Loading...
HomeMy WebLinkAboutTIC 2020-12-07 Item 2A - Final Acceptance - 2020 Overlay and Repair Program with Miles Resources https://tukwilawa.sharepoint.com/sites/publicworks/engineering/PW Drop Box/01 TIC Agenda/2020 Agenda Items/TIC 12-07-2020 Last/2020 Overlay closeout/Info memo 2020 Overlay Closeout .docx INFORMATIONAL MEMORANDUM TO: Transportation and Infrastructure Committee FROM: Hari Ponnekanti, Interim Public Works Director BY: Scott Bates, Traffic Engineering Project Manager CC: Mayor Ekberg DATE: December 4, 2020 SUBJECT: 2020 Overlay and Repair Project Project No. 92010401, Contract No. 20-068 Project Completion and Acceptance ISSUE Accept contract as complete and authorize release of performance bond. BACKGROUND The Notice to Proceed for Contract No. 20-068 with Miles Resources, LLC of Puyallup, Washington was issued on August 24, 2020 for the 2020 Overlay and Repair Project. This overlay project provided hot mix asphalt (HMA) paving on S 158th St from 39th Pl S to 42nd Ave S and 54th Ave S from S 166th St to Slade Way. The street improvements included: pavement grinding; asphalt paving; removing and replacing concrete curbs, gutters, driveways, and ADA ramps; adjusting surface utilities to grade; and installation of guardrail and roadway channelization. ANALYSIS Construction was physically completed on September 25, 2020. The budget for the 2020 Overlay & Repair construction was $299,449.05 and included a 5% contingency, which was not utilized. Under- runs were primarily due to fewer quantities needed during the roadway excavation, and the haul and repair phase of the project. Construction Contract Amount $ 299,449.05 Additions/Change Orders 0.00 Under-runs (22,229.04) Total Amount Paid $ 277,220.01 RECOMMENDATION Council is being asked to formally accept and authorize the release of the performance bond, subject to standard claim and lien release procedures, for the 2020 Overlay and Repair Project construction contract with Miles Resources in the final amount of $277,220.01 and consider this item on the Consent Agenda at the December 14, 2020 Special Meeting. Attachment: Notice of Completion Contract No. 20-068 1 Revised # Assigned to: UBI Number: Yes No Yes Telephone # Bond Number: If Retainage is not withheld, please select one of the following and List Surety's Name & Bond Number. Date Work Commenced Date Work Completed Contractor Address Date Contract Awarded Retainage Bond Contract/Payment bond (valid for federally funded transportation projects) Name: Department Use Only Original NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT Project Name Date Assigned: Job Order Contracting Federally funded transportation project? Contractor's Name Description of Work Done/Include Jobsite Address(es) Affidavit ID* No (if yes, provide Contract Bond Statement below) Name & Mailing Address of Public Agency E-mail Address Contract Number Notice is hereby given relative to the completion of contract or project described below Date:Contractor's UBI Number: Date Work Accepted Were Subcontracters used on this project? If so, please complete Addendum A.       Yes No $ $$ $$ $$ % $ $$ Contact Name:Title: Affidavit ID* - No L&I release will be granted until all affidavits are listed. Amount Disbursed p Sales Tax Rate Contract Amount NOTE: These two totals must be equal TOTAL Comments: Sales Tax Amount Reductions ( - ) Note: The Disbursing Officer must submit this completed notice immediately after acceptance of the work done under this contract. NO PAYMENT SHALL BE MADE FROM RETAINED FUNDS until receipt of all release certificates. Submitting Form: Please submit the completed form by email to all three agencies below. TOTAL Liquidated Damages Email Address: Phone Number: p Sub-Total Additions ( + ) Amount Retained (If various rates apply, please send a breakdown) Contract Release (855) 545-8163, option # 4 ContractRelease@LNI.WA.GOV Employment Security Department Registration, Inquiry, Standards & Coordination Unit (360) 902-9450 publicworks@esd.wa.gov Department of Revenue Public Works Section (360) 704-5650 PWC@dor.wa.gov F215-038-000 10-2014REV 31 0020e (10/26/15) p@g2 Subcontractor's Name:UBI Number: (Required)Affidavit ID* Addendum A: Please List all Subcontractors and Sub-tiers Below This addendum can be submitted in other formats. Provide known affidavits at this time. No L&I release will be granted until all affidavits are listed. For tax assistance or to request this document in an alternate format, please call 1-800-647-7706. Teletype (TTY) users may use the Washington Relay Service by calling 711. REV 31 0020e Addendum (10/26/15)F215-038-000 10-2014 3