Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit PG18-0145 - BOEING #9-55 LOBBY REMODEL - LEAD FREE 1" Febco SERIES LF850 DOUBLE CHECK VALVE ASSEMBLY (DCVA) INSIDE
BOEING LOBBY REMODEL 9725 E MARGINAL WAY S PGI 8-0145 Parcel No: Address: \.� City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206'431'3670 Inspection Request Line: 206~438'9350 VVebsite:h|up://www.Tvkwi|aVVA.nox PLUMBING/GAS PIPING PERMIT 5624201036 9725 E MARGINAL WAY S Project Name: BOEING LOBBY REMODEL Permit Number: P618'0145 Issue Date: 1/24/2019 Permit Expires On: 7/23/2019 Owner: Name: Address: Contact Person: Name: Address: Contractor: Name: Address: License No: Lender: Name: Address: BOEING COMPANY THE POBOX S7O7MK[ZU-59PROPERTY TAX DEPT, SEATTLE, WA, 98124 CONNIE HARDIN 4600 S 134 PL , SEATTLE, WA, 98168 HOLADAY PARKS INC 46OOS134PL,SEATTLE, WA, 98168 U0LADP879NO Phone: (206) 250-4530 Phone: (206) 248-9700 Expiration Date: 9/3/2019 DESCRIPTION OF WORK: PLUMBING WORK FOR LOBBY REMODEL FIXTURES ON PAGE 2 INCLUDES INSTALLATION OF A LEAD FREE 1 Febco SERIES LF850 DOUBLE CHECK VALVE ASSEMBLY (DCVA) INSIDE JANITORIAL CLOSET #125 FOR IRRIGATION. Valuation of Work: $50,000.00 Water District: TUKWILA Sewer District: TUKWILA Fees Collected: $362.61 Current Codes adopted by the City of Tukwila: International Building Code Edition: International Residential Code Edition: International Mechanical Code Edition: Uniform Plumbing Code Edition: International FueI Gas Code: Permit Center Authorized Signature: 2015 2015 2015 2015 2015 National Electrical Code: WA Cities Electrical Code: WAC 296-46B: WA State Energy Code: 2017 2017 2017 2015 I hearby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or locJaws regulating colnstruction or the performance of work. I am authorized to sign and obtain this develop Ent reit arfi'd agree to the condj ns attached to this permit. Signature:\ Print Name: L� 5f 1 Date: ` This permit shall become null and void if the work is not commenced within 180 days for the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ***PLUMBING/GAS PIPING PERMIT CONDITIONS*** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R-3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 gauge. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor/ceiling assemblies and fire -resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its enlire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. 13: The applicant agrees that he or she will hire a licensed plumber to perform the work outlined in this permit. 14: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency ad Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments 15: ***PUBLIC WORKS PERMIT CONDITIONS*** 16: Backflow shall be installed per manufacturer's specification and tested by a certified tester upon installation. Backflow test report shall be forwarded to the Public Works Inspector. Thereafter backflow shall be tested annually at property owner expense and test reports forwarded to Tukwila Water Dept., 600 Minkier Blvd, Tukwila, WA 98188, phone 206 433-1850. 17: Backflow installation requires a separate Public Works inspection. Contractor shall call 206438-9350 or 206 433-0179 to schedule backflow inspection with Scott Moore, Public Works Inspector. PERMIT INSPECTIONS REQUIRED Permit Inspection Line: (206) 438-9350 8004 GROUNDWORK 1900 PLUMBING FINAL 8005 ROUGH -IN PLUMBING CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Plumbing/Gas Permit No. W-1 — Project No. Date Application Accepted: t Il' II,' Date Application Expires: (For office use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **Please Print** SITE LOCATION Site Address: Tenant Name: 9725 East Marginal Way So Boeing Lobby Remodel King Co Assessor's Tax No.: 5624200990 Suite Number: PROPERTY OWNER Name: Connie Hardin Address: 4600 S 134th P1 Name: Boeing Company City: Seattle State: WA Cita!:. Seattle State: WA Address: Box 3707 Phone: (206) 250-4530 Fax: (206) 248-8700 City: Seattle State: WA Zip: 98168 CONTACT PERSON — person receiving all project communication Name: Connie Hardin Address: 4600 S 134th P1 Address: 4600 S 134th P1 City: Seattle State: WA Cita!:. Seattle State: WA Zip: 98168 Phone: (206) 250-4530 Fax: (206) 248-8700 Email: connieh@holadayparks.com Floor: New Tenant: ❑ Yes ..No PLUMBING CONTRACTOR INFORMATION Company Name: Holaday Parks Address: 4600 S 134th P1 City: Seattle State: WA Zip: 98168 Phone: (206) 250-4530 Fax: (206) 248-8700 Contr Reg No.: HOLADPI379NO Exp Date: 09/19/2018 Tukwila Business License No.: 0100857 2.Pct ?,e,Lvt Valuation of Project (contractor's bid price): $ 50,000 Scope of Work (please provide detailed information): Plumbing work for Lobby Remodel. Fixtures on page 2. Building Use (per Intl Building Code) - Occupancy (per Int'l Building Code): Utility Purveyor: Water: Sewer H:\Applications\Forms-Applications On Line\20i 1 Applications\Plumbing Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 / \ f 1 Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity'ejow: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain 1 Shower, single head trap 4 Sinks 1 Rain water system — per drain (inside building) 1 Grease interceptor for commercial kitchen (>750 gallon capacity) Each additional medical gas inlets/outlets greater than5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1-5) i Fixture Type Qty Bidet Drinking fountain or water cooler (per head) 1 Lavatory 4 Urinal 1 Water heater and/or vent 1 Repair or alteration of water piping and/or water treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 nun) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 i Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial 1 Wash fountain Water closet 5 Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Gas piping outlets i Fixture Type Qty Dental unit, cuspidor Floor drain 1 Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1-5 inlets/outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices Ml) S:%.(c i id -hs -A -Lb PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENAL • PERJU,Y BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDI 0 R� U 0 ZED AGEN Signature. Print Name:Q�Y�� 111 6 Y\t C Mailing Address: "�l H:\Applications\Forms-Applications On Line \2011 Applications\Plumbing Permit Application Revised 8-9-11.docx Revised: August 2011 bh Day Telephone: City Date: State Zip Page 2 of 2 ceipt Nun kR16041 DESCRIPTIONS PermitTRAK ACCOUNT 1 QUANTITY PAID $362.61 PG18-0145 Address: 9725 E MARGINAL WAY S Apn: 5624201036 $362.61 Credit Card Fee $10.56 Credit Card Fee R000.369.908.00.00 0.00 $10.56 PLUMBING $338.51 PERMIT FEE R000.322.100.00.00 0.00 $237.66 PERMIT ISSUANCE BASE FEE R000.322.100.00.00 0.00 $33.15 PLAN CHECK FEE R000.322.103.00.00 0.00 $67.70 TECHNOLOGY FEE $13.54 TECHNOLOGY FEE TOTAL FEES PAID BY RECEIPT: R16041 R000.322.900.04.00 0.00 $13.54 $362.61 Date Paid: Wednesday, December 12, 2018 Paid By: CONNIE HARDIN Pay Method: CREDIT CARD 09756G Printed: Wednesday, December 12, 2018 1:03 PM 1 of 1 cer C....1 SYSTEMS Page 1 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA 0017340000802374464500 Date: 12/12/2018 01:03:09 PM CREDIT CARD SALE VISA CARD NUMBER: **********1947 K TRAN AMOUNT: $362.61 APPROVAL CD: 09756G RECORD #: 000 CLERK ID: jazzel X {CARDHOLDER'S SIGNATURE} I AGREE TO PAY THE ABOVE TOTAL AMOUNT ACCORDING TO THE CARD ISSUER AGREEMENT (MERCHANT AGREEMENT IF CREDIT VOUCHER) Thank you! Merchant Copy https://elassie.convergepay.comNirtualMerchant/transaction.do?dispatehMethod=printTr... 12/12/2018 Page 2 of 2 CO TUKWILA ETRAKIT 6200 SOUTHCENTER BLVD TUKWILA, WA 98188 206-433-1870 CITY OF TUKWILA Date: 12/12/2018 01:03:09 PM CREDIT CARD SALE VISA CARD NUMBER: **********1947 K TRAN AMOUNT: $362.61 APPROVAL CD: 09756G RECORD #: 000 CLERK ID: jazzel Thank you! Customer Copy https://classic.convergepay.com/V irtualMerchant/transaction.do?dispatchMethod=printTr... 12/12/2018 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 438-9350 P.ect: 's bi•re.ir\ -# 9-3-5 Type of Inspection: Pl—t.ty414) it Ft ik./Arl_ 'Address: D Date Called: Special Instructions: * L ii p21,ik2(e1._ ilia Date Wanted: a.m. P.m. Requester: ir 1 Phone No: 706,- ,Approved per per applicable codes. 0 Corrections required prior to approval. InspectoXV Date [1 Z6- 2-er27 REINSPECTION FEE EQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. (F) INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION P‘/E3 -a/ i5"-- 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 438-9350 (206) 431-3670 Project: gar/NO- Type of Inspection: )1ztoiv.Di.vditZk Address: q725 r PlifrfaitIA Date Called: Special Instructions: 9- 5:C ,i r- 125 441N 64-Tht Date Wanted: m t" -c---/9 a.. P.m. Requester: 4)A-0,0 RROOKS Phone No: 425 -519 -1492- 1:51 Approved per applicable codes. D Corrections required prior to approval. COMMENTS: f"KrAhCi) el -044 511,16- 6---P6 0 OsattAg frP PAY& — Pi -01481X6-- Pk -t1 IN rim) pefrofzimo IP 64-7ovti /me wi_ey.A) 1 INI L-t-c.j) 77 : i --16,1 vu A-717. A) SMOCK ins 572:4€ _1045 16c7— c5,4) V9-1--- . Inspector: 1 1 Date: (ZS( cr REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection, DCBP-1 ES-F-LF850S For Non -Health Hazard Applications Job Name Job Location Engineer Boeing 9-55 Tukwila, WA I { f�roval LIi ' � _1 i<- tractor's P.O. No TUKWILA PUBLIC WORKS _ Contractor J JAN 0 9 2019 Approval _Permit Application PG18-0145 ,---._._..—_Representative REVIEWED FOR LEAD FREE* CODE COMPLIANCE APPROVED Series LF850 JAN 24 2019 Double Check Valve Assemblies Size: 1/2" - 2" (15mm - 50mm) City of Tukwila BUILDING DIM$4614 The FEBCO Series LF850 Double Check Valve Assemblies are designed for non -health hazard applications. The LF850S features Lead Free* construction to comply with Lead Free* installation requirements. End Connections - NPT ANSI / ASME 81.20.1. The Lead Free* Double Check Valve Assemblies shall comply with state codes and standards, where applicable, requiring reduced lead content. Pressure - Temperature Max. Working Pressure: Hydrostatic Test Pressure: Temperature Range: 175psi (12.1 bar) 350psi (24.1 bar) 32°F to 140°F (0°C to 60°C) Materials Valve Body: Lead Free* cast copper silicon alloy Elastomers: Silicone Springs: Stainless Steel Models CORRECTI • LF850 - Standard Assembly with Ball Valves LTR# • LF850U - Standard Assembly with Union Ball Valves Approvals - Standards • ANSI/AWWA Conformance (C510-92) • Approved by the Foundation for Cross -Connection Control and Hydraulic Research at the University of Southern Califomia. 1015 Typical Installation3:)& el® 864.5 G.nAKI t6 MG/A.1516PG kPa psi 138 20 103 15 69 34 5 5 = 0 0 kPa psi 138 20 103 15 69 10 34 5 0 0 Series LF850 '/z" (15mm) 0 3 6 9 2 5 18 gpm 0 11 23 34 45 57 681pm 3/4" (20mm) 0 0 5 19 10 38 15 57 20 76 25 95 30 gpm 1 4 Ipm oi kPa psi 138 20 103 15 69 10 34 5 0 0 0 1" (25mm) 10 20 30 40 50 60 gpm 0 38 76 114 152 190 227 Ipm le • 013/45 12" (300mm) Minimum CI to Fxed ciTYlvl•Clsi V LK Psi 138 20 JAN 0 8 214 103 15 69 10 34 5RMIT CENTER ° 0 0 kPa psi 138 20 103 15 69 10 34 5 0 0 kPa psi 138 20 103 15 69 10 34 5 0 0 0 11/4" (32mm) 0 20 40 60 80 100 120 gpm 0 76 152 227 303 379 454 Ipm 11/2' (40mm) Series LF850 '1/2" - 2" (15-50mm) Outdoor Installation 20 40 60 80 100 120 gpm 0 76 152 227 303 379 454 Ipm 2" (50mm) 30 60 90 120 114 227 341 454 FEBCO product specifications in U.S. customary units and metric are approximate and are provided for reference only. For precise measurements, please contact FEBCO Technical Service. FEBCO reserves the right to change or modify product design, construction, specifications, or materials with- out prior notice and without incurring any obligation to make such changes and modifications on FEBCO products previously or subsequently sold. 150 180gpm 570 681 Ipm A WATTS Brand Series LF850 / Size: 1/2" - 2" (15mm - 50mm) Dimensions and Weights Size: 1/2" - 2" (15 - 50mm) SIZE (DN) DIMENSIONS WEIGHT in. mm in. A mm B in. I mm in. C mm in. D mm in. E mm lbs. kgs. 1 15 10 254 11/2 38 11 38 3% 79 11/4 32 4.2 1.9 3/4 20 103/4 273 11/2 38 11 38 3% 79 1'/4 32 4.4 2.0 1 25 121/2 318 1% 48 1% 41 33e 86 11/2 38 6.8 3.1 1 Y4 32 15% 403 3 76 21 64 41/4 108 21/4 57 15.8 7.2 11/2 40 16% 416 3 76 21 64 41/4 108 21/4 57 16.2 7.4 2 50 17% 450 312 89 21/2 64 41/4 108 21/4 57 21.1 9.6 Note: Dimensions are nominal. Allowances must be made for normal manufacturing tolerances Noryl® is a registered trademark of SABIC Innovative Plastics". /FEITC01, ITEM DESCRIPTION 1 Body 1.2 Tailpiece 1.4 0 -Ring 2 Cover 2.2 0 -Ring 3 Seat 3.1 0 -Ring 4 Poppet 5 Seat Disc 5.1 Disc Retainer 5.2 Rnd HD Screw 6 Spring 7 Guide 8 Retainer Spacer 9 Ball Valve (w/tap) 9.1 Ball Valve 11 Test Cock 21 Hex HD Capscrew 60 Identification Plate 61 Drive Screw Stick Check Assembly MATERIALS Lead Free* cast copper silicon alloy Lead Free* cast copper silicon alloy Silicone Lead Free* cast copper silicon alloy Silicone Noryl® Silicone Noryt® Silcone Noryl® Stainless Steel Stainless Steel Noryt® Noryl® Lead Free* cast copper silicon alloy Lead Free* cast copper silicon alloy Lead Free* cast copper silicon alloy Stainless Steel Brass Stainless Steel * The wetted surface of this product contacted by consumable water contains less than 0.25% of lead by weight. ** Metric Dimensions are nominal pipe diameter. This product is produced with NPT threaded end connections. NOTICE The information contained herein is not intended to replace the full product installation and safety information available or the experience of a trained product installer. You are required to thoroughly read all installation instructions and product safety information before beginning the installation of this product. A WAITS Brand USA: Tel: (800) 767-1234 • Fax: (800) 788-4491 • FEBCOonline.com Canada: Tel: (905) 332-4090 • Fax: (905) 332-7068 • FEBCOonline.ca Latin America: (52) 81-1001-8600 • Fax: (52) 81-8000-7091 • FEBCOonline.com ES-F-LF850S 1622 © 2017 FEBCO /' City of Tukwila Department of Community Development December 20, 2018 CONNIE HARDIN 4600 S 134 PL SEATTLE, WA 98168 CORRECTION LTR#Y. Wl8O)15 RE: Correction Letter # 1 PLUMBING/GAS PIPING Permit Application Number PG18-0145 BOEING LOBBY REMODEL - 9725 E MARGINAL WAY S Dear CONNIE HARDIN, Allan Ekberg, Mayor Jack Pace, Director ECEVEr) CITY OF -t j1Q'J LA JAN 082019 PERMIT CE TER This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - PG DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL INFORMATION NOTE) PLAN SUBMITTALS: (Min. size 11x17 to a preferably maximum size of 24x36; all sheets shall be the same size; larger sizes may be negotiable. "New revised" plan sheets shall be the same size sheets as those previously submitted.) "STAMP AND SIGNATURES" (If applicable) For Engineers: "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a licensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of `specifications" (calculations) to be stamped and signed; Front page only will be sufficient (WAC 196-23-010 & 196-23-020). Architects: "date" only not required (WAC 308-12-081). (BUILDING REVIEW NOTES) 1. Plans provided, and cover sheet specify what appears to be all construction work and special inspections. Please clarify and mark only the work that is part of the plumbing permit. Mark cover sheet accordingly. Note: Contingent on response to these corrections, further plan review may request for additional corrections. PW - PG DEPARTMENT: Joanna Spencer at 206-431-2440 if you have questions regarding these comments. • 1. Any fire sprinkler work requires a fire sprinkler permit from Tukwila Fire Dept. Add a note on fire prevention plans. DLR Group Response: General Note 2 added to drawing 1M260 which states "ALL WORK ON THE FIRE PROTECTION SYSTEM REQUIRES A FIRE SPRINKLER PERMIT FROM TUKWILA FIRE DEPARTMENT." See full size replacement sheet attached with this response. 2. Riser Diagram on 2/M310 calls for Reverse Pressure Zone Backflow. Is it existing or proposed? If proposed show size/ manufacturer/model # and submit backflow cut sheet. Add appropriate call out on plan. Will it be installed inside or outside the building? DLR Group Response: Riser 2/M310 diagram has been revised to show a double check backflow preventer. Backflow preventer tagged as DCBP-1, FEBCO LF850U, LOCATE IN 125 JANITOR. Cut sheet provided. See full size replacement Sheet and DCBP-1 cutsheet attached with this response. r\ / 3. Detail 2/M450 calls for an irrigation backflow preventer. I assume it needs to be Double Check Valve Assembly (DCVA). Is it going to be installed inside or outside the building? Please confirm and show location on plan. DLR Group Response: Detail 2/M450 has been revised to show backflow preventer DCBP-1 to be installed in 125 JANITOR. Febco Series LF850. See full size replacement sheet attached with this response. 4. Detail 4/M500 calls for Domestic Water Backflow. Is it existing or proposed? If proposed show size/manufacturer/model # on plan and submit backflow cut sheet. Will it be installed inside or outside the building? DLR Group Response: Detail 4/M500 has been revised to reflect installation of new double check backflow preventer. Mfgr/model number shown on this detail and Detail 2/M450. See full size replacement sheet attached with this response. Attachments: 1M260 M310 M450 M500 DCBP-1 Backflow Preventer Cut Sheet 6300 Southcenter Boulevard Suite #700 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Y 1 City of Tukwila Department of Community Development December 20, 2018 CONNIE HARDIN 4600 S 134 PL SEATTLE, WA 98168 RE: Correction Letter # 1 PLUMBING/GAS PIPING Permit Application Number PG 18-0145 BOEING LOBBY REMODEL - 9725 E MARGINAL WAY S Dear CONNIE HARDIN, Allan Ekberg, Mayor Jack Pace, Director This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the following departments: BUILDING - PG DEPARTMENT: Allen Johannessen at 206-433-7163 if you have questions regarding these comments. • (GENERAL INFORMATION NOTE) PLAN SUBMITTALS: (Min. size 11x17 to a preferably maximum size of 24x36; all sheets shall be the same size; larger sizes may be negotiable. "New revised" plan sheets shall be the same size sheets as those previously submitted.) "STAMP AND SIGNATURES" (If applicable) For Engineers: "Every page of a plan set must contain the seal/stamp, signature of the licensee(s) who prepared or who had direct supervision over the preparation of the work, and date of signature. Specifications that are prepared by or under the direct supervision of a licensee shall contain the seal/stamp, signature of the licensee and the date of signature. If the "specifications" prepared by a Iicensee are a portion of a bound specification document that contains specifications other than that of an engineering or land surveying nature, the licensee need only seal/stamp that portion or portions of the documents for which the licensee is responsible." It shall not be required to have each page of "specifications" (calculations) to be stamped and signed; Front page only will be sufficient (WAC 196-23-010 & 196-23-020). Architects: "date" only not required (WAC 308-12-081). (BUILDING REVIEW NOTES) 1. Plans provided, and cover sheet specify what appears to be all construction work and special inspections. Please clarify and mark only the work that is part of the plumbing permit. Mark cover sheet accordingly. Note: Contingent on response to these corrections, further plan review may request for additional corrections. PW - PG DEPARTMENT: Joanna Spencer at 206-431-2440 if you have questions regarding these comments. • I. Any fire sprinkler work requires a fire sprinkler permit from Tukwila Fire Dept. Add a note on fire prevention plans. 2. Riser Diagram on 2/M310 calls for Reverse Pressure Zone Backflow. Is it existing or proposed? If proposed show size/ manufacturer/model # and submit backflow cut sheet. Add appropriate call out on plan. Will it be installed inside or outside the building? 3. Detail 2/M450 calls for an irrigation backflow preventer. I assume it needs to be Double Check Valve Assembly (DCVA). Is it going to be installed inside or outside the building? Please confirm and show location on plan. 4. Detail 4/M500 calls for Domestic Water Backflow. Is it existing or proposed? If proposed show size/manufacturer/model # on plan and submit backflow cut sheet. Will it be installed inside or outside the building? 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 Please address the comments above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plan pages, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a 'Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections/revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, 1 can be reached at (206)433-7165. Sincerely, lei ache le Ripley Permit Technician File No. PG18-0145 6300 Southcenter Boulevard Suite #100 • Tukwila Washington 98188 • Phone 206-431-3670 • Fax 206-431-3665 \ �y 'TENT COORD COPY PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG18-0145 DATE: 01/08/19 PROJECT NAME: BOEING LOBBY REMODEL SITE ADDRESS: 9725 E MARGINAL WAY S Original Plan Submittal X Response to Correction Letter # 1 Revision # before Permit Issued Revision # after Permit Issued DEPARTMENTS: I* \\ Building Division (/ \isPublic Works w iq Fire Prevention Structural n Planning Division Permit Coordinator 111 PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 01/10/19 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Corrections Required Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 02/07/19 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 12/18/2013 ()ERMIT COORD COPY c: PLAN REVIEW/ROUTING SLIP PERMIT NUMBER: PG18-0145 DATE: 12/12/18 PROJECT NAME: BOEING LOBBY REMODEL SITE ADDRESS: 9725 E MARGINAL WAY S X Original Plan Submittal Response to Correction Letter # Revision # Revision # before Permit Issued after Pen -nit Issued DEPARTMENTS: Building Division ci CA)S42. Public Works Fire Prevention Structural Planning Division Permit Coordinator PRELIMINARY REVIEW: Not Applicable (no approval/review required) DATE: 12/13/18 Structural Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Approved with Conditions Corrections Required Denied (corrections entered in Reviews) (ie: Zoning Issues) DUE DATE: 1/10/19 Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED:____________ Departments issued corrections: Bi g Fire Ping PW Staff initials: 12/18/2013 City ofTukwila q REVISION y SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Web site: h . wv‘vv.TIlktivila\N"Veov Revision submittals midst be submitted in person at the Permit Center. Revisions iriff not be accepted through the mail, fax, etc. Date: 1/7/19 Plan Check/Permit Number: PG18-0145 Response to Incomplete Letter # X Response to Correction Letter # 1 Revision # after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner Deferred Submittal # Project Name: BOEING LOBBY REMODEL Project Address: 725 E MARGINAL WAY S Contact Person: Phone Number: 7A (Z S •'4S Summary of Revision: CC �L —C. , r 1- CL r l l c i( A ��� S ` Ti)e\‘'---C.—S)_____ RFCFi ED CITY OF TUKWILA JAN 0 8 2019 PERMIT CENTER Sheet Number(s): _1M260, M310, M450, M500, DCBP-1 Backflow Preventer Cut Sheet "Cloud" or liigllfighf all areas of revision including date o revision Received at the City of Tukwila PermitCenter by: zedp rn/� — Entered in TRAKiT on v I 1 rmit Center (Brenda)\FormsTermit Center Documents (Word)1Revision Submittal Form.doc Revised: August 201S HOLADAY PARKS INC I1ome Espanol Contact Safety & Health Claims & Insurance Washington State Department of Labor & Industries Page 1 of 3 Search L&I A Z Index 1lelp My 1&1 Workplace Rights Trades & Licensing HOLADAY PARKS INC Owner or tradesperson Principals BECK, DAVID CARL, PRESIDENT CONNELL, DANIEL A, PRESIDENT GIRI, BIJIT, PRESIDENT PIZZEY, GRACE K, VICE PRESIDENT FREEL, JERRY LEE, VICE PRESIDENT PARKS, GERALD T JR, PRESIDENT (End: 08/12/2015) NAILON, JUNE ANNETTE, VICE PRESIDENT (End: 08/12/2015) O'CONNOR, BONNY K, SECRETARY (End: 08/12/2015) BECK, DAVID CLARENCE, TREASURER (End: 08/12/2015) VAN DER VEEN, ERIC M, VICE PRESIDENT (End: 08/14/2013) PIZZEY, GRACE KATHERINE, VICE PRESIDENT (End: 08/14/2013) VAN DER VEEN, JULIE ELIZABETH, MEMBER (End: 08/14/2013) CONNELL, DANIEL AARON, MEMBER (End: 08/14/2013) GIRI, BUIT, MEMBER (End: 08/14/2013) KIEL, RINALD HOWARD, MEMBER (End: 08/14/2013) WHITMYRE, CHRISTIAN, MEMBER (End: 08/14/2013) NELSON, MICHAEL, SECRETARY (End: 11/04/2010) PARKS, DAVID L, TREASURER (End: 11/04/2010) TALBOT, PAUL, TREASURER (End: 11/04/2010) Doing business as HOLADAY PARKS INC 4600 S 134TH PL SEATTLE, WA 98168 206-248-9700 KING County WA UBI No. Business type 578 004 089 Corporation Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 1/24/2019 HOLADAY PARKS INC Governing persons DAVID BECK DAN CONNELL; JERRY FREEL; BIJIT GIRI; GRACE PIZZEY; License Verify the contractor's active registration / license / certification (depending on trade) and any past violations. Construction Contractor License specialties GENERAL License no. HOLADPI379NO Effective — expiration 01/21/1983— 09/03/2019 Bond LIBERTY MUTUAL INS CO Bond account no. 23000452 Active. Meets current requirements. $12,000.00 Received by L&I Effective date 08/23/2002 09/01/2002 Expiration date Until Canceled Insurance Phoenix Insurance Company, The Policy no. DTCO1F465357PHX18 Received by L&I 10/30/2018 $1,000,000.00 Effective date 11/01/2018 Expiration date 11/01/2019 Insurance history Savings No savings accounts during the previous 6 year period. Lawsuits against the bond or savings No lawsuits against the bond or savings accounts during the previous 6 year period. L&I Tax debts No L&I tax debts are recorded for this contractor license during the previous 6 year period, but some debts may be recorded by other agencies. License Violations No license violations during the previous 6 year period. Workers' comp Do you know if the business has employees? If so, verify the business is up-to-date on workers' comp premiums. L&I Account ID 177,231-00 Account is current. Doing business as HOLADAY PARKS INC Estimated workers reported Quarter 3 of Year 2018 "Greater than 100 Workers" L&I account contact T4 / CASSANDRA SMITH (360)902-5632 - Email: SMCA235@Ini.wa.gov Public Works Strikes and Debarments Verify the contractor is eligible to perform work on public works projects. Contractor Strikes No strikes have been issued against this contractor. Page 2 of 3 Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 1/24/2019 HOLADAY PARKS INC Contractors not allowed to bid 1 No debarments have been issued against this contractor. Workplace safety and health Check for any past safety and health violations found on jobsites this business was responsible for. Inspection results date 12/06/2018 Inspection no. 317951619 Location 620 Terry Ave Seattle, WA 98104 Inspection results date 09/22/2016 Inspection no. 317940948 Location 1007 Stewart St Seattle, WA 98101 Inspection results date 08/09/2016 Inspection no. 317940177 Location 1011 Western Ave, Suite 1000 Seattle, WA 98104 Inspection results date 05/05/2016 Inspection no. 317940156 Location 4600 S 134th PI Tukwila, WA 98168 Inspection results date 06/11/2014 Inspection no. 317319382 Location 1011 Dexter Ave Seattle, WA 98102 Inspection results date 05/08/2014 Inspection no. 317278497 Location 2nd and 110th Ave Bellevue, WA 98004 No violations No violations No violations No violations No violations No violations Page 3 of 3 Washington State Dept. of Labor & Industries Use of this site is subject to the laws of the state of Washington. Help us improve https://secure.lni.wa.gov/verify/Detail.aspx?UBI=578004089&LIC=HOLADPI379N0&SAW= 1/24/2019 0'-10" '4" t -RISER OFF]cF oNc RM TRppAtilt tN ROOM- T tN1 _E,MNG CENTER 3" 2-1/2' 2-1/2" SV- WATER MOTOR ALARM ALL PIPING ELEV. 11'-3" TYPICAL COMPUTER LAB �PUTER AINING LOBBY 102 c V`I` 7-- T SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE y,t ORG 09-055 LOBBY REMODEL - DCN-02 W5761826 DLR GROUP CLN 12.12.18 A CITY OF TUKWILA CORRECTION LETTER #1 PG18-0145 W5761826 DLR GROUP CLN 01.07.19 VESTIBULE T ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED Immo A I' • IMIA�.. ` Insp. I DRAWN 111 I\\MEM I MN FILE.COPY Permit No. Plan review approval I'; subject to errors ana omissions Approval of construction aocuments does riot a 'prize t viol :tion of any adopted code or ord !^ eii t I,I approve Fiala Copy and 1� �I is aCKnO e•,ea: City of Tui wila BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of the Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review. DATE CHECKED SUBTITLE APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER SEPARATE PERMIT R UIRED FOR: Mechanical [E Electrical ❑ Plumbing 1I Gas Piping City of Tukwila BUILDING DIVISION FIRE PROTECTION 09-055 LOBBY REMODEL SPRINKLER MAIN RISER • - FIRE PROTECTION SPRINKLER HEAD 4— WATER MOTOR ALARM J El RETURN AIR GRILLE AIR DIFFUSER 2'X4' FLUORESCENT LIGHT 2'X2' FLUORESCENT LIGHT 1'X4' FLUORESCENT LIGHT 1'X8' FLUORESCENT LIGHT INCANDESCENT LIGHT FIXTURE (4)TUBE SURFACE MOUNT (2)TUBE SURFACE MOUNT GENERAL NOTES 1. CONTRACTOR TO PROVIDE CAD FILE AT END OF PROJECT S.O ►G .T ► 1 WIRK 2. ALL WORK ON THE FIRE PROTECTION SYSTEM REQUIRES A FIRE SPINKLER PERMIT FROM TUKWILA FIRE DEPARTMENT. CONSTRUCTION \OTES: EXTEND PIPING AND MOUNT HEAD IN LOCATION INDICATED. PROVIDE NEW HEAD AT THIS LOCATION. TEMPORARILY REMOVE HEADS AS REQUIRED TO SUPPORT REPLACEMENT OF NEW VAV TERMINAL UNITS. WHERE EXISTING HEADS HAVE BEEN REMOVED, REPLACE WITH NEW HEADS. REFERENCE 1M10A FOR EXTENT OF WORK. INSTALL SEISMIC BRACING ON SPRINKLER SYSTEM TO BRING THE SYSTEM INTO COMPLIANCE WITH FM DATA SHEET 2-8. REVIEWED FOR CODE COMPLIANCE . APPROVED JAN 242019 City of Tukwila BUILDING DIVISION CORRECTION LTR# DLR Group Architecture Engineering Planning Interiors CURRENT REVISION W5761826 RECEIVE: JAN 09 20 TUKWILA PUBLIC WORK RECEIVED • CITY OF TUKWILA. • JAN 08 2019 PERMIT CENTER SYMBOL DATE 01.07.19 BUILDING 09-55 ALL DEV. CENTER, WA SHEET 1 M260 JOB NO. W5761826 COMP NO. DWG NO. 9-55-1M260 AHOCHSTETLER: 9/10/2018 CONSTRUCTION NOTES: SYM A B _C <- 1-1 /2” V 2" SAN �isE� �iuc�av V — WAST �c VE\T -1/4" V <- 2" V 1 NO SCALE REVISION RECORD DRAWING 09-055 LOBBY REMODEL - DCN-02 W5761826 CITY OF TUKWILA CORRECTION LETTER #1 PG18-0145 W5761826 BY NAT DLR GROUP DLR GROUP APPROVED CLN CLN • DATE 10.19.87 •12.12.18 01.07.19 SYM REVISION M310 1-1/4" V 1-1/2" V / 3/8" OD HEAT TRACE 1-1 /4" HW 1-1/2" CW- HWH-1' PRESSURE/TEMP VALVE DRAIN TO FUNNEL DRAIN 2" FD-1 SHOCK ARRESTOR / WADE W-10 I,o SHOCK ARRESTOR WADE W-10 1-1/2" 1 /2" -TRAP PRIMER (ABOVE CLG) CW 1-1/2" CW 1/2" HW HEAT TRACE 1" CW HEAT TRACE 1' 1/2" CW TO HOSE BIBB 1-1/2" 3/8" OD /-`e �ISE� DIAGA NO SCALE V BY 6" SAN APPROVED DATE DOMESTIC WATER ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN DATE STRAINER -`e 3/8" OD CHECKED SUBTITLE FEBCO LF850 DOUBLE CHECK BACK FLOW PREVENTER LOCATE IN 125 JANITOR CW TO IRRIGATION STUB -OUT -1/4" HW 2" SHUT-OFF VALVE 2" PRESSURE REGULATOR PRV-1 FLOOR PENETRATION (TYP) 2 2 3/4" CW TO DF (P-5) & HOSE BIBBS. PRESSURE GAUGE (2 TYP) -2" WATER SUPPLY (BELOW FLOOR) ISSUE FOR PERMIT 12.12.18 ISON ETRIC DIAGAN PROVIDE NEW FIXTURE AS SCHEDULED. CONNECT TO EXISTING UTILITIES FROM REMOVED FIXTURE. ADJUST EXISTING UTILITY CONNECTIONS AS NEEDED TO CONNECT INTO NEW FIXTURE. 2> CAP EXISTING UTILITY AT INDICATED LOCATION. PROVIDE NEW FIXTURE AS SCHEDULED. PROVIDE NEW UTILITIES IN WALL FOR FIXTURE AS SHOWN. EXISTING FLOOR DRAIN TO REMAIN. ® EXISTING TRAP PRIMER TO REMAIN. 6 PROVIDE NEW 2" V LINE TO SERVE NEW MOP SINK, P-4. 7� PROVIDE NEW ICE MAKER OUTLET BOX, RECESSED IN WALL, AS SCHEDULED FOR ICE MAKER AT REFRIGERATOR. PROVIDE NEW ICE MAKER OUTLET BOX, RECESSED IN WALL, AS SCHEDULED FOR COFFEE MACHINE.. PROVIDE NEW FIXTURE AS SCHEDULED. ROUTE COLD WATER, HOT WATER, VENT, AND SANITARY LINES TO FIXTURE AS SHOWN. ]iii.>PROVIDE NEW FIXTURE AS SCHEDULED. ROUTE COLD WATER, VENT, AND SANITARY LINES TO FIXTURE AS SHOWN. PROVIDE NEW ELECTRIC HOT WATER HEATER AS SCHEDULED. ROUTE 1-1/2" CW, 1-1 /4" HW FROM PREVIOUS POINT OF CONNECTION TO NEW WATER HEATER LOCATION. ROUTE DISCHARGE FROM T&P VALVE TO NEW FLOOR DRAIN IN CLOSET. PROVIDE NEW FLOOR DRAIN AS SCHEDULED. PROVIE TRAP PRIMER RECESSED IN WALL. PROVIDE WITH ACCESS PANEL WITH VANDAL PROOF SCREWS. ROUTE 1/2" CW TO NEW FLOOR DRAIN. PROVIDE NEW 2" V LINE TO KITCHENETTE. RELOCATE WATER HAMMER ARRESTOR TO NEW END OF CW LINE. RELOCATE CONNECTION FOR TRAP PRIMER AS SHOWN. CAP (E) DOMESTIC WATER LINES AT MAINS. CAP (E) WASTE AND VENT LINES AT MAINS. 18 PROVIDE HEAT TRACE ON NEW HOT WATER PIPING AS INDICATED BY HATCHED PIPING. REVIEWED FOR CODE COMPLIANCE APPROVED JAN242019 City of Tukwila BUILDING DIVISION CURRENT REVISION W5761826 _ RECEIVED CITY OF TUKWr<LI. JAN082019 PERMIT CENTER DLR Group Architecture 'Engineering Planning Interiors' SYMBOL DATE 01.07.19 ENGINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER 09-055 LOBBY REMODEL DLI\G 09—055 DEV. CENTER, WA SHEET V3O JOB NO. W5761826 COMP NO. DWG NO. 09-055-M310 r-- 2" SAN (BELOW FLOOR) C 2"V 2"V WOMEN 1 P-3 1- 2 W� P-3 1-1/4" V (ABOVE FLR) FROM DF (P-5). 123 124 4 0 4" SD 6" SAN FLOOR PENETRATION L "njG 1/4"=1'-0" 4" VTR v ALA\ — WAST & VE\T 2" CW (BELOW FLOOR) 1-1/4" HW- 1-1/2" CW 1/2" HW HEAT TRACE FLOOR PENETRATION SHOCK ARRESTOR -\ J LAK 1/4"-1,-0" 2" FD-1 -1/4" HW TM V-1 WOMEN HOSE BIBB 7- 3/4" CW TO DF (P-5) & HOSE BIBBS 7- 1" CW TO IRRIGATION HOSE BIBB IRRIGATION CONTROLLER BY LANDSCAPE BACKFLOW PREVENTER DCBP-1 BY DIV. 22. FEBCO SERI S F: 0. 2" SHUT-OFF VALVE PRESURE REGULATOR, PRV-1. SEE RISERS 3/8" (TYP)~ HATCH NPRINTER-ACCESS CEILING ESTKOV PLA\ � VESTIC WATER SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE rrti� ORIG 09-055 LOBBY REMODEL - DCN-02 W5761826 DLR GROUP- CLN 12.12.18 A CITY OF TUKWILA CORRECTION LETTER #1 PG18-0145 W5761826 DLR GROUP CLN 01.07.19 1/2" CW (AT CEILING) -\ C 15 1/2" HW FD-1 —1/2" V P-8 7 ---! r--I 1011 ; 10 L_J L__J L_J HWH-I\TP-1 E\LAGGED 1/4"=1'-0" ,<iTc E\ETTE PLA\ -1/4" HW -1/2'' CW 2" V 13 450/ REVIEWED FOR CODE COMPLIANCE . APPROVED JAN242019 City of Tukwila BUILDING DIVISION ISSUE FOR PERMIT 12.12.18 ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN DATE CHECKED SUBTITLE fECEIVED CITY OF TUKWILA ENLARGED PLU JAN 0 8 2019 PERMIT CENTER NOTES: FOR MECHANICAL LEGENDS AND ABBREVIATIONS SEE SHEETS M1a , M1b AND M1c. CONSTRUCTION NOTES: PROVIDE NEW FIXTURE AS SCHEDULED. CONNECT TO EXISTING UTILITIES FROM REMOVED FIXTURE. ADJUST EXISTING UTILITY CONNECTIONS AS NEEDED TO CONNECT INTO NEW FIXTURE. CAP EXISTING UTILITY AT INDICATED LOCATION. PROVIDE NEW FIXTURE AS SCHEDULED. PROVIDE NEW UTILITIES IN WALL FOR FIXTURE AS SHOWN. EXISTING FLOOR DRAIN TO REMAIN. I EXISTING TRAP PRIMER TO REMAIN. RELOCATE FLOOR CLEANOUT ON STORM DRAIN LINE TO AVOID NEW WALL AT KITCHENETTE. SAW CUT FLOOR AS NEEDED. PATCH AND REPAIR. 7 PROVIDE NEW ICE MAKER OUTLET BOX, RECESSED - IN WALL, AS SCHEDULED FOR ICE MAKER AT REFRIGERATOR. PROVIDE NEW COFFEE MAKER OUTLET BOX, RECESSED IN WALL, AS SCHEDULED FOR COFFEE MACHINE. PROVIDE NEW FIXTURE AS SCHEDULED. ROUTE COLD WATER, HOT WATER, VENT, AND SANITARY LINES TO FIXTURE AS SHOWN. 1 PROVIDE NEW FIXTURE AS SCHEDULED. ROUTE COLD WATER, VENT, AND SANITARY LINES TO FIXTURE AS SHOWN. PROVIDE NEW ELECTRIC HOT WATER HEATER AS SCHEDULED. ROUTE 1-1/2" CW, 1-1/4" HW FROM PREVIOUS POINT OF CONNECTION TO NEW WATER HEATER LOCATION. ROUTE DISCHARGE FROM T&P VALVE TO NEW FLOOR DRAIN IN CLOSET. PROVIDE NEW FLOOR DRAIN AS SCHEDULED. PROVIE TRAP PRIMER RECESSED IN WALL. PROVIDE WITH ACCESS PANEL WITH VANDAL PROOF SCREWS. ROUTE 1/2" CW TO NEW FLOOR DRAIN. PROVIDE NEW 2" V LINE TO KITCHENETTE. 1 SAW CUT FLOOR TO INSTALL NEW SANITARY, VENT, AND COLD WATER LINE UNDER FLOOR. SEE ARCH FOR EXACT LOCATIONS OF SAW CUT LOCATIONS. PATCH AND REPAIR FLOOR AS NEEDED. CAP (E) CW AND HW LINES AT MAINS. CAP (E) WASTE AND VENT LINES AT MAINS. 18.> RELOCATE WATER HAMMER ARRESTOR TO NEW END OF CW LINE. RELOCATE CONNECTION FOR TRAP PRIMER AS SHOWN. 19 TERMINATE CONDENSATE WITH 1" AIR GAP AT JANITOR'S SINK. "P> PROVIDE HEAT TRACING ON NEW HOT WATER PIPING AS INDICATED BY HATCHED PIPING. DLR Group Architecture Engineering Planning Interiors v1BING PLA\ S CURRENT REVISION W5761826 SYMBOL A DATE 01.07.19 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER 09-055 LOBBY REMODEL 3U L I\G 0c-355 COL. A-K/1-7 DEV. CENTER, WA SHEET V5O JOB NO. W5761826 COMP NO. DWG NO. 09-055-M450 AHOCHSTETLER: 9/10/2018 11:21:34 AM DUCT NOTE: PARTI11ON FIRE RATED ACOUSTICAL CAULKING LOOSE ROCKWOOL OR GLASS FIBER 3/4" DIA. BACKER ROD SLEEVE AS REQUIRED THIS DETAIL APPLIES TO ALL DUCTS PENETRATING WALLS, FLOOR OR CEILING OF ANY SPACE. WALL DUCT PE\ETATIO SCALE: NONE SEISMIC SUPPORT STRAP OR CABLES CAN MATCH SIZE TO GRILLE) LAY -IN RETURN GRILLE (SURFAE MOUNTED SIMILAR)- T-BAR CEIUNG RIGID DUCT MOUNT IN ACCORDANCE WITH LOCAL & STATE AHJ. �11 M500 PULL BACK JACKET AND INSULATION FROM CORE DUCT. COLLECT EXCESS INNER DUCT PAST COLLAR BEAD UNTIL FULLY STRETCHED THEN WRAP AT LEAST TWICE AROUND WITH APPROVED DUCT TAPE. SECURE WITH APPROVED CLAMP. PULL JACKET & INSULATION BACK OVER THE CORE. SECURE JACKET WITH TWO WRAPS OF DUCT TAPE OR AN APPROVED CLAMP. TUCK IN EDGE OF JACKET OR TAPE. NOTE: USE FOR ALL RETURN GRILLES INSULATED FLEXIBLE DUCT INSTALLED WITH INNER DUCT STRETCHED TAUT (TAKE UP SLACK (MAX. STRENGTH) CEILING TILE .-THN i\sraLLArio\ DETAIL��1 SCALE: NONE SYM REVISION BY APPROVED M500 DATE SYM KEY NOTES: L'J DUCT U SHEET METAL STRAP 1" (25.4mm) WIDE, OF SAME METAL GAUGE AS DUCT. 0 STEEL ANGLE NOT LESS THAN • 1"x 1"x 1/8" (25.4 x 25.4 x 3 mm), SIZED TO MATCH DUCT. ® SHEET METAL BAND, 1" (25,4mm) WIDE OF SAME METAL GAUGE AS DUCT. ALL THREAD HANGER ROD WITH ACCESSORIES AS USED FOR LIGHT PIPE HANGER. © SELF TAPPING CADMIUM PLATED HEX HEADED SHEET METAL SCREW STRAPS TO BE TIGHT AGAINST DUCT. HANGER SIZES FOR RECTANGULAR DUCT MAX. LENGTH ANY SIDE HANGER HORIZONTAL SUPPORT ANGLE MAXIMUM SPACING 30' 36" 48" 60" 84" 1 "x 18 GAUGE STRAP 1/4" ROUND ROD 1/4" ROUND ROD 5/16" ROUND ROD 3/8" ROUND ROD NONE REQUIRED 1-1/2" x 1-1/2" x 1/8" 2" x 2" x 1/8" 2" x 2" x 1/8" 2" x 2" x 1/8" 10'-0" 8'-0" 8'-0" 8'-0" 8'-0" D ,CT SCALE: NONE A\C REDUCE TO 1" AT VALVE Tvv 'DI SCALE: NONE DI PAINT INTERIOR OF DUCT FLAT BLACK 12" ON EITHER SIDE OF BRANCH CONNECTION TAIL M500 THERMOMETER, TYP 7 PRESSURE GAUGE (TYP) — 1-1/4" CW UNION (TYP) REDUCE TO 1" AT VALVE -- 1-1/4" 120' HW C �LTAIL 1, EA/RA -+-- BRANCH DUCT, SIZE TO MATCH AIR DEVICE UNO W \-AIR DEVICE 1/4W, 4" MIN. 1/4W, 4" MIN. PREFABRICATED BRANCH FITTING. WITH INTEGRAL VOLUME DAMPER, EXCEPT VOLUME DAMPERS NOT REQUIREDBETWEEN AHU'S AND VAV TU'S, TRANSITION RECTANGULAR TO ROUND FOR ROUND BRANCH DUCT CONNECTIONS. PLAN VIEW DUCT MOUNTED AIR DEVICE MAIN DUCT --�� NOTE: SEAL ALL AROUND BRANCH DUCT CONNECTIONS. EA/RA TURNING VANES SUPPLY REGISTER OR BRANCH DUCT TA SCALE: NONE REVISION (5 M500 MAIN DUCT SIZE AS INDICATED BRANCH DUCT, SIZE TO MATCH AIR DEVICE UNO _ _ _ EA/RA W (D) I SA PLAN VIEW BRANCH DUCT TAKE -OFF VOLUME DAMPER, WHERE INDICATED, TYP 2 PLACES SQUARE ELBOW SHOWN. PROVIDE ROUND ELBOW WHEN SHOWN PLANS AREA A=AREA(B+C) PLAN VIEW AIR SPLIT TYPE DUCT TAKE -OFF KOFF D TAIL BY APPROVED DATE ORG ORIGINAL - DCN-02 W5761826 DLR GROUP CLN 09.14.18 A CI1Y OF TUKNILA CORRECTION LETTER 111 PG18-0145 W5761826 DLR GROUP CLN 01.07.19 M500 PIPE HANGER AS NOTED IN SPECIFICATIONS. INSULATION AS SHOWN ON PLANS & NOTED IN SPECIFICATIONS. PIPE AS SHOWN ON PLANS & NOTED IN SPECIFICATIONS. I\SULATED DRE HA\G SCALE: NONE HANGER RODS FROM STRUCTURE (TYP.) SPRING VIBRATION ISOLATOR (TYP.) FLEX DUCT. MAX 12" LENGTH MED PRESSURE PRIMARY AIR THREADED ROD; ATTACH TO STRUCTURE. GALV. METAL SHIELD, AS NOTED IN SPECS., BETWEEN HANGER & INSULATION, UP TO CENTERLINE OF PIPE, RIGID INSULATION AS NOTED IN SPECS. \G DETAIL (3 M500 l/� FAN/MOTOR INDUCED AIR INLET CONTROL BOX ti ELECTRIC HEATING COIL LOW PRESSURE S.A. DUCT FLEXIBLE DUCT CONNECTION -MAX 12" LENGTH _NOTE: PROVIDE MINIMUM OF 36" CLEARANCE IN FRONT OF ALL ELECTRICAL CONTROLLERS/PANELS. FAN. POWERED VAV T SCALE: NONE ADAPTERURB (E) ROOF CURB DETAIL 1C01)CINERsND TahTu U RN .COF SCALE: NONE /3k/ VCU\T AHU DETAIL ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED APPROVED BY DEPT. (6 M500 VENT APT.rnD AIR CONDENSATE DRAIN. ROUTE TO NEAREST ROOF DRAIN DATE DRAWN CHECKED ENGINEER CHECKED APPROVED APPROVED M500 DATE FINISHED FLOOR •v • o• • v a • ' 0, . 10' (MIN) • • • o •• ••" TFIB • TRAP PRIMER TRAP PRIMER CONNECTION OUTLET - TP DEEP SEAL P-TRAP TYPICAL FLOC DAI\ D SCALE: NONE MED PRESSURE PRIMARY AIR FLASHING WHERE OVER FINISH AREAS • • • •o n ' • . • :JAIL • • •v • a " 0. • • •e �41 M500 NOTE: 1. PROVIDE SECTION OF STRAIGHT DUCT AT TERMINAL UNIT INLET WITH LENGTH AS RECOMMENDED BY UNIT MANUFACTURER, BUT IN NO CASE LESS THAN FOUR TIMES THE DIAMETER OF THE UNIT INLET CONNECTION. 2. PROVIDE MINIMUM OF 36" CLEARANCE IN FRONT OF ALL ELECTRICAL CONTROLLERS/PANELS. INSULATED FLEXIBLE DUCT SAME IZE" AS SUPPLY DUCT (12 MAX. LENGTH) AllIIIIIIIIIIIIillll0 RIGID DUCT SEE PLANS FOR SIZES CONICAL REDUCER SUBTITLE TITLE FA\ 1-CONTROL BOX VAV BOXI POWERED VAV T SCALE: NONE 5' MAX SEE PLANS FOR SIZES J DETAIL NOTE: PROVIDE CONNECTING PIPING BE1WEEN CONDENSING UNIT & INDOOR UNIT PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE FLEXIBLE CONNECTIONS AT EACH UNIT. REFRIGERANT LINES 4x4 TREATED SLEEPERS ON TOP OF TRAFFIC PADS (TYP) AS REQUIRED. SPACE EVERY 5'-0". PROVIDE MASTIC TO TACK DOWN. RIVET & SOLDER ALL JOINTS WATERTIGHT-' _1 16 GAUGE SHEET METAL HOUSING WITH FLASHING MOPPED INTO ROOF LARGE ENOUGH FOR REF. PIPING AND CONTROL WIRING SEAL W/MASTIC ROOFING MATERIAL. PROVIDE W/ WEEP HOLE. GOOF vCU\ SCALE: NONE T CO ND SERVICE VALVE, TYP. FLEXIBLE CONNECTION, TYP. C) I NC U T ISSUE FOR PERMIT 12.12.18 MECHANICAL DETAILS 3U MECHANICAL MASTER 09-055 LOBBY REMODEL L LI\C 09- 355 DEV. CENTER, WA M500 CONDENSING UNIT SECURE UNIT TO CURB 1/4" R.I.S. ISOLATION 18 GA. CAP WITH OVERLAP OVER ROOF FLASHING 3/4" PRESSURE TREATED PLYWOOD ROOF FLASHING TREATED CANT STRIP ROOF CURB �ETAIL (9 CURRENT REVISION W5761826 REVIEWED FOR CODE COMPLIANCE APPROVED JAN 242019 City of Tukwila BUILDING DIVISION fECEiVE► CITY OF TUKI,ViLA JAN 0 8 2019 PERMIT CENTER DLR Group Architecture Engineering Planning Interiors SYMBOL A DATE 01.07.18 SHEET V500 JOB NO. W5761826 COMP NO. DWG NO. 09-055-M500