HomeMy WebLinkAbout1979 - Bill of Sale - Benaroya Company / City of Tukwila - 7910180582BILL OF SALE
KNOW ALL MEN BY THESE PRESENTS, that for valuable consideration,
JACK A. BENAROYA COMPANY, a Washington corporation, the Grantor, does
hereby grant, bargain, convey nnd`sel] to the CITY OF TUKWILA, King
County, Washington, a municipal corporation, the Grantee, the improve-
ments described on Exhibit A situated in King County, Washington, being
an installed underground waterline located within the easement right-of-
way described in that certain Easement dated February 12, 1979 and
recorded under King County recording number 7905100959; together with
any other appurtenances theretU.
To have and to hold the same to the said Grantee, its successors
and assigns forever.
Grantor covenants it is the lawful owner of said improvements; that
the same are free from all encumbrances; that all bills for labor and
material have been paid; that it has the right to sell the same as
aforesaid; that it will warrant and defend the same against the lawful
claims and demand of all persons and will pay any costs, including
reasonable attorney's fees incurred by Grantee, arising out of any such
claim or demand.
The Bill of Sale is given in consideration of the agreement of the
Grantee, for itself, its successors and assigns to incorporate said
Utilities in its utility system and to maintain them as provided in the
applicable City Ordinances.
EXHIBIT A
UNDERGROUND COSTS
PARKWAY PLAZA WEST
TUKNIIA, WASHINGTON
Material
1 - 10" NRS Gate Valve 578.00
1 - 10" Tee 301.00
2 - lO" 1/4 Bends 348.00
3 - 10" 1/8 Bends 372.00
1 - 10 x8 Reducer (Fl. x MJ) 99,00
1 - 8" Uni-Flange I5I.00
2 - Roadway Boxes & Covers 82.00
255' - l0" C.I. Pipe @ $8.83/ft. 3,252.00
Concrete Blocking 200.00
Rods and Clamps 70.00
110' - 8" C.I. Pipe @ $7.04/ft 774.00
l - B x8 x 5 Tee 121.00
1 - 8" Plug 28.00
1 - 6" Hydrant Repair Gate Valve 184.00
1 - G" Hydrant 521.00
Material Total: $5,681.00
Cartage 150.00
Backhoe - 38 Hours @ $35/hour 1,680.00
Tamper 300.00
Labor 1,947.00
Engineering 214.00
Fabrication 153.00
Zone 77.00
Subtotal: $10,102.00
Overhead - 15% l 515-00
Subtotal: $11,617,00
Profit - 10% 1,162.00
Total Costs: $12,779,00