISPENSER Finish Face of Wall 50mm 11" 280mm B-221 .,- 0 0 IL 0 E 0 .... E 0). , MATERIALS: 18-8, type -304, 22 -gauge (0.8mm) stainless steel with satin finish. All -welded construction with beveled opening. c GI -C3 < o 0 o ... -o '6 C LI. 0 0 E E 0 (..) o cc OPERATION: Dispenses single- or half -fold paper toilet seat covers from beveled opening. Dispenser fills from bottom through concealed opening. Capacity: 250 toilet seat covers or one box. INSTALLATION: Mount unit on wall or toilet partition with two flat -head screws, not furnished by manufacturer, at points indicated by an S. For plaster or dry wall construction, provide concealed backing that complies with local building codes, then secure unit with flat- head screws not furnished. For other wall surfaces, provide fiber plugs or expansion shields for use with screws, not furnished, or provide 1/8" (3mm) toggle bolts or expansion bolts. Note: Provide a 5" (125mm) minimum clearance from bottom of dispenser to top of any horizontal projection to provide room for filling dispenser from bottom. SPECIFICATION: Surface -mounted toilet -seat -cover dispenser shall be type -304, 22 -gauge (0.8mm) stainless steel with all -welded construction; exposed surfaces shall have satin finish. Dispenser shall have a concealed opening in bottom for filling. Capacity shall be 250 paper toilet seat covers or one box. Surface -Mounted Seat -Cover Dispenser shall be Model B-221 of Bobrick Washroom Equipment, Inc., Clifton Park, New York; Jackson, Tennessee; Los Angeles, California; Bobrick Washroom Equipment Company, Scarborough, Ontario; Bobrick Washroom Equipment Pty. Ltd., Australia; and Bobrick Washroom Equipment Limited, United Kingdom. The illustrations and descriptions herein are applicable to production as of the date of this Technical Data Sheet. The manufacturer reserves the right to, and does from time to time, make changes and improvements in designs and dimensions. Revised 11/17/15 Printed in U.S.A. 2015 by Bobrick Washroom Equipment, Inc. Technical Data SURFACE -MOUNTED SOAP DISH B-680 B-6807 Specify Model Required: 0 Model B-680 Bright polished stainless steel 0 Model B-6807 Satin -finish stainless steel 4 1/4" 110mm SPAVOWWfilifte rP- C • 2" 50mm Typ. Finish Face of Wall s s Concealed Wall Plate MATERIALS: Flange and Support Arm — 18-8, type -304, 22 -gauge (0.8mm) stainless steel. Concealed, 16 -gauge (1.6mm) stainless steel mounting bracket. All -welded construction. Secured to wall plate with a stainless steel setscrew. Concealed Wall Plate — 18-8, type -304, 16 -gauge (1.6mm) stainless steel. Soap Dish — 18-8, type -304, 22 -gauge (0.8mm) stainless steel. Drawn, one-piece, seamless construction. Welded to the support arm. Two drain holes and two ridges to support bar of soap. INSTALLATION: To remove concealed wall plate from back of flange and mounting bracket, loosen setscrew. Mount wall plate so prongs are at top; secure with two sheet -metal screws, furnished by manufacturer, at points indicated by an S. Engage flange onto prongs of wall plate, then secure into position by tightening setscrew at bottom. For plaster or dry wall construction, provide concealed backing to comply with local building codes, then secure unit with sheet -metal screws furnished. For other wall surfaces, provide fiber plugs or expansion shields for use with sheet -metal screws furnished, or provide 1/8" (3mm) toggle bolts or expansion bolts. SPECIFICATION: Surface -mounted soap dish shall be type -304 stainless steel with (insert one: bright polished or satin) finish. Flange and support arm shall be 22 gauge (0.8mm) and equipped with a concealed, 16 -gauge (1.6mm) mounting bracket that is secured to a concealed, 16 -gauge (1.6mm) wall plate with a stainless steel setscrew. Drawn, one-piece, seamless, 22 -gauge (0.8mm) soap dish shall be welded to the support arm and shall have two drain holes and two soap -support ridges. Surface -Mounted Soap Dish shall be Model (insert model number) of Bobrick Washroom Equipment, Inc., Clifton Park, New York; Jackson, Tennessee; Los Angeles, California; Bobrick Washroom Equipment Company, Scarborough, Ontario; Bobrick Washroom Equipment Pty. Ltd., Australia; and Bobrick Washroom Equipment Limited, United Kingdom. The illustrations and descriptions herein are applicable to production as of the date of this Technical Data Sheet. The manufacturer reserves the right to, and does from time to time, make changes and improvements in designs and dimensions. Revised 06/30/15 R/A, SIC Printed in U.S.A. ©2015 by Bobrick Washroom Equipment, Inc. Document G710 - 2017 Architect's Supplemental Instructions PROJECT: (name and address) 73-17158-00 City of Tukwila Justice Center Tukwila, WA 98188 OWNER: (name and address) City of Tukwila 2600 Southcenter Blvd. Tukwila, WA 98188 CONTRACT INFORMATION: Contract For: General Construction Date: April 02, 2018 ARCHITECT: (name and address) DLR Group Inc. (a Washington Corporation) 51 University Street, Suit 600 Seattle, WA 98101 ASI INFORMATION: ASI Number: 039 Date: August 25, 2020 CONTRACTOR: (name and address) BNBuilders 2601 Fourth Avenue, Suite 350 Seattle, WA 98121 The Contractor shall carry out the Work in accordance with the following supplemental instructions without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will be no change in the Contract Sum or Contract Time. (Insert a detailed description of the Architect's supplemental instructions and, if applicable, attach or reference specific exhibits.) ASI -39 — Additional Toilet Room Accessories Add seat cover dispensers to public toilet rooms, and toiletries shelves to shower locations. Provide Bobrick B-221 Surface Mounted Seat -Cover Dispensers in the following rooms at each water closet (toilet compartment): Eight units total; • A101 — Three units • A102 — Two units • C104 — One unit C105 — One unit • C110 — One unit Provide Bobrick B-680 Surface -Mounted Soap Dish at the back wall 44" from finish floor in all shower enclosures. Six units total; • B113 — One unit A204 — Two units A206 — Three units ISSUED BY THE ARCHITECT: DLR Group, Inc (a Washington Corporation). ARCHITECT (Firm name SIGNATURE Erica Loynd, Project Manager PRINTED NAME AND TITLE July 30, 2020 DATE AIA Document G710" - 2017. Copyright © 1979, 1992 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects." "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 16:29:40 ET on 08/25/2020 under Order No.8182007020 which expires on 04/01/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA46) BNBuilders October 23, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for Added Mini -Fridge & Microwaves Dear Ethan, In accordance with email direction on 9/23/2020, BNBuilders hereby submits our proposal for added (1) mini -fridge and (11) microwaves. The total proposal of this subject work is Six Thousand Five Hundred Twenty four dollars $6,524.00. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5237 in the forthcoming change order. Sincerely, Mary Chan Project Manager CC: Justine Kim (justinekRsoseaj.com) Geri Urbas (qeri.urbas(bnbuilders.com) Steve Schmitz (sschmitzdIroroup.com) BNBuilders 2601 4.th Avenue, Suite 350 Seattle, WA 98121 T. 206.382.3443 F: 206.382.3440 B 13NBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: GENERAL CONTRACTOR* BNBuilders, Inc. DESCRIPTION OF CHANGE: added (1) mini -fridge and (11) microwaves COP #: 5237 DATE: 10/23/2020 BP 10.00 Misc. Specialties / Equipment lst-tier Subcontractor Cost Total (Direct Construction Costs) GCCM Costs GC/CM Mark-up on MACC Costs Rounding Adjustment $5,733.72 $480.00 $310.69 -$0.41 'Total Change Request $6,524.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date 5.00% COP Cost Breakdown M o 44 M ("Na 174 n. ® U U U $/Unit Costs V3 44 Vf 1 Vf EA 1 ERV> 44 44 11 44 ER li 63 64 to 64 1 fr3 E4 64 iH 11 EA Vf EH FR 11 69 64 EA U B. Material $/Unit Costs �$ - 63 b4 ER EA 43 63 Ex3 EA ER' EA 64 EA 44 EA b4 fl3 EA b4' V3 FA 64 N) Vf EA ER Vf lfl A.1. Labor Premium $/hour Cost A.1. Labor $/hour Cost 120 I $ 480 YA 11 fR &4. 69 H3 • • 64 Hf' 1 EA ;d4 1111111111 64 M EA ER 6'3 f1Y b9' V3' 69 64 11111 Vi Vf EA EA U3 Vs O VD Total Cost of Work A. Quantity Unit Prod. Hours 1 1 1 4 Description Protect Management Tukwila Justice Cenber SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center CCD/ASI #: COP #: 5237 Contractor Name: BNBuilders DATE: 10/23/2020 DESCRIPTION OF CHANGE: added (1) mini -fridge and (11) microwaves Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractor's Total Direct Cost Subcontractor's Mark-up (Excludes Labor Premium) Labor Premium $o.00 $0.00 $0.00 $0.00 $0.00 Moo ITotal Subcontractor Direct Costs + Mark-up + Labor Premium $o.00 Total Sub -tier Subcontractor Costs $5,309.00 15% Subcontractor's Mark-up on Sub -tier Subcontractor(s) MIME 8% 'Total Subcontractor Change Request $5,733.72 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date met aeon appliance an 1749 First Avenue South Seattle, WA 98134 Phone: (206) 623-8811 Fax: (206) 623-8816 www.metropolitanappliance.com Sold To: Customer # CBNBUIL BN BUILDERS INC * 2601 4TH AVE #350 SEATTLE, WA 98121 Phone: (206) 382-3443 PATRICK.REED@BNBUILDERS.COM SalesPerson Aaron PO Number erms N30 Order Tax Exempt # 12-31-2019 Number 24349 Date 09/22/2020 Page 1 Ship To: TUKWILA JUSITCE CENTER 15005 TUKWILA INTERNATIONAL BL SEATTLE, WA 98188 Phone: (206) 639-0990 Ship Method Metro Delivery Comment RFI 515_A228 Undercounter Refr. o e Qty 1 um ers Model Number AL54 1 ADD -INS -REF 11 PES7227SLSS Brand. Model Description Summit, ADA compliant built-in all refrigerator -SS DOOR/BLK CABINET Install Refrigerator + Microwaves General Electric, Countertop, Stainless Steel Microwave Unit Amount $1,010.00 $185.00 $374.00 Extended $1,010.00 $185.00 $4,114.00 Thank you for your business Summary Sub Total Taxable Sub Total Tax 0.00% Total Total Payments Amount Due $5,309.00 $5,309.00 $0.00 $5,309.00 $0.00 $5,309.00 Mary Chan From: Ethan Bernau <ethanb@sojsea.com> Sent: Wednesday, September 23, 2020 8:49 AM To: Mary Chan; Geri Urbas Cc: Rick Philipovich; BiII Brown; Jeff Clark; Steve Schmitz; Erica Loynd Subject: RE: TJC GaIIey kitchen appliances Attachments: BNB-Tukwi|a][Q92220.pdf Mary, Please proceed with the order. Thanks, Ethan Bernau 1 Project ManagerLEED AP, AssocDBIA 101Yes|erWay | Suite GU6|Seattle, VVA98lO4 TZO6.838.3T05|C2O6Jl5.5558|sxjsea.cmmn Shiels|Obleta|Johnsen Project Focused. Community Driven. From: Mary Chan <Mary.Chan@bnbuilders.com> Sent: Wednesday, September 23, 2020 8:28 AM To: Geri Urbas <Geri.Urbas@bnbuilders.com>; Ethan Bernau <ethanb@sojsea.com> Cc: Rick Philipovich <Rick.Philipovich@bnbuilders.com>; Bill Brown <Bill.Brown@bnbuilders.com>; Jeff Clark <Jeff.Clark@bnbuilders.com> Subject: RE: TJC Galley kitchen appliances ]'he supplier informed us if wc can release the order before today 9/23, we can rcccive (4) microwaves and (1) refrigerator this wecc. remaining microwaves `will bcxvaUx6lcwithin 3~4weeks, Please ..provid.c...directiorro.1 :tow- shalkproceed. Thanks, Mary Chan BNBuilders 26O|4rhAvenue, Suite 350 Seattle, Y<\98l21 206.588.9235 cell 206.382.3443 office 0 fax Twitter Fuoboo& | Linkcdun 6u6oKdcr*.rn,a From: Mary Chan Sent: Tuesday, September 22 2020 4:47 PM To: Geri Urbas <Geri.Urbas@bnbuilders.com>; Ethan Bernau <ethanb@soisea.com> Cu: Rick Phi|ipovich<0ck.PhiUpovich@bnbui|ders,conn>; Bill Brown <8iU.Bnzyvn@bnbu|ders.com>;Jeff Clark <]effl1ark@bnbu|ders.com> Subject: RE: TJC Galley kitchen appliances Ethan, 1 See aoxcbcc quote for the added zr providedirection to proceed. T\n working with rhco` on lead knzc but ‘vitritccl to ger this in front of you for a decision. Mary Chan1BNBuilders 2601kh\rrouv 3^kr35V | SemWC`W.,\98121 206.588..9235 cell | 206.3823,143 office 1 2)6j82]44o6z From: Geri Urbas <Geri.Urbas@bm> Sent: Tuesday, September 22, 2020 12:11 PM To: Mary Chan <Mary.Chan@bnbuilders.com> Cc: Rick Phi|ipovich<Rick.phUipovich@bnbui|deo.conn>; Bill Brown <Bill.Brown@bnbuilders.com>; Jeff Clark <Jeff.Clark@bnbuilders.com> Subject: FW: GaIIey kitchen appliances Importance: High Mary — do you know who to contact regarding this? From: Ethan Bernau a.ozn7> Sent: Tuesday, September 22, 2020 11:30 AM To: Bill Brown «QiU.B[own@bnbui|ders.conm>;GeriUr6as<Beri.Urbac@bnbui|de,szonn> Subject: FW: GaIIey kitchen appliances Importance: High Can you please follow up on this while Jeff is out? There is 1 refrigerator and 11 microwaves that need to get ordered. Ethan Bermaw| .com Project Manager, LEED AP, AssocDBIA lO1Yes|erWay | Suite 6U6|Seattle, WA 98104 T 206.838.37051C 206.715.55581 sojsea.com Shiels |Obletz|Johnsen Project Focused. Community Driven. From: Ethan Bernau Sent: Monday, September 21, 2020 2:06 PM To: Jeff C!ark (BNB) <Jeff.Clark@bnbuilders.com> Subject: FW: Galley kitchen appliances Jeff, You're getting a quote for the microwaves too, correct? Ethan From: Rachel Bianchi <Rachel.Bianchi@TukwilaVV4.gov> Sent: Friday, September 18 2020 3:46 PM To: Ethan Bernau <ethanb@soisea.com>; Schmitz, Steve <sschmitz@dlrgroup.com>; Jeff Clark <]ef[C|ark@bnbui|den.conn» Subject: Re: GaIIey kitchen appliances 2 Yes, please. Thank you. From: Ethan Bernau <ethsea.conm> Date: Friday, September 18, 2020 at 12:53 PM To: "Schmitz, Steve" <sschnnitz@d|rgroup.conl>,Jeff Clark <Jeff.C|ark@bnbui|ders.conm>, Rachel Bianchi <Rachel.Bianchi@TukwilaWA.gov> Subject: RE: GaIIey kitchen appliances Rachel, Do you want BNB to order the microwaves too? Ethan From: Schmitz, Steve <sschnnitz@DLRGROUP.cunl> Sent: Friday, September 18, 2020 12:46 PM To: Ethan Bernau <ethanb0aso|seazonn>; Jeff Clark <]eff.C|arkVabn6ui|ders.com>., Rachel Bianchi <Rachel.Bianchi@tukwilawa.gov> Galley kitchen Subject: RE: a eyapp|iances Ethan, There is room at each casework for a microwave oven of approximately 24 1/8" width x 14" height. The unit we used as basis -of -design was a GE Profile 2.2 cu countertop microwave oven. ht ps1Yxvxvxv.geapp|iances.com/app|iance/GE'Prof|e-2-3_[u-Ft-Countgrtop'Sensor-Mi PE57227SL5S There are spaces for eleven of these microwaves in the foliowing rooms: • Patrol • EOC • ConfA • Kitchen (3) • ]uryRomm • Courts office • Admin office • P5U An example elevation for your information: 33" 5Y/4" OVERALL - 30" PLAM-1 CABINETS 0 SINK -3 & FAUCETB/0. MCRO GE PE87226SF66 810. PLAM-1 CABINETS PLAM-1 TOE KICK 0 Steven J. Schmitz, AIA Architect 1 Associate sschmitzdIrgroup.com it 41 „I. it DLR Group 0: 206-461-6000 1 d: 206-461-6044 51 University Street, Suite 600 Seattle, WA 98101 F.E. F.E. 1151-""rr 13" — 666 ti623 oc, :715,1t I IREFt SUMMIT "AL54 BIO -m14 18" - 2e1,,,i" VERIFY - 115!4' OVERALL - VIF, 0.1'2 ("T'' ELEVATION Y SCALE- 17 =1",0' From: Ethan Bernau <ethanb@solsea.com> Sent: Friday, September 18, 2020 12:27 PM To: Jeff Clark <Jeff.Clark@bnbuilders.com>; Rachel Bianchi <Rachel.Bianchi@tukwilawa.gov> Cc: Schmitz, Steve <sschmitz@DLRGROUP.com> Subject: RE: Galley kitchen appliances Steve, could you please send Rachel the casework dimensions for the microwave cubbies. From: Jeff Clark <Jeff.Clark@bnbuilders.com> Sent: Friday, September 18, 2020 12:25 PM To: Rachel Bianchi <Rachel.Bianchi@tukwilawa.gov> Cc: Ethan Bernau <ethanb@sojsea.com> Subject: RE: Galley kitchen appliances 4 INDICATES LIGHTIN BE B/0 i 88-1 COUNT' & BACKSPt 1-1/2" X 1-1 ALUMINUM Rachel, Contact for Metro Appliance below Aaron Freedman, President Metropolitan Appliance "The Only Appliance Store You'll Ever Qoed!" (206) 623-8811 1749 1st Ave S. Seattle 98134 Jeff Clark 1 BNBuilders 2601 40Avenue. Suite 1 Seattle, WA 98121 206,382,3443 office | 206,550.0960 cell From: Ethan Bernau <ethanbisea.com» Sent: Friday, September 18, 2020 12:22 PM To: Jeff Clark <Jeff.Clark@bnbuilders.com> Subject: FW: Galley kitchen appliances Jeff, see below. From: Rachel Bianchi <Rachel.Bianchi@TukwilaWA.gov> Sent: Friday, September 18, 2020 12:21 PM Tm:EthonBe,nau°athanb@soisea.com>;PhiHuynh«P.Huynh@Tukm/|oVVA.govx Subject: Re: Galley kitchen appliances Jeff was going to get me his contact for wholesale appliances. 1 am also still waiting on the dimensions. From: Ethan Berngu<ethanb0Dsoiseazom> Date: Friday, September 18, 2020 at 12:19 PM To: Phi Huynh<PJHuynh@Tuk»vlaVVA.goV> Cc: Rachel Bianchi <Rachel.Bianchi@TukwilaWA.gov> Subject: RE: GaIIey kitchen appliances Phi, The fridge for the PD Admin suite has been ordered so it should show up soon. We have not ordered microwaves for the Hub main kitchen and galley kitchens. This was a miss we just discovered. I think there are around 10 needed. Probably the quickest solution is for the City to order them directly from amazon, Costco, etc. Ethan Bernau I ethanbPsojsea.com Project Manager, LEED AP, Assoc. DBIA 101YeoierWay1Suite6061Seattie'VVA98104 T2U6.8383TO5|C206.7l5.5558|sojsem.cqm Shiels|Obleto|Johnsen Project Focused. Community Driven. 5 From: Phi Huynh <P.H Sent: Friday, September 18, 2020 11:46 AM To: Ethan Bernau <ethsea'o»nl> Subject: GaIIey kitchen appliances Hi Ethan, Do you know when the microwaves will come in, as well as the fridge for the PD Admin suite? Thanks, Phi CAUTION: This email links from an unknown or suspicious origin. originated from outside the City of Tukwila network. Please DO NOT open attachments or click CAUTION: This email originated from outside the City of Tukwila network. Please DO NOT open attachments or click links from an unknown or suspicious origin. 6 N BNBuilders October 30, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for Sign Revision for Gun Locker Sign C102 Dear Ethan, In accordance with Owner Request, BNBuilders hereby submits our proposal for Room ID Sign change at C102 - remove "gun locker" text and replace with new sign "storage" text. The total proposal of this subject work is Five Hundred Ninety Six dollars $596.00. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5248 in the forthcoming change order. Sincerely, Mary Chan Project Manager CC: Justine Kim (justinek(@,soseai.com) Geri Urbas (qeri.urbasbnbuilders.com) Steve Schmitz (sschmitzAdIrqroup.com) BNBuilders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 $28.38, BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: GENERAL CONTRACTOR: BNBuilders, Inc. COP #: 5248 DATE: 10/30/2020 DESCRIPTION OF CHANGE: Room ID Sign change at C102 - remove "gun locker" text and replace with new sign "storage" text BP 09.20 Northwest Partition $447.50 lst-fier Subcontractor Cost Total (Direct Construction Costs) GCCM Costs GC/CM Mark-up on MACC Costs Rounding Adjustment $447.50 $120.00 $0.12 Total Change Request $596.00 To the best of my knowledge and belief, I certify that all costs listed above are correct Contractor Signature Date 5:00% COP Cost Breakdown 0 co c•I 0 0 0 0 0 0 0 t...... E Q. o- 10 c..3 $/Unit CostsIs 64 64 69 tft 69 69 , , 69 69 . , 69 E9. ................ EA 69 69 69 69 69 69 69 69 £9 69 69 69 69 69 69 C, L B. Material 1 $/Unit Costs MEM 1111.111111111111111111111 69 69 69 69 69 69 69 69 69 69 69 69 696969 69 69 6969 6 696969 69 69 69 Di Al. Labor Premium 0 o 69 , 0 0 = . , 69 6.0 00 -0 ai _II < 0 CN1 7) 69 . I 696969696969696969696969696969696969696969696969 1 v oil,. 111111111111111 $ 120 z 0 ° Csi ,,...A. I 1 1 1 Total Cost of Work A. Quantity Unit Prod. Hours I I 1 1 Description Project Management Ordi NORTHWEST rithl PARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle, WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR -0089 External/RCO# GC Ref# Date Oct 29, 2020 Job # 2066 Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 Description: Room ID Sign change at C102 - remove "gun locker" text and replace with new sign Labor Frame Interior Total Miscellaneous Charges Quantity UOM Unit Total Rate Total 4.00 Hrs 4.00 72.31 $289.24 Total Labor $289.24 Total B8,0 Tax .48% GL Insurance 1% Total Other Subtrade Charges $1.87 $3.92 Total Miscellaneous Charges $5.79 Total Sign Wizards - Added sign decals $101.00 Total Other Subtrade Charges $101.00 Notes: Remove exterior sign at C102 that says "gun locker" and replace with new sign that says "storage". AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers Run on: 20006 - 144th Avenue NE, Woodinville, WA 98072 October 29, 2020 2:02 PM T 425-375-2500 Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: Sub Total: Overhead 15%: Sub Overhead: $289.24 $0.00 $101.00 $0.00 $5.79 $396.03 $43.39 $8.08 15.00% 8.00% Total: $447.50 F 425-375-2540 http://www.nwpart.com Sign Wizards 1111 SE Grand Ave Portland, OR 97214 Ph: (503) 235-6967 FAX: (503) 233-2711 Email: orders@signwizards.com Web: http://www.signwizards.com Estimate #: 31420 Page 1 of 1 Created Date: Salesperson: Email: Not Specified: Not Specified: Entered bY: 10/29/2020 1:59:26PM Mark Tucker Prepared For: Contact: Phone: (503) 235-6967 (503) 233-2711 Email: Mark Tucker Address: Northwest Partitions Chris Ayers N/A Portland, OR Description: Tukwila Justice Center - room C102 sign change - supply only Quantity Unit Price Subtotal Product: Architectural Sign Description: Room ID signs - tan painted background Room #C102 - re -make sign without "GUN LOCKER.' text • 1-5 in (H) x 8 in (W) , Door Signs Quantity $86.00 $86.00 Unit Price Subtotal 2 Product: Shipping UPS Description: Shipping via UPS • 1 Package(s) to be shipped on 11/13/2020 Payment Terms: Payment due upon completion of order. 1 $15.00 $15.00 Estimate Total: $101.00 Subtotal: $101.00 Total: $101.00 Deposit Required: $50.50 Client Reply Request El Estimate Accepted "As Is". Please proceed with Order. D Other: D Changes required, please contact me. SIGN: Date: / / Print Date: 10/29/2020 2:01:26PM CCB: #67127 WA: SIGNWI*032OR DBE/WBE: #1264 0 •X w it) Mary Chan From: Ethan Bernau <ethanb@j com' Sent: Tuesday, October 27, 2020 4:10 PM To: Schmitz, Steve; Mary Chan Subject: RE: TJC - New Storage Room Sign C102 Approved by City too. Ethan Bemmau|ethanb6asoisea.com Project Manager, LEED AP, Assoc. DBIA 101Yes(erVVay1Suite6061Seattie'yVA98104 T 206.838.37051C 206.715.55581 sojsea.com Shiebs|Obletz|Johnsen Project Focused. Community Driven. From: SchmitzSteve <sschmitz@DLRGROUP.com> Sent: Tuesday, October 27 2020 8:36 AM To: Mary[han«Mary.Chan@bnboUde,s.com>;Ethon8ernau<ethanb0Dsojsea.cnnm> Subject: RE: TJC - New Storage Room Sign C102 Acceptable. Steven J. Schmitz, AIA Architect | Associate DLR Gro o: 206-461-6000 1 d: 206-461-6044 51 University Street, Suite 600 Seattle, WA 98101 From: Mary Chan <Mary.Chan@bnbuilders.com> Sent: Tuesday, October 27, 2020 8:29 AM To: Ethan Bernau <ethanbsV'sea'conl»;Schmitx, Steve «sschnoitz@DLRGROUP.cpm> Subject: TJC - New Storage Room Sign C102 Please review the attached cut sheet for the updated sign and confirm it is acceptable to order. Thanks, Mary Chan BNBuilders 2601 4/i`/\rcuvC, SLI,c}50 Seattle, Y\AY8|2| 206.588.9235 c6| 206.382]44]oxh,c 206.382.344(0 fax Twitter | *cc6ouk | Linke6zo | bubuUd=n.cnm B N B 13NBuilders October 26, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for ASI -48.1 Door C103 Alarm Device and Spandrel Addition Dear Ethan, In accordance with ASI -48.1 Door C103 Alarm Device and Spandrel Addition, BNBuilders hereby submits our proposal for Furnish and Install for Door C103: Detex Alarm with cylinder housing, temporary core, and keys. Omega Thermalite Panel in Dark Bronze Anodized 48" x 96". The total proposal of this subject work is Four Thousand Four Hundred Fifty Seven dollars $4,457.00. BNB has not proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5251 in the forthcoming change order. Sincerely, Mary Chan Project Manager CC: Justine Kim (justineksoseaj.com) Geri Urbas (qeri.urbas@bnbuilders.com) Steve Schmitz (sschmitzdIrgroup.com) BNBuilders 2601 4th Avenue, Suite 350 Seattle, \NA 98121 T: 206,382.3443 F- 206.382.3440 B BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: ASI 48.1 GENERAL CONTRACTOR: BNBuilders, Inc. DESCRIPTION OF CHANGE. Furnish and Install for Door C103: COP #: 5251 DATE: 10/26/2020 Detex Alarm with cylinder housing, temporary core, and keys. Omega Thermalite Panel in Dark Bronze Anodized 48" x 96" BP 08.40 General Storefronts $3,764.85 lst-tier Subcontractor Cost Total (Direct Construction Costs) GCCM Costs GC/CM Mark-up on MACC Costs Rounding Adjustment $3,764.85 $480.00 $212.24 -$0.09 Total Change Request $4,457.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Dale 5.00% COP Cost Breakdown N N N Q O au 0 0 0 $/Unit Costs tri 1111111 to 69696969 to 69 H1 69 69 1 69 69 1111 64 69 69 64 111111 69 69 69 64 69 69 69 69 69 U $/Unit Costs 69 to 69 GI E9 49 69 69 69 64 69 64 ffl 64 64 64 69 69 to Ui 69 69 69 69 64 V3' Cd A.1. Labor Premium $/hour Cost -- 69 69 A.1. Labor $/hour Cost MEM $ 480 69 e e 69 ui i 1 69 69 e e 49 fR e i. 69, 69 e e tl3 69 e e 64 69 e e 69 b9 i. a 64 to i 1 69 69 1 e 69 t9 69 69 64 b4 0 CO 69 Total Cost of Work A. Quantity Unit Prod. Hours I I I 4 Description Project Management GENERAL STOREFRONTS, INC. COP/CHANGE ORDER SUMMARY Project Name: Tukwila Justice Center Subcontractor: General Storefronts, Inc. Description: Furnish and Install for Door C103: Detex Alarm with cylinder housing, temporary core, and keys. Lead Time 7-10 days Omega Thermalite Panel in Dark Bronze Anodized 48" x 96" Lead Time 23-25 days *Formal Change Order required to proceed with procurement of material* Itemize all costs on attached COP Cost Breakdown form. 1. MATERIAL COSTS a. material costs b. freight costs (itemize) Date 10/21/20 COP# ASI -48.1 2. EQUIPMENT COSTS a. rental equipment (per spec approved source) b. owned equipment (per invoices attached) 3. JOBSITE COSTS a. labor b. material costs 4. OVERHEAD & PROFIT a. NTE 15% portion of 1, 2, & 3 5. SUB -TIER CONTRACTORS / SUPPLIERS a. b. c. d. 6. OVERHEAD & PROFIT ON SUB -TIER CONTRACTORS a. NTE 5% of Line 5 for each sub -tier 7. INSURANCE/TAXES a. volume driven liability insurance b. volume driven b&o taxes 8. Bond 1,769.32 1. MATERIAL COSTS $ 1,769.32 2. EQUIPMENT COSTS $ 1,377.94 3. JOBSITE COSTS $ 1,377.94 SUBTOTAL 1 thru 3 472.05 $ 3,147.00 4. OVERHEAD & PROFIT $ 472.00 5. SUB -TIER CONTRACTORS $ - 6. OVERHEAD & PROFIT ON SUBCONTRACTORS $ 1.000 % of 1-3 & 5 $ 31.47 1.000 % of 1-3 & 5 $ 31.47 Bond 2.250 82.85 7. INSURANCE $ 63.00 TOTAL COST TOTAL COST INCLUDING BOND 3,682.00 3,764.85 GSI -013 ASI-48.1.xlsx Page of Issued 10/21/2020 GENERAL STOREFRONTS, INC. COST BREAKDOWN GSI CO No COP/CCD/ PR / RFI No Total Cost $ 1,377.94 04 co M w IN- .. v" ca.s is 4 1.... . cq Equipment ... en 0 0 Unit $ Material Cost $1,225.801 0 0 . o L() Nr... $ 293.52 . m i 44 co M w .. ,,,... try C D $1,225.80 00000000 CI' C). q C! q CD. q q 00000000 to Eft 44 64 64 41 N 44 $0.00 N 0. 01 M N 69. 00 cp =,! ci ca 69. tF) Labor Cost I 1 44. $ 1,377.94 $ 1 1 1 44 $ 1,377.94 I 1 1 1 1 1 1 1 1 64 4 . . . 1 . , 429. 41 0) N. N. 01 ... )0. M. D (4) 4- 0 co $84.94 N M 0- ).... 6 oi �0 $77.37 $46.28 0 N 6 '4' 63 ,..-. 0 c a a a a amm 0 Eoa3 3 2 a c. N 0 _,... (i) ..-- ..- •-• ,,,- ,, ',.. V" l'... T. l'.. V... V"' 'C'. ", ',. `,. Description Apprentice Journeyman Foreman Driver Project Manager Project Adminstrator Administrative Safety Costs Document Reproduction CO o o 1.-. a E m Jobsite Subtotal1 E c E a zt- Glass Panels Jbar Sealant Automatics Misc Material, screws, tape Paint COVID-19 a to u.. Hardware Skylights/Canopies Shop Drawings 'Materials Subtotal Rental 'Equipment Subtotal 'Total Cost of Work 'Labor 0 *c ID 'Equipment Issued 10/21/2020 GSI -013 AS1-48.1.xlsx ACCESS HARDWARE SUPPLY Access Hardware Supply 14447 Griffith St. San Leandro, CA 94577 (510) 483-5000 SOLD TO: General Storefronts Inc 18931 59th Ave NE, Ste, 4 Arlington, WA 98223 CONFIRM TO: Bill George Quote ORDER NUMBER: ORDER DATE: SALESPERSON: CUSTOMER NO: TEL NO: FAX NO: PAGE 11 S875752 10/20/2020 0107 00-GEN2813 1 (360) 474-8410 360-474-8421 SHIP TO: General Storefronts Inc 18931 59th Ave NE, Ste. 4 Arlington, WA 98223 11 1 11 1 111 CUSTOMER P.O.: SHIP VIA UPS GROUND F.O.B. ORIG TERMS: Net 30 6iVWcf. Jucticd QTY SHIPPED BIO DET0159 Bin: 25 SCH4949 Bin: 43 SCH5000 Bin: 43 SCH5001 Bin: 43 DET EAX-500 DOOR MOUNT SCH 20 -061T -ICC -626 MORT CYL SCH 48-056-ICX CUT CTRL KEY SCH 48-101-ICX CUT KEY Thank you 1 1 1 2 0 0 0 0 0 0 0 0 NO MERCHANDISE RETURNED WITHOUT PRIOR APPROVAL NO MERCHANDISE RETURNED AFTER 90 DAYS RESTOCK FEES MAY APPLY ***Some items may be subject to a tariff surcharge*** Printed 10/20/2020 12:12:02PM User: JD Net Order: Less Discount: Freight: Sales Tax: 293.52 0.00 0.00 0.00 293.52 PACIFIC ARCHITECTURAL PRODUCTS ADVANCED BUILDING ENVELOPES SINCE 19 12301 SE Carpenter Drive • Clackamas, Oregon 97015 Tel: 503.239.8128 • Fax: 503.905.8684 www.panelguys.com BILL TO: GENERAL STOREFRONTS - PAP 18931 59TH AVE. NE, SUITE 4 ARLINGTON WA 98223 QUOTE P00535265 Account: GES Branch: 40PAP Phone: (360)-474-8410 Fax: (360)-474-8421 SHIP TO: GENERAL STOREFRONTS 18931 59TH AVE NE, SUITE 4 ARLINGTON WA 98223 Page 1 of 1 PO: REF: JOB: ACTIVATION DATE: 10/20/20 CLOSE DATE: 11/19/20 SALES PAP AGENTS TYPE: DIRECT QUOTED FOR:BILL QUOTED BY: SAmauba SHIP VIA: FRT TERM: QUANTITY UOM ITEM/DESCRIPTION PRICE/UOM AMOUNT 1 EA 4'x8' THERMOLITE (1"0A) DARK BRONZE ANO 2S 1,225.80 PAYMENT TERMS: 1% 10 days ADI - Net 30 days Total $1,225.80 PRINTED: 10/20/20 10:56:39 AIA Document G710 Architect's Supplemental Instructions 2017 PROJECT: (name and address) 73-17158-00 City of Tukwila Justice Center OWNER: (name and address) City of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 CONTRACT INFORMATION: Contract For: General Construction Date: April 02, 2018 ARCHITECT: (name and address) DLR Group Inc. (a Washington Corporation) 51 University Street, Suit 600 Seattle, WA 98122 ASI INFORMATION: ASI Number: 48.1 Date: October 12, 2020 CONTRACTOR: (name and address) BNBuilders 2601 Fourth Avenue, Suite 350 Seattle, WA 98121 The Contractor shall carry out the Work in accordance with the following supplemental instructions without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will be no change in the Contract Sum or Contract Time. (Insert a detailed description of the Architect's supplemental instructions and, if applicable, attach or reference specific exhibits.) Description: ASI -48.1 Door C103 Alarm Device and Spandrel Addition. At Door C103, provide a battery powered door mount exit alarm. Proposed as Detex EAX-500 Series. Replace glazing lite in door with spandrel thermally broken metal to match adjacent anodized frame, to provide owner with added privacy. Add interior and exterior signage indicating "EMERGENCY EXIT ONLY, ALARM WILL SOUND!" in prominent white -on -red background. This supplemental instruction overrides previously issued ASI -48 Attachments: EAX Exit Alarms Product Data Insulated Glazing Panels brochure ISSUED BY THE ARCHITECT: DLR Group Inc. (a Washington Corporation) ARCHITECT (Finn nan SIGNATURE Erica Loynd, Project Manager PRINTED NAME AND TITLE October 12, 2020 DATE AIA Document G710' — 2017. Copyright CD 1979, 1992 and 2017 by The American Institute of Architects. All rights reserved. The 'American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 17:05:17 ET on 10/12/2020 under Order No.8182007020 which expires on 04/01/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA3A) �=����K�r�X� �~~~�� EXIT ALARMS EAX-500 Battery Powered Door or Wall Mount Exit Alarm The Detex EAX-500 Series is designed for applications requiring a battery -powered alarm on secured doors. The alarm, with approximately 100dB, will sound when an unauthorized exit occurs. The redesigned shape and smaller size of the EAX-500 makes it the ideal choice for quick and easy installations on emergency exit and restricted doors. Shown with mortise cyJinder (cylinder sold separately) Benefits • Low cost, self-contained door alarm with piezo horn that sounds to warn unauthorized use of a door or gate Features • Secure, tamper resistant housing ▪ Door or wall mount • Quick, easy installation saves time and money • Patented plastic template allows for foolproof alignment of internal magnetic door contact and accurate installation • Tapered cover aliows for installation on narrow stile doors • Intelligent circuit senses the external magnet|ocodVn automatically and sets the correct door handing Mechanical Options • Patented cam mb| automatically adjusts for different sizes of cylinders without use of spacers ^AJamncanon|ybesi|anuedby proper control key • 100 dB piezo alarm • LED visual and audible arming indicators • Modern graphics on cover to demonstrate key rotation and operation • 9VDC battery operated with Low Battery Alert • Key required to reset alarm • FieId selectable 2 -minute auto rearm, if desired • Field selectable status indicators, if desired • EAX-500 may be ordered in several kit configurations: SK1 Kit aliows for walI mounting and includes (1)white K8S'1O38S door contact SK2 Kit aliows for wall mounting and includes (2) white MS -1039S door contacts SK3 Kit allows for wall mounting and includes (1) brown MS -1059S door contact SK4 Kit aliows for wall mounting and includes (2) brown MS -1059S door contacts SK5 Kit aliows for wall mounting and includes (1) grey MS -2049S door contact SK6 Kit aliows for wall mounting and includes (2) grey MS -2049S door contacts • KS - Key Stop (Key removed only when armed) • OKC - Outside Key Contro(Rim Cylinder required) • EAX-500SK includes exit alarm d for wall mounting, and surface magnetic door contacts specify cover lock # additional surface contacts can be ordered separately (add suffix ^xMC05 orx|C7^tm include factory installed cylinder) lite Safety, Security and Security &SUMO Electrical Options Other EAX Exit Alarms Include: • EAX-500W- Weatherized Battery Powered • EAX-2500 - AC Powered • EAX-3500 includes timed bypass alarm, rechargeable battery (mortise cylinder sold separately) Accessories • EAX-3500FK includes timed bypass alarm, rechargeable battery, flush magnetic switch and plug-in 24VDC transformer • EAX-3500SK includes timed bypass alarm, rechargeable battery, surface magnetic switch and plug-in 24VDC transformer • MC65 - Detex Mortise Cylinder pre-installed at factory Technical Information • IC7 - 7 pin interchangeable core housing, pre-installed at factory (Compatible with most standard 7 pin IC format cores) • Machine and Self -Drilling Screws (Std.) Finishes • Optional Sex Nuts or Security Torx Screws available • Optional Cylinder Nut Wrench P/N: 103779 • GY - Grey Dimensions Front and Side View Mortise Cylinder (sold separately) - dimensions .715" approximate .313" November 1, 2019 • BK - Black Riser Diagra 0 Left -side mounting Right -side mounting Door switch actuated Double door application as shown above available with EAX-500, EAX-2500 and EAX-3500. Note: Double door application as shown above not available with EAX-500W weatherized alarm. Cancer & Reproductive Harm - www.detex.com/prop65 Listings and Approvals UL Classified Miscellaneous Fire Door Accessory ANSI/BHMAA156.29 Detex Limited Warranty 3 Year Limited Manufacturer's Warranty Where Trust is Buff' life Safely, Security and Seeurily,lssur Detex Corporation 302 Detex Drive New Braunfels, Texas 78130-3045 USA PH. (830) 629-2900 (800) 729-3839 FAX (800) 653-3839 http://www.detex.com USA Sales: marketing@detex.com International Sales: export@detex.com ' doittivmmtatutttltAttR441*PkwItUMAttkAft -• I OMEGA PANEL PRODUCTS CZ Effective March 2019 NI LAMINATORS INC. Tech Support: 800.523.2347 Laminatorslnc.com NEW INSULATED GLAZING PANELS In addition to our standard MGtThernlO|iterw panel, Laminators now offers fabricated options to provide additional R'V8lUe, new aesthetics, and the ability to create hairline joints between panels. Thermolite Glazing Panels are designed to easily fit into any standard or custom glazing system. With building and energy efficiency codes becoming even more stringent, these panels can be a smart solution for your next project. When you need a high-tech look with ene[gy'saving, insulating properties for glazing in5ed3. Thermolite panels are the answer. Thermolite panels are constructed with an insulating foam core sandwiched between finished aluminum sheets and two corrugated stabilizers. Available in smooth or stucco -embossed finishes in a variety of colors, Thermolite panels create a highly decorative and durable surface with excellent insulating properties. Features ures ^ Custom Colors • Smooth orStucco-Embossed Finish-'' • Project -Specific Customization • 5 -Year Panel Construction Warranty 'See chart for details. Applications • CurbinVVaUs • Window Systems • Window Rop|8Cernert • Commercial Door Systems • Opaque Glazing • Storefronts • |n'Fi||Pane|s • Spandrels • Butt Glazing ����U���U U��nw UU~U��� unnu.nsmm��u.nuu. U -MAX A 7 -ply, rabbet edge panel designed to provide increased insulation on the interior face of the panel. Theono|iie U'k4AXisamuUi1ayered, insulated glazing panel that consists of two foam plastic cores bonded to three thermoplastic stabilizers with finished sheets of aluminum on each face. Intended for use iostandard glazing [Dockets of window. glazing, and curtain wall systems, panels include stepped edges on the interior side. Panels offer higher R -Values than standard 1 in. The/mo|iteand [hermo!ite WE panels and are available in thicknesses ranging; from • Increases R'Vo|vebyl0O-2G0%(over standard l in. n'till panels) ^ Up to 3-1/2 in. overall panel thickness ����U���KU��rm�� ounu~xunwx��x~nnu~ °�u. Designed to provide new aesthetics with the ability to adjust the reveal created between the face of the mullion and the face of the panel. The//oo|i\eSF isaninsulated glazing insert panel that consists of fabricated Laminators Onnega-L\k'ACM panel bonded on the exerior [ace of .a standard ThermWte paiiel to create stepped edges. Intended for use inwindow, glazing. and curtain wall systems. panels are available in thicknesses ranging from 1-3/4 to 3-1/2 in. • 2-4 stepped eclges • Can provide Hirsh aesthetic • Upkz3'l/2 in. overall panel tIuckness l�����U���UU��nw0�� o n nx~xwmvn��u.o u u. WE u. Edge treatment allowing for metal -to -metal butt -glazed joints. Therrnolite WE is on insulated glazing insert panel that consists of foam pMstic core bonded 00 both sides to thermoplastic stabilizers with finished sheets nfaluminum on each face that encapsulate the edges for metal -to -metal hairline joints in buU'g|ozedapp|icatimns Intended for risc in windowg|odng, and curtain wall systems, panelo ere available in thicknesses ranging from 3/4 -to 2-1/2 in. ` 1-4 wrapped/panned edges • Up to 2-1/2 in. panel thickness FLAT INSULATED PANE S - / References & Testing AAMA2GO5 •NN ASTM B209 • • ASTM C518 • • �� ° �mm�m�M~�°=� Thennu|ite is an insulated gazing insert panelthat consistof a foarn plastic core bonded on both sides to thermoplastic stabilizers with finished sheets of alurninum on each face. Intended for Lise in window, O|adng, and curtain wall systems. panels are available in thioknesses ranging from 3/4 to 3-1/2 in. ^ Available in smooth or stucco-ernbossed finishes ^ Fits into standard 1 in, insulating glass and glazing pockets and storefront extrusions ~ Available in stock sheets and cut -to -size Applications ` Curtain Walls ` Storefronts • Spandrels ` Opaque Glazing ~ Sunrooms ~ In -Fill Panels ^ Grow Rooms OMEGA FOAM4LY® �������� m0=0 Omega Foam -Ply is an insulated glazing panel that consists of a foam plastic core bonded on both sides to hardboaid stabilizers with finished sheets of aluminum on each face. Intended for use in window, glazing, and curtain wall systems. panels are available in thicknesses ranging from 5/8 to 3-1/2 in. • Can be cut onsite with standard carpentry tools. very low-cost instaUation ^ Available in a variety of colors and surface finishes • Available in stock sheets and cut -to -size Applications ` Storefronts ' Opaque Glazing ~ Dunruoms • In -Fill Panels • Spandrels Partitions \/oluntary Specification, Performance Requirenients. and TestProcedures for Superior Performing Organic Coatings on AlLlrninurn Extrusions and Fanels Standard Specification for Aluminum and Aluminum-AlIoy Sheet and Plate Standard Test Method for Steady -State Thermal Transmission Properties by Means of the Heat FIow Meter Apparatus ASTM E84 M • ASTM 6529 E Standard Test Method for Surface Burning Characteristics of Building Materials Standard Guide for Conducting Flexural Tests on Bearns and Girders for Building Construction GLAZING PANELS COMPARISON CHART NEW Fabricated Panels ] ,° � "" SE '"= | "'=°"'""`"= Custom fabricated upmmax imum panel blank size of 4 ft. x 12 ft. Stabilizers Insulating Core Aluminum Backer Aluminum Face (Nominal) Face Color Finish Face Texture Finish Panel Thickness R'Va|ue (hr ~Fft9 BTU) Extruded Corrugated Polypropylene Expanded Polystyrene (EPS): 2.0 pcI density (Type IX) Po|yisucyanu/o|e(|SD): 2.0 pc:I' density (Type |) Mill finish 0.013 m. orsame surface astooe depending onapplication 0.028o/0.032 in. 0.024 in. O.0\3 in. PVDF/Kynar50O^ Polyester Anodized '----'---------- Smooth and/or stucco -embossed 1-1/2 in. to 3-1/2 in. R-5.2 to R-lb.g depending on insulating core and panel thickness 0.028 or 0.032 in. 0.024 in. PVDF/Kynar50D* Anodized Exterior: Smoot5 finish only Interior: Smooth and/or sk/czo'embossed 1-3/4 in. to 3/4 in. Lc 3-1/2 in. 2'1/2 in R-6.0 to R-15.7 depending on insulating core and panel thickness R-2.2 to R-12.0 depending on insulating core and panel thickness Weight Tolerance Thermal Expansion 1.82 ps[(+/-) based on2'l/2in. (norn), standard 2.39 psf (+/-) based on2in. (nom), standard 1.40ps[(+/') based ori 1 in. (non0standard Length & Width: +/- 1/16 in. Squareness: Diagonals equal wilhin 1/8 in. Thickness: +/ 5/64 in. 4ft. x8 ft. |4ft. xlOft. p4ft. x1 t. 5 t. widths available in select colots Extruded Corrugated Polypropylene Exterior Grade Hardboard Expanded Polystyrene (EPS): 2.0 pcfdensiiy (Type IX) Polyisocyanurate (ISO): 2.0 pci density (Type |) Mill finish 0.013 In. or same surface as face depending on application 0.028 or 0.032 in. 0.024 in. 0.013 in. PYOF7Kyna/5OOw Polyester Anodized Smooth and/or stucco -embossed 3/4 in. to 3-1/2 in. R-2.2 to R-17.4 depending on insulating core and panel thickness 1.40 psf (+/) based onlin. (nom), standard 5/8 O. to R-1.7 to R'17.5 depending on insulating:, core and panel thickness 1.81 psf (+/-) based onlin. (nom), standard Length &VVidth: +/- 1/16 in. Squareness: Diagonals equal within 1/8 in. Thickness: +/-5/64in. 13.1x10-" in./in./°F For speciIcs on R'Ya|ue. mer(ormnmzinxvomhnn, and oUnnahlehad un.ryingcapacities, refer mour Technical Data Sheets. °5U. \iviUWsavailable inselect colors. Refer toour Architectural Color Cha/ifor specific size. finish, and color availability. T|elmoUteand OrneziaFoam-Ply can hecustom cut tosize. IOMEGA PANEL PRODUCTS 52 10 LAMINATORS INC. 3255 Penn Street, Hatfield, PA 19440-1731 800.523.2347 Laminatorslnc.com @2019 Laminators Inc. All rights reserved. (03/19) BNBui ders January 14, 2021 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for Contract Time Extension Dear Ethan, BNBuilders hereby submits our proposal for revising the contract's date of Final Completion from December 18, 2020 to April 30, 2021. The contract time is extended primarily to account for Owner directed changes issued after occupancy of the building. The contract's date of Substantial Completion is unchanged. Substantial Completion was achieved ahead of schedule on August 28,2020. The total proposal of this subject work is zero dollars $0.00. Please acknowledge your acceptance of this proposal and reference CP 5278 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (geri.urbasbnbuilders.com) Steve Schmitz (sschmitz(@Alreiroup.com) BNBuilders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 at*, TO: 18-049(u) Council Approval N/A Sheet 1 of 1 CITY OF TUKWILA CONTRACT CHANGE ORDER NO. 016 ‘,/ DATE: 10/30/2020 PROJECT NO.: 91630501 PROJECT NAME: PSP - Justice Center BUDGET NO.: 305.98 CONTRACT NO.: 18-049.1 ( u ) You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not included in the plans and specifications on this contract: NOTE: This change order is not effective until approved by the "Owner" and a notice to proceed is issued. Conditions: A. The following change, and work affected thereby, are subject to all contract stipulations and covenants; B. The rights of the "Owner" are not prejudiced; C. All claims against the "Owner" which are incidental to or as a consequence of this change are waived; and D. The Contractor must submit all Field Overhead and Home Office Overhead Rates for approval in advance of all change orders. CHANGE: See Attached Exhibit "A" We the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above and below. ACCEPTED: Date 11/5/20 By(/Z ./ -.....,, , // Original Contract (without tax)* Previous Change Order This Change Order (without tax) REV. CONTRACT AMOUNT Contractor BNBuilders Title Project Manager $ 34,049,999.00 APPROVED BY THE CITY OF TUKWILA $ 2,627,141.00 v/ Date 11 ZO $ 142,426.00 By Mayor $ 36,819,566.00 iginal Contract Time: 546 days (December 18, 2020) Additional Contract Time for this Change Order: 0 days Updated Contract Time: 546 days (December 18, 2020) Deputy City Administrator )11/9 V/111 SOJ Program Director ORIGINAL: City Clerk (1 of 2) Contractor (2 of 2) cc: Finance Department (w/encumbrance) Project Management File PW Project Finance File '511'61- 4/: 116414 -e -S *The original contract value is construction only and does NOT include preconstruction or amendments to preconstruction. Exhibit "A" CHANGE ORDER CITY OF TUKWILA Project Name Project# TO CONTRACTOR: SUMMARY OF CHANGE - PUBLIC SAFETY PLAN Justice Center CO # 16 91630501 Contract # 18-049.1 (u ) Date 10/30/20 BNBuildet.:s 2601 Fourth Ave, Suite 350 Seattle, WA 98121 COP/CCD # Description Reason Code Amount COP 5101 Civil Waterline & Site Revisions (ASI 024). Revised water services and updated Double Check Valve Assemblies (DCVA) per KCWD 125 updated details. Fire Dept Connection (FDC) at SE building corner shifted toward building per KCWD 125 to avoid crossing existing main. Revised Seattle City Light routing per SCL inspector. AD $77,681.00 COP 5122 Exterior Detention Frame Detail. Additional material and labor to connect exterior detention doorframes to the building, custom mounting plates at A120, A126 and C139 as well as spray foam, per RFI 321. DC $1,144.00 COP 5141 Impacts Due to SCL Schedule Delays in Energizing Permanent Power. Provided a generator to enable the elevator installation to commence on schedule. Provided a generator for the jobsite trailer in the North Lot. Constructed a temporary ramp and cold patch asphalt at vault on 150th in order to open the sidewalk for public use. AD $10,247.00 COP 5160 HSS Column Clarifications at West Storefront. Added steel angles at door jamb for Renlita door per RFI 056. Conflict between architectural and structural details. DC $4,076.00 COP 5161 Bollards Around Security Pedestals. Pour foundations and install additional bollards for card readers at South Sallyport per RFI 454 & 454.1. DC $3,373.00 COP 5164.1 Additional Cooler/Freezer Power Monitoring. Provide and program additional receptacles and dedicated circuits for monitoring of evidence coolers and freezers. OC $3,225.00 COP 5173 Security Compliance Revisions (ASI 035). Install an additional camera and intercom in the SE corner of A130 (PD Patrol Area) and patch/paint wall per third -party PREA review. OC $6,940.00 COP 5178 Framing Furr Out Revisions. Furr out wall and paint to cover plumbing line by east storefront and resize door opening to fit mechanical equipment/grill in vestibule ceiling per RFI 482 and 429. DC $3,323.00 COP 5204 Additional East Storefront Exit Signs. Supply and install two additional emergency self -luminous exit devices above the East Storefront doors and provide 5 extra exit devices as requested in preparation of final inspections per RFI 502. AD $3,312.00 COP 5205 Additional Door Thresholds & Gaskets. Provide new thresholds on the exterior doors and new gasketing on interior doors per email direction on 6/4/2020. DC $1,752.00 COP 5207 Draft Barrier Heater (DBH) C120 Replacement. The initial DBH shown for the north wall of staff hallway C120 is too long. This PCO is to provide and install a smaller DBH that will fit the north side of the wall per RFI 499. DC $1,037.00 COP 5223 ADA Vault Lids. Installed anti -slip coating on 13 vault lids identified by Public Works inspector during final inspections per RFI 523. AD $9,048.00 COP 5224 Additional Fire Extinguisher & Signage. Added sprinkler riser/FACP signs, signage for roof access and added fire extinguisher per Fire Marshal final inspections and per RFI 510. AD $1,165.00 COP 5227 Courts Lighting Level Circuiting. Install additional conduit in C100 & C135 due to lighting circuitry revisions, City electrical inspector's emergency power testing, and per RFI 527. AD $11,237.00 COP 5238 Added Thresholds (ASI 047). Added thresholds at storefront doors with thresholds that do no cover the concrete control joints, ensuring the thresholds remain ADA compliant and does not interfere with door operations. OC $4,866.00 Change Order No. 16 $142,426.00 N B• BNBuilders October 21, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for ASI 24 — Civil Waterline & Site Revisions Dear Ethan, BNBuilders hereby submits our proposal (REV 2) for ASI 024 — Civil Waterline & Site Revisions. The total proposal of this subject work is Seventy Seven Thousand Six Hundred Eighty One dollars $77,681.00. There is a zero -day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5101 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim ustinek sosea .com) Geri Urbas (qeri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dlrgroup.com) BNBuilders 2601 .4'h Avenue, Suite 35G Seattle, \VA 98121 T: 206.382.34.43 6: 208218223440 B N BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: ASI 024 GENERAL CONTRACTOR: BNBuilders, Inc. DESCRIPTION OF CHANGE: ASI 024 - Civil Waterline & Site Revisions COP #: 5101 DATE: 10/21/2020 BP 26.00 Valley BP 31.00 Iliad $1,134.00 $72,848.00 1st -tier Subcontractor Cost Total (Direct Construction Costs) $73,982.00 GC/CM Mark-up on MACC Costs ( Insurance, B&O and Bond ONLY) $3,699.10 5.00% Rounding Adjustment -$0.10 Total Change Request $77,681.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date VALLEY 'The Electrical Solution", VALLEY ELECTRIC CHANGE ORDER PROPOSAL Tukwila Justice Center Contract: 118021.1-05 PROPOSAL DESCRIPTION: Added 4" conduit at South end of site for Comcast pathway. Excludes trenching and backfill. (Conduit priced in previous change Cost for added hand holes and connections.) ASI # DATE 9/15/2020 Addendum# VE JOB # 19146 Time Ext Rqrd (days): 1 RFI# VE CP # 022-R2 Self Performed Work LABOR COST 5.32 hrs SUPERVISION 0.0% Ibr SAFETY 0.0% Ibr SMALL TOOLS 0.0% Ibr MATERIAL COST EQUIPMENT COST 24' Scissor Lift OH & PROFIT - SELF 15.0% Subcontractor Quotes Quote Quote Quote Quote Month $90.62 SUBTOTAL COST: SUBTOTAL DIRECT COST QUOTES: OH & PROFIT - SUBS 8.0% Bond Permit Fee BIM hrs 85.00 $ 482.10 $ 503.84 $ 985.94 $ 147.89 TOTAL CHANGE PRICE: $ 1,134.00 NOTE: 1) Proposal valid for acceptance within 30 days. 2) While Valley Electric considers our proposal amount full compensation for this change, we expressly reserve the right to seek additional time and compensation at a later date for the impact of multiple changes, if any, or for indirect costs that were not reasonably foreseen by Valley Electric at the time of settlement on this change. 3) This construction change has been estimated using the drawings furnished; an engineering evaluation of the drawings, for function and compatibility with the vendor furnished equipment, has not been performed. 4) Permit costs are specifically excluded. Should this change, or it become necessary to procure/pay for an increased permit fee this would become an added cost to the change price reflected above. Our proposal amount does not include the following: - Overtime / Shift Work - Fireproofing Repairs Concrete/GWB Repairs - Shutdown Costs - Painting and Patching Valley Electric Co. Job #19146 Contract # Detailed Labor and Material Breakdown 19146 - CP #022 - ASI 024 - Added Site Conduit R2 Page 2 of 2 Print: 9/15/2020 Description Qty Net Price U Labor U Total Mat($) Total Hours 4" END BELL - PVC 2 1691.88 C 10 C $33.84 0.20 TYPE 1 WSDOT J -BOX 2 235 E 2.56 E $470.00 5,12 SUB COORDINATION (As Needed) 0 1 E 0.00 0.00 POSTING/RECORD DWGS 0 1.538 E $0.00 0.00 CLEAN UP (.5% Lbr) 0 0.1538 E $0.00 0.00 TESTING (.75% Lbr) 0 0.2307 E $0,00 0.00 WARRANTY (As Needed) 0 0.3076 E $0.00 0.00 Totals: $503.84 5.32 CONFIDENTIAL BNBBNBultders TJC Project No. SUBCONTRACTOR: Subcontractor CP Breakdown Summary Iliad Cost Event #: CP #: Document #: 52 ASI 024 Revisions (DCVA, SCL routing, CB elev. DESCRIPTION OF WORK: changes, Comcast routing, revised hydrant) Date: 5/10/2020 L SUBCONTRACTOR'S DIRECT WORK A. DIRECT LABOR COSTS B. MATERIAL COSTS C. EQUIPMENT COSTS D. SUBTOTAL DIRECT WORK (Per Cost Breakdown Attached) A. 25,263 ( Per Cost Breakdown Attached) 21,359 (Per Cost Breakdown Attached) C. o 11.872 (Total A, B, C, and D Above) D s 58,294 II. SUBTIER SUBCONTRACTORS G. Subtier Subcontractor Cost (Subcontractor Estimates Attached) 1) Evergreen Sawcut 2) 3) 4) H. Subtotal Subcontractor Costs Direct Cost Fee $ 1,000 $ � - $ $ 1,000 $ M. FEE Breakdown Per Contract A. Fee on Direct Work (Item E) 15% 8,744.03 B. Fee on Subtier Subcontractor DirecCosts (Item H) 6% IV. SUBTOTAL V. TOTAL VL UNIT PRICE TOTAL SUBTOTAL (Total of Parts I, II, III Above) Liability Insurance 5.80% Bond Costs 1% TOTAL (Total of Parts I, II, III, IV Above) TOTAL 68,038 3,946 I 864 I $ 72,848 COP Cost Breakdown Project Name: TJC Project No. Subcontractor: Iliact Work Description: ASI 024 Revisions (DCVA, SCL routing, CB elev. changes, Comcast routing, revised hydrant) Cost Event ft: 53 CP 8: Document Date: 1/9/2020 Spec Section Description Quantity Unit Prod. Hours A. Labor B, Material C. Equipment D. Contract Unit Price Unit Prices Cost $/hour Cost S/Unit Costs 5/Unit Costs Operator1 Operator ea 112 71.46 $ 8,004 1 eo 112 71.46 $ 8.004 $ - 8 - 8 - Laborer 1 ea 112 59,91 $ 6,710 8 - 8 - Laborer 1 ea 112 59.91 $ 6,710 8 - $ - $ - Loader 1 ea 112 - 8- 44.12 $ 4.941 - Excavator 1 ea 112 - - 52.05 5 5,830 - Tool Truck 1 ea 112 $ - 8.04 5 900 8- 6" CB risers 2 ea - 54.32 $ 109 - - $ - $ - - $ - Add. demo at new hydrant location - $ - $ - asphalt haulout 12 yd - 20.00 9 240 8 - - sawcut $ - $ - $ - $ - $ - 5 - $ - 5 - Removal/installation DCVA north lot 5- $ - $ - asphalt haulout 12 yd $ - 20.00 $ 240 6 - - Disposal fee vault/DCVA1 ea $ - 550.00 $ 550 $ - - sawcut - $ - $ - - 687•LA DCVA Vault 1 ea $20,220 $ - 8 - 8 - Survey staking for ASI 024 1 ea $ 1,560 $ - $ - 5 - - - S - 5 - Flogger 1 ea 40 57.00 $ 2,280 - $ - 5 - $ - - $ - - $ - 0 - 5 - $ - $ - $ - $ • $ - - $ - - $ - - $ - $ - $ - $ - 5 - - 0 - $ - $ - 5 - $ - $ - $ - -0 - Total Cost of Work A. Total Cost of Unit Price Work $ 25,263 B. $21,359 C. $11,672 D. 5 58.294 Change: Cost? Protect existing lee and valve for ISOth hydrant Na Revised Eel routing Yes Revised Cornsest rooting Yes Revised services to connect to ex main No FDO shift SE building comer No Revised hydrant local= Yes Raised 08 40 elevations Yes North <Age of north lot groding No Change in 095A models No Installing North lot DC5A Yes toAIA Document G7IOTM - 2017 Architect's Supplemental Instructions PROJECT: (nanie and address) 73-17158-00 City of Tukwila Justice Center Tukwila, WA 98188 OWNER: (name and address) City of Tukwila 2600 Southcenter Blvd. Tukwila, WA 98188 CONTRACT INFORMATION: Contract For: General Construction Date: April 02, 2018 ARCHITECT: (name and address) DLR Group Inc. (a Washington Corporation) 51 University Street, Suit 600 Seattle, WA 98101 ASI INFORMATION: ASI Number: 024 Date: January 8, 2020 CONTRACTOR: (name and address) BNBuilders 2601 Fourth Avenue, Suite 350 Seattle, WA 98121 The Contractor shall carry out the Work in accordance with the following supplemental instructions without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will be no change in the Contract Sum or Contract Time. (Insert a detailed description of the Architect's supplemental instructions and, if applicable, attach or reference specific exhibits.) ASI 024 - Civil Waterline & Site Revisions C3.05 — Revised to show protection of the existing water main. Revised demolition extents for the fire hydrant on the corner of 150th and TIB to protect the existing tee and valve. C4.00 — Update to as -built electrical duct bank and vault locations. Revised SCL routing per SCL inspector. Added information to utilize spare 4" conduit behind retaining wall for Comcast pathway. C4.05 — Revised water services to connect to the existing main. Deleted water main replacement. Updated DCVA assemblies per BNB material submittal and KCWD 125 detail numbers to conform to current edition of KCWD 125 details. The freestanding FDC at the SE building corner was shifted toward the building at the request of the Water District to avoid crossing the existing main. C4.06 — Revised fire hydrant location per potholing conducted by BNB. Updated DCVA assemblies per BNB material submittal and KCWD 125 detail numbers to conform to current edition of KCWD 125 details. C4.11 — Revised water profiles to match plan revisions above. C4.21 & C4.22 — Most recent version of KCWD 125 details added to the plan set. C6.00 — Raised rim elevations of catch basins #12 and #13 six inches to match ponding design elevation. C7.01 & C7.21 — Added clarifying grading information for sidewalk along the north edge of the property and flexibility to account for the change in existing grade similar to the west edge of the parking lot. C8.00 — Added traffic arrow striping at the driveways to 150th. Revised fence line to provide clearance from already installed duct bank. Added wheel stops to protect the fence where located just behind the curb. C9.01 — Revised (2) fire hydrant callouts to reference the water plans (C4.05 and C4.06) DRAWING ATTACHMENTS: C1.01 - WATER COVER SHEET C3.05 - WATER DEMOLITION PLAN C4.00 - UTILITY PLAN - SOUTH C4.05 - WATER PLAN - SOUTH AIA Document G710Tm — 2017. Copyright © 1979, 1992 and 2017 by The American Institute of Architects. AH rights reserved. WARNING: This AIA5 Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 19:24:11 ET on 01/08/2020 under Order No. 0563223301 which expires on 04/26/2020, and is not for resale. User Notes: (3B9ADA39) C4.06 WATER PLAN - NORTH C4.11 —UTILITY PROFILES C4.21 KCWD 125 STANDARD DETAILS (NP) C4.22 - KCWD 125 STANDARD DETAILS (NP) C6.00 - STORM DRAINAGE PLAN - SOUTH C7.01 - GRADING PLAN NORTH C7.21 - GRADING SECTIONS C8.00 - PAVING PLAN - SOUTH C9.01 - S 150TH STREET PLAN & PROFILE ISSUED BY THE ARCHITECT: DLR Group Inc. (a Washington Corporation) ARCHITECT (Firm nai e) SIGNATURE Erica Loynd, Project Manager PRINTED NAME AND TITLE January 8, 2020 DATE AIA Document G710TM — 2017. Copyright © 1979, 1992 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA" Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 19:24:11 ET on 01/08/2020 under Order No. 0563223301 which expires on 04/26/2020, and is not for resale. User Notes: (3B9ADA39) LC) L-1 F— C:) >— F— _J 1 cn + + + + + + + _ ++++++ + + d +-°F + +- ,s --r-+ + ±� e__-+-:+--+. 4 +++ + + + �++++++�� +-, �- f _. +--+- :- r + + + + + + + + + + + O Ga O g N U W W LC) N se- t� w CL iLOLJ- LO W D CCW 0) CC© V) M N M M M tel M Y 0 .1 - LU .1- • H C.) 0 .1- < E cK • — = 1--- __I al CL I 0 (/1< 1-- --: 3: LU E5 D LIJ C) m x cc CD 0 ----.., Ld LA CC LL1 i_LJ 0 -J 0 LLJ U -I ea —I> Z —I 1-,- CC U-1 0 ___I < U.1 Li_ 0 LLI Z < _1 D CC N M. • co UJ 0 CC 0 Li 00 0I 0 w fa: z . z 0 2 o x0 Z 0 z0 0 m D C7) 03 _J (f) CL IA a; 11-1 W CCctj o-LJJ a. _J (nu ›- :E UJ 0_ 0= CC X 0 0M CO C.) 0) Li: 3" BRASS NIPPLE CC 0 s,,,, 1-2 LI - 0 a_ 0 (33 1.1.1 0 <4: z —0 W CC 0 0 F- EJ Do cy . :-_:' La 0 - LLI U.1 H. I co 0-"--- LL1W 0 HI —1 M Li.1 1 1-1-1 W - 0 a X LLI N r: 0 8 < bo w __I NI m m ." 0 ..-- Li' 0 z D I CL uLi 1.1.1 —I Lii 0 0- CU N u) 0 Li < U: OD 0 I— D —I i--/ Ui 0 0 < 1 Lai nai i- CC Lil LL < u) 0 D 1 0 M Ell _I -I LAP :LI • Cr) x = ILI 711 Z CN I- 0 Z Lo.`1- o _ , LA cc 01 0 a: —I LI- Z M — CC 11.1 0 • 0 1- LLi 2 Z o >-- D cc ommo (7) cl-.. co x _1 --1 o 0 v) -7 w cn 0 cc cc N ILA M 0 Ct b °:_, LA < cc a 1f) CY) 1.1- Z W -1 Ct (i) 0_ x ., __I U) c) M I— LLJ 0 0 C) 0 <-- H< .7z • ,., < 00 U.1 U) "r I -LI 03 —1 1 1 IJJ I— F_ i_d = 0 I— a cr) cn 11- )3 I " I ) 0") LO N + +W. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +C. + + + + + + + + + + + + + ,+ + + + + + + + + + I + + + + + + + + + + + + + + + t= LU Ec F— r- '76 + + .t . m u..) V)V) Cd, X"- 7 (s u8) i9M=3I 1.0.0t2=1112] (aNOJl38) o l# 80 N BNBuilders October 21, 2020 Shels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 321 Dear Ethan, In accordance with RFI 321 — Exterior Detention Frame Detail Rev. 3 dated 12/05/2019, BNBuilders hereby submits our proposal for the additional material/labor needed to connect the exterior detention doorframes to the building. The total proposal of this subject work is One Thousand One Hundred Forty Four dollars $1,144.00. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5122 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (geri.urbas(@bnbuilders.com) Steve Schmitz (sschmitz@dIrgrouricom) BNBuiltlers 2601 4'1' Avenue., Suite Seattle, 1A/A 98121 206.382.34,43 F: 206.3823440 Tukwila Justice Center GCICM CHANGE ORDER REQUEST SUMMARY BN Builders PROJECT NAME: Tukwila Justice Center CCD/ASI #: 5122 GENERAL CONTRACTOR: BNBuilders, Inc. COP #: RFI 321 DATE: 10/21/2020 DESCRIPTION OF CHANGE: Furnish and install custom mounting plates at A120, A126 and C139 as well as spray foam per RFI 0321. IBP 09.20 Northwest Partition lst-tier Subcontractor Cost Total (Direct Construction Costs) GC/CM Mark-up on MACC Costs Rounding Adjustment $1,090.001 $1,090.00 $54.50 -$0.50 !Total Change Request $1,144.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date NORTHWEST PARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle, WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Description: Sprayfoam at exterior doors as directed by BNB Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR -0046 External/RCO# GC Ref# Date Mar 23, 2020 Job # 2066 Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 Total Miscellaneous Charges Total B&0 Tax 48% GL Insurance 1% Total Other Subtrade Charges Insulation $0.00 $0.00 Total Miscellaneous Charges Notes: EWA #28308 - Insulpro COR #04. $0.00 Total $1,009.00 Total Other Subtrade Charges $1,009.00 AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers 20006 - 144th Avenue NE, Woodinville, WA 98072 T 425-375-2500 Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: $0.00 $0.00 $1,009.00 $0.00 $0.00 Sub Total: Overhead 15%: Sub Overhead: $1,009.28 $0.00 15.00% $80.72 8.00% Total: $1,090.00 F 425-375-2540 http://www.nwpart.com Project: Customer: Contractor COR #: Insulpro COR #: rtia#117 Tukwila Justice Center Northwest Partitions Inc, 04 INSULPR 0 OJ Change Order Form Attention: Chris Ayers Subject: Spray Foam at Exterior Doors Reference: AWA 28308 Date: 2/25/2020 escrpton of Work: Spray Foam per Rob at NWP 1. Direinsurancect Labor - Rates are inclusive or all direct labor, delivery, stocking, superintendence, supervision, management, labor burden, taxes, small tools, , safety, warranty, general condition costs and similar. Labor 150:08VAROIONN'Efa,tal 8229 Hr etteteettettReett6.t TotTafttioufs3 2. Materials Descrj .4e44440,41 DOW Froth Pak MMESABOIN 3.0 NUaltiOtOOR 0.0 0.0 0.0 0.0 0.0 246.87 Subtotal Labor Cost: FAN 1,261.44 EA ttifiettegignat ittieteitteiteane 1080%lidettelt 3. Equipment egdittfaentX4e4444.-. fltaltklkfnfhjLfglleaigao 4. Delivery and Logistics Expenses 0010040VMM Rate Reiteet4Reettitte, 0.5 0.0 0.0 0,0 0.0 Materia Cost 630.72 0.0 0.0 0.0 0,0 Subtotal Material Cost: Total Equip'. Cost, • $ $ Subtotal Equipment Cost: efeiRetefelettit Submitted By: ' 0.0 Total4:24. ,DoliVetyOdsf$ $ - $ - $ - Subtotal Delivery Cost: Subtotal Labor, Material, Equipment, and Delivery Cost: Markup (15%) : V5JAVIMIL Total Change •Order Request: Commercial Accounts Manager Insulpro Projects 11 877.59 4 Additional rk Authoriza De ait the EXTRA, r k wo is Carmen VanDiest Subject: FW: Spray foam exterio doors From: Robert Boucher [mailto:RBoucher@nwpart.com] Sent: Tuesday, February 18, 2020 2:12 PM To: Jeffrey Grods Cc: Robert Boucher Subject: Fwd: Spray foam exterior doors Here you go Jeff does this work for you Robert nwp Get Outlook for iOS {aka.msl From: Robert Boucher <RBoucher@nwpart.com> Sent: Tuesday, February 18, 2020 12:54:07 PM To: Robert Kaznakoff<RKaznakoff@nwpartcom> Cc: Robert Boucher <RBoucher@nwpart.com> Subject: Fwd: Spray foam exterior doors Get Outlook for iOS From: Ephram Harsh <Ephram.Harsh@bnbuilders.com> Sent: Tuesday, February 18, 2020 12:47:24 PM To: Robert Boucher <RBoucher@nwpart.com> Subject: RE: Spray foam exterior doors Confirmed. Please proceed on T&M. EphramHarsh I8NBu|den: 2601 4th Avenue, Suite 350 Seattle, YVA 98121 M2Os.681.5U72 Click Here to Send Me Files fbnbuilders.sharefile.coml Twitterftwdter.onml / Faoobook[laoebnokzmmJ | Unked|n[linkedin.coml | BNBui|dom.comIbnbui|dere.connl From: Robert Boucher <RBoucher@nwpart.com> Sent: Tuesday, February 18, 2020 9:29 AM To: Ephram Harsh <Ephram.Harsh@bnbuilders.com> Subject: Fw: Spray foam exterior doors From: Chris Ayers <ChMsA@nwpart.mm> Sent: Tuesday, February 18, 2020 9:24 AM To: Robert Boucher <RBoucher@nwpart.com>; Robert Kaznakoff <RKaznakoff@nwpart.com> Subject: RE: Spray foam exterior doors 1 EWA. Have them sign to authorize us to proceed with the work and then sign at end of each day on our EWA tickets. Complete daily as needed. If Insulpro is going to perform the work, please have them complete a EWA for us to sign. Thanks NM NORTHWEST raliV PARTITIONS www.nwpart.com OinkprutecLoudaovn.00m} CHRIS AYERSSENIOR P: 425.375.2500 [:425.375.351Q 20006 144th Ave NE, Woodinville, WA 98072 1,ALet's goGREEN, save the planet! (Please do not print el unless you need it.) From: Robert Boucher <RBoucher@nwpart.com> Sent: Tuesday, February 18 2020 9:15 AM To: Chris Ayer<ChhsA@nwpart.com:;Robert kaznakoff <RKaznakoff@nvvpartzom> Cc: Robert Boucher <RBoucher.Wnwpart.com> Subject: Spray foam exterior doors Good morning Chris this is Robert and B&B wantus to spray foam the exterior security doors and stuff the Mineral wool in the security windows in Al There's a total of Three exterior doors to spray foam and three windows to stuff mineral wool in they want us to send them a change order for the work but they want to proceed with the work ASAP so how do you want me to handle this Robert NWP. Get Outlook for iOS ilinkprotect.cudasvc.coml 2 ��0� K �U ��Group DLR Group |� ^ PROJECT: City of Tukwila Justice Center DATE SENT: 13/5/2019 73-17158-00 SUBJECT: TJC RFI #321_Exterior Detention «nw• 321 Frame Detail Rev. 2 |,Ps: RFI |nxmsM)rTxLro: 01693 PURPOSE Answered VIA Email gossTzom: ANSWER: FROM It is not possible to make the welded connection provided on submittal 01-083463-0 for the exterior detention frames. The way the detail is drawri, the foll face will interfere with the placement of the weld. We recommend creating a bolted connection as shown. If this is acceptable, please confirm the following or advise with a new detail: 1. Confirm if interior weld is still necessary 2. Provide width of threaded rod 3. Provide spacing of shim/threaded bolt along door height Response (Answered) from: Tammie Rodgers (R & N Systems Design, LLC) Remarks: Proposed installation modification is acceptable, welding vvill not be necessary. Provide minimum 3/8" diameter bolt, evenly spaced, and directly across from each side of the frame at 12" O„C. minimum, 16" 0,C. maximum to allow for avoiding hardware prep. Dimples in frame shall be plugged and finished smooth for a seamless, flat appearance, Tammie Rodgers, R&N Systems Design 12.4.2019 Response (Answered) from: Steven Schmitz (DLR Group) Remarks: See additional requirements for insulating and sealing the recessed opening per JRS comments, attached. Sealing of bolted connections and potentia thermal bridging conditions is paramount to Iongevity of this connection. Steve Schmitz - DLR Group 12.05.19 NAME COMPANY EMAIL PnONE 206 -461 - Page 1 of NAME | COMPANY TO NAME Bill Brown DESCRIPTION OF CONTENTS COMPANY BNBui|ders F ] DATE: /o: �ra������.����� 12/5/2019 01693 PHONE 6094x73-6094 EMAIL | PHONE bU|broVYn6�bnbVUd�r�.c | | ' 306-382-3443 om QTv DATED TITLE TJC RFI #321_Extehor 1 12/2/2019 Detention Frame Detail Rev. 2.pdf COPIES: Bill Brown Brenna Christensen Dillon Webster Ephram Harsh Ethan Bernau Geri Urbas Jeff Clark Sabrina Ames Steven Schmitz (BNBui|ders) (BNBui|ders) (DLR Group) (8NBu||dens) (Shie|aOb|etzJohnsen) (8NBui|ders) (BNBui|ders) (DLR Group) (DLR Group) Page 2 of .2 B N B BNBuilders Request for Information RFI No: 321 Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: December 02, 2019 Submitted To: Steve Schmitz Submitted By: Bill Brown DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Exterior Detention Frame Detail Rev. 2 Discipline: Architectural BN Builders, Inc. 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor Subcontractor RFI Na• Question Date Required: 12/9/2019 It is not possible to make the welded connection provided on submitta01-083463-0 for the exterior detention frames The way the detail is drawn, the foil face will interfere with the placement of the weld We recommend creating a bolted connection as shown. If this is acceptable, please confirm the following or advise with a new detail 1. Confirm if interior weld is still necessary 2. Provide width of threaded rod 3. Provide spacing of shinYthreaded bolt along door height Answer Proposed installation modification is acceptable, welding will not be necessary. Provide minimum 3/8" diameter bolt, evenly spaced, and directly across from each side of the frame at 12" 0.C. minimum, 16" 0.C. maximum to allow for avoiding hardware prep. Dimples in frame shall be plugged and finished smooth for a seamless, fiat appearance. See additional requirements for insulating and sealing the recessed opening per JRS comments, attached. Sealing of bolted connections and potential therrnal bridging conditions is paramount to longevity of this connection. [SS, DLR Group] Tammie Rodgers Answered by: R&N Systems Design Date Answered: Dec 4, 2019 Copies To: Company & Contact Fax Notes Page 1 of 1 41 0 •aE o 0 4-c a .173 < Q) *r.. 4- a) 0 a.) _a a. 0 " C 00 E (1) Continuous NIIIIIELVIN11111111111011111111.., I 1 t4.11 ItAl1111111VAAVAMMll \ (0 0 Panel Dimension (See Elevations) BNBuitiders October 21, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for Costs Relating to SCL Dear Ethan, BNBuilders hereby submits our proposal for additional costs relating to Seattle City Light (SCL). There are (4) separate events included within this proposal. - Providing a generator to enable the elevator installation to commence - Providing a generator for the jobsite trailer in the North lot - Constructing a temporary ramp on 150th in order to open the sidewalk for public use - Install cold patch around the electrical vault on 150th to allow SCL to remove/replace the incorrectly installed vault lid The total proposal of this subject work is Ten Thousand Two Hundred Forty -Seven dollars $10,247.00. There is a zero -day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5141 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justineksoseaj.com) BNIBui clers 2601 dieh Avenue, Suite 350 Seattle, WA 98121 1: 206.382.3443 F: 206,382.3440 B N B BNBuilders Geri Urbas (geri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dIrgroup.com) BNBuilders 2601 4''' Avenue, Suite 350 Seattle, WA 98121 T: 2.0638234,43 .206,323440 $10,247.001 BNB BN Builders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: COP #: 5141 GENERAL CONTRACTOR: BNBuilders, Inc. DATE: 10/21/2020 DESCRIPTION OF CHANGE: Additional costs relating to SCL Generator for Elevator installation (Permanent power unavailable due to SCL) Generator for Jobsite Trailer (Permanent power unavailable to due SCL at the North lot) Temporary Ramp constructed to open sidewalk at 150th due to SCL having to replace the vault lid Cold patch around the electrical vault on 150th due to incorrect lid having to be replaced by SCL lst-tier Subcontractor Cost Total (Direct Construction Costs) GCCM Costs GC/CM Mark-up on MACC Costs Rounding Adjustment $0.00 $9,759.24 $487.96 40.20 !Total Change Request To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date 5.00% COP Cost Breakdown CZ) 1!) 1 0) 0) ea 00.0c E z rj 9 w 1: C u 2 o (...) w 0.. 0 118021.100 0 a) z co A.1. Labor A.1. Labor Premium B. Material C. Equipment Description Quantity Unit Prod. Hours_ $/hour Cost _ $/hour Cost _ $/Unit Costs $/Unit Costs _ <-(0 0)0) 0)0) ea ea 1111111111111111111111111 ea ua ua 64 64 U4 04 64 64 V4 64 64 04 64 64 64 64 64 04 V4 64 $ 2,673 1$ - 1$ - 1 B.1$ 98 1 C.1$ 6,988 I ... 69- 6/9- co CO let, 69- i 64 1 1 04 1 04 111 En 69- i 69- 1 1 64 i I I 04 1 64 8 69- ii 64 04 1 1 69. i 64 I 64 4 En- 00 l"... co 01 En- 4 64 3 69- i 64 I 69- 1 er> 4 4 En- 3 04 i 4 4 I 1 1 ft 1 4 4 64 i 69- 1 69- 4 69- i 64 4 64 4 En- 1 1 64 ................. 36 74.26 Total Cost of Work A.I ) 'Generator for Elevator 1 'Generator for Jobsite Trailer Temporary Ramp & cold patch for Electrical Vault on 150th moui.Laers inc 400 Lost vournat - oetaxJ. 18021.100 Tukwila Justice Ctr Construct. ite Range: to 10-21-2020 Cost Invoice #/ Period End Code Pay ID/Ref 1 Date Description Vendor/Employee rage Is System Date: 10-21-20 System Time: 3:13 pm Record Security: Disabled Hours Cost 800005141 ImPaets Due to Permanent Pewer E 178055491-001 02-26-2020Rental 7 N Equipment United Rentals 4,21 .25 0179441_, 0- 00 uAd m 011 4 2 21 313-22Material Spply ssociatePetro1prdscc 0 „ 0184146-/N 03-24-2020 Material Supply Associated Petro1m Prods, Ine 371.88 182801467-001 06-20-2020 RENTAL EI1UIP'8ENT United Rentals 1'49 *44 , 102440060 001 06 10 4020 00N0RAT0R united Rental, 498.00 L HEG 04-25-2020 PRcost Casey pren nen 1 6. 00 REG 04-25-2020 PR cost Cyrea Kynlynn 13.00 REG 04-25-2020 PR cost chariee centred" 3.00 REG 04-25-2°20 PR e08t Wade E Hall 4.00 M 1800141595 07-29-2020 Material Supply Atlas Construetlen SPecialts0 5, 9, 9, 9. 8.2 Cost Code Total 36.00 riuudtie rutin MITARVMMM, Fueling Success old To: 8NBULDER INC* 2601 4TH AVE SUITE 350 SEATTLE, WA 98121 206^382-3443 .o. Invoice Ship To: 1015 BNBUILDERS INC TW TUKWILA JUSTICE 15045 INTERNATIONAL BLVD TUmmlu\vvA 98188 (206) 382-3443 BOL#TMVvSales Order. 1243383 Ordered By Invoice Number: Invoice Date: Invoice Due Date: Order Number: Shipping Date: Salesperson: Customer Number: 0179441 -IN 3/13/2020 12:00:00A1 4/27/2020 12:00:0OA| 0179441 2V13/2020 12o0:00A| MPETERSON 06-1007951 VVhse 136 Terms NET 45 DAYS em Number Ordered Shipped Back Ordered Price Qty Amount 1101001 ULSD #2 DYED - BULK FEDERAL LUST TAX FEDERAL OIL SPILL TAX WA HAZARDOUS TAX vv4PPT TAX /M|SCFEE ENVIRONMENTAL SURCHARGE FUEL SURCHARGE 3004001 DEMURRAGE 1.000 0.000 130.400 0.000 1.000 0.000 2.4392 130.400 0.00100 0.00214 0,02600 0.01951 318.07 0.13 0.28 3.39 2.54 1.59 111 2.50859 75.0000 1.000 Net Invoice Freight: Sales Tax: 327.11 75.00 402.11 0.00 0.00 Invoice Total: 402.11 ut Here \ ssociated Petroleum Products DO BOX 1397 racoma, WA 98401 253) 627-6179 Fax (253) 627-3637 BNBUILDERS INC* 2601 4TH AVE SUITE 350 SEATTLE, WA 98121 206-382-3443 Invoice Date: Invoice Due Date: Customer #: Invoice Balance: Invoice #: Amount Remitted: APP PO Box 34600 Seattle, WA 98124-1600 04272020 061007951 2 0179441 0000040211 9 Cut Here 3/13/2020 12:00:0OAM 4/27/2020 12:00:00 06-1OO7en1 402.11 0179441 -IN LIILI.LILI old To: BNBUILDERS INC' 2601 4TH AVE SUITE 350 SEATTLE, WA 98121 206-382-3443 Invoice Ship To: 1015 BNBUILDERS INC TW TUKWILA JUSTICE 15045 INTERNATIONAL BLVD TUKWILA, WA 98188 (206) 382-3443 Invoice Number: Invoice Date: Invoice Due Date: Order Number: Shipping Date: Salesperson: Customer Number: 0184146 -IN 3/24/2020 12:00:00A1 5/8/2020 12:00:00AM 0184146 3/24/2020 12:00:00AI MPETERSON 06-1007951 .0. BOL# TMW Sales Order: 1249980 Ordered By Whse 136 Terms NET 45 DAYS em Number Ordered Shipped Back Ordered Price Qty Amount 1101001 ULSD #2 DYED - BULK FEDERAL LUST TAX FEDERAL OIL SPILL TAX WA HAZARDOUS TAX WA PPT TAX / MISC FEE ENVIRONMENTAL SURCHARGE FUEL SURCHARGE 3004001 DEMURRAGE 1.000 0.000 124.300 1.000 0.000 0.000 2.3210 124.300 0.00100 0.00214 0.02600 0,01857 288.50 0.12 0.27 3.23 2.31 1.44 1.01 2.38844 75.0000 1.000 Net Invoice: Freight: Sales Tax: Invoice Total: 296.88 75.00 371.88 0.00 0.00 371.88 Lit Here \ssociated Petroleum Products DO BOX 1397 racoma, WA 98401 253) 627-6179 Fax (253) 627-3637 BNBUILDERS INC* 2601 4TH AVE SUITE 350 SEATTLE, WA 98121 206-382-3443 Cut Here Invoice Date: 3/24/2020 12:00:OOAM Invoice Due Date: 5/8/2020 12:00-00A Customer #: 06-1007951 Invoice Balance: 371.88 Invoice #: 0184146 -IN Amount Remitted: APP PO Box 34600 Seattle, WA 98124-1600 05082020 061007951 3 0184146 0000037188 3 `......=•1 MP .0. WM ••••••ramwr ••••••••=••••• PUNER&HVAC BRANCH H55 3400 LIND AVENUE SW RENTON WA 98057 253-548-2125 253-548-3001 FAX WHIMIMMIMARMIHMMMAHM TUKWILA REGIONAL JUSTICE CENTE 15045 TUKWILA INTERNATIONAL BL TUKWILA WA 98188-2245 Office: 206-382-3443 Cell: 206-639-0990 GRIZZLY RETAIL RENTALS LLC 2601 4TH AVE STE 350 SEATTLE WA 98121-1283 INVOICE 78655481-001 Customer # : 843317 Invoice Date : 02/26/20 Date Out : 02/04/20 12:00 PM Billed Through : 03/03/20 00:00 UR Job Loc : 15045 TUKWILA INTERN UR Job # : 257 Customer Job ID: P.O. # : SKY -60468 Ordered By : BEN ROE Reserved By : TERESA CARPENTER Salesperson : COLBY NICHOLSON Invoice Amount: $4,217.25 Terms: Due Upon Receipt Payment options: Contact our credit office 704-916-4870 REMIT TO: UNITED RENTALS (NORTH AMERIOA),INC. FILE 51122 LOS ANGELES CA 90074-1122 ENTAL ITEMS: 0.1: Equipment Description Minimum 1 060-1501CU GENERATOR 70-84 KVA 1205.94 Make: CUMMINS Model: C60D6R Serial: L140780628 Meter out: 10597.00 Meter in: .00 Substituted for: GENERATOR 70-84 KVA TIER 4 ALES/MISCELLANEOUS ITEMS: Qt' Item 1 DELIVERY CHARGE 1 PICKUP CHARGE OMMENTS/NOTES: CONTACT: BEN ROE CELL#: 206-906-8267 Dav Week 4 Week 1205.94 1339.93 Amount 4021.25 4,021.25 Rental Subtotal: 4,021.25 Price Unit of Measure Extended Amt. Billing period: 28 Days From 2/04/20 12:00 PM Thru 3/03/20 12:00 PM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDACADEMY.UR.COM TRAINING IS NOT AVAILABLE ON CERTAIN EQUIPMENT IN CANADA. 98.000 EACH 98.00 98.000 EACH 98.00 Sales/Misc Subtotal: 196.00 Agreement Subtotal: 4,217.25 Total: 4,217.25 )TICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.comilegalfrental-service-terms-US and which a incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. You Can Now Access invoice History and Update Purchase Orders Online To Sign Up, contact URControlSupport@ur.com Page: 1111111111111111111 BRANCH 805 17700 WEST VALLEY HIGHWAY TUKWILA WA 98188 425-251-8150 TUKWILA REGIONAL JUSTICE CENTE 15045 TUKWILA INTERNATIONAL BL TUKWILA WA 98188-2245 Office: 206-382-3443 Cell: 206-659-2561 GRIZZLY RETAIL RENTALS LLC 2601 4TH AVE STE 350 SEATTLE WA 98121-1283 INVOICE # 182440069-001 Customer # : 843337 Invoice Date : 06/18/20 Date Out : 06/02/20 03:00 PM Billed Through : 06/30/20 00:00 UR Job Loc : 15045 TUKWILA INTERN UR Job # : 257 Customer Job ID: P.O. # : SKY -60627 Ordered By :AUSTIN PROCTOR Reserved By : STUART LIVINGSTON Salesperson : COLBY NICHOLSON Invoice Amount: $498.00 Terins: Due Upon Receipt Payment options: Contact our credit office 704-916-4898 REMIT TO: UNITED RENTALS (NORTH AMERICA),INC. FILE 51122 LOS ANGELES CA 90074-1122 ENTAL ITEMS: Otv Equipment Description 1 10922893 GENERATOR 6.5-6.9 KW Make: HONDA Model EB6500.X11 Serial: EBLC-103.6681 ALES/MTSCELLANEOUS ITEMS: Oto.., Item 1 DELIVERY OMMENTS/NOTES: Minimum Day Week 75.00 150.00 Price CONTACT: AUSTIN PROCTOR CELL#: 206-659-2561 [DEL/MCI] Billing period: 28 Days From 6/02/20 03:00 PM Thru 6/30/20 03:00 PM ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDACADEMY.UR.COM TRAINING IS NOT AVAILABLE ON CERTAIN EQUIPMENT IN CANADA. 4 Week Amount 400.00 400.00 Rental Subtotal.: 400.00 Unit of Measure Extended. Amt. 98.000 EACH 98.00 SalesiMisc Subtotal: 98.00 Agreement Subtotal: 498.00 Total: 498.00 )TICE: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals.com/legal/rental-service-terms-US and which 3 incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. You Can Now Access invoice History and Update Purchase Orders Online To Sign Up, contact URConfrolSupport@ur.com Page: WNW Nam, as at wk. "sr BRANCH 805 17700 WEST VALLEY HIGHWAY TUKWILA WA 98188 425-251-8150 1111111111111111111111111111113111111111011111 TUKWILA REGIONAL JUSTICE CENTE 15045 TUKWILA INTERNATIONAL BL TUKWILA WA 98188-2245 Office: 206-382-3443 Cell: 206-659-2561 GRIZZLY RETAIL RENTALS LLC 2601 4TH AVE STE 350 SEATTLE WA 98121-1283 INVOICE # 182801467-001 Customer # 8,91.417 Invoice Date : 06/29/20 Rental Out : 06/12/20 11.:00 AM Rental In :.06/2,1/2P 07:38 AM UR Job Loc :• 1504.5 TT.JKWILA INTERN UR. Job # :257 Customer Job P.O. # : SKY -60631 Ordered By :AUSTIN PROcTOR' Reserved By :VANESSA JOHNSTON Salesperson : COLBY NICHOLSON Invoice Amount: $1,498.44 Terms: Due Upon Receipt Payment options: Contact our credit olTice 704-916-4898 REM IT TO: UNITED RENTALS (NORTH AMERICA),INC. FILE 51122 LOS ANGELES CA 90074-1122 ENTAL ITEMS: Otv Eauicfnent Description 1 109.98777 GENERATOR 45-49 KVA TIER 4 Make: MAGNUM PRO Model: MMG4bIF4 Serial: 300433:504 Meter out: 1466.30 ALES/MISCELLANEOUS ITEMS: Ot,/ Item Minimum Day 198.00 Mete x in: 1570.40 48.30 DYED DIESEL 1. DELIVERY CHARGE 1 PICKUP. CHAR -TE OMMENTS/NOTES: CONTACT: AUSTIN PROCTOR CELL#: 206-659-2561 CALL AUSTIN AND HE WILL. DIRECT YOU IN [DYEDDSL/MCII ARE YOU OR YOUR EMPLOYEES IN NEED OF OPERATOR CERTIFICATION TRAINING? CONTACT UNITED ACADEMY TODAY 844-222-2345 OR WWW.UNITEDACADEMY.UR.COM TRAINING IS NOT AVAILABLE ON CERTAIN EQUIPMENT IN CANADA. Price Week 4 Week 450.00 1250_00 Amount 90.0..00 Renta l Subtotal: 900.00 Unit of Measure Extended Amt. 6.800 EACH 328.44 135.000 EACH 135.00 135.000 EACH 135.00 Sales/31sSubLotal: 598.44 Agreement Subtota:: 1,170.00 Fuei: 328.44 Total: 1,498.44 10710E: This invoice is subject to the terms and conditions of the Rental and Service Agreement, which are available at https://www.unitedrentals,comilegal/rental-service-terms-US and which re incorporated herein by reference. A COPY OF THE RENTAL AND SERVICE AGREEMENT TERMS ARE AVAILABLE IN PAPER FORM UPON REQUEST. You Can Now Access Invoice History and Update Purchase Orders Online To Sign Up, contact URControlSupport@ur.com Page: Construction Specialties ��K��������n��es Sold Ta -------- 4ww22nd Ave. W Seattle, WA98199 Fax (206) 283-7546 .�����' 1215Thornton Ave SvV WA98047 Fax (253) 826-0260 (206) 283-200Toll Free (866) GO ATLAS mwvw.ananconmrucUonapeckgtieKnm B N BUILDERS, INC 2601 4TH AVE, SUITE 350 SEATTLE, WA 98121 Ship Ta Invoice Number |m00141595 Invoice Date 07/29/2020 Page 1 Order Number on131032 Order Date 07/28/2020 Ship Date 07/29m020 TUKWILA JUSTICE CENTER 15045 TUKWILA INTERNATIONAL BLVD STEPHAN 206-482-4050 BEN 206-406-8267 TUKWILA, WA Reference Order Date Customer No. Salesperson PO Number Ship Via Terms Extended Price Jul 28, 2020 006707 05 118021 100 OT 1%1oTHNET 30 Qty. Ord. Qty. Shp Qty. e^0 Item Number Description Unitpnce uonw Extended Price 5.00 5.00 0.00 008-99-000 Due Date ASPHALT COLD PATCH Amount Due Discount Date 1e.64 Disc. Amount EA 98.20 8/28/2020 98.20 8/10/2020 0.98 Non-taxable PLEASE REMIT TOComments: Tax summary: WA o'no Taxable ATLAS CONSTRUCTION 1729 0.00 SPECIALTIES COMPANY, INC Subtotal PO BOX 1245 Total sales tax SUMNER, WA98390 Total amount There will be a minimum20% restock charge for authorized Costs associated with the collection Less payment material returns Material must have aminimum90day of past due accounts, including Less pmt. disc remaining shelt No returns on custom or special order material attorney's fees shall be the sole responsibility of the recipient Items or charges marked with an asterisI*) are taxable. Amount due 98.20 0.00 98.20 0.00 98.20 0.00 0.00 98.20 BNBuilders April 28, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 056_HSS Column Clarifications at West Storefront Dear Ethan, BNBuilders hereby submits our proposal for added steel angles at door jamb for Renlita door per RFI 056. The total proposal of this subject work is four thousand and seventy-six dollars $4,076.00. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5160 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justineksoseaj.com) Geri Urbas (qeri.urbas(bnbuilders.com) Steve Schmitz (sschmitz(@,dIrqroup.com) BNBuilders 2601 HAvenue, Suite 350 Seattle, WA 9812'1 T: 206.3823443 F:.206,382,3440 Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY 13NBuilders PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 056 COP #: 5160 GENERAL CONTRACTOR: BNBuilders, Inc. DATE: 4/28/2020 DESCRIPTION OF CHANGE: Added steel angles at door jamb for Renlita door per RFI 056 IBP 08.10 Doors, Frames and Hardware lst-tier Subcontractor Cost Total (Direct Construction Costs) GC/CM Mark-up on MACC Costs Rounding Adjustment $3,881.521 $3,881.52 $194.08 $040 'Total Change Request $4,076.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date Tukwila Justice Cenber SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center CCD/ASI #: COP #: Contractor Name: BNBuilders DATE: DESCRIPTION OF CHANGE: Added steel angles at door jamb for Renlita door per RFI 056 RFI 056 5160 4/2812020 Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractor's Total Direct Cost Subcontractors Mark-up (Excludes Labor Premium) Labor Premium $0,00 $o.00 $o.00 ITotal Subcontractor Direct Costs + Mark-up + Labor Premium $0.00 Total Sub -tier Subcontractor Costs $3,594.00 15% Subcontractors Mark-up on Sub -tier Subcontractor(s) $287.52 8% ITotal Subcontractor Change Request $3,881.52 To the best of my knowledge and belief, I certify that all costs listed above are correct Contractor Signature Date DOOR ESTIMATE WORKSHEET REV. 08/03/09 Q JOB NAME; JOB TOTAL CD a) 0 0 0 0 o 0 0 00 MATERIAL & EQUIP. 0 0 0 VI' 0 ta TTL LBR COST 0 0 (0 800 0 0 0 0 0 0 0 0 .4 Cq <,.^) 0 e) 0 0 0 0 0 0 0 0 0 cS 0 0 DOOR WEIGHT o 0.00 0.00 0.00 0.00 0.00 1 0.00 WT/SQ FT. a a 0.00 0.00 0.00 0,00 0.00 0.00 0.00 u. d0 = 11113 allo , o 1 0 a 0 o 0 0 0 0 — 000000 I 0°000 LI- (0Q00000C‘4 H 0 Install Angle 6" x 41 Prep & Paint 0.00 0.00 0.001 0 0 0 COILING GRILLES TOTALS DOOR TYPE/ DOOR # Labor Rate= $100.00 per Hour DLR m�m�u 0 �up DLR Group pR0}E[-H SUoIECT: TYPE: PURPOSE: QUESTION: SUGGESTION: ANSWER: City of Tukwila Justice Center 73-17158-00 TJC RFI #056_HSS Column Clarification at West Storefront RFI Answered ,‘" DATE SENT: REI|[, TRANSMITTAL ID.: ERFal 6/7/2019 056 00407 Info Exchange 1. There is conflict for these 2 door post location b/w arch & struc. Arch plan A1.1B refers det-11/A10.2 which shows center of post 9'3/8 from grid -N whereas this struc plan shows 6" from gridline. Currently we have followed 6" dim per this plan since this struc sheet is the latest version. Please confirm/suggest soon. 2.There is conflict for these 2 door post location b/w arch & struc. As per arch plan A1.1B we get center of post 11'-10"5/8 from grid -12 whereas this struc plan shows 11'-9"1/2 from grid -12. Currently we have followed 11'-9"1/2 from grid -12 per this plan since this struc sheet is latest. Please confirm/suggest soon. Response (Answered) from: Steven Schmitz (DLR Group) Remarks: 1. CONFIRMED BY ARCH TO REFER TO STRUCTURAL. PLEASE NOTE UPDATED DETAIL 11/A10.2 PER RFI FOR FUTURE REFERENCE. CONTINUE/START TO WORK WITH GARAGE DOOR MANUFACTURER FOR INSTALL. 2. SEE ATTACHED STRUCTURAL SKETCH FOR UPDATED LOCATIONS AFTER COORDINATION. FKOn NAME | COMPANY EMAIL - — -� �� '� �--- _ PnoNe Sabrina Ames DLR Group eennes@d|rgroUp/corn 206-461- 6094x73-6094 0 Bill Brown DESCRIPTION Or CONTE -NTS COMPANY EMAIL PHONE biU brovV�V�bnbu||ders c BNBuilders ' ' ' 206-382-3443 om ()TY DATED TITLE mUMBER SCALE SIZE Page 1 of 2 REL ra m~�:� DATE: 6/7/2019 ID: 00407 QTY DATED TITLE � r-- - TJC RFI #056 HSS — | � � 1 5/20/2019 Column ClarificationWest f � | COPIES: Bill Brown ( Dillon Webster (DLR Group) Ethan Bernau (Shie|s Obletz Johnsen) Geri Urbas (BNBuilders) Jeff Clark (BNBuilders) Sabrina Ames (DLR Group) Steven Schmitz (DLR Group) Page 2 of 2 BNBuilders Request for Information RFI No: 056 Tukwila Justice Ctr Construct 15005 Tukwila InterBlvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: May 20, 2019 Submitted To: Steve Schmitz Submitted By: Dennis Archibald DLR Group, Inc 51 University Stree Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: HSS Column Clarification at West Storefront Discipline: Structural Document Reference: S1.1B Subcontractor: BN Builders, Inc. Question Lundahl Spec Section: 051200 Subcontractor RFI No: 39 Date Required: S/27/2019 1. There is conflict for these 2 doopost location b/w arch & struc. Arch plan A1.1B refers det-11/A10.2 which shows center of post 9"3/8 from grid -N whereas this struc plan shows 6" from gridline. Currently we have followed 6" dim per this plan since this struc sheet is the latest version. Please confirm/suggest soon. 2.There is conflict for these 2 door posIocation b/w arch & struc. As per arch plan A1.1B we get center of post 11'-10"5/8 from grid -12 whereas this struc plan shows 11'-9"1/2 from grid -12. Currently we have followed 1V-9"1/2 from grid -12 per this plan since this struc sheet is Iatest. Please confirm/suggest soon. Answer 1. CONFIRMED BY ARCH TO REFER TO STRUCTURAL. PLEASE NOTE UPDATED DETAIL 11/A10.2 PER RFI FOR FUTURE REFERENCE. CONTINUE/START TO WORK WITH GARAGE DOOR MANUFACTURER FOR INSTALL. 2. SEE ATTACHED STRUCTURAL SKETCH FOR UPDATED LOCATIONS AFTER Answered by: Date Answered: Copfes To: Company & Contact Fax Notes 6.7.19 Page 1 of 1 Page: 1 Nillgt11111". RFI: 39 Conflict at door pos Project: 19022 - Tukwila Justice Center Rev: 0 REQUEST FOR � ==������ �=F~,====IO^° Area: Reference: SOL RF#23 cust project: 05-17-/9 : 12:40 From: AMANDA HEUSSER To: Jeff Clark ( BNBui|ders ) Address: Sent date: 05-17-19 Response required by: U5-21-1S12:0OAM By: Email Jeff.C|ark@Bnbui|dere.00m Phone: 206-382-3443 Project schedule will be impacted if a response is not received by the date above CC: Regarding Attachments Sol Sk#23.pdf r�ues /on Question 1 A1.1B refers to detail 11/A10.2 which shows the center of the post 9 3/8" from grid N Whereas the structural plan shows 6" from gridline. Please review and confirm we can provide a 6" dimension per the structural sheet to avoid the conflict between the 2 door post Iocations. Question 2 A1.1Bshows the center nfthe post 11'-105/8^from grid 12whereas the structural plan shows 11'-01/2^from gridline 12. Please review and confirm we can provide a 11'- 9 1/2"" dimension per the structural sheet to avoid the conflict between the 2 door post Iocations. Lundahl Ironworks Company P.O. Box 59 Franklin ID 83237 Fax: (208) 646-2700 Phone: (208) 646-2600 This report was generated by FabTrol MRP so ware. For product information, call (541) 485-4719 or visit www.fabtrol.com EN \ CCD 1601 Fifth Avenue, Suite 1600 rryff Seattle, WA 98101 o 206.622.5822 kpff.com 2'-1" 10'-1" 14'-6" 14'-0" 18'-0" RFI 056 MATCH LINE SEE 1C <q- (FW2) (98'-0") TYP AT PERIMETER, UNO PROJECT NO. 1800576 TUKWILA JUSTICE CENTER DATE 06-06-2019 REFERENCE SHEET S1.1B BY IF SKETCH NO. SSK-16 z Z Q 0 ,,81£ 1 a v 8 CCI 00 ETAL STUDS tx 0 wcn_ d cL CC ZZ w `L LU W 0-1 s• V LO U.. tO C.? Ll. H Go 0 rt aO Z Z Q 00 Q W _`Z Z = 0 iLL 2 d u_ 0 dO_2� Q_ 0 Q I O0 (/) O W u_-Jw2 , (_ m O -J w O co w 2H Q20 J >- W Q Qcn 21-2 Q MC 5 I - w 0 CC 2- 0O <= W Owu1w d 1- Z W D E - 650m ®z zo o.. = 0 go UW =0 0 W0 ._r-. 0)< QO EE I- �� QO OJ u- i -- • ilio W� OD en Z Q2 Q co i7)" t7,1=Z2 O ft cn 0 u- < Et en 0 w Z = oa = ,- g O O ac O.. w> m W W a- 1—j 1-= =10— ZO ��u W w Q Z W 8 (tU- CLQ! 12 W=ci H. U� W d ~gig �{m Xkij WO'w co 0w Q W J>0 W _j Cf) OD= Oo -w7O =-O®1- 0- 0®.. OOua wz Lc)0) c 1- 0) Q �-0cncn 0 F- 0 CtL LUCt 0 oo 0 0 w J Q LL V/) Nr - O_ 0) QEL CC Z m Q c cn O w I --c2 0 a_ w U n w 1— O BNB BN uilders August 3, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 454.1 - Bollards Around Security Pedestals Dear Ethan, In accordance with RFI 454.1 dated 4/28/2020, BNBuilders hereby submits our proposal to install additional bollards for the South Sallyport pedestals. The total proposal of this subject work is Three Thousand Three Hundred Seventy Three dollars $3,373. This proposal does not include potential additional costs relating to NSS activities. BNB reserves the right to pursue additional costs at a later time for NSS related activities as it pertains to this change. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference 5161 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (geri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dIrgroup.com) BN Bu ilders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 B N B BN Builders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 454.1 GENERAL CONTRACTOR: BNBuilders, Inc. DESCRIPTION OF CHANGE: install additional bollards for the South Sallyport pedestals. COP #: 5161 DATE: 7/27/2020 BP 03.00 BNB (FoundationslStructure/Waterproofing) $3,211.96 lst-tier Subcontractor Cost Total (Direct Construction Costs) $3,211.96 GC/CM Mark-up on MACC Costs $160.60 5% Rounding Adjustment $0.44 Total Change Request $3,373.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date Tukwila Justice Cenber SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAMETukwila Justice CenteCCD/ASI #: COP #: Contractor Name: BN BuiTders DATE: DESCRIPTION OF CHANGE: Pour foundations and install additional bollards per RFI 454 & 454.1 454 5161 7/27/2020 Subcontractor Direct Costs (attach all necessary substntiating docu Labor (Excluding Labor Premium) Material Equipment Subcontractors Total Direct Cost Subconlractors Mark-up (Excludes Labor Premium) Labor Premium Total SubcontractoDirect Costs + Mark-up + LaboPremium Total Sub -tier Subcontractor Costs 15% Subcontractors Mark-up on Sub -tier Subcontractor(s) $0.00 m% Total Subcontractor Change Reques 53,211.96 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date COP Cost Breakdown Project Name: Tukwila Justice Center Project No. 118021100 Contractor #REF! Work Description: Pour foundations and install additional bollards per RFI 454 & 454.1 CCD/RFI: 454 CP #: 5161 Date: 7/27/20 Description Quantity Unit Prod. Hours A.1. Labor A.1. Labo Premium B. Material C. Equipment $/hour Cost $/hour Cost $/Unit Costs $/Unit Costs Bollards 2 $ - 120.16 $ 240 $ - Concrete 0.087 CYD $ - 150.00 $ 13 $ - gou oncrete (2 Journeyman Carpenters 4 hours) 8 74.26 $ 594 $ - $ - Set Bollards (2 Journeyman Carpenters 2 hours) 4 74.26 $ 297 $ - $ - Vac Truck $ - $ - $ 1,500 Paint bollards (1 Journeyman Carpenters 2 hours) 2 74.26 $ 149 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ — $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ $ - $ - $ - $ - $ - $ - - $ - $ - _ Total Cost of Work A. $ 1,040 $ - $ - B. $ 253 C. $ 1,500 17:2:18 MAY 4 2020 FERGUSON ENTERPRISES #3007 ACCEPT B/0 WOLSELEY INDUSTRIAL GROUP PO BOX 847411 SHOWROOM DALLAS, TX 75284-7411 SOURCE IB FRT = OB SHIP = SALESMAN TAG PO NUM OML CONTACT VENDOR VENDOR PO NO DEPART TIME ROUTE DESC. CHECKED BY AISLE LOC d z z 0 LINE WEIGHT WRITER Derrick C Board PACKED BY ROUTE NO. d Z. 0 INSTRUCTIONS < tM w z m DELIVERED BY TOTAL CN1 CI � •cr rsi vr LENGTHS SHIP DATE w I— ce 0 v) w X 0 co v) is <C tr) 0 0 re. i --- z 0 ORDERED BY BNBUILDERS INC 2601 4TH AVE STE 350 SEATTLE, WA 98121 206-382-3443 z 1.— E -- DESCRIPTION Received as Payment on Account PIF DCB 8210483 ORDER DATE ITEM CODE d 0 E -:-a w 2 <:c z m 0 0 ce 0 se m CONTRACT NO. _ 2 tol CUSTOMER ALPHA BNBUILDERS CUSTOMER P.O. NO. ORDER QTY. CUSTOMER NO. 32589 w Z .75 TOTAL WEIGHT OF ORDER: 0 0 0 < UJ IX 03 w> - D <C 03 V ACCEPT B/O FERGUSON ENTERPRISES #3007 WOLSELEY SHOWROOM INDUSTRIAL GROUP PO BOX 8474117 SOURCE -- DALLAS, DALLAS, TX 75284-7411 IB FRT OB SHIP = SALESMAN TAG PO NUM OML CONTACT VENDOR VENDOR PO NO DEPART TIME ROUTE DESC. CHECKED BY Shipment Information : PAID $240.32 BY Visa CC# XXXXXXXXXXXX0209 ON 05/04/20 TOTAL $240.32 LESS CASH DISCOUNT 0 z WRITER Derrick C Board PACKED BY ROUTE NO. INSTRUCTIONS vi 0 o DELIVERED BY LENGTHS SHIP DATE 1 0 W c a.z Q [ORDERED BY BNBUILDERS INC � ry 2601 4TH AVE STE 350Y SEATTLE, WA 981.21 206-382-3443 BID NO. ORDER DATE JOB NAME CONTRACT NO. CUSTOMER ALPHA BNBUILDERS CUSTOMER P:0.NO, CUSTOMER NO 32589 a%v u.""N V .kbae c z 4 w 0W WLU W W V, W cemo o c z-�, Lu a) c�a) =c.. a E Z o z, 0 ) < w • L.11 W s J J V) z v) 0 CL Z teJj 0 O d2 m• v. :18 MAY 4 2020 SHOWROOM SOURCE _ IB FRT = OB SHIP = SALESMAN TAG PO NUM OML CONTACT VENDOR VENDOR PO NO. DEPART TIME ROUTE DESC. CHECKED BY Date 05/04/2020 Account # XXXXXXXXXXXX0209 Authorization # 79451 D Amount $240 32 I agree to pay the total amount of this purchase. By signing below, I understand and authorize backordered products to be pre -authorized and charged to my credit card account upon shipment. If third party payer fails to pay for any reason, then I agree to pay any unpaid balance. 2 2 WRITER Derrick C Board PACKED BY 2 \ INSTRUCTIONS 0 DELIVERED BY JSON ENTERPRISES #3007 IX 847411 \S, TX 75284-7411 )6-767-7700 Fax: 206-763-3090 WHSE PAYMENT ON ACCOUNT 7 2m LENGTHS SHIP DATE \ o & > \ m / (-) \. . ORDERED BY BNBUILDERS INC'' 2601 4TH AVE STE 350 SEATTLE, WA 98121 4 206-382-3443 ORDER DATE (7.5 0 m CONTRACT NO. CUSTOMER ALPHA BNBUILDERS > k e CUSTOMER NO. 32589 2 » Q. b\ /3 \/ ot 3% 11.▪ 1\ CCI \\ // / k\ 2 • J. CC 0 ) /C ° ƒ0 / o 0• ƒ 0/ 2/ /tti /\` w \2 11.1 o 2: CC LAJ • \ a «. DLR Group �� �� up PROJECT: City of Tukwila Justice Center DATE SENT: 4/22/2020 73-17158-00 SUBJECT' TJC RFI #454_Bollards around RF -IID 454 Security Pedestals TYPE: RFI TRANSMITTAL ID: 02256 �l PURPOSE: For Construction VIA: Info Exchange QUESTION. Please reference SE 6.2 for the reader/intercom pedestal detail. Note that this detail calls out for (4) bollards for each pedestal. However, AS1.1 which identifies the type and location of bollards, does not require bollards for each pedestal. If the bollards per SE 6.2 are required (40 EA), provide the type and foundation details. SUGGESTION: ANSWER: Note: There is additional costs associated with adding these bollards noted in SE 6.2 Response (Answered) from: Steven Schmitz (DLR Group) Remarks: Not required where installed behind civiI curbs. Provide (1) 48" bollard at PD sallyport gate pedestals at front of pedestal to prevent vehicular incursions. Steve Schmitz - DLR Group 04.32.20 FROM NAME cOMPxwv- - -�--- EMAIL Michelle Javan DLR Group mjavan@dIrgroup.conn TO COMPANY NAME C - - - -- �] -_- 8U| Brown BNBui{ders Shie|s Obletz Ethan Bernau Johnsen Geri Urbas BNBuUd8ns Jeff Clark BNRiU|ders EMAIL - ' — biU.bnuwn@bnbui|ders'c orn PHONE 206-461- 6065x736065 PHONE 206-382-3443 ethanb@sojsea.com 206-838-3705 gehurb��V�bnbV1k1er�.c ' 206-382-3443 om Jeff.Clark@bnbuilders.c 206-382-3443 Page 1 of 2. NAME Michelle Javan Steven Schmitz Taras Yaremchuk REMARKS COMPAN'( DLR Group DLR Group BNBuilders EMAIL OM DATE: ID: ransmittai 4/22/2020 02256 P mjavan@dlrgroup.com sschmitz@dlrgroup.com taras.yaremchuk@bnbui Iders.com Response (Answered) from: Steven Schmitz (DLR Group) Remarks: Not required where installed behind civil curbs. 206-461- 6065x736065 206-461- 6044x73-6044 206-382-3443 Provide (1) 48" bollard at PD sallyport gate pedestals at front of pedestal to prevent vehicular incursions. Steve Schmitz - DLR Group 04.22.20 DESCRIPTION OF CONTENTS QTY DATED TITLE NUMBER SCALE SIZE TJC RFI #454 Bollards 1 4/17/2020 around Security Pedestals.pdf Page 2 of 2 B N B BNBuilders Request for Information RFI No: 454 Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: April 17, 2020 Submitted To: Steve Schmitz Submitted By: Bill Brown DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Bollards around Security Pedestals Discipline: Architectural BN Builders, Inc. 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor: BNBuilders Subcontractor RFI No Question Date Required: 4/24/2020 Please reference SE 6.2 for the reader/intercom pedestal detail Note that this detail calls out for(4) bollards for each pedestal However, AS1.1 which identifies the type and location of bollard$ does not require bollards for each pedestal If the bollards per SE 6.2 are required (40 EA), provide the type and foundation details Note: There is additional costs associated with adding these bollards noted in SE6.2 Answer Not required where installed behind civil curbs. Provide (1) 48" bollard at PD sallyport gate pedestals at front of pedestal to prevent vehicular incursions. Answered by: Steve Schmitz - DLR group Date Answered: 04/22/2020 Copies To: Company & Contact Fax Notes Page 1 of 1 [tub ijO_ 01.11r1F414Cdr4905% '1amL <„` lam 41 En kg`w 400 46 Popo :<- 440 *. a iO .di, oopoeottotoPP PPop FMoP 00oo j ilyl1` �QC►iE►lUn/iW //1111\\\\\ DIR up DLR Group PROJECT: SUBJECT: TYPE: PURPOSE; QUESTION: SUGGESTION: ANSWER: FROM NAME Michelle Javan TO NAME � - Bill Brown Ethan Bernau Geri Urbas Jeff Clark Michelle Javan Steven Schmitz City of Tukwila Justice Center 73-17158-00 T]CRFI #454.1_8nUnrdsaround Security Pedestals RFI Answered DATE SENT: RR0: TRANSMITTAL ID: VIA: 4/28/2020 454.1 02303 Info Exchange Please provide type of bollard and foundation details (if required) as requested in RFI 454 for the security pedestal protection. Response (Answered) from: Steven Schmitz (DLR Group) Remarks: Bollards in Asphalt require footings. Bollards in concrete may be bolted to surface via concrete anchors. Bollards may be prefabricated or fabricated per minimum dimensions shown. Steve Schmitz - DLR Group 04.27.20 COMPANY DLR Group COMPANY 8NBu||dans 3hiels Obletz Johnsen BNBuilders BNBuilders DLR Group DLR Group EMAIL EMAIL b|U.hrovvn@bnbui|dars.c OM ethanb@sojsea.com gah.urbas@bnbui|dors.c om ]eff.CJark@bnbui|ders.c om mjavan@dIrgroup.com sschmitz@d|rgrDup.cUrn PHONE 206-461- 6065x736065 PHONE 206-382-3443 206-838-3705 206-382-3443 206-461- 6065x736065 206-461- 6044x73-6044 200-382-3443 Page 1 of NAME COMPANY EMAIL |dars.conn DESCRIPTION 0FCONTENTS QTY DA FED TITLE -DC RFI #454.1_Bollards I 4/37/2020 around Security 0(1' � DATE: To: sr ittA 4/28/2020 02303 „ NUMBER SCALE Page 2 of 2 B N B BNBuilders Request for Information RFI No: 454.1 Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: April 27, 2020 Submitted To: Steve Schmitz Submitted By: Bill Brown DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Bollards around Security Pedestals Discipline: Architectural BN Builders, Inc. 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor: Subcontractor RFI Ncr Question Date Required: 5/4/2020 Please provide type of bollard and foundation details (if required) as requested in RFI 454 for the security pedestal protection. Answer Bollards in Asphalt require footings. Bollards in concrete may be bolted to surface via concrete anchors. Bollards may be prefabricated or fabricated per minimum dimensions shown. Provide: Diameter : 4" Length: 72" Pipe Schedule: 40 Galvanized Paint: Safety Yellow Quantity (2) Answered by: Steve Schmitz - DLR Gorup Copies To: Company & Contact Date Answered: 04/27/2020 Fax Notes Page 1 of 1 ALIGN ITTI LEADING EDGE OF' CARD READER 4" PIPE CONCRETE FILLED PAINT SAFETY YELLOW 2000 PSICONCRETE FOOTING " O. PIPE I RFS 454 FOR REFERENCE D R Group DLR Group PROJECT: sua]scT: PURPOSE: QUESTION: SUGGESTION: ANSWER: City of Tukwila Justice Center 73-17158-00 T]CRFI #4S4_Bo||andaaround Security Pedestals RFI For Construction WM� DATE SENT: REI ID; [RAN InAL/o' VIA: :�� 4/32/2020 454 02256 Info Exchange Please reference SE 6.2 for the reader/intercom pedestal detail. Note that this detail calls out for (4) bollards for each pedestal. However, ASL1 which identifies the type and location of bollards, does not require bollards for each pedestal. If the bollards per SE 6.2 are required (40 EA), provide the type and foundation details. Note: There is additionai costsassociated with adding these boilards noted in SE 6.2 Response (Answered) from: Steven Schmitz (DLR Group) Remarks: Not required where installed behind civil curbs. Provide (1) 48" bollard at POsaUyport gate pedestals at front of pedestal to prevent vehicular incursions. Steve Schmitz - DLR Group 04.22.20 FROM NAME COMPANY Michelle Javan DLR Group TO ' - NAME ! COMPANY Bill Brown BNBV||ders Ethan Bernau Geri Urbas Jeff Clark Shiels Obletz Johnsen BNBuUderS BNBuilders EMAIL EN AIL biU,broVyn@bObui|d8rs.c om PHONE 2O6-461' 6065x736065 p:Oms 206-382-3443 ethanb@sojsea.conn 206-838-3705 geh.urbas@bnbui|dery.c om 206-383-3443 206-382-3443 Page 1 of 2 NAME Michelle Javan Steven Schmitz Taras Yaremchuk REMARKS 454��|�� FOR � REFERENCE COMPA DLR Group DLR Group 8NBuUders DATE: lD� OM sschmitz@d|rgmup.com -- - taras.yaremchuk@bnbui |dens.conl Response (Answered) from: Steven Schmitz (DLR Group) Remarks: Not required where installed behind civil curbs. ^tti4 4/22/2020 02256 PHONE 200-461- 6065x736065 ""-`" �[ � 1- - - 6044x73-6044 206-382-3443 Provide (1) 48, bollard at PD sallyport gate pedestals at front of pedestal to prevent vehicular ncursions. Steve Schmitz - DLR Group 04.22.20 QTY | DATED TITLE TJC RF#454_Bolards 4/ 7/2020 | around Security Pedesta|s.pdf CC� [ NUMBER L� SIZE Page 2 of B N B BNBuilders RFI 454 FOR REFEREN E equest for Information RFI No: 454 Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Projec 18021.100 Date: April 17, 2020 Submitted To: Steve Schmitz DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Bollards around Security Pedestals DisciplThe: Architectural Submitted By: Bill Brown BN Builders, Inc. 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor: BNBuilders Subcontractor RFI Na Question Date Required: 4/24/2020 Please reference SE 6.2 for the reader/intercom pedestal detail Note that this detail calls out for(4) bollards for each pedestal However, AS1.1 which identifies the type and location of bollards does not require bollards for each pedestal If the bollards per SE 6.2 are required (40 EA), provide the type and foundation details Note: There is additional costs associated with adding these bollards noted in SE6.2 Answer Not required where installed behind civil curbs. Provide (1) 48" bollard at PD sallyport gate pedestals at front of pedestal to prevent vehicular incursions. Answered by: Steve Schmitz - DLR group Date Answered: 04/22/2020 Copies To: Cornpany & Contact Fax Notes Page 1 of 1 uJ cf) 0 0 0 0 w 1 0 w UJ 12[ -J LL 0 in 111 u j W 1– Z 36" (NOT TO SCALE) CC LU CL 0 0- F- 0 0 IfIA I– 0 owCK o 0 LL 1–zo n: C) CD ct CC La] CD CO 0 0 CONDUIT TO TVSS IN SEC ROOM 4 FOR REFERENCE ISC211161 Pim 110 'co -04,04 BNB BNBuilders August 21, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 470.1 - Additional Cooler Power & Monitoring Dear Ethan, In accordance with RFI 470.1 dated 6/30/2020, BNBuilders hereby submits our proposal to provide and program additional receptacles and dedicated circuits for evidence coolers. The total proposal of this subject work is Three Thousand Two Hundred Twenty Five dollars $3,225. This proposal does not include potential additional costs relating to NSS activities. BNB reserves the right to pursue additional costs at a later time for NSS related activities as it pertains to this change. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference 5164.1 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (geri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dlrgroup.com) BNBuilders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 BN BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 470.1 GENERAL CONTRACTOR: BNBuilders, Inc. COP #: 5164.1 DATE: 7/21/2020 DESCRIPTION OF CHANGE: provide and program additional receptacles and dedicated circuits for evidence coolers. BP 22.00 Johansen $1,645.55 BP 26.00 Valley lst-tier Subcontractor Cost Total (Direct Construction Costs) $1,426.00 $3,071.55 GC/CM Mark-up on MACC Costs $153.58 5% Rounding Adjustment -$0.13 Total Change Request $3,225.00 To the best of my knowledge and belief, I certify that all costs listed above are correct Contractor Signature Date VALLEY "The Electrical Solution",, VALLEY ELECTRIC CHANGE ORDER PROPOSAL Tukwila Justice Center Contract: 118021.1-05 PROPOSAL DESCRIPTION: RFI #470.1 Additional Cooler Location - Adding dedicated circuits to Cooler location. SL # DATE 7/1/2020 Addendum# VE JOB # 19146 Time Ext Rqrd (days): 5 RFI# 470.1 VE CP # 034 Self Performed Work LABOR COST 12.26 hrs $90.62 $ 1,111.00 SUPERVISION 0.0% Ibr $ - SAFETY 0.0% Ibr SMALL TOOLS 0.0% Ibr $ MATERIAL COST $ 129.23 EQUIPMENT COST 24' Scissor Lift Month $ OH & PROFIT - SELF 15.0% Subcontractor Quotes Quote Quote Quote Quote SUBTOTAL COST: SUBTOTAL DIRECT COST QUOTES: OH & PROFIT - SUBS 8.0% Bond Permit Fee BIM hrs 85.00 $ 1,240.23 $ 186.03 TOTAL CHANGE PRICE: $ 1,426.00 NOTE: 1) Proposal valid for acceptance within 30 days. 2) While Valley Electric considers our proposal amount full compensation for this change, we expressly reserve the right to seek additional time and compensation at a later date for the impact of multiple changes, if any, or for indirect costs that were not reasonably foreseen by Valley Electric at the time of settlement on this change. 3) This construction change has been estimated using the drawings furnished; an engineering evaluation of the drawings, for function and compatibility with the vendor furnished equipment, has not been performed. 4) Permit costs are specifically excluded. Should this change, or it become necessary to procure/pay for an increased permit fee this would become an added cost to the change price reflected above. Our proposal amount does not include the following: - Overtime / Shift Work - Fireproofing Repairs - Concrete/GWB Repairs - Shutdown Costs - Painting and Patching Valley Electric Co. Job #19146 Contract # Detailed Labor and Material Breakdown 19146 - CP #034- RFI 470.1 Additional Cooler Location Page 1 of 1 Print: 7/1/2020 Description Qty Net Price U Labor U Total Mat($) Total Hours 3/4" CONDUIT- EMT 100 67.7 C 5 C $67.70 5.00 3/4" CONN COMP STL - EMT 2 89.86 C 30 C $1.80 0.60 3/4" COUPLING COMP STL - EMT 10 99.76 C 14 C $9.98 1.40 #12 THHN BLACK 500 97.2 M 6 M 48 60 . 3.00 #12 WIRE POWER TERM 6 0 E 0.15 E $0.00 0.90 OPEN & CLOSE PANEL 1 0 E 1 E $0.00 1.00 WIRE CONN RED 6 19.32 C 6 C $1.16 0.36 SUB COORDINATION (As Needed) 0 1 E $0.00 0.00 POSTING/RECORD DWGS 0 0.613 E $0.00 0.00 CLEAN UP (.5% Lbr) 0 0.0613 E $0.00 0.00 TESTING (.75% Lbr) 0 0.09195 E $0.00 0.00 WARRANTY (As Needed) 0 0.1226 E $0.00 0.00 Totals: $129.23 12.26 CONFIDENTIAL Johansen Mechanical, Inc. PHONE 425-481-2266 FAX 425-486-6933 CHANGE ORDER DETAIL JOB NAME Tukwila Justice Center BILLING CONTRACTOR BN Buliders, Inc. JOHANSEN JOB # P11960 DATE: JM|COR #: 8035 DESCRIPTION: -Provide two additional receptacles and dedicated circuits for evidenCe coolers so there are a total of (3) receptacles/circuits. Utilize existing pathway for existing fridge circuit. | EXCLUSIONS: REFERENCE: BNB RF|#47U.ONLYAdditional 3rd Cooler Location �n addition to TJC RFI 47Q/JKO|CO 8826)] SCHEDULE IMPACT: Yes 1. LABOR: A. LABOR (FIELD FOREMAN) B. LABOR (FIELD JRNYMAN) C. LABOR (SHOP JRNYMAN) D. LABOR (DELIVERY) E. LABOR (SERVICE) F. DETAILING G. SHOP FOREMAN/COORD H. PROJECT STAFF U. MATERIAL AND EQUIPMENT A. MATERIALS B. EQUIPMENT C. FREIGHT O. RENTALS E. VEHICLES (1nmorLABOR ^A^) III. SUBCONTRACTORS A. ALL SUBS RB@ HRS@ 070O1HR8@ HRS @ OOUHRS@ 0.00IHRS 0.00 HRS @ 0.00 HRS @ LABOR TOTAL $ 101.46 = $ $ 05.06 = $ $ 95.06 = $ $ 79.60 = $ $ 104'92 = $ $ 97.78 = $ $ 101.46 = $ $ 103.73 = $ MATERIAL EQUIPMENT TOTAL SUB SUBTOTAL IV. OTHER DIRECT COSTS A. SAFETY @ B. SMALL TOOLS AND CONSUMABLES @ C. PERMITS |^$ OF LABOR U% OF LABOR |$ --- �----''Y OTHER DIRECT COSTS TOTAL � � 1.5OO£8 � V. TOTAL ITEMS I, II, Ill, AND IV VI. OVERHEAD & FEES A. OVERHEAD B. PROFIT C. SUBCONTRACTOR MARKUP VALID FOR 30 DAYS 8% TOTAL AMOUNT FOR THIS CI-IANGE ORDER PROPOSAL � � � � 1,509.68 120.77 15.10 1,645.55 This change proposal only includes costs that can be dentified at this time. This change proposal does not include any amount for changes in the sequence of work, delays, disruptions, rescheduling, extended overhead, acceleration or impact costs. Johansen Mechanical expressly reserves the right to address any and all of these and related items of cost prior to final settlement of the contract. From: GigiCanter [maiho:gigi@candcsoudons]bill Sent: Monday, July 20, 2020 2:50 PM To: Josh Blackburn <joshb@lohansenmech.com> Subject: RE: T][RFI #47O.1 Additiona|Coo|erLocation(RespondedQ'C|osed).pdf Description Hours RFI 470.1 Item Description Additional Cost RFI 470.1 Additional Cost Add RFI 470.1 � Cooler Temperature Sensor (CLR-T) $44.00 $44.00 $95.00 Freezer Temperature Sensor (FRZ-T) (Technician) Additional Checkout, Functional TesinA, Commissioning $0.00 1 Current Switch (CLR-S) $124.00 $124.00 Current Switch (FRZ-S) $562.50 $0.00 FX-PCX2721-0 Expansion Module w/8U1; 2A0 $84.38 $0.00 Subtotal Coritrols Material Changes $168'00 $168.00 1 Allowable Markup (15%) $25.20 $25.30 Total Controls Material Changes $193.20 $193.20 Description Hours RFI 470.1 Hourly Rate Cost RFI 470.1 (Engineering Labor) Update DDC Control Drawings Sequence of Opera�ons,f|ovvdio0ranm,wiring detail, and �ourplan 2.5 �1US�0O ' $263.50 (Programming) Add (1) additional graphic page, configure (1) alarm 2 $95.00 $190.00 (Technician) Additional Checkout, Functional TesinA, Commissioning 2 $55.00 $110.00 Subtotal Controls Labor Charges $562.50 Allowable Markup (15%) $84.38 Description Qty RFI 470.1 Rate Cost RFI 470.1 Electrical Labor 6 $95.00 $570.00 Electrical Materials $25 per conduit stub up 0 $25.00 $0.00 $25 wire 1 $25.00 $25.00 Misc materials ($25) 1 $25.00 $25.00 Subtotal $620.00 Allowable Markup (8%) $49.60 Total Electrical Labor & Materials Changes $669.60 Total Controls Labor & Materials + Electrical Labor & Materials $1,509.68 -Gigi Gigi Canter C&C Solutions, LLC A Veteran Owned Business gigi@candcsolutions.biz Office: 800-381-8208 Cell: (360) 900-6911 DLR &r� Group � �� 0 DLR Group = PROJECT: City of Tukwila JusticGCent�r DATESENT: 6/30/3020 73-17158-00 SUBJECT: TJC RFI #470.1_Additional Cooler RFI ID 470.1 Location.pdf TYPE: RFI TRANSMI I I AL ID: 02471 PURPOSE: Answered VIA: Info Exchange QUESTION: SUGGESTION: ANSWER: see attached RFI 470.1 Additional Cooler Location. Response (Answered) from: Steven Schmitz (DLR Group) Remarks: here is our response. Steven J. Schmitz, AIA Architect | Associate DLR Group o: 206-461-6000 1 d: 206-461-6044 51 University Street, Suite 600 Seattle, WA 98101 FROM NAME � COMPANY � EMAIL _-_ Michelle Javan DLR Group mjavan@dIrgroup.com TO NAME COMPANY Bill Brown BNBui|ders Shke|s Obletz Ethan8ennau Johnsen Geri Urbas BNBu|ders EMAIL biU.brovvn@bnbu||ders.c om ethanb@sojsea.com geh.urbas@bnbuUders.o om PHONE 206-461- 6065x73-6065 PHONE 306-382-3443 306-838-3705 200-382-3443 Page 1 of 2 mAME Jeff Clark Michelle Javan PhillipTracy .-- �- - Steven Schmitz | --� Taras Yaremchuk DESCRIPTION OF CONTENTS QTY DATED COMPANY BNBuUdans DLR Group BN Builders, Inc. DLR Group BN8ui|ders 1 6/26/2020 TFTLE DATE: (D� B14[L Jeff.Clark@bnbuilders.c om 'avan@d|rgroup.cUrn PhiUip.tracy@bnbu||ders .corn � - sschnnitz@d|rgroVp^corn taras.yaremchuk@bnbui 7]CRFI #47O.1_Addit|ona| Con|erLocatkon.pdf NVMoE SCALE ra sm~ttaS 6/30/2020 02471 PHONE 306-382-3443 206-461- OO65�73-6OhS - - 306-382-3443 206-461- 6044x73-6044 205-382r3443 SIZE Page 2 of 2 Request for Information RFI No: 470.1 BNBmi|dmns Tukwila Justice Ctr Construct. 15005 Tukwila InterBlvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: June 26, 2020 Submitted To: Steve Schmitz DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Additional Cooler Monitoring Discipline: Mechanical Subcontractor: Johansen Construction Co., Inc Question Submitted 6y:Bill Brown BN Builders, Inc. 2601 4th AvenueSuite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor RFI Na Date Required: 7/3/2020 RFI 470idendfied2coolers that required additional monitoring Itwas mentioned during aseperatecommissioning meeting that a third cooler will need monitoring Please provide location This will require additional rework and programming Answer Provide two additional receptacles and dedicated circui s for evidence coolers so there are Utilize existing pathway for existing fridge circuit. Ammnnarmdbr Sean Avery - DLR Group total ofreceptacles/circuits. Date Answered: 06/30/2020 Copies To: Company & Contact Fax Notes Page 1 of 1 RF DLR Group. Utilize existing pathway for 2; dd tion l Circuit Add second dp ex for additional Circuit: eItMFAU§ItElt@NTER - 1St FLOOR EVIDENCE A139 Al & A2 FREEZER & REFRIGERATOR LOCKERS < A134 < A129 C17.1 MONEY VESTIBU E < A142 DLR Group. dditiarl frlgtcr receptacle fOr r1 Iatd comer < A142 RH 470 REFERENCE DLR Group DLR Group '71 " mr PROJECT � City ofTukvvi|a]us�DATE s : 5/14/3030 73-17158-00 SUBJECT: TJC RFI #470_Additional Cooler RFI ID 470 Location TYPE: RFI Tnxwsn///«LID: 03350 PURPOSE: Answered VIA: Info Exchange QUESTION: SuGGeSToom: ANSWER: FROM NAME Michelle Javan To During the commissioning meeting, it was brought up that there are multiple "coolers" that are owner furnished and installed that are to be monitored by the BMS. These cooler locations are not indicated on the drawings. Please provide, the quantity, Models and locations of aforementioned "coolers". This will require rework and have additional cost associated with the change. Response (Answered) from: Steven Schmitz (DLR Group) Remarks: There is one refrigerator and one freezer identified in the contract documents "FF&E' as provided by owner. See provided info for Hoshizaki Steve Schmitz - DLR Group COMPANY EMAIL PHONE 206-461- 6065x736065 DLR Group mjavan@dIrgroup.com NAME COMPANY Bill Brown BNBu|ders Shiels Obletz Ethan Bernau Johnsen Geri Urbas 8NBuUder; Jeff Clark BNBuilders EMAIL bil|.brown@bnbu|ders.c om ethanb@sojsea.com geh.urbas@bnbu1|densc om leff.Clark@bnbDid8rS.c om PHONE 206-382-3443 206-838-3705 206-382-3443 206-383-3443 Page 1 of 2 RFI 470 FOR REFERENCE Transmitcal 5/14/2020 02350 NAME Michelle Javan Steven Schmitz Taras Yaremchuk DE:SCRIP NON OF CON1 ENTS QTY DATED 1 COMPANY DLR Group DLR Group BNBuilders 5/6/2020 TITLE DATE: EMAIL mjavan@dIrgroup.com sschmitz@dlrgroup.com taras.yaremchuk@bnbui Iders.com TJC RFI #470_Additional Cooler Location.pdf NUMBER SCALE PHONE 206-461- 6065x736065 206-461- 6044x73-6044 206-382-3443 SIZE F,c,ge. 2 of 2 BN BNBmi|dens RH 470 FOR REFERE st for Information RFI��� No: -"�~° Tukwila Justice Ctr Construct. 15OO5Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: May 06, 2020 Submitted To: Steve Schmitz DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: AddtionaI Cooler Location Discipline: Mechanical Subm/ttedBy: Bill Brown BN Buliders, Inc. 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor Johansen Construction Co., Inc fuhmontractorRFIAcr 80 Question Date Required: 5/13/2020 During the commissioning meeting it was brought up that there are multiple"coolers" that are owner furnished and installed that are to be monitored by the BMS These cooler locations are not indicated on the drawings Please provide, the quantity, Models and locations ofaffonementioned"coo|ers'. This will require rework and have additional cost associated with the change Answer There is one refrigerator and one freezer identified in the as provided by owner. See provided info for Hoshizaki units. Answered by:Steve Schmitz - DLR Group Date Answered: 05/12/2020 Copies To: Company & Contact Fax Notes Page 1 of 1 .F1470 FOR REFERENCE rr Johansen Mechanical 20109 144th Ave NE Woodinville, WA 98072 (425) 481-2266 Bus (425) 486-6933 Fax DCVR/ RFI DESIGN CLARIFICATION VARIATION REQUEST / REQUEST FOR INFORMATION RFI #: 080 DATE: 05/05/20 TO: BN Builders, Inc. 2601 4th Ave, Suite 350 Seattle, WA 98121 PHONE NUMBER: 206-492-0363 FAX NUMBER: 206-382-3440 ATTENTION: Jeff Clark FROM: Cory Slack PROJECT: Tukwila Justice Center ITEM : cooler locations REF. Detail 33 on M4.2 DESCRIPTION: During the commissioning meeting, it was brought up that there are multiple "coolers" that are owner furnished and installed that are to be monitored by the BMS. These cooler locations are not indicated on the drawings. Please provide, the quantity, Models and locations of afforementioned "coolers" DATE: 5 -May -20 SIGNED BY: COST IMPACT: Yes SCHEDULE IMPACT: Cory Slack REPLY REQUIRED BY: NO 05/11/20 CLARIFICATION: APPROVED DISAPPROVED: VARIATION REMARKS: RECEIVED BY: DATE: APPROVAL: DATE: RF 4-f81fAMUtWdtit@NTER - 1st FLOOR EVIDENCE A139 Al & A2 FREEZER & REFRIGERATOR • LOCKERS A134 MONEY CABINET WR1 STOIA1 CA NE r DLR Grotip: frir9r r for r1cornerr Additional located WR1 STOIA1 CA NE r %L workspace. YOur workstyle. �� °�� �� FOR U �~U~�K_.U`� "~�� ��t@tion 28356�y 5GOl6thAYenuePage 136 / 144 (confd) <�� -- Suite 470 Seattle; VVY\981U8 206.768.8000 vww.opeu'sq.uxn 450 Open Top, No Top Panels CISCO-EAGL 451 10051911 - 62 qt. WeathertighTote Clear SKU#: 10051911 23-1/2^x17-3/4^x11'3/4^h MASTERCARD Quantity 15 Unit Price 28.72 Extended Price 430 80 452 GFD43ESSMVVW 'GB07J5cu. ft. Capacity Front Load Electric Dryer MASTERCARD 1 1,034.47 1,034.47 453 GFW430SSMVVW - GE® 4.5 cu. ft. Capacity Front Load ENERGY STAR® Washer MASTERCARD 454 F2A-FS - Hoshizaki Upright Freezer Steelheart F2A-FS Dimension: 55^VV83.5^D7S.5''H MASTERCARD Tag For Al 1 1,034.47 1.04.47 5,147,13 5, 47.13 455 R2A-FS - Hoshizak Upright Refrigerator S(eeiheart R2A-FS Dimension: 55''VvJJ.5^OT9.5^H MASTERCARD To Fnr 1 3,333.33 3,333.33 - — 456 FREIGHT - FREIGHT HOSHIZAK OPENSQUARE -- -- 467 FREIGHT - FREIGHT MAYLINE OPENSQUARE 1 339.08 339.08 1 137.93 137.93 458 FREIGHT - FREIGHT NORIX OPENSQUARE 194.25 194.25 459 FREIGHT - FREIGHT MAGNUSON GROUP OPENSQUARE 1 3.103.45 3,103.45 460 FREIGHT - FREIGHT DECORATIVE FILMS 1 345.00 345.00 OPENSQUARE 461 FREIGHT ' FREIGHT 8ERNHARDT 1 1,135.39 1,135.39 OPENSQUARE 462 FREIGHT - FREIGHT BLUDOT 1 1,456.32 OPENSQUARE _ NOTE: ORDER SUBJECT TO OPENSQUARE TERMS AND CONDITIONS UNLESS CLIENT AGREEMENT SUPERSEDES. mcorkwby ^���Opc°Stit"°Ily m� 1,456.32 BNBuilders August 10, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for ASI 035 - Security Compliance Revisions Dear Ethan, In accordance with ASI 035 dated 5/20/20, BNBuilders hereby submits our proposal to install an additional camera and intercom in the SE corner of A130 and patch/paint wall. The total proposal of this subject work is Six Thousand Nine Hundred Forty dollars $6,940. This proposal does not include potential additional costs relating to NSS activities. BNB reserves the right to pursue additional costs at a later time for NSS related activities as it pertains to this change. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference 5173 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (geri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dlrgroup.com) BNBu ilders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 B BN Builders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: ASI 035 GENERAL CONTRACTOR: BNBuilders, Inc. COP #: 5173 DATE: 8/10/2020 DESCRIPTION OF CHANGE: install an additional camera and intercom in the SE corner of A130 and patchIpaint wall. BP 0920 Northwest Partition $616.00 BP 09.90 Northwest Complete Contracting $275.71 BP 26.00 Valley $5,718.00 1st -tier Subcontractor Cost Total (Direct Construction Costs) $6,609.71 GC/CM Mark-up on MACC Costs $330.49 5% Rounding Adjustment -$0.20 'Total Change Request $6,940.00 To the best of my knowledge and belief, I certify that all costs listed above are correct, Contractor Signature Date MI NORTHWEST IMMO PARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle, WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Description: ASI #35 - patching drywall at new camera location Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR -0073 External/RCO# GC Ref# Date Aug 07, 2020 Job # 2066 Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 Labor Quantity UOM Unit Total Rate Total Hang Interior GWB Finish Tape Stock D/W - Onsite Clean -Up D/W 1.50 Hrs 1.50 73.76 $110.64 3.00 Hrs 3.00 70.77 $212.31 1.50 Hrs 1.50 72.31 $108.47 1.00 Hrs 1.00 72.31 $72.31 Total Labor $503.73 Material Size Quantity UOM Unit Price Total 5/8" TYPE "X" DRYWALLI X58 4X8 1.00 SHT .414 SQFT $13.25 LITE ALL PURPOSE COMPOUND BOX 1.00 EA 11.82 EA $11.82 Total Miscellaneous Charges Total Material $25.07 Total 68,0 Tax .48% GL Insurance 1% $2.54 $5.31 Total Miscellaneous Charges $7.85 AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers 20006 - 144th Avenue NE, Woodinville, WA 98072 Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: $503.73 $25.07 $0.00 $0.00 $7.85 Sub Total: Overhead 15%: Sub Overhead: $536.68 $79.32 15.00% $0.00 8.00% Total: $616.00 T 425-375-2500 F 425-375-2540 http://www.nwpart.com STEELER CONSTRUCTION SUPP••LY Where customer service still has meaning. Tacoma, WA 540 East 15th Street Tacoma, WA 98422 Telephone: (253) 572-8200 Fax:(253) 572-8400 NORTHWEST PARTITIONS (12) 20006 144TH AVE NE Job: TUKWILA JUSTICE CENTER Location: TUKWILA Bid Number: M20190405002 Bid Date: 4/5/2019 Req. at Jobsite: 9/10/2019 Code 6005162-43 6005162-54 6005162-68 6005200-54 6005200-68 600S200-97 6005250-54 6005250-68 600T125-43 600T125-54 600T150-43 600T150-54 600T150-68 600T200-54 600T200-68 600T200-97 600T250-54 600T250-68 150U50-54 200A200-43 600F5-33 400FS-54 CRCCLIPHVY 1625125-30 162T100-30 2505125-33 250SLT250-33 250T125-33 3625125-30 362S125-33 3625125-43 3625162-43 3625162-54 362S250-54 362S250-68 362T125-30 362T125-33 362T125-43 Description 6" 18 Ga Stud w/ 1-5/8" Leg 6" 16 Ga Stud w/ 1-5/8" Leg 6" 14 Ga Stud w/ 1-5/8" Leg 6" 16 Ga Joist w/ 2" Leg 6" 14 Ga Joist w/ 2" Leg 6" 12 Ga Joist w/ 2" Leg 6" 16 Ga Joist w/ 2-1/2" Leg 6" 14 Ga Joist w/ 2-1/2" Leg 6" 18 Gauge Track w/ 1-1/4" Leg 6" 16 Gauge Track w/ 1-1/4" Leg 6" 18 Gauge Track w/ 1-1/2" Leg 6" 16 Gauge Track w/ 1-1/2" Leg 6" 14 Gauge Track w/ 1-1/2" Leg 6" 16 Gauge Track w/ 2" Leg 6" 14 Gauge Track w/ 2" Leg 6" 12 Gauge Track w/ 2" Leg 6" 16 Gauge Track w/ 2-1/2" Leg 6" 14 Gauge Track w/ 2-1/2" Leg 1-1/2" Black Iron 16 Gauge 2" x 2" Framing Angle 18 Gauge 6" x 20 Ga Flat Stock Backing 4" x 16 Ga Flat Stock Backing Clip for Cold Rolled Channel Heavy Gauge 1-5/8" 20 Gauge Stud 1-5/8" 20 Gauge Track w/ 1" Leg 2-1/2" 20 Gauge Stud 2-1/2" 20 Gauge Slotted Track 2-1/2" 20 Gauge Track w/ 1-1/4" Leg 3-5/8" 20 Gauge Stud 3-5/8" 20 Gauge Stud 3-5/8" 18 Gauge Stud 3-5/8" 18 Ga Stud w/ 1-5/8" Leg 3-5/8" 16 Ga Stud w/ 1-5/8" Leg 3-5/8" 16 Ga Joist w/ 2-1/2" Leg 3-5/8" 14 Ga Joist w/ 2-1/2" Leg 3-5/8" 20 Gauge Track w/ 1-1/4" Leg 3-5/8" 20 Gauge Track w/ 1-1/4" Leg 3-5/8" 18 Gauge Track w/ 1-1/4" Leg UOM Container Per Unit Price LF Studs 1000 LF 1306.8 LF Studs 1000 LF 1640.4 LF Studs 1000 LF 2065.2 LF Studs 1000 LF 1791.6 LF Studs 1000 LF 2254.8 LF Studs 1000 LF 4317.6 LF Studs 1000 LF 2008.8 LF Studs 1000 LF 2538 LF Track 1000 LF 1135.2 LF Track 1000 LF 1459.2 LF Track 1000 LF 1200 LF Track 1000 LF 1507.2 LF Track 1000 LF 1888.8 LF Track 1000 LF 1777.2 LF Track 1000 LF 2104.8 LF Track 1000 LF 3979.2 LF Track 1000 LF 1651.2 LF Track 1000 LF 2403.6 LF Each 1000 LF 436.8 LF Each 1000 LF 625.2 LF Each 1000 LF 970.8 LF Each 1000 LF 873.6 EA Pieces 1 EA 0.828 LF Studs 1000 LF 594 LF Track 1000 LF 562.8 LF Studs 1000 LF 447.6 LF Track 1000 LF 954 LF Track 1000 LF 519.6 LF Studs 1000 LF 532.8 LF Studs 1000 LF 997.2 LF Studs 1000 LF 1296 LF Studs 1000 LF 986.4 LF Studs 1000 LF 1286,4 LF Studs 1000 LF 2580 LF Studs 1000 LF 2060.4 LF Track 1000 LF 478.8 LF Track 1000 LF 950.4 LF Track 1000 LF 1226.4 STEELER coNsTRuC1'tON SUPPLY ere customer service still has meaning. Tacoma, WA 540 East 15th Street Tacoma, WA 98422 Telephone: (253) 572-8200 Fax:(253) 572-8400 NORTHWEST PARTITIONS (12) 20006 144TH AVE NE Job: TUKWILA JUSTICE CENTER Location: TUKWILA Bid Number: M20190405002 Bid Date: 4/5/2019 Req. at Jobsite: 9/10/2019 362T125-54 362T250-33 362T250-54 362T250-68 600S125-30 6005125-33 6005162-33 600T125-30 600T125-33 150A150-30 SECURI.0-16 SECURACLP B1XW B412NB CJGWB LWAP LWTAPING PTAPE X58 X58H1 X58MM R X58DURO 400CH-33 400JT-33 X1SWLGLAS BULLET3 Bullet Strips 300A300-54 3-5/8" 16 Gauge Track w/ 1-1/4" Leg 3-5/8" 20 Gauge Track w/ 2-1/2" Leg 3-5/8" 16 Gauge Track w/ 2-1/2" Leg 3-5/8" 14 Gauge Track w/ 2-1/2" Leg 6" 20 Gauge Stud 6" 20 Gauge Stud 6" 20 Ga Stud w/ 1-5/8" Leg 6" 20 Gauge Track w/ 1-1/4" Leg 6" 20 Gauge Track w/ 1-1/4" Leg 1-1/2" x 1-1/2" Framing Angle 20 Gauge AMICO Security Mesh 1" x 16 Gauge AMICO Secure Clip 300/Carton B1XW Corner Bead B4 - 1/2" No Bead L Metal Control Joint for GWB #093 USG e Weight All Purpose Joint Compnd 3.5 gal ite Weight Taping Joint Compnd 3.5 gal 2-1/16" Paper Tape - 500'/Roll 5/8" Type X GWB 5/8" Type X High Impact GWB 5/8" Type X Mold & Moisture Resistant GWB 5/8" Type X Cementitious Backer Bd 4" 20 Gauge Shaftwall Stud 4" 20 Gauge J Track 1" Fiberglass Shaftwall Liner Wallboard Ballistic/Bullet Panel - Level 3 Level 3 strips 3" x 3" framing angle 16 GA LF LF LF LF LF LF LF LF LF LF SF EA LF LF LF EA EA EA SF' SF SF SF LF LF SF SF LF LF Track Track Track Track Studs Studs Studs Track Track Each Sheets Boxes Boxes Boxes Boxes Box Box Rolls Sheets Sheets Sheets Sheets Studs Track Sheets Sheets Each Each 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF piece container 1000 LF 1000 LF 1000 LF container container container 1000 SF 1000 SF 1000 SF 1000 SF 1000 LF 1000 LF 1000 SF piece piece 1000 LF 1044 1380 1651.2 2403.6 718.8 1380 1183.2 661.2 903.6 331.2 95.58 364.0 364.0 364.0 .82 .82 4.8 414 1256.4 594 1098 1254 864 1038 769.524 0 1170 Tukwila Justice Center SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center Contractor Name: BNBuilders DESCRIPTION OF CHANGE: CCD/ASI #: COP #: DATE: 46 8/7/2020 Spot prime and repaint 1 walls for ASI 35 Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractor's Total Direct Cost Subcontractors Mark-up (Excludes Labor Premium) Labor Premium $205.50 $34.25 $0.00 $239.75 $35.96 $0.00 To al Subcontractor Direct Costs + Mark-up + Labor Premium $275.71 Total Sub -tier Subcontractor Costs 15% Subcontractors Mark-up on Sub -tier Subcontractor(s) $0.00 8% 'Total Subcontractor Change Request $275.71 To the best of my knowledge and belief, I certify that all costs listed above are correct. Brian Biermanski 8/7/2020 Contractor Signature Date COP Cost Breakdown Project Name: Tukwila Justice Center Project No. 118021.100 Contractor BNBuilders, Inc. Work Description: Spot prime and repaint 1 walls for ASI 35 CCD/RFI: CP #: Date: 8/7/20 46 Description Quantity Unit Prod. Hours A.1. Labor A.1. Labor Premium B. Material C. Equipment $/hour Cost $/hour Cost $/Unit Costs $/Unit Costs $ - $ - $ - Labor 3 68.50 $ 206 - - $ - $ - $ - Paint 1 Gallon - 24.00 24 $ - 1.5" Tape 1 Roll $ - 6.97 7 - Masking Paper 1 Roll $ - 3.28 3 $ - $ - - _ $ - $ - - $ - - $ - - $ - - $ - $ - $ - $ - $ - $ - $ - $ - . $ - - $ - $ - - $ - - - - $ - - $ - $ - $ - $ - $ - - - $ - $ - - Total Cost of Work A. $ 206 - - B. 34 C. $ - TOTAL CHANGE PRICE: $ 5,718.00 I !ALLEY "The Electrical Solution VALLEY ELECTRIC CHANGE ORDER PROPOSAL Tukwila Justice Center Contract: 118021.1-05 PROPOSAL DESCRIPTION: ASI 35 - Added camera and talk through communicators. SL # Addendum# RFI# DATE 6/22/2020 VE JOB # 19146 Time Ext Rqrd (days): 5 VE CP # 029 Self Performed Work LABOR COST 11.78 hrs $90,62 $ 1,067.50 SUPERVISION 0.0% Ibr $ - SAFETY 0.0% Ibr $ - SMALL TOOLS 0.0% Ibr $ MATERIAL COST $ 152.55 EQUIPMENT COST 24' Scissor Lift Month $ - SUBTOTAL COST: OH & PROFIT - SELF 15.0% Subcontractor Quotes GO -TEK JCI Quote Quote SUBTOTAL DIRECT COST QUOTES: OH & PROFIT - SUBS 8.0% Bond Permit Fee BIM hrs 85.00 $ 1,220.05 $ 183.01 $ 560.00 $ 3,435.00 $ 3,995.00 $ 319.60 NOTE: 1) Proposal valid for acceptance within 30 days. 2) While Valley Electric considers our proposal amount full compensation for this change, we expressly reserve the right to seek additional time and compensation at a later date for the impact of multiple changes, if any, or for indirect costs that were not reasonably foreseen by Valley Electric at the time of settlement on this change. 3) This construction change has been estimated using the drawings furnished; an engineering evaluation of the drawings, for function and compatibility with the vendor furnished equipment, has not been performed, 4) Permit costs are specifically excluded. Should this change, or it become necessary to procure/pay for an increased permit fee this would become an added cost to the change price reflected above. Our proposal amount does not include the following: - Overtime / Shift Work - Fireproofing Repairs - Concrete/GWB Repairs - Shutdown Costs - Painting and Patching Valley Electric Co. Job #19146 Detailed Labor and Material Breakdown Contract # 19146 - CP #029 - ASI 35 Add Camera, Talk Through Communicator and Backboxex Total Material $ 152.55 Page 1 of 1 Print: 6/22/2020 Total Labor 11.78 Item Description Qty Net Price U Labor U Total Mat($) Total Hours on 3/4" CONDUIT - EMT 90 67.7 C 5 C $60.93 4.50 on 3/4" CONN SS STL - EMT 2 29.69 C 10 C $0.59 0.20 on 3/4" COUPLING SS STL - EMT 1 34.33 C 5 C $0.34 0.05 on 3/4" CONN COMP STL - EMT 2 89.86 C 30 C $1.80 0.60 on 3/4" COUPLING COMP STL - EMT 7 99.76 C 14 C 6.98 0.98 on 3/4" 1-H STRAP - EMT - STEEL 11 12.15 C 4 C $1.34 0.44 on 3/4" SNAP CLOSE CLIP - 2 169.25 C 7.2 C $3.39 0.14 on 3/4" SNAP CLOSE CLIP ON ANGLE BRKT 2 126.45 C 8.2 C $2.53 0.16 on 3/4" FLEX - STEEL 10 63.54 C 5 C $6.35 0.50 on CBL - CMP CAT6A UTP BLU 70 0.44 E 11.08 M $30.80 0.78 on 4x 1 1/2" SQ BOX COMB KO 1 294.08 C 30 C $2.94 0.30 on 4x 1 1/2" SQ BOX 2 281.29 C 30 C $5.63 0.60 on 4" SQ 1G PLSTR RING 5/8" RISE 1 93.77 C 15 C $0.94 0.15 on #10x3/4 P/H SELF -TAP SCREW 2 8.19 C 3.1 C $0.16 0.06 on #8x1/2 WAFER HEAD SHEET MTL SCREW 5 5.87 C 2.31 C $0.29 0.12 on CCTV CAMERA HOUSING 1 0 E 0.92 E $0.00 0.92 on 22/2AWG 88 114 M 10 M $10.03 0.88 on TELESCOPING BRACKET 5 3.5 E 0.08 E $17.50 0.40 on on SUB COORDINATION (As Needed) 0 1 E $0.00 0.00 on POSTING/RECORD DWGS 0 0.589055 E $0.00 0.00 on CLEAN UP (.5% Lbr) 0 0.0589055 E $0.00 0.00 on TESTING (.75% Lbr) 0 0.0883583 E $0.00 0.00 on WARRANTY (As Needed) 0 0.117811 E $0.00 0.00 on Totals: $152.55 11.78 CONFIDENTIAL a) -o GO-TEK Auto a ion 128118th Ave West Suite A202 -A203 Everett, WA 98204 COR 2020.01 Va Justice Center. Date June 2, 2020 TEK AUTOMATION ey Electric — GO-TEK Eng. Services for Tukwila Services Performed By: GO-TEK Automation 128118th Ave yVent Suite A202 -A203 Everett, WA 98204 Services Performed For: Valley Electric 1100 Merrill Creek Parkway Everett, WA 98203 This Change Order Request (COR) is issued pursuant to the Current Projecin Process between Valley Electric ("Client") and GO-TEK Automation ("Contractor"), effective June 2, 2020 (the "Agreement"). This COR is subject to the terms and conditions contained in the Agreement between the two parties and are made a part thereof. Any term not otherwise defined herein shall have the meaning specified in the Agreement. In the event of any conflict or inconsistency between the terms of this COR and the terms of this Agreement, the terms of this COR shall govern and prevail. This COR# 2020.01 Valley Electric — GO-TEK Eng. Services (hereinafter called the "COR"), effective as of June 2, 2020, is entered into by and between Contractor and Client, and is subject to the terms and conditions specified below. The Exhibit(s) to this COR, if any, shall be deemed to be a part hereof. In the event of any inconsistencies between the terms of the body of this COR and the terms of the Exhibit(s) horeto, the terms of the body of this COR shall prevail. Period of Performance These Services shall commence on June 2, 2020, and are valid through the end of the Purchase Order July 30 2020, and is valid for a period of one year. GO-TEK will initiate a rate and services review with VaIIey Electric at 45 days prior to contract end date. Scope of Work Contractor shall provide the Services and Deliverable(s) as follows: " Integrate camera #100(V942O-W31OM|R-XS)into SCADA system, ° JU8TTALK'V2" Duplex Talk Through Communicator is a standalone unit and will not be integrated into the SCADA system — No Action 2020.0/Valley Electric —GO'7EKEng. Services Anc �� Schedule Fee ������Une This engagement wilbe conducted on a Time & Materials basis. Client agrees to the hourly rates and expenses as defined within this Fee Schedule. Engineering and Field Services will be billedY2 hour increments. Contractor will provide a minimum of one resource based on the following functional/rate structure: Engineering — to Integrate #100 Camera Travel Time Per Diem when Onsite Expenses — Above and beyond the Fixed expenses Total Cost of Change Order Terms • $560 00 The above change order amount will be included either as an additional invoice or as part of a final invoice. Change orders are subjecto the payment schedule set forth by the original contract. All invoices are Net -30 days. Completion Criteria • Is defined as either an approved completion of the scope of work or the Project Lead informing GO-TEK the work is complete. • IN WITNESS WHEREOF, the parties hereto have caused this COR to be effective as of the day, month and year first written above. 1100 Merrill Creek Parkway ; Everett, WA 98203 By: Valley Electric Name: Collin Tuthill Title: Project Manager Collin Tuthill — Project Manager 2020.0/Valley Electric —GQ'7EK Eng. Services Purchose d By: GO-TEK Automation Name: Chris Ryan Title: Project Manager 2 Tukwila Justice Johnson Controls Proposal ASI 035 6/4/2020 Johnson ( Controls Visitor Visitation room Taik Through Communicator 1 $ 2,162 $ 2,162 Vicon vy^zu^WxzoM/x-XsCamera 1 $ 455 $ 455 Camera License $ 68 $ 68 Labor 1 $ 750 $ 750 $ - 3,435 1 Excludes Installation 3 Excludes Cabling 4 Excudes Network Switch Expansion (not antipicated) 5 John McInnes Johnson Controls 74AIA ��� 2017 Document ��� N�� �� � � Architect's Supplemental Instructions PROJECT: (name and 73~17158'00 City of Tukwila Justice Center Tukwila, WA 98188 OWNER: (name and address) City of Tukwila 268OSouUhConterBlvd. Tukwila, WA 98188 CONTRACT INFORMATION: Contract For: General Construction Date: April 02, 2018 ARCHITECT: address) DLR GrouInc. (a Washingto Corporation) 51 University Street, Suit 600 Seattle, WA 98101 ASI INFORMATION: ASI Number: 035 Date: May 20, 2020 CONTRACTOR: (name andaddress) BNBuilders 2601 Fourth Avenue, Suite 350 Seattle, WA 98121 The Contractor shall carry out the Work in accordance with the following supplemental instructions withouchange in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will be no change in the ContracSum or Contract Time. (Insert a detailed o'escription of the Architect's supplementalinstructions and, if applicable, attach or reference specific exhibits.) May 20, 2020 DRAWINGS VOLUME 2 OF 2 ITEM NO. 1 SHEET SEl]A—SEC. ELEC. PLAN, LEVEL l—AREA .A A. Add aVicon, 2K4Pwall mounted camera part #V942Q'VV3lOM|R'X5inOpen Office Al3U. Mount the camera ut9''6''AFF and ensure the camera has an unobstructed view of the "JUSTTALK" unit and window. Route cabling and conduit to MDF A107. Coordinate with other disciplines as required. B. Add "JUSTTALK-V2" DuplexTo|kThmu h Cm nicutor units at OpenOfficeAJ3OendJVHuNingAJ22 Mount the units at 2'-10" AFF to the top, just below the window with microphones and speakers side pointing down. Provide the volume control knobs on the staff side and secure the units with tamper resistant torx stainless steel screws. Provide 12VDC power supplies in the security equipment rack in MDF A107. Route 12VDC power wire with ground to the units using 34" raceway provided by Division 26. Provide 22 AWG intercom audio cables as required. C. Division 26 shall furnish and install two (2) shallow single -gang boxes and 3/4" conduit for the units. Offset backboxes on the staff side wall so they are not back to back. Conceal backboxes and conduit along the staff side wall and route conduit to MDF A107. ITEM NO. 2 SHEET SE4.6 — SEC. ELEC., IP VIDEO RISER A. Add camera #100 to IP Video Riser diagram ITEM NO. 3 SHEET 3E4.7—SEC. ELEC., IP VIDEO SCHEDULE A. Add camera #100 to camera schedule. ASI — PREA C compliance Revision ATTACHMENTS Drawing Attachments: DRAWING SHEET SElJA—SEC. ELEC. PLAN, LEVEL l—AREA A DRAWING SHEET SE4.6 — SEC. ELEC., IP VIDEO RISER DRAWING SHEET SE4,7 — SEC. ELEC., IP VIDEO SCHEDULE ISSUED BY THE ARCHITECT DLR Group, Inc (a Washington Corporation). ARCHITECT (Firm name) SIGNATURE Erica Loynd, Project Manager PRINTED NAME AND TITLE May 5, 2020 DATE AIA Document G710" - 2017. Copyright (3, 1979, 1992 and 20 17 by The American Institute of Architects. All rights reserved. The "American Institute of Archltects,"AlA," the AIA Logo, and 'AIA Contract Documents' are registered trademarks and may not be used without permission This document was produced by AIA software at 21:08:20 ET on 05/20/2020 under Order No.8182007020 which expires on 04/01/2021, is not for resale, is licensed for one-time useonly, and may only be used in accordance with the AIA Contract Documents° Terms of Service. To report copyright violations, e-mail copyrightgala.orgUser Notes: (3B9ADA35) 1 O Y -Q Camera Schedule E U 4 p 0 cD -o 0 c 0 0 1 0 0 0 0 aas U< CO W C Cf) • co f 6/SE6.3 2/SE6.3 2/SE6.3 2/SE6.3 3/SE6.3 Cr) W cc CO W c 3/SE6.3 Cr) W cc C) W N CO W h 4/SE6.3 4/SE6.3 4/SE6.3 C) LO ® r 15' 0" O N4) T- 0 T- 15' 0" Q N T- ® N T- 0 N T- 0 N r 0 N r o r ® 00 O 00 ® - O 00 O oo 180° 180° 180° 180° 180° o 0) O 0) O c3) o 0) O c) O _ o 0) o rn 0 0) 0 0) iL CL El. XCRNR XCRNR XCRNR X XCRNR V -1020 -VVIR -180 V-1020-WIR-180 V -1020 -VVIR -180 0 co T- 0 N 0 1- V-1020-WIR-180 V-1020-WIR-180 V988D-W311 MIR V988D-W311 MIR V988D-W311 MIR V988D-W311 MIR V988D-W311 MIR V988D-W311 MIR V942D-W310M I R -XS V942D-W310M I R -XS V942D-W310M I R -XS V942D-W310MIR-XS Exterior Camera Exterior Camera Exterior Camera Exterior Corner Exterior Corner Exterior Corner Exterior Dome Camera Exterior Dome Camera Exterior Dome Camera Exterior Dome Camera Exterior Dome Camera Exterior Dome Camera Wide Angle Camera Wide Angle Camera Wide Angle Camera Wide Angle f-'omor' v- 0 N 0 08 0) 0 0 T- - N T- CID r- 4- — Lr) T- c0 e- Im- T- CO T- 0) T- 0 N T- N June 4, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 482 & 429 — Framing/Furr Out Revisions Dear Ethan, BNBuilders hereby submits our proposal for RFI 482 & 429 — Framing/Furr Out Revisions The total proposal of this subject work is one thousand four hundred and thirty-seven dollars $3,323.00. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5178 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (qeri.urbas(@,bnbuilders.com) Steve Schmitz (sschmitz@dIrqroup.com) BNBuilders 2601 45 Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 BNBui ders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 482 COP #: 5178 GENERAL CONTRACTOR: BNBuilders, Inc. DATE: 6/4/2020 DESCRIPTION OF CHANGE: RFI 482 - Furr out wall and paint to cover plumbing line by east storefront RFI 429 - Resize door opening to fit mechanical equipment/grill in vestibule ceiling BP 09.20 Northwest Partition BP 09.90 Northwest Complete Contracting ist-tier Subcontractor Cost Total (Direct Construction Costs) $3,039.001 $126.07 $3,165.07 GC/CM Mark-up on MACC Costs $158.25 5% Rounding Adjustment -$0.32 Total Change Request $3,323,00 To the best of my knowledge and belief, 1 certify that all costs listed above are correct Contractor Signature Date ON NORTHWEST IM\IPARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle,WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Description: RFI #482 - added furring wall Hage 1 ot 1 REQUEST FOR CHANGE ORDER Ref.# COR -0056 External/RCO# GC Ref# Date May 29, 2020 Job # 2066 Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 Labor Layout Frame Interior Hang Interior GWB Finish Tape Stock D/W - Onsite Clean -Up D/W Material 5/8" TYPE "X" DRYWALL! X58 LITE TAPING COMPOUND LITE ALL PURPOSE COMPOUND 2 1/2" STUD 1 5/8" FLANGE (33MILS) 20GA 2 1/2" TRACK 1 1/4" LEG (33MILS) 20GA Equipment 19' SCISSOR LIFT-2WD ELEC - JLG 1930ES - Genie GS -1930 - SKYJACK-SJ1113219 Total Miscellaneous Charges Size 4'X12' BOX BOX 14' 10' Quantity UOM Unit Total 0.25 Hrs 0.25 2.00 Hrs 2.00 Hrs 6.00 Hrs 1.50 Hrs 1.50 Hrs Quantity UOM 1.00 SHT 1.00 EA 1.00 EA 3.00 PCS 1.00 PCS Quantity UOM 10.00 EA 2.00 2.00 6.00 1.50 1.50 Rate 77.57 72.31 73.76 70.77 72.31 72.31 Total $19.39 $144.62 $147.52 $424.62 $108.47 $108.47 Total Labor Unit Price .414 SQFT 11.82 EA 11.82 EA .7368 LF .5196 LF $953.09 Total $19.87 $11.82 $11.82 $30.95 $5.20 Total Material Unit Price 3.41 EA $79.66 Total $34.10 Total Equipment $34.10 Total B&0 Tax .48% GL Insurance 1% $5.12 $10.72 Total Miscellaneous Charges $15.84 AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers 20006 - 144th Avenue NE, Woodinville, WA 98072 Run on: May 29, 2020 7:35 AM Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: Sub Total: Overhead 15%: Sub Overhead: $953.09 $79.66 $0.00 $34.10 $15.84 $1,082.97 $160.03 $0.00 15.00% 8.00% Total: $1,243.00 T 425-375-2500 F 425-375-2540 http://www.nwpart.com STEELER CONSTRUCTION SUPPLY Where customer service still has meaning. Tacoma, WA 540 East 15th Street Tacoma, WA 98422 Telephone: (253) 572-8200 Fax:(253) 572-8400 NORTHWEST PARTITIONS (12) 20006 144TH AVE NE Job: TUKWILA JUSTICE CENTER Location: TUKWILA Bid Number: M20190405002 Bid Date: 4/5/2019 Req. at Jobsite: 9/10/2019 Code 6005162-43 6005162-54 6005162-68 6005200-54 6005200-68 600S200-97 6005250-54 6005250-68 600T125-43 600T125-54 600T150-43 600T150-54 600T150-68 600T200-54 600T200-68 600T200-97 600T250-54 600T250-68 150U50-54 200A200-43 600FS-33 400FS-54 CRCCLIPHVY 1625125-30 162T100-30 2505125-33 2505LT250-33 250T125-33 3625125-30 3625125-33 3625125-43 3625162-43 3625162-54 362S250-54 3625250-68 362T125-30 362T125-33 362T125-43 Description 6" 18 Ga Stud w/ 1-5/8" Leg 6" 16 Ga Stud w/ 1-5/8" Leg 6" 14 Ga Stud w/ 1-5/8" Leg 6" 16 Ga Joist w/ 2" Leg 6" 14 Ga Joist w/ 2" Leg 6" 12 Ga Joist w/ 2" Leg 6" 16 Ga Joist w/ 2-1/2" Leg 6" 14 Ga Joist w/ 2-1/2" Leg 6" 18 Gauge Track w/ 1-1/4" Leg 6" 16 Gauge Track w/ 1-1/4" Leg 6" 18 Gauge Track w/ 1-1/2" Leg 6" 16 Gauge Track w/ 1-1/2" Leg 6" 14 Gauge Track w/ 1-1/2" Leg 6" 16 Gauge Track w/ 2" Leg 6" 14 Gauge Track w/ 2" Leg 6" 12 Gauge Track w/ 2" Leg 6" 16 Gauge Track w/ 2-1/2" Leg 6" 14 Gauge Track w/ 2-1/2" Leg 1-1/2" Black Iron 16 Gauge 2" x 2" Framing Angle 18 Gauge 6" x 20 Ga Flat Stock Backing 4" x 16 Ga Flat Stock Backing Clip for Cold Rolled Channel Heavy Gauge 1-5/8" 20 Gauge Stud 1-5/8" 20 Gauge Track w/ 1" Leg 2-1/2" 20 Gauge Stud 2-1/2" 20 Gauge Slotted Track 2-1/2" 20 Gauge Track w/ 1-1/4" Leg 3-5/8" 20 Gauge Stud 3-5/8" 20 Gauge Stud 3-5/8" 18 Gauge Stud 3-5/8" 18 Ga Stud w/ 1-5/8" Leg 3-5/8" 16 Ga Stud w/ 1-5/8" Leg 3-5/8" 16 Ga Joist w/ 2-1/2" Leg 3-5/8" 14 Ga Joist w/ 2-1/2" Leg 3-5/8" 20 Gauge Track w/ 1-1/4" Leg 3-5/8" 20 Gauge Track w/ 1-1/4" Leg 3-5/8" 18 Gauge Track w/ 1-1/4" Leg UOM LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF LF EA LF LF LF LF LF LF LF LF LF LF LF LF LF LF Container Per Studs 1000 LF Studs 1000 LF Studs 1000 LF Studs 1000 LF Studs 1000 LF Studs 1000 LF Studs 1000 LF Studs 1000 LF Track 1000 LF Track 1000 LF Track 1000 LF Track 1000 LF Track 1000 LF Track 1000 LF Track 1000 LF Track 1000 LF Track 1000 LF Track 1000 LF Each 1000 LF Each 1000 LF Each 1000 LF Each 1000 LF Pieces 1 EA Studs 1000 LF Track 1000 LF Studs 1000 LF Track 1000 LF Track 1000 LF Studs 1000 LF Studs 1000 LF Studs 1000 LF Studs 1000 LF Studs 1000 LF Studs 1000 LF Studs 1000 LF Track 1000 LF Track 1000 LF Track 1000 LF Unit Price 1306.8 1640.4 2065.2 1791.6 2254.8 4317.6 2008.8 2538 1135.2 1459.2 1200 1507.2 1888.8 1777.2 2104.8 3979.2 1651.2 2403.6 436.8 625.2 970.8 873.6 0.828 594 562.8 447.6 954 519.6 532.8 997.2 1296 986.4 1286.4 2580 2060.4 478.8 950.4 1226.4 STEELER CONSTRUCTION SUPPLY Where customer service still has meaning. Telephone: (25 Tacoma, WA 540 East 15th Street Tacoma, WA 98422 572-8200 Fax:(253) 572-8400 NORTHWEST PARTITIONS (12) 20006 144TH AVE NE Job: TUKWILA JUSTICE CENTER Location: TUKWILA Bid Number: M20190405002 Bid Date: 4/5/2019 Req. at Jobsite: 9/10/2019 362T125-54 362T250-33 362T250-54 362T250-68 6005125-30 600S125-33 600S162-33 600T125-30 600T125-33 150A150-30 SECUR1.0-16 SECURACLP B1XW B412NB CJGWB LWAP IAA/TAPING PTAPE X58 X58H1 X58MMR X58DURO 400CH-33 400JT-33 X1SWLGLAS BULLET3 Bullet Strips 300A300-54 3-5/8" 16 Gauge Track w/ 1-1/4" Leg 3-5/8" 20 Gauge Track w/ 2-1/2" Leg 3-5/8" 16 Gauge Track w/ 2-1/2" Leg 3-5/8" 14 Gauge Track w/ 2-1/2" Leg 6" 20 Gauge Stud 6" 20 Gauge Stud 6" 20 Ga Stud w/ 1-5/8" Leg 6" 20 Gauge Track w/ 1-1/4" Leg 6" 20 Gauge Track w/ 1-1/4" Leg 1-1/2" x 1-1/2" Framing Angle 20 Gauge AMICO Security Mesh 1" x 16 Gauge AMICO Secure Clip 300/Carton B1XW - Corner Bead B4 - 1/2" No Bead L Metal Control Joint for GWB #093 USG eight All Purpose Joint Cornpnd 3.5 eight Taping Joint Copnd 3.5 ga LF LF LF LF LF LF LF LF LF LF SF EA LF LF LF Track Track Track Track Studs Studs Studs Track Track Each Sheets Boxes Boxes Boxes Boxes 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF 1000 LF piece container 1000 LF 1000 LF 1000 LF 2-1/16" Paper Tape - 500'/Roll 5/8" Type X GWB 5/8" Type X High Impact GWB 5/8" Type X Mold & Moisture Resistant GWB 5/8" Type X Cementitious Backer Bd 4" 20 Gauge Shaftwall Stud 4" 20 Gauge J Track 1" Fiberglass Shaftwall Liner Wallboard Ballistic/Bullet Panel - Level 3 Level 3 strips 3" x 3" framing angle 16 GA EA SF SF SF SF LF LF SF SF LF LF Rolls Sheets Sheets Sheets Sheets Studs Track Sheets Sheets Each Each finer' container container 1000 SF 1000 SF 1000 SF 1000 SF 1000 LF 1000 LF 1000 SF piece piece 1000 LF 1044 1380 1651.2 2403.6 718.8 1380 1183.2 661.2 903.6 331.2 95.58 364.0 364.0 364.0 ,82 4.8 414 1256.4 594 1098 1254 864 1038 769.524 0 1170 Chris Ayers From: Sent: To: Subject: Chris- Here you go Reveca Franco <FrancoR@steeler.com> Tuesday, February 11, 2020 6:59 AM Chris Ayers; Terry Henry RE: Tukwila Justice Center - steel pricing request ASAP 2. 800T125-54 12' 2 pieces= 1720 mft From: Chris Ayers [mailto:ChrisA@nwprtzom] Sent: Tuesday, February 11, 2020 6:37 AM To: Terry Henry <HenryTsteeler.com> Cc: Reveca Franco <FrancoR@steeler.com> Subject: Tukwila Justice Center - steel pricing request ASAP Importance: High Morning Terry and Reveca, Can I get quick pricing please for 2 items. 1. DOO512S'S412'3pieces 2. OOOT12S'S412'2pieces Thank you, aorta NORTHWEST rdroPARMIONS �E��|/l��K�/��T|K��T[\A —_ - _ .� �'__���'...._-..P: 425.375.2500 D: 425.375.2519 20006 144th Ave NE, Woodinville, WA 98072 Lets go GREEN save the planet! (Please do not print email unless you need it.) Click here to report thiemail as spam. This email omascanned hyRhJcfeodo This email message, including any attachments, is for sole use of the intended reci ieot and may contain confidential and privileged info' illation. Any unauthorized review, use, disclosure, or distribution is prohibited. 1 NORTHWEST PARTITIONS Sales Rep: Connor Ball Ahern Rentals Cat -Class Cat/Class Description Account Pricing *AII Pricing is confidential* ^ !A R Account # 265218 Contact 11. 425-241-8004 Effective Date: 9/1/18 Rates Expire: 6/30/19 Typical Make/Model Daily Weekly 620-5745 SCISSORt.IFT,19',32 '`,ELECT Electric Scissor Lifts Skyjack S11113219 115 250 4 Week 345 620-5754 SC1SSORLIFT,26',32 ,ELECT Skyjack SJ1113226 165 $ 325 575 620-5755 SCISSORLIFT,26',46",ELECT Skyjack SJII14626 $ 165 $ 325 $ 575 620-5784 SCISSORLI FT,32',46-48",ELECT Skyjack 511114632, JLG 3246E5 185 475 795 620-5759 SCISSORLIFT,26',68",GAS,4X4 All Electric Scissor Lifts larger then 32please call for quote fuel Sciswr Lifts (exit) Skyjack 51682611T, Genie GS-2668RT 195 450 865 620-5786 SCISSORLIFT,32',68",GAS,4X4 Skyjack516832RT, Genie GS-3268RT $ 215 $ 515 990 620-5798 SCISSORLIFT,43',GA5,4X4 Skyjack SJ8243, Genie GS-439ORT 285 $ 720 $ 1,500 620-5799 605-5645 605-5670 SCISSORLIFT,53',GA5,4X4 Genie GS-5390RT All scissor lifts larger then 53' please call for quote FORKLIFT,3600-5000LB,15'7",YARD FORKLIFT,5900LB,19',TELESCOPING Yard/Warehouse Forklifts Hyster H50, Yale GP050 $ 347 Reach Forklifts Xtreme 5919 140 195 $ 941 495 595 2,500 885 $ 1,595 605-5675 FORKLIFT,6000LB,36',TELESCOPING Skytrak 6036 340 $ 1,175 $ 1,925 605-5683 FORKLIFT,8000LB,42',TELESCOPING Xtreme XR842, Skytrak 8042 365 $ 1,275 2,350 605-5686 FORKLIFT,10000LB,54',TELESCOPING Skytrak 10054 $ 485 $ 1,575 $ 3,250 615-5711 LIFT,PERSONNEL,12',ELECT,2 MAN ermine' Lifts JLG 1230ES, Snorkel 1‘412 $ 105 $ 200 350 615-5721 LI FT,PERSONNEL,20',DRIVABLE,ELEC JLG 20MVL, Genie GR20 $ 125 250 400 600-5799 BOOM,ARTICULATED,30',NARROW,ELEC, W/J16 Boom UftsEioarlc JLG E300AJ $ 200 800 $ 1,475 600-5850 BOOM,ARTICULATED,40',ELECTRIC,NARROW JLG E400AN, Genie Z40/23N 325 $ 900 1,575 600-5857 600-5852 BOOM,ARTICULATED,45',ELECT JLG E450,41, Genie Z45/25J DC nigenummi„„,,„gottiggfogottgoolzogogocapionnommob....ohno BOOM,TELESCOPING,40',DSL,4X4 JLG 400S, Genie S40 325 $ 350 900 $ 895 $ 1,575 1,625 600-5797 BOOM,TELESCOPING,45',DSL,W/JIB Snorkel TB47J, Skyjack 5145T $ 350 $ 895 $ 1,625 600-5866 BOOM,TELESCOPING,60',DSL,4X4 JLG 600S, Genie 560, Snorkel TB60 $ 420 $ 1,095 $ 1,995 600-5879 Additional: * All pricing is in U.S. Dollars and does not include Sales Tax or Environmental Recovery Fees * Delivery and pick up will be charged at $75 each way (per truckload) on standard loads within 30 miles of the servicing Ahern branch. * Deliveries over 30 miles, requiring permit, oversized loads or outside of normal business hours may be subject to additional fees. BOOM,TELESCOPING,66',DSL,W/JIB,4X4 JLG 66051, Snorkel TB66J All reach boom lifts larger then 66' please call for quote. 420 $ 1,095 $ 1,995 Add $150 roundtrip delivery/pick-up fee, Environmental Fees and WSST (10.1% in most cities) to the above rates. Take monthly total, add round trip fee, add in 10.1% for taxes to come up with a total. Take the total and divide by 20 man days in a rental month to get cost per man day, divide by 8 to get hourly rate. Example: 19' scissor lift: $345/month + $150 trip fee = $495 x 10.1% for tax = $545 $545/ 20 man days = $27.25 /day /8 hours = $3.41 per hour = charge rate. Page 1 of 1 Ahern Initials Customer Initials $126.07, Tukwila Justice Center SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center Contractor Name: BNBuilders DESCRIPTION OF CHANGE: CCD/ASI tt: COP #: DATE: RFI # 482 26 6/112020 Extra Work Painting East Plumbing Line near Area A Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractors Total Direct Cost Subcontractor's Mark-up (Excludes Labor Premium) Labor Premium $ 109.63 $16.44 $0.00 'Total Subcontractor Direct Costs + Mark-up + Labor Premium Total Sub -tier Subcontractor Costs 15% Subcontractors Mark-up on Sub -tier Subcontractor(s) $0.00 8% frotal Subcontractor Change Request $126.07 To the best of my knowledge and belief, I certify that all costs listed above are correct. Sheila Rost 6/1/2020 Contractor Signature Date COP Cost Breakdown Project Name: Tukwila Justice Center Project No. 118021.100 Contractor BNBuilders, Inc. Work Description: Extra Work painting fur wall Area A Storefront CCD/RFI: 482 CP #: 26 Date: 6/1/20 Description Quantity Unit Prod. Hours Al. Labor A.1. Labor Premium B. Material C. Equipment $/hour Cost $/hour Cost $/Unit Costs $/Unit Costs - _ - Labor 1.25 68.50 $ 86 - . $ - - - Paint 1 Gallon - 24.00 $ 24 $ - $ - $ - - _ - - $ - $ - - $ - - - $ - - $ - $ - $ - - - - $ - - - $ - - $ - $ - - - - $ - - - $ - - - $ - - _ $ - - _ $ - - - $ - - _ _ $ - - ' - $ - $ - - _ $ - _ _ $ - - $ - ' _ _ $ - . - Total Cost of Work A. 86 $ - $ - B. 24 C. - �-�N �� � �� ��Group DLR Group PROJECT: SUBJECT: TYPE: PURPOSE: QUESTION: SUGGESTION: ANSWER: FROM NAME Michelle Javan TO NAME Bill Brown Ethan Bernau Geri Urbas Jeff Clark Michelle Javan Steven Schmitz City of Tukwila Justice Center 73-17158-00 TJC RFI #482_East Plumbing Line near Area A Storefront RFI Answered RFI Tran DATE SENT: RFI ID: TRANSMII IAL ID: 5/27/2020 482 02383 VIA. Info Exchange Please reference P1.1A and the attached photos. The minimum width of the 90 degree fitting for HB -2 just south of Gridline 9 cannot fit within the wall cavity. Is it acceptable to for the pipe to exit the wail as shown in this location? if unacceptable, an alternative option would be to notch the wall out to incase the plumbing line. Response (Answered) from: Samuel Taufen (DLR Group) Remarks: Furr out wall over plumbing pipe as needed to conceal equipment. Steve Schmitz - DLR Group 05.27.20 COMPANY DLR Group : COMPANY BNBuilders Johnsen BNBuilders 8N8u|ders PHONE 206-461- 6065x736065 EMAIL PHONE bill om ethanb@sojsea.com geh.urbaa��bnbu1|dera.c .~~,,..._~..~~~~.~ OM ]eff.C]ark@bnbuUdera.c om DLR Group n@d|rgroup^com DLR Group |sschmitz@d(rgmup.com 206-382-3443 206-838-3705 206-382-3443 206-382-3443 206-461- 6065x736065 206 -461 - Page 1 of 2 NAME Taras Yaremchuk DESCRIPTION OF CONTENTS QTY DATED COMPANY EMAIL RFI T DATE: ID: BNBuilders nsr ttal 5/27/2020 02383 PHONE 6044x73-6044 taras.yaremchuk@bnbui 206-382-3443 Iders.com TITLE TIC RFI #482_East 1 5/21/2020 Plumbing Line near Area A Storefront. pdf NUMBER SCALE SIZE Page 2 of 2 Request for Information RFI No: 482 BNBmi|dwns Tukwila Justice Ctr Construct. 15005Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: May 21, 2020 Submitted To: Steve Schmitz DLR Group, Inc 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: 3/4^ East Plumbing Line near Area A Storefront Discipline: Plumbing Submitted By: Bill Brown BN Builders, Inc ZGO14th Avenue, Suite 3SO Seattle, WA 98121 Tel: (206)382-3443 Subcontractor Subcontractor RFI No. Question Date Required: 5/20/2020 Please reference P1.1A and the attached photos The minimum width of the 90 degree fitting for HB -2 just south ofGridline9 cannot fit within the wall cavity. Is it acceptable to for the pipe to exit the wall as shown in this locatioa If unacceptable, an alternative option would be to notch the wall out to incase the plumbing line Answer Furr out wall over plumbing pipe as needed to conceal equipment. Answered by: Steve Schmitz - DLR Group Date Answered: 05/27/2020 Copies To: Company & Contact Fax Notes Page 1 of 1 NORTHWEST IWO PARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle, WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Description: RFI #429 resizing openings for frame height changes. r-clyc 1 1 REQUEST FOR CHANGE ORDER Ref.# COR -0050 External/RCO# GC Ref# Date Apr 07, 2020 Job # 2066 Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 Labor Layout Frame Interior Hang Interior GWB Finish Tape Stock D/W - Onsite Clean -Up D/W Material 6" STUD 1 1/4" FLANGE (33MILS) 20GA 6" TRACK 1 1/4" LEG (33MILS) 20GA 5/8" TYPE "X" DRYWALL! X58 90 DEG PAPER BEAD WITH METAL EXTRA WIDE EVEN LEG LITE ALL PURPOSE COMPOUND Equipment 19' SCISSOR LIFT-2WD ELEC - JLG 1930ES - Genie GS -1930 - SKYJACK-SJ1113219 Total Miscellaneous Charges Size 14' 10' 4'X12' 10' BOX Quantity UOM Unit Total Rate 0.50 Hrs 0.50 77.57 8.00 Hrs 8.00 72.31 2.00 Hrs 2.00 73.76 5.00 Hrs 5.00 70.77 1.50 Hrs 1.50 72.31 1.50 Hrs 1.50 72.31 Quantity UOM 4.00 PCS 3.00 PCS 1.00 SHT 2.00 EA 2.00 EA Quantity UOM 15.00 EA Total $38.79 $578.48 $147.52 $353.85 $108.47 $108.47 Total Labor Unit Price 1.38 LF .9036 LF .414 SQFT .364 LF 11.82 EA $1,335.58 Total $77.28 $27.11 $19.87 $7.28 $23.64 Total Material Unit Price 3.41 EA $155.18 Total $51.15 Total Equipment $51.15 Total B&O Tax .48% GL Insurance 1% $7.40 $15.49 Total Miscellaneous Charges $22.89 AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers 20006 - 144th Avenue NE, Woodinville, WA 98072 Run on: April 7, 2020 12:06 PM T 425-375-2500 Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: $1,335.58 $155.18 $0.00 $51.15 $22.89 Sub Total: Overhead 15%: Sub Overhead: $1,564.71 $231.29 15.00% $0.00 8.00% Total: $1,796.00 F 425-375-2540 http://www.nwpart.com DLR Group DLR Group RFI T ,� ns PROJECT' City of Tukwila Justice Center DATE SENT: 4/2/2020 73-17158-00 SUBJECT: TJC RFI #429_Door B119.1 & RFI ID 429 B119.2 Heights TYPE: RFI TRANSMITTAL ID: 02157 al PURPOSE: Answered VIA: Info Exchange QUESTION: SUGGESTION: ANSWER: FROM NAME Michelle Javan TO NAME On sheet A9.3 detail 24 shows the door frames at 119.1 to be 101-0". Back when the submittal was reviewed door 119.1 was submitted as 9'-4" and door 119.2 as 10'-0" with a comment to change 119.2to91-0". When iooking at the vestibule area B119 there is MEP in the way which would necessitate to change the door frames heights. By 119.1 there is a duct with it's lowest point at 81-7" and by 119.2 sprinkler lines at 9'-7". It is proposed to change both of these door heights to 816T! to avoid these conflicts. Please confirm this solution is acceptable. Please also confirm if the window above the doors into be deleted or shrunk in size. Response (Answered) from: Steven Schmitz (DLR Group) Remarks: Door B119.1 has been clarified as no conflict. Door B119.2 (inner storefront), lower transom as needed to avoid as -built header. This solution is acceptable. Steve Schmitz - DLR Group 04.02.20 Taras Yaremchuk Bill Brown COMPANY DLR Group BNOm||dens BNBu||dara EMAIL EMAIL taras.yaremchuk@bnbui om 206-461- 6065x736065 PHONE 206-382-3443 206-382-3443 Page 1 of 2 NAME Brenna Christensen Ephram Harsh Ethan Bernau Geri Urbas Jeff Clark Michelle Javan Sabrina Ames Steven Schmitz DESCRIPTION OF CONTENTS COMPANY BNBuilders BNBuilders Johnsen BNBuilders BNBuilders DLR Group DLR Group DLR Group RFI T DATE: ID: an ttal 4/2/2020 02157 EMAIL PHONE brenna.christensen@bn 206-382-3443 206-382-3443 ers.com ethanb@sojsea.com geh.urbas@hnbui|ders.c om om QTY DATED TITLE TJC'RFI #429Door _ 1 3/24/2020 B119.1 & 9.2 Heights javan@d|rgroup.conn 206-838-3705 306-382-3443 206-382-3443 206-461- ' 6065x730065 206-461- 6094x73-6094 206-461- 6044x73-6044 Page 2 of 2 Request for Information RFI No: 429 BNBmi|dmrm Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: March 24, 2020 Submitted To: Steve Schmitz Submitted By: Taras Yaremchuk DLR Group, Inc. BNBuilders 51 University Street 26O14th Avenue, Suite 35O Suite 600 Seattle, WA 98121 Seattle, WA 98101 Tel: (206)382-3443 Fax: (206)382-3440 Tel: 206.461.6000 Fax: 206.461.6049 Subject' Door 119.1 & 119.2 Heights Discipline: Architectural Subcontractor Subcontractor RFI Na Question Date Required: 3/31/2020 On sheet A9.3 detail 24 shows the door frames at 119.1 to be 10'-0". Back when the submittal was reviewed doorl 9.1 was submitted as9''4''and door 11Q2ay1O''U"with acomment tochange 11g.2tog''O''. When looking at the vestibule area 1119 there is MEP in the way which would necessitate to change the door frames heightsBy 11g.1there baduct with its lowest point at8'-7"and bv110.Zsprinkler lines atQ'-7". It is proposed to change both of these door heights to81-6" to avoid these conflicts Please confirm this solution is acceptable Please also confirm if the window above the doors is to be deleted or shrunk in size Answer Door B119.1 has been clarified as no conflict. Door B119.2 (inner storefront), lower transomas needed to avoid as -built header. This solution is acceptable. Steve DLR GroupDate Answered: 04/02/2020 Answered by: Copies To: Company & Contact Fax Notes Page 1 of 1 B N B BN uliders July 9, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 502 - East Storefront Exit Signs Dear Ethan, In accordance with RFI 502 dated 6/22/20, BNBuilders hereby submits our proposal to supply/install two emergence self -luminous exit devices above the East Storefront doors and provide 5 extra exit devices as requested in preparation of final inspection. The total proposal of this subject work is Three Thousand Three Hundred Twelve dollars $3,312. There is a zero day impact to the Project Schedule. BNB has not proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference 5204 in the forthcoming change order. Sincerely, JeffClark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (geri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dlrgroup.com) BNBuilders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 $3,154.001 B BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 502 GENERAL CONTRACTOR: BNBuilders, Inc. COP #: 5204 DATE: 7/9/2020 DESCRIPTION OF CHANGE: supply/install two emergence self -luminous exit devices above the East Storefront doors and provide 5 extra exit devices as requested in preparation of final inspection. IBP 26.00 Valley lst-tier Subcontractor Cost Total (Direct Construction Costs) Additional NSS GC/CM Mark-up on MACC Costs Rounding Adjustment ITotal Change Request To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date $3,154.00 $0.00 $157.70 $0.30 $3,312.00 TOTAL CHANGE PRICE: $ 3,154.00 I VALLEY "The Electrical Solution VALLEY ELECTRIC CHANGE ORDER PROPOSAL Tukwila Justice Center Contract: 118021.1-05 PROPOSAL DESCRIPTION: RFI 502 - Swapping out (2) exits signs at the store front. Includes provision of an additional (5) exit signs for potential future changes (material only). SL # DATE 7/7/2020 Addendum# VE JOB # 19146 Time Ext Rqrd (days): 5 RFI# 502 VE CP # 032 Self Performed Work LABOR COST SUPERVISION SAFETY SMALL TOOLS MATERIAL COST EQUIPMENT COST 24' Scissor Lift -2.83 hrs $96.12 $ (272.02) 0.0% Ibr 0.0% Ibr 0.0% Ibr $ OH & PROFIT - SELF 15.0% Subcontractor Quotes Quote Quote Quote Quote Month $ SUBTOTAL COST: SUBTOTAL DIRECT COST QUOTES: OH & PROFIT - SUBS 8.0% Bond Permit Fee BIM hrs 85.00 $3,014.93 $ 2,742.91 411.44 NOTE: 1) Proposal valid for acceptance within 30 days. 2) While Valley Electric considers our proposal amount full compensation for this change, we expressly reserve the right to seek additional time and compensation at a later date for the impact of multiple changes, if any, or for indirect costs that were not reasonably foreseen by Valley Electric at the time of settlement on this change. 3) This construction change has been estimated using the drawings fumished; an engineering evaluation of the drawings, for function and compatibility with the vendor fumished equipment, has not been performed. 4) Permit costs are specifically excluded. Should this change, or it become necessary to procure/pay for an increased permit fee this would become an added cost to the change price reflected above. Our proposal amount does not include the following: - Overtime / Shift Work Fireproofing Repairs - Concrete/GWB Repairs - Shutdown Costs - Painting and Patching Valley Electric Co. Job #19146 19146 - CP #032 - RFI 502 Store Front Exits R2.xls Contract # Page 2 of 2 Print: 7/7/2020 Description Qty Net Price U Labor U Total Mat( $) Total Hours #12/2C CABLE MC - STL ARMOR -55 359 M 26 M ($19.75) -1.43 3/8" CONN SADDLEGRIP MC -4 63.75 C 10 C ($2.55) -0.40 4x 2 1/8" SQ BOX COMB KO -2 363.65 C 30 C ($7,27) -0.60 EXIT SIGN 7 435.05 E 0 E $3,045.35 0.00 1/2" 1-H STRAP - EMT - STEEL -10 8.57 C 4 C ($0.86) -0.40 SUB COORDINATION (As Needed) 0 1 E $0.00 0.00 POSTING/RECORD DWGS 0 -0.1415 E $0.00 0.00 CLEAN UP (.5% Lbr) 0 -0.01415 E $0.00 0.00 TESTING (.75% Lbr) 0 -0.021225 E $0.00 0.00 WARRANTY (As Needed) 0 -0.0283 E $0.00 0.00 Totals: $3,014.93 -2.83 CONFIDENTIAL Date: Jun 22, 2020 Quote: GRASB20-19456-1 works to your advantage Project TUKWILLA JUSTICE CENTER - Nuclear exit Location Quote GRASB20-19456-1 To: Collin Tuthill Valley Electric 1100 Merrill Creek Parkway Everett WA 98203 Phone: (425) 405-0832 Fax: (425) 407-0578 EMail: collint@velectric.com QTY Type MFG Part -2- EXIT 7 SIGNTEX EMA-10-1-R-BA Quote Page 1/2 Graybar Electric Company, Inc. 1919 6th Avenue South Seattle WA 98134 Phone: (206) 292-4848 Fax: (206) 701-2949 From: Jodi Gabriel Quoter Ph: (206) 701-2671 email: jodi.gabriel@graybar.com For Bid Date Jun 22, 2020 Expires Jul 22, 2020 Total: Price UQ ExtPrice $435.05 • $870.10 $3,045.35 Graybar Electric Company, Inc. Jodi Gabriel Page 1/2 ���� ����up DLR Group PROJECT: SUBJECT: TYPE: PURPOSE: QUESTION: SUGGESTION: ANSWER: FROM TO NAME Michelle Javan NAME Bill Brown Ethan Bernau Geri Urbas Jeff Clark Michelle Javan Phillip Tracy Steven Schmitz City of Tukwila Justice Center 73-17158-00 TJC RFI #502_B100.1 & B100.2 Exit Signs RFI Answered VIA: Info Exchange RFI T nsm~ttaN DATE SENT: RFI ID: TxyNSMz//xLID: 6/22/2020 502 02453 Along the East storefront, there is a steel HSS beam between the upper and lower storefront sections. Therefore, there is no available space to install a concealed conduit pathway to the two exit signs above doors B100.1 & B100.2. Please confirm it is acceptable to use a mounted Emergence SeIf-Luminous Sign (See attached product data). Response (Answered) from: Scan Avery (DLR Group) Remarks: Confirmed, please use the Emergence Self -Luminous Sign as proposed. DLR Group COMPANY BNBuilders Shiels Obletz Johnsen BNBuilders BNBuilders DLR Group BN Builders, Inc. DLR Group EMAIL EMAIL am ethanb@sojsea.com om ]eff.C|8rk@bnbVi|ders.c om mjavan @d|rgroup.onrn PhiUip,tnacy@bnbui|dens .corn PHONE 206-461- 6065x73-6065 PHONE 206-382-3443 206-838-3705 206-382-3443 206-382-3443 206-461- 6065x73-6065 206-382-3443 206 -461 - Page 1 of 2 NAME Taras Yaremchuk COMPANY DESCRIPTION OF CONTENTS BNBui|ders QTY DATED 1 6/22/2020 DATE: co: EMAIL ,) 1 PHONE 6044x73-6044 barao�anern bnbui --�~ 200-382-3443 S��tt�0 6/22/2020 02453 � TITLE NUMBER SCALE B100.2 Exit Signs.pdf SIZE Page 2 of 2 B N B BNBuilders Request for Information RFI No: 502 Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: June 22, 2020 Submitted To: Steve Schmitz DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: B100.1 & B100.2 Exit Signs Discip/ine: Electrical Subcontractor Valley Electric Co. Question Along the East storefron there is a steel HSS beam between the available space to install a concealed conduit pathway to the two acceptable to use a mounted Emergence SelfLuminous Sign (See Answer Submitted By: Bill Brown BN Builders, Inc. 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor RFI Na' Date Required: 6/29/2020 upper and lower storefront sectionsTherefore, there is no exit signs above doors g10.1 & B100.2. Please confirm it is attached product data). Answered by: Response (Answered) from: Sean Avery (DLR Group) Remarks: Confirmed, please use the Emergence Self-Lumhous Sign as proposed. Date Answered: Copies To: Company & Contact Fax Notes Page 1 of 1 w z J ¢ w z J Emergence Self- Luminous Signs Aluminum Housing Series EMA LIGHTING • INTERNALLY ILLUMINATED BY SELF- LUMINOUS TRITIUM GAS LAMPS WITH GUARANTEED LUMINOUS LIFE UP TO 20 YEARS, AS SPECIFIED. • OBSERVATION TESTED FOR VISIBILITY UP TO 125 FT IN COMPLETE DARKNESS. • NO ELECTRICAL CONNECTIONS, NO HEAT GENERATED, AND NO MAINTENANCE REQUIRED FOR THE LIFE SPECIFIED, UP TO 20 YEARS. SUITABLE FOR USE IN WET LOCATIONS. • OUTPUT AT 525 NANOMETER WAVELENGTH (GREEN) PROVIDES MAXIMUM VISIBILITY IN LOW AMBIENT BRIGHTNESS. • No EXTERNAL LIGHT REQUIRED FOR ACTIVATION. CODES & APPROVALS • MANUFACTURED AND TESTED TO UL STANDARD 924 AND LIFE SAFETY CODE NFPA 101 AND NATIONAL ELECTRICAL CODE ARTICLE 500, CLASS I AND II CONDITIONS. SEALED SOURCE AND DEVICE REGISTERED WITH USNRC FOR DISTRIBUTION TO GENERAL LICENSEES. FIXTURE SCHEDULE MODEL APPROVAL CATALOG NO JOB INFORMATION EMA.08.07.06 CONSTRUCTION • DOUBLE- WALL HOUSING OF EXTRUDED ALUMINUM WITH MINIMUM WALL THICKNESS OF .09" (2.3MM). No VISIBLE MOUNTING HARDWARE. • STANDARD FINISH: SATIN ANODIZED BRUSHED ALUMINUM; OPTIONAL FINISHES AVAILABLE IN PAINTED ENAMEL COLOR. • POLYCARBONATE FACEPLATE WINDOW OF .125 (3 MM) MINIMUM THICKNESS. • UNIVERSAL FIELD ADJUSTABLE CHEVRON ARROWS AND UNIVERSAL MOUNTING BRACKETS. WARRANTIES • UNCONDITIONAL WARRANTY IS PROVIDED AGAINST FAILURE TO MEET REQUIRED STANDARDS OF ILLUMINATED LIFE, AS SPECIFIED ON THE PRODUCT LABEL. DESIGNED & MANUFACTURED IN THE USA Intertek CONFORMS TO UL 924/ CSA 22.2 #141 )Signtex LIGHTING SPECIFIED EMERGENCY Inc LIGHTING Emergence Aluminum Housing Luminous Signs Series EMA Self- SUGGESTED SPECIFICATIONS: Supply and install Signtex, Inc EMERGENCE Series EMA self luminous EXIT signs illuminated by tritium gas lamps. The housing shall be fabricated from extruded aluminum with overall dimensions of 14" x 9" x 3/4", having a minimum external wall thickness of .09" and a polycarbonate window of .125" minimum thickness. Universal mounting brackets shall be supplied. For signs specified w ith a luminous life of 10 years, the minimum initial brightness measured at any point on the external surface shall be 0.12 ft L (.21 cd/m2 ); for any other specified lifetime, the minimum surface brightness shall be 0.012 ft L (.021 cd/m )2per year of specified luminous life. MOUNTING DATA & DIMENSIONS: 14" (356 mm) STANDARD MOUNTS 9" (229 mm) OPTIONAL CANOPY MOUNTS E ‹ ) 5" (127 mm) ORDERING INFORMATION: EMA 10 MODEL SERIES EMA USEFUL LIFE 10=10 YRS 20=20 YRS EMA.08.07.06 OPTIONS & ACCESSORIES: DESCRIPTION CODE Pendant Mount Kit Canopy Mount Kit White Housing Black Housing —I 3/4" (19mm) 1 1/2" (38 mm) SINGLE DOUBLE FACE FACE EXAMPLE: EMA1 01 GBA-PEN 1 NO. OF FACES 1=1 2=2 Signtex Inc 220 VFWAvenue,Grasonville,MD21638 TEL:(410)827-8300 Fax:(410)827-8866 sales@signtexinc.com www.signtexinc.com FACE COLOR IMVIn G=GREEN "COLOR"= CUSTOM COLOR BA -PEN HOUSING COLOR BA= BRUSHED ALUMINUM PEN CAN B OPTIONS/ ACCESSORIES SEE ABOVE DISTRIBUTOR: BNBuilders June 30, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 496 - Additional Door Thresholds & Gaskets Dear Ethan, In accordance with RFI 496 dated 6/24/2020, BNBuilders hereby submits our proposal to provide new thresholds on the exterior doors and new gasketing on interior doors per email direction on 6/4/2020. The total proposal of this subject work is One Thousand Seven Hundred Fifty Two dollars $1,752. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference 5205 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (geri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dIrgroup.com) BN Builders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 $1,668.651 BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 496 GENERAL CONTRACTOR: BNBuilders, Inc. COP #: 5205 DATE: 6126/2020 DESCRIPTION OF CHANGE: provide new thresholds on the exterior doors and new gasketing on interior doors per email direction on 614/2020. 1BP 08.10 Doors, Frames and Hardware lst-tier Subcontractor Cost Total (Direct Construction Costs) Additional NSS GC/CM Mark-up on MACC Costs Rounding Adjustment $1,668.65 $o.00 $83.43 -$0.08 Total Change Request $1,752.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date Tukwila Justice Cenber SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 496 COP #: 5205 Contractor Name: BN Builders DATE: 612612020 DESCRIPTION OF CHANGE: provide new thresholds on the exterior doors and new gasketing on interior doors per email on 614/2020. Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractors Total Direct Cost Subcontractors Mark-up (Excludes Labor Premium) Labor Premium $1,451.00 $217.65 $0.00 'Total Subcontractor Direct Costs + Mark-up + Labor Premium $1,668.65 Total Sub -tier Subcontractor Costs 15% Subcontractor's Mark-up on Sub -tier Subcontractor(s) $o.OO 8% ITotal Subcontractor Change Request $1,668.65 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date COP Cost Breakdown Project Name: Tukwila Justice Center Project No. 118021.100 Contractor BNBuilders, Inc. Work Description: CCD/RFI: 0 CP #: 0 Date: 1/0/00 Description Quantity Unit Prod. Hours A.1. Labor A.1. Labor Premium B. Material C. Equipment $/hour Cost $/hour Cost $/Unit Costs $/Unit Costs Additional Door Gasket Sets 57 $ - 15.00 $ 855 $ - Additional Exterior Thresholds 6 $ - 99.33 $ 596 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $- $ - $ - $ - $ - $ - $ - $ - $ - - $ - $ - $- $ - $ $ - $ - $ - $- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Total Cost of Work A. $ - $ - $ - B. $ 1,451 C. $ - DATE: June 5, 2020 BN Builders FAX: ATTN: Bill Brown PROJECT: Tukwila Justice CHI JOB: 11634 187OONorth Creek Parkway 'SUITE 110 BOTHELL, WASHINGTON 98011 TEL (206) 298-4770 FAX (206) 298-4777 WE HAVE REVIEWED REVISIONS PER AND DETERMINED THEY WOLJLD RESULT IN A NET ADD OF$ 855. MATERIALS TAX TOTAL THIS PRICE REVISION IS FOR Adding 57 gaskets sets S44D 17 = $ 15. x 57 = $ 855. Gaskets are in stock at CHI REVISION FORM G.C. REF # gaskets CHI REF # ERP CO# HARDWARE $ 855. HOLLOW METAL $ WOOD DOORS $ DOOR SOURCE $ FREIGHT PRODUCTS PER SECTION WE WILL NOT PROCEED WITHOUT A SIGNED COPY OF THIS PROPOSAL OR ARE IN RECEIPT OF A WRITTEN CHANGE ORDER. SINCERELY, CONTRACT HARDWARE INC. Bill Brown From: Schmitz, Steve <sschmitz@DLRGROUP.com> Sent: Thursday, June 4, 2020 4:07 PM To: Bill Brown Cc: Jeff Clark; Austin Proctor; Wade Hall Bill, Pernko S44 is the appropriate replacement in every instance this occurs except for interview rooms, which require a better sound seal. Let me know if you have any further issues. Steven J. Schmitz, AIA Architect | Associate DLR Group o: 206-461-6000 1 d: 206-461-6044 51 University Street, Suite 600 Seattle, WA 98101 From: Bill Brown <Bill.Brown@bnbujlders.com> Sent: Thursday, June 4, 2020 3:02 PM To: Schmitz, Steve <sschmitz@DLRGROUp.com> Cc: Jeff Clark <Jeff.Clark@bnbuilders.com>; Austin Proctor <Austin.Proctor@bnbuilders.com>; Wade Hall <Wade.Hall@bnbuilders.com> Subject: TJC 5773D Door Gasketin8Issue Steve, As I mentioned on our phone call yesterday, we could have a potential issue with the 5773D smoke screen gasketing that has been spec'd out. I have attached a link to a video that shows you the issue we are running into more clearly. As the gasketing is pretty thick, the doors do not completely close without being forced shut. They naturally want to push back open because of the gasketing. In the video, I'm in room A112 and demonstrate a natural close and then a forced close. Before we install the rest of these, would like to confirm this is the intent. Call me if you have any questions. Link to video: https://bnbuilders.egnvte.com/d1/0E24Bxj1s1 Bill Brown |8NBulders zeo14th Avenue, Suite aon|Seattle, WA 98121 206.382,3443 office 1 206.382.3440 fax 1 206A92.0363 cell 1 18706 North Creek Parkway , SUITE 110 BOTHELL, WASHINGTON 98011 TEL (206) 298-4770 FAX (206) 298-4777 REVISION FORM DATE: June 25, 2020 BN Builders FAX: ATTN: Bill Brown PROJECT: Tukwila Justice CHI JOB: 11634 WE HAVE REVIEWED REVISIONS PER RFI#496 G.C. REF # CHI REF # ERP CO# RFI#496 AND DETERMINED THEY WOULD RESULT IN A NET ADD OF $ $525 MATERIALS TAX TOTAL THIS PRICE REVISION IS FOR Adding 6 Pemko thresholds HARDWARE $525. HOLLOW METAL $ WOOD DOORS $ DOOR SOURCE $ FREIGHT $ PRODUCTS PER SECTION WE WILL NOT PROCEED WITHOUT A SIGNED COPY OF THIS PROPOSAL OR ARE IN RECEIPT OF A WRITTEN CHANGE ORDER. SINCERELY, ACCEPTANCE: CONTRACT HARDWARE INC. Steve Sand AHC AUTHORIZED SIGNATURE DATE 0-�0 �� ~ ��|N �� ��Group RFI ����������0ttaN DLR Group PROJECT: City of Tukwila Justice Center DATE SENT: 6/24/2020 73-17158-00 SUBJECT: TJC RFI #496_Door Threshold RFI ID 496 Clarifications TYPE: RFI Tn»m5Ml//ALID: 02458 PURPOSE: Answered VIA: Info Exchange QUESTION: SUGGESTION: ANSWER: FROM 1. All doors that require thresholds where the flooring transitions from carpet to concrete are specified to have a Type A 166 Threshold (see attachment 1). If we use this threshold as planned, the threshold will be slightly angled as shown in the attached photos (see attachments 2-4). Please confirm this is the intent or provide an alternative threshold for these conditions. 2. On the foliowing exterior doors shown below, the threshold currently spec'd is only 2.5" wide. Please reference the attached photo. In these conditions, it is recommended that an 8" threshold be used to cover the expansion joints between the exterior slab and stem wall. If wanted, please provide an alternative threshold model. 51 A119 C129 C128 C127 C102 Response (Answered) from: Steven Schmitz (DLR Group) Remarks: 1) This is acceptable. 2) Pemko 253x5_FG may be used. Steve Schmitz - DLR Group 06.24.20 NAME COMPANY EMAIL PHONE 206 -461 - Michelle Javan | DLR Group | javan@d|ngroupconn6065x73-6065 | Page 1 of 2 TO NAME Phillip Tracy Bill Brown Ethan Bernau Geri Urbas Jeff Clark Michelle Javan Steven Schmitz Taras Yaremchuk DESCRTPTION OF CONTENTS COMPANY BN Builders, Inc. BNBuilders Johnsen BNBuilders BNBuilders DLR Group DLR Group | BN8u||ders RFI Tr DATE: ID: EMAIL PNUip. bnbui|ders .com biU.brnwn@bnbui|ders.c om ethanb@sojsea.com geri.urbas@bnbuilders.c om om � PHONE 206-382-3443 s ~ttaN 6/24/2020 02458 306-382-3443 206-838-3705 206-382-3443 206 -461- 6065x73 -6065 O6 -461- 206-461 6044x73-6044 206-382-3443 QTY DATED NUMBER SCALE Threshold Clarifications.pdf Page 2 of 2 Request for Information RFI No: 496 BNBuilders Tukwila Justice Ctr Construct. 1SO05Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: June 09, 2020 Submitted To: Steve Schmitz Submitted By: Phillip Tracy DLR Group, Inc. BNBuilders 51 University Street 2601 4th Avenue, Suite 350 Suite 600 Seattle, WA 98121 Seattle, WA 98101 Tel: (206)382-3443 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Door Th reshold Clarifications Discipline: Architectural Subcontractor: Subcontractor RFI Question Date Required: 6/16/2020 1. All doors that require thresholds where the flooring transitions from carpet to concrete are specified to have a Type A66 Threshold (see attachment 1). If we use this threshold aop|anned the threshold will be slightly angled as shown in the attached photos (see attachments 2-4). Please confirm this is the intent or provide an alternative threshold for these conditions 2. On the following exterior doors shown be|ovy the threshold cunent|yspedd is only 3.S" wide. Please reference the attached photo. In these conditions, it is recommended that an 8" threshold be used to cover the expansion joints between the exterior slz and stem wall. If wanted, please provide an alternative threshold model Si AI19 C1I9 C1%Q C127 C102 Answer 1) This is acceptable. 2) Perak° 253x5__FG may be used, Steve Schmitz - DLR Group Answered by: Date Answered:06/24/2020 Copfes To: Company & Contact Fax Notes Page 1 of 1 Saddle Thresholds (cont.) 1665 AVAILABLE FINISHES: A, D, G 5/16" (L1) k 169 AVAILABLE FINISHES: A, D, G ANSI (aluminum): J32100, )32130 1/2" 02.71 5" (127.0) 1700 30 (76.2( AVAILABLE FINISH: A ANSI (aluminum): J32100, J32130 1/2" (12.7) n BHMA 170 AVAIL A13IE FINISHES; A, (1, BDG D, G ANSI (aluminum): J32100,132130 ANSI (brass): J12100, J12130 1/2., (12.7) 4" (101.6) n 166 AVAIL/113L[ FINISHE D, G ANSI 01u minim* J32100, J32130 (63.5) n ABLOY The global leader in 105 door opening solutions NOTE: Products shown in this section may not be drawn to scale. AVAILABLE FINISHES FOR PRODUCTS SHOWN ON THIS PAGE (see General Information section for finish chart) B (Mill Finish Extruded Bronze [Brass]) BDG (Bright Dip Gold Anodized) D (Dark Bronze Ano iz d G (Go • Anodized) 800-346-7707 I www.pemko.com NOTE: G is available with limited inventory Check the web site for the up-to-date catalog cony, ight “)201 S-2+)17 Pcmj' H Con Asc, Rep, (ntii( UCH 10 1.14101t1 01 put t tytthout opt ess ye, ita'r, ol l'eroko Alonofounfin, o oh:1nm! IEKUIUEUI A r% BNB BNBuilders June 30, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 499 - DBH-C120 Replacement Dear Ethan, In accordance with RFI 499 dated 6/25/2020, BNBuilders hereby submits our proposal to provide and install a new draft barrier heater in hallway C120. The total proposal of this subject work is One Thousand Thirty Seven dollars $1,037. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference 5207 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (geri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dlrgroup.com) BNBuilders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 B BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 499 GENERAL CONTRACTOR: BNBuilders, Inc. DESCRIPTION OF CHANGE: provide and install a new draft barrier heater in hallway C120. COP #: 5207 DATE: 6/26/2020 BP 22.00 Johanesen $987.69 lst-tier Subcontractor Cost Total (Direct Construction Costs) Additional NSS GC/CM Mark-up on MACC Costs Rounding Adjustment $987.69 $0.00 $49.38 -$0.07 Total Change Request $1,037.00 To the best of my knowledge and belief, I certify that all costs listed above are correct, Contractor Signature Date JOB NAME BILLING CONTRACTOR JOHANSEN JOB # P11960 Johansen Mechanical, Inc. PHONE 425-481-2266 FAX 425-486-6933 CHANGE ORDER DETAIL Tukwila Justice Center DATE: 1 25 -Jun -20 : BN Builders, Inc. JMI COR #: 8030 DESCRIPTION: :The DBH schedule on M6.2 is called out for DBH-C120 to haVe a length of 6'-0". The width of the I 'hallway is only 5'-10" per design. Therefore, the DBH can't fit along the North side as intended. EXCLUSIONS: REFERENCE: SCHEDULE IMPACT: I. LABOR: A. LABOR (FIELD FOREMAN) B. LABOR (FIELD JRNYMAN) C. LABOR (SHOP JRNYMAN) O. LABOR (DELIVERY) E. LABOR (SERVICE) F. DETAILING Q. SHOP FOREMAN/COORD H. PROJECT STAFF U. MATERIAL AND EQUIPMENT A. MATERIALS B. EQUIPMENT C. FREIGHT D. RENTALS E. VEHICLES (lo%mLABOR �") III. SUBCONTRACTORS A. ALL SUBS RS@ RS @ 0.001HRS RS @ 0.00 RS @ / 0.001HRB@ 0.00 HRS @ 0.00 HRS @ LABOR TOTAL $ 101.40 = $ $ 05.06 = $ $ 95.06 = $ $ 79.69 = $ $ 104.92 = $ $ 97.78 = $ $ 101.46 = $ $ 103.73 = $ MATERIAL EQUIPMENT TOTAL SUB SUBTOTAL IV. OTHER DIRECT COSTS A. SAFETY @ B. SMALL TOOLS AND CONSUMABLES @ C. PERMITS 10 .46 - | 0% OF LABOR - OTHER DIRECT COSTS TOTAL V. TOTAL ITEMS I, II, III, AND IV VI. OVERHEAD & FEES A. OVERHEAD B. PROFIT C. SUBCONTRACTOR MARKUP VA ID FOR 30 DAYS TOTAL AMOUNT FOR THIS CHANGE ORDER PROPOSAL � 851.46 127.72 � � � 8.51 987.69 This change proposal only includes costs that can be identified at this time. This change proposal does not include any amount for changes in the sequence of work, delays, disruptions, rescheduling, extended overhead, acceleration or impact costs. Johansen Mechanical expressly reserves the right to address any and all of these and related items of cost prior to final settlement of the contract. r cms Customer: All Bidders Project: Tukwila Justice Center Quote #: 1802'50 Equipment Proposal Engineer: DLR Group Date: June 25, 2020 Addendums:4 Custom frlechanical Solutions,Inc,is proud to offer the foliowing scope of work for your consideration: Base Bid Qty: (1) SteIpro AALUX DraftHeaters, including: ▪ Model: AALUX115071W • Pedestal Mounts ° Thermostat • Ground Freight • Standard One Year Parts Warranty Total Net Price (excluding tax $750 Exclusions: disconnects, special colors, expedited production or freight, startup,labor warranty Above pricing does not include future material surcharges related to steel and aluminum tariffs. All proposals are good for 30 days - please contact your salesperson for any requirements longer than that timeframe. Sincerely, Dave Greenheck Custom Mechanical Solutions, Inc. Direct 206.973.0244 Mobile 425.985.8354 dave@cmswa.com Custom Mechanical Solutions, Inc. I 2810 Eastlake Avenue East, Seattle, WA 98102 cmswa.com 206.973.3900 1/2 ���� 0 �0�� ���� ~_�=~° ~ Group DLR Group PROJECT: SUBJECT: TYPE: PURPOSE: QUESTION: SUGGESTION: ANSWER: FROM NAME Michelle Javan TO ' NAME Bill Brown Ethan Bernau Geri Urbas Jeff Clark Michelle Javan City of Tukwiia Justice Center 73-17158-00 TJC RF#499_DBH C120 Width Conflict RFI Answered VIA: Info Exchange FI Transmittal DATE SENT: RFI ID; TRANSMII IAL ID: 6/25/2020 499 02460 The DBHschedule onMG`2iscalled out for D8H-C12Otohave alength of6''O" The width of the haliway is oniy 5-10' per design. Therefore, the DBH can't fit along the North side as originally intended. The next size down is roughly 60" and operates at 750w compared to the 900w spec'd and has a capacity of 2560 BTU/h compared to the 3071 BTU/h spec'd for that location. Please provide direction as to whether this DBH should be replaced with a smaller DBH. Response (Answered) from: Samuel Taufen (DLR Group) Remarks: The suggested smaller DBH is acceptable to install. COMPANY DLR Group COMPANY BNBuilders Shie|s(]bietz JohnsenBNBuilders BNBuilders DLR Group EMAIL PHONE mjavan@dIrgroup.com 206-461- 6065x73-6065 EMAIL PHONE biU brown��bObui|d�r�.0 | ' 206-382-3443 om ethanb@sojsea.com geh.VrUas@bnbui|ders.c om ]eftC|ark@bnbu||ders.c om javmn@d|rgnnup.corn 206-838-3705 205-382-3443 206-382-3443 206-461- 6065x73-6065 Page 1 of 2 RFI Tr DATE: NAME | COMPANY | EMAIL Phillip Tracy.comSteven Schmitz DLR Group sschmitz@dIrgroup.comtaras.yaremchuk@bnbuiTaras Yaremchuk BNBuildersDESCRIPTION OF CONTENTSPhillip.tracy@bnbuilders BNBuU' d�rs Inc. [QTY DATED TITLE T ' RFI ' 1 | 6/15/2020 | '----'---- — � -- Widthf PHONE 206-382-3443 206-461- 6044x73-6044 206-382-3443 ' ��~tt��Q 6/25/2020 02460 � NUMBER SCALE SIZE Page 2 of 2 Request for Information RFI No: 499 BNBuilders Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB P'ect # 118021.100 Date: June 15, 2020 Submitted To: Steve Schmitz DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: DBH C120 Width Conflict Discipline: Mechanical Subcontractor: Johansen Construction Co., Inc SubmittedBy Bill Brown BN Builders, Inc. 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor RFI No. 83 Question Date Required: 6/22/2020 The DBH schedule on Fv.2 is called out for DBH-C120 to have a Iength of 6'-0". The width of the haliway is only5'-lO' per design. Therefore, the DBH can't fit along the North side as originally intended The next size down is rough| @7' and operates at 750w compared to the 900w specd and has a capacity of 2560 BTU/h compared to the 3071 BTU/h specd for that location. Please provide direction as to whether this DBH should be replaced with a smaller DBH Answer The suggested smaller DBH 15 acceptable acceptable to instaI. Answered by: Sam TaUfeR Date Answered: 0 20 Copies To: Company & Contact Fax Notes Page 1 of 1 Johansen Mechanical inc. 20109 144th Ave NE • Woodinville, WA 98072 (425) 481-2266 Bus - (425) 486-6933 Fax DCVR/ RFI DESIGN CLARIFICATION VARIATION REQUEST / REQUEST FOR INFORMATION RFI #: 083 PHONE NUMBER: 206-492-0363 DATE: 06/12/20 FAX NUMBER: 206-382-3440 TO: BN Builders, Inc. ATTENTION: Jeff Clark 2601 4th Ave, Suite 350 FROM: Josh Blackburn Seattle, WA 98121 PROJECT: Tukwila Justice Center ITEM : DBH C120 REF. M1.1C DESCRIPTION: DBH C120 is shown on the north wall of staff hallway C120. The north wall is 70" wide, DBH C120 overall length is 71-7/8" Please provide direction as to whether this DBH should be replaced with a smaller DBH or relocated to a different wall. As it stands now, if relocated to the east or west wall of the hallway, the DBH would be located on the ramp, and may not look aesthetically pleasing. DATE: 12 -Jun -20 SIGNED BY: COST IMPACT: Yes SCHEDULE IMPACT: Potentially Josh Blackburn REPLY REQUIRED BY: CLARIFICATION: APPROVED DISAPPROVED: VARIATION REMARKS: RECEIVED BY: DATE: APPROVAL: DATE: .SPLIT SYSTEM CONDENSER UNIT SCI- OVER CF OVER DIMENE (LxW; rX G'V ti) 37x37) PyC' CV 37x37) 37x37) 37x37) 37x37) 38x38) () M M M ELECTRICAL DATA W U < M 26 A < M 26 A 26 A < CO 26 A <c<cQ CO N N U 208V 25 CT.- CC? Vr a,6} i3> CD r r r r r r r e- e- v- r 0.4 c5 0.5 fd. AIR FLOW (CFM) r r c - r r r r 7— r V— Voltage O Ch 208 V 208 V 208 V > CO O CV 208 V > 00 O CV 208 V > Oa O CV 208 V > 0 O CV rQlaw, 11„z a Q <C c\[ CA cam[ cv N N CA r r c - Ce W LIJ OR co d; CV OD 06 V; N 21.4 e1; CV V; CV (p - 20.8 co N CAPACITY COOLING (MBH) 0 24 M 24 N N 24 24 c- r SERVES 0 Q: AC -A113 0 Q AC -A224 AC -A225 cci C9 Q AC -C132 o m IU -C128 N 0 Q r-- 0 3 0 CU -AC -A113 0 d 3 0 CU -AC -A224 CU -AC -A225 CU -AC -6120 CU -AC -C132 o 0 co N_ 0 0 CD CA C) 3 0 EEN INDOOR AND OUTDOOR UNITS. SIZE PER MANUFACTURER RECOMMENDATIONS. J- M N 3 W -J CO Z a w CO J Ce W W CO CC LU C7 W O ?- 0 Z w O_ LL U— LU c Z W CD d o w o 0 Lu fc w m W W Cn H Q Z Z O p. Z Cl O 0 0 U z LO til oH Cr)1 ) W 0 X 0 W co m ¢o O m v 0_ 0_ H O 0 Cl O H w QZ U E W CD W Q w N J J w O z j0O S < W C/)—doZU 6 a oc 0 v) 1- .SPLIT SYSTEM INDOOR UNIT SCHEDULE. BASIS OF DESIGN (MITSUBISHI) PKA-A36KA7 PKA-A24KA7 PKA-A36KA7 PKA-A24KA7 PKA-A24KA7 PKA-A24KA7 PKA-A24KA7 PEAD-A24AA7 PHASE VOLTAGE > co O CV 208 V 208 V 208 V 208V 208 V 208 V > 00 O CV Vr r r r r r cq N it LU OQ coal V; N 07 1 21.4 '3; CV 21.4 V; N Cid CD AIR FLOW (CFM) 920 0 920 635 0 M CO 635 CO CO T- In COOLING CAP. TONS O Ch o CV 0 M 0 CV 0 CV 0 CV 2.0 2.0 IX N.,.. <C _ Q AC -A113 a Q <C N cy <L Q AC -A225 N m Q I AC -C132 c) 0 — TECHNICAL SPEC CODE WATTS BTU/H ESIDENTIALUSE 00 W PER LINEAR FOOT CODE FICATIONS VOLTAGE LENGTH WEKFHT PRC! WATTS BTU/H VOLTS IN. LB WORSW CA AALUX106031 300 UX106038 LUX106032 300 300 0X109042 AALUX109047 1024 1024 1024 1536 1536 1536 2,00 300 UX109032 300 300 UX109037 1024 1024 1024 1024 120 23 5/8 208 235/8 240 23 5/8 208 35 7/16 240 35 7/16 277 35 7/16 6.4 6.4 6.4 507.50 507.50 507.50 571.50 9.1 571.50 9.1 571.50 9.1 571.50 574.50 574.50 574.50 638.00 638.00 638.00 638.00 UX112068 UX112062 LUX112067 AALUX115078 AALUX115072 AALUX115077 600 2048 600 2048 600 2048 750 750 750 750 2560 2560 2560 2560 UX112048 UX112042 LUX112047 UX11 AALUX115062 AALUX115057 LUX115055 490 400 400 400 500 500 500 500 x365 1365 1365 1365 1706 1706 1706 1706 In 208 240 277 208 240 277 480 471/4 47 1/4 47 1/4 59 1/16 59 1/16 59 1/16 59 1/16 _ 636.00 703.00 13.6 635.00 703.00 13.6 636.00 703.00 13.6 636.00 703.00 _ 699.50 699.50 699.50 699.50 699.50 16.8 16:8 16.8 16.8 766.50 766.50 766.50 766.50 766.50 AALUX118098 AALUX118092 AALUX118097 AALUX118095 AALUX121101 AALUX121108 AALUX121102 AALUX121107 AALUX121105 1050 1050 1050 1050 1050 3071 3071 3071 3583 3583 3583 3583 3583 2848 8068 600 2048 LUX118062 600 2048 AALUX118087 600 2048 AALUX118065 600 2048 AALUX121071 AALUX121078 AALUX121072 AALUX121077 AALUX121075 700 700 700 700 2388 2388 2388 2386 700 2388 208 240 277 480 70 7/8 707/8 707/8 70 7/8 120 8211/16 208 8211/16 240 8211/16 277 8211/16 480 8211/16 20.0 20.0 20.0 20.0 23.1 23.1 23.1 23.1 23.1 766.50 766.50 766.50 766.50 766,50 833.00 833.00 833.00 0 833.00 830.00 897.00 830.00 897.00 830.00 897.00 830.00 897.00 830.00 897.00 AALUX124128 UX124122 UX124127 1200 UX124125 1200 AALUX127138 AALUX127132 AALUX1271 AALUX12713! 7 1350 1350 1350 1350 4607 4607 4607 4607 880 2730 M On 894.50 961.50 UX124088 800 2730 208 941/2 26,7 894.50 961.50 UX124082 : 800 2730 240 941/2 26.7 894.50 961.50 LUX124087 800 2730 277 941/2 26.7 894.50 1025.00 LUX124085 800 2730 480 941/2 26.7 894.50 961.50 AALUX127098 AALUX127092 LUX127097 0X127095 900 3071 208 106-5/16 26.7 958.00 1025.00 900 3071 240 106 5/16 26.7 958.00 1025.00 900 3071 277 106 5/16 26.7 958.00 1025.00 900 3071 480 1065/16 26.7 958.00 1025.00 Add W for white, SW for soft white or CA for clear anodized (finish) (consult the optional colors chart or contact your °STELPRO representative for all other colors). --- not available TECHNICAL DRAWINGS 1' [25.4mm] 21/8' [54mm] 21/8' [54mm] (0 07/8' [22mm 1 518' [41mm] 2" [51mrn] 13/8' [35mm] 7/8' 21/8' (22.2mm] [54mm] 4 1/16' [103mm] LENGTH 23/8' [60mm] 7YP. KO 07/8' [22mm 53/4' 1' [25.4mm] [ 14700] -� KO 03/8' 1Omm] A&4 31/2' [88.900] 7/8' [22mm] 31/8' [79mm] 4 2' [115.3mm] T 2. [50.9mm] °STELPRO reserves the right to modify descriptions, manufacturing specifications or prices without prior notice. No returns accepted on optional -color products. For all the latest models and prices, please refer to our website at www.stelpro.com. B BNBuilders August 20, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 523 - ADA Vault Lid Paint Dear Ethan, In accordance with RFI 523 dated 8/7/20, BNBuilders hereby submits our proposal to delineate vault covers along TIB and 150th, surface prep plates, apply initial seal and finish with top ADA coat. To remain on schedule, some of this work was completed on a Saturday as OT. The total proposal of this subject work is Nine Thousand Forty Eight dollars $9,048. This proposal does not include potential additional costs relating to NSS activities. BNB reserves the right to pursue additional costs at a later time for NSS related activities as it pertains to this change. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference 5223 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (geri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dIrgroup.com) BN Builders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 B BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 523 GENERAL CONTRACTOR: BNBuilders, Inc. COP #: 5223 DATE: 8/20/2020 DESCRIPTION OF CHANGE: delineate vault covers along TIB and 150th, surface prep plates, apply initial seal and finish with top ADA coat. To remain on schedule, some of this work was completed on a Saturday as OT. IBP 03.01 BNB (Site Concrete) $8,617.32 lst-tier Subcontractor Cost Total (Direct Construction Costs) $8,617.32 GC/CM Mark-up on MACC Costs $430.87 5% Rounding Adjustment -$0.19 'Total Change Request $9,048.00 To the best of my knowledge and belief, I certify that all costs listed above are correct Contractor Signature Date Tukwila Justice Cenber SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center Contractor Name: BN Builders CCD/ASI #: RFI 523 COP #: 5223 DATE: 812012020 DESCRIPTION OF CHANGE: Delineate vault covers along TIB and 150th, surface prep plates, apply initial seal and finish with top ADA coat. Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractors Total Direct Cost Subcontractor's Mark-up (Excludes Labor Premium) Labor Premium $o.00 $0.00 $0.00 $0.00 $o.00 $o.00 Total Subcontractor Direct Costs + Mark-up + Labor Premium $0.00 Total Sub -tier Subcontractor Costs Subcontractors Mark-up on Sub -tier Subcontractor(s) $7,979.00 $638.32 Total Subcontractor Change Request $8,61732 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Dale 15% 8% o Date Contract Work Additional Prep Vault Work Notes —� Delineated around (13) vault covers. Surface prepped plates, applied Masterseal 350, sand to refusal and applied TC 295 top coat. Removed all masking and cleaned work area. All 8/15/20 7,330 workers on OT. Removed cover plates (13) on the electrical vaults. Ground edges clean of epoxy coating so plates seat properly (total of 6 hours of ticket). Continued to prep and install joints. Total 8/17/20 $2,594.00 649 lineal footage caulked = 171. Total lineal footage prepped 524. Total Submitted EWA # CO r` r• 0 00 r� �s Project Name: TJC Project No. 20-4868 Contractor: BNBuitclers Grayhawk COP No, EWA 410778 Date: 8115/2020 Con(ractor Ref. No. - Scope: Delineated around (13) vault covers. Surface prepped plates, applied Masterseal 35 and cleaned work area. All workers on OT. nd to refusal nd applied TC 295 top coat. Removed all masking Description Acetone Unit Labor Material Equipment Total Quantity Type Unit $ Cost Unit $ Cost Unit $ Cost Cost 5 gallons 5- 524.72 592.52 I 5 - 59252 Aggregate - 60 pound bags 4 ea 521.47 592.52 $ .. 592.52 Bags - Clear 0.1 rolls 3 - 391.25 $ 912 I $ • $ 9,12 Buckets - 3 Gallon 6 ea $ - 1 59.29 5 55.73 $ - $ 55.73 Chip Brushes 1 pack $ - $15.74 $ 15.74 $ - $ 30.00 ' 3 3015:0704 - 530.00; $ 1 ea $ . $ Duct Tape 0.4 1 case $ - , 5171.50 $ 68.60 1 $ - $ 68.60 Drill Kit Extension Cords 3 ea 5 55.001 $ 15.001 $ 15.00 Generator 2 ea • ; $ - 5103.05 $ 206.10 1' $ 206.10 Gloves - Nitrile : 1 box - ; 520.01 $ 20.00 $ 20.00 Hand Grinders 1 ea , $ _ $ - 530.00 $ 30.00 $ 30.00 ' 1 kits , 590.98 I - $ 590.98 Masterseal 350 - 5590.98 5 Masterseat 295 2 kits $ - $530.34 5 1,060.67 , $ 1,060,67 Nap Rollers 1 pack , 5 - 514.14 $ 14.14 !Nap Roller Frames 4 I ea ' ; $ - : 1 58.361 $ ' ' 33,44 j 0 - 3144 Rags 1 '- 1 box i ; $ ... : $ - 522.19 I $ . . 22.19 1$ 22.19 I Wire Wheel 4 I ea $ - ' 5154. $ 30.17 ) $ 30.17 . ZEC Pads • 4 ea 1 ' $ - 318.44 $ 73.74 ' $ _ 5 INtiNgtii, tiVtititteititelaZi 73.74 14.14 4V,0 ,'Aqtik.IN*N4-1.$1,tes,WkItNis.4; ,A40** Labor 1 - Labor Hours (Op 27 1 hrs 5123.001 5 3,321.00 $ $ - $ 3,321.00 ;0,)0.00000)10000000)))000,000040 0400f100000).0; 4401011); flalintIONAtitg:41411ASC104111.10•21010111011flinr' Supervision Foreman (CT) ' 12 hrs , 5129.00 $ 1.548.00 $ 1,548.00 00000,000) 0004, . . , AV4.1* iZezzq EWA ,t10775 Page el Punted 87202020 AYHAWN CONSTRUCTION, INC. 9606 NE 180th Street* Bothell, WA 98011 PH (425).402-4122 * FAX (425) 402-4132 GRAYHCCO2P1-1 EXTRA WORK AUTHORIZATION 0773 .... , CONTRACTOR REF/PO # 1 DATE „."/ : t CUSTOMER BILLED TO: 0 / ' JOB # TENANT/JOB NAME: FLOOR: 7 JOB BLDG AND/OR AREA: ,6 , DESCRIPTION OF WORK: j.,4,14u, L‘,3 .., (..,0, , or - „:„.11-- l'31 , „..331‘)., r...! 0...„cr-t ../.(4 1 II711*D "),..l.,-,t,...t.1' CC"... 30 /1 *1[3 lc ‘0333: ,--L-.13:111 -‘. IA I. ' -,....4-2,...‘ G.l ‘ )/lArcv.jr' 1 01 4-4 I, ---t,..' it - , ' CA; 'Irk.% V) % ' 1::',,.:y • ,I, /, ,, t., ,,...: im--- I ct srreo.,_ 0'l?.4.-1 t .‘,. i) <2.,:.0. et --"00-, eeg3 2, ', cLy.(- 1 NOTES: CUSTOMER NOTES, THIS WORK IS: WORK ADDED WORK: COMPLETE , DESCRIBED TRACKING QUOTED COST TO CONTINUE IS: AUTHORIZATION ONLY WORK DESCRIBED ABOVE i AUTHORIZED BY:( /3 COMPANY it/Ip —3 COMPLETE CERTIFICATION COMPANY GRAYHAWK CONSTRUCTION, INC. REP: SIGNED: ' ' ll 4 .'-' SIGNED. MATERIALS QTY UNIT PR, AMOUNT MISCELLANEOUS t 'I 1 ITEM QTY UNIT RATE IAMOUNT , (",.!...."'j '70 53'./.3... TRUCKING 1 EA t.,2 X FUEL GAL I . 1 PARKING t t i MATL DELIV 1 EA ,.... LIFT RENTAL WKS \-3,, ,c., TOTAL MATERIALS S TOTAL MISC $ LABOR HOURS PREMIUM ONLY TOTALS DATE TRADE REG OT DT INITIALS RATE AMOUNT ' MATLS: 1.3.-i.(11 IA.32, ,v.,..-1,-.,,,,,, LABOR: 1, L -L -i , ,- ,misc: 1 ...„"›. BOND: [ , [ [ ' [ SUBTOTAL: I [ B&QTAX. 3 1 OTHER CONSTRUCTION, INC. 9606 NE 180th Street • Bothell, WA 98011 PH (425) 402-4122 • FAX (425) 402-4132 GRAYHCCO2-19H MATERIAL AUTHORIZATION EWA NO. 77 ,IS? CONTRACTOR REF/PO # DATE (2 CUSTOMER BR_ ED TO: 13 ft) )3 . I JOB # .7,:k.I.. - ,-15.3:(A.7).-' TENANT/JOB NAME: 1 S,•', FLOOR: JOB BLDG AND/OR AREA: ./U(0,,,,. ,•,-1 c I f:1"5 CITY: 1 ‘,,,„.,1,,,:k.„2 , 0,„,. DESCRIPTION OF WORK: CUSTOMER NOTES: THIS WORK IS: WORK ADDED WORK: COMPLETE .:Li DESCRIBED TRACKING QUOTED COST TO CONTINUE j/ IS: AUTHORIZATION ONLY WORK DESCRIBED ABOVE AUTHORIZED BY: COMPANY COMPLETE CERTIFICATION COMPANY GRAYHAWK CONST REP: UCTION, INC. SIGNED:SIGNED:,f . C n .., " iae<", ' ' MATERIALS QTY I UNIT PR. AMOUNT MISCELLANEOUS ?, e 4.1.;„(:):_'ItNiv ••'0,•-•(.-, .„„ -..,. -- ITEM QTY UNIT RATE AMOUNT • . ,.., '"" >WI C.4:-. vt,,-,i .;.. 4 A' TRUCKING EA ,zAe FUEL GAL t 4!,•-•-),;4 ,„.;,,„-- I:Vv. 1/1., 3,%:-1' N PARKING 1 ATL DELIV EA r LIFT RENTA WKS 1‘ ''''' tr-t ;--t4 1, Cc,:c; t , (21.1 ).:W LI Cy, \\,,,, ,,:\ 4 \•/*.'k£ 5 (3 '.- A, !c,:•t ',4,,•• f - .,. , rn r At AA Arm:41 io r-4 S 1 TOTAL MISC 1 ,,t; Project Name: TJC Project No. 20-4888 Contractor; BNBullders VON 61A tAwm CONSTRUCTtON NC Grayhawk COP No, EWA #10780 Date: 8717/2020 Contractor Ref. No. Scope: Removed cover plates (13) on the electrical vaults. Ground edges clean of epoxy coating so plates seat properly (total of 6 hours of ticket). Continued to prep and install joints. Total lineal footage caulked =111. Total lineal footage prepped 524. Unit Labor Material Equipment Total Description Quantity Type Unit $ Cost Unit 3 Cost Unit $ ' Cost • Cost 08 '3M Bond Breaker Tape 1 ! roll $40 $ 40.08 ' 375.00. $ 75.00 $ 115.08 1 • , ! • 2491.4474. !I ! $ - $ 21.47 !Acetone 2 1 gallons $ - i 324,72 $ 49.44 . '', $21.47! $ Aggregate - 80 pound bags 1 ! ea • $1 $ - $ • - , Drill Kit ' 1 ea ! $ - , , $ - 530.00 $ 30,00 $ 30.00 t Duct Tape • t Generator 1 ea • • • • • • 2 units • 04 case $ 3171,50 $ 68.60 $ 68.60 - 3103.05 $ 103.05 3 103.05 'Masterseal NP2 • !Medium Bronze Tint Kits 00,1h,:04,041A4,. 2 • kits • • $ 552,74! $ 105.49 $ - 56.93 $ 13,85 41V,41,4A ifitSit* • ' $ $ 105.49 $ tLabor • !I , • • !Labor Hours 24 I hrs I 890.00! $ 2,160.00 - • 'VS *.n 'Supervision • WANkt,$t1 qtAllkwY2:, *OffklA 13.85 $ 2,160.00 Foreman 6 hrs 396.00 $ 576 00 576 00 trif*Pas 3**** '`•�aN1 EWA 410180 Patio of *Mg* As'i "04* *VOW Printed F3/2n17.070 .,„„„„ HAIY, CONSTRUCTION, INC, 9606 NE 180th Street. Bothell, WA 98011 PH (425) 402 -4122 FAX (425) 402 -4132 opAyHccopi. X RA WORK AUTHORIZATION NO, 1078) „,-- CONTRACTOR REF/PO # DATE \ CUSTOMER BILLED TO: \?"),VI2) JOB ft TENANT/JOB NAME: c'T"':‘,) C, FLOOR: JOB BLDG AND/OR AREA: CITY: 4, K t.0 ,,, DESCRIPTION OF WORK: ,,,-- 1..,„, co .„,,,(, 4 ' `,7) i...e.L.vi\-- ( IC'S ) ' .V.,L.. -j e. ..., ' . '<: ):CA., kvse: \‘ 4,-,1,Er tit-, ,_ t_tt„(,,t,47;;,-, 44 1 CI l''' ek/ r,--;.? - ,,-: - ' , - , ' -.'” t'Vl C --ks. ' -t; cl I.- L-). 2(2 - , "tall ,,LIL'oStyL I '"-.,, 4t,,r)L", .Th c,) -‘ C * cOt.,r". t J1- 'i ,....t..„)\ t,.. \-- t.-. 47,, ). ‘,... *44 ,.. 0.k...)7 \-,) i (.4 C 4 s\ M. , I''s,Vor., --tt C ' ''' --- !-L, Lc -7i. CUSTOMER NOTES: n 2,,,,i THIS WORK IS: WORK ADDED WORK: COMPLETE DESCRIBED TRACKING QUOTED COST TO CONTINUE / IS: AUTHORIZATION ONLY WORK DESCRIBED ABOVE i COMPLETE CERTIFICATION AUTHORIZED BY: COMPANY - ' , COMPANY GRAYHAWK CON/STRUCTIO I, INC, REP: )-\\,/ I.E. SIGNED: ,, ,, _. SIGNED: IV ATERIALS QTY UNIT PR, AMOUNT MISCELLANEOUS '.:,,A.11 t 1-'''' 0- ''',..„5 .1-;' ? 2 ITEM QTY UNIT RATE !AMOUNT ' TRUCKING EA FUEL GAL PARKING MATL DELIV EA L , 1 , \ A ' --,i ) FT RENTAL, WKS , „,,,,, t . O'' il ''s7') I.,, N -\,\ !';1/'<.:-.;•, i C.„(--.'tt TOTAL MATERIALS TOTAL MIS - LABOR HOURS PREMIUM ONLY TOTALS DATE TRADE REG OT DT 1 INITIALS RATE AMOUNT MAILS: LABOR: MSC: 4" SUBTOTAL: ' ii ID- IIP 1 1 TI-ITAI 1iTryr, ,z D R up RFI Transmittal DLR Group PROJECT: City of Tukwila Justice Center DATE SENT: 8/7/2020 73-17158'00 SUBJECT: TJC RFI #533 Anti-S|ip Vault Lids nnm523 TYPE: RFI Tn«wSmI/ /ALID: 02523 PURPOSE: Answered VIA: Info Exchange QUESTION: SUGGESTION: ANSWER: FROM NAME Michelle Javan TO During a site walk with the Public Works department, it was noted that 13 vault lids need to be coated with anti -slip and painted for ADA compliance. If required, BNB recommends the attached N69 Polyamidoamine Epoxy and then sealing with a 1095 urethane for color and gloss. Please confirm it's required to install anti -slip on the vault lids. This is not shown in the contract documents and will be an additional cost if BNB is directed to proceed. If required, please confirm the suggest products are acceptable and provide color or advise on alternative product. Color options can be found using the following link: Response (Answered) from: Michael Herseth (KPFF Consulting Engineers (WA)) Remarks: Please see attached KPFF response. COMPANY 1 EMAIL DLR Group mjavan@dIrgroup.com | PHONE 206-4616065x73-6065 - NAME COMPANY EMAIL PHONE | | om Ethan Bernau Geri Urbas Jeff Clark Shiels Obletz Johnsen BNBuilders BNBuilders ethanb@sojsea.com geh.urbas@bnbu||ders.c 306-838-3705 206-382-3443 om � --'--'=-~''~~~'- � 206-382-3443 on) Page 1 of 2 NAME Michelle Javan Phillip Tracy Steven Schmitz Taras Yaremchuk DESCRIPTION OF CONTENTS COMPANY RFI T DATE: ID: a EMAIL PHONE s,,,-ttaN 8/7/2020 02523 QTY DATED T]CRB#S33_And-SUp 1 | 8/3/3020Vault Lids.pdf DLR Group BN Builders, Inc. DLR Group BNBui|dens TITLE javan@d|rgroup.cVnl .com taras.yaremchuk@bnbui 2O6 -4O1 - 6065X73-6065 | | 206-382-3443 NUMBER | SCALE 206 -461- 6044x73 -6044 06-4G1- 206-383-3443 SIZE Page 2 of 2 Request for Information RFI No: 523 BNBuilders Tukwila JmmticaCtr Construct. 15Q05Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: August 03, 2020 Submitted To: Steve Schmitz Submitted By: DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject. Anti -Slip Discipline: Civil Subcontractor: Subcontractor RFI Question Date Required: 8/10/2020 During a site walk with the Public Works department it was noted that 13 vault lids need to be coated with anti -slip and painted for a ADA com|i If required, BNB recommends the attached N59 Polyamidoamine Epoxy and then sealing with a1005 urethane for color and gloss Please conflrm is required to install anti -slip on the vault lids This is not shown in the contract documents and will be an additional cost if BNB is directed to proceed If required, pleasenM m the suggest products are acceptable and provide color or advise on alternative prodmt Color n be found using the following link https://www.tnemec.com/products/view/series'1O9S'enduna'shie|d/co|ors/ Answer Non -slip vault lids are required per the Public Works inspector and Tukwila Construction Standards. The contract drawings specify compliance with the Tukwila Construction Standards in the City of Tukwila General Note 7 on C1.00. Section 5.8 of the Tukwila Construction Standards states "All grates within sidewalks, walkways or other pedestrian areas must meet ADA requirements for slip resistance." The suggested products do not provide sufficient data to ensure the coating meets ADA requirements for slip resistance. Contractor shall provide coefficient of friction data for the proposed product or select a different product such as E650 Non -Skid Epoxy Floor Coating by Exterior Performance Coatings Inc which has tested and published coefficient of friction values. M Herseth Answered br Date Answered: Copies To: Company & Contact Fax Notes Page 1 of 1 TNEMEC A HI -BUILD EPDXOLINE® 11 GENERIC DESCRIPU10N Polyamicloamine Epoxy COMMON USAGE An advanced generation epoxy for protection and finishing of steel and concrete. It has excellent resistance to abrasion and is suitable for immersion as well as chemical contact exposure. Contact your local Tnemec representative for a list of chemicals. This product can also be used for lining storage tanks that contain demineralized, deionizecl or distilled water. COLORS Refer to Tnemec Color Guide. Note: Epoxies chalk with extended exposure to sunlight. Lack of ventilation, incomplete mixing, miscatalyzation or the use of heaters that emit carbon dioxide and carbon monoxide during application and initial stages of curing may cause yellowing to occur. FINISH Satin iw .!t it SURFACBt/FILLER/PATCHER Series 215, 217, 218 PRIMERS Steel: Self -priming or Series 1, 27, 27WB, 37H, 66, L69, L69F, N69F, V69F, 90E-92, 90-97, H90-97, 90G -1K97, 90-98, 91- 1120, 94-H20, 135, 161, 394, V530 Galvanized Steel and Non -Ferrous Metal: Self -priming or Series 66, L69, L69F, N69F, V69F, 161 Concrete: Self -priming or Series 27WB, 130, 1254 CMU: Self -priming or 130, 1254 TOPCOATS Series 22, 27WB, 46H-413, 66, L69, L69F, N69, N69F, V69, V69F, 72, 73, 104, 113, 114, 118, 141, 156, 157, 161, 180, 181, 262, 265, 287, 446, 740, 750, 1026, 1028, 1029, 1070, 1070V, 1071, 1071V, 1072, 1072V, 1074, 1074U, 1075, 1075U, 1077, 1078, 1078V, 1080, 1081, 1094, 1095, 1096, 1224. Note: The following recoat times apply for Series N69: Immersion Service -Surface must be scarified after 60 days. Atmospheric Service -After 60 days, scarification or an epoxy tie -coat is required. When topcoating with Series 740 or 750, recoat time for N69 is 21 days for atmospheric service. Contact your Tnemec representative for specific recommendations. up �{ ... ,,6,� STEEL Immersion Service: SSPC-SP1O/NACE 2 Near -White Blast Cleaning or ISO Sa 2 1/2 Very Thorough Blast Cleaning with a minimum angular anchor profile of 1.5 mils. Non -Immersion Service: SSPC-SP6/NACE 3 Commercial Blast Cleaning or ISO Sa 2 Thorough Blast Cleaning with a minimum angular anchor profile of 1.5 mils. Note: Commercial Blast Cleaning generally produces the best coating performance for this exposure. If conditions will not permit this, in moderate exposures Series N69 may be applied to SSPC-SP2 or SP3 Hand or Power Tool Cleaned surfaces (SSPC Rust Grade Condition C). Surface preparation recommendations will vary depending on substrate and exposure conditions. Contact your Tnemec representative or Tnemec Technical Services. All external surfaces of ductile iron pipe and fittings shall be delivered to the application facility without asphalt or any other protective lining on the exterior surface. All oils, small deposits of asphalt paint, grease, and soluble deposits should be removed and uniformly abrasive blasted using angular abrasive in accordance with NAPF 500-03-04: Extemal Pipe Surface condition. When viewed without magnification, the exterior surfaces shall he free of all visible dirt, dust, loose annealing oxide, rust, mold coating and other foreign matter. Any area where rust reappears before application shall be reblasted. The surface shall contain a minimum angular anchor profile of 1.5 mils (38.1 microns) (Reference NACE RP0287 or ASTM D 4417, Method C). CONCRETE Allow new cast -in-place concrete to cure a minimum of 28 days at 75°F (24°C). Verify concrete dryness in accordance with ASTM F 1869 "Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride" (moisture vapor transmission should not exceed three pounds per 1,000 square feet in a 24 hour period), F 2170 "Standard Test Method for Determining Relative Humidity in Concrete using in situ Probes" (relative humidity should not exceed 80%), or D 4263 "Standard Test Method for Indicating Moisture in Concrete by the Plastic Sheet Method" (no moisture present). Prepare concrete surfaces in accordance with NACE No. 6/SSPC-SP13 Joint Surface Preparation Standards and ICRI Technical Guidelines. Abrasive blast, shot -blast, water jet or mechanically abrade concrete surfaces to remove laitance, curing compounds, hardeners, sealers and other contaminants and to provide an ICRI-CSP 2- 3 surface profile. Large cracks, voids and other surface imperfections should he filled with a recommended filler or surfacer. CMU Allow mortar to cure for 28 days. Level protrusions and mortar spatter. PAINTED SURFACES Non -Immersion Service: Ask your Tnemec representative for specific recommendations. PIIUAED SURFACES Immersion Service: Scarify the Series N69 prime coat surface by abrasive -blasting with a fine abrasive before topcoating if: (a) the Series N69 prime coat has been in exterior exposure for 60 days or longer and Series 66, 46H-413, L69, L69F, N69, N69F, V69, V69F or 161 is the specified topcoat; (b) the Series N69 prime coat has been in exterior exposure for 14 days or longer and Series 104 is the specified topcoat; (c) the Series N69 prime coat has been in exterior exposure for 7 days or longer and Series 262 or 265 is the specified topcoat. ALL SURFACES Must be clean, dry and free of oil, grease, chalk and other contaminants. GALVANIZED STEEL & NON- FERROUS METAL CAST/DU[l1LE IRON CASA A OM, VOLUME SOLIDS 67.0 ± 2.0% (mixed) t RECOMMENDED DFT 2.0 to 10.0 mils (50 to 255 microns) per coat. Note: The number of coats and thickness requirements will vary with substrate, application method and exposure. Contact your Tnemec representative. © November 26, 2019 byTnemec Com Inc Published technical data and instructions are subject to change without notice. The online catalog at PDSN69 Page 1 of 3 Company umw.tnemec,com should be referenced for the most current technical data and instructions or you may contact your Tnemec reoresentative for current technical data and instructions. PRODUCE DATA SHEET HI -BUILD EPDXOLINE® II 1 SERIES N69 CORING TIME AT 5 MILS OFT VOLATILE ORGANIC COMPOUNDS A Without 44-700 Accelerator Temperature To Handle To Recoat Immersion 90°F (32°C) 5 hours 7 hours 7 days 80°F (27°C) 7 hours 9 hours 7 days 70°F (21°C) 9 hours 12 hours 7 days 60°F (16°C) 16 hours 22 hours 9 to 12 days 50°F (10°C) 24 hours 32 hours 12 to 14 days Curing time varies with surface temperature, air movement, humidity and film thickness. Note: For faster curing and low- temperature applications, add No. 44-700 Epoxy Accelerator; see separate product data sheet for cure information. Unthinned: 2.40 lbs/gallon (285 grams/litre) Thinned 10% (No. 4 Thinner): 2.80 lbs/gallon (334 grams/litre) Thinned10% (No. 60 Thinner): 2.80 lbs/gallon (335 grams/litre) HAPS Unthinned: 2.40 lbs/gal solids Thinned 10% (No. 4 Thinner): 3.25 lbs/gal solids Thinned 10% (No. 60 Thinner): 2.40 lbs/gal solids 1,074 mil sq ft/gal (26.4 m2/L at 25 microns). See APPLICATION for coverage rates. t THEORETICAL COVERAGE NUMBER OF C ' I HEMS PACKAGING NET WEIGHT PER GALLON STORAGE TEMPERATURE mmRERBIs-Dula SHELF LIFE FLASH POINT -SETA HEALTH d SAFETY TE OVERAGE RATES MIXING THINNING POT IJFE SPRAY UIE Two: Part A (amine) and Part B (epoxy) - One (Part A) to one (Part B) by volume. 13.67 ± 0.25 lbs (6.10 ± .11 kg) (mixed) t Minimum 20°F (-7°C) Maximum 110°F (43°C) (Dry) Continuous 250°F (121°C) Intermittent 275°F (135°C) Part A: 24 months; Part B: 12 months at recommended storage temperature. Part A: 82°F (28°C) Part B: 93°F (34°C) Paint products contain chemical ingredients which are considered hazardous. Read container label warning and Material Safety Data Sheet for important health and safety information prior to the use of this product. Keep out of the reach of children. s e Part A Part B Yield (mixed) Large Kit 5 gallon pail 5 gallon pail 10 gallons (37.9 L) Small Kit 1 gallon can 1 gallon can 2 gallons (7.6 L) 13.67 ± 0.25 lbs (6.10 ± .11 kg) (mixed) t Minimum 20°F (-7°C) Maximum 110°F (43°C) (Dry) Continuous 250°F (121°C) Intermittent 275°F (135°C) Part A: 24 months; Part B: 12 months at recommended storage temperature. Part A: 82°F (28°C) Part B: 93°F (34°C) Paint products contain chemical ingredients which are considered hazardous. Read container label warning and Material Safety Data Sheet for important health and safety information prior to the use of this product. Keep out of the reach of children. s e Dense Concrete & Masonry From 100 to 150 sq ft (9.3 to 13.9 m2) per gallon. CMU: From 75 to 100 sq ft (7.0 to 9.3 m2) per gallon. (1) Note for Steel: Roller or brush application requires two or more coats to obtain recommended film thickness. Also, Series N69 can be spray applied to an optional high -build film thickness range of 8.0 to 10.0 dry mils (205 to 255 dry microns) or 11.5 to 14.5 wet mils (209 to 370 wet microns). Allow for overspray and surface irregularities. Film thickness is rounded to the nearest 0.5 mil or 5 microns. Application of coating below minimum or above maximum recommended dry film thicknesses may adversely affect coating performance. t Start with equal amounts of Series N69 Parts A and B. Power mix contents of each container separately, making sure no pigment remains on the bottom. Pour a measured amount of Part B into a clean container large enough to hold both components. If Series 44-700 isnot being used, proceed with mixing and add an equal volume of Part A to Part B while under agitation. Continue agitation until the two components are thoroughly mixed. Note: Both components must be above 50°F (10°C) prior to mixing. For optimum mixing and application properties, the material should be above 60°F (16°C). If using Series N69 accelerator, slowly add four (4) fluid ounces of 44-700 per gallon to Series N69 Part A material while under agitation and proceed with adding Part B. Note: The use of more than the recommended amount of 44-700 will adversely affect performance. Thin by volume and thoroughly mix. Failure to thoroughly mix the Part A and Part B components prior to thinning can affect product's gloss and performance. Do not use mixed material beyond pot life limits. Note: For application of the unaccelerated version to surfaces between 50°F to 60°F (10°C to 16°C) or the accelerated version to surfaces between 35°F to 50°F (2°C to 10°C), allow mixed material to stand 30 minutes and restir before using. Use No. 4 or No. 60 Thinner. For air spray, thin up to 10% or 3/4 pint (380 mL) per gallon. For airless spray, roller or brush, thin up to 5% or 1/4 pint (190 mL) per gallon. Without 44-700: 6 hours at 50°F (10°C) 4 hours at 75°F (24°C) 1 hour at 100°F (38°C) With 44-700: 2 hours at 50°F (10°C) 1 hour at 75°F (24°C) 30 minutes at 100°F (38°C) Without 44-700: 1 hour at 75°F (24°C) With 44-700: 30 minutes at 75°F (24°C) Note: Spray application after listed times will adversely affect ability to achieve recommended dry film thickness. November 26, 2019 by Tnemec Company, Inc. PDSN69 Page 2 of 3 Dry Mils (Microns) Wet Mils (Microns) Sq Ft/Gal (m2/Gal) Suggested (I) 6.0 (150) 9.0 (230) 179 (16.6) Minimum 2.0 (50) 3.0 (75) 537 (49.9) Maximum 10.0 (250) 15.0 (375) 107 (10.0) Dense Concrete & Masonry From 100 to 150 sq ft (9.3 to 13.9 m2) per gallon. CMU: From 75 to 100 sq ft (7.0 to 9.3 m2) per gallon. (1) Note for Steel: Roller or brush application requires two or more coats to obtain recommended film thickness. Also, Series N69 can be spray applied to an optional high -build film thickness range of 8.0 to 10.0 dry mils (205 to 255 dry microns) or 11.5 to 14.5 wet mils (209 to 370 wet microns). Allow for overspray and surface irregularities. Film thickness is rounded to the nearest 0.5 mil or 5 microns. Application of coating below minimum or above maximum recommended dry film thicknesses may adversely affect coating performance. t Start with equal amounts of Series N69 Parts A and B. Power mix contents of each container separately, making sure no pigment remains on the bottom. Pour a measured amount of Part B into a clean container large enough to hold both components. If Series 44-700 isnot being used, proceed with mixing and add an equal volume of Part A to Part B while under agitation. Continue agitation until the two components are thoroughly mixed. Note: Both components must be above 50°F (10°C) prior to mixing. For optimum mixing and application properties, the material should be above 60°F (16°C). If using Series N69 accelerator, slowly add four (4) fluid ounces of 44-700 per gallon to Series N69 Part A material while under agitation and proceed with adding Part B. Note: The use of more than the recommended amount of 44-700 will adversely affect performance. Thin by volume and thoroughly mix. Failure to thoroughly mix the Part A and Part B components prior to thinning can affect product's gloss and performance. Do not use mixed material beyond pot life limits. Note: For application of the unaccelerated version to surfaces between 50°F to 60°F (10°C to 16°C) or the accelerated version to surfaces between 35°F to 50°F (2°C to 10°C), allow mixed material to stand 30 minutes and restir before using. Use No. 4 or No. 60 Thinner. For air spray, thin up to 10% or 3/4 pint (380 mL) per gallon. For airless spray, roller or brush, thin up to 5% or 1/4 pint (190 mL) per gallon. Without 44-700: 6 hours at 50°F (10°C) 4 hours at 75°F (24°C) 1 hour at 100°F (38°C) With 44-700: 2 hours at 50°F (10°C) 1 hour at 75°F (24°C) 30 minutes at 100°F (38°C) Without 44-700: 1 hour at 75°F (24°C) With 44-700: 30 minutes at 75°F (24°C) Note: Spray application after listed times will adversely affect ability to achieve recommended dry film thickness. November 26, 2019 by Tnemec Company, Inc. PDSN69 Page 2 of 3 PRODUCT DATA SHEET HI -BUILD EPDXOLINE® 11 1 SERIES N69 APPLICATION EQUIPME1IT Air S ra Gun Fluid Tip Air Cap Aix Hose ID Mat'l Hose IDo'. Atomizine. Pressure Pot Pressure DeVilbiss JGA E 765 or 704 5/16" or 3/8" (7.9 or 9 5 mm) 3/8" or 1/2" (n .-.5 or 12* 7 7bar) mrri) 50-80 psi 10-20 psi (0714 bar) Low temperatures or longer hoses require higher po pressure. Airless Spray Tip Orifice Atomizing Pressure Mat'l Hose ID Manifold Filter 0.015-0.019" 3000-4800 psi 1/4" or 3/8" 60 mesh (380-485 microns) (207-330 bar) (6.4 or 9.5 mm) (250 microns) Use appropriate tip/atomizing pressure for equipment, applicator technique and weather conditions. Spray application of first coa on CMU should be followed by backrolling. Note: Application over inorganic zinc -rich primers: Apply a wet mist coat and allow tiny bubbles to form. When bubbles disappear in 1 to 2 minutes, apply a full wet coat at specified mil thickness. Roller: Use 3/8" or 1/2" (9.5 mm or 12.7 mm) synthetic woven nap roller cover. Use longer nap to obtain penetration on rough or porous surfaces. Brush: Recommended for small areas only. Use high quality natural or synthetic bristle brushes. RUM TEMPERATURE Minimum 50°F (10°C) Maximum 135°F (57°C) The surface should be dry and at least 5°F (3°C) above the dew point. Coating will not cure below minimum surface temperature. afANUP Flush and clean all equipment immediately after use with the recommended thinner or MEK. 1. Values may vary with color. WARRANTY & LIMITATION OF SELLER'S LIABILITY: Tnemec Company, Inc. warrants only that its coatings represented herein meet the formulation standards of Tnemec Company, Inc. THE WARRANTY DESCRIBED IN THE ABOVE PARAGRAPH SHALL BE IN LIEU OF ANY OTHER WARRANTY, EXPRESSED OR IMPLIED, INCLUDING BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, THERE ARE NO WARRANTIES THAT EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF. The buyer's sole and exclusive remedy against Tnemec Company, Inc shall be for replacement of the product in the event a defective condition of the product should be found to exist and the exclusive remedy shall not have failed as essential purpose as long as Tnemec is willing to provide comparable replacement product to the buyer. NO OTHER REMEDY (INCLUDING, BUT NOT LIMITED TO, INCIDENTAL OR CONSEQUENTIAL DAMAGES FOR LOST PROFITS, LOST SALES, INJURY TO PERSON OR PROPERTY, ENVIRONMENTAL INJURIES OR ANY OTHER INCIDENTAL OR CONSEQUENTIAL LOSS) SHALL BE AVAILABLE TO THE BUYER. Technical and application information herein is provided for the purpose of establishing a general profile of the coating and proper coating application procedures. Test performance results were obtained in a controlled environment and Tnemec Company makes no claim that these tests or any other tests, accurately re resent all environments, As a plication, environmental and design factors can vary significantly, due care should be exercised in the selection and use of the coatin . 6800 Corporate Drive Kansas Ciiy, Missouri 64120-1372 +1816-483-3400 www.tnemec.com November 26, 2019 by Tnemec Company, Inc. PDSN69 Page 3 of 3 TN EMEC ENDURA-SHIELD GENERIC DESCRIPTION COMMON USAGE COLORS FINISH PRIMERS TOPCOATS Aliphatic Acrylic Polyurethane A user friendly, low VOC, aliphatic polyurethane coating that provides excellent color and gloss retention for exterior applications to steel, concrete and other miscellaneous substrates. Direct -to -Metal capability allows for a labor-saving, high -build, single coat application. Refer to Tnemec Color Guide. Note: Certain colors may require multiple coats depending on method of application and finish coat color. When feasible, the preceding coat should be in the same color family, but noticeably different. Semi -gloss Steel: Series 1, 27, 27WB, 66, L69, L69F, N69, N69F, V69, V69F, 90-97, 90G -1K97, 91-H20, 94-I-120, 132, 133, 135, 138, L140, L140F, N140, N140F, V140, V140F, 141, 161, 394, 1224 Galvanized Steel & Non -Ferrous Metal: Series 27, 66, L69, L69F, N69, N69F, V69, V69F, 161 Concrete: Series 27WB, 66, L69, L69F, N69, N69F, V69, V69F, L140, L140F, N140, N140F, V140, V140F, 141, 161, 1224, 1254 CMU: Series 1254 Note: The following maximum recoat times apply; Series L69F, 132, 133, 138, L14OF or 141, 14 days; Series L69 or L140, 21 days; Series 1, 27, 27WB, 66, N69, N69F, V69, V69F, 135, N140, N140F, V140, V140F, 161, 394, 1224, 1254, 30 days; Series 90-97, 90G -1K97, 91-H20, 94-H20, 60 days. Contact your Tnemec representative for specific recommendations. Series 700, 701 MYER ALLSURFACES Must be clean, dry and free of oil, grease, chalk and other contaminants. VOLUME SOLIDS RECOMMENDED DFI CURING TIME VOLATILE ORGANIC COMPOUNDS THEORETICAL COVERAGE NUMBER OF COMPONENTS MIXING RA11O PACKAGING NET WEIGHT PER GALLON STORAGE TEMPERATURE TEMPERATURE RESISTANCE SHELF LIFE RASH POINT- SETA HEALTH i SAFETY 66.0 ± 2.0% (mixed) t Topcoat Service: 2.0 to 5.0 mils (51 to 127 microns) per coat. Direct -to -Metal; over Zinc or MIO -Zinc: 3.0 to 6.0 mils (76 to 154 microns) Note: Number of coats and thickness requirements will vary with substrate, application method and exposure. For DTM or applications over zinc or MIO -zinc, consult the latest version of Tnemec Technical Bulletin 13-100 or contact your Tnemec representative. Temperature To Touch To Handle To Recoat 75°F (24°C) 1-2 hours 9 hours 10-12 hours To resist moisture: 8 hours. Curing time varies with surface temperature, air movement, humidity and film thickness. Note: For faster cure in temperatures down to 35°F (2°C), add No. 44-456 Urethane Accelerator, see separate product data sheet for cure information. Note: The use of Series 44-456 accelerator is not recommended when temperatures exceed 75°F (24°C). Unthinned: 1.93 lbs/gallon (232 grams/litre) Unthinned: 0.73 lbs/gallon (88 grams/litre) (TBAc exempt) Thinned 15% (No. 10 Thinner): 2.79 lbs/gallon (335 grams/litre) Thinned 15% (No. 10 Thinner): 1.96 lbs/gallon (234 grams/litre) (TBAc exempt) Thinned 15% (No. 46 Thinner): 1.99 lbs/gallon (238 grams/litre) Thinned 15% (No. 46 Thinner): 0.81 lbs/gallon (97 grams/litre) (TBAc exempt) Unthinned: 0.00 lbs/gal solids Thinned 15% (No. 10 Thinner): 0.04 lbs/gal solids Thinned 15% (No. 46 Thinner): 0.09 lbs/gal solids 1,059 mil sq ft/gal (26.0 m2/L at 25 microns). See APPLICATION for coverage rates. t Two: Part A and Part B By volume: Four (Part A) to one (Part B) 12.73 ± 0.25 lbs (5.77 ± .11 kg) t Minimum 40°F (4°C) Maximum 110°F (43°C) (Dry) Continuous 250°F (121°C) Intermittent 275°F (135°C) Part A: 12 months; Part B: 12 months at recommended storage temperature. Part A: 73°F (23°C) Part B: 40°F (4°C) Paint products contain chemical ingredients which are considered hazardous. Read container label warning and Safety Data Sheet for important health and safety information prior to the use of this product. Keep out of the reach of children. © May 15, 2020 by Tnemec Company, Inc. Published technical data and instructions are subject to change without notice. The online catalog at PDS1095 Page 1 of 2 nm-a',tnemec.com should be referenced for the most current technical data and instructions or you may contact your Tnemec representative for current technical data and instructions. PART A (Partially filled) PART B (Partially filled) Yield (Mixed) Large Kit 6 gallon pail 1 gallon can 5 gallons (18.9L) Small Kit 1 gallon can 1 quart can 1 gallon (3.79L) 12.73 ± 0.25 lbs (5.77 ± .11 kg) t Minimum 40°F (4°C) Maximum 110°F (43°C) (Dry) Continuous 250°F (121°C) Intermittent 275°F (135°C) Part A: 12 months; Part B: 12 months at recommended storage temperature. Part A: 73°F (23°C) Part B: 40°F (4°C) Paint products contain chemical ingredients which are considered hazardous. Read container label warning and Safety Data Sheet for important health and safety information prior to the use of this product. Keep out of the reach of children. © May 15, 2020 by Tnemec Company, Inc. Published technical data and instructions are subject to change without notice. The online catalog at PDS1095 Page 1 of 2 nm-a',tnemec.com should be referenced for the most current technical data and instructions or you may contact your Tnemec representative for current technical data and instructions. EN URA -SHIELD' PRODUCT DATA SHEET SERIES 1095 APP COVERAGE RATES e -to-Metal• over Zinc or MIO -Zinc Dry Mils (Microns) Wet Mils (Microns) Sq Ft/Gal (m2/Gal) Suggested 2.5 (65) 4.0 (100) 423 (39.3) Minimum 2.0 (50) 3.0 (75) 529 (49.2) Maximum 5.0 (125) 7.5 (190) 212 (19.7) -to-Metal• over Zinc or MIO -Zinc Note: Coverage rates based on unthinned material. Allow for overspray and surface irregularities. Film thickness is rounded to the nearest 0.5 mil or 5 microns. t MIXING Stir contents of the container marked Part A, making sure no pigment remains on the bottom. If using Series 44-456 accelerator, slowly add four (4) ounces of Series 44-456 per mixed gallon of Series 1095 while under agitation. Note: The use of more than the recommended amount of Series 44-456 accelerator will adversely affect performance. Add the contents of the container marked Part B to Part A while under mechanical agitation. Continue agitation until the two components are thoroughly mixed. Do not use mixed material beyond pot life limits. Caution: Part B is moisture- sensitive and will react with atmospheric moisture. Keep unused material tightly closed at all times. Do not reseal mixed material. An explosion hazard may be created. THINNING Thinning is required for proper application. Use No. 10 Thinner. For air spray, airless spray, brush or roller, thin up to 15% or 19 ounces (562 mL) per gallon, Note: In areas that require lower VOC, use No. 46 Thinner. POT HIE Without 44-456: 4 hours at 75°F (24°C) APPl1CAT1ON EQUIPMENT With 44-456: 5 hours at 35°F (2°C) 4 hours at 55°F (13°C) 3 hours at 75°F (24°C) Gun Dry Mils (Microns) Wet Mils (Microns) Sq Ft/Gal (m2/Gal) Suggested 4.0 (100) 6.0 (150) 265 (24.6) Minimum 3.0 (75) 4.5 (115) 353 (32.7) Maximum 6.0 (150) 9.0 (230) 176 (16.4) Note: Coverage rates based on unthinned material. Allow for overspray and surface irregularities. Film thickness is rounded to the nearest 0.5 mil or 5 microns. t MIXING Stir contents of the container marked Part A, making sure no pigment remains on the bottom. If using Series 44-456 accelerator, slowly add four (4) ounces of Series 44-456 per mixed gallon of Series 1095 while under agitation. Note: The use of more than the recommended amount of Series 44-456 accelerator will adversely affect performance. Add the contents of the container marked Part B to Part A while under mechanical agitation. Continue agitation until the two components are thoroughly mixed. Do not use mixed material beyond pot life limits. Caution: Part B is moisture- sensitive and will react with atmospheric moisture. Keep unused material tightly closed at all times. Do not reseal mixed material. An explosion hazard may be created. THINNING Thinning is required for proper application. Use No. 10 Thinner. For air spray, airless spray, brush or roller, thin up to 15% or 19 ounces (562 mL) per gallon, Note: In areas that require lower VOC, use No. 46 Thinner. POT HIE Without 44-456: 4 hours at 75°F (24°C) APPl1CAT1ON EQUIPMENT With 44-456: 5 hours at 35°F (2°C) 4 hours at 55°F (13°C) 3 hours at 75°F (24°C) Gun Fluid Tip Air Cap Air Hose ID Mat'l Hose ID Atomizing Pressure Pot Pressure DeVilbiss JGA E 765 or 704 5/16" or 3/8" (7.9 or 9.5 mm)) 3/8" or 1/2" (9.5 or 12.7 nun 50-80 psi (3.4-5:5 bar) 10-20 psi (0.7-1.4 bar) Low temperatures or longer hoses require higher po pressure. Tip Orifice Atomizing Pressure Mat'l Hose ID Manifold Filter 0.013"-0.017" 3000-3500 psi 1/4" or 3/8" 60 mesh (330-430 microns) (206-241 bar) (6.4 or 9.5 mm) (250 microns) Use appropriate tip/atomizing pressure for equipment, applicator technique and weather conditions. Roller: Use 1/4° or 3/8" (6.4 mm or 9.5 mm) high quality synthetic woven nap roller cover. Do not use medium or long nap roller covers. Two coats are required to obtain dry film thickness above 3.0 mils (75 microns). Brush: Recommended for small areas only. Use high quality natural or synthetic bristle brushes. Two coats are required to obtain recommended film thickness. SURFACE TEMPERATURE Minimum 40°F (4°C) Maximum 120°F (49°C) The surface should be dry and at least 5°F (3°C) above the dew point. Cure time necessary to resist direct contact with moisture at a surface temperature of 75°F (24°C) is 8 hours. CLEANUP Flush and clean all equipment immediately after use with xylene or MEK. Use Tnemec No. 74 Thinner when needed to comply with VOC regulations. t Values may vary with color. WARRANTY & LIMITATION OF SELLER'S LIABILITY: Tnemec Company, Inc. wanants only that Ss coatings represented herein meet the formulation: standards of Tnemec Company, Inc. THE WARRANTY- DESCRIBED IN THE ABOVE PARAGRAPI-I SHALL BE IN LIEU OF ANY OTHER WARRANTY, EXPRESSED OR IMPLIED, INCLUDING BUT NOT LIMITED TO, ANY IMIPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. THERE ARE NO WARRANTIES THAT EXTEND BEYOND THE DESCRIPTION ON TI -IE FACE HEREOF. The buyers sole and exclusive remedy against Tnemec Company,. Inc. shall be for replacement of the product in the event a defective condition of the product should be found toexist and the exclusive remedy shall not have failed its essential purpose -as long as Tnemec is willing to provide comparable replacement product to the buyer. NO OTHER REMEDY (INCLUDING, BUT NOT LIMITED TO, INCIDENTAL OR CONSEQUENTIAL DAMAGES FOR LOST PROFITS, LOST SALES, INJURY TO PERSON OR PROPERTY, ENVIRONMENTAL INJURIES OR ANY OTHER INCIDENTAL OR CONSEQUENTIAL LOSS) SHALL BE AVAILABLE TO THE BUYER. Technical and application information herein is provided for the purpose of establishing a general profile of the coating and proper coating application. procedures. Test performance results wereobtained in a controlled environment and Tnemec Company makes no claim that thesetests or any othertests, accurately reresent all environments: Asa..lication, environmental and design factors can vary significantly, due care should be exercised in the selection and use of the coatin . © May 15, 2020 by Tnemec Company, Inc. City, Missouri 64120.1372 +1. 3400 www.' PDS1095 Page 2 of 2 BNBuilders August 28, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 510 & 524 Additional Fire Marshall Extinguisher & Signage Dear Ethan, BNBuilders hereby submits our proposal for RFI 510 & 524 Additional Fire Marshall Extinguisher & Signage. The total proposal of this subject work is one thousand one hundred and sixty-five dollars $1,165.00. This proposal does not include potential additional costs relating to NSS activities. BNB reserves the right to pursue additional costs at a later time for NSS related activities as it pertains to this change. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5224 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek(@,soseai.com) Geri Urbas (qeri.urbas(@,bnbuilders.com) Steve Schmitz (sschmitzdIrgroup.com) BNBuilders 2601 4'11 Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 B BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 510, 524 COP #: 5224 GENERAL CONTRACTOR: E3NBuilders, Inc. DATE: 8/27/2020 DESCRIPTION OF CHANGE: RFI 510 - Added sprinkler riser/FACP signs RFI 524 - Added fire marshall signage for roof access and fire extinguisher IBP 09.20 Northwest Partition BP 10.00 Misc. Specialties / Equipment lst-tier Subcontractor Cost Total (Direct Construction Costs) GC/CM Mark-up on MACC Costs Rounding Adjustment $754.001 $355.40 $1,109.40 $55.47 $0.13 Total Change Request $1,165.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date 5.00% Tukwila Justice Cenber SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center Contractor Name: BNBuilders CCD/ASI #: COP #: DATE: RFI 524 5224 812712020 DESCRIPTION OF CHANGE: Procure and install fire extinguisher in A100 along with hardware to surface mount Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractor's Total Direct Cost Subcontractors Mark-up (Excludes Labor Premium) Labor Premium $159.04 $150.00 $0.00 $309.04 $46.36 $0.00 Total Subcontractor Direct Costs + Mark-up + Labor Premium $355.40 Total Sub -tier Subcontractor Costs Subcontractor's Mark-up on Sub -tier Subcontractor(s) $0.00 Total Subcontractor Change Request $355.40 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date 15% 8% COP Cost Breakdown Project Name: Tukwila Justice Center Project No. 118021.100 Contractor BNBuilders, Inc. Work Description: CCD/RFI: RFI 524 CP #: 5224 Date: 8/27/20 Description Quantity Unit Prod. Hours A.1. Labor A.1. Labor Premium B. Material C. Equipment $/hour Cost $/hour Cost $/Unit Costs $/Unit Costs Labor 2 hr 2 79.52 $ 159 $ - $ - Material and hardware 1 ea $ - 150.00 "$ 150 $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ Total Cost of Work A. $ 159 $ - $ - B. $ 150 C. $ - NORTHWEST 1WPARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle, WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Description: RFI #510 - Sprinkler, FACP Signs added and installed REQUEST FOR CHANGE ORDER Ref.# COR -0069 External/RCO# GC Ref# Date Jul 16, 2020 Job # 2066 Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 Labor Quantity UOM Unit Total Rate Total Frame Interior 4.00 Hrs 4.00 72.31 $289.24 Total Miscellaneous Charges Total Labor $289.24 Total B&O Tax .48% GL Insurance 1% Total Other Subtrade Charges $1.55 $3.24 Total Miscellaneous Charges $4.79 Total Sign Wizards - Added sign decals $33.00 Total Other Subtrade Charges $33.00 AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers 20006 - 144th Avenue NE, Woodinville, WA 98072 Run on: July 16, 2020 1:44 PM Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: $289.24 $0.00 $33.00 $0.00 $4.79 Sub Total: Overhead 15%: Sub Overhead: $326.97 $43.39 15.00% $2.64 8.00% Total: $373.00 T 425-375-2500 F 425-375-2540 http://www.nwpart.com WIZARDS Your Complete Sign Source Sign Wizards 1111 SE Grand Ave Portland, OR 97214 Ph: (503) 235-6967 FAX: (503) 233-2711 Email: orders@signwizards.com Web: http://www.signwizards.com Estimate #: 30894 Page 1 of 1 Created Date: Salesperson: Email: Not Specified: Not Specified: Entered by: 7/16/2020 9:56:32AM Mark Tucker (503) 235-6967 (503) 233-2711 Mark Tucker Prepared For: Contact: Phone: Email: Address: Northwest Partitions Chris Ayers N/A Portland, OR Description: RFI 510 - Sprinkler, FACP signs Quantity Unit Price Subtotal Product: Edge Prints 3 Description: Edge Prints - White text on Tomato Red vinyl "SPRINKLER RISER" - qty 2 "FIRE ALARM CONTROL - qty 1 • 3- 3.5 in (H) x 9 in (W) Edge Print(s) on Tomato Red High Performance • Gerber Color Spot (GCS) Series White, Quantity $6.00 $18.00 Unit Price Subtotal Product: Installation of Non -Electric Signs Description: Installations - Non -Electric Signs Note: Earliest available install date is Aug 19 • 1 hr of Install Time. • Using a Crew of 1 Personnel. • 6 hr of Travel Time. Product: Shipping UPS Description: Shipping - if we are not installing • 1 Package(s) to be shipped on 7/24/2020 via UPS - Ground 1 Quantity NIVVP will install to save on time & costs. Chris Ayers/PM 07-16-2020 Payment Terms: Payment due upon completion of order. $630.00 $630.O0 Subtotal Total is $33 Estimate Total: Subtotal: Total: Deposit Required: $663.00 $663.00 $663.00 $331.50 Client Reply Request El Estimate Accepted "As Is". Please proceed with Order. El Other: El Changes required, please contact me. SIGN: Date: / / Print Date: 7/16/2020 9:57:45AM CCB: #67127 WA: SIGNWI*032OR DBENVBE: #1264 ON NORTHWEST NW PARTITIONS To: BNBuilders, Inc. 2601 4th Ave Suite 350 Seattle, WA 98121 Phone: (206)382-3443 Fax: (360)398-2302 Description: RFI #524 - Added fire marshall required roof access sign Page 1 of 1 REQUEST FOR CHANGE ORDER Ref.# COR -0076 External/RCO# GC Ref# Date Aug 20, 2020 Job # 2066 Project: Tukwila Justice Center 15001 Tukwila International Blvd Tukwila, WA 98188 Labor Frame Interior Total Miscellaneous Charges Quantity UOM Unit Total Rate Total 4.00 Hrs 4.00 72.31 $289.24 Total Labor $289.24 Total B&O Tax .48% GL Insurance 1% Total Other Subtrade Charges $1.58 $3.31 Total Miscellaneous Charges $4.89 Total Sign Wizards - Added sign decals $40.00 Total Other Subtrade Charges $40.00 Notes: Added fire extinguisher and DAS sign is by others. We are providing only the roof access vinyl sign on door. AUTHORIZED BY: ON BEHALF OF: BNBuilders, Inc. PROJECT MANAGER: Harold C Ayers ESTIMATOR: Harold C Ayers Run on: 20006 - 144th Avenue NE, Woodinville, WA 98072 August 20, 2020 6:16 AM Labor Total: Material Total: Sub Trade Total: Equipment Total: Misc. Total: $289.24 $0.00 $40.00 $0.00 $4.89 Sub Total: Overhead 15%: Sub Overhead: $334.41 $43.39 15.00% $3.20 8.00% Total: $38t00 T 425-375-2500 F 425-375-2540 http://www.nwpart.com 0 R up R I Transmittal DLR Grou p PROJECT: City of Tukw|a Justice Center DA FE SENT 7/8/3020 73-17158-00 SUBJECT: TJC RFI #510_Additional Fire RFI ID 510 Marshal Requirements TYPE: RFI TRAmSm]//A/ID: 02484 PURPOSE: Answered VIA: Info Exchange QUESTION: SUGGESTION: ANSWER: SOJ provided BNB with notes from a preliminary walk with the Fire Marshall on another project for reference. After reviewing, the following conditions have not been met on the Tukwila Justice Center: 1. When the spririkler riser 15 Iocated inside a room (in this case Si), the door to the room shall have a sign with one -inch Iettersvohichyead^SprinNer Riser.° Please advise. If signs are required, please provide details. 2. Fire department connections (FDC's) shall be appropriately signed, have the building address served by the FDC stenciled vertically in 3 -inch high white numbers on a "safety red" background directly beneath the hose connection facing the direction of vehicular access, and protected from potential vehicular damage. The contract documents do not show this wording or any signage for the FDC. Please confirm we are to provide stenciled address. 3. Post Indicator Valves /P|V's\ shall have the building address served by the PIV stenciled vertically in 3 -inch high white numbers on a "Safety Red" background, facing the direction of vehicular access. The contract documents do not show this wording or any signage for the PIV. Please confirm we are to provide stenciled address. Response (Answered) from: Steven Schmitz (DIR Group) Remarks: 1. Provide added AM] signage. Center signage on door. Additionally, MDF room A107 requires AHJ signage per permit condition, with one -inch letters which reads "FIRE ALARM CONTROL" per city ordinance #2437. Match sign -type ']' per submittal 01-101433-1. 2. Per Specification "IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT" 210553-3.4-B-1, labeling shall be installed, "Near each valve and control device", additionally Civil detail 1/C4.00 indicates that some signage is required. "Note: FDC shall have permanent signage installed per IFC 912.4 Sign shall read "Automatic Sprinklers and Standpipes". TMC requirement can be added as noted. Provide stenciled address. Address shall read: 15005. Page 1 of 2 FROM NAME Michelle Javan TO NAME Phillip Tracy Bill Brown Jeff Clark Steven Schmitz Taras Yaremchuk QTY | DATED RFI Tr DATE: ID: � ��-tt��8 7/8/2020 02484 �� 3. See response 2. Provide stenciled address. Address shall read 15005. Steve Schmitz - DLR Group 07.07.20 COMPANY DLR Group COMPANY BN Builders, Inc. Shiels Obletz Johnsen BNBuilders BNBuilders DLR Group DLR Group BNBuilders javan@d|rgroup.corn EMAIL Phillip.tracy@bnbuilders .com bU|.brovvn@bnbui|ders.c om ethanb@sojsea.com geri.urbas@bnbuilders.c onn ]ef[C3ark@bnbuUders.c om ndavan@d|rgrnup.conn taras.yaremchuk@bnbui Iders.com TITLE TJC RFI #510_Additional 7/2/2020 Fire Marshal Requirements.pdf PHONE 206-461- 6065x73-6065 PHONE 206-382-3443 208-382-3443 | —�---- 206-838-3705 206-382-3443 206-382-3443 206-461- 6065x73-6065 206-461- 6044x73-6044 206-382-3443 NUMBER SCALE SIZE Page 2 of 2 Request for Information RFI No: 510 BNBuilders Tukwila JmsticeCtr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: July 02, 2020 Submftted To: Steve Schmitz Submitted By: Phillip Tracy DLR Group, Inc. BNBuilders 51 University Street 26O14th Avenue, Suite 3SU Suite 600 Seattle, WA 98121 Seattle, WA 98101 Tel: (206)382-3443 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Additional Fire Marshal Requirements Discipline: Architectural Subcontractor: Subcontractor RFI Question Date Required: 7/9/2020 SO] provided BNB with notes from a preliminawalk with the Fire Marshall onanother project for referenceAfterreviewing, the following conditions have not been met on the Tukwila Justice Center 1. When the sprinkler riser is located inside a room(in this case S1), the door to the room shall have a sign with oneinch letters which read "Sprinkler Riser." Please advise.lfsigns are require�please prov�edetails Z. Fire depar�nentconnecbons(FD<�s)shall be appro signed, have the building address served by the FDC stenciled vertically in 3 -inch high white numbers on a'safetvred" background directly beneath the hose connection facing the direction of vehicular access, and protected from potential vehicular damage The contract documents do not show this wording or any signage for the FDC Please confirm we are to provide stenciled address 3. Post Indicator Valves shall have the building address served by the PIV stenciled vertically ir8-inch high white numbers ona"Safety Red"background, facing the direction of vehicular access The contract documents do not show this wording or any signage for the PlV.Please confirm weare toprovide stenciled address Answer 1 ed AjFj signage. Center signage on door. Additionally, MDF room A107 requires AEU signage per permit condition, with one -inch letters which reads "FIRE ALARIVI CONTROL" per city ordinance #2437. Match sign -type °X per submittal 01-101423-1. 2. Per Specification "IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT" 210553-3.4-B-1, labeling shall be installed, "Near each valve and control device", additionally Civil detail 1/C4.00 indicates that some signage is required. "Note: FOC shall have permanent signage installed per IFC 912.4 Sign shall read "Automatic Sprinklers arid Standpipes". TMC requirement can be added as noted. Provide stenciled address. Address shall read: 15005. 3. See response 2. Provide stenciled address. Address shall read 15005. - Answered by: SteY��!xnu DLR Group Date Answered: 07/0//2020' Copies To: Company & Contact Fax Notes Page 1 of 1 TUKWILA JUSTICE CENTER TUKWILA, WASHINGTON 3.4 PIPE LABEL INSTALLATION 73-17158-00 CONFORMED SET A. Stenciled Pipe -Label Option: Stenciled labels may be provided instead of manufactured pipe labels, at Installer's option. Install stenciled pipe labels, complying with ASME A13.1, with painted, color -coded bands or rectangles on each piping system. 1. Identification Paint: Use for contrasting background. 2. Stencil Paint: Use for pipe marking. ocate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and as follows: plenums; an 1. 2. Near each branch connection excluding short takeoffs. Where flow pattern is not obvious, mark each pipe at branch. 3. Near penetrations and on both sides of through walls, floors, ceilings, and inaccessible enclosures. 4. At access doors, manholes, and similar access points that permlt a view of concealed piping. 5. Near major equipment items and other points of origination and termination. 6. Spaced at maximum intervals of 50 feet along each run. Reduce intervals to 25 feet in areas of congested piping and equipment. 7. On piping above removable acoustical ceilings. Omit intermediately spaced labels. C. Directional Flow Arrows: Arrows shall be used to indicate direction of flow in pipes including pipes where flow is allowed in both directions. 3.5 VALVE -TAG INSTALLATION A. Install tags on valves and control devices in fire -suppression piping systems. List tagged valves in a valve -tag schedule. B. Valve -Tag Application Schedule: Tag valves according to size, shape, and with captions similar to those indicated in "Valve -Tag Size and Shape" Subparagraph below: 1. Valve -Tag Size and Shape: a. Fire -Suppression Standpipe: 1-1/2 inches, round. b. Wet -Pipe Sprinkler System: 1-1/2 inches, round. c. Dry -Pipe Sprinkler System: 1-1/2 inches, round. 3.6 WARNING -TAG INSTALLATION A. Write required message on, and attach warning tags to, equipment and other items where required. END OF SECTION 210553 IDENTIFICATION FOR FIRE -SUPPRESSION PIPING AND EQUIPMENT 210553 -5 w CD LLJ 0 w taG () NIV <7. A re) BALL DRIP ASSEMBLY ATCC. 0 'DLRp DLR Group RFI T PROJECT City of Tukwila Justice Center DATE SENT8/13/2020 73-17158-00 SUBJECT: TJC RFI #534_Additiona| Fire RFI ID 524 Marshall Extinguisher &Signage TYPE: RFI TRANSMI I I AL ID: 02544 PURPOSE: Answered VIA: Info Exchange QUESTION: SUGGESTION: ANSWER: Per the walk on 8/7 between the Fire Marshall, BNB & SOJ there were added items required to be complete; 1. There needs to be a fire extinguisher at the east lobby hallway. RFI 019 does not provide one in the area that 15 accessible by the general public in corridors A100/13100. It is proposed to use a surface mounted extinguisher. Please provide a Iocation along with fire extinguisher type. 2. Need sign on door for DAS equipment Rm 113. Please provide signage description and type. 3. Need roof access signage on door A202. Please provide signage description and type. Response (Answered) from: Steven Schmitz (DLR Group) 1) Provide model B456 ABC type fire extinguisher 2) Provide signreading"OASEQUIPMENTROOy4" 3) Provide sign reading "ROOF ACCESS" Per 1023.9.1 Signage Requirements: "The stairway's upper terminus, ROOF ACCESS, shall be placed under the stairway identification in 1 -inch -high (25 mm) block lettering with 1/4 -inch (6 mm) strokes." Steve Schmitz - DLR Group 08.12.20 FROM NAME Michelle Javan TO NAME Taras Yaremchuk COMPANY DLR Group COMPANY BNBuilders EMAIL javan@dkoroup.corn EMAIL taras.yaremchuk@bnbui PHONE 206-461- 6065x73-6065 PHONE 206-382-3443 Page 1 of 2 NAME . Bill Brown Ethan Bernau Geri Urbas ; Jeff Clark Michelle Javan Phillip Tracy ' Steven Schmitz DESCRIPTION OF CONTENTS QTY ' DATED CO PANY BNBuilders Shiels Obletz Johnsen BNBuilders BNBuilders DATE: ID: EMAIL PHONE OM ethanb@sojsea.com s ~ttaU 8/12/2020 02544 206-838-3705 206-382-3443 om Jeff.Clark@bnbuilders.c 206-382-3443 om 206 -461 - DLR Group mjavan@dIrgroup.com 6065x73-6065 BN Builders, Inc. 206-382-3443 .com 206 -461 - DLR Group TITLE TJC RFI #524_Fire 8/7/2020 Marshall Additional Extinguisher & Signage.pdf Page 2 of 2 Request for Information RFI N 524 BNBuilders Tukwila Justice Ctr Construct. 15VO5Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: August 07, 2020 Submitted To: Steve Schmitz Submitted BrTarasYamanuchuk DLR Group, Inc. BNBuilders 51 University Street I601 4th Avenue, Suite 350 Suite 600 Seattle, WA 98121 Seattle, WA 98101 Tel: (206)382-3443 Fax: (206)382-3440 Tel: 206.461.6000 Fax: 206.461.6040 Subject: Fire Marshall Additional Extinguisher & Signage Discipline: Architectural Subcontractor: BNBuilders Subcontractor RFI Question Date Required: 8/14/2020 Per the walk on 8/7 between the Fire Marsha4 BNB & SOJ there were added items required to be complete 1.There needs tobeafincextinguisher atthe east lobby haliway RFI 019 does not provide one in the area that is accessible by the general public in corridors A100/B100. It is proposed to use a surface mounted extinguisher Please provide a location along with fire extinguisher type Z. Need sign on door for DAS equipment Rm113. Please provide signage description and type 3. Need roof access signage on door II202. Please provide signage description and type Answer 1) Provide model B456 ABC type fire extinguisher 2) Provide sign reading "DAS EQUIPMENT ROOM°' 3) Provide sign reading "ROOF ACCESS" Per 1023.9.1 Signage Requirements: "The stairways upper terminus, ROOF ACCESS, shall be placed under the stairway identification in lUnch-bigh (25 mm) block lettering with 1/4 -inch (6 rrim) strokes." Answered by: Date Answered: Copfes To: Company & Contact Fax Notes Page 1 of 1 B EACV N.,. FIRE SUPPLY.COM Your Gateway to Life Safety LINKS > Amerex 10 Ib ABC Fire Extinguisher - Model B456 Amerex 10 Ib ABC Fire Extinguisher - Model B456 (/products/amerex-l01b- abc-extinguisher) Amerex 10 Ib ABC Fire Extinguisher - Model B456. 4a:80BC - ABC or Multi -Purpose extinguishers utilize a specially fluidized and siliconized mono ammonium phosphate dry chemical. It chemically insulates Class A fires by melting at approximately 350°F and coats surface to which it is applied. It smothers and breaks the chain reaction of Class B fires and will not conduct electricity back to the operator. 61-8-349 $58.99 Availability: Many In Stock https://beaconfiresupply.com/products/amerex-10Ib-abc-extinguisher?variant=9057628651567 1/6 WOMENS • (A O TOILET 6.3 J CLERKS WINDO <A110) RECORDS LOBBY <A100> rface fire sher FINGERPRINT <A109> INTERVIEW <A103> 1/2" 7'-5314"1' 11'-0" INTERVIEW <A104> S6.2 36.2 MDF <A107> WAITING <A105> SOFT INTERVIEW <A106) , T.r BNB BN Builders August 25, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for RFI 527 - Courts Lighting Level Circuiting Dear Ethan, In accordance with RFI 527 dated 8/12/20, BNBuilders hereby submits our proposal to install and paint conduit in C100 & C135 that was added due to the revisions in lighting circuitry. The total proposal of this subject work is Eleven Thousand Two Hundred Thirty Seven dollars $11,237. This proposal does not include potential additional costs relating to NSS activities. BNB reserves the right to pursue additional costs at a later time for NSS related activities as it pertains to this change. There is a zero day impact to the Project Schedule. BNB has proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference 5227 in the forthcoming change order. Sincerely, Jeff Clark Project Manager CC: Justine Kim (justinek@soseaj.com) Geri Urbas (geri.urbas@bnbuilders.com) Steve Schmitz (sschmitz@dIrgroup.com) BNBuilders 2601 4th Avenue, Suite 350 Seattle, WA 98121 T: 206.382.3443 F: 206.382.3440 B BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: RFI 527 GENERAL CONTRACTOR: BNBuilders, Inc. COP #: 5227 DATE: 8/25/2020 DESCRIPTION OF CHANGE: install and paint conduit in C100 & C135 that was added due to the revisions in lighting circuitry. BP 09.90 Northwest Complete Contracting $657.80 BP 26.00 Valley $10,044.00 lst-tier Subcontractor Cost Total (Direct Construction Costs) $10,701.80 GC/CM Mark-up on MACC Costs $535.09 5% Rounding Adjustment $0.11 Total Change Request $11,237.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date Tukwila Justice Center SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center CCD/ASI #: COP #: Contractor Name: BNBuilders DATE: DESCRIPTION OF CHANGE: 65 8/25/2020 Prep prime and paint 1471f of conduit for RFI 527 Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractor's Total Direct Cost Subcontractor's Mark-up (Excludes Labor Premium) Labor Premium $548.00 $24.00 $0.00 $572.00 $85.80 $0.00 Total Subcontractor Direct Costs + Mark-up + Labor Premium $657.80 Total Sub -tier Subcontractor Costs 15% Subcontractor's Mark-up on Sub -tier Subcontractor(s) $0.00 8% Total Subcontractor Chane Request $657.80 To the best of my knowledge and belief, I car* that all costs listed above are correct. Brian Biermanski V2502020 Contractor Signature Date COP Cost Breakdown Project Name: Tukwila Justice Center Project No. 118021.100 Contractor BNBuilders, Inc. Work Description: RFI 527 Conduit CCD/RFI: CP #: 65 Date: 8/25/20 Description Quantity Unit Prod. Hours A.1. Labor A.1. Labor Premium B. Material C. Equipment $/hour Cost $/hour Cost $/Unit Costs $/Unit Costs $ - - $ - Labor 8 68.50 $ 548 - _ $ - - - Paint 1 Gallon $ - 24.00 24 $ - 1.5" Tape 0 Roll $ - 6.97 $ - - Paper 0 Roll $ - 3.28 $ - - 6" Roller 0 Each $ - 4.97 $ - _ $ - $ - $ - $ - $ - $ - $ - $ - - $ - $ - $ - $ - $ - $ - $ - $ - _ $ - - _ $ - - _ $ - - _ $ - - $ - $ - - $ - $ - - $ - $ - $ - $ - Total Cost of Work A. $ 548 - $ - B. 24 C. - VALLEY "The Electrical Solution"o, VALLEY ELECTRIC CHANGE ORDER PROPOSAL Tukwila Justice Center Contract: 118021.1-05 PROPOSAL DESCRIPTION: RFI 527 Emergency Lighting Circuits - Revised Emergency Circuiting As Requested by Electrical Inspector. SL # DATE 8121/2020 Addendum# VE JOB # 19146 Time Ext Rqrd (days): 5 RFI# 527 VE CP # 046 Self Performed Work LABOR COST- OT 40.00 hrs $126.71 $ 5,068.40 LABOR COST- DT 20.00 hrs $161.20 $ 3,224.00 SUPERVISION 0.0% Ibr $ SAFETY 0.0% Ibr $' SMALL TOOLS 0.0% Ibr $ MATERIAL COST $ 441.08 EQUIPMENT COST 24' Scissor Lift Month $ SUBTOTAL COST: $ 8,733.48 OH & PROFIT - SELF Subcontractor Quotes Quote Quote Quote Quote 15.0% SUBTOTAL DIRECT COST QUOTES: OH & PROFIT - SUBS 8.0% Bond Permit Fee BIM hrs 85.00 $ 1,310.02 TOTAL CHANGE PRICE: $ 10,044.00 NOTE: 1) Proposal valid for acceptance within 30 days. 2) While Valley Electric considers our proposal amount full compensation for this change, we expressly reserve the right to seek additional time and compensation at a later date for the impact of multiple changes, if any, or for indirect costs that were not reasonably foreseen by Valley Electric at the time of settlement on this change. 3) This construction change has been estimated using the drawings furnished; an engineering evaluation of the drawings, for function and compatibility with the vendor furnished equipment, has not been performed. 4) Permit costs are specifically excluded. Should this change, or it become necessary to procure/pay for an increased permit fee this would become an added cost to the change price reflected above. Our proposal amount does not include the following: - Overtime 1 Shift Work - Fireproofing Repairs - Concrete/GWB Repairs -Shutdown Costs - Painting and Patching Valley Electric Co. Job #19146 19146 - CP #046 - RFI 527 Emergenacy Lighting Circuits.xls Contract # Page 2 of 2 Print: 8/21/2020 Description Qty Net Price U Labor U Total Mat($) Total Hours 3/4" CONDUIT - EMT 300 64.96 C 0 C $194.88 0.00 3/4" CONN COMP STL - EMT 14 21.74 C 0 C $3.04 0.00 3/4" COUPLING COMP STL - EMT 38 26.92 C 0 C $10.23 0.00 3/4" 1-H STRAP - RMC - STEEL 32 80.63 C 0 C $25.80 0.00 #12 THHN SOLID BLACK 1000 97.77 M 0 M $97.77 0.00 4x 1 1/2" SQ BOX COMB KO 2 48.37 C 0 C $0,97 0.00 4x 1 1/2" OCT BOX NMC CLAMP 6 1806.44 C 0 C $108.39 0.00 SUB COORDINATION (As Needed) 0 1 E $0.00 0.00 POSTING/RECORD DWGS 0 0 E $0.00 0.00 CLEAN UP (.5% Lbr) 0 0 E $0.00 0.00 TESTING (.75% Lbr) 0 0 E $0.00 0.00 WARRANTY (As Needed) 0 0 E $0.00 0.00 Totals: $441.08 0 CONFIDENTIAL Group DLR Group m� ���� Transmit al -- _ -_- _ - _ _-� PROJECT: City of Tukwila Justice Center DATE SENT: 8/12/2020 73-17158-00 SUBJECT: TJC RFI #527_Courts Lighting nom527 Level Circuiting TYPE: RFI TRAmsw//|»LID: 02545 PURPOSE: Answered VIA: Info Exchange SUGGESTION: ANSWER: FROM [NAME TO During the emergency power testing with the COT Electrical Inspector, a correction was issued regarding the light levels in Courtroom C135 & the courts lobby C100. Please reference the attached drawing and inspection report and advise on the - Courtroom (C135) - Only 2 of the 10 P4 fixtures are shown in the plans to connect to the emergency system. Please provide revised circuiting information for these fixtures. Court Lobby (C100) - The plans shown that none of the P3 fixtures are to connect to the emergency system. Please provide revised circuiting information for these areas. Response (Answered) from: Mark Niechwiadowicz (DLR Group) Remarks: See response on returned RFI Michelle Javan | DLR Group Bill Brown | BNBuilders Shiels Ob|etz Ethan Bernau | Johnsen EMAIL PHONE 206-461- 6065x73-6065 EMAIL PHONE b|U.brovvn@bnbu||ders�c 206-383_3443 ethanb@sojsea.com 206-838-3705 Page 1 of 2 nANIs Geri UrbasJeff ClarkMichelle JavanPhillip TracySteven SchmitzTaras YaremchukDESCRIPTION OF CONTENTS COMPANY BN8u||ders BNBui|ders DLR Group BN Builders, Inc. DLR Group BNBui|ders Er Trans ttaU 8/12/2020 02545 DATE: ID: geh.urbas@bnbui|ders.c | OM ]eff.[]ark@bnbui|ders.c om PhiUip.tracy@bnbui|dars .com |ders.conn QTY DATED TITLE NUMBER lQCRFI #527_COus 1 8/10/2020UgbbDgLeVB|Circuiting.pdf | PHONE 206-382-3443 306-382-3443 206-461- 6065x73-6065 206-382-3443 206-461- 6044x73-6044 306-382-3443 Page 2 of 2 B N B BNBuilders Request for Information RFI No: 527 Tukwila Justice Ctr Construct. 15005 Tukwila Inter. Blvd. Tukwila, WA 98188 BNB Project # 118021.100 Date: August 10, 2020 Submitted To: Steve Schmitz DLR Group, Inc. 51 University Street Suite 600 Seattle, WA 98101 Tel: 206.461.6000 Fax: 206.461.6049 Subject: Courts Lighting Level Circuiting Discipline: Electrical Submitted By: Bill Brown BN Builders, Inc. 2601 4th Avenue, Suite 350 Seattle, WA 98121 Tel: (206)382-3443 Subcontractor: Valley Electric Co. Subcontractor RFI Mx 58 Question Date Required: 8/17/2020 During the emergency power testing with the COT Electrical Inspectora correction was issued regarding the light levels in Courtroom C135 & the courts lobby C100. Please reference the attached drawing and inspection report and advise on the following: - Courtroom (C135) - Only 2 of the 10 P4 fixtures are shown in the plans to connect to the emergency system Please provide revised circuiting information for these fixtures - Court Lobby (C100) - The plans shown that none of the P3 fixtures are to connect to the emergency system Please provide revised circuiting information for these areas Answer See circuiting commentson attached lighting plan. DLR Group Mark Niechwiadowicz 8/11/2020 Answered by: Date Answered: Copies To: Company & Contact Fax Notes Page 1 of 1 REQUEST FOR INFORMATION VALLEY "The Electrical Solution" ° GENERAL CONTRACTOR RFI NUMBER: TO: BNB PROJECT: Tukwila Justice Center JOB NUMBER: ITEM: 19146 Lighting Level Circuiting ATTN: Bill Brown REQUEST NUMBER: SPEC SECTION: DRAWING(S): 058 E1.1C DESCRIPTION F REQUEST During emergency power testing with the COT Electrical inspector, he issued a correction regarding light levels in the highlighted areas on the attached drawing. Please provide revised circuiting information for these areas. RECOMMENDATION POSSIBLE COST IMPACT In order to maintain project schedules, we request this information within 7 days. In the event that we are not in receipt of the required information within the specified time, we cannot be responsible for delays or extra costs resulting there from. SIGNED: Chloe Jones DATE: 8/06/2020 OWNER IREPRE.SEI\ITATIVE'S RESPONSE RECEIVED: APPROVED: DATE: DATE: VALLEY ELECTRIC COMPANY OF MT. VERNON, INC. 1100 MERRILL CREEK PARKWAY EVERETT, WA 98203 425.407.0832 O 0 BNBuilders October 7, 2020 Shiels Obletz Johnsen Attn: Ethan Bernau 101 Yesler Way Suite 606 Seattle, WA 98104 RE: BNB Cost Proposal for ASI 047 Rev 1 Dear Ethan, In accordance with ASI 047 dated 9/10/20 and per OAC Meeting 9/30/2020 to reduce scope, BNBuilders hereby submits our proposal for added thresholds. The total proposal of this subject work is Four Thousand Eight Hundred Sixty -Six dollars $4,866.00. BNB has not proceeded with the revised design as directed and therefore requests your prompt acceptance of this proposal. Please acknowledge your acceptance of this proposal and reference CP 5238 in the forthcoming change order. Sincerely, Mary Chan Project Manager CC: Justine Kim austineksoseaj.com) Geri Urbas (qeri.urbasbnbuilders.com) Steve Schmitz (sschmitzdIrgroup.com) BNBuilders 2601 4'1' Avenue, Suite 350 Seattle, WA 98121 T 206 382 3443 F. 206 382 3440 B BNBuilders Tukwila Justice Center GC/CM CHANGE ORDER REQUEST SUMMARY PROJECT NAME: Tukwila Justice Center CCD/ASI #: ASI 047 GENERAL CONTRACTOR: BNBuilders, Inc. DESCRIPTION OF CHANGE: ASI 47 - Added Thresholds COP #: 5238 DATE: 10/7/2020 A100.1, A100.2, A137.2, B100.1, B100.2, B118.2 and C100. BP 08.10 Doors, Frames and Hardware $4,154.45 1st -tier Subcontractor Cost Total (Direct Construction Costs) GCCM Costs GC/CM Mark-up on MACC Costs Rounding Adjustment $4,154.45 $480.00 $231.72 40.17 Total Change Request $4,866.00 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date 5.00% COP Cost Breakdown Tukwila Justice Center 118021.100 m z « E o qz A.1. Description Quantity Unit Prod. Hours $/hou Labor Al. Labor Premium B. Material C. Equipment r Cost . $/hour Cost $/Unit Costs $/Unit Costs i 64 1 1 64 1 64 1 1 64 1 64 t 1 64 i 03 lei 69- 64 1 6% 1 64 1 6% 1 cry 1 co 1 64 1 64 1 6% i 6% 1 64 1 .64 i EFT 1 Ea $ 480 1$ - 1$ - 1 B.1$ - 1 C.1$ 4 64 1 6% 1 6% 1 63 4 6% 1 64 1 1 04 4 1 69- 1 64 1 64 1 64 1 64 1 64 1 6% 4 64 i 64 1 1 6% 1 64 4 6% 1 64 4 64 i 64 1 64 CD 00 "cr 6% ill 64 64 64 o 64 e III 6% 63 63 111111 04 64 64 64 11111 6% 64 6% 6% 64 1 b4 1 64 I 64 ea 64 64 1 b4 CD C\1 v— Total Cost of Work A. .:r !Project Management 1 Tukwila Justice Cenber SUBCONTRACTOR CHANGE ORDER REQUEST SUMMARY CALCULATION PROJECT NAME: Tukwila Justice Center Contractor Name: BNBuilders DESCRIPTION OF CHANGE: ASI 47 - Added Thresholds CCD/ASI #: ASI 47 COP #: 5239 DATE: 10/16/2020 A100.1, A100.2, A137.2, B100.1, B100.2, B118.2 and C100. Subcontractor Direct Costs (attach all necessary substantiating documentation) Labor (Excluding Labor Premium) Material Equipment Subcontractors Total Direct Cost Subcontractors Mark-up (Excludes Labor Premium) Labor Premium $1,908.48 $70.00 $0.00 $1,978.48 $296.77 $0.00 Total Subcontractor Direct Costs + Mark-up + Labor Premium $2,275.25 Total Sub -tier Subcontractor Costs $1,740.00 15% Subcontractor's Mark-up on Sub -tier Subcontractor(s) $139.20 8% Total Subcontractor Change Request $4,154.45 To the best of my knowledge and belief, I certify that all costs listed above are correct. Contractor Signature Date COP Cost Breakdown Project Name: Tukwila Justice Center Project No. 118021.100 Contractor BNBuilders, Inc. Work Description: CCD/RFI: 0 CP #: 0 Date: 1/0/00 Description Quantity Unit Prod. Hours A.1. Labor A.1. Labor Premium B. Material C. Equipment $/hour Cost $/hour Cost $/Unit Costs $/Unit Costs Foreman 24 79.52 $ 1,908 $ 70 $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ $ - $ - $ $ - $ $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Total Cost of Work A. $ 1,908 $ - $ - B. $ 70 C. $ - Contract Hardware 18706 North Creek Parkway , SUITE 110 BOTHELL, WASHINGTON 98011 TEL (206) 298-4770 FAX (206) 298-4777 REVISION FORM DATE: revised 10/6/ 20 BN Builders FAX: ATTN: Bill Brown PROJECT: Tukwila Justice CHI JOB: 11634 WE HAVE REVIEWED REVISIONS PER ASI#47 G.C. REF # ASI#47 CHI REF # ERP CO# AND DETERMINED THEY WOULD RESULT IN A NET ADD OF $ 1,740. MATERIALS TAX TOTAL THIS PRICE REVISION IS FOR Adding 7 thresholds Pemko 255x6-AFG- (11" wide) For doors A100.1, A100.2, A137.2, B100.1, B100.2, B118.2, C100. Will call Auburn HARDWARE $ '1,740. HOLLOW METAL $ WOOD DOORS $ DOOR SOURCE $ FREIGHT PRODUCTS PER SECTION WE WILL NOT PROCEED WITHOUT A SIGNED COPY OF THIS PROPOSAL OR ARE IN RECEIPT OF A WRITTEN CHANGE ORDER. SINCERELY, ACCEPTANCE: CONTRACT HARDWARE INC. Steve Sand AHC AUTHORIZED SIGNATURE DATE 0AIA Document G710 - 2017 Architect's Supplemental Instructions PROJECT: (name and address) 73-17158-00 City of Tukwila Justice Center OWNER: (name and address) City of Tukwila 6200 Southcenter Blvd, Tukwila, WA 98188 CONTRACT INFORMATION: Contract For: General Construction Date: April 02, 2018 ARCHITECT: (name and address) DLR Group Inc. (a Washington Corporation) 51 University Street, Suit 600 Seattle, WA 98122 ASI INFORMATION: ASI Number: 47 Date: September 10, 2020 CONTRACTOR: (name and address) BNBuilders 2601 Fourth Avenue, Suite 350 Seattle, WA 98121 The Contractor shall carry out the Work in accordance with the following supplemental instructions without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will be no change in the Contract Sum or Contract Time. (Insert a detailed description of the Architect 's supplemental instructions and, if applicable, attach or reference specific exhibits.) Addition of Exterior Thresholds: Where no thresholds are installed, and at storefront doors with thresholds that do not cover the concrete control joints, add or replace thresholds with Pemko 255x6_FG or similar. Ensure threshold remains ADA compliant and does not interfere with door operations. Set threshold in sealant to prevent air leakage. ISSUED BY THE ARCHITECT: DLR Group Inc. (a Washington Corporation) ARCHITECT (Firm name) Erica Loynd, Project Manager PRINTED NAME AND TITLE September 10, 2020 DATE AIA Document 0710". — 2017. Copyright © 1979, 1992 and 2017 by The American Institute of Architects. All rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, and 'AIA Contract Documents" are registered trademarks and may not be used without permission. This document was produced by AIA software at 19:21:05 ET on 09/10/2020 under Order No.8182007020 which expires on 04/01/2021, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documentso Terms of Service. To report copyright violations, e-mail copyright@aia.org. User Notes: (3B9ADA3D)