Loading...
HomeMy WebLinkAbout12-010 - CH2M Hill - 42nd Avenue South Phase III Design (Southcenter Boulevard/South 160th Street)City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 12-010(h) Council Approval N/A Agreement Number: 12-010 ( h) CONTRACT FOR SERVICES Amendment #8 Between the City of Tukwila and CH2M Hill Engineers, Inc. That portion of Contract No. 12-010 between the City of Tukwila and CH2M Hill Engineers, Inc. is hereby amended as follows: Section 2: Scope of Services shall be supplemented with the following: The Consultant agrees to perform construction phase support services, as identified on Exhibit A-1 attached hereto, including the provision of all labor, materials, equipment and supplies. Section 3: Time for Performance shall be modified as follows: Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product pursuant to this Agreement by December 31, 2018, unless an extension of such time is granted in writing by the City. Section 4: Payment, A. shall be supplemented with the following: A. Payment for the work provided by the Consultant shall be made as provided in Exhibit B, attached hereto, provided that the total amount of payment to the Consultant for this work shall not exceed $29,005.00 without express written modification of the Agreement signed by the City. The new contract total shall not exceed $1,462,632.88 without express written modification of the Agreement signed by the City. B. Nothing herein shall be construed as limiting the City's recovery for any costs associated with defective design work. All other provisions of the contract shall remain in full force and effect. Dated this 11 day of AP n 1 , 20 1 CITY OF TUKWILA lilt IN AIIan Ekberg, ATTEST/AUTHENTICATED Christy O'Flaherty, MMC, City Cle CA Revised December 2016 CH2M Hill Engineers, Inc. 7 Printed Name: (Rfr/6 �}, L� v%' r V /5, /'/��aS� a/ 'Vag APPROVED AS TO FORM O ice of the City Attorney / c5f6 l6i/17 Page 1 of 1 Exhibit A-1 40th _ 42nd Ave S. Phase III City of Tukwila Amendment 8 Scope of Work TASK 13 13. Services During Construction The scope of work for Task 13, Services During Construction, is amended as follows: This amendment is to add budget for services during the construction phase. Extra budget is necessary to support the following: 1) Additional geotechnical support related to the wetter and softer than anticipated conditions and late construction start at the Gilliam Creek culvert including: a. Site visits b. Consulting on the development of shoring and dewatering plans c. Preliminary design of a wet season temporary utility support d. 'Review of contractor shoring and dewatering proposals/submittals e. Subcontracting for geotechnical Drilling services in response to a changed condition notification. f. Inspection during drilling and production of drilling logs to document results 2) Responses to additional review comments from Seattle City Light. a. Several rounds of comments and responses came from SCL after the project was advertised for construction. 3) Century Link support - plan revisions requested by Century Link. Note: Century Link has agreed to reimburse the City of Tukwila for charges related to this work. 1 Exhibit B - Consultant Fee Summary City of Tukwila 40th - 42nd Avenue South Phase 111 Amendment #8 2/21/2018 Budget Summary By Task Task Description Labor Hours Total Labor Total Reimbursable Overall Totals Roadway Design Task 13 - Services During Bidding and Construction 55 $10,007 $0 $10,007 Utility Undergrounding Total 55 $10,007 $0 $10,007 Culvert & Stormdrain Task 13 - Services During Bidding and Construction 196 $36,302 $8,700 $45,002 Culvert & Stormdrain Total 196 $36,302 $8,700 $45,002 Century Link Support • Task 13 - Services During Bidding and Construction 27 $3,997 $0 $3,997 Century Link Support Total 27 $3,997 $0 $3,997 SUBTOTAL 278 $50,305 $8,700 $59,005 Credit for Design Services AMENDMENT #8 TOTALS 430,000 $29,005 Exhibit B - Consultant Fee Summary City of Tukwila 40th - 42nd Avenue South Phase III Direct Labor Classification Hours x Rate = Cost Project Manager 14.0 $192.77 $2,698.78 Sr. Engineer 188.0 $192.77 $36,240.76 Engineer 46.0 $160.57 $7,386.22 Sr. Technician 26.0 $138.61 $3,603.86 Technician 0.0 $76.03 $0.00 Office 4.0 $93.83 $375.32 278.0 $50,304.94 Expenses Category Quantity X Rate = Cost Driller - Holocene $8,700.00 Total Expenses $8,700.00 Credit for Design Services 430,000.00 GRAND TOTAL $29,004.94 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: 12-010(g) Council Approval 5/15/17 CONTRACT FOR SERVICES Amendment #7 Between the City of Tukwila and CH2M Hill Engineers, Inc. That portion of Contract No. 12-010 between the City of Tukwila and CH2M Hill Engineers, Inc. is hereby amended as follows: Section 2: Scope of Services shall be supplemented with the following: The Consultant agrees to perform construction phase support services, as identified on Exhibit A-1 attached hereto, including the provision of all labor, materials, equipment and supplies. Section 3: Time for Performance shall be modified as follows: Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product pursuant to this Agreement by June 30, 2018, unless an extension of such time is granted in writing by the City. Section 4: Payment, A. shall be supplemented with the following: A. Payment for the work provided by the Consultant shall be made as provided in Exhibit B, attached hereto, provided that the total amount of payment to the Consultant for this work shall not exceed $50,267.26 without express written modification of the Agreement signed by the City. The new contract total shall not exceed $1,433,627.88 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this 3 rd day of E , 20 11 CITY OF TUKWILA Allan Ekberg, Mayor ATTEST/AUTHENTICATED CH2M Hill Engineers, Inc. Printed Name: Cig rtiiY- �e7 APPROVED AS TO FORM I ah Cir Z ocitirlals Chris 'Flaherty, MMC, City Clerk 0 ice of the City Attorney CA Revised December 2016 Page 1 of 1 City of Tukwila Agreement Number: 12 -0160 6200 Southcenter Boulevard, Tukwila WA 98188 CONTRACT FOR SERVICES Amendment #6 Between the City of Tukwila and CH2M Hill Engineers, Inc That portion of Contract No. 12 -010 between the City of Tukwila and CH2M Hill Engineers, Inc is amended as follows: Section 2: Scope of Services shall be supplemented with the following: The Consultant agrees to perform the services, identified on Exhibit A -1 attached hereto, including the provision of all labor, materials, equipment and supplies. Section 3: Time for Performance shall be modified as follows: 3. Time for Performance. Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement by December 31, 2017, unless an extension of such time is granted in writing by the City. Section 4: Payment shall be modified as follows: A. Payment for the work provided by the Consultant shall be made as provided in Exhibit B -1, attached hereto, provided that the total amount of payment to the Consultant for this work shall not exceed $218,783.05 without express written modification of the Agreement signed by the City. The new total contract shall not exceed $1,383,360.62 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this CITY OF WILA day of ok) 1)-€4 ,20 b CH2M HILL ENGINEERS, INC. Allan Ekberg, Mayor 10,e Printed Name: ATTEST /AUTHENTICATED / AA A ry ' 04 14. APPROVED AS TO FORM Chris O'Flah rty, MMC, City Cler $J �') c/,___7/6/4///-6.5 Page 1 of 1 Exhibit A -1 40th — 42nd Ave S. Phase III City of Tukwila Amendment 6 Scope of Work The scope of work is amended as follows: General Assumptions The project schedule has incurred additional delays while permitting issues were being resolved within the City. The CONSULTANT assisted in these discussions, developing concepts and analyzing alternatives to the Detention Pond design. The result of these discussions has added some significant changes to the design primarily related to the stormwater detention facilities. The current direction is to eliminate the stormwater detention Pond adjacent to Gilliam Creek and install a detention vault in S. 158th St., just west of 42nd Ave S. Additional coordination with private utility service providers is required to resolve outstanding issues and finalize the design. Feedback from the public outreach will also require design revisions. Amendments 4 and 5 extended the duration from December 31, 2015 to December 31, 2016 without any scope or budget adjustments. This Amendment 6 defines scope and budget adjustments for additional services as well as account for the extended duration through December 31, 2017. TASK 1 1. Project Management Due to the 12 month time extension, additional project management is required for providing overall project administration, team management, schedule management, scope and budget management, and the preparation of progress reports and invoicing. With a credit for 2 months of inactivity, the additional duration for purposes of project management is assumed to be 10 months. Deliverables: • Monthly progress reports and invoices (10) • Bi- Monthly meeting materials (5), notes and action items • Schedule updates TASK 2 2. Gilliam Creek Culvert 2.5.2 Culvert 60 %, 90 %, and Final Design Additional work will be required to coordinate with other Utilities (SCL, Century Link and Comcast) related to the temporary support of their facilities during the culvert installation. We need to facilitate a decision on how this work will be contracted and revise the contract documents. Assumptions: • CH2M will participate in up to 6 meetings with utility providers and City Staff to reach a conclusion/ decision on the preferred approach to the construction of the temporary support system. • CH2M will incorporate necessary plan revisions, special provisions, bid items /bid schedules into the contract documents. • The preferred approach is assumed to not require any additional design, including utility support systems by CH2M (beyond what was included in the 90% submittal.) Deliverables: • Meeting notes and action items from design coordination with SCL, Century Link and Comcast. • Incorporate revisions to contract documents. TASK 3 3. Geotechnical Engineering Additional work will be required to determine the soil conditions and groundwater conditions at the proposed detention vault site at the west leg of S 158th Street. Geotechnical exploration to include 2 boring to a depth of 20 feet and a piezometer in one of the boring. Perform standard penetration test sampling at 2.5 feet interval, and sieve size analyses. Assumptions: • No infiltration test will be performed. • The CONSULTANT will collect monthly readings of the water level in the piezometer. • Temporary closure of S 158th Street will be needed. Deliverables: • Technical memorandum to supplement the geotechnical data report and recommendation report with design recommendations for the detention vault design. TASK 4 4. Survey and Mapping No additional work under this task 2 TASK 5 5. 30% Design No additional work under this task TASK 6 6. Environmental Documentation 6.1 Environmental Support The CONSULTANT will provide the following support: Assist Public Works in the completion of the Special Permission Permit • Prepare plans and documentation related to the landscaping plan required for the Special Permission permit. o Prepare drawings to show locations of plantings within the stream buffer and along the roadway corridor o Develop memorandum documenting how the project would mitigate tree removal and the landscaping requirements based upon Tukwila Municipal Code. • Address comments from City of Tukwila Planning staff on Special Permissions Application. Comments on the Special Permission Application will be delineated and complete responses provided. • Coordinate with Public Works on the Special Permissions Permit: o One (1) meeting with Public Works to be attended by up to two (2) CONSULTANT team members with Public Works Staff to review proposals to address City of Tukwila Planning comments on Special Permission Permit o One (1) meeting with Public Works and Planning staff to discuss path forward with regards to stormwater and Special Permission Permit. Meeting to be attended by up to three (3) CONSULTANT team members. • Development of concise working memorandum documenting preliminary determinations of potential environmental issues related to alternatives to locating stormwater pond adjacent to Gilliam Creek. Memorandum will address the environmental issues of up to six (6) other locations in the project area to collect and discharge stormwater. Information will be presented to City of Tukwila Public Works to assist in finding a location outside of Gilliam Creek buffer. • Revise Special Permission Application and supporting information based upon coordination and meeting with Public Works and Planning staff members. This will include a 5 year stream buffer monitoring plan that assumes the first year is performed by the contractor and the following 4 years by the City of Tukwila. Deliverables • Special Permissions Permit Application. Application includes City of Tukwila application form, Special Permissions permit information, and landscape plans • Revised Special Permissions permit application package • Memorandum addressing response to comments on the Special Permission. 3 TASK 7 7. Right of Way 7.1 Acquisitions from private property Slope easements for two parcels. Assumptions: • Two (2) permanent Slope Easements are required (parcels #15854 and #15838) Deliverables: • Parcel /Easement calculations, legal descriptions and exhibits • Parcel/ Easement exhibits for each parcel (2) • Record easement with King County (2) • Appraisals (2) • Negotiations with property owner (2) to secure the necessary rights TASK 8 8. Agency, Stakeholder, and Community Coordination 8.1. Stakeholder and Agency Coordination (CITY, Property Owners, Utilities, WSDOT) 8.1.4. Utilities The CONSULTANT will assist in additional coordination with utility companies including: Seattle City Light (SCL), Comcast, Century Link and Zayo to facilitate finalize undergrounding plans for power and communication lines along 42nd Ave S. The CONSULTANT will assist in the coordination with Valley View Sewer regarding sewer connections /stubs for 3 parcels currently on septic system ( #15458, #15837, #15838) Assumptions: • Up to 4 additional meetings with utility companies to coordinate the design of their facilities with the other proposed project improvements. Deliverables: • Meeting minutes and action items 4 TASK 9 9. Contract Drawings 9.3. Roadway and Stormwater Drainage 9.3.1. Roadway Sections The CONSULTANT will revise and update the roadway sections to incorporate City directed changes to the bike facilities. r Deliverables: • Revisions incorporated into the 100% Typical Roadway Sections 9.3.2. Paving, Grading and Drainage Plans and Profiles The CONSULTANT will revise the plans to incorporate the following design changes: • Revise stormwater collection and conveyance system to direct the appropriate flow volume to the new stormwater vault in S. 158th Street as described in Task 9.3.3. • Revise layout for the storm main north of 158th Street to move manhole covers out of the wheel path due to a shift to the roadway centerline stripe. • Revise the layout of the storm drain systems that discharges into the pond. • Revise storm drain profiles as needed per the revised layout. • Revise Grading on Parcels #15854 and #15838 where we are changing from a wall to a sloped interface. • Revise limits of paving/ overlay to include the entire 160th intersection. Deliverables: • Revisions incorporated into 100% Paving, Grading and Drainage Plans and Profiles and Detail Sheets 9.3.3. Stormwater Management Facilities • Design of stormwater vault including inlet and outlet structures and associated storm drain collection systems, grading and paving. • Two additional Plan sheets to show the vault details and section. • Revise Demolition and Erosion Control Plans, and Paving Plans to cover changes around the detention vault and the former detention pond site. • Add an additional stormwater treatment device to the storm drain system (that was formerly used to discharge to the pond) north of the culvert. Assumptions: • The detention vault to be pre -cast concrete. • A Contractor designed shoring plan will be required. • One field visit Deliverables: • 100% Stormwater Management Plans and Details (4) 5 9.5. Utility 9.5.2. Utility Undergrounding Plans — Power and Communication The CONSULTANT will revise the plans to incorporate any changes that come out of the additional coordination with SCL, Century Link, Comcast and ZAYO. Deliverables: • 100% Utility Undergrounding Plans, Profiles and Details (16) 9.6. Structures No additional work under this task 9.7. Channelization, Illumination and Signing The CONSULTANT will revise the plans to incorporate revisions to the striping including a shift to the centerline stripe and striping for the bicycle facilities. The CONSULTANT will coordinate with WSDOT regarding under bridge lighting. Deliverables: • Revisions incorporated into 100% Channelization, Illumination, and Signing Plans (6) TASK 10 10. Specifications Due to the changes to the stormwater detention facilities, and continued discussions related to supporting. Power and Communications lines during the construction of the culvert at Gilliam Creek, additional work will be required to the specifications as follows: The CONSULTANT will prepare and incorporate special provisions related to the Stormwater detention vault and related facilities. The CONSULTANT will prepare and incorporate special provisions related to the utility support system at the culvert. Deliverables: • 100% Stormwater Detention Specifications • 100% Stream Buffer Mitigation Specifications 1) 1 year monitoring plan 2) Temporary Irrigation • 100% Special Provision and bid schedule for the Utility Support System at the culvert crossing 6 TASK 11 11. Cost Estimating Due to the changes described above, additional work will be required for the cost estimate. • 11.2 Engineer's Estimate Deliverables: • 100% Cost estimate Exhibit B - Consultant Fee Summary City of Tukwila 40th - 42nd Avenue South Phase III Amendment #6 10/28/2016 Budget Summary By Task Task Description Labor Hours Total Labor Total Reimbursable Overall Totals Roadway Design Task 1 - Project Management , 138 $25,267 $150 , $25,417 Task 3 - Geotechnical Engineering 35 $4,268 $12,000 $16,268 Task 4 - Survey and Mapping 0 $0 $0 $0 Task 6 - Environmental Documentation 0 $0 $0 $0 Task 8 - Agency, Stakeholder & Community Coordination * 48 $10,447 $0 $10,447 Task 9 - Contract Drawings 358 $52,008 $0 $52,008 Task 10 - Specifications 80 $14,554 $0 $14,554 Task 11 - Cost Estimating 44 $7,233 $0 $7,233 Task 12 - Major Milestone Reviews (30 %, 60 %, 90 %, 100 %) 0 $0 $0 $0 Task 13 - Services During Bidding and Construction 0 $0 $0 $0 Roadway Design Total 703 $113,777 $12,150 $125,927 Culvert & Stormdrain Task 1 - Project Management 49 $9,024 $0 $9,024 Task 2- Gilliam Creek Culvert 58 $11,977 $0 $11,977 Task 3 - Geotechnical Engineering 23 $2,845 $0 $2,845 Task 4 - Survey and Mapping 0 $0 $0 $0 Task 5 - 30% Roadway Design 0 $0 $0 $0 Task 6 - Environmental Documentation 138 $28,926 $0 $28,926 Task 9 - Contract Drawings 140 19,911 $0 $19,911 Culvert & Stormdrain Total 408 $72,683 $0 $72,683 Right of. Way, Task 1 - Project Management 10 $1,805 $0 $1,805 Task 7 - Right of Way 50 $8,369 $10,000 $18,369 Right Of Way Total. 60 $10,174 $10,000 $20,174 AMENDMENT #6.TOTALS 1,171 $196,633 $22,150 $218,783 2 TOTAL 3m0,-- Fo u fl M 4 - y rax .... eo 4 74..la nn - or vis::: M NN mm e ` *» N 83,212 Vigm - ' « N 0 N6 .« N 93,294 o sin roo m MM N M im o M N Fe N •-"'` N N 'm_ N N N 83,681 819,911 mi°°A N 4 N N 03v NN um N r ne N p e « u « 87,233 87,233 87,233 $196,633 J I- f 0 00 n m R V �p If N h N n t00 N v n � n m 4« y h 12 2 vei 4 p d 4 M,s 2 N ;1,4448824 O OS V te g443,_ r O $93.83 LOE 09 b S O 0 0 0 0 0 0 0 0 0 000 0 0 0 0 0 0 0 0 0 F« OW Wn0 00 0 000 00 0 0 00 < 40 0 r H N 20 0 e 0 0 00 40 1 Sr. Technician �O « O O 0 00 O O- O 0 • O O m m °o 20 20 - - 1 00 0--, nW 00 0 o OO o 46 '� a 12 om O 0 00 IN 1 68 8 _ m� a o o 24 0 NN 12 150 CH2M HILL 11 N $135.73 LOE 00 0 0 00 00 0 24 I 24 00 000 0 0 0 0 O O O O N WI; y°O J °_ o 2 ?•oo o 0 0 o 00 - -- 140_.. —. $o a m ° 80 0 0 0 40 40 NN 12 202 Sr. En ineer a 011 p 39 24 0 .- 42 42 42 24 12 12 0 0g0 24 24 m 24 24 24 24 24 - 78 38 2 r v e g 32 32 0 0 N 0 N.4 m N 0 P1 Sr. Consultant 4 lo °'O N J 00 0 00 0 00 N m 24 24 m0 00 000 I 0 0 00 0 0 00 78 Sr. Project Mena er 8242.52 LOE 88 68 20 20 N a m 4 0000 14 6 00 N NNN 24 12 N o N 12 0 00 0 0 eQa t0 2 Requested 810 Rate Task Name Task 1 - Project Management Overall Project Management Monthly Progress Report, and Invoices (10) Coordination Meetings with City Bi-Monthty Project Team Meetings - 5 meetings, 2 Hours, 3 staff - City and Bellevue Office: Meeting Agendas, Summaries, Action Items Task 2 - Gilliam Creek Culvert Culvert 60 %, 90 %, and Final Design Additional Utility Coordination Utility revisions incorporated to final design Task 3 - Geotechnical Engineering Soil & Groundwater Conditions Complete Site Reconnaissance 1 Complete Subsurface Exploration and Laboratory Testing including Coordination of Access Engineer Present Monthly Monitoring (5 months) Update Technical Memo Task 6 - Environmental Support Meetings - 2 meetings 3 staff Special Permissions Permit Application Revised Special Permissions Permit Application Package - Memorandum addressing response to comments on the Special Permission Task 7 -Right of Way ROW Acquisition Support — Ta6k 8 - Agericy, Stakeholder & Community Coordination Stakeholder and Agency Coordination Utility Owners: up to 4 meetings Task 9 - Contract Drawings ,Roadway and Stormwater Drainage ';Roadway Sections Revisions 100% Roadway Sections 'Paving, Grading and Drainage Plans and Profiles Revisions 100% Roadway Paving, Grading and Drainage Plans and Profiles and Detail Sheets Evaluate Bike Lanes/sharrow configuration Atormwatar Management Facilities Prepare 100% Stormwater Management Plans and Details (4) Utility 'Utility Undergrounding Plans -Power and Communication 100% Utility Undergrounding Plans, Profiles and Details (16) (6) Task 10 - Specifications 100% Stormwater Detention Specifications upcuar r,ermmn auu um a..,,cau,c w, MC ...may uuyyun.7yamu, at the culvert crossing Task 11 - Cost Estimating Engineer's Estimate 100% Cost Estimate TOTALS Exhibit B = Consultant Fee Summary City of Tukwila 40th - 42nd Avenue South Phase III Direct Labor Classification Quantity Hours x Rate = Cost .. Sr. Project Manager Travel - Mileage 160.0 $0.540 $242.52 Acquisitions - Sub $38,803.20 Sr. Consultant $5,000.00 78.0 $219.02 $5,000.00 $17,083.56 Sr. Engineer 321.0 $192.77 $61,879.17 Engineer 202.0 $160.57 $32,435.14 Surveyor 24.0 $135.73 $3,257.52 Jr. Engineer 150.0 $104.35 $15,652.50 Sr. Technician 136.0 $138.61 $18,850.96 Technician 40.0 $76.03 $3,041.20 Office 60.0 $93.83 $5,629.80 1,171.0 $196,633.05 Expenses Category . Quantity X Rate _ Cost Drilling - Sub $12,000.00 Travel - Mileage 277.8 $0.540 $150.00 Acquisitions - Sub $5,000.00 Appraisals - Sub $5,000.00 Total Expenses $22,150.00 GRAND TOTAL $218,783.05 Exhibit B - Consultant Fee Summary City of Tukwila 40th - 42nd Avenue South Phase III October 28, 2016 Reimbursables Reimbursable Item Task 1 - Project Management Task 3 -. . Geotechnical Engineering Task 7 - Right of Way Totals Drilling - Sub $12,000.00 $12,000.00 Travel - Mileage $150.00 $150.00 Acquisitions - Sub $5,000.00 $5,000.00 Appraisals - Sub $5,000.00 $5,000.00 Totals $1 50.00 $12,000.00 $10,000.00 $22,150.00. City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: /02-0 T 0( &) CONTRACT FOR SERVICES Amendment #5 Between the City of Tukwila and CH2M Hill Engineers, Inc That portion of Contract No. 12 -010 between the City of Tukwila and CH2M Hill Engineers, Inc is amended as follows: Section XX: 3. Time for Performance. Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement by December 31, 2016, unless an extension of such time is granted in writing by the City. All other provisions of the contract shall remain in full force and effect. L'\-- Dated this 30 day of CITY OF TUKWILA 3�- , 20 /(D Allan Ekberg, Mayor r _. CA: 2012 CONTRACTOR CH2M HILL ENGINEERS, INC. Printed Name/TitIc ,Tun ,Le, Vice President z -di a /e,/ 6//t/ 9e-S Page 1 of 1 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: 12 -010 (a) CONTRACT FOR SERVICES Amendment #4 Between the City of Tukwila and CH2M Hill Engineers, Inc. That portion of Contract No. 12 -010 between the City of Tukwila and CH2M Hill Engineers, Inc. is amended as follows: Section 3: Time for Performance. Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement by June 30, 2016, unless an extension of such time is granted in writing by the City. All other provisions of the contract shall remain in full force and effect. Dated this )U b day of 1-E Vnaben , 20 /5 CITY OF TUKWILA ATTEST /AUTHENTICATED '11 -14%, 41)) City Clerk CA: 2012 CONTRACTOR Printed Name itle: Ut L_ /V P APPROVED AS TO FORM C'jj avt &IAA City Attorney Page 1 of 1 �J ;NILq qs City of Tukwila Agreement Number: 12-010 (c) O. 6200 Southcenter Boulevard, Tukwila WA 98188 Council Approval 5/18/15 1908_ CONTRACT FOR SERVICES Amendment#3 Between the City of Tukwila and CH2M Hill Engineers, Inc. That portion of Contract No. 12-010 between the City of Tukwila and CH2M Hill Engineers, Inc. is amended as follows: Section 2: Scope of Services shall be supplemented with the following: The Consultant agrees to perform the services, identified on Exhibit A-1 attached hereto, including the provision of all labor, materials, equipment and supplies. Section 4: Payment shall be modified as follows: A. Payment for the work provided by the Consultant shall be made as provided in Exhibit B-1, attached hereto, provided that the total amount of payment to the Consultant for this work shall not exceed $437,583.57 without express written modification of the Agreement signed by the City. The new total contract shall not exceed $1,164,577.57 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this )-\.s J day of rn el-E1 , 20 CITY OF TUKWILA CH2M HILL ENGINEERS, INC. c Jim if erton,,i • Printed Name/Title: unapte, Vice President ATTEST/AUTHENTICATED APPROVED AS TO FORM 0/4 OT)cd/A/P .4 Ai.. ...A r,. City Clerk it'y Att. ney CA:2012 /S�� � ��Gjy�Page 1 of 1 • Exhibit A-1 40th — 42nd Ave S. Phase III City of Tukwila Amendment 3 Scope of Work The scope of work is amended as follows: General Assumptions The original AGREEMENT had a contract duration of 18 months commencing in February,2012. The schedule assumed a continuous uninterrupted effort ending in August,2013. The project schedule has incurred periods of delay with little or no activity (approximately 10 months total) while design decisions including Utility Undergrounding were evaluated by the City. Two time extension Amendments have been executed for a total of 24 months without any scope or budget adjustments. Amendment 1 extended the duration to December 31,2014,and Amendment 2 extended the duration to December 31,2015. This Amendment 3 defines scope and budget adjustments for additional services within the extended duration. TASK 1 1 . Project Management Due to the incorporation of utility undergrounding, and the extension of the project schedule, additional project management is required for providing overall project administration,team management, schedule management,scope and budget management,and the preparation of progress reports and invoicing. The original scope of work assumed a project duration of 18 months. With credit for 10 months of inactivity,the additional duration for purposes of project management is assumed to be 14 months. Deliverables: • Monthly progress reports and invoices (14) • Bi-Monthly meeting materials (7),notes and action items • Schedule Updates TASK 2 2. Gilliam Creek Culvert 2.5.2 Culvert 60%, 90%, and Final Design Additional work will be required to prepare a unique performance specification (special provision) to describe the work required to support in-place the existing Seattle City Light(SCL) underground electrical ductbank during the culvert construction. The excavation and installation of the proposed culvert will require the concrete encased ductbank to be supported over a long free span during construction. Additional work will be required to coordinate with other Utilities (Puget Sound Energy (PSE) and Valley View Sewer) related to the temporary support and/or by-pass during the culvert installation.The CONSULTANT will incorporate plans, details and specifications from PSE,and Valley View Sewer into the contract package. Deliverables: • Design coordination with SCL,PSE and Valley View Sewer to incorporate into contract • Special Provision for Contractor Designed Support System for SCL Ductbank TASK 3 3. Geotechnical Engineering 3.2 Geotechnical Analysis and Report Due to the incorporation of utility undergrounding,and the addition of a Stormwater Detention Pond, additional geotechnical field exploration will be required. Assumptions: • Up to 5 additional borings totaling 125 feet to provide subsurface information for the'design of large SCL Electrical Vaults (4) and the Stormwater Detention Pond (1). Deliverables: • Boring Logs and Laboratory analysis • Incorporate additional subsurface information into Geotechnical Design Report 2 TASK 4 4. Survey and Mapping 4.3 Supplemental Surveys Due to the incorporation of utility undergrounding, and the addition of the Stormwater Detention Pond,additional field survey is required to supplement the basemap and DTM. The additional coverage required includes the following: • North Side of 160th west of 42nd to the next utility pole where the Undergrounding will terminate. • Additional Survey to incorporate trenches on up to 10 private properties to provide power and communications services and locate the existing service connection points. • Topo of property at 15421 42nd Ave S.for the design of the Stormwater Detention Pond Assumptions: • The City will support the CONSULTANT to secure rights of entry for private properties, within the defined project limits,to be surveyed prior to the commencement of field survey work. Deliverables: • Supplemental design surveys • Updated basemapping TASK 5 5. 30% Design 5.2. Stormwater Design 5.2.2. Stormwater Management Concept The CONSULTANT will evaluate the option of providing an off-site stormwater pond and develop a conceptual design to support decision making on its viability. • Preliminary Pond sizing and site assessment and optimization of available space. Work shall include sizing the pond,site layout,preliminary grading,and inlet and outlet configuration. Assumptions: • After evaluating three options for stormwater vaults it was decided to evaluate the viability of an off-site stormwater pond on City-owned property. Deliverables: • Develop a Schematic Pond Concept 3 TASK 6 6. Environmental Documentation 6.1 Environmental Support The CONSULTANT will provide the following support: • JARPA-Consultation and coordination with Tribe to justify methodology for Gilliam Creek Culvert sizing. • Review and respond to SEPA comments • Cultural Resources Memo-research and memo preparation • Tree Permit- develop plans showing trees to be removed and replacement requirements. TASK 7 7. Right of Way 7.1 Acquisitions from private property Due to the addition of the off-site Stormwater Detention Pond and incorporation of utility undergrounding,acquisition of right of way is necessary. This includes a Project Funding Estimate (PFE) to define the total right-of-way costs,parcel calculations,legal descriptions,parcel maps, and right of way plans. Appraisals and Acquisitions are not in this scope of work and will be added by amendment after the PFE is complete and the costs for right-of-way are better defined. Due to the incorporation of utility undergrounding,it is anticipated that additional property will be necessary for placement of equipment and facilities to make the undergrounding of the aerial overhead utilities possible.This work is dependent on the needs of SCL and the private telecommunications companies. Temporary rights will also be needed to construct services for power and communications to each property. Assumptions: • 4 parcels will require permanent rights for Utilities • 15 parcels will require temporary rights (construction easement) • City owns the residential parcel for the Stormwater Detention Pond and the boundary for the pond site will be defined by the preparation of a parcel exhibit and description. • Appraisals and Acquisitions are not in this scope of work Deliverables: • Project Funding Estimate (PFE) • Parcel calculations,legal descriptions and exhibits • Right-of-Way plan 4 TASK 8 8. Agency, Stakeholder, and Community Coordination 8.1. Stakeholder and Agency Coordination (CITY, Property Owners, Utilities, WSDOT) Due to the incorporation of utility undergrounding additional coordination will be necessary. 8.1.3. Property Owners (replace existing task with the following) Fifteen(15) properties are anticipated to be affected by the utility undergrounding and would be impacted by trenching across their property to points of service. The CONSULTANT will prepare for and attend up to 40 Property Owner Meetings to coordinate new underground power and communications service connections to each property south of SR 518. The CONSULTANT will assist the Cl't'Y in obtaining Rights of Entry for the purpose of installing the trench and conduit to each property requiring conversion from overhead to underground power and communications. Assumptions: • Up to three (3) meetings with each private property owner will be necessary to determine trenching routes,connection points,and obtain rights-of-entries • Up to 40 meetings total will be necessary. Deliverables: • Preparation and attendance at 40 property owner meetings 8.1.4. Utilities The CONSULTANT will coordinate with utility companies including:Seattle City Light(SCL), Comcast,Century Link and Zayo to facilitate the undergrounding of all power and communication lines along 42nd Ave S. Assumptions: • Up to twelve meetings with utility companies to coordinate the design of their facilities with the other proposed project improvements. Deliverables: • Meeting minutes and Action items 5 Task 9 9. Contract Drawings 9.3. Roadway and Stormwater Drainage 9.3.1. Roadway Sections The CONSULTANT will revise and update the roadway sections to incorporate City directed changes to the location and configuration of the proposed west sidewalk along the roadway. Deliverables: • Revisions incorporated into 90% and 100% Typical Roadway Sections 9.3.2. Paving, Grading and Drainage Plans and Profiles The CONSULTANT will revise the location and configuration of the west sidewalk (from 7' sidewalk with 4' amenity zone to 8' sidewalk with 3' amenity zone) along with removal of the Timber utility poles and addition of new Luminaires will necessitate significant revisions to the paving plans. Driveway types will change hydrants will be relocated (all behind sidewalk),and mailboxes may need to be placed in clusters with localized widening to the amenity zone.This will require coordination with Property Owners and Post Office which is covered under 8.1. Deliverables: • Revisions incorporated into 90% and 100% Paving,Grading and Drainage Plans and Profiles and Detail Sheets 9.3.3. Stormwater Management Facilities • Design of Stormwater Pond including inlet and outlet structures and associated grading, retaining wall, erosion and sedimentation control,planting and fencing plan • Two additional Plan sheets showing grading plan and sections for the pond. • Revise Demolition and Erosion Control Plan to cover additional area at Pond Site. • Add additional Retaining wall plan,profile and details • Additional planting on Landscaping plans at the pond site. Deliverables: • 60%,90%,and 100% Stormwater Management Plans and Details (4) 9.5. Utility 9.5.2. Utility Undergrounding Plans — Power and Communication Seattle City Light,Century Link and Comcast have overhead utilities. The CITY has decided to move these facilities underground into a Joint Power/Communications Ductbank. Seattle City Light(SCL) will provide the type, size and approximate location of vaults and conduits for the underground system, as well as SCL Construction Guidelines and general design assumptions.The CONSULTANT will coordinate utility work to confirm compatibility with existing and proposed utilities,storm drain, signal,illumination,landscaping,irrigation,and urban design. The CONSULTANT will confirm clearance requirements with SCL.Only SCL 6 approved materials,specifications and construction guidelines will be used in designing SCL facilities. These items will be included in the contract documents. Coordination meetings will be needed with Century Link and Comcast to determine the vaults, conduit runs and other facilities. Each private telecommunications company will be required to provide a plan layout showing the vault and conduit system that they need to underground their facilities. The CONSULTANT will confirm that space is available and coordinate with each,to shift vaults to fit with other existing and proposed features. These vaults will be shown on the Utility Undergrounding plans,with references to the Utility Company Plans for details of the Vaults and conduits. Where conflicts are identified between the utility undergrounding design and the current design of stormwater,illumination, and traffic signal equipment locations,the CONSULTANT will make adjustments to the utility company locations to avoid conflicts. Where significant modifications are identified the CONSULTANT will alert the CITY prior to making revisions. Final Utility Undergrounding drawings will include plans,sections and details. Plans will indicate poles and other SCL facilities to be removed,new vaults,and ductbank runs. Utility undergrounding sections will show bedding,backfill and conduit spacing requirements for the joint utility trench. Profiles will be developed for the Ductbank that show depth of cover and crossing utilities.Vault location tables will be developed to describe the type size and location for each vault. Additional Details and tables will be included for the conversion of private property power and communications services. The CONSULTANT will coordinate with the CITY,overhead utility companies,and other stakeholders to resolve design issues,clarify design requirements,and to integrate the undergrounding plans,specifications, and costs into the project documents. The CONSULTANT will update the project drawings and design to incorporate utility undergrounding of overhead utilities.The following discipline plans will be updated:General Sheets,Site Preparation and TESC,Paving,Utility and Drainage,Illumination. For the 100% Submittal-Review comments from the 90% submittal will be incorporated into the Utility Undergrounding Plans.The Ductbank profiles will be refined using the pothole information collected.Vault location tables will be developed to describe the type size and location for each vault. For SCL Vaults,the CONSULTANT will develop Butterfly Vault details to show how the conduits enter each vault. Deliverables: • 60%,90%, and 100% Utility Undergrounding Plans,Profiles and Details (16) 9.6. Structures Original scope under task 5.5 assumed up to 3 retaining walls approximately 100' long with a maximum height of 6'. The project requirements have been refined and require the following additional work items. 9.6.1. Design Calculations The CONSULTANT will prepare plans and specifications for 8 retaining walls. The stormwater pond will also require a retaining wall. These walls total approximately 700' in length with two of the walls approaching 10' high in places. The resulting block walls and soldier pile walls require additional design and details that were not in the original scope of work and budget. Deliverables: • Additional Plan and Profile sheets for Soldier Pile Walls • Additional Details sheets for Soldier pile walls (assume 4 sheets) • Additional work to prepare specifications and cost estimate. 9.7. Channelization, Illumination and Signing Due to the incorporation of utility undergrounding,additional work will be required to layout new luminaires with underground wiring,site a service cabinet(metered) served from the SCL vault. • Deliverables: Revisions incorporated into 90% and 100% Channelization,Illumination,and Signing Plans (6) TASK 10 10. Specifications Due to the incorporation of utility undergrounding, additional work will be required on the specifications as follows: The CONSULTANT will incorporate special provisions provided by the utility companies into the project specifications. Deliverables: • 90%,and 100% Utility Undergrounding Specifications TASK 11 11 . Cost Estimating Due to the incorporation of utility undergrounding additional work will be required'for the cost estimate as follows: • 11.2 Engineer's Estimate The CONSULTANT will develop a construction cost estimate for each utility company facility relocation that will include the construction costs for the joint trench and installation costs for the associated conduits,vaults,hand holes,closures and pedestals. Quantities for conduits,vaults, hand holes,closures and pedestals will be provided by each utility company for their facilities. The CONSULTANT will incorporate the construction costs into the total project construction estimate and create three additional bid schedules (B,C, D)for the bid package. Deliverables: • 60%,90%,and 100% Utility Undergrounding Cost estimate including additional bid schedules for SCL,Century Link and Comcast. 8 • Exhibit B-1 - Consultant Fee Summary City of Tukwila 40th -42nd Avenue South Phase Ill 4/24/2015 Overall Project Budget Summary By Task ;, .Ei`F 9Ty Yr 4�1,a t :, t fit ''• s k7h 91 y: s LJ +X% sy A_mendment{ ii -3< ; } g, :-e Task Description,:... `.. , i .=, . . a .rt i u P g. azies,udget �:. }. ,^, r Total Budget r r; ,•Ongmai Budget Task 1 -Project Management $73,585 $43,222 $116,807 Task 2-Gilliam Creek Culvert $79,757 $14,659 $94,416 Task 3-Geotechnical Engineering $45,331 $29,711 $75,042 Task 4-Survey and Mapping $71,805 $16,456 $88,261 Task 5-30%Roadway Design $130,090 $5,138 $135,228 Task 6-Environmental Documentation $0 $16,364 $16,364 Task 7-Right of Way $0 $26,941 $26,941 Task 8-Agency,Stakeholder and Community Coordination $10,138 $30,160 $40,298 Task 9-Contract Drawings $254,934 $227,100 $482,034 Task 10-Specifications $12,191 $8,236 $20,427 Task 11 -Cost Estimating $10,228 $19,596 $29,824 Task 12-Major Milestone Reviews(30%,60%, 90%, 100%) $25,150 $0 $25,150 Task 13-Services During Bidding and Construction $13,785 $0 $13,785 .;;.ys, z t t s''J P r .+ Ei 3 ,y su #s ray^ u �.. �T ,�3v. ._. ,' t tii O lA;LS, .. ti�� . ..�. °�i t �.:._ $, $ %.00.4 ,' ' .: t<$1 r1�4,5 • • Exhibit B-1 -Consultant Fee Summary City of Tukwila 40th -42nd Avenue South Phase III Amendment#3 4/24/2015 Budget Summary By Task •q ie a...zi om . T o l k X P r y . ,3? ,�n<. S ? i R bru Sti u• �4 T� d4A;°:.�,f Rg. 4,W S. Zh�1. F am,,i p4c- l i� � •S F 4 :�., � . ar/ � tg; ual; �}t x .Rota� ( � .kay.,er'aP.'l l }i ql�, O� A3 x �t�i . � ^� i y1 i4, o: :,*4: €3i ot7i g .4�xlyvti N x > a r i n Task Des l n �at �t t wt � t��> il 011.01#0d,, , bo03 3iRembuasbler kota-s� i 3kiN EM J Uder oundn no yO ESIRMAN y BI IN s .a" ha5t Task 1 -Project Management 156 $25,933 $0 $25,933 Task 3-Geotechnical Engineering • 24 $4,626 $17,600 $22,226 Task 4-Survey and Mapping 82 $9,319 $554 $9,874 Task 6-Environmental Documentation 0 $0 $0 $0 Task 8-Agency, Stakeholder&Community Coordination* 147 $30,160 $0 $30,160 Task 9-Contract Drawings 1,304 $188,436 $0 $188,436 Task 10-Specifications 40 $8,236 $0 $8,236 Task 11 -Cost Estimating 120 $19,596 $0 $19,596 Task 12-Major Milestone Reviews(30%,60%,90%, 100%) 0 $0 $0 $0 Task 13 Services During Bidding and Construction 0 $0 $0 $0 g �r �{��j y � �J��,j v-� t< <��,Q��r :4�jp�Y?,,�'��Y cy���`�.y��.�� .�!x Yp� p�`+�" `�;pyY� ,� i :ivY+e*� JM 3°A €aA itEt�l t W �'e. ,'Fi; �i ! :s i7`We id N Y "wY�.kV9n i�'.i ', 0 e� f4 �.?1i Tj''Y -k�`�" :.'.�,�K3'--.'. Y_: a"S`✓. _F5,3?e nay"i 4t+-S b- r`:�?.� '4' tea�T.),;Y .,,N if�.�,A ::.t ..SJy. r� F� .F i;, a ,.e 'i..,-;C y'r'%'1 :zi` }.?t6"'. .yh '' e i� Y�t 1r 54 '€5�.. i Ysrf �1!'y3t qty ri-, to ,' >rr�r7 _ Y� S a v�✓ v. F L t �bWO. I ,JN N�t a: ,5..&r Cdt.. nos h.n?.✓?'x;`��r�4x S i' U 'u ��'m+y'y,�.c,7:a�:�?'.:�,r„.;�C,U�V;Eff&S,torrnc{ram��,tl.��7s v....,y� _�,v, ��- �-. � �`.,r;, > %" ;� � �,..:�� .�,a�: Task 1 -Project Management 65 $10,806 $0 $10,806 Task 2-Gilliam Creek Culvert 80 $14,659 $0 $14,659 Task 3-Geotechnical Engineering 16 $3,084 $4,400 $7,484 Task 4-Survey and Mapping 54 $6,213 $370 $6,583 Task 5-30%Roadway Design 32 $5,138 $0 $5,138 Task 6-Environmental Documentation 88 $16,364 $0 $16,364 Task 9-Contract Drawings 280 38,664 $0 $38,664 k PIW f f ttltn ISP SZO INI I IS I , -a' :��•�.n;^ str-- ';err• a.•„ =.x ...v rir� an >�.. 2r`S ,.V,. K;�' ',�i.4, 3.t :.r..-s.. '7-.s5r,:>. :,.F ;.d, ,n v_y+y ,j:`-`u' fit,x�..,.�yg 4>• "t( t W £7f... s„iJ ;4,c;i,�.�: (,.,'y. . "�:a �,,-r g,l A . _�,:;LC.f f.NUR ANN •`tl�i%,�:�.ViJS:•LRnI;;"M�'�T+� .Me�F,4�$Illght3�1�VIV.C�y�;..�:�.rra!'".�',�15SU..rF`�-�..'3�!4•?_'+.;� f.�M ..��a�:.c ix,W'�h�` 2�ile��?�ri3/'•,,;?bs�"�'�Y. �... �� nel: 5. �-..:,. ��'? ?i,���;i tl4\„ Task 1 -Project Management 39 $6,483 $0 $6,483 Task 7-Right of Way _ 160 $16,941 $10,00_0 $26,941 F,`, ', h'4 ,', ,ENAMENDMENVV TOTALS ,M Y} ie; .2;687.j-+ 0.4.0:0031 . $32;924, ,''4$437458433 *Includes credit($2,673) for existing scope replaced in the Amendment • EZh i bit B 1 Consultant Fee Summary City of Tukwila `! :40th 42nd Avenue South Phase III' ' Direct Labor Classification;; = Sr. Project Manager 160.0 $242.52 $38,803.20 Sr. Consultant 118.0 $219.02 $25,844.36 Sr. Engineer 638.0 $192.77 $122,987.26 Engineer 443.0 $160.57 $71,132.51 Surveyor 140.0 $135.73 $19,002.20 Jr. Engineer 544.0 $104.35 $56,766.40 Sr. Technician 304.0 $138.61 $42,137.44 Technician 220.0 $76.03 $16,726.60 Office 120.0 $93.83 $11,259.60 $404,659 57 Expenses rK:'t`Cost Drilling $20,000.00 Laboratory Services $2,000.00 Survey - Leica DNA03 Digital Level 0.5 $44.00 $22.00 Survey - Leica Smart Pole GPS 0.4 $184.00 $82.00 Survey - Leica Smart Pole TPS 3.2 $186.00 $600.00 Survey -Truck 3.9 $56.00 $220.00 Acquisitions-Sub $0.00 Appraisals- PEE $10,000.00 total xenses ,;� r. . ... '_ � . .r. pY_$32s2400, • ., rc. ,:t� 3;,.,lJa`!.. � .,r.�li 7i.✓55 rv. A `..,.. �.r1,. ,r.A. =ua,� ...�l. • , • +`' ^I - ^�. ' .�i•2, +i�'' v' i` Ly. P" �r -k� k LY.e >+i `�i 'T ft..•dam, J��� xt(� i 8 g % 4,, ),. •,' �": , •`,a ck` g' „."', A'c� ft t..§ Uh kv'3 a't iAh$.�;,4 T_m .. Xi. N ate; N m m'Wi o+ A a N chi`t m mY`ad,,`t:.,e N °C'50"01- nob g1'1i 1_,�,rJ�f a a a 4` b a "°a `° ''a-` ¢ R n c4 h 5E N Ni N W a1 a a ks W 23.412 r t+t ri m(�ry6 mm e m imp a o` v'mi n,, °.<°3 t>� �` L.q m p>, .m Ix,.. rf''i „ m h;a .. ::1;1:41:;,!..-.L,7 . N W n n t;` '_S,, {, ..ti m . a r,�a _ N•p...--..,=:. _ c ,o. w <Fj v.e n n.:w W t W a K. a kg w w w<o,..A.,9,-b C N N+ 'hr''?r r E<' ui'K N . m ! ' t- T. O sC Yri wxv { .ft N Aw S n i 'm U"'' N`ry' m _ b•:--. Y „,,:v s O �•wi?X "h'''p� ;�i w w f�y w x:i. �1��'�w w o w x wl w�w w ';i � �iSi`9 w'4�w w w a w-w J w: •ra SH. 1r .a iqz' k S+ar f� - � .�' :A. s�'� tA" 1nt Z; �`T ��. fir'frg c`�•''21',71', .,�`M f%�t `' sS��•' >r.,-` Y} 'r�`'' ! a v 8 o { i� f u".' +it¢ ysa rz Fu b6, ''' oc 0 w44'','a t'•aNei " W i`5am •b 14.n NO: W 012 om o0 -q-0 o e .O rEm e r-4 Fes" :;rC..a.v.. moo`m Qg„e:atm nMMm '�'N -ap o.m .-+°04m3 a�:No ..amiV N 'm,.:q• t 9�i ii.T.?° - TO 2 L,4-.4„ `Ikl. 5j,,t !..2.!..r.;.- '- ti F° r' �„i kJW A: '4,1"m r r� wJ N { ,,,,k,.,,,...,,,,,,,,,,,,,,,..: ,xJC,,•; .4 a , . 0v-a •as ' tea 'i ;rr >} V mx r 1� Ili za �, S'�'• i", .;? .''fi•'° a.! x=' ".- /.�qy �(�"{;,4 if e,';:A,UI a L C S ry .. 7[E�j,� b ay r �q°{2�11� ayf � ,fk, £,- v�� jx Qz f Y ..:,yi hIl�� ,alatm :j 0� 0 � ,i4 k.CA �r Tof ','J/ ��..,zz I `- G hi O.'0.1 O ,5O•."O O N ^ 5 aI N N O O O 'f0 O 000 O O"++IO O O t '0 kpc m{oic `4: 4 p q�i 'tt 1„,„-- "' 'u l � '`,"I. f` �5 `L': s, �� :w gi It'. - IA�`6 .' T t w ate',z e- {vt �, s 4+ ;r 1n - -; > 1 .,-,, try.L iE o 3>~' i '?: • G ''l'+5. m!' t - 'i '' s.y ; r ,,,,..;t 0 y E at ]u ?2 9 � hp�� W �yrt J f� � y '?N�- - O O O o D- O�,I°o O n O O o o ,.,,4 .„.. O !)' o p0 Ji.'.N -, n��1e L N f� C,n J 1 ! 'u 4 W a £ � W tt0 ,g co.W. 1 R q' �h m'm O ` O �, N Y Nl. FJS m .L,M. j 'o !' 7 !P .mss 2"f' '. N. a° o R`11t r }rT 4+3 t a, E 5. 4 r' k� ' Ogg Yy z s� (P ae t ,fir t t :°P.".; F, L'•�S.L� im � _o_ OO OD'7aO b.4o o6 0 ,0 - 0 •03 ° 4 ° �*r r°oo o`O o°ion ,:r:.o (�'04 o E1 3 g 1 ;471 /3.1 yr *'4'$ u *„ ,�'y�a�-�.�osdr;,P�„ ;Ny! • u m � m ;j� .�.,•,e,F • • J"J]/ a j'1'•, 71 b 3 t L r 4"u ff I 1 i5t'.- "• J J' S `cf Yw of eY s :a+n'to F' •'Y.,:. _ `s„{"`;"k: v�`c *� r`a r T� 4 tr ',.i �k ti t °' •�' '4 SS L. 1L $ + 4 L io. OgR, O' NbtN ^ ?� ..I O Oy O O..,ii OO4OO . O.. �rJ�W rrh �����o� .2,�" o b r o fib`,1 t o� o o�Drys o"`� '`�.N w't- O" b at;' �:�v�G ° �,Ly °.S{`t-!� 4`r�2r4'.°+oro� a ,n �{� 04,�'v- +;, x) o ��fr' ;c4 �i ` ' gtl,•,.Y 3 4 •,y� �'/e wi e Y (e bb Z iw s S Y{ttf iRt, .fis"��5v' [, e+ xx,a "'::443 44 - f !�; •1 {'c K. �,4 { �� J" ' x+n tb i 5 j 'w' r' try 3.a, �ia3, ]Y t '� is �, F' t" J a3' P.j L ti}r°o.' '.0 Est t;. x., 4 i 1,.4; d i� '' • - •-iv o y, • 2 t a a-:, 070 40 4o.pt ° °-o O •e , by o€0 0 0 p..,i•Q a l � �m. � o'�gOr�S o�ipCg��yy}..O ��^^ a f•a� m O b n W I'm {q� ,� �,� yQ; L t g.).:46 Yt f E w o f 'A'' 0 4. '�'DI x�" I t D t . . p ?;'" +rs; • r 1 ri i "-1• ��{ y7' `ARP k W• � '� Y O D. O O�Ot Op O O pp CO�m N�N.N O O m tV� �y p M a �J O �:`,9"O ,,°-'°'AS"O� O Ili 141. C `'-, t Y Q tl'r'V Y +,i 4 l'�n?r qt N f f,4 S N �F.- dq m •t. .�y 4 m r+$ stJ'4 '+ r a ,' •2, zti; "r1t '• 67 ie kr fi�r'5 Y'- rdfn Air(%�ii: s{it@3r:u :0;:.•6,4 s ✓'; f 4+r k. A 'c N - S Nk e. aF %`,,,o ., `, OO 00 O.000'OoO 0a m0. - Si.dm D ypO N W..O NOOq lO'AO eh., .- SOOm J -,, O Q � NM 7N Q71"e�m m�.m00^�I.• ,+ �} Cl S y N m 43 wYfc is c S�� to 7 i yN 0I k N �p v4N m .. m. rn cz @�' > i f.` tin y AJiIRE y � gr a n -.,,, f�_.iA 'i'i'w"�F ,*g'a Ti-,+? '�E`; `d', s.''lFi.' t',.T�Al {;2':. '+ '•`. uW. �' tT Uc c xg'' �_ ^z @�`y ty x'`�y K 'gam �y91,'y[y,,4�. ,9� •' p �'.y�SU J .,,� pK off[• la`• '+.f•o o3N P. *g� �`L `• r 5a.. 't �., ?r A A:��1 4 "g1,3 " -t� ]r • 1,1,>= F l, c c'io .its .t�h'rri''. .- " i' _ t % ,c, •� ;rf 1 J. ,nu.' S is V'j.o m L 0 0 if b 6 ed O O•�b'y O b... O p O �m'L��w M m Off. o�J_ O � O :il' '.�N. c O O O 'Y O m "+11 1-+4[O .1^'l->> J N N•N N dT 3 !i W 43' 'I�: Ar N'44r * tl ''�,,' f,5 N Nr .N.. k to e1 ,�� 4. " ''".' 7.t'7z s r' "" '+JSifjM e� .„� C' a t 7. §r x rn ii '. f r 1 E" -a m�'. 01'f. 1 S `4'at �J. ` i k q it :; -. �k 33 .r. �. . fix. 'u ) -.4 '''b S4: r-,, t�xap° ryi,} i, C' it s ••."tgS Yy • ,�,"' gyrr�;� �^.1 a 5'� -F Cr pj 0` Oa OO dO'w,O_�, O ; OO'3O'.'t O'2 O im'1 .-4'15,;'O YNt_ ^3�1 Oa. OSfv p '„NO O YO O ^ `F• a l.. zj'''''''r eii 15. axsa�A, 4„,-,,...,,,ks . .2+5 ,,?. f µ yy h ,Y r Y'i 4 ,i .rx�5; 0,der t F' .{,, . ire, ,",,.. �u_{, 'o-` v 3v y y`k i 's,'r. Ei , V. ? J r iy'i.N ti £$ ' 4, p:4 :: 0 �� `j Q t�C '47+_ .f^ C e,i W: 3ne Q.0 s 4 r� rte. o: F. "i. m;•k "'s' rr o "' x'Y`- < 1 5�,py a1 IC:,ti m ai b' I m' ' :'P• CL a 3 kk 'j ,�i.- ', tt c i CF o m o °S o n ;p r ..ly gyp.y �t N' rc if,., 8,, •' t r" ,rho nL ia' e4: rn• o�! t q � r o 7 xy�a �} m ��"�a .�:_ E. �� o 4 d. E m•U ar • �n��, � m �`t -t, t , `i` '�'�.,,y.E },.o "s m' m{ sq 'hi•` 'c Z' o' rig O n" [ti 1 �c '', a its_ A't. G to m. v ^� .n ° D c o of E rn s A -„ c '•1 m f ,c+ t c S°m ti • f E c; 9 c �`y. +a m '`'"m ”.,:m :o '' g i 1'o 2-c 'E .£ n J. c c '° �. i rn ,E ci c c m m E c' , a. rc _ a' �Y x% v m E N X22 °' cS o• ,, 2, m c ' � R•E s's t r E E ai'{' .•. ° 3>v rn "r• i *�..i•V c3�`m m .`y o c 0:- s 1 c'-, a of o a; o' m e E: m E. 7rni• c m a r z m a�"a m .e mr c gE' c, o' , , y c;oS t m m `•a U a ° '� mSS c c i m, o rn m C. fir:m, o E F 0 .. Ta".t e im: v L'1O �,E'' @ t:m is 3 E {co a6 gig a c R'1 &( a m n of 1 e; wry°. `Y 5c '$°..'`a C un c..m o Ji .':g! 54.v „r E it-,3 E } I o rn 1 n i3,m m: o.v c 7 c' r� Fc 4 a .m mrj.'g'' m °m ,o m > aNEI m ;.„2,,,�oo °; Q ODE E:2c ptt..0.0 81 aa ;r of a°y7 �im of r R y ' j E, E Ef'4 N U tog 2 °ii w ci Vim , U Saa U c10 tom'?L',W mo` m 0,,.§...-, rn°'+°=J 4'e{o{ a 7.4 a bf, a P: im.° c o'r �J., r! c a m at p4�.m 3i0.m ai m t of`�' U w E >.o Y Jp NI c m 4,11.1 E c•a .6i-.7-, �: y c t o b m r.o; .3 of m i e r i .+a ea e!-', , , m m:.•L '::.;;:',?j, ir it `e- 'm-5T Fm m G2• o m`°v P!` 3,ci,E•a E,c.Ec ' c m art g a) -4 c1 @- E Ed:m c ” o ° E ` o • d c fat "{� U m rn ..,3 y of +� m or O ny o o° m m E w t is m? m F glA�cU S:4 LO;. j1. v s �.� f ,. m $ f m T J7'' o`° .�T�t°n°. Si,a'ti c fms� "'�O.a>.Q''4�m E °x >! °c c o, ~D ',:j o m W i0 m ° �.'_y .� u,g Eo': ' (m "'cm 3°: c'i'CE aEii°; 2o. gE ms, i1N V21 VI mii n > ° m:D o cc °l •rea ° ,' i` v:•°-'•la;,;�,yo m 9 6:0 4(o! it m c 1.0 �m ° c m c rn m iu +rn _ `�� ))0 d:A re5 > y m! ea t':H � C ¢: m ° m O of °yqr� .g.. .m.: y I `<U: -° �1 ti'51 m}SM n O"Li ES o' in�c °•�O'° 35 F b m s U,'^d ma o, a or m - 0:C O p- m m.i••m to`Q: . W.�1 'L 7 3 7 fl fe C7 bad mr a C�kc=v1 nri y n sa".'f,. �i w i9a o c m'- y�"�: ' @ y" o° m o to tO m H 3 ugh•pm > �, 4 Y�i Y.�m�d CUr Y io;2:v mfm OtY �` ie° t�h° m; �aY YO Y� °Y ;�7 m er'1.2 TmI a O ki 51g C 'mY , m= 'i' U ¢ i m m{e m m L mS m m fo1 p m a 2''n' m';t 12>.+Yrt > E m m O m'e'm42''1 m m w €•y;E 2`e m .°'m m m °+.; Y v m b, E m. i•a Qi m,mr; m •'s=;m m,,,c o m en Q4 m m 3 E m'O m .,- m:o o °1. m m o rn=m`m 2 ..m s ;3�;m'�'i m c -f e� f-o. r=.-e_ma,0.,°FrgvY:0,ent-gior-1,Ecc U1--t-:tit- aaeir-rc?rc� aa�vm !��a-oW �tU�rvi� e� •. m 2 N ''/.::'''''''. d 5 Y N WI N Eir„el N e.,v n1.0` a N NS a 'n' W l• m' „- , a - t� a ti:',;;TAY.a 4�- ,. ~Q +, ; boQ �qfp QQN,m yQoM}, QQ Q A ao Q' `o oan 03 v �; an 1. -Q,: r , L °IF. 4g .Q""+ Q k 5 Q 2�Q y Q Cm;x}E Q.N•y�'1 rh 1 °' .'�u m n i m .4 3,,:. Q i•�k- r d `. ti,• T0 ys !C, s ,J$+' 'r s „� mr2 t.^, �; err _ w U°a .,•. .E` ai, t K sa i!3,? _LA. rigv �,HR('.' 5 �a? ....a %yak;��'.5 53 .; ? _- ,'�1..r , au • • Exhibit B-1 - Consultant Fee Summary City of Tukwila 40th -42nd Avenue South Phase Ill April 24, 2015 Reimbursables t'.'J':. ak .+ =. .. )':t�t.a.i.i.{tif ,..n Y. :TfFiiir:.�.... kw ':'tli., v)'- <+ -0:;b�ter,:.:f�•t'vy s�..r.i s,�'.i."r.;:,;r.h',.ysr o4}l r.;•,.�..1�;','�.9vx,7 pyt(r�`?�s+1''=-r;_�v;t,r�•-s s j'G j r i�,^r,�>�3 5i il$�.'�r.+4.>.,z9}YN._f 3ss7�ys!`S•t,'y,;:,.,,,R"t..°tt.�".5 ri t r�c.r�a t i-�a�`-b'`1m3�'�"l e F'rw;C t Fpu..bii.th,p t�,71°a.a f{•h�`u,':�V{i^dr�rF"'i�'{m+�+�-_�rst fL$,''�'•„a.;s�4+�"i t'b;'F'.'',,:lsarM1.�tr e t,�?+.k9 vS_:„t,�'Y�F.;.+�r f.lJ.�.0,c rs..t�r!Y f C t-(,7 e,�,r�"a.?.,h".0 s Cm•..t.}:,.4;l3.'-;5a�P�k 7 4.�i:.'3 a si�-r i,J'Sl�L°,��y.a sl":C:.�)f:l'q a'r�s:r jf�ry�i.'<,sJ.a?$E.qq�i'�M sY S"a 5 l v-,�1s.�M;'�yr.��srx'i;„,'n'x�p s y L'3fv r�Afi�,i G4,t�.,:vI x 4��,ke.yS!P.'�ol k 4"o/�'lt�tc1k7 1��t`*°+`„`e�',o-�r,��."r'(L.,x.�,Yc c*+�`,s,�A..Y!Y,r,•h.^,syC.5ni e'rn,shR t”;t�..1 M 4 s7 cr,?y�`Y{a1a*!}�.�.•.'N l✓)ys�+f'.k S".�..'�''4r.fi i�Ja s"�Y.X a'-�:'A.m.E'nr�<�s•rr,l'-v�ac•!!';i Y�-,5.'id J T¢p"t?.�33 3_;F j�,■Mf'ri!^�'t�i,'x�1 fa•cW 4 r'.•,-°.�i�{crt."�N Y,k,�.a•rE^"1.�,'F'r�;�+fi��+�.4 n Yr t;�'.�3 1y)�,r«j�„e 4!;;r9y r a y.xi'1 a��tTt`i%...�,1a�s.,r.st�+rr.�i h�y�1'���k+^•'w"4 3i j',r',`t s��'7 L 0.^j�S h�°)r j,7 sx s.):-8.�J n,�r,qi3;{ne�,.R..t:-�M”4�f{t�i'�i?t'g s'r"�,?j_2 I;f h'nx,'t)�p Y,>tr t.r�--is,.;4?�'F:ft'�r sS�A+`rr 3r;ev*F t;?<>il 0 fi y}y Pa f�rX•("?ud�y 5$N�*2^ti1a�t+,*t,>J..M.�r�r+k',_r,^r,'a fi,Z''.fg tS a-a��al 3i-(.Il�Y tr+`? rsi�..;a?:s�.' e s,. w y t4 4l�' , hN�E}'i Y: wn A,VP j, r� `" 4' 1. i �Jc ?}- t rp s- :}E . }4-y t } i+ s iv sk- ,Pvt'w 0 "T ik. T askiilisurve Y .6i it,94rys h of Wa ,hc"i'� ',/{ Ne h )+ 1{jf C b6.i+ ,gf . ' � ' %,, J 1 . P,21• !.'I a 4Fb r 4tY. N�,.8a4, D g1 sF r A Sn 1p1 42 n� � ��"f n ss3 ��{4 ` i ra l a rly kT Y i nu.7 � . $20,000.00$20,000.00 Drilling Laboratory Services $2,000.00 $2,000.00 Survey- Leica DNA03 Digital Level $22.00 $22.00 Survey- Leica Smart Pole GPS $82.00 $82.00 Survey - Leica Smart Pole TPS $600.00 $600.00 Survey -Truck $220.00 $220.00 Travel-Mileage $0.00 Travel -Parking $0.00 Appraisals -PFE $10,000.00 $10,000.00 r:+p4 $ .. $32 924.00 .�,'. ?t s+ Jf= d,d k�� t 7= r rt ti ) � .:r = � Totals , ,M } 22 00000 924 00 10 00000 •+,4 1 r �)? a.>....•.r� :,.,+ v.:clf.•t'F`d.P.�.H.r';fx5':>r <.-e.xM,..� ..)+„� i�.. z.,).., i_.Se.,... ✓+ Y n.:Y.4-•. --F .. • City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: 12-010 ( CONTRACT FOR SERVICES Amendment #2 Between the City of Tukwila and CH2M Hill Engineers, Inc. That portion of Contract No. 12-010 between the City of Tukwila and CH2M HILL Engineers, Inc. is amended as follows: Section 3: 3. Time for Performance. Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement by December 31, 2015, unless an extension of such time is granted in writing by the City. All other provisions of the contract shall remain in full force and effect. Dated this (4 day of N CITY OF TUKWILA (PO ATTEST/AUTHENTICATED ct6-- - City Clerk CA: 2012 , 20 (4 CH2M HILL Engineers, Inc. Printed Na ./T LL. Tung Le, Vice President APPROVED AS TO FORM / City Attorney / 46 Page 1 of 1 City of Tukwila 6200 Southcenter Boulevard, Tukwila WA 98188 Agreement Number: 12 -010 Co-) CONSULTANT AGREEMENT Amendment #1 Between the City of Tukwila and CH2M Hill Engineers, Inc. That portion of Contract No. 12 -010 between the City of Tukwila and CH2M Hill Engineers, Inc. is amended as follows: Section 3: 3. Time for Performance. Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement by December 31, 2014, unless an extension of such time is granted in writing by the City. All other provisions of the contract shall remain in full force and effect. Dated this T day of bk, co aloc '/ CITY OF TUKWILA ■.i./ Jim . • •erton, M,eq A ' EST /AUTHENTICATED CA: 2012 ,20 CH2M HILL ENGINEERS, INC. Timothy Bevan, Vice President APPROVED AS TO FORM City Attorney l sad/ a a76//V4- S Page 1 of 1 12 -010 Council Approval 216112 CONSULTANT AGREEMENT FOR DESIGN SERVICES THIS AGREEMENT is entered into between the City of Tukwila, Washington, herein -after referred to as "the City and CH2M Hill Engineers, Inc., hereinafter referred to as "the Consultant in consideration of the mutual benefits, terms, and conditions hereinafter specified. 1. Project Designation. The Consultant is retained by the City to perform design services in connection with the project titled 40 -42 Avenue South Phase III. 2. Scope of Services. The Consultant agrees to perform the services, identified on Exhibit "A" attached hereto, including the provision of all labor, materials, equipment and supplies. 3. Time for Performance. Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement by December 31, 2013. unless an extension of such time is granted in writing by the City. 4. Payment. The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: A. Payment for the work provided by the Consultant shall be made as provided on Exhibit "B" attached hereto, provided that the total amount of payment to the Consultant shall not exceed $726,994.00 without express written modification of the Agreement signed by the City. B. The Consultant may submit vouchers to the City once per month during the progress of the work for partial payment for that portion of the project completed to date. Such vouchers will be checked by the City and, upon approval thereof, payment shall be made to the Consultant within 30 days of receipt of vouchers in the amount approved. C. Final payment of any balance due the Consultant of the total contract price earned will be made promptly upon its ascertainment and verification by the City after the completion of the work under this Agreement and its acceptance by the City. D. Payment is provided in this section shall be full compensation for work performed, services rendered, and for all materials, supplies, equipment and incidentals necessary to complete the work. E. The Consultant's records and accounts pertaining to this Agreement are to be kept available for inspection by representatives of the City and state for a period of three (3) years after final payments. Copies shall be made available upon request. 5. Ownership and Use of Documents. All documents, drawings, specifications and other materials produced by the Consultant in connection with the services rendered under this Agreement shall be the property of the City whether the project for which they are made is executed or not. The Consultant shall be permitted to retain copies, including reproducible copies, of drawings and specifications for information, reference and use in connection with the Consultant's endeavors. The Consultant shall not be responsible for any use, unauthorized reuse, change or alteration of the said documents, drawings, specifications or other materials by the City on any project other than the project specified in this Agreement. 6. Compliance with Laws. The Consultant shall, in performing the services contemplated by this Agreement, faithfully observe and comply with all federal, state, and local laws, ordinances and regulations, applicable to the services to be rendered under this Agreement. 7. Indemnification. The Consultant shall indemnify, defend and hold harmless the City, its officers, and employees, for any claims, losses or liability, including attorney's fees, arising out of claims by third parties for injury or death to persons or damage to property only to the proportionate extent caused by the negligence or willful misconduct of the Consultant, its officers, subconsultants,and employees, in performing the work required by this Agreement. This paragraph shall not apply to any damage resulting from the negligence of the City, its officers and employees. To the extent any of the damages referenced by this paragraph were caused by or resulted from the concurrent negligence of the City, its officers or employees, this obligation to indemnify, defend and hold harmless is valid and enforceable only to the extent of the negligence of the Consultant, its officers, subconsultants and employees. 8. Insurance. The Consultant shall secure and maintain in force throughout the duration of this contract comprehensive general liability insurance, with coverage of $500,000 per occurrence and $1,000,000 aggregate for personal injury; and $500,000 per occurrence/ aggregate for property damage, and professional liability insurance in the amount of $1,000,000 per claim and in the aggregrate. Said general liability policy shall name the City of Tukwila as an additional insured. Policies shall not be cancelled without thirty (30) days prior written notice to the City. Certificates of coverage as required by this section shall be delivered to the City within fifteen (15) days of execution of this Agreement. 9. Independent Contractor. The Consultant and the City agree that the Consultant is an inde- pendent contractor with respect to the services provided pursuant to this Agreement. Nothing in this Agreement shall be considered to create the relationship of employer and employee between the parties hereto. Neither the Consultant nor any employee of the Consultant shall be entitled to any benefits accorded City employees by virtue of the services provided under this Agreement. The City shall not be responsible for withholding or otherwise deducting federal income tax or social security or for contributing to the state industrial insurance program, otherwise assuming the duties of an employer with respect to the Consultant, or any employee of the Consultant. 10. Covenant Against Contingent Fees. The Consultant warrants that they have not employed or retained any company or person, other than a bonafide employee working solely for the Consultant, to solicit or secure this contract, and that they have not paid or agreed to pay any company or person, other than a bonafide employee working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the City shall have 2 the right to annul this contract without liability, or in its discretion to deduct from the contract price or consideration, or otherwise recover, the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. 11. Discrimination Prohibited. The Consultant, with regard to the work performed by it under this Agreement, will not discriminate on the grounds of race, color, national origin, religion, creed, age, sex or the presence of any physical or sensory handicap in the selection and retention of employees or procurement of materials or supplies. 12. Assignment. The Consultant shall not sublet or assign any of the services covered by this Agreement without the express written consent of the City. 13. Non- Waiver. Waiver by the City of any provision of this Agreement or any time limitation provided for in this Agreement shall not constitute a waiver of any other provision. 14. Termination. A. Either party reserves the right to terminate this Agreement at any time by giving ten (10) days written notice to the other party. On termination, Consultant will be paid for all authorized services performed up to the termination date. B. In the event of the death of a member, partner or officer of the Consultant, or any of its supervisory personnel assigned to the project, the surviving members of the Consultant hereby agree to complete the work under the terms of this Agreement, if requested to do so by the City. This section shall not be a bar to renegotiations of this Agreement between surviving members of the Consultant and the City, if the City so chooses. 15. Attorneys Fees and Costs. In the event either party shall bring suit against the other to enforce any provision of this Agreement, the prevailing party in such suit shall be entitled to recover its costs, including reasonable attorney's fees, incurred in such suit from the losing party. 16. Notices. Notices to the City of Tukwila shall be sent to the following address: City Clerk City of Tukwila 6200 Southcenter Boulevard Tukwila, WA 98188 Notices to Consultant shall be sent to the following address: CH2M HILL ENGINEERS, Inc. 1100112 TH Ave NE, Suite 400 Bellevue, WA 98004 ATTN: Roger Mason 17. Standard of Care. The standard of care applicable to the Consultant's Services will be the degree of skill and diligence normally employed by professional engineers or consultants performing 3 the same or similar Services at the time said services are performed. The Consultant will reperform any services not meeting this standard without additional compensation. 18. City- Furnished Data. The City will provide to the Consultant all data in the City's possession relating to the Consultant's services on the Project. The Consultant will reasonably rely upon the accuracy, timeliness, and completeness of the information provided by the City. 19. No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Consultant and has no third -party beneficiaries. 20. Integrated Agreement. This Agreement, together with attachments or addenda, represents the entire and integrated Agreement between the City and the Consultant and supersedes all prior negotiations, representations, or agreements written or oral. This Agreement may be amended only by written instrument signed by both the City and the Consultant. DATED this day of CITY OF TUKWILA PO Ot-rLI Jim Ha eon, May Attest/Authenticated: CONSULTANT B: O y Tung Le Title:Vice President Approved as to Form: Christy O'Flaherty, eMC, City Clerk Office of the City Attorney rd Exhibit A 40 42 Avenue South Phase III City of Tukwila Scope for Surveying and Engineering Services City Project No. 94 -RS03 January 2012 Contents CityProject No. 94 -RS03 ii Contents..................................................................................................................... iii Introduction ..............................1 40th 42nd AVENUE SOUTH PHASE III ..............................1 ProjectDescription ..............................1 ProjectLimits ..............................1 Assumptions............................................................................................................... 2 GeneralAssumptions 2 Design Standards and References 3 1 Project Management ..............................4 1.1. Overall Project Management 4 1.2. Coordination Meetings with CITY 4 1.3. Project Quality Plan 5 2 Gilliam Creek Culvert 6 2.1. Data Collection and Permitting Agency Requirements 6 2.2. Basis of Culvert Design 7 2.3. Culvert 30% Design 7 2.4. Culvert Permitting 8 2.5. Culvert 60%,90%, and Final Design 8 2.5.1. Contract Drawings 9 3. Geotechnical Engineering .............................10 3.1. Subsurface Exploration and Data Report .............................10 3.2. Geotechnical Analysis and Report .............................12 4 Survey and Mapping .............................14 4.1. Survey and Construction Control .............................14 4.2. Base Mapping .............................14 4.2.1 Topography Map .............................15 4.2.2 Utilities Survey and Mapping .............................15 4.3. Supplemental Surveys .............................15 4.4. Right of Way Field Surveys .............................15 4.4.1 Right of Way Field Surveys .............................15 4.4.2. Records Research and Right of Way Calculations .............................16 5 30% Design .............................17 5.1. Roadway Design .............................17 5.1.1. Refinement of Preferred Alignments .............................17 5.1.2. Develop Roadway Plans .............................18 5.1.3. Pavement Design .............................18 5.1.4. Roadway Design Documentation .............................19 5.2. Stormwater Design .............................19 5.2.1. Data Collection and Stormwater Requirements Documentation ...........................19 29 5.2.2. Stormwater Management Concept 20 5.3. Utility Design 20 5.3.1. Preliminary Utility Plans Water and Sewer 21 5.3.2. Cost Comparison of Overhead Utility Relocation Options 21 5.3.3. Preliminary Utility Undergrounding Plans Power and Communication 30 (Optional) 21 5.4. Traffic Design 22 5.4.1. Conceptual Illumination Design 22 5.5. Structures Design 22 5.5.1. Data Collection and Review 22 5.5.2. Design Criteria 23 5.5.3. Preliminary Structures Design 23 5.6. Landscape Urban Design 23 5.6.1. Landscape Design Report and Plans 23 5.6.2. Urban Design and Visualization 24 5.7. Cost Estimates, Schedule, and Construction Phasing 24 5.8. 30% Design Package 24 6. Environmental Documentation (Optional) 25 7 Right of Way Optional) 26 8. Agency, Stakeholder, and Community Coordination 27 8.1. Stakeholder and Agency Coordination (CITY, Property Owners, Utilities, WSDOT) 27 8.1.1. City Coordination 27 8.1.2. WSDOT .............................27 8.1.3. Property Owners 28 8.1.4. Utilities 28 8.2. Community Coordination 28 8.2.1. Community Meetings 8.2.2. Public Information Newsletter 28 9 Contract Drawings 29 9.1. Cover Sheet, Index, Notes, and Survey Control 29 9.2. Construction Staging 29 9.3. Roadway and Stormwater Drainage 30 9.3.1. Roadway Sections 30 9.3.2. Paving, Grading and Drainage Plans and Profiles 30 9.3.3. Stormwater Management Facilities 30 9.3.4. Intersection Grading 31 9.4. Site Prep and Temporary Erosion and Sedimentation Control 31 9.5. Utility 31 9.5.1. Utility Plans Water and Sewer 31 9.5.2. Utility Undergrounding Plans Power and Communication (Optional) 31 9 .5.3. Utility Potholing 32 9.6. Structures 32 IV 9.6.1. Design Calculations 33 9.7. Channelization, Illumination and Signing 33 9.8. Landscape, Irrigation and Urban Design 33 9.8.1. Landscape and Urban Design Plans and Details 33 9.9. Submittals (60%,90%, and 100% Bid Ready) 34 9.9.1. 60% Submittal 34 9.9.2. 90% Submittal 34 9.9.3. 100% Submittal 34 10 Specifications 35 11 Cost Estimating 36 11.1 Quantities 36 11.2 Engineer's Estimate 36 12. Major Milestone Reviews (30, 60, 90, 100%) 37 13. Services During Bidding 38 v Introduction During the term of this AGREEMENT, CH2M HILL Engineers, Inc. (CONSULTANT) shall perform professional services for the City of Tukwila (CITY) in connection with the following project: 40th 42nd AVENUE SOUTH PHASE III Project Description The 40th -42nd Avenue South Phase 3 Project includes roadway widening, asphalt overlay and replacement, curb, gutter, bike lane /sharrow, sidewalks, lighting, storm drainage facilities, utility relocations, and analysis of a fish passable culvert crossing for Gilliam Creek. The 1992 Design Report information will be updated to reflect current conditions, criteria and costs. Additionally, the City has chosen to incorporate other elements into the project that provide consistency With City planning efforts and with current regulatory requirements. These include: accommodating bicycles via a bike lane and sharrow lane; analyzing the replacement of Gilliam Creek culvert with a fish passable culvert; managing stormwater to meet King County Level 2 flow control requirements; and evaluating undergrounding of utilities. These additional design elements will be incorporated into the Final Design. The updated report will also document current applicable state and /or federal agency requirements and permitting needs. The elements of work for the design phase include: project management, roadway /civil /non- motorized, utilities, Gilliam Creek culvert, survey /mapping, stormwater, traffic, geotechnical, structures, illumination, community/ agency coordination, landscaping /urban design, cost estimating, construction staging, right -of -way (ROW) determination, specifications, and quality review. Environmental and ROW acquisitions may be added later by supplement at the request of the CITY. Project Limits This project provides improvements along 42nd Avenue South from S. 154th Street to S. 160th Street. The side streets will be improved to provide a transition into 42nd Avenue South. The project also includes the analysis of a fish passable culvert crossing for Gilliam Creek whose limits are assumed to extend approximately 200 ft upstream and downstream of the existing culvert. This scope of work includes hydraulic analysis of Gilliam Creek beyond this 200 ft so that hydraulic constraints and hydraulic impacts of culvert alternatives can be assessed. Assumptions The following general assumptions are made in developing the Scope of Work and Budget for 40 11, 42nd Avenue South Phase III Project. Additional detail is included in the task descriptions contained in the remainder of the Scope of Work. General Assumptions 1. This AGREEMENT has contract duration of 18months. CONSULTANT'S ability to meet the completion date is contingent upon timely receipt of information from the CITY and others and provided the scope proceeds as outlined and within the timeframe above. 2. Before it can be built, this project will require a SEPA Determination of Non significance (DNS) based on completion of a SEPA Environmental Checklist. It is assumed that federal funds and /or NEPA are not involved. 3. Right of Way services and SEPA and /or NEPA environmental documentation services are not included in this scope of work. 4. Unless otherwise specified herein, the CITY is responsible for paying for and securing any permits as well as securing all City permits. CONSULTANT assumes no responsibility for delays to the project as a result of the permitting process. 5. In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the project, the CONSULTANT will have no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that might affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by operating personnel or third parties; and other economic and operational factors that might materially affect the ultimate project cost or schedule. The CONSULTANT, therefore, will not warranty that the actual project costs, financial aspects, economic feasibility, or schedules will not vary from CONSULTANT'S opinions, analyses, projections, or estimates. 6. In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect total PROJECT cost and /or execution. These conditions and cost /execution effects are not the responsibility of CONSULTANT. 7. If there are changes in any of the Design Standards and References listed below, CONSULTANT may seek additional compensation if work performed needs to be altered or revised as a result of changes to design standards or references. 8. CITY will provide to CONSULTANT all data in CITY's possession relating to CONSULTANT's services on the PROJECT. CONSULTANT will reasonably rely upon the accuracy, timeliness, and completeness of the information provided by CITY. 9. CONSULTANT's deliverables are limited to the sealed and signed hard copies. Computer- generated drawing files furnished by CONSULTANT are for CITY or others' convenience. Any conclusions or information derived or obtained from these files will be at user's sole risk. 10. A wetlands reconnaissance will be performed to determine if any wetlands are present. Should any wetlands be located that would be affected, a supplement maybe prepared to include a Wetlands discipline report and if requested Wetlands Mitigation report. The scope and cost estimate will be developed when requested. 11. The CITY shall provide or make available the following items to the CONSULTANT: The City of Tukwila Publications listed as "Design Standards and References" Existing GIS Mapping information of the Project including general utility location maps for CITY water, sanitary sewer, and storm drainage facilities. Copies of existing record drawing information of the project area. Existing survey horizontal vertical control in NAD 83/91 (Horizontal) and NAVD 88 (Vertical). Title reports, assessor maps, and recorded plat maps. One set of consolidated review comments for each Major Milestone Submittal (30 60 and -90 Design Standards and References The project shall be developed in accordance with the latest edition, amendments, and revisions of the following publications, where applicable: 1. City of Tukwila Publications: a. Infrastructure Design Standards and Construction Standards, Dated April 12, 2010 b. Walk and Roll Plan, Dated January 20, 2009 c. City's Boiler Plate Standard Special Provisions for the 2010 WSDOT Specifications 2. State Publications: a. 2010 Standard Specifications for Road, Bridge, and Municipal Construction (M 41 -10) b. Standard Plans for Road, Bridge, and Municipal Construction (M 21 -01) c. Design Manual (M 22 -01) 3. American Association of State Highway and Transportation Officials Publications: a. A Policy on Geometric Design of Highways and Streets (2004 "Green Book 4. U.S. Department of Transportation Publications: a. Manual on Uniform Traffic Control Devices for Streets and Highways (current edition) 5. Other Publications: a. National Electrical Code b. Book of American Society for Testing and Materials Standards c. Proposed Accessibility Guidelines for Pedestrian Facilities in the public Right -of -Way (July 26, 2011) by US Access Board TASK 1 1. Project Management This task will be continuous throughout the project duration, which is assumed to be 18 months. It will include the work to set up and plan the project and establish project- specific procedures, including communication, quality control (QC), overall project coordination with the City and project team, and project closeout. Components of this work include planning the project, chartering the project team, endorsing the plan, executing the project, managing change, and closing the project. 1.1. Overall Project Management The CONSULTANT will prepare project instructions to communicate the requirements of the assigned work elements to team members and will lead team meetings and provide direction and oversight of the CONSULTANT'S project team to implement the work plan and coordination of work activities over the duration of the project. This effort is for the overall project rather than a specific task and is intended to provide the leadership that the team will need to understand project priorities, deadlines, budget constraints, and resolve issues that arise. For budgeting purposes, bi- monthly meetings, two hours in length are assumed over the duration of the project (9 meetings). This task is to fund the attendance of the Project Manager, and the Project Assistant at these meetings. Other project team members attending these meetings are to be funded under their specific work task. Deliverable(s): Project Setup and Instructions Monthly progress reports and invoices (18) Project schedule and schedule updates Project Records and project closeout 1.2. Coordination Meetings with CITY The CONSULTANT will prepare and conduct a two -hour kick -off meeting. The meeting shall address the project measures of success, roles, responsibilities, and operating guidelines. For budgeting purposes, this meeting will be two -hours at the CONSULTANT'S Bellevue office and will be attended by the CITY and 6 CONSULTANT staff, including the project manager, technical leads for roadway, water resources, and utilities. Agencies technical and reviewing staff will be encouraged to attend. The CONSULTANT will plan, facilitate and host bi- monthly project management team (PMT) meetings. These meetings will occur rotating between the CITY's office and the CONSULTANT'S office and are assumed to be 2 hours in length. Up to three CONSULTANT team staff members will attend each meeting, depending on the agenda. The CONSULTANT will prepare meeting agendas, meeting summaries, and action items. Deliverable(s): Kickoff meeting materials Bi- Monthly meeting materials (9), notes and action items 1.3. Project Quality Plan The CONSULTANT will prepare a project quality plan (PQP) that addresses quality control. The project quality manager will administer the PQP. Quality control includes technical discipline review while the work is in progress and senior review of work products prior to submittal to the CITY. (See Task 12 for Quality Reviews) The PQP will include the following: Process, sequence, and procedures of reviews Individual roles and responsibilities of reviewers Approval process Deliverable(s): Draft and Final Quality Management Plan TASK 2 2. Gilliam Creek Culvert 2.1. Data Collection and Permitting Agency Requirements The purpose of this sub -task is to assess the physical and habitat conditions of Gilliam Creek in the vicinity of the project and to identify and document the permitting requirements related to the Gilliam Creek Culvert. The CONSULTANT will utilize the survey information collected in Task 5 and will conduct a site walk through under this Task 2.1 to assess the physical and habitat conditions on Gilliam Creek. The CONSULTANT will outline issues regarding the culvert that are important to the permitting agencies including Washington Department of Fish and Wildlife (WDFW), the U.S. Army Corps of Engineers (USACE), and National Marine Fisheries Service (NMFS) of the National Atmospheric and Oceanic Administration (NOAA) in anticipation of the project requiring both an Hydraulic Project Approval (HPA) permit and a 404 permit. The CONSULTANT will conduct a wetlands delineation for the project area. Delineation of the wetlands in the vicinity of the culvert is necessary for the culvert replacement permit application. The CONSULTANT will document the wetlands delineation in a deliverable for this sub -task. The CONSULTANT will outline the preliminary permit requirements assuming culvert replacement. The CONSULTANT will document anticipated permit requirements in a deliverable for this sub -task. The CONSULTANT will contact and meet with the permitting agencies to commence dialog about the project. This sub -task includes communication and coordination between the CONSULTANT, the CTY, and the permitting agencies that will occur before JARPA submittal (sub -task 2.5). It is anticipated that up to two (2) field visits with up to two (2) CONSULTANT staff will occur as part of this sub -task, including one (1) field visit with the permitting agencies and one (1) field visit for wetlands delineation. Assumption(s). The geotechnical information needed for culvert design will be obtained under Task 3 of this scope of work. The survey information needed for culvert design will be obtained under Task 4 of this scope of work. Deliverable(s): Draft and Final Gilliam Creek Culvert Data Collection and Permitting Requirements Memorandum Wetlands Delineation for the project area, Final only Field visits and coordination with permitting agencies 2.2. Basis of Culvert Design The purpose of this sub -task is to develop options, or alternatives, for Gilliam Creek Culvert replacement and to evaluate and assess these options against design criteria and anticipated permitting requirements then to identify a preferred option for culvert replacement. The CONSULTANT will perform hydrologic and hydraulic analysis on Gilliam Creek, analyzing stream hydraulics and sediment transport under existing conditions. The CONSULTANT will use HEC -RAS to assess hydraulic conveyance capacity of the existing culvert, and to set hydraulic design criteria, acknowledging that the culvert currently lacks capacity for the design year storm events. The CONSULTANT will also model hydraulics of up to three (3) replacement options (i.e. a bridge, a box culvert, or an arch culvert). It is assumed that survey information for hydraulic modeling will be collected as part of Task 4 of this scope of work. Once the hydrologic and hydraulic analysis has been performed, the CONSULTANT will consider hydraulics and other factors (including permittability, constructability, and feasibility) to identify a preferred option for culvert replacement. Preliminary construction staging/ sequencing concepts and existing site constraints will be identified. Potential constraints from a structural and constructability perspective will be identified. The CONSULTANT will document this effort in a basis of design memorandum. It is anticipated that one (1) field visit with up to two (2) CONSULTANT staff will occur as part of this sub -task. Deliverable(s): Draft and Final Gilliam Creek Culvert Basis of Design Memorandum Field visit 2.3. Culvert 30% Design For the preferred culvert replacement alternative, a preliminary layout will be prepared for the purpose of establishing culvert type, size, and location to be used to prepare final design. Geometric requirements will be defined, such as elevations, length, width, and height. Preliminary opinions of cost will be developed. The CONSULTANT will submit this preliminary layout to the CITY for comment and will address these comments in preparation of the 30% design. The CONSULTANT will prepare the 30% Design Plans and 30% Design Technical Memorandum. It is anticipated that the 30% design plans will include 6 sheets described in Task 2.5.1 with plan view sheets at 1" 20' scale. This task includes up to two (2) meetings throughout the course of the project with the permitting agencies and the CITY, assuming up to two (2) CONSULTANT attendees at each meeting. The CONSULTANT will prepare a meeting summary for each meeting with the CITY during this Task 2.3. Assumption(s): Culvert 30% Design Plans and 30% Design Technical Memorandum will be prepared as part of this subtask 2.3 but will also be incorporated into the 30% Design package deliverable under Task 5.9 Deliverable(s): Draft and Final Gilliam Creek Culvert Conceptual Design Plan, assuming 1 drawing Draft and Final Gilliam Creek Culvert 30% Design Plans, assuming up to five (5) sheets, delivered as PDFs Draft and Final Gilliam Creek Culvert 30% Design Technical Memorandum Meetings with the CITY 2.4. Culvert Permitting The CONSULTANT will prepare a preliminary draft and draft Joint Aquatic Resource Project Application (DARPA). The CONSULTANT will request CITY comments on the preliminary draft and then will prepare a draft JARPA that addresses CITY comments. The CONSULTANT will then provide the CITY with the draft JARPA for the CTTY's submittal to the permitting agencies. The JARPA will be submitted with the 30% design plans and 30% design technical memorandum prepared as part of Task 2.3. It is assumed for this scope of work that a Biological Assessment (BA) will be needed and will be prepared by the CONSULTANT as part of JARPA preparation. (If an ESA -listed species may be present, a BA is needed. Since Coho and Chinook may be present in the lower reaches of Gilliam Creek, it is likely that a BA will be required.) This sub -task includes communication and coordination between the CONSULTANT, the CITY, and the permitting agencies that will occur after JARPA submittal up until the HPA and 404 permits are issued. This coordination may include meetings with the permitting agency staff and the project team or it may include responding to requests for additional information from the permitting agencies. Assumption(s): The JARPA will suffice as application for both the HPA and 404 permits. A Biological Assessment (BA) will be needed and will be prepared as part of the JARPA submittal. The local government (City and County) permit requirements (including shoreline, critical areas, and floodplain) will be addressed by CITY staff, with the CONSULTANT focusing on the state and federal government permit requirements. Deliverable(s): Preliminary Draft and Draft JARPA, including Biological Assessment (with attached 30% design plans and 30% design technical memorandum prepared as part of Task 2.3). Coordination with permitting agencies during the permit application review process 2.5. Culvert 60 90 and Final Design This task progresses the design from the preferred alternative developed in Task 2.3 to preparing the 60% contract drawings for review, the 90% contract drawings for review, and 100% (bid ready) contract drawings, for the Gilliam Creek Culvert. 2.5.1. Contract Drawings The CONSULTANT will prepare plan view sheets at a 1 20' scale. Following is a proposed list of drawings. Site Plan Including Erosion Control and Stream Flow Diversion. (1) Replacement Culvert Plan, Profile and Cross Section (1). The CONSULTANT will prepare a plan, profile and cross section for the Culvert denoting alignment, widths, grades/ elevations, paving and grading limits, sidewalks, bike lanes /sharrows, and landscaping. This drawing will include temporary erosion and sedimentation control (TESC). Replacement Culvert Sections and Details (1). This includes the design and documentation including foundation components in accordance with the approved Design Criteria for the Gilliam Creek Culvert. Construction Staging, and Traffic Control (1). The construction staging plans prepared by the CONSULTANT will serve as the basis for the contractor to bid the project and to prepare detailed construction staging and traffic maintenance plans. Roadway Repair and Miscellaneous Details (1) Assumption(s): Culvert design and roadway design will occur concurrently so that advanced construction of the culvert is compatible and logically sequenced with the proposed roadway improvements construction to be performed later. Storm drainage facilities and utility relocations are constructed under the roadway design contract. The construction contractor will prepare a Stormwater Pollution Prevention Plan SWPPP) that is consistent with Dept. of Ecology requirements and incorporates the TESC plans. If the CITY determines that the SWPPP should be included in the project bid documents, the scope may be amended to include its preparation by the CONSULTANT. Deliverables: 60%,90%, and 100% Drawings TASK 3 3. Geotechnical Engineering This scope of work covers geotechnical engineering services to support develop of contract documents for the construction of retaining walls, utilities, Gilliam Creek culvert, and pole foundations. The geotechnical work includes geotechnical field reconnaissance and subsurface exploration to define subsurface conditions. This information is needed for project planning and to determine preliminary structure and foundation types. The geotechnical work will be conducted during the 30% Design phase of the project. Assumptions: Geotechnical issues and assumptions for the project are discussed below. These elements will be coordinated with the Structures scope of work. Short sections of standard concrete cantilever walls are likely where the wall height is less than 5 feet. Up to 2 of the borings totaling 50 feet were assumed to provide subsurface information that would support the design of retaining walls, Gilliam Creek Culvert, and design of minor utility relocations. Existing subsurface information will be used whenever possible and the full allocation of borings (i.e. 2 borings) will not be used if subsurface conditions can be reasonably interpolated from existing explorations. 3.1. Subsurface Exploration and Data Report The CONSULTANT will perform site reconnaissance, subsurface exploration, and laboratory testing for preliminary geotechnical design of the project elements. Obtain and review existing information, coordinate and plan access and restoration for test holes, test pits, infiltration testing, and pumping test and identify features that affect other geotechnical design work elements. For planning purposes it is assumed that the subsurface exploration will consist of the following: 1. Two (2) test hole locations with drilling footage totaling up to 50 Lineal Feet (If). The purpose of these test holes and laboratory testing of selected samples from the borings will be to establish a preliminary subsurface profile, develop preliminary soil design properties, and determine the groundwater elevation across the site. During the drilling program, Standard Penetration Tests (SPTs) will be conducted at intervals of 5 feet or at stratigraphic changes in soil. An automatic hammer may be used to conduct SPTs. Piezometers will be installed in the borings, in accordance with Washington State Department of Ecology Standards. 2. One infiltration test at the preferred stormwater detention /treatment /infiltration site. 3. Monitoring groundwater levels in the piezometers monthly for a period of one year. 10 A geotechnical engineer or engineering geologist will be provided during test hole drilling and test pit excavation to: Visually classify soils following ASTM methods Record blow counts during SPT's Collect and store samples of soil for laboratory testing and classification The boring and test pit logs will include observations made by drilling crews during drilling. Depths at which groundwater is encountered will also be recorded. Test holes will be restored to grading and filling similar to the existing conditions. Laboratory tests will be conducted on selected soil samples to determine gradation and moisture content of site soils. The actual number and type of tests will depend upon the materials encountered. For planning purposes it is assumed that the laboratory testing program will consist of the following: Test Type Number of Tests Atterberg Limits 2 Moisture contents 5 Consolidation 2 Grain size analyses 15 Percent passing number 200 sieve 2 Compaction tests 2 Hydrometer tests 2 Combined hydrometer and gradation tests 3 Soil resistivity and PH 2 Permeability of granular soils tests 1 Assumptions: The CONSULTANT will obtain permits for drilling from the Washington State Department of Ecology. The CONSULTANT will obtain permits from the CITY for any work within the CITY right of way. The CONSULTANT will obtain the necessary permits or approvals from WSDOT before working within the WSDOT right of way. The CONSULTANT will stake boring, test pit, and well locations and make calls to One -Call or private locators for underground utility clearance. Equipment and labor to conduct the explorations and restore the site upon completion will be provided by the CONSULTANT. Vehicular traffic control will be provided at boring and test pit locations; the CONSULTANT will develop traffic control plans and provide traffic control devices and flaggers. The soils are uncontaminated. Soil samples will not be returned to the CITY and will be discarded within 6 months of the sampling date. The CONSULTANT will survey the final exploration locations. Cultural resource monitoring is not included. m Access onto private property will not be needed. The stormwater infiltration site will have sufficient space to excavate a test pit and run an infiltration test. If the property is not available, the infiltration rate will be estimated from the gradation of surface samples or samples from nearby borings. Deliverables: Geotechnical Data Report containing the boring and test pit logs, laboratory test results, and description of the exploration methods. The data report will also contain applicable logs and laboratory test results from previous geotechnical or hydrogeological explorations in the project vicinity, as well as published descriptions of site geology, unless the published geology is found to conflict with the results of the subsurface exploration. It is intended that the Geotechnical Data Report, containing the uninterrupted subsurface data from subsurface explorations, will become part of the construction contract documents. 3.2. Geotechnical Analysis and Report The CONSULTANT will perform engineering studies to provide preliminary geotechnical design recommendations for foundations, retaining wall types, stormwater vaults, permanent cut and fill slopes, and assumptions for temporary slopes. The geotechnical studies for preliminary design will include: A review of observable existing site field conditions and available geotechnical information, including the results of available exploration and laboratory testing programs conducted in the vicinity of the Project. Estimation of dewatering to construct the utilities in dry conditions, to be used for permitting only. Estimation of stormwater infiltration rate at one pond site. Determination of lateral earth pressures for walls. Evaluation of geotechnical considerations related to constructability. The CONSULTANT will prepare a geotechnical report summarizing the subsurface conditions and preliminary geotechnical recommendations for the project. The report is intended to be used in tandem with the Draft Geotechnical Data Report, so that data are not repeated in the recommendations report. The report will present: Subsurface interpretation and recommended preliminary soil properties for use in design. Recommendations for subsurface explorations and analyses to support final design. A summary of potential special foundation, wall, and construction considerations; this summary will identify geotechnical issues that could affect the methods and the costs of construction. The CONSULTANT will provide the draft Geotechnical Report to the CITY for review and comment. The comments will be incorporated into the final report and responded to in writing to verify resolution. The document length is assumed to be approximately 30 pages excluding appendices and attachments. Assumptions: High groundwater is at least 5 feet below the bottom of the proposed 42nd Avenue South profile so that considerations of long -term groundwater seepage into the roadway prism, 12 buoyancy control of the roadway, and other analyses related to constructing a roadway below the water table will not be needed. Walls greater than 5 feet in height, settlement mitigation, installation of utilities by trenchless methods, and widening of the existing opening beneath SR 518 are not anticipated; if this assumption is incorrect, a secondary exploration and /or additional geotechnical analyses and recommendations will be added as a supplement to this scope. Deliverable(s): Geotechnical Design Report (Draft and Final) 13 TASK 4 4. Survey and Mapping This task involves field surveying to establish horizontal and vertical control within the project limits, collecting existing topographic features and producing a project basemap and Digital Terrain Model (DTM) to be used in preliminary design, and conducting additional survey work to supplement the basemap and DTM as the design progresses. Assumutions: Unless otherwise specified, the CONSULTANT will secure rights of entry for private properties, within the defined project limits, to be surveyed prior to the commencement of field survey work. As part of the geotechnical work, the CONSULTANT will secure a right of entry permit for subsurface explorations in the WSDOT right of way. The CONSULTANT will coordinate the subsurface explorations with the survey work so they occur concurrently. 4.1. Survey and Construction Control The CONSULTANT will establish horizontal and vertical control points along the corridor and within the project limits described above. Approximately 6 control points will be established and will be made available for the construction Contractor's use during construction. The CONSULTANT will locate, field survey, and calculate positions for monuments and control points throughout the project limits, using the Washington State plane coordinate system. Conventional or GPS surveying methods will be used on this project. Monuments or corners to be located and field surveyed include the following: Section Corners Side street monuments Monuments on 42nd Avenue South centerline, S. 154th, S.158th, S. 160th centerline. Field Survey and Note Reduction. Perform note reduction of the field survey data. Horizontal Datum will be NAD83 /91, Washington State Plane Coordinates, North Zone, US Survey Feet. Vertical Datum will be NAVD 88, Feet. CONSULTANT will set up to 6, permanent control points for use during construction. Deliverables: Field survey and construction control plans, copies of survey field notes, ASCII file of control points. 4.2. Base Mapping Conventional ground surveys will be utilized to develop the project basemap. The limits of survey are: Along 42nd Avenue South from the centerline of S. 154th to 100ft south of S. 160th; 150 feet wide, 75 feet each side of centerline of the 42nd Avenue South centerline; 150 feet east and west along S. 158th Street and S.160th Street; along Gilliam Creek, 500ft upstream and downstream of the existing culvert; 50 feet wide, 25 feet each side of centerline, assuming Gilliam Creek cross sections every 25 feet (for hydraulic modeling purposes) plus survey of any culverts, weirs, or other structures for 500 ft upstream and downstream of the existing culvert. 14 4.2.1 Topography Map Mapping work to prepare 1 =20' topographic base map and digital terrain model (DTM) of the project within the limits described above. The base map will include building faces, building corners, signs, trees (deciduous trees 6 -inch diameter and greater, and evergreen trees 4 -inch diameter and greater), curbs, sidewalks, culverts, utility poles, signal and illumination poles and other surface features (junction boxes and traffic controller service cabinets) within the mapping area as describe above. One -foot contours will be generated from the DTM. Field survey shall establish existing pavement surface elevation on 42nd Avenue South, S. 154th, S. 158th and S. 160th Streets within the limits noted above. Profiles of the existing roadway surface will be surveyed along the curb lines /edge pavement and along the crown line. Deliverables: 1 =20' topographic base map 4.2.2 Utilities Survey and Mapping Field survey to locate paint marks at 50 -ft intervals and surface feature (valves, manholes, catch basins, junction boxes, vaults) to delineate the utilities to the full extent of the mapping limits. Irrigation systems will not be included. The CONSULTANT will prepare a utility base map from this information. The CONSULTANT will also locate utility paint marks along S. 154th, S. 158th, and S. 160th within the limits noted above. Perform observation and measure -downs of existing storm drain catch basins and manholes. The approximate size, type (brick, concrete), and general condition of the structures to confirm suitability for continued use, and approximate size and location of storm drainage pipes will be documented. These observations will be made from the surface. NOTE: Wetland delineations are not included in scope and may be added by amendment. Deliverables: Design basemapping in AutoCad 2008 format with planimetric features and an InRoads compatible DIM surface. GIS Shapefile or geodatabase formatted files will be provided to the CITY 0 Copies of field notes. 4.3. Supplemental Surveys It is assumed that during the design phase, some level of supplemental survey may be necessary, and for purposes such as private property match /conforms, utility features, structure elevations, or features requiring more definition for design purposes. For budgeting purposes this task item has been estimated not to exceed 40 -field crew hours. Any costs for performing additional survey beyond 40 -field crew hours, will be covered by supplemental agreement. Deliverables: Supplemental design surveys, updates to basemapping. 4.4. Right of Way Field Surveys 4.4.1 Right of Way Field Surveys 15 The CONSULTANT will perform field surveys to locate controlling section corners, plat monuments, street right of way monuments, and visible property corners to facilitate calculations for section and sub- section lines, parcel lines, and street centerline and right of way lines. The CONSULTANT will incorporate this information into the basemap. Deliverables: Copies of survey field notes, ASCII file of right of way and section monuments 4.4.2. Records Research and Right of Way Calculations The CONSULTANT will establish the existing right of way and centerlines for the following: 42nd Avenue South 5.154th to 5.160th Gilliam Creek The CONSULTANT shall calculate and establish right of way lines using field surveyed evidence of existing monumentation, assessor maps, recorded plats, and title report information. The CITY shall provide the CONSULTANT with all title reports and supporting documentation. Deliverables: Right of way calculations and supporting documentation Existing right of way lines and centerlines 16 TASK 5 5. 30% Design This task involves updating information relevant to the Preferred Project Alternative contained in the City's "Design Memorandum for Improvements to 42nd Avenue South S. 160 Street to S. 130th Street" dated 1992, to reflect project changes and new information obtained since the time of the original report. The CONSULTANT will review the Design Memo and update to reflect current project knowledge, current design standards, input from third parties, and City- requested changes since the time of the original report. This work will be used to support the review and confirmation of the preferred project alternative to be developed further during 30% Design. Task 5, 30% Design, will advance the design to establish the concepts for roadway improvements, basic channelization, utility and drainage systems. This task will progress the major design elements to 30% level, and perform specific activities to support this design level. See Attachment A for a Sheet List by discipline. The 30% Design effort will be expected to include modifying the design concept based on agency, stakeholder, and community input; these modifications will be assumed to be minor adjustments within the project limits described. Documentation of the 30% Design task will include the preparation of technical memorandum that assess project impacts and establish design criteria. Quantity takeoffs will be performed for each discipline under this task, which will be compiled in Task 11 Cost Estimating. Design coordination meetings to support the 30% design efforts are included in Task 8 Agency, Stakeholder, and Community Coordination. 5.1. Roadway Design 5.1.1. Refinement of Preferred Alignments Once the topography and right -of -way survey has been performed and right -of -way centerlines and parcel lines are established in Task 4, the CONSULTANT will refine the horizontal and vertical alignments and finalize the design and basic project footprint (pavement edges, curb lines, and sidewalk limits) for other disciplines to begin advancing design to the 30% level. The CONSULTANT will utilize existing and forecasted traffic counts (provided by the CITY), to confirm channelization needs and the layout will be revised to address traffic operations. The CONSULTANT will develop vertical alignments for the 30% submittal based on the DTM derived from the topographic survey. Develop alternatives for pedestrians and bikes. Up to two alternatives will be prepared. The CONSULTANT will work with CITYto select a preferred alternative and prepare a roll plot showing the footprint. The CONSULTANT will identify ADA non compliance issues and will prepare a Maximum Extent Feasible report. Deliverable(s): Horizontal and vertical alignment documentation. One cross section per alternative and a roll plot with layout per alternative. 30% Project Footprint Roll Plot Maximum Extent Feasible Report 17 5.1.2. Develop Roadway Plans The CONSULTANT will develop 30% Roadway Plans that include the following elements: Preliminary Horizontal and Vertical Alignment Plans (30 The CONSULTANT will prepare preliminary horizontal alignment plans at 1 =20' scale for the selected alternative. The CONSULTANT shall prepare preliminary vertical profile drawings for the selected alternative. Preliminary horizontal and vertical alignment plans will be produced for the main roadways and cross streets. Typical Roadway Sections (30 The CONSULTANT will prepare preliminary Typical Roadway Section Plans not to scale (NTS) and are anticipated to consist of two (2) drawings for selected alternative and cross streets. The sections will denote roadway widths, bike lanes /sharrow, sidewalks, and traffic lanes. Preliminary Paving and Grading Plans (30 The CONSULTANT will prepare Preliminary Paving and Grading Plans at 1 =20' scale for the selected alternative. The Plans will show dimensions for roadway outlines and sidewalks for the selected alternative. The Plans will also show curb returns, tapers, intersection layouts, proposed driveway access and other pertinent surface features, which are typically shown at the preliminary phase. A preliminary layout of property limits will be developed and shown in the form of cut /fill lines and property reconstruction limit. Preliminary Right -of -Way Plans (30 Using the construction limits developed for the Paving and Grading Plans and the Drainage and Utility Plans, the CONSULTANT will identify right -of -way needs, including acquisition areas, permanent easements and potential construction easements. Approximate square footage will be calculated for parcels identified for full and partial takes. The Preliminary Right -of -Way Needs Map /Plan will be developed at 1 =20' scale. Deliverable(s): 30% Roadway Plans to be included in the 30% Drawing Set 5.1.3. Pavement Design The CONSULTANT will prepare pavement designs for roadways that will be reconstructed. Evaluating existing pavement section strength (falling weight deflectometer [FWD] tests) is not included in this Scope of Work and will be performed by the City. Two pavement sections will be designed for the project limits, including the following: Flexible pavement design 42nd Avenue South Flexible pavement design for side street approaches, The subgrade strength parameters (resilient modulus) will be provided under separate subtask (Le. Geotechnical). Traffic volumes, including percentage and classification of trucks, will be used from the information generated from the forecasted traffic volumes provided by the CITY. The pavement sections will be shown on the typical cross sections as described under Task 5.1.2 Roadway Plans. Deliverable(s): Pavement design memorandum to be included in the 30% Design Report 18 5.1.4. Roadway Design Documentation Following are the design documentation elements: Design criteria: The CONSULTANT will confirm geometric design criteria for the project. The project design criteria will reference City Design Standards; City Walk and Roll Plan, WSDOT Design Manual where applicable, ADA, and AASHTO 2004. Design exceptions: The CONSULTANT will identify any variances to CITY design standards. These will be documented and presented in working review sessions with the appropriate reviewers to gain concurrence. Deliverable(s): Project design criteria to be included in the 30% Design Report Design Exception Documentation to be included in the 30% Design Report 5.2. Stormwater Design This task includes development of stormwater design criteria and development of a conceptual stormwater plan. This task also includes defining and advancing the conceptual stormwater plan with development, evaluation, and selection of water quality treatment and flow control facilities to be carried forward into 30% design. 5.2.1. Data Collection and Stormwater Requirements Documentation The CONSULTANT will collect and review available data and information pertaining to hydrology, drainage issues, sensitive areas, basin plan requirements, and other parameters that may affect stormwater management at the site. Sources of data are the CITY's Stormwater Comprehensive Plan and the Gilliam Creek Basin Plan. The CITY will provide drainage system information in GIS format and any available record drawing information of existing storm sewers, culverts, stormwater management facilities, or related planning information in the vicinity of the site. The CONSULTANT will outline and document stormwater requirements for the project site including those for flow control, water quality treatment, and erosion /sediment control. The CONSULTANT will then develop design criteria corresponding to those stormwater requirements. The CONSULTANT will prepare a Stormwater Design Criteria Technical Memorandum documenting the drainage design and erosion/ sediment control criteria. Some initial assumptions that will be used in developing the stormwater management design for the project include: KCSWDM flow control and treatment menus will be used and software for these flow control and treatment menus will be utilized The constructed storm drainage system within the project limits are not expected to require fish passage design. Stormwater management facilities will be designed for 42nd Avenue South flows only and will not provide additional management for offsite (or "regional flows. It is anticipated that up to three (3) field visits or meetings with up to two (2) CONSULTANT staff in attendance will occur as part of this sub -task. One of these visits will be to obtain comments on the draft deliverable for inclusion into a final deliverable for this sub -task. 19 Deliverables: Draft and Final Stormwater Design Criteria Technical Memorandum (up to 10 pages in length including graphics, documenting available information regarding stormwater at the project site and applicable stormwater requirements) 5.2.2. Stormwater Management Concept The CONSULTANT will develop up to three (3) options for stormwater management. Each option may include a series of elements, such as a treatment train for water quality in addition to a vault for storage. Opportunities for flow control and treatment of stormwater from existing roadway surfaces will be examined. This will consist of examining maximum footprints available on identified parcels. The CONSULTANT will then assess the constructability, feasibility, and effectiveness of each of the options. It is assumed that geotechnical investigations to assess stormwater management option feasibility will be performed under Task 3 of this scope of work. The CONSULTANT will document results of this assessment, along with a recommended stormwater management option, in a Stormwater Management Concept Technical Memorandum. The CONSULTANT will prepare one conceptual drainage plan (of the recommended stormwater management concept) showing estimated footprint and location of proposed combined water quality and flow control facilities; conveyance systems, impervious surfaces, right -of -way, and site topographic features. It is anticipated that up to three (3) field visits or meetings with up to two (2) CONSULTANT staff in attendance will occur as part of this sub -task. One of these visits will be to obtain comments on the draft deliverable for inclusion into a final deliverable for this sub -task. The deliverable for this sub -task will be used in a later task to develop the 30% stormwater design. Deliverables: Draft and Final Stormwater Management Concept Technical Memorandum and Conceptual Drainage Plan (up to 20 pages in length including graphics and conceptual drawings, documenting up to three (3) options for stormwater management, an assessment of those stormwater management options, and a recommended stormwater management concept for the project site.) 5.3. Utility Design The CONSULTANT will contact each potentially- impacted utility company (listed below under assumptions) and will develop an updated list of utility contact information. Data regarding known changes to utility infrastructure in the project area will be requested, along with updated record drawing information. The CONSULTANT'S effort for this task will involve incorporating the updated record drawing information into the project basemap and documenting any expected significant change in project impacts. Assumptions: Overhead utilities within project limits will be relocated underground. These utilities include: Seattle City Light Distribution Power, and Transmission Power Comcast Cable TV/ Fiber Optics Century Link Telephone Underground utilities within project limits include: 20 Seattle City Light Power Seattle Public Utilities Water Puget Sound Energy Natural Gas Valley View Sewer Sanitary Sewer Water District 125 Water Highline Water District Water City Storm Drainage (and Sanitary Sewer) Century Link- Telephone 5.3.1. Preliminary Utility Plans Water and Sewer The CONSULTANT will prepare preliminary utility relocation plans for sanitary sewer, water lines, and associated appurtenances within the project limits. Utility drawings prepared at this design stage will indicate removals, lines to be abandoned, relocations, and new lines for water and sanitary sewer. Sections will show bedding and backfill requirements for the watermain and sewer lines. The CONSULTANT will coordinate with Puget Sound Energy (PSE) for relocations and proposed upgrades to gas facilities within the project area. PSE will develop plans showing any gas line relocations. These relocations will be shown on the Utility plans for reference and noted as work done by others. 5.3.2. Cost Comparison of Overhead Utility Relocation Options The CONSULTANT will prepare a cost estimate comparing overhead -to- overhead relocation to overhead -to- underground relocation of power and telecommunication facilities. These options will be presented to the City Council for direction on the preferred option to incorporate into final design. 5.3.3. Preliminary Utility Undergrounding Plans Power and Communication (Optional) The CONSULTANT will show the proposed locations of non -City utilities on the Utility Undergrounding Plans. As identified in the list above, Seattle City Light, Century Link and Comcast have overhead utilities that will need to move underground. The CONSULTANT will provide the layout for the utility undergrounding associated with CITY (SCL) and private telecommunication facilities to the 30 percent level in order to communicate the design intent. Seattle City Light (SCL) will provide the type, size and approximate location of vaults and conduits for the underground system, as well as SCL Construction Guidelines and general design assumptions. The CONSULTANT will coordinate utility work to confirm compatibility with existing and proposed utilities, storm drain, signal, illumination, landscaping, irrigation, and urban design. The CONSULTANT will confirm clearance requirements with SCL. Only SCL approved materials, specifications and construction guidelines will be used in designing SCL facilities. These items will be included in the contract documents. Coordination meetings will be needed with Century Link and Comcast to determine the vaults, conduit runs and other facilities. Each private telecommunications company will be required to provide a plan layout showing the vault and conduit system that they need to underground their facilities. The CONSULTANT will confirm that space is available and coordinate with each, to shift vaults to fit with other existing and proposed features. These vaults will be shown on the Utility 21 Undergrounding plans, with references to the Utility Company Plans for details of the Vaults and conduits. At this design stage, Utility Undergrounding drawings will include plans and sections: Plans will indicate poles and other SCL facilities to be removed, new vaults, and ductbank runs with preliminary ductbank configurations. Utility undergrounding sections will show bedding, backfill and conduit spacing requirements for the joint utility trench. Deliverables for Task 5.3: Cost Comparison of Overhead Utility Relocation Options 30% Utility Plans to be included in the 30% Drawings Set 30% Utility Undergrounding Plans to be included in the 30% Drawings Set 5.4. Traffic Design It is assumed that S.154�h Street /42nd Avenue South intersection will not be impacted or require modification. 5.4.1. Conceptual Illumination Design The CONSULTANT will prepare preliminary illumination design plans as part of the 30 %design package. Illumination design will be based on the width of the roadway and potential for placing luminaries on the outside along the corridor segment. The CONSULTANT will work with the CITY to determine the general layout and configuration type of light fixture(s) for the roadway and pedestrian lighting to be used on this project and model photometrics that match the chosen fixture. The CONSULTANT will provide preliminary lighting designs for up to two design options that show spacing of luminaries for each option meeting lighting requirements. Design options will show the lane configuration, type of luminaire configuration, spacing between luminaries, and the light level results. Plan sheets will indicate luminaries' locations. Deliverables for Task 5.3: Illumination Plans (6) 5.5. Structures Design This task consists of preliminary structures design for retaining wall and stormwater vault concepts to be carried forward into final design and construction in subsequent phases of the project. Assumptions: There will be up to three (3) retaining walls approximately 100' long. The maximum wall height is expected to be 4 to 6'. 5.5.1. Data Collection and Review Assemble and review the data needed to perform the structures work elements including: Review of available site survey and geotechnical data. Review contract drawings or as -built plans as available for the SR 518 Bridge. Review of existing reports, maps, utilities, and plans. 22 Review proposed alternative roadway, profiles, and related geometrics. Perform one(1) site visit for two (2) staff to photograph the site and identify potential conflicts with existing features. 5.5.2. Design Criteria Prepare structural design criteria to be used for designing the retaining walls and related structures in accordance with applicable, AASHTO and WSDOT codes and standards. Prepare design criteria and layouts for stormwater vaults (if vaults or other below ground facilities are the preferred stormwater management option) Deliverable(s): Structures Design Criteria to be included in the 30% Design Report 5.5.3. Preliminary Structures Design The CONSULTANT will evaluate up to two (2) alternatives for the retaining walls. Approximate geometric requirements will be defined, such as elevations, length, width, and height. Preliminary construction staging/ sequencing concepts and existing site constraints will be identified. Advantages and disadvantages of each concept and potential constraints from a structural and constructability perspective will be identified. Comparative -level opinion of costs will be developed for the major cost elements of each alternative. For the preferred alternative, preliminary layouts will be prepared for the purpose of establishing retaining wall type, size, and location to be used for establishing a basis for final design. Preliminary opinions of cost will be developed. Preliminary foundation design concepts for the structural elements (vaults) of the project will be prepared in coordination with the project geotechnical engineer. This task includes one (1) meeting throughout the course of the project with agency staff and the project team to coordinate the technical elements of the work. Deliverable(s). Structures Preliminary Design Technical Memorandum to be included in the 30% Design Report 30% Retaining Wall Plans to be included in the 30% Drawing Set 5.6. Landscape Urban Design This task involves preliminary landscape architecture, and urban design work to develop 30 level design plans for the roadway corridor, planting strips and the areas disturbed by construction to the ROW and /or in construction easements. This task includes the development, evaluation, and selection of plant material, irrigation type, water connection points, bridge and wall aesthetic treatments and architectural elements for the purpose of selecting the concepts to be carried forward into final design and construction. 5.6.1. Landscape Design Report and Plans The CONSULTANT will prepare plans noting specific areas to be landscaped, the plant material palettes to be used, and urban design elements. 23 Deliverable(s): 30% Landscape Plans to be included in the 30% Drawing Set 5.6.2. Urban Design and Visualization The CONSULTANT will prepare up to 6 graphics to support the selection of hardscape /surface treatments, lighting and urban design treatments, and wall and bridge treatments. Deliverable(s): Up to 6 graphics to be included in the 30% Design Report 5.7. Cost Estimates, Schedule, and Construction Phasing Based on the preferred alternative, the CONSULTANT will prepare a cost estimate, schedule, and construction phasing discussion to reflect current project information. As part of this task, the CONSULTANT will prepare the following: Material quantities and Unit prices Confirm escalation and appropriate cost contingency Right -of -way costs Stormwater system costs Undergrounding Utility Costs Engineering and environmental documentation Costs Project schedule and Construction phasing discussion Deliverable(s): Budget -Level Project Cost Estimate, Schedule, and Construction Phasing Discussion 5.8. 30% Design Package The CONSULTANT will prepare draft and final versions of a 30% Design Memorandum document that summarizes the results of the technical work and documents the baseline project elements, and includes the following: Compilation of information and analysis Executive summary and comprehensive discussion of updated information Exhibits, tables, and plans Deliverable(s): 30% Design Memorandum exhibits, maps, and tables. (3 halfsize hard copies,1 pdf). 30% Drawing Set (3 halfsize hard copies,1 pdf) 24 TASK 6 6. Environmental Documentation (Optional) SEPA and /or NEPA Environmental Documentation task(s) are not included in the scope and budget. Should the CITY request support from the CONSULTANT, an amendment will be necessary. TASK 7 7. Right of Way (Optional) Right of Way services including parcel calculations, legal descriptions, parcel maps, right of way plans, appraisals, negotiations, and coordination are not included in this scope of work but may be added under a future amendment. 26 TASK 8 8. Agency, Stakeholder, and Community Coordination Work to be performed under this task also includes general administrative coordination with the key project review agencies and affected utility companies, as well as technical coordination to obtain engineering review and approval of project technical work. This work is for coordination with the pre design update, 30 60 90% and 100% levels of design completion. 8.1. Stakeholder and Agency Coordination (CITY, Property Owners, Utilities, WSDOT) The CONSULTANT will coordinate the preparation and review of the project design work with CITY staff and review agencies and stakeholders at the 30 60% and 90% levels of design completion. The CONSULTANT will respond and adjudicate agency and stakeholder review comments and incorporate revisions if agreed to by the City. (Note that coordination with the permitting agencies for Gilliam Creek Culvert replacement, including WDFW and the USACE, is included under Task 2.) 8.1.1. City Coordination The CONSULTANT will prepare for and attend up to one City Council meeting. The CONSULTANT will prepare presentation graphics showing applicable project information. It is assumed these Council meetings would occur at the time of key milestone submittals (30, 60, 90, 100 Deliverables: Project briefing materials 8.1.2. WSDOT The CONSULTANT will be responsible for coordinating, supporting, and attending meetings between project staff and WSDOT representatives, including scheduling, preparing meeting materials, and summarizing meeting discussion, issues, and follow -up activities. WSDOT Bridae and Structures Assumption: The CONSULTANT will attend a meeting with WSDOT Bridge and Structures staff to confirm constraints, criteria and to receive comments on draft work products related to the existing WSDOT bridge and retaining walls affected by this project. Up to one (1) meeting is assumed at two (2) hours each for two (2) CONSULTANT staff Deliverables: Agenda and Meeting Minutes 27 8.1.3. Property Owners The CONSULTANT will prepare for and attend up to four Property Owner Meetings. The CONSULTANT will prepare drawings and exhibits showing applicable project information. It is assumed these meetings will be an informal format and occur as needed during the design of the project. 8.1.4. Utilities The CONSULTANT will coordinate with utility companies within the project area to identify utilities that require relocation. The CONSULTANT will provide utility companies with project plans and information as requested. 8.2. Community Coordination 8.2.1. Community Meetings The CONSULTANT will prepare for and attend up to one Community Meeting. It is assumed these meetings will be Open House format and occur at the time of selected key milestone submittals. The community meeting will provide an overview of information about the project vicinity and expected effects of the improvements, including a question- and -answer period. The CONSULTANT will also present and solicit feedback regarding aesthetic treatment and urban design options. The CITY will sponsor the community meetings and will pay any associated costs. 8.2.2. Public Information Newsletter The CONSULTANT will prepare one project newsletter describing the project improvements, status, schedule, and contact information for the project. The CONSULTANT will prepare originals for bulk mailings which will be copied and mailed by the CITY. Deliverables for Task 8. Information material targeted specifically for elected official or agency outreach, as requested by the CITY Summary documentation for each meeting between the CITY, agencies, stakeholders, and the public Newsletter 28 TASK 9 9. Contract Drawings This final design task progresses the design from 30% level to preparing the 60% contract drawings for review the 90% contract drawings for review, and 100% (bid ready) contract drawings. See Attachment A for sheet list by Discipline. In addition to preparing the contract drawings, the CONSULTANT will maintain design documentation including design calculations. Quantity take- offs will be performed for each discipline under this task, to be compiled in Task 11, Cost Estimating. Assumption: Roadway, utilities and stormwater facilities will be coordinated with the Gilliam Creek design work in Task 2 to optimize compatibility and constructability of both projects. 9.1. Cover Sheet, Index, Notes, and Survey Control The CONSULTANT will prepare the contract drawings in accordance with the CITY's design standards. Unless otherwise noted or directed by the CITY, the CONSULTANT will prepare plan view sheets at a 1 20' scale. The CONSULTANT will prepare a cover sheet and an index of drawings. The list of plan sheet titles in the indices will match the titles as they appear on the plan sheets. See Appendix A for preliminary list of the contract drawing sheets. The CONSULTANT will prepare a vicinity map showing the project limits. The vicinity map will include the beginning and ending of construction, stations, major cross streets, waterways, and critical areas. The CONSULTANT will prepare general notes, abbreviations, and symbols sheet. The CONSULTANT will prepare an alignment table and plan sheet for survey control, monumentation, and alignments. The plan sheet will include alignment centerlines, and horizontal and vertical control. Deliverables: 60%,90%, and 100% Cover sheet with Index, and Notes (1) 60%,90%, and 100% Survey Control, and Alignment Plan (1) 9.2. Construction Staging The CONSULTANT will develop construction staging plan at a scale to show the project limits for each stage of construction. The plan will include staging notes describing contractor requirements for maintaining traffic lanes, access to parcels, and maintenance of a safe work zone. The plan will also delineate specific areas of concern such as interfaces with other construction contracts, critical access requirements for individual properties, commitments made to adjacent property owners and businesses, and the CITY and other agency requirements. The CONSULTANT will coordinate with the CITY, School District's Transportation Division, and King County Metro to identify requirements for closures, detour and /or relocation of facilities for any transit route or facilities 29 and specific roadways, and will include these requirements in the Construction Staging plan. The construction staging plan prepared by the CONSULTANT will serve as the basis for the contractor to bid the project and to prepare detailed construction staging and traffic maintenance plans. Deliverables: 60%,90%, and 100% Construction Staging Plan (1) 9.3. Roadway and Stormwater Drainage Assumption: Design related meetings with the CITY to support this task are quantified in Task 8. 9.3.1. Roadway Sections Roadway sections will be developed for 42nd Avenue South and side streets denoting roadway widths, sidewalks, bike lanes /sharrows, landscaping, pavement design, and traffic lanes. Deliverables: 60%,90%, and 100% Roadway Section Sheet (1) 9.3.2. Paving, Grading and Drainage Plans and Profiles The CONSULTANT will prepare roadway modification plans that will show dimensions for roadway outlines and sidewalks. The plans will also show curb returns, tapers, intersection layouts, and proposed driveway access. Property conform limits will be developed and shown in the form of cut -and -fill lines and property reconstruction limits. The CONSULTANT will perform property interface design to existing terrain, including driveway grading, and identify retaining wall location and grading to match existing. Property interface design will be shown on these plans. The CONSULTANT will prepare plans and details for the gravity drainage design, including plan views of drainage pipes and structures, connections to the existing stormwater systems, stormwater treatment and flow control facilities, and nonstandard drainage details. These storm system layouts will include catch basin and manhole locations, and the details to describe the stormwater facilities. The CONSULTANT will prepare vertical profile drawings for the main roadways and cross streets within the project area. Cross -slope diagrams will be included on the profiles. These plans will include profiles for the gravity storm drains required within the project limits. Pipe elevations on inverts, size, length, and type as well as drainage structures will be included. Profiles of the stormwater facilities will also be included. Existing and proposed utility crossings will be depicted based on pothole data and utility profiles. Deliverables: 60%,90%, and 100% Paving, Grading and Drainage Plans and Profiles (6) 60%.90%, and 100% Paving, Grading and Drainage Detail Sheets (3) 9.3.3. Stormwater Management Facilities Separate plans and details for one combined water quality and flow control facility showing grading, and typical sections of the facility will be prepared. Deliverables: 60%,90%, and 100% Stormwater Management Plans and Details (4) 30 9.3.4. Intersection Grading Grading Plans will be prepared for two (2) intersections in the project area at 1 inch =10 feet scale showing curb return alignment data for each leg of the intersection including tables with gutter elevations at PC, PT, quarter; grades, radius and length of curve. Deliverables: 60%,90%, and 100% Intersection Grading Plans (2) 9.4. Site Prep and Temporary Erosion and Sedimentation Control Assumotions: The construction contractor will prepare a Stormwater Pollution Prevention Plan (SWPPP) that is consistent with Dept. of Ecology requirements and incorporates the TESC plans. If the CITY determines that the SWPPP should be included in the project bid documents, the scope may be amended to include its preparation by the CONSULTANT. The CONSULTANT will define the site prep and demolition activities, including items to be abandoned, salvaged, recycled or removed, and identify facilities that need to be protected during construction. Site Prep plans will include surface feature items, such as pavements (by type), sidewalk, curbs, walls, and miscellaneous structures. Demolition for utilities, drainage features, signing, striping, illumination will not be included in these drawings and will be shown on the discipline drawings. Temporary Erosion Control measures for the project will be shown on the Site Prep and TESC Plans. The CONSULTANT will prepare temporary erosion control details which show erosion and sedimentation controls measures to be used for this project. These plans will not be included in the 60% submittal. Deliverables: 90% and 100% Site Prep and Erosion Control Plans and Details (6) 9.5. Utility 9.5.1. Utility Plans Water and Sewer The CONSULTANT will prepare Utility Plans for sanitary sewer, water mains and associated appurtenances within the project limits. For the 60% Submittal Review comments from the 30% submittal will be incorporated into the Utility Plans and Sections. Profiles will be developed for new water mains and sewer lines. This information will aid in the development of the Potholing plan as outlined in task 9.7.3. For the 90% Submittal Review comments from the 60% submittal will be incorporated into the Utility Plans. The water and sewer profiles will be refined using the pothole information collected. The CONSULTANT will continue to coordinate with Puget Sound Energy to incorporate any planned Gas Line work into the Utility Plans. This work will be shown for reference only and noted as work to be done "by others 9.5.2. Utility Undergrounding Plans Power and Communication (Optional) The CONSULTANT will continue to coordinate with SCL, Century Link and Comcast to refine the layout of the Power and communication facilities. 31 For the 60% Submittal Review comments from the 30% submittal will be incorporated into the Utility Undergrounding Plans. Ductbank profiles will be developed using assumed depths for existing utilities and designed locations of proposed utilities. This information will aid in the development of the Potholing plan as outlined in task 9.7.3. Vault details will be developed for SCL vaults only. For the 90% Submittal Review comments from the 60% submittal will be incorporated into the Utility Undergrounding Plans. The Ductbank profiles will be refined using the pothole information collected. Vault location tables will be developed to describe the type size and location for each vault. For SCL Vaults, the CONSULTANT will develop Butterfly Vault details to show how the conduits enter each vault. 9.5.3. Utility Potholing The CONSULTANT will develop a potholing program to confirm existing utility location, depth and size. Critical pothole locations will be determined during the design phase and coordinated with the various utility owners. These critical locations will include locations where proposed utilities (storm drain, water, and the joint power /telecommunications trench) cross existing utilities that will remain. Documentation will consist of pothole location shown on plan drawings with additional information in tabular form. Tabular information will include utility type, size, location, and depth. It is assumed that a no -fee permit will be required from the CITY to perform this work. Assume twenty (20) potholes. The CONSULTANT will subcontract with utility pothole company to perform utility locates. The utility pothole company will be responsible for obtaining a CITY permit, traffic control, utility locates prior to potholing, handling and disposal of possible contaminated materials, and recording pothole data. The CONSULTANT will coordinate with the pothole company to confirm scope and schedule of utility locate work is performed as agreed to with the CITY. Potholing will be performed after the 60% submittal. Information gathered will be incorporated into the 90% plans and profiles. Deliverables for Task 9.6. 60%,90%, and 100% Utility Plans, Profiles and Details (8) 60%,90%, and 100% Utility Undergrounding Plans, Profiles and Details (16) 90% and 100% plans will include Pothole locations and a Pothole Data table 9.6. Structures This task involves final design and contract documentation preparation for retaining walls. Assumutions: Calculations, analyses, design, plans, specifications, and other project work will be prepared in English units. The CONSULTANT will coordinate the design of any structures below the existing SR518 Bridge with WSDOT to develop a design that meets WSDOT's requirements for the project. 32 9.6.1. Design Calculations Prepare analysis and design calculations for retaining walls, stormwater vaults, including foundation components in accordance with the approved Design Criteria Memorandum. Deliverables: 60%,90%, and 100% Retaining Wall and /or Stormwater Vault Design Calculations 60%,90%, and 100% Retaining Wall Elevation and Details (2) 9.7. Channelization, Illumination and Signing The CONSULTANT will prepare plans and details for the channelization, including lane and edge stripes, stop bars, pavement markings, crosswalks, and geometry of striped medians and turn pockets. Limits of channelization will match paving limits and extended beyond paving limits to match extent of channelization modified due to construction staging and temporary traffic control. The CONSULTANT will prepare the illumination plans, and details in accordance with the CITY guidelines and the MUTCD. The CONSULTANT will submit to the CITY a set of illumination plans showing proposed locations for the new illumination, wiring diagrams, and electrical hardware. The CONSULTANT will prepare quantity takeoffs, tabulations, and backup calculations for this work based on the CITY guidelines. CONSULTANT will coordinate with CITY staff to receive comments on each plan submittal and respond to each set of comments. After coordination with the CITY and Seattle City Light (as specified in Task 8), and the type of light fixture(s) for the roadway and pedestrian lighting to be used on this project has been determined, the CONSULTANT shall model photometric to match the chosen fixture. Deliverables: 60%,90% and 100% Channelization, Illumination and Signing Plans (6) 9.8. Landscape, Irrigation and Urban Design This task involves final design and contract documentation preparation for landscape, irrigation and urban design. 9.8.1. Landscape and Urban Design Plans and Details Landscape plans will be prepared to include the type, location and quantity of plant material for the streetscape and for the stormwater management facility (if above ground). Urban design elements will be located and called out to the detail sheets. Detail sheets will be prepared that include details for items such as planting diagrams and urban design elements. Irrigation plans will be prepared that includes the layouts for project required irrigation for planted streetscape and drainage facilities areas. Landscape improvements will be coordinated with the drainage improvements. Detail sheets will be prepared that include details for items such as connections for the irrigation lines to water and power sources. Deliverables: 60%,90%, and 100% Landscape, Irrigation and Urban Design Plans and Details (6) 33 9.9. Submittals (60 90 and 100% Bid Ready) For each submittal (60%,90%, and 100 the CONSULTANT will assemble the plans into a single comprehensive plan set. 9.9.1. 60% Submittal At the 60% review, 30% comments will be resolved and addressed. Deliverables: 60% Plans (1 electronic PDF 60% outline of technical specifications (as described in Task 10) 60% Opinion of Cost (as described in Task 11) 9.9.2. 90% Submittal At the 90% review, 60% comments will be resolved and addressed. Deliverables: 90% Plans (1 electronic PDF) 90% draft special provisions and contract specifications (as described in Task 10) 90% Opinion of Cost (as described in Task 11) 9.9.3. 100% Submittal Final Plans: Drawings will be stamped and signed by the appropriate CONSULTANT team professional licensed in the State of Washington Deliverables: 100% Plans (1 full size 4mil Mylar Set) Final Special Provisions and Contract Specifications (as described in Task 10) Final Cost Estimate (as described in Task 11) Plans and Specifications uploaded to the Builders Exchange site 10 Copies of Plans and Specifications 34 TASK 10 10. Specifications The CONSULTANT will use of the WSDOT/APWA 2010 Standard Specifications in preparing the contract documents for the project design. The CONSULTANT will assemble the contract provisions including amendments, general special provisions, and special provisions for the project. A contract specifications outline will be prepared for the 60% final design submittal, with specification sections included beginning with the 90% submittal. This task will include the preparation of the boilerplate provisions of the contract and Division 1 Specifications. A sample boilerplate provisions will be provided by the CITY. Deliverables; Outline specifications with the 60% submittal Project specifications with the 90% and bid -ready submittals 35 TASK 11 11. Cost Estimating Assumptions: Cost opinions in the 30 60 90% and bid -ready design submittals will follow the practices set for by the Association for the Advancement of Cost Estimating (AACE), Recommended Practice No. 17R -97. Budget -level cost estimates will include contingency factors as defined by the AACE document to account for project uncertainties that cannot be explicitly accounted for at the project's various engineering stages. 11.1 Quantities The CONSULTANT will compile quantities from different disciplines for the project into a single summary of quantities sheet. Quantity tabulation sheets will not be prepared. 11.2 Engineer's Estimate The CONSULTANT will prepare an engineer's estimate (opinion of cost) for the project at the 30 60 90 and final levels of completion. The estimates will be prepared using the summary of quantity sheets with documented unit costs, lump -sum prices, and back up. The estimates will be submitted in hard copy and PDF Format. Cost estimates will be stamped and signed by the CONSULTANT team professional licensed in the State of Washington. Deliverables: One 30% design level estimate One 60% design level estimate One 90% design level estimate One final bid -ready design level estimate. K] TASK 12 12. Major Milestone Reviews (30, 60 90,100 This task provides for a senior review of major work deliverables to be performed at the 30, 60, 90 and 100% submittals as defined in the Quality Management Plan. These reviews will be performed after deliverables are assembled and before their submittal to the CITY. Quality control efforts and reviews will include the work performed by the CONSULTANT. Routine checking of calculations, plan sheets, and other work, done as peer review on the various discipline items, is included in the scope of the individual tasks and therefore not included in this Task. Deliverables: Review comments, to be formally documented, responded to, and filed in the Project Files. 37 TASK 13 13. Services During Bidding The CONSULTANT will provide services during the bidding period to support the CITY with responses to technical questions and preparation of addenda. The CONSULTANT will attend the bid opening, prepare bid tabulations, and support the CITY in the evaluation of the apparent low bidder and recommendation of award. Assumptions: Responses to technical questions are assumed to require a maximum of 30 hrs Up to one (1) Addenda will be requested Services during bidding are limited by the number of hours budgeted. Inspection services are not included. Selection of the Contractor is the sole responsibility of the CITY. 38 Exhibit B Consultant Fee Summary City of Tukwila 40th 42nd Avenue South Phase III 1/11/2012 Budget Summary By Task Task Description Task 1 Project Management Task 2 Gilliam Creek Culvert Task 3 Geotechnical Engineering Task 4 Survey and Mapping Task 5 30% Roadway Design Task 6 Environmental Documentation (Optional) Task 7 Right of Way (Optional) Task 8 Agency, Stakeholder and Community Coordination Task 9 Contract Drawings Task 10 Specifications Task 11 Cost Estimating Task 12 Major Milestone Reviews (30 60 90 100 Task 13 Services During Bidding and Construction TOTALS Labor Total Total Overall Hours Labor Reimbursable Totals Culvert Roadway 520 1 $73,315 1 $270 1 $73,585 $11,013 1 $62,572 558 1 $79,757 1 $0 I $79,757 $79,757 1 $0 200 1 $32,331 1 $13,000 I $45,331 $11,333 I $33,998 614 I $68,091 1 $3,714 I $71,805 $17,951 1 $53,854 976 I $130,090 1 $0 I $130,090 1$130,090 0 I $0 1 $0 I $0 1 $0 0 I $0 1 $0 I $0 1 $0 52 I $9,041 I $1,097 I $10,138 1 $10,138 2,025 1 $252,434 I $2,500 1 $254,934 1$254,934 96 1 $12,191 I $0 I $12,191 1 $12,191 80 I $10,228 I $0 I $10,228 1 $10,228 112 I $25,150 I $0 I $25,150 I $25,150 96 I $13,785 1 $0 I $13,785 1 $13,785 5,329 1 $706,413 1 $20,581 1 $726,994 $120,054 J$606,940 $726,994 Exhibit B Consultant Fee Summary City of Tukwila 40th 42nd Avenue South Phase 111 Direct Labor Classification I I Hoursl x I Sr. Project Manager 334.0 N f Sr. Consultant 52.0 N I Sr. Engineer I 204.0 N I Engineer 1,740.0 N Scientist I 72.0 N Surveyor I 144.0 N I Jr. Engineer I 1,171.0 N N Senior Technician I 1,141.0 I Technician 155.0 Office 316.0 I 5,329.0 Rate I I Cost $224.55 I $75,000 $202.80 N $10,546 $178.49 I $36,412 $148.68 I $258,703 $134.86 I I $9,710 $125.68 I I $18,098 $96.62 I I $113,142 $128.34 I I $146,436 $70.40 I $10,912 $86.88 I $27,454 I $706,413 Expenses Category Quantity X Rate Cost Drilling $10,000 Laboratory Services $3,000 Postage Freight 18.0 $15.00 $270 Reprographics $2,500 Survey Leica DNA03 Digital Level 2.0 $44.00 $88 Survey Leica Smart Pole GPS 2.0 $184.00 $368 Survey Leica Smart Pole TPS 13.0 $186.00 $2,418 Survey Truck 15.0 $56.00 $840 Travel Mileage 900.9 $0.555 $500 Travel Parking 39.8 $15.00 $597 Total Expenses $20,581